PASOMNxxxxxxxxxxx
PASOMNxxxxxxxxxxx
3.4.5 Old jumpering cables dismantlement..............................................................38 3.4.6 Daily maintenance ......................................................................................... 39 3.5 DDF migration.................................................................................................... 39 3.5.1 Migration and rollback..................................................................................... 39 3.5.2 Old E1 cables dismantlement..........................................................................40 4 Definitions............................................................................................................. 40
PASOMNxxxxxxxxxxx
1 Overview
Huawei has been awarded C5 migration project from Omantel, most of the jobs are between Omantel and Huawei. Now Huawei is kindly looking forward to cooperation with your company. This document out cables the requirement of C5 migration project, including new subscriber cable termination, MDF port test, old subscriber cable dismantlement, document update, daily activity during migration and other related job for this project. The subcontractor shall comply strictly with all the technical, design specifications, guide cables and procedures from Omantel and Huawei. The scope of work and responsibilities of the subcontractor are as follows, but not limited to.
2 General Requirements
2.1 All the work and materials shall be in accordance with approved generic drawings provided by Huawei, and to the satisfaction and approval from Omantel. The subcontractor shall fully cooperate with Huawei representative and follows given instructions related to work being implemented. The contract will be as a Back to Back contract, i.e., whatever change in order or directive comes from Omantel and is devoted to Huaweis scope of work, it will automatically be applied to the contract and will be obligated to subcontractor. Meantime, it will not affect the previously decided lump sum price by both parties. The subcontractor shall provide enough teams to keep good progress that always meets or exceeds the requirements from Omantel and Huawei. The subcontractor shall be solely responsible to the damage or loss of materials taking place by his own mistake or careless operation during the project. The subcontractor shall be solely responsible for all the Safety and Quality at site in accordance with the standards of Omantel and Huawei. The subcontractor shall submit regularly concerned management report to Huawei, and attend the project management meeting of Huawei or attend Omantel meeting on behalf of Huawei. After completion of work at the site, the subcontractor must clean up the site, and remove all debris resulting from his work; i.e. keep up the site status to its
2.2
2.7
PASOMNxxxxxxxxxxx
original one. Meanwhile, all unused materials have to be prepared a list and returned back to Huawei warehouse in Muscat. 2.8 The subcontractor shall be solely responsible to provide all transportation vehicles and installation tools, such as laptop, multimeter, wire stripper, wiring knife, etc. The subcontractor shall be solely responsible to provide relevant documentation to Huawei, such as check list, supplier certificate, quality selfinspection form, self-test results, including both hardcopy and softcopy etc., as per the standards from Omantel and Huawei.
2.9
2.10 The subcontractor shall be solely responsible to pass PAC successfully and correct all the mistakes, if any. 2.11 The price of the agreement is a lump sum price. The subcontractor shall be solely responsible to all the expenses, such as salary, accommodation, transportation, telecommunication and insurance for his employees, etc. 2.12 It is unacceptable to Huawei that the subcontractor re-subcontracts the project to other subcontractor. The detailed descriptions of different part as follows are as a guide and procedure, but the subcontractor can not just limit on them. The subcontractor should hand over the complete job to Huawei and Omantel.
PASOMNxxxxxxxxxxx
PASOMNxxxxxxxxxxx
Under this scenario, the broadband service and voice service will be migrated to the new MSAN together. The new jumbering cable need be routing and terminated between old vertical MDF and new horizontal MDF, the old jumpering cable between vertical MDF and old horizontal MDF will be cut down.
PASOMNxxxxxxxxxxx
Prerequisite
Omantel already provide the MDF allocation list information, including telephone number, MDF port location, port attribute, etc.
Remark: For the ISDN BRA subscribers test, the NT1 and ISDN telephone should be prepared by subcontractor. For the broadband service test, the modem should be prepared by subcontractor.
