Manual Testing

Testing performed by human with out third party tool is nothing but manual testing.
Or
Test directly performed by the tester via keyboard, mouse inputs to the application under test is
nothing but manual testing.
What is testing?
Testing is a process of verifying the s/w to check whether it fulfills the requirements or not with the
intent of finding errors.
Or
Testing is nothing but detection it is a process execution of application in controlled manner with
the intent of finding errors.
Or
To ensure that our application is working according to the customer requirements or not.
Requirements
Ms –word, excel sheet for writing test cases, bug reports, and build for testing that’s all.

What is the purpose of testing?

 To get the quality product.


 To detect the bugs.
 To gain confidence in the s/w.
 To reduce the rework.
 Customer will be able to get his work done
 To ensure that complete functionality is implemented.

What is quality?
A quality product is bug free, delivers on time, with in budget, meets the customer requirements,
and maintainable.

Why quality?

1) To reduce the rework.

2) To satisfy the customer requirements

What is maintainable?
Whether the s/w is easy to maintain in production and if any problem is occurred it can be solved
easily with less efforts and less cost.

Qualities of testers
1. Test breaking attitude
2. Take customer point of view
3. To maintain good communication of with developers
4. Should have good knowledge in SDLC
5. Should be able to report technically

When you start testing?


After getting the SRS document then we will prepare test cases while developers are preparing
coding we are preparing the test cases and after releasing the build from them then we will go for
execution.

When to Stop Testing?


This is very difficult to determine. Many modern software applications are so complex, and run in
such as interdependent environment

So, common factors are in deciding when to stop testing.

• Deadlines (release deadlines, testing deadlines.)


• Test cases completed with certain percentage passed.
• Test budget is depleted
• Coverage of code/functionality/requirements reaches a specified point
• The rate at which Bugs can be found is too small
• Beta or Alpha Testing period ends
• The risk in the project is under acceptable limit.

Quality Control:
A set of activities designed to evaluate a developed work product.
Or
All those necessary steps taken for fulfilling the requirements of quality.

QUALITY CONTROL measures the quality of a product

Quality Assurance
All those planned and necessary ideas to provide adequate confidence that the product/service will
satisfy the given requirements of quality.

QUALITY ASSURANCE measures the quality of processes used to create a quality product

What is difference b/w QA and QC?


Q. A Q.C
It is verification process it is validation process
It prevents the problems it identifies the problems
Prepare the test plan implement the test plan
Verifies the reports generates the reports

Software Requirements Specification (SRS) document, containing:


• Introduction
ƒ Purpose
ƒ Scope
ƒ Major Constraints and References
• Functional Requirements
ƒ Context Diagram
ƒ Functional Decomposition Diagram
ƒ System Functions
ƒ Database Requirements
ƒ User Interface Requirements
ƒ External Software Interface / Compatibility Requirements
ƒ Reports Requirements
ƒ Security Requirements
• Use Case Specifications
• Acceptance Criteria

Project Manager: (roles, responsibilities)

• Preparation of Software Requirements Specification (SRS)


• Formation Development Team, Test Team
• Management of requirements through out the project life cycle activities
• Preparation of Detailed Design Document
• Unit Test cases and Integration Test cases
• Guidance on programming and related coding conventions / standards

QA Manager:

• Preparation of System Test Plan


• Formation of Test Team
• Schedule Preparation
• Module Allocation
• Reviews on Test Process
• Client Interaction
• Verify Status Reports

Test Team (Testers & Test Lead):

Testing, is the core competence of any Testing Organization.

• Understand the Application Under Test


• Prepare test strategy
• Assist with preparation of test plan.
• Design high-level conditions
• Develop test scripts
• Understand the data involved
• Execute all assigned test cases
• Record defects in the defect tracking system
• Retest fixed defects
• Assist the test leader with his/her duties
• Provide feedback in defect triages
• Automate test scripts
• Understanding of SQL

What is verification &validation?

