Name of Work : Construction of additional blcks (4 No) (Stilt+5 floors pattern) at AARAMBH town s Colony, Chandanagar(v), Serilingampally(m), R.

R Dist.

Sl.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Name of Work : Construction of additional blcks (4 No) (Stilt+5 floors pattern) at AARAMBH town ship, Papi Colony, Chandanagar(v), Serilingampally(m), R.R Dist.

Description Provision for CIVIL WORKS Formation of Internal Roads Provision for LAYING OF PAVER TILES IN DRIVE WAYS Provision for BACKUP GENERATORS Provision for MOTORS (12X15000) Provision for LIFTS (8X1100000) Provision for Retaining walls along chakali kunta (100x Provision for Avenue plantation Provision for Septick tank Provision for additional facilities for Senior citizens Provision for court yard retaining wall around blocks Payment towards drawl of lots, printig letters, hire charges of car, scrolling news,postage etc Advertisement charges HUDA & Municipal charges Street lighting Water proofing to lifts Expansion joints Lightening arrester Fiber sheeting roofing Provision for rock cutting on hillock Provision for internal Sanitary @ 7.5% on civil works Provision for internal electrification @ 10% Provision for External electrification (2 Trnsfmr, 1 ring main) Provision for external sanitary and water supply @ 10% Provision for vat and service tax @ 8.04% Provision for technical personnel (2 GE,2 Diploma)(2*324+2*250) Provision for Quality Control charges @ 1% Provision for INSURANCE @ 0.6% Provision for round off GRANT TOTAL

RAMBH town ship, Papireddy

Amount 230943221.64 1500000.00 2250000.00 1000000.00 200000.00 8800000.00 1000000.00 500000.00 2500000.00 1000000.00 500000.00 45000.00 30000.00 5000000.00 600000.00 100000.00 200000.00 200000.00 200000.00 5000000.00 17320741.62 23094322.16 5000000.00 23094322.16 18567835.02 500000.00 2309432.216 1385659.33 1192145.2 354032679.36 ######

Name of Work : Construction of 1 Block (Stilt+5) 80 flats ( Sft) (AARAMBH - II, Papireddy Colony, Chandanagar(v), Serilingampally(m), R.R Dist.
Item No 1 Description Quantity Rate Per Amount Total

Internal Sanitary Fittings


'A' Supply laying, jointing and testing of 101.60mm (6" dia) Block DI 900.4 RM

Total 'B' Supply laying, jointing and testing of 150 mm (6" dia) Block DI

900.4

RM

1207.5

RM

Total 'A' Supplying and fixing of 152.40mm x 101.60mm (6'x4") SWG gully trap Block DI

1207.5

RM

341

No.s

Total Supply and fixing of 4" (101.6mm)dia SWG bend for WC air tight Block DI

341

No.s Each

165

No.s

Total 'A' Construction of 3'-0 dia clear Inspector Chamber with 9" thick brick masonry walls in CM (1:6) prop Block DI

165

No.s Each

228

No.s

Total 'A' Supplying and fixing of 101.60mm (4" dia) PVC pipe

228

No.s RM

3594

RM

Total 'B' Supplying and fixing of 101.60mm (4" dia) PVC/SWR Single Y Junction Block DI

3594

RM Each

17

No.s

Total Suppy and fixing of PVC (101.6mm) 4" dia single Y Block DI

17

No.s Each

731

No.s

Item No

Description

Quantity

Rate

Per

Amount

Total

Internal Sanitary Fittings


Total 'B' Supplying and fixing of 101.60mm (4" dia) PVC/SWR Plug bend Block DI 731 No.s Each 759 No.s

10

Total 'A' S & F of 101.6 PVC/SWR Vent cowls Block DI

759 170

No.s Each No.s

11

Total 'A' Supply and fixing of 76.20mm (3" dia) PVC/SWR pipe Block DI

170

No.s RM

6777.5

RM

12

Total 'A' Supplying and fixing of 3" (76.20mm dia) PVC/SWR Nahany traps with jally Block DI

6777.5

RM Each

589

No.s

13

Total Supply and fixing of Y junction 76.2mm dia Block DI

589 327

No.s Each No.s

14

Total Supply and fixing of double Y junction 76.2mm dia Block DI

327

No.s Each

17

No.s

15

Total 'A' Supplying and fixing of 3" (76.20mm dia) PVC/SWR Plug Bend Block DI

17

No.s Each

337

No.s

16

Total 'A' Supplying and fixing of 3" (76.20mm dia) PVC/SWR plain bend Block DI

337

No.s Each

85

No.s

17

Total "A" S & F of 76.20mm went coal Block DI

85 101

No.s Each No.s

Item No

Description

Quantity

Rate

Per

Amount

Total

Internal Sanitary Fittings

18

Total 'B' Supplying and fixing of European type Hindustan neycer or parry ware WC Block DI

101

No.s Each

195

No.s

19

Total 'A' Supplying and fixing of 558.8mm x 406.4mm indian make white glazed wash hand basin Block DI

195

No.s Each

320

No.s

20

Total 'A' Making holes n masanory work and redoing good as directed by the department Block DI

320

No.s Each

610

No.s

Total 21 'A' Supplying and fixing of stain less steel sink Block DI

610

No.s Each

80

No.s

Total

80

No.s RM

Internal Water Supply


22 'A' Internal water supply 3 layers 40mm dia PPR pipes for portable Block DI

2751.5

RM

23

Total 'A' Internal water supply 3 layers 63mm dia PPR pipes for portable Block DI

2751.5

RM RM

564

RM

24

Total 'A' Internal water supply 3 layers 50mm dia PPR pipes for portable Block DI

564

RM RM

194.6

RM

25

Total 'A' Internal water supply 3 layers 32mm dia PPR pipes for portable Block DI

194.6

RM RM

700

RM

Item No

Description

Quantity

Rate

Per

Amount

Total

Internal Sanitary Fittings

26

Total 'A' Internal water supply 3 layers 25mm dia PPR pipes for portable Block DI

700

RM RM

795

RM

27

Total 'A' Internal water supply 3 layers 20mm dia PPR pipes for portable Block DI

795

RM RM

835

RM

28

Total Supply and fixing of 12.7mm dia of CP long body bibcock of Jaquare company Block DI

835

RM Each

200

No.s

29

Total Supply and fixing of 12.7mm dia of CP short body bibcock of Jaquare company Block DI

200

No.s Each

80

No.s

30

Total Supply and fixing of 24.4 mm dia and 609.6mm long Aluminum auodised towel rod Block DI

80

No.s Each

195

No.s

31

Total Supply and fixing of Jaquare company wall mixure of CP non telephonic shower arrangements 15mm etc complete Block DI

195

No.s Each

195

No.s

32

Total Supply and fixing of Jaquare company wall mixure of CP fancy shower arrangements 15mm etc complete Block DI

195

No.s Each

195

No.s

33

Total Supply and fixing of CP soup dish heavy type NP screws etc complete Block DI

195

No.s Each

195

No.s

Item No

Description

Quantity

Rate

Per

Amount

Total

Internal Sanitary Fittings

34

Total Supply and fixing of PVC low level sistran parryware slim line flush tank Block DI

195

No.s Each

195

No.s

35

Total Supply and fixing of 20mm dia PPR gate walves Block DI

195

No.s Each

195

No.s

36

Total Supply and fixing of 50mm dia PPR gate walves Block DI

195

No.s Each

800

No.s

37

Total Supply and fixing of 40mm dia PPR gate walves Block DI

800

No.s Each

160

No.s

38

Total Supply and fixing of 63mm dia PPR gate walves Block DI

160

No.s Each

400

No.s

39

Total Making holes in RCC slab Block DI

400 195

No.s Each No.s

Total

195

No.s

Name of Work : Construction of 4 Blocks (Stilt+5) AARAMBH-II, Papireddy Colony, Chandanagar(v), Serilingampally(m), R.R Dist.

ABSTRACT Sl.No Description 1 Earth work excavation by machinary and depositing on bank with an intial lead of 10m and lift of 2m in mixture of gravel and soft disintegrated rock like shales ,ordinary gravel stoney earth and earth mixed with fair size boulders including shoring shuttering and bailing out of water etc for foundations . For block DH For block PF For block DI For block PSCH 2 Disposal of excavated earth available at site (using machine) to a distance of 500 Mts. and filling in Ditches, Lowlying area and road embankment in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work. Qty as per item 1 7758.87 cum 3 Excavation in rock by way of benching ,chiselling, wedging, and Boring in fourndation, grade levelling including all lead and lift charges and disposal of rock from the site as directed by the department.( A rate of Rs.164.90 per Cum For block DH For block PF For block DI For block PSCH Disposal of excavated surplus rock available at site with a lead of 0.50 KM including transporting, loading and unloading charges etc., complete as directed by the Engineer in charge. 2425.10 cum 5 Earth work Excavation in hard rock and boulders of more than 3 cum in size where ever quarrying is done by controlled blasting without stacking For block DH For block PF For block DI For block PSCH 6 Disposal of excavated surplus rock available at site with a lead of 0.50 KM including transporting, loading and unloading charges etc., complete as directed by the Engineer in charge. 1005.00 cum 7 Drilling of 25mm dia and 800 mm deep in hard rock or sheet rock by pneumatic grouting and placing of 16 mm dia Tor steel bars and grouting holes with slurry excluding cost of steel and its fabrication charges but including cost and conveyance of al For block DH For block PF For block DI 630.00 cum 375.00 cum cum cum 1005.00 cum Nos Quantity Unit

2181.47 3017.40 307.08 2560.00 8065.95

cum cum cum cum cum

486.68 352.84 92.12 792.79 1724.44

cum cum cum cum cum

5255.20 Rmt 3836.80 Rmt 2255.20 Rmt

Page 9 of 81

Sl.No Description For block PSCH 5 Providing and laying VCC M20 in foundations, machine foundations, footings and bases of columns and under floors including the cost of centering and shuttering for Column footings levelling course For block DH For block PF For block DI For block PSCH 6 Providing and laying cement concrete 1:5:10 (1 cement :5 coarse sand :10 graded stone aggregate 40 mm. nominal size) mm. ) in basement under floors For block DH For block PF For block DI For block PSCH 7 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational FOR FOOTINGS For block DH For block PF For block DI For block PSCH 8 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational FOR PEDESTALS For block DH For block PF For block DI For block PSCH 9 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational FOR PLINTHBEAM For block DH For block PF For block DI For block PSCH 10 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational FOR COLUMNS UPTO PLINTH BEAM

Nos

Quantity Unit 2742.00 Rmt 14089.20 Rmt

66.37 48.11 28.57 91.26 234.31

cum cum cum cum cum

100.76 72.81 133.63 159.05 466.25

cum cum cum cum cum

210.16 152.36 98.25 288.99 749.76

cum cum cum cum cum

30.63 23.29 12.91 42.05 108.87

cum cum cum cum cum

46.43 43.04 78.24 70.46 238.18

cum cum cum cum cum

For block For block For block DH PF DI 16.34 23.60 28.58 FOR COLUMNS

For block PSCH 95.38

163.90 cum

Page 10 of 81

Sl.No Description

GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR SEVENTH FLOOR 11 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational ROOF BEAMS

Nos For block For block For block DH PF DI 43.37 32.98 82.80 43.37 32.98 82.80 43.37 32.98 82.80 43.37 32.98 82.80 43.37 32.98 82.80 43.37 32.98 82.80 2.03 2.70 5.40 1.35 1.35 2.70

Quantity For block PSCH 73.75 73.75 73.75 73.75 73.75 73.75 10.13 5.40

Unit

232.89 232.90 232.90 232.90 232.90 232.90 20.25 10.80

cum cum cum cum cum cum cum cum

GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR SEVENTH FLOOR 12 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational ROOFSLAB

For block For block For block DH PF DI 14.29 14.63 96.96 14.29 14.63 43.55 14.29 14.63 43.55 14.29 14.63 43.55 14.29 14.63 43.55 14.29 14.63 43.55 1.74 2.11 4.67 0.71 0.71 1.42

For block PSCH 13.10 13.10 13.10 13.10 13.10 13.10 3.07 1.47

138.98 85.57 85.57 85.57 85.57 85.57 11.59 4.31

cum cum cum cum cum cum cum cum

GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR SEVENTH FLOOR 13 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational Lintels

For block For block For block DH PF DI 123.99 88.53 94.23 123.99 88.53 94.23 123.99 88.53 94.23 123.99 88.53 94.23 123.99 88.53 94.23 123.99 88.53 94.23 4.13 2.73 3.69 0.59 0.59 1.17

For block PSCH 185.52 185.52 185.52 185.52 185.52 185.52 4.13 0.49

492.27 492.27 492.27 492.27 492.27 492.27 14.68 2.84

cum cum cum cum cum cum cum cum

For block For block For block DH PF DI GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR SEVENTH FLOOR 14 BED BLOCKS For block For block For block DH PF DI GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR 0.44 0.44 0.44 0.44 0.36 0.36 0.36 0.36 6.68 7.12 7.12 7.12 1.80 1.80 1.80 1.80 1.80 0.00 0.02 1.40 1.40 1.40 1.40 1.40 0.00 0.02 2.44 2.44 2.44 2.44 2.44 0.00 0.03

For block PSCH 2.81 2.81 2.81 2.81 2.81 0.00 0.06 8.45 8.45 8.45 8.45 8.45 0.00 0.13 cum cum cum cum cum cum cum

For block PSCH 0.70 0.70 0.70 0.70 8.18 8.62 8.62 8.62 cum cum cum cum

Page 11 of 81

Sl.No Description FIFTH FLOOR SIXTH FLOOR SEVENTH FLOOR 15 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational Chajjas

0.44 0.05

Nos 0.36 0.05

7.12 0.05

0.70 0.05

Quantity Unit 8.62 cum 0.20 cum

For block For block For block DH PF DI GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR 16 Racks and lofts Ground Floor FLOOR RCC M20 grade mix (Design Mix as per SS) with stone aggregate of 20mm and 12mm size mechanically mixed etc, necessary reinforcement including cost and conveyance of all materials and water to work site seignorage and all operational, incidential labour charges such as centering (steel Centering) mixing concrete, laying, lift charges, curing, etc., complete for finished item of work as per standard specification but excluding cost on steel reinforcement and its fabrication charges etc complete for finished item of work to the required strength as directed by department for 60 mm thick to 40 mm thick at free end, plastering 12mm thick in CM(1:4) Prop. For all exposed faces (Bottom & Sides) etc. For block For block For block DH PF DI GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR 17 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational CUPBOARD SHELVES For block DH For block PF For block DI For block PSCH 91.783 91.783 91.783 91.783 91.783 68.15 68.15 68.15 68.15 68.15 114.70 114.70 114.70 114.70 114.70 61.000 61.000 61.000 61.000 61.000 43.92 43.92 43.92 43.92 43.92 78.08 70.76 70.76 70.76 70.76

For block PSCH 103.70 103.70 103.70 103.70 103.70 286.70 279.38 279.38 279.38 279.38 Sqm Sqm Sqm Sqm Sqm

For block PSCH 91.78 91.78 91.78 91.78 91.78 366.42 366.42 366.42 366.42 366.42 Sqm Sqm Sqm Sqm Sqm

684.84 527.70 878.37 684.84 2775.75

Sqm Sqm Sqm Sqm Sqm

Page 12 of 81

Sl.No Description 18 BRICK MASONERY in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size 290x225x140mm(made up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including cost and conveyance of all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall.

Nos

Quantity

Unit

For block For block For block DH PF DI FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR SEVENTH FLOOR 19 GROUND FLOOR Masonary in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size 290x225x140mm(made up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including cost and conveyance of all materials,labour charges,curing etc., complete for 10.00 cm. Thick Main Wall. For block For block For block DH PF DI 70.08 52.04 219.85 70.08 52.04 219.85 70.08 52.04 219.85 70.08 52.04 219.85 70.08 52.04 219.85 106.82 106.82 106.82 106.82 106.82 61.87 4.28 92.05 92.05 92.05 92.05 92.05 51.20 4.28 255.48 255.48 255.48 255.48 255.48 26.26 13.53

For block PSCH 176.52 176.52 176.52 176.52 176.52 135.78 17.12 630.86 Cum 630.86 Cum 630.86 Cum 630.86 Cum 630.86 Cum 275.12 Cum 39.22 cum

FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR 20 Ground floor steps PCC M-20 Grade mix with stone aggregate of 20 mm & 12mm size mechanically mixed including cost and conveyance of all materials and water to work site, seignorage fee and all opertational ,incidential,labour charges such as centering from work, steel centering,mixing concrete, laying, lift charges ,vibrating,curing etc complete for finished item of work as per Standard Specification etc complete for finished item of work to the required strength as directed by department for steps.

For block PSCH 130.25 130.25 130.25 130.25 130.25

472.23 472.22 472.22 472.22 472.22

Cum Cum Cum Cum Cum

GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR

For block For block For block DH PF DI 0.68 0.68 1.35 0.68 0.68 1.35 0.68 0.68 1.35 0.68 0.68 1.35 0.68 0.68 1.35 0.68 0.68 1.35 0.68 0.68 1.35

For block PSCH 2.7 2.7 2.7 2.7 2.7 2.7 2.7

5.40 5.40 5.40 5.40 5.40 5.40 5.40

Cum Cum Cum Cum Cum Cum Cum

Page 13 of 81

Sl.No Description 21 Plastering 12mm thick in 2 coats with a base coat of 8mm thick in CM (1:6) prop and top coat 4mm thick in CM(1:4)prop with dubara sponge finishing including cost and conveyance of all materials seignorage and water to work site and all operational ,incidential labour charges such as scaffolding, mixing, motor , lift charges, curing etc. complete for finished item of work as per SS No. 901, 904 for internal walls

Nos

Quantity

Unit

GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR SEVENTH FLOOR 22 Plastering 12mm thick in 2 coats with a base coat of 8mm thick in CM (1:6) prop and top coat 4mm thick in CM(1:4)prop with dubara sponge finishing including cost and conveyance of all materials seignorage and water to work site and all operational ,incidential labour charges such as scaffolding, mixing, motor , lift charges, curing etc. complete for finished item of work as per SS No. 901, 904 for external walls

For block For block For block DH PF DI 2041.72 1533.27 2946.47 4195.63 2744.60 5649.64 4195.63 2744.60 5649.64 4195.63 2744.60 5649.64 4195.63 2744.60 5649.64 4195.63 2744.60 5649.64 463.94 383.00 383.61 25.09 25.09 27.88

For block PSCH 3252.34 5090.66 5090.66 5090.66 5090.66 5090.66 923.40 100.37

9773.80 17680.53 17680.53 17680.53 17680.53 17680.53 2153.95 178.44

Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm

For block For block For block DH PF DI FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR SEVENTH FLOOR 1177.65 1177.65 1177.65 1177.65 1177.65 437.52 28.48 965.40 965.40 965.40 965.40 965.40 361.84 28.48 1691.47 1691.47 1691.47 1691.47 1691.47 363.03 28.48

For block PSCH 2178.511 2178.511 2178.511 2178.511 2178.511 994.625 28.48 6013.04 6013.04 6013.04 6013.04 6013.04 2157.01 113.90 Sqm Sqm Sqm Sqm Sqm Sqm Sqm

23 Supply and fixing of doors as per approved drawings with 2nd class teak wood frame of section 100mm x 65 mm and ISI marked flush door shutter of 35mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 22021991 (Part-I) with teak veneer on one face and commercial ply on another face (lipping) including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos.MS Z hold fasts of size 300mmx40mmx5mm including

Page 14 of 81

Sl.No Description cost of ISI marked fixtures of 3Nos Brass butt hinges 150mm long, 1No. Aluminium aldrop 300mm long, 1No. Aluminium tower bolt of 300 mm long at top, 1No. 150mm long Brass handle, 1No. Brass door stopper and 1No rubber bush including cost of second class teak wood frame, making, finishing and fixing the fixtures to door with required number of screws, bolt and nuts including all labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) of size 1.05 x 2.00 mts (3-6 x 6-6) For block DH For block PF For block DI For block PSCH 24 Door of size 3-0 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of polynon frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. For block DH For block PF For block DI For block PSCH 25 Door of size 2-6 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. For block DH For block PF For block DI For block PSCH Aluminium Sliding Door of size 6-0 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. For block DH For block PF For block DI For block PSCH 295x6x6.5

Nos

Quantity

Unit

50 45 80 50 225

Nos Nos Nos Nos Nos

125 90 215 125 555

Nos Nos Nos Nos Nos

51 46 2 51 150

Nos Nos Nos Nos Nos

50 45 80 125 300 11505

Nos Nos Nos Nos Nos Sft

Page 15 of 81

Sl.No Description 26 Door of size 2-6 x 6-6 Supply and door frame made of hollow extruded PVC section (Nandi or equivalent) having dimensions of 40 x57mm with the wall thickness of 2mm +/- 0.2 mm duly reinforced with seasoned woood plank at the hinges side the door frame top 2 corners shall be metricut/weilded. with door shutters made of rigid PVC extruded hollow section (Nandi For block DH For block PF For block DI For block PSCH

Nos

Quantity

Unit

125 90 165 125 505

Nos Nos Nos Nos Nos

27 NCL WINDOE OF SIZE 3-0 x 4-0 Providing and fixing windows made of prepainted steel (base steel as per IS 513 of 0.60 mm thick galvonised as per IS 277 with zinc of 150 GSM) For block DH For block PF For block DI For block PSCH 785*.9*1.2 28 NCL WINDOE OF SIZE 3-0 x 2-6 Providing and fixing windows made of prepainted steel (base steel as per IS 513 of 0.60 mm thick galvonised as per IS 277 with zinc of 150 GSM) For block DH For block PF For block DI For block PSCH 225*.9*.75 29 Manufacturing & supply of 2'-0" x 1"-6" steel ventilator including cost of steel & glass For block DH For block PF For block DI For block PSCH 510*.6*.45 30 Ground floor Flooring with Grananalothic concrete Flooring 50 mm thick with CC 1:1:2 prop. Using 6mm to 12 mm size (SSS) grade hard granite stone mesigne crushed metal laid Granalothically over an existing bed of CC 1:5:10 Prop. 10 cm thic. CC slab laib in alternate panels of size not exceeding 1.5X1.5m and finishing the top surface to required smooth ness and slopes including cost and conveyance of all meterials and all operational incidental and seinarage charges and mixing concrete, laying, curing etc. complete for finisheditemof work.(APSS NO:701and 707 ) For block DH For block PF For block DI For block PSCH 200 135 250 200 785 847.8 Nos Nos Nos Nos Nos Nos

50 50 70 50 220 151.88

Nos Nos Nos Nos Nos Sqm

125 90 170 125 510 137.7

Nos Nos Nos Nos Nos Sqm

1024.11 830.95 1542.27 1563.98 4961.30

Sqm Sqm Sqm Sqm Sqm

Page 16 of 81

Sl.No Description 31 Flooring with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastring in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. complete for finished item In rooms flooring with 8.3mm thk ceramic tiles of size(400 x 400mm) with 1" thk mortar in CN(1:6) prop

Nos

Quantity

Unit

For block For block For block DH PF DI FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR 32 Dadooing with coluru glazed tiles 6.5mm thick of size(300 x 200 mm) 1st quality (as per manufacturers specification ) of approved make ISI CM (1:5) prop with grey cement slurry for kitchen,bathroom,balcony & lift cladding Toilet dadooing For block For block For block DH PF DI FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR 33 Supplying and application of two coats of ALTEK super fine , one coat of ALTEK water based coment primer and twocoats of ALTEK flora ( plastic emulsion paint ) to interior faces of new walls and ceeling of approved colour as per manufacturer's specifications including cost and conveyance of all matirials to site and labour charges such as preparing the wall, applying primary coat etc. complete for finished item of work for INTERNAL WALLS AND CEILING (Total 2 coats). For block DH For block PF For block DI For block PSCH 503.20 503.20 503.20 503.20 503.20 362.78 362.78 362.78 362.78 362.78 782.45 782.45 782.45 782.45 782.45 821.29 821.29 821.29 821.29 821.29 583.07 583.07 583.07 583.07 583.07 759.92 759.92 759.92 759.92 759.92

For block PSCH 1598.48 1598.48 1598.48 1598.48 1598.48 Total 3762.76 3762.76 3762.76 3762.76 3762.76 18813.82 Sqm Sqm Sqm Sqm Sqm Sqm

For block PSCH 655.24 655.24 655.24 655.24 655.24 Total 2303.67 2303.67 2303.67 2303.67 2303.67 11518.35 Sqm Sqm Sqm Sqm Sqm Sqm

23483.79 15639.27 31578.29 29629.04 100330.39

Sqm Sqm Sqm Sqm Sqm

34

"B" -Supply and application of one coats of Altek water based cement primer and two coats of harmony (Acrylic emulsion paint exterior grade) to exterior faces of new walls and ceiling of approved colour as per manufacturer's specifications including c For block DH For block PF For block DI For block PSCH 6935.79 5656.53 9625.57 12497.18 34715.07 Sqm Sqm Sqm Sqm Sqm

Page 17 of 81

Sl.No Description 35 Painting to new wood work and flush shutters with lappam finish , over a primary coat and painting two coats of synthetic enamel paint 1st grade of approved brand and shade (Total 3 coats) including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc. complete (APSS No.1200, 1207 & 1211) in all floors. For block DH For block PF For block DI For block PSCH 36 Supply and fixing of high polished Black granite 16 to 18 mm thick (upto 2.43 Mts length) including the rounding the exposed edges of granite slab and polished set over a base of 20mm thick C.M(1:5) prop over already for KITCHEN PLATFORM