Prerequisite
PASOMNxxxxxxxxxxx
Before test, plug out the isolator on new horizontal MDF port if the port is voice over ADSL 1. Huawei provide the dialing test tool and test data 2. The test telephone number has been provided by Omantel, which has CLIP function
3. The new jumperling cables between vertical MDF and new horizontal MDF have been finished by subcontractor 4. The software for dialing test tool has been installed in subcontractor laptop correctly
3 4 5
After test, plug in the isolator back to the new horizontal MDF port Provide the test report Correct the MDF issues according to test report The software of dialing test tool will generate report automatically
After migration
No. Sub-items For the voice service, make a sample test manually on vertical MDF port Compare the test result with latest MDF allocation list Correct the MDF issues Make broadband service test on vertical MDF after migration manually (10% port), make a record of modem activation rate Prepare the verification report
Prerequisite
1. The migration has been finished
2. The sample port list has been confirmed by Omantel and Huawei
2 3
PASOMNxxxxxxxxxxx
There are two scenarios of the test result. Scenario 1: No dial tone The reason could be: this port is for ISDN BRA; duplexing is not well; duplexing to a not working port. First of all, measure the voltage by the multimeter, if around -48V means that is a POTS port, if else means that is an ISDN port. If that is the POTS port, please try to duplex again or find out the correct port and make the duplexing. If that is the ISDN port, test with the NT1 and ISDN telephone again, if there is no dial tone yet, please try to duplex again or find out the correct port and make the duplexing. Scenario 2: Wrong number It means the new jumpering cable is connected to the wrong port (other working port). Please correct the new jumpering cable connection according to the latest MDF allocation list.
Prerequisite
1. The new subscriber cables have already been laid on MDF rack and marker is correctly marked. 2. The port mapping table has already been provided by Huawei.
Route the new subscriber cables into the new horizontal MDF blocks
2 3
Strip the subscriber cable Wire the separated twisted pair cables to corresponding MDF port The new port mapping table has already been provided by Huawei.
PASOMNxxxxxxxxxxx
It had been tested and proven that when the bridge tap is less than 30 meters, the degradation of speed is small and within acceptable range. In the MDF rack, the new jumpering cable usually is no more than 30 meter, but considering the subscriber cable from MSAN to new horizontal MDF, the bridge tap will exceed 30 meter, so the isolators will be used at the new horizontal MDF.
No. Sub-items Routing new jumpering cable between 1
Prerequisite
New horizontal MDF has been installed;
The new port mapping table has already been provided by Huawei.
Remarks: before doing the duplexing, its necessary to check and make sure the new MSAN
cables are not connected to the boards. Pull it out from the board if found connected.
Prerequisite
1. The new MSAN rack has been installed and data has been configured
2. The new subscriber cables have already been laid in MSAN rack and marked correct marker 3. The wiring has been finished and test
Plug out the isolator on the new horizontal MDF port if this is voice over ADSL port Plug in the isolator to the ADSL_out position
Remark: the old subscriber cable of exchange and DSLAM should also be unplugged from old
PASOMNxxxxxxxxxxx
equipment or just plug out the service board, but it is suggested to require Omantel to finish this job, since we do not know other vendors equipment. And they also should make a marker on the cable themselves before they disconnect the cable. After migration, the isolator also need be plugged into the ADSL_out port to avoid the ADSL speed reduction caused by bridge tap
Prerequisite
If decide to rollback by Omantel and Huawei after sample test
Remark: the old subscriber cable should also be plugged into exchange and DSLAM or just plug into the service board, but it is suggested to require Omantel to finish this job.
Prerequisite
PASOMNxxxxxxxxxxx
Prerequisite
Prerequisite
3.2
If there is not space available for new horizontal MDF blocks or vertical MDF can support jumpering cable duplexing, but horizontal MDF can support the duplexing, then horizontal MDF duplexing solution can be used. Under this scenario, the broadband service and voice service will be migrated to the new MSAN separately. First, the new subscriber cables from new MSAN will be routed and duplex on the existing horizontal MDF port.
PASOMNxxxxxxxxxxx
Second, new jumbering cables need be routed and terminated between vertical MDF and horizontal MDF, but these new jumpering cables should be migrated one by one on migration night.