V&V is process that helps to determine if the s/w requirements are complete, correct and if s/w of
each development phase fulfills the requirements and conditions, imposed by previous phase etc.

Verification is typically involves reviews, plans, meetings and to evaluate documents, plans,
code requirements & specifications this can be done with the help of check lists issue lists, walk
through &inspection meetings

Validation typically involves actual testing and it will be started after completion of verification.

12. What is verification? validation?

Verification and validation (v&v) is a process that helps to determine if the s/w requirments are
complet, correct and if the s/w of each development phase fulfills the requirements and conditions,
imposed by the previous phase etc.
Verification typically involves reviews and meetings to evaluate documents, plans, code,
requirements, and specifications. This can be done with checklists, issues lists, walkthroughs, and
inspection meetings.
Validation typically involves actual testing and takes place after verifications are completed.
Verification requires several types of reviews, include Requirement Review, Code Walkthroughs,
Code Inspections, Design reviews, reviews of reviews....The system users (Developers) will involve
in these reviews to find the defects before they build a system. Some of the examples we discussed
below please check that one. For Effective Development process each verification example is linked
with another (It also depends up on the type of project...)

Validation is accomplished simply by executing a real-life functions (For Example if you check the
bulb working or not , then you should switch on ...) .Here also validations examples are linked with
each other, one's out put effective input of another validation( depends up on the project type)

Verification answers the question, “Are we building the right Product?”

Validation addresses, “Are we building the Product Right?"

{Depend up on the project type, verification examples are will vary... Below are some standard
examples}
Verification Examples:-

Verification
Performed by Deliverable
Example
Requirement Developers, Review statement of requirements ready to be
Review Customer translated in to system
System Design and configuration document is ready
Design Reviews Developer
for computer program
Code Computer software ready for testing or ready for more
Developers
Walkthroughs detailed inspection
Computer software is ready for testing by developers
Code Inspections Developers
and Testers

Validation Examples:-

Validation Performed
Deliverable
Examples By
software unit is ready for testing with other unit or
Unit Testing Developers
components.
Portions of the system ready for testing with other
Integrated Testing Developers
portions of the system.
System Testing Testers A Tested computer system, based on what was specified
User Acceptance
Users Tested computer system based on the user needs ...
Testing

Summary:
1. Verification and Validation are very essentials in the software testing.
2. It starts when Project starts.
3. It minimizes the cost of testing.
4. Verification is non executable method.
5. Validation is physically executed method.

What is a 'walkthrough'?

A 'walkthrough' is an informal meeting for evaluation or informational purposes. Little or no


preparation is usually required.

Or

It is an informal meeting for information purpose. No preparation is required .just sharing the ideas.

People Involved
The following people attended the meeting:
 Architect. The architect organized and chaired the meeting. He wanted to create a threat
model early in the design phase, to influence subsequent design decisions.
 Business Analyst. The business analyst was invited to the meeting to answer and clarify
questions regarding the security objectives and primary use cases. Note that the business
analyst is an optional attendee and might not be required if the architect can answer the
questions.
 Developer. The developer wanted to understand the security implications of various design
and implementation choices.
 Test Lead. The test lead was invited to the meeting because the architect wanted the threat
model to help define the test strategy. The test lead wanted to know where to focus his
security testing.
Note:This meeting did not involve any operations or network staff. Make sure you know
your operational constraints. If necessary, check with your IT staff about relevant corporate
policies or other infrastructure constraints.

