Consultants RITES - JV

Government of Kerala, Public Works Department KERALA STATE TRANSPORT PROJECT KSTP-Phase 4, World Bank Loan No.IN 4653

Package No.: IV Contractor: RB(M) SDN BHD

BULK DENSITY OF SAND FOR FIELD DENSITY TEST As Per IS : 2720, Part 28
Date of Testing : Source : Pouring Set No : Proposed Use : Book No. : 1 1. 2. 3. 4. 5. 6. Average weight of sand in cylinder before pouring Average weight of sand in cyclinder after filling in the container and cone, W 2 (g) Average weight of sand in cone, W 3 (g) Weight of sand in container, W 4 = (W 1- W 2)-W 3 (g) Volume of Container, V (cc) Bulk density of sand D=W 4 / V (g/cc) Trials 2 3 Average Tested By :

Note: Sand to be used shall be clean uniformly graded natural sand passing 1.00 mm sieve and retained on 600 micron sieve

Tested by

Witnessed by

Checked by

Lab Technician Contractor

Lab Technician Consultant

M.E. Contractor

M.E. Consulta

Seen by

M.E. Consultant

KERALA STATE TRANSPORT PROJECT - IV UPGRADATION OF STATE HIGHWAY


PALAKKAD TO SHORNUR (KM 0.000 TO 45.300) LINK NO. 50.1 THRISSUR TO KUTTIPURAM (KM 19.600 TO 52.680) LINK NO. 40
CLIENT : PUBLIC WORKS DEPARTMENT (GOVERNMENT OF KERALA) CONSULTANT : RITES CONTRACTOR : ROAD BUILDER (M) SDN. BHD.

Q.C.No. :

FIELD DENSITY TEST (BY SURFACE MOISTURE DENSITY GAUGE)


Book No. Selection Test No. Chainage Representing test Chainage Offset from centre line (m) Layer No. or level Density count Moisture count Mode or Depth (mm) Marshall Density (Kg/m3) GMM (Kg/m3) Offset wet density Wet density (Kg/m3) Voids % Compaction (MA) % Compaction required Remarks Tested By 98% 98% 98% 98% 98% 98% Pass/Fail Checked By 98% 98% Back Scatter Mode PCC / DBM / DBM II / BC 1 2 ISQ No. 3 4 5 Date 6 7 8

Tested by

Witnessed by

Checked by

Lab Technician Contractor

Lab Technician Consultant

M.E. Contractor

Seen by

M.E. Consultant

KERALA STATE TRANSPORT PROJECT - IV UPGRADATION OF STATE HIGHWAY


PALAKKAD TO SHORNUR (KM 0.000 TO 45.300) LINK NO. 50.1 THRISSUR TO KUTTIPURAM (KM 19.600 TO 52.680) LINK NO. 40
CLIENT : PUBLIC WORKS DEPARTMENT (GOVERNMENT OF KERALA) CONSULTANT : RITES CONTRACTOR : ROAD BUILDER (M) SDN. BHD.

Q.C.No. :

NUCLEAR COMPACTION TEST DATA


Serial No : Location : Compaction required : Layer : Stage of Work : Date : Tested by :

1 TEST NUMBER 2 CHAINAGE 3 DEPTH 4 COUNT ITEM (SEC) 5 WET DENSITY OFFSET KG/M3 6 MOISTURE OFFSET 7 TRUE MOISTURE 8 GAUGE TIME 9 WET DENSITY KG/M3 10 % MOISTURE 11 DRY DENSITY KG/M3 12 MDD KG/M3 13 OPTIMUM MOISTURE % 14 % COMPACTION 15 AVG. % COMPACTION

Tested by

Witnessed by

Checked by

Seen by

Lab Technician Contractor

Lab Technician Consultant

M.E. Contractor

M.E. Consultant

M.E. Consultant

Consultants RITES-BECA-WSA (JV) Link Link 50.1 40

Government of Kerala, Public Works Department KERALA STATE TRANSPORT PROJECT KSTP-Phase 1, World Bank Loan No.IN 4653

Package No.: IV Contractor: RB(M) SDN BHD

FIELD DENSITY TEST (Using nuclear density gauge )


Date: Location: Stage of Work: Required degree of compaction: Determination No. Chainage Wet Density of soil (kg/Cum) Moisture content (%) Dry Density (kg/Cum) Degree of compaction (%) 1 2 3 4 5 Depth: Type of Materials: MDD: OMC: 6 7 8 9 10 11 12

Determination No. Chainage Wet Density of soil (kg/Cum) Moisture content (%) Dry Density (kg/Cum) Degree of compaction (%) Remarks:

13

14

15

16

17

18

19

20

21

22

23

24

For Contractor

For Consultant

Consultants RITES-BECA-WSA (JV) Link Link 50.1 40

Government of Kerala, Public Works Department KERALA STATE TRANSPORT PROJECT KSTP-Phase 1, World Bank Loan No.IN 4653

Package No.: IV Contractor: RB(M) SDN BHD

FIELD DENSITY TEST As Per IS : 2720, Part 28


Date Location Stage of Work Required degree of compaction 1. Determination No. 2. Chainage 3. Wt. of sand before pouring (gm) 4. Wt. of sand after pouring (gm) 5. Wt. of sand in hole + cone (gm) 6. Wt.of sand in cone (gm) 7. Wt. of sand in hole (gm) 8. Volume of hole (cc) 9. Wt. of wet soil of hole (gm) 10.Wet Density of soil (gm/cc) 11.Container No. 12.Container Weight (gm) 13.Wt. of wet soil + Container (gm) 14.Wt.of dry soil + Container (gm) 15.Wt. of water (gm) 16.Moisture content (%) 17.Dry Density (gm/cc) 18.Degree of compaction (%) 1 Type of Materials Unit weight of sand MDD OMC 2 3 4 5 6

Remarks:

For Contractor

For Consultant

Consultants RITES-BECA-WSA (JV) Link Link 50.1 40

Government of Kerala, Public Works Department KERALA STATE TRANSPORT PROJECT KSTP-Phase 1, World Bank Loan No.IN 4653

Package No.: IV Contractor: RB(M) SDN BHD

FIELD DENSITY TEST FOR GSB & WMM As Per IS : 2720, Part 28
Date Location Stage of Work Required degree of compaction 1. Determination No. 2. Chainage 3. Wt. of sand before pouring (gm) 4. Wt. of sand after pouring (gm) 5. Wt. of sand in hole + cone (gm) 6. Wt.of sand in cone (gm) 7. Wt. of sand in hole (gm) 8. Volume of hole (cc) 9. Wt. of wet soil of hole (gm) 10.Wet Density of soil (gm/cc) 11.Container No. 12.Container Weight (gm) 13.Wt. of wet soil + Container (gm) 14.Wt.of dry soil + Container (gm) 15.Wt. of water (gm) 16.Moisture content (%) 17.Dry Density (gm/cc) 18. Wt. of material retained on 19mm 19.% of material retained on 19mm 20. MDD after correction 21.Degree of compaction (%) 1 Type of Materials Unit weight of sand MDD OMC 2 3 4 5 6

Remarks:

For Contractor

For Consultant