Você está na página 1de 33

Series 900

As seen on
Knit and Crochet
PATTERNS
Copyright Interweave Press LLC. Not to be reprinted. All rights reserved.
Chevron
Market Bag
Kristen TenDyke
publishers of Interweave Knits magazinejoin the online knitting community at KnittingDaily.com
Visit InterweaveStore.com/knittingpatterns for more great patterns!
Chevron Market Bag originally published in Interweave Knits, Spring 2010. Interweave Press LLC. Not to be reprinted. All rights reserved.
page 1
knittingpatterns
Originally published in
Interweave Knits, Spring 2010
K
a
t
h
r
y
n

M
a
r
t
i
n
publishers of Interweave Knits magazinejoin the online knitting community at KnittingDaily.com
Visit InterweaveStore.com/knittingpatterns for more great patterns!
page 3
Chevron Market Bag originally published in Interweave Knits, Spring 2010. Interweave Press LLC. Not to be reprinted. All rights reserved.
CHEVRON
MARKET BAG
K r i s t e n Te n D y k e
Finished Size 28" circumference and 15" tall,
not including strap.
Yarn Nashua Handknits Creative Focus
Cotton (100% mercerized cotton; 93 yd [84
m]/50 g): #24 ivory, 7 balls. Yarn distributed
by Westminster Fibers.
Needles Size 4 (3.5 mm): 16" circular (cir)
and set of double-pointed (dpn). Adjust needle
size if necessary to obtain the correct gauge.
Notions Markers (m); stitch holders; tapestry
needle.
Gauge 20 sts and 48 rows = 4" in purl brioche st.
Stitch Guide
Sl 1 yo (counts as 1 st): Bring yarn to front
between needles, sl 1 pwise, wrap yarn over
needle to back of work to complete yo, then
place yarn in correct position to work the next
st (depending on what next st isknit, purl,
or yo).
Brk1: K2tog (slipped st and its companionyo).
Purl Brioche Stitch in Rows: (multiple of 2
sts + 1)
Set-up row: (RS) Knit.
Row 1: (WS) K1, *sl 1 yo (see Stitch Guide),
k1; rep from * to end.
Row 2: (RS) K1, *brk1 (see Stitch Guide), k1;
rep from * to end.
Row 3: K2, sl 1 yo, *k1, sl 1 yo, rep from * to
last 2 sts, k2.
Row 4: K2, brk1, *k1, brk1; rep from * to last
2 sts, k2.
Rep Rows 14 for patt.
Purl Brioche Stitch in Rounds: (multiple of
2 sts)
Rnd 1: *P1, sl 1 yo, rep from * around.
Rnd 2: *K1, brk1; rep from * around.
Rnd 3: *Sl 1 yo, p1; rep from * around.
Rnd 4: *Brk1, k1; rep from * around.
Rep Rnds 14 for patt.
BASE
CO 15 sts. Work purl brioche st in rows (see
Stitch Guide) until piece measures 11" from
CO. BO all sts.
BAG
With RS of base facing, cir needle, and beg
at beg of BO edge, pick up and knit 14 sts
along BO edge, 56 sts along side edge, 14 sts
along CO edge, then 56 sts along 2nd side
edge140 sts total. Place marker (pm) and
join in the rnd. Work in purl brioche st in rnds
(see Stitch Guide) until piece measures 2" from
pick-up rnd, ending with Rnd 2 of patt. Work
Rnds 112 of Lower Brioche chart once. Work
Rnds 114 of Lace chart 4 times. Work Rnds
114 of Upper Brioche chart once. Work in
purl brioche st in rnds for 1". Next rnd: Work
15 sts in patt, BO 55 sts pwise, work 15 sts,
then slip these 15 sts to a holder for strap, BO
55 sts pwise15 sts rem on needle for strap.
Cont in patt (purl brioche st in rows) over
these 15 sts until strap measures 15" from bag
BO, ending with a RS row. Place sts on holder.
Transfer 15 held sts to needle, join yarn, and
work as for first strap. Join two ends of strap
with three-needle BO (see Glossary).
FINISHING
Cord: With dpn, CO 3 sts. Work I-cord (see
Glossary) for 30". BO all sts. Block pieces to
measurements. Thread I-cord through eyelets
at highest point of upper brioche patt. Tie an
overhand knot at each end of cord. Tie in bow.
Weave in ends.
Kristen TenDyke is a designer and technical
editor. She uses her graphic-design degree
in her job with Classic Elite Yarns, and it also
comes in handy when she self-publishes her
patterns online at www.kristentendyke.com.
Place stitches to be joined onto two separate needles. Hold them with
riht sides ot knittin tacin toether. Insert a third needle into tirst
stitch on each ot the other two needles and knit them toether as one
stitch. *Knit next stitch on each needle the same way. Pass tirst stitch
over second stitch. Repeat trom * until one stitch remains on third
needle. Cut yarn and pull tail throuh last stitch.
Three-Needle Bind-Off
I-Cord
With doublepointed needle, cast on desired number ot stitches. *With
out turnin the needle, slide the stitches to other end ot the needle, pull
the yarn around the back, and knit the stitches as usual, repeat trom
* tor desired lenth.
KRISTEN TENDYKES CHEVRON
MARKET BAG uses a dense lace motif of
interconnecting points and chevrons to
create a fabric that stretches but retains
strength. Right-leaning, left-leaning, and
centered decreases are sometimes
chained to form strong diagonals and
sometimes stacked for vertical lines, with
adjacent yarnovers to create open areas
and balance the fabric. YARN Nashua
Handknits Creative Focus Cotton,
distributed by Westminster Fibers
publishers of Interweave Knits magazinejoin the online knitting community at KnittingDaily.com
Visit InterweaveStore.com/knittingpatterns for more great patterns!
page 4
Chevron Market Bag originally published in Interweave Knits, Spring 2010. Interweave Press LLC. Not to be reprinted. All rights reserved.
RISK-FREE
TRIALOFFER
Discover knitwear designs that will capture your imagination.
From cover to cover, Interweave Knits magazine gives you great
projects, from the beginner to the advanced. Every issue is packed full
of captivating smart designs, step-by-step instructions, easy-to-
understand illustrations, plus well-written, lively articles sure to inspire.
Take advantage of this special risk-free offer today!
interweave.com/go/kdiwk
k2tog
k on RS; p on WS
p on RS; k on WS
sl 1 yo (counts as 1 st)
brk1: k2tog (yo and sl st)
ssk
yo
k1tbl
*sl 1 pwise wyb,
replace m, cont
working sts as shown
pattern repeat
sl 1 kwise, k2tog, psso
14 st repeat
13*
11
9
7*
5
3
1
Lace
14 st repeat
11*
9
7
5
3
1
Lower Brioche
14 st repeat
13*
11
9
7*
5
3
1
Upper Brioche
Copyright Interweave Press LLC. Not to be reprinted. All rights reserved.
J
o
e