Meeting Guidelines
The architect outlined the following meeting guidelines:
 The meeting was to be limited to one hour.
 A single nominated person would take notes. In this case, the developer was asked to take
notes.
 The team would record issues that needed to be taken offline for further discussion.
The architect specified the amount of time he wanted to spend on each step so that the meeting
would complete in an hour. He wanted steps 1, 2, and 3 to be completed in approximately 20
minutes and the rest of the meeting time to be spent on threat and vulnerability identification. He
also allowed time for a five-minute meeting wrap-up.
What's an 'inspection'?
An inspection is more formalized than a 'walkthrough', typically with 3-8 people including a
moderator, reader, and a recorder to take notes. The subject of the inspection is typically a document
such as a requirements spec or a test plan, and the purpose is to find problems and see what's
missing, not to fix anything. Attendees should prepare for this type of meeting by reading thru the
document; most problems will be found during this preparation. The result of the inspection meeting
should be a written report. Thorough preparation for inspections is difficult, painstaking work, but is
one of the most cost effective methods of ensuring quality. Employees who are most skilled at
inspections are like the 'eldest brother' in the parable in 'Why is it often hard for management to get
serious about quality assurance?'. Their skill may have low visibility but they are extremely valuable
to any software development organization, since bug prevention is far more cost-effective than bug
detection.

Testing types

What white box testing?

It is nothing but testing the structural part of application.


Or

It is a testing approach that examines the application program structure and derives test cases from
the application program logic.

This is also called

open box testing

or structual testing

or clear box testing

or glass box testing

It is purely taken care by developers or development dept.

To perform this testing s/w awarness is required.

To perform this testing intermediate code manual is required.

During this testing test engineers has to follow WBT techniques.

WBT techniques:

these are 3

1. execution testing:

What is black box testing?

It is nothing but testing the functional part of application. No need of knowledge of internal logic of
code.

Unit testing

The testing of individual software components

Or

Testing the individual functionality of the application is nothing but unit testing.

Module testing

Testing the combined functionalities of an application is nothing but module testing.


Integration testing

Testing the combined modules of application is nothing but integration testing.

Exhaustive testing

The last executable statement within a component.

What is base line document? Can u say any two?

Which document‘s certified o/p of one stage passed on to another stage is nothing but base line
document.

E.g.: the 1st version of SRS is considered as a base line document.

What is SDLC? And STLC?

SDLC stands for s/w development life cycle. It specifies how exactly u develop a s/w through
various steps and procedures followed to develop a s/w is nothing but SDLC.

(Or)

It begins when s/w 1st time introduced and ends when s/w is no longer in use.

STLC stands for s/w testing life cycle. It specifies how performed to achieve quality and found bugs
with a systematic procedure is nothing but STLC.

(Or)

It begins at ending of the requirement phase means at design level and ends when s/w is no longer
in use.

What kinds of testing u have done?

Usability, functionality, Regression testing, little bit involved in Database testing.

What is out come of testing?

A quality product.

What type of testing tester do?

Black box testing such as usability, functionality, data base testing, regression like that.

After completion of testing what would u deliver to the client?


 Test plan document

 Test scenarios documents

 Test case document

 Defect reports

 Status reports (monthly, weekly, daily)

 Test scripts

 Project/product sign off document.

What is test case?

Test case is a document which describes INPUT, ACTION, EVENT and EXPECTED RESPONSE
to determine if feature of an application is working correctly or not.
Test case is a sequence of steps to test the correct behavior of a functionality/feature of an
application.
It is nothing but a document which contains a set of inputs and executions results based on
conditions to determine a feature of an application.
It is purely taken care by testers
By taking the help of test cases we can test whether the application is properly working or not.

Status
Pass
Fail

What is good test case?


In my view Which test case covers maximum functionalities, finding the faults effectively, easy to
use, ease to understand, does not do unnecessary things is called as good test case.

Entry criteria
 Approved test plan
 Requirement specification
 ECP& BVA prepared
 Test case template
 Any design document
Exit criteria

Test case should reviewed and approved.

It is a document which contains a set of possible inputs and executions for expected results based on
conditions to determine a feature of application.
Uses

By taking the help of test cases we can test whether the application is properly working or not.

What is a good test case?

A good test case is one that has a high probability of finding an as yet undiscovered area.

Which one (minimum test cases) covers maximum functionalities is called as good test case.

Or

A good test case is has not more than steps and cover more functionality in a single shot.

