Supervisory Indication & Buzzer in FACP-A In Ground Floor Reception Lobby Trouble Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Supervisory Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Alarm Indication in MFACP In Fire Command Centre In Tower-2 Activation Of FIRE PUMP-EXHAUST FANS . Evacuation Messages through VA System in Flat Units & Lift Corridors. Staircase Pressurization Fans (ASPF-01,02) Alarm Indication in FACP-A In Ground Floor Reception Lobby To Open all Access Doors and Gate Barrier Activation Of FIRE ALARM Sounder / Bell Activation Of Car Park Ventilation System (MFAF,MEF,JF) Trouble Indication & Buzzer in FACP-A In Ground Floor Reception Lobby Alarms and Trouble Monitoring in BMS in Main Control Room

Indication in MIMIC Panel Ground Floor Reception Lobby

ATS Changeover & Generator Start-UP

S/N 1

CAUSE DESCRIPTION DESCRIPTION BASEMENT-2 Activation of Smoke Detector Activation of Heat Detector (CP Ventilation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) BASEMENT-1 Activation of Smoke Detector Activation of Heat Detector (CP Ventilation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) LOWER GROUND FLOOR Activation of Smoke Detector Activation of Heat Detector (CP Ventilation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) GROUND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) 1st FLOOR TO 9th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve)

X X X X X X X

X X X X X

X X X X X

X X X X X X

X X X X

X X X X

X X X X

X X

X X X X

X X X X X

SIGNAL to Fire Brigade Via Auto Dialer

EFFECTS DESCRIPTION

Indication in Main MIMIC Panel In Fire Command Centre In Tower-2

Recall Elevator to Ground Floor

Stop Fresh Air Fan - ROOF

X X X X X X

X X X X

X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X

6 10th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) 7 ROOF FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) 8 COMMON Devices Trouble Battery Failure Power Failure Network Failure Short / Open Circuit Grounding Fault

X X X X

X X X

X X X X

X X X X X X X

X X X

X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X

X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X

X X X

X X X

X X X

X X X

X X X X

X X X X

X X X X

APARTMENT B
Alarm Indication in MFACP In Fire Command Centre In Tower-2 Activation Of FIRE PUMP-EXHAUST FANS . Evacuation Messages through VA System in Flat Units & Lift Corridors. Staircase Pressurization Fans (ASPF-01,02) Alarm Indication in FACP-B In Ground Floor Reception Lobby To Open all Access Doors and Gate Barrier Supervisory Indication & Buzzer in FACP-A In Ground Floor Reception Lobby Supervisory Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Activation Of FIRE ALARM Sounder / Bell Activation Of Car Park Ventilation System (MFAF,MEF,JF) Trouble Indication & Buzzer in FACP-A In Ground Floor Reception Lobby Alarms and Trouble Monitoring in BMS in Main Control Room Trouble Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 ATS Changeover & Generator Start-UP

Indication in MIMIC Panel Ground Floor Reception Lobby

S/N 1

CAUSE DESCRIPTION DESCRIPTION BASEMENT-2 Activation of Smoke Detector Activation of Heat Detector (CP Ventilation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) BASEMENT-1 Activation of Smoke Detector Activation of Heat Detector (CP Ventilation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) LOWER GROUND FLOOR Activation of Smoke Detector Activation of Heat Detector (CP Ventilation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) GROUND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) 1st FLOOR TO 9th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve)

X X X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X

X X X X X

X X X X X

X X X X

SIGNAL to Fire Brigade Via Auto Dialer

EFFECTS DESCRIPTION

Indication in Main MIMIC Panel In Fire Command Centre In Tower-2

Recall Elevator to Ground Floor

Stop Fresh Air Fan - ROOF

X X X X X X

X X X X X

X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X

X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X

X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X X X

X X X X

X X X X

X X X X

X X

X X

X X

X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

6 10th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) 7 ROOF FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) 8 COMMON Devices Trouble Battery Failure Power Failure Network Failure Short / Open Circuit Grounding Fault

X X X X

X X X X

X X X X

X X X X

X X

X X

X X

X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X X X X X

X X X X X X X X

X X X X X X X X

X X X X X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

APARTMENT C
Alarm Indication in MFACP In Fire Command Centre In Tower-2 Activation Of FIRE PUMP-EXHAUST FANS . Evacuation Messages through VA System in Flat Units & Lift Corridors. Staircase Pressurization Fans (ASPF-01,02) Alarm Indication in FACP-C In Ground Floor Reception Lobby To Open all Access Doors and Gate Barrier Supervisory Indication & Buzzer in FACP-A In Ground Floor Reception Lobby Supervisory Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Activation Of FIRE ALARM Sounder / Bell Activation Of Car Park Ventilation System (MFAF,MEF,JF) Trouble Indication & Buzzer in FACP-A In Ground Floor Reception Lobby Alarms and Trouble Monitoring in BMS in Main Control Room Trouble Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 ATS Changeover & Generator Start-UP

