Description
Unit
6mm
8mm
10mm
12mm
16mm
20mm
25mm
28mm
32mm
Total
18.502
533.262
439.121
419.589
560.789
711.314
587.256
769.013
0.000
4038.846
OPENING BALANCE
UPTO FEB
MARCH
MT
APRIL
MT
MT
18.502
533.262
439.121
419.589
560.789
711.314
587.256
769.013
0.000
4038.846
RA -14
MT
18.234
456.632
384.608
305.077
399.128
685.825
552.279
740.388
0.000
3542.171
RA -14
MT
0.000
12.336
39.449
65.898
60.178
14.652
33.460
0.000
0.000
225.973
RA - 15
MT
RA - 15
MT
18.234
468.968
424.057
370.975
459.306
700.477
585.739
740.388
0.000
3768.144
MT
PHYSICAL BALANCE
MT
MT
SCRAP
MT
MT
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
13.555
MT
0.268
64.294
15.064
48.614
101.483
10.837
1.517
28.625
0.000
257.147
10
13.555
Remarks
Unit
6mm
MT
MT
d
3
4
5
MT
MT
1
2
a
b
c
Description
8mm
10mm
12mm
16mm
28mm
32mm
Total
22.112
20.27
0.000
0
4103.546
3770.367
MT
18.234
0.000
3492.211
MT
2.036
68.689
53.926
32.926
46.617
40.741
29.668
3.231
0.000
277.834
MT
1.000
34.000
25.000
16.000
30.000
15.000
15.000
2.000
0.000
138.000
MT
MT
21.270
1.000
0.000
0.000
3908.045
135.000
0.000
50.000
20mm
25mm
Remarks
0.000
50.000
.
Billing Engineer
JAL
Site Incharge
JAL
Project Incharge
JAL
a
b
c
d
Description
1 Total Cement issued up to 31.03.2013
2 Consumptions up to 15.03.2013
As per certified bill No13thfor period up to 31.01.2013..
Bill submitted & under checking.
Bill No14thfor period up to15.03.2013
Bill yet to be submitted for workdone up to period 31.03.2013
Sub Total (2a+2b+2c)
3 Physical Balance as on 31.03.2013
Billing Engineer
JAL
Unit
Bags
Bags
Bags
Bags
Bags
Bags
Bags
OPC
PPC
0
221593
0
202812
0
189781
0
0
0
0
Site Incharge
13031
6500
209312
1100
Date:- 05.04.2013
ge
Total
Remarks
221593
202812
189781
13031
6500
209312
1100
.
Project
Incharge
JAL
JAL
BRICKWORK 230MM
BRICKWORK 230MM
PALSTER INTERNAL
cum
RCC -COLUMNS
RCC - BEAM/SLABS
RCC - STAIRCASE
cum
SHUTTERING - COLUMNS
SHUTTERING - BEAM/SLABS
SHUTTERING -STAIRCASE
sqm
79a
79b
72a
72b
72c
79a
79b
72a
72b
72c
cum
sqm
cum
cum
sqm
sqm
79-a
STEEL COLUMNS
STEEL BEAMS SLAB
STEEL STAIRCASE
Dia
10
12
16
20
25
28
79-a
STEEL COLUMNS
STEEL BEAMS SLAB
STEEL STAIRCASE
Dia
10
12
16
20
25
28
79-a
STEEL COLUMNS
STEEL BEAMS SLAB
STEEL STAIRCASE
Dia
10
12
16
20
25
28
79-a
STEEL COLUMNS
STEEL BEAMS SLAB
STEEL STAIRCASE
Dia
10
12
16
20
25
28