COMMISSIONING PROCEDURE

PROJECT : 5X660 MW Mundra Power Project

COMMNG ELEC - 057

6.6 KV SWITCHGEAR CHARGING PROCEDURE Equipment to be charged:

Preconditions: Completed 1. Civil, Erection, Pre-commissioning & Commissioning activities are completed for the HT swgr, HT Cable 2. Completion of the primary & secondary earthing including earth pits & interconnection of primary earthing with the main plant earthing grid 3. Relay settings adopted for upstream CB & 6.6 KV SWGR Incomer, Bus coupler & Bus PT panels 4. Availability of 220 V D.C. control supply & 415 V A.C. Supply for HT swgr 5. Ensure availability of Fire extinguisher 6. Clearance obtained from working parties & HPGC Procedure Completed 1. 6.6kV switchgear shall be in a condition ready for charging. Remove all temporary Grounds from the switchgear. Ensure that all covers are closed. 2. Test & record final IR value of the HT cable from upstream CB to the 6.6 KV swgr 3. Test & record final IR value of the bus 4. Inspect 6.6kV Incomer panels. Incomer- 1, Bus coupler & Bus PT CBs shall be racked in to Service position. Confirm that relays are in Service, and all alarms are reset 5. Note upstream Bus voltage and confirm that it is within normal range (6.6kV 5%) 6. Close upstream CB thereby charging the HT cable up to the incomer & portion of the I/C # 1 7. Inspect the charged portions for any abnormality. 8. Check the Voltage at the incomer # 1 relay & voltmeter. Record PT secondary voltages in the table below. Confirm the positive phase sequence 9. Close incomer # 1 CB thereby charging the Bus 1 10. Inspect the charged portions of switchgear for any abnormality. Contactor Adani Project Adani Commssioning Page 1 of 3

COMMISSIONING PROCEDURE
PROJECT : 5X660 MW Mundra Power Project

COMMNG ELEC - 057

11. Check the Voltage at the Bus 1 bus PT voltmeter & relay. Record PT secondary voltages in the table below. Confirm the positive phase sequence. 12. Rack in & close the bus coupler CB, thereby charging the Bus 2 of the swgr 13. Check the Voltage at the Bus 2 bus PT voltmeter & relay. Record PT secondary voltages in the table below. Confirm the positive phase sequence. 14. Phase out between the Incomer, Bus-1 & Bus- 2 PTs & Record. A proper phase match is essential. 15. Note Energy meter readings of 6.6kV Incomer panels Voltage record Inc-1 PT Measurement terminal nos Van Vbn Vcn Vab Vbc Vca Va-earth Vb-earth Vc-earth Vn-earth Bus-1 PT (fed from I/C-1) Bus-2 PT (fed from I/C-1)

Contactor

Adani Project

Adani Commssioning Page 2 of 3

COMMISSIONING PROCEDURE
PROJECT : 5X660 MW Mundra Power Project

COMMNG ELEC - 057

Phase-out record I/C-1 PT Va Bus-1 PT Va Vb Vc Vb Va Vb Vc Vc Va Vb Vc Voltage (Volts) Remarks

Bus-1 PT Va

Bus-2 PT Va Vb Vc

Voltage (Bus-1 and Bus-2 fed from I/C- 1 only)

Remarks

Vb

Va Vb Vc

Vc

Va Vb Vc

Contactor

Adani Project

Adani Commssioning Page 3 of 3