Indication in MIMIC Panel Ground Floor Reception Lobby

S/N 1

CAUSE DESCRIPTION DESCRIPTION BASEMENT-2 Activation of Smoke Detector Activation of Heat Detector (CP Ventilation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) BASEMENT-1 Activation of Smoke Detector Activation of Heat Detector (CP Ventilation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) LOWER GROUND FLOOR Activation of Smoke Detector Activation of Heat Detector (CP Ventilation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) GROUND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) 1st FLOOR TO 9th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve)

X X X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X

X X X X X

X X X X X

X X X X

SIGNAL to Fire Brigade Via Auto Dialer

EFFECTS DESCRIPTION

Indication in Main MIMIC Panel In Fire Command Centre In Tower-2

Recall Elevator to Ground Floor

Stop Fresh Air Fan - ROOF

X X X X X X

X X X X X

X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X

X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X

X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X X X

X X X X

X X X X

X X X X

X X

X X

X X

X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

6 10th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) 7 ROOF FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) 8 COMMON Devices Trouble Battery Failure Power Failure Network Failure Short / Open Circuit Grounding Fault

X X X X

X X X X

X X X X

X X X X

X X

X X

X X

X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X X X X X

X X X X X X X X

X X X X X X X X

X X X X X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

TOWER-1
Alarm Indication in MFACP In Fire Command Centre In Tower-2 Evacuation Messages through VA System in Offices & Lift Corridors. Staircase Pressurization Fans (ASPF-01,02) To Open all Access Doors and Gate Barrier Supervisory Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Lift Shaft Pressurization Fan (LSPF-01,02) Lift Lobby Pressurization Fan (LPF-01,02) Activate Openable Window at every office floor Activation Of Car Park Ventilation System (MFAF,MEF,JF) Alarms and Trouble Monitoring in BMS in Main Control Room Trouble Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Indication in MIMIC Panel 1st Basement Control Room Activation Of FIRE ALARM SOUNDER / ALARM Bell ATS Changeover & Generator Start-UP

S/N 1

CAUSE DESCRIPTION DESCRIPTION BASEMENT-2 Activation of Smoke Detector Activation of Heat Detector (CP Ventlation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) BASEMENT-1 Activation of Smoke Detector Activation of Heat Detector (CP Ventlation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) GROUND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 1ST & 2ND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 3RD FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel

X X X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X

X X X

X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X

X X X

X X X

X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

SIGNAL to Fire Brigade Via Auto Dialer

EFFECTS DESCRIPTION

Indication in Main MIMIC Panel In Fire Command Centre In Tower-2

Activation Of Fire Pump Exhaust Fans

Air Handling Unit Of Affected Floor

ROOF Fresh Air Fan (FAF) Stop

Treated Fresh Air Handling Unit

Recall Elevator to Ground Floor

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

TOWER-1
Alarm Indication in MFACP In Fire Command Centre In Tower-2 Evacuation Messages through VA System in Offices & Lift Corridors. Staircase Pressurization Fans (ASPF-01,02) To Open all Access Doors and Gate Barrier Supervisory Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Lift Shaft Pressurization Fan (LSPF-01,02) Lift Lobby Pressurization Fan (LPF-01,02) Activate Openable Window at every office floor Activation Of Car Park Ventilation System (MFAF,MEF,JF) Alarms and Trouble Monitoring in BMS in Main Control Room Trouble Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Indication in MIMIC Panel 1st Basement Control Room Activation Of FIRE ALARM SOUNDER / ALARM Bell ATS Changeover & Generator Start-UP

S/N 6

10

11

CAUSE DESCRIPTION DESCRIPTION 4th FLOOR BASEMENT-2 Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 5th to 16th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 17th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 18th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel ROOF & UPPER ROOF Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) COMMON Devices Trouble Battery Failure Power Failure Network Failure Short / Open Circuit Grounding Fault

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X

X X X X X X X X X

X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X X X X X X

X X X X X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X X

SIGNAL to Fire Brigade Via Auto Dialer

EFFECTS DESCRIPTION

Indication in Main MIMIC Panel In Fire Command Centre In Tower-2

Activation Of Fire Pump Exhaust Fans

Air Handling Unit Of Affected Floor

ROOF Fresh Air Fan (FAF) Stop

Treated Fresh Air Handling Unit

Recall Elevator to Ground Floor

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

TOWER-2
Evacuation Messages through VA System in Offices & Lift Corridors. Staircase Pressurization Fans (ASPF-01,02) To Open all Access Doors and Gate Barrier Supervisory Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Lift Shaft Pressurization Fan (LSPF-01,02) Lift Lobby Pressurization Fan (LPF-01,02) Activate Openable Window at every office floor Activation Of Car Park Ventilation System (MFAF,MEF,JF) Alarms and Trouble Monitoring in BMS in Main Control Room Trouble Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Indication in MIMIC Panel 1st Basement Control Room Activation Of FIRE ALARM SOUNDER / ALARM Bell ATS Changeover & Generator Start-UP

