2 x 500 MW Mong Duong 1 Thermal Power Plant Project


DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

DISCIPLINE = C&I, Control & Instrument


MD-0-V-111-31-00714

Panel Outline Drawing for Turbine Control System (1 of 3)

BILL

25/10/12

MD-0-V-111-31-00715

Panel Outline Drawing for Turbine Control System (2 of 3)

BILL

25/10/12

MD-0-V-111-31-00716

Panel Outline Drawing for Turbine Control System (3 of 3)

BILL

25/10/12

MD-0-V-111-31-00732

Panel Outline Drawing for Turbine Control System (1 of 18)

BILL

25/10/12

MD-0-V-111-31-00733

Panel Outline Drawing for Turbine Control System (2 of 18)

BILL

25/10/12

MD-0-V-111-31-00734

Panel Outline Drawing for Turbine Control System (3 of 18)

BILL

25/10/12

MD1-0-E-545-01-00001

Communication Layout-Symbol and Legend

BILL

12/12/12

MD1-0-E-545-01-00101

Communication Layout- Installation Details (1)

BILL

12/12/12

MD1-0-E-545-01-00102

Communication Layout- Installation Details (2)

BILL

12/12/12

MD1-0-E-545-01-00201

Communication Layout- Riser Diagram Telephone System

BILL

12/12/12

MD1-0-E-545-01-00301

Communication Layout- Riser Diagram Public Address System

BILL

12/12/12

MD1-0-E-545-01-00401

Communication Layout- Riser Diagram CCTV System

BILL

12/12/12

MD1-0-E-545-01-00501

Communication Layout- Riser Diagram Lan System

BILL

12/12/12

MD1-0-E-545-01-02001

Communication Layout- Turbine BLDG Ground Floor

BILL

24/12/12

MD1-0-E-545-01-02002

Communication Layout- Turbine BLDG Mez. Floor

BILL

24/12/12

MD1-0-E-545-01-02003

Communication Layout- Turbine BLDG Operating Floor

BILL

24/12/12

MD1-0-E-545-01-03001

Communication Layout- Central Control BLDG Ground Floor

BILL

14/09/12

MD1-0-E-545-01-03002

Communication Layout- Central Control BLDG 1st Floor

BILL

14/09/12

MD1-0-E-545-01-03003

Communication Layout- Central Control BLDG 2nd Floor

BILL

14/09/12

MD1-0-E-545-01-03004

Communication Layout- Central Control BLDG 3rd Floor

BILL

14/09/12

MD1-0-E-545-01-04101

Communication Layout - Coal Handling Control BLDG

BILL

29/05/13

MD1-0-E-545-01-04201

Communication layout - fuel oil pump house

BILL

08/03/13

MD1-0-E-545-01-04401

COMMUNICATION LAYOUT - FIRE PROTECTION PUMP HOUSE

BILL

04/03/13

MD1-0-E-545-01-04501

Communication Layout - Ash Slurry Pump House Ground Floor

BILL

05/07/13

MD1-0-E-545-01-04502

Communication Layout - Ash Slurry Pump House 1st Floor

BILL

05/07/13

MD1-0-E-545-01-04601

Communication Layout - ESP Control & Ash Elec. BLDG

BILL

20/05/13

MD1-0-E-545-01-04801

Communication Layout - Diesel Generator House

BILL

30/05/13

MD1-0-E-545-01-04901

Communication Layout - Cooling Water Pump House

BILL

05/07/13

MD1-0-E-545-01-05101

Communication Layout - Gaseous Chlorination BLDG

BILL

19/07/13

MD1-0-E-545-01-05201

Communication Layout - Fuel Oil Unloading Pump House

BILL

12/06/13

MD1-0-E-545-01-05301

Communication Layout - Return Water Pump House

BILL

16/07/13

MD1-0-E-545-01-05401

Communication Layoout-Switchyard Control BLDG Ground Floor

BILL

11/03/13

MD1-0-E-545-01-05402

Communication Layoout-Switchyard Control BLDG 1st Floor

BILL

11/03/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-E-545-01-05501

COMMUNICATION LAYOUT - WATER TREATMENT BLDG GROUND FLOOR

BILL

04/03/13

MD1-0-E-545-01-06401

Communication Layout - Limestone Storage BLDG

BILL

16/07/13

MD1-0-E-545-01-06501

Communication Layout - Limestone Handling Control BLDG

BILL

29/05/13

MD1-0-E-545-01-06901

Communication Layout - Main Transformer Area Unit1

BILL

16/07/13

MD1-0-E-545-01-06902

Communication Layout - Main Transformer Area Unit2

BILL

16/07/13

MD1-0-E-545-01-08301

Communication Layout - Workshop BLDG

BILL

27/05/13

MD1-0-E-545-01-08401

Communication layout - bulldozer garage

BILL

23/04/13

MD1-0-E-545-01-08501

Communication Layout - I&C Electrical and Mechamical Warehouse

BILL

16/07/13

MD1-0-E-545-01-08601

Communication Layout- Admin. Bldg Ground Floor

BILL

19/12/12

MD1-0-E-545-01-08602

Communication Layout- Admin. Bldg 1st Floor

BILL

19/12/12

MD1-0-E-545-01-08603

Communication Layout- Admin. Bldg 2nd Floor

BILL

19/12/12

MD1-0-E-545-01-08604

Communication Layout- Admin. Bldg 3rd Floor

BILL

19/12/12

MD1-0-E-545-01-08901

Communication Layout- Common Service BLDG

BILL

25/01/13

MD1-0-E-750-01-00001

Fire Detection & Alarm System- Symbol and Legend

BILL

07/03/13

MD1-0-E-750-01-00051

FIRE DETECTION & ALARM SYSTEM - INSTALLATION DETAIL (1)

BILL

07/03/13

MD1-0-E-750-01-00052

FIRE DETECTION & ALARM SYSTEM - INSTALLATION DETAIL (2)

BILL

07/03/13

MD1-0-E-750-01-00053

FIRE DETECTION & ALARM SYSTEM - INSTALLATION DETAIL (3)

BILL

07/03/13

MD1-0-E-750-01-00061

FIRE DETECTION & ALARM SYSTEM - EQUIPMENT DETAIL (1)

BILL

07/03/13

MD1-0-E-750-01-00062

FIRE DETECTION & ALARM SYSTEM - EQUIPMENT DETAIL (2)

BILL

07/03/13

MD1-0-E-750-01-00101

Fire Detection & Alarm Layout- Block Diagram

BILL

08/07/13

MD1-0-E-750-01-00102

Fire Detection & Alarm Layout- Block Diagram (2)

AC

BILL

07/01/13

MD1-0-E-750-01-00151

Fire Detection & Alarm System- Interface Diagram

BILL

08/07/13

MD1-0-E-750-01-00201

Fire Detection & Alarm Layout- Riser Diagram (1)

BILL

12/03/13

MD1-0-E-750-01-00202

Fire Detection & Alarm Layout- Riser Diagram Steam Turbine BLDG

BILL

28/02/13

MD1-0-E-750-01-00203

Fire Detection & Alarm Layout- Riser Diagram (3)

RT

BILL

15/10/12

MD1-0-E-750-01-00204

Fire Detection & Alarm Layout- Riser Diagram (4)

BILL

06/03/13

MD1-0-E-750-01-00205

Fire Detection & Alarm Layout- Riser Diagram (5)

RT

BILL

02/07/13

MD1-0-E-750-01-00206

Fire Detection & Alarm Layout- Riser Diagram (6)

BILL

02/07/13

MD1-0-E-750-01-00207

Fire Detection & Alarm System - Riser Diagram Coal Handling Control BLDG.

BILL

11/07/13

MD1-0-E-750-01-00208

Fire Detection & Alarm Layout- Riser Diagram (8)

BILL

28/05/13

MD1-0-E-750-01-00209

Fire Detection & Alarm Layout- Riser Diagram (9)

BILL

16/07/13

MD1-0-E-750-01-00210

Fire Detection & Alarm Layout- Riser Diagram (10)

BILL

16/05/13

MD1-0-E-750-01-00212

Fire Detection & Alarm System- Riser Diagram Fire Protection Pump- House

BILL

25/03/13

MD1-0-E-750-01-00213

Fire Detection & Alarm Sys-Riser Diagram Gaseous Chlorination bldg.

BILL

02/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-E-750-01-00215

Fire Detection & Alarm System - Riser Diagram Limestone Handling System Control.

AC

AUTHORISED
BILL

RECEIVED
11/07/13

MD1-0-E-750-01-02001

Fire Detection & Alarm Layout- Turbine BLDG Ground Floor

BILL

28/02/13

MD1-0-E-750-01-02002

Fire Detection & Alarm Layout- Turbine BLDG Mez Floor

BILL

28/02/13

MD1-0-E-750-01-02003

Fire Detection & Alarm Layout- Turbine BLDG Operating Floor

BILL

28/02/13

MD1-0-E-750-01-02004

Fire Detection & Alarm Layout- Turbine BLDG Lower Roof & Crane Ruway

BILL

28/02/13

MD1-0-E-750-01-03001

Fire Detection & Alarm Layout- Central Control BLDG Ground Floor

BILL

12/03/13

MD1-0-E-750-01-03002

Fire Detection & Alarm Layout- Central Control BLDG 1st Floor

BILL

12/03/13

MD1-0-E-750-01-03003

Fire Detection & Alarm Layout- Central Control BLDG 2nd Floor

BILL

12/03/13

MD1-0-E-750-01-03004

Fire Detection & Alarm Layout- Central Control BLDG 3rd Floor

BILL

12/03/13

MD1-0-E-750-01-03005

Fire Detection & Alarm Layout- Central Control BLDG Roof Floor

BILL

12/03/13

MD1-0-E-750-01-04101

Fire Detection & Alarm Layout - Coal Handling System Control BLDG

BILL

11/07/13

MD1-0-E-750-01-04201

Fire detection & alarm layout - fuel oil pump house

BILL

28/05/13

MD1-0-E-750-01-04251

Fire detection & alarm layout - diesel oil storage tank, fuel oil storage tank-2

BILL

28/05/13

MD1-0-E-750-01-04401

Fire Detection & Alarm System- Fire Protection Pump House Ground Floor

BILL

25/03/13

MD1-0-E-750-01-04501

Fire Detection & Alarm layout-ash Slurry Pump House Ground floor

BILL

17/07/13

MD1-0-E-750-01-04502

Fire Detection & Alarm layout-ash Slurry Pump House First floor

BILL

17/07/13

MD1-0-E-750-01-04601

Fire Detection & Alarm layout-esp Control House No.1

BILL

02/07/13

MD1-0-E-750-01-04701

Fire Detection & Alarm layout-esp Control House No.2

BILL

02/07/13

MD1-0-E-750-01-04801

Fire Detection & Alarm layout- Diesel Generator House

RT

BILL

02/07/13

MD1-0-E-750-01-04901

Fire Detection & Alarm layout - Cooling Water Pump House

BILL

02/07/13

MD1-0-E-750-01-05101

Fire Detection & Alarm layout - Gaseous Chlorination bldg

BILL

02/07/13

MD1-0-E-750-01-05201

Fire Detection & Alarm Layout - Fuel Oil Unloading Pump House

BILL

02/07/13

MD1-0-E-750-01-05301

Fire Detection & Alarm layout - Return Water Pump House

BILL

02/07/13

MD1-0-E-750-01-05401

Fire Detection & Alarm layout- Switchyard Control Bldg Ground Floor

BILL

06/03/13

MD1-0-E-750-01-05402

Fire Detection & Alarm layout- Switchyard Control Bldg 1st Floor

BILL

06/03/13

MD1-0-E-750-01-05451

Fire detection & alarm layout - station transformer

BILL

27/05/13

MD1-0-E-750-01-05501

Fire detection & alarm layout - water treatment bldg.

BILL

28/05/13

MD1-0-E-750-01-06201

Fire detection & alarm layout - coal yard dry storage shed

BILL

28/05/13

MD1-0-E-750-01-06401

Fire Detection & Alarm Layout - Limestone Storage Shed

BILL

11/07/13

MD1-0-E-750-01-06501

Fire Detection & Alarm Layout - Limestone Handling System Control Building

BILL

11/07/13

MD1-0-E-750-01-06701

Fire Detection & Alarm Layout - Limestone Grinding House Ground Floor

BILL

11/07/13

MD1-0-E-750-01-06702

Fire Detection & Alarm Layout - Limestone Grinding House EL.+7,130 & EL.+17,4908

BILL

11/07/13

MD1-0-E-750-01-07001

Fire Detection & Alarm Layout - Aux. Boiler Area

BILL

16/07/13

MD1-0-E-750-01-08301

Fire detection & alarm layout - workshop bldg

BILL

28/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-E-750-01-08401

Fire detection & alarm layout - bulldozer garage

AUTHORISED
BILL

RECEIVED
28/05/13

MD1-0-E-750-01-08501

Fire detection & alarm layout - i&c electrical and mecahnical warehouse

BILL

28/05/13

MD1-0-E-750-01-08601

Fire Detection & Alarm Layout- Administration BLDG Ground Floor

BILL

16/05/13

MD1-0-E-750-01-08602

Fire Detection & Alarm Layout- Administration BLDG 1st Floor

BILL

25/03/13

MD1-0-E-750-01-08603

Fire Detection & Alarm Layout- Administration BLDG 2nd Floor

BILL

25/03/13

MD1-0-E-750-01-08604

Fire Detection & Alarm Layout- Administration BLDG 3rd Floor

BILL

25/03/13

MD1-0-E-750-01-08605

Fire Detection & Alarm Layout- Administration BLDG 4th Floor

BILL

16/05/13

MD1-0-E-750-01-08901

Fire Detection & Alarm Layout- Riser Diagram (11)

BILL

28/05/13

MD1-0-E-750-01-09203

Fire detection & alarm layout - car garage 3

BILL

28/05/13

MD1-0-F-750-03-00001

System Discription for Fire Fighting System & Fire Alarm System

RT

BILL

24/04/13

MD1-0-F-750-07-00001

Fire Risk Assessment

BILL

03/07/13

MD1-0-F-750-07-00002

Fire Safety Report

BILL

03/07/13

MD1-0-F-750-23-00200

Fire Extinguisher Location Plan for Limestone Handling System Control Building

BILL

08/07/13

MD1-0-H-201-01-00901

HVAC Control Wiring Plan for Steam Turbine Building Ground Floor (1/2)

BILL

31/01/13

MD1-0-H-201-01-00902

HVAC Control Wiring Plan for Steam Turbine Building Ground Floor (2/2)

BILL

31/01/13

MD1-0-H-201-01-00903

HVAC Control Wiring Plan for Steam Turbine Building Mezzanine Floor (1/2)

BILL

31/01/13

MD1-0-H-201-01-00904

HVAC Control Wiring Plan for Steam Turbine Building Mezzanine Floor (2/2)

BILL

31/01/13

MD1-0-H-201-01-00905

HVAC Control Wiring Plan for Steam Turbine Building Operation Floor (1/2)

BILL

31/01/13

MD1-0-H-201-01-00906

HVAC Control Wiring Plan for Steam Turbine Building Operation Floor (2/2)

BILL

31/01/13

MD1-0-H-201-01-00907

HVAC Enlarged Control Wiring Plan for AVR Room-1.2

BILL

31/01/13

MD1-0-H-201-01-00908

HVAC Enlarged Control Wiring Plan for Sampling Room 1,2

BILL

31/01/13

MD1-0-H-201-03-00901

HVAC Control Sequence of Operation for Steam Tubine Building

BILL

31/01/13

MD1-0-H-201-08-00901

HVAC Control Equipment Schedule for Steam Turbine Building

BILL

31/01/13

MD1-0-H-201-08-00902

HVAC Control I/O Schedule for Steam Turbine Building

BILL

31/01/13

MD1-0-H-201-32-00901

HVAC Control Block Diagram for Steam Turbine Building

BILL

31/01/13

MD1-0-H-203-01-00901

HVAC Control Wiring Plan for Central Control Building 2nd Floor

BILL

19/12/12

MD1-0-H-203-01-00902

HVAC Control Wiring Plan for Central Control Building 3rd Floor

BILL

19/12/12

MD1-0-H-203-01-00903

HVAC Control Wiring Plan for Central Control Building Roof

BILL

19/12/12

MD1-0-H-203-01-00904

HVAC Room Enlarged HVAC Control Wiring Plan-1

BILL

19/12/12

MD1-0-H-203-01-00905

HVAC Room Enlarged HVAC Control Wiring Plan-2

BILL

19/12/12

MD1-0-H-203-03-00901

HVAC Control Sequence of Operation for Central Control Building-1

BILL

19/12/12

MD1-0-H-203-03-00902

HVAC Control Sequence of Operation for Central Control Building-2

BILL

19/12/12

MD1-0-H-203-08-00901

HVAC Control Equipment Schedule for Central Control Building-1

BILL

19/12/12

MD1-0-H-203-08-00902

HVAC Control Equipment Schedule for Central Control Building-2

BILL

19/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-H-203-08-00903

HVAC Control Equipment Schedule for Central Control Building-3

AUTHORISED
BILL

RECEIVED
19/12/12

MD1-0-H-203-08-00904

HVAC Control I/O Schedule for Central Control Building-1

BILL

19/12/12

MD1-0-H-203-08-00905

HVAC Control I/O Schedule for Central Control Building-2

BILL

19/12/12

MD1-0-H-203-32-00901

HVAC Control Block Diagram for Central Control Building (1/5)

BILL

19/12/12

MD1-0-H-203-32-00902

HVAC Control Block Diagram for Central Control Building (2/5)

BILL

19/12/12

MD1-0-H-203-32-00903

HVAC Control Block Diagram for Central Control Building (3/5)

BILL

19/12/12

MD1-0-H-203-32-00904

HVAC Control Block Diagram for Central Control Building (4/5)

BILL

19/12/12

MD1-0-H-203-32-00905

HVAC Control Block Diagram for Central Control Building (5/5)

BILL

19/12/12

MD1-0-H-203-35-00901

Configuration Diagram for Hvac Control BMS System

BILL

20/05/13

MD1-0-H-204-01-00901

HVAC Control Wiring Plan for Coal Handling Control Building Ground Floor

BILL

03/07/13

MD1-0-H-204-03-00901

HVAC Control Sequence of Operation for Coal Handling Control Building

BILL

03/07/13

MD1-0-H-204-08-00901

HVAC Control Equipment Schedule for Coal Handling Control Building

BILL

03/07/13

MD1-0-H-204-08-00902

HVAC Control I/O Schedule for Coal Handling Control Building

BILL

03/07/13

MD1-0-H-204-32-00901

HVAC Control Block Diagram for Coal Handling Control Building

BILL

03/07/13

MD1-0-H-205-01-00901

Hvac control wiring plan for fuel oil pump house ground floor

BILL

04/04/13

MD1-0-H-205-03-00901

Hvac control sequence of operation for fuel oil pump house

BILL

04/04/13

MD1-0-H-205-08-00901

Hvac control equipment schedule for fuel oil pump house

AC

BILL

04/04/13

MD1-0-H-205-08-00902

Hvac control i/o point schedule for fuel oil pump house

BILL

04/04/13

MD1-0-H-205-32-00901

Hvac control block diagrma for fuel oil pump house

BILL

04/04/13

MD1-0-H-207-01-00901

Hvac control wiring plan for fire protection pump house gound floor

BILL

04/04/13

MD1-0-H-207-03-00901

Hvac control sequence of operation for fire protection pump house

BILL

04/04/13

MD1-0-H-207-08-00901

Hvac control equipment schedule for fire protection pump house

AC

BILL

04/04/13

MD1-0-H-207-08-00902

Hvac control i/o point schedule for fire protection pump house

BILL

04/04/13

MD1-0-H-207-32-00901

Hvac control block diagram for fire protection pump house

BILL

04/04/13

MD1-0-H-208-01-00901

Hvac control wiring plan for ash slurry pump house first floor

BILL

26/04/13

MD1-0-H-208-03-00901

Hvac control sequence of operation for ash slurry pump house

BILL

26/04/13

MD1-0-H-208-08-00901

Hvac control equipment schedule for ash slurry pump house

BILL

26/04/13

MD1-0-H-208-08-00902

Hvac control i/o schedule for ash slurry pump house

BILL

26/04/13

MD1-0-H-208-32-00901

Hvac control block diagram for ash slurry pump house

BILL

26/04/13

MD1-0-H-209-01-00901

Hvac control wiring plan for esp control & ash elec.building-1 ground floor

BILL

03/04/13

MD1-0-H-209-01-00902

Hvac control wiring plan for esp control & ash elec.building-1 first floor

BILL

03/04/13

MD1-0-H-209-01-00903

Hvac control wiring plan for esp control & ash elec.building-1 roof

BILL

03/04/13

MD1-0-H-209-01-00904

Hvac control wiring plan for esp control & ash elec.building-2 ground floor

BILL

03/04/13

MD1-0-H-209-01-00905

Hvac control wiring plan for esp control & ash elec.building-2 first floor

BILL

03/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-H-209-01-00906

Hvac control wiring plan for esp control & ash elec.building-2 roof

AUTHORISED
BILL

RECEIVED
03/04/13

MD1-0-H-209-03-00901

Hvac control sequence of operation for esp control & ash elec. building-1

BILL

03/04/13

MD1-0-H-209-03-00902

Hvac control sequence of operation for esp control & ash elec. building-2

BILL

03/04/13

MD1-0-H-209-08-00901

Hvac control equipment schedule for esp control & ash elec. building-1

AC

BILL

03/04/13

MD1-0-H-209-08-00902

Hvac control i/o point schedule for esp control & ash elec. building-1

BILL

03/04/13

MD1-0-H-209-08-00903

Hvac control equipment schedule for esp control & ash elec. building-2

AC

BILL

03/04/13

MD1-0-H-209-08-00904

Hvac control i/o point schedule for esp control & ash elec. building-2

BILL

03/04/13

MD1-0-H-209-32-00901

Hvac control block diagram for esp control & ash elec. building-1

BILL

03/04/13

MD1-0-H-209-32-00902

Hvac control block diagram for esp control & ash elec. building-2

BILL

03/04/13

MD1-0-H-210-01-00901

Hvac control wiring plan for diesel generator house ground floor

BILL

13/05/13

MD1-0-H-210-03-00901

Hvac control sequence of operation for diesel generator house

BILL

13/05/13

MD1-0-H-210-08-00901

Hvac control equipment schedule for diesel generator

BILL

13/05/13

MD1-0-H-210-08-00902

Hvac control i/o point schedule for diesel generator house

BILL

13/05/13

MD1-0-H-210-32-00901

Hvac control block diagram for diesel generator house

BILL

13/05/13

MD1-0-H-211-01-00901

Hvac control wiring plan for cooling water pump house ground floor

BILL

23/04/13

MD1-0-H-211-03-00901

Hvac control sequence of operation for cooling water pump house

BILL

23/04/13

MD1-0-H-211-08-00901

Hvac control equipment schedule for cooling water pump house

BILL

23/04/13

MD1-0-H-211-08-00902

Hvac control i/o schedule for cooling water pump house

BILL

23/04/13

MD1-0-H-211-32-00901

Hvac control block diagram for cooling water pump house

BILL

23/04/13

MD1-0-H-212-01-00901

Hvac control wiring plan for gaseous chlorination building ground floor

BILL

04/04/13

MD1-0-H-212-01-00902

Hvac control wiring plan for gaseous chlorination building roof

BILL

04/04/13

MD1-0-H-212-03-00901

Hvac control sequence of operation for gaseous chlorination building

BILL

04/04/13

MD1-0-H-212-08-00901

Hvac control equipment schedule for gaseous chlorination building

AC

BILL

04/04/13

MD1-0-H-212-08-00902

Hvac control i/o point schedule for gaseous chlorination building

BILL

04/04/13

MD1-0-H-212-32-00901

Hvac control block diagram for gaseous chlorination building

BILL

04/04/13

MD1-0-H-213-01-00901

Hvac control wiring plan for fuel oil unloading pump house ground floor

BILL

17/05/13

MD1-0-H-213-03-00901

Hvac control sequnece of operation for fuel oil unloading pump house

BILL

17/05/13

MD1-0-H-213-08-00901

Hvac control equipment for fuel oil unloading pump house

BILL

17/05/13

MD1-0-H-213-08-00902

Hvac control i/o schedule for fuel oil unloading pump house

BILL

17/05/13

MD1-0-H-213-32-00901

Hvac control block diagram for fuel oil unloading pump house

BILL

17/05/13

MD1-0-H-215-01-00901

HVAC Control Wiring Plan for Switchyard Control Building Ground Floor

BILL

04/03/13

MD1-0-H-215-01-00902

HVAC Control Wiring Plan for Switchyard Control Building 1st Floor

BILL

04/03/13

MD1-0-H-215-01-00903

Hvac control wiring plan for switchyard control building roof

BILL

04/03/13

MD1-0-H-215-03-00901

HVAC Control Sequence of Operation for Switchyard Control Building

BILL

04/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-H-215-08-00901

HVAC Control Equipment Schedule for Switchyard Control Building

AUTHORISED
BILL

RECEIVED
04/03/13

MD1-0-H-215-08-00902

HVAC Control I/O Schedule for Switchyard Control Building

BILL

04/12/12

MD1-0-H-215-32-00901

HVAC Control Block Diagram for Switchyard Control Building

BILL

04/12/12

MD1-0-H-216-01-00901

HVAC Control Wiring Plan for Water Treatment Building Ground Floor

BILL

11/03/13

MD1-0-H-216-01-00902

Hvac control wiring plan for waste water pond pump room

BILL

30/05/13

MD1-0-H-216-03-00901

HVAC Control Sequence of Operation for Water Treatment Building

BILL

11/03/13

MD1-0-H-216-08-00901

HVAC Control Equipment Schedule for Water Treatment Building

BILL

11/03/13

MD1-0-H-216-08-00902

HVAC Control I/O Point Schedule for Water Treatment Building

BILL

11/03/13

MD1-0-H-216-08-00903

Hvac control i/o point schedule for waste water pond pump room

BILL

30/05/13

MD1-0-H-216-32-00901

HVAC Control Block Diagram for Water Treatment Building

BILL

11/03/13

MD1-0-H-217-01-00901

HVAC Control Wiring Plan for Limestone Handling SYS. Control Building

BILL

03/07/13

MD1-0-H-217-03-00901

HVAC Control Sequence of Operation for Limestone Handling SYS. Control Building

BILL

03/07/13

MD1-0-H-217-08-00901

HVAC Control Equipment Schedule for Limestone Handling SYS. Control Building

BILL

03/07/13

MD1-0-H-217-08-00902

HVAC Control I/O Schedule for Limestone Handling SYS. Control Building

BILL

03/07/13

MD1-0-H-217-32-00901

HVAC Control Block Diagram for Limestone Handling SYS. Control Building

BILL

03/07/13

MD1-0-H-219-01-00901

Hvac control wiring plan for limestorne storage shed ground floor

BILL

23/04/13

MD1-0-H-219-03-00901

Hvac control sequence of operation for limestorne storage shed

BILL

23/04/13

MD1-0-H-219-08-00901

Hvac control equipment for limestorne storage shed

BILL

23/04/13

MD1-0-H-219-08-00902

Hvac control i/o schedule for limestorne storage shed

BILL

23/04/13

MD1-0-H-219-32-00901

Hvac control block diagram for limestorne storage shed

BILL

23/04/13

MD1-0-H-250-01-00901

Hvac control wiring plan for workshop building ground floor

BILL

04/04/13

MD1-0-H-250-03-00901

Hvac control sequence of operation for workshop building

BILL

04/04/13

MD1-0-H-250-08-00901

Hvac control equipment schedule for workshop building

AC

BILL

04/04/13

MD1-0-H-250-08-00902

Hvac control i/o point schedule for workshop building

BILL

04/04/13

MD1-0-H-250-32-00901

Hvac control block diagram for workshop building

BILL

04/04/13

MD1-0-H-252-01-00901

Hvac control wiring plan for i&c electrical & mechanical warehouse ground floor

BILL

29/03/13

MD1-0-H-252-03-00901

Hvac control sequence of operation for i&c electrical & mechnical warehouse

BILL

29/03/13

MD1-0-H-252-08-00901

Hvac control equipment schedule for i&c electrical & mechanical warehouse

BILL

29/03/13

MD1-0-H-252-08-00902

Hvac control i/o point schedule for i&c electrical & mechanical warehouse

BILL

29/03/13

MD1-0-H-252-32-00901

Hvac control block diagram for i&c electrical & mechanical warehouse

BILL

29/03/13

MD1-0-H-254-01-00901

HVAC Control Wiring Plan for Administration Building Ground Floor

BILL

08/01/13

MD1-0-H-254-01-00902

HVAC Control Wiring Plan for Administration Building 2nd Floor

BILL

08/01/13

MD1-0-H-254-01-00903

HVAC Control Wiring Plan for Administration Building Roof

BILL

08/01/13

MD1-0-H-254-01-00904

HVAC Control Wiring Plan for Administration Auditorium Area

BILL

08/01/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-H-254-01-00905

HVAC Control Wiring Plan for Administration Auditorium Roof

AUTHORISED
BILL

RECEIVED
08/01/13

MD1-0-H-254-01-00906

HVAC Room Enlarged HVAC Control Wiring Plan for Admin BLDG HVAC Room-1&2

BILL

08/01/13

MD1-0-H-254-01-00907

HVAC Room Enlarged HVAC Control Wiring Plan for Admin BLDG HVAC Room-3&4

BILL

08/01/13

MD1-0-H-254-03-00901

HVAC Control Sequence of Operation for Admin. BLDG (1/3)

BILL

08/01/13

MD1-0-H-254-03-00902

HVAC Control Sequence of Operation for Admin. BLDG (2/3)

BILL

08/01/13

MD1-0-H-254-03-00903

HVAC Control Sequence of Operation for Admin. BLDG (3/3)

BILL

08/01/13

MD1-0-H-254-08-00901

HVAC Control Equipment Schedule for Admin. Bldg (1/4)

BILL

08/01/13

MD1-0-H-254-08-00902

HVAC Control Equipment Schedule for Admin. Bldg (2/4)

BILL

08/01/13

MD1-0-H-254-08-00903

HVAC Control Equipment Schedule for Admin. Bldg (3/4)

BILL

08/01/13

MD1-0-H-254-08-00904

HVAC Control Equipment Schedule for Admin. Bldg (4/4)

BILL

08/01/13

MD1-0-H-254-08-00905

HVAC Control I/O Schedule for Admin. Bldg (1/6)

BILL

08/01/13

MD1-0-H-254-08-00906

HVAC Control I/O Schedule for Admin. Bldg (2/6)

BILL

08/01/13

MD1-0-H-254-08-00907

HVAC Control I/O Schedule for Admin. Bldg (3/6)

BILL

08/01/13

MD1-0-H-254-08-00908

HVAC Control I/O Schedule for Admin. Bldg (4/6)

BILL

08/01/13

MD1-0-H-254-08-00909

HVAC Control I/O Schedule for Admin. Bldg (5/6)

BILL

08/01/13

MD1-0-H-254-08-00910

HVAC Control I/O Schedule for Admin. Bldg (6/6)

BILL

08/01/13

MD1-0-H-254-32-00901

HVAC Control Block Diagram for Admin. BLDG (1/6)

BILL

08/01/13

MD1-0-H-254-32-00902

HVAC Control Block Diagram for Admin. BLDG (2/6)

BILL

08/01/13

MD1-0-H-254-32-00903

HVAC Control Block Diagram for Admin. BLDG (3/6)

BILL

08/01/13

MD1-0-H-254-32-00904

HVAC Control Block Diagram for Admin. BLDG (4/6)

BILL

08/01/13

MD1-0-H-254-32-00905

HVAC Control Block Diagram for Admin. BLDG (5/6)

BILL

08/01/13

MD1-0-H-254-32-00906

HVAC Control Block Diagram for Admin. BLDG (6/6)

BILL

08/01/13

MD1-0-H-255-01-00901

Hvac control wiring plan for common service building ground floor

BILL

04/04/13

MD1-0-H-255-01-00902

Hvac control wiring plan for common service building roof plan

BILL

04/04/13

MD1-0-H-255-03-00901

Hvac control sequence of operation for common service building

BILL

04/04/13

MD1-0-H-255-08-00901

Hvac control equipment & i/o schedule for common service building

AC

BILL

04/04/13

MD1-0-H-255-08-00902

Hvac control equipment & i/o schedule for common service building

BILL

04/04/13

MD1-0-H-255-08-00903

Hvac control i/o point schedule for common service building (2/2)

BILL

04/04/13

MD1-0-H-255-32-00901

Hvac control block diagram for common service building

BILL

04/04/13

MD1-0-J-600-01-00001

Central Control Room Layout

BILL

26/03/13

MD1-0-J-600-01-00002

Electronic Equipment Room Layout

BILL

15/03/13

MD1-0-J-600-01-00003

Local control room layout for gaseous chlorination building

BILL

25/03/13

MD1-0-J-600-01-00011

Instrument Location Drawing fro BOP

IC

BILL

19/07/13

MD1-0-J-600-02-00001

Technical Specification and Datasheet for Pressure Gauges (BOP)

AC

BILL

05/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-J-600-04-00001

Design criteria for control and instrumentation

AUTHORISED
BILL

RECEIVED
26/07/12

MD1-0-J-600-08-00001

Control Valve List

BILL

16/08/12

MD1-0-J-600-08-00003

Instrument Set Point & Alarm List

BILL

03/05/13

MD1-0-J-600-08-00004

DCS Input/Output List

BILL

08/04/13

MD1-0-J-600-33-00001

Typical Drive Control Logic Diagram

BILL

05/09/12

MD1-0-J-600-33-00002

Control Logic Diagram

BILL

12/06/13

MD1-0-J-600-34-00001

Control Loop Diagram

BILL

12/06/13

MD1-0-J-600-35-00001

Instrument Interconnection Wiring Diagram for BOP

IC

BILL

11/06/13

MD1-0-J-600-35-00002

Instrument Interconnection Wiring Diagram for Boiler

BILL

29/05/13

MD1-0-J-600-36-00001

Overall control configuration diagram

BILL

07/08/12

MD1-0-J-620-03-00001

System Description- Sampling and Analysis System

AC

BILL

18/07/13

MD1-0-J-620-21-00001

P & I Diagram- Sampling and Analysis System

AC

BILL

18/07/13

MD1-0-M-010-05-00001

Procedure for Plant Identification (KKS numbering)

BILL

30/07/13

MD1-0-M-100-07-00001

Classification- Hazardous Areas

BILL

22/11/12

MD1-0-T-030-05-00189

Inspection test Plan for Communication System Installation

BILL

27/12/12

MD1-0-T-030-05-00190

Inspection Test Plan for Fire Detection & Alarm Installation

BILL

27/12/12

MD1-0-T-055-05-00205

Method statement for communication

BILL

23/05/13

MD1-0-T-055-05-00206

Method statement for fire alarm

BILL

28/05/13

MD1-0-T-056-05-00001

Method Statement for Calibration of instruments

BILL

19/07/13

MD1-0-T-056-05-00002

Method Statement for Installation of Control & Instrumentation

BILL

19/07/13

MD1-0-V-111-01-00028

Turbine Instrument Location Drawing- Steam Valve (1/2)

BILL

26/09/12

MD1-0-V-111-01-00029

Turbine Instrument Location Drawing- Steam Valve (2/2)

BILL

26/09/12

MD1-0-V-111-01-00417

Generator Sensor Location (1/2)

BILL

07/08/12

MD1-0-V-111-01-00418

Generator Sensor Location (2/2)

BILL

07/08/12

MD1-0-V-111-02-00400

Hazardous Area Classification for Generator

BILL

23/10/12

MD1-0-V-111-03-00701

Description of Mark Vie Control System

BILL

26/10/12

MD1-0-V-111-03-00705

Screen Design for Turbine Control System

BILL

24/07/13

MD1-0-V-111-04-00022

Installation Guideline of High Pressure Control System for STG

BILL

11/03/13

MD1-0-V-111-04-00400

Gas Detector Location

BILL

23/10/12

MD1-0-V-111-05-00702

Mark VIe Control System Guide (GEH-6721)

BILL

25/10/12

MD1-0-V-111-05-00706

Automatic Turbine Start-up Procedure

BILL

20/12/12

MD1-0-V-111-05-00712

HMI Operator Guide

BILL

25/10/12

MD1-0-V-111-08-00707

Software List for Turbine Control System

BILL

20/12/12

MD1-0-V-111-08-00708

Alarm List for Turbine Control System

BILL

11/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-111-08-00710

Turbine Control System io List

STS
I

AUTHORISED
BILL

RECEIVED
12/04/13

MD1-0-V-111-08-00711

Setpoint List for Turbine Control System

IC

BILL

16/07/13

MD1-0-V-111-08-00717

DCS Interface Signal Database for Turbine Control System

BILL

20/12/12

MD1-0-V-111-09-00703

Instrument & Equipment List for Steam Turbine and Generator

RT

BILL

28/03/13

MD1-0-V-111-10-00413

Generator Local Gauge Board For Seal Oil Feed Line

BILL

20/12/12

MD1-0-V-111-11-00017

Performance test instrumentation for steam turbine

IC

BILL

28/03/13

MD1-0-V-111-12-00722

Network Topology for Turbine Control System

BILL

10/07/13

MD1-0-V-111-31-00714

Panel Outline Drawing for Turbine Control system (1 of 3)

BILL

25/10/12

MD1-0-V-111-31-00715

Panel Outline Drawing for Turbine Control system (2 of 3)

BILL

25/10/12

MD1-0-V-111-31-00716

Panel Outline Drawing for Turbine Control system (3 of 3)

BILL

25/10/12

MD1-0-V-111-31-00732

Panel Layout Drawing for Turbine Control System (1 of 18)

BILL

25/10/12

MD1-0-V-111-31-00733

Panel Layout Drawing for Turbine Control System (2 of 18)

BILL

25/10/12

MD1-0-V-111-31-00734

Panel Layout Drawing for Turbine Control System (3 of 18)

BILL

25/10/12

MD1-0-V-111-31-00735

Panel Layout Drawing for Turbine Control System (4 of 18)

BILL

25/10/12

MD1-0-V-111-31-00736

Panel Layout Drawing for Turbine Control System (5 of 18)

BILL

25/10/12

MD1-0-V-111-31-00737

Panel Layout Drawing for Turbine Control System (6 of 18)

BILL

25/10/12

MD1-0-V-111-31-00738

Panel Layout Drawing for Turbine Control System (7 of 18)

BILL

25/10/12

MD1-0-V-111-31-00739

Panel Layout Drawing for Turbine Control System (8 of 18)

BILL

25/10/12

MD1-0-V-111-31-00740

Panel Layout Drawing for Turbine Control System (9 of 18)

BILL

25/10/12

MD1-0-V-111-31-00741

Panel Layout Drawing for Turbine Control System (10 of 18)

BILL

25/10/12

MD1-0-V-111-31-00742

Panel Layout Drawing for Turbine Control System (11 of 18)

BILL

25/10/12

MD1-0-V-111-31-00743

Panel Layout Drawing for Turbine Control System (12 of 18)

BILL

25/10/12

MD1-0-V-111-31-00744

Panel Layout Drawing for Turbine Control System (13 of 18)

BILL

25/10/12

MD1-0-V-111-31-00745

Panel Layout Drawing for Turbine Control System (14 of 18)

BILL

25/10/12

MD1-0-V-111-31-00746

Panel Layout Drawing for Turbine Control System (15 of 18)

BILL

25/10/12

MD1-0-V-111-31-00747

Panel Layout Drawing for Turbine Control System (16 of 18)

BILL

25/10/12

MD1-0-V-111-31-00748

Panel Layout Drawing for Turbine Control System (17 of 18)

BILL

25/10/12

MD1-0-V-111-31-00749

Panel Layout Drawing for Turbine Control System (18 of 18)

BILL

25/10/12

MD1-0-V-111-31-00761

Panel layout drawing for steam turbine vms(vibration monitoring system) (1 of 3)

BILL

21/03/13

MD1-0-V-111-31-00762

Panel layout drawing for steam turbine vms(vibration monitoring system) (2 of 3)

BILL

21/03/13

MD1-0-V-111-31-00763

Panel layout drawing for steam turbine vms(vibration monitoring system) (3 of 3)

BILL

21/03/13

MD1-0-V-111-35-00001

Wiring Diag. Lube Oil Tank (1/2)

BILL

05/03/13

MD1-0-V-111-35-00002

Wiring Diag. Lube Oil Tank (2/2)

BILL

05/03/13

MD1-0-V-111-35-00003

Wiring Diagram- MOB For steam TBN Piping

IC

BILL

27/11/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-111-35-00004

Steam turbine and generator wiring diagram - hydraulic power unit (1/3)

STS
I

AUTHORISED
BILL

RECEIVED
24/01/13

MD1-0-V-111-35-00005

Steam turbine and generator wiring diagram - hydraulic power unit (2/3)

BILL

20/03/13

MD1-0-V-111-35-00006

Steam turbine and generator wiring diagram - hydraulic power unit (3/3)

BILL

20/03/13

MD1-0-V-111-35-00007

Wiring Diagram- Lube Oil Conditioner- Main (1/3)

IC

BILL

27/11/12

MD1-0-V-111-35-00008

Wiring Diagram- Lube Oil Conditioner- Main (2/3)

IC

BILL

27/11/12

MD1-0-V-111-35-00009

Wiring Diagram- Lube Oil Conditioner- Main (3/3)

IC

BILL

27/11/12

MD1-0-V-111-35-00010

Steam turbine and generator wiring diagram - turning gear (1/2)

BILL

24/01/13

MD1-0-V-111-35-00011

Steam turbine and generator wiring diagram - turning gear (2/2)

BILL

24/01/13

MD1-0-V-111-35-00400

Electrical Connection Diagram (Stator Cooling Water System) (1/8)

BILL

26/07/12

MD1-0-V-111-35-00402

Electrical Connection Diagram (Stator Cooling Water System) (3/8)

BILL

05/03/13

MD1-0-V-111-35-00403

Electrical Connection Diagram (Stator Cooling Water System) (4/8)