Nos

Quantity

Unit

727.95 582.18 1583.21 727.95 3621.28

Sqm Sqm Sqm Sqm Sqm

For block For block For block DH PF DI FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR 37 Supplying and laying of polished shabad stone of tandur blue variety of 25.40 mm thick single piece over a base of 20 mm thick in C. M (1:8) with neat cement joints to full depth including cost and conveyance of all materials and labour charges for laying, cutting seigniorage charges etc complete for tread and risers For block For block For block DH PF DI 19.08 19.08 19.53 19.08 19.08 19.53 19.08 19.08 19.53 19.08 19.08 19.53 19.08 19.08 19.53 19.08 19.08 19.53 19.08 19.08 19.53 32.19 32.19 32.19 32.19 32.19 25.99 25.99 25.99 25.99 25.99 46.20 46.20 46.20 46.20 46.20

For block PSCH 64.25 64.25 64.25 64.25 64.25 168.62 168.63 168.63 168.63 168.63 Sqm Sqm Sqm Sqm Sqm

GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR 38 Surface preparation by means of chipping & cleaning testing for leakage points and grouting the same with neat cement slurry and repairing of cracks and pot holes,if any with polymer repair motor and applying two coats of polymer based water proofing slurry coating.Sika top seal 107 with coverage of 3Kg per sq mtr for two coats and providing cement screed of average 50mm thick with smooth finish,and continuing the same upto height of 300mm all along the parapet wall and other adjoining walls in form of vatta SCREED CONCRETE For block DH For block PF For block DI For block PSCH

For block PSCH 76.32 76.32 76.32 76.32 76.32 76.32 76.32

134.01 134.01 134.01 134.01 134.01 134.01 134.01

Sqm Sqm Sqm Sqm Sqm Sqm Sqm

986.86 726.00 1503.02 1504.57 4720.45

Sqm Sqm Sqm Sqm Sqm

Page 18 of 81

Sl.No Description 39 Lift cladding with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastering in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. ceramic tiles of size(300 x 300mm) with 1" thk mortar in CM(1:6) prop For block DH For block PF For block DI For block PSCH

Nos

Quantity

Unit

31.13 31.13 75.63 124.51 262.40

Sqm Sqm Sqm Sqm Sqm

40

Impervious coat 20mm thick average over roof slab with CM(1:4) prop. Mixed with approved water proofing compound at the rate of 1.0 kg per bag of cement (50 kgs) and laid when the slab is green with thread lining at 1-6x1-6 pannels and finished smooth with neat cement rendering as directed including cost and conveyance of all materials and water to work site, seignorage fee and all operational, incidental, labour charges such as mixing mortar, laying, curing etc., complete for Toilets For block For block For block DH PF DI For block PSCH

Page 19 of 81

Name of Work : Construction of 1 Block (Stilt+5) total 50 flats, 25 flats Type - 1 (1026.55 sft) and 25 flats Type - 2 (1212.23 sft) under AARAMBH ,RGK Scheme-II, Papireddy Colony, Chandanagar(v), Serilingampally(m), R.R Dist. Block DH Agmt Description Nos Length Breadth Depth Quantity item no 1 Earth work excavation and depositing on bank with an intial lead of 10m and lift of 2m in mixture of gravel and soft disintegrated rock like shales ,ordinary gravel stoney earth and earth mixed with fair size boulders including shoring shuttering and bailing out of water etc for foundations . Block DH 2 1 1 1 56.5 29.7 1.30 Unit

2181.47 cum

Excavation in rock by way of benching ,chiselling, wedging, and Boring in fourndation, grade levelling including all lead and lift charges and disposal of rock from the site as directed by the department.( A rate of Rs.164.90 per Cum For Coloumn footings for type 1 (External) For Coloumn footings for type 1 (Internal) For Coloumn footings for type 2 (external) For Coloumn footings for type 2 (Internal) For Coloumn footings for staircase For Coloumn footings for lift 1 5 5 5 5 2 4 11 1 3 1 8 1 1 1 1 1 1 2.4 1.8 1.8 2.4 1.8 1.8 1.10 1.10 1.10 31.68 7.13 14.26 486.68 cum 1.8 1.8 1.10 142.56 2.4 2.4 1.10 95.04 1.8 1.8 1.10 196.02

Earth work Excavation in hard rock and boulders of more than 3 cum in size where ever quarrying is done by controlled blasting without stacking 1 1 28 15 1.50 630.00 cum 1 Drilling of 25mm dia and 800 mm deep in hard rock or sheet rock by pneumatic grouting and placing of 16 mm dia Tor steel bars and grouting holes with slurry excluding cost of steel and its fabrication charges but including cost and conveyance of al For block DH External columns 101 7 7 1 1 0.8 3959.20 internal columns 20 9 9 1 1 0.8 1296.00 Net Quantity: Total 5255.20 Rmt 5 Providing and laying VCC M20 in foundations, machine foundations, footings and bases of columns and under floors including the cost of centering and shuttering for Column footings levelling course 49.09 17.28 66.37 cum 6 Providing and laying cement concrete 1:5:10 (1 cement :5 coarse sand :10 graded stone aggregate 40 mm. nominal size) mm. ) in basement under floors Type 1 Stilt floor 5 1 1 11.1 8.9 0.1 49.40 Type 2 Stilt floor 5 1 1 9.4 8.9 0.1 41.83 Corridor 1 1 1 49.5 2 0.1 9.90 for staircase 1 1 1 8.9 3.28 0.1 2.92 0.1 -3.29 0.1 -1.63 1 1 0.15 5.21 Cum 1 1 0.15 0.77 Total qty 100.76 Cum 7 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational for footings External columns 101 1 1 1.8 1.8 0.475 155.44 Internal columns 20 1 1 2.4 2.4 0.475 54.72 210.16 cum VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational 8 FOR PEDESTALS External columns 101 1 1 0.75 0.75 0.45 25.57 Internal columns 20 1 1 0.75 0.75 0.45 5.06 for sump 2 1 1 5.14 3.38 0.125 4.34 LIFT 1 1 1 2.26 2.26 0.125 0.64 30.63 cum 9 FOR PLINTHBEAM TYPE 1 B1 Deduct for beam portions (81.59+61.38) Deduct for columns for sump LIFT 1 121 2 1 1 1 1 1 142.97 0.3 5.14 2.26 0.23 0.45 3.38 2.26 External columns internal columns 101 20 1 1 1 1 1.8 2.4 1.8 2.4 0.15 0.15

8.9

0.23

0.3

6.14

Page 20 of 81

Agmt Description item no B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 TYPE 2 B1 B2 B3 B4 B5 B6 B7 B8 FOR STAIR CASE LW SW lift all round

Nos

Length

Breadth

Depth

Quantity

Unit

5 5 5 5 5 5 5 5 5 5 4 4 4 4 4 4 4 4

3 1 2 1 1 2 1 1 1 1 2 1 2 1 2 1 2 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2.15 3.05 2.790 3.860 4.350 11.100 6.630 3.760 6.860 1.050 8.900 2.990 1.990 2.870 9.400 1.470 5.060 3.290

0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3

2.23 1.05 1.93 1.33 1.50 7.66 2.29 1.30 2.37 0.36 0.00 4.91 0.83 1.10 0.79 5.19 0.41 2.79 0.91 45.07 cum 0.41 0.45 0.50 1.36 46.43 cum 13.64 2.70 11.93 4.75 16.34 cum 36.20 7.17 43.37 43.37 43.37 43.37 43.37 43.37

1 1 1

1 2 1

1 1 1

5.930 3.280 7.200 Total qty

0.23 0.23 0.23

0.3 0.3 0.3

10 Columns upto Plinth beam External columns Internal columns for side walls of sump for side walls of lift COLUMNS FOR GROUND FLOOR External columns Internal columns First floor Second floor Third floor Fourth floor Fifth floor COLUMNS FOR SIXTH FLOOR Staircase columns lift columns COLUMNS FOR SEVENTH FLOOR lift columns

101 20 2 2

1 1 1 1

1 1 1 1

0.3 0.3 17.04 9.04

0.45 0.45 0.175 0.175

1 1 2 1.5

101 20

1 1

1 1

0.3 0.3

0.45 0.45

2.655 2.655 Total qty

cum cum cum cum cum cum

2 4

1 1

1 1

0.3 0.3

0.45 0.45

2.5 2.5

0.68 1.35 2.03 cum

1.35 1.35 cum Filling in trenches, sides of foundations, basements etc., with carted earth with a lead of 12km in layers not exceeding 15cms thick consolidating each deposited layer by watering and ramming including c/c of earth, water to workspot 11 Up to bottom of plinth beam item no 1+2+3 Deduct for useful earth qty @50% OF item 1 Deduct footings qty Deduct pedestals qty Deduct plinth beam qty Deduct cols up to PB qty Total qty 11 ROOF BEAMS GROUND FLOOR TYPE 1 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 3298.15 -1090.73 -210.16 -30.63 -46.43 -16.34 1903.86 Cum

0.3

0.45

2.5

2 3 1 2 1 1 2 1 1 1

1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1

8.90 2.15 3.05 2.79 3.86 4.35 11.10 6.63 3.76 6.86

0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38

1.56 0.56 0.27 0.49 0.34 0.38 1.94 0.58 0.33 0.60

Page 21 of 81

Agmt Description item no B11 TYPE 2 B1 B2 B3 B4 B5 B6 B7 B8 At stair case for lift alround GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR At stair case for lift alround SEVENTH FLOOR for lift alround 11 ROOFSLAB for Ground Floor For Type 1 For Type 2 corridor waist slab midlanding slab top slab for sump ROOFSLAB for Ground Floor ROOFSLAB for First Floor ROOFSLAB for Second Floor ROOFSLAB for third Floor ROOFSLAB for Fourth Floor ROOFSLAB for Fifth Floor ROOFSLAB for Sixth Floor stair case head room lift room ROOF SLAB SEVENTH FLOOR lift room 12 Lintels FIRST FLOOR over D over D1 over D2 Over sliding door over W over W! over lift Lintels Lintels Lintels Lintels for SECOND FLOOR for THIRD FLOOR for FOURTH FLOOR for FIFTH FLOOR

Nos

Length

Breadth

Depth

Quantity

Unit

1 2 1 2 1 2 1 2 1 2 1 1

1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1

1.05 8.90 2.99 1.99 2.87 9.40 1.47 5.06 3.29 3.28 5.90 8.12

0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38

0.09 7.13 1.56 0.26 0.35 0.25 1.64 0.13 0.88 0.29 0.57 0.52 0.71 7.16 14.29 14.29 14.29 14.29 14.29 14.29

cum

cum cum cum cum cum cum cum

2 2 1

1 1 1

1 1 1

3.28 5.90 8.12

0.23 0.23 0.23

0.38 0.38 0.38

0.57 1.03 0.71 1.74 cum 0.71 56.80 48.10 11.39 1.35 1.14 5.21 123.99 123.99 123.99 123.99 123.99 123.99 123.99

1 5 5 1 2 2 2

1 1 1 1 1 1 1 1

1 1 1 1 1 1

8.12 11.10 9.40 49.50 3.00 1.50 5.14

0.23 8.9 8.9 2.00 1.5 3.3 3.38

0.38 0.115 0.115 0.115 0.15 0.115 0.15

cum cum cum cum cum cum cum

1 1

1 1

1 1

8.90 2.26

3.28 2.26

0.115 0.15

3.36 0.77 4.13 cum 0.59 0.21 0.31 0.37 0.32 0.49 0.09 0.02 1.80 1.80 1.80 1.80 1.80

1 10 25 35 10 40 10 1

1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1

2.26 1.37 1.22 1.07 2.10 1.22 0.91 1.07

2.26 0.15 0.1 0.1 0.1 0.1 0.1 0.15

0.115 0.1 0.1 0.1 0.15 0.1 0.1 0.1

cum cum cum cum cum

SEVENTH FLOOR over lift Bed blocks over D over D1 over D2 bed blocks for first floor bed blocks for second floor bed blocks for third floor bed blocks for fourth floor bed blocks for fifth floor

1 10 25 10

1 2 2 2

1 3 3 3

1.07 0.15 0.15 0.15

0.15 0.14 0.10 0.10

0.10 0.10 0.10 0.10

0.02 cum 0.13 0.23 0.09 0.44 0.44 0.44 0.44 0.44 0.44

cum cum cum cum cum cum

Page 22 of 81

Agmt Description item no

Nos

Length

Breadth

Depth

Quantity

Unit

Chejjas over Windows FOR FIRST 13 FLOOR Chejjas over Windows W Chejjas over Windows W1 Chejjas over Windows FOR FIRST FLOOR Chejjas over Windows FOR SECOND FLOOR Chejjas over Windows FOR THIRD FLOOR Chejjas over Windows FOR FOURTH FLOOR Chejjas over Windows FOR FIFTH FLOOR

40 10

1 1

1 1

1.22 1.22

0.6 0.6

48.80 12.20 61.00 SQM 61.00 SQM 61.00 SQM 61.00 SQM 61.00 SQM 61.00 SQM

14

Racks and lofts Ground Floor FLOOR RCC M20 grade mix (Design Mix as per SS) with stone aggregate of 20mm and 12mm size mechanically mixed etc, necessary reinforcement including cost and conveyance of all materials and water to work site seignorage and all operational, incidential labour charges such as centering (steel Centering) mixing concrete, laying, lift charges, curing, etc., complete for finished item of work as per standard specification but excluding cost on steel reinforcement and its fabrication charges etc complete for finished item of work to the required strength as directed by department for 60 mm thick to 40 mm thick at free end, plastering 12mm thick in CM(1:4) Prop. For all exposed faces (Bottom & Sides) etc. Type 1 Lofts in kitchen kitchen platform two sides Deduct for sink master bed bed 1 bed2 Type 2 Lofts in kitchen kitchen platform two sides Deduct for sink master bed bed 1 5 5 5 5 5 5 1 1 1 1 1 1 1 1 1 1 1 1 2.53 4.08 0.52 4.17 3.20 2.90 0.45 0.65 0.40 0.60 0.60 0.60 5.69 13.26 -1.04 12.51 9.60 8.70 48.72 5.40 15.60 -1.04 12.00 11.10 43.06 Sqm 91.78 Sqm 91.78 91.78 91.78 91.78 Sqm Sqm Sqm Sqm

5 5 5 5 5

1 1 1 1 1

1 1 1 1 1

2.40 4.80 0.52 4.00 3.70

0.45 0.65 0.40 0.60 0.60 First floor second floor third floor fourth floor fifth floor

VRCC M20 FOR CUPBOARD 15 SHELVES Type 1 kitchen Shelves horizontal kitchen Shelves horizontal kitchen Shelves verticals Master bed horizontal Master bed verticals bed 1 bed 1 bed 2 bed 2 Type 2 kitchen Shelves horizontal kitchen Shelves horizontal kitchen Shelves verticals Master bed horizontal Master bed verticals bed 1 bed 1

5 5 5 5 5 5 5 5 5

1 2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1 1

2.53 1.80 1.50 2.09 1.98 2.44 1.98 1.87 1.98

0.32 0.32 0.32 0.53 0.53 0.53 0.53 0.53 0.53

4.048 5.76 4.8 11.077 10.494 12.932 10.494 9.911 10.494 80.01 Sqm 3.84 5.60 4.80 10.60 10.49 11.13 10.49 56.96 Sqm

5 5 5 5 5 5 5

1 2 2 2 2 2 2

1 1 1 1 1 1 1

2.40 1.75 1.50 2.00 1.98 2.10 1.98

0.32 0.32 0.32 0.53 0.53 0.53 0.53

Total Qty for first floor

136.97 Sqm

Page 23 of 81

Agmt Description item no

Nos

Length

Breadth

Depth

Quantity

Unit

Total Qty for five floor

684.84 Sqm

16

Masonary in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size 290x225x140mm(made up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including cost and conveyance of all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall. for type 1 All around Deduct for sitout and utility deduct columns deduct for door D deduct for windows w deduct for windows w1 deduct for windows v deduct for lintels over doors deduct for lintels over windows deduct for exhaust fan for type 2 All around Deduct for sitout and utility deduct columns deduct for door D deduct for windows w deduct for windows w1 deduct for windows v deduct for lintels over doors deduct for exhaust fan at staircase L/W s/W at lift room allaround Corridor parapet wall BM for First floor BM for Second floor BM for Third floor BM for Fourth floor BM for Fifth floor BM for Sixth floor at stair case Parapet wall at lift room allaround 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 1 2 1 1 1 1 9 1 5 1 3 1 6 1 1 1 8 1 3 1 2 1 1 1 1 1 9 1 1 1 1 1 1 1 1 1 0.79 1 1 1 1 1 1 1 1 0.79 1 1 1 1.00 39.40 5.40 0.30 1.06 0.91 0.91 0.60 1.37 1.22 0.30 36.00 5.22 0.30 1.06 0.91 0.91 0.60 1.37 0.30 4.72 3.14 7.01 2.00 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 2.66 2.66 2.66 1.98 1.22 0.75 0.45 0.10 0.10 0.30 2.66 2.66 2.66 1.98 1.22 0.75 0.45 0.10 0.30 2.66 1.00 2.66 1.00 73.22 -10.04 -5.02 -1.47 -3.89 -0.48 -0.57 -0.10 -0.51 -0.05 66.91 -9.70 -4.46 -1.47 -2.33 -0.48 -0.38 -0.10 -0.05 1.75 0.88 2.61 2.52 106.82 106.82 106.82 106.82 106.82 106.82

Cum Cum Cum Cum Cum Cum Cum

1 1 1

1 1 1

1 1 1

16.77 312.06 7.01

0.14 0.14 0.23

2.2 1.2 2.655

5.17 52.43 4.28 61.87 Cum

SEVENTH FLOOR at lift room allaround 1 1 1 7.010 0.23 2.655 4.28 GROUND FLOOR Masonary in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size 290x225x140mm(made up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including cost and conveyance of all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall. 17 Type 1 Master bed room two sides bed room1 two sides bed room2 three sides between kitchen and utility toilets west side L/W toilets west side S/W East side toilet sitout deduct for door D1 deduct for door D2 deduct for lintels over d1 deduct for lintels over d2 Type 2 Master bed room two sides bed room1 two sides between drawing and dining kitchen and utility sitout two sides East side toilet two sides 5 5 5 5 5 5 5 5 5 5 5 5 1 1 1 1 2 1 1 1 3 4 3 4 1 1 1 1 1 1 1 1 1 1 1 1 7.840 6.140 8.260 2.230 2.230 2.250 1.315 1.375 0.900 0.750 1.220 1.050 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 2.655 2.655 2.655 2.655 2.655 2.655 2.655 2.655 1.98 1.98 0.1 0.1 10.41 8.15 10.97 2.96 5.92 2.99 1.75 1.83 -2.67 -2.97 -0.18 -0.21 38.93 Cum 9.03 9.16 3.58 2.92 3.58 5.04

5 5 5 5 5 5

1 1 1 1 1 1

1 1 1 1 1 1

6.800 6.900 2.700 2.200 2.700 3.800

0.1 0.1 0.1 0.1 0.1 0.1

2.655 2.655 2.655 2.655 2.655 2.655

Page 24 of 81

Agmt Description item no west side toilet two sides deduct for door D1 deduct for door D2 deduct for lintels over d1 deduct for lintels over d2

Nos

Length

Breadth

Depth

Quantity

Unit

5 5 5 5 5

1 2 3 2 3

1 1 1 1 1

1.600 0.900 0.750 1.220 1.050

0.1 0.1 0.1 0.1 0.1

2.655 1.98 1.98 0.1 0.1 Total qty

BM for First floor BM for Second floor BM for Third floor BM for Fourth floor BM for Fifth floor

2.12 -1.78 -2.23 -0.12 -0.16 31.16 70.08 70.08 70.08 70.08 70.08 70.08

Cum Cum Cum Cum Cum Cum Cum

18

Ground floor steps PCC M-20 Grade mix with stone aggregate of 20 mm & 12mm size mechanically mixed including cost and conveyance of all materials and water to work site, seignorage fee and all opertational ,incidential,labour charges such as centering from work, steel centering,mixing concrete, laying, lift charges ,vibrating,curing etc complete for finished item of work as per Standard Specification etc complete for finished item of work to the required strength as directed by department for steps. For staircase steps Groun floor first floor second floor third floor fourth floor fifth floor sixth floor 1 1 1 1 1 1 1 0.50 0.50 0.50 0.50 0.50 0.50 0.50 20 20 20 20 20 20 20 1.50 1.50 1.50 1.50 1.50 1.50 1.50 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.675 0.675 0.675 0.675 0.675 0.675 0.675 0.675 cum cum cum cum cum cum cum cum

19

Plastering 12mm thick in 2 coats with a base coat of 8mm thick in CM (1:6) prop and top coat 4mm thick in CM(1:4)prop with dubara sponge finishing including cost and conveyance of all materials seignorage and water to work site and all operational ,incidential labour charges such as scaffolding, mixing, motor , lift charges, curing etc. complete for finished item of work as per SS No. 901, 904 for internal walls Type 1 GROUND floor Columns all around Beams B1 to B11 two sides ceiling Type 2 Stilt floor Columns all around Beams B1 to B11 two sides ceiling Corridor ceiling staircase room bottom 5 5 5 14 1 1 1 1 1 1.50 81.59 11.10 2.655 0.76 8.9

278.775 310.042 493.95 1082.767 Sqm

5 5 5 1 1

9 1 1 1 1

1 1 1 1 1

1.500 61.380 9.400 49.50 8.90

2.655 0.76 8.9 2 3.28

FIRST FLOOR Type 1 master bed alaround master bed ceiling bed room 1 bed room 1 ceiling bed room 2 bed room 2 ceiling drawing alround drawing alround ceiling dining dining ceiling passage between drawing and dining two sides passage between drawing and dining two sides ceiling kitchen kitchen ceiling sitout sitout ceiling utility three sides utility ceiling west side toilets 1 west side toilets 2 west side toilets cielings west side toilets cielings

179.2125 233.244 418.3 99.00 29.19 958.9485 Sqm 2041.7155 Sqm

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

1.000 1.000 1.000

1.000 1.000 1.000

16.080 4.070 12.700 3.340 11.330 2.670 15.210 4.430 16.560 3.075 0.895 1.335 8.190 2.430 4.450 3.175 4.580 2.230 7.060 7.260 2.330 2.330

3.035 3.97 3.035 2.995 3.035 2.995 3.035 3.175 3.035 5.205 3.035 0.895 3.035 2.855 3.035 1.55 3.035 1.175 3.035 3.035 1.2 1.3 244.014 80.7895 192.7225 16.7 171.93275 39.98325 230.81175 70.32625 251.298 80.026875 27.16325 5.974125 124.28325 34.68825 67.52875 24.60625 69.5015 13.10125 107.1355 110.1705 13.98

2.000

Page 25 of 81

Agmt Description item no east side toilets east side toilets ceiling washbasin area three sides washbasin area ceiling deductions D1 D2 Type 2 master bed alaround master bed ceiling bed room 1 bed room 1 ceiling drawing alround drawing alround ceiling dining dining ceiling kitchen three sides kitchen ceiling sitout sitout ceiling utility three sides utility ceiling west side toilets 1 west side toilets cielings east side toilets east side toilets ceiling washbasin area three sides washbasin area ceiling deductions D1 D2 staircase two sides mid landing wall lift alaround waist slab ceiling corridor corridor between lift and staircase

Nos

Length

Breadth

Depth

Quantity

Unit

5 5 5 5 5 5

3.000 4.000

7.420 2.395 2.315 0.500 0.910 0.750

3.035 1.315 1.315

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 1

1.000 1.000 1.000

1.000 1.000 1.000

2.000 3.000 1.000

1.000

1 1

1.000 1.000

1.000 1.000

14.000 3.200 14.200 3.600 16.800 4.900 11.750 3.000 8.050 2.300 7.000 3.000 4.200 2.200 8.400 2.600 7.400 2.200 2.315 0.500 0.910 0.750 14.530 3.130 7.200 5.625 49.500 2.820

3.8 3.5 3.5 4.15 2.95 1.4 1 1.6 1.5 1.315

3.13 2 3.28

first floor second floor third floor fourth floor fifth floor sixth floor parapet wall all round staircase head room staircase room ceiling lift room all around lift room ceiling SEVENTH FLOOR lift room all around lift room ceiling

312.060 17.450 5.625 7.200 1.800

1.8

15.145 112.5985 3.035 15.747125 35.130125 1.98 3.2875 1.98 27.027 29.7 2215.37275 Sqm 3.035 212.45 3.035 60.8 215.485 3.035 63 254.94 3.035 85.75 178.30625 3.035 62.25 122.15875 3.035 33.925 106.225 3.035 21 63.735 3.035 11 127.47 3.035 20.8 112.295 3.035 16.5 35.130125 1.98 3.2875 1.98 18.018 3.035 22.275 1 44.09855 3.035 3.13 21.852 5.625 49.5 9.2496 1980.25578 Sqm 4195.62853 4195.62853 4195.62853 4195.62853 4195.62853 4195.62853 1.2 374.472 2.68 46.766 3.13 17.60625 3.035 21.852 3.24 463.93625 Sqm 3.035 21.852 3.24 25.092 Sqm

