Escolar Documentos
Profissional Documentos
Cultura Documentos
Supplier A BASF Err:504 0.00 1.00 3.00 Err:504 Err:504 0.00 48 Err:504 Err:504 Err:504 Before Err:504
Material B Transport Err:504 0.00 0.00 0.00 Err:504 Err:504 0.00 English Err:504 Err:504 Err:504 Err:504 Before Err:504
MNO.
*
C
D
P&G MPC
Customs
Err:504
Err:504
0.00
0.00
1.50
6.00
14.00
0.00
Err:504
Err:504
Err:504
Err:504
0.00
8.00
Español Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
After Err:504
Total Err:504
After Err:504
Enter
Enterwork
work
Inventory order
atorder
Supplier (Purchasing)
(Planning)
Supplier
production
Clearing material for export Inspection Unloading
Inspection
Storagetrucks
at plant
Making and packing
Transport
0.5
0.5 days
days by land Storage
Inland in outside
freight W/HW/Hinland
to Outside freight
0.50.5
days to P&G
days(mt)
3 days (mt)
0 days 1 days
Transport 1 days 5 days 1 days
1Material
days waiting at port by ship (Jeddah Port) 9 days
Port Usage for loading (mt)
1/ days
clearing 0.5 days
14 days Custom clearance / Custom Broker
4 days 4 days
5 days
7
39
38
37
36
35
33
32
31
30
29
28
27
26
25
23
22
21
20
19
18
17
16
15
13
12
11
10
10
11
12
13
15
16
17
9
8
6
5
3
2
1
0
1
2
3
5
6
8
9
34
24
14
14
4
4
BASF Transport P&G MPC Customs