BILL

05/03/13

MD1-0-V-111-35-00404

Electrical Connection Diagram (Stator Cooling Water System) (5/8)

BILL

05/03/13

MD1-0-V-111-35-00406

Electrical Connection Diagram (Stator Cooling Water System) (7/8)

BILL

05/03/13

MD1-0-V-111-35-00408

Electrical Connection Diagram (Gas Control System) (1/8)

BILL

05/03/13

MD1-0-V-111-35-00409

Electrical Connection Diagram (Gas Control System) (2/8)

BILL

05/03/13

MD1-0-V-111-35-00411

Electrical Connection Diagram (Gas Control System) (4/8)

BILL

05/03/13

MD1-0-V-111-35-00412

Electrical Connection Diagram (Gas Control System) (5/8)

BILL

05/03/13

MD1-0-V-111-35-00416

Electrical Connection Diagram (Seal Oil System) (1/6)

BILL

05/03/13

MD1-0-V-111-35-00418

Electrical Connection Diagram (Seal Oil System) (3/6)

BILL

05/03/13

MD1-0-V-111-35-00419

Electrical Connection Diagram (Seal Oil System) (4/6)

BILL

05/03/13

MD1-0-V-111-35-00421

Electrical Connection Diagram (Seal Oil System) (6/6)

BILL

05/03/13

MD1-0-V-111-35-00718

Control Systems Overall Block Diagrams

BILL

20/12/12

MD1-0-V-111-35-00719

Turbine & Generator Protection & Interlock Diagram

BILL

20/12/12

MD1-0-V-111-36-00715

TCS Control System Configuration Drawing

BILL

11/03/13

MD1-0-V-111-36-00716

VMS Control System Configuration Drawing

BILL

11/07/13

MD1-0-V-112-08-00004

Hp/Lp i/o List for Turbine bypass System

BILL

15/04/13

MD1-0-V-112-08-00005

Hpu, Hvp-Hp/Lp Load List for Turbine bypass System

BILL

15/04/13

MD1-0-V-112-35-00005

Hpu, Hp/Lp, System Layout for Turbine bypass System

BILL

15/04/13

MD1-0-V-112-35-00006

Hpu, Hp/Lp, Electrical System ak Layout for Turbine bypass System

BILL

15/04/13

MD1-0-V-112-35-00007

Hpu, Hp/Lp, ak1-1 and ak 1-2, Smartrak for Turbine bypass System

BILL

15/04/13

MD1-0-V-113-08-00053

Condenser leak detection system instrument list

BILL

22/04/13

MD1-0-V-113-09-00020

Condenser - Instrument Data Sheet

BILL

10/07/13

MD1-0-V-113-09-00025

Condenser leak detection system technical data sheet

BILL

22/04/13

MD1-0-V-113-10-00054

Condenser leak detection system local control panel with installation drawing

BILL

22/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-113-35-00055

Condenser leak detection system wiring diagram

STS
I

AUTHORISED
BILL

RECEIVED
28/02/13

MD1-0-V-114-08-00001

Instrument List for Feedwater Heater

IC

BILL

17/05/13

MD1-0-V-114-09-50021

Lp#1 & lp#2 feedwater heater level gauge data sheet

AC

BILL

18/04/13

MD1-0-V-114-09-50025

Lp#1 & lp#2 feedwater heater safety & relief valve data sheet

AC

BILL

18/04/13

MD1-0-V-121-09-00003

Instrument data sheet and catalog for bfp & bfbp

BILL

08/04/13

MD1-0-V-121-09-00004

[BFBP] Flow Element Specification of Discharge Line

RT

BILL

11/07/13

MD1-0-V-121-09-00005

[BFP] Flow Element Specification of Balance Line

RT

BILL

11/07/13

MD1-0-V-121-33-00002

Logic Flow Chart for Fluid Coupling for BFP & BFBP

BILL

12/07/13

MD1-0-V-121-35-00001

Temperature Sensor Terminal Box Drawing for Boiler Feed Pump and Booster Pump

IC

BILL

16/07/13

MD1-0-V-121-35-00002

Vibration Sensor Terminal Box Drawing for Boiler Feed Pump and Booster Pump

BILL

16/07/13

MD1-0-V-121-35-00003

Pressure Switch Terminal Box Drawing for Boiler Feed Pump and Booster Pump

IC

BILL

16/07/13

MD1-0-V-121-35-00004

Reverse Switch Terminal Box Diagram for Boiler Feed Pump and Booster Pump

IC

BILL

16/07/13

MD1-0-V-121-35-00005

Wiring diagram for hydraulic coupling for bfp & bfbp

BILL

08/04/13

MD1-0-V-121-35-00006

Flow Transmitter(BP Discharge) Stand Drawing for Booster Pump

IC

BILL

18/07/13

MD1-0-V-121-35-00007

Flow Transmitter(Balance Line) Stand for Main Boiler Feedwater Pump

IC

BILL

18/07/13

MD1-0-V-122-09-00003

Instrument Data Sheet and Catalogue for CEP

AC

BILL

04/07/13

MD1-0-V-123-08-00011

Condenser Vacuum Pump- Instrument Data

BILL

12/06/13

MD1-0-V-123-08-00014

Condenser vaccum pump - i/o list

BILL

04/04/13

MD1-0-V-123-08-00022

Condenser vacuum pump instrument set point and alarm list

BILL

16/04/13

MD1-0-V-123-10-00007

Condenser Vacuum Pump- Terminal Box Drawing

BILL

06/03/13

MD1-0-V-123-22-00021

Condenser vaccum pump - flow chart

BILL

04/04/13

MD1-0-V-123-33-00005

Condenser Vacuum Pump- Recommended Logic Diagram

BILL

06/03/13

MD1-0-V-123-35-00006

Condenser Vacuum Pump- Wiring Diagram

BILL

06/03/13

MD1-0-V-123-57-00023

Condenser vacuum pump control valve list with catalog

BILL

16/04/13

MD1-0-V-123-57-00024

Condenser vacuum pump safety valve data with catalog

BILL

15/05/13

MD1-0-V-123-57-00025

Condenser Vacuum Pump - Solenoid Valve Data With Catalog

BILL

15/05/13

MD1-0-V-131-08-00011

Instrument list for circulating water pumps

BILL

06/02/13

MD1-0-V-131-08-00024

Setpoint and alarm list for motor

BILL

06/02/13

MD1-0-V-131-08-00025

Instrument list for motor

BILL

06/02/13

MD1-0-V-131-09-00007

Instrument specification and data sheets for motor

IC

BILL

06/02/13

MD1-0-V-131-10-00004

Motor instrument junction box drawing

IC

BILL

06/02/13

MD1-0-V-131-11-00003

Instrument Installation detail Drawing with Bill of Materials

BILL

22/04/13

MD1-0-V-131-11-00008

Instrument installation detail drawing for motor

IC

BILL

06/02/13

MD1-0-V-132-08-00047

Sea Water Intake Facility - PLC I/O List

IC

BILL

19/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-132-08-00067

DCS Interface I/O Communications

IC

AUTHORISED
BILL

RECEIVED
19/07/13

MD1-0-V-132-09-00071

Sea Water Intake Facility - Pressure Transmitter Technical Data Sheet.

BILL

18/04/13

MD1-0-V-132-09-00073

Sea Water Intake Facility - Level Transmitter Data

AC

BILL

06/06/13

MD1-0-V-132-09-00074

Sea Water Intake Facility - Pressure Indicator Data Sheet

BILL

06/06/13

MD1-0-V-132-09-00075

Sea Water Intake Facility - Differential Pressure Switch Data Sheet

BILL

06/06/13

MD1-0-V-132-33-00078

Sea water intake facility - control logic diagram

BILL

13/05/13

MD1-0-V-133-09-00016

Water box vacuum pump instrument data sheet & catalogue

BILL

29/05/13

MD1-0-V-134-03-00044

Control philosophy (condenser tube cleaning system)

BILL

20/02/13

MD1-0-V-134-09-00033

Instrument list & data sheet for ctcs

BILL

02/04/13

MD1-0-V-134-09-00051

Technical data sheet for control panel (condenser tube cleaning system)

BILL

19/02/13

MD1-0-V-134-34-00021

Control logic diagram (condenser tube cleaning system)

BILL

20/02/13

MD1-0-V-135-03-00037

Control philosophy(debris filter)

BILL

11/03/13

MD1-0-V-135-08-00011

Electrical load list for control panel(debris filter)

BILL

20/02/13

MD1-0-V-135-09-00026

Instrument list & data sheet - df

BILL

02/04/13

MD1-0-V-135-09-00043

Technical data sheet for control panel(debris filter)

BILL

11/03/13

MD1-0-V-135-34-00014

Control logic diagram(debris filter)

BILL

11/03/13

MD1-0-V-141-08-00013

Electrical Load List

BILL

01/11/12

MD1-0-V-141-08-00014

Equipment List of All the Electrical Equipment

BILL

01/11/12

MD1-0-V-141-08-00015

Cable List

BILL

01/11/12

MD1-0-V-141-08-00016

Auto Filter- Instrumentation List

IC

BILL

07/05/13

MD1-0-V-141-08-00018

Auto Filter- DCS Interface I/O List

IC

BILL

12/11/12

MD1-0-V-141-08-00019

Set Point & Alarm List, Auto Filter

IC

BILL

12/11/12

MD1-0-V-141-31-00001

Single Line Diagram

BILL

01/11/12

MD1-0-V-141-33-00001

Control Logic Diagram, Auto Filter

IC

BILL

31/10/12

MD1-0-V-141-34-00001

Control LOOP Diagram, Auto Filter

IC

BILL

31/10/12

MD1-0-V-141-35-00001

Electrical Connection and Wiring Diagram

BILL

01/11/12

MD1-0-V-142-08-00005

Electrical load list

BILL

19/03/13

MD1-0-V-142-08-00007

Instrument list

BILL

19/03/13

MD1-0-V-142-09-00003

Instrument data

BILL

19/03/13

MD1-0-V-142-11-00002

Instrument hook-up drawings

BILL

19/03/13

MD1-0-V-142-11-00003

Junction box drawing for service water pump

BILL

19/03/13

MD1-0-V-142-11-10003

Junction box drawing for closed cooling water pump

BILL

19/03/13

MD1-0-V-142-11-20003

Junction box drawing for condensate make-up pump

BILL

19/03/13

MD1-0-V-142-11-30003

Junction box drawing for auxiliary cooling water booster pump

BILL

19/03/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-142-11-40003

Junction box drawing for demi. water transfer pump

STS
I

AUTHORISED
BILL

RECEIVED
19/03/13

MD1-0-V-151-08-00029

Air Compressor-DCS Interface I/O List (Hardwired)

IC

BILL

15/11/12

MD1-0-V-151-08-00030

Air Compressor-DCS Interface I/O List (Communication)

IC

BILL

15/11/12

MD1-0-V-161-08-06000

Instrument Index

BILL

06/02/13

MD1-0-V-161-08-06001

I/O List

BILL

06/02/13

MD1-0-V-161-08-06003

Set Point List for Alarm & Interlocking

BILL

06/02/13

MD1-0-V-161-09-16111

Instrument Data Sheets, Temperature Gauges

BILL

31/10/12

MD1-0-V-161-09-16121

Instrument Data Sheets, Orifice Plates and Flanges

BILL

31/10/12

MD1-0-V-161-09-16124

Instrument Data Sheets, Rotameters (Variable Area Flowmeters)

IC

BILL

31/10/12

MD1-0-V-161-09-62105

Data Sheet for Feed Water Regulating Valve

AC

BILL

26/03/13

MD1-0-V-161-09-62106

Data Sheet for Spray Control Valves

AC

BILL

26/03/13

MD1-0-V-161-10-16131

Boiler drum level indicator workpackage vendor documents & drawings

IC

BILL

24/04/13

MD1-0-V-161-10-16140

Boiler pressure gauge workpackage vendor documents & drawings

BILL

24/04/13

MD1-0-V-161-10-16190

Boiler cctv workpackage vendor documents & drawings

BILL

24/04/13

MD1-0-V-161-10-16212

Boiler Feedwater Regulating Valves Vendor Drawings & Documents

BILL

24/07/13

MD1-0-V-161-10-16250

Blowdown & Blow-off Valve Workpackage Vendor Documents & Drawings

IC

BILL

24/07/13

MD1-0-V-161-33-06002

Control Narrative

IC

BILL

10/07/12

MD1-0-V-161-33-06200

Logic Diagram. Drawing Index

BILL

24/12/12

MD1-0-V-161-33-06201

Logic Diagram. Symbol & Legend

BILL

24/12/12

MD1-0-V-161-33-06202

Logic Diagram. Main Interlocks, Master Fuel Trip

BILL

24/12/12

MD1-0-V-161-33-06203

Logic Diagram. Hardwired Trip Relays For Mater Fuel Trip 1

BILL

24/12/12

MD1-0-V-161-33-06204

Logic Diagram. Hardwired Trip Relays For Mater Fuel Trip 2

BILL

24/12/12

MD1-0-V-161-33-06205

Logic Diagram. Hardwired Trip Relays For Mater Fuel Trip 3

BILL

10/07/12

MD1-0-V-161-33-06206

Logic Diagram. Hardwired Trip Relays For Mater Fuel Trip 4

BILL

24/12/12

MD1-0-V-161-33-06207

Logic Diagram. Main Interlocks, Furnace Purge

BILL

24/12/12

MD1-0-V-161-33-06208

Logic Diagram. Main Interlocks, Loss of Fuel Trips

BILL

24/12/12

MD1-0-V-161-33-06209

Logic Diagram. Main Interlocks, Drum Level Trips

BILL

10/07/12

MD1-0-V-161-33-06210

Logic Diagram. Main Interlocks, Furnace Pressure Trips

BILL

10/07/12

MD1-0-V-161-33-06211

Logic Diagram. Main Interlocks, Total Air Flow Trips

BILL

10/07/12

MD1-0-V-161-33-06212

Logic Diagram. Main Interlocks, Loop Seal Air Pressure Trips

BILL

24/12/12

MD1-0-V-161-33-06213

Logic Diagram. Main Interlocks, Loss of Fan Trips

BILL

24/12/12

MD1-0-V-161-33-06214

Logic Diagram. Main Interlocks, Cyclone Flue Gas Temperaute Trips

BILL

24/12/12

MD1-0-V-161-33-06215

Logic Diagram. Main Interlocks, Bed Temperature 1

BILL

24/12/12

MD1-0-V-161-33-06216

Logic Diagram. Main Interlocks, Bed Temperature 2

BILL

10/07/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-33-06217

Logic Diagram. Main Interlocks, Solid Fuel Feed Permissive

AUTHORISED
BILL

RECEIVED
24/12/12

MD1-0-V-161-33-06218

Logic Diagram. Main Interlocks, Oil Fuel Permissive

BILL

24/12/12

MD1-0-V-161-33-06219

Logic Diagram. Main Interlocks, Superheater Protection Trips

BILL

24/12/12

MD1-0-V-161-33-06220

Logic Diagram. Air Paths in Purge Position

BILL

10/07/12

MD1-0-V-161-33-06221

Logic Diagram. MFT to Trips

BILL

24/12/12

MD1-0-V-161-33-06222

Logic Diagram. Fuel Feeder "1" (Typical for No. 1-6)

BILL

10/07/12

MD1-0-V-161-33-06223

Logic Diagram. Fuel Feeder "7"

BILL

10/07/12

MD1-0-V-161-33-06224

Logic Diagram. Fuel Feeder "8"

BILL

10/07/12

MD1-0-V-161-33-06225

Logic Diagram. Fuel Chain Conveyor "1"

BILL

24/12/12

MD1-0-V-161-33-06226

Logic Diagram. Fuel Chain Conveyor "2"

BILL

24/12/12

MD1-0-V-161-33-06227

Logic Diagram. Fuel Oil Header Trip Valve

BILL

24/12/12

MD1-0-V-161-33-06228

Logic Diagram. Fuel Oil Leak Test

BILL

24/12/12

MD1-0-V-161-33-06229

Logic Diagram. Heavy Oil Circulating

BILL

24/12/12

MD1-0-V-161-33-06230

Logic Diagram. Start-up Burner "1" Start Sequence (Typical)

BILL

24/12/12

MD1-0-V-161-33-06231

Logic Diagram. Start-up Burner "1" Proven/Failure (Typical)

BILL

24/12/12

MD1-0-V-161-33-06232

Logic Diagram. Start-up Burner "1" Oil Gun Scavence (Typical)

BILL

24/12/12

MD1-0-V-161-33-06233

Logic Diagram. Pilot Burner "1" Start Sequence (Typical)

BILL

24/12/12

MD1-0-V-161-33-06234

Logic Diagram. Pilot Burner "1" Oil Gun Scavence (Typical)

BILL

24/12/12

MD1-0-V-161-33-06235

Logic Diagram. Cyclone Flue Gas Temperature Monitoring

BILL

24/12/12

MD1-0-V-161-33-06236

Logic Diagram. Furnace Bed Temperature Monitoring

BILL

10/07/12

MD1-0-V-161-33-06237

Logic Diagram. Induced Draft Fan A

BILL

24/12/12

MD1-0-V-161-33-06238

Logic Diagram. Induced Draft Fan B

BILL

24/12/12

MD1-0-V-161-33-06239

Logic Diagram. I.D Fan Damper & Vanes

BILL

24/12/12

MD1-0-V-161-33-06240

Logic Diagram. Loop Seal Blower A

BILL

24/12/12

MD1-0-V-161-33-06241

Logic Diagram. Loop Seal Blower B

BILL

24/12/12

MD1-0-V-161-33-06242

Logic Diagram. Loop Seal Blower C

BILL

24/12/12

MD1-0-V-161-33-06243

Logic Diagram. Secondary Air Fan A

BILL

24/12/12

MD1-0-V-161-33-06244

Logic Diagram. Secondary Air Fan B

BILL

24/12/12

MD1-0-V-161-33-06245

Logic Diagram. S.A Fan Damper & Vanes

BILL

10/07/12

MD1-0-V-161-33-06246

Logic Diagram. Primary Fan A

BILL

24/12/12

MD1-0-V-161-33-06247

Logic Diagram. Primary Fan B

BILL

24/12/12

MD1-0-V-161-33-06248

Logic Diagram. P.A Fan Damper & Vanes

BILL

10/07/12

MD1-0-V-161-33-06249

Logic Diagram. Air Heater Main Motor

BILL

24/12/12

MD1-0-V-161-33-06250

Logic Diagram. Air Heater Aux. Motor

BILL

24/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-33-06251

Logic Diagram. Limestone Injection Blower "A" Control

AUTHORISED
BILL

RECEIVED
10/07/12

MD1-0-V-161-33-06252

Logic Diagram. Limestone Injection Blower "B" Control

BILL

10/07/12

MD1-0-V-161-33-06253

Logic Diagram. Limestone Injection Blower "C" Control

BILL

10/07/12

MD1-0-V-161-33-06254

Logic Diagram. Limestone Feed Rotary Valve "A1"

BILL

10/07/12

MD1-0-V-161-33-06255

Logic Diagram. Limestone Feed Rotary Valve "A2"

BILL

10/07/12

MD1-0-V-161-33-06256

Logic Diagram. Limestone Feed Rotary Feeder 'A"

BILL

10/07/12

MD1-0-V-161-33-06257

Logic Diagram. Limestone Feed Rotary Valve "B1"

BILL

10/07/12

MD1-0-V-161-33-06258

Logic Diagram. Limestone Feed Rotary Valve "B2"

BILL

10/07/12

MD1-0-V-161-33-06259

Logic Diagram. Limestone Feed Rotary Feeder "B"

BILL

10/07/12

MD1-0-V-161-33-06260

Logic Diagram. Stripper Cooler "A" Blower (Typical)

BILL

24/12/12

MD1-0-V-161-33-06261

Logic Diagram. S/C A Stripper Spray Valves (Typical)

BILL

10/07/12

MD1-0-V-161-33-06262

Logic Diagram. S/C A Cooler 1 Spray Valves (Typical)

BILL

10/07/12

MD1-0-V-161-33-06263

Logic Diagram. Stripper/Cooler a Rotary Valve (Typical)

BILL

10/07/12

MD1-0-V-161-33-06264

Logic Diagram. SH Attemp. Spraywater Block Valves

BILL

10/07/12

MD1-0-V-161-33-06265

Logic Diagram. RH Attemp. Spraywater Block Valves

BILL

10/07/12

MD1-0-V-161-33-06266

Logic Diagram. MFT To DCS Controls

BILL

10/07/12

MD1-0-V-161-33-06267

Logic Diagram. ERV Open/Close

BILL

24/12/12

MD1-0-V-161-33-06268

Logic Diagram. MOV Template

BILL

10/07/12

MD1-0-V-161-33-06269

Logic Diagram. Motorized Dampers-1

BILL

10/07/12

MD1-0-V-161-33-06270

Logic Diagram. Motorized Dampers-2

BILL

10/07/12

MD1-0-V-161-33-06271

Logic Diagram. Motorized Valve-1

BILL

10/07/12

MD1-0-V-161-33-06272

Logic Diagram. Motorized Valve-2

BILL

10/07/12

MD1-0-V-161-33-06273

Logic Diagram. Motorized Valve-3

BILL

10/07/12

MD1-0-V-161-33-06274

Logic Diagram. Motorized Valve-4

BILL

10/07/12

MD1-0-V-161-33-06275

Logic Diagram. Motorized Valve-5

BILL

10/07/12

MD1-0-V-161-33-06276

Logic Diagram. Motorized Valve-6

BILL

10/07/12

MD1-0-V-161-33-06277

Logic Diagram. Motorized Valve-7

BILL

10/07/12

MD1-0-V-161-33-06278

Logic Diagram. Motorized Valve-8

BILL

10/07/12

MD1-0-V-161-33-06279

Logic Diagram. Motorized Valve-9

BILL

10/07/12

MD1-0-V-161-33-06280

Logic Diagram. Motorized Valve-10

BILL

10/07/12

MD1-0-V-161-33-06281

Logic Diagram. Limestone Silo Vent Fan

BILL

10/07/12

MD1-0-V-161-33-06282

Logic Diagram. Limestone Silo Vent Pulse Control

BILL

24/12/12

MD1-0-V-161-33-06283

Logic Diagram. AH Oil Pumps

BILL

24/12/12

MD1-0-V-161-33-06284

Logic Diagram. SA Fan a Lube Oil Pumps-1

BILL

24/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-161-33-06285

Logic Diagram. SA Fan a Lube Oil Pumps-2

STS
I

AUTHORISED
BILL

RECEIVED
24/12/12

MD1-0-V-161-33-06286

Logic Diagram. SA Fan B Lube Oil Pumps-1

BILL

24/12/12

MD1-0-V-161-33-06287

Logic Diagram. SA Fan B Lube Oil Pumps-2

BILL

24/12/12

MD1-0-V-161-33-06288

Logic Diagram. PA Fan A Lube Oil Pumps-1

BILL

24/12/12

MD1-0-V-161-33-06289

Logic Diagram. PA Fan A Lube Oil Pumps-2

BILL

24/12/12

MD1-0-V-161-33-06290

Logic Diagram. PA Fan B Lube Oil Pumps-1

BILL

24/12/12

MD1-0-V-161-33-06291

Logic Diagram. PA Fan B Lube Oil Pumps-2

BILL

24/12/12

MD1-0-V-161-33-06300

Sama Diagram. Drawing Index

BILL

24/12/12

MD1-0-V-161-33-06301

Sama Diagram. Symbols and Legend

BILL

10/07/12

MD1-0-V-161-33-06302

Sama Diagram. Boiller Master

BILL

24/12/12

MD1-0-V-161-33-06303

Sama Diagram. Total Air Flow

BILL

24/12/12

MD1-0-V-161-33-06304

Sama Diagram, Primary Air Flow & Pressure

BILL

24/12/12

MD1-0-V-161-33-06305

Sama Diagram, Secondary Air Flow & Pressure

BILL

24/12/12

MD1-0-V-161-33-06306

Sama Diagram, Ring Duc Air Flow

BILL

24/12/12

MD1-0-V-161-33-06307

Sama Diagram, BTU Compensation

BILL

24/12/12

MD1-0-V-161-33-06308

Sama Diagram, Fuel Feeders Front Wall

IC

BILL

24/12/12

MD1-0-V-161-33-06309

Sama Diagram, Fuel Feeders Rear Wall

BILL

10/07/12

MD1-0-V-161-33-06310

Sama Diagram, Oil Master

BILL

24/12/12

MD1-0-V-161-33-06311

Sama Diagram, Start-up Burner 1 Control

IC

BILL

24/12/12

MD1-0-V-161-33-06312

Sama Diagram, Drum Level

BILL

24/12/12

MD1-0-V-161-33-06313

Sama Diagram, Furnace Pressure

BILL

24/12/12

MD1-0-V-161-33-06314

Sama Diagram, First Stage Superheater Temperature

BILL

24/12/12

MD1-0-V-161-33-06315

Sama Diagram, Second Stage Superheater Temperature

BILL

24/12/12

MD1-0-V-161-33-06316

Sama Diagram, Reheater Temperature

BILL

24/12/12

MD1-0-V-161-33-06317

Sama Diagram, Loop Seal Air Pressure

BILL

24/12/12

MD1-0-V-161-33-06318

Sama Diagram, Bed Pressure Control

BILL

24/12/12

MD1-0-V-161-33-06319

Sama Diagram, Stripper/Cooler a Air Flow and Pressure

BILL

24/12/12

MD1-0-V-161-33-06320

Sama Diagram, Stripper/Cooler a Ash Drain and Spray Flow

BILL

24/12/12

MD1-0-V-161-33-06321

Sama Diagram, Stripper/Cooler B Air Flow and Pressure

BILL

24/12/12

MD1-0-V-161-33-06322

Sama Diagram, Stripper/Cooler B Ash Drain and Spray Flow

BILL

24/12/12

MD1-0-V-161-33-06323

Sama Diagram, Stripper/Cooler C Air Flow and Pressure

BILL

24/12/12

MD1-0-V-161-33-06324

Sama Diagram, Stripper/Cooler C Ash Drain and Spray Flow

BILL

24/12/12

MD1-0-V-161-33-06325

Sama Diagram, Stripper/Cooler D Air Flow and Pressure

BILL

24/12/12

MD1-0-V-161-33-06326

Sama Diagram, Stripper/Cooler D Ash Drain and Spray Flow

BILL

24/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-33-06327

Sama Diagram, Limestone Feed

AUTHORISED
BILL

RECEIVED
24/12/12

MD1-0-V-161-33-06328

Sama Diagram, Scah Control

BILL

10/07/12

MD1-0-V-161-33-06329

Sama Diagram, Main Steam Vent Valve

BILL

24/12/12

MD1-0-V-161-33-06330

Sama Diagram, Blowdown Tank Drain Dischage Temp.

BILL

10/07/12

MD1-0-V-161-33-06331

Sama Diagram, Fuel Gas and Seperators Monitoring

BILL

24/12/12

MD1-0-V-161-33-06332

Sama Diagram, Drum Metal Temperature Monitoring

BILL

10/07/12

MD1-0-V-161-33-06333

Sama Diagram, Tube Metal Temperature Monitoring

BILL

24/12/12

MD1-0-V-161-33-06334

Sama Diagram, S.A Fan and Motor BRG/WDG Temp. & VIB. Monitoring

BILL

24/12/12

MD1-0-V-161-33-06335

Sama Diagram, P.A Fan and Motor BRG/WDG Temp. & VIB Monitoring

BILL

24/12/12

MD1-0-V-161-33-06336

Sama Diagram, Loop Seal Blower and Motor Temp. Monitoring

BILL

10/07/12

MD1-0-V-161-33-06337

Sama Diagram, S/C Blowers and Motor BRG/WDG temp. Monitoring (Typical)

BILL

10/07/12

MD1-0-V-161-33-06338

Sama Diagram, Reheater Temperature

BILL

24/12/12

MD1-0-V-161-33-06339

Sama Diagram Drum Level Control, Three Element Selection

BILL

24/12/12

MD1-0-V-161-33-06340

Sama Diagram Drum Level Control, Blower Surge (Typic For Loop (A, B, C)

BILL

24/12/12

MD1-0-V-161-33-06341

Sama Diagram Drum Level Control, Blower Surge (Typic For SC Blower (A-D)

BILL

24/12/12

MD1-0-V-161-33-06342

Sama Diagram, Air Heater Temperature Monitoring

BILL

24/12/12

MD1-0-V-161-33-06343

Sama Diagram, SA Fan Lube Oil Monitoring

BILL

24/12/12

MD1-0-V-161-33-06344

Sama Diagram, FA Fan Lube Oil Monitoring

BILL

24/12/12

MD1-0-V-161-57-00031

Instrument Connection Arrangement- Furnace and HRA

BILL

25/01/13

MD1-0-V-161-57-00032

Instrument Connection Arrangement- Furnace and HRA

BILL

25/01/13

MD1-0-V-161-57-00033

Metal Temp Thermocouple Arrangement

BILL

25/01/13

MD1-0-V-161-57-00034

IN-BED Thermocouples Arrangement

BILL

25/01/13

MD1-0-V-161-57-00035

IN-BED Thermocouples Arrangement

BILL

25/01/13

MD1-0-V-161-57-00036

Instrument Connection Sects & Details

BILL

25/01/13

MD1-0-V-161-57-00037

Metal Temp Thermocouple Arrangement and Details

BILL

25/01/13

MD1-0-V-161-57-00038

Instrument Connections Bill of Quantities

BILL

25/01/13

MD1-0-V-161-57-00039

Instrument Connections Bill of Quantities

BILL

25/01/13

MD1-0-V-161-57-00040

Instrument Connection Arrangement- Aux Equipment

BILL

25/01/13

MD1-0-V-161-57-06401

Instrument Location Plan Drawing Index

BILL

07/02/13

MD1-0-V-161-57-06403

Instrument Location Plan at EL 12115

BILL

07/02/13

MD1-0-V-161-57-06404

Instrument Location Plan at EL 15315 THR EL 15700

BILL

07/02/13

MD1-0-V-161-57-06405

Instrument Location Plan at EL 18365 THR EL 19700

BILL

07/02/13

MD1-0-V-161-57-06406

Instrument Location Plan at EL 22865 Key Level

BILL

07/02/13

MD1-0-V-161-57-06407

Instrument Location Plan at EL 27787 THR EL 28800

BILL

07/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-V-161-57-06408

Instrument Location Plan at EL 32060 THR EL 34970 Key Level

BILL

07/02/13

MD1-0-V-161-57-06409

Instrument Location Plan at EL 37600

BILL

31/10/12

MD1-0-V-161-57-06410

Instrument Location Plan at EL 40300

BILL

07/02/13

MD1-0-V-161-57-06411

Instrument Location Plan at EL 43600 THR EL 43890

BILL

31/10/12

MD1-0-V-161-57-06412

Instrument Location Plan at EL 46700

BILL

07/02/13

MD1-0-V-161-57-06413

Instrument Location Plan at EL 49077 THR EL 49275

BILL

07/02/13

MD1-0-V-161-57-06414

Instrument Location Plan at EL 51850 Key Level

BILL

07/02/13

MD1-0-V-161-57-06415

Instrument Location Plan at EL 54005 THR EL 56575

BILL

07/02/13

MD1-0-V-161-57-06416

Instrument Location Plan at EL 57026

BILL

07/02/13

MD1-0-V-161-57-06417

Instrument Location Plan at EL 58400 THR EL 59572

BILL

07/02/13

MD1-0-V-161-57-06418

Instrument Location Plan at EL 61213 THR EL 62703

BILL

07/02/13

MD1-0-V-161-57-06419

Instrument Location Plan- Instrument Enclosure Details

BILL

31/10/12

MD1-0-V-161-57-06420

Instrument Location Plan- Local Control Box Details

BILL

31/10/12

MD1-0-V-161-57-06421

Instrument Location Plan- Local Control Box Details

BILL

31/10/12

MD1-0-V-161-57-06500

Instrument Installation Details, Cover Sheet & Notes

IC

BILL

18/07/13

MD1-0-V-161-57-06501

Instrument Installation Details, Drawing Index

BILL

18/07/13

MD1-0-V-161-57-06502

Instrument Installation Details, Material List Summary

BILL

18/07/13

MD1-0-V-161-57-06503

Instrument Installation Details, Pressure Transmitter, Feed Water & Spray Water

IC

BILL

18/07/13

MD1-0-V-161-57-06504

Instrument Installation Details, Pressure & Level Transmitters, Steam Drum Right

IC

BILL

18/07/13

MD1-0-V-161-57-06505

Instrument Installation Details, Pressure & Level Transmitters, Steam Drum Left

IC

BILL

18/07/13

MD1-0-V-161-57-06506

Instrument Installation Details Pressure & Flow Transmitters, Sootblower Steam

IC

BILL

18/07/13

MD1-0-V-161-57-06507

Instrument Installation Details, Pressure Transmitters, PSH Outlet

IC

BILL

18/07/13

MD1-0-V-161-57-06508

Instrument Installation Details, Pressure Gauge, Steam Drum

IC

BILL

18/07/13

MD1-0-V-161-57-06509

Instrument Installation Details, Pressure Transmitter, SB Auxiliary Steam

IC

BILL

18/07/13

MD1-0-V-161-57-06510

Instrument Installation Details, Flow Transmitter, Spary & Blowdown Water

IC

BILL

18/07/13

MD1-0-V-161-57-06511

Instrument Installation Details, Pressure Switch, Main Steam ERV

IC

BILL

18/07/13

MD1-0-V-161-57-06512

Instrument Installation Details, Pressure Gauge, Blowdown Tank

IC

BILL

18/07/13

MD1-0-V-161-57-06513

Instrument Installation Details, Pressure Gauge, PA & SA SCAH Steam

IC

BILL

18/07/13

MD1-0-V-161-57-06514

Instrument Installation Details, O2 Analyzer

IC

BILL

18/07/13

MD1-0-V-161-57-06515

Instrument Installation Details, Pressure Transmitter, Air Service

IC

BILL

18/07/13

MD1-0-V-161-57-06516

Instrument Installation Details, Diff. Pressure Transmitter, Air Service

IC

BILL

18/07/13

MD1-0-V-161-57-06517

Instrument Installation Details, Flow Transmitter, SC Air Service

IC

BILL

18/07/13

MD1-0-V-161-57-06518

Instrument Installation Details, Flow Transmitter, LS Air Service

IC

BILL

18/07/13

MD1-0-V-161-57-06519

Instrument Installation Details, Pressure Transmitter, Flue Gas Service

IC

BILL

18/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-57-06520

Instrument Installation Details, Diff. Pressure Transmitter, Flue Gas Service(1)

IC

AUTHORISED
BILL

RECEIVED
18/07/13

MD1-0-V-161-57-06521

Instrument Installation Details, Diff. Pressure Transmitter, Flue Gas Service(2)

IC

BILL

18/07/13

MD1-0-V-161-57-06522

Instrument Installation Details, Diff. Pressure Transmitter, Flue Gas Service(3)