S/N 1

CAUSE DESCRIPTION DESCRIPTION BASEMENT-2 Activation of Smoke Detector Activation of Heat Detector (CP Ventlation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) BASEMENT-1 Activation of Smoke Detector Activation of Heat Detector (CP Ventlation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) GROUND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 1ST & 2ND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 3RD FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 4th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel

X X X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X

X X

X X

X X

X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X

X X X

X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X

X X X

X X X

X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

SIGNAL to Fire Brigade Via Auto Dialer

EFFECTS DESCRIPTION

Indication in Main MIMIC Panel In Fire Command Centre In Tower-2

Activation Of Fire Pump Exhaust Fans

Air Handling Unit Of Affected Floor

Alarm Indication in MFACP In Fire Command Centre In Tower-2

ROOF Fresh Air Fan (FAF) Stop

Treated Fresh Air Handling Unit

Recall Elevator to Ground Floor

X X X X

X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X

TOWER-2
Evacuation Messages through VA System in Offices & Lift Corridors. Staircase Pressurization Fans (ASPF-01,02) To Open all Access Doors and Gate Barrier Supervisory Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Lift Shaft Pressurization Fan (LSPF-01,02) Lift Lobby Pressurization Fan (LPF-01,02) Activate Openable Window at every office floor Activation Of Car Park Ventilation System (MFAF,MEF,JF) Alarms and Trouble Monitoring in BMS in Main Control Room Trouble Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Indication in MIMIC Panel 1st Basement Control Room Activation Of FIRE ALARM SOUNDER / ALARM Bell ATS Changeover & Generator Start-UP

S/N 7

10

11

12

13

CAUSE DESCRIPTION DESCRIPTION 5th FLOOR BASEMENT-2 Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 6th to 18th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 19th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 20th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 21st FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel ROOF & UPPER ROOF Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) COMMON Devices Trouble Battery Failure Power Failure Network Failure Short / Open Circuit Grounding Fault

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X

X X X

X X X X X X X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X X X X X X

X X X X X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X X

SIGNAL to Fire Brigade Via Auto Dialer

EFFECTS DESCRIPTION

Indication in Main MIMIC Panel In Fire Command Centre In Tower-2

Activation Of Fire Pump Exhaust Fans

Air Handling Unit Of Affected Floor

Alarm Indication in MFACP In Fire Command Centre In Tower-2

ROOF Fresh Air Fan (FAF) Stop

Treated Fresh Air Handling Unit

Recall Elevator to Ground Floor

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

TOWER-3
Trouble Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Supervisory Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Alarm Indication in MFACP In Fire Command Centre In Tower-2 Evacuation Messages through VA System in Offices & Lift Corridors. Staircase Pressurization Fans (ASPF-01,02) To Open all Access Doors and Gate Barrier Lift Shaft Pressurization Fan (LSPF-01,02) Lift Lobby Pressurization Fan (LPF-01,02) Activate Openable Window at every office floor Activation Of Car Park Ventilation System (MFAF,MEF,JF) Alarms and Trouble Monitoring in BMS in Main Control Room Activation Of FIRE ALARM SOUNDER / ALARM Bell ATS Changeover & Generator Start-UP

Indication in MIMIC Panel 1st Basement Control Room

S/N 1

CAUSE DESCRIPTION DESCRIPTION BASEMENT-2 Activation of Smoke Detector Activation of Heat Detector (CP Ventlation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) BASEMENT-1 Activation of Smoke Detector Activation of Heat Detector (CP Ventlation) Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) GROUND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 1ST & 2ND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 3RD FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 4th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 5th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel

X X X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X

X X

X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X

X X X

X X X

X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

SIGNAL to Fire Brigade Via Auto Dialer

EFFECTS DESCRIPTION

Activation Of Fire Pump Exhaust Fans

Indication in Main MIMIC Panel In Fire Command Centre In Tower-2

Air Handling Unit Of Affected Floor

ROOF Fresh Air Fan (FAF) Stop

Treated Fresh Air Handling Unit

Recall Elevator to Ground Floor

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

TOWER-3
Trouble Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Supervisory Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Alarm Indication in MFACP In Fire Command Centre In Tower-2 Evacuation Messages through VA System in Offices & Lift Corridors. Staircase Pressurization Fans (ASPF-01,02) To Open all Access Doors and Gate Barrier Lift Shaft Pressurization Fan (LSPF-01,02) Lift Lobby Pressurization Fan (LPF-01,02) Activate Openable Window at every office floor Activation Of Car Park Ventilation System (MFAF,MEF,JF) Alarms and Trouble Monitoring in BMS in Main Control Room Activation Of FIRE ALARM SOUNDER / ALARM Bell ATS Changeover & Generator Start-UP