PASOMNxxxxxxxxxxx
PASOMNxxxxxxxxxxx
PASOMNxxxxxxxxxxx
Prerequisite
Omantel already provide the MDF allocation list(including vertical and horizontal MDF) information, including telephone number, MDF port location, port attribute, etc.
Appendix 2 Scope of Work MDF(100% port) For the broadband service, make a sample test on vertical MDF(10% port) and make a record of modem activation rate Check the duplexing port status for each port when doing above test and make a record Feed back the test report to Omantel Check all issues with Omantel and update the MDF allocation list if it is wrong Replace the old MDF module if the duplexing port is broken, or just move the subscriber to another spare MDF port, including the jumper cable and subscriber cable
PASOMNxxxxxxxxxxx
Remark: for the ISDN BRA subscribers test, the NT1 and ISDN telephone should be prepared by subcontractor.
Prerequisite
1. Huawei provide the dialing test tool and test data 2. The test telephone number has been provided by Omantel, which has CLIP function 3. The wiring has been finished by subcontractor 4. The software for dialing test tool has been installed in subcontractor laptop correctly
2 3
Provide the test report Correct the MDF issues according to test report
Appendix 2 Scope of Work No. Sub-items Make a sample test manually on vertical MDF port Compare the test result with latest MDF allocation list Correct the MDF issues Prepare the verification report
PASOMNxxxxxxxxxxx
Prerequisite
1. The migration has been finished
2. The sample port list has been confirmed by Omantel and Huawei
2 3 4
During broadband service migration During the broadband service migration, the voice service will also be influenced, so voice service also need be tested.
No. 1 Sub-items For the voice service, make a manually test on vertical MDF port (100% port) Compare the test result with latest MDF allocation list Correct the MDF issues For the broadband service, make a sample test on vertical MDF(10% port) and make a record of modem activation rate Prepare the verification report
Prerequisite
2 3
Remark:
The voice service test should be done during migration, not after migration, all issue should be corrected immediately.
PASOMNxxxxxxxxxxx
The subcontractor should finish the new subscriber cables routing and termination in existing MDF blocks of exchange side according to new port mapping table.
No. Sub-items Route the new subscriber cables to the corresponding horizontal MDF blocks Strip the subscriber cable Wire the separated twisted pair cables to corresponding MDF port The port mapping table has already been provided by Huawei.
Prerequisite
1. The new subscriber cables have already been laid on MDF rack and marker is correctly marked. 2. The port mapping table has already been provided by Huawei
2 3
Remark: before doing the duplexing, its necessary to check and make sure the new MSAN
cables are not connected to the boards. Pull it out from the board if found connected.
3.2.2.2
Definition:
On the migration night, subcontractor should finish the migration as following procedure. If need, also finish the rollback procedure. Migration
No. Sub-items
Prerequisite
1. The new MSAN rack has been installed and data has been configured
2. The new subscriber cables have already been laid in MSAN rack and marked correct marker 3. The wiring has been finished and test
Remark: the old subscriber cable of exchange should also be unplugged from old equipment or just plug out the service board, but it is suggested to require Omantel to finish this job, since we do not know other vendors equipment. And they also should make a marker on the cable themselves before they disconnect the cable.
Prerequisite
If decide to rollback by Omantel and Huawei after
Appendix 2 Scope of Work from the MSAN service board sample test
PASOMNxxxxxxxxxxx
Remark: the old subscriber cable should also be plugged into exchange and DSLAM or just plug into the service board, but it is suggested to require Omantel to finish this job.
Prerequisite
3.2.3.2
Definition:
In order to avoid bridge tap issue during broadband service migration, the subscriber cables from old exchange should be dismantled from duplexing point. This step is necessary for the voice over ADSL subscribers. No. 1 2 Sub-items Dismantle the old exchange subscriber cables from duplex point of horizontal MDF block Make a marker on each cable
Prerequisite
PASOMNxxxxxxxxxxx
Remarks: there will be a monitoring stage after migration, only when the migration is confirmed successfully, the old cables will be dismantled completely.