IC

BILL

18/07/13

MD1-0-V-161-57-06523

Instrument Installation Details, Pressure Transmitter, Furnace Bed Pressure

IC

BILL

18/07/13

MD1-0-V-161-57-06524

Instrument Installation Details, Diff. Pressure Transmitter, Furnace Bed Density

IC

BILL

18/07/13

MD1-0-V-161-57-06525

Instrument Installation Details, Diff. Pressure Transmitter, Cyclone Return Leg

IC

BILL

18/07/13

MD1-0-V-161-57-06526

Instrument Installation Details, Diff. Pressure Transmitter, Stripper Cooler Bey

IC

BILL

18/07/13

MD1-0-V-161-57-06527

Instrument Installation Details, Flow Transmitter, Primary Air to Plenum

IC

BILL

18/07/13

MD1-0-V-161-57-06528

Instrument Installation Details, Flow Transmitter, Secondary Air to Ring Duct

IC

BILL

18/07/13

MD1-0-V-161-57-06529

Instrument Installation Details, Flow Transmitter, Secondary Air to Start-up Bur

IC

BILL

18/07/13

MD1-0-V-161-57-06530

Instrument Installation Details, Flow Transmitter, Secondary Air to Air Bustle

IC

BILL

18/07/13

MD1-0-V-161-57-06531

Instrument Installation Details, Instrument Air Supply, Pneumatic Valve & Damper

IC

BILL

18/07/13

MD1-0-V-161-57-06532

Instrument Installation Details, Instrument Support Details

IC

BILL

18/07/13

MD1-0-V-161-57-06533

Instrument Installation Details, Instrument Air Supply Pneumatic Valve & Damper

IC

BILL

18/07/13

MD1-0-V-161-57-06551

Instrument Installation Details, Instrument Enclosure Outline Drawing - Type A

BILL

18/07/13

MD1-0-V-161-57-06552

Instrument Installation Details, Instrument Enclosure Layout Drawing - Type A

IC

BILL

18/07/13

MD1-0-V-161-57-06553

Instrument Installation Details, Instrument Enclosure - Assignment List

BILL

18/07/13

MD1-0-V-161-57-06554

Instrument Installation Details, Instrument Enclosure Outline Drawing - Type B

IC

BILL

18/07/13

MD1-0-V-161-57-06555

Instrument Installation Details, Instrument Enclosure Layout Drawing - Type B

IC

BILL

18/07/13

MD1-0-V-161-57-06556

Instrument Installation Details, Instrument Enclosure Outline & Layout Drawing C

IC

BILL

18/07/13

MD1-0-V-162-01-00003

Instrument Arrangement Plot Plan

IC

BILL

11/06/13

MD1-0-V-162-11-00011

Instrument Installation Drawing

IC

BILL

11/06/13

MD1-0-V-162-11-00012

Graphic Display Requirement and Drawing

IC

BILL

11/06/13

MD1-0-V-162-36-00001

Control system configuration diagram

BILL

05/03/13

MD1-0-V-163-09-00009

Actuator Data for IDF Inlet Damper

AC

BILL

27/05/13

MD1-0-V-167-09-00006

Instrument Data & Dwg

RT

BILL

19/07/13

MD1-0-V-171-01-00077

GENERAL ARRANGEMENT AND DATA SHEET OF LINEAR ACTUATOR FOR CHS

BILL

25/01/13

MD1-0-V-171-01-02123

INSTRUMENT & CONTROL SYSTEM EARTHING & SCREENING SYSTEM FOR COAL HANDLING IC

BILL

11/03/13

MD1-0-V-171-03-02102

Control Write-up/Control Philosophy for Coal Handling System

AC

BILL

03/07/13

MD1-0-V-171-06-02009

Cable Sizing Calculation for CHS

RT

BILL

08/10/12

MD1-0-V-171-06-02116

Instrument data & calculation details for chs

BILL

08/04/13

MD1-0-V-171-08-02001

Electrical Load List for Coal Handling System

BILL

10/07/13

MD1-0-V-171-08-02025

Lighting Schedule fof CHS

RT

BILL

08/10/12

MD1-0-V-171-08-02105

Instrument List for Coal Handling System

BILL

09/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-171-08-02107

I/O List of for Coal Handling System

STS
I

AUTHORISED
BILL

RECEIVED
08/07/13

MD1-0-V-171-08-02120

Control systems overall block diagram for chs

BILL

06/03/13

MD1-0-V-171-08-02122

Interface Signals List for Coal Handling System

BILL

14/03/13

MD1-0-V-171-08-02124

Alarm List & Set Point List for Coal Handling System

BILL

08/07/13

MD1-0-V-171-08-02139

Communication IO List for Coal Handling System

BILL

04/07/13

MD1-0-V-171-09-02118

GA & BOM & System Architecture for CCTV System For CHS

BILL

04/07/13

MD1-0-V-171-11-02113

GA of Junction Box for CHS

BILL

04/07/13

MD1-0-V-172-01-00121

General Arrangement and Data Sheet of Belt Scale for Limestone Handling System

AC

BILL

11/06/13

MD1-0-V-172-01-00122

General Arrangement and Data Sheet of Metal Detector for Limestone Handling Sysm

AC

BILL

11/06/13

MD1-0-V-172-06-02113

Instrument data & calculation detail for lhs

BILL

28/03/13

MD1-0-V-172-08-02105

Instrument List for Limestone Handling System

RT

BILL

06/11/12

MD1-0-V-172-08-02107

I/O List for Limestone Handling System

BILL

08/07/13

MD1-0-V-172-08-02117

Interface Signals List for Limestone Handling System

BILL

08/07/13

MD1-0-V-172-08-02138

Communication IO List for Limestone Handling System

BILL

03/07/13

MD1-0-V-172-51-02108

PLC ARCHITECTURE DIAGRAM FOR LIMESTONE HANDLING SYSTEM

BILL

16/01/13

MD1-0-V-181-01-00005

Cable Tray & Conduit Lay Out for AUX. Boiler Area

BILL

23/05/13

MD1-0-V-181-02-00001

Auxiliary Boiler Package Cable Specification

BILL

23/05/13

MD1-0-V-181-05-00012

Operation Control Philosophy

BILL

28/12/12

MD1-0-V-181-08-00014

Auxiliary Boiler Package Cable Schedule

BILL

23/05/13

MD1-0-V-181-08-00015

AUXILIARY BOILER PACKAGE INSTRUMENT LIST

AC

BILL

01/03/13

MD1-0-V-181-08-00016

Auxiliary boiler pacakge terminal point list

IC

BILL

01/03/13

MD1-0-V-181-08-00017

Auxiliary boiler package control valve list

AC

BILL

23/05/13

MD1-0-V-181-08-00018

Auxiliary package mov list

BILL

23/05/13

MD1-0-V-181-08-00019

AUXILIARY BOILER PACKAGE PLC I.O LIST

IC

BILL

01/03/13

MD1-0-V-181-09-00011

Auxiliary boiler package level gauge

IC

BILL

04/03/13

MD1-0-V-181-09-00012

AUXILIARY BOILER PACKAGE MANUAL VALVE

BILL

28/12/12

MD1-0-V-181-09-00013

AUXILIARY BOILER PACKAGE STEAM & AIR TRAP

AC

BILL

28/12/12

MD1-0-V-181-09-00014

AUXILIARY BOILER PACKAGE INSTRUMENT DATA

AC

BILL

28/12/12

MD1-0-V-181-09-00015

AUXILIARY BOILER PACKAGE CONTROL VALVE

BILL

28/12/12

MD1-0-V-181-09-00016

Auxiliary Boiler Package CCTV Data Sheet

BILL

23/05/13

MD1-0-V-181-10-00024

Auxiliary boiler package lighting & small power system

BILL

12/03/13

MD1-0-V-181-10-00025

Auxiliary boiler package electric heat tracing system dwg

BILL

01/03/13

MD1-0-V-181-10-00026

Auxiliary Boiler Package GA Drawing for PLC Cabinet

BILL

23/05/13

MD1-0-V-181-10-00027

Auxiliary boiler package instrument installation hook-up drawing

BILL

12/03/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-181-10-00028

Auxiliary Boiler Package General Arrangement Drawing for Porta Cabin

STS
I

AUTHORISED
BILL

RECEIVED
23/05/13

MD1-0-V-181-32-00001

Auxiliary boiler package schematics of plc

BILL

12/03/13

MD1-0-V-181-36-00001

AUXILIARY BOILER PACKAGE CONTROL SYSTEM

BILL

12/03/13

MD1-0-V-181-56-00001

Auxiliary Boiler Package Stack Lightning System Drawing

BILL

23/05/13

MD1-0-V-181-57-00004

Auxiliary boiler package sump pump control panel & local push botton switch

BILL

01/03/13

MD1-0-V-182-09-11011

Instrument Data Sheet and Catalog for Air Receiver Tank of EDG

AC

BILL

04/07/13

MD1-0-V-182-10-11009

Flow Meter Outline for Emergency Diesel Generator

BILL

10/07/13

MD1-0-V-182-33-32002

Control logic diagram

BILL

03/04/13

MD1-0-V-182-35-30002

Flow Meter Wiring Diagram for Emergency Diesel Generator

RT

BILL

04/07/13

MD1-0-V-182-36-32001

Control philosophy

BILL

03/04/13

MD1-0-V-186-08-00104

Instrument & Equipment List

BILL

18/04/13

MD1-0-V-186-08-00105

Instrument list for field erected tank

BILL

06/03/13

MD1-0-V-186-08-00107

Drawing of instrument & equipment for field erected tank

IC

BILL

18/04/13

MD1-0-V-186-08-00108

Data sheet of instrument & equipment for field erected tank

BILL

18/04/13

MD1-0-V-400-10-01712

Hyd. unit & control panel drawing for combined nrv dn2400

BILL

11/03/13

MD1-0-V-400-32-01211

Schematic & wiring diagram for motor operated cast valves

BILL

29/03/13

MD1-0-V-400-32-01611

WIRING DIAGRRAM & ACTUATOR DRAWING FOR MOTOR OPERATED BUTTERFLY VALVE

BILL

22/03/13

MD1-0-V-400-32-01711

Schematic & wiring diagram for combined nrv dn2400

BILL

11/03/13

MD1-0-V-545-05-00001

Inspection and test plan

BILL

12/07/13

MD1-0-V-545-05-00002

Qa/qc manual

BILL

24/04/13

MD1-0-V-545-05-00004

FAT Procedure for Communication System

BILL

12/07/13

MD1-0-V-545-05-00005

SAT Procedure for Communication System

BILL

12/07/13

MD1-0-V-545-09-00001

Technical Datasheet for Communication System

BILL

12/07/13

MD1-0-V-550-09-00001

Technical Datasheet for CCTV System

BILL

12/07/13

MD1-0-V-610-01-00002

Distributed Control System Power and Ground Plan

RT

BILL

16/07/13

MD1-0-V-610-01-00003

Power Consumption & Heat Dissipation

BILL

07/05/13

MD1-0-V-610-02-00004

Distributed Control System Planing Installation Specification

BILL

27/05/13

MD1-0-V-610-02-00005

Distributed control system online performance monitoring system specification

BILL

07/05/13

MD1-0-V-610-03-00003

Dcs design & function description

BILL

20/02/13

MD1-0-V-610-05-00002

Distributed control system inspection and test procedure

BILL

29/05/13

MD1-0-V-610-07-00002

Distributed Control System FAT Report

BILL

16/07/13

MD1-0-V-610-08-00007

Distributed Control System Bill of Material

BILL

11/06/13

MD1-0-V-610-08-00008

Distributed control system quality inspection and test plan

BILL

29/05/13

MD1-0-V-610-10-00001

Equipment outline detail for distributed control system

BILL

27/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-610-10-00002

Distributed control system name plate list

STS
I

AUTHORISED
BILL

RECEIVED
07/05/13

MD1-0-V-610-11-00001

Distributed Control System Ovation Graphic Diagram

BILL

17/04/13

MD1-0-V-610-11-00002

Distributed control system io summary and assignment table

BILL

07/05/13

MD1-0-V-610-11-00003

Distributed control system io list

BILL

07/05/13

MD1-0-V-610-35-00001

Distributed control system internal connection and wiring diagram

BILL

07/05/13

MD1-0-V-610-36-00001

Distributed control system system configuration

BILL

07/05/13

MD1-0-V-620-09-00001

Datasheet and Catalog for SWAS

BILL

13/05/13

MD1-0-V-620-10-00001

Panel Layout Drawing for SWAS

BILL

13/05/13

MD1-0-V-620-21-00001

P&I Diagram for SWAS

BILL

13/05/13

MD1-0-V-620-32-00001

Schematic and Wiring Diagram for SWAS

BILL

13/05/13

MD1-0-V-620-35-00001

Interconnection Wiring Diagram for SWAS

IC

BILL

13/05/13

MD1-0-V-630-02-00001

Equipment and System Specification for CEMS

BILL

09/05/13

MD1-0-V-630-09-00001

Instrument Data Sheet for CEMS

BILL

09/05/13

MD1-0-V-630-09-00002

Technical Catalog and Brochure for CEMS

BILL

09/05/13

MD1-0-V-630-10-00001

Panel Arrangement Drawing for CEMS

BILL

09/05/13

MD1-0-V-630-11-00001

Instrument and Analyzer Installation Detail Drawing for CEMS

BILL

09/05/13

MD1-0-V-630-21-00001

P&I Diagram for CEMS

BILL

09/05/13

MD1-0-V-630-32-00001

Schematic & Wiring Diagram for CEMS

BILL

09/05/13

MD1-0-V-630-35-00001

Interconnection Wiring Diagram for CEMS

IC

BILL

09/05/13

MD1-0-V-630-36-00001

System Configuration Diagram for CEMS

BILL

09/05/13

MD1-0-V-640-03-00001

System overview for vibration monitoring system(bop)

BILL

25/03/13

MD1-0-V-640-08-00001

Signal list for vibration monitoring system(bop)

BILL

25/03/13

MD1-0-V-640-08-00003

Sub-supplier's list for vibration monitoring system(bop)

IC

BILL

25/03/13

MD1-0-V-640-08-00007

Code and standards for vibration monitoring system(bop)

BILL

25/03/13

MD1-0-V-640-08-00009

Cable list for vibration monitoring system(bop)

IC

BILL

25/03/13

MD1-0-V-640-08-00011

Technical catalog and brochure for vibration monitoring system(bop)

IC

BILL

25/03/13

MD1-0-V-640-10-00001

Panel equipment installation drawings for vibration monitoring system(bop)

BILL

25/03/13

MD1-0-V-640-35-00002

Interconnection wiring diagram for vibration monitoring system(bop)

BILL

25/03/13

MD1-0-V-640-36-00001

System configuration diagram for vibration monitoring system(bop)

BILL

25/03/13

MD1-0-V-650-05-00003

Technical catalog and brochure for control valve & regulating valve (bop)

BILL

29/04/13

MD1-0-V-650-05-00004

O&m manual for control valve & regulating valve (bop)

BILL

29/04/13

MD1-0-V-650-05-10003

Technical catalog and brochure for pneumatic operated shut-off valve (bop)

BILL

02/05/13

MD1-0-V-650-05-10004

O&m manual for pneumatic operated shut-off valve (bop)

BILL

02/05/13

MD1-0-V-650-09-00001

Data sheets for control valve & regulating valve(bop)

BILL

29/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-650-09-10001

Data sheets for pneumatic operated shut-off valve (bop)

AUTHORISED
BILL

RECEIVED
02/05/13

MD1-0-V-650-10-00001

Assembly drawing for control valve & regulating valve(bop)

BILL

29/04/13

MD1-0-V-650-10-10001

Assembly drawing for pneumatic operated shut-off valve (bop)

BILL

02/05/13

MD1-0-V-660-01-40001

Inspection Test Plan for Level Gauge and Switch (BOP)

BILL

05/07/13

MD1-0-V-660-05-40001

Inspection Test Procedure for Level Gauge and Switch (BOP)

BILL

05/07/13

MD1-0-V-660-06-00001

Thermowell stress calculation report for field transmitter (bop)

BILL

12/04/13

MD1-0-V-660-09-00001

Datasheet and catalogue for field transmitter (bop)

BILL

12/07/13

MD1-0-V-660-09-10001

Data Sheet and Catalogue for Displacer Level Transmitter (BOP)

BILL

27/05/13

MD1-0-V-660-09-40001

Data Sheet and Catalogue for Level Gauge and Switch (BOP)

BILL

07/05/13

MD1-0-V-660-11-00001

Dimensional drawings for field transmitter (bop)

BILL

12/07/13

MD1-0-V-660-11-10001

Dimensional Drawing for Displacer Level Transmitter (BOP)

BILL

27/05/13

MD1-0-V-660-11-20001

Dimensional Drawing for Coriolis Flowmeter(BOP)

BILL

27/05/13

MD1-0-V-660-11-20002

Dimensional Drawing for Radar Level Transmitter(BOP)

BILL

27/05/13

MD1-0-V-660-11-40001

Dimensional Drawing for Level Gauge and Switch (BOP)

BILL

07/05/13

MD1-0-V-750-09-00037

Equipment Data Sheet: Main Fire Alarm Control Panel

BILL

23/04/13

MD1-0-V-750-09-00038

Equipment Data Sheet: Local Fire Alarm Control Panel

BILL

23/04/13

MD1-0-V-750-09-00039

Equipment Data Sheet: Annunciator Panel

BILL

18/03/13

MD1-0-V-750-09-00040

Equipment Data Sheet: Manual Call Point

BILL

18/03/13

MD1-0-V-750-09-00041

Equipment Data Sheet: Horn & Strobe

BILL

18/03/13

MD1-0-V-750-09-00042

Equipment Data Sheet: Fire Detectors

BILL

18/03/13

MD1-0-V-750-09-00043

Equipment Data Sheet: Module

BILL

18/03/13

MD1-0-V-750-09-00044

Equipment Data Sheet: Module Box

BILL

18/03/13

MD1-0-V-750-09-00045

Equipment Data Sheet: Manual Release Station for Water Spray

BILL

18/03/13

MD1-0-V-750-09-00046

Equipment Data Sheet: Manual Release Station for Foam Water Spray

BILL

18/03/13

MD1-0-V-750-09-00047

Equipment Data Sheet: Local Fire Suppression Panel

BILL

23/04/13

MD1-0-V-750-09-00048

Equipment Data Sheet: Discharge Lamp

BILL

18/03/13

MD1-0-V-750-09-00049

Equipment Data Sheet: Manual Release Station for Gas Suppression

BILL

18/03/13

MD1-0-V-750-09-00050

Equipment Data Sheet: Led Indicator

BILL

18/03/13

MD1-0-V-750-09-00051

Equipment Data Sheet: Isolator

BILL

18/03/13

MD1-0-V-750-09-00052

Equipment Data Sheet: Terminal Box

BILL

18/03/13

MD1-0-V-750-09-00053

Equipment Data Sheet: Power Supply Panel

BILL

18/03/13

MD1-0-V-750-09-00055

Equipment Data Sheet: Mimic Panel for Main Fire Alarm Panel

BILL

18/03/13

MD1-0-V-750-09-00056

Equipment Data Sheet: Mimic Panel for Sub-Fire Alarm Panel

BILL

18/03/13

MD1-0-V-750-09-00057

Equipment Data Sheet: Transponder Panel

BILL

23/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-750-10-00123

Main fire alarm system panel assembly and outline dimension drawing

STS
I

AUTHORISED
BILL

RECEIVED
20/02/13

MD1-0-V-750-10-00124

Main fire alarm system panel internal / external connection drawing

BILL

20/02/13

MD1-0-V-750-10-00125

Local fire alarm system panel assembly and outline Local fire alarm system pane

BILL

20/02/13

MD1-0-V-750-10-00126

Local fire alarm system panel internal / external connection drawing

BILL

20/02/13

MD1-0-V-750-10-00127

Fire alarm system typical wiring diagram

BILL

20/02/13

MD1-0-V-750-10-00128

Fire alarm system graphic annunciator panel outline dimension drawing

BILL

20/02/13

MD1-0-V-750-10-00130

Fire Alarm Sys Mimic Panel Outline Dimension Drawing for Main Fire Alarm Panel

BILL

18/03/13

MD1-0-V-750-10-00132

Fire alarm system mimic panel outline dimension drawing for sub-fire alarm pane

BILL

28/02/13

MD1-0-V-750-10-00141

Fire alarm system transponder panel assembly and outline dimension drawing

BILL

20/02/13

MD1-0-V-750-10-00142

Fire alarm system transponder panel internal / external connection drawing

BILL

20/02/13

MD1-0-V-750-32-00069

Clean agent fire extinguishing system electrical schematic drawing for main con)

BILL

20/02/13

MD1-0-V-750-32-00077

Clean agent fire extinguishing system electrical schematic drawing for electron)

BILL

20/02/13

MD1-0-V-750-32-00085

Clean agent fire extinguishing system electrical schematic drawing for control )

BILL

20/02/13

MD1-0-V-750-32-00093

Clean agent fire extinguishing system electrical schematic drawing for esp contd

BILL

28/02/13

MD1-0-V-750-32-00101

Clean agent fire extinguishing system electrical schematic drawing for esp cont

BILL

28/02/13

MD1-0-V-750-33-00072

Clean agent fire extinguishing system cause and effect diagram for main control)

BILL

20/02/13

MD1-0-V-750-33-00080

Clean agent fire extinguishing system cause and effect diagram for electronic e)

BILL

20/02/13

MD1-0-V-750-33-00088

Clean agent fire extinguishing system cause and effect diagram for control & pr)

BILL

20/02/13

MD1-0-V-750-33-00096

Clean agent fire extinguishing system cause and effect diagram for esp control c

BILL

28/02/13

MD1-0-V-750-33-00104

Clean agent fire extinguishing system cause and effect diagram for esp control m

BILL

28/02/13

MD1-0-V-750-33-00134

Fire Alarm System Cause and Effect Chart Local Fire Alarm Control Panel-2(SWYD)

BILL

18/03/13

MD1-0-V-750-35-00070

Clean agent fire extinguishing system electrical terminal & wiring diagram for )

BILL

20/02/13

MD1-0-V-750-35-00078

Clean agent fire extinguishing system electrical terminal & wiring diagram

BILL

20/02/13

MD1-0-V-750-35-00086

Clean agent fire extinguishing system electrical terminal & wiring diagram for )

BILL

20/02/13

MD1-0-V-750-35-00094

Clean agent fire extinguishing system electrical terminal & writing diagram

BILL

28/02/13

MD1-0-V-750-35-00102

Clean agent fire extinguishing system electrical terminal & wiring diagram for

BILL

28/02/13

MD1-0-V-750-55-00122

Battery Calculation Local Fire Alarm Control Panel-2(SWYD Control Building)

BILL

18/03/13

MD1-0-V-805-01-00101

Instrument Location Drawing for WT & WWT System

BILL

02/07/13

MD1-0-V-805-02-00001

Instrument data sheet for wt & wwt

BILL

18/04/13

MD1-0-V-805-02-00002

Plc & hmi specification for wt & wwt

BILL

17/04/13

MD1-0-V-805-03-00003

HMI Graphics for WT & WWT System

IC

BILL

16/07/13

MD1-0-V-805-08-00009

Instrument list for wt & wwt

IC

BILL

25/04/13

MD1-0-V-805-08-00010

Set-point list for alarm and interlocking for wt & wwt

BILL

25/04/13

MD1-0-V-805-08-00012

I/o list for plant dcs for wt&wwt

BILL

25/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-805-08-00031

I/o list for plc for wt & wwt system

STS
I

AUTHORISED
BILL

RECEIVED
25/04/13

MD1-0-V-805-11-00006

Outline and dimensional drawings identifying components and name plates inclusi

BILL

02/07/13

MD1-0-V-805-32-00001

Schematic diagram for wt & wwt

BILL

17/05/13

MD1-0-V-805-33-00002

Control logic diagram with description

BILL

17/04/13

MD1-0-V-805-34-00002

Control loop diagram for wt & wwt

BILL

17/04/13

MD1-0-V-805-35-00001

Interconnection wiring diagrams for wt & wwt

BILL

17/04/13

MD1-0-V-805-36-00002

Configulation drawing for control system for wt & wwt

BILL

17/04/13

MD1-0-V-850-08-00008

ELECTRICAL LOAD LIST FOR BOILER CHEMICAL DOSING SYSTEM

BILL

18/01/13

MD1-0-V-850-08-00011

Instrument list for boiler chemical dosing system

BILL

08/04/13

MD1-0-V-850-08-00012

Io list for plc for boiler chemical dosing system

BILL

08/03/13

MD1-0-V-850-08-00013

Io list for plc for boiler chemical dosing system chemical dosing system

BILL

08/03/13

MD1-0-V-850-09-00002

Instrument data sheet for boiler chemical dosing system

BILL

08/04/13

MD1-0-V-850-33-00001

Control logic diagram for chemical dosing system

BILL

25/04/13

MD1-0-V-850-34-00001

Control loop diagram for ammonia storage system

BILL

25/04/13

MD1-0-V-850-36-00001

Configuration drawing for control system chemical dosing system cover

BILL

08/03/13

MD1-0-V-850-73-00002

Dimensional outline drawing for control panel chemical dosing system cover

BILL

15/03/13

MD1-0-V-850-73-00003

Instrument Installtion Detail Drawing with Bill of Materials for Chemical Dosinm

BILL

09/05/13

MD1-0-V-850-73-00004

Interconnection wiring diagram for boiler chemical dosing system

IC

BILL

04/07/13

MD1-0-V-860-02-00004

Technical specification of control system and peripheral equipment for gaseous m

BILL

27/03/13

MD1-0-V-860-02-00006

System Software and Sofware Application Specification Gaseous

BILL

05/02/13

MD1-0-V-860-08-00009

Cable Schedule for Gaseous Chlorination System

BILL

18/07/13

MD1-0-V-860-08-00010

Electrical Load List for Gaseous Chlorination System

BILL

18/07/13

MD1-0-V-860-08-00011

Electrical Equipment List (Panel, J/B), LCP, etc) for Gaseous Chlorination Systm

BILL

18/07/13

MD1-0-V-860-08-00016

Instrument List for Gaseous Chlorination System

BILL

10/07/13

MD1-0-V-860-08-00018

Set-point List for Alarm and Interlocking for Chemical Dosing System (Chlorine)

BILL

10/07/13

MD1-0-V-860-08-00019

IO List for PLC Gaseous Chlorination System

BILL

10/07/13

MD1-0-V-860-08-00020

IO List for Plant DCS for Gaseous Chlorination System

BILL

10/07/13

MD1-0-V-860-09-00003

Instrument and Control Valve Specification and Data Sheet Gaseous

BILL

10/07/13

MD1-0-V-860-11-00011

Detailed sectional drawings for control valves and other types of valves gaseoum

BILL

02/07/13

MD1-0-V-860-33-00001

Control Logic Diagram for Gaseous Chlorination System

BILL

11/06/13

MD1-0-V-860-35-00001

Wiring Diagams Gaseous Chlorination System

BILL

12/12/12

MD1-0-V-860-57-00001

Electrical hook-up drawing for gaseous chlorination system

BILL

23/05/13

MD1-0-V-860-57-00002

Configuration drawing for control system. gaseous chlorination system

BILL

20/02/13

MD1-0-V-860-57-00003

Instrument location drawing for gaseous chlorination system

BILL

10/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-870-08-00012

Instrument list for Sewage Treatment System

STS
I

AUTHORISED
BILL

RECEIVED
18/04/13

MD1-0-V-870-08-00013

Set-Point for Alarm and Interlocking List for Sewage Treatment System

BILL

18/04/13

MD1-0-A-200-51-00001

Architectural Details/ Abbreviation, Legend & symbols

NIGEL

01/06/12

MD1-0-A-200-51-00002

Architectural Details/ Floor & Wall Junction Details

NIGEL

01/06/12

MD1-0-A-200-51-00003

Architectural Details/ Ceiling & Wall Junction Details

NIGEL

01/06/12

MD1-0-A-200-51-00004

Architectural Details/ Roof Details-1

AC

NIGEL

02/10/12

MD1-0-A-200-51-00005

Architectural Details/ Roof Details-2

AC

NIGEL

02/10/12

MD1-0-A-200-51-00006

Architectural Details/ Wall & Roof Penetration Details

AC

NIGEL

02/10/12

MD1-0-A-200-51-00007

Architectural Details/ Block Wall Details

AC

NIGEL

02/10/12

MD1-0-A-200-51-00008

Architectural Details/ Stair & Handrail Details

AC

NIGEL

02/10/12

MD1-0-A-200-51-00009

Architectural Details/ Door Head Details

NIGEL

01/06/12

MD1-0-A-200-51-00010

Architectural Details/ Door Jamb Details

NIGEL

01/06/12

MD1-0-A-200-51-00011

Architectural Details/ Door Sill Details

NIGEL

01/06/12

MD1-0-A-200-51-00012

Architectural Details/ Window Details

NIGEL

02/10/12

MD1-0-A-200-52-00001

Architectural Details/ General Notes (R.C)