A good test case satisfies the criteria means:

Finding faults efficiently

Easy to maintain

Cheap to use

Easy to understand and does not do unnecessary things.

How will u prepare test cases?

By using docs. Like BRS, CRS, SRS (through requirements) we prepare use cases by using use
cases we prepare test cases.

How u prepare good test case?

Each and every company follows their own format for test cases. But the final aim is to cover all the
functionality to test the project.

How will u check that Ur test cases are covered all requirements?

By using traceability matrix (TRM)

What is TRM? And CRM?

It is showing the relationship b/w requirements& corresponding test cases.

Or

It is mapping b/w requirements & test cases.


CRM means Cross Reference Matrix

It is mapping b/w requirements &maps (design maps).

Like I mean

Minimum number of test cases =no. of inputs*1.6

E.g.: suppose u have a web page for addition of two numbers

Then u have input 1:

Input 2:

Sum:

In this form we have two input objects (input 1, input 2)

So, minimum test cases for this form will be

Test cases=input object 1*1.6= (i.e.) 2*1.6=3.2(minimum of test cases it should have is 3) but max
can vary.

What is Test scenario?

Test scenario represents a series of actions that are associated together from initiation stage to
completion

Means it specifies overall view of one object total functionality.

Entry criteria:

 approved test plan

 requirments specification (or) SRS

 any design document

 test scenario template

Exit criteria:

test scenario should be reviewed and approved.


What is an Entry criteria?

It is a condition which input of the phase as to satisfy to get entry into the phase is nothing but entry
criteria.

What is an exit criteria?

It is a condition which output of the phase as to satisfy to get exit from the phase is nothing but exit
criteria.

What is test data?

A set of values are used in test or that are necessary to execute the test based on test case
requirements we will prepare the test data.

What is an error?

A mistake in coding is called as an error.

What is defect or issue?

This error is found by test engineer during the testing period that is called defect or issue.

What is bug?

This defect or issue is accepted by development dept. or developer is called as bug.

What is fault?

A manifestation of an error in s/w. A fault. An incorrect step, process, or data definition in a


computer program

What is failure?

The inability of a system or system component to perform a required function within specified
limits. A failure may be produced when a fault is encountered.

Top to down testing

With out presence of sub modules testing the application by using the main module is called as top
to down testing.

Stub

Instead of sub module we need to take the help of temporary programs is called stub.
Bottom to top testing

Without presence of main module testing the application by using sub module is called as bottom to
top testing.

Drivers

Instead of main module we have to use temporary program is called as driver.

Sand witch testing

The combination of top to down &bottom to top approaches is called as sand witch testing.

This is the final stage of integration testing.

Static testing

Verification performed with out executing the system’s code. It is also called as static analysis.

Or

With out executing the test functionality is called as static testing.

E.g.: GUI, Usability

Dynamic testing

Verification &validation performed which executes the system’s code is called as dynamic testing.

Test driver or test harness

A program or test tool used to execute tests. It is also known as test harness.

What is end to end testing?

It is nothing system testing. The term system testing means the combination of functionality testing
&non functionality testing.

Defect leak

The defect which can be found and reproduced by end user/client people the same we (test
engineer) unable to found at the time of testing. This is also called as ‘defect leakage’.

Black box testing techniques:

1. Equivalence partitioning
2. Boundary value analysis
3. Cause-effective graphing
4. Error guessing

Equivalence partitioning: test the inputs would be selected from each portion of BVA.

Boundary value analysis: testing the inputs at boundaries. Upper, lower

Cause-effective graphing: a graphical representation of inputs and the associated out puts effects
which can be used to design test cases.

Error guessing:

Smoke testing:

Usability testing

How is to understand &navigate the application is nothing but usability testing.

Re testing and Regression testing

Retest: retesting means executing the test cases again on the same build like I mean which is
already tested by providing multiple test data.

Like max, min, -ve, +ve, zero, int, float etc.

Regression testing: means executing the same test cases on the modified build.