C
o
c
a
publishers of Interweave Crochet magazinejoin the online crochet community at crochetme.com
Visit InterweaveStore.com/crochetpatterns for more great patterns!
Birch Vest originally published in Interweave Crochet, Fall 2010. Interweave Press LLC. Not to be reprinted. All rights reserved.
page 1
crochetpatterns
Birch Vest
Kristin Omdahl
Originally published in
Interweave Crochet, Fall 2010
publishers of Interweave Crochet magazinejoin the online crochet community at crochetme.com
Visit InterweaveStore.com/crochetpatterns for more great patterns!
Birch Vest originally published in Interweave Crochet, Fall 2010. Interweave Press LLC. Not to be reprinted. All rights reserved.
page 2
Some concentration required
FINISHED SIZE 34 (38, 42, 46, 50)" bust circumference and 28 (28
1
2, 29,
29
1
2, 30)" in length. Garment shown measures 34", modeled with 0" ease.
YARN Malabrigo Silky Wool [50% silk, 50% baby merino; 150 yd [137
m]/1
3
4 oz [50 g]; ): #433 acorn, 4 (5, 5, 6, 6) balls.
HOOK Size G/6 (4 mm). Adjust hook size if necessary to obtain correct
gauge.
NOTIONS Stitch markers (m); yarn needle; three
3
4" buttons.
GAUGE 17 sts and 6 rows = 4" in dc, blocked.
Notes
Garment is worked from the top down beg at the neck.
Stitch Guide
Treble crochet 2 together (tr2tog): *Yo 2times, insert hook in indi-
cated st, yo and pull up lp, [yo and draw through 2 lps on hook] 2
times; rep from *, yo and draw through rem 3 lps on hook.
Treble crochet 3 together (t3tog): *Yo 2 times, insert hook in indicat-
ed st yo and pull up lp, [yo and draw through 2 lps on hook] 2 times;
rep from * 2 more times, yo and draw through rem 4 lps on hook.
3tr-cluster (3tr-cl): *Yo 2 times, insert hook in indicated st, yo and pull
up lp, [yo and draw through 2 lps on hook] 2 times; rep from * 2 more
times in same st, yo and draw through rem 4 lps on hook.
Reverse dc (rev dc): Yo, working from left to right, insert hook in next
st to right, yo and pull up lp (3 lps on hook), [yo and draw through 2
lps on hook] 2 times.
Picot: Ch 3, sl st in third ch from hook.
V-st: (2dc, ch 2, 2 dc) in indicated st or sp.
Fan patt
Row 1: Ch 1, sc in frst 2 sts, *[ch 4, sk next (tr, ch 2, tr), sc in next tr] 2
times, sk next (tr, ch 2, tr), ch 1, [tr, ch 1] 6 times in next tr, sk next (tr,
ch 2, tr), sc in next tr, [ch 4, sk next (tr, ch 2, tr), sc in next tr] 2 times;
rep from * to last st, sc in last tr, turn.
Row 2: Ch 1, sc in frst 2 sc, *ch 4, sc in next sc, ch 2, [tr, ch 2] in each of
next 2 tr, (tr, ch 2) 2 times in each of next 2 tr, (tr, ch 2) in each of next
2 tr, sk next (sc, ch 4), sc in next sc, ch 4, sc in next sc, rep from * to
last st, sc in last sc, turn.
Row 3: Ch 4 (counts as sc and ch 3), sc in next st, *ch 2, [3tr-cl (see
Stitch Guide) in next tr, picot (see Stitch Guide), ch 3] 8 times, sk next
(sc, ch 4), (sc, ch 5, sc) in next sc; rep from * to last 2 sc omitting fnal (sc,
ch 5, sc), sc in next sc, ch 2, dc in last sc, turn.
Row 4: Ch 4 (counts as tr), tr2tog (see Stitch Guide) working one leg
in same st and 2nd leg in next ch-3 sp, *ch 4, [dc in next ch-3 sp, ch
4] 5 times, tr3tog (see Stitch Guide) working frst leg in next ch-3 sp,
2nd leg in next ch-5 sp, and 3rd leg in next ch-3 sp; rep from * to last
2 ch-3 sps, omitting fnal tr3tog, tr2tog working frst leg in next ch-3
sp and 2nd leg in fnal ch-3 sp, tr in last sc, turn.
Row 5: Ch 3 (counts as dc), dc in frst tr2tog, dc in next ch-4 sp, *ch
2, hdc in same ch-4 sp, hdc in next dc, hdc in next ch-4 sp, [ch 2, sc
in same ch-4 sp, sc in next dc, sc in next ch-4 sp] 3 times, ch 2, hdc
in same ch-4 sp, hdc in next dc, hdc in next ch-4 sp, ch 2, dc in same
ch-4 sp, dc in next st, dc in next ch-4 sp; rep from * across, working
last dc in last tr, turn.
Row 6: Ch 4 (counts as tr), tr in next 2sts, *ch 2, tr in next 3 sts; rep
from * across,turn.
Rep Rows 16 for patt.
Yoke
Ch 42 (50, 58, 66, 74).
Row 1: (RS) 2 dc in 3rd ch from hook, dc in next 3 (4, 5, 6, 7) ch,
V-st (see Stitch Guide) in next ch, dc in next 7 (9, 11, 13, 15) ch,
V-st in next ch, dc in next 14 (16, 18, 20, 22) ch, V-st in next ch,
dc in next 7 (9, 11, 13, 15) ch, V-st in next ch, dc in next 3 (4, 5,
6, 7) ch, 2 dc in last ch, turn54 (62, 70, 78, 86) dc.
Row 2: Ch 2 (does not count as st), 2 dc in frst dc, *dc to ch-2 sp,
V-st in next ch-2 sp; rep from * 3 times, dc to last dc, 2 dc in last
dc, turn72 (80, 88, 96, 104) dc.
Rows 34: Rep Row 2108 (116, 124, 132, 140) dc.
Row 5: Ch 3 (counts as dc), *dc to ch-2 sp, V-st in next ch-2 sp;
rep from * 3times, dc to end, turn124 (132, 140, 148, 156) dc.
Rep Row 5 eight (nine, ten, eleven, twelve) more times252
(276, 300, 324 348) dc. Next row: Ch 3, dc in frst dc, dc in next
34 (37, 40, 43, 46) dc for front, ch 12 for underarm, sk next 58
(64, 70, 76, 82) dc for armhole, dc in next 66 (72, 78, 84, 90) dc
for back, ch 12 for underarm, sk next 58 (64, 70, 76, 82) dc for
armhole, dc in last 35 (38, 41, 44, 47) dc for front, turn161 (173,
185, 197, 209) sts including underarm ch. Beg lower body lace:
K R I S T I N O MDA H L
BIRCH VEST
44 (44, 58, 58, 58)"
112 (112, 147.5, 147.5, 147.5) cm
b
u
s
t
:

3
2

(
3
6
,

4
0
,

4
4
,

4
8
)
"
8
1
.
5

(
9
1
.
5
,

1
0
1
.
5
,

1
1
2
,

1
2
2
)

c
m
19"
48.5 cm
9

(
9
1
2
,

1
0
,

1
0
1
2
,

1
1
)
"
2
3

(
2
4
,

2
5
.
5
,

2
6
.
5
,

2
8
)

c
m
6 (6
1
4, 6
1
2, 6
3
4, 7)"
15 (16, 16.5, 17, 18) cm
4 (4
1
2, 5
1
2, 6, 6
1
2)"
10 (11.5, 14, 15, 16.5) cm
body
publishers of Interweave Crochet magazinejoin the online crochet community at crochetme.com
Visit InterweaveStore.com/crochetpatterns for more great patterns!
Birch Vest originally published in Interweave Crochet, Fall 2010. Interweave Press LLC. Not to be reprinted. All rights reserved.
page 3
Row 1 (inc): Ch 4 (counts as tr), tr in next 2 sts, [ch 2, sk next 2
sts, tr in next 3 sts] 7 (13, 7, 13, 19) times, [ch 2, sk next st, tr in
next 3 sts] 22 (10, 28, 16, 4) times, [ch 2, sk next 2 sts, tr in next 3
sts] 7 (13, 7, 13, 19) times, turn111 (111, 129, 129, 129) tr.
Work fan patt (see Stitch Guide) 4times6 (6, 7, 7, 7) fans.
Fasten off. Front bands:
Row 1: (RS) Beg at lower right front edge and with RS facing,
join at corner, ch 3 (counts as dc throughout), work 83 (85, 87,
89, 91) dc evenly up right front to foundation ch, 3 dc in beg
foundation ch, place marker (pm) in center dc of 3-dc group, dc
in next 38 (46, 54, 62, 70) ch of neckline, 3 dc in last foundation
ch, pm in center dc of 3-dc group, work 84 (86, 88, 90, 92) dc
evenly down left front, turn212 (224, 236, 248, 260) dc.
Row 2: Ch 3, *dc in each st to m, 3 dc in marked st, move m to
center dc; rep from *, dc in next 25 (27, 29, 31, 33) dc, [ch 2, sk
next 2 sts, dc in next 6 sts] 2 times, ch 2, sk next 2 sts, dc to end,
turn210 (222, 234, 246, 258) dc and 3 ch-2 sps.
Row 3: Ch 3, dc across, working 3 dc in each marked st and 2 dc
in each ch-2 sp, do not turn, remove m220 (232, 244, 256, 268)
dc.
Edging: Working from left to right, rev dc (see Stitch Guide) in
each st around left front, neck, and right front, work 3 rev dc at
lower corner of right front, work rev dc in each st and ch across
bottom of vest, work 3 rev dc in last st, sl st in beg rev dc to join.
Fasten off and weave in loose ends.
Finishing
Gently block vest by hand, washing in cool water. Lay fat to dry.
Using buttonholes as a guide, sew buttons to left-front band.
KRISTIN OMDAHL, cohost of Crochet Corner on Knitting Daily TV, is the
author of Wrapped in Crochet (Interweave, 2008) and Crochet So Fine (In-
terweave, 2010).
beg begin(s); beginning
bet between
blo back loop only
CC contrasting color
ch chain
cm centimeter(s)
cont continue(s); continuing
dc double crochet
dtr double treble crochet
dec(s)(d) decrease(s); decreasing;
decreased
est established
fdc foundation double crochet
flo front loop only
foll follows; following
fsc foundation single crochet
g gram(s)
hdc half double crochet
inc(s)(d) increase(s); increasing;
increased
k knit
lp(s) loop(s)
MC main color
m marker
mm millimeter(s)
patt(s) pattern(s)
pm place marker
p purl
rem remain(s); remaining
rep repeat; repeating
rev sc reverse single crochet
rnd(s) round(s)
RS right side
sc single crochet
sk skip
sl slip
sl st slip(ped) stitch
sp(s) space(es)
st(s) stitch(es)
tch turning chain
tog together
tr treble crochet
WS wrong side
yd yard
yo yarn over hook
* repeat starting point
( ) alternate measurements and/or
instructions
[ ] work bracketed instructions a
specifed
number of times
Abbreviations
RISK-FREE
TRIAL OFFER
Interweave Crochet IS A MUST- HAVE
FOR THOSE WHO LOVE TO CROCHET!
interweave.com/kdiwc
#4301-H RENDEZVOUS MITERED GARTER ST. SCARF
Designed By: Barry Klein Copyright: March 2011

TRENDSETTER YARNS USED:
Rendezvous #4-4/50gr.
Trendsetter Needles #11

SIZE: 6 x 64.

GAUGE: With #11 needle and Rendezvous
in Garter St.; 12sts = 4.

STITCHES USED:
Garter St.:
KNIT every row.

#4301-H Rendezvous Mitered Garter St. Scarf Knitting Instructions

SCARF: With #11 needle and A, Cast on 3sts. Knit 1 row. Work as follows:

Row 1: K1 Increasing in stitch, K2.
Row 2: K1 Increasing in stitch, K3.
Row 3: K1 Increasing in stitch, K4.
Continue in this manner, increasing in first stitch of each row until the length from cast on tail to needle is
6 and making sure an even number of stitches are on the needle.

Change to work short row mitered sequence as follows:
Row 1(RS): K1 Increasing in stitch, SSK. Turn work.
Row 2 and all WS rows: Knit across the stitches just worked.
Row 3: K1 Increasing in stitch, K1, SSK. Turn work.
Row 5: K1 Increasing in stitch, K2, SSK. Turn work.
Row 7: K1 Increasing in stitch, K3, SSK. Turn work.
Row 9: K1 Increasing in stitch, K4, SSK. Turn work.
Continue in this sequence, working 1 additional stitch before SSK every RS row until the complete row is
worked. Last row will be a RS row ending with SSK.

Continue in the mitered sequence alternating from side to side until enough yarn remains for the final
miter.

Scarf Finish as follows:
Work in Short Row Mitered Sequence until of stitches are on the right needle. Work next RS row as
follows:
Row 1 (RS): K1, SSK, work until the center join SSK as before and both needles will now have same
number of stitches.
Row 2 and all WS rows: Knit across the stitches just worked.
Repeat these 2 rows until 6 stitches remain.
Row 1: K1, SSK.
Row 2: Turn and K2.
Row 3: K1, SSK.
Row 4: Turn and K2.
Row 5: K1, SSK and bind off all stitches. Pull tail through to finish off.