7.200 1.800

1.8

Plastering 12mm thick in 2 coats with a base coat of 8mm thick in CM (1:6) prop and top coat 4mm thick in CM(1:4)prop with dubara sponge finishing including cost and conveyance of all materials seignorage and water to work site and all operational ,incidential labour charges such as scaffolding, mixing, motor , lift charges, curing etc. complete for finished item of work as per SS No. 901, 904 for external walls 20 type 1 all around corridor wall inbetween flats deductions door D W W1 V deductions for utility and sitout portion 5 5 5 5 5 5 5 1.000 9.000 1.000 5.000 1.000 3.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 40.000 2.000 1.060 0.910 0.910 0.600 5.500 3.15 2.14 1.98 1.22 0.75 0.45 2.655 630 192.6 -10.494 -27.755 -3.4125 -4.05 -73.0125 703.876 Sqm

type 2 all around deductions door D

5 5

1.000 1.000

1.000 1.000

36.660 1.060

3.15 1.98

577.395 -10.494

Page 26 of 81

Agmt Description item no W W1 V deductions for utility and sitout portion

Nos

Length

Breadth

Depth

Quantity

Unit

5 5 5 5

3.000 1.000 2.000 1.000

1.000 1.000 1.000 1.000

0.910 0.910 0.600 5.300

1.22 0.75 0.45 2.655

-16.653 -3.4125 -2.7 -70.3575 473.778 Sqm 1177.654 1177.654 1177.654 1177.654 1177.654 Sqm Sqm Sqm Sqm Sqm

first floor second floor third floor fourth floor fifth floor sixth floor parapet wall all round staircase head room lift room all around door decurition seventh floor lift all roujd 21

312.060 18.570 9.040 0.750

1.14 2.79 3.15 1.98

355.7484 51.8103 28.476 1.485 437.5197 Sqm 28.476 Sqm

1.000

1.000

9.040

3.15

cost supply and fixing of Teak Wood Door of size 1.06 X 1.98 m including all labour charges 10 1 5 50 nos

22

Door of size 3-0 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. 5 1 25 125 Door of size 2-6 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. Balcony for machine room 50 1 51 Door of size 2-6 x 6-6 Supply and door frame made of hollow extruded PVC section (Nandi or equivalent) having dimensions of 40 x57mm with the wall thickness of 2mm +/- 0.2 mm duly reinforced with seasoned woood plank at the hinges side the door frame top 2 corners shall be metricut/weilded. with door shutters made of rigid PVC extruded hollow section (Nandi 5 1 10 1 nos

23

nos

24

24

Attached toilet 5 25 125 nos Sliding Door of size 6-0 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. at sitout 5 10 1 50 nos

25

NCL WINDOE OF SIZE 3-0 x 4-0 Providing and fixing windows made of prepainted steel (base steel as per IS 513 of 0.60 mm thick galvonised as per IS 277 with zinc of 150 GSM) 5 40 200 Nos

26

NCL WINDOE OF SIZE 3-0 x 2-6 Providing and fixing windows made of prepainted steel (base steel as per IS 513 of 0.60 mm thick galvonised as per IS 277 with zinc of 150 GSM) Kitchen window 5 10 Manufacturing & supply of 2'-0" x 1"-6" steel ventilator including cost of steel & glass 50 Nos

27

Attached toilet 28

25

125

Nos

Ground floor Flooring with Grananalothic concrete Flooring 50 mm thick with CC 1:1:2 prop. Using 6mm to 12 mm size (SSS) grade hard granite stone mesigne crushed metal laid Granalothically over an existing bed of CC 1:5:10 Prop. 10 cm thic. CC slab laib in alternate panels of size not exceeding 1.5X1.5m and finishing the top surface to required smooth ness and slopes including cost and conveyance of all meterials and all operational incidental and seinarage charges and mixing concrete, laying, curing etc. complete for finisheditemof work.(APSS NO:701and 707 ) Type 1 Type 2 staircase room Corridor Deduction for Columns 5 5 1 1 1 1 1 1 1 121 1 1 1 1 1 11.1 9.4 8.9 49.5 0.3 8.9 8.9 3.28 2 0.45

493.95 418.3 29.192 99 -16.335

Page 27 of 81

Agmt Description item no

Nos

Length

Breadth

Depth

Quantity

Unit

1024.107 29 Flooring with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastring in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. complete for finished item In rooms flooring with 8.3mm thk ceramic tiles of size(400 x 400mm) with 1" thk mortar in CN(1:6) prop Type 1 First floor qty Master bed 5 1 1 4.07 3.97 80.79 bed 1 5 1 1 2.995 3.34 50.02 bed 2 5 1 1 2.995 2.67 39.98 drawing 5 1 1 4.43 3.175 70.33 dining 5 1 1 3.075 5.2 79.95 between drawing and dining 5 1 1 0.895 1.335 5.97 kitchen 5 1 1 2.43 2.855 34.69 utility 5 1 1 2.23 1.175 13.10 sitout 5 1 1 3.175 1.55 24.61 west side toilet 1 5 1 1 2.33 1.2 13.98 west side toilet 2 5 1 1 2.33 1.3 15.15 east side toilet 5 1 1 2.395 1.3 15.57 washbasin area 5 1 1 0.5 1.3 3.25 skirting m.bed room 5 1 1 14.43 0.1 7.22 bed 1 5 1 1 11.02 0.1 5.51 bed 2 5 1 1 10.43 0.1 5.22 drawing 5 1 1 14.44 0.1 7.22 dining 5 1 1 7.96 0.1 3.98 kitchen 5 1 1 7.32 0.1 3.66 utility 5 1 1 3.83 0.1 1.92 sitout 5 1 1 4.46 0.1 2.23 484.32 Type 2 First floor qty Master bed 5 1 1 3.80 3.2 60.80 bed 1 5 1 1 3.6 3.5 63.00 drawing 5 1 1 4.9 3.5 85.75 dining 5 1 1 4.15 3 62.25 kitchen 5 1 1 2.95 2.3 33.93 utility 5 1 1 2.2 1 11.00 sitout 5 1 1 3 1.4 21.00 west side toilet 5 1 1 2.6 1.6 20.80 east side toilet 5 1 1 2.2 1.5 16.50 washbasin area 5 1 1 0.6 1.6 4.80 skirting m.bed room 5 1 1 12.35 0.1 6.18 bed 1 5 1 1 12.55 0.1 6.28 drawing 5 1 1 14.04 0.1 7.02 dining 5 1 1 7.5 0.1 3.75 kitchen 5 1 1 7.95 0.1 3.98 utility 5 1 1 3.45 0.1 1.73 sitout 5 1 1 3.80 0.1 1.90 410.65 Total 821.29 Quantity Second floor 821.29 Third floor 821.29 fourth floor 821.29 fifth floor 821.29 821.29 Dadooing with coluru glazed tiles 6.5mm thick of size(300 x 200 mm) 1st quality (as per manufacturers specification ) of approved make ISI CM (1:5) prop with grey cement slurry for kitchen,bathroom,balcony & lift cladding Toilet dadooing Type 1 west side T1 allaround west side T1 allaround Deduct for dooor portion east side Toilet allaround Deduct for dooor portion Kitchen dadooing three sides utility three sides wash basin side Type 2

Sqm

Sqm

Sqm Sqm Sqm Sqm Sqm

30

5 5 5 5 5

1 1 2 1 1

1 1 1 1 1

7.06 7.26 0.75 7.42 0.75

2.1 2.1 1.98 2.1 1.98

74.13 76.23 -14.85 77.91 -7.42 206.00 42.48 23.36 8.02 73.86

5 5 5

1 1 1

1 1 1

6.965 3.83 1.315

1.22 1.22 1.22

Page 28 of 81

Agmt Description item no west side toilet allaround Deduct for dooor portion east side Toilet allaround Deduct for dooor portion Kitchen dadooing three sides utility three sides wash basin side

Nos

Length

Breadth

Depth

Quantity

Unit

5 5 5 5

1 1 1 1

1 1 1 1

8.40 0.75 7.40 0.75

2.1 1.98 2.1 1.98

88.20 -7.42 77.70 -7.42 151.06 41.48 21.04 9.76 72.28 503.20 Sqm Sqm Sqm Sqm Sqm

5 5 5

1 1 1

1 1 1

6.8 3.45 1.6 Total Quantity

1.22 1.22 1.22

31

second floor 503.20 third floor 503.20 fourth floor 503.20 fifthfloor 503.20 Supplying and application of two coats of ALTEK super fine , one coat of ALTEK water based coment primer and twocoats of ALTEK flora ( plastic emulsion paint ) to interior faces of new walls and ceeling of approved colour as per manufacturer's specifications including cost and conveyance of all matirials to site and labour charges such as preparing the wall, applying primary coat etc. complete for finished item of work for INTERNAL WALLS AND CEILING (Total 2 coats). Quantity same as internal ceiling and plastering Ground floor 1st floor to 5 floor 6 th floor

32

2041.7155 20978.1426 463.93625 23483.7944 "B" -Supply and application of one coats of Altek water based cement primer and two coats of harmony (Acrylic emulsion paint exterior grade) to exterior faces of new walls and ceiling of approved colour as per manufacturer's specifications including c First floor 1177.65 Second floor 1177.65 Third floor 1177.65 Fourth floor 1177.65 Fifth floor 1177.65 Sixth floor 437.52 6325.79 Add for Chejjas Chejjas over Windows Chejjas over Windows W 40 5 2 1.220 0.46 488.00 Chejjas over Windows W1 10 5 2 1.220 0.46 122.00 610.00 Grand total 6935.79 Painting to new wood work and flush shutters with lappam finish , over a primary coat and painting two coats of synthetic enamel paint 1st grade of approved brand and shade (Total 3 coats) including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc. complete (APSS No.1200, 1207 & 1211) in all floors. main door d1 d2 10 25 10 5 5 5 1.8 1.8 1.8 1.06 0.91 0.75 1.98 1.98 1.98

4195.6285

Sqm

Sqm Sqm Sqm Sqm Sqm Sqm Sqm

SQM SQM

33

188.892 405.405 133.65 SQM 727.947

34

35

Supply and fixing of high polished Black granite 16 to 18 mm thick (upto 2.43 Mts length) including the rounding the exposed edges of granite slab and polished set over a base of 20mm thick C.M(1:5) prop over already for KITCHEN PLATFORM First floor 5 1 1 4.54 0.6 TYPE 1 two sides 5 1 1 4.50 0.6 13.62 TYPE 2 two sides 10 1 1 3.94 0.1 13.5 add for Faces 10 1 1 0.75 0.15 3.94 add for verticql Faces 1.125 First floor 32.185 second floor 32.185 third floor 32.185 fourth floor 32.185 fifthfloor 32.185 Supplying and laying of polished shabad stone of tandur blue variety of 25.40 mm thick single piece over a base of 20 mm thick in C. M (1:8) with neat cement joints to full depth including cost and conveyance of all materials and labour charges for laying, cutting seigniorage charges etc complete for tread and risers

Sqm Sqm Sqm Sqm Sqm

Page 29 of 81

Agmt Description item no Ground floor treads Raisers Mid landing add for skirting midlanding 3 sides

Nos

Length

Breadth

Depth

Quantity

Unit

36

9 4.5 0.10 4.95 0.63 Ground floor quantity 19.08 first floor 19.08 second floor 19.08 third floor 19.08 fourth floor 19.08 fifthfloor 19.08 Surface preparation by means of chipping & cleaning testing for leakage points and grouting the same with neat cement slurry and repairing of cracks and pot holes,if any with polymer repair motor and applying two coats of polymer based water proofing slurry coating.Sika top seal 107 with coverage of 3Kg per sq mtr for two coats and providing cement screed of average 50mm thick with smooth finish,and continuing the same upto height of 300mm all along the parapet wall and other adjoining walls in form of vatta 1.5 Type 1 terrace Type 2 terrace Corridor portion Staircase portion Lift portion 5 5 1 1 1 1 1 1 1 1 1 1 1 1 10.80 9.10 50.50 8.6 1.8 8.60 8.60 2.00 3.13 1.8

2 2 1 1

10 10 1 1

1 1 1 1

1.5 1.5 3.3 6.3

0.30 0.15

Sqm Sqm Sqm Sqm Sqm Sqm

37

464.40 391.30 101.00 26.918 1 3.24 Total qty Sqm 986.86 Lift cladding with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastering in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. ceramic tiles of size(300 x 300mm) with 1" thk mortar in CM(1:6) prop Ground floor Total front face up to beam Deduct opening Side faces Top face Deduct Switch portion

1 -1 1 1 -1

1 1 2 1 2

1 1 1 1 1

2.26 0.7 0.3 0.7 0.28

2.82 2.00 2.00 0.30 0.08

6.37 -1.40 1.20 0.21 -0.04 6.34 Sqm

38

First floor to fifth floor Total front face up to beam 1 1 1.93 2.62 5.06 1 Deduct opening -1 1 0.71 2.00 -1.42 1 Side faces 1 2 0.29 2.00 1.16 1 Top face 1 1 0.71 0.29 0.21 1 Deduct Switch portion -1 2 0.28 0.08 -0.04 1 For Each floor 4.96 Sqm For Five floors 24.79 Sqm 31.13 Sqm Total for GF+5floors Impervious coat 20mm thick average over roof slab with CM(1:4) prop. Mixed with approved water proofing compound at the rate of 1.0 kg per bag of cement (50 kgs) and laid when the slab is green with thread lining at 1-6x1-6 pannels and finished smooth with neat cement rendering as directed including cost and conveyance of all materials and water to work site, seignorage fee and all operational, incidental, labour charges such as mixing mortar, laying, curing etc., complete for Toilets For type 1 W/SToilet 1 5 1 1 2.33 1.30 15.15

Page 30 of 81

Name of Work : Construction of 1 Block (Stilt+5) 5 flats Type-1 and 4 flats Type-2, total 45 flats (885.86 Sft) (PEARL -F) AARAMBG - II, block PF Agmt Description Nos Length Breadth depth Quantity item no 1 Earth work excavation and depositing on bank with an intial lead of 10m and lift of 2m in mixture of gravel and soft disintegrated rock like shales ,ordinary gravel stoney earth and earth mixed with fair size boulders including shoring shuttering and bailing out of water etc for foundations . Filling portion Block area 2 1 1 1 1 1 1 49.00 59.40 20.00 31.00 1.20 1.00 Unit

1176.00 1841.40 3017.40 cum

Excavation in rock by way of benching ,chiselling, wedging, and Boring in fourndation, grade levelling including all lead and lift charges and disposal of rock from the site as directed by the department.( A rate of Rs.164.90 per Cum For Coloumn footings for type 1 (External) For Coloumn footings for type 1 (Internal) For Coloumn footings for type 2 (external) For Coloumn footings for type 2 (Internal) For Coloumn footings for staircase For Coloumn footings for lift For Coloumn footings for corridor Net Qty earth work excavation 5 5 4 4 4 4 3 8 1 8 1 1 1 1 1 1 1 1 1 1 1 1.80 2.40 1.80 2.40 1.80 1.80 1.80 1.80 2.40 1.80 2.40 1.80 1.80 1.80 1.10 1.10 1.10 1.10 1.10 1.10 1.10 142.56 31.68 114.05 25.34 14.26 14.26 10.69 352.84 cum

Earth work Excavation in hard rock and boulders of more than 3 cum in size where ever quarrying is done by controlled blasting without stacking and disposal of excavated rock within a distance of 2km from work spot 1 1 1 30.00 5.00 2.50 375.00 cum

Drilling of 25mm dia and 800 mm deep in hard rock or sheet rock by pneumatic grouting and placing of 16 mm dia Tor steel bars and grouting holes with slurry excluding cost of steel and its fabrication charges but including cost and conveyance of al For block PF External columns 83 7 7 1 1 0.80 3253.60 internal columns 9 9 9 1 1 0.80 583.20 Net Quantity: Total 3836.80 Rmt 5 Providing and laying VCC M20 in foundations, machine foundations, footings and bases of columns and under floors including the cost of centering and shuttering for Column footings levelling course External columns internal columns 83 9 1 1 1 1 1.80 2.40 1.80 2.40 0.15 0.15 40.34 7.78 48.11 Cum

6 Providing and laying cement concrete 1:5:10 (1 cement :5 coarse sand :10 graded stone aggregate 40 mm. nominal size) mm. ) in basement under floors Type 1 Stilt floor Type 2 Stilt floor Corridor Staircase portion Deduct for beam portions (63.55+65.47) Deduction for Columns for sump LIFT 5 4 1 1 1 1 2 1 1 1 1 1 1 92 1 1 1 1 1 1 1 1 1 1 8.50 8.65 52.75 4.73 129.02 0.30 4.40 2.26 8.40 8.40 2.00 3.60 0.23 0.45 4.9 2.26 0.10 0.10 0.10 0.10 0.10 0.10 0.15 0.15 Total qty 35.70 29.06 10.55 1.70 -2.97 -1.24 6.47 Cum 0.77 72.81 Cum

7 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational Footings BLOCK No. PF External columns Internal columns

127.74 24.62 152.36 cum VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational 8 BLOCK No. PF FOR PEDESTALS

83 9

1 1

1 1

1.80 2.40

1.80 2.40

0.475 0.475

Page 31 of 81

Agmt Description item no External columns Internal columns for sump LIFT

Nos

Length

Breadth

depth

Quantity

Unit

21.01 2.28 5.39 0.64 23.29 cum VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational FOR PLINTHBEAM TYPE 1 B1 B2 B3 B4 B5 B6 B7 B8 B9 TYPE 2 B1 B2 B3 B4 B5 B6 B7 B8 Corridor two sides corridor connecting beams for stair case 3 sides for stair case front side lift all round

83 9 2 1

1 1 1 1

1 1 1 1

0.75 0.75 4.40 2.26

0.75 0.75 4.9 2.26

0.45 0.45 0.125 0.125

5 5 5 5 5 5 5 5 5

2 1 1 1 1 3 2 1 1

1 1 1 1 1 1 1 1 1

8.40 4.79 2.79 3.39 1.17 8.50 1.79 2.54 2.99

0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30

5.80 1.65 0.96 1.17 0.40 8.80 1.24 0.88 1.03 21.92 4.64 0.29 2.48 0.85 7.25 1.10 0.77 0.70 18.07 0.98 0.28 0.87 0.43 0.50 3.05 43.04 cum 21.29 2.31 13.02 2.37 23.60 cum 29.75 3.23 32.98 32.98 32.98 32.98 32.98 32.98

4 4 4 4 4 4 4 4 1 1 1 1 1

2 1 2 1 3 2 1 1 1 2 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1

8.40 1.04 4.49 3.09 8.75 1.99 2.79 2.54 14.15 2.00 12.60 6.25 7.20

0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 Total qty

10 Columns upto plinth beam External columns Internal columns for side walls of sump for side walls of lift 11 COLUMNS FOR GROUND FLOOR External columns Internal columns First floor Second floor Third floor Fourth floor Fifth floor COLUMNS FOR SIXTH FLOOR Staircase columns lift columns COLUMNS FOR SEVENTH FLOOR

83 9 2 1

1 1 1 1

1 1 1 1

0.30 0.30 18.60 9.04

0.45 0.45 0.175 0.175

1.90 1.90 2.00 1.50 Total qty 2.655 2.655 Total qty

83 9

1 1

1 1

0.3 0.3

0.45 0.45

cum cum cum cum cum cum

4 4

1 1

1 1

0.30 0.30

0.45 0.45

2.5 2.5

1.35 1.35 2.70 cum

1.35 1.35 Filling in trenches, sides of foundations, basements etc., with carted earth with a lead of 12km in layers not exceeding 15cms thick consolidating each deposited layer by watering and ramming including c/c of earth, water to workspot 11 Up to bottom of plinth beam item no 1+2+3 For balance portion with out filling Deduct for useful earth qty @50% OF item 1 Deduct footings qty Deduct pedestals qty Deduct plinth beam qty Deduct cols up to PB qty 3745.24 386.88 -1508.70 -152.36 -23.29 -43.04 -23.60 2381.13 Cum

0.30

0.45

2.5

10.40

31.00

1.20

Total qty

Page 32 of 81

Agmt Description item no 12 ROOF BEAMS GROUND FLOOR TYPE 1 B1 B2 B3 B4 B5 B6 B7 B8 B9 TYPE 2 B1 B2 B3 B4 B5 B6 B7 B8 For stair case For lift alround For Corridor two sides

Nos

Length

Breadth

depth

Quantity

Unit

2 1 1 1 1 3 2 1 1 2 1 2 1 3 2 1 1 2 2 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

8.40 4.79 2.79 3.39 1.17 8.50 1.79 2.54 2.99 8.40 1.04 4.49 3.09 8.75 1.99 2.79 2.54 3.30 4.73 8.12 14.15

0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 Total qty

GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR For stair case For lift alround SEVENTH FLOOR For lift alround 13 ROOFSLAB for Ground Floor For Type 1 For Type 2 corridor waist slab midlanding slab top slab for sump ROOFSLAB for Ground Floor ROOFSLAB for First Floor ROOFSLAB for Second Floor ROOFSLAB for third Floor ROOFSLAB for Fourth Floor ROOFSLAB for Fifth Floor ROOFSLAB for Sixth Floor stair case head room lift room ROOF SLAB FOR SEVETH FLOOR lift room 14 Lintels for FIRST FLOOR over D over D1 over D2 Over sliding door over W over W! over lift Lintels for SECOND FLOOR Lintels for THIRD FLOOR Lintels for FOURTH FLOOR Lintels for FIFTH FLOOR

1.47 0.42 0.24 0.30 0.10 2.23 0.31 0.22 0.26 5.55 1.47 0.09 0.78 0.27 2.29 0.35 0.24 0.22 0.58 0.83 0.71 1.24 9.07 14.63 14.63 14.63 14.63 14.63 14.63 14.63

cum

cum cum cum cum cum cum cum cum

2 2 1

1 1 1

1 1 1

3.30 4.73 8.12

0.23 0.23 0.23

0.38 0.38 0.38 Total qty 0.38 0.115 0.115 0.115 0.15 0.115 0.15 Total qty

0.58 0.83 0.71 2.11 cum 0.71 41.06 33.42 12.13 1.35 0.57 6.47 95.00 88.53 88.53 88.53 88.53 88.53 88.53

1 5 4 1 2 1 2

1 1 1 1 1 1 1

1 1 1 1 1 1 1

8.12 8.40 8.40 52.75 3.00 1.50 4.90

0.23 8.5 8.65 2.00 1.50 3.30 4.4

cum cum cum cum cum cum cum cum

1 1

1 1

1 1

4.73 2.26

3.6 2.26

0.115 0.15 Total qty 0.115

1.96 0.77 2.73 cum 0.59

2.26

2.26

9 18 27 9 27 9 1

1 1 1 1 1 1 1

1 1 1 1 1 1 1

1.37 1.22 1.07 2.10 1.22 0.91 1.07

0.15 0.10 0.10 0.10 0.10 0.10 0.15

0.10 0.10 0.10 0.15 0.10 0.10 0.10 Total qty

0.18 0.22 0.29 0.28 0.33 0.08 0.02 1.40 1.40 1.40 1.40 1.40

cum cum cum cum cum

Page 33 of 81

Agmt Description item no LINTELS FOR SEVENTH FLOOR over lift For BEDBLOCKS For D For D1 For D2 15 Chejjas over Windows FOR FF Chejjas over Windows W Chejjas over Windows W1

Nos

Length

Breadth

depth

Quantity

Unit

1 9 18 9

1 2 2 2

1 3 3 3

1.07 0.15 0.15 0.15

0.15 0.14 0.10 0.10

0.10 0.10 0.10 0.10

0.02 cum 0.11 0.16 0.08 0.36 cum 32.94 10.98 43.92 SQM SQM SQM SQM SQM

27 9

1 1

1 1

1.22 1.22

0.46 0.46

16

Total qty Chejjas over Windows FOR SECOND FLOOR 43.92 Chejjas over Windows FOR THIRD FLOOR 43.92 Chejjas over Windows FOR FOURTH FLOOR 43.92 Chejjas over Windows FOR FIFTH FLOOR 43.92 Racks and lofts Ground Floor FLOOR RCC M20 grade mix (Design Mix as per SS) with stone aggregate of 20mm and 12mm size mechanically mixed etc, necessary reinforcement including cost and conveyance of all materials and water to work site seignorage and all operational, incidential labour charges such as centering (steel Centering) mixing concrete, laying, lift charges, curing, etc., complete for finished item of work as per standard specification but excluding cost on steel reinforcement and its fabrication charges etc complete for finished item of work to the required strength as directed by department for 60 mm thick to 40 mm thick at free end, plastering 12mm thick in CM(1:4) Prop. For all exposed faces (Bottom & Sides) etc. Type 1 Lofts in kitchen kitchen platform two sides Deduct for sink master bed bed 1 Type 2 Lofts in kitchen kitchen platform two sides Deduct for sink master bed bed 1 5 5 5 5 5 1 1 1 1 1 1 1 1 1 1 2.20 4.25 0.52 3.40 3.20 0.45 0.65 0.40 0.60 0.60 4.95 13.81 -1.04 10.20 9.60 37.52

4 4 4 4 4

1 1 1 1 1

1 1 1 1 1

2.55 4.15 0.52 3.50 3.20

0.45 0.65 0.40 0.60 0.60 First floor second floor third floor fourth floor fifth floor

4.59 10.79 -0.83 8.40 7.68 30.63 Sqm 68.15 Sqm 68.15 68.15 68.15 68.15 Sqm Sqm Sqm Sqm

VRCC M20 FOR CUPBOARD 17 SHELVES Type 1 kitchen Shelves horizontal kitchen Shelves horizontal kitchen Shelves verticals Master bed horizontal Master bed verticals bed 1 bed 1 Type 2 kitchen Shelves horizontal kitchen Shelves horizontal kitchen Shelves verticals Master bed horizontal Master bed verticals bed 1 bed 1

5 5 5 5 5 5 5

1 2 2 2 2 2 2

1 1 1 2 1 1 1

2.20 1.55 1.50 1.28 1.98 2.05 1.98

0.32 0.32 0.32 0.53 0.53 0.53 0.53

3.52 4.96 4.80 13.57 10.49 10.87 10.49 58.70 Sqm 3.07 4.48 3.84 8.48 8.40 10.18 8.40 46.84 Sqm

4 4 4 4 4 4 4

1 2 2 2 2 2 2

1 1 1 1 1 2 1

2.40 1.75 1.50 2.00 1.98 1.20 1.98

0.32 0.32 0.32 0.53 0.53 0.53 0.53

Total Qty for first floor Total Qty for five floor 18 Over head tankds at sixth floor