Like I mean which is already tested when ever the changes are made or some new functionalities are
add make sure that changes are not effected the previous functionality.

Regression testing are two types


Bug regression testing
Functional regression testing

For e.g.

If there are 1000 test cases to be executed in the first build....And of the 1000 test cases, 100 fail and
900 pass....

suppose in 1000 test cases 3rd ,7th ,12th , 20th ..... like that upto 100 test cases are failed

initially while we are executing the test cases(1000) the 3rd test case has failed then we will conduct
retesting on that for clarification whether it is bug or not? Before sending the bug report with the
status of 'new' And the same way we will conduct retesting on the remaining failed test cases like
7th , 12th , 20th .....
Then after bug fixing whenever the modified build(2nd build) is received, Functional
REGRESSION Testing has to be done on the 900 test cases and the remaining 100 failed test cases
are to be Bug Regression testing. Suppose in that 3rd one has failed once again then we will do
retesting for clarification whether it has been fixed or not? if it is not fixed before sending the bug
with the status of 're-open' and bug regression testing on 100 testcases and functional regresssion
testing on 900 test cases and on overall 1000 test cases we will conducting regression testing.

Which is doing first retesting or regression testing?

Retesting is first

generally retesting starts from initial build(1st build) and regression testing starts from modified
build(2nd build)

Data volume testing or volume testing

During this testing test engineers estimate the storage in terms of no. of records.

Security testing

Whether the application is providing privacy or not to the customer data.

Storage testing

Estimate the limit of storage in terms of bytes is nothing but storage testing.

Authentication testing

Testing life cycle

 preparation of test plan(unit, integration,...)

 design your test cases

 prepare test data and test procedures

 executing the test cases as per procedures

 prepare defect reports

 regression testing after verification defect fix


How to track defect?
 Identify the test failure
 report defect
 fix the problem
 analyze the problem
 reproduce the problem
 problem complet

SDLC

What is SDLC?

It specifies how exactly u develop a s/w through various steps and procedures followed to develop a
s/w is nothing but SDLC.

S/W project.

S/w related problems are solved by s/w engineers through s/w engineering process are called as s/w
project.

There are 6 phases

1. information gathering
2. analysis
3. design
4. coding
5. testing
6. release& maintenance

Information gathering:

In this phase business analysist gather the requirements and prepare the BRS.

This time they verify whether the requirements are specified correctly or not and whether the
customer is providing complete information or not.

Analysis:

In this phase sr.analysist or P.M. prepare the s/w RS document with the help of BRS.

This document consists 2 sub documents

1. system requirement specification (SRS)


2. functional requirement specification(FRS)

SRS – contains the details of s/w, h/w, o/s


FRS – contains the details of functionality to be used in project.

And also in this phase they verify

Whether the customer requirements are achievable things or not

And testable things or not

And meets to the cost or not.

Design:

In this phase designer creates two types of documents

1. HLD
2. LLD

HLD --- consists of main module of the project from root to leaf and multiple LLD mo0dules.

LLD --- consists of sub modules of main module and along with flow diagrams, E.R diagrams
prepared by internal designer.

And also in this phase they verify

Whether the HLD & LLD are defined correctly or not.

Whether the HLD & LLD‘s are complete or not.

Whether it is following any data flow diagrams & ER diagrams or not.

Coding:

The design must be translated into programming form (language)

Programming language like C, C++ and JAVA like that are used for coding.

Programming tools like compilers, interpreters, debuggers are used to generate the code.

Specific type of application chooses the right programming language.

Testing:

Once the code is generated then the testing will be started by using diff.types of methodologies like
WBT, BBT with the help of their techniques.

WBT-- It is nothing but testing the structural part of application.


BBT-- It is nothing but testing the functional part of application. No need of knowledge of internal
logic of code.

Release & maintain:

After performing

What is testing ?

Testing is a process of verifying the s/w to check whether it fulfills the requirements
or not with the intent of finding errors.