3.2.3.3
Definition:
On the migration night, subcontractor should finish the migration as following procedure. If need, also finish the rollback procedure. Migration
No. Sub-items If MDF blocks can not support jmpering cable duplexing, please plug out the old jumpering cables on migration point and make a marker on each old cable if MDF blocks can support jumpering cable duplexing, please plug in the isolators at ADSL_in and ADSL_out point, this scenario could be much easier for rollback 1 In case of horizontal MDF block, please plug in the isolators at ADSL_in In case of vertical MDF block, please plug in the isolators at ADSL_out In case of horizontal MDF and vertical MDF, please plug in the isolators at ADSL_in and ADSL_out 1. The new MSAN rack has been installed Punch the new jumpering cables on vertical MDF migration point. 2. Broadband service data has been configured on MSAN and BRAS 3. The cables of voice over ADSL subscribers from old exchange have been dismantled from duplexing point
Prerequisite
Appendix 2 Scope of Work If horizontal MDF migration is not finished in step 3.2.3.1, please finish the new jumpering punching on horizontal MDF
PASOMNxxxxxxxxxxx
Remarks: the jumpering cable should be migrated one by one on migration point, only when the previous jumpering cable test is ok, subcontractor can start to migrate the next jumpering cable
Prerequisite
Remark: whether to rollback is decided by Omantel and Huawei after sample test
Prerequisite
PASOMNxxxxxxxxxxx
This part describes the dismantlement of old jumpering cables after migrations, including the jumpering cables between vertical MDF and horizontal MDF and the jumpering cables between old exchange and old DSLAM.
No. Sub-items Dismantle the old jumpering cables 1
Prerequisite
Prerequisite
3.3
In case of both vertical MDF and horizontal MDF does not support duplexing, but new MDF block space is available (or there are enough spare horizontal MDF blocks), this method could be proposed, because the voice service and broadband service can be migrated together.
PASOMNxxxxxxxxxxx
PASOMNxxxxxxxxxxx
Prerequisite
Omantel already provide the MDF allocation list information, including telephone number, MDF port location, port attribute, etc.
3 4
PASOMNxxxxxxxxxxx
Remark: for the ISDN BRA subscribers test, the NT1 and ISDN telephone should be prepared by subcontractor.
During migration
No. Sub-items For the voice service, execute dialing test on vertical MDF manually(100% port) Compare the test result with latest MDF allocation list Correct the MDF issues For the broadband service, make a sample test on vertical MDF(10% port) and make a record of modem activation rate Prepare the verification report
Prerequisite
1. The subscriber data has been configured on MSAN and NGN by Huawei 2. The wiring has been finished by subcontractor
2 3
Remarks: the voice service test should be done during migration, not after migration, all issue should be corrected immediately.
Prerequisite
1. The new subscriber cables have already been laid on MDF rack and marker is correctly marked. 2. The port mapping table has already been provided by Huawei.
Route the new subscriber cables into the new horizontal MDF blocks
2 3
Strip the subscriber cable Wire the separated twisted pair cables to corresponding MDF port The port mapping table has already been provided by Huawei.
PASOMNxxxxxxxxxxx
Prerequisite
New horizontal MDF has been installed
horizontal MDF
2 3 Terminate the new jumpering cables on new horizontal MDF side Make a marker for each cable on vertical MDF side
Prerequisite
Remarks: the jumpering cable should be migrated one by one, only when the previous jumpering cable test is ok, subcontractor can start to migrate the next jumpering cable
PASOMNxxxxxxxxxxx
Prerequisite
Prerequisite
Prerequisite
PASOMNxxxxxxxxxxx
Prerequisite
3.4
If horizontal MDF do not support duplexing and new MDF block space is not available, this solution could be the only choice.
PASOMNxxxxxxxxxxx
PASOMNxxxxxxxxxxx
PASOMNxxxxxxxxxxx
PASOMNxxxxxxxxxxx
Prerequisite
Omantel already provide the MDF allocation list(including vertical and horizontal MDF) information, including telephone number, MDF port location, port attribute, etc.
Appendix 2 Scope of Work MDF(100% port) For the broadband service, make a sample test on vertical MDF(10% port) and make a record of modem activation rate Feed back the test report to Omantel Check all issues with Omantel and update the MDF allocation list if it is wrong
PASOMNxxxxxxxxxxx
Remark: for the ISDN BRA subscribers test, the NT1 and ISDN telephone should be prepared by subcontractor.