105.54 Sqm

527.70 Sqm

Page 34 of 81

Agmt Description item no RCC Columns for tank RCC beams over all RCC bottom slab RCC Top slab RCC Side walls 19 Sump at Ground floor RCC Columns for tank CC 1:5:10 RCC bottom slab RCC Top slab RCC Side walls allaround

Nos

Length

Breadth

depth

Quantity

Unit

2 2 2 2 2

4 1 1 1 1

1 1 1 1 1

0.30 14.80 4.66 4.06 15.44

0.45 0.23 4.26 3.66 0.175

1.20 0.38 0.15 0.125 2.00

1.30 2.59 5.96 3.71 10.81 24.36 1.30 6.29 6.29 6.29 14.47 34.65

Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum

2 2 2 2 2

4 1 1 1 1

1 1 1 1 1

0.30 5.03 5.03 5.03 17.48

0.45 4.17 4.17 4.17 0.23

1.20 0.15 0.15 0.15 1.80

20

Masonary in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size 290x225x140mm(made up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including cost and conveyance of all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall. for type 1 All around Deduct for sitout and utility deduct columns deduct for door D deduct for windows w deduct for windows w1 deduct for windows v deduct for lintels over doors deduct for lintels over windows deduct for exhaust fan for type 2 All around Deduct for sitout and utility deduct columns deduct for door D deduct for windows w deduct for windows w1 deduct for windows v deduct for lintels over doors deduct for exhaust fan For staircase L/W s/W lift room allaround Corridor parapet wall Corridor parapet wall BM for First floor BM for Second floor BM for Third floor BM for Fourth floor BM for Fifth floor BM for Sixth floor Stair case 3sides Parapet wall at lift room allaround BM FOR SEVENTH FLOOR at lift room allaround 5 5 5 5 5 5 5 5 5 5 4 4 4 4 4 4 4 4 4 1 1 1 1 1 1 1 8 1 3 1 2 1 4 1 1 1 8 1 3 1 2 1 1 2 1 1 7 1 1 1 1 1 1 1 1 1 1 0.79 1 1 1 1 1 1 1 1 0.79 1 1 1 1 1 33.20 4.80 0.30 1.06 0.91 0.91 0.60 1.37 1.22 0.30 36.00 5.22 0.30 1.06 0.91 0.91 0.60 1.37 0.30 4.72 3.30 7.01 2.00 14.15 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 2.655 2.655 2.655 1.98 1.22 0.75 0.45 0.1 0.1 0.3 2.655 2.655 2.655 1.98 1.22 0.75 0.45 0.1 0.3 2.655 1.000 2.655 1.000 1.000 Total qty 61.70 -8.92 -4.46 -1.47 -2.33 -0.48 -0.38 -0.10 -0.34 -0.05 53.52 -7.76 -3.57 -1.18 -1.87 -0.38 -0.30 -0.08 -0.04 3.51 0.46 2.61 1.96 1.98 92.05 92.05 92.05 92.05 92.05 92.05

Cum cum Cum Cum Cum Cum Cum

1 1 1

1 1 1

1 1 1

13.06 255.35 7.01

0.14 0.14 0.23

2.2 1.2 2.655 Total qty 2.655

4.02 42.90 4.28 51.20 Cum 4.28

7.01

0.23

Masonary in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size 290x225x140mm(made up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including cost and conveyance of all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall. 21 Type 1 Master bed room two sides bed room1 two sides between kitchen and utility Toilets North side 2 sides South side toilet 2 sides sitout 2 sides Wash area side deduct for door D1 deduct for door D2 5 5 5 5 5 5 5 5 5 1 1 1 1 1 1 1 2 3 1 1 1 1 1 1 1 1 1 6.30 6.60 2.00 3.10 4.10 2.40 0.40 0.90 0.75 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 2.655 2.655 2.655 2.655 2.655 2.655 2.655 1.98 1.98 8.36 8.76 2.66 4.12 5.44 3.19 0.53 -1.78 -2.23

Page 35 of 81

Agmt Description item no deduct for lintels over d1 deduct for lintels over d2 Type 2 Master bed room two sides bed room1 two sides between drawing and dining between kitchen and utility sitout two sides North side toilet two sides South side toilet two sides deduct for door D1 deduct for door D2 deduct for lintels over d1 deduct for lintels over d2

Nos

Length

Breadth

depth

Quantity

Unit

5 5

2 3

1 1

1.22 1.05

0.1 0.1

0.1 0.1

-0.12 -0.16 28.77 Cum

22

6.90 6.80 0.37 2.34 2.55 3.93 3.82 -1.43 -1.78 -0.10 -0.13 23.28 Total qty 52.04 BM for First floor 52.04 BM for Second floor 52.04 BM for Third floor 52.04 BM for Fourth floor 52.04 BM for Fifth floor 52.04 Ground floor steps PCC M-20 Grade mix with stone aggregate of 20 mm & 12mm size mechanically mixed including cost and conveyance of all materials and water to work site, seignorage fee and all opertational ,incidential,labour charges such as centering from work, steel centering,mixing concrete, laying, lift charges ,vibrating,curing etc complete for finished item of work as per Standard Specification etc complete for finished item of work to the required strength as directed by department for steps. For staircase steps Groun floor first floor second floor third floor fourth floor fifth floor sixth floor 1 1 1 1 1 1 1 0.50 0.50 0.50 0.50 0.50 0.50 0.50 20 20 20 20 20 20 20 1.50 1.50 1.50 1.50 1.50 1.50 1.50 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.675 0.675 0.675 0.675 0.675 0.675 0.675

4 4 4 4 4 4 4 4 4 4 4

1 1 1 1 1 1 1 2 3 2 3

1 1 1 1 1 1 1 1 1 1 1

6.50 6.40 0.35 2.20 2.40 3.70 3.60 0.90 0.75 1.22 1.05

0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1

2.655 2.655 2.655 2.655 2.655 2.655 2.655 1.98 1.98 0.1 0.1

Cum Cum Cum Cum Cum Cum Cum

Cum Cum Cum Cum Cum Cum Cum

23

Plastering 12mm thick in 2 coats with a base coat of 8mm thick in CM (1:6) prop and top coat 4mm thick in CM(1:4)prop with dubara sponge finishing including cost and conveyance of all materials seignorage and water to work site and all operational ,incidential labour charges such as scaffolding, mixing, motor , lift charges, curing etc. complete for finished item of work as per SS No. 901, 904 for internal walls Type 1 GROUND floor Columns all around Beams B1 to B9 two sides ceiling Type 2 Stilt floor Columns all around Beams B1 to B8 two sides ceiling Corridor ceiling staircase room bottom 5 5 5 9 1 1 1 2 1 1.50 63.55 8.50 2.655 0.38 8.40 179.21 241.49 357.00 777.70 Sqm

4 4 4 1 1

9 1 1 1 1

1 1 1 1 1

1.50 65.47 8.65 52.75 4.73

2.66 0.76 8.40 2.00 3.60 Total qty

143.37 199.03 290.64 105.50 17.03 755.57 Sqm 1533.27 Sqm.

FIRST FLOOR Type 1 master bed alaround master bed ceiling bed room 1 bed room 1 ceiling drawing alround drawing ceiling dining alround dining ceiling kitchen kitchen ceiling sitout sitout ceiling utility three sides utility ceiling North side toilet

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1

13.60 3.60 13.00 3.50 13.90 4.60 9.60 3.65 7.30 2.65 3.80 2.80 4.00 2.00 6.60

3.035 3.2 3.035 3 3.035 3 3.035 2.8 3.035 2 3.035 1.4 3.035 1 3.035

206.38 57.60 197.28 52.50 210.93 69.00 145.68 51.10 110.78 26.50 57.67 19.60 60.70 10.00 100.16

Page 36 of 81

Agmt Description item no North side toilet ceiling South side toilet South side toilet ceiling washbasin area two sides washbasin area ceiling deductions D1 D2 Type 2 master bed alaround master bed ceiling bed room 1 bed room 1 ceiling drawing alround drawing ceiling dining alround dining ceiling kitchen kitchen ceiling sitout sitout ceiling utility three sides utility ceiling North side toilet North side toilet ceiling South side toilet South side toilet ceiling washbasin area two sides washbasin area ceiling deductions D1 D2

Nos

Length

Breadth

depth

Quantity

Unit

5 5 5 5 5 5 5

1 1 1 1 1 2 3

1 1 1 1 1 1 1

2.00 8.00 2.70 1.00 1.30 0.91 0.75

1.3 1.3

3.035 3.035 3.035

0.5 1.98 1.98

30.35 121.40 17.55 15.18 3.25 -18.02 -22.28 1523.30 169.96 48.84 152.96 39.60 171.17 58.08 111.69 37.52 91.05 21.62 46.13 15.68 50.99 8.80 87.41 27.92 84.98 11.44 14.57 3.12 -14.41 -17.82 1221.30 2744.60 2744.60 2744.60 2744.60 2744.60 2744.60

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 3

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

14.00 3.70 12.60 3.30 14.10 4.40 9.20 3.35 7.50 2.35 3.80 2.80 4.20 2.20 7.20 2.30 7.00 2.20 1.20 1.30 0.91 0.75

3.035 3.3 3.035 3 3.035 3.3 3.035 2.8 3.035 2.3 3.035 1.4 3.035 1 1.3 1.3 3.035 0.6 1.98 1.98 Total qty 3.035 3.035 3.035

first floor second floor third floor fourth floor fifth floor sixth floor parapet wall all round staircase head room staircase room ceiling lift room all around lift room ceiling SEVENTH FLOOR at lift room allaround ceiling

Sqm Sqm Sqm Sqm Sqm Sqm

1 1 1 1 1

1 1 1 1 1

1 1 1 1 1

255.35 12.86 4.73 7.20 1.80

1.2 2.68 3.6 3.035 1.8

306.42 34.46 17.03 21.85 3.24 383.00 Sqm 21.85 3.24 25.09 Sqm

1 1

1 1

1 1

7.20 1.80

3.035 1.8

Plastering 12mm thick in 2 coats with a base coat of 8mm thick in CM (1:6) prop and top coat 4mm thick in CM(1:4)prop with dubara sponge finishing including cost and conveyance of all materials seignorage and water to work site and all operational ,incidential labour charges such as scaffolding, mixing, motor , lift charges, curing etc. complete for finished item of work as per SS No. 901, 904 for external walls 24 type 1 all around corridor wall inbetween flats corridor wall deductions door D W W1 V deductions for utility and sitout portion 5 5 1 5 5 5 5 5 1 7 1 1 3 1 2 1 1 1 1 1 1 1 1 1 33.80 2.00 14.15 1.06 0.91 0.91 0.60 4.80 3.15 2.14 2.14 1.98 1.22 0.75 0.45 2.655 532.35 149.80 30.28 -10.49 -16.65 -3.41 -2.70 -63.72 615.45

type 2 all around deductions door D W W1 V deductions for utility and sitout portion

4 4 4 4 4 4

1 1 3 1 2 1

1 1 1 1 1 1

34.10 1.06 0.91 0.91 0.60 5.00

3.15 1.98 1.22 0.75 0.45 2.655

429.66 -8.40 -13.32 -2.73 -2.16 -53.1

Page 37 of 81

Agmt Description item no

Nos

Length

Breadth

depth

Quantity

Unit

Total qty first floor second floor third floor fourth floor fifth floor sixth floor parapet wall all round staircase head room lift room all around door decurition Seventh floor Lift alround

349.95 Sqm 965.40 Sqm 965.40 965.40 965.40 965.40 965.40 4827.02 Sqm Sqm Sqm Sqm Sqm

260.39 13.62 9.04 0.75 9.04

1.14 2.79 3.15 1.98 Total qty 3.15 Total qty

296.84 38.00 28.48 -1.49 361.84 Sqm 28.48 28.48 Sqm 5217.33

cost supply and fixing of Teak Wood Door of size 1.06 X 1.98 m including all 25 labour charges 9 1 5 45 Nos

26

Door of size 3-0 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. 18 1 5 90 Nos

27

Door of size 2-6 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. Balcony for machine room 5 1 9 1 45 Nos 1 Nos 46 Nos

28

Door of size 2-6 x 6-6 Supply and door frame made of hollow extruded PVC section (Nandi or equivalent) having dimensions of 40 x57mm with the wall thickness of 2mm +/- 0.2 mm duly reinforced with seasoned woood plank at the hinges side the door frame top 2 corners shall be metricut/weilded. with door shutters made of rigid PVC extruded hollow section (Nandi Attached toilet 5 18 90 Nos Sliding Door of size 6-0 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. at sitout 5 9 1 45 nos

24

29

NCL WINDOE OF SIZE 3-0 x 4-0 Providing and fixing windows made of prepainted steel (base steel as per IS 513 of 0.60 mm thick galvonised as per IS 277 with zinc of 150 GSM) 5 27 135 Nos

30

NCL WINDOE OF SIZE 3-0 x 2-6 Providing and fixing windows made of prepainted steel (base steel as per IS 513 of 0.60 mm thick galvonised as per IS 277 with zinc of 150 GSM) Kitchen window 5 9 Manufacturing & supply of 2'-0" x 1"-6" steel ventilator including cost of steel & glass 50 Nos

31

Attached toilet 32

18

90 Nos

Ground floor Flooring with Grananalothic concrete Flooring 50 mm thick with CC 1:1:2 prop. Using 6mm to 12 mm size (SSS) grade hard granite stone mesigne crushed metal laid Granalothically over an existing bed of CC 1:5:10 Prop. 10 cm thic. CC slab laib in alternate panels of size not exceeding 1.5X1.5m and finishing the top surface to required smooth ness and slopes including cost and conveyance of all meterials and all operational incidental and seinarage charges and mixing concrete, laying, curing etc. complete for finisheditemof work.(APSS NO:701and 707 ) Type 1 Type 2 staircase room Corridor Deduction for Columns 5 5 1 1 1 1 1 1 1 88 1 1 1 1 1 8.50 8.65 4.73 52.75 0.30 8.40 8.40 3.60 2.00 0.45 357.00 363.30 17.03 105.50 -11.88 830.95

Sqm

Page 38 of 81

Agmt Description item no 33

Nos

Length

Breadth

depth

Quantity

Unit

34

Flooring with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastring in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. complete for finished item In rooms flooring with 8.3mm thk ceramic tiles of size(400 x 400mm) with 1" thk mortar in CN(1:6) prop Type 1 First floor qty Master bed 5 1 1 3.60 3.2 57.60 bed 1 5 1 1 3.50 3.0 52.50 drawing 5 1 1 4.60 3.0 69.00 dining 5 1 1 3.65 2.8 51.10 kitchen 5 1 1 2.65 2.0 26.50 utility 5 1 1 2.00 1.0 10.00 sitout 5 1 1 2.80 1.4 19.60 North side toilet 5 1 1 2.00 1.3 13.00 South side toilet 5 1 1 2.70 1.3 17.55 washbasin area 5 1 1 0.50 1.3 3.25 skirting m.bed room 5 1 1 11.95 0.10 5.98 bed 1 5 1 1 11.35 0.10 5.68 drawing 5 1 1 12.84 0.10 6.42 dining 5 1 1 7.80 0.10 3.90 kitchen 5 1 1 6.55 0.10 3.28 utility 5 1 1 5.25 0.10 2.63 sitout 5 1 1 3.80 0.10 1.90 washbasin area 5 1 1 1.00 0.10 0.50 350.37 Type 2 First floor qty Master bed 4 1 1 3.70 3.3 48.84 bed 1 4 1 1 3.30 3.0 39.60 drawing 4 1 1 4.40 3.3 58.08 dining 4 1 1 3.35 2.8 37.52 kitchen 4 1 1 2.35 2.3 21.62 utility 4 1 1 2.20 1.0 8.80 sitout 4 1 1 2.80 1.4 15.68 North side toilet 4 1 1 2.30 1.3 11.96 South side toilet 4 1 1 2.20 1.3 11.44 washbasin area 4 1 1 0.60 1.3 3.12 skirting m.bed room 4 1 1 12.35 0.10 4.94 bed 1 4 1 1 10.95 0.10 4.38 drawing 4 1 1 14.10 0.10 5.64 dining 4 1 1 7.40 0.10 2.96 kitchen 4 1 1 6.75 0.10 2.70 utility 4 1 1 5.65 0.10 2.26 sitout 4 1 1 3.80 0.10 1.52 washbasin area 4 1 1 1.20 0.10 0.48 232.70 Total First floor 583.07 Quantity Second floor 583.07 Third floor 583.07 fourth floor 583.07 fifth floor 583.07 583.07 Dadooing with coluru glazed tiles 6.5mm thick of size(300 x 200 mm) 1st quality (as per manufacturers specification ) of approved make ISI CM (1:5) prop with grey cement slurry for kitchen,bathroom,balcony & lift cladding dadooing Type 1 North side T allaround South side T allaround Deduct for dooor portion Kitchen two sides utility three sides wash basin side Type 2 North side T allaround South side T allaround Deduct for dooor portion Kitchen two sides utility three sides wash basin side

Sqm

Sqm Sqm Sqm Sqm Sqm Sqm

5 5 5 5 5 5

1 1 2 1 1 1

1 1 1 1 1 1

6.60 8.00 0.75 4.65 4.00 1.30

2.10 2.10 1.98 1.22 1.22 1.22

69.30 84.00 -14.85 28.36 24.40 7.93 199.14 60.48 58.80 -11.88 22.69 25.62 7.93 163.64

4 4 4 4 5 5

1 1 2 1 1 1

1 1 1 1 1 1

7.20 7.00 0.75 4.65 4.20 1.30

2.10 2.10 1.98 1.22 1.22 1.22

Page 39 of 81

Agmt Description item no First floor second floor third floor fourth floor fifthfloor 31

Nos

Length

Breadth

depth

Quantity

Unit

Total Quantity

362.78 Sqm 362.78 362.78 362.78 362.78 Sqm Sqm Sqm Sqm

Supplying and application of two coats of ALTEK super fine , one coat of ALTEK water based coment primer and twocoats of ALTEK flora ( plastic emulsion paint ) to interior faces of new walls and ceeling of approved colour as per manufacturer's specifications including cost and conveyance of all matirials to site and labour charges such as preparing the wall, applying primary coat etc. complete for finished item of work for INTERNAL WALLS AND CEILING (Total 2 coats). Quantity same as internal ceiling and plastering Ground floor 1st floor to 5 floor 6 th floor

2744.6

1533.27 13723.00 383.00 15639.27 Sqm

36

"B" -Supply and application of one coats of Altek water based cement primer and two coats of harmony (Acrylic emulsion paint exterior grade) to exterior faces of new walls and ceiling of approved colour as per manufacturer's specifications including c First floor Second floor Third floor Fourth floor Fifth floor Sixth floor Seventh floor Add for Chajjas Chejjas over Windows Chejjas over Windows W Chejjas over Windows W1 965.40 965.40 965.40 965.40 965.40 361.84 28.48 5217.33 Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm

27 9

5 5

2 2

1.22 1.22

0.46 0.46 Total qty Grand total

329.40 109.80 439.20 Sqm 5656.53 Sqm

37

Painting to new wood work and flush shutters with lappam finish , over a primary coat and painting two coats of synthetic enamel paint 1st grade of approved brand and shade (Total 3 coats) including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc. complete (APSS No.1200, 1207 & 1211) in all floors.

main door d1 d2

9 18 9 1

5 5 5 1

1.8 1.8 1.8 1.8

1.06 0.91 0.75 0.75

1.98 1.98 1.98 1.98

170.00 291.89 120.29 2.67 582.18 Sqm

38

Supply and fixing of high polished Black granite 16 to 18 mm thick (upto 2.43 Mts length) including the rounding the exposed edges of granite slab and polished set over a base of 20mm thick C.M(1:5) prop over already for KITCHEN PLATFORM First floor TYPE 1 two sides 5 1 1 4.05 0.60 12.15 TYPE 2 two sides 4 1 1 4.05 0.60 9.72 add for Faces 9 1 1 3.45 0.10 3.11 add for verticql Faces 9 1 1 0.75 0.15 1.01 Total qty 25.99 second floor 25.99 third floor 25.99 fourth floor 25.99 fifthfloor 25.99 Supplying and laying of polished shabad stone of tandur blue variety of 25.40 mm thick single piece over a base of 20 mm thick in C. M (1:8) with neat cement joints to full depth including cost and conveyance of all materials and labour charges for laying, cutting seigniorage charges etc complete for tread and risers Ground floor treads 2 10 1 1.50 0.30 9.00

Sqm Sqm Sqm Sqm Sqm Sqm

39

Page 40 of 81

Agmt Description item no Raisers Mid landing add for skirting midlanding 3 sides Ground floor quantity first floor second floor third floor fourth floor fifthfloor 40

Nos

Length

Breadth

depth

Quantity

Unit

2 1 1

10 1 1

1 1 1

1.50 3.30 6.30

0.15 1.50 0.10

4.50 4.95 0.63 19.08 19.08 19.08 19.08 19.08 19.08

Sqm Sqm Sqm Sqm Sqm Sqm

Surface preparation by means of chipping & cleaning testing for leakage points and grouting the same with neat cement slurry and repairing of cracks and pot holes,if any with polymer repair motor and applying two coats of polymer based water proofing slurry coating.Sika top seal 107 with coverage of 3Kg per sq mtr for two coats and providing cement screed of average 50mm thick with smooth finish,and continuing the same upto height of 300mm all along the parapet wall and other adjoining walls in form of vatta Type 1 terrace Type 2 terrace Corridor portion Staircase portion Lift portion 332.10 270.54 105.50 14.619 3.24 Total qty Sqm 726.00 Lift cladding with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastering in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. ceramic tiles of size(300 x 300mm) with 1" thk mortar in CM(1:6) prop Lift cladding Ground floor Total front face up to beam Deduct opening Side faces Top face Deduct Switch portion 5 4 1 1 1 1 1 1 1 1 1 1 1 1 1 8.20 8.35 52.75 4.43 1.80 8.10 8.10 2.00 3.30 1.80

41

1 -1 1 1 -1

1 1 2 1 2

1 1 1 1 1

2.26 0.70 0.30 0.70 0.28

2.82 2.00 2.00 0.30 0.08

6.37 -1.40 1.20 0.21 -0.04 6.34 Sqm

42

First floor to fifth floor Total front face up to beam 1 1 1.93 2.62 5.06 1 Deduct opening -1 1 0.71 2.00 -1.42 1 Side faces 1 2 0.29 2.00 1.16 1 Top face 1 1 0.71 0.29 0.21 1 Deduct Switch portion -1 2 0.28 0.08 -0.04 1 For Each floor 4.96 Sqm For Five floors 24.79 Sqm 31.13 Sqm Total for GF+5floors Impervious coat 20mm thick average over roof slab with CM(1:4) prop. Mixed with approved water proofing compound at the rate of 1.0 kg per bag of cement (50 kgs) and laid when the slab is green with thread lining at 1-6x1-6 pannels and finished smooth with neat cement rendering as directed including cost and conveyance of all materials and water to work site, seignorage fee and all operational, incidental, labour charges such as mixing mortar, laying, curing etc., complete for Toilets For type 1 N/SToilet For type 1 S/SToilet For type 2 N/SToilet For type 2 S/SToilet First floor qty Second floor qty Third floor qty Fourth floor qty Fifth Floor Qty 5 5 4 4 1 1 1 1 1 1 1 1 2.00 2.70 2.30 2.20 1.30 1.30 1.30 1.30 13.00 17.55 11.96 11.44 53.95 53.95 53.95 53.95 53.95

Sqm Sqm Sqm Sqm Sqm

43

Fabrication and placing of Tor steel/Fe 415 grade steel reinforcement confirming to IS-226 and 1786-1985 of SAIL/ VSP/ TISCON or any approved TMT of different diameters straightening, cutting & bending to required sizes & shapes placing in position with cover blocks of approved material & size tieing firmly with MS binding wire 18 guage forming grills for reinforcement work as per approved design & drawings to be supplied at the time of executing the work including cost & conveyance of steel and all materials and all wastages such as overlaps, couplings, welded joints, chairs,space bars, binding wire, cover blocks and all operational, incidential, labour charges such as cutting, bending, placing in position, tieing etc., complete for finished item of work as directed by Engineer in charge.

