Você está na página 1de 6

Ask question from Experts Construction Cost Estimate. A high level rough estimate.

A more accurate estimate can be prepared after reviewing the structural and elevation drawings of the building and by using the exact dimensions of each wall. This high level estimate is based on th various cost involved in a construction project. Total Area: Project Cost in Rs.: 3162 sft 4069474.238 Project Cost Rs. Per SFT: 1287 Bill of Quantity (This is an Estimate only. Exaxt quantity can be arrived after reviewing the plans. Write to support Get prices from multiple vendors and put in this sheet. Compare the cost of your project. Note that actual quantity may vary depending upon the design. Item Quantity Unit Rate Total Amount Bazri Binding Wire Bitumen Brick Blast Brick Tiles Bricks Cement Cement for Base Coarse Cement Paint CI Pipe Coarse Sand Commercial Hardwood Earth Fine Sand Glaze Tile Hard Wood Shutter Hardwood and Commercial Plyboard Hardwood Window Shutter Iron Grills Labour for Brick Sup. Str Labour for Brick Tiles Labour for Brick Work Foundation Labour for Ceiling Plaster Labour for Cement Concrete Labour for Ceramic Glaze Tile Labour for DPC Labour for Earth Excavation & Earth Filling Labour for pipe including cost of Joints Labour for Pointing Labour for RCC Labour for Steel RCC Labour for Wall Plaster MS Steel Oil Bound Distemper with Labour Paint Work with Labour Sand Shuttering Stone Blast White Cement 69.564 CUM 63.24 Kg 107.508 Kg 28.458 CUM 12648 NOS 61342.8 NOS 1103.8384 Bags 53.754 Bags 474.3 SqM 47.43 Meter 37.944 CUM 1422.9 RFT 28.458 CUM 44.268 CUM 467.976 SqM 47.43 NOS 12.648 94.86 790.5 NOS NOS Kg 1400 70 60 600 7 6 320 320 35 500 1300 201 220 975 800 4380 4590 1030 70 97389.6 4426.8 6450.48 17074.8 88536 368056.8 353227.02 17201.28 16600.5 23715 49327.2 286002.9 6260.76 43161.3 374380.8 207743.4 58054.32 97705.8 55335 47430 34782 15810 12648 22134 41106 1581 63240 7905 37944 34782 18972 50592 316200 82338.48 37944 95571.45 94860 66402 2687.7 3255579.39

6324 1328.04 632.4 98.022 4743 63.24 3.162

Kg SqM SqM CUM SFT CUM Bags Sub Total:

50 62 60 975 20 1050 850

Item Cement Concrete 1:6:12 Cement Stone Blast Sand Labour for Cement Concrete Total for Cement Concrete 1:6:12 Brick Work in Foundation with Cement Mortar 1:6 Labour for Brick Work Foundation Sand Cement Bricks Total for Brick Work in Foundation with Cement Mortar 1:6 Horizontal DPC with Cement Concrete 1:2:4( 40MM) Labour for DPC Bitumen Cement Coarse Sand Bazri Total for Horizontal DPC with Cement Concrete 1:2:4( 40MM) Earth Work in Excavation in Foundation and Filling under Floors Labour for Earth Excavation & Earth Filling Total for Earth Work in Excavation in Foundation and Filling under Floors

Quantity Foundation 148.614 63.24 31.62

Unit

Rate

Total Amount

Bags CUM CUM

320 1050 975

47556.48 66402 30829.5 22134 166921.98

9.486 44.268 15810

CUM Bags NOS

975 320 6

15810 9248.85 14165.76 94860 134084.61

53.754 7.905 6.324 12.648

Kg Bags CUM CUM

60 320 1300 1400

1581 3225.24 2529.6 8221.2 17707.2 33264.24

63240 63240

Super Structure RCC without Steel Cement Concrete 1:1.5:3 Labour for RCC Shuttering Bazri Coarse Sand Cement Total for RCC without Steel Cement Concrete 1:1.5:3 MS Steel For RCC Labour for Steel RCC MS Steel Binding Wire Total for MS Steel For RCC Brick Work in Super Structure Cement Mortar 1:6 Labour for Brick Sup. Str Cement Sand Bricks Total for Brick Work in Super Structure Cement Mortar 1:6 Brick Tile Tracing on Roof Earth Sand Cement Labour for Brick Tiles Brick Tiles Bitumen Total for Brick Tile Tracing on Roof Rain Water Pipe CI Pipe Labour for pipe including cost of Joints Total for Rain Water Pipe Flooring