Indication in MIMIC Panel 1st Basement Control Room

S/N 8

10

11

12

13

CAUSE DESCRIPTION DESCRIPTION 6th to 18th FLOOR BASEMENT-2 Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 19th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 20th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 21st FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel ROOF & UPPER ROOF Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) COMMON Devices Trouble Battery Failure Power Failure Network Failure Short / Open Circuit Grounding Fault

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X

X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

X X X X X X X X

X X X X X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X X

SIGNAL to Fire Brigade Via Auto Dialer

EFFECTS DESCRIPTION

Activation Of Fire Pump Exhaust Fans

Indication in Main MIMIC Panel In Fire Command Centre In Tower-2

Air Handling Unit Of Affected Floor

ROOF Fresh Air Fan (FAF) Stop

Treated Fresh Air Handling Unit

Recall Elevator to Ground Floor

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

UTILITY
Alarm Indication in MFACP In Fire Command Centre In Tower-2 To Open all Access Doors and Gate Barrier Supervisory Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Evacuation Messages through VA System Activation Of Car Park Ventilation System (MFAF,MEF,JF) Alarms and Trouble Monitoring in BMS in Main Control Room Trouble Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Activation Of FIRE ALARM SOUNDER / ALARM Bell ATS Changeover & Generator Start-UP

Indication in MIMIC Panel Ground Floor Office

S/N 1

CAUSE DESCRIPTION DESCRIPTION BASEMENT-2 Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) BASEMENT-1 Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) GROUND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel ROOF & UPPER ROOF Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) COMMON Devices Trouble Battery Failure Power Failure Network Failure Short / Open Circuit Grounding Fault

X X X X X

X X X

X X X X X

X X X

X X X

X X X

X X X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X

X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X

X X

X X X X X

SIGNAL to Fire Brigade Via Auto Dialer

EFFECTS DESCRIPTION

Indication in Main MIMIC Panel In Fire Command Centre In Tower-2

Activation Of Fire Pump Exhaust Fans

X X X X

X X X X X

X X X X X X

X X X X X

CARPARK
Trouble Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Supervisory Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Alarm Indication in MFACP In Fire Command Centre In Tower-2 Evacuation Messages through VA System in Offices & Lift Corridors. To Open all Access Doors and Gate Barrier Alarms and Trouble Monitoring in BMS in Main Control Room Activation Of FIRE ALARM SOUNDER / ALARM Bell ATS Changeover & Generator Start-UP

Indication in MIMIC Panel Ground Floor Control Room

S/N 1

12

13

CAUSE DESCRIPTION DESCRIPTION GROUND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 1st FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 2nd FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 3rd FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 4th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 5th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel ROOF & UPPER ROOF Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) COMMON Devices Trouble Battery Failure Power Failure Network Failure Short / Open Circuit Grounding Fault

X X X

X X X

X X X X X X X X X

X X X

X X X

X X X

X X X X X

X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X

X X X

X X X X X

X X X X X

X X X

X X X

X X X

X X X

X X X

X X X X X

X X X X X

X X X

X X X

X X X

X X X

X X X

X X X X X

X X X X X

X X X

X X X

X X X

X X X

X X X

X X X X X

X X X X X

X X X

X X X

X X X

X X X

X X X

X X X X X

X X X X X

X X X

X X X

X X X

X X X

X X X

X X X

X X X X X

SIGNAL to Fire Brigade Via Auto Dialer

EFFECTS DESCRIPTION

Activation Of Fire Pump Exhaust Fans

Indication in Main MIMIC Panel In Fire Command Centre In Tower-2

Recall Elevator to Ground Floor

X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

RECREATION BUILDING
Alarm Indication in MFACP In Fire Command Centre In Tower-2 Evacuation Messages through VA System in Offices & Lift Corridors. To Open all Access Doors and Gate Barrier Supervisory Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Activation Of Car Park Ventilation System (MFAF,MEF,JF) Alarms and Trouble Monitoring in BMS in Main Control Room Trouble Indication & Buzzer in MFACP In Fire Command Centre In Tower-2 Indication in MIMIC Panel Lower Ground Control Room Activation Of FIRE ALARM SOUNDER / ALARM Bell ATS Changeover & Generator Start-UP