Page 41 of 81

Name of Work : Construction of 1 Block (Stilt+5) 45 flats ( block DI

Sft) (AARAMBH - II, Papireddy Colony, Chandanagar(v),

Agmt Nos item Description Length Breadth depth Quantity no 1 Earth work excavation for levelling in hard rock boulders of more than 3 cum in size requiring controlled blasting etc. including all incidental charges hire charges of machinery etc complete for finished item of work as per standard specification as directed by the Engineer in charge For Coloumn footings for type 1 (External) For Coloumn footings for type 1 (Internal) For Coloumn footings for type 2 (external) For Coloumn footings for type 2 (Internal) For Coloumn footings for type 3 (external) For Coloumn footings for type 3 (Internal) For Coloumn footings for type 4 (external) For Coloumn footings for type 4 (Internal) For Coloumn footings for staircase & lift For Coloumn footings for corridor extra for columns for sump Net Qty earth work excavation TOTAL EARTH WORK EXCAVATION QTY 2 1 10 2 9 2 11 3 11 3 2 1 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 8 20 4 1 1 1 2.4 1.8 1.8 1.8 2.4 1.8 1.8 1.8 1.00 1.00 1.00 1.50 17.28 51.84 64.80 58.32 307.08 cum 307.08 cum 1.8 1.8 1.00 35.64 2.4 2.4 1.00 17.28 1.8 1.8 1.00 35.64 2.4 2.4 1.00 11.52 1.8 1.8 1.00 29.16 2.4 2.4 1.00 11.52 1.8 1.8 1.00 32.40

Unit

Excavation in rock by way of benching ,chiselling, wedging, and Boring in fourndation, grade levelling including all lead and lift charges and disposal of rock from the site as directed by the department.( A rate of Rs.164.90 per Cum For Coloumn footings for type 1 (External) For Coloumn footings for type 1 (Internal) For Coloumn footings for type 2 (external) For Coloumn footings for type 2 (Internal) For Coloumn footings for type 3 (external) For Coloumn footings for type 3 (Internal) For Coloumn footings for type 4 (external) For Coloumn footings for type 4 (Internal) For Coloumn footings for staircase & lift For Coloumn footings for corridor 1 10 2 9 2 11 3 11 3 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 8 20 1 1 2.4 1.8 1.8 2.4 1.8 0.30 0.30 5.18 15.55 1.8 1.8 0.30 10.69 2.4 2.4 0.30 5.18 1.8 1.8 0.30 10.69 2.4 2.4 0.30 3.46 1.8 1.8 0.30 8.75 2.4 2.4 0.30 3.46 1.8 1.8 0.30 9.72

1.8 0.30 19.44 Total 92.12 cum 3 Drilling of 25mm dia and 800 mm deep in hard rock or sheet rock by pneumatic grouting and placing of 16 mm dia Tor steel bars and grouting holes with slurry excluding cost of steel and its fabrication charges but including cost and conveyance of al For block DI External columns 41 49 1 1 1 0.8 1607.20 internal columns 10 81 1 1 1 0.8 648.00 2255.20 Rmt Net Quantity: Total 4 Providing and laying VCC M20 in foundations, machine foundations, footings and bases of columns and under floors including the cost of centering and shuttering for Column footings levelling course External columns internal columns 41 10 1 1 1 1 1.8 2.4 1.8 2.4 0.15 0.15 19.926 8.64 28.566

Page 42 of 81

Agmt Nos item Description Length Breadth depth Quantity no 5 Providing and laying cement concrete 1:5:10 (1 cement :5 coarse sand :10 graded stone aggregate 40 mm. nominal size) mm. ) in basement under floors Type 1 Stilt floor Deduct for beam portions (63.55+65.47) Deduct fo columns Type 2 Stilt floor 1 -1 -1 9 9 9 9 4 4 4 4 2 2 2 2 2 2 2 2 2 1 1 1 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 1 2 1 1 12 1 -3 -1 -1 1 -1 -2 -2 1 -2 -2 -1 -1 -1 -1 -1 -12 1 1 1 1 -8 11.7 68.18 0.45 8.22 8.32 3.5 4.9 9.08 3.2 3.96 1.47 10.8 11.1 8.145 4.495 3.92 2.85 4.045 2.665 0.45 39.27 19.87 5.86 5.14 0.45 9.26 0.23 0.23 8.32 0.23 0.23 0.23 8.27 0.23 0.23 0.23 8.325 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 1.80 1.80 3.99 3.38 0.23 0.1 10.83

Unit

0.1 -1.57 0.1 -0.12 0.1 61.55 0.1 -5.17 0.1 -0.72 0.1 -1.01 0.1 30.04 Type 3 Stilt floor 0.1 -0.29 0.1 -0.73 0.1 -0.27 0.1 17.98 Type 4 Stilt floor 0.1 -1.02 0.1 -0.75 0.1 -0.21 0.1 -0.18 0.1 -0.13 0.1 -0.19 0.1 -0.12 Deduct for columns 0.1 -0.25 Corridor longitudinal 0.1 14.14 Corridor longitudinal 0.1 7.15 lift and staircase 0.1 4.68 for sump 0.15 7.82 Cum Deduct columns 0.1 -0.17 Total qty 133.63 Cum 6 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational footings BLOCK No. DI External columns Internal columns for sump LIFT

63.099 27.36 6.51495 1.2769 98.25 cum VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all 7 operational BLOCK No. DI FOR PEDESTALS External columns 41 1 1 0.75 0.75 0.45 10.38 Internal columns 10 1 1 0.75 0.75 0.45 2.53 12.91 cum 10 Columns upto plinth beam External columns Internal columns for side walls of sump for side walls of lift 8 FOR PLINTHBEAM TYPE 1 all round TYPE 2 all round internal beams 41 10 3 2 1 1 1 1 1 1 1 1 0.300 0.300 18.60 9.04 0.45 0.45 0.175 0.175 0.625 0.625 2 1.5 Total qty 3.46 0.84 19.53 4.75 28.58 cum

41 10 3 2

1 1 1 1

1 1 1 1

1.8 2.4 5.14 2.26

1.8 2.4 3.38 2.26

0.475 0.475 0.125 0.125

1 9 9 9 9 4 4 4 4 4 2 2 2 2 2 2 2

1 2 3 1 1 2 4 1 2 2 2 2 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

68.18 8.680 8.320 5.000 3.500 9.540 8.270 3.200 3.960 1.470 11.100 8.165 4.495 3.920 2.850 4.045 2.665

0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3

4.70 10.78 15.50 3.11 2.17 5.27 9.13 0.88 2.19 0.81 3.06 2.25 0.62 0.54 0.39 0.56 0.37

Type 3

Type 4

Page 43 of 81

Agmt item no

Description Corridor Connecting beams Corridor longitudinal Corridor crosswards inbetween blocks around lift 1 1 1 1 1 1

Nos 36 2 2 12 4 2 1 1 1 1 1 1

Length 1.800 39.270 19.870 2.000 1.800 8.120

Breadth 0.23 0.23 0.23 0.23 0.23 0.23

depth 0.3 0.3 0.3 0.3 0.3 0.3 Total qty

Quantity 4.47 5.42 2.74 1.66 0.50 1.12 78.24 cum

Unit

9 COLUMNS FOR GROUND FLOOR Type 1 columns Type 2 Type 3 Type 4 Corridor columns Coloumns for staircase & lift First floor Second floor Third floor Fourth floor Fifth floor COLUMNS FOR SIXTH FLOOR Staircase and lift columns COLUMNS FOR Seventh floor Lift columns

1 9 4 2 20 2

12 11 14 14 1 8

1 1 1 1 1 1

0.3 0.3 0.3 0.3 0.3 0.3

0.45 0.45 0.45 0.45 0.45 0.45

2.655 2.655 2.655 2.655 2.655 2.655 Total qty

4.30 35.48 20.07 10.04 7.17 5.73 82.80 82.80 82.80 82.80 82.80 82.80

cum cum cum cum cum cum

0.3

0.45 Total qty

2.5

5.40 5.40 cum

2.5 2.70 2.70 cum Total qty Filling in trenches, sides of foundations, basements etc., with carted earth with a lead of 12km in layers not exceeding 15cms thick consolidating each deposited layer by watering and ramming including c/c of earth, water to workspot 11 Up to bottom of plinth beam item no 1+2 Deduct for useful earth qty Deduct footings qty Deduct pedestals qty Deduct plinth beam qty Deduct cols up to PB qty Total qty 10 ROOF BEAMS GROUND FLOOR TYPE 1 Verticle Horizontal TYPE 2 all round internal beams 399.20 -98.25 -12.91 -78.24 -28.58 181.22 Cum

0.3

0.45

1 1

1 1

3 4

12 9.1

0.23 0.23

0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 Total qty

3.15 3.18

Type 3

Type 4

Corridor Connecting beams Corridor longitudinal Corridor crosswards inbetween blocks around lift GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR

9 9 9 9 4 4 4 4 4 2 2 2 2 2 2 2 1 1 1 1 1 1

2 3 1 1 2 4 1 2 2 2 2 1 1 1 1 1 20 2 2 12 4 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

8.680 8.320 5.000 3.500 9.540 8.270 3.200 3.960 1.470 11.100 8.165 4.495 3.920 2.850 4.045 2.665 1.800 39.270 19.870 2.000 1.800 8.120

0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

13.66 19.63 3.93 2.75 6.67 11.56 1.12 2.77 1.03 3.88 2.85 0.79 0.69 0.50 0.71 0.47 3.15 6.86 3.47 2.10 0.63 1.42 96.96 43.55 43.55 43.55 43.55 43.55 43.55

cum cum cum cum cum cum cum cum

Page 44 of 81

Agmt item no

Description SIXTH FLOOR For stair case For lift alround Seventh floor For lift alround

Nos

Length

Breadth

depth

Quantity

Unit

2 2 2

2 2 1

1 1 1

5.715 3.570 8.120

0.23 0.23 0.23

0.38 0.38 0.38 Total qty 0.38 Total qty

2.00 1.25 1.42 4.67 cum 1.42 1.42 cum

8.120

0.23

11 ROOFSLAB for Ground Floor For Type 1 For Type 2 For Type 3 For Type 4 Corridor longitudinal Corridor longitudinal waist slab midlanding slab midlanding slab top slab for sump ROOFSLAB for Ground Floor ROOFSLAB for First Floor ROOFSLAB for Second Floor ROOFSLAB for third Floor ROOFSLAB for Fourth Floor ROOFSLAB for Fifth Floor ROOFSLAB for Sixth Floor Seventh fstair case head room ROOFSLAB for Seventh Floor Lift slab

1 9 4 2 2 2 2 2 2 3

1 1 1 1 1 1 3 1 1 1

1 1 1 1 1 1 1 1 1 1

9.56 8.68 9.54 11.20 39.27 19.87 2.400 1.595 1.565 5.14

12 8.68 8.73 8.625 1.80 1.80 1.23 1.71 1.71 3.38

0.115 0.115 0.115 0.115 0.115 0.115 0.15 0.115 0.115 0.15 Total qty

13.19 77.98

16.26 2.66 0.63 0.62 7.82 110.71 94.23 94.23 94.23 94.23 94.23 94.23

cum cum cum cum cum cum cum

2 2

1 1

1 1

5.72 2.26

4.305 2.26

0.15 0.115

3.69 Cum 1.17 Cum

12 Lintels and Bressmers for FF over D over D1 over D2 Over sliding door over W over W 1 over lift Lintels for FIRST FLOOR Lintels for SECOND FLOOR Lintels for THIRD FLOOR Lintels for FOURTH FLOOR Lintels for FIFTH FLOOR LINTELS FOR SEVENTH FLOOR over lift Bed blocks for FF For D For D1 For D2 For SF For TF For FF For Fifth F For Seventh F 13 Chejjas over Windows FOR FF Chejjas over Windows W Chejjas over Windows W1 Chejjas over Windows FOR SECOND FLOOR Chejjas over Windows FOR THIRD FLOOR Chejjas over Windows FOR FOURTH FLOOR Chejjas over Windows FOR FIFTH FLOOR

16 43 29 16 50 14 2

1 1 1 1 1 1 1

1 1 1 1 1 1 1

1.370 1.220 1.070 2.100 1.220 0.910 1.070

0.15 0.1 0.1 0.1 0.1 0.1 0.15

0.1 0.1 0.1 0.15 0.1 0.1 0.1 Total qty

0.33 0.52 0.31 0.50 0.61 0.13 0.03 2.44 2.44 2.44 2.44 2.44

cum cum cum cum cum

2 16 43 29

1 6 6 6

1 1 1 1

1.07 0.150 1.500 1.500

0.15 0.14 0.1 0.1

0.10 0.1 0.1 0.1 Total qty

0.03 cum 0.20 3.87 2.61 6.68 7.12 7.12 7.12 7.12 0.05

15 50 14

1 1 1

1 1 1

0.150 1.220 1.220

0.23 0.46 0.46 Total qty

0.1

Cum Cum Cum Cum Cum Cum

61.00 17.08 78.08 SQM 70.76 SQM 70.76 SQM 70.76 SQM 70.76 SQM

Page 45 of 81

Agmt item no

Description

Nos

Length

Breadth

depth

Quantity

Unit

14

Racks and lofts Ground Floor FLOOR RCC M20 grade mix (Design Mix as per SS) with stone aggregate of 20mm and 12mm size mechanically mixed etc, necessary reinforcement including cost and conveyance of all materials and water to work site seignorage and all operational, incidential labour charges such as centering (steel Centering) mixing concrete, laying, lift charges, curing, etc., complete for finished item of work as per standard specification but excluding cost on steel reinforcement and its fabrication charges etc complete for finished item of work to the required strength as directed by department for 60 mm thick to 40 mm thick at free end, plastering 12mm thick in CM(1:4) Prop. For all exposed faces (Bottom & Sides) etc. Type 1 FF Lofts in kitchen kitchen platform two sides Deduct for sink master bed bed 1 Type 2 Lofts in kitchen kitchen platform two sides Deduct for sink master bed bed 1 Type 3 Lofts in kitchen kitchen platform two sides Deduct for sink master bed bed 1 Type 4 Lofts in kitchen kitchen platform two sides Deduct for sink master bed bed 1 FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2.200 4.250 0.520 3.400 3.200 0.45 0.65 0.4 0.6 0.6 0.99 2.76 -0.21 2.04 1.92

8 8 8 8 8 4 4 4 4 4 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2.550 4.150 0.520 3.500 3.200 2.550 4.150 0.520 3.500 3.200 2.550 4.150 0.520 3.500 3.200

0.45 0.65 0.4 0.6 0.6 0.45 0.65 0.4 0.6 0.6 0.45 0.65 0.4 0.6 0.6 Total qty

9.18 21.58 -1.66 16.80 15.36 4.59 10.79 -0.83 8.40 7.68 2.30 5.40 -0.42 4.20 3.84 114.70 Sqm 114.70 114.70 114.70 114.70 114.70

15 Kitchen Shelves Type 1 kitchen Shelves horizontal kitchen Shelves horizontal kitchen Shelves verticals Master bed horizontal Master bed verticals bed 1 bed 1 Type 2 kitchen Shelves horizontal kitchen Shelves horizontal kitchen Shelves verticals Master bed horizontal Master bed verticals bed 1 bed 1 Type 3 kitchen Shelves horizontal kitchen Shelves horizontal kitchen Shelves verticals Master bed horizontal Master bed verticals bed 1 bed 1 Type 4 kitchen Shelves horizontal kitchen Shelves horizontal kitchen Shelves verticals Master bed horizontal Master bed verticals bed 1

1 1 1 1 1 1 1

1 2 2 2 2 2 2

1 1 1 2 1 1 1

2.200 1.550 1.500 1.280 1.980 2.050 1.980

0.32 0.32 0.32 0.53 0.53 0.53 0.53

0.70 0.99 0.96 2.71 2.10 2.17 2.10 11.74 Sqm 6.14 8.96 7.68 16.96 16.79 20.35 16.79 93.68 Sqm 3.07 4.48 3.84 8.48 8.40 10.18 8.40 46.84 Sqm 1.54 2.24 1.92 4.24 4.20 5.09

8 8 8 8 8 8 8

1 2 2 2 2 2 2

1 1 1 1 1 2 1

2.400 1.750 1.500 2.000 1.980 1.200 1.980

0.32 0.32 0.32 0.53 0.53 0.53 0.53

4 4 4 4 4 4 4

1 2 2 2 2 2 2

1 1 1 1 1 2 1

2.400 1.750 1.500 2.000 1.980 1.200 1.980

0.32 0.32 0.32 0.53 0.53 0.53 0.53

2 2 2 2 2 2

1 2 2 2 2 2

1 1 1 1 1 2

2.400 1.750 1.500 2.000 1.980 1.200

0.32 0.32 0.32 0.53 0.53 0.53

Page 46 of 81

Agmt item no bed 1

Description 2

Nos 2 1

Length

Breadth

depth

Quantity

Unit

1.980 0.53

4.20 23.42 Sqm 175.67 175.67 175.67 175.67 175.67 175.67 878.37

FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR TOTAL QTY FOR 5 FLOORS

for first floor

16

Masonary in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size 290x225x140mm(made up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including cost and conveyance of all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall. Ground floor Lift room alaround staircase sidewall First floor for type 1 Long wall cross wall deduct for door D deduct for windows w1 deduct for windows w2 deduct for windows v deduct for kitchen window Parapet wall for type 2 Long wall sw deduct for door D deduct for windows w deduct for windows w1 sitout wall utility wall Sliding door for type 3 Long wall sw deduct for door D deduct for windows w deduct for windows w1 deduct for ventilators v for type 4 Long wall sw deduct for door D deduct for windows w deduct for windows w1 BM for First floor BM for Second floor BM for Third floor BM for Fourth floor BM for Fifth floor BM for Sixth floor at lift room allaround staircase sidewall Parapet wall BM for seventh floor at lift room allaround Parapet wall 1 1 1 1 1 1 1 1 9 9 9 9 9 9 9 9 4 4 4 4 4 4 2 2 2 2 2 2 2 1 -3 -1 -4 -1 1 2 2 -1 -3 -1 -1 -1 -1 2 2 -1 -3 -1 -2 2 2 -1 -5 -1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 12.000 8.980 1.050 0.900 0.750 0.600 0.750 59.140 8.680 8.400 1.060 0.910 0.910 3.000 2.150 2.850 9.540 8.450 1.060 0.910 0.910 0.600 10.670 8.465 1.060 0.910 0.910 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 2.655 2.655 1.98 1.22 1.22 0.45 1.22 1 2.655 2.655 1.98 1.22 0.75 2.655 2.655 1.98 2.655 2.655 1.98 1.22 0.75 0.45 2.655 2.655 1.98 1.22 0.75 Total qty 9.56 7.15 -0.31 0.49 0.14 0.16 0.14 17.74 62.22 60.22 2.83 4.50 0.92 10.75 -7.71 -7.62 30.39 26.92 1.26 2.00 0.41 0.32 17.00 13.48 0.63 1.67 0.20 255.48 255.48 255.48 255.48 255.48 255.48 2 2 1 1 1 1 8.12 12.04 0.23 0.23 2.85 2.655 10.65 14.70 25.35

cum Cum Cum Cum Cum Cum

2 2 2

1 1 1

1 1 1

8.12 9.29 9.29

0.23 0.23 0.23

2.85 2.655 1 Total qty 2.5 1 Total qty

10.64532 11.345877 4.2734 26.26 Cum 9.338 4.1952 13.53 Cum

2 2

1 1

1 1

8.12 9.12

0.23 0.23

GROUND FLOOR Masonary in CM(1:6)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size 290x225x100mm(made up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including cost and conveyance of all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall. 17 Type 1 cw in middle of the flat wall between toilet master bed & bed 1 1 1 1 2 3 8.96 11.40 0.1 0.1 2.655 2.655 4.76 9.08

Page 47 of 81

Agmt item no

Description CW master bed bed deduct for door D1 deduct for door D2 Opening Type 2 cw in middle of the flat wall between toilet master bed & bed in between toilet and children bed between toilet kitchen and utility inbetween drawing and master bed Type 3 cw in middle of the flat cw CW deduct for door D1 deduct for door D2 Type 4 wall between dining and drawing 1 1 1 1 1

Nos 1 1 -4 -3 -1 1 1 1 1 1

Length 2.52 2.76 0.91 0.75 0.75

Breadth 0.1 0.1 0.1 0.1 0.1

depth 2.655 2.655 1.98 1.98 1.98

Quantity

Unit

0.67 0.73 0.72 0.45 0.15 16.55 Cum 20.07 23.42 14.34 10.51 8.12 76.46 Cum 12.34 17.95 3.56 1.44 1.19 36.48 Cum 4.62 1.56 1.42 4.30 1.01 0.74 3.91 0.64 1.44 0.89 0.16 20.68 7.85 1.99 0.72 1.60 57.52 69.68 219.85 219.85 219.85 219.85 219.85 219.85 219.85

9 9 9 9 9

1 2 2 2 1

1 1 1 1 1

8.40 4.90 3.00 2.20 3.40

0.1 0.1 0.1 0.1 0.1

2.655 2.655 2.655 2.655 2.655

4 4 4 4 4

2 2 1 -2 -2

1 1 1 1 1

5.81 8.45 3.35 0.91 0.75

0.1 0.1 0.1 0.1 0.1

2.655 2.655 2.655 1.98 1.98

deduct for door D1 deduct for door D2 deduct for ventilators parapet all along corridor cw corridor inbetweenblocks brick filling for bath rooms

2 2 2 2 2 2 2 2 2 2 2 2 1 4 8 165

1 1 1 2 1 1 1 1 -4 -3 -3 1 1 1 1 1

2 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1

4.35 2.93 2.67 4.05 1.90 1.40 3.68 1.20 0.91 0.75 0.60 39.270 19.870 1.800 2.000 1.400

0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 2.49

2.655 2.655 2.655 2.655 2.655 2.655 2.655 2.655 1.98 1.98 0.45 1 1 1 1 0.1

Cum

Total qty BM for First floor BM for Second floor BM for Third floor BM for Fourth floor BM for Fifth floor BM for SIXTH floor FOR paraet wall type1 parapet wall all round type2 paraper wall type3 paraper wall type4 paraper wall staircase head room staircase room ceiling corridor wallallaround

Cum Cum Cum Cum Cum Cum Cum

1 1 1 1 1 1 1

1 8 4 2 2 2 1

1 1 1 1 1 1 1

42.640 34.320 36.140 39.200 13.585 5.435 111.000

0.1 0.1 0.1 0.1 0.1 0.1 0.1

1 1 1 1 2.68 3.895 1

4.26 27.46 14.46 7.84 7.28 4.23 11.10 76.63

18

Ground floor steps PCC M-20 Grade mix with stone aggregate of 20 mm & 12mm size mechanically mixed including cost and conveyance of all materials and water to work site, seignorage fee and all opertational ,incidential,labour charges such as centering from work, steel centering,mixing concrete, laying, lift charges ,vibrating,curing etc complete for finished item of work as per Standard Specification etc complete for finished item of work to the required strength as directed by department for steps. For staircase steps Groun floor first floor second floor third floor fourth floor fifth floor sixth floor 2 2 2 2 2 2 2 0.5 0.5 0.5 0.5 0.5 0.5 0.5 20 20 20 20 20 20 20 1.500 1.500 1.500 1.500 1.500 1.500 1.500 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.15 0.15 0.15 0.15 0.15 0.15 0.15 1.35 1.35 1.35 1.35 1.35 1.35 1.35 Cum Cum Cum Cum Cum Cum Cum

Page 48 of 81

Agmt item no

Description

Nos

Length

Breadth

depth

Quantity

Unit

19

Plastering 12mm thick in 2 coats with a base coat of 8mm thick in CM (1:6) prop and top coat 4mm thick in CM(1:4)prop with dubara sponge finishing including cost and conveyance of all materials seignorage and water to work site and all operational ,incidential labour charges such as scaffolding, mixing, motor , lift charges, curing etc. complete for finished item of work as per SS No. 901, 904 for internal walls Type 1 GROUND floor Columns all around Beams B1 to B9 two sides ceiling Type 2 Stilt floor Columns all around Beams B1 to B8 two sides 1 1 1 1 12 3 4 1 1 1 1 1 1.50 12.00 9.10 12.00 2.655 0.38 0.38 9.10 47.79 13.68 13.83 109.20 184.50 Sqm

ceiling Type3 Stilt floor Columns all around Beams B1 to B8 two sides

9 9 9 9 9 9

11 2 3 1 1 1

1 1 1 1 1 1

1.500 8.680 8.320 3.500 5.000 8.680

2.66 0.38 0.38 0.38 0.38 9.32

394.27 59.37 85.36 11.97 17.10 728.08 1296.15 Sqm

ceiling Type 4 Stilt floor Columns all around Beams B1 to B8 two sides

4 4 4 4 4 4 4

14 2 4 1 2 2 1

1 1 1 1 1 1 1

1.500 9.540 8.270 3.200 3.960 1.470 8.270

2.66 0.38 0.38 0.38 0.38 8.68 9.54

223.02 29.00 50.28 4.86 12.04 102.08 315.58 736.87 Sqm

ceiling waist slab midlanding slab bottom of corridor

2 2 2 2 2 2 2 2 2 2 2 2 2 2

14 2 2 1 1 1 1 1 1 3 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1

1.500 11.100 8.165 4.498 3.920 2.850 4.045 2.665 11.100 2.400 1.595 1.565 39.27 19.87 1.23 1.23 1.23 1.80 1.80

2.66 0.38 0.38 0.38 0.38 8.68 8.68 8.68 8.17

111.51 16.87 12.41 3.42 2.98 49.48 70.22 46.26 181.26 494.42 Sqm 17.71 3.92 141.37 71.53 234.54 Sqm

Total qty FIRST FLOOR Type 1 master bed alaround master bed ceiling bed room 1 bed room 1 ceiling bed room 2 bed room 1 ceiling drawing alround drawing ceiling kitchen kitchen ceiling sitout sitout ceiling utility three sides utility ceiling Master bed toilet Master bed toilet bed1 toilet ceiling bed2 toilet ceiling pooja and store

2946.47 Sqm.

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

15.150 4.295 13.760 3.075 14.350 3.805 22.170 7.685 12.340 3.245 7.020 3.300 4.925 2.925 11.390 4.295 10.260 1.325 10.190 3.805 9.200

3.035 3.28 3.035 3.805 3.035 3.37 3.035 3.4 3.035 2.925 3.035 1.875 3.035 1.1 1.4 3.805 3.035 1.29 3.035 3.035 3.035 3.035

45.98 14.09 41.76 11.70 43.55 12.82 67.29 26.13 37.45 9.49 21.31 6.19 14.95 3.22 34.57 13.04 31.14 5.04 30.93 4.91 27.92

Page 49 of 81

Agmt item no ceiling

Description 1 1

Nos 1 14 1 1

Length 3.245 0.750

Breadth 1.355

depth

Quantity 4.40 -20.79 487.07 387.87 113.22 349.63 91.80 437.04 140.76 357.83 95.85 254.03 48.51 211.96 67.74 196.67 27.72 0.00 36.45 16.83 0.00 -48.65 -26.73 -4.86 -35.84 -59.74 -11.95 11.95 2717.83 178.70 53.43 176.03 52.26 189.38 59.63 181.13 53.52 2.18 127.71 26.54 69.81 16.47 50.99 8.80 103.43 31.56 87.41 12.80 -14.41 -11.88 -2.16 1455.49 96.82 31.54 80.49 21.78 73.99 18.57 77.33 20.29 84.13 23.92 64.34 14.06 57.06 9.43 52.20 6.60 50.14 17.79 40.06 5.32