What is quali ty?


A quality product is bug free, delivers on time, with in budget, meets the customer
requirements, and maintainable.
BRS:
The BRS defines the requirements of customer to be developed.
SRS :
The SRS defines the functional requirements to be developed and the system
requirements to be used.
Re views:
A document level testing technique during this review, the responsible people are
estimating the completeness & correctness of corresponding document.
What is a 'w alkthrough'?
A 'walkthrough' is an informal meeting for evaluation or informational
purposes and is conduct by quality assurance people. In this they can see all the
coding standard and also follow them in manually.. Little or no preparation is
required. Also walkthrough does not have minutes of the meet. can happen at any
time. no schedule such as.
Walkthrough is there for both Testing and Coding.
What's an 'ins pection'?

An inspection is more formalized than a 'walkthrough', typically with 3-8 people


including a moderator, reader, and a recorder to take notes. The subject of the
inspection is typically a document such as a requirements spec or a test plan, and
the purpose is to find problems and see what's missing, not to fix anything.
Attendees should prepare for this type of meeting by reading thru the document;
most problems will be found during this preparation. The result of the inspection
meeting should be a written report. Thorough preparation for inspections is
difficult, painstaking work, but is one of the most cost effective methods of ensuring
quality. Employees who are most skilled at inspections are like the 'eldest brother'
in the parable in 'Why is it often hard for management to get serious about quality
assurance?'. Their skill may have low visibility but they are extremely valuable to
any software development organization, since bug prevention is far more cost-
effective than bug detection.

What is verifi ca tion? valid ation?


Verifi ca tion and validation (v&v) is a process that helps to determine if the s/w
requirments are complet, correct and if the s/w of each development phase fulfills
the requirements and conditions, imposed by the previous phase etc.
Verifi ca tion typically involves reviews and meetings to evaluate documents,
plans, code, requirements, and specifications. This can be done with checklists,
issues lists, walkthroughs, and inspection meetings.
Valida tion typically involves actual testing and takes place after verifications are
completed.

Verifi ca tion answers the question, “Are we building the righ t Product? ”
Valida tion addresses, “Are we building the Product Right? "

What whi te box testing?


It is nothing but testing the structural part of application.
Or
It is a testing approach that examines the application program structure and
derives test cases from the application program logic.
This is also called
open box testing
or structual testing
or clear box testing
or glass box testing
There are 4 White Box Testing Techniques:
1.Basis Path Testing
2.Control Structure testing
3.Program technique Testing
4.Mutation Testing
1.B asi s Path T esting:
During this test the programmers concentrate on the execution of programs
without any runtime errors. To conduct this test, the corresponding programmer
follows the below approach.
• Write a program with respect to LLD (Low Level Design)
• Draw a flow graph for that program.
• Calculate cyclomatic complexity.
• Runt that program more than one time to cover all executable areas.

Eg:
- -------
- -------- Condition
If (?)
-------
------- T F
else
-------
-------
--------
-------- Cyclomatic Complexity =
2(1+1)