S/N 1

CAUSE DESCRIPTION DESCRIPTION BASEMENT-2 Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) BASEMENT-1 Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH First/Trouble Alarm Signal of FM200 2nd Alarm Signal of FM200 Activation of Tamper Switch (Valve) GROUND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 1ST & 2ND FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 3RD FLOOR FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 4th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH

X X X X X

X X X

X X X X X

X X X

X X X

X X X

X X X

X X X X

X X

X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X

X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X X X X

X X X X X

X X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X

X X X X

X X X X

SIGNAL to Fire Brigade Via Auto Dialer

EFFECTS DESCRIPTION

Indication in Main MIMIC Panel In Fire Command Centre In Tower-2

Activation Of Fire Pump Exhaust Fans

Air Handling Unit Of Affected Floor

Treated Fresh Air Handling Unit

Recall Elevator to Ground Floor

X X X X

X X X X X

X X X X X X

X X X X X X X X X X X X X X X X

10

11

12

13

Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 5th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 6th to 18th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 19th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 20th FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel 21st FLOOR Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) Failure Of Openable Window Panel ROOF & UPPER ROOF Activation of Smoke Detector Activation of Heat Detector Activation of Manual Call Point Activation Of Water - FLOW SWITCH Activation of Tamper Switch (Valve) COMMON Devices Trouble Battery Failure Power Failure Network Failure Short / Open Circuit Grounding Fault

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X X X X

X X X X X

X X X X X

X X

X X X X X

X X X X X

X X X X X

X X

X X X X X

X X X X X

X X X X X

X X

X X X X X

X X X X X

X X X X X

X X

X X X X X

X X X X X

X X X X X

X X X X X

Reference FPD INSP - 782/11


5-Oct-11

CDD FILE NUMBER 22580


Updated : 22 November 2011

Item

Deficiencies/Deviations/Directions

AEB Supervising Consultant Response/Remarks


Refer to Soft Copy of Architectural and Fire Alarm Drawings. ( HVAC No CDD approved drawing). Fire Fighting Drawing /Justification submitted to CDD for Approval.

Midmac & Samko/Fire Specialists

Submit the complete sheets of CDD approved plans of Tower 1 ( Architectural, Fire Alarm, Fire Fighting and ACMV ) CD copy. No designated Fire Engine Hard standing. of 6m x 15m ( minimum ), with longer side parallel to the faade of the building provided ( Tower 1 ). Fireman's access panel shall be provided with either a red or orange triangle of equal sides ( minimum 150mm on each side), which can b upright or inverted, on the external side of the building wall and wordings "Fire Fighting Access - Do not Obstruct" of at least 25mm height on the internal side ( Tower 1 ). * Fire department access panel shall be tempered glass ( NFPA 5000, Chapter 39, Section 46.5.31 ).

Done - See Attached Photo

Done See Attached Photo

Justify the rating of double swing glass doors at the lift lobby of Basement levels 1 & 2.

AEB actions to justify fire rating of double swing glass doors in lift lobby.

Done - See Attached Documents

Justify the installation of non fire rated sliding glass window in aluminum frames within the exit staircase AEB confirmed the CDD requirements to be executed by Done - See Attached Photo enclosure at the roof top level of Tower 1. Midmac As per IFC design layouts - the MCC Panels must be totally enclosed on staircase landing.
This is similar to CDD comments at Apartments; AEB request Midmac to provide letter of confirmation for the works performed in accordance to CDD approved methodology and approved materials.

Justify un-enclosed electrical equipments inside the exit staircase at the top most level of Tower 1.

Refer to Attached Sketch Proposal & CDD approved Architectural Layout; AEB design layout with MCC Panel.

All vertical and horizontal penetrations or openings on the fire rate walls / slabs particularly exit access corridor, fire fighting / smoke - stop lobby, electrical room, shall be sealed with approved CDD fire stopping materials. No testing of fire fighting system at the time inspection.

Done - See Attached Photo

* Justify reducing the capacity of fire pumps serving basement 1 and basement 2 as indicated in the CDD AEB uploaded the justification of using 3-numbers Fire approved plan 528-MP-M-FF-004 ( 8 of 9 ) dated April 10, 2011 should be 1900 GPM. During inspection it Pumps to CDD Planning Section . Awaiting Approval was found out the pump capacity is 1000 GPM. "As Built" drawings including justification shall be from CDD. submitted in the CDD Planning Section for evaluation and approval. 9 Provide automatic suppression system in the storages at basement level. AEB to check and verify CDD approved plans for storage rooms are equipped with automated suppression Store provided with Sprinkler System - Refer to Attached Photo system at basement areas. As per CDD approved plans for General Towers at Ground & 1st floor provision of fire sprinklered system; however the CDD requirements will be carried out by ID Fit-out tenancy works.