Copyright Interweave Press LLC. Not to be reprinted. All rights reserved.
publishers of Interweave Knits magazinejoin the online knitting community at KnittingDaily.com
Visit InterweaveStore.com/knittingpatterns for more great patterns!
Albus Argyle Socks originally published for Intarsia Indepth. Interweave Press LLC. Not to be reprinted. All rights reserved.
page 1
knittingpatterns
A
n
n
e

S
w
a
n
s
o
n
Albus
Argyle
Socks
Anne Berk
publishers of Interweave Knits magazinejoin the online knitting community at KnittingDaily.com
Visit InterweaveStore.com/knittingpatterns for more great patterns!
Albus Argyle Socks originally published for Intarsia Indepth. Interweave Press LLC. Not to be reprinted. All rights reserved.
page 2
ALBUS ARGYLE
SOCKS
A n n e B e r k
T
his is a completely traditional argyle
sock, knit from the top down, with solid
color heel and toe, traditional gusset and heel
shaping. The only new aspect is that it is knit
in the round, entirely seamless.
Finished Size 8 (9
1
4, 11
1
4)" foot circumfer-
ence, and 10
1
4 (12, 14
1
2)" long from back of
heel to tip of toe. Foot length is adjustable.
Yarn Louet North America Gems #1 Super
Fine (100% merino wool; 185 yd [169 m]/1
3
4
oz [50 g]): steel gray (MC) 2 (3, 3) skeins; teal
(CC1), navy (CC2), willow (AC1), goldilocks
(AC2) 1 skein each.
Needles Size 2 (2.75 mm): long circular
(cir) for magic-loop method or set of double-
pointed (dpn).
Notions Markers (m); tapestry needle.
Gauge 32 sts and 44 rows = 4" in patt.
NOTES
t
The instructions are written to knit the
large diamond motifs using intarsia in the
round and to add the accent color lines
during finishing using duplicate stitch.
Accent color lines can be knit at the same
time as the sock if preferred. If the accent
color lines are all the same color, make
the accent color strand twice the length
that you need, and begin knitting from
mid-strand, carrying each end up across
the work, according to the chart. This
eliminates two ends to weave in for each
accent strand used.
t
Wind butterflies of each color by wind-
ing yarn around the palm of the hand
10-30 times. Now, remove the yarn from
the hand, wind the loose end around the
middle of the loop a few times, then secure
with a half-hitch loop (pretend you are
making a e-wrap cast on, and place around
the butterfly, then pull securely). You
will knit from the other end of the yarn,
and pull out yarn a bit at a time. Alterna-
tively, wind the same amount of yarn onto
bobbins.
Prepare 1 yarn butterfly or bobbin for each
diamond, and 2 for the main color (MC).
Each section will need its own source of
yarn. On Row 1, strand the MC behind the
contrast color (CC) diamonds. On Row 2,
begin the 2nd strand of MC after working
first CC diamond.
As you get more comfortable with the
technique, lengthen the strands you are
working with to reduce the number of
ends to weave in. As butterflies are used
and get messy, unwind them and re-wind,
or just let hang loose and pull through to
untangle. Store butterflies or prepared
bobbins in a ziplock baggie, and carry with
the work instead of the balls of yarn. More
butterflies and bobbins can be created as
work progresses.
t
Note on loops: when turning work,
you will always create a loop as you link the
yarn strands over each other, which marks
the end of the row. You should always have
one loop on the needlebut only one. If
you find that you have two loops next to
each other, one is a false loop that was
created by not pulling the previous yarn
through the loop when you finished the
previous row. The loop that you come to
first on the needle is the false one. Pull
that yarn free from the real loop and you
will be good to go.
Leave 4" tails when adding new yarn and
when you come to the end of a strand, so
that ends can be woven in securely. Weave
ends into the joined links, use a sharp
needle to weave the yarn into the links,
not around them, for security. You should
not need any knots. When weaving, gently
guide the needle through the fibers of the
links, for 3-4 links, then return along the
same path. This will smush the fibers all
together, and they arent going anywhere.
You will not be sewing into any actually
knitted sts, and nothing will show on the
public side.
Do not stop working at the end of a row.
Without a loop in the knitting to tell you
where you are, you will lose track of your
place, and where to turn the work. When
working a loop, always turn the work
afterward, and work at least a few stitches,
creating a new loop. Placing a locking
marker at the end of the row can also be
a helpful guide when first learning this
technique.
When the strands get tangled, take a
moment to untangle the yarn butterflies,
or undo the butterflies and pull the entire
strand free. Generally, once you get a few
separated, the rest untangle very easily.
SOCK
With MC and cir needle or dpn, CO 64 (78,
94) sts. Place marker (pm) and join in the rnd
being careful not to twist sts. Work k1, p1
ribbing for 2
1
2 (3, 3)", or desired length. Next
rnd Knit, dec 0 (4, 4) sts evenly around64
(74, 90) sts rem. Remove m.
Row 1: RS (Set-up row) Join CC1, leaving a 4"
tail. With CC1, k1, drop CC1, cross MC over
CC1, with CC1, k1 (0, 0), with MC, k30 (36,
44), join CC2 leaving a 4" tail, k2 (1, 1), cross
MC over CC2, with MC, k30 (36, 44), turn.
Row 2: (WS) With MC Sl 1 pwise (the beg of
row moves 1 st, you will work the sl st at the
end of the row), take the strand of CC1 from
the edge of the section to the right and bring
over the top of MC that you were just knitting
with, note the loop of color CC1 at beg of
row, where it crossed over to be locked by MC,
with MC p28 (34, 42), pick up CC2 from under
MC to link colors, with CC2, p4 (3, 3), join new
MC, p1, cross CC2 over MC, with MC, p27 (33,
41). The loop of CC1 signals the end of row.
Pull on the loop to loosen enough yarn to purl
with. Put your butterfly of MC through the
loop of CC1 to link the colors. With the yarn
from the loop of CC1, p4 (3, 3) including sl
st of MC from beg of row. Gently tighten the
loop to draw up the extra yarn, turn. Leave
the yarn butterflies or bobbins to the outside
of the work.
Row 3: (RS) Sl 1 kwise from right needle left
needle (beg of row moves over 1 st again, as
you increase the size of the diamond, sl st will
be worked at beg of Row 3), cross MC from
the edge of the section to the right over top of
CC1, note the loop of MC at beg of row. With
CC1, k6 (5, 5), drop CC1, pick up MC from un-
der CC1 to link, with MC, k26 (32, 40), pick up
CC2 from under MC, with CC2, k6 (5, 5). Pick
up MC from under CC2, with the yarn from
publishers of Interweave Knits magazinejoin the online knitting community at KnittingDaily.com
Visit InterweaveStore.com/knittingpatterns for more great patterns!
Albus Argyle Socks originally published for Intarsia Indepth. Interweave Press LLC. Not to be reprinted. All rights reserved.
page 3
RISK-FREE
TRIAL OFFER
Interweave Knits IS A MUST- HAVE
FOR THOSE WHO LOVE TO KNIT!
interweave.com/go/kdiwk
the loop of MC, k26 (32, 40). Gently tighten
the loop to draw up the extra yarn, turn.
Follow chart, cont to form diamonds, being
careful to link yarn at each color change. Work
31 (37, 45) rows of chart once, then reverse
CC1 and CC2 and work chart again. Row 1 on
second rep of chart will be a WS row.
The heel flap needs to be knit on an even
number of sts, in order for the heel st patt to
work correctly. With diamond motif centered
below, arrange 32 (36, 44) sts on one needle
for the heel flap as foll. With MC, k17 (18,
22) sts, ending at end of heel sts. Heel sts
should be centered above one diamond and