4743 56.916 28.458 509.082

SFT CUM CUM Bags

20 1400 1300 320

34782 94860 79682.4 36995.4 162906.24 409226.04 18972 316200 4426.8 339598.8

6324 63.24

Kg Kg

50 70

113.832 25.296 45532.8

Bags CUM NOS

320 975 6

47430 36426.24 24663.6 273196.8 381716.64

28.458 3.162 28.458 12648 53.754

CUM CUM Bags NOS Kg

220 975 320 7 60

6260.76 3082.95 9106.56 34782 88536 3225.24 144993.51 23715 7905 31620

47.43 Meter

500

Ceramic Glaze Tiles Flooring 300X300 MM First Quality with course Glaze Tile 309.876 Cement 58.7974 White Cement 3.162 Cement for Base Coarse 53.754 Fine Sand 44.268 Brick Blast 28.458 Coarse Sand 3.162 Labour for Ceramic Glaze Tile Total for Ceramic Glaze Tiles Flooring 300X300 MM First Quality with course

SqM Bags Bags Bags CUM CUM CUM

800 320 850 320 975 600 1300

247900.8 18813.9 2687.7 17201.28 43161.3 17074.8 4110.6 41106 392056.38

Plastering/Wall tiles Plaster on Ceiling (Roof) Cement Mortar 1:4 Sand Cement Labour for Ceiling Plaster Total for Plaster on Ceiling (Roof) Cement Mortar 1:4 Plaster on Walls Cement Mortar 1:4 Labour for Wall Plaster Cement Sand Total for Plaster on Walls Cement Mortar 1:4 Cement Pointing Cement Mortar 1:2 Sand Labour for Pointing Cement Total for Cement Pointing Cement Mortar 1:2 Glazed Tiles in Dado or Skirting in Bathroom snd Kitchen Walls Glaze Tile Total for Glazed Tiles in Dado or Skirting in Bathroom snd Kitchen Walls

6.324 34.782

CUM Bags

975 320

6165.9 11130.24 12648 29944.14

126.48 18.972

Bags CUM

320 975

50592 40473.6 18497.7 109563.3

3.162 31.62

CUM Bags

975 320

3082.95 37944 10118.4 51145.35

158.1

SqM

800

126480 126480

Door,Window,Cupboard shutter,Iron Grills Hardwood Door Hard Wood Shutter Total for Hardwood Door Hardwood Frame Including Labour Commercial Hardwood Total for Hardwood Frame Including Labour Hardwood Window Hardwood Window Shutter Total for Hardwood Window Hard Wood Frame and Commercial Plyboard Shutter Hardwood and Commercial Plyboard Total for Hard Wood Frame and Commercial Plyboard Shutter Iron Grilling with Labour Iron Grills Total for Iron Grilling with Labour Paint Paint on Wooden Doors and Windows Paint Work with Labour Total for Paint on Wooden Doors and Windows Oil Bound Distemper with Filling on Walls Oil Bound Distemper with Labour Total for Oil Bound Distemper with Filling on Walls Exterior Finish Cement Paint Snowcem Cement Paint Total for Exterior Finish Cement Paint Snowcem 790.5 Kg 70 47.43 NOS 4380 207743.4 207743.4

1422.9

RFT

201

286002.9 286002.9 97705.8 97705.8

94.86

NOS

1030

12.648

NOS

4590

58054.32 58054.32 55335 55335

632.4

SqM

60

37944 37944

1328.04

SqM

62

82338.48 82338.48

474.3

SqM Sub Total:

35

Add 10% for Electric fitting wiring & Labor: Add 10% for Water Supply fitting & Sanitary: Add 5% for Sewerage: Grand Total:

16600.5 16600.5 3255579.39 325557.939 325557.939 162778.9695 4069474.238

See Elevation/Interior Designs Cost Estimate. A high level rough estimate. the exact dimensions of each wall. This high level estimate is based on the square feet of constructed area and would help you in understanding breakup of Project Labor Cost in Rs.: Project Labor Rs. Cost Per SFT:

486157.5 154 antity can be arrived after reviewing the plans. Write to support@gharexpert.com) depending upon the design. Knowledgebase Links Vendor 1 Price Quoted by Vendor 1 Guidelines for Bazri Guidelines for Binding Wire Guidelines for Bitumen Guidelines for Brick Blast Guidelines for Brick Tiles Guidelines for Bricks Guidelines for Cement Guidelines for Cement for Base Coarse Guidelines for Cement Paint Guidelines for CI Pipe Guidelines for Coarse Sand Guidelines for Commercial Hardwood Guidelines for Earth Guidelines for Fine Sand Guidelines for Glaze Tile Guidelines for Hard Wood Shutter Guidelines for Hardwood and Commercial Plyboard Guidelines for Hardwood Window Shutter Guidelines for Iron Grills Guidelines for Labour for Brick Sup. Str Guidelines for Labour for Brick Tiles Guidelines for Labour for Brick Work Foundation Guidelines for Labour for Ceiling Plaster Guidelines for Labour for Cement Concrete Guidelines for Labour for Ceramic Glaze Tile Guidelines for Labour for DPC Guidelines for Labour for Earth Excavation & Earth Filling Guidelines for Labour for pipe including cost of Joints Guidelines for Labour for Pointing Guidelines for Labour for RCC Guidelines for Labour for Steel RCC Guidelines for Labour for Wall Plaster Guidelines for MS Steel Guidelines for Oil Bound Distemper with Labour Guidelines for Paint Work with Labour Guidelines for Sand Guidelines for Shuttering Guidelines for Stone Blast Guidelines for White Cement

Vendor 2

Price Quoted by Vendor 2

Guidelines for Foundation Guidelines for Cement Concrete 1:6:12

Guidelines for Brick Work in Foundation with Cement Mortar 1:6

Guidelines for Horizontal DPC with Cement Concrete 1:2:4( 40MM)

Guidelines for Earth Work in Excavation in Foundation and Filling under Floors

Guidelines for Super Structure Guidelines for RCC without Steel Cement Concrete 1:1.5:3

Guidelines for MS Steel For RCC

Guidelines for Brick Work in Super Structure Cement Mortar 1:6

Guidelines for Brick Tile Tracing on Roof

Guidelines for Rain Water Pipe

Guidelines for Flooring Guidelines for Ceramic Glaze Tiles Flooring 300X300 MM First Quality with course

Guidelines for Plastering/Wall tiles Guidelines for Plaster on Ceiling (Roof) Cement Mortar 1:4

Guidelines for Plaster on Walls Cement Mortar 1:4

Guidelines for Cement Pointing Cement Mortar 1:2

Guidelines for Glazed Tiles in Dado or Skirting in Bathroom snd Kitchen Walls

Guidelines for Door,Window,Cupboard shutter,Iron Grills Guidelines for Hardwood Door

Guidelines for Hardwood Frame Including Labour

Guidelines for Hardwood Window

Guidelines for Hard Wood Frame and Commercial Plyboard Shutter

Guidelines for Iron Grilling with Labour

Guidelines for Paint Guidelines for Paint on Wooden Doors and Windows

Guidelines for Oil Bound Distemper with Filling on Walls

Guidelines for Exterior Finish Cement Paint Snowcem

Você também pode gostar