10 Justify non provision of sprinkler system in the Ground Floor and 1stFloor Offices of Tower 1.

11

Provide proper directional arrows and identification of each zone control valve, riser and piping which are serving.

Done - See Attached Photo

12 Some sprinkler heads were still provided with protected seal at the time of inspection.

Done - See Attached Photo

Page 17

It was noted that there were a lot of Common & Supervisory Fault / Trouble at FACP. Rectify the system 13 and restore to normal operating condition. Submit Record of Completion duly acknowledged, signed / stamped by the supervising consultant.

Supervisory fault still experienced at the Apartment Buildings are operational and at many occasions valves are being closed by the Facility maintenance team/tenants which is causing common faults. Done - Refer to attached T & C Report

14 Justify non provision of evacuation message through PS System in Offices and Lift Corridors in Tower 1.

15 Justify non provision of detection system in the Ground Floor and 1st Floor Offices of Tower 1. 16

Similar comment as Item-10 to be carried out by ID Fitout tenancy works. Done - See Attached Photo

Provide Duct Smoke Detector in the air supply to the pressurized stairwell. On detection of smoke in the AEB verified the CDD requirements to provide air supply, the supply fan (s) shall be stopped ( as per NFPA 92A).

Submit the update Cause and Effect Matrix showing the sequence of operation of all the system related 17 to LIFE, SAFETY & FIRE PROTECTION indicating what will occur during fire alarm activation / simulation. Shall be acknowledged, signed / stamped by supervising consultant. > Submit fire strategy report detailing the sequence of operation of the smoke management system

AEB will update the Cause and Effect Matrix for Midmac & Samko with all fire specialists to perform the sequence of operation of the Smoke Management Done - Refer to Updated |Cause and Effect Matrix System

AEB requested for a dialogue session with NAFFCO A/C units for all FM 200 protected areas shall be interfaced or associated with the Control Panel. Split specialist for technical clarification and justify CDD 18 type A/C units at Qtel room did not shut down upon activation of alarm for FM 200 System at the time of requirement for implementation inside all FM-200 inspection. system rooms. 19 Local fire alarm bells installed inside the enclosed rooms protected by FM 200 system shall be relocated outside and it will activated. Justify the resume normal operation of all elevators / lifts after resetting the FACP. It should be at lift machine room. Smoke management system testing at Basement Level 1 & 2 was not satisfactory at the time of inspection. * Some supply and exhaust fans not interfaced at FACP working during testing at fire mode. Similar to Item-18 AEB requested Midmac & ETA to justify CDD comments necessary to provide.

Works in Progress to be Completed by 15 December 2011.

Works in Progress.

20

Done - See Attached Photo

21

System tested and inspected on 21.11.2011 , However one Fan found not working; Rectifications work in progress. Midmac & Samko to provide the basement smoke management schematic diagram operating as individual system; and provide justification overall manual over-ride at Main Fire Command Centre. Works in progress and expected to complete by 30.11.2011.

* Justify non provision of manual override for the smoke management system at FCC.

* Justify the efficiency of jet fans of basement ventilation system since there are a lot of obstructions.

Done - Guide Vanes provided on Jet Fans by the Specialist (Systemair) - refer to attached Letter.

Submit CFD analysis and calculation for Basement Ventilation System ( Sufficient make up air should be 22 provided to satisfy the exhaust requirements and attain a 10 ACH at fire mode and 4 to 6 ACH at normal mode). 23 Interfacing of escalator to FACP was not yet demonstrated at the time of inspection.

AEB requested Specialist - Systemair to examine the Done - Refer to attached CFD Analysis and Calculations in Soft CFD Analysis as per CDD requirements for confirmation Copy.( CD) reply to CDD AEB to review CDD requirements for the installed Interfacing control cables for CDD requirements of Escalators outdoor escalators (ground level) to be interfaced with linked with main FACP- Escalator panel in progress. Work schedule FACP. to be completed on 30.11.2011.

Page 18

24

AEB confirmed receipt of test report conducted with Data Tabulation for Staircase Pressurization - Refer to attach Data tabulation for pressurization system ( Staircase Pressure Differential ) of staircases and fire lift lobby Staircase Pressurization System; but the Fire Lift Lobby Report. Fire Lift Lobby Pressurization System for Tower -1/2/3 by per floor shall be acknowledged, signed / stamped by supervising consultant ( for Tower 1 ). test reports for Tower-1/2/3 still outstanding. 30.11.2011. AEB request for submission of Emergency Power Single Line Diagram related to installed Split Air-Conditioning Done - Refer to attached Diagram. Units in the FCC room complete with room layout defining the indoor fan coil units locations.