instep centered above the second diamond.
Place next 32 (38, 46) st on holder for instep.
Heel fap:
Row 1: (WS) *Sl 1, p1; rep to end.
Row 2: (RS) Sl 1, knit to end.
Rep Rows 1 and 2: 15 (17, 21) more times,
and then work Row 1 once more. Turn Heel:
Row 1: (RS) K18 (20, 24), ssk, k1, turn.
Row 2: (WS) Sl 1, p5, p2tog, p1, turn.
Row 3: Sl 1 pwise, knit to 1 st before gap, ssk,
k1, turn.
Row 4: Sl 1 pwise, purl to 1 st before gap,
p2tog, p1, turn.
Work Rows 3 and 4 until all sts have been
worked. With RS facing, knit heel sts, pick
up and knit 16 (18, 22) sts on the left edge of
the flap, picking up into the slipped sts, pm.
Starting on Row 1 of chart and working center
diamond only, knit across all instep sts in
patt, centering the new diamond on top of the
previous one, pm, pick up and knit 16 (18, 22)
sts on right edge of the flap, pm. Knit to motif
edge, turn work, make loop and purl 1 row
even, loop yarn, finishing row, turn. Gusset
Dec row (RS) Knit to m, sl m, k1, ssk, work in
patt to 3 sts before m, k2tog, k12 sts decd.
Working in St st with MC over foot and gus-
set, and argyle patt over instep, rep Dec row
every RS row 8 (9, 11) more times64 (74,
90) sts rem.
Size note: If the ankle is large, but the foot
is a smaller size, continue to decrease gusset
until the correct stitch count for the foot.
Work the foot for the smaller size.
When finished with argyle chart, work with
MC only for remainder of sock, in the rnd.
Cont working even in St st until the foot
covers the little toe, or 7
1
2 (8
1
2, 9)" from heel.
Lengthen or shorten the foot here to adjust
for individual size. Toe: Dec rnd On needle
1, (instep) k1, ssk, knit to end; on needle 2
(instep) knit to last 3 sts, k2tog, k1; on needle
3 k1, ssk, knit to last 3 sts, k2tog, k14 sts
decd. Next rnd Knit. Rep last 2 rnds 7 (9, 11)
more times32 (34, 42) sts rem. Then rep
Dec rnd every rnd 4 (4, 5) times16 (18, 22)
sts rem.
FINISHING
Use Kitchener st (see page 5) to graft toe
seam. Using Argyle chart as a guide and du-
plicate st, add accent lines using any combina-
tion of AC1 and AC2.
Anne Berk was certifed by TKGA as a Master
Knitter in 2003. She has written patterns
and articles for many publications, including
Piecework, Sockupied, ColorKnit and Twist
Collective. Anne is also an optometrist in
private practice in Portland, OR, is a distance
runner and a busy wife and mom.
beg beginning; begin; begins
bet between
BO bind of
CC contrasting color
cm centimeter(s)
cn cable needle
CO cast on
cont continue(s); continuing
dec(s) decrease(s); decreasing
dpn double-pointed needle(s)
foll following; follows
g gram(s)
inc increase(s); increasing
k knit
k1f&b knit into front and back of
same st
k2tog knit two stitches together
kwise knitwise
LC left cross
m(s) marker(s)
MC main color
mm millimeter(s)
M1 make one (increase)
M1R (L) make one right (left)
p purl
p1f&b purl into front and back of
same st
p2tog purl two stitches together
patt(s) pattern(s)
pm place marker
psso pass slipped stitch over
p2sso pass two slipped stitches
over
pwise purlwise
RC right cross
rem remain(s); remaining
rep repeat; repeating
rev St st reverse stockinette stitch
rib ribbing
rnd(s) round(s)
RS right side
rev sc reverse single crochet
sc single crochet
sk skip
sl slip
sl st slip stitch (sl 1 st pwise
unless otherwise indicated)
ssk slip 1 kwise, slip 1 kwise,
k2 sl sts tog tbl (decrease)
ssp slip 1 kwise, slip 1 kwise, p2
sl sts tog tbl (decrease)
st(s) stitch(es)
St st stockinette stitch
tbl through back loop
tog together
WS wrong side
wyb with yarn in back
wyf with yarn in front
yo yarn over
* repeat starting point
(i.e., repeat from *)
* * repeat all instructions
between asterisks
( ) alternate measurements
and/or instructions
[ ] instructions that are to be
worked as a group a
specifed number of times
ABBREVIATIONS
publishers of Interweave Knits magazinejoin the online knitting community at KnittingDaily.com
Visit InterweaveStore.com/knittingpatterns for more great patterns!
Albus Argyle Socks originally published for Intarsia Indepth. Interweave Press LLC. Not to be reprinted. All rights reserved.
page 4
MC
CC1
CC2
AC1
AC2
turning point
Key
90 sts
45
43
41
39
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
Large, size 111/4"
74 sts
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
Medium, size 91/4"
publishers of Interweave Knits magazinejoin the online knitting community at KnittingDaily.com
Visit InterweaveStore.com/knittingpatterns for more great patterns!
Albus Argyle Socks originally published for Intarsia Indepth. Interweave Press LLC. Not to be reprinted. All rights reserved.
page 5
MC
CC1
CC2
AC1
AC2
turning point
Key
64 sts
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
Small, size 8"
Illustration by Gayle Ford
Step 1: Bring threaded
needle through front
stitch as if to purl and
leave stitch on needle.
Step 2: Bring threaded
needle through back
stitch as if to knit and leave stitch on needle.
Step 3: Bring threaded needle through first front stitch
as if to knit and slip this stitch off needle. Bring thread-
ed needle through next front stitch as if to purl and
leave stitch on needle.
Step 4: Bring threaded needle through first back stitch
as if to purl (as illustrated), slip this stitch off, bring
needle through next back stitch as if to knit, leave this
stitch on needle.
Repeat Steps 3 and 4 until no stitches remain on
needles.
Kitchener Stitch
Cleopatra Crochet Wire Cu
This incredibly simple, yet strikingly sophisticated accessory takes only a few short
hours to make. Working with wire instead of yarn is the only learning curve here, as the
entire project is worked in only slip stitch and single crochet!
Even the clasp is joined to the cuff bracelet seamlessly.
Materials:
one spool of 28 gauge non-tarnish silver or gold wire; Artistic Wire; 40yds per spool
one 5-strand bar clasp in matching color tone
B/1 (2.25mm) crochet hook for crocheting with wire
Steel 10 (1.3mm) crochet hook for joining clasp to bracelet
Gauge: 5 sts/5.5 rows = 1
Finished size(s): 2.5 x 7 not including clasp
Instructions:
Ch 14
Row 1: sc in 2nd ch from hook and ea ch across.
-- 13 scs (See Figure 1)
Row 2: ch1, sc in ea st across. -- 13 sts
(See Figure 2)
Row 3 - 28:rep row 2
(See Figure 3)
Round 29: do not turn, working along end of
rows, slip stitch in ea row, turn, working along
bottom of beginning chain, slip stitch in ea of
rst 4 chains. *Holding bar clasp close next to
bracelet, insert hook into next chain and loop on
bar clasp, yarn over, pull thorugh all. (See Figure
4). Rep from * 4 more times. Continue to slip
stitch in ea st to end of row, turn, working along
end of rows, slip stitch in end of each row, turn,
work slip stitch in ea of next 4 sts from row 28.
*Holding bar clasp close next to bracelet, insert
hook into next chain and loop on bar clasp, yarn
over, pull thorugh all. Rep from * 4 more times.
Continue to slip stitch in ea st to end of round.
Slst in rst slst at beg of round to join. Fasten off.
(See Figure 6)
Figure 1
Figure 2
Kristin Omdahl and Styled By Kristin patterns are for your personal use only and not to be used to create items for commercial gain. All Styled by Kristin patterns are
licensed for single use and remain the intellectual property of Kristin Omdahl and Styled by Kristin. This pattern may not be reproduced or transmitted in any form or
by any means, electronic, mechanical, photocopying, recording or otherwise.
Copyright 2012, All Rights Reserved
Figure 3 Figure 4
Figure 5 Figure 6
Copyright Interweave Press LLC. Not to be reprinted. All rights reserved.
J
o
e