AC

NIGEL

10/08/12

MD1-0-A-200-52-00002

Architectural Details/ Re-bar Details-1

NIGEL

01/06/12

MD1-0-A-200-52-00003

Architectural Details/ Re-bar Details-2

NIGEL

02/10/12

MD1-0-A-200-52-00004

Architectural Details/ Concrete Structure Joint Details

AC

NIGEL

02/10/12

MD1-0-A-200-52-00005

Architectural Details/ P.C Concrete CHK'DPL & Grating Cover Details

AC

NIGEL

02/10/12

MD1-0-A-200-54-00001

Architectural Details/ General Notes Steel

NIGEL

01/06/12

MD1-0-A-200-54-00002

Architectural Details/ Steel Stair Details

NIGEL

02/10/12

MD1-0-A-200-54-00003

Architectural Details/ Steel Handrail Details

AC

NIGEL

02/10/12

MD1-0-A-200-54-00004

Architectural Details/ Steel Ladder Details

AC

NIGEL

02/10/12

MD1-0-A-200-54-00005

Architectural Details/ Steel Connection Details-1

AC

NIGEL

02/10/12

MD1-0-A-200-54-00006

Architectural Details/ Steel Connection Details-2

AC

NIGEL

02/10/12

MD1-0-A-200-54-00007

Architectural Details/ Steel Connection Details-3

AC

NIGEL

02/10/12

MD1-0-A-200-54-00008

Architectural Details/ Steel Connection Details-4

AC

NIGEL

02/10/12

MD1-0-A-200-55-00001

Design Calculation for Steel Connection

AC

NIGEL

02/10/12

MD1-0-A-200-55-00002

Design Calculation for Miscelleneous Steel and Connection Details

AC

NIGEL

02/10/12

MD1-0-A-200-55-00003

Design Calculation for Miscelleneous Concrete and Masonry Details

AC

NIGEL

02/10/12

MD1-0-A-200-55-00004

Exterior Color Schedule for Overall View

MARK

11/10/12

MD1-0-A-201-51-00001

Turbine Building/ Ground Floor Plan

AC

NIGEL

07/02/13

MD1-0-A-201-51-00002

Turbine Building/ Mezzanine Floor Plan

NIGEL

07/02/13

DISCIPLINE = CIV, Civil & Architecture

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-201-51-00003

Turbine Building/ Operating Floor Plan

AUTHORISED
NIGEL

RECEIVED
07/02/13

MD1-0-A-201-51-00004

Turbine Building/ Lower Roof & Crane Runway Plan

NIGEL

07/02/13

MD1-0-A-201-51-00005

Turbine Building/ Higher Roof Plan

NIGEL

07/02/13

MD1-0-A-201-51-00006

Turbine Building/ South Elevation

NIGEL

07/02/13

MD1-0-A-201-51-00007

Turbine Building/ North Elevation

NIGEL

07/02/13

MD1-0-A-201-51-00008

Turbine Building/ East & West Elevation

NIGEL

07/02/13

MD1-0-A-201-51-00009

Turbine Building/ Main Section 1 & 2

AC

NIGEL

07/02/13

MD1-0-A-201-51-00010

Turbine Building/ Main Section 3

AC

NIGEL

07/02/13

MD1-0-A-201-51-00011

Turbine Building/ Interior Finish Schedule

NIGEL

07/02/13

MD1-0-A-201-51-00012

Turbine Building/ Door & Window Schedule

IC

NIGEL

07/02/13

MD1-0-A-201-52-00001

Turbine Building/ Pile & Foundation Plan-1

NIGEL

29/11/12

MD1-0-A-201-52-00002

Turbine Building/ Pile & Foundation Plan-2

NIGEL

27/12/12

MD1-0-A-201-52-00003

Turbine Building/ C.E.P & C.W.P PIT Framing Plan

AC

NIGEL

16/07/13

MD1-0-A-201-52-00004

Turbine Building/ C.E.P & C.W.P PIT Details-1

AC

NIGEL

16/07/13

MD1-0-A-201-52-00005

Turbine Building/ C.E.P & C.W.P PIT Details-2

AC

NIGEL

16/07/13

MD1-0-A-201-52-00006

Turbine Building/ Ground Floor Framing Plan-1

NIGEL

12/12/12

MD1-0-A-201-52-00007

Turbine Building/ Ground Floor Framing Plan-2

NIGEL

12/12/12

MD1-0-A-201-52-00008

Turbine Building / Mezzanine Floor Framing Plan-1

NIGEL

16/07/13

MD1-0-A-201-52-00009

Turbine Building / Mezzanine Floor Framing Plan-2

NIGEL

16/07/13

MD1-0-A-201-52-00010

Turbine Building / Mezzanine Floor Framing Plan-3

NIGEL

16/07/13

MD1-0-A-201-52-00011

Turbine Building / Operating Floor Framing Plan-1

NIGEL

16/07/13

MD1-0-A-201-52-00012

Turbine Building / Operating Floor Framing Plan-2

NIGEL

16/07/13

MD1-0-A-201-52-00013

Turbine Building / Operating Floor Framing Plan-3

NIGEL

16/07/13

MD1-0-A-201-52-00014

Turbine Building / Heater Floor Framing Plan-1

AC

NIGEL

16/07/13

MD1-0-A-201-52-00015

Turbine Building / Heater Floor Framing Plan-2

RT

NIGEL

16/07/13

MD1-0-A-201-52-00016

Turbine Building / Lower Roof Framing Plan-1

AC

NIGEL

16/07/13

MD1-0-A-201-52-00017

Turbine Building / Lower Roof Framing Plan-2

AC

NIGEL

16/07/13

MD1-0-A-201-52-00018

Turbine Building / Framing Section-1

AC

NIGEL

16/07/13

MD1-0-A-201-52-00019

Turbine Building / Framing Section-2

AC

NIGEL

16/07/13

MD1-0-A-201-52-00020

Turbine Building / Deck Slab Section Details-1

IC

NIGEL

16/07/13

MD1-0-A-201-52-00021

Turbine Building / Deck Slab Section Details-2

IC

NIGEL

16/07/13

MD1-0-A-201-53-00001

Turbine Building/ Foundation Re-bar Details-1

NIGEL

26/12/12

MD1-0-A-201-53-00002

Turbine Building/ Foundation Re-bar Details-2

AC

NIGEL

05/02/13

MD1-0-A-201-53-00003

Turbine Building/ Foundation Re-bar Details-3

NIGEL

26/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-201-53-00004

Turbine Building/ Foundation Re-bar Details-4

AUTHORISED
NIGEL

RECEIVED
26/12/12

MD1-0-A-201-53-00005

Turbine Building/ Foundation Re-bar Details-5

NIGEL

26/12/12

MD1-0-A-201-53-00006

Turbine Building/ Foundation Re-bar Details-6

NIGEL

26/12/12

MD1-0-A-201-53-00007

Turbine Building/ Foundation Re-bar Details-7

NIGEL

26/12/12

MD1-0-A-201-53-00008

Turbine Building/ Foundation Re-bar Details-8

AC

NIGEL

05/02/13

MD1-0-A-201-53-00009

Turbine Building/ Foundation Re-bar Details-9

NIGEL

26/12/12

MD1-0-A-201-53-00010

Turbine Building/ Foundation Re-bar Details-10

AC

NIGEL

05/02/13

MD1-0-A-201-53-00015

Valve Box Rebar Details-1

NIGEL

01/03/13

MD1-0-A-201-53-00020

Turbine Building/ Tie Girder Re-bar Details-1

NIGEL

05/02/13

MD1-0-A-201-53-00021

Turbine Building/ Tie Girder Re-bar Details-2

NIGEL

05/02/13

MD1-0-A-201-53-00022

Turbine Building/ Tie Girder Re-bar Details-3

NIGEL

05/02/13

MD1-0-A-201-53-00023

Turbine building / manhole re-bar details-1

NIGEL

15/05/13

MD1-0-A-201-53-00024

Turbine building / manhole re-bar details-2

NIGEL

15/05/13

MD1-0-A-201-53-00025

Turbine building / manhole re-bar details-3

NIGEL

15/05/13

MD1-0-A-201-53-00026

Turbine building / manhole re-bar details-4

NIGEL

15/05/13

MD1-0-A-201-53-00027

Turbine building / manhole re-bar details-5

NIGEL

15/05/13

MD1-0-A-201-53-00028

Turbine building / manhole re-bar details-6

NIGEL

15/05/13

MD1-0-A-201-53-00031

Turbine Building / Ground Floor Slab Re-Bar Details-1

AC

NIGEL

24/07/13

MD1-0-A-201-53-00032

Turbine Building / Ground Floor Slab Re-Bar Details-2

AC

NIGEL

24/07/13

MD1-0-A-201-53-00033

Turbine Building / Ground Floor Slab Re-Bar Details-3

AC

NIGEL

24/07/13

MD1-0-A-201-53-00034

Turbine Building / Mezzanine Floor Slab Re-Bar Details-1

AC

NIGEL

24/07/13

MD1-0-A-201-53-00035

Turbine Building / Mezzanine Floor Slab Re-Bar Details-2

AC

NIGEL

24/07/13

MD1-0-A-201-53-00036

Turbine Building / Mezzanine Floor Slab Re-Bar Details-3

AC

NIGEL

24/07/13

MD1-0-A-201-53-00037

Turbine Building / Operating Floor Slab Re-Bar Details-1

AC

NIGEL

24/07/13

MD1-0-A-201-53-00038

Turbine Building / Operating Floor Slab Re-Bar Details-2

AC

NIGEL

24/07/13

MD1-0-A-201-53-00039

Turbine Building / Operating Floor Slab Re-Bar Details-3

AC

NIGEL

24/07/13

MD1-0-A-201-53-00040

Turbine Building / Heater Floor Slab Re-Bar Details-1

AC

NIGEL

24/07/13

MD1-0-A-201-53-00041

Turbine Building / Heater Floor Slab Re-Bar Details-2

AC

NIGEL

24/07/13

MD1-0-A-201-53-00042

Turbine Building / Lower Roof Slab Re-Bar Details-1

AC

NIGEL

24/07/13

MD1-0-A-201-53-00043

Turbine Building / Lower Roof Slab Re-Bar Details-2

AC

NIGEL

24/07/13

MD1-0-A-201-53-00065

Turbine Building / Equip. Foundation Plan & Section, Re-Bar Details-6

AC

NIGEL

24/07/13

MD1-0-A-201-53-00066

Turbine Building / Equip. Foundation Plan & Section, Re-Bar Details-7

AC

NIGEL

24/07/13

MD1-0-A-201-54-00001

Turbine Building/ Steel Column Location Plan-1

AC

NIGEL

07/02/13

MD1-0-A-201-54-00002

Turbine Building/ Steel Column Location Plan-2

AC

NIGEL

07/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-201-54-00003

Turbine Building/ Base Plate Details-1

AC

AUTHORISED
NIGEL

RECEIVED
07/02/13

MD1-0-A-201-54-00004

Turbine Building/ Base Plate Details-2

AC

NIGEL

07/02/13

MD1-0-A-201-54-00005

Turbine Building/ Base Plate Details-3

AC

NIGEL

07/02/13

MD1-0-A-201-54-00006

Turbine Building/ Base Plate Details-4

AC

NIGEL

07/02/13

MD1-0-A-201-54-00007

Turbine Building/ Base Plate Details-5

AC

NIGEL

07/02/13

MD1-0-A-201-54-00010

Turbine Building/ Mezzanine Floor Steel Framing Plan-1

AC

NIGEL

07/02/13

MD1-0-A-201-54-00011

Turbine Building/ Mezzanine Floor Steel Framing Plan-2

AC

NIGEL

07/02/13

MD1-0-A-201-54-00012

Turbine Building/ Operating Floor Steel Framing Plan-1

AC

NIGEL

07/02/13

MD1-0-A-201-54-00013

Turbine Building/ Operating Floor Steel Framing Plan-2

AC

NIGEL

07/02/13

MD1-0-A-201-54-00014

Turbine Building/ Heater Floor Steel Framing Plan-1

AC

NIGEL

07/02/13

MD1-0-A-201-54-00015

Turbine Building/ Heater Floor Steel Framing Plan-2

AC

NIGEL

07/02/13

MD1-0-A-201-54-00016

Turbine Building/ Lower Roof Steel Framing Plan-1

AC

NIGEL

07/02/13

MD1-0-A-201-54-00017

Turbine Building/ Lower Roof Steel Framing Plan-2

AC

NIGEL

07/02/13

MD1-0-A-201-54-00020

Turbine Building/ Higher Roof Steel Framing Plan-1

AC

NIGEL

07/02/13

MD1-0-A-201-54-00021

Turbine Building/ Higher Roof Steel Framing Plan-2

AC

NIGEL

07/02/13

MD1-0-A-201-54-00022

Turbine Building/ Steel Framing Elevation-1

AC

NIGEL

07/02/13

MD1-0-A-201-54-00023

Turbine Building/ Steel Framing Elevation-2

AC

NIGEL

07/02/13

MD1-0-A-201-54-00024

Turbine Building/ Steel Framing Elevation-3

AC

NIGEL

07/02/13

MD1-0-A-201-54-00025

Turbine Building/ Steel Framing Elevation-4

AC

NIGEL

07/02/13

MD1-0-A-201-54-00026

Turbine Building/ Steel Framing Elevation-5

AC

NIGEL

07/02/13

MD1-0-A-201-54-00027

Turbine Building/ Steel Framing Elevation-6

AC

NIGEL

07/02/13

MD1-0-A-201-54-00028

Turbine Building/ Steel Framing Elevation-7

AC

NIGEL

07/02/13

MD1-0-A-201-54-00029

Turbine Building/ Steel Framing Elevation-8

AC

NIGEL

07/02/13

MD1-0-A-201-54-00030

Turbine Building/ Steel Framing Elevation-9

AC

NIGEL

07/02/13

MD1-0-A-201-54-00031

Turbine Building/ Steel Framing Elevation-10

AC

NIGEL

07/02/13

MD1-0-A-201-54-00032

Turbine Building/ Steel Framing Elevation-11

AC

NIGEL

07/02/13

MD1-0-A-201-54-00033

Turbine Building/ Steel Framing Elevation-12

AC

NIGEL

07/02/13

MD1-0-A-201-54-00034

Turbine Building/ Steel Framing Elevation-13

AC

NIGEL

07/02/13

MD1-0-A-201-54-00035

Turbine Building/ Steel Framing Elevation-14

AC

NIGEL

07/02/13

MD1-0-A-201-54-00036

Turbine Building/ Steel Framing Elevation-15

AC

NIGEL

07/02/13

MD1-0-A-201-54-00037

Turbine Building/ Steel Framing Elevation-16

AC

NIGEL

07/02/13

MD1-0-A-201-54-00038

Turbine Building/ Steel Framing Elevation-17

AC

NIGEL

07/02/13

MD1-0-A-201-54-00039

Turbine Building/ Steel Framing Elevation-18

AC

NIGEL

07/02/13

MD1-0-A-201-54-00050

Turbine Building/ Steel Column Details

AC

NIGEL

10/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-201-54-00051

Turbine Building/ Crane Girder Details-1

AC

AUTHORISED
NIGEL

RECEIVED
10/04/13

MD1-0-A-201-54-00052

Turbine Building/ Crane Girder Details-2

AC

NIGEL

10/04/13

MD1-0-A-201-54-00053

Turbine Building/ Crane Girder Details-3

AC

NIGEL

10/04/13

MD1-0-A-201-54-00054

Turbine Building/ Roof Frame Details

AC

NIGEL

10/04/13

MD1-0-A-201-54-00056

Turbine Building/ Wall Frame Details-2

AC

NIGEL

10/04/13

MD1-0-A-201-54-00057

Turbine Building/ Wall Frame Details-3

AC

NIGEL

10/04/13

MD1-0-A-201-54-00058

Turbine Building/ Roof Truss Details-1

AC

NIGEL

10/04/13

MD1-0-A-201-54-00059

Turbine Building/ Roof Truss Details-2

AC

NIGEL

10/04/13

MD1-0-A-201-54-00065

Turbine Building/ Steel Stair Plan & Section-1

AC

NIGEL

10/04/13

MD1-0-A-201-54-00066

Turbine Building/ Steel Stair Plan & Section-2

AC

NIGEL

10/04/13

MD1-0-A-201-54-00067

Turbine Building/ Steel Stair Plan & Section-3

AC

NIGEL

10/04/13

MD1-0-A-201-54-00068

Turbine Building/ Steel Stair Plan & Section-4

AC

NIGEL

10/04/13

MD1-0-A-201-54-00069

Turbine Building/ Steel Stair Plan & Section-5

AC

NIGEL

10/04/13

MD1-0-A-201-54-00080

Turbine Building/ Girth Elevation-1

AC

NIGEL

10/04/13

MD1-0-A-201-54-00081

Turbine Building/ Girth Elevation-2

AC

NIGEL

10/04/13

MD1-0-A-201-54-00082

Turbine Building/ Girth Elevation-3

AC

NIGEL

10/04/13

MD1-0-A-201-54-00083

Turbine Building/ Girth Elevation-4

AC

NIGEL

10/04/13

MD1-0-A-201-54-00084

Turbine Building/ Girth Elevation-5

AC

NIGEL

10/04/13

MD1-0-A-201-54-00085

Turbine Building/ Girth Elevation-6

AC

NIGEL

10/04/13

MD1-0-A-201-54-00086

Turbine Building/ Girth Elevation-7

AC

NIGEL

10/04/13

MD1-0-A-201-54-00090

Turbine Building/ Purlin Plan-1

AC

NIGEL

10/04/13

MD1-0-A-201-54-00091

Turbine Building/ Purlin Plan-2

AC

NIGEL

10/04/13

MD1-0-A-201-54-00100

Turbine Building/ Roof Walkaway Framing Plan & Detail-1

AC

NIGEL

10/04/13

MD1-0-A-201-54-00101

Turbine Building/ Roof Walkaway Framing Plan & Detail-2

AC

NIGEL

10/04/13

MD1-0-A-201-54-00110

Turbine Building/ Girth Detail-1

AC

NIGEL

10/04/13

MD1-0-A-201-54-00111

Turbine Building/ Girth Detail-2

AC

NIGEL

10/04/13

MD1-0-A-201-54-00120

Turbine Building/ Removable Hatch Details-1

AC

NIGEL

10/04/13

MD1-0-A-201-54-00121

Turbine Building/ Removable Hatch Details-2

AC

NIGEL

10/04/13

MD1-0-A-201-54-00130

Turbine Building/ Steel Connection Details-1

AC

NIGEL

10/04/13

MD1-0-A-201-54-00131

Turbine Building/ Steel Connection Details-2

AC

NIGEL

10/04/13

MD1-0-A-201-54-00132

Turbine Building/ Steel Connection Details-3

AC

NIGEL

10/04/13

MD1-0-A-201-54-00137

Turbine Building/ Misc. Steel Details-1

AC

NIGEL

10/04/13

MD1-0-A-201-54-00139

Turbine Building/ Misc. Steel Details-3

AC

NIGEL

10/04/13

MD1-0-A-201-54-00140

Turbine Building/ Misc. Steel Details-4

AC

NIGEL

10/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-201-54-00141

Turbine Building/ Misc. Steel Details-5

AC

AUTHORISED
NIGEL

RECEIVED
10/04/13

MD1-0-A-201-54-00142

Turbine Building/ Misc. Steel Details-6

AC

NIGEL

10/04/13

MD1-0-A-202-51-00001

Turbine Foundation/Pile Arrangement Plan

NIGEL

26/11/12

MD1-0-A-202-51-00002

Turbine Foundation/ Plan 1

NIGEL

09/04/13

MD1-0-A-202-51-00003

Turbine Foundation/ Plan-2

NIGEL

09/04/13

MD1-0-A-202-51-00004

Turbine Foundation/ Plan-3

NIGEL

09/04/13

MD1-0-A-202-51-00005

Turbine Foundation/ Section-1

NIGEL

09/04/13

MD1-0-A-202-51-00006

Turbine Foundation/ Section-2

NIGEL

09/04/13

MD1-0-A-202-51-00007

Turbine Foundation/ Section-3

NIGEL

09/04/13

MD1-0-A-202-51-00008

Turbine Foundation/ Section-4

NIGEL

09/04/13

MD1-0-A-202-53-00001

Turbine Foundation/Re-bar Detail-1

AC

NIGEL

09/04/13

MD1-0-A-202-53-00002

Turbine Foundation/Re-bar Detail-2

AC

NIGEL

09/04/13

MD1-0-A-202-53-00003

Turbine Foundation/Re-bar Detail-3

AC

NIGEL

09/04/13

MD1-0-A-202-53-00004

Turbine Foundation/Re-bar Detail-4

AC

NIGEL

09/04/13

MD1-0-A-202-53-00005

Turbine Foundation/Re-bar Detail-5

AC

NIGEL

09/04/13

MD1-0-A-202-53-00006

Turbine Foundation/Re-bar Detail-6

AC

NIGEL

09/04/13

MD1-0-A-202-53-00007

Turbine Foundation/Re-bar Detail-7

AC

NIGEL

09/04/13

MD1-0-A-202-53-00008

Turbine Foundation/ Re-bar Detail-8

AC

NIGEL

09/04/13

MD1-0-A-202-53-00009

Turbine Foundation/ Re-bar Detail-9

AC

NIGEL

09/04/13

MD1-0-A-202-53-00010

Turbine Foundation/ Re-bar Detail-10

AC

NIGEL

09/04/13

MD1-0-A-202-53-00011

Turbine Foundation/ Re-bar Detail-11

AC

NIGEL

09/04/13

MD1-0-A-202-53-00012

Turbine Foundation/ Re-bar Detail-12

AC

NIGEL

09/04/13

MD1-0-A-202-53-00013

Turbine Foundation/ Re-bar Detail-13

AC

NIGEL

09/04/13

MD1-0-A-202-53-00014

Turbine Foundation/ Re-bar Detail-14

AC

NIGEL

09/04/13

MD1-0-A-202-53-00015

Turbine Foundation/ Re-bar Detail-15

AC

NIGEL

09/04/13

MD1-0-A-202-53-00016

Turbine Foundation/ Re-bar Detail-16

AC

NIGEL

09/04/13

MD1-0-A-202-53-00017

Turbine Foundation/ Re-bar Detail-17

AC

NIGEL

09/04/13

MD1-0-A-202-55-00001

Turbine Foundation/ Structural Calculation Sheets

AC

NIGEL

20/11/12

MD1-0-A-203-51-00001

Central Control Building/ Ground Floor Plan

NIGEL

29/11/12

MD1-0-A-203-51-00002

Central Control Building/ 1st Floor Plan

NIGEL

29/11/12

MD1-0-A-203-51-00003

Central Control Building/ 2nd Floor Plan

NIGEL

29/11/12

MD1-0-A-203-51-00004

Central Control Building/ 3rd Floor Plan

NIGEL

29/11/12

MD1-0-A-203-51-00009

Central Control Building/ South Elevation

NIGEL

29/11/12

MD1-0-A-203-51-00010

Central Control Building/ Main Section 1

NIGEL

29/11/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-203-51-00011

Central Control Building/ Main Section 2

AUTHORISED
NIGEL

RECEIVED
29/11/12

MD1-0-A-203-51-00012

Central Control Building/ Interior Finish Schedule

NIGEL

14/11/12

MD1-0-A-203-51-00013

Central Control Building/ Door & Window Schedule

NIGEL

23/07/12

MD1-0-A-203-51-00020

Central Control Building / Wall Section-1

IC

NIGEL

16/07/13

MD1-0-A-203-51-00021

Central Control Building / Wall Section-2

IC

NIGEL

16/07/13

MD1-0-A-203-51-00022

Central Control Building / Wall Section-3

IC

NIGEL

16/07/13

MD1-0-A-203-51-00023

Central Control Building / Stair Plan & Section-1

IC

NIGEL

16/07/13

MD1-0-A-203-51-00024

Central Control Building / Stair Plan & Section-2

IC

NIGEL

16/07/13

MD1-0-A-203-51-00025

Central Control Building / Stair Plan & Section-3

IC

NIGEL

16/07/13

MD1-0-A-203-51-00026

Central Control Building / Stair Plan & Section-4

IC

NIGEL

16/07/13

MD1-0-A-203-51-00027

Central Control Building / Toilet & Shower Room Enlarged Plan & Details-2

IC

NIGEL

16/07/13

MD1-0-A-203-51-00040

Central Control Building / Ceiling Plan-1

IC

NIGEL

16/07/13

MD1-0-A-203-51-00041

Central Control Building / Ceiling Plan-2

IC

NIGEL

16/07/13

MD1-0-A-203-53-00001

Central Control Building/ Foundation Re-bar Details-1

AC

NIGEL

05/12/12

MD1-0-A-203-53-00002

Central Control Building/ Foundation Re-bar Details-2

AC

NIGEL

05/12/12

MD1-0-A-203-53-00003

Central Control Building/ Foundation Re-bar Details-3

AC

NIGEL

05/12/12

MD1-0-A-203-53-00004

Central Control Building/ Foundation Re-bar Details-4

AC

NIGEL

05/12/12

MD1-0-A-203-53-00006

Central Control Building/ Tie Girder Re-bar Details-1

AC

NIGEL

05/12/12

MD1-0-A-203-53-00007

Central Control Building/ Tie Girder Re-bar Details-2

AC

NIGEL

05/12/12

MD1-0-A-203-53-00008

Central Control Building/ Tie Girder Re-bar Details-3

AC

NIGEL

05/12/12

MD1-0-A-203-53-00011

Central Control Building/ Ground Floor Slab Re-bar Details-1

NIGEL

28/02/13

MD1-0-A-203-53-00028

Central Control Building/ Manhole Re-bar Detail-1

NIGEL

28/02/13

MD1-0-A-203-53-00029

Central Control Building/ Manhole Re-bar Detail-2

NIGEL

28/02/13

MD1-0-A-203-53-00030

Central Control Building/ Manhole Re-bar Detail-3

NIGEL

28/02/13

MD1-0-A-203-53-00031

Central Control Building/ Manhole Re-bar Detail-4

NIGEL

28/02/13

MD1-0-A-203-53-00032

Central Control Building/ Manhole Re-bar Detail-5

NIGEL

28/02/13

MD1-0-A-203-53-00033

Central Control Building/ Manhole Re-bar Detail-6

NIGEL

28/02/13

MD1-0-A-203-53-00041

Central Control Building/ Trench Rebar Details-1

NIGEL

28/02/13

MD1-0-A-203-53-00042

Central Control Building/ Trench Rebar Details-2

NIGEL

28/02/13

MD1-0-A-203-53-00043

Central Control Building/ Trench Rebar Details-3

NIGEL

28/02/13

MD1-0-A-203-54-00001

Central Control Building/Steel Column Location Plan

AC

NIGEL

09/11/12

MD1-0-A-203-54-00002

Central Control Building/ Base Plate Details-1

AC

NIGEL

09/11/12

MD1-0-A-203-54-00003

Central Control Building/ Base Plate Details-2

AC

NIGEL

09/11/12

MD1-0-A-203-54-00005

Central Control Building/ 1st Floor Steel Framing Plan

AC

NIGEL

09/11/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-203-54-00006

Central Control Building/ 2nd Floor Steel Framing Plan

AC

AUTHORISED
NIGEL

RECEIVED
09/11/12

MD1-0-A-203-54-00007

Central Control Building/ 3rd Floor Steel Framing Plan

AC

NIGEL

09/11/12

MD1-0-A-203-54-00008

Central Control Building/ Roof Steel Framing Plan

AC

NIGEL

09/11/12

MD1-0-A-203-54-00009

Central Control Building/ Steel Framing Elevation-1

AC

NIGEL

09/11/12

MD1-0-A-203-54-00010

Central Control Building/ Steel Framing Elevation-2

AC

NIGEL

09/11/12

MD1-0-A-203-54-00011

Central Control Building/ Steel Framing Elevation-3

AC

NIGEL

09/11/12

MD1-0-A-203-54-00012

Central Control Building/ Steel Framing Elevation-4

AC

NIGEL

09/11/12

MD1-0-A-203-54-00013

Central Control Building/ Steel Framing Elevation-5

AC

NIGEL

09/11/12

MD1-0-A-203-54-00014

Central Control Building/ Steel Framing Elevation-6

AC

NIGEL

09/11/12

MD1-0-A-203-54-00015

Central Control Building/ Steel Framing Elevation-7

AC

NIGEL

09/11/12

MD1-0-A-203-54-00016

Central Control Building/ Steel Framing Elevation-8

AC

NIGEL

09/11/12

MD1-0-A-203-54-00017

Central Control Building/ Steel Framing Elevation-9

AC

NIGEL

09/11/12

MD1-0-A-203-54-00018

Central Control Building/ Steel Framing Elevation-10

AC

NIGEL

09/11/12

MD1-0-A-203-54-00021

Central Control Building/ Steel Wall Frame Details-1

AC

NIGEL

22/11/12

MD1-0-A-203-54-00022

Central Control Building/ Steel Wall Frame Details-2

AC

NIGEL

22/11/12

MD1-0-A-203-54-00023

Central Control Building/ Steel Wall Frame Details-3

AC

NIGEL

22/11/12

MD1-0-A-203-54-00024

Central Control Building/ Steel Wall Frame Details-4

AC

NIGEL

22/11/12

MD1-0-A-203-54-00025

Central Control Building/ Steel Stair Details-1

AC

NIGEL

22/11/12

MD1-0-A-203-54-00026

Central Control Building/ Steel Stair Details-2

AC

NIGEL

22/11/12

MD1-0-A-203-54-00027

Central Control Building/ Steel Stair Details-3

AC

NIGEL

22/11/12

MD1-0-A-203-54-00028

Central Control Building/ Steel Stair Details-4

AC

NIGEL

22/11/12

MD1-0-A-203-54-00031

Central Control Building/ Girth Details

AC

NIGEL

22/11/12

MD1-0-A-203-54-00032

Central Control Building/ Steel Connection Details-1

AC

NIGEL

22/11/12

MD1-0-A-203-54-00033

Central Control Building/ Steel Connection Details-2

AC

NIGEL

22/11/12

MD1-0-A-203-54-00034

Central Control Building/ Steel Connection Details-3

AC

NIGEL

22/11/12

MD1-0-A-203-54-00035

Central Control Building/ Steel Connection Details-4

AC

NIGEL

22/11/12

MD1-0-A-203-54-00036

Central Control Building/ Steel Misc. Details

AC

NIGEL

22/11/12

MD1-0-A-203-55-00001

Central Control Building/ Structural Calculation Sheets

NIGEL

04/04/13

MD1-0-A-204-51-00003

Coal handling system control building / main sections

NIGEL

18/06/13

MD1-0-A-204-53-00002

Coal Handling System Control Building / Girder Rebar Details-1

NIGEL

18/06/13

MD1-0-A-205-51-00002

Fuel Oil Pump House/ Elevation

NIGEL

27/12/12

MD1-0-A-205-51-00003

Fuel Oil Pump House/ Main Section

NIGEL

27/12/12

MD1-0-A-205-52-00001

Fuel Oil Pump House/ Foundation Plan

AC

NIGEL

07/03/13

MD1-0-A-205-52-00004

Fuel Oil Pump House/ Misc Details

AC

NIGEL

07/03/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-205-53-00001

FUEL OIL PUMP HOUSE / FOUNDATION & COLUMN REBAR DETAILS-1

IC

AUTHORISED
NIGEL

RECEIVED
01/03/13

MD1-0-A-205-53-00003

FUEL OIL PUMP HOUSE / GIRDER REBAR DETAILS

IC

NIGEL

01/03/13

MD1-0-A-205-53-00004

FUEL OIL PUMP HOUSE / WALL REBAR DETAILS

IC

NIGEL

01/03/13

MD1-0-A-207-51-00001

Fire Protection Pump House/ Ground Floor Plan & Roof Plan, Interior Finish

NIGEL

27/12/12

MD1-0-A-207-51-00002

Fire Protection Pump House/ Elevation

NIGEL

27/12/12

MD1-0-A-207-51-00003

Fire Protection Pump House/ Main Section

NIGEL

26/11/12

MD1-0-A-207-51-00004

Fire Protection Pump House/ Interior Finishing, Door & Window Schedule

NIGEL

27/12/12

MD1-0-A-207-51-00011

Fire protection pump house / wall sections

NIGEL

18/06/13

MD1-0-A-207-52-00001

Fire Protection pump House/Foundation Plan

NIGEL

07/02/13

MD1-0-A-207-52-00002

Fire Protection pump House/Framing Plan-1

NIGEL

07/02/13

MD1-0-A-207-52-00003

Fire Protection pump House/Framing Plan-2

NIGEL

07/02/13

MD1-0-A-207-52-00004

Fire Protection pump House/Framing Elevation

NIGEL

07/02/13

MD1-0-A-207-53-00001

Fire Protection Pump House/ Foundation & Column Rebar Details

NIGEL

08/02/13

MD1-0-A-207-53-00002

Fire Protection Pump House/ Girder Rebar Details

NIGEL

08/02/13

MD1-0-A-207-53-00003

Fire Protection Pump House/ Ground Slab & Sump PIT Rebar Details

NIGEL

08/02/13

MD1-0-A-207-53-00004

Fire Protection Pump House/ Roof Slab Rebar Details

NIGEL

08/02/13

MD1-0-A-207-53-00005

Fire Protection Pump House/ Equipment Foundation Rebar Details

NIGEL

08/02/13

MD1-0-A-207-55-00001

Fire Protection Pump House/ Structural Calculation Sheets

NIGEL

08/02/13

MD1-0-A-208-52-00001

Ash slurry pump house / foundation plan

RT

NIGEL

10/06/13

MD1-0-A-208-52-00002

Ash slurry pump house / ground floor framing plan

RT

NIGEL

10/06/13

MD1-0-A-208-52-00003

Ash slurry pump house / 1st floor framing plan

RT

NIGEL

10/06/13

MD1-0-A-208-52-00004

Ash slurry pump house / framing elevation-1

RT

NIGEL

10/06/13

MD1-0-A-208-52-00005

Ash slurry pump house / framing elevation-2

RT

NIGEL

10/06/13

MD1-0-A-208-52-00006

Ash slurry pump house / framing elevation-3

RT

NIGEL

10/06/13

MD1-0-A-208-53-00001

Ash Slurry Pump House / Foundation Re-bar Detail-1

RT

NIGEL

10/06/13

MD1-0-A-208-53-00002

Ash Slurry Pump House / Foundation Re-bar Detail-2

RT

NIGEL

10/06/13

MD1-0-A-208-53-00003

Ash Slurry Pump House / Foundation Re-bar Detail-3

RT

NIGEL

10/06/13

MD1-0-A-208-53-00004

Ash Slurry Pump House / Foundation Re-bar Detail-4

RT

NIGEL

10/06/13

MD1-0-A-208-53-00005

Ash Slurry Pump House / Foundation Re-bar Detail-5

RT

NIGEL

10/06/13

MD1-0-A-208-53-00006

Ash Slurry Pump House / Ground Floor Girder Re-bar Detail-1

RT

NIGEL

10/06/13

MD1-0-A-208-53-00007

Ash Slurry Pump House / Ground Floor Girder Re-bar Detail-2

RT

NIGEL

10/06/13

MD1-0-A-208-53-00010

Ash Slurry Pump House / Wall Re-bar Detail-1

RT

NIGEL

10/06/13

MD1-0-A-208-53-00011

Ash Slurry Pump House / Wall Re-bar Detail-2

RT

NIGEL

10/06/13

MD1-0-A-208-53-00012

Ash Slurry Pump House / Wall Re-bar Detail-3

RT

NIGEL

10/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-A-208-53-00013

Ash Slurry Pump House / Wall Re-bar Detail-4

RT

AUTHORISED
NIGEL

RECEIVED
10/06/13

MD1-0-A-208-54-00001

Ash Slurry Pump House / Steel Column Location Plan

RT

NIGEL

10/06/13

MD1-0-A-208-54-00002

Ash Slurry Pump House / Base Plate Details-1

RT

NIGEL

10/06/13

MD1-0-A-208-54-00003

Ash Slurry Pump House / Base Plate Details-2

RT

NIGEL

10/06/13

MD1-0-A-208-54-00004

Ash Slurry Pump House / Base Plate Details-3

RT

NIGEL

10/06/13

MD1-0-A-208-54-00005

Ash Slurry Pump House / Roof Steel Framing Plan

RT

NIGEL

10/06/13

MD1-0-A-208-54-00006

Ash Slurry Pump House / First Floor And Roof Steel Framing Plan

RT

NIGEL

10/06/13

MD1-0-A-208-54-00007

Ash Slurry Pump House / Steel Framing Elevation-1

RT

NIGEL

10/06/13

MD1-0-A-208-54-00008

Ash Slurry Pump House / Steel Framing Elevation-2

RT

NIGEL

10/06/13

MD1-0-A-208-54-00009

Ash Slurry Pump House / Steel Framing Elevation-3

RT

NIGEL

10/06/13

MD1-0-A-208-54-00010

Ash Slurry Pump House / Steel Framing Elevation-4

RT

NIGEL

10/06/13

MD1-0-A-208-55-00001

Ash slurry pump house / structural calculation sheets

RT

NIGEL

06/06/13

MD1-0-A-209-51-00001

ESP Control & Ash Elec. Bulding/Ground & First Floor Plan

AC

NIGEL

26/06/13

MD1-0-A-209-51-00002

ESP Control & Ash Elec. Bulding/ Roof Plan

AC

NIGEL

26/06/13

MD1-0-A-209-51-00003

ESP Control & Ash Elec. Bulding/ Elevation

AC

NIGEL

26/06/13

MD1-0-A-209-51-00004

ESP Control & Ash Elec. Bulding/ Main Section

AC

NIGEL

26/06/13

MD1-0-A-209-51-00005

ESP Control & Ash Elec. Bulding/ Interior Finishing Door & Window Schedule

IC

NIGEL

26/06/13

MD1-0-A-209-52-00001

ESP Control & Ash Elec. Building/Foundation Plan

AC

NIGEL

26/06/13

MD1-0-A-209-52-00002

ESP Control & Ash Elec. Building/ Ground & First Floor Framing Plan

AC

NIGEL

26/06/13

MD1-0-A-209-52-00003

ESP Control & Ash Elec. Building/ Roof Framing Plan

AC

NIGEL

26/06/13

MD1-0-A-209-52-00004

ESP Control & Ash Elec. Building/ Framing Elevation-1 (Unit 1)

AC

NIGEL

26/06/13

MD1-0-A-209-52-00005

ESP Control & Ash Elec. Building/ Framing Elevation-2 (Unit 1)

AC

NIGEL

26/06/13

MD1-0-A-209-52-00006

ESP Control & Ash Elec. Building/ Framing Elevation-3 (Unit 2)

AC

NIGEL

26/06/13

MD1-0-A-209-52-00007

ESP Control & Ash Elec. Building/ Framing Elevation-4 (Unit 2)

AC

NIGEL

26/06/13

MD1-0-A-209-53-00001

Esp control & ash elec.building/ foundation & column

NIGEL

15/05/13

MD1-0-A-209-53-00002

Esp control & ash elec.building / girder rebar details-1

NIGEL

15/05/13

MD1-0-A-209-53-00003

Esp control & ash elec.building / girder rebar details-2

NIGEL

15/05/13

MD1-0-A-209-53-00004

Esp control & ash elec. building / girder rebar details-3

IC

NIGEL

26/06/13

MD1-0-A-209-53-00005

ESP Control & Ash Elec. Building / Ground Floor Slab Rebar Details (Unit 1&2)

IC

NIGEL

26/06/13

MD1-0-A-209-53-00006

ESP Control & Ash Elec. Building / First Floor Slab Rebar Details (Unit 1&2)

IC

NIGEL

26/06/13

MD1-0-A-209-53-00007

ESP Control & Ash Elec. Building / Roof Slab Rebar Details (Unit 1&2)

IC

NIGEL

26/06/13

MD1-0-A-209-53-00008

ESP Control & Ash Elec. Building / Trench Rebar Details-1 (Unit 1)

IC

NIGEL

26/06/13

MD1-0-A-209-53-00009

ESP Control & Ash Elec. Building / Trench Rebar Details-2 (Unit 2)

IC

NIGEL

26/06/13

MD1-0-A-209-55-00001

EPS Control Building/ Structural Calculation Sheets

AC

NIGEL

26/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-A-210-52-00001

Diesel generator house / foundation plan

AC

AUTHORISED
NIGEL

RECEIVED
25/06/13

MD1-0-A-210-52-00002

Diesel generator house / ground floor framing plan

AC

NIGEL

25/06/13

MD1-0-A-210-52-00003

Diesel generator house / framing section

RT

NIGEL

25/06/13

MD1-0-A-210-53-00001

Diesel Generator House / Foundation Rebar Detail

IC

NIGEL

25/06/13

MD1-0-A-210-53-00002

Diesel Generator House / Ground Floor Girder Rebar Detail

IC

NIGEL

25/06/13

MD1-0-A-210-53-00003

Diesel Generator House / Ground Floor Slab Rebar Detail

IC

NIGEL

25/06/13

MD1-0-A-210-53-00004

Diesel Generator House /Trench Rebar Detail-1

IC

NIGEL

25/06/13

MD1-0-A-210-53-00005

Diesel Generator House / Trench Rebar Detail-2

IC

NIGEL

25/06/13

MD1-0-A-210-53-00006

Diesel Generator House / Equipment Foundation Rebar Detail

RT

NIGEL

25/06/13

MD1-0-A-210-54-00001

Diesel Generator House / Steel Column Location Plan

AC

NIGEL

25/06/13

MD1-0-A-210-54-00002

Diesel Generator House / Base Plate Detail

AC

NIGEL

25/06/13

MD1-0-A-210-54-00003

Diesel Generator House / Roof Framing Plan

AC

NIGEL

25/06/13

MD1-0-A-210-54-00004

Diesel Generator House / Framing Elevation-1

AC

NIGEL

25/06/13

MD1-0-A-210-54-00005

Diesel Generator House / Framing Elevation-2

AC

NIGEL

25/06/13

MD1-0-A-210-55-00001

Diesel generator house / structural calculation sheets

RT

NIGEL

25/06/13

MD1-0-A-212-51-00001

Gaseous Chlorination Building/ Ground Floor Plan

RT

NIGEL

10/07/13

MD1-0-A-212-51-00002

Gaseous Chlorination Building/ Roof Plan

RT

NIGEL

10/07/13

MD1-0-A-212-51-00003

Gaseous Chlorination Building/ Elevation

RT

NIGEL

10/07/13

MD1-0-A-212-51-00004

Gaseous Chlorination Building/ Main Section

RT

NIGEL

10/07/13

MD1-0-A-212-51-00005

Gaseous Chlorination Building / Interior Finishing, Door & Window Schedule

IC

NIGEL

10/07/13

MD1-0-A-212-52-00001

Gaseous Chlorination Building/ Pile & Foundation Plan

AC

NIGEL

10/07/13

MD1-0-A-212-52-00002

Gaseous Chlorination Building/ Ground Floor Framing Plan

AC

NIGEL

10/07/13

MD1-0-A-212-52-00003

Gaseous Chlorination Building/ Roof Floor Framing Plan

AC

NIGEL

10/07/13

MD1-0-A-212-52-00004

Gaseous chlorination building / framing elevation-1

AC

NIGEL

10/07/13

MD1-0-A-212-52-00005

Gaseous Chlorination Building/ Framing Elevation-2

AC

NIGEL

10/07/13

MD1-0-A-212-52-00006

Gaseous Chlorination Building/ Framing Elevation-3

AC

NIGEL

10/07/13

MD1-0-A-212-53-00001

Gaseous chlorination building / foundation & column rebar details

IC

NIGEL

16/07/13

MD1-0-A-212-53-00002

Gaseous chlorination building / girder rebar details-1

IC

NIGEL

16/07/13

MD1-0-A-212-53-00003

Gaseous chlorination building / girder rebar details-2

IC

NIGEL

16/07/13

MD1-0-A-212-53-00004

Gaseous Chlorination Building / Ground Floor Slab Rebar Details

IC

NIGEL

16/07/13

MD1-0-A-212-53-00005

Gaseous chlorination building / roof floor slab rebar detail

IC

NIGEL

16/07/13

MD1-0-A-212-53-00006

Gaseous Chlorination Building / Equipment Foundation Rebar Details

IC

NIGEL

16/07/13

MD1-0-A-212-53-00007

Gaseous Chlorination Building / Trench Rebar Details

IC

NIGEL

16/07/13

MD1-0-A-212-55-00001

Gaseous Chlorination Builing/ Structural Calculation Sheets

AC

NIGEL

10/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-A-213-51-00001

Fuel Oil Unloading Pump House/ Ground Floor & Roof Plan

AC

NIGEL

10/06/13

MD1-0-A-213-51-00002

Fuel Oil Unloading Pump House/ Elevations

AC

NIGEL

10/06/13

MD1-0-A-213-51-00003

Fuel Oil Unloading Pump House/ Main Sections

AC

NIGEL

10/06/13

MD1-0-A-213-51-00004

Fuel Oil Unloading Pump House/ Interior Finish & Door Schedule

IC

NIGEL

10/06/13

MD1-0-A-213-52-00001

Fuel oil unloading pump house / ground floor & roof framing plan

AC

NIGEL

10/06/13

MD1-0-A-213-52-00002

Fuel oil unloading pump house / framing sections

AC

NIGEL

10/06/13

MD1-0-A-214-52-00001

RT

NIGEL

26/03/13

MD1-0-A-214-55-00001

Return Water Pump House / Stuctural Calulation Sheet

RT

NIGEL

26/03/13

MD1-0-A-215-51-00001

Switchyard Control Building/ Ground Floor Plan

NIGEL

22/11/12

MD1-0-A-215-51-00002

Switchyard Control Building/ 1st Floor Plan

NIGEL

22/11/12

MD1-0-A-215-51-00003

Switchyard Control Building/ Roof Plan

NIGEL

22/11/12

MD1-0-A-215-51-00004

Switchyard Control Building/ Elevation-1

NIGEL

22/11/12

MD1-0-A-215-51-00005

Switchyard Control Building/ Elevation-2

NIGEL

22/11/12

MD1-0-A-215-51-00006

Switchyard Control Building/ Main Sections

NIGEL

22/11/12

MD1-0-A-215-51-00007

Switchyard Control Building/ Interior Finish Schedule

AC

NIGEL

09/08/12

MD1-0-A-215-51-00008

Switchyard Control Building/ Door & Window Schedule

AC

NIGEL

09/08/12

MD1-0-A-215-51-00011

Switchyard Control Building/ Wall Section-1

NIGEL

11/03/13

MD1-0-A-215-51-00012

Switchyard Control Building/ Wall Section-2

NIGEL

11/03/13

MD1-0-A-215-51-00013

Switchyard Control Building/ Ceiling Plan-1

NIGEL

11/03/13

MD1-0-A-215-51-00014

Switchyard Control Building/ Ceiling Plan-2

NIGEL

11/03/13

MD1-0-A-215-51-00015

Switchyard Control Building/ Toilet Enlarged Plan & Details

NIGEL

11/03/13

MD1-0-A-215-51-00016

Switchyard Control Building/ Stair Plan & Section

NIGEL

11/03/13

MD1-0-A-215-52-00001

Switchyard Control Building/ Foundation Plan

NIGEL

27/07/12

MD1-0-A-215-52-00002

Switchyard Control Building/ Ground Floor Framing Plan

NIGEL

22/11/12

MD1-0-A-215-52-00003

Switchyard Control Building/ 1st Floor Framing Plan

NIGEL

22/11/12

MD1-0-A-215-52-00004

Switchyard Control Building/ Roof Framing Plan

NIGEL

22/11/12

MD1-0-A-215-52-00005

Switchyard Control Building/ Framing Section-1

NIGEL

10/08/12

MD1-0-A-215-52-00006

Switchyard Control Building/ Framing Section-2

NIGEL

10/08/12

MD1-0-A-215-52-00007

Switchyard Control Building/ Framing Section-3

NIGEL

10/08/12

MD1-0-A-215-53-00001

Switchyard Control Building/Foundation Rebar Detail-1

NIGEL

31/07/12

MD1-0-A-215-53-00002

Switchyard Control Building/Foundation Rebar Detail-2

NIGEL

31/07/12

MD1-0-A-215-53-00003

Switchyard Control Building/Foundation Rebar Detail-3

NIGEL

31/07/12

MD1-0-A-215-53-00004

Switchyard Control Building/ Column Rebar Detail-1

NIGEL

09/10/12

MD1-0-A-215-53-00005

Switchyard Control Building/ Column Rebar Detail-2

NIGEL

09/10/12

Return water pump house / pile & foundation plan

AUTHORISED

RECEIVED

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-215-53-00006

Switchyard Control Building/ Column Rebar Detail-3

AUTHORISED
NIGEL

RECEIVED
09/10/12

MD1-0-A-215-53-00010

Switchyard Control Building/ Ground Floor Girder Rebar Detail-1

NIGEL

22/11/12

MD1-0-A-215-53-00011

Switchyard Control Building/ Ground Floor Girder Rebar Detail-2

NIGEL

22/11/12

MD1-0-A-215-53-00012

Switchyard Control Building/ Ground Floor Girder Rebar Detail-3

NIGEL

22/11/12

MD1-0-A-215-53-00020

Switchyard Control Building/ 1st Floor Girder Rebar Detail-1

NIGEL

09/10/12

MD1-0-A-215-53-00021

Switchyard Control Building/ 1st Floor Girder Rebar Detail-2

NIGEL

09/10/12

MD1-0-A-215-53-00022

Switchyard Control Building/ 1st Floor Girder Rebar Detail-3

NIGEL

09/10/12

MD1-0-A-215-53-00023

Switchyard Control Building/ 1st Floor Girder Rebar Detail-4

NIGEL

09/10/12

MD1-0-A-215-53-00024

Switchyard Control Building/ 1st Floor Girder Rebar Detail-5

NIGEL

09/10/12

MD1-0-A-215-53-00025

Switchyard Control Building/ 1st Floor Girder Rebar Detail-6

NIGEL

09/10/12

MD1-0-A-215-53-00026

Switchyard Control Building/ 1st Floor Girder Rebar Detail-7

NIGEL

09/10/12

MD1-0-A-215-53-00030

Switchyard Control Building/ Roof Girder Rebar Detail-1

NIGEL

09/10/12

MD1-0-A-215-53-00031

Switchyard Control Building/ Roof Girder Rebar Detail-2

NIGEL

09/10/12

MD1-0-A-215-53-00032

Switchyard Control Building/ Roof Girder Rebar Detail-3

NIGEL

09/10/12

MD1-0-A-215-53-00033

Switchyard Control Building/ Roof Girder Rebar Detail-4

NIGEL

09/10/12

MD1-0-A-215-53-00040

Switchyard Control Building/Ground Floor Slab Rebar Detail

NIGEL

04/12/12

MD1-0-A-215-53-00041

Switchyard Control Building/1st Floor Slab Rebar Detail

NIGEL

16/11/12

MD1-0-A-215-53-00042

Switchyard Control Building/Roof Slab Rebar Detail

AC

NIGEL

04/12/12

MD1-0-A-215-53-00043

Switchyard Control Building/Stair Rebar Detail

NIGEL

16/11/12

MD1-0-A-215-53-00050

Switchyard Control Building/Wall Re-bar Detail-1

NIGEL

03/10/12

MD1-0-A-215-53-00051

Switchyard Control Building/Wall Re-bar Detail-2

NIGEL

03/10/12

MD1-0-A-215-53-00052

Switchyard Control Building/ Trench Rebar Detail-1

AC

NIGEL

04/12/12

MD1-0-A-215-53-00053

Switchyard Control Building/ Trench Rebar Detail-2

AC

NIGEL

04/12/12

MD1-0-A-215-53-00054

Switchyard Control Building/Misc. Rebar Detail-1

AC

NIGEL

04/12/12

MD1-0-A-215-53-00055

Switchyard Control Building/Misc. Rebar Detail-2

NIGEL

16/11/12

MD1-0-A-215-53-00056

Switchyard Control Building/Misc. Rebar Detail-3

NIGEL

16/11/12

MD1-0-A-215-53-00057

Switchyard Control Building/Misc. Rebar Detail-4

NIGEL

16/11/12

MD1-0-A-215-53-00058

Switchyard Control Building/Misc. Rebar Detail-5

NIGEL

16/11/12

MD1-0-A-215-55-00001

Switchyard Control Building/ Structural Calculation Sheets

AC

NIGEL

09/10/12

MD1-0-A-216-51-00001

Water Treatment Building/ Ground Floor Plan

NIGEL

07/02/13

MD1-0-A-216-51-00003

Water Treatment Building/ Roof Plan

NIGEL

07/02/13

MD1-0-A-216-51-00004

Water Treatment Building/ Elevation-1

NIGEL

07/02/13

MD1-0-A-216-51-00005

Water Treatment Building/ Elevation-2

NIGEL

07/02/13

MD1-0-A-216-51-00006

Water Treatment Building/ Main Sections

NIGEL

07/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-216-51-00007

Water Treatment Building/ Interior Finishing Schedule

IC

AUTHORISED
NIGEL

RECEIVED
17/12/12

MD1-0-A-216-51-00011

Water treatment building / wall section -1

NIGEL

21/06/13

MD1-0-A-216-51-00012

Water treatment building / wall section -2

NIGEL

21/06/13

MD1-0-A-216-51-00013

Water treatment building / ceiling plan

NIGEL

21/06/13

MD1-0-A-216-51-00014

Water treatment building / toilet detail

NIGEL

21/06/13

MD1-0-A-216-53-00001

Water Treatment Bulding/Foundation Rebar Detail-1

NIGEL

28/03/13

MD1-0-A-216-53-00002

Water Treatment Bulding/Foundation Rebar Detail-2

NIGEL

28/03/13

MD1-0-A-216-53-00003

Water Treatment Bulding/Foundation Rebar Detail-3

NIGEL

28/03/13

MD1-0-A-216-53-00004

Water Treatment Bulding/Foundation Rebar Detail-4

NIGEL

28/03/13

MD1-0-A-216-53-00005

Water Treatment Bulding/ Ground Floor Girder Rebar Detail-1

NIGEL

28/03/13

MD1-0-A-216-53-00006

Water Treatment Bulding/ Ground Floor Girder Rebar Detail-2

NIGEL

28/03/13

MD1-0-A-216-53-00007

Water Treatment Bulding/ Ground Floor Girder Rebar Detail-3

NIGEL

28/03/13

MD1-0-A-216-53-00008

Water Treatment Bulding/ Ground Floor Girder Rebar Detail-4

NIGEL

28/03/13

MD1-0-A-216-53-00009

WATER TREATMENT BUILDING / GROUND FLOOR SLAB REBAR DETAIL-1

NIGEL

28/03/13

MD1-0-A-216-53-00010

WATER TREATMENT BUILDING / GROUND FLOOR SLAB REBAR DETAIL-2

NIGEL

28/03/13

MD1-0-A-216-53-00013

WATER TREATMENT BUILDING / MISC. REBAR DETAIL

NIGEL

28/03/13

MD1-0-A-216-53-00020

Water treatment building / foundation re-bar detail-5

NIGEL

28/03/13

MD1-0-A-216-54-00001

Water Treatment Building/ Steel Column Location Plan

NIGEL

28/12/12

MD1-0-A-216-54-00002

Water Treatment Building/ Base Plate Detail-1

NIGEL

04/03/13

MD1-0-A-216-54-00003

Water Treatment Building/ Base Plate Detail-2

NIGEL

04/03/13

MD1-0-A-216-54-00004

Water Treatment Building/ Base Plate Detail-3

NIGEL

04/03/13

MD1-0-A-216-54-00005

Water Treatment Building/ Lower Roof Steel Framing Plan

NIGEL

04/03/13

MD1-0-A-216-54-00007

Water Treatment Building/ Steel Framing Elevation-1

NIGEL

04/03/13

MD1-0-A-216-54-00008

Water Treatment Building/ Steel Framing Elevation-2

NIGEL

04/03/13

MD1-0-A-216-54-00009

Water Treatment Building/ Steel Framing Elevation-3

NIGEL

04/03/13

MD1-0-A-216-54-00010

Water Treatment Building/ Steel Framing Elevation-4

NIGEL

04/03/13

MD1-0-A-216-55-00001

Water Treatment Building/ Structural Calculation Sheets

AC

NIGEL

28/03/13

MD1-0-A-218-53-00001

Coal Yard Dry Storage Shed/ Foundation Rebar Detail

NIGEL

21/03/13

MD1-0-A-218-53-00002

Coal Yard Dry Storage Shed/ Ground Floor Girder Rebar Detail-1

NIGEL

21/03/13

MD1-0-A-218-53-00003

Coal Yard Dry Storage Shed/ Ground Floor Girder Rebar Detail-2

AC

NIGEL

21/03/13

MD1-0-A-218-53-00004

Coal Yard Dry Storage Shed/ Foundation Rebar Detail-2

RT

NIGEL

21/03/13

MD1-0-A-218-55-00001

Coal Yard Dry Storage shed/ Structural Calculation Sheets (for Sub-Structure)

RT

NIGEL

21/03/13

MD1-0-A-218-55-00003

Coal Yard Dry Storage Shed/ Design Calculation For Roof Drain

NIGEL

14/01/13

MD1-0-A-218-55-00004

Coal yard dry storage shed / design calculation for roof gutter

AC

NIGEL

03/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-219-51-00002

Limestone storage shed / roof plan

AUTHORISED
NIGEL

RECEIVED
05/03/13

MD1-0-A-219-51-00003

Limestone storage shed / elevations-1

NIGEL

03/04/13

MD1-0-A-219-51-00004

Limestone storage shed / elevations-2

NIGEL

03/04/13

MD1-0-A-219-51-00005

Limestone storage shed / main sections

NIGEL

28/06/13

MD1-0-A-219-51-00006

Limestone storage shed / interior finish schedule, door & window schedule

IC

NIGEL

03/04/13

MD1-0-A-219-51-00007

Limestone Storage Shed / W All Section

IC

NIGEL

22/03/13

MD1-0-A-219-51-00008

Limestone Storage Shed / Ladder Detail

IC

NIGEL

22/03/13

MD1-0-A-219-51-00009

Limestone Storage Shed / Roof Walkway Framing Plan

IC

NIGEL

22/03/13

MD1-0-A-219-51-00010

Limestone Storage Shed / Roof Walkway Detail

IC

NIGEL

22/03/13

MD1-0-A-219-51-00011

Limestone Storage Shed / Shutter Door Detail

IC

NIGEL

22/03/13

MD1-0-A-219-55-00002

Limestone storage shed / structural calculation sheets(for super-structure)