25 The independent ventilation system at FCC shall be connected to Emergency Power Supply System.

26

Some identification markings for mechanical equipment rooms, shafts ( exhaust & fresh air ) and other important building services / rooms shall be provided.

Done - Refer to attached Photos.

27 FM 200 System shall comply to the requirements as follows:

Done - See Attached Photo

As per CDD requirements, the caution signs must be * Caution signs shall be provided outside the protected areas of FM 200 System "This room is protected visible, 100mm height and installed outside protected Done - See Attached Photo with FM 200 System ; Do Not Enter In Case of Alarm". rooms of FM-200 System As per CDD requirements, the caution sign must be * Manual Pull Station shall be provided with proper label " Manual Gas Release Station" and should provided with proper label wordings complete with Midmac to provide CDD requirements accordingly with the correct have protective cover for accidental release of agent and tampering. protective cover against accidental release of agent identification words; however NAFFCO confirmed not required. and tampering/vandalism act. * A manual mechanical means of discharging the required agent shall be provided on the storage container. * The Control Panel shall be connected to the Buildings Main Fire Alarm Panel and shall provide Alarm, Gas Discharged and Fault indications on the Main Panel. * The activation of Abort Button during second alarm will stop the countdown timer and as soon abort button is released, the discharged delay countdown will restart at the preset duration. This CDD comment is related to the basement ventilation system under fire scenario activation and local Kahramaa electricity supply failure shall require the auto-transfer power to the emergency generator system serving all fire fighting systems. Done - See Attached Photo and Material Brochure.

Only one alarm is provided - Print Out Attached.

Done- refer to attached drawing.

Functional test of ATS for power change-over of Kahramaa to Emergency Power Supply System / 28 Generator Set ( EPSS ) and vice versa initiating an alarm ( Life Safety & Fire Protection ) with essential loads connected shall be witnessed by QCDD.

Done - Refer to attached T & C Report

Submit testing, commissioning and acceptance data report of Fire Alarm and Detection System, Fire 29 Fighting System, Smoke Control and Ventilation System and lift operations done by the contractors duly acknowledged by the supervising consultants for Tower 1, Basement 1 & 2.

Similar Item-28 but to include Lifts System integration Refer to attached T & C Report for Smoke Control and Ventilation report under fire scenario activation. System ; Lift Load Test Report.

Page 19

July 16 2011

CDD REQUIREMENTS FOR SUBMISSION-INSPECTION


S/N Submit the complete sheets of CDD approved plans and CDD approved product certificate for Automatic Dry Powder Fire Extinguisher System, FM 200 system and other gaseous system (if any) AEB SUBMISSION REQUIRED
CDD approved plans are included in application; refer to attached material certificates for FM 200 & Fire extinguisher Midmac to submit all reports and include test/commissioning for fire protection, fire alarm & voice evacuation, fire pumps, FM-200, lifts, smoke control & ventilation systems See attached scan approved CDD drawings. Midmac to submit all battery calculations for fire alarm system, FM 200, voice evacuation system. Midmac to submit all test reports for fire sprinkler system Test in progress - Midmac to compile and submit all tests

MIDMAC SUBMISSION AEB HEAD OFFICE SUBMISSION REQUIRED REQUIRED

Submit testing, commissioning, acceptance report (w/procedure/methodology), sequence of operation of fire protection system, fire detection and alarm system including the communication and voice evacuation system, fire pumps including its control, FM-200 Automatic Dry Powder Fire Suppression system, lifts and smoke control and ventilation system done by the contractor duly approved, acknowledged by supervising consultant.

Submit detailed lift sections and lay-out plan on how to ccess the fire lift and its accessibility on all floors.

Provide calculations for battery stand-by power supply taking into consideration the power requirements of all alarms, initiating devices and auxiliary components under full load conditions for Fire Detection & Alarm System, FM 200 System and other systems.

Submit hydrostatic pressure testing and flushing report for the sprinkler system done by the contractor and witnessed, acknowledged, signed/stamped by the supervising consultant.

Submit tabulation of pressurization system (Staircase Pressure Differential, fire lift lobby, smoke stop lobby) per floor. Submit complete hydraulic flow calculations of FM-200 automatic fire suppression system. The individual sections of pipe and each fitting to be uised, as shown on the isometrics, must be identified and included in the calculation. Total agent discharge time must be shown and detailed by zone and calculations for battery stand-by power supply taking into consideration the power requirements of all alarms, initiating devices and auxiliary components under full load conditions of FM-200 system. Submit enclosure integrioty test report for FM 200 system. The test shall be conducted by a qualified tester acceptable to the QCD. Submit FM 200 Testing and alarms report - Simualtion test for the 1st mode and 2nd mode and test on electrical supervision system (simulate fault by disconnecting any detector/devioce connected to the firing circuit). Following shall be satisfied: Fault signal correctly registered at control panel/sub-main fire alarm panel a) Audible fault alarm and fault indicator functioning b) FM200 must be integrated also with main fire alarm. All ventilation must automatically shut down during the alarm. Submit the fire pumps sequence of operation, test report to evaluate its performed through the flow meter on its rated/peak flow and pressure.