H
a
n
c
o
c
k
TM publishers of Interweave Knits magazinejoin the online knitting community at KnittingDaily.com
Visit InterweaveStore.com/knittingpatterns for more great patterns!
Amstel Hat originally published in Interweave Knits, Fall 2012. Interweave Press LLC. Not to be reprinted. All rights reserved.
page 1
knittingpatterns
TM
Amstel Hat
Courtney Kelley
Originally published in
Interweave Knits, Fall 2012
TM publishers of Interweave Knits magazinejoin the online knitting community at KnittingDaily.com
Visit InterweaveStore.com/knittingpatterns for more great patterns!
Amstel Hat originally published in Interweave Knits, Fall 2012. Interweave Press LLC. Not to be reprinted. All rights reserved.
page 2
AMSTEL HAT
C o u r t n e y K e l l e y
Finished Size 20" brim circumference,
with ribbing stretched.
Yarn The Fibre Company Road to China
(65% baby alpaca, 15% silk, 10% camel,
10% cashmere; 69 yd [63 m]/1oz [50 g]):
blue tourmaline, 2 skeins. Yarn distrib-
uted by Kelbourne Woolens.
Needles Bodysize 8 (5 mm): 16"
circular (cir) and set of 5 double-pointed
(dpn). Brimsize 6 (4 mm): 16" cir. Adjust
needle size if necessary to obtain the
correct gauge.
Notions Marker (m); tapestry needle.
Gauge 16 sts and 28 rows = 4" in charted
patt (Rows 1124) on larger needles.
NOTES
t
Hat is worked from the top down.
HAT
Using the Emily Ocker method (see page 3),
CO 8 sts, divided evenly over 4 dpn. Place
marker (pm) and join in the rnd. Next rnd
[K1, k1f&b] 4 times12 sts: 3 sts on each
needle. Work Rnds 110 of Chevron chart,
changing to larger cir needle when neces-
sary88 sts: 22 sts on each needle. Work
Rnds 1124 two times, then work Rnds
2530. Change to smaller cir needle and
work chart Rnd 3172 sts rem. Cont in rib
patt as established for 1". BO all sts.
FINISHING
Pull CO tail to close hole in center. Weave
in ends and block.
Courtney Kelley is coeditor of the new book,
November Knits, and coauthor of Vintage
Modern Knits (Interweave, 2012 and 2011,
respectively). She lives in Philadelphia,
Pennsylvania, and is part owner of Kel-
bourne Woolens, distributor of The Fibre
Company yarns. You can see more of her
work at www.kelbournewoolens.com/blog.
knit
purl 2
no stitch
k1f&b
p3tog
pattern repeat
work 2x
31
29
27
25
23
21
19
17
15
13
11
1
3
5
7
9
2 2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Chevron
TM publishers of Interweave Knits magazinejoin the online knitting community at KnittingDaily.com
Visit InterweaveStore.com/knittingpatterns for more great patterns!
Amstel Hat originally published in Interweave Knits, Fall 2012. Interweave Press LLC. Not to be reprinted. All rights reserved.
page 3
beg beginning; begin; begins
bet between
BO bind of
CC contrasting color
cm centimeter(s)
cn cable needle
CO cast on
cont continue(s); continuing
dec(s) decrease(s); decreasing
dpn double-pointed needle(s)
foll following; follows
g gram(s)
inc increase(s); increasing
k knit
k1f&b knit into front and back of
same st
k2tog knit two stitches together
kwise knitwise
LC left cross
m(s) marker(s)
MC main color
mm millimeter(s)
M1 (P) make one (purl)
M1R (L) make one right (left)
p purl
p1f&b purl into front and back of
same st
p2tog purl two stitches together
patt(s) pattern(s)
pm place marker
psso pass slipped stitch over
p2sso pass two slipped stitches
over
pwise purlwise
RC right cross
rem remain(s); remaining
rep repeat; repeating
rev St st reverse stockinette stitch
rib ribbing
rnd(s) round(s)
RS right side
rev sc reverse single crochet
sc single crochet
sk skip
sl slip
sl st slip stitch (sl 1 st pwise
unless otherwise indicat-
ed)
ssk slip 1 kwise, slip 1 kwise,
k2 sl sts tog tbl (decrease)
ssp slip 1 kwise, slip 1 kwise,
p2 sl sts tog tbl (decrease)
st(s) stitch(es)
St st stockinette stitch
tbl through back loop
tog together
WS wrong side
wyb with yarn in back
wyf with yarn in front
yo yarn over
* repeat starting point (i.e.,
repeat from *)
* *
repeat all instructions
between asterisks
( ) alternate measurements
and/or instructions
[ ] instructions that are to be
worked as a group a speci-
fed number of times
ABBREVIATIONS
I
l
l
u
s
t
r
a
t
i
o
n
s