AC

NIGEL

26/03/13

MD1-0-A-219-55-00004

Limestone storage shed/ design calculation for roof drain

NIGEL

26/03/13

MD1-0-A-221-51-00001

Lubrication Oil Storage Shelter / Ground Floor Plan & Roof Plan

RT

NIGEL

12/07/13

MD1-0-A-221-51-00002

Lubrication Oil Storage Shelter / Elevations

RT

NIGEL

12/07/13

MD1-0-A-221-51-00003

Lubrication Oil Storage Shelter / Main Sections

RT

NIGEL

12/07/13

MD1-0-A-221-51-00004

Lubrication Oil Storage Shelter / Interior Finish Schedule

IC

NIGEL

12/07/13

MD1-0-A-250-51-00001

Workshop building / ground floor

AC

NIGEL

10/07/13

MD1-0-A-250-51-00002

Workshop building / roof plan

NIGEL

10/07/13

MD1-0-A-250-51-00003

Workshop building / elevations

AC

NIGEL

10/07/13

MD1-0-A-250-51-00004

Workshop building / main section-1 & main section-2

AC

NIGEL

10/07/13

MD1-0-A-250-51-00005

Workshop building / main section-3

AC

NIGEL

10/07/13

MD1-0-A-250-51-00006

Workshop building / interior finish schedule, door & window schedule

IC

NIGEL

10/07/13

MD1-0-A-250-51-00007

Workshop Building / Wall Section Detail-1

IC

NIGEL

11/07/13

MD1-0-A-250-51-00008

Workshop Building / Wall Section Detail-2

IC

NIGEL

11/07/13

MD1-0-A-250-51-00009

Workshop Building / Ground Floor Ceiling Plan

IC

NIGEL

11/07/13

MD1-0-A-250-51-00010

Workshop Building / Toilet Enlarged Plan

IC

NIGEL

11/07/13

MD1-0-A-250-51-00011

Workshop Building / Shower Enlarged Plan

IC

NIGEL

11/07/13

MD1-0-A-250-52-00001

Workshop building / pile & foundation plan

AC

NIGEL

11/07/13

MD1-0-A-250-52-00002

Workshop Building / Ground Floor Framing Plan

AC

NIGEL

11/07/13

MD1-0-A-250-52-00003

Workshop Building / Framing Section-1

AC

NIGEL

11/07/13

MD1-0-A-250-52-00004

Workshop Building / Framing Section-2

AC

NIGEL

11/07/13

MD1-0-A-250-53-00001

Workshop building / foundation rebar detail-1

AC

NIGEL

11/07/13

MD1-0-A-250-53-00002

Workshop building / foundation rebar detail-2

AC

NIGEL

11/07/13

MD1-0-A-250-53-00003

Workshop building / foundation rebar detail-3

AC

NIGEL

11/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-A-250-53-00004

Workshop building / ground floor girder rebar detail-1

AC

AUTHORISED
NIGEL

RECEIVED
11/07/13

MD1-0-A-250-53-00005

Workshop building / ground floor girder rebar detail-2

AC

NIGEL

11/07/13

MD1-0-A-250-53-00006

Workshop building / ground floor girder rebar detail-3

AC

NIGEL

11/07/13

MD1-0-A-250-53-00007

Workshop building / ground floor girder rebar detail-4

AC

NIGEL

11/07/13

MD1-0-A-250-54-00001

Workshop Building / Steel Column Location Plan

AC

NIGEL

11/07/13

MD1-0-A-250-54-00002

Workshop Building / Base Plate Details - 1

AC

NIGEL

11/07/13

MD1-0-A-250-54-00003

Workshop Building / Base Plate Details - 2

AC

NIGEL

11/07/13

MD1-0-A-250-54-00004

Workshop Building / Base Plate Details - 3

AC

NIGEL

11/07/13

MD1-0-A-250-54-00005

Workshop Building / Steel Framing Plan

AC

NIGEL

11/07/13

MD1-0-A-250-54-00006

Workshop Building / Crane Girder Steel Framing Plan

AC

NIGEL

11/07/13

MD1-0-A-250-54-00007

Workshop Building / Roof Steel Framing Plan

AC

NIGEL

11/07/13

MD1-0-A-250-54-00008

Workshop Building / Steel Framing Elevation - 1

AC

NIGEL

11/07/13

MD1-0-A-250-54-00009

Workshop Building / Steel Framing Elevation - 2

AC

NIGEL

11/07/13

MD1-0-A-250-54-00010

Workshop Building / Steel Framing Elevation - 3

AC

NIGEL

11/07/13

MD1-0-A-250-54-00011

Workshop Building / Roof Purlin Plan

IC

NIGEL

11/07/13

MD1-0-A-250-54-00012

Workshop Building / Girth Elevation-1

IC

NIGEL

11/07/13

MD1-0-A-250-54-00013

Workshop Building / Girth Elevation-2

IC

NIGEL

11/07/13

MD1-0-A-250-54-00014

Workshop Building / Girth Detail

IC

NIGEL

11/07/13

MD1-0-A-250-54-00015

Workshop Building / Roof Walkway Framing Plan & Section

IC

NIGEL

11/07/13

MD1-0-A-250-54-00016

Workshop Building / Roof Walkway Detail

IC

NIGEL

11/07/13

MD1-0-A-250-54-00017

Workshop Building / Ladder Detail

IC

NIGEL

11/07/13

MD1-0-A-250-54-00018

Workshop Building / Steel Connection Detail - 1

IC

NIGEL

11/07/13

MD1-0-A-250-54-00019

Workshop Building / Steel Connection Detail - 2

IC

NIGEL

11/07/13

MD1-0-A-250-54-00020

Workshop Building / Steel Connection Detail - 3

IC

NIGEL

11/07/13

MD1-0-A-251-51-00001

Bulldozer Garage/ Ground Floor Plan

NIGEL

25/06/13

MD1-0-A-251-51-00002

Bulldozer Garage/ Roof Plan

NIGEL

05/03/13

MD1-0-A-251-51-00003

Bulldozer Garage/ Elevations

NIGEL

05/03/13

MD1-0-A-251-51-00004

Bulldozer Garage/ Main Sections

NIGEL

25/06/13

MD1-0-A-251-51-00005

Bulldozer Garage/ Interior Finish Schedule, Door & Window Schedule

IC

NIGEL

25/06/13

MD1-0-A-251-52-00001

Bulldozer garage / foundation plan

RT

NIGEL

25/06/13

MD1-0-A-251-52-00002

Bulldozer garage / ground floor framing plan & section

RT

NIGEL

25/06/13

MD1-0-A-251-53-00001

Bulldozer Garage / Foundation Rebar Detail

IC

NIGEL

16/07/13

MD1-0-A-251-53-00002

Bulldozer Garage / Ground Floor Girder Rebar Details

IC

NIGEL

16/07/13

MD1-0-A-251-53-00003

Bulldozer Garage / Ground Floor Slab Rebar & Section

IC

NIGEL

16/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-251-54-00001

Bulldozer garage / steel column location plan & roof steel framing plan

AUTHORISED
NIGEL

RECEIVED
25/06/13

MD1-0-A-251-54-00002

Bulldozer garage / base plate details

AC

NIGEL

25/06/13

MD1-0-A-251-54-00003

Bulldozer garage / steel framing elevations

NIGEL

25/06/13

MD1-0-A-251-54-00004

Bulldozer Garage / Roof Purlin Plan

AC

NIGEL

25/06/13

MD1-0-A-251-54-00005

Bulldozer Garage / Steel Connection Details

NIGEL

25/06/13

MD1-0-A-251-55-00001

Bulldozer garage / structural calculation sheets

RT

NIGEL

25/06/13

MD1-0-A-252-51-00001

I&C Electrical and Mechanical Warehouse/ Ground Floor Plan

NIGEL

10/07/13

MD1-0-A-252-51-00006

I&C Electrical and Mechanical Warehouse/ Interior Finish Schedule

NIGEL

28/02/13

MD1-0-A-252-51-00008

I&C Electrical and Mechanical Warehouse / Wall Sections-1

IC

NIGEL

10/07/13

MD1-0-A-252-51-00009

I&C Electrical and Mechanical Warehouse / Wall Sections-2

IC

NIGEL

10/07/13

MD1-0-A-252-51-00010

I&C Electrical and Mechanical Warehouse / Ceiling Plan

IC

NIGEL

10/07/13

MD1-0-A-252-51-00011

I&C Electrical and Mechanical Warehouse / Toile Enlarged Plan

IC

NIGEL

10/07/13

MD1-0-A-252-54-00001

I&c electrical and mechanical warehouse / steel column location plan

AC

NIGEL

10/07/13

MD1-0-A-252-54-00002

I&c electrical and mechanical warehouse / base plate details-1

AC

NIGEL

10/07/13

MD1-0-A-252-54-00003

I&c electrical and mechanical warehouse / base plate details-2

AC

NIGEL

10/07/13

MD1-0-A-252-54-00004

I&c electrical and mechanical warehouse / base plate details-3

AC

NIGEL

10/07/13

MD1-0-A-252-54-00005

I&c electrical and mechanical warehouse / base plate details-4

AC

NIGEL

10/07/13

MD1-0-A-252-54-00007

I&c electrical and mechanical warehouse / lower roof steel framing plan

AC

NIGEL

10/07/13

MD1-0-A-252-54-00008

I&c electrical and mechanical warehouse / higher roof steel framing plan

AC

NIGEL

10/07/13

MD1-0-A-252-54-00009

I&c electrical and mechanical warehouse / crane girder steel framing plan

AC

NIGEL

10/07/13

MD1-0-A-252-54-00010

I&c electrical and mechanical warehouse / steel framing I&c electrical and mech

AC

NIGEL

10/07/13

MD1-0-A-252-54-00011

I&c electrical and mechanical warehouse / steel framing elevation-2

AC

NIGEL

10/07/13

MD1-0-A-252-54-00012

I&C Electrical and Mechanical Warehouse / Lower Roof Purlin Plan

IC

NIGEL

11/07/13

MD1-0-A-252-54-00013

I&C Electrical and Mechanical Warehouse / Higher Roof Purlin Plan

IC

NIGEL

11/07/13

MD1-0-A-252-54-00014

I&C Electrical and Mechanical Warehouse / Girth Elevation-1

IC

NIGEL

11/07/13

MD1-0-A-252-54-00015

I&C Electrical and Mechanical Warehouse / Girth Elevation-2

IC

NIGEL

11/07/13

MD1-0-A-252-54-00016

I&C Electrical and Mechanical Warehouse / Girth Details

IC

NIGEL

11/07/13

MD1-0-A-252-54-00017

I&C Electrical and Mechanical Warehouse / Roof Walkway Framing Plan & Section

IC

NIGEL

11/07/13

MD1-0-A-252-54-00018

I&C Electrical and Mechanical Warehouse / Roof Walkway Detail

IC

NIGEL

11/07/13

MD1-0-A-252-54-00019

I&C Electrical and Mechanical Warehouse / Ladder Detail

IC

NIGEL

11/07/13

MD1-0-A-252-54-00020

I&C Electrical and Mechanical Warehouse / Steel Connection Detail-1

AC

NIGEL

11/07/13

MD1-0-A-252-54-00021

I&C Electrical and Mechanical Warehouse / Steel Connection Detail-2

AC

NIGEL

11/07/13

MD1-0-A-252-54-00022

I&C Electrical and Mechanical Warehouse / Steel Connection Detail-3

AC

NIGEL

11/07/13

MD1-0-A-252-54-00023

I&C Electrical and Mechanical Warehouse / Steel Connection Detail-4

AC

NIGEL

11/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-252-55-00002

I&C Electrical and Mechanical Warehouse/Design Calculation for Roof Drain

AUTHORISED
NIGEL

RECEIVED
21/03/13

MD1-0-A-254-51-00001

Administration Building/ Ground Floor Plan

NIGEL

28/11/12

MD1-0-A-254-51-00002

Administration Building/ 1st Floor Plan

NIGEL

28/11/12

MD1-0-A-254-51-00003

Administration Building/ 2nd Floor Plan

NIGEL

28/11/12

MD1-0-A-254-51-00004

Administration Building/ 3rd Floor Plan

NIGEL

28/11/12

MD1-0-A-254-51-00005

Administration Building/ 4th Floor Plan

NIGEL

28/11/12

MD1-0-A-254-51-00006

Administration Building/ Roof Floor Plan

NIGEL

28/11/12

MD1-0-A-254-51-00007

Administration Building/ East Elevation

NIGEL

28/11/12

MD1-0-A-254-51-00008

Administration Building/ West Elevation

NIGEL

28/11/12

MD1-0-A-254-51-00009

Administration Building/ South Elevation

NIGEL

28/11/12

MD1-0-A-254-51-00010

Administration Building/ North Elevation

NIGEL

28/11/12

MD1-0-A-254-51-00011

Administration Building/ Main Section-1

AC

NIGEL

24/10/12

MD1-0-A-254-51-00012

Administration Building/ Main Section-2

NIGEL

28/11/12

MD1-0-A-254-51-00013

Administration Building/ Main Section-3

AC

NIGEL

24/10/12

MD1-0-A-254-51-00014

Administration Building/ Interior Finish Schedule-1

NIGEL

28/11/12

MD1-0-A-254-51-00015

Administration Building/ Interior Finish Schedule-2

NIGEL

10/09/12

MD1-0-A-254-51-00016

Administration Building/ Interior Finish Schedule-3

NIGEL

10/09/12

MD1-0-A-254-51-00017

Administration Building/ Door Schedule

IC

NIGEL

28/11/12

MD1-0-A-254-51-00018

Administration Building/ Door & Window Schedule

IC

NIGEL

13/11/12

MD1-0-A-254-51-00034

Administration Building / Steel Ladder Detail

IC

NIGEL

17/07/13

MD1-0-A-254-52-00002

Administration Building/ Ground Floor Framing Plan

AC

NIGEL

28/01/13

MD1-0-A-254-52-00004

Administration Building/ 2nd Floor Framing Plan

AC

NIGEL

28/01/13

MD1-0-A-254-52-00005

Administration Building/ 3rd Floor Framing Plan

AC

NIGEL

28/01/13

MD1-0-A-254-52-00006

Administration Building/ 4th Floor Framing Plan

AC

NIGEL

28/01/13

MD1-0-A-254-52-00007

Administration Building/ Roof Framing Plan

AC

NIGEL

28/01/13

MD1-0-A-254-52-00020

Administration Building/ Stair Framing Plan & Detail-1

AC

NIGEL

23/10/12

MD1-0-A-254-52-00021

Administration Building/ Stair Framing Plan & Detail-2

AC

NIGEL

28/01/13

MD1-0-A-254-52-00022

Administration Building/ Stair Framing Plan & Detail-3

AC

NIGEL

23/10/12

MD1-0-A-254-52-00030

Administration Building/ Cable Trench Details

NIGEL

27/12/12

MD1-0-A-254-53-00001

Administration Building/ Foundation Rebar Detail-1

AC

NIGEL

25/10/12

MD1-0-A-254-53-00002

Administration Building/ Foundation Rebar Detail-2

AC

NIGEL

25/10/12

MD1-0-A-254-53-00003

Administration Building/ Foundation Rebar Detail-3

AC

NIGEL

25/10/12

MD1-0-A-254-53-00004

Administration Building/ Foundation Rebar Detail-4

AC

NIGEL

25/10/12

MD1-0-A-254-53-00005

Administration Building/ Foundation Rebar Detail-5

AC

NIGEL

25/10/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-254-53-00006

Administration Building/ Foundation Rebar Detail-6

AC

AUTHORISED
NIGEL

RECEIVED
25/10/12

MD1-0-A-254-53-00007

Administration Building/ Foundation Rebar Detail-7

AC

NIGEL

25/10/12

MD1-0-A-254-53-00008

Administration Building/ Foundation Rebar Detail-8

AC

NIGEL

25/10/12

MD1-0-A-254-53-00009

Administration Building/ Foundation Rebar Detail-9

AC

NIGEL

25/10/12

MD1-0-A-254-53-00010

Administration Building/ Foundation Rebar Detail-10

AC

NIGEL

25/10/12

MD1-0-A-254-53-00011

Administration Building/ Foundation Rebar Detail-11

AC

NIGEL

25/10/12

MD1-0-A-254-53-00012

Administration Building/ Foundation Rebar Detail-12

AC

NIGEL

25/10/12

MD1-0-A-254-53-00013

Administration Building/ Foundation Rebar Detail-13

AC

NIGEL

25/10/12

MD1-0-A-254-53-00014

Administration Building/ Foundation Rebar Detail-14

AC

NIGEL

25/10/12

MD1-0-A-254-53-00015

Administration Building/ Foundation Rebar Detail-15

AC

NIGEL

25/10/12

MD1-0-A-254-53-00016

Administration Building/ Foundation Rebar Detail-15

AC

NIGEL

25/10/12

MD1-0-A-254-53-00020

Administration Building/ Column Rebar Detail-1

AC

NIGEL

25/10/12

MD1-0-A-254-53-00021

Administration Building/ Column Rebar Detail-2

AC

NIGEL

25/10/12

MD1-0-A-254-53-00022

Administration Building/ Column Rebar Detail-3

AC

NIGEL

25/10/12

MD1-0-A-254-53-00023

Administration Building/ Column Rebar Details-4

AC

NIGEL

25/10/12

MD1-0-A-254-53-00024

Administration Building/ Column Rebar Details-5

AC

NIGEL

25/10/12

MD1-0-A-254-53-00025

Administration Building/ Column Rebar Details-6

AC

NIGEL

25/10/12

MD1-0-A-254-53-00026

Administration Building/ Column Rebar Details-7

AC

NIGEL

25/10/12

MD1-0-A-254-53-00027

Administration Building/ Colum Rebar Detail-8

NIGEL

31/01/13

MD1-0-A-254-53-00030

Administration Building/ Wall Rebar Details-1

NIGEL

31/01/13

MD1-0-A-254-53-00031

Administration Building/ Wall Rebar Details-2

NIGEL

31/01/13

MD1-0-A-254-53-00032

Administration Building/ Wall Rebar Details-3

NIGEL

31/01/13

MD1-0-A-254-53-00033

Administration Building/ Wall Rebar Details-4

NIGEL

31/01/13

MD1-0-A-254-53-00034

Administration Building/ Wall Rebar Details-5

NIGEL

31/01/13

MD1-0-A-254-53-00035

Administration Building/ Wall Rebar Details-6

NIGEL

31/01/13

MD1-0-A-254-53-00036

Administration Building/ Wall Rebar Details-7

NIGEL

31/01/13

MD1-0-A-254-53-00037

Administration Building/ Wall Rebar Details-8

NIGEL

31/01/13

MD1-0-A-254-53-00038

Administration Building/ Wall Rebar Details-9

NIGEL

31/01/13

MD1-0-A-254-53-00039

Administration Building/ Wall Rebar Details-10

NIGEL

31/01/13

MD1-0-A-254-53-00040

Administration Building/ Wall Rebar Details-11

NIGEL

31/01/13

MD1-0-A-254-53-00041

Administration Building/ Wall Rebar Details-12

NIGEL

31/01/13

MD1-0-A-254-53-00042

Administration Building/ Wall Rebar Details-13

NIGEL

31/01/13

MD1-0-A-254-53-00043

Administration Building/ Wall Rebar Details-14

NIGEL

31/01/13

MD1-0-A-254-53-00044

Administration Building/ Wall Rebar Details-15

NIGEL

31/01/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-254-53-00045

Administration Building/ Wall Rebar Details-16

AUTHORISED
NIGEL

RECEIVED
31/01/13

MD1-0-A-254-53-00046

Administration Building/ Wall Rebar Details-17

NIGEL

31/01/13

MD1-0-A-254-53-00050

Administration Building/ Ground Floor Girder Rebar Details-1

AC

NIGEL

06/12/12

MD1-0-A-254-53-00051

Administration Building/ Ground Floor Girder Rebar Details-2

AC

NIGEL

06/12/12

MD1-0-A-254-53-00052

Administration Building/ Ground Floor Girder Rebar Details-3

AC

NIGEL

06/12/12

MD1-0-A-254-53-00053

Administration Building/ Ground Floor Girder Rebar Details-4

AC

NIGEL

25/10/12

MD1-0-A-254-53-00054

Administration Building/ Ground Floor Girder Rebar Details-5

NIGEL

31/01/13

MD1-0-A-254-53-00055

Administration Building/ Ground Floor Girder Rebar Details-6

AC

NIGEL

25/10/12

MD1-0-A-254-53-00056

Administration Building/ Ground Floor Girder Rebar Details-7

AC

NIGEL

25/10/12

MD1-0-A-254-53-00057

Administration Building/ Ground Floor Girder Rebar Details-8

AC

NIGEL

06/12/12

MD1-0-A-254-53-00058

Administration Building/ Ground Floor Girder Rebar Details-9

AC

NIGEL

06/12/12

MD1-0-A-254-53-00062

Administration Building/ 1st Floor Girder Rebar Details-1

AC

NIGEL

25/10/12

MD1-0-A-254-53-00063

Administration Building/ 1st Floor Girder Rebar Details-2

AC

NIGEL

06/12/12

MD1-0-A-254-53-00064

Administration Building/ 1st Floor Girder Rebar Details-3

AC

NIGEL

06/12/12

MD1-0-A-254-53-00065

Administration Building/ 1st Floor Girder Rebar Details-4

AC

NIGEL

06/12/12

MD1-0-A-254-53-00066

Administration Building/ 1st Floor Girder Rebar Details-5

AC

NIGEL

25/10/12

MD1-0-A-254-53-00067

Administration Building/ 1st Floor Girder Rebar Details-6

AC

NIGEL

25/10/12

MD1-0-A-254-53-00068

Administration Building/ 1st Floor Girder Rebar Details-7

AC

NIGEL

25/10/12

MD1-0-A-254-53-00069

Administration Building/ 1st Floor Girder Rebar Details-8

NIGEL

31/01/13

MD1-0-A-254-53-00071

Administration Building/ 2nd Floor Girder Rebar Details-1

AC

NIGEL

06/12/12

MD1-0-A-254-53-00072

Administration Building/ 2nd Floor Girder Rebar Details-2

AC

NIGEL

06/12/12

MD1-0-A-254-53-00073

Administration Building/ 2nd Floor Girder Rebar Details-3

AC

NIGEL

06/12/12

MD1-0-A-254-53-00074

Administration Building/ 2nd Floor Girder Rebar Details-4

AC

NIGEL

06/12/12

MD1-0-A-254-53-00075

Administration Building/ 2nd Floor Girder Rebar Details-5

AC

NIGEL

06/12/12

MD1-0-A-254-53-00076

Administration Building/ 2nd Floor Girder Rebar Details-6

AC

NIGEL

25/10/12

MD1-0-A-254-53-00079

Administration Building/ 3rd Floor Girder Rebar Details-1

AC

NIGEL

25/10/12

MD1-0-A-254-53-00080

Administration Building/ 3rd Floor Girder Rebar Details-2

AC

NIGEL

25/10/12

MD1-0-A-254-53-00081

Administration Building/ 3rd Floor Girder Rebar Details-3

AC

NIGEL

25/10/12

MD1-0-A-254-53-00082

Administration Building/ 3rd Floor Girder Rebar Details-4

AC

NIGEL

06/12/12

MD1-0-A-254-53-00083

Administration Building/ 3rd Floor Girder Rebar Details-5

AC

NIGEL

25/10/12

MD1-0-A-254-53-00084

Administration Building/ 3rd Floor Girder Rebar Details-6

AC

NIGEL

25/10/12

MD1-0-A-254-53-00087

Administration Building/ 4th Floor Girder Rebar Details-1

AC

NIGEL

25/10/12

MD1-0-A-254-53-00088

Administration Building/ 4th Floor Girder Rebar Details-2

AC

NIGEL

25/10/12

MD1-0-A-254-53-00089

Administration Building/ 4th Floor Girder Rebar Details-3

AC

NIGEL

25/10/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-254-53-00090

Administration Building/ 4th Floor Girder Rebar Details-4

AC

AUTHORISED
NIGEL

RECEIVED
06/12/12

MD1-0-A-254-53-00091

Administration Building/ 4th Floor Girder Rebar Details-5

AC

NIGEL

06/12/12

MD1-0-A-254-53-00092

Administration Building/ 4th Floor Girder Rebar Details-6

AC

NIGEL

25/10/12

MD1-0-A-254-53-00093

Administration Building/ 4th Floor Girder Rebar Details-7

AC

NIGEL

25/10/12

MD1-0-A-254-53-00096

Administration Building/ Roof Floor Girder Rebar Details-1

AC

NIGEL

25/10/12

MD1-0-A-254-53-00097

Administration Building/ Roof Floor Girder Rebar Details-2

AC

NIGEL

25/10/12

MD1-0-A-254-53-00098

Administration Building/ Roof Floor Girder Rebar Details-3

AC

NIGEL

25/10/12

MD1-0-A-254-53-00099

Administration Building/ Roof Floor Girder Rebar Details-4

AC

NIGEL

25/10/12

MD1-0-A-254-53-00100

Administration Building/ Ground Floor Slab Rebar Details-1 (T.O.C EL +0.750)

NIGEL

31/01/13

MD1-0-A-254-53-00101

Administration Building/ Ground Floor Slab Rebar Details-2 (T.O.C EL +0.750)

NIGEL

31/01/13

MD1-0-A-254-53-00102

Administration Building/ Ground Floor Slab Rebar Details-3 (T.O.C EL +0.750)

NIGEL

31/01/13

MD1-0-A-254-53-00103

Administration Building/ Ground Floor Slab Rebar Details-4 (T.O.C EL +0.450)

NIGEL

31/01/13

MD1-0-A-254-53-00104

Administration Building/ 1st Floor Slab Rebar Details-1 (T.O.C EL +5.250)

AC

NIGEL

25/10/12

MD1-0-A-254-53-00105

Administration Building/ 1st Floor Slab Rebar Details-2 (T.O.C EL +5.250)

NIGEL

31/01/13

MD1-0-A-254-53-00106

Administration Building/ 1st Floor Slab Rebar Details-3 (T.O.C EL +5.250)

AC

NIGEL

25/10/12

MD1-0-A-254-53-00107

Administration Building/ 1st Floor Slab Rebar Details-4 (T.O.C EL +6.250)

NIGEL

31/01/13

MD1-0-A-254-53-00108

Administration Building/ 2nd Floor Slab Rebar Details-1 (T.O.C EL +9.450)

NIGEL

31/01/13

MD1-0-A-254-53-00109

Administration Building/ 2nd Floor Slab Rebar Details-2 (T.O.C EL +9.450)

NIGEL

31/01/13

MD1-0-A-254-53-00110

Administration Building/ 2nd Floor Slab Rebar Details-3 (T.O.C EL +9.450)

NIGEL

31/01/13

MD1-0-A-254-53-00111

Administration Building/ 3rd Floor Slab Rebar Details-1 (T.O.C EL +13.650)

AC

NIGEL

25/10/12

MD1-0-A-254-53-00112

Administration Building/ 3rd Floor Slab Rebar Details-2 (T.O.C EL +13.650)

NIGEL

31/01/13

MD1-0-A-254-53-00113

Administration Building/ 3rd Floor Slab Rebar Details-3 (T.O.C EL +13.650)

NIGEL

31/01/13

MD1-0-A-254-53-00114

Administration Building/ 4th Floor Slab Rebar Details-1 (T.O.C EL +17.850)

NIGEL

31/01/13

MD1-0-A-254-53-00115

Administration Building/ 4th Floor Slab Rebar Details-2 (T.O.C EL +17.850)

NIGEL

31/01/13

MD1-0-A-254-53-00116

Administration Building/ 4th Floor Slab Rebar Details-3 (T.O.C EL +17.850)

NIGEL

31/01/13

MD1-0-A-254-53-00117

Administration Building/ Roof Floor Slab Rebar Details-1 (T.O.C EL +21.450)

NIGEL

31/01/13

MD1-0-A-254-53-00118

Administration Building/ Roof Floor Slab Rebar Details-2 (T.O.C EL +21.450)

NIGEL

31/01/13

MD1-0-A-254-53-00120

Administration Building/ Stair Rebar Detail-1

NIGEL

31/01/13

MD1-0-A-254-53-00121

Administration Building/ Stair Rebar Detail-2

NIGEL

31/01/13

MD1-0-A-254-53-00122

Administration Building/ Stair Rebar Detail-3

NIGEL

31/01/13

MD1-0-A-254-53-00130

Administration Building/ Cable Trench Rebar Details

IC

NIGEL

07/03/13

MD1-0-A-254-54-00002

Administration Building/ "SB1" Steel Structural Detail-2

NIGEL

27/12/12

MD1-0-A-254-54-00003

Administration Building/ "SB1" Steel Structural Detail-3

NIGEL

27/12/12

MD1-0-A-254-54-00004

Administration Building/ "SB1" Steel Structural Detail-4

NIGEL

27/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-A-254-55-00001

Administration Building/ Structurual Calculation Sheets

AUTHORISED
NIGEL

RECEIVED
30/01/13

MD1-0-A-255-53-00022

Common Service Building / Equipment Foundation Rebar Details

IC

NIGEL

16/07/13

MD1-0-A-255-55-00001

Common Service Building/ Structural Calculation Sheets

AC

NIGEL

28/01/13

MD1-0-A-257-51-00004

Car Garage-1 / Interior Finish Schedule

NIGEL

11/07/13

MD1-0-A-258-51-00001

Car Garage-2 / Ground Floor Plan & Roof Plan

AC

NIGEL

11/07/13

MD1-0-A-258-51-00002

Car Garage-2 / Elevations

AC

NIGEL

11/07/13

MD1-0-A-258-51-00003

Car Garage-2 / Main Sections

AC

NIGEL

11/07/13

MD1-0-A-258-51-00004

Car Garage-2 / Interior Finish Schedule

NIGEL

11/07/13

MD1-0-A-259-51-00001

Car Garage-3/ Ground Floor Plan

NIGEL

04/03/13

MD1-0-A-259-51-00002

Car Garage-3/ Roof Plan

NIGEL

04/03/13

MD1-0-A-259-51-00003

Car Garage-3/ Elevations

NIGEL

04/03/13

MD1-0-A-259-51-00004

Car Garage-3/ Main Sections

NIGEL

04/03/13

MD1-0-A-259-51-00005

Car Garage-3/ Interior Finish Schedule, Door & Window Schedule

IC

NIGEL

04/03/13

MD1-0-A-259-52-00001

Car garage-3 / foundation & column plan

AC

NIGEL

25/06/13

MD1-0-A-259-52-00002

Car garage-3 / ground floor framing plan & details

NIGEL

25/06/13

MD1-0-A-259-52-00003

Car garage-3 / roof floor framing plan

NIGEL

25/06/13

MD1-0-A-259-52-00004

Car garage-3 / framing sections-1

NIGEL

25/06/13

MD1-0-A-259-52-00005

Car garage-3 / framing sections-2

NIGEL

25/06/13

MD1-0-A-259-53-00001

Car Garage-3 / Foundation Rebar Details-1

NIGEL

25/06/13

MD1-0-A-259-53-00002

Car Garage-3 / Foundation Rebar Details-2

NIGEL

25/06/13

MD1-0-A-259-53-00003

Car Garage-3 / Column Rebar Details

NIGEL

25/06/13

MD1-0-A-259-53-00004

Car Garage-3 / Girder Rebar Details-1

NIGEL

25/06/13

MD1-0-A-259-53-00005

Car Garage-3 / Girder Rebar Details-2

NIGEL

25/06/13

MD1-0-A-259-53-00006

Car Garage-3 / Girder Rebar Details-3

NIGEL

25/06/13

MD1-0-A-259-53-00008

Car Garage-3 / Ground Floor Slab Rebar Plan & Section

IC

NIGEL

25/06/13

MD1-0-A-259-53-00009

Car Garage-3 / Roof Floor Slab Rebar Plan & Section

IC

NIGEL

25/06/13

MD1-0-C-070-06-00010

Calculation for Geotechnical and Structural Capacity of Bored Pile (D=800)

NIGEL

31/10/12

MD1-0-C-070-06-00020

Calculation for Geotechnical and Structural Capacity of PC Pile (D=400)

AC

NIGEL

26/11/12

MD1-0-C-070-07-00010

Site Classification Report for Seismic Design

NIGEL

28/11/12

MD1-0-C-160-01-00010

Boiler Unit#1 Foundation Arrangement Plan

NIGEL

08/01/13

MD1-0-C-160-01-00011

Boiler Unit #2 Foundation Arrangement Plan

NIGEL

08/01/13

MD1-0-C-160-01-00020

Boiler Unit#1 Pile Arrangement Plan

NIGEL

08/01/13

MD1-0-C-160-01-00021

Boiler Unit #2 Soil Replacement Plan & Section (1)

NIGEL

08/01/13

MD1-0-C-160-01-00022

Boiler Unit #2 Soil Replacement Plan & Section (2)

NIGEL

08/01/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-C-160-01-00023

Boiler Unit #2 Soil Replacement Plan & Section (3)

AUTHORISED
NIGEL

RECEIVED
08/01/13

MD1-0-C-160-01-00040

Boiler Unit#1 Construction Joint Plan

NIGEL

08/01/13

MD1-0-C-160-01-00041

Boiler Unit #2 Construction Joint Plan

NIGEL

08/01/13

MD1-0-C-160-01-00090

Boiler Unit#1 S.A Fan Foundation Plan & Section

NIGEL

08/01/13

MD1-0-C-160-01-00100

Boiler Unit #2 S.A Fan Foundation Plan & Section

NIGEL

08/01/13

MD1-0-C-160-01-00140

Boiler Unit#1 P.A Fan Foundation Plan & Section

NIGEL

08/01/13

MD1-0-C-160-01-00150

Boiler Unit #2 P.A Fan Foundation Plan & Section

NIGEL

08/01/13

MD1-0-C-160-01-00240

Boiler Unit#1 Miscellaneous Equipment Foundation Plan & Section

NIGEL

08/01/13

MD1-0-C-160-01-00250

Boiler Unit #2 Miscellaneous Equipment Foundation Plan & Section

NIGEL

08/01/13

MD1-0-C-160-01-00300

Boiler Unit#1 PA and SA Ducts Foundation Plan & Section

NIGEL

08/01/13

MD1-0-C-160-01-00350

Boiler Unit #2 PA and SA Ducts Foundation Plan & Section

NIGEL

08/01/13

MD1-0-C-160-11-00010

Boiler Unit #1 Foundation Detail (1)

NIGEL

08/01/13

MD1-0-C-160-11-00011

Boiler Unit #1 Foundation Detail (2)

NIGEL

08/01/13

MD1-0-C-160-11-00012

Boiler Unit #1 Foundation Detail (3)

NIGEL

08/01/13

MD1-0-C-160-11-00013

Boiler Unit #1 Foundation Detail (4)

NIGEL

08/01/13

MD1-0-C-160-11-00014

Boiler Unit #1 Foundation Detail (5)

NIGEL

08/01/13

MD1-0-C-160-11-00015

Boiler Unit #1 Foundation Detail (6)

NIGEL

08/01/13

MD1-0-C-160-11-00020

Boiler Unit #2 Foundation Detail (1)

NIGEL

08/01/13

MD1-0-C-160-11-00021

Boiler Unit #2 Foundation Detail (2)

NIGEL

08/01/13

MD1-0-C-160-11-00022

Boiler Unit #2 Foundation Detail (3)

NIGEL

08/01/13

MD1-0-C-160-11-00023

Boiler Unit #2 Foundation Detail (4)

NIGEL

08/01/13

MD1-0-C-160-11-00024

Boiler Unit #2 Foundation Detail (5)

NIGEL

08/01/13

MD1-0-C-160-11-00025

Boiler Unit #2 Foundation Detail (6)

NIGEL

08/01/13

MD1-0-C-160-53-00010

Boiler Unit #1 Foundation Reinforcement Plan (1)

NIGEL

08/01/13

MD1-0-C-160-53-00011

Boiler Unit #1 Foundation Reinforcement Plan (2)

NIGEL

08/01/13

MD1-0-C-160-53-00012

Boiler Unit #1 Foundation Reinforcement Plan (3)

NIGEL

08/01/13

MD1-0-C-160-53-00020

Boiler Unit #2 Foundation Reinforcement Plan(1)

NIGEL

08/01/13

MD1-0-C-160-53-00021

Boiler Unit #2 Foundation Reinforcement Plan(2)

NIGEL

08/01/13

MD1-0-C-160-53-00022

Boiler Unit #2 Foundation Reinforcement Plan(3)

NIGEL

08/01/13

MD1-0-C-160-53-00023

Boiler Unit #2 Foundation Reinforcement Plan(4)

NIGEL

08/01/13

MD1-0-C-160-53-00030

Boiler Unit #1 Foundation Reinforcement Section & Detail (1)

NIGEL

08/01/13

MD1-0-C-160-53-00032

Boiler Unit #1 Foundation Reinforcement Section & Detail (3)

NIGEL

08/01/13

MD1-0-C-160-53-00033

Boiler Unit #1 Foundation Reinforcement Section & Detail (4)

NIGEL

08/01/13

MD1-0-C-160-53-00034

Boiler Unit #1 Foundation Reinforcement Section & Detail (5)

NIGEL

08/01/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-C-160-53-00035

Boiler Unit #1 Foundation Reinforcement Section & Detail (6)

AUTHORISED
NIGEL

RECEIVED
08/01/13

MD1-0-C-160-53-00036

Boiler Unit #1 Foundation Reinforcement Section & Detail (7)

NIGEL

08/01/13

MD1-0-C-160-53-00037

Boiler Unit #1 Foundation Reinforcement Section & Detail (8)

NIGEL

08/01/13

MD1-0-C-160-53-00038

Boiler Unit #1 Foundation Reinforcement Section & Detail (9)

NIGEL

08/01/13

MD1-0-C-160-53-00039

Boiler Unit #1 Foundation Reinforcement Section & Detail (10)

NIGEL

08/01/13

MD1-0-C-160-53-00042

Boiler Unit #2 Foundation Reinforcement Section & Detail (3)

NIGEL

08/01/13

MD1-0-C-160-53-00043

Boiler Unit #2 Foundation Reinforcement Section & Detail (4)

NIGEL

08/01/13

MD1-0-C-160-53-00044

Boiler Unit #2 Foundation Reinforcement Section & Detail (5)

NIGEL

08/01/13

MD1-0-C-160-53-00045

Boiler Unit #2 Foundation Reinforcement Section & Detail (6)

NIGEL

08/01/13

MD1-0-C-160-53-00046

Boiler Unit #2 Foundation Reinforcement Section & Detail (7)

NIGEL

08/01/13

MD1-0-C-160-53-00047

Boiler Unit #2 Foundation Reinforcement Section & Detail (8)

NIGEL

08/01/13

MD1-0-C-160-53-00048

Boiler Unit #2 Foundation Reinforcement Section & Detail (9)

NIGEL

08/01/13

MD1-0-C-160-53-00049

Boiler Unit #2 Foundation Reinforcement Section & Detail (10)

NIGEL

08/01/13

MD1-0-C-160-53-00100

Boiler Unit #1 S.A Fan Foundation Reinforcement Detail (1)

NIGEL

08/01/13

MD1-0-C-160-53-00101

Boiler Unit #1 S.A Fan Foundation Reinforcement Detail (2)

NIGEL

08/01/13

MD1-0-C-160-53-00110

Boiler Unit #2 S.A Fan Foundation Reinforcement Detail(1)

NIGEL

08/01/13

MD1-0-C-160-53-00111

Boiler Unit #2 S.A Fan Foundation Reinforcement Detail (2)

NIGEL

08/01/13

MD1-0-C-160-53-00150

Boiler Unit #1 P.A Fan Foundation Reinforcement Detail (1)

NIGEL

08/01/13

MD1-0-C-160-53-00151

Boiler Unit #1 P.A Fan Foundation Reinforcement Detail (2)

NIGEL

08/01/13

MD1-0-C-160-53-00160

Boiler Unit #2 P.A Fan Foundation Reinforcement Detail (1)

NIGEL

08/01/13

MD1-0-C-160-53-00161

Boiler Unit #2 P.A Fan Foundation Reinforcement Detail (2)

NIGEL

08/01/13

MD1-0-C-160-53-00250

Boiler Unit #1 Miscellaneous Equipment Foundation Reinforcement Detail

NIGEL

08/01/13

MD1-0-C-160-53-00251

Boiler Unit #2 Miscellaneous Equipment foundation Reinforcement Detail

NIGEL

08/01/13

MD1-0-C-163-01-00010

I.D FAN UNIT#1A PILE ARRANGEMENT PLAN

RT

NIGEL

27/05/13

MD1-0-C-163-01-00011

I.D FAN UNIT#1B PILE ARRANGEMENT PLAN

RT

NIGEL

06/03/13

MD1-0-C-163-01-00012

I.D FAN UNIT#1A FOUNDATION PLAN

RT

NIGEL

27/05/13

MD1-0-C-163-01-00013

I.D FAN UNIT#1B FOUNDATION PLAN

RT

NIGEL

06/05/13

MD1-0-C-163-01-00014

I.D FAN UNIT#1B FOUNDATION PLAN

RT

NIGEL

06/05/13

MD1-0-C-163-01-00015

I.d fan unit#2b foundation plan & section

RT

NIGEL

06/05/13

MD1-0-C-163-06-00010

CALCULATION FOR I.D FAN FOUNDATION

RT

NIGEL

27/05/13

MD1-0-C-163-06-00020

Calculation for i.d fan unit#1b, #2(a,b) foundation

RT

NIGEL

06/05/13

MD1-0-C-163-11-00010

I.D FAN FOUNDATION SECTION & DETAIL

RT

NIGEL

27/05/13

MD1-0-C-163-11-00011

I.d fan unit#1b foundation section & detail

RT

NIGEL

06/05/13

MD1-0-C-163-11-00012

I.d fan unit#2a foundation section & detail

RT

NIGEL

06/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-C-163-11-00013

I.d fan unit#2b foundation section & detail

RT

AUTHORISED
NIGEL

RECEIVED
06/05/13

MD1-0-C-163-53-00010

I.d fan unit#1a foundation reinforcement detail (1)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00011

I.d fan unit#1a foundation reinforcement detail (2)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00012

I.d fan unit#1a foundation reinforcement detail (3)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00013

I.d fan unit#1a foundation reinforcement detail (4)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00014

I.d fan unit#1a foundation reinforcement detail (5)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00020

I.d fan unit#2a foundation reinforcement detail (1)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00021

I.d fan unit#2a foundation reinforcement detail (2)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00022

I.d fan unit#2a foundation reinforcement detail (3)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00023

I.d fan unit#2a foundation reinforcement detail (4)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00024

I.d fan unit#2a foundation reinforcement detail (5)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00030

I.d fan unit#1b, #2b foundation reinforcement detail (1)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00031

I.d fan unit#1b, #2b foundation reinforcement detail (2)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00032

I.d fan unit#1b, #2b foundation reinforcement detail (3)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00033

I.d fan unit#1b, #2b foundation reinforcement detail (4)

RT

NIGEL

27/05/13

MD1-0-C-163-53-00034

I.d fan unit#1b, #2b foundation reinforcement detail (5)

RT

NIGEL

27/05/13

MD1-0-C-171-01-00100

Coal runoff pond plan & section

AC

NIGEL

03/07/13

MD1-0-C-171-01-00150

Coal Stock Area (No.1-1) Pile Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00151

Coal Stock Area (No.1-2) Pile Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00152

Coal Stock Area (No.2-1) Pile Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00153

Coal Stock Area (No.2-2) Pile Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00155

Coal Stock Area (No.3-2) Pile Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00156

Coal Stock Area (No.4-1) Pile Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00157

Coal Stock Area (No.4-2) Pile Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00158

Coal Stock Area (No.1-4) Pile & Pile Load Test Schedule

NIGEL

05/03/13

MD1-0-C-171-01-00160

Coal Stock Area (No.1-1) Pile Cap Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00161

Coal Stock Area (No.1-2) Pile Cap Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00162

Coal Stock Area (No.2-1) Pile Cap Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00163

Coal Stock Area (No.2-2) Pile Cap Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00165

Coal Stock Area (No.3-2) Pile Cap Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00166

Coal Stock Area (No.4-1) Pile Cap Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00167

Coal Stock Area (No.4-2) Pile Cap Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00170

Coal Stock Area (No.1) Construction Joint Arrangement Plan

NIGEL

05/03/13

MD1-0-C-171-01-00171

Coal Stock Area (No.2) Construction Joint Arrangement Plan

NIGEL

05/03/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-C-171-01-00173

Coal Stock Area (No.4) Construction Joint Arrangement Plan

AUTHORISED
NIGEL

RECEIVED
05/03/13

MD1-0-C-171-01-00200

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Overall Plan

NIGEL

27/06/13

MD1-0-C-171-01-00201

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Plan(1)

NIGEL

27/06/13

MD1-0-C-171-01-00202

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Plan(2)

NIGEL

27/06/13

MD1-0-C-171-01-00203

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Plan(3)

NIGEL

27/06/13

MD1-0-C-171-01-00204

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Plan(4)

