Project Name Advanced stage Respective Total districts investment Advanced stage Construction Major period equipment Project

Construction unit ****** Dragon King Engineering ditch mine Inner and coal Mongolia preparation 21.1606 million plant Survey yuan, project and sources 2011 Design - 2013Coal, of funds raised air compressor, 740 Project million is cage, yuan located cited for in enterprises, coal, Erdos centrifugal City, bank Inner loans, pump, Mongolia 13.75 lifting A China United In Cement the build-up Co., Henan phase Ltd. 100 Not Mengjin available. tons Started / year ingrinding the June construction 2011 plant -Board 2011 project chain (updated) hoist, Project wire is****** belt located hoist, in pump, Luoyang rotary City, kiln, Henan belt Provin convey Tengzhou China Construction United Shandong Cement Preparation Co., NotLtd. available. 4600t Construction / d cement 2011 Preparation clinker 2012 production Board chain line hoist, installation Project wire is****** belt located hoist, in pump, Shandong rotary Province kiln, belt inconvey the to Peach iron Verification 2 million t / a Chongqing ofmining project project approval 977 million yuan. Environmental 2011 Impact 2012 Assessment Mining machine, Project mining is****** located equipment, in Wushan cranes,County, monitoring Chongqing equipm ****** Annual output Engineering of 200,000 Hebei karats of100 diamond million projects yuan. Construction VCD September design Liquid 2011 March argon 2013 storage Science tank and are Technology two sets of Industrial DC arc Park plasma project jet CV is Annual production Construction capacity Hebei Preparation of 200,000 18.54 m3 million concrete Construction yuan. mixing July Preparation station 2011project December Mixing equipment, 2011 Project tube is****** located hopper, east concrete of Outer pump, Ring truck Road and West so o ****** Biomass-based In the co-extruded build-up Zhejiang phase materials, 50 million high-quality yuan. Under green construction June projects 2011 December Extruder, etc. 2012 (reference) Hill Industrial Park project is located in Hexi Road Groove under Verification the plantChongqing of branch project (50kt approval Unknown. / a) expansion Environmental project 2011 Impact 2012 Assessment Coal machine, Project cited coal, is****** located lifting in equipment, Chongqing axial Yongchuan, mine fan,mine belt ****** Steel Engineering In the build-up Co.,Henan Ltd. phase Zhengzhou 120 million Yinxiang yuan. Under produce construction June 50,000 2011-December tons Automatic of steel structure production 2011 Project is line, located nine CNC in Gongyi cutting City, machine, Wing Road, H beam Zhe ****** Annual output In the of 23,000 build-up Henan tons phase metallurgical 41 million materials yuan. Under construction project June 2011-December Crusher, roller 2011 Xichuan machine, project pressis the located ball machine, in town, forklift, an annual forklifts out ****** Xixia Zhongxin In the metallurgy build-up Henan Accessories phase 30 million Co., Ltd. yuan. Under produce construction 35,000 June 2011-June tonsCrushing of new 2013 energy granulation Project saving production is rule located sheet in line, production Xixia wire Tian line, line Guan comprehensive construction Xiang Cao p V Gongyi CityIn Ruifeng the build-up Co., Henan Ltd. phase produce 23.9600,000 millionUnder yuan. tons of construction cement June 2011-November ready-mixed Computer mortar batching 2011 Project production system, is****** located line three-cylinder in Gongyi m dryer, m North VS18518 Town Imp Villa Gongyi Tianbo In the Material build-up Henan Co., phase Ltd. 6000 29 million tons ultra yuan, Under fine ofconstruction grinding which June 9 million of 2011-December materials yuan Crusher, project raised Raymond 2011 by Project the enterprise, Mill, is****** located semicolon domestic in Gongyi machine, bank City, ultrasound loan North 20 Park million equipm Yam yu Xu Wei of Gongyi Verification City Metallurgical Henan of project approval 28 Materials million yuan. Record Co., Ltd. produce July 2011-December 50,000 Melting tons of furnace, 2011 aluminum Project air compressors, powder, is****** located aluminum in high Gongyi temperature particles, City, Nishimura aluminum hammer back bal cr ****** 450,000 tons Verification / year coal Sichuan of processing project Province approval Unknown. projects Environmental 2011 Impact 2012 Assessment Coal, air compressor, Project is cage, located cited incoal, Tian centrifugal Tong Tiexizhen pump, Chuk lifting Yu New miningIn 100,000 the build-up tons Zhejiang of phase fluorite $ ore 7 million. in investment Under construction projects 2011-6 to 2012-5 Rock drilling machines, Project is****** located winches, inair Pan'an compressors, nine bamboo excavators, Village ****** Annual output Verification of 600 million Jiangxi of project m2 Province of approval 105 construction million yuan. Environmental projects EHV 2011 Impact etched 2012 Assessment Fire-fighting foil facilities, Project is security located facilities, in Jiangxi water years supply Stone and Town drain In ****** 3,000 tons of In high the build-up quality Zhejiang seamless phase 29.36 stainless million steel Under yuan. tube construction production 2011-5 to line 2012-12 Cold technological broaching According machine, transformation to solid the project furnace, projectisstraightening located in Township machines C ****** 500 tons of In stainless the build-up steel Zhejiang phase production 15.97 technology million Under yuan. projects construction 2011-1 to 2013-7 Broaching machine, According solid to furnace, the project mold, is located etc. (reference) in Township C 140,000 tons Verification / year expansion Guangdong15 of project of approval concrete million admixtures yuan. Environmental 2011 Impact 2012 Assessment Composite filling, Project finished is****** located raw material in Dongguan reserve City, tank, meaning stirringsan th Linfen, Shanxi Verification Coking Group Shanxi of project Co., approval 179.8855 coal washing million Record plant yuan, expansion 2011 including 2012 project fixed Fine asset coal dewatering investment Project screen, 172,855,500 is****** located heavy in Yaodu yuan, medium initial Liu village, cyclone, working Linfen, coal capital cent Sh 7 ****** Coal Pingshuo Verification Coal Industry Shanxi of project Co.,approval Ltd. 3,210,475,300 low-quality Record yuan, coal utilization of2011 which 2012 3,195,241,600 demonstration Lurgi furnace project yuan (reference) Ping of fixed Lu District assets recycling investment, project initial is located workingin capit eco Annual production In the build-up capacity Zhejiang phase of 600,000 49.75 cubic million meters Under yuan, of construction including ready-mixed 2011-6 fixed to 2012-12 concrete Pumps, asset investment: forklifts, projects Project concrete 48.25 is****** located million trucks, yuan inetc. Dongyang (410 (reference) civil; Mazhaizhen equipmentvillag 415 Shanxi Coking Verification Co., Ltd. Shanxi of sail project 3.6 million approval 156.66 tons million / year Record yuan, of heavy of 2011 which: medium 2012 106.66 coal Spray million washing devices, yuan project Project crusher, in fixed is****** assets located filter, filter investment, in Luliang press, conveyor, Xingxian initial working Corning etc. (refere capita tow Song County Verification Mining Co., Henan of Ltd. project boy approval 500 Yuk million.Record Ming Zhuang fluorite July powder 2011-November processing Crusher, mixer, 2011 plant Project storage tailings is****** located tank, projects autoclave, in the old steam county curing town car, boy dust Son Quarry granite Verification used in Guangdong12 construction of project approval projects million yuan, Record of which 2011-07 4 million February yuan Mining investment March machine, -2012-12 Project in mining construction, is****** located equipment, in equipment the cranes, town Nanxiong investment monitoring Zhuji equipm 8 millio Oce Annual output In the of 7000 build-up tons Henan phase castings 29production million yuan, Under and ofprocessing construction which June 23 million 2011-December projects 7T yuan / h advanced raised 2012 by Project the environmental enterprise, is****** located domestic hot west stove, of Xiangcheng bank 1T / loans h energy Circle, to 6interm millio an Zhengzhou In Xin the Chang build-up Henan Aluminum phase Co., 20 million Ltd. 6,000 yuan. Under tons construction of aluminum June 2011-October castings Die casting tons 2011 machine ofProject items (blast is****** located furnace in Gongyi with automatic City, Shibata temperature Industri Boiler expansion Verification project Guangdong23.805 of(update) project approvalmillion Has yuan. been filed 2011 (EIA 2012 at the Ventilation, same time) dust Project removal is****** located equipment, in Dongguan crusher. City, (Reference) Guangdong Shunda smooth Engineering day annual Shanxi output521 of 50,000 milliontons yuan, Preliminary ofthe chemical enterprise 2011 design mining - 2013Energy itself. of silicon reduction project Project furnace, is****** located hydride in north device, Shanxi reducing Province exhaust Pings dry ****** Yun Yu Coal Project Preparation proposal Shanxi Plant phase Improvement Not available, Project Project self. 2011 2012 Coal, air compressor, Project is cage, located cited incoal, Shanxi centrifugal Jinzhong pump, Xiyang lifting Yun ****** 1.2 million tVerification / a mergers Shanxi of and project acquisitions approval Unknown. integration Environmental project 2011 Impact 2012 Assessment Coal machine, Wellhead cited coal, housing lifting equipment, project is located axial mine in the fan, northe belt Construction Inprojects the build-up alloy Hebei phase flanges514.18 million Started yuan. in the June construction 2011 June Presses, 2012 punching Project machine, is****** located CNC in Mengcun lathe, 30 lathes, pipe fittings vertical gather drill ****** Construction Inof the pipe build-up manufacturing Hebei phase 350 million yuan. Started in the July construction 2011 July Hydraulic 2013 machine, Project a is large located frequency east of induction Port Road, simmer south machin of Yan New Yangyuan In the Yao build-up JiaHebei Zhuang phase phosphate 17.5 million million Started yuan. tons in / the year July construction open 2011 pit July Ore mining 2012 equipment, project Project power is****** equipment located Yangyuan and public Huashaoyingzhen aids. (Reference) Y ****** Hebei Qianmeng In the pipe build-up fittings Hebei phase Products 175 million Manufacturing yuan. Started in Co., the July Ltd. construction 2011 construction July Hydraulic 2013 projects machine, Project a is large located frequency in Yanshan induction Portsimmer Road, south machin e ****** New manufacturing In the build-up projects Hebei phase Rectangular 255 million Pipeyuan. Started in the July construction 2011 July Hydraulic 2013 machine, Project a is large located frequency in Yanshan induction Portsimmer Road, south machin e Zhumadian In trench the build-up linerHenan Industrial phase Co., 70 million Ltd. 20,000 yuan. Under t of construction high-end June 2011-July project Driving, its2012 power fast saving frequency Project trench is****** smelting located liner in equipment, Zhumadian automatic equipment molding indus ****** Annual output In the of 10,000 build-up Zhejiang tons phase of copper 22.58rods million deep Under yuan. processing construction 2011-6 project to 2011-12 Male frequency Training induction project furnace is located and auxiliary 188 City accessories Town strange (fo ****** 1.2 million tons Verification / year of Shanxi of merger projectand approval Unknown. reorganization Environmental and integration 2011 Impact 2012 project Assessment Fire-fighting of mine facilities, Project is security located facilities, in southeastern water supply Baode and city, drain the New 500,000 Engineering tons iron Hebei powder processing 79.86 million plant Construction yuan. project August design 2011 Install August magnetic 2012 Project separator, is****** located ball mill, in Luanping tailings pumps Yangshugou and other Mun p ****** Annual output In the of 60 build-up million Hebei phase coal gangue, 13.97 million coal ash Started yuan. sintered in the June shale construction 2011 project April Bipolar 2012 vacuum Fengfeng brick machine, waterfront cutter project and other is located production in the new equ ****** New high-pressure Construction pipe Hebei fittings, Preparation high Of pressure 517 million Construction flange yuan, projects the July total Preparation 2011 area December Hydraulic of 120 mu, 2012 machine, total Project construction a is large located frequency area in Mengcun of 4induction 6,200 pipe square simmer fittings meters. machin gather An Annual output Verification of 6 million Henan of project Yintiezhiguan approval 20 million project yuan. Record July 2011-December RYYT2451W 2011 unglazed Project is****** transmission located in Yuzhou color Industries, offset printing an annua plate, ****** Annual output In the of 1600 build-up tons Zhejiang phase of solar 184.2 glassmillion production Under yuan. construction line project 2011-1 to 2013-12 Fire-fighting facilities, Song Dong security Sheng facilities, Town project water supply is located andnorth drain Aluminum Co., In the Ltd. build-up Zhengzhou Henan phase Mingxin 60 million produce yuan. Under 50,000 construction tons June of 2011-December aluminum Aluminum alloy rod 2011 rod Project continuous projectis****** located casting in and Gongyi rolling City, production Wing Street lineWi (fo ****** Xixia LundaVerification Construction Henan of Steel project Co., approval 150 Ltd. million produce yuan. Record 100,000July tons 2011-July of steel The production 2016 cutting machine, line Enter town, bending the project machine, is located CNC drilling in Xixia and Steel other In ****** Shanxi Meiyuan Construction Jia Yuan Shanxi Preparation Coal Company Not available. mine Construction resource integration 2011 Preparation 2012project Coal, air compressor, Qinyuancage, project cited is located coal, centrifugal north of the pump, city, lifting away Casting of processing In the build-up 9000 Henan phase tons of 30 construction million yuan. Under projects construction June 2011-October IF saving 2011 furnace, Project IGPS-600-1S is****** located in fixed Anyang arms City, resin Long sand An mixer, Distric Z ****** Annual output Verification of 1.5 million Hubei of project square approval 15 meters million ofyuan. new Record technology July projects 2011 October Automatic APCP2011 foil Guri coating Project line, in composite Zigui Mau line Industrial (reference Park, only) an annu ****** Annual output Verification of 500,000 Henan of project carat single approval 500crystal million diamond yuan. Record project August 2011-August Cubic press, 2013 electronic Articles by control industrial system agglomeration (for reference) area project i ****** Large machine Verification castings Hubei of and project forgings approval 1 billion Project yuan. (Phase Environmental I) 2011 Impact 2012 Assessment Sand off the machine, Xiangyang medium project frequency is locatedinduction in Shenzhen furnace, City cr In ****** Machine tool Verification industry, precision Hubei of project machining approval 10 million. parts Environmental and related 2011 items Impact 2012 Assessment Hydraulic machines, Xiangyang injection project molding is located machine, in Shenzhen extruder City equip In ****** Annual output Engineering of 3 million Hebei tons of slag 259 II million project yuan. Preliminary December design 2011 Large June vertical 2012 Handan mill, bagCounty filter. (Reference) households in the project village ****** 30,000 tonsConstruction finishing casting Hebei Preparation mechanical 29.86 million transmission Construction yuan. project August Preparation 2011 Double August column 2012 Handan verticalCounty lathe, boring households machine, in the universal village project tool m

Energy saving Engineering high-efficiency Hebei air-source 120 million heat pump, yuan. Preliminary boiler October design carbon 2011 dioxide Bending November production device, 2013 Project line refrigerant is****** located tables, north vacuum of Gaoyang pumps, high-Paul, test pumps th Cangzhou Yadu In the Pipe build-up Fittings Hebei phase Manufacture 574.68 million Co., Started to yuan. push in a the June new construction system 2011 December Hydraulic of high pressure push 2012 Project system large is****** machines, diameter located inon Mengcun hydraulic the elbow, machines, Gaozhaizhen pipe production automa flow Annual output In the of 15,000 build-up Henan tons phase of steel 19.8 strip million production Under yuan. construction line June project 2011-June Cold 2012 rolling, hardening Project is****** furnace, located in punch, Yucheng tapeCounty production Industries, lines, p ****** Hubei DayeVerification Wang Baoshan Hubei of project Tanjiawan, approval $ 5.3 Sheng million. Environmental Qi, Liu nest 2011 ore Impact 2012 mining Assessment Mining 30 000 machine, t of iron Daye mining ore City, projects equipment, Hubei inProvince, cranes, themonitoring security project equipm is Utilization of Verification annual production Henan of project capacity approval 150 million of 2 million yuan. Record tons of August slag waste 2011 Large to project December vertical Project mill, 2012 bag is****** filters located (for inreference) Anyang County, Xu Ravine c ******testing Xinmi Zhengxing In the Refractories build-up Henan phase Co.,20 Ltd. million 60,000 yuan. Under tons of construction high June quality 2011-July refractory Press, 2013 Raymond, renovation New crushers, super-secret project project equipment, is located transformers, in the town e o Processing Verification 150,000 tons GuangdongUnknown. of of project tailings approval in iron utilization Environmental project 2011 Impact 2012 Assessment Mining machine, Project mining is****** located equipment, in Dong monitoring Town, where equipment, the mout ven ****** Annual output In the of 2 build-up 300 Hebei phase square 257.8 meters million of Started ultra yuan. white in the solar July construction 2011 glassJuly project Furnace, 2012 washing Project machine, area ismilling located machine in Yongnian and so County, on. (Refere high****** New anti-corrosion In the build-up pipe Hebei insulation, phase 558 pipe million project yuan. Started in the June construction 2011 December Baden Fairbanks 2012 Project highis pressure located in foaming Mengcun machine, pipe fittings PE pipe indust extr ****** Annual output Construction of 2 million Hebei Preparation tons sand 62.45 production million Construction yuan. line July Preparation 2011 January Ore rig,2012 jaw crusher, New project impact iscrusher, located in circular Tangshan vibrating Jidong screen Qi Ce e ****** New pre-tensioned In the build-up prestressed Hebei phase concrete 542.4 million pipe Started production yuan. in the July line construction centrifugal 2011 October Centrifuge, 2013 autoclave. Project is (Reference) located east of Port Road, south of Yan ****** Household appliances, Verification Hubei of construction, project approval 83.49 automotive million Record yuan, glassof production which October 13.49 line 2011 Furnace, million October yuan glass 2013 enterprises East straight Avenue line own Development edging funds, machine, bank project loan glass 40in million washing Jingzhou, share ma th ****** Yanshi Zhengda In thePipe build-up Co., Henan phase Ltd. Project 120 million of processing yuan, Underof construction 120,000 which June 100 tons 2011-April million of Crane, steel yuan 2012 76-tube raised Project production by theis enterprise, located line, high in domestic Yanshi frequency Yue bank Tan welding, loans Industries, to compu 20 m Y Annual output In the of 350,000 build-up Henan tons phase of slag 10 million powder yuan. Under production construction June line 2011-June Efficient 2012 rotary Project dryer, new is****** located high thin in Yanjin tube mill, horse forklift, Township rollerHigh pres Silicon Industry In the Co., build-up Ltd. Yunnan Yunnan phase Yongchang 10 million. 100,000 Started in t / the a April chemical construction 28, 2011 grade Ball -2014 mill, silicon magnetic February metal Project to separator, double is****** located energy filter in Yunnan machine, savingLongling, projects brick making (update) the constru mach Anshun Huozhou Feasibility Coal study Shanxi Energy stage Group 300Co., million Ltd. yuan. Is3preparing million tons 2011 a feasibility of-mine 2013Coal project study machine, (updated) Project cited coal, is****** located lifting in equipment, Shanxi Huozhou, axial mine constructio fan, belt Huozhou Coal Feasibility Group Co., study Shanxi Ltd. stage 5 million 2.5 billion. tons Coal Is preparing mine land 2011 a feasibility projects - 2013Coal study machine, Project cited coal, is****** located lifting in equipment, Shanxi Province, axial mine Linfen fan, City belt Anze Huozhou Feasibility Coal Energy study Shanxi stage GroupNot Co., available. Ltd. 4Is million preparing tons 2011 a offeasibility mine - 2013Coal project study machine, Project cited coal, is****** located lifting in equipment, Shanxi Huozhou, axial mine constructio fan, belt ****** Shaanxi Coal Engineering is a high Shaanxi pass mine and About coal $ 5.8 preparation Engineering billion. plant 2011 (not construction reported 2013Coal, approval, Jiabao air compressor, and Project approval is cage, located in cited the inpreparation coal, the Bin centrifugal Huang of reports Long pump, long suppor lifting coa White Lake, Verification Xinjiang Hami Xinjiang of project City, aapproval stone 8.9241 mine million limestone Environmental yuan. mining 2011 Impact 2012 project Assessment Rock drilling machines, Project is****** located winches, inexcavators, Hamilton Township, transformers, Lake pum Cit ****** New straw collection Engineering tube Hebei curing technology 580 million and yuan. Construction equipment August design manufacturing 2011 Cold February pushing 2013 machine, Nanpi County beveling project machine, is located hydraulic east industrial press equi zo ****** Industrial 5000t / d clinker Verification production Xinjiang of project line of approval 828.189 pure low million temperature Environmental yuan. waste 2011 Impact 2012 heat power Assessment Loose, generation-cum-supporting screw type Toksun air County compressor, comprehensive conveyor Park belts, project energy air is purifier, located, savin m Xinjiang Hami Verification City Toudaogou Xinjiang of project mine approval 1.7567 shalemillion mining Environmental yuan. project 2011 Impact 2012 Assessment Rock drilling machines, Project is****** located winches, inexcavators, Hamilton City, transformers, 36 degrees pum az The overall In annual the build-up output Hebei of phase 50,000 1.06 tons billion aluminum yuan. Started reconstruction in the July construction 2011project -2014 Cold July relocation rolling mill, Project foil rolling is****** located mill, foil in Shijiazhuang coating machine, equipment anodizing man New Sandwich Construction panels and Hebei Preparation steel product 11.5 million processing Construction yuan. project July Preparation 2011 January Shearing 2012 machine, Qing County roll ****** forming Economic machine, Development composite Zone boardin prod He ****** New Valley Feasibility Coal Co., Ltd. study Shanxi nine stage mining Not area available, infrastructure Project the enterprise 2011 (technical 2012 itself. innovation) Coal, air compressor, project After thecage, project cited is located coal, centrifugal in Xiaoyi City, pump, Shanxi lifting ****** Annual output In the of 50 build-up Articles Zhejiang phase of concrete 69.49projects million Under yuan, construction including 2011-5 fixed to 2012-12 Fire-fighting asset investment: facilities, Project 63.44 is security located million facilities, yuan in North (civil water Industrial engineering supply Area, and 2684; Dongy drain e ****** Qingsong Building Verification Materials Xinjiang of project Dabancheng approval 1.913 billion 2 Environmental 75000t yuan. / d clinker 2011 Impact 2012 production Assessment Loose,line screw type Project air is compressor, located in Urumqi conveyor Dabancheng belts, air purifier, District m ****** Annual output Verification of 25 MW Zhejiang ofof project amorphous approval 1.3 billion silicon yuan, Record solar including cell glass, 2011-8 fixed Nissan to asset 2013-8 Glass 1300 investment: furnace, tons of Project solar 1.1 rolling billion ultra-white is mill located yuan imported (Civil glass in Shaoxing molding, 16907; project equipment County furnace, Binhai pull 70122; mach Indu Lushi Wuli River In theHongxiang build-up Henan phase calcium $ 7.2 factory million. 100,000 Under construction tonsJune of lime 2011-October project Energy-efficient 2011 Project kiln, blower, is****** located fan, indesulphurization the former village and Lushi dust Wul rem Produce 60,000 In the tons build-up of Zhejiang aluminum phase 160 rolled million products yuan, Under production including construction 2011-5 line fixed to project asset 2013-5 Casting investment: furnace, Project 152 briquetting million is****** located yuan machine, in(civil New spectrum engineering Port Changshan analyzer, 5800;Hui, equip etc.p( 300,000 tons In of the construction build-up Zhejiang phase stone$project 4.8 million. Under construction 2011-6 to 2012-5 Excavators, jaw Project crusher, is****** located rock drill, in Jinhua etc. (reference) City soup Town Heav ****** 3000t / d clinker Verification production Xinjiang of project line technological approval About 3.4 million. Has transformation been filed 2011 project (EIA 2012 at (update) the Loose, same screw time) type Project air is compressor, located within conveyor Yanqi Qin belts, Long air purifier, cement m In fine selection In the of build-up 10,000 Henan phase tons grinding 120 million materials, yuan, Under items of construction which: of June solar domestic 2011-December photovoltaic Airenterprises classifier, panels 2012 semicolon Project raised 100 is****** located machine, millionin yuan flash Xuchang bank machine, loan County 20 ultrasonic Fine million Chem yua scr Chifeng Jingzi Construction Mining Ltd. Inner Preparation 600T Mongolia /D $ concentrator 40 millionConstruction self-financing, project 2011 Preparation have 2012 been Mining implemented. machine, Project mining is****** located equipment, in Chifeng monitoring Linxi equipment, industrial park, ven Chifeng Jingzi Construction Mining Co., Inner Preparation Ltd. Mongolia 10,000 180 million, tons / year Construction self-financing, of refined 2011 Preparation tin have 2012 smelting been Mining project implemented. machine, Project air compressor, is****** located incage, Chifeng mining Linxi equipment, industrial park, cran Yong Rong Engineering Qingpeng Chongqing ChongqingCoal About cement 382.5 Preliminary production million yuan. 2011 design line supporting 2012 Condensing cogeneration steam Project project turbine, is****** located generator, in Shapingba kiln waste Qingmuguanzhe heat boiler (S Chang-Yu Industrial In the build-up Co., Henan Ltd. phase Zhengzhou 104 million annual yuan. Under output construction of June 8,000 2011-June tonsCNC of steel 2013 flame structure cutting Project project machine, is****** located assembly in Xingyang machine, industry automatic clustersub (C 2000 tons NdFeB Verification transformation Guangdong93.8 of project approval projects millionHas yuan. been filed 2011 2012 Crusher, sedimentation Project is****** tank, located filter, in Dongguan spiral classifier, City (Pingyuan) hydrocyclon In Pingyu Jinxin In Color the build-up Steel Henan Co., phase Ltd.6.73 produce million 250,000 Under yuan. square construction June meters 2011-July color Complex 2012 steel machine, tile expansion Project color is****** located steel pressure-shaped in Pingyu Industries, machine, Pingyu c-bea Jin ****** Produce 60,000 In the tons build-up of Zhejiang cold-rolled phase 220 stainless million steel yuan. Under production construction 2011-5 project to 2013-5 Wuxi production South four-high City project reversing is located mill, annealing in Lishui furnace seven hund pro ****** Industrial pipe Verification fittings manufacturing Hubei of project approval 90projects million yuan. with Record special July 2011 July Presses, 2012 cutting Caidian device extravagant (for reference) project is located in East Hil ****** Produce 50,000 In the tons build-up of Zhejiang aluminum phase 260.86 alloy production million Under yuan. project construction 2011-5 to 2013-5 AGC system control South City reversible project rolling is located mill, 20T in Lishui rapid seven melting hund fu Yanshi Shun In Kai the build-up Wire Henan Co., phase Ltd. 2000 30 million tons ofyuan. bright Undercopper construction June rod,2011-June copper Wire project 2013 drawing machine, Project is****** partnership, located in the high-speed Palace Yanshi machines, Guxianzh elec Produce 50,000 Verification tons of Jiangsu of aluminum project Province approval Unknown. rod processing Environmental project 2011 Impact 2012 Assessment Melting furnace, Project holding is****** located furnace, incasting Zhenjiang machine, City, Jiangsu centrifugal Prov p Baotou Aluminum Verification often Inner of north project Mongolia Aluminum approval Unknown. Co., Ltd. Hasproduce been filed 2011 250,000 (EIA 2012 at tons the Melting aluminum same furnace, time) foil Project holding project is****** located furnace, inthe Baotou aluminum Rare Earth melt line High-tech proce 90,000 tonsVerification / year of gold Inner of project and Mongolia silver approval Unknown. copper zinc Environmental and lead2011 mining Impact 2012 project Assessment Rock drilling machines, Project is****** located winches, inexcavators, Schleswig Bayan transformers, high wood pum 100,000 cubic Verification meters /Inner of year project of Mongolia sand approval Unknown. and gravel Environmental mining project 2011 Impact stone 2012 Assessment Rock drilling machines, Project is****** located winches, inexcavators, Inner Mongolia transformers, Alxa Zongbie pum Annual output In the of 21.75 build-up Henan million phase square 600meters million high-grade yuan, Underof construction which: polished June domestic 2011-May project Ball enterprises mill, 2013 press, Project raised trimming 400 is****** located machine, millionin yuan Hebi polishing ofCity bank Mountain machine, loans 200 City etc. million Indu (refe ****** Annual output In the of 50,000 build-up Zhejiang tons phase aluminum 253.77 construction million Under yuan. construction project 2011-5 to 2013-5 Hydraulic double-action South City extrusion project ispress located aluminum in Lishuibar seven furnace, hund New HeavyEngineering Steel coke Chongqing oven project 23 and billion. its supporting Engineering projects 2011 2012 # 6 (update) Coke, coking plant, Project tamping is****** located coke in oven, New Changshou instrumentation, heavy testin stee ****** Guang'an Guang'an Engineering District Sichuan Qiyi Province Reservoir 249.3316 and million Survey canal yuan. and system 2011 Design supporting 2012 Hoists, reconstruction pumps, Project valves, projects area turbine, is tolocated expand glass in pipe, Guang automation Zheng Shan, control tos

Design units Summary table Time ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ******

****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ******

****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ******

****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ****** ******

Você também pode gostar