b
y

G
a
y
l
e

F
o
r
d
EMILY OCKERS CIRCULAR BEGINNING
This technique comes from Elizabeth Zimmermanns
Knitters Almanac (Dover, 1981). Make a simple loop
of yarn with the short end hanging down (Figure 1).
With a crochet hook, *draw a loop through main loop,
then draw another loop through this loop (Figure2).
Repeat from * for each stitch to be cast on (Figure 3).
After several inches have been worked, pull on the
short end (shown by arrow) to tighten the loop and
close the circle.
Figure 2
Figure 3
Figure 1
RISK-FREE
TRIAL OFFER
Discover knitwear designs that will
capture your imagination.
You dont have to be a designer or a knitting pro to
make beautiful knitted garments and accessories,
and you dont have to hunt all over for inspiring
designs.
From cover to cover, Interweave Knits magazine
gives you great projects, from the beginner to the
advanced. Every issue is packed full of captivating
smart designs, step-by-step instructions, easy-to-
understand illustrations, plus well-written, lively
articles sure to inspire.
Take advantage of this special risk-free ofer today!
interweave.com/go/kdiwk
6606 Lush Cowl
designed by Laura Bryant 2012
A generous cowl with subtle shaping oers several styling opons.
Wear it down on your shoulders, or on one shoulder as above.
Drape loosely around your neck for dramac eect.
Double up and stack all that luscious texture for a column of color.
Main body is one skein of Wild, Cool or Neat Stu; we used Nevada.
Two skeins of Plume create a deep, rich fur edge.
I want one in every color, how about you?
One Size: approx 10 x 36
Materials:
1 Full skein

Stu A
2 Plume B
Circ Needles #9 & 10 or size to get gauge
Gauge: With Stu on #9, 16 sts & 24 rows = 4
Cowl: With B and #10 needle, CO 120 sts. Knit 2 rows.
Join for circular kning, taking care not to twist. Work
garter stch (k 1 rnd, p 1 rnd) for 4 rnds. Change to A
and stockinee st (k every rnd) and work to 5. Change
to # 9 needle and work to 7. Dec 10 sts evenly spaced
around next rnd. Knit 1 rnd. Dec 10 sts evenly spaced
on next rnd. Cont to 8. Work 9 rnds B in garter st on
#9 needle, then BO all sts in B with elasc bind o: *k
2 tog, slip st back to LH needle* repeat **. Fasten o &
bury end.


www.prismyarn.com
www.prismyarn.com info@prismyarn.com
This airy scarf has great drape and style. The entier scarf
is worked in garter stitch, then stitches are dropped and
allowed to run to the cast on edge during bind off.
Stitches on either side of the dropped stitch are twisted to
discourage spreading, Take your gauge over basic garter
stitch.
Tencel Dropped Stitch Scarf
One size, approx 5 x 66
Materials:
2 skeins Prism Tencel Tape, 100% Tencel, 2 oz/120 yds
Needles size 8 or size to get gauge
Stitch markers
Gauge: in garter stitch, 28 sts & 36 rows = 4
Using either knit-on or backward loop cast on method,
CO 22 sts.
Set up pattern:
K 2, *k1 tbl, place marker (pm), k 1, pm, k 1 tbl, k 2;
repeat from * to end.
Every row: K 2, *k 1 tbl, sm, k 1, sm, k 1 tbl, k 2; repeat
from * to end.
Work to end of second skein, leaving enough to BO.
BO 3 sts, *drop marker, drop next st, (yo and pass last st
over yo) 3 times, BO next 4 sts and repeat from * across.
Copyright Interweave Press LLC. Not to be reprinted. All rights reserved.
j
o
e