Prerequisite
1. The subscriber data has been configured on MSAN and NGN by Huawei 2. The wiring has been finished by subcontractor
2 3
Remarks: the test should be done during migration, not after migration, all issue should be corrected immediately.
During broadband service migration During the broadband service migration, the voice service will also be influenced, so voice service also need be tested.
No. 1 Sub-items For the voice service, make a manually test on vertical MDF port (100% port) Compare the test result with latest MDF allocation list Correct the MDF issues
Prerequisite
2 3
Appendix 2 Scope of Work For the broadband service, make a sample test on vertical MDF(10% port) and make a record of modem activation rate Prepare the verification report
PASOMNxxxxxxxxxxx
Remark: the voice service test should be done during migration, not after migration, all issue should be
corrected immediately.
Prerequisite
1. The new subscriber cables have already been laid on MDF rack and marker is correctly marked. 2. The port mapping table has already been provided by Huawei.
Route the new subscriber cables into the horizontal MDF blocks
2 3
Prerequisite
PASOMNxxxxxxxxxxx
been configured on MSAN and NGN 2. The MSAN cable has been connected to MSAN 3. The port test has been finished
Prerequisite
If decide to rollback by Omantel and Huawei after sample test
Prerequisite
The port mapping table has been provide
PASOMNxxxxxxxxxxx
On the migration night, subcontractor should finish the migration as following procedure. If need, also finish the rollback procedure. Migration
No. Sub-items If MDF blocks can not support jmpering cable duplexing, please plug out the old jumpering cables on migration point and make a marker on each twist pairs if MDF blocks can support jumpering cable duplexing, please plug in the isolators at ADSL_in and ADSL_out point, this scenario could be much easier for rollback 1 In case of the horizontal MDF block, please plug in the isolators at ADSL_in In case of the vertical MDF block, please plug in the isolators at ADSL_out In case of horizontal MDF and vertical MDF, please plug in the isolators at ADSL_in and ADSL_out 1. The new MSAN rack has been installed 2 Punch the new jumpering cables on vertical MDF migration point If horizontal MDF migration is not finished in step 3.4.3.1, please finish the new jumpering punching on horizontal MDF 2. Broadband service data has been configured on MSAN and BRAS
Prerequisite
Remarks: the jumpering cable should be migrated one by one on migration point, only when the previous jumpering cable test is ok, subcontractor can start to migrate the next jumpering cable
Prerequisite
Appendix 2 Scope of Work Dismantle the new jumpering cables on the migration point of vertical MDF block and horizontal MDF block According to the migration step, repunch the old jumpering cables on migration point according to the marker on the cable. Or plug out the isolators at ADSL_in and ADSL_out point
PASOMNxxxxxxxxxxx
Remark: whether to rollback is decided by Omantel and Huawei after sample test
Prerequisite
Prerequisite
PASOMNxxxxxxxxxxx
DSLAM
Prerequisite
3.5
DDF migration
This part describes the DDF migration scenario of PRA subscriber. If the PBX is connected to old device through E1 cable, then the migration should be finished on DDF. If the PBX is connected to old device through twisted pairs, the migration follow the normal PSTN migration procedure. The PRA service test after migration should be done by Huawei and Omantel.
Prerequisite
PASOMNxxxxxxxxxxx
Prerequisite
4 Definitions
HUAWEI Subcontractor PAC MDF CLIP MSAN DDF PSTN DSLAM ISDN NGN ADSL BRAS BRA PRA HUAWEI Tech. Investments Oman Co., Ltd. Contractor assigned by HUAWEI Primary Acceptance Certification Main Distribution Frame Calling Cable Identification Presentation Multi-service Access Node Digital Distribution Frame Public Switched Telephone Network Digital Subscriber Line Access Multiplexer Integrated Services Digital Network Next Generation Network Asymmetric Digital Subscriber Line Broadband Remote Access Server Basic Rate Access Primary Rate Access