Unit

1.98

Type 2 master bed alaround master bed ceiling bed room 1 bed room 1 ceiling drawing alround drawing ceiling dining alround dining ceiling kitchen kitchen ceiling master bed toilet ceiling childrenbed toilet ceiling Sitout alround Sitout ceiling Utility ceiling Utility alround deductions D1 D2 ventilators openings openings openings Extra at washbasin Type 3 master bed alaround master bed ceiling bed room 1 bed room 1 ceiling drawing alround drawing ceiling dining alround dining ceiling dining ceiling kitchen kitchen ceiling sitout sitout ceiling utility three sides utility ceiling master bed toilet ceiling childrenbed toilet ceiling deductions D1 D2 ventilators Type 4 master bed alaround master bed ceiling bed room 1 bed room 1 ceiling bed room 2. bed room 1 ceiling drawing alround drawing ceiling dining alround dining ceiling kitchen kitchen ceiling sitout sitout ceiling utility three sides utility ceiling master bed toilet ceiling childrenbed toilet ceiling

9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 -3 -2 -2 -1 -1 -1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

14.200 3.700 12.800 3.400 16.000 4.600 13.100 3.550 9.300 2.450 7.760 2.480 7.200 2.200 8.700 3.000 2.200 6.100 0.910 0.750 0.600 1.500 2.500 0.500 0.500

3.035 3.4 3.035 3 3.035 3.4 3.035 3 3.035 2.2 1.4 1.4 3.035 1.35 0.85 3.035 1.98 1.98 0.45 2.655 2.655 2.655 2.655 3.035 3.035 3.035

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

14.720 4.110 14.500 3.900 15.600 4.450 14.920 4.460 1.600 10.520 3.160 5.750 1.350 4.200 2.200 8.520 2.600 7.200 2.000 0.910 0.750 0.600

3.035 3.25 3.035 3.35 3.035 3.35 3.035 3 0.34 3.035 2.1 3.035 3.05 3.035 1 1.6 1.6 1.98 1.98 0.45 3.035 3.035 3.035

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

15.950 4.350 13.260 3.630 12.190 3.000 12.740 3.195 13.860 3.680 10.600 3.300 9.400 3.250 8.600 3.300 8.260 2.930 6.600 1.400

3.035 3.625 3.035 3 3.035 3.095 3.035 3.175 3.035 3.25 3.035 2.13 3.035 1.45 3.035 1 1.2 1.9 3.035 3.035 3.035

Page 50 of 81

Agmt item no

Description childrenbed toilet ceiling deductions D1 D2 ventilators lift and staircase lift internal 2 2 2 2 2 1 1

Nos 1 1 4 3 3 1 2 1 1 1 1 1 1 1

Length 8.680 3.095 0.910 0.750 0.600 19.870 7.200

Breadth

depth 3.035

Quantity 52.69 7.71 -14.41 -8.91 -1.62 62.59 45.36 989.25 5649.64 5649.64 5649.64 5649.64 5649.64 5649.64 46.90 37.75 39.75 43.12 72.82 21.17 122.10 383.61 24.64 3.24 27.88

Unit

1.245 1.98 1.98 0.45 3.15 3.15

Total qty first floor second floor third floor fourth floor fifth floor sixth floor type1 parapet wall all round type2 paraper wall type3 paraper wall type4 paraper wall staircase head room staircase room ceiling corridor wallallaround Seventh floor lift room all around lift room ceiling

Sqm Sqm Sqm Sqm Sqm Sqm

1 1 1 1 1 1 1

1 1 1 1 2 2 1

1 1 1 1 1 1 1

42.640 34.320 36.140 39.200 13.585 5.435 111.000

1.1 1.1 1.1 1.1 2.68 3.895 1.1

1 1

1 1

1 1

8.120 1.800

3.035 1.8

Plastering 12mm thick in 2 coats with a base coat of 8mm thick in CM (1:6) prop and top coat 4mm thick in CM(1:4)prop with dubara sponge finishing including cost and conveyance of all materials seignorage and water to work site and all operational ,incidential labour charges such as scaffolding, mixing, motor , lift charges, curing etc. complete for finished item of work as per SS No. 901, 904 for external walls 20 type 1 long walls sw door D W1 W2 V 1 1 1 1 1 1 2 2 1 3 1 4 1 1 1 1 1 1 12.000 9.560 1.050 0.910 0.750 0.600 3.15 3.15 1.98 0.75 0.75 0.45 75.60 60.23 -2.08 -2.05 -0.56 -1.08 130.06

type 2 all around deductions door D W W1 V

9 9 9 9 9 9

4 1 3 1 2 2

1 1 1 1 1 1

8.680 1.060 0.910 0.910 0.850 0.600

3.15 1.98 1.22 0.75 3.04 0.45

984.312 -18.8892 -29.9754 -6.1425 -46.512 -4.86 877.93 Sqm 240.41 220.00 -8.40 -13.32 -2.73 -2.16 433.80 139.86 108.68 -4.20 -11.10 -1.37 -14.59 -1.62 34.02 249.68 1691.47 1691.47 1691.47 1691.47 Sqm Sqm Sqm Sqm

type 3 long walls sw door D W W1 V type 4 long walls sw door D W W1 V lift and staircase

4 4 4 4 4 4

2 2 1 3 1 2

1 1 1 1 1 1

9.540 8.730 1.060 0.910 0.910 0.600

3.15 3.15 1.98 1.22 0.75 0.45

2 2 2 2 2 2 2 1

2 2 1 5 1 2 3 1

1 1 1 1 1 1 1 1

11.100 8.625 1.060 0.910 0.910 1.200 0.600 10.800

3.15 3.15 1.98 1.22 0.75 3.04 0.45 3.15

Total qty first floor second floor third floor Page 51 of 81

Agmt item no

Description fourth floor fifth floor sixth floor type1 parapet wall all round type2 paraper wall type3 paraper wall type4 paraper wall lift and staircase staircase room ceiling corridor wallallaround

Nos

Length

Breadth

depth

Quantity

Unit

1691.47 Sqm 1691.47 Sqm 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 59.450 34.800 36.620 39.450 10.800 5.860 118.280 1.1 1.1 1.1 1.1 3.15 3.99 1 65.40 38.28 40.28 43.40 34.02 23.38 118.28 363.03 Sqm

cost supply and fixing of Teak Wood Door of size 1.06 X 1.98 m including all 21 labour charges 5 16 1 80 Nos

22

Door of size 3-0 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. 215 Nos Door of size 2-6 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. Balcony for machine room 0 2 0 Nos 2 Nos 2 Nos

23

24

Door of size 2-6 x 6-6 Supply and door frame made of hollow extruded PVC section (Nandi or equivalent) having dimensions of 40 x57mm with the wall thickness of 2mm +/- 0.2 mm duly reinforced with seasoned woood plank at the hinges side the door frame top 2 corners shall be metricut/weilded. with door shutters made of rigid PVC extruded hollow section (Nandi Attached toilet 165 Nos Sliding Door of size 6-0 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. at sitout 5 16 1 80 nos

24

25

NCL WINDOE OF SIZE 3-0 x 4-0 Providing and fixing windows made of prepainted steel (base steel as per IS 513 of 0.60 mm thick galvonised as per IS 277 with zinc of 150 GSM) 250 Nos

26

NCL WINDOE OF SIZE 3-0 x 2-6 Providing and fixing windows made of prepainted steel (base steel as per IS 513 of 0.60 mm thick galvonised as per IS 277 with zinc of 150 GSM) Kitchen window Manufacturing & supply of 2'-0" x 1"-6" steel ventilator including cost of steel & glass 70 Nos

27

Attached toilet 28

170 Nos

Ground floor Flooring with Grananalothic concrete Flooring 50 mm thick with CC 1:1:2 prop. Using 6mm to 12 mm size (SSS) grade hard granite stone mesigne crushed metal laid Granalothically over an existing bed of CC 1:5:10 Prop. 10 cm thic. CC slab laib in alternate panels of size not exceeding 1.5X1.5m and finishing the top surface to required smooth ness and slopes including cost and conveyance of all meterials and all operational incidental and seinarage charges and mixing concrete, laying, curing etc. complete for finisheditemof work.(APSS NO:701and 707 ) Type 1 Type 2 Type 3 Type 4 staircase room Corridor Deduction for lifts Deduction for Columns 1 9 4 2 2 1 1 1 1 1 1 1 1 1 2 2 -2 195 1 1 1 1 1 1 1 1 1 12 8.68 9.54 11.2 5.86 39.27 19.87 2.26 0.3 9.56 8.68 8.73 8.625 3.99 1.8 1.8 2.26 0.45 114.72 678.0816 333.1368 193.2 46.7628 141.372 71.532 -10.2152 -26.325 1542.265

Sqm

Page 52 of 81

Agmt Nos item Description Length Breadth depth Quantity no 29 Flooring with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastring in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. complete for finished item In rooms flooring with 8.3mm thk ceramic tiles of size(400 x 400mm) with 1" thk mortar in CN(1:6) prop Type 1 First floor qty Master bed 1 1 1 4.30 3.28 14.09 bed 1 1 1 1 3.075 3.805 11.70 bed 2 1 1 1 3.37 3.805 12.82 drawing and dining 1 1 1 7.685 3.4 26.13 kitchen 1 1 1 3.245 2.925 9.49 74.23 Type 2 First floor qty Master bed 9 1 1 3.75 3.4 114.75 bed 1 9 1 1 3.4 3 91.80 drawing 9 1 1 3.4 4.6 140.76 dining 9 1 1 3 3.55 95.85 kitchen 9 1 1 2.45 2.2 48.51 376.92 Type 3 First floor qty Master bed 4 1 1 4.11 3.25 53.43 bed 1 4 1 1 3.9 3.35 52.26 drawing 4 1 1 4.45 3.35 59.63 dining 4 1 1 4.46 3 53.52 kitchen 4 1 1 3.16 2.1 26.54 extra 4 1 1 0.34 1.6 2.18 194.13 Type 4 First floor qty Master bed 2 1 1 4.35 3.625 31.54 bed 1 2 1 1 3.63 3 21.78 bed 2 2 1 1 3.68 3.25 23.92 drawing 2 1 1 3.095 3 18.57 dining 2 1 1 3.195 3.175 20.29 kitchen 2 1 1 3.3 2.13 14.06 utility 2 1 1 3.3 1 6.60 sitout 2 1 1 3.25 1.45 9.43 114.64 First floor Second floor Third floor fourth floor fifth floor 30 Total Quantity

Unit

Sqm

Sqm

Sqm

Sqm

759.92 Sqm Sqm Sqm Sqm Sqm

759.92 759.92 759.92 759.92 759.92 Flooring with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastring in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. complete for finished item In rooms flooring with 8.3mm thk ceramic tiles of size(300 x 300mm) with 1" thk mortar in CN(1:6) prop Type 1 First floor qty Master bed toilet 1 1 1 4.30 1.4 6.01 bed 1 toilet 1 1 1 3.805 1.225 4.66 bed 2 toilet 1 1 1 1.29 3.805 4.91 Pooja and store 1 1 1 4.295 1.355 5.82 21.40 Type 2 Master bed toilet 9 1 1 2.20 1.4 27.72 bed 1 toilet 9 1 1 1.4 2.48 31.25 58.97 Type 3 Master bed toilet 4 1 1 2.66 1.6 17.02 bed 1 toilet 4 1 1 2 1.6 12.80 29.82 Type 4 Master bed toilet 2 1 1 4.25 1.4 11.90 bed 1 toilet 2 1 1 3 1.4 8.40 bed 2 toilet 2 1 1 3.095 1.24 7.68 27.98 First floor Total Quantity Page 53 of 81

Sqm

Sqm

Sqm

Sqm

138.17 Sqm

Agmt item no Second floor Third floor fourth floor fifth floor 30

Description

Nos

Length

Breadth

depth

Quantity Sqm Sqm Sqm Sqm

Unit

138.17 138.17 138.17 138.17 138.17 Flooring with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastring in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. complete for finished item In rooms flooring with 8.3mm thk ceramic tiles of size(250 x 250mm) with 1" thk mortar in CN(1:6) prop Type 1 First floor qty Sitout 1 1 1 3.30 1.875 6.19 Utility 1 1 1 3.925 1.1 4.32 10.51 Type 2 Sitout 9 1 1 3.00 1.35 36.45 Utility 9 1 1 2.2 0.85 16.83 53.28 Type 3 Sitout 4 1 1 3.05 1.35 16.47 Utility 4 1 1 1.95 0.95 7.41 23.88 Type 4 Sitout 2 1 1 3.25 1.45 9.43 Utility 2 1 1 3.3 1 6.60 16.03 First floor Second floor Third floor fourth floor fifth floor Total Quantity

Sqm

Sqm

Sqm

Sqm

103.69 Sqm Sqm Sqm Sqm Sqm

30

103.69 103.69 103.69 103.69 103.69 Flooring with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastring in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. complete for finished item In rooms flooring with 8.3mm thk ceramic tiles of size(250 x 250mm) with 1" thk mortar in CN(1:6) prop for Skirting Type 1 First floor qty Bed 1 Toilet alround 1 1 1 13.76 0.1 1.38 1 1 1 10.26 0.1 1.03 1 1 1 10.19 0.1 1.02 1 1 1 14.35 0.1 1.44 Drawing and daining 1 1 1 22.17 0.1 2.22 M bed 1 1 1 15.15 0.1 1.52 Pooja and store 1 1 1 9.2 0.1 0.92 sitout 1 1 1 7.05 0.1 0.71 10.21 Type 2 Drawing 9 1 1 16.00 0.1 14.40 M bed 9 1 1 14.2 0.1 12.78 C bed 9 1 1 12.8 0.1 11.52 Dining 9 1 1 13.1 0.1 11.79 Kitchen 9 1 1 9.3 0.1 8.37 Sitout 9 1 1 8.7 0.1 7.83 Utility 9 1 1 6.1 0.1 5.49 72.18 Type 3 Kitchen 4 1 1 10.52 0.1 4.21 Dining 4 1 1 14.92 0.1 5.97 Extra 4 1 1 2.28 0.1 0.91 M bed 4 1 1 14.72 0.1 5.89 C bed 4 1 1 14.5 0.1 5.80 Drawing 4 1 1 15.6 0.1 6.24 Sitout 4 1 1 8.8 0.1 3.52 Utility 4 1 1 5.8 0.1 2.32 34.86 Type 4 Kitchen 2 1 1 10.86 0.1 2.17 Dining 2 1 1 13.86 0.1 2.77 Bed 1 2 1 1 13.26 0.1 2.65 Drawing 2 1 1 12.74 0.1 2.55 Mbed 2 1 1 15.95 0.1 3.19 Bed2 2 1 1 12.19 0.1 2.44 Page 54 of 81

Sqm

Sqm

Sqm

Agmt item no Sitout Utility

Description 2 2

Nos 1 1 1 1

Length 6.15 5.3

Breadth

depth 0.1 0.1

Quantity 1.23 1.06 18.06 Sqm 135.31 Sqm Sqm Sqm Sqm Sqm

Unit

First floor Second floor Third floor fourth floor fifth floor 30

Total Quantity

135.31 135.31 135.31 135.31 135.31 Dadooing with coluru glazed tiles 6.5mm thick of size(300 x 200 mm) 1st quality (as per manufacturers specification ) of approved make ISI CM (1:5) prop with grey cement slurry for kitchen,bathroom,balcony & lift cladding dadooing Type 1 MB T allaround Bed1 Bed2 Kitchen two sides utility three sides Type 2 MB T allaround Bed1 Kitchen two sides wash basin side Type 3 MB T allaround Bed1 Kitchen two sides wash basin side Type 4 MB T allaround Bed1 Bed2 Kitchen two sides wash basin side

1 1 1 1 1

1 1 1 1 1

1 1 1 1 1

7.80 7.05 7.18 12.34 4.295

1.98 1.98 1.98 1.22 1.22

15.44 13.95 14.21 15.05 5.23 63.88 128.30 138.28 102.11 26.35 395.04 67.47 57.02 51.33 11.71 187.53 43.16 26.13 34.37 26.49 5.85 136.00 782.45 Sqm 782.45 782.45 782.45 782.45 Sqm Sqm Sqm Sqm

9 9 9 9

1 1 1 1

1 1 1 1

7.20 7.76 9.3 2.4

1.98 1.98 1.22 1.22

4 4 4 4

1 1 1 1

1 1 1 1

8.52 7.20 10.52 2.4

1.98 1.98 1.22 1.22

2 2 2 2 2

1 1 1 1 1

1 1 1 1 1

10.90 6.60 8.68 10.86 2.4

1.98 1.98 1.98 1.22 1.22

Total Quantity second floor third floor fourth floor fifthfloor 31

Supplying and application of two coats of BIRLA WALL PUTTY super fine , one coat of BIRLA WALL PUTTY water based coment primer and twocoats of BIRLA WALL PUTTY flora ( plastic emulsion paint ) to interior faces of new walls and ceeling of approved colour as per manufacturer's specifications including cost and conveyance of all matirials to site and labour charges such as preparing the wall, applying primary coat etc. complete for finished item of work for INTERNAL WALLS AND CEILING (Total 2 coats). Quantity same as internal ceiling and plastering Ground floor 1st floor to 5 floor 6 th floor

5649.64

2946.47 28248.20 383.61 31578.29 Sqm

32

"B" -Supply and application of one coats of Altek water based cement primer and two coats of harmony (Acrylic emulsion paint exterior grade) to exterior faces of new walls and ceiling of approved colour as per manufacturer's specifications including c First floor 1691.47 Second floor 1691.47 Third floor 1691.47 Fourth floor 1691.47 Fifth floor 1691.47 Sixth floor 363.03 8820.37 Add for Chejjas Page 55 of 81

Sqm Sqm Sqm Sqm Sqm Sqm Sqm

Agmt item no

Description Chejjas over Windows Chejjas over Windows W Chejjas over Windows W1

Nos

Length

Breadth

depth

Quantity

Unit

50 16

5 5

2 2

1.220 1.220

0.46 0.46 Total qty Grand total

610.00 195.20 805.20 Sqm 9625.57 Sqm

33

Painting to new wood work and flush shutters with lappam finish , over a primary coat and painting two coats of synthetic enamel paint 1st grade of approved brand and shade (Total 3 coats) including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc. complete (APSS No.1200, 1207 & 1211) in all floors.

main door d1 d2

16 43 29

5 5 5

2.25 2.0 2.0

1.06 0.91 0.75

1.98 1.98 1.98

377.78 774.77 430.65 1583.21 Sqm

34

Supply and fixing of high polished Black granite 16 to 18 mm thick (upto 2.43 Mts length) including the rounding the exposed edges of granite slab and polished set over a base of 20mm thick C.M(1:5) prop over already for KITCHEN PLATFORM First floor TYPE 1 two sides 1 1 1 4.05 0.6 2.43 TYPE 2 two sides 9 1 1 4.05 0.6 21.87 TYPE 3 two sides 4 1 1 4.05 0.6 9.72 TYPE 4 two sides 2 1 1 4.05 0.6 4.86 add for Faces 16 1 1 3.45 0.1 5.52 add for verticql Faces 16 1 1 0.75 0.15 1.80 Total qty 46.20 second floor 46.20 third floor 46.20 fourth floor 46.20 fifthfloor 46.20 Supplying and laying of polished shabad stone of tandur blue variety of 25.40 mm thick single piece over a base of 20 mm thick in C. M (1:8) with neat cement joints to full depth including cost and conveyance of all materials and labour charges for laying, cutting seigniorage charges etc complete for tread and risers Ground floor treads Raisers Mid landing add for skirting midlanding 3 sides Ground floor quantity first floor second floor third floor fourth floor fifthfloor 2 2 1 1 10 11 1 1 1 1 1 1 1.5 1.5 3.3 6.3 0.30 0.15 1.5 0.10 9.00 4.95 4.95 0.63 19.53 19.53 19.53 19.53 19.53 19.53

Sqm Sqm Sqm Sqm Sqm Sqm

35

Sqm Sqm Sqm Sqm Sqm Sqm

36

Surface preparation by means of chipping & cleaning testing for leakage points and grouting the same with neat cement slurry and repairing of cracks and pot holes,if any with polymer repair motor and applying two coats of polymer based water proofing slurry coating.Sika top seal 107 with coverage of 3Kg per sq mtr for two coats and providing cement screed of average 50mm thick with smooth finish,and continuing the same upto height of 300mm all along the parapet wall and other adjoining walls in form of vatta Type 1 terrace Type 2 terrace Type 3 terrace Type 4 terrace Corridor portion Corridor portion Staircase portion Lift portion 110.16 650.25 320.11 183.67 141.37 71.53 19.44 6.48 Total qty 1503.02 Lift cladding with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastering in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. ceramic tiles of size(300 x 300mm) with 1" thk mortar in CM(1:6) prop Lift cladding Ground floor Total front face up to beam Deduct opening 1 9 4 2 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 11.80 8.50 9.36 10.90 39.27 19.87 5.4 1.8 9.34 8.50 8.55 8.43 1.80 1.80 1.8 1.8

Sqm

37

2 -2

1 1

4 2

2.26 0.7

2.82 2.00

50.99 -5.60

Page 56 of 81

Agmt item no

Description Side faces Top face Deduct Switch portion 2 2 -2

Nos 2 1 2 2 2 2

Length 0.3 0.7 0.28

Breadth 2.00 0.30 0.08

depth

Quantity 4.80 0.84 -0.18 50.85 Sqm

Unit

38

First floor to fifth floor Total front face up to beam 1 1 1.93 2.62 5.06 2 Deduct opening -1 1 0.71 2.00 -1.42 2 Side faces 1 2 0.29 2.00 1.16 2 Top face 1 1 0.71 0.29 0.21 2 Deduct Switch portion -1 2 0.28 0.08 -0.04 2 For Each floor 4.96 Sqm For Five floors 24.79 Sqm 75.63 Sqm Total for GF+5floors Impervious coat 20mm thick average over roof slab with CM(1:4) prop. Mixed with approved water proofing compound at the rate of 1.0 kg per bag of cement (50 kgs) and laid when the slab is green with thread lining at 1-6x1-6 pannels and finished smooth with neat cement rendering as directed including cost and conveyance of all materials and water to work site, seignorage fee and all operational, incidental, labour charges such as mixing mortar, laying, curing etc., complete for Toilets For type 1 mb Toilet For type 1 Toilet For type 2 For type 2 For type 3 For type 3 For type 4 For type 4 Toilet Toilet Toilet Toilet Toilet Toilet 1 1 1 1 1 1 1 1 1 1 1 1 1 9 9 4 4 2 2 2 1 1 1 1 1 1 1 1 1 1 1.4 1.225 1.29 1.5 1.4 2.75 2 2.85 3.095 1.4 2.50 2.30 2.30 2.70 2.00 1.60 1.60 1.20 1.25 1.90 3.50 2.82 2.97 328.05 226.80 70.40 51.20 13.68 15.41 10.64 145.09 145.09 145.09 145.09 145.09

First floor qty Second floor qty Third floor qty Fourth floor qty Fifth Floor Qty

Sqm Sqm Sqm Sqm Sqm

39

Fabrication and placing of Tor steel/Fe 415 grade steel reinforcement confirming to IS-226 and 1786-1985 of SAIL/ VSP/ TISCON or any approved TMT of different diameters straightening, cutting & bending to required sizes & shapes placing in position with cover blocks of approved material & size tieing firmly with MS binding wire 18 guage forming grills for reinforcement work as per approved design & drawings to be supplied at the time of executing the work including cost & conveyance of steel and all materials and all wastages such as overlaps, couplings, welded joints, chairs,space bars, binding wire, cover blocks and all operational, incidential, labour charges such as cutting, bending, placing in position, tieing etc., complete for finished item of work as directed by Engineer in charge. Total plinth area of the buildings 7377.55Sqm or 79377.12 Sft Steel is provided @ 4.5Kg/sft 79377.12 x 4.5 per Sft =357.97 MT

or say

360.00 Mt

40

Providing MS hand railing as per drawings using 40mm hollow MS tube at top, 20mm MS square bars at 600mm c/c for verticals and 20mm x 6mm MS flat in two rows in middle including cutting bars, welding, fixing in position, applying one coat of red oxide including cost & conveyance of all materials to site labour charges etc complete for finished item of work in all floors (0.90mts height). First Floor for sitout 1 1 1 1 1 9 4 2 1 1 1 1 3.30 2.90 3.06 3.25 0.9 0.9 0.9 0.9 2.97 23.49 11.00 5.85 43.31 43.31 43.31 43.31 43.31 Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm

First floor qty Second floor qty Third floor qty Fourth floor qty Fifth Floor Qty

Page 57 of 81

Name of Work : Construction of 1 Block (Stilt+5) 80 flats ( Sft) (AARAMBH - II, Papireddy Colony, Chandanagar(v), Serilingampally(m), R.R Dist.
Item No 1 Description Nos Length Breadth depth Quantity Unit