NIGEL

27/06/13

MD1-0-C-171-01-00205

Coal Stock Area Equipment FDN Pile Schedule & Pile Load Test Schedule

NIGEL

27/06/13

MD1-0-C-171-01-00206

Coal Stock Area Stacker/ Reclaimer Pile Arrangement Detail-1

NIGEL

27/06/13

MD1-0-C-171-01-00207

Coal Stock Area Stacker/ Reclaimer Pile Arrangement Detail-2

NIGEL

27/06/13

MD1-0-C-171-01-00208

Coal Stock Area Stacker/ Reclaimer Pile Arrangement Section-1

NIGEL

27/06/13

MD1-0-C-171-01-00209

Coal Stock Area Stacker/ Reclaimer Pile Arrangement Section-2

NIGEL

27/06/13

MD1-0-C-171-01-00210

Coal stock belt conveyor end of bc08, bc11 pile arrangement plan & section

AC

NIGEL

19/03/13

MD1-0-C-171-01-00211

Coal stock belt conveyor end of bc09, bc10 pile arrangement plan & section

AC

NIGEL

19/03/13

MD1-0-C-171-06-00010

Calculation for Coal Stock Area Foundation

NIGEL

05/03/13

MD1-0-C-171-06-00020

Calculation for coal runoff pond structure

AC

NIGEL

03/07/13

MD1-0-C-171-06-00030

Calculation for Coal Stock Area Equipment Foundation

NIGEL

27/06/13

MD1-0-C-171-06-00040

Calculation for coal belt conveyor foundation

AC

NIGEL

02/07/13

MD1-0-C-171-11-00075

Coal Stock Area FDN Shear Reinforcement Detail

NIGEL

05/03/13

MD1-0-C-171-11-00105

Coal stock belt conveyor end of bc08, bc11 foundation plan, section & detail

AC

NIGEL

19/03/13

MD1-0-C-171-11-00106

Coal stock belt conveyor end of bc09, bc10 foundation plan, section & detail

AC

NIGEL

19/03/13

MD1-0-C-171-11-00310

Belt conveyor bc-01a/b pile arrangement plan

AC

NIGEL

02/07/13

MD1-0-C-171-11-00311

Belt conveyor bc-01a/b foundation detail-1

AC

NIGEL

02/07/13

MD1-0-C-171-11-00312

Belt conveyor bc-01a/b foundation detail-2

AC

NIGEL

02/07/13

MD1-0-C-171-11-00313

Belt conveyor bc-01a/b foundation detail-3

AC

NIGEL

02/07/13

MD1-0-C-171-11-00314

Belt conveyor bc-01a/b foundation detail-4

AC

NIGEL

02/07/13

MD1-0-C-171-11-00315

Belt conveyor bc-01a/b foundation detail-5

AC

NIGEL

02/07/13

MD1-0-C-171-11-00316

Belt conveyor bc-01a/b foundation detail-6

AC

NIGEL

02/07/13

MD1-0-C-171-11-00320

Belt conveyor bc-02a/b foundation plan

NIGEL

02/07/13

MD1-0-C-171-11-00321

Belt conveyor bc-02a/b foundation detail-1

NIGEL

02/07/13

MD1-0-C-171-11-00322

Belt conveyor bc-02a/b foundation detail-2

NIGEL

02/07/13

MD1-0-C-171-11-00330

Belt conveyor bc-03a/b pile arrangement plan

NIGEL

02/07/13

MD1-0-C-171-11-00331

Belt conveyor bc-03a/b foundation detail-1

NIGEL

02/07/13

MD1-0-C-171-11-00332

Belt conveyor bc-03a/b foundation detail-2

NIGEL

02/07/13

MD1-0-C-171-11-00333

Belt conveyor bc-03a/b foundation detail-3

NIGEL

02/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-C-171-11-00334

Belt conveyor bc-03a/b foundation detail-4

AUTHORISED
NIGEL

RECEIVED
02/07/13

MD1-0-C-171-11-00335

Belt conveyor bc-03a/b foundation detail-5

AC

NIGEL

02/07/13

MD1-0-C-171-11-00340

Belt conveyor bc-05a/b foundation plan

NIGEL

02/07/13

MD1-0-C-171-11-00341

Belt conveyor bc-05a/b foundation detail

NIGEL

02/07/13

MD1-0-C-171-11-00350

Belt conveyor bc-06a/b foundation plan

NIGEL

02/07/13

MD1-0-C-171-11-00351

Belt conveyor bc-06a/b foundation detail-1

NIGEL

02/07/13

MD1-0-C-171-11-00352

Belt conveyor bc-06a/b foundation detail-2

NIGEL

02/07/13

MD1-0-C-171-11-00360

Belt conveyor bc-08 & bc-11 foundation plan

NIGEL

02/07/13

MD1-0-C-171-11-00361

Belt conveyor bc-08 & bc-11 foundation detail

AC

NIGEL

02/07/13

MD1-0-C-171-11-00370

Belt conveyor bc-09 & bc-10 foundation plan

NIGEL

02/07/13

MD1-0-C-171-11-00371

Belt conveyor bc-09 & bc-10 foundation detail

AC

NIGEL

02/07/13

MD1-0-C-171-53-00110

Coal runoff pond re-bar plan & section (1)

RT

NIGEL

03/07/13

MD1-0-C-171-53-00111

Coal runoff pond re-bar plan & section (2)

RT

NIGEL

03/07/13

MD1-0-C-171-53-00150

Coal Stock Area FDN. (No.1-1) Slab Rebar Plan

NIGEL

05/03/13

MD1-0-C-171-53-00151

Coal Stock Area FDN. (No.1-2) Slab Re-bar Plan

NIGEL

05/03/13

MD1-0-C-171-53-00152

Coal Stock Area FDN. (No.2-1) Reinforcement Plan

NIGEL

05/03/13

MD1-0-C-171-53-00153

Coal Stock Area FDN. (No.2-2) Reinforcement Plan

NIGEL

05/03/13

MD1-0-C-171-53-00155

Coal Stock Area FDN. (No.3-1) Reinforcement Plan

NIGEL

05/03/13

MD1-0-C-171-53-00156

Coal Stock Area FDN. (No.4-1) Reinforcement Plan

NIGEL

05/03/13

MD1-0-C-171-53-00157

Coal Stock Area FDN. (No.4-2) Reinforcement Plan

NIGEL

05/03/13

MD1-0-C-171-53-00208

Coal stock belt conveyor end of bc08, bc11 foundation re-bar plan & section

RT

NIGEL

06/05/13

MD1-0-C-171-53-00209

Coal stock belt conveyor end of bc09, bc10 foundation re-bar plan & section

RT

NIGEL

06/05/13

MD1-0-C-171-53-00310

Belt conveyor bc-01 a/b foundation re-bar detail -1

AC

NIGEL

02/07/13

MD1-0-C-171-53-00311

Belt conveyor bc-01 a/b foundation re-bar detail -2

AC

NIGEL

02/07/13

MD1-0-C-171-53-00312

Belt conveyor bc-01 a/b foundation re-bar detail -3

AC

NIGEL

02/07/13

MD1-0-C-171-53-00313

Belt conveyor bc-01 a/b foundation re-bar detail -4

AC

NIGEL

02/07/13

MD1-0-C-171-53-00314

Belt conveyor bc-01 a/b foundation re-bar detail -5

AC

NIGEL

02/07/13

MD1-0-C-171-53-00315

Belt conveyor bc-01 a/b foundation re-bar detail-6

AC

NIGEL

02/07/13

MD1-0-C-171-53-00320

Belt conveyor bc-02 a/b foundation re-bar detail -1

NIGEL

02/07/13

MD1-0-C-171-53-00330

Belt conveyor bc-03 a/b foundation re-bar detail -1

NIGEL

02/07/13

MD1-0-C-171-53-00331

Belt conveyor bc-03 a/b foundation re-bar detail -2

NIGEL

02/07/13

MD1-0-C-171-53-00332

Belt conveyor bc-03 a/b foundation re-bar detail -3

NIGEL

02/07/13

MD1-0-C-171-53-00333

Belt conveyor bc-03 a/b foundation re-bar detail -4

NIGEL

02/07/13

MD1-0-C-171-53-00340

Belt conveyor bc-05 a/b foundation re-bar detail -1

NIGEL

02/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-C-171-53-00350

Belt conveyor bc-06 a/b foundation re-bar detail -1

AUTHORISED
NIGEL

RECEIVED
02/07/13

MD1-0-C-171-53-00370

Belt conveyor bc-09 & bc-10 foundation re-bar detail -1

NIGEL

02/07/13

MD1-0-C-172-01-00010

Limestone Grinding House Mechanical FDN. Pile Arragement Plan

AC

NIGEL

10/06/13

MD1-0-C-172-01-00011

Limestone Grinding House Mechanical Foundation Plan

AC

NIGEL

10/06/13

MD1-0-C-172-01-00020

Limestone grinding house steel structure pile arrangement plan

AC

NIGEL

26/07/13

MD1-0-C-172-01-00030

Limestone Grinding House Pit Structure Plan

AC

NIGEL

28/06/13

MD1-0-C-172-01-00040

Limestone handling system tower lt-01 & conveyor l-02 fdn. & pile arrange plan

RT

NIGEL

27/05/13

MD1-0-C-172-01-00041

Limestone handling system tower lt-02 & conveyor l-03 fdn. & pile arrange plan

RT

NIGEL

27/05/13

MD1-0-C-172-01-00042

Limestone handling system tower lt-03 & conveyor l-04 fdn. & pile arrange plan

RT

NIGEL

27/05/13

MD1-0-C-172-01-00043

Limestone handling system tower lt-04 & conveyor l-05 fdn. & pile arrange plan

RT

NIGEL

27/05/13

MD1-0-C-172-01-00044

Limestone handling system transfer tower lt-01 foundation details (1)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00045

Limestone handling system transfer tower lt-02 foundation details (1)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00046

Limestone handling system transfer tower lt-03 foundation details (1)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00047

Limestone handling system transfer tower lt-04 foundation details (1)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00048

Limestone handling system belt conveyor l-02 foudation details (1)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00049

Limestone handling system belt conveyor l-02 foudation details (2)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00050

Limestone handling system belt conveyor l-02 foudation details (3)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00051

Limestone handling system belt conveyor l-02 foudation details (4)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00052

Limestone handling system belt conveyor l-02 foudation details (5)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00053

Limestone handling system belt conveyor l-03 foudation details (1)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00054

Limestone handling system belt conveyor l-03 foudation details (2)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00055

Limestone handling system belt conveyor l-03 foudation details (3)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00056

Limestone handling system belt conveyor l-03 foudation details (4)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00057

Limestone handling system belt conveyor l-04 foudation details (1)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00058

Limestone handling system belt conveyor l-04 foudation details (2)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00059

Limestone handling system belt conveyor l-04 foudation details (3)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00060

Limestone handling system belt conveyor l-04 foudation details (4)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00061

Limestone handling system belt conveyor l-05 foudation details (1)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00062

Limestone handling system belt conveyor l-05 foudation details (2)

RT

NIGEL

27/05/13

MD1-0-C-172-01-00063

Limestone handling system belt conveyor l-05 foudation details (3)

RT

NIGEL

27/05/13

MD1-0-C-172-06-00010

Calculation for Limestone Grinding House Pit Structure

AC

NIGEL

28/06/13

MD1-0-C-172-06-00011

Calculation for limestone transfer tower foundation lt-01, lt-02, lt-03 and lt-4

RT

NIGEL

27/05/13

MD1-0-C-172-06-00013

Calculation for limestone belt conveyor foundation bc-02

RT

NIGEL

27/05/13

MD1-0-C-172-06-00014

Calculation for limestone belt conveyor foundation bc-03

RT

NIGEL

27/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-C-172-06-00015

Calculation for limestone belt conveyor foundation bc-04

RT

AUTHORISED
NIGEL

RECEIVED
27/05/13

MD1-0-C-172-06-00016

Calculation for limestone belt conveyor l-05 foundation

RT

NIGEL

27/05/13

MD1-0-C-172-06-00020

Calculation for limestone grinding house steel structure foundation

AC

NIGEL

26/07/13

MD1-0-C-172-06-00030

Calculation for Limestone Grinding House Mechanical Foundation

RT

NIGEL

10/06/13

MD1-0-C-172-11-00030

Limestone Grinding House Pit Structure Section & Detail (1)

AC

NIGEL

28/06/13

MD1-0-C-172-11-00031

Limestone Grinding House Pit Structure Section & Detail (2)

AC

NIGEL

28/06/13

MD1-0-C-172-11-00032

Limestone Grinding House Pit Structure Section & Detail (3)

AC

NIGEL

28/06/13

MD1-0-C-172-11-00040

Limestone grinding house steel structure foundation detail (1)

RT

NIGEL

26/07/13

MD1-0-C-172-11-00041

Limestone grinding house steel structure foundation detail (2)

RT

NIGEL

26/07/13

MD1-0-C-172-11-00042

Limestone grinding house steel structure foundation detail (3)

AC

NIGEL

26/07/13

MD1-0-C-172-11-00043

Limestone grinding house steel structure foundation detail (4)

AC

NIGEL

26/07/13

MD1-0-C-172-11-00044

Limestone grinding house steel structure foundation detail (5)

AC

NIGEL

26/07/13

MD1-0-C-172-11-00050

Limestone Grinding House Mechanical Foundation Detail (1)

AC

NIGEL

10/06/13

MD1-0-C-172-11-00051

Limestone Grinding House Mechanical Foundation Detail (2)

AC

NIGEL

10/06/13

MD1-0-C-172-11-00052

Limestone Grinding House Mechanical Foundation Detail (3)

AC

NIGEL

10/06/13

MD1-0-C-172-11-00053

Limestone Grinding House Mechanical Foundation Detail (4)

AC

NIGEL

10/06/13

MD1-0-C-172-11-00054

Limestone Grinding House Mechanical Foundation Detail (5)

AC

NIGEL

10/06/13

MD1-0-C-172-53-00010

Limestone handling system transfer tower lt-01 foundation details (2)

RT

NIGEL

27/05/13

MD1-0-C-172-53-00011

Limestone handling system transfer tower lt-02 foundation details (2)

RT

NIGEL

27/05/13

MD1-0-C-172-53-00012

Limestone handling system transfer tower lt-03 foundation details (2)

RT

NIGEL

27/05/13

MD1-0-C-172-53-00013

Limestone handling system transfer tower lt-04 foundation details (2)

RT

NIGEL

27/05/13

MD1-0-C-172-53-00030

Limestone grinding house pit reinforcement detail (1)

AC

NIGEL

28/06/13

MD1-0-C-172-53-00031

Limestone grinding house pit reinforcement detail (2)

AC

NIGEL

28/06/13

MD1-0-C-172-53-00032

Limestone grinding house pit reinforcement detail (3)

AC

NIGEL

28/06/13

MD1-0-C-172-53-00033

Limestone grinding house pit reinforcement detail (4)

AC

NIGEL

28/06/13

MD1-0-C-172-53-00034

Limestone grinding house pit reinforcement detail (5)

AC

NIGEL

28/06/13

MD1-0-C-172-53-00035

Limestone grinding house pit reinforcement detail (6)

AC

NIGEL

28/06/13

MD1-0-C-172-53-00036

Limestone Grinding House Pit Reinforcement Detail (7)

AC

NIGEL

28/06/13

MD1-0-C-172-53-00040

Limestone Grinding House Steel Str. Foundation Re-bar Detail (1)

RT

NIGEL

26/07/13

MD1-0-C-172-53-00041

Limestone Grinding House Steel Str. Foundation Re-bar Detail (2)

RT

NIGEL

26/07/13

MD1-0-C-172-53-00042

Limestone Grinding House Steel Str. Foundation Re-bar Detail (3)

RT

NIGEL

26/07/13

MD1-0-C-172-53-00043

Limestone Grinding House Steel Str. Foundation Re-bar Detail (4)

RT

NIGEL

26/07/13

MD1-0-C-172-53-00044

Limestone Grinding House Steel Str. Foundation Re-bar Detail (5)

RT

NIGEL

26/07/13

MD1-0-C-172-53-00045

Limestone Grinding House Steel Str. Foundation Re-bar Detail (6)

RT

NIGEL

26/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-C-173-01-00010

Dry Flight Conveyor Support Foundation Plan (1)

RT

AUTHORISED
NIGEL

RECEIVED
18/07/13

MD1-0-C-173-01-00011

Dry Flight Conveyor Support Foundation Plan (2)

RT

NIGEL

18/07/13

MD1-0-C-173-01-00012

Dry Flight Conveyor Support Foundation Plan (3)

RT

NIGEL

18/07/13

MD1-0-C-173-01-00013

Dry Flight Conveyor Support Foundation Plan (4)

RT

NIGEL

18/07/13

MD1-0-C-173-01-00142

Bottom ash silo unit #1b foundation plan

RT

NIGEL

27/05/13

MD1-0-C-173-01-00143

Bottom ash silo unit #2a foundation plan

RT

NIGEL

27/05/13

MD1-0-C-173-01-00182

Ash pipe lines pipe rack - 1 fdn & pile arrangement plan

NIGEL

26/07/13

MD1-0-C-173-01-00183

Ash pipe lines pipe rack - 1 foundation details

NIGEL

26/07/13

MD1-0-C-173-01-00184

Ash pipe lines pipe rack - 1 structure details

AC

NIGEL

26/07/13

MD1-0-C-173-01-00185

Ash pipe lines pipe rack - 2 (discharge canal) fdn & pile

NIGEL

24/07/13

MD1-0-C-173-01-00186

Ash pipe lines pipe rack-2 overpassing md2 discharge canal foundation details

NIGEL

24/07/13

MD1-0-C-173-01-00187

Ash pipe lines pipe rack-2 overpassing md2 discharge canal structure details (1)

NIGEL

24/07/13

MD1-0-C-173-01-00188

Ash pipe lines pipe rack-2 overpassing md2 discharge canal structure details (2)

NIGEL

24/07/13

MD1-0-C-173-01-00189

Ash pipe lines pipe rack-2 overpassing md2 discharge canal structure details (3)

NIGEL

24/07/13

MD1-0-C-173-01-00190

Ash pipe lines pipe rack - 2 overpassing md2 discharge canal connection details

NIGEL

24/07/13

MD1-0-C-173-01-00191

Ash pipe lines pipe rack - 3 fdn & pile arrangement plan

NIGEL

26/07/13

MD1-0-C-173-01-00192

Ash pipe lines pipe rack - 3 foundation details

NIGEL

26/07/13

MD1-0-C-173-01-00193

Ash pipe lines pipe rack - 3 structure details

AC

NIGEL

26/07/13

MD1-0-C-173-01-00197

Ash Pipe Lines Trench Details (1)

RT

NIGEL

30/05/13

MD1-0-C-173-01-00198

Ash Pipe Lines Trench Details (2)

RT

NIGEL

30/05/13

MD1-0-C-173-06-00010

Calculation for ash piperack structure and foundation (pr-2) overpassing md2 dl

NIGEL

24/07/13

MD1-0-C-173-06-00011

Calculation for ash pipe rack-1,3 steel structure and foundation

NIGEL

26/07/13

MD1-0-C-173-06-00012

Calculation for ASH Pipe Lines Sleeper Foundation

NIGEL

09/05/13

MD1-0-C-173-06-00013

Calculation for ASH Pipe Lines Trench

AC

NIGEL

30/05/13

MD1-0-C-173-06-00040

Calculation for bottom ash silo foundation (shallow)

RT

NIGEL

27/05/13

MD1-0-C-173-06-00050

Calculation For Dry Flight Conveyor Support Foundation

RT

NIGEL

18/07/13

MD1-0-C-173-11-00020

Dry Flight Conveyor Support Foundation Detail (1)

RT

NIGEL

18/07/13

MD1-0-C-173-11-00021

Dry Flight Conveyor Support Foundation Detail (2)

RT

NIGEL

18/07/13

MD1-0-C-173-11-00022

Dry Flight Conveyor Support Foundation Detail (3)

RT

NIGEL

18/07/13

MD1-0-C-173-11-00023

Dry Flight Conveyor Support Foundation Detail (4)

RT

NIGEL

18/07/13

MD1-0-C-173-11-00024

Dry Flight Conveyor Support Foundation Detail (5)

RT

NIGEL

18/07/13

MD1-0-C-173-11-00025

Dry Flight Conveyor Support Foundation Detail (6)

RT

NIGEL

18/07/13

MD1-0-C-173-11-00026

Dry Flight Conveyor Support Foundation Detail (7)

RT

NIGEL

18/07/13

MD1-0-C-173-11-00027

Dry Flight Conveyor Support Foundation Detail (8)

RT

NIGEL

18/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-C-173-11-00028

Dry Flight Conveyor Support Foundation Detail (9)

RT

AUTHORISED
NIGEL

RECEIVED
18/07/13

MD1-0-C-173-11-00029

Dry Flight Conveyor Support Foundation Detail (10)

RT

NIGEL

18/07/13

MD1-0-C-173-11-00030

Dry Flight Conveyor Support Foundation Detail (11)

RT

NIGEL

18/07/13

MD1-0-C-173-11-00031

Dry Flight Conveyor Support Foundation Detail (12)

RT

NIGEL

18/07/13

MD1-0-C-173-11-00032

Dry Flight Conveyor Support Foundation Detail (13)

RT

NIGEL

18/07/13

MD1-0-C-173-11-00033

Dry Flight Conveyor Support Foundation Detail (14)

RT

NIGEL

18/07/13

MD1-0-C-173-11-00140

Bottom ash silo unit #1b,2a foundation section

RT

NIGEL

27/05/13

MD1-0-C-173-11-00141

Bottom ash silo unit #1b,2a foundation detail

RT

NIGEL

27/05/13

MD1-0-C-173-53-00180

Ash pipe lines pipe rack-2 overpassing md2 discharge canal foundation reinf. des

NIGEL

24/07/13

MD1-0-C-173-53-00181

Ash Pipe Lines Trench Reinf. Details(1)

RT

NIGEL

30/05/13

MD1-0-C-173-53-00182

Ash Pipe Lines Trench Reinf. Details(2)

RT

NIGEL

30/05/13

MD1-0-C-180-01-00010

FLUE GAS DUCT FOR UNIT#1 FOUNDATION PLAN & SECTION (1)

RT

NIGEL

09/05/13

MD1-0-C-180-01-00020

Flue gas duct for unit#1 foundation plan

RT

NIGEL

09/05/13

MD1-0-C-180-01-00021

Flue gas duct for unit#2 foundation plan

RT

NIGEL

09/05/13

MD1-0-C-180-01-00030

Flue gas duct for unit#1b soil replacement plan

RT

NIGEL

09/05/13

MD1-0-C-180-01-00031

Flue gas duct for unit#2a soil replacement plan

RT

NIGEL

09/05/13

MD1-0-C-180-01-00032

Flue gas duct for unit#2b soil replacement plan

RT

NIGEL

09/05/13

MD1-0-C-180-06-00010

Calculation for flue gas duct foundation

RT

NIGEL

09/05/13

MD1-0-C-180-11-00010

Flue gas duct foundation detail(1)

RT

NIGEL

09/05/13

MD1-0-C-180-11-00011

Flue gas duct foundation detail(2)

RT

NIGEL

09/05/13

MD1-0-C-180-11-00012

Flue gas duct foundation detail(3)

RT

NIGEL

09/05/13

MD1-0-C-180-11-00013

Flue gas duct foundation detail(4)

RT

NIGEL

09/05/13

MD1-0-C-181-01-00011

Auxiliary Boiler Pile Foundation Plan & Detail

NIGEL

28/02/13

MD1-0-C-181-01-00012

Auxiliary Boiler Foundation Plan & Section(1)

NIGEL

28/02/13

MD1-0-C-181-01-00014

Auxiliary Boiler Foundation Plan & Section(3)

NIGEL

28/02/13

MD1-0-C-181-01-00016

Auxiliary Boiler Foundation Plan & Section(5)

NIGEL

28/02/13

MD1-0-C-184-01-00010

Station Auxiliary Transformer Area Sump Pump Pit Plan & Section

IC

NIGEL

31/05/13

MD1-0-C-184-06-00010

Calculation For Sump Pump Pit

IC

NIGEL

31/05/13

MD1-0-C-184-53-00010

Station Auxiliary Transformer Area Sump Pump Pit Rebar plan

IC

NIGEL

31/05/13

MD1-0-C-184-53-00011

Station Auxiliary Transformer Area Sump Pump Pit Rebar Section & Detail

IC

NIGEL

31/05/13

MD1-0-C-185-01-00030

Start Up Flash Tank Unit#1 Foundation Plan & Section

RT

NIGEL

24/07/13

MD1-0-C-185-01-00031

Start Up Flash Tank Unit#2 Foundation Plan & Section

RT

NIGEL

24/07/13

MD1-0-C-185-01-00080

Dirty Oil Tank Foundation Plan & Section

RT

NIGEL

24/07/13

MD1-0-C-185-06-00010

Calculation for Shop Fabricated Tank Foundation (Dirty Oil & Start Up Flash Tan)

RT

NIGEL

24/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-C-185-11-00030

Start Up Flash Tank Unit#1,2 Foundation Detail

RT

AUTHORISED
NIGEL

RECEIVED
24/07/13

MD1-0-C-185-11-00080

Dirty Oil Tank Foundation Detail

RT

NIGEL

24/07/13

MD1-0-C-186-01-00010

Raw Water Storage Tank Pile Location Plan & Section(1)

NIGEL

24/10/12

MD1-0-C-186-01-00011

Raw Water Storage Tank Pile Location Plan & Section(2)

NIGEL

24/10/12

MD1-0-C-186-01-00012

Raw Water Storage Tank (1) Foundation Plan & Section

NIGEL

24/10/12

MD1-0-C-186-01-00013

Raw Water Storage Tank (2) Foundation Plan & Section

NIGEL

24/10/12

MD1-0-C-186-01-00020

Filtered Water Storage Tank (1) Pile Location Plan & Section

NIGEL

05/10/12

MD1-0-C-186-01-00021

Filtered Water Storage Tank (2) Pile Location Plan & Section

NIGEL

05/10/12

MD1-0-C-186-01-00022

Filtered Water Storage Tank (1) Foundation Plan & Section

NIGEL

05/10/12

MD1-0-C-186-01-00023

Filtered Water Storage Tank (2) Foundation Plan & Section

NIGEL

05/10/12

MD1-0-C-186-01-00030

Demi Water Storage Tank Pile Location Plan & Section (1)

NIGEL

22/10/12

MD1-0-C-186-01-00031

Demi Water Storage Tank Pile Location Plan & Section (2)

NIGEL

22/10/12

MD1-0-C-186-01-00032

Demi Water Storage Tank (1) Foundation Plan & Section

NIGEL

28/11/12

MD1-0-C-186-01-00033

Demi Water Storage Tank (2) Foundation Plan & Section

NIGEL

28/11/12

MD1-0-C-186-01-00080

Portable Water Storage Tank Foundation Plan & Section

NIGEL

11/01/13

MD1-0-C-186-01-00090

Fire Water Storage Tank (1) Pile Location Plan & Section

NIGEL

24/10/12

MD1-0-C-186-01-00091

Fire Water Storage Tank (2) Pile Location Plan & Section

NIGEL

24/10/12

MD1-0-C-186-01-00092

Fire Water Storage Tank (1) Foundation Plan & Section

NIGEL

28/11/12

MD1-0-C-186-01-00093

Fire Water Storage Tank (2) Foundation Plan & Section

NIGEL

28/11/12

MD1-0-C-186-01-00100

Diesel Oil Storage Tank Foundation Plan & Section

NIGEL

11/01/13

MD1-0-C-186-01-00120

Fuel Oil Storage Tank (1) Foundation Plan & Section

AC

NIGEL

13/11/12

MD1-0-C-186-01-00121

Fuel Oil Storage Tank (2) Foundation Plan & Section

AC

NIGEL

13/11/12

MD1-0-C-186-01-00122

Fuel Oil Storage Tank (1), (2) Soil Replacement Plan

AC

NIGEL

13/11/12

MD1-0-C-186-01-00132

Fuel Oil Area Oil Separator FDN. & Valve Pit FDN. Plan Sections & Details

RT

NIGEL

08/07/13

MD1-0-C-186-01-00140

Fuel Oil Pipe Lines Foundation Arrangement Plan(1)

IC

NIGEL

14/06/13

MD1-0-C-186-01-00141

Fuel Oil Pipe Lines Foundation Arrangement Plan(2)

IC

NIGEL

10/05/13

MD1-0-C-186-01-00142

Fuel oil pipe lines pipe rack - 1 fdn & pile arrangement plan

NIGEL

26/07/13

MD1-0-C-186-01-00143

Fuel oil pipe lines pipe rack - 1 foundation details

NIGEL

26/07/13

MD1-0-C-186-01-00144

Fuel oil pipe lines pipe rack - 1 structure details

AC

NIGEL

26/07/13

MD1-0-C-186-01-00145

Fuel oil pipe lines pipe rack - 2 fdn & pile arrangement plan

NIGEL

26/07/13

MD1-0-C-186-01-00146

Fuel oil pipe lines pipe rack - 2 foundation details

NIGEL

26/07/13

MD1-0-C-186-01-00147

Fuel oil pipe lines pipe rack - 2 structure details

AC

NIGEL

26/07/13

MD1-0-C-186-01-00148

Fuel Oil Pipe Lines Sleeper Foudation Details

IC

NIGEL

14/06/13

MD1-0-C-186-06-00010

Calculation for Diesel Oil Storage Tank Foundation

NIGEL

13/11/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-C-186-06-00011

Calculation for Raw Water Storage Tank Foundation

AUTHORISED
NIGEL

RECEIVED
28/11/12

MD1-0-C-186-06-00012

Calculation for Filtered Water Storage Tank Foundation

NIGEL

28/11/12

MD1-0-C-186-06-00013

Calculation for Demi Water Storage Tank Foundation

NIGEL

28/11/12

MD1-0-C-186-06-00014

Calculation For Condensate Water Storage Tank Foundation

NIGEL

19/12/12

MD1-0-C-186-06-00017

Calculation for Portable Water Storage Tank Foundation

NIGEL

11/01/13

MD1-0-C-186-06-00018

Calculation for Fire Water Storage Tank Foundation

NIGEL

28/11/12

MD1-0-C-186-06-00019

Calculation for Fuel Oil Storage Tank Foundation

AC

NIGEL

13/11/12

MD1-0-C-186-06-00021

Calculation for Fuel Oile Pipe Line Sleeper Foundation

IC

NIGEL

14/06/13

MD1-0-C-186-06-00023

Calculation for fuel oil pipe rack-1,2 steel structure and foundation

NIGEL

26/07/13

MD1-0-C-186-06-00024

Calculation for Fuel Oil Separator Structure

RT

NIGEL

08/07/13

MD1-0-C-186-12-00030

Demi Water Storage Tank Foundation Bar Bending Schedule

IC

NIGEL

22/10/12

MD1-0-C-186-53-00010

Raw Water Storage Tank (1) Foundation Reinforcement Detail

NIGEL

24/10/12

MD1-0-C-186-53-00011

Raw Water Storage Tank (2) Foundation Reinforcement Detail

NIGEL

24/10/12

MD1-0-C-186-53-00020

Filtered Water Storage Tank (1), (2) Foundation Reinforcement Detail

NIGEL

05/10/12

MD1-0-C-186-53-00040

Condensate Water Storage Tank (1), (2) Foundation Reinforcement Detail

NIGEL

19/12/12

MD1-0-C-186-53-00050

Fuel Oil Storage Tank (1), (2) Foundation Reinforcement Detail

AC

NIGEL

13/11/12

MD1-0-C-186-53-00100

Diesel Oil Storage Tank Foundation Reinforcement Detail

NIGEL

13/11/12

MD1-0-C-186-53-00140

Fire Water Storage Tank (1), (2) Foundation Reinforcement Detail

NIGEL

24/10/12

MD1-0-C-300-01-00100

PERIMETER FENCE AND GATE OVERALL LAYOUT PLAN

AC

NIGEL

28/02/13

MD1-0-C-300-01-00110

PERIMETER FENCE PLAN & SECTIONS

AC

NIGEL

28/02/13

MD1-0-C-300-01-00111

PERIMETER FENCE DETAILS

AC

NIGEL

28/02/13

MD1-0-C-300-01-00112

PERIMETER FENCE REBAR DETAILS

MD1-0-C-300-01-00150

PERIMETER FENCE AND GATE MAIN GATE PLAN, ELEVATION & SECTION

MD1-0-C-300-01-00200

Borehole Location Plan

MD1-0-C-300-01-00201

Rock Bed Contour Plan

MD1-0-C-300-02-00010

General Notes (1)

MD1-0-C-300-02-00011

General Notes

MD1-0-C-300-02-00015

MD1-0-C-300-02-00016

MD1-0-C-300-02-00017

NIGEL

28/02/13

AC

NIGEL

28/02/13

NIGEL

02/07/12

NIGEL

02/07/12

RT

NIGEL

13/08/12

NIGEL

14/09/12

Standard Details: Reinforcing Bar

RT

NIGEL

02/07/12

Standard Details: Ladder Details

RT

NIGEL

02/07/12

Standard Details: Handrail Details

RT

NIGEL

02/07/12

MD1-0-C-300-02-00018

Standard Details: Bored Pile Details

NIGEL

28/12/12

MD1-0-C-300-04-00010

Design Criteria- Civil & Architecture

AC

NIGEL

13/07/12

MD1-0-C-300-06-00010

CALCULATON FOR FOUNDATIONS OF PERIMETER FENCE

AC

NIGEL

28/02/13

MD1-0-C-300-11-00121

Switchyard Fence & Gate - Section & Detail (2)

NIGEL

06/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-C-340-01-00020

Perimeter Asphalt Road Paving Plan(1)

AC

AUTHORISED
NIGEL

RECEIVED
28/01/13

MD1-0-C-340-01-00100

Coal storage yard paving layout plan (1)

RT

NIGEL

05/07/13

MD1-0-C-340-01-00101

Coal Storage Yard Paving Layout Plan (2)

RT

NIGEL

05/07/13

MD1-0-C-340-01-00102

Coal Storage Yard Paving Layout Plan (3)

RT

NIGEL

05/07/13

MD1-0-C-340-01-00110

Coal storage yard paving plan & section

RT

NIGEL

05/07/13

MD1-0-C-340-01-00200

Perimeter Asphalt Road Longitudinal Profile (1)

RT

NIGEL

28/01/13

MD1-0-C-340-06-00010

Calculation for Perimeter Asphalt Road Paving

NIGEL

28/01/13

MD1-0-C-340-11-00010

Perimeter Asphalt Road Paving Section & Detail(1)

AC

NIGEL

28/01/13

MD1-0-C-350-01-00150

550KV Switchyard Area Storm Drainage Layout Plan

RT

NIGEL

12/06/13

MD1-0-C-350-01-00151

110KV Switchyard Area Storm Drainage Layout Plan

RT

NIGEL

12/06/13

MD1-0-C-350-01-00200

Coal storage yard drain ditch layout plan

RT

NIGEL

05/07/13

MD1-0-C-350-06-00001

Hydraulic calculaton for storm water drainage system

RT

NIGEL

12/06/13

MD1-0-C-350-06-00010

Calculation for Storm Water Drainage System

IC

NIGEL

12/06/13

MD1-0-C-350-11-00010

Perimeter Asphalt Road Storm Drainage Detail(1)

AC

NIGEL

28/01/13

MD1-0-C-350-11-00011

Perimeter Asphalt Road Storm Drainage Detail(2)

AC

NIGEL

28/01/13

MD1-0-C-350-11-00020

Switchyard Area Storm Drainage Details (1)

IC

NIGEL

12/06/13

MD1-0-C-350-11-00021

Switchyard Area Storm Drainage Details (2)

RT

NIGEL

12/06/13

MD1-0-C-350-11-00022

Switchyard Area Storm Drainage Detail (3)

IC

NIGEL

12/06/13

MD1-0-C-350-11-00030

Coal Storage Yard Drainage Detail (1)

IC

NIGEL

05/07/13

MD1-0-C-350-11-00031

Coal Storage Yard Drainage Detail (2)

IC

NIGEL

05/07/13

MD1-0-C-370-01-00050

C.W Intake Pump Station Plan & Section (1)

AC

NIGEL

06/06/13

MD1-0-C-370-01-00051

C.W Intake Pump Station Plan & Section (2)

RT

NIGEL

06/06/13

MD1-0-C-370-01-00052

C.W Intake Pump Station Plan & Section (3)

AC

NIGEL

06/06/13

MD1-0-C-370-01-00053

C.W Intake Pump Station Plan & Section (4)

AC

NIGEL

06/06/13

MD1-0-C-370-01-00054

C.W Intake Pump Station Plan & Section (5)

RT

NIGEL

06/06/13

MD1-0-C-370-01-00055

C.W Intake Pump Station Plan & Section (6)

AC

NIGEL

06/06/13

MD1-0-C-370-01-00056

C.W Intake Pump Station Plan & Section (7)

AC

NIGEL

06/06/13

MD1-0-C-370-01-00057

C.W Intake Pump Station Plan & Section (8)

AC

NIGEL

06/06/13

MD1-0-C-370-01-00070

C.W Intake Pump Station Pile Arrangement Plan & Section

RT

NIGEL

06/06/13

MD1-0-C-370-01-00100

C.W Inlet & Discharge Pipe Bedding Plan (1)

AC

NIGEL

22/04/13

MD1-0-C-370-01-00101

C.W Inlet & Discharge Pipe Bedding Plan (2)

AC

NIGEL

22/04/13

MD1-0-C-370-01-00102

C.W Inlet & Discharge Pipe Bedding Plan (3)

AC

NIGEL

22/04/13

MD1-0-C-370-01-00107

C.W Inlet & Discharge Pipe Bedding Cross Section Detail (1)

AC

NIGEL

22/04/13

MD1-0-C-370-01-00108

C.W Inlet & Discharge Pipe Bedding Cross Section Detail (2)

AC

NIGEL

22/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-C-370-01-00109

C.W Inlet & Discharge Pipe Bedding Cross Section Detail (3)

AC

AUTHORISED
NIGEL

RECEIVED
22/04/13

MD1-0-C-370-01-00130

C.W Pipe Valve Pit Structure Plan & Section (1)

RT

NIGEL

12/07/13

MD1-0-C-370-01-00131

C.W Pipe Valve Pit Structure Plan & Section (2)

RT

NIGEL

12/07/13

MD1-0-C-370-01-00132

C.W Pipe Valve Pit Structure Plan & Section (3)

AC

NIGEL

12/07/13

MD1-0-C-370-01-00150

Seal PIT Structure (Type A) Plan & Section

AC

NIGEL

27/05/13

MD1-0-C-370-01-00151

Seal PIT Structure (Type B) Plan & Section

AC

NIGEL

27/05/13

MD1-0-C-370-01-00170

SEAL PIT STRUCTURE (TYPE-A) PILE ARRANGEMENT PLAN & SECTION

AC

NIGEL

27/05/13

MD1-0-C-370-01-00171

SEAL PIT STRUCTURE (TYPE-B) PILE ARRANGEMENT PLAN & SECTION

AC

NIGEL

27/05/13

MD1-0-C-370-01-00200

C.W Discharge Culvert Plan & Profile

NIGEL

26/02/13

MD1-0-C-370-01-00205

C.W Discharge Culvert Plan & Section (1)

NIGEL

26/02/13

MD1-0-C-370-01-00206

C.W Discharge Culvert Plan & Section (2)

NIGEL

26/02/13

MD1-0-C-370-06-00030

Calculation for C.W Intake Pump Station

RT

NIGEL

06/06/13

MD1-0-C-370-06-00040

Calculation for Seal PIT Structure

AC

NIGEL

27/05/13

MD1-0-C-370-06-00061

Calculation for Temporary Slope Stability - C.W Outfall

NIGEL

21/06/13

MD1-0-C-370-06-00070

Calculation for Temporary Work- Seal PIT Structure

NIGEL

11/01/13

MD1-0-C-370-06-00080

Calculation for C.W Pipe Bedding

NIGEL

22/04/13

MD1-0-C-370-06-00130

Calculation for C.W Pipe Valve Pit Structure

AC

NIGEL

12/07/13

MD1-0-C-370-11-00050

C.W Intake Pump Station Detail (1)

AC

NIGEL

06/06/13

MD1-0-C-370-11-00051

C.W Intake Pump Station Detail (2)

AC

NIGEL

06/06/13

MD1-0-C-370-11-00052

C.W Intake Pump Station Detail (3)

AC

NIGEL

06/06/13

MD1-0-C-370-11-00053

C.W Intake Pump Station Detail (4)

AC

NIGEL

06/06/13

MD1-0-C-370-11-00054

C.W Intake Pump Station Detail (5)

AC

NIGEL

06/06/13

MD1-0-C-370-11-00055

C.W Intake Pump Station Detail (6)

RT

NIGEL

06/06/13

MD1-0-C-370-53-00050

C.W Intake Pump Station- Re-bar Detail (1)

RT

NIGEL

06/06/13

MD1-0-C-370-53-00051

C.W Intake Pump Station- Re-bar Detail (2)

RT

NIGEL

06/06/13

MD1-0-C-370-53-00052

C.W Intake Pump Station- Re-bar Detail (3)

AC

NIGEL

06/06/13

MD1-0-C-370-53-00053

C.W Intake Pump Station- Re-bar Detail (4)

AC

NIGEL

06/06/13

MD1-0-C-370-53-00054

C.W Intake Pump Station- Re-bar Detail (5)

AC

NIGEL

06/06/13

MD1-0-C-370-53-00055

C.W Intake Pump Station- Re-bar Detail (6)

AC

NIGEL

06/06/13

MD1-0-C-370-53-00056

C.W Intake Pump Station- Re-bar Detail (7)

AC

NIGEL

06/06/13

MD1-0-C-370-53-00057

C.W Intake Pump Station- Re-bar Detail (8)

AC

NIGEL

06/06/13

MD1-0-C-370-53-00058

C.W Intake Pump Station- Re-bar Detail (9)

AC

NIGEL

06/06/13

MD1-0-C-370-53-00059

C.W Intake Pump Station- Re-bar Detail (10)

AC

NIGEL

06/06/13

MD1-0-C-370-53-00060

C.W Intake Pump Station- Re-bar Detail (11)

AC

NIGEL

06/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-C-370-53-00061

C.W Intake Pump Station- Re-bar Detail (12)

AC

AUTHORISED
NIGEL

RECEIVED
06/06/13

MD1-0-C-370-53-00062

C.W Intake Pump Station- Re-bar Detail (13)

RT

NIGEL

06/06/13

MD1-0-C-370-53-00063

C.W Intake Pump Station- Re-bar Detail (14)

RT

NIGEL

06/06/13

MD1-0-C-370-53-00064

C.W Intake Pump Station- Re-bar Detail (15)

RT

NIGEL

06/06/13

MD1-0-C-370-53-00065

C.W Intake Pump Station- Re-bar Detail (16)

RT

NIGEL

06/06/13

MD1-0-C-370-53-00100

C.W Inlet & Discharge Pipe Incasement (Type-1) Detail

AC

NIGEL

22/04/13

MD1-0-C-370-53-00101

C.W Inlet & Discharge Pipe Incasement (Type-2) Detail

AC

NIGEL

22/04/13

MD1-0-C-370-53-00102

C.W Inlet & Discharge Pipe Incasement (Type-3) Detail

AC

NIGEL

22/04/13

MD1-0-C-370-53-00103

C.W Inlet & Discharge Pipe Incasement (Type-4) Detail

AC

NIGEL

22/04/13

MD1-0-C-370-53-00104

C.W Inlet & Discharge Pipe Incasement (Type-5) Detail

AC

NIGEL

22/04/13

MD1-0-C-370-53-00105

C.W Inlet & Discharge Pipe Incasement (Type-6) Detail

AC

NIGEL

22/04/13

MD1-0-C-370-53-00106

C.W Inlet & Discharge Pipe Incasement (Type-7) Detail

AC

NIGEL

22/04/13

MD1-0-C-370-53-00107

C.W Inlet & Discharge Pipe Incasement (Type-8) Detail

AC

NIGEL

22/04/13

MD1-0-C-370-53-00108

C.W Inlet & Discharge Pipe Incasement (Type-9) Detail

AC

NIGEL

22/04/13

MD1-0-C-370-53-00109

C.W Inlet & Discharge Pipe Incasement (Type-10) Detail

AC

NIGEL

22/04/13

MD1-0-C-370-53-00130

C.W Pipe Valve Pit Structure Rebar Detail (1)

AC

NIGEL

12/07/13

MD1-0-C-370-53-00131

C.W Pipe Valve Pit Structure Rebar Detail (2)

AC

NIGEL

12/07/13

MD1-0-C-370-53-00150

Seal PIT Structure (Type A-B) Reinforcement Detail (1)

AC

NIGEL

27/05/13

MD1-0-C-370-53-00151

Seal PIT Structure (Type A-B) Reinforcement Detail (2)

AC

NIGEL

27/05/13

MD1-0-C-370-53-00200

C.W Discharge Culvert- Rebar Detail (1)

NIGEL

26/02/13

MD1-0-C-370-53-00201

C.W Discharge Culvert- Rebar Detail (2)

NIGEL

26/02/13

MD1-0-C-370-53-00202

C.W Discharge Culvert- Re-bar Detail (3)

NIGEL

26/02/13

MD1-0-C-370-53-00203

C.W Discharge Culvert- Re-bar Detail (4)

NIGEL

26/02/13

MD1-0-C-370-53-00204

C.W Discharge Culvert- Re-bar Detail (5)

NIGEL

26/02/13

MD1-0-C-370-53-00205

C.W Discharge Culvert- Re-bar Detail (6)

NIGEL

26/02/13

MD1-0-C-370-53-00207

C.W Discharge Culvert- Re-bar Detail (8)

NIGEL

26/02/13

MD1-0-C-370-56-00150

Seal PIT Structure (Type-A)- Temporary Work Plan & Section (1)

IC

NIGEL

11/01/13

MD1-0-C-370-56-00151

Seal PIT Structure (Type-A)- Temporary Work Plan & Section (2)

IC

NIGEL

11/01/13

MD1-0-C-370-56-00152

Seal PIT Structure (Type-B)- Temporary Work Plan & Section (1)

IC

NIGEL

11/01/13

MD1-0-C-370-56-00153

Seal PIT Structure (Type-B)- Temporary Work Plan & Section (2)

IC

NIGEL

11/01/13

MD1-0-C-370-56-00154

Seal PIT Structure-Temporary Work Diesel (1)

IC

NIGEL

11/01/13

MD1-0-C-370-56-00155

Seal PIT Structure-Temporary Work Diesel (2)

IC

NIGEL

11/01/13

MD1-0-C-370-56-00156

Seal PIT Structure-Temporary Work Diesel (3)

IC

NIGEL

11/01/13

MD1-0-C-370-56-00200

C.W Discharge Culvert Temporary Work Plan & Section

AC

NIGEL

08/11/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-C-370-56-00250

C.w outfall structure temporary coffer dam plan & Sec(1)

STS
I

AUTHORISED
NIGEL

RECEIVED
21/06/13

MD1-0-C-370-56-00251

C.w outfall structure temporary coffer dam plan & Sec(2)

NIGEL

21/06/13

MD1-0-C-370-56-00252

C.w outfall structure temporary coffer dam plan & Sec(3)

NIGEL

21/06/13

MD1-0-C-370-56-00253

C.w outfall structure temporary coffer dam plan & Sec(4)

NIGEL

21/06/13

MD1-0-C-370-56-00254

C.w outfall structure temporary coffer dam plan & Sec(5)

NIGEL

21/06/13

MD1-0-C-370-56-00255

C.w outfall structure temporary coffer dam plan & Sec(6)

NIGEL

21/06/13

MD1-0-C-370-56-00256

C.w outfall structure temporary coffer dam plan & Sec(7)

NIGEL

21/06/13

MD1-0-C-370-56-00257

C.w outfall structure temporary coffer dam plan & Sec(8)

NIGEL

21/06/13

MD1-0-C-370-56-00258

C.w outfall structure temporary coffer dam plan & Sec(9)

NIGEL

21/06/13

MD1-0-C-370-56-00259

C.w outfall structure temporary coffer dam plan & Sec(10)

NIGEL

21/06/13

MD1-0-C-370-56-00260

C.w outfall structure temporary coffer dam plan & Sec(11)

NIGEL

21/06/13

MD1-0-C-370-56-00261

C.w outfall structure temporary coffer dam plan & Sec(12)

NIGEL

21/06/13

MD1-0-C-505-01-00010
MD1-0-C-505-01-00011

0
1

Main & Unit Aux. Transformer Unit #1 Pile Arrangement Plan


Main & Unit Aux. Transformer Unit #2 Pile Arrangement Plan

A
A

NIGEL
NIGEL

27/05/13
24/07/13

MD1-0-C-505-01-00012

Main & Unit Aux. Transformer Unit #1 Foundation Plan

NIGEL

24/07/13

MD1-0-C-505-01-00013

Main & Unit Aux. Transformer Unit #2 Foundation Plan

NIGEL

24/07/13

MD1-0-C-505-01-00020

Main & Unit Aux. Transformer Unit #1 Grating & support Beam Arrangement Plan&Sec

NIGEL

27/05/13

MD1-0-C-505-01-00021

Main & Unit Aux. Transformer Unit #2 Grating & support Beam Arrangement Plan&Sec

NIGEL

27/05/13

MD1-0-C-505-06-00010

Calculation for Main & Unit Aux. Transformer Foundation

NIGEL

24/07/13

MD1-0-C-505-11-00010

Main & Unit Aux. Transformer Unit #1 Foundation Section(1)

NIGEL

24/07/13

MD1-0-C-505-11-00011

Main & Unit Aux. Transformer Unit #1 Foundation Section(2)

NIGEL

24/07/13

MD1-0-C-505-11-00012

Main & Unit Aux. Transformer Unit #2 Foundation Section(1)

NIGEL

24/07/13

MD1-0-C-505-11-00013

Main & Unit Aux. Transformer Unit #2 Foundation Section(2)

NIGEL

24/07/13

MD1-0-C-505-11-00020

Main & Unit Aux. Transformer Unit # 1,2 Foundation Section(1)

NIGEL

24/07/13

MD1-0-C-505-11-00021

Main & Unit Aux. Transformer Unit # 1,2 Foundation Section(2)

NIGEL

24/07/13

MD1-0-C-505-53-00010

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Plan (1)

NIGEL

24/07/13

MD1-0-C-505-53-00011

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Plan (2)

NIGEL

24/07/13

MD1-0-C-505-53-00012

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Plan (3)

NIGEL

24/07/13

MD1-0-C-505-53-00013

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Section (1)

NIGEL

24/07/13

MD1-0-C-505-53-00014

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Section (2)

NIGEL

24/07/13

MD1-0-C-505-53-00020

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Plan (1)

NIGEL

24/07/13

MD1-0-C-505-53-00021

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Plan (2)

NIGEL

24/07/13

MD1-0-C-505-53-00022

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Plan (3)

NIGEL

24/07/13

MD1-0-C-505-53-00023

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Section (1)

NIGEL

24/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-C-505-53-00024

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Section (2)

AUTHORISED
NIGEL

RECEIVED
24/07/13

MD1-0-C-505-53-00030

Main & Unit Aux. Transformer Unit #1, #2 Foundation Reinforcement Detail (1)

NIGEL

24/07/13

MD1-0-C-505-53-00031

Main & Unit Aux. Transformer Unit #1, #2 Foundation Reinforcement Detail (2)

AC

NIGEL

24/07/13

MD1-0-C-560-11-00010

Cathodic protection system foundation detail

IC

NIGEL

20/06/13

MD1-0-C-570-01-00010

Switchyard Overall Foundation Layout Plan

NIGEL

03/04/13

MD1-0-C-570-01-00019

Switchyard Foundation Layout Plan (500KV Area) (1)

NIGEL

03/04/13

MD1-0-C-570-01-00020

Switchyard Foundation Layout Plan (500KV Area) (2)

NIGEL

03/04/13

MD1-0-C-570-01-00021

Switchyard Foundation Layout Plan (110KV Area)

NIGEL

03/04/13

MD1-0-C-570-01-00022

Switchyard Foundation Layout Plan (Power Block Area)

NIGEL

03/04/13

MD1-0-C-570-01-00060

Switchyard Foundation Plan & Section (1)

NIGEL

03/04/13

MD1-0-C-570-01-00061

Switchyard Foundation Plan & Section (2)

NIGEL

03/04/13

MD1-0-C-570-01-00062

Switchyard Foundation Plan & Section (3)

NIGEL

03/04/13

MD1-0-C-570-01-00063

Switchyard Foundation Plan & Section (4)

NIGEL

03/04/13

MD1-0-C-570-01-00064

Switchyard Foundation Plan & Section (5)

NIGEL

03/04/13

MD1-0-C-570-01-00065

Switchyard Foundation Plan & Section (6)

NIGEL

03/04/13

MD1-0-C-570-01-00066

Switchyard Foundation Plan & Section (7)

NIGEL

03/04/13

MD1-0-C-570-01-00067

Switchyard Foundation Plan & Section (8)

NIGEL

03/04/13

MD1-0-C-570-01-00068

Switchyard Foundation Plan & Section (9)

NIGEL

03/04/13

MD1-0-C-570-01-00069

Switchyard Foundation Plan & Section (10)

NIGEL

03/04/13

MD1-0-C-570-01-00070

Switchyard Foundation Plan & Section (11)

NIGEL

03/04/13

MD1-0-C-570-01-00071

Switchyard Foundation Plan & Section (12)

NIGEL

03/04/13

MD1-0-C-570-01-00072

Switchyard Foundation Plan & Section (13)

NIGEL

03/04/13

MD1-0-C-570-01-00080

Station Aux. Transformer Foundaion Plan & Sections

NIGEL

05/02/13

MD1-0-C-570-01-00081

STATION AUX. TRANSFORMER GRATING,

NIGEL

14/05/13

MD1-0-C-570-01-00100

Switchyard Area (500KV) Cable Trench Layout Plan

RT

NIGEL

06/11/12

MD1-0-C-570-01-00150

Switchyard Area (110KV) Cable Trench Layout Plan

RT

NIGEL

06/11/12

MD1-0-C-570-01-00200

Switchyard Area Cable Trench Section

NIGEL

03/04/13

MD1-0-C-570-01-00250

Switchyard Area Cable Trench Cover Plan (1)

AC

NIGEL

03/04/13

MD1-0-C-570-01-00251

Switchyard Area Cable Trench Cover Plan (2)

AC

NIGEL

03/04/13

MD1-0-C-570-01-00252

Switchyard Area Cable Trench Cover Plan (3)

AC

NIGEL

03/04/13

MD1-0-C-570-01-00253

Switchyard Area Cable Trench Cover Plan (4)

AC

NIGEL

03/04/13

MD1-0-C-570-01-00254

Switchyard Area Cable Trench Cover Plan (5)

AC

NIGEL

03/04/13

MD1-0-C-570-01-00255

Switchyard Area Cable Trench Cover Plan (6)

AC

NIGEL

03/04/13

MD1-0-C-570-06-00010

Calculation for Foundation of Switchyard

NIGEL

03/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-C-570-06-00011

Calculation for Foundations of Station Aux. Transformer

AUTHORISED
NIGEL

RECEIVED
05/02/13

MD1-0-C-570-06-00020

Calculation for Switchyard Area Cable Trench

NIGEL

03/04/13

MD1-0-C-570-11-00010

Switchyard Area Duct Bank Detail

NIGEL

03/04/13

MD1-0-C-570-11-00020

Switchyard Area Cable Trench Cover Detail

AC

NIGEL

03/04/13

MD1-0-C-570-53-00010

Switchyard Foundation Re-bar Plan & Section (1)

NIGEL

03/04/13

MD1-0-C-570-53-00011

Switchyard Foundation Re-bar Plan & Section (2)

NIGEL

03/04/13

MD1-0-C-570-53-00012

Switchyard Foundation Re-bar Plan & Section (3)

NIGEL

03/04/13

MD1-0-C-570-53-00013

Switchyard Foundation Re-bar Plan & Section (4)

NIGEL

03/04/13

MD1-0-C-570-53-00015

Switchyard Foundation Re-bar Plan & Section (6)

NIGEL

03/04/13

MD1-0-C-570-53-00016

Switchyard Foundation Re-bar Plan & Section (7)

NIGEL

03/04/13

MD1-0-C-570-53-00017

Switchyard Foundation Re-bar Plan & Section (8)

NIGEL

03/04/13

MD1-0-C-570-53-00018

Switchyard Foundation Re-bar Plan & Section (9)

NIGEL

03/04/13

MD1-0-C-570-53-00019

Switchyard Foundation Re-bar Plan & Section (10)

NIGEL

03/04/13

MD1-0-C-570-53-00020

Switchyard Foundation Re-bar Plan & Section (11)

NIGEL

03/04/13

MD1-0-C-570-53-00021

Switchyard Foundation Re-bar Plan & Section (12)

NIGEL

03/04/13

MD1-0-C-570-53-00022

Switchyard Foundation Re-bar Plan & Section (13)

NIGEL

03/04/13

MD1-0-C-570-53-00030

Station Aux. Transformer Foundaion Rebar Details

NIGEL

05/02/13

MD1-0-C-570-53-00100

Switchyard Area Cable Trench Reinforcement Detail

NIGEL

03/04/13

MD1-0-C-570-53-00101

Switchyard Area Marshalling Kiosk Reinforement Detail

NIGEL

03/04/13

MD1-0-C-591-01-00030

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (1)

IC

NIGEL

20/06/13

MD1-0-C-591-01-00031

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (2)

IC

NIGEL

20/06/13

MD1-0-C-591-01-00032

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (3)

IC

NIGEL

20/06/13

MD1-0-C-591-01-00033

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (4)

IC

NIGEL

20/06/13

MD1-0-C-591-01-00034

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (5)

IC

NIGEL

20/06/13

MD1-0-C-591-01-00035

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (6)

IC

NIGEL

20/06/13

MD1-0-C-591-01-00036

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (7)

IC

NIGEL

20/06/13

MD1-0-C-591-01-00037

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (8)

IC

NIGEL

20/06/13

MD1-0-C-591-01-00100

Cable Trench Plan (Station Aux. TR. Area)

IC

NIGEL

03/06/13

MD1-0-C-591-01-00200

Cable Tray Sleeper Foundation Plan (Station Aux. TR.Area)

IC

NIGEL

03/06/13

MD1-0-C-591-06-00030

Calculation for Electrical Manhole (CCB~Admin. Bldg.&WWT)

IC

NIGEL

20/06/13

MD1-0-C-591-06-00100

Caculation for Cable Trench Structure

IC

NIGEL

03/06/13

MD1-0-C-591-06-00200

Calculation for Cable Tray Sleeper Foundation

IC

NIGEL

03/06/13

MD1-0-C-591-11-00012

Electrical Duct Bank Detail (CCB~Admin. Bldg.&WWT)

IC

NIGEL

20/06/13

MD1-0-C-591-11-00070

Electrical Manhole Detail (CCB~Admin. Bldg.&WWT) (1)

IC

NIGEL

20/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-C-591-11-00071

Electrical Manhole Detail (CCB~Admin. Bldg.&WWT) (2)

STS
I

AUTHORISED
NIGEL

RECEIVED
20/06/13

MD1-0-C-591-11-00100

Cable Trench Structure Detail (Station Aux. TR. Area)

IC

NIGEL

03/06/13

MD1-0-C-591-11-00200

Cable Tray Sleeper Foundation Detail (Station Aux. TR.Area)

IC

NIGEL

03/06/13

MD1-0-C-840-01-00010

Waste water treatment area layout plan (1)

AC

NIGEL

25/03/13

MD1-0-C-840-01-00011

Waste water treatment area layout plan (2)

AC

NIGEL

25/03/13

MD1-0-C-840-01-00012

Waste water treatment area layout plan (3)

AC

NIGEL

25/03/13

MD1-0-C-840-06-00020

Calculation for filter, tank and Pump Mat Foundation of WT and WWT Area

NIGEL

03/07/13

MD1-0-C-840-06-00030

Calculation for box culvert & trench structure, pipe support foundation of wt &a

RT

NIGEL

25/03/13

MD1-0-C-840-06-00100

Calculation for Clarifer Concrete Structure, pH Adjust Pond and Mixing Pond

NIGEL

12/04/13

MD1-0-C-840-11-00020

Wt & wwt area trench details

RT

NIGEL

25/03/03

MD1-0-C-840-11-00021

Wt & wwt area stair & pipe support fdn. details (1)

RT

NIGEL

25/03/13

MD1-0-C-840-11-00022

Wt & wwt area stair & pipe support fdn. details (2)

RT

NIGEL

25/03/13

MD1-0-C-840-11-00051

WT & WWT Area Clarifier and Clarifier Internal PDN. Plan & Sections

NIGEL

12/04/13

MD1-0-C-840-11-00052

WT & WWT Area Clarifier and Clarifier Internal PDN. Sections & Details

NIGEL

12/04/13

MD1-0-C-840-11-00053

WT & WWT Area Clarifier Pile Arrangement Plan & Details

NIGEL

12/04/13

MD1-0-C-840-11-00054

WT & WWT Area Clarifier & Clarifier Internal FDN. Pile Arrangement Plan

NIGEL

12/04/13

MD1-0-C-840-11-00250

Waste Water Treatment Activated Carbon Filter FDN Detail

AC

NIGEL

03/07/13

MD1-0-C-840-11-00251

WT & WWT Area pressure Filter & Activated Carbon Filter FDN Details

AC

NIGEL

03/07/13

MD1-0-C-840-11-00260

WT & WWT Area Grativity Filter FDN. Plan & Sections

AC

NIGEL

03/07/13

MD1-0-C-840-11-00270

WT & WWT Area Acid Caustic Storage Tank FDN. Plan & Sections

AC

NIGEL

03/07/13

MD1-0-C-840-11-00271

WT & WWT Area Acid Caustic Storage Tank FDN. Detail (1)

AC

NIGEL

03/07/13

MD1-0-C-840-11-00272

WT & WWT Area Acid Caustic Storage Tank FDN. Detail (2)

AC

NIGEL

03/07/13

MD1-0-C-840-11-00280

WT & WWT Area Acid Caustic & Polymer FDN. Plan & Sections

AC

NIGEL

03/07/13

MD1-0-C-840-11-00281

WT & WWT Area Acid Caustic & Polymer FDN. Sections

AC

NIGEL

03/07/13

MD1-0-C-840-11-00282

WT & WWT Area Acid Caustic & Polymer FDN. Details (1)

AC

NIGEL

03/07/13

MD1-0-C-840-11-00283

WT & WWT Area Acid Caustic & Polymer FDN. Details (2)

AC

NIGEL

03/07/13

MD1-0-C-840-11-00284

WT & WWT Area Acid Caustic & Polymer FDN. Details (3)

AC

NIGEL

03/07/13

MD1-0-C-840-11-00285

WT & WWT Area Acid Caustic & Polymer FDN. Details (4)

AC

NIGEL

03/07/13

MD1-0-C-840-11-00290

WT & WWT Area Regeneration Pump FDN. Plan & Sections

AC

NIGEL

03/07/13

MD1-0-C-840-11-00300

Waste Water Treatment CPI Oil Separator FDN. Detail

AC

NIGEL

03/07/13

MD1-0-C-840-11-00301

WT & WWT Area Oily Wastewater, recovered Oil Transfer & Oil Sludge Pump FDN. Des

AC

NIGEL

03/07/13

MD1-0-C-840-11-00302

WT & WWT Area Mixing Blower CPI Oil Water Separator FDN. Details

AC

NIGEL

03/07/13

MD1-0-C-840-11-00310

WT & WWT Area Filter Backwash, Demin Plant Feed Water & Filtered Water

AC

NIGEL

03/07/13

MD1-0-C-840-11-00311

WT & WWT Area Filter Backwash, Demin Plant Feed Water & Filtered Water

AC

NIGEL

03/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-C-840-11-00320

WT & WWT Area Raw Water & Mudded Pump FDN. Plan & Sections

AC

AUTHORISED
NIGEL

RECEIVED
03/07/13

MD1-0-C-840-53-00250

WT & WWT Area Pressure Filter & Activated Carbon Filter FDN Reinf. Plan & Secti

NIGEL

03/07/13

MD1-0-C-840-53-00260

WT & WWT Area Gravity Filter FDN Reinforcement Plan & Sections

NIGEL

03/07/13

MD1-0-C-840-53-00270

WT & WWT Area Acid Caustic Storage Tank FDN Reinf. Plan & Sections

NIGEL

03/07/13

MD1-0-C-840-53-00271

WT & WWT Area Acid Caustic Storage Tank FDN Reinf. Details (1)

NIGEL

03/07/13

MD1-0-C-840-53-00272

WT & WWT Area Acid Caustic Storage Tank FDN Reinf. Details (2)

NIGEL

03/07/13

MD1-0-C-840-53-00280

WT & WWT Area Acid Caustic & Polymer FDN Plan & Sections

NIGEL

03/07/13

MD1-0-C-840-53-00282

WT & WWT Area Acid Caustic & Polymer FDN Details (1)

NIGEL

03/07/13

MD1-0-C-840-53-00283

WT & WWT Area Acid Caustic & Polymer FDN Reinf. Details (2)

NIGEL

03/07/13

MD1-0-C-840-53-00284

WT & WWT Area Acid Caustic & Polymer FDN Reinf. Details (3)

NIGEL

03/07/13

MD1-0-C-840-53-00285

WT & WWT Area Acid Caustic & Polymer FDN Reinf. Details (4)

NIGEL

03/07/13

MD1-0-C-840-53-00290

WT & WWT Area Regeneration Pump FDN Reinf. Plan & Sections

NIGEL

03/07/13

MD1-0-C-840-53-00300

Wastewater Recovered Oil, CIP Oil Water Separator, Mixing Blower FDN

NIGEL

03/07/13

MD1-0-C-840-53-00301

WT & WWT Area Oily Wasterwater, Recovered Oil Transfer & Oil Sludge Pump FDN Rel

NIGEL

03/07/13

MD1-0-C-840-53-00302

WT & WWT Area Mixing Blower, CIP Oil Water Separator FDN Reinf. Details

NIGEL

03/07/13

MD1-0-C-840-53-00310

WT & WWT Area Filter Backwash, Demin Plant Feed Water & Filtered Water Transfer

NIGEL

03/07/13

MD1-0-C-840-53-00311

WT & WWT Area Filter Backwash, Demin Plant Feed Water & Filtered Water Transfer

NIGEL

03/07/13

MD1-0-C-840-53-00320

WT & WWT Area Raw Water & Mudded Pump FDN Reinf. Plan & Sections

NIGEL

03/07/13

MD1-0-C-870-01-00050

Sanitary Sewer System Sump Pit (Admin. Bldg. North) Detail

RT

NIGEL

18/07/13

MD1-0-C-870-06-00050

Calculation for Sanitary Sump Pit

RT

NIGEL

18/07/13

MD1-0-C-870-53-00050

Sanitary Sewer System Sump Pit (Admin. Bldg. North) Re-Bar Detail

IC

NIGEL

18/07/13

MD1-0-D-215-01-00201

Plumbing Plan for Switchyard Control Building Ground Floor

NIGEL

12/12/12

MD1-0-D-215-01-00202

Plumbing Plan for Switchyard Control Building 1st Floor

NIGEL

12/12/12

MD1-0-D-215-01-00301

Enlarged Plumbing Plan for Switchyard Control Building Ground Floor

NIGEL

12/12/12

MD1-0-D-215-01-00302

Enlarged Plumbing Plan for Switchyard Control Building, 1st Floor

NIGEL

12/12/12

MD1-0-P-010-01-00002

Construction Temporary Facility Plan

NIGEL

30/11/12

MD1-0-T-030-01-00045

Inspection & Test Plan for Site Preparation & Earth Work

NIGEL

23/07/12

MD1-0-T-030-01-00046

Inspection & Test Plan for Reinforced Concrete Work

NIGEL

23/07/12

MD1-0-T-030-05-00027

Inspection & Test Plan of PC Spun Piling Work

NIGEL

10/08/12

MD1-0-T-030-05-00047

Inspection & Test Plan for Bored Cast-In-Situ Piling Work

NIGEL

04/07/12

MD1-0-T-030-05-00191

Inspection & Test Plan for masonry & Plastering Work

MAX

12/12/12

MD1-0-T-030-05-00192

ITP for Roof Waterproofing Work

MAX

14/01/13

MD1-0-T-030-05-00343

Inspection & Test Plan for Painting

AC

MAX

22/03/13

MD1-0-T-030-05-00348

ITP for the Permanent Ground Anchor of Intake Structure

NIGEL

06/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-T-030-05-00368

Itp for roof and wall cladding installation

AUTHORISED
MAX

RECEIVED
18/03/13

MD1-0-T-030-07-00045

Welder qualification test report for pile splicing

NIGEL

06/06/12

MD1-0-T-040-07-00031

Material Approval Request for Civil and Architecture Work

NIGEL

25/07/12

MD1-0-T-040-07-00032

Material Approval Request for Bored Pile

NIGEL

06/06/12

MD1-0-T-040-07-00033

Material Approval Request for pc pile (Vinaincon)

RT

NIGEL

20/04/12

MD1-0-T-040-07-00034

Material Approval Request for PC pile (Fecon)

NIGEL

01/08/12

MD1-0-T-040-07-00035

Material Approval Request for Electorodes of PC piles (Kiswel)

NIGEL

09/05/12

MD1-0-T-040-07-00036

Material Approval Request for steel bars for concrete reinforcement

NIGEL

14/06/12

MD1-0-T-040-07-00042

Material Approval Request for Paint around the Splicing joint of PC spun piles

RT

NIGEL

09/05/12

MD1-0-T-040-07-00055

Material Approval Request for Steel Pipe

AC

NIGEL

14/06/12

MD1-0-T-040-07-00057

Material Approval Request for cement (Thang Long)

NIGEL

10/09/12

MD1-0-T-040-07-00079

Material Approval Request for P.C Stand and HDPE hose

NIGEL

23/07/12

MD1-0-T-040-07-00116

Material Approval Request for Concrete Aggregate (Vina Fly Ash)

NIGEL

26/09/12

MD1-0-T-040-07-00117

Material Approval Request for Concrete Admixture (Sika)

NIGEL

27/08/12

MD1-0-T-040-07-00137

Material Approval Request for Concrete Works

AC

NIGEL

27/09/12

MD1-0-T-050-01-00048

Preliminary Design of Coffer Dam

AC

NIGEL

22/06/12

MD1-0-T-050-05-00026

Method Statement of PC Spun Piling Work

NIGEL

28/01/13

MD1-0-T-050-05-015

Method Statement of Concrete Trial Mix Design & Batch Plant Test Plan

NIGEL

11/06/12

MD1-0-T-050-05-016

Method Statement of Pile Load Test

IC

NIGEL

06/04/12

MD1-0-T-051-04-00067

Concrete Mix Design

NIGEL

17/07/12

MD1-0-T-051-04-00155

Additional Concrete Mix Design

NIGEL

13/11/12

MD1-0-T-051-04-00363

Additional Concrete Mix Design (Ha Long cement)

AC

NIGEL

19/02/13

MD1-0-T-051-05-00050

Method Statement of bored piling works

NIGEL

28/01/13

MD1-0-T-051-05-00058

Method Statement of Ground-water Monitoring wells

NIGEL

03/07/12

MD1-0-T-051-05-00063

Method statement Trial for Water Tightness on Contiguous Pile Walls by C-Jet

NIGEL

29/10/12

MD1-0-T-051-05-00065

Method Statement of Concrete and Formworks

NIGEL

06/08/12

MD1-0-T-051-05-00077

Method Statement of Earth & Contiguous Pile Wall Work

IC

NIGEL

23/08/12

MD1-0-T-051-05-00109

Method Statement of Mass Concreting for Stack Foundation

NIGEL

06/11/12

MD1-0-T-051-05-00123

Method Statement for Working Pile Load Test of Bored Pile

NIGEL

06/11/12

MD1-0-T-051-05-00222

Method Statement of Concreteing for Boiler Foundation

MAX

05/12/12

MD1-0-T-051-06-00125

Structural Calculation of Temp. Sheet- Pile Cofferdam for CW Intake P.Station

IC

NIGEL

09/11/12

MD1-0-T-051-07-00151

Interpretation Report for the Preliminary Tensile Pile Load Test of Bored Pile

NIGEL

20/11/12

MD1-0-T-051-07-00232

Dynamic Load Test Report for Filtered, Fire, Demi, Raw Water Storage Tanks

RT

NIGEL

28/01/13

MD1-0-T-051-07-00233

Pile Load Test Report for Stack

NIGEL

05/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-T-051-07-00234

Static Load Test Report for Filtered, Fire, Demi, Raw Water Storage Tanks

RT

AUTHORISED
NIGEL

RECEIVED
22/11/12

MD1-0-T-051-07-00238

Material Approval Request for Non-Shrinkage Concrete

AC

NIGEL

06/11/12

MD1-0-T-051-07-00245

Static Load Test Report for Pile No. 22 & 29- Turbine #1

NIGEL

28/01/13

MD1-0-T-051-07-00254

Evaluation of Working Pile Load Test in Water Storage Tanks Area

RT

NIGEL

12/11/12

MD1-0-T-051-07-00255

Water Test Result for Ground Water Monitoring Wells

IC

NIGEL

14/01/13

MD1-0-T-051-07-00258

Static Load Test Report for Pile No.67-Turbine #1

NIGEL

13/11/12

MD1-0-T-051-07-00268

Interpretation & Counterm Easure Report of Working Pile Load Tests in Boiler 1

NIGEL

18/12/12

MD1-0-T-051-07-00269

Interpretation & Counterm Easure Report of W. Pile Load Test in Turbine Bldg

NIGEL

22/11/12

MD1-0-T-051-07-00278

Material Approval Request for Asphalt Premix

MAX

27/02/13

MD1-0-T-051-07-00286

Static Load Test Report for Pile No.374, 455, 378 & 200- Boiler #1

NIGEL

28/11/12

MD1-0-T-051-07-00291

Material Approval Request for Sand & Crushed Stone

RT

NIGEL

21/11/12

MD1-0-T-051-07-00292

Correlation of DPLT and SPLT for Bored Piles

RT

NIGEL

14/12/12

MD1-0-T-051-07-00320

Interpretation Report for Plate Load Test at Chimney Foundation #2

NIGEL

19/12/12

MD1-0-T-051-07-00321

Bored Pile Sonic Test Report in Boiler 1- Part 1

NIGEL

17/01/13

MD1-0-T-051-07-00329

Static Load Test Report for Pile No.34-Boiler #1

NIGEL

14/01/13

MD1-0-T-051-07-00330

Bored Pile Sonic Test Report in Boiler 1- Part 2

NIGEL

17/01/13

MD1-0-T-051-07-00331

Dynamic Load Test Report For Boiler 1-Part 1

NIGEL

28/01/13

MD1-0-T-051-07-00332

Dynamic Load Test Report For Boiler 1-Part 2

NIGEL

28/01/13

MD1-0-T-051-07-00333

Static Load Test Report for Pile No.81&87- Turbine #2

NIGEL

28/01/13

MD1-0-T-051-07-00334

Additional Soil Investigation Report (2nd)

IC

NIGEL

28/01/13

MD1-0-T-051-07-00337

Material Approval Request Ground Anchor for Intake

NIGEL

10/05/13

MD1-0-T-051-07-00338

Static Load Test Report for Pile No.184- Turbine Building #1

NIGEL

28/02/13

MD1-0-T-051-07-00339

Static Pile Load Test Report for Coal Yard No.1&3 and Common Service Building

NIGEL

01/03/13

MD1-0-T-051-07-00341

Material Approval Request For Non-Shrink Concrete (SACA Grout)

AC

NIGEL

01/03/13

MD1-0-T-051-07-00345

Bored Pile Sonic Test Report in Boiler 1- Part 3

NIGEL

05/03/13

MD1-0-T-051-07-00351

Dynamic load test report for coal stock area no.1

NIGEL

28/02/13

MD1-0-T-051-07-00353

Dynamic load test report for coal stock area no.3

NIGEL

28/02/13

MD1-0-T-051-07-00355

Dynamic load test report for common service building

IC

NIGEL

28/02/13

MD1-0-T-051-07-00356

Dynamic load test report for esp unit #1a

IC

NIGEL

28/02/13

MD1-0-T-051-07-00358

Material approval request for chemical-oil resistant paint (fosroc)

AC

NIGEL

28/02/13

MD1-0-T-051-07-00359

Bored pile sonic test report for stg #1

NIGEL

04/04/13

MD1-0-T-051-07-00376

Static load test report for pile no.462-turbine building#2

IC

NIGEL

04/04/13

MD1-0-T-051-07-00377

Static load test report for pile no.25-stack#1

IC

NIGEL

04/04/13

MD1-0-T-051-07-00378

Static load test report for pile no.14-aux. boiler

IC

NIGEL

04/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-T-051-07-00379

Dynamic load test report for turbine building #1

IC

AUTHORISED
NIGEL

RECEIVED
04/04/13

MD1-0-T-051-07-00380

Dynamic load test report for stack #1

IC

NIGEL

04/04/13

MD1-0-T-051-07-00381

Bored pile sonic test report for turbine building#1-part 1

NIGEL

04/04/13

MD1-0-T-051-07-00383

Static load test report for pile no.74-esp

IC

NIGEL

04/04/13

MD1-0-T-051-07-00384

Dynamic load test report for fuel oil tanks

IC

NIGEL

04/04/13

MD1-0-T-051-07-00385

Dynamic load test report for aux. boiler

IC

NIGEL

04/04/13

MD1-0-T-051-07-00386

Bored pile sonic test report for stack 1

NIGEL

26/03/13

MD1-0-T-051-07-00391

Water Test Result For Ground Water Monitoring Wells (2nd)

IC

MAX

04/04/13

MD1-0-T-051-07-00395

Material approval request for pha lai fly ash

AC

NIGEL

23/04/13

MD1-0-T-051-07-00396

Material approval request for reinforcement (kyoei)

RT

NIGEL

13/05/13

MD1-0-T-051-07-00402

Material approval request for manhole cover (thien phat) (rev a)

MAX

14/06/13

MD1-0-T-051-07-00403

Permanent ground anchor testing report (rev.a)

RT

NIGEL

20/06/13

MD1-0-T-051-07-00407

Material Approval Request for Oil Containment Facilities (Rev.A)

MAX

14/05/13

MD1-0-T-051-07-00413

Material Approval Request for Reinforced Concrete

AC

NIGEL

28/05/13

MD1-0-T-051-07-00414

Material Approval Request for Steel Grating (KINH'S GRATING)

MAX

10/06/13

MD1-0-T-051-07-00416

MAR for R.C.W. External Painting (chimney)

AC

NIGEL

13/05/13

MD1-0-T-051-07-00417

MAR for External Insulation for Steel Liners(Chimney)

NIGEL

13/05/13

MD1-0-T-051-07-00419

MAR for Acid Resistant Protection(Chimney)

NIGEL

13/05/13

MD1-0-T-051-07-00420

MAR for Corrugated Steel Sheet(Chimney)

NIGEL

13/05/13

MD1-0-T-051-07-00421

MAR for Steel Structure Painting(Chimney)

NIGEL

13/05/13

MD1-0-T-051-07-00422

MAR for Expansion Joints(Chimney)

NIGEL

13/05/13

MD1-0-T-051-07-00425

Material Approval Request For Chain Link Fence ( An Toan Thang )

AC

BAO

12/07/13

MD1-0-T-051-07-00430

Bored Pile Sonic Test Report for Turbine Building #2-Part 1

NIGEL

29/05/13

MD1-0-T-051-07-00431

Bored Pile Sonic Test Report in Boiler #1 - Part 4 (Rev.A)

NIGEL

29/05/13

MD1-0-T-051-07-00433

Material Approval Request For Steel Grating (CKV)

RT

MAX

11/06/13

MD1-0-T-051-07-00435

Dynamic Load Test Report for PC Pile in Belt Conveyor BC- 01A - Park 2 (Rev.A)

RT

NIGEL

19/07/13

MD1-0-T-051-07-00436

Dynamic Load Test Report for PC Pile in Bottom Ash Silo Unit #2B (Rev.A)

RT

NIGEL

19/07/13

MD1-0-T-051-07-00437

Dynamic Load Test Report for PC Pile in Coal Stock Area No.2 - Part 4 (Rev.A)

RT

NIGEL

19/07/13

MD1-0-T-051-07-00438

Dynamic Load Test Report for PC Pile in Coal Stock Belt Conveyor BC 09 (Rev.A)

IC

NIGEL

24/07/13

MD1-0-T-051-07-00439

Dynamic Load Test Report for PC Pile in Coal Stock Belt Conveyor BC 11 (Rev.A)

IC

NIGEL

24/07/13

MD1-0-T-051-07-00440

Dynamic Load Test Report for PC Pile in Limestone Handing System (Rev.A)

RT

NIGEL

24/07/13

MD1-0-T-051-07-00441

Dynamic Load Test Report for PC Pile in Stacker Reclaimer 1&2-Part 4 (Rev.A)

RT

NIGEL

24/07/13

MD1-0-T-051-07-00443

Dynamic Load Test Report for PC Pile in Condensate Water Storage Tank (1)

RT

NIGEL

24/07/13

MD1-0-T-051-07-00444

Dynamic Load Test Report for PC Pile in Gaseous Chlorination Building

RT

NIGEL

24/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-T-051-07-00446

Dynamic Load Test Report for PC Pile in Main & Unit Aux.Transformer Unit #2

RT

AUTHORISED
NIGEL

RECEIVED
24/07/13

MD1-0-T-051-07-00447

Dynamic Load Test Report for PC Pile in Ash Pipe Lines Pipe Rack #2

RT

NIGEL

24/07/13

MD1-0-T-051-07-00454

Static Load Test Report for PC Pile No P73 in Ash Pipe Lines Pipe Rack -2

NIGEL

26/06/13

MD1-0-T-051-07-00456

Static Load Test Report for Pile No.124 in Gaseous Chlorination Building

IC

NIGEL

10/07/13

MD1-0-T-051-07-00459

Material Approval Request For Chemical - Oil Resistant Paint (KCC)

RT

MAX

24/07/13

MD1-0-T-051-07-00462

Dynamic Load Test Report For Coal Stock Belt Conveyor BC-08

IC

NIGEL

27/06/13

MD1-0-T-051-07-00463

Dynamic Load Test Report For Seal Pit Structure

RT

NIGEL

27/06/13

MD1-0-T-051-07-00467

Static Load Test Report for PC Pile No.02 in Clarifier - WT & WWT Area

NIGEL

24/07/13

MD1-0-T-051-07-00469

Static Load Test Report for PC Pile No.73 in Belt Conveyor BC-01A

NIGEL

24/07/13

MD1-0-T-051-07-00470

Lateral Load Test Report for Pile No T-01 in Limestone Unloading Jetty

RT

NIGEL

26/07/13

MD1-0-T-051-07-00471

Static Load Test Report for Pile No.T-02 in Limestone Unloading Jetty

RT

NIGEL

26/07/13

MD1-0-T-051-07-00472

Dynamic Load Test Report for PC Pile in Ash Pipe Lines Pipe Rack - 1

IC

NIGEL

26/07/13

MD1-0-T-051-07-00473

Dynamic Load Test Report for PC Pile in Coal Stock Belt Conveyor BC-10

IC

NIGEL

26/07/13

MD1-0-T-051-07-00474

Dynamic Load Test Report for PC Pile in Belt Conveyor BC-03A

RT

NIGEL

26/07/13

MD1-0-T-051-07-00477

Water Test Result for Ground Water Monitoring Wells (3rd)

IC

MAX

22/07/13

MD1-0-T-051-11-00039

PC Spun Pile Design (Minh Duc)

NIGEL

26/09/12

MD1-0-T-051-11-00061

PC Spun Pile Design (Fecon)

NIGEL

26/09/12

MD1-0-T-052-05-00054

Method Statement of Earth Works

NIGEL

10/07/12

MD1-0-T-052-05-00066

Method Statement for the installation of Roof and Wall Cladding System

IC

NIGEL

24/09/12

MD1-0-T-052-05-00075

Concrete Testing Plan

AC

NIGEL

20/11/12

MD1-0-T-052-05-00078

Method Statement for Reinforcement

IC

NIGEL

02/11/12

MD1-0-T-052-05-00108

Method Statement for Undergeround Waterproofing Works

IC

NIGEL

27/09/12

MD1-0-T-052-05-00112

Method Statement for Anti Termite Soil Treatment Works

IC

NIGEL

13/11/12

MD1-0-T-052-05-00114

Method Statement for STG Foundation Concrete Works

NIGEL

06/12/12

MD1-0-T-052-05-00135

Inspection & Test Plan for Steel Structure (DAEJOO)

MD1-0-T-052-05-00138

Method Statement for Concrete Repair Works

MD1-0-T-052-05-00157

MD1-0-T-052-05-00159
MD1-0-T-052-05-00161

MAX

05/02/13

RT

NIGEL

28/09/12

Method Statement for Masonry & Plastering Works

NIGEL

06/11/12

Method statement for painting works

IC

NIGEL

20/03/13

Method statement for tile installation works

IC

NIGEL

20/03/13

MD1-0-T-052-05-00163

Method statement for waterproofing system to concrete roof slab

IC

NIGEL

20/03/13

MD1-0-T-052-05-00280

Method Statement for Settlement Monitoring Works

IC

NIGEL

11/03/13

MD1-0-T-052-05-00366

Method statement for raised access floor works

IC

NIGEL

19/03/13

MD1-0-T-052-05-00367

Method statement for suspended ceiling works

IC

NIGEL

20/03/13

MD1-0-T-052-05-00468

Method Statement for STG Top Table Concrete Works

IC

ALAN

26/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-T-052-07-00064

Material Approval Request for Waterproofing to Underground Concrete Structure

AUTHORISED
NIGEL

RECEIVED
07/08/12

MD1-0-T-052-07-00080

Material Approval Request for Anti Termite Soil Treatment (Hockley Internationa)

NIGEL

27/08/12

MD1-0-T-052-07-00081

Material Approval Request for Anti Termite Soil Treatment (Sichuan Province )

RT

NIGEL

25/07/12

MD1-0-T-052-07-00127

Material Approval Request for Doors

AC

NIGEL

17/09/12

MD1-0-T-052-07-00128

Material Approval Request for Joint Materias & Waterproofing (FOSROC)

AC

NIGEL

07/11/12

MD1-0-T-052-07-00129

Material Approval Request for Windows and Glass

AC

NIGEL

05/04/13

MD1-0-T-052-07-00134

Material Approval Request for Doors (SINH SUNG)

AC

NIGEL

26/09/12

MD1-0-T-052-07-00139

Material Approval Request for Joint Materials & Waterproofing (SIKA)

MAX

21/06/13

MD1-0-T-052-07-00140

Material Approval Request for Doors (VIET JAPAN)

AC

MAX

05/07/13

MD1-0-T-052-07-00141

Material Approval Request for Protection Board (VIET THAI)

RT

NIGEL

12/10/12

MD1-0-T-052-07-00142

Material Information for Hollow Concrete Block (DONG TAM)

NIGEL

19/03/13

MD1-0-T-052-07-00154

Material Approval Request for Ceramic Tile (Dongtam)

AC

NIGEL

26/03/13

MD1-0-T-052-07-00160

Material approval request for wooden door (sagaco)

AC

NIGEL

04/04/13

MD1-0-T-052-07-00162

Material approval request for vinyl tile (gerflor)

AC

NIGEL

04/04/13

MD1-0-T-052-07-00245

Material Approval Request Metal Roof & Wall Cladding

MAX

28/01/13

MD1-0-T-052-07-00276

Material Approval Request for Ceiling (Austrong)

MAX

05/07/13

MD1-0-T-052-07-00283

Material Approval Request for Hardener (FOSROC)

AC

NIGEL

26/11/12

MD1-0-T-052-07-00287

Material Approval Request for Hollow Concrete Block (Khang Minh)

MAX

05/07/13

MD1-0-T-052-07-00288

Material Approval Request for Hollow Concrete Block (BUT SON)

AC

NIGEL

26/11/12

MD1-0-T-052-07-00290

Material Approval Request for Paint (Jotun)

RT

MAX

16/07/13

MD1-0-T-052-07-00294

Material Approval Request for Weldmesh (Song Hop Luc)

MAX

05/07/13

MD1-0-T-052-07-00296

Material Approval Request for Access Floor (XIANGLI Floor)

AC

MAX

05/02/13

MD1-0-T-052-07-00297

Material Approval Request for Ceiling (USG)

AC

NIGEL

05/03/13

MD1-0-T-052-07-00298

Material Approval Request for Vinyl & Carpet Tile (TOLI)

AC

NIGEL

26/11/12

MD1-0-T-052-07-00349

Material approval request for insulation board (lemax)

AC

NIGEL

28/02/13

MD1-0-T-052-07-00373

Material Approval Request for Clinker Brick (Viglacera Halong)

AC

NIGEL

26/03/13

MD1-0-T-052-07-00374

Material approval request for metal roller shutter door (vina sanwa)

AC

NIGEL

26/03/13

MD1-0-T-052-07-00388

Material Approval Request for Terrazzo Tile (Secoin)

AC

NIGEL

26/03/13

MD1-0-T-052-07-00389

Material Approval Request for Toilet Cubicle (Shengzhen)

AC

NIGEL

26/03/13

MD1-0-T-052-07-00393

Material approval request for access floor (mero)

MAX

11/06/13

MD1-0-T-052-07-00398

Material approval request for paint (international)

AC

NIGEL

14/05/13

MD1-0-T-052-07-00475

Material Approval Request for Joint Materials (X-CALIBUR)

AC

MAX

18/07/13

MD1-0-T-053-05-00145

Method Statement for Steel Structure Painting (DAEJOO)

IC

NIGEL

28/12/12

MD1-0-T-053-05-00148

Method Statement for Steel Structure Shop Fabrication

NIGEL

25/10/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-T-053-05-00250

Method Statement for Grouting

IC

AUTHORISED
NIGEL

RECEIVED
05/12/12

MD1-0-T-053-05-00251

Method Statement for Erection of Steel Structure

IC

NIGEL

05/12/12

MD1-0-T-053-05-00259

Inspection & Test Plan for Steel Structure PEB (Kirby)

MAX

12/12/12

MD1-0-T-053-05-00260

Method Statement for Inspection & Testing

IC

NIGEL

09/01/13

MD1-0-T-053-05-00262

Method Statement for PEB Fabrication

IC

NIGEL

09/01/13

MD1-0-T-053-05-00263

Method Statement for PEB Painting

IC

NIGEL

09/01/13

MD1-0-T-053-05-00264

Method Statement for PEP Packing (Kirby)

MAX

12/12/12

MD1-0-T-053-05-00362

Method statement for steel structure repair works

IC

NIGEL

04/03/13

MD1-0-T-053-07-00240

Material Approval Request for Non Shrink Mortar

AC

NIGEL

12/12/12

MD1-0-T-053-07-00252

Material Approval Request for Deck Plate

AC

NIGEL

12/12/12

MD1-0-T-053-07-00266

Material Approval Request for PEB Bolt

AC

NIGEL

26/12/12

MD1-0-T-053-07-00279

Material Approval Request for Grating

RT

NIGEL

26/11/12

MD1-0-T-053-07-00315

Material Approval Request for Asphalt Impregnated Board

NIGEL

27/12/12

MD1-0-T-053-07-00347

Material Approval Request for Grouting Material (SIKA)

MAX

14/05/13

MD1-0-T-053-07-00357

Material approval request for boiler steel structure paint(international paint)

MAX

11/06/13

MD1-0-T-053-07-00387

Material approval request for grouting material (sika 318vn)

AC

NIGEL

26/03/13

MD1-0-T-054-05-00082

Method Statement for Underground Piping (GRP)

NIGEL

01/10/12

MD1-0-T-054-07-00400

Material approval request for hdpe pipes and fittings (ug fire fighting piping )

BAO

21/06/13

MD1-0-T-054-07-00401

Material approval request for paint (ag fire fighting piping system)-hai phong t

RT

BAO

18/04/13

MD1-0-T-054-07-00432

Material Apporval Request For Paint(international Paint Singapore)

AC

MAX

24/07/13

MD1-0-T-054-07-00466

Material Approval Request for Paint(HEMPEL)

AC

MAX

09/07/13

MD1-0-T-055-05-00346

Method Statement For Switchyard Steel Structure Installation

MAX

22/01/13

MD1-0-T-057-07-00152

Material Approval Request for U-PVC (DE NHAT)

RT

NIGEL

12/10/12

MD1-0-T-057-08-00316

Common service building kitchen facilites specification

IC

NIGEL

21/06/13

MD1-0-T-070-07-00018

Soil Investigation Report

NIGEL

06/07/12

MD1-0-T-070-07-00024

Interpretation Report for the PDA tests and Dynamic Load Tests of PC Spun Pile

NIGEL

05/07/12

MD1-0-T-070-07-00025

Interpretation Report for the Preliminary Pile Load Test of PC Spun Pile

NIGEL

05/07/12

MD1-0-T-070-07-00029

Interpretation Report for the Preliminary Pile Load Test adjacent Turbine

NIGEL

05/07/12

MD1-0-T-070-07-00059

Bored Pile Capacity Analysis

IC

NIGEL

02/07/12

MD1-0-T-070-07-00060

Additional Soil Investigation Report

NIGEL

01/10/12

MD1-0-T-300-04-00010

Structurual calculation of Earth Retaining structures for CW Intake Pump Station

NIGEL

20/11/12

MD1-0-T-370-56-00100

Temporary Earth Retaining Structures for CW Intake Pump Station of Excavation

IC

NIGEL

20/11/12

MD1-0-T-370-56-00101

Temporary Earth Retain. Structures for C.W Intake P.Station of Ground- Stage

IC

NIGEL

20/11/12

MD1-0-T-370-56-00103

Temporary Earth Retaining Structure for C.W Intake Pump Station of Side Plan (1)

IC

NIGEL

20/11/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-T-370-56-00104

Temporary Earth Retaining Structures for C.W Intake Pump Station of Side Plan (2

IC

AUTHORISED
NIGEL

RECEIVED
20/11/12

MD1-0-T-370-56-00106

Temporary Earth Retaining Structures for C.W Intake Pump Station-Typical Sec. (1

IC

NIGEL

20/11/12

MD1-0-T-370-56-00107

Temp. Earth Retain. Structures for C.W Intake Pump Sta. of Geo Tech. Instr. Plan

IC

NIGEL

20/11/12

MD1-0-T-370-56-00108

Temporay Earth Retaining structures for C.W Intake Pump Sta. of Detail Geo Tech.

IC

NIGEL

20/11/12

MD1-0-T-370-56-00109

Temp. Earth Retain. Structure for C.W Intake Pump Sta. of Anchor Detail

IC

NIGEL

20/11/12

MD1-0-T-370-56-00110

Temp. Earth Retain. Structur. for C.W Intake Pump Station of Guide Beam for bore

IC

NIGEL

20/11/12

MD1-0-T-370-56-00111

Temp. Earth Retain. Structure For C.W Intake Pump Sta. of Re-bar Cage

IC

NIGEL

20/11/12

MD1-0-T-370-56-00112

Temp. Earth Retain. Structure for C.W Intake Pump Sta. of Cap Beam of Continguos

IC

NIGEL

20/11/12

MD1-0-T-370-56-00113

Temp. Earth Retain. Struct. for C.W Intake Pump Sta. of Dewatering Plan

IC

NIGEL

20/11/12

MD1-0-T-370-56-00114

Temp. Earth Retain. Structure for C.W Intake Pump Station of Dewatering Section

IC

NIGEL

20/11/12

MD1-0-T-370-56-00200

Permanent Bay Wall Structure for C.W Intake Pump Station- Layout Plan (1)

NIGEL

31/05/13

MD1-0-T-370-56-00201

Permanent Bay Wall Structure for C.W Intake Pump Station- Layout Plan (2)

NIGEL

31/05/13

MD1-0-T-370-56-00202

Permanent Bay Wall Structure for C.W Intake Pump Station- Pile Arrang. Plan

NIGEL

31/05/13

MD1-0-T-370-56-00203

Permanent Bay Wall Structure for C.W Intake Pump Station- Ground Anchor Stage 1

NIGEL

31/05/13

MD1-0-T-370-56-00204

Permanent Bay Wall Structure for C.W Intake Pump Station- Ground Anchor Stage 2

NIGEL

31/05/13

MD1-0-T-370-56-00205

Permanent Bay Wall Structure for C.W Intake Pump Station- Ground Anchor Stage 3

NIGEL

31/05/13

MD1-0-T-370-56-00206

Permanent Bay Wall Structure for C.W Intake Pump Station- Tie Cable Arrang.

NIGEL

31/05/13

MD1-0-T-370-56-00219

Permanent Bay Wall Str. for C.W Intake P.Station- Const. Sequence- Type W1(1)

NIGEL

31/05/13

MD1-0-T-370-56-00220

Permanent Bay Wall Str. for C.W Intake P.Station- Const. Sequence- Type W1(2)

NIGEL

31/05/13

MD1-0-T-370-56-00221

Permanent Bay Wall Str. for C.W Intake P.Station- Const. Sequence- Type W5

NIGEL

31/05/13

MD1-0-T-370-56-00222

Permanent Bay Wall Str. for C.W Intake P.Station- Geotech. Instruments Plan

NIGEL

31/05/13

MD1-0-T-370-56-00225

Permanent Bay Wall Str. for C.W Intake P.Station- Re-bar Cage For Contig. Bore 1

NIGEL

31/05/13

MD1-0-T-370-56-00226

Permanent Bay Wall Str. for C.W Intake P.Station- Re-bar Cage For Contig. Bore 2

NIGEL

31/05/13

MD1-0-T-370-56-00227

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 3

NIGEL

31/05/13

MD1-0-T-370-56-00228

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 4

NIGEL

31/05/13

MD1-0-T-370-56-00229

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 5

NIGEL

31/05/13

MD1-0-T-370-56-00230

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 6

RT

NIGEL

16/11/12

MD1-0-T-370-56-00231

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 7

NIGEL

31/05/13

MD1-0-T-370-56-00232

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 8

NIGEL

31/05/13

MD1-0-T-370-56-00233

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 9

NIGEL

31/05/13

MD1-0-T-370-56-00234

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Rear Bore Pile

NIGEL

31/05/13

MD1-0-T-370-56-00235

Permanent Bay Wall Str. for CW Intake P.Station- RC Bond Beam Detail

NIGEL

31/05/13

MD1-0-T-370-56-00236

Permanent Bay Wall Str. for CW Intake P.Station- Facial Concrete Detail

NIGEL

31/05/13

MD1-0-T-370-56-00237

Permanent Bay Wall Str. for CW Intake P.Station-Cap Beam Detail (1)

NIGEL

31/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-T-370-56-00238

Permanent Bay Wall Str. for CW Intake P.Station-Cap Beam Detail (2)

AUTHORISED
NIGEL

RECEIVED
31/05/13

MD1-0-T-370-56-00239

Permanent Bay Wall Str. for CW Intake P.Station-Cap Beam Detail of Rear Bore

NIGEL

31/05/13

MD1-0-T-370-56-00240

Permanent Bay Wall Str. for CW Intake P.Station-Connection Detail

NIGEL

31/05/13

MD1-0-T-370-56-00301

Temp. Sheet- Pile Cofferdam for CW Intake P.Station: Excav. Plan (1)

IC

NIGEL

22/10/12

MD1-0-T-370-56-00302

Temp. Sheet- Pile Cofferdam for CW Intake P.Station: Excav. Plan (2)

IC

NIGEL

22/10/12

MD1-0-T-370-56-00303

Temp. Sheet- Pile Cofferdam for CW Intake P.Station: Excav. Section (1)

IC

NIGEL

22/10/12

MD1-0-T-370-56-00304

Temp. Sheet- Pile Cofferdam for CW Intake P.Station: Excav. Section (2)

IC

NIGEL

22/10/12

MD1-0-T-370-56-00305

Temp. Sheet- Pile Cofferdam for CW Intake P.Station: Excav. Section (3)

IC

NIGEL

22/10/12

MD1-0-T-370-56-00306

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Side Plan Detail of Sheet Pile (1

IC

NIGEL

22/10/12

MD1-0-T-370-56-00307

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Side Plan Detail of Sheet Pile (2

IC

NIGEL

22/10/12

MD1-0-T-370-56-00308

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Geo Tech. Instruments Plan

IC

NIGEL

22/10/12

MD1-0-T-370-56-00309

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Geo Tech. Instruments Detail

IC

NIGEL

22/10/12

MD1-0-T-370-56-00310

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Wale & Struts Joint Detail

IC

NIGEL

22/10/12

MD1-0-T-370-56-00311

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Tie Cable Detail

IC

NIGEL

22/10/12

MD1-0-T-370-56-00312

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Sheet Pile Detail (1)

IC

NIGEL

22/10/12

MD1-0-T-370-56-00313

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Sheet Pile Detail (2)

IC

NIGEL

22/10/12

MD1-0-T-370-56-00404

PERMANENT BAY WALL STRUCTURES FOR C.W INTAKE PUMP STATION OF MD-1_EXCAVATION
I PL)

NIGEL

31/05/13

MD1-0-T-370-56-00405

PERMANENT BAY WALL STRUCTURES FOR C.W INTAKE PUMP STATION OF MD-1_EXCAVATION
I PL)

NIGEL

31/05/13

MD1-0-T-470-01-10001

GENERAL PLAN OF LIMESTONE & FUEL OIL UNLOADING JETTY

RT

NIGEL

15/03/13

MD1-0-T-470-01-10002

TYPICAL SECTION OF LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

MD1-0-T-470-01-10003

PILE ARRANGEMENT OF LIMESTONE UNLOADING JETTY

AC

NIGEL

10/04/13

MD1-0-T-470-01-10004

GENERAL PLAN OF LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

MD1-0-T-470-01-10005

SECTION & DETAIL OF LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

MD1-0-T-470-01-10006

FOOTING GENERAL OF CONVEYOR BASE

RT

NIGEL

15/03/13

MD1-0-T-470-01-10007

HANDRAIL PLAN & SECTION OF LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

MD1-0-T-470-01-10008

P.C PILE HEAD DETAILS LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

MD1-0-T-470-01-20001

TYPICAL SECTION(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

MD1-0-T-470-01-20002

PILE ARRANGEMENT(FUEL OIL UNLOADING PUMP HOUSE)

AC

NIGEL

10/04/13

MD1-0-T-470-01-20003

PUMP HOUSE PLAN & SECTION(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

MD1-0-T-470-01-20004

PUMP HOUSE SECTION & STAIR DETAIL(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

MD1-0-T-470-01-20005

HANDRAIL PLAN & SECTION(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

MD1-0-T-470-01-20006

P.C PILE HEAD DETAILS(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

MD1-0-T-470-04-00001

Unloading jetty design criteria

RT

NIGEL

14/03/13

MD1-0-T-470-53-10001

LIMESTONE BAR ARRANGEMENT(1)

RT

NIGEL

15/03/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-T-470-53-10002

LIMESTONE BAR ARRANGEMENT(2)

RT

AUTHORISED
NIGEL

RECEIVED
15/03/13

MD1-0-T-470-53-10003

LIMESTONE BAR ARRANGEMENT(3)

RT

NIGEL

15/03/13

MD1-0-T-470-53-10004

CONVEYOR BASE BAR ARRANGEMENT

RT

NIGEL

15/03/13

MD1-0-T-470-53-10005

ACCESS BRIDGE BAR ARRANGEMENT(1)

RT

NIGEL

15/03/13

MD1-0-T-470-53-10006

ACCESS BRIDGE BAR ARRANGEMENT(2)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20001

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(1)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20002

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(2)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20003

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(3)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20004

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(4)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20005

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(5)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20006

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(6)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20007

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(7)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20008

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(8)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20009

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(9)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20010

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(10)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20011

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(11)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20012

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(12)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20013

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(13)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20014

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(14)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20015

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(15)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20016

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(16)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20017

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(17)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20018

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(18)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20019

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(19)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20020

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(20)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20021

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(21)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20022

TRESTLE BAR ARRANGEMENT(1)

RT

NIGEL

15/03/13

MD1-0-T-470-53-20023

TRESTLE BAR ARRANGEMENT(2)

RT

NIGEL

15/03/13

MD1-0-T-470-55-00001

CALCULATION OF LIMESTONE UNLOADING JETTY AND FUEL OIL UNLOADING PUMP HOUSE RT

NIGEL

15/03/13

MD1-0-V-114-06-00005

Calculation of Anchor Bolt Sizing

IC

NIGEL

04/12/12

MD1-0-V-114-09-00005

Load Information for Static Load and Thermal Expansion and Sliding Friction

IC

NIGEL

04/12/12

MD1-0-V-115-09-00002

Foundation & Loading Data

IC

NIGEL

14/09/12

MD1-0-V-121-52-00001

Foundation drawing for boiler feedwater pump & boiler feedwater booster pump

IC

NIGEL

03/05/13

MD1-0-V-133-11-00002

Water box vacuum pump foundation drawing

NIGEL

20/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-151-10-00002

Air Compressor- Dimension & Foundation Drawing for Air-Compressor

IC

AUTHORISED
NIGEL

RECEIVED
22/11/12

MD1-0-V-151-10-00003

Air Compressor- Dimension & Foundation Drawing for Air Dryer

IC

NIGEL

22/11/12

MD1-0-V-151-10-00004

Air Compressor- Dimension & Foundation Drawing for IA/SA Receiver Tank (1 of 2)

IC

NIGEL

22/11/12

MD1-0-V-161-01-01005

SA and PA Fan to AH Duct Loads to Steel Plan and Elevation

IC

NIGEL

03/10/12

MD1-0-V-161-01-04101

Blowndown Tank Load and Foundation Drawing

IC

NIGEL

24/10/12

MD1-0-V-161-01-32531

Anchor Bolt Drawing & Hilti Anchor Literature for Loop Seal Blower

NIGEL

06/02/13

MD1-0-V-161-01-32532

Loop Seal Blower General Arrangement

IC

NIGEL

24/10/12

MD1-0-V-161-01-32541

Anchor Bolt Drawing & Hilti Anchor Literature for Stripper Cooler Blower

NIGEL

06/02/13

MD1-0-V-161-01-32542

Stripper Cooler Blower General Arrangement

IC

NIGEL

24/10/12

MD1-0-V-161-06-01107

Base Plate & Anchor Bolt Design (Metric)

IC

NIGEL

06/12/12

MD1-0-V-161-09-14611

Boiler structure handrail paint msds

NIGEL

04/04/13

MD1-0-V-161-09-16125

Instrument Data Sheets, Avaraging Pitot Tubes

RT

NIGEL

19/12/12

MD1-0-V-161-09-16131

Instrument Data Sheets, Gauge Glasses and Gauge Valves

RT

NIGEL

19/12/12

MD1-0-V-161-09-16133

Instrument Data Sheets, Silo Level Detectors (Radar type)

AC

NIGEL

19/12/12

MD1-0-V-161-09-16134

Instrument Data Sheets, Level Switches

AC

NIGEL

19/12/12

MD1-0-V-161-09-16135

Instrument Data Sheets, Level Instruments (Conductivity Type)

AC

NIGEL

19/12/12

MD1-0-V-161-09-16141

Instrument Data Sheets, Pressure Gauges

AC

NIGEL

19/12/12

MD1-0-V-161-09-16142

Instrument Data Sheets, Pressure Transmitters

AC

NIGEL

19/12/12

MD1-0-V-161-09-16161

Instrument Data Sheets, Flue Gas O2 Analyzers

NIGEL

19/12/12

MD1-0-V-161-10-14340

Anchor Bolts Shop Details

NIGEL

28/11/12

MD1-0-V-161-12-00003

Steel Structure MTO of Base Plate for Boiler

IC

NIGEL

06/12/12

MD1-0-V-161-12-00004

Steel Structure MTO of Base Plate for Bridge

IC

NIGEL

06/12/12

MD1-0-V-161-12-00005

Steel Structure MTO of Anchor Rod

IC

NIGEL

06/12/12

MD1-0-V-161-54-01100

Column Base Load Plan

IC

NIGEL

06/12/12

MD1-0-V-161-54-01101

Column Base Load Table (1)

IC

NIGEL

06/12/12

MD1-0-V-161-54-01102

Column Base Load Table (2)

IC

NIGEL

06/12/12

MD1-0-V-161-54-01103

Anchor Bolt Location Plan

IC

NIGEL

06/12/12

MD1-0-V-161-54-01104

Column Base Plate Detail Table

IC

NIGEL

06/12/12

MD1-0-V-161-54-01105

Anchor Rod Schedule and Detail for Columns

IC

NIGEL

06/12/12

MD1-0-V-161-54-01106

Standard Base Plate Details

IC

NIGEL

06/12/12

MD1-0-V-161-54-01107

Column Schedule

IC

NIGEL

28/12/12

MD1-0-V-161-54-01110

Steel Framing Plan (Lev A) TOS EL.10030, 12077 & 13100

NIGEL

28/12/12

MD1-0-V-161-54-01111

Steel Framing Plan (Lev B) TOS EL. 15277, 15662

IC

NIGEL

28/12/12

MD1-0-V-161-54-01112

Steel Framing Plan (Lev C) TOS EL. 17790, 18327, 19377, 19662 & 20562

NIGEL

28/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-161-54-01113

Steel Framing Plan (Lev D) TOS EL. 22827, 23030 & 25167

STS
I

AUTHORISED
NIGEL

RECEIVED
28/12/12

MD1-0-V-161-54-01114

Steel Framing Plan (Lev A1) TOS EL. 18650 & 20150

NIGEL

28/12/12

MD1-0-V-161-54-01115

STEEL FRAMING PLAN(LEVEL B1) TOS EL 9592

NIGEL

19/03/13

MD1-0-V-161-54-01120

Steel Framing Plan (Level E) TOS EL25725, 25288, 26899

NIGEL

28/12/12

MD1-0-V-161-54-01121

Steel Framing Plan (Level F) TOS EL27587, 27749, 28762 & 30282

NIGEL

19/03/13

MD1-0-V-161-54-01122

Steel Framing Plan (Level G) TOS EL32022 & 33129

NIGEL

19/03/13

MD1-0-V-161-54-01123

Steel Framing Plan (Level H) TOS EL34932

NIGEL

19/03/13

MD1-0-V-161-54-01130

Steel Framing Plan (Level I) TOS EL.37562

NIGEL

19/03/13

MD1-0-V-161-54-01131

Steel Framing Plan (Level J) TOS EL.40262

NIGEL

19/03/13

MD1-0-V-161-54-01132

Steel Framing Plan (Level K) TOS EL.43852

NIGEL

19/03/13

MD1-0-V-161-54-01133

Steel Framing Plan (Level L) TOS EL.46662

NIGEL

19/03/13

MD1-0-V-161-54-01134

Steel Framing Plan (Level M) TOS EL.49039, 49237

NIGEL

19/03/13

MD1-0-V-161-54-01135

Steel Framing Plan (Level N) TOS EL 51812

NIGEL

19/03/13

MD1-0-V-161-54-01140

Steel Framing Plan (Level O) TOS EL.53967, 54442, 55042

NIGEL

28/12/12

MD1-0-V-161-54-01141

Steel Framing Plan (Level P) TOS EL.55050, 55662, 56477

NIGEL

19/03/13

MD1-0-V-161-54-01142

Steel Framing Plan (Level Q) TOS EL.55050, 55662, 56477

NIGEL

28/12/12

MD1-0-V-161-54-01143

Steel Framing Plan (Level R) TOS EL.59534, 59566

NIGEL

19/03/13

MD1-0-V-161-54-01144

Steel Framing Plan (Level S) TOS EL. 61175 & 62665

NIGEL

28/12/12

MD1-0-V-161-54-01145

Steel Framing Plan (Level T) TOS EL. 65555

NIGEL

19/03/13

MD1-0-V-161-54-01146

Roof Plan (Level U)

NIGEL

28/12/12

MD1-0-V-161-54-01147

Girts Section (Level V)-RD1146 Section

NIGEL

28/12/12

MD1-0-V-161-54-01148

STEEL FRAMING PLAN - RD 1143 FOR U2A & U2B

NIGEL

28/12/12

MD1-0-V-161-54-01149

ROOF PLAN (FOR U1B & U2B)

NIGEL

28/12/12

MD1-0-V-161-54-01150

STEEL FRAMING - FOR BRIGE TOP EL.51812,

NIGEL

19/03/13

MD1-0-V-161-54-01160

Steel Framing Plan Support Beam for Hook

IC

NIGEL

03/05/13

MD1-0-V-161-54-01161

Elevator Tower Framing

IC

NIGEL

03/05/13

MD1-0-V-161-54-01162

Elevator Tower Girt - Rd 1161

IC

NIGEL

03/05/13

MD1-0-V-161-54-01200

STEEL FRAMING BENT G

IC

NIGEL

28/12/12

MD1-0-V-161-54-01201

Steel Framing Bent H

NIGEL

19/03/13

MD1-0-V-161-54-01202

BENT J & J4

NIGEL

28/12/12

MD1-0-V-161-54-01203

BENT K

NIGEL

28/12/12

MD1-0-V-161-54-01204

BENT L

NIGEL

28/12/12

MD1-0-V-161-54-01205

BENT K4, L6, L9, N & P

NIGEL

28/12/12

MD1-0-V-161-54-01206

BENT M

NIGEL

28/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-161-54-01207

BENT 1, 3 & 4 (#1A) 14, 16 &17(#2A), 7.1, 9 & 10 (#1B) 20.1, 22&23 (#2B)

STS
I

AUTHORISED
NIGEL

RECEIVED
28/12/12

MD1-0-V-161-54-01208

BENT 2 (#1A), 15 (#2A), 8 (#1B), 21 (#2B)

NIGEL

28/12/12

MD1-0-V-161-54-01209

BENT 7 (#1A), 20 (#2A), 13 (#1B), 26 (#2B)

NIGEL

28/12/12

MD1-0-V-161-54-01210

BENT 5&6 (#1A), 18&19 (#2A), 11&12 (#1B), 24&25 (#2B)

NIGEL

28/12/12

MD1-0-V-161-54-01211

BENT 3.2 (#1A), 16.2 (#2A), 9.2 (#1B), 22.2 (#2B)

NIGEL

28/12/12

MD1-0-V-161-54-01212

BENT 5.8 (#1A), 18.8 (#2A), 11.8 (#1B), 24.8 (#2B)

NIGEL

28/12/12

MD1-0-V-161-54-01213

BENT 1.8 & 7.3(#1A), 14.8 & 20.3(#2A), 7.6 & 13.3 (#1B), 20.6 & 26.3 (#2B)

NIGEL

28/12/12

MD1-0-V-161-54-01214

BENT 3.8 & 5.2(#1A), 16.8 & 18.2(#2A), 9.8 & 11.2 (#1B), 22.8 & 24.2 (#2B)

NIGEL

28/12/12

MD1-0-V-161-54-01216

STEEL FRAMING - FOR BRIGE BENT 13.1, 13.2, 13.8, 13.9

NIGEL

19/03/13

MD1-0-V-161-54-01217

Steel Framing - For Bride Bent G & CCB Egress Platform

NIGEL

19/03/13

MD1-0-V-161-54-01218

Steel Framing - for Brige Bent H

NIGEL

19/03/13

MD1-0-V-161-54-01219

West Stair Tower for 4 Units

IC

NIGEL

28/12/12

MD1-0-V-161-54-01220

East Stair Tower for 4 Units

NIGEL

28/12/12

MD1-0-V-161-54-01300

GENERAL NOTES

NIGEL

28/12/12

MD1-0-V-161-54-01301

Standard Beam, End PL, Field & Column Splice Details

IC

NIGEL

28/12/12

MD1-0-V-161-54-01302

Standard Horizontal Bracing Details

NIGEL

28/12/12

MD1-0-V-161-54-01303

Standard Vertical Bracing Details & Wing Plate Connections

IC

NIGEL

28/12/12

MD1-0-V-161-54-01304

Typical Wide Flange Vertical Bracing connections

NIGEL

28/12/12

MD1-0-V-161-54-01305

Standard Vertical Bracing Details & Typical Hanger Details

NIGEL

28/12/12

MD1-0-V-161-54-01306

Standard Beam Connection

NIGEL

28/12/12

MD1-0-V-161-54-01309

Steel Framing Details and Girder Schedule

IC

NIGEL

28/12/12

MD1-0-V-161-54-01310

Standard Steel Framing Details for Stairs

IC

NIGEL

28/12/12

MD1-0-V-161-54-01311

Standard Handrail and Grating Details

IC

NIGEL

28/12/12

MD1-0-V-161-54-01312

Standard Checkered Plate Details

IC

NIGEL

28/12/12

MD1-0-V-161-54-01313

Typical Ladder Details

IC

NIGEL

28/12/12

MD1-0-V-161-54-01315

PLAN OF BOX GIRDERS AT SILO SUPT LEVEL

IC

NIGEL

07/01/13

MD1-0-V-161-54-11103

Anchor Bolts Erection Drawing

NIGEL

07/02/13

MD1-0-V-161-56-36501

Limestone Blower Foundation Drawing

IC

NIGEL

24/10/12

MD1-0-V-162-06-00006

Esp Foundation loading Calculation

NIGEL

25/04/13

MD1-0-V-162-06-00007

Duct Foundation Loading Calculation

IC

NIGEL

29/05/13

MD1-0-V-162-55-00001

Foundation Loading of ESP

NIGEL

25/04/13

MD1-0-V-162-55-00002

Loading Data for Duct

IC

NIGEL

04/12/12

MD1-0-V-163-06-00001

Wind load, seismic load & chemical anchor calculation for i.d. fan

RT

NIGEL

13/05/13

MD1-0-V-171-01-00032

Mechanical Load Data of Transfer Tower No.TT-01 for Coal Handling System

IC

NIGEL

16/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-171-01-00033

Mechanical Load Data of Transfer Tower No.TT-02

IC

AUTHORISED
NIGEL

RECEIVED
16/07/13

MD1-0-V-171-01-00034

Mechanical Load Data of Transfer Tower No.TT-03

IC

NIGEL

16/07/13

MD1-0-V-171-01-00035

Mechanical Load Data of Transfer Tower No.TT-04

IC

NIGEL

16/07/13

MD1-0-V-171-01-00036

Mechanical Load Data of Transfer Tower No.TT-05

IC

NIGEL

16/07/13

MD1-0-V-171-01-00037

Mechanical Load Data of Transfer Tower No.TT-06

IC

NIGEL

16/07/13

MD1-0-V-171-01-00080

Typical standard drawing for technological anchor bolt for chs

IC

NIGEL

03/05/13

MD1-0-V-171-01-01004

Typical Standard Drawing for Anchor Bolt For CHS

IC

NIGEL

03/05/13

MD1-0-V-171-01-01017

Structural GA Drawing & Loading Data of HGTU Tower for Conv. BC-8, 9, 10&11 forS

IC

NIGEL

16/07/13

MD1-0-V-171-01-01027

Structural General Arrangement for Belt Conveyor No. BC-09 for CHS

NIGEL

02/07/13

MD1-0-V-171-01-01028

Structural General Arrangement of Belt Conveyor BC-10 for CHS

NIGEL

02/07/13

MD1-0-V-171-51-02111

Plc configuration diagram for coal handling system

BILL

20/02/13

MD1-0-V-171-55-01017

Structural Design Calculation for HGTU Tower for Conveyor BC-08, 09, 10&11

IC

NIGEL

16/07/13

MD1-0-V-171-55-01022

Structural Design Calculation for Belt Conveyor BC-02A/B for CHS

NIGEL

17/05/13

MD1-0-V-171-55-01023

Structural Design Calculation for Belt Conveyor BC-03A/B for CHS

NIGEL

17/05/13

MD1-0-V-171-55-01024

Structural Design Calculation for Belt Conveyor BC-05A/B for CHS

NIGEL

17/05/13

MD1-0-V-171-55-01025

STRUCTURAL DESIGN CALCULATION FOR BELT CONVEYOR NO. BC-06A/B FOR CHS

NIGEL

17/05/13

MD1-0-V-171-55-01027

Structural Design Calculation for Belt Conveyor No. BC-09 for CHS

NIGEL

02/07/13

MD1-0-V-171-55-01028

Structural Design Calculation for Belt Conveyor No. BC-10 for CHS

NIGEL

02/07/13

MD1-0-V-172-01-00087

Typical standard drawing for technological anchor bolt for lhs

RT

NIGEL

25/07/13

MD1-0-V-172-01-01002

Typical Standard Drawing for Anchor Bolt For LHS

RT

NIGEL

25/07/13

MD1-0-V-172-01-01016

Structural general arrangement and loading data grinding house

NIGEL

28/06/13

MD1-0-V-172-01-01017

STRL. General Arrangement of Shed Attached to Grinding House

NIGEL

28/06/13

MD1-0-V-172-55-01011

Structural Design Calculation for Transfer Tower LT-01

NIGEL

27/05/13

MD1-0-V-172-55-01013

Structural Design Calculation for Transfer Tower LT-03

NIGEL

27/05/13

MD1-0-V-172-55-01014

Structural Design Calculation for Transfer Tower LT-04

NIGEL

27/05/13

MD1-0-V-172-55-01016

Structural design calculation for grinding house

NIGEL

28/06/13

MD1-0-V-172-55-01017

Structural Design Calculation For Shed Attached to Grinding House

NIGEL

28/06/13

MD1-0-V-173-54-00801

Conveyor Supporting Structure- Foundation Load Data (1 of 5)

IC

NIGEL

12/07/13

MD1-0-V-173-54-00802

Conveyor Supporting Structure- Foundation Load Data (2 of 5)

IC

NIGEL

12/07/13

MD1-0-V-173-54-00803

Conveyor Supporting Structure- Foundation Load Data (3 of 5)

IC

NIGEL

12/07/13

MD1-0-V-173-54-00812

Conveyor Supporting Structure- Foundation Load Data (4 of 5)

IC

NIGEL

12/07/13

MD1-0-V-173-54-00813

Conveyor Supporting Structure- Foundation Load Data (5 of 5)

IC

NIGEL

12/07/13

MD1-0-V-173-54-00873

Buffer Hopper Tower - Foundation Load Data

IC

NIGEL

16/07/13

MD1-0-V-173-54-00874

Buffer Hopper Support Structure - Structural GA - Plan

IC

NIGEL

16/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-173-54-00875

Buffer Hopper Support Structure - Structural GA - Elevation

IC

AUTHORISED
NIGEL

RECEIVED
16/07/13

MD1-0-V-173-54-00877

Pipe Rack from Fly Ash Silo-1 Foundation Load Data

IC

NIGEL

08/07/13

MD1-0-V-173-54-00878

Pipe Rack Near FA Silo 2 - Foundation Load Data

IC

NIGEL

08/07/13

MD1-0-V-173-54-00879

Pipe Rack from Ash Slurry Pump House to FA Silo - Foundation Load Data

IC

NIGEL

08/07/13

MD1-0-V-173-54-00880

Pipe Rack Near F.A Silo - 1 Structural GA - Plan

IC

NIGEL

08/07/13

MD1-0-V-173-54-00881

Pipe Rack Near F.A Silo - 1 Structural GA - Elevation

IC

NIGEL

08/07/13

MD1-0-V-173-54-00882

Pipe Rack Near F.A Silo - 2 Structural GA - Plan

IC

NIGEL

08/07/13

MD1-0-V-173-54-00883

Pipe Rack Near F.A Silo - 2 Structural GA - Elevation

IC

NIGEL

08/07/13

MD1-0-V-173-54-00884

Pipe Rack from Ash Slurry Ash Water Pump House to FA Silo - Structural GA - Plan

IC

NIGEL

08/07/13

MD1-0-V-173-54-00885

Pipe Rack from Ash Slurry Ash Water Pump House to FA Silo - Structural GA - Elen

IC

NIGEL

08/07/13

MD1-0-V-173-55-00901

Conveyor Supporting Structure- Design of Superstructure (Vol 1)

IC

NIGEL

07/12/12

MD1-0-V-173-55-00902

Conveyor Supporting Structure- Design of Superstructure (Vol 2)

IC

NIGEL

07/12/12

MD1-0-V-173-55-00905

Buffer Hopper Support Structure - Design of Superstructure

IC

NIGEL

16/07/13

MD1-0-V-173-55-00906

Pipe Rack near FA Silo 1 - Calculation of Foundation Load Data & Design of Supee

IC

NIGEL

08/07/13

MD1-0-V-173-55-00907

Pipe Rack near FA Silo 2 - Calculation of Foundation Load Data & Design of Supee

IC

NIGEL

08/07/13

MD1-0-V-173-55-00908

Pipe Rack from Ash Slurry ash water pump house to FA Silo - Design of Superstrue

IC

NIGEL

08/07/13

MD1-0-V-181-01-00001

Auxiliary Boiler Package General Arrangement of Foundation

NIGEL

28/02/13

MD1-0-V-181-06-00012

Auxiliary Boiler Package Boiler Loading Calcuation

NIGEL

28/02/13

MD1-0-V-181-06-00013

Auxiliary Boiler Package Economizer Loading Calculation

NIGEL

28/02/13

MD1-0-V-181-06-00014

Auxiliary Boiler Package Steel Structure Loading Calculation

NIGEL

28/02/13

MD1-0-V-181-06-00015

Auxiliary Boiler Package P.D Fan Loading Calculation

NIGEL

28/02/13

MD1-0-V-181-06-00016

Auxiliary Boiler Package Boiler Feed Water Pump Loading Calcuation

NIGEL

28/02/13

MD1-0-V-181-06-00017

Auxiliary Boiler Package Blowdown Tank Loading Calculation

NIGEL

28/02/13

MD1-0-V-181-06-00018

Auxiliary Boiler Package Diesel Oil Tank Loading Calculation

NIGEL

28/02/13

MD1-0-V-181-06-00019

Auxiliary Boiler Package Heavy Oil Tank Loading Calculation

NIGEL

28/02/13

MD1-0-V-181-11-00001

Auxliary Boiler Foundation- Civil Input

NIGEL

28/02/13

MD1-0-V-181-11-00002

Auxiliary Boiler package Foundation Arrangement of F.D Fan with Loading Data

NIGEL

28/02/13

MD1-0-V-181-11-00003

Package Boiler Feed Water Pump Foundation-Civil Input

NIGEL

28/02/13

MD1-0-V-181-11-00004

Auxiliary Boiler Package Economizer Foundation-Civil Input

NIGEL

28/02/13

MD1-0-V-181-11-00005

Auxiliary Boiler Package Blowdown Tank Foundation- Civil Input

NIGEL

28/02/13

MD1-0-V-181-11-00006

Diesel Oil Tank -Civil Input

NIGEL

28/02/13

MD1-0-V-181-11-00007

Auxliary Boiler Package Heavy Oil