Você está na página 1de 2

Zero Chain Chain name Time Cost Process Inventory Delay Transport Inspection BeginX Width EndX Num

Supplier A BASF Err:504 0.00 1.00 3.00 Err:504 Err:504 0.00 48 Err:504 Err:504 Err:504 Before Err:504
Material B Transport Err:504 0.00 0.00 0.00 Err:504 Err:504 0.00 English Err:504 Err:504 Err:504 Err:504 Before Err:504
MNO.
*
C
D
P&G MPC
Customs
Err:504
Err:504
0.00
0.00
1.50
6.00
14.00
0.00
Err:504
Err:504
Err:504
Err:504
0.00
8.00
Español Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
After Err:504
Total Err:504
After Err:504

Total SCT Err:504 0.00 8.50 17.00 Err:504 Err:504 8.00


Total Leadtime Err:504 N° processes Before Err:504
Activities Exchange rate (1$ = X SR) 3.76 18 After Err:504
Process = 1
Inventory = 2
Transport = 3
Inspection = 4
Delay = 5
Process Inventory
CommandButton1 Number
Lot size Average Inventory (max) Inventory (min) Storage Capacity
Transport Inspection Delay
Cost
of lots
Activity Number tanks / Capacity Acumulated Txtbox Txtbx Txtbx
Phase Activities days Chain Cost per mt Lots mt mt days mt days mt Size Max Max Left Top Width Height Txtbx Top Union Left
type cont / m2 per unit Cost Left width Height
Work Orders Process Enter work order (Purchasing) 0 1 A 48 98 6 6 48 213 24 60 A1 48
Enter work order (Planning) 0 1 A 54 98 6 6 54 213 24 60 A1 48
Supplier inventory Inventory at Supplier 3 2 A 60 98 36 7 60 214 36 60 A2 54
Production Execution Supplier production 0 1 A 96 98 8 8 96 214 24 60 A1 90
Transport Transport by land 1 3 B 104 98 12 25 104 223 24 60 B3 98
Port process Clearing material for export 1 1 D 116 98 12 12 116 216 24 60 D1 110
Port process Material waiting at port 4 5 D 128 98 48 48 128 234 48 60 D5 122
Ocean Freight Transport by ship (Jeddah Port) 14 3 B 176 98 168 42 176 231 168 60 B3 170
Destination Port Custom clearance / Custom Broker 5 1 D 344 98 60 60 344 240 60 60 D1 338
Port Operations Inspection 1 4 D 404 98 12 12 404 216 24 60 D4 398
Port Operations Port Usage for loading / clearing 4 5 D 416 98 48 48 416 234 48 60 D5 410
Transport Inland freight to Outside W/H 1 3 C 464 98 12 25 464 223 24 60 C3 458
Storage Storage in outside W/H 9 2 C 476 98 108 22 476 221 108 60 C2 470
Transport inland freight to P&G 0 3 B 584 98 6 25 584 223 24 60 B3 578
Reciving in Plant Unloading trucks 0 1 C 590 98 6 6 590 213 24 60 C1 584
Inspection Inspection 0 4 C 596 98 6 6 596 213 24 60 C4 590
Storage Storage at plant 5 2 C 602 98 60 12 602 216 60 60 C2 596
Plant Conversion Making and packing 1 1 C 662 98 12 12 662 216 24 60 C1 656
###
Material: ; GCAS:

Enter
Enterwork
work
Inventory order
atorder
Supplier (Purchasing)
(Planning)
Supplier
production
Clearing material for export Inspection Unloading
Inspection
Storagetrucks
at plant
Making and packing
Transport
0.5
0.5 days
days by land Storage
Inland in outside
freight W/HW/Hinland
to Outside freight
0.50.5
days to P&G
days(mt)
3 days (mt)
0 days 1 days
Transport 1 days 5 days 1 days
1Material
days waiting at port by ship (Jeddah Port) 9 days
Port Usage for loading (mt)
1/ days
clearing 0.5 days
14 days Custom clearance / Custom Broker
4 days 4 days
5 days

7
39
38
37
36
35

33
32
31
30
29
28
27
26
25

23
22
21
20
19
18
17
16
15

13
12
11
10

10
11
12
13

15
16
17
9
8

6
5

3
2
1
0
1
2
3

5
6

8
9
34

24

14

14
4

4
BASF Transport P&G MPC Customs

Você também pode gostar