Complete Hydarulic Flow calculations of FM-200 System.

Midmac submitted .

Note that all rooms with FM200 are not provided with ventilation, instead split a/c units installed.

Midmac to perform the test required and submit the test report with endorsement. Midmac to submit all T & C reports

10

11

Submit fire pumps test performance curve on which the system curve and duty point (100% & 150% data) together with hudraulic calculations of the sprinkler system.

Midmac to submit omplete Fire Pump test reports including performance curve and hydraulic calcualtions. Calculations are provided & available.

12

Submit calculation for the duration of fire water storage tank (excluding freeboard) in relation with the fire pump capacity. Submit letter of confirmation from the supervising consultant stating that approved fire stopping materials were used in all penetrations for protected areas (attached product catalogue/brochure) with accredited applicators. Submit Test Report for the composite glass panels used in the curtain wall/faade (shall not have plastic materials/combustible core) Submit proof of certification that smoke exhaust duct thickness have an appropriate fire resistance rating to withstand temperature of smoke to ensure reliability at the design temperature and length of exposure. Submit the Fire Strategy Report for the Smoke Prging System / Management Systems. Submit the Cause and Effect Matrix showing the sequence of operation of all the system related to LIFE SAFETY & FIRE PROTECTION indicating what will occur during fire alarm activation/simulation. Submit the Single Line Diagram of EPSS (Emergency Power Supply System) and test/commissioning report of generator running on its full load with essential load connected.

13 14 15 16 17

Midmac to provide certificate for glass composite

18

19

Submit functional test of ATS for power change-over of Kahramaa to emergency power supply system (EPSS) and vice versa initiating an alarm (Life Safety & Fire Protection) with essential loads connected and test shall be witnessed by QCDD. Submit site development plan showing the access way of fire apparatus, various provisions of breeching inlets and fire hydrants. Fire engine hardstanding access roads shall be kept clear of obstructions with vertical clearance of 4.5 meters and clear width of 4.0 meters.

Midmac to submit test/commissioning report of generator running at full load. Midmac to submit test/commissioning report of ATS change-over & vice versa with generator connected with essential loads See attached documents See attached documents CDD format for AEB endorsement - structural declaration

20 21

22 23 24

Provide fire engine hardstanding certificate showing the ground floor slab is capable of carrying an imposed stationary load See attached documents of 45 Tons. Site Access - Fire Engine Hardstanding. Exit Discharge - panic hardware (no locks) a) Flush bolts for doors (auto per 7.2.1.5.10) locks shall not require use of key (7.2.1.5.2) b) Location of latches (7.2.1.5.9.1) c) Physical barrier fr. BFL to GFL discharge d) handrails (760 mm ) of all portions of required egress width of stairs - the egress width shall be provided along the natural path of travel (7.2.2.4.2 - handrails)
a) Access Control schematic See attached documents See attached documents Complied; see attached lift details. a) See attached documents. See attached documents

25 26

Fireman lifts - protected against H2 0 per 101 7.2.13.6 Staircase pressurization/smoke purging system. a) Fire rated cables per NFPA 70. b) Motorized pressure relief dampers w/ DPS (measure change pressure across doors).

b) Midmac to provide.

27

c) Manual override system @ FCC d) Smoke vents (listed, visual insp., fail safe, auto open, override etc. - NFPA 704 - 5.1, 5.2.4/5.3 FCC room. a) Fire resistance rating (ext.) b) Manual override for energy fans c) EPSS annunciators/indicator d) Etc.

c) Midmac to provide d) Refer to matrix table. a) See attached documents.


c) refer to genset control panel signal to FACP Midmac to submit fire command center layout c/w all items required by CDD

28 29

Fire strategy report (evacuation plan) Fire pump room a) Ventilation b) Fire telephone c) Fuel tank for diesel pump d) Ventilcation for tank NOTE : All calibrated equipments/tools necessary for the actual test of the system such as manometer, anemometer, cold smoke generator, techometer, volt-meter/multi-tester, etc. shall be available on site.
Midmac to submit fire pump room layout c/w all items required by CDD Midmac to submit all calibrated certificates for actual test of systems.

AEB HO to provide