h
a
n
c
o
c
k
publishers of Interweave Crochet magazinejoin the online crochet community at crochetme.com
Visit InterweaveStore.com/crochetpatterns for more great patterns!
Cables and Lace Broomstick Hat originally published in Crochet So Fine (Interweave, 2010).
Interweave Press LLC. Not to be reprinted. All rights reserved.
page 1
crochetpatterns
Cables and Lace
Broomstick Hat
Kristin Omdahl
Originally published in
Crochet So Fine
(Interweave, 2010)
publishers of Interweave Crochet magazinejoin the online crochet community at crochetme.com
Visit InterweaveStore.com/crochetpatterns for more great patterns!
Cables and Lace Broomstick Hat originally published in Crochet So Fine (Interweave, 2010).
Interweave Press LLC. Not to be reprinted. All rights reserved.
page 2
yarn
DK weight (#3 Light); 168 yd (154 m).
shown: Lion Brand Yarn, Micros-
pun (100% microfiber acrylic; 168 yd
[154m]/2.5 oz [70 g]): sterling #910-
150, 1 skein.
hook
E/4 (3.5mm) or size needed to obtain
gauge.
not i ons
3 straight or 1 circular U.S. 17
(12.75mm) knitting needle(s); tapestry
needle.
gauge
6 sts = 1" (2.5 cm); 11 rows in Cable
Band patt = 4" (10 cm).
f i ni shed si ze
20" (51 cm) in circumference.
This hat is a play on the juxtaposition of cables and lace. The brims
cable is dense, textured, and thickgreat for keeping your ears
protected in a blustering storm. The body of the hat is worked in
EURRPVWLFNODFHZKLFKLVDOVRWH[WXUHGEXWOLJKW$WUVWJODQFH
you might think the openwork would not be very warm, but the
twisted loops of broomstick lace have little pockets of air in the
center, which help trap warmth.
cables and lace
broomstick hat
publishers of Interweave Crochet magazinejoin the online crochet community at crochetme.com
Visit InterweaveStore.com/crochetpatterns for more great patterns!
Cables and Lace Broomstick Hat originally published in Crochet So Fine (Interweave, 2010).
Interweave Press LLC. Not to be reprinted. All rights reserved.
page 3
special stitches
Broomstick Lace
Pull up a long loop with yarn on hook, slip loop off of hook
and onto knitting needle as stitch holder. *Working to the
right, insert hook into next stitch (figure 1), pull up a long
loop, and slip loop off of hook and onto knitting needle as a
stitch holder. Repeat from * across or as directed by pattern.
Slip loops off of knitting needle (as long as you are gentle
with your work and dont leave it unattended, it is safe to
slip the loops off of the knitting needle). Insert crochet hook
into first 6 loops, sl st into grouped 6 loops (figure 2) and
draw up yarn long enough to be about the height of the
loops, ch 1 (figure 3), 6 sc in same group of loops (figure 4),
**group next 6 loops together, 6 sc in next group of loops
(figure 5), repeat from ** across or as directed by pattern.
4
5
1
3
2
Back post double crochet (bpdc)
Yarn over hook, insert hook from back to front, to back
again around the post of next stitch, yarn over hook,
draw yarn through stitch, [yarn over hook, draw yarn
through 2 loops on hook] twice.
Front post double crochet (fpdc)
Yarn over hook, insert hook from front to back to front
again around post of stitch indicated, yarn over hook
and pull up a loop (3 loops on hook), [yarn over hook
and draw through 2 loops on hook] twice1 fpdc made.
Front post treble crochet (fptr)
Yarn over hook twice, insert hook in specified stitch
from front to back, right to left, around the post (or
stem). Yarn over hook, pull through work only, *yarn
over hook, pull through 2 loops on hook. Rep from *
twice1 fptr made.
publishers of Interweave Crochet magazinejoin the online crochet community at crochetme.com
Visit InterweaveStore.com/crochetpatterns for more great patterns!
Cables and Lace Broomstick Hat originally published in Crochet So Fine (Interweave, 2010).
Interweave Press LLC. Not to be reprinted. All rights reserved.
page 4
1
BOTTOM
EDGING
FOUNDATION ROW
CABLED BAND
3
2
5
4
6
= chain (ch)
= slip st (sl st)
= single crochet (sc)
= double crochet (dc)
= group of 4
broomstick lace lps
= group of 6
broomstick lace lps
= Front Post dc (FPdc)
= Front Post tr (FPtr)
= Back Post dc (BPdc)
stitch key
stitch diagram A
Cables and Lace
Broomstick Hat
Cabled Band
Refer to stitch diagram A for assistance.
Ch 10.
ROW 1: Dc in 4th ch from hook and in
each ch across8 dc.
ROW 2: Ch 3, skip first st, bpdc around
the post of each st across8 sts.
ROW 3: Ch 3, skip first 5 sts, fptr around
post of next st, fptr around post of next
st, working behind last 2 sts made, dc
in 4th and 5th sts; working in front of
all sts, fptr in 2nd and 3rd st, dc in last
st8 sts.
ROW 4: Ch 3, skip first st, bpdc in each st
across8 sts.
ROW 5: Ch 3, skip first st, fpdc in each st
across8 sts.
ROW 6: Rep Row 4.
ROWS 7120: Rep Rows 36 thirteen
times; rep Rows 34. Fasten off, leaving
a 12" (30.5 cm) tail for sewing seam.
Sew last row to foundation ch.
Bottom Edging
With RS facing, join yarn in any row-end
st on one side edge of Band. Working in
ends of rows across one side of Band,
(sl st, ch 1, sl st) in end of each row
around, join with sl st in first sl st at beg
of rnd. Fasten off60 ch-1 sps.
Hat Body
Refer to stitch diagram B on p. 5 for
assistance.
FOUNDATION RND: Working in oppo-
site ends of rows, join with sl st to any
row-end st, ch 1, 2 sc in each row-end st
around, join with sl st in first sc at beg of
rnd120 sc. Do not turn.
RND 1: Pull up a long lp with yarn on
hook, slip lp off of hook and onto knit-
ting needle as st holder, *working to the
right, pick up a lp in next st, pull up long
lp, slip lp off of hook and onto knitting
needle as stitch holder, rep from * until
you have used every st120 lps on
needle. Slip lps off of knitting needle (as
long as you are gentle with your work
and dont leave it unattended, it is safe
to slip the lps off of the knitting needle).
Insert crochet hook into first 6 lps, sl
st into grouped 6 lps and draw up yarn
long enough to be about the height of
the lps, ch 1, 6 sc in same group of lps,
**group next 6 lps together, 6 sc in next
group of lps, rep from ** around, join
with sl st in first sc. Do not turn.
RND 2: Sl st in each of next 3 sts, pull
up long lp with yarn on hook, slip lp off
of hook and onto knitting needle as st
holder, *working to the right, pick up a
lp in next st, pull up long lp, slip lp off
of hook and onto knitting needle as st
holder, rep from * until you have used
every st. Slip lps off of knitting needle.
Insert crochet hook into 6 lps, sl st into
grouped 6 lps and draw up yarn long
enough to be about the height of the lps,
ch 1, 6 sc in same group of lps, **group
next 6 lps together, 6 sc in next group of
lps, rep from ** around, join with sl st in
first sc.
RNDS 34: Rep Rnd 2.
RND 5 (DEC RND): Sl st in each of next
3 sts, pull up long lp with yarn on hook,
slip lp off of hook and onto knitting
needle as st holder, *working to the
right, pick up a lp in next stitch, pull
up long lp, slip lp off of hook and onto
knitting needle as st holder, rep from *
until you have used every st. Slip lps off
of knitting needle.
Insert crochet hook into 6 lps, sl st into
grouped 6 lps and draw up yarn long
enough to be about the height of the lps,
ch 1, 4 sc in same group of lps, **group
next 6 lps together, 4 sc in group of lps,
rep from ** across, join with sl st in first
sc. Do not turn80 sc.
RND 6: Sl st in each of next 2 sts, pull
up long lp with yarn on hook, slip lp off
of hook and onto knitting needle as st
holder, *working to the right, pick up a
lp in next st, pull up long lp, slip lp off
of hook and onto knitting needle as st
publishers of Interweave Crochet magazinejoin the online crochet community at crochetme.com
Visit InterweaveStore.com/crochetpatterns for more great patterns!
Cables and Lace Broomstick Hat originally published in Crochet So Fine (Interweave, 2010).
Interweave Press LLC. Not to be reprinted. All rights reserved.
page 5
stitch diagram B
1
FOUNDATION ROW
HAT BODY
2
3
4
5
6
7
8
holder, rep from * until you have used
every st, slip lps off of knitting needle.
Insert hook into 4 lps, sl st into grouped
4 lps and draw up yarn long enough to
be about the height of the lps, ch 1, 4 sc
in same group of lps, **group next 4 lps
together, 4 sc in grouped 4 lps, rep from
** around, join with sl st in first sc. Do
not turn.
RND 7: Rep Rnd 6.
RND 8 (DEC RND): Sl st in each of next
2 sts, pull up long lp with yarn on hook,
slip lp off of hook and onto knitting
needle as st holder, *working to the
right, pick up a lp in next st, pull up long
lp, slip lp off of hook and onto knitting
needle as st holder, rep from * until you
have used every st. Slip lps off of knit-
ting needle.
Insert crochet hook into 4 lps, sl st into
grouped 4 lps and draw up yarn long
enough to be about the height of the lps,
ch 1, 2 sc in same group of lps, **group
next 4 lps together, 2 sc in group of lps,
rep from ** around, join with sl st in first
sc40 sts.
Fasten off, leaving long tail for draw-
ing center tight. With tapestry needle,
weave tail through each st on Row 8,
pull tightly to draw the sts together.
Fasten off securely.
Wet or steam block to finished mea-
surements. Weave in loose ends with a
tapestry needle.

Você também pode gostar