One should run the above program 2 times to cover all executable
areas. A programmer gets confidence that a program is running only when the
cyclomatic complexity is reached in running the programs designed.
NOTE: The above program should be run 2 times
One time to check whether if condition is satisfied or not
Next time to check whether the else condition is satisfied or
not, without any runtime errors.
2. Control Struc ture Testing:
During this test, the corresponding programmer concentrates on
correctness of program execution in this test, they verify every statements of
program execution. In this test, they verify every statements input state & Output
state.
Eg: Debugging
3. Program Te chnique Te sting:
During this test, the programmers concentrate on the execution
speed of a program. If the execution speed is not reasonable, then programmers
perform changes in the structure of the program without disturbing functionality
A B
of the program.
Eg: Swapping Program
i. c=a;
a=c+b;
1. Us ability testing
2. Functional T esting
3. Non – Functional Te sting
1.Usabili ty Testing:
In general, the separate testing team starts test execution with usability
testing. During this test, the team concentrates on user-friendliness of the software
build screens. The usability testing consists of 2 sub tests.
a) User – Interface Testing
b) Manuals Support Testing
a) User - interface Testing: -
In User Interface Testing software build is tested for
Ease of use (Understandability)
Look & Feel (Attractiveness)
Speed in Interface (Short navigations)
These are applied on every screen in the software build.
b) Manu als Support Te sting: -
Also known as “Help - documents testing”. During this test, the
testing team concentrates on correctness & completeness of Help – Documents /
User Manuals.
NOTE: In general, the testing team conducts User- interface testing & then
conducts functional & non–Functional Tests. All the end of testing
process, the testing team concentrates on Manuals Support Testing
Receive build from development team.
User Interface Testing
(Usability Testing)
Functional & Non – Functional Testing
Manuals Support Testing
What is uni t testing?
Testing the individual functionaity of an application is nothing but unit testing.
Or
testing the small part an application is nothing but unit testing.
What is modu al tes ting?
Testing the combined functioalities of an application is nothing but modual testing.
What is integ ration testing?
Testing the combined moduals of an application is nothing but integration testing.
2. Functional Te sting:
A Moderator testing level during which the testing team
concentrates on customer requirements interms of functionality. During this test,
the testing team applies below sub-tests on the software build.
i) Functionalit y Testing
ii) Sanita tion Testing
i) Functionalit y Testing: -
During this test, the testing team concentrates on correctness of
every functionality with respect to requirements. In this test, the testing team
follows the below coverage.
GUI Coverage / Behavioral Coverage
(Changes in Properties of Objects in Screen)
Error Handling Coverage
(Preventing incorrect Operations)
Input Domain Coverage
(Taking correct size & type of Inputs)
Manipulations Coverage
(Returning correct output)
Backend Coverage
(The Impact of front-end screens operations on backend tables)
Order of functionalities Coverage
Sanit ation tes ting: -
This is also known as “Garbage Testing”. During this test, the testing team
identifies extra functionalities in the software build with respect to customer
requirements.
3. Non-Functionali ty T esting:
A complex level in system testing during which the testing team
concentrates on extra characteristics of the software.
i. Recovery Testing
ii. Compatibility Testing
iii. Configuration Testing
iv. Inter system Testing
v. Installation Testing
vi. Load Testing
vii. Stress Testing
viii. Data Volume Testing
Re cov ery Te sting: -
It is also known as “Reliability Testing”. During this testing team
validates that whether the software build changes from abnormal mode to normal
mode.

(Abnormal)

Back up & Recovery Procedures

Normal
ii) Co mpatibility Testing: -
Also Known as “Portability Testing”. During this test, the testing team
validates whether the software build is running on customer expected platforms or
not? Platforms are Operating Systems, Compilers, Browsers & Other system
software.

iii) Config ura tion Te sting: -


It is also known as “Hardware compatibility test”. During this test, the
testing team validates whether the software the software build is supporting
different technologies, hardware devices or not?

Eg: Different printer technologies, various network technologies, etc.


Inter System Testing:
It is also known “END – TO – END” Testing. During this test, the team
validates whether the software build is co-existent with other software to share
common resources or not?
Install ation testing:
During this testing test engineers validates how much space is occupied by the
application and whether they validates the application is providing easy navigation
steps to install. It is also called as port testing.

What is load testing?


The execution of our s/w build and the customer expected configuration and load
to estimate the speed in processing is called as load testing. this is also called as
scalability testing. scalability testing means that the no. of concurrent users.

What is stress testing ?


The execution of our s/w build and the customer expected configuration and more
than the customer expected load to estimate peak load is called as stress testing.

What is soak testing?


When running a system at high level of speed for a prolong period of time this test
executes several times more transactions in an entire day if the system may stop
working after no. of transactions have been proceed due to memory leaks or other
defects so, soak testing provide an opportunity to identify such defects.
Da ta Volume Testing: -
During this test, the testing team estimates the peak limit of data handled by
our software build.