Internal Sanitary Fittings


'A' Supply laying, jointing and testing of 101.60mm (6" dia) Type 1 From toilets to man holes Type 2 From toilets to man holes Type 3 From toilets to man holes Type 4 From toilets to man holes 2 'B' Supply laying, jointing and testing of 150 mm (6" dia) Type 1 1 1 Type 2 9 3 'A' Supplying and fixing of 152.40mm x 101.60mm (6'x4") SWG gully trap Type 1 1 Type 2 9 Type 3 4 Type 4 2 4 Supply and fixing of 4" (101.6mm)dia SWG bend for WC air tight Type 1 1 Type 2 9 Type 3 4 Type 4 2 'A' Construction of 3'-0 dia clear Inspector Chamber with 9" thick brick masonry walls in CM (1:6) prop Type 1 Connecting man holes Type 2 9 Type 3 4 Type 4 2 6 'A' Supplying and fixing of 101.60mm (4" dia) PVC pipe Type 1 1 Type 2 9 Type 3 4 Type 4 2 7 'B' Supplying and fixing of 101.60mm (4" dia) PVC/SWR Single Y Junction Type 1 1 4 22 176 3594 RM Each 1 4 22 352 2 8 21 3024 1 2 21 42 1 9 18 228 No.s RM 1 9 36 2 8 144 1 3 6 165 No.s Each 1 3 12 2 8 144 1 3 3 1 8 16 341 No.s Each 1 8 32 4 8 288 5 1 5 1 8 15 1080 1207.5 RM 2 1 1 1 39.1 49.3 78.2 49.3

1 1 9 9 4 2

2 2 2 2 1 1

1 1 3 5 3 3

5.5 21.7 5.5 5.5 3 3

11 43.4 297 495 36 18 900.4

RM

1 1

1 1

3 27

3 27

Item No

Description

Nos 1 5 0 1 1 1 0 2 2

Length

Breadth

depth

Quantity 5 0 8 4 17

Unit

Internal Sanitary Fittings


Type 2 0 Type 3 4 Type 4 2 8 Suppy and fixing of PVC (101.6mm) 4" dia single Y Type 1 1 Type 2 9 Type 3 4 Type 4 2 9 'B' Supplying and fixing of 101.60mm (4" dia) PVC/SWR Plug bend Type 1 1 Type 2 9 Type 3 4 Type 4 2 10 'A' S & F of 101.6 PVC/SWR Vent cowls Type 1 1 Type 2 9 Type 3 4 Type 4 2 11 'A' Supply and fixing of 76.20mm (3" dia) PVC/SWR pipe Type 1 1 1 Type 2 9 Type 3 4 Type 4 2 12 'A' Supplying and fixing of 3" (76.20mm dia) PVC/SWR Nahany traps with jally Type 1 1 Type 2 9 Type 3 4 Type 4 2 13 Supply and fixing of Y junction 76.2mm dia Type 1 1 Type 2 9 Type 3 4 Type 4 2 1 4 8 327 No.s 1 4 16 4 8 288 3 5 15 1 8 16 589 No.s Each 1 6 24 7 8 504 9 5 45 1 5 22 220 6777.5 RM Each 1 5 20 400 4 8 21 6048 1 3 5 5 21 0.3 105 4.5 1 4 8 170 No.s RM 1 4 16 2 8 144 1 2 2 1 4 8 759 No.s Each 1 4 16 16 5 720 3 5 15 1 1 2 731 No.s Each 1 1 4 16 5 720 5 1 5 No.s Each

Item No 14

Description

Nos

Length

Breadth

depth

Quantity

Unit

Internal Sanitary Fittings


Supply and fixing of double Y junction 76.2mm dia Type 1 1 Type 2 0 Type 3 4 Type 4 2 15 'A' Supplying and fixing of 3" (76.20mm dia) PVC/SWR Plug Bend Type 1 1 Type 2 9 Type 3 4 Type 4 2 16 'A' Supplying and fixing of 3" (76.20mm dia) PVC/SWR plain bend Type 1 1 Type 2 9 Type 3 4 Type 4 2 17 "A" S & F of 76.20mm went coal Type 1 1 Type 2 9 Type 3 4 Type 4 2 18 'B' Supplying and fixing of European type Hindustan neycer or parry ware WC Type 1 1 Type 2 9 Type 3 4 Type 4 2 'A' Supplying and fixing of 558.8mm x 406.4mm indian make white glazed wash hand basin Type 1 1 Type 2 9 Type 3 4 Type 4 2 20 'A' Making holes n masanory work and redoing good as directed by the department Type 1 1 Type 2 9 Type 3 4 10 5 200 6 5 270 8 5 40 4 5 40 320 No.s Each 4 5 80 4 5 180 4 5 20 3 5 30 195 No.s Each 3 5 60 2 5 90 3 5 15 1 4 8 101 No.s Each 1 4 16 1 8 72 1 5 5 1 4 8 85 No.s Each 1 4 16 2 2 36 5 5 25 1 4 8 337 No.s Each 1 4 16 4 8 288 5 5 25 1 2 4 17 No.s Each 1 2 8 0 0 0 1 5 5 Each

19

Item No Type 4

Description

Nos

Length

Breadth

depth

Quantity

Unit

Internal Sanitary Fittings


2 21 'A' Supplying and fixing of stain less steel sink Type 1 1 Type 2 9 Type 3 4 Type 4 2 5 1 10 80 No.s RM 1 Type 2 9 Type 3 4 Type 4 2 23 'A' Internal water supply 3 layers 63mm dia PPR pipes for portable Type 1 1 Type 2 9 Type 3 4 Type 4 2 24 'A' Internal water supply 3 layers 50mm dia PPR pipes for portable Type 1 1 Type 2 9 Type 3 4 Type 4 2 25 'A' Internal water supply 3 layers 32mm dia PPR pipes for portable Type 1 1 Type 2 9 Type 3 4 Type 4 2 26 'A' Internal water supply 3 layers 25mm dia PPR pipes for portable Type 1 1 Type 2 9 Type 3 4 Type 4 2 27 'A' Internal water supply 3 layers 20mm dia PPR pipes for portable Type 1 1 1 5 9 45 1 1 30 60 795 RM RM 1 1 45 180 1 1 60 540 1 1 15 15 1 1 40 80 700 RM RM 1 1 60 240 1 1 40 360 1 1 20 20 0 0 0 0 194.6 RM RM 0 0 0 0 0 0 0 0 1 1 194.6 194.6 0 0 0 0 564 RM RM 1 1 112 448 0 0 0 0 1 1 116 116 2 5 8 160 2751.5 RM RM 10 5 2 400 8 5 6 2160 1 15 2.1 31.5 5 1 20 5 1 45 5 1 5 10 5 100 610 No.s Each

Internal Water Supply


22 'A' Internal water supply 3 layers 40mm dia PPR pipes for portable Type 1

Item No Type 2

Description

Nos

Length

Breadth

depth

Quantity

Unit

Internal Sanitary Fittings


9 Type 3 4 Type 4 2 28 Supply and fixing of 12.7mm dia of CP long body bibcock of Jaquare company Type 1 1 Type 2 9 Type 3 4 Type 4 2 29 Supply and fixing of 12.7mm dia of CP short body bibcock of Jaquare company Type 1 1 Type 2 9 Type 3 4 Type 4 2 30 Supply and fixing of 24.4 mm dia and 609.6mm long Aluminum auodised towel rod Type 1 1 Type 2 9 Type 3 4 Type 4 2 Supply and fixing of Jaquare company wall mixure of CP non telephonic shower arrangements 15mm etc complete Type 1 1 Type 2 9 Type 3 4 Type 4 2 Supply and fixing of Jaquare company wall mixure of CP fancy shower arrangements 15mm etc complete Type 1 1 Type 2 9 Type 3 4 Type 4 2 33 Supply and fixing of CP soup dish heavy type NP screws etc complete Type 1 1 Type 2 9 Type 3 4 Type 4 2 3 5 30 3 5 60 2 5 90 3 5 15 3 5 30 195 No.s Each 3 5 60 2 5 90 3 5 15 3 5 30 195 No.s Each 3 5 60 2 5 90 3 5 15 3 5 30 195 No.s Each 3 5 60 2 5 90 3 5 15 1 5 10 80 No.s Each 1 5 20 1 5 45 1 5 5 3 5 30 200 No.s Each 3 5 60 2 5 90 4 5 20 1 5 10 100 835 RM Each 1 5 12 240 1 5 10 450

31

32

Item No

Description

Nos

Length

Breadth

depth

Quantity 195

Unit No.s Each

Internal Sanitary Fittings


34 Supply and fixing of PVC low level sistran parryware slim line flush tank Type 1 1 Type 2 9 Type 3 4 Type 4 2 35 Supply and fixing of 20mm dia PPR gate walves Type 1 1 Type 2 9 Type 3 4 Type 4 2 36 Supply and fixing of 50mm dia PPR gate walves Type 1 1 Type 2 9 Type 3 4 Type 4 2 37 Supply and fixing of 40mm dia PPR gate walves Type 1 1 Type 2 9 Type 3 4 Type 4 2 38 Supply and fixing of 63mm dia PPR gate walves Type 1 1 Type 2 9 Type 3 4 Type 4 2 39 Making holes in RCC slab Type 1 1 Type 2 9 Type 3 4 Type 4 2 3 5 30 195 No.s 3 5 60 2 5 90 3 5 15 5 5 50 400 No.s Each 5 5 100 5 5 225 5 5 25 2 5 20 160 No.s Each 2 5 40 2 5 90 2 5 10 10 5 100 800 No.s Each 10 5 200 10 5 450 10 5 50 3 5 30 195 No.s Each 3 5 60 2 5 90 3 5 15 3 5 30 195 No.s Each 3 5 60 2 5 90 3 5 15

Name of Work : Construction of 1 Block (Stilt+5) total 50 flats, 25 flats Type - 1 (1026.55 sft) and 25 flats Type - 2 (1212.23 sft) under AARAMBH ,RGK Scheme-II, Papireddy Colony, Chandanagar(v), Serilingampally(m), R.R Dist. Block P SCH Agmt Description Nos Length Breadth depth Quantity item no 1 Earth work excavation and depositing on bank with an intial lead of 10m and lift of 2m in mixture of gravel and soft disintegrated rock like shales ,ordinary gravel stoney earth and earth mixed with fair size boulders including shoring shuttering and bailing out of water etc for foundations . Unit

1 80.00 32.00 1.00 2560.00 cum 1 1 2 Excavation in rock by way of benching ,chiselling, wedging, and Boring in fourndation, grade levelling including all lead and lift charges and disposal of rock from the site as directed by the department.( A rate of Rs.164.90 per Cum

For Coloumn footings for type 1 (External) For Coloumn footings for type 1 (Internal) For Coloumn footings for type 2 (external) For Coloumn footings for type 2 (Internal) For Coloumn footings for staircase For Coloumn footings for lift Net Qty earth work excavation

5 5 15 15 4 4

10 2 8 1 1 1

1 1 1 1 1 1

1.8 2.4 1.8 2.4 1.8 1.8

1.8 2.4 1.8 2.4 1.8 1.8

1.10 1.10 1.10 1.10 1.10 1.10

178.20 63.36 427.68 95.04 14.26 14.26 792.79 cum

3 Drilling of 25mm dia and 800 mm deep in hard rock or sheet rock by pneumatic grouting and placing of 16 mm dia Tor steel bars and grouting holes with slurry excluding cost of steel and its fabrication charges but including cost and conveyance of al External columns 170 7 7 1.00 1.00 0.30 2499.00 internal columns 10 9 9 1.00 1.00 0.30 243.00 Net Quantity: Total 2742.00 Rmt 4 Providing and laying VCC M20 in foundations, machine foundations, footings and bases of columns and under floors including the cost of centering and shuttering for Column footings levelling course 82.62 8.64 91.26 5 Providing and laying cement concrete 1:5:10 (1 cement :5 coarse sand :10 graded stone aggregate 40 mm. nominal size) mm. ) in basement under floors Type 1 Stilt floor Type 2 Stilt floor Corridor Deduct for beam portions (81.59+61.38) for sump 5 15 1 1 1 1 1 1 1 1 1 4 1 1 1 1 1 1 9.70 10.53 174.68 142.97 4.66 5.30 2.26 6.90 5.43 2.00 0.23 3.00 1.75 2.26 0.10 0.10 0.10 33.47 85.77 34.94 External columns internal columns 170 10 1 1 1 1 1.8 2.4 1.8 2.4 0.15 0.15

0.10 -3.29 0.10 1.40 0.10 3.71 for lift 4 1 1 0.15 3.06 Total qty 159.05 Cum 6 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational FOR FOOTINGS BLOCK No. DH External columns 170 1 1 1.80 1.80 0.475 261.63 Internal columns 10 1 1 2.40 2.40 0.475 27.36 288.99 cum 7 VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all operational FOR PEDESTALS External columns Internal columns corridor columns for sump for lift 8 FOR PLINTHBEAM TYPE 1 external vertical external vertical external vertical 170 10 38 1 1 4 1 1 1 1 4 1 1 1 1 1 1 1 0.45 0.45 0.45 4.66 5.30 2.26 0.45 0.45 0.45 3.00 1.75 2.26 0.75 0.75 0.75 0.125 0.125 0.125 25.82 1.52 5.77 1.75 4.64 2.55 42.05 cum

1 1 1

1 2 2

1 1 1

2.69 2.50 2.69

0.23 0.23 0.23

0.30 0.30 0.30

0.19 0.35 0.37

Page 64 of 81

Agmt Description item no external vertical external horizontal external horizontal external horizontal external horizontal Internal beams vertical Internal beams vertical Internal beams horizontal Internal beams horizontal Internal beams horizontal

Nos

Length

Breadth

depth

Quantity

Unit

1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1

2.84 1.84 4.76 2.84 3.16 2.64 2.84 1.87 2.69 3.01 FOR 5 FLATS

0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30

0.20 0.13 0.33 0.20 0.22 0.18 0.20 0.13 0.19 0.21 2.87 14.34

TYPE 2 1 1 2 4 1 1 10.53 4.83 FOR 15 FLATS staircase plinth beam lift beams 4 4 4 4 1 1 1 1 1 1 1 1 4 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4.28 1.70 1.80 1.20 12.00 10.00 2.00 34.89 35.70 4.50 6.00 2.00 7.20 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.23 0.23 0.30 0.30 1.45 1.33 2.79 41.79 2.36 0.94 0.99 0.66 4.96 0.83 0.69 0.14 2.41 2.46 0.31 0.41 0.14 1.99 9.38 70.46 43.61 2.57 14.62 5.36 19.74 9.49 cum 95.38 69.65 4.10 15.57 73.75 73.75 73.75 73.75 73.75 73.75

corridor plinthbeam

lift all round

9 Columns upto plinth beam External columns Internal columns corridor columns for side walls of sump for side walls of sump for side walls of lift 10 COLUMNS FOR GROUND FLOOR External columns Internal columns corridor columns First floor Second floor Third floor Fourth floor Fifth floor COLUMNS FOR SIXTH FLOOR Staircase columns lift columns COLUMNS FOR SEVENTH FLOOR lift columns

170 10 38 1 4 4

1 1 1 1 1 1

1 1 1 1 1 1

0.30 0.30 0.45 15.32 14.10 9.04

0.45 0.45 0.45 0.175 0.175 0.175

1.90 1.90 1.90 2 2 1.5

170 10 38

1 1 1

1 1 1

0.30 0.30 0.30

0.45 0.45 0.45

3.035 3.035 3.035 Total qty

cum cum cum cum cum cum

14 16

1 1

1 1

0.3 0.3

0.45 0.45

2.5 2.5

4.73 5.40 10.13 cum

5.40 5.40 cum Filling in trenches, sides of foundations, basements etc., with carted earth with a lead of 12km in layers not exceeding 15cms thick consolidating each deposited layer by watering and ramming including c/c of earth, water to workspot 11 Up to bottom of plinth beam item no 1+2 Deduct for useful earth qty @50% OF item 1 Deduct footings qty Deduct pedestals qty Deduct plinth beam qty Deduct cols up to PB qty Total qty 10 ROOF BEAMS 3352.79 -1280.00 -288.99 -42.05 -70.46 -95.38 1575.91 Cum

16

0.3

0.45

2.5

Page 65 of 81

Agmt Description item no GROUND FLOOR TYPE 1 long beams

Nos

Length

Breadth

depth

Quantity

Unit

short beams

1 1 1 1 1 1 1 1 1 1 1 1 1 1 4 4 4 4

1 1 1 1 2 1 1 1 1 1 2 4 1 1 2 1 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

8.35 8.20 2.34 2.54 3.00 5.85 5.70 5.70 6.00 3.00 10.53 4.83 3.46 1.75 3.38 1.70 1.20 0.90

0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38

TYPE 2 long beams short beams cross beams At stair case for lift alround

GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR At stair case for lift alround

0.73 0.72 0.20 0.22 0.52 0.51 0.50 0.50 0.52 0.26 4.69 1.84 1.69 0.30 0.15 2.36 0.59 0.84 0.63 8.41 13.10 13.10 13.10 13.10 13.10 13.10

cum

cum cum cum cum cum cum cum

4 4 4 4 4 4

2 1 2 2 2 2

1 1 1 1 1 1

3.38 1.70 1.20 0.90 1.20 0.90

0.23 0.23 0.23 0.23 0.23 0.23

0.38 0.38 0.38 0.38 0.38 0.38

SEVENTH FLOOR for lift alround 11 ROOFSLAB for Ground Floor For Type 1 For Type 2 corridor corridor corridor corridor corridor corridor corridor corridor corridor corridor triangle piece waist slab midlanding slab top slab for sump top slab for sump ROOFSLAB for Ground Floor ROOFSLAB for First Floor ROOFSLAB for Second Floor ROOFSLAB for third Floor ROOFSLAB for Fourth Floor ROOFSLAB for Fifth Floor ROOFSLAB for Sixth Floor stair case head room lift room ROOF SLAB SEVENTH FLOOR lift room 12 Lintels GF over lift LINTELS FIRST FLOOR over D over D1 over D2

0.57 1.03 0.84 0.63 3.07 cum 0.84 0.63 1.47 38.48 98.67 1.78 1.98 1.86 7.78 10.44 4.85 1.82 4.85 2.79 2.03 1.14 5.87 1.17 2.10 5.57 185.52 185.52 185.52 185.52 185.52 185.52 185.52

5 15 1 1 1 1 1 1 1 1 1 1 3 4 4 1 4

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

9.70 10.53 7.74 8.59 8.09 33.82 45.40 21.10 7.93 21.10 12.13 8.83 3.30 4.25 1.70 4.66 5.30

6.9 5.432 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.00 2.3 1.5 3 1.75

0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.115 0.15 0.115 0.15 0.15

cum cum cum cum cum cum cum

4 4

1 1

1 1

4.25 1.80

2.3 1.8

0.115 0.15

4.50 1.94 4.13 cum 0.49 0.06 0.41 0.31 0.27

4 4 20 25 25

1 1 1 1 1

1 1 1 1 1

1.80 1.07 1.37 1.22 1.07

1.8 0.15 0.15 0.10 0.10

0.15 0.10 0.10 0.10 0.10

Page 66 of 81

Agmt Description item no Over sliding door over W over W! over lift Lintels Lintels Lintels Lintels for SECOND FLOOR for THIRD FLOOR for FOURTH FLOOR for FIFTH FLOOR

Nos

Length

Breadth

depth

Quantity

Unit

25 65 20 4

1 1 1 1

1 1 1 1

2.10 1.22 0.91 1.07

0.10 0.10 0.10 0.15

0.15 0.10 0.10 0.10

0.79 0.79 0.18 0.06 2.81 2.81 2.81 2.81 2.81 2.81 0.06 0.25 0.23 0.23 0.70 0.70 0.70 0.70 0.70 0.70

cum cum cum cum cum cum

SEVENTH FLOOR over lift Bed blocks over D over D1 over D2 bed blocks for first floor bed blocks for second floor bed blocks for third floor bed blocks for fourth floor bed blocks for fifth floor

4 20 25 25

1 2 2 2

1 3 3 3

1.07 0.15 0.15 0.15

0.15 0.14 0.10 0.10

0.10 0.10 0.10 0.10

cum cum cum cum cum cum

13 Chejjas over Windows FOR GF Chejjas over Windows W Chejjas over Windows W1 Chejjas over Windows FOR FIRST FLOOR Chejjas over Windows FOR SECOND FLOOR Chejjas over Windows FOR THIRD FLOOR Chejjas over Windows FOR FOURTH FLOOR Chejjas over Windows FOR FIFTH FLOOR

65 20

1 1

1 1

1.22 1.22

0.46 0.46

79.30 24.40 103.70 SQM 103.70 SQM 103.70 SQM 103.70 SQM 103.70 SQM 103.70 SQM 103.70

14

Racks and lofts Ground Floor FLOOR RCC M20 grade mix (Design Mix as per SS) with stone aggregate of 20mm and 12mm size mechanically mixed etc, necessary reinforcement including cost and conveyance of all materials and water to work site seignorage and all operational, incidential labour charges such as centering (steel Centering) mixing concrete, laying, lift charges, curing, etc., complete for finished item of work as per standard specification but excluding cost on steel reinforcement and its fabrication charges etc complete for finished item of work to the required strength as directed by department for 60 mm thick to 40 mm thick at free end, plastering 12mm thick in CM(1:4) Prop. For all exposed faces (Bottom & Sides) etc. Type 1 Lofts in kitchen kitchen platform two sides Deduct for sink master bed bed 1 bed2 Type 2 Lofts in kitchen kitchen platform two sides Deduct for sink master bed bed 1 First floor second floor third floor fourth floor fifth floor 5 5 5 5 5 5 1 1 1 1 1 1 1 1 1 1 1 1 2.53 4.08 0.52 4.17 3.20 2.90 0.45 0.65 0.40 0.60 0.60 0.60 5.69 13.26 -1.04 12.51 9.60 8.70 48.72 5.40 15.60 -1.04 12.00 11.10 43.06 91.78 91.78 91.78 91.78 91.78

5 5 5 5 5

1 1 1 1 1

1 1 1 1 1

2.40 4.80 0.52 4.00 3.70

0.45 0.65 0.40 0.60 0.60

Sqm Sqm Sqm Sqm Sqm Sqm

VRCC M20 FOR CUPBOARD 15 SHELVES Type 1 kitchen Shelves horizontal

2.53

0.32

4.048

Page 67 of 81

Agmt Description item no kitchen Shelves horizontal kitchen Shelves verticals Master bed horizontal Master bed verticals bed 1 bed 1 bed 2 bed 2 Type 2 kitchen Shelves horizontal kitchen Shelves horizontal kitchen Shelves verticals Master bed horizontal Master bed verticals bed 1 bed 1

Nos

Length

Breadth

depth

Quantity

Unit

5 5 5 5 5 5 5 5

2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1

1.80 1.50 2.09 1.98 2.44 1.98 1.87 1.98

0.32 0.32 0.53 0.53 0.53 0.53 0.53 0.53

5.76 4.8 11.077 10.494 12.932 10.494 9.911 10.494 80.01 Sqm 3.84 5.6 4.8 10.6 10.494 11.13 10.494 56.958 Sqm

5 5 5 5 5 5 5

1 2 2 2 2 2 2

1 1 1 1 1 1 1

2.40 1.75 1.50 2.00 1.98 2.10 1.98

0.32 0.32 0.32 0.53 0.53 0.53 0.53

Total Qty for first floor Total Qty for five floor Over head tankds at sixth floor RCC Columns for tank RCC beams over all RCC bottom slab RCC Top slab RCC Side walls Sump at Ground floor RCC Columns for tank CC 1:5:10 RCC bottom slab RCC Top slab RCC Side walls allaround 2 2 2 2 2 4.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 0.300 14.800 5.130 4.530 17.000 0.45 0.23 5.03 4.43 0.175 1.200 0.38 0.15 0.125 1.9

136.968 Sqm

684.84 Sqm 1.296 2.58704 7.74117 5.016975 11.305 Cum Cum Cum Cum Cum

2 2 2 2 2

4.000 1.000 1.000 1.000 1.000

1.000 1.000 1.000 1.000 1.000

0.300 5.030 5.030 5.030 17.480

0.45 4.17 4.17 4.17 0.23

1.200 0.15 0.15 0.15 1.8

1.296 6.29253 6.29253 6.29253 14.47344

Cum Cum Cum Cum Cum

16

Masonary in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size 290x225x140mm(made up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including cost and conveyance of all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall. for type 1 L/W SW Deduct for sitout and utility deduct for door D deduct for windows w deduct for windows w1 deduct for windows v deduct for lintels over doors deduct for lintels over windows deduct for exhaust fan for type 2 lw lw sw sw deduct for door D deduct for windows w deduct for windows w1 deduct for windows v deduct for lintels over doors deduct for exhaust fan at staircase L/W at lift room allaround Corridor walls 5 5 5 5 5 5 5 5 5 5 5 5 15 15 15 15 15 15 15 15 15 15 1 1 1 1 1 1 1 1 1 1 1 2 1 4 1 3 4 5 1 2 2 2 2 1 3 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.79 1 1 1 1 1 1 1 1 1 0.79 1 1 1 1 1 1 1 8.20 8.35 5.85 6.00 5.00 1.06 0.91 0.91 0.60 1.37 1.22 0.30 4.24 4.83 1.60 3.15 1.06 0.91 0.91 0.60 1.37 0.30 3.35 6.28 12.00 2.00 4.50 6.00 2.00 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.23 0.14 0.14 0.14 0.14 0.14 2.655 2.655 2.655 2.655 2.655 1.98 1.22 0.75 0.45 0.1 0.1 0.3 2.655 2.655 2.655 2.655 1.98 1.22 0.75 0.45 0.1 0.3 2.655 2.655 0.6 0.6 0.6 0.6 0.6 15.24 15.52 10.87 11.15 -18.59 -1.47 -3.11 -0.48 -0.57 -0.38 -0.43 -0.05 47.27 53.86 17.84 35.13 -4.41 -6.99 -1.43 -0.57 -0.29 -0.15 2.49 3.83 1.01 0.17 0.38 0.50 0.17

Page 68 of 81

Agmt Description item no BM for First floor BM for Second floor BM for Third floor BM for Fourth floor BM for Fifth floor BM for Sixth floor at stair case Parapet wall at lift room allaround

