Você está na página 1de 1

Resolve the following numerical problems number 1.11 to 1.15 at the end of Heizers Chapter 1.

Besides, also resolve the following: Problem 1: Mance Fraily, the Production Manager at Ralts Mills, can currently expect his operation to produce 1000 square yards of fabric for each ton of raw cotton. Each ton of raw cotton requires 5 labor hours to process. He believes that he can buy a better quality raw cotton, which will enable him to produce 1200 square yards per ton of raw cotton with the same labor hours. What will be the impact on productivity (measured in square yards per labor-hour) if he purchases the higher quality raw cotton? Problem 2: C. A. Ratchet, the local auto mechanic, finds that it usually takes him 2 hours to diagnose and fix a typical problem. What is his daily productivity (assume an 8 hour day)? Mr. Ratchet believes he can purchase a small computer trouble-shooting device, which will allow him to find and fix a problem in the incredible (at least to his customers!) time of 1 hour. He will, however, have to spend an extra hour each morning adjusting the computerized diagnostic device. What will be the impact on his productivity if he purchases the device? Problem 3: The Dulac Box plant produces wooden packing boxes to be used in the local seafood industry. Current operations allow the company to make 500 boxes per day, in two 8-hour shifts (250 boxes per shift). The company has introduced some moderate changes in equipment, and conducted appropriate job training, so that production levels have risen to 300 boxes per shift. Labor costs average $10 per hour for each of the 5 full-time workers on each shift. Capital costs were previously $3,000 per day, and rose to $3,200 per day with the equipment modifications. Energy costs were unchanged by the modifications, at $400 per day. What is the firm's multifactor productivity before and after the changes? Problem 4: Gibson Products produces cast bronze valves for use in offshore oil platforms. Currently, Gibson produces 1600 valves per day. The 20 workers at Gibson work from 7 a.m. until 4 p.m., with 30 minutes off for lunch and a 15 minute break during the morning work session and another at the afternoon work session. Gibson is in a competitive industry, and needs to increase productivity to stay competitive. They feel that a 20 percent increase is needed. Gibson's management believes that the 20 percent increase will not be possible without a change in working conditions, so they change work hours. The new schedule calls on workers to work from 7:30 a.m. until 4:30 p.m., during which workers can take one hour off at any time of their choosing. Obviously, the number of paid hours is the same as before, but production increases, perhaps because workers are given a bit more control over their workday. After this change, valve production increased to 1800 units per day. a. Calculate labor productivity for the initial situation b. Calculate labor productivity for the hypothetical 20 percent increase c. What is the productivity after the change in work rules? Problem 5: A foundry produces circular utility access hatches (manhole covers). Currently, 120 covers are produced in an 8hour shift. If labour productivity were to be increased by 20%, what kind of output should be expected? If the labour wages are 6.19 per hour, how much would the additional productivity cost?

Você também pode gostar