Stora ge testing:
during this testing test engineers estimates the limit of storage interms of bytes.
Se curi ty testing:
During this testing test engineers validates whether the applcation is providing
privacy or not to the customer's data( user operations)

Au thentication testing:
During this testing test engineers verifies whether the application is having login
screen or not means whether our application is allowing valid users or not with
login id and password.
Acce ss control testing:
it is used to check whether the user is having the permissions or not to access the
data(services)
eg: manager,adminidtrator, authentication user etc.are having the permisssions to
accesss the data.
Parallel Te sting: -
It is also known as “Comparative Testing” or “Competitive Testing”. During this
test, the testing team is comparing the recent software build with previous versions
of the software build or with the competitive software in market to estimate
competitiveness. This testing is only applicable to software products.
Ad-hoc Te sting: -
In general, every testing team conducts planned testing, but testing team
adopts informal testing sometimes due to some challenges or risks.
Eg: Lack of time, lack of resources, lack of team size, lack of skill, etc.
This informal testing is also known as Ad-hoc testing. There are
different styles in Ad-hoc testing.
Buddy T esting: -
A developer and a tester are working together as buddies t help each other to
find out the defects early. Due to lack of time developers and testers are working
together.
Eg: 1:1 (or) 2:1 (or) 3:1 (preferable)
or
Due to lack of time, the management groups programmers & testers as
“Buddies”. Every buddy group consists of programmers & testers.
Pair T esting: -
this test is done by 2 testers one is Sr. and another one Jr. in them to find the
defects on the same functionality, here Sr. tester is sharing his experience with Jr.
tester (new)
when the new tester has lack of knowledge on the or application
or
Due to lack of knowledge on project domain the management groups a senior tester
& a Junior Programmers are developed and conducted testing, these all are called
Pair testing.
Mo nkey Testing: -
Due to lack of time, the testing team concentrates on some of the main
activities in the software build for testing. This style of testing is known as “Monkey
testing” or “Chimpanzee testing” or “Gorilla testing”.
Ex plora tory T esting: -
Due to lack of proper documentation of the software being built, the test
engineers depend on past experience, discuss with others, browse the Internet or
Operate similar projects and contact customer side people if possible. This style of
testing is called “Exploratory Testing”.
or
Exploratory testing is an approach in software testing with simultaneous learning,
test design and test execution. While the software is being tested, the tester learns
things that together with experience and creativity generates new good tests to run.
De fect Seeding : -
To estimate the efficiency of test engineers, the programmers add some bugs
to the build. This task is called defect seeding / debugging.
alpha testing(non- conve ntional):
testing the application at the developer's site by the enduser.
Beta testing(conve ntional):
Testing the application at the customer's site by the customer.
En cryption and decryption testing:
it is purly taken care by the development dept. coding and decoding the data is
called as encryption
converting the data from one formate to another formate is called as decryption.
Beau ty testing:
user interface testing is also called as beau ty or cosmotic testin g.

Sta tic testing


Verification performed with out executing the system’s code. It is also called as
static analysis.
Or
With out executing the test functionality is called as static testing.
E.g.: GUI, Usability

Dynamic testing
Verification &validation performed which executes the system’s code is called as
dynamic testing.
Sanity testing:
Sanity testing is overall functionality oriented.Whether the released build is
stable or not for further testing. It is also called as build acceptance
testing(BAT).After receiving the initial build testing team conducts testing to find
out whether the build is working or not. Which is the first testing technique applied
on the build? To check the whether the build is acceptable for 1. All menu items are
opening or not
1. All menu items are opening or not
2. All text boxes are accepting key board values or not.
3. All objects are responding or not etc.
When we get the initial build from the development team, we perform sanity
testing. whether build is working properly interims of following factors Easy
to understand, Easy to Operate, Short Navigations. With significant of s/w
we have to apply this testing(new version)