Nos

Length

Breadth

depth

Quantity

Unit

176.52 176.52 176.52 176.52 176.52 176.52 1 5 15 4 2 1 1 1 1 1 1 1 16.77 33.20 31.92 7.01 0.14 0.14 0.14 0.23 2.20 1.20 1.20 2.655

Cum Cum Cum Cum Cum Cum

10.33 27.89 80.44 17.12 135.78 Cum

SEVENTH FLOOR at lift room allaround 4 1 1 7.010 0.23 2.655 17.12 GROUND FLOOR Masonary in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size 290x225x140mm(made up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including cost and conveyance of all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall. 17 Type 1 Master bed room two sides 5 5 5 5 5 5 5 5 5 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 2.34 2.54 6.61 5.70 3.00 3.20 1.60 0.50 0.90 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 2.655 2.655 2.655 2.655 2.655 2.655 2.655 2.655 2.655 3.11 3.37 8.77 7.57 7.97 4.25 2.12 0.66 1.19 39.02 Cum 16.85 15.61 13.78 5.97 9.96 17.92 11.15 91.24 130.25 130.25 130.25 130.25 130.25 130.25

Type 2 15 15 15 15 15 15 15 1 1 1 1 1 1 1 1 1 1 1 5 5 1 4.23 3.92 3.46 1.50 0.50 0.90 2.80 0.10 0.10 0.10 0.10 0.10 0.10 0.10 2.655 2.655 2.655 2.655 2.655 2.655 2.655 Total qty BM for First floor BM for Second floor BM for Third floor BM for Fourth floor BM for Fifth floor

Cum Cum Cum Cum Cum Cum Cum

18

Ground floor steps PCC M-20 Grade mix with stone aggregate of 20 mm & 12mm size mechanically mixed including cost and conveyance of all materials and water to work site, seignorage fee and all opertational ,incidential,labour charges such as centering from work, steel centering,mixing concrete, laying, lift charges ,vibrating,curing etc complete for finished item of work as per Standard Specification etc complete for finished item of work to the required strength as directed by department for steps. For staircase steps Groun floor first floor second floor third floor fourth floor fifth floor sixth floor 4 4 4 4 4 4 4 0.50 0.50 0.50 0.50 0.50 0.50 0.50 20 20 20 20 20 20 20 1.50 1.50 1.50 1.50 1.50 1.50 1.50 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.15 0.15 0.15 0.15 0.15 0.15 0.15 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7

19

Plastering 12mm thick in 2 coats with a base coat of 8mm thick in CM (1:6) prop and top coat 4mm thick in CM(1:4)prop with dubara sponge finishing including cost and conveyance of all materials seignorage and water to work site and all operational ,incidential labour charges such as scaffolding, mixing, motor , lift charges, curing etc. complete for finished item of work as per SS No. 901, 904 for internal walls Type 1 GROUND floor Columns all around Beams B1 to B11 two sides 5 5 5 5 5 5 5 12 1 1 1 2 1 1 1 1 1 1 1 1 1 1.500 8.500 2.350 2.540 3.000 5.850 5.700 2.655 0.76 0.76 0.76 0.76 0.76 0.76

238.95 32.3 8.93 9.652 22.8 22.23

Page 69 of 81

Agmt Description item no 5 5 5 5

Nos

Length

Breadth

depth

Quantity

Unit

ceiling Type 2 Stilt floor Columns all around Beams B1 to B11 two sides ceiling corridor columns corridor beams

1 1 1 1

1 1 1 1

5.700 3.000 6.000 9.700

0.76 0.76 0.76 6.90

21.66 21.66 11.4 32.3 334.65 756.532 477.9 240.084 247.608 857.6685 151.34 5.88 6.49 6.15 25.70 34.50 16.04 6.03 16.04 9.22 6.71 349.36 39.10 2495.8123 3252.3443 Sqm

Corridor ceiling staircase room bottom

15 15 15 15 1 1 1 1 1 1 1 1 1 1 1 1 4

8 1 1 1 38 1 1 1 1 1 1 1 1 1 1 1 1

1 2 4 1 1 2 2 2 2 2 2 2 2 2 2 1 1

1.50 10.53 5.43 10.53 1.50 7.74 8.54 8.09 33.82 45.40 21.10 7.93 21.10 12.13 8.83 174.68 4.25

0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 2.00

2.655 0.76 0.76 5.43 2.655 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 2.3

FIRST FLOOR Type 1 master bed alaround master bed ceiling bed room 1 bed room 1 ceiling drawing alround drawing alround ceiling kitchen kitchen ceiling sitout sitout ceiling utility three sides utility ceiling toilets 1 toilets 1 toilets 2 toilets 2 deductions D1 D2 Type 2 bed alaround bed ceiling Hall cum kitchen alround Hall cum kitchen ceiling sitout sitout ceiling toilets 1 toilets 1 deductions D1 D2 staircase two sides mid landing wall lift alaround waist slab ceiling corridor

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

1.000 1.000 1.000

1.000 1.000 1.000

2.000 2.000

13.006 3.503 13.500 3.520 17.200 5.600 9.200 3.000 8.120 3.000 8.120 3.000 9.980 9.200 3.000 3.000 0.910 0.750

3.035 3 3.035 3.2 3.035 3 3.035 1.6 3.035 1.206 3.035 1.206 3.035 3.035 1.99 1.6 1.98 1.98

197.37 52.55 204.86 17.60 261.01 84.00 139.61 24.00 123.22 18.09 123.22 18.09 151.45 139.61 29.85 24.00 18.02 14.85 1641.39 Sqm 679.23 207.60 915.05 376.29 436.13 69.03 450.70 84.00 27.03 22.28 103.19 13.60 21.85 16.80 26.50 3449.27 Sqm 5090.66 5090.66 5090.66 5090.66 5090.66 5090.66 573.60 199.20 31.89

15 15 15 15 15 15 15 15 15 15 4 4 4 4 1

1.000

1.000

1.000 1.000 2.000 2.000 1.000 1.000 1.000

1.000 1.000 1.000 1.000 1.000

14.920 4.000 20.100 4.890 9.580 3.460 9.900 3.200 0.910 0.750 4.250 1.700 7.200 4.200 26.500

3.035 3.46 3.035 5.13 3.035 1.33 3.035 1.75 1.98 1.98 3.035 1 3.035 1.7 1.34

first floor second floor third floor fourth floor fifth floor sixth floor parapet wall all round type 1 parapet wall all round type 2 staircase head room

478.000 166.000 11.900

1.2 1.2 2.68

Page 70 of 81

Agmt Description item no staircase room ceiling lift room all around lift room ceiling SEVENTH FLOOR lift room all around lift room ceiling Plastering 12mm thick in 2 coats with a base coat of 8mm thick in CM (1:6) prop and top coat 4mm thick in CM(1:4)prop with dubara sponge finishing including cost and conveyance of all materials seignorage and water to work site and all operational ,incidential labour charges such as scaffolding, mixing, motor , lift charges, curing etc. complete for finished item of work as per SS No. 901, 904 for external walls 20 type 1 all around corridor wall inbetween flats deductions door D W W1 V

Nos

Length

Breadth

depth

Quantity

Unit

4 4 4

4.200 7.200 1.800

1.7 2.68 1.8

28.56 77.18 12.96 923.40 Sqm 87.41 12.96 100.37 Sqm

4 4

7.200 1.800

3.035 1.8

5 5 5 5 5 5

1 1 1 4 1 3

1 1 1 1 1 1

33.20 26.50 1.06 0.91 0.91 0.60

3.15 2.14 1.98 1.22 0.75 0.45

522.9 283.55 -10.494 -22.204 -3.4125 -4.05 766.2895

type 2 all around deductions door D W W1 V first floor second floor third floor fourth floor fifth floor sixth floor parapet wall all round staircase head room lift room all around door decurition

15 15 15 15 15

1 1 3 1 2

1 1 1 1 1

32.00 1.06 0.91 0.91 0.60

3.15 1.98 1.22 0.75 0.45

1512 -31.482 -49.959 -10.2375 -8.1 1412.2215 2178.511 2178.511 2178.511 2178.511 2178.511 734.16 145.08 113.9 1.485 994.625

4 4

644.000 13.000 9.040 0.750

1.14 2.79 3.15 1.98

cost supply and fixing of Teak Wood Door of size 1.06 X 1.98 m including all 21 labour charges 10 1 5 50

22

Door of size 3-0 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. 5 1 25 125 Door of size 2-6 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. Balcony for machine room 50 1 51 Door of size 2-6 x 6-6 Supply and door frame made of hollow extruded PVC section (Nandi or equivalent) having dimensions of 40 x57mm with the wall thickness of 2mm +/- 0.2 mm duly reinforced with seasoned woood plank at the hinges side the door frame top 2 corners shall be metricut/weilded. with door shutters made of rigid PVC extruded hollow section (Nandi 5 1 10 1

23

nos

24

Page 71 of 81

Agmt Description Nos Length Breadth depth Quantity Unit item no Attached toilet 5 25 125 24 Sliding Door of size 6-0 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976. at sitout 25 5 25 1 125 nos nos

NCL WINDOE OF SIZE 3-0 x 4-0 Providing and fixing windows made of prepainted steel (base steel as per IS 513 of 0.60 mm thick galvonised as per IS 277 with zinc of 150 GSM) 5 40 200 Nos

26

NCL WINDOE OF SIZE 3-0 x 2-6 Providing and fixing windows made of prepainted steel (base steel as per IS 513 of 0.60 mm thick galvonised as per IS 277 with zinc of 150 GSM) Kitchen window 5 10 Manufacturing & supply of 2'-0" x 1"-6" steel ventilator including cost of steel & glass 50 Nos

27

Attached toilet 28

25

125

Nos

Ground floor Flooring with Grananalothic concrete Flooring 50 mm thick with CC 1:1:2 prop. Using 6mm to 12 mm size (SSS) grade hard granite stone mesigne crushed metal laid Granalothically over an existing bed of CC 1:5:10 Prop. 10 cm thic. CC slab laib in alternate panels of size not exceeding 1.5X1.5m and finishing the top surface to required smooth ness and slopes including cost and conveyance of all meterials and all operational incidental and seinarage charges and mixing concrete, laying, curing etc. complete for finisheditemof work.(APSS NO:701and 707 ) Type 1 Stilt floor Type 2 Stilt floor staircase room Corridor Deduction for Columns 5 15 4 1 1 1 1 121 1 1 1 1 1 1 1 9.70 10.53 4.2 174.68 0.3 2.3 2 0.45 6.90 5.43 334.65 857.6685 38.64 349.36 -16.335 1563.9835 Sqm

29

Flooring with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastring in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. complete for finished item In rooms flooring with 8.3mm thk ceramic tiles of size(400 x 400mm) with 1" thk mortar in CN(1:6) prop Type 1 First floor qty Master bed 5 1 1 3.52 3.2 56.32 bed 1 5 1 1 3.5 3 52.50 drawing 5 1 1 5.6 3 84.00 kitchen 5 1 1 3.00 1.6 24.00 utility 5 1 1 3.00 1.1 16.50 sitout 5 1 1 3.00 1.1 16.50 toilet 1 5 1 1 3.00 1.99 29.85 toilet 2 5 1 1 3.00 1.6 24.00 skirting m.bed room 5 1 1 11.85 0.1 5.93 bed 1 5 1 1 11.4 0.1 5.70 drawing 5 1 1 16.72 0.1 8.36 kitchen 5 1 1 9.2 0.1 4.60 utility 5 1 1 6.2 0.1 3.10 sitout 5 1 1 6.20 0.1 3.10 334.46 Sqm Type 2 First floor qty Master bed 15 1 1 3.46 4 207.60 15 1 1 1.75 1.2 31.50 kitchen cum dining and hall 15 1 1 4.89 5.13 376.29 utility 15 1 1 3.46 1.33 69.03 toilet 15 1 1 3.2 1.75 84.00 skirting m.bed room 15 1 1 17.4 0.1 26.10 kitchen cum dining and hall 15 1 1 22 0.1 33.00 utility 15 1 1 9.50 0.1 14.25 841.76 corridor flooring tiles 1 1 1 7.75 2 15.50 1 1 1 8.59 2 17.18 1 1 1 8.09 2 16.18 1 1 1 33.82 2 67.64 1 1 1 45.40 2 90.80 1 1 1 21.10 2 42.20 1 1 1 7.93 2 15.86

Page 72 of 81

Agmt Description item no 1 1 1 1 1 corridor flooring tiles skirting 1 1 1 1 1 1 1 1 1 1 1 1

Nos

Length

Breadth

depth

Quantity

Unit

1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

21.10 12.13 8.83 3.38 9.50 7.75 8.59 8.09 33.82 45.40 21.10 7.93 21.10 12.13 8.83 3.38 9.50

2 2 2 2 3 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1

First floor Second floor Third floor fourth floor fifth floor 30

Total Quantity

42.20 24.26 17.66 6.76 28.50 384.74 1.55 1.72 1.62 6.76 9.08 4.22 1.59 4.22 2.43 1.77 0.68 1.90 37.52 1598.48 1598.48 Sqm Sqm Sqm Sqm Sqm

1598.48 1598.48 1598.48 1598.48 1598.48 Dadooing with coluru glazed tiles 6.5mm thick of size(300 x 200 mm) 1st quality (as per manufacturers specification ) of approved make ISI CM (1:5) prop with grey cement slurry for kitchen,bathroom,balcony & lift cladding Toilet dadooing Type 1 T1 allaround T2 allaround Deduct for dooor portion Kitchen dadooing three sides utility three sides Type 2 toilet allaround Deduct for dooor portion Kitchen dadooing three sides utility three sides

5 5 5

1 1 2

1 1 1

9.00 8.60 0.75

2.1 2.1 1.98

94.50 90.30 -14.85 169.95 29.28 19.52 48.80 308.70 -22.27 286.43 73.20 76.86 150.06 655.24 Sqm 655.24 655.24 655.24 655.24 Sqm Sqm Sqm Sqm

5 5

1 1

1 1

4.8 3.2

1.22 1.22

15 15

1 1

1 1

9.80 0.75

2.1 1.98

15 15

1 1

1 1

4 4.2 Total Quantity

1.22 1.22

second floor third floor fourth floor fifthfloor 31

Supplying and application of two coats of ALTEK super fine , one coat of ALTEK water based coment primer and twocoats of ALTEK flora ( plastic emulsion paint ) to interior faces of new walls and ceeling of approved colour as per manufacturer's specifications including cost and conveyance of all matirials to site and labour charges such as preparing the wall, applying primary coat etc. complete for finished item of work for INTERNAL WALLS AND CEILING (Total 2 coats). Quantity same as internal ceiling and plastering Ground floor 1st floor to 5 floor 6 th floor

3252.3443 5090.6591 25453.2953 923.396 29629.0356 Sqm

32

"B" -Supply and application of one coats of Altek water based cement primer and two coats of harmony (Acrylic emulsion paint exterior grade) to exterior faces of new walls and ceiling of approved colour as per manufacturer's specifications including c

Page 73 of 81

Agmt Description item no

Nos

Length

Breadth

depth

Quantity

Unit

First floor Second floor Third floor Fourth floor Fifth floor Sixth floor Add for Chejjas Chejjas over Windows Chejjas over Windows W Chejjas over Windows W1

2178.51 2178.51 2178.51 2178.51 2178.51 994.63 11887.18

Sqm Sqm Sqm Sqm Sqm Sqm Sqm

40 10

5 5

2 2

1.220 1.220

0.46 0.46 Grand total

488.00 122.00 610.00 SQM 12497.18 SQM

33

Painting to new wood work and flush shutters with lappam finish , over a primary coat and painting two coats of synthetic enamel paint 1st grade of approved brand and shade (Total 3 coats) including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc. complete (APSS No.1200, 1207 & 1211) in all floors.

main door d1 d2

34

35

188.892 405.405 133.65 727.947 Supply and fixing of high polished Black granite 16 to 18 mm thick (upto 2.43 Mts length) including the rounding the exposed edges of granite slab and polished set over a base of 20mm thick C.M(1:5) prop over already for KITCHEN PLATFORM First floor TYPE 1 two sides 5 1 1 4.54 0.6 13.62 TYPE 2 two sides 15 1 1 4.50 0.6 40.5 add for Faces 20 1 1 3.94 0.1 7.88 add for verticql Faces 20 1 1 0.75 0.15 2.25 First floor 64.25 second floor 64.25 third floor 64.25 fourth floor 64.25 fifthfloor 64.25 Supplying and laying of polished shabad stone of tandur blue variety of 25.40 mm thick single piece over a base of 20 mm thick in C. M (1:8) with neat cement joints to full depth including cost and conveyance of all materials and labour charges for laying, cutting seigniorage charges etc complete for tread and risers Ground floor treads Raisers Mid landing add for skirting midlanding 3 sides Ground floor quantity first floor second floor third floor fourth floor fifthfloor 8 8 4 4 10 10 1 1 1 1 1 1 1.5 1.5 3.3 6.3 0.30 0.15 1.5 0.10 36 18 19.8 2.52 76.32 76.32 76.32 76.32 76.32 76.32

10 25 10

5 5 5

1.8 1.8 1.8

1.06 0.91 0.75

1.98 1.98 1.98

SQM

Sqm Sqm Sqm Sqm Sqm

Sqm Sqm Sqm Sqm Sqm Sqm

36

Surface preparation by means of chipping & cleaning testing for leakage points and grouting the same with neat cement slurry and repairing of cracks and pot holes,if any with polymer repair motor and applying two coats of polymer based water proofing slurry coating.Sika top seal 107 with coverage of 3Kg per sq mtr for two coats and providing cement screed of average 50mm thick with smooth finish,and continuing the same upto height of 300mm all along the parapet wall and other adjoining walls in form of vatta Type 1 terrace Type 2 terrace Corridor portion Staircase portion Lift portion 5 15 1 4 4 1 1 1 1 1 1 1 1 1 1 9.42 10.25 174.68 4.2 1.8 6.62 5.15 2.00 2.3 1.8 Total qty 311.80 791.81 349.36 38.64 12.96 1504.57

Sqm

Page 74 of 81

Agmt Description Nos Length Breadth depth Quantity Unit item no 37 Lift cladding with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of cement plastering in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour including cost and conyance of all meterials, labour and all taxes etc. ceramic tiles of size(300 x 300mm) with 1" thk mortar in CM(1:6) prop Ground floor Total front face up to beam Deduct opening Side faces Top face Deduct Switch portion

4 -4 4 4 -4

1 1 2 1 2

1 1 1 1 1

2.26 0.7 0.3 0.7 0.28

2.82 2.00 2.00 0.30 0.08

25.49 -5.60 4.80 0.84 -0.18 25.35 Sqm

38

First floor to fifth floor Total front face up to beam 4 1 1.93 2.62 20.23 1 Deduct opening -4 1 0.71 2.00 -5.68 1 Side faces 4 2 0.29 2.00 4.64 1 Top face 4 1 0.71 0.29 0.82 1 Deduct Switch portion -4 2 0.28 0.08 -0.18 1 For Each floor 19.83 Sqm For Five floors 99.15 Sqm 124.51 Sqm Total for GF+5floors Impervious coat 20mm thick average over roof slab with CM(1:4) prop. Mixed with approved water proofing compound at the rate of 1.0 kg per bag of cement (50 kgs) and laid when the slab is green with thread lining at 1-6x1-6 pannels and finished smooth with neat cement rendering as directed including cost and conveyance of all materials and water to work site, seignorage fee and all operational, incidental, labour charges such as mixing mortar, laying, curing etc., complete for Toilets For type 1 Toilet 1 5 1 1 3 1.99 29.85

Page 75 of 81

DETAILED ESTIMATE

Formation of internal roads for additional blocks from DG to DI blocks in Aarambh township at Chandanagar projec
Estimate S.No Description of item Nos L Measurments B

1 Earthen formation in embankment with hardgravelly soils conveyed (crried earth ) with 12 KM lead from borrowed area including watering and consolidation to proctor density with 10 tonnes power road including watering. conveyed of water for initial lead of 1/2 km complete as directed by the Dept. 2 Earth work excavation and depositing on bank with an initial lead of 10 Mts and lift of 2.0 Mts in hard gravelly soils including breaking clods, ramming, sectioning , leveling the surface to correct formation etc. complete as directed by the Dept., 3 Providing, laying, spreading and compacting graded HBG crushed stone aggrigate to wetmix macadem specification including cost, seighonerage of all materials and including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site etc.. complete 4 Plain cement concrete work of mix (1:4:8) prop. using 40mm guage hard granite machine crushed metal including cost of machine mixing, laying, levelling, tamping, curing and conveyance of all materials and all operational, incidental and labour charges,seignfor laying c.c.pavement. For kerb stones

100.00

16.64+9.14/2

100.00

1.37

100.00

6.40

1 2

100.00 100.00

6.40 0.20

5 PCC M-20 Grade mix with stone aggregate of 20 mm & 12mm size mechanically mixed including cost and conveyance of all materials and water to work site, seignorage fee and all opertational ,incidential,labour charges such as centering from work, steel centering,mixing concrete, laying, lift charges ,vibrating,curing etc complete for finished item of work as per Standard Specification etc complete for finished item of work to the required strength as directed by department for laying of c.c.pavement 6 Cost and supply of masticpad of 12.70mm thick for expansion joints Horizontal joints Vertical joints

100.00

6.40

23 1

6.40 100.00

7 Providing KERBING to the roads with 1.00x0.2 x 0.2 mm size with M20 PCC of 8 height 2 8 Painting with synthetic enamil paint two coats over a primary coat of white primer including c/c of all materials and all labour charges etc., complete for kerb stones. 9 Provision for unforseen charges 100.00

100.00

ownship at Chandanagar project.


Estimate Amount : 15,00,000/D Quantity Unit

asurments

2.50

3222.50 Cum

0.40

109.60 Cum

0.15

96.00 Cum

0.08 0.08 Total

48.00 Cum 3.00 Cum 51.00 Cum

0.10

64.00 Cum

0.10 0.10 Total

147.20 Sqm 10.00 Sqm 157.20 Sqm

200.00 Rm

0.40

80.00 Sqm

ABSTRACT ESTIMATE

Formation of internal roads for additional blocks from DG to DI blocks in Aarambh township at Chandanagar project.
Estimate Amount : 15,00,000/S.No Quantity Description of item Earthen formation in embankment with hardgravelly soils conveyed (crried earth ) with 12 KM lead from borrowed area including watering and consolidation to proctor density with 10 tonnes power road including watering. conveyed of water for initial lead of 1/2 km complete as directed by the Dept. Earth work excavation and depositing on bank with an initial lead of 10 Mts and lift of 2.0 Mts in hard gravelly soils including breaking clods, ramming, sectioning , leveling the surface to correct formation etc. complete as directed by the Dept., 2 109.60 Providing, laying, spreading and compacting graded HBG crushed stone aggrigate to wetmix macadem specification including cost, seighonerage of all materials and including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site etc.. complete 3 96.00 Plain cement concrete work of mix (1:4:8) prop. using 40mm guage hard granite machine crushed metal including cost of machine mixing, laying, levelling, tamping, curing and conveyance of all materials and all operational, incidental and 51.00 labour charges,seignfor laying c.c.pavement. PCC M-20 Grade mix with stone aggregate of 20 mm & 12mm size mechanically mixed including cost and conveyance of all materials and water to work site, seignorage fee and all opertational ,incidential,labour charges such as centering from work, steel centering,mixing concrete, laying, lift charges ,vibrating,curing etc complete for finished item of work as per Standard Specification etc complete for finished item of work to the required strength as directed by department for laying of c.c.pavement 64.00 Cost and supply of masticpad of 12.70mm thick for expansion 157.20 joints Providing KERBING to the roads with 1.00x0.2 x 0.2 mm size 200.00 with M20 PCC of 8 height Painting with synthetic enamil paint two coats over a primary coat of white primer including c/c of all materials and all labour 80.00 charges etc., complete for kerb stones. Provision for unforseen charges 1535.90 1 Cum 147446 57.40 1 Cum 6291 Rate Per Amount

3222.50

203.00 1 Cum

654168

3154.20 1 Cum

160864

5 6 7

5462.80 1 Cum 461.00 1 Sqm 233.10 1 Rm

349619 73760 46620

8 9

82.80 1Sqm LS Total

6624 54608 1500000

DATA

S.No

Quantity

Description of item Earthen formation in embankment with hardgravelly soils conveyed (crried earth ) with 12 KM lead from borrowed area including watering and consolidation to proctor density with 10 tonnes power road including watering. conveyed of water for initial lead of 1/2 km complete as directed by the Dept.

Rate

Per

Amount

1 1 Earth work SS 20 A 1 Carting from 12 Km lead for extra watering and consolidation to proctor density 1 with power roller rolling including watering 1 Deduct for loading, unloading & stacking 1 Seignorage charges 13.00 166.00 28.00 24.00 20.00

1 Cum 1 Cum 1 Cum 1 Cum 1 Cum 1 Cum Total

13.00 166.00 28.00 -24.00 20.00 203.00

Cost and supply of masticpad of 12.70mm thick for expansion joints 1 Initial cost Painting with synthetic enamil paint two coats over a primary coat of white primer including c/c of all materials and all labour charges etc., complete for kerb stones. Cost of ready mixed wood primer grade 1 Painter 1st class Painter 2nd class Add for M.A&LALI @ 53% cost of synthetic enamil paint Painter 1st class Painter 2nd class Add for M.A&LALI @ 53%

461.00

1 Sqm 1 Sqm

461.00

3 0.6 0.21 0.49 1.1 0.36 0.84

121.00 206.00 188.00 175.00 206.00 188.00

10 Sqm 1 lit Each Each 1 Lit Each Each Total 1 Sqm

72.60 43.26 92.12 71.75 192.50 74.16 157.92 123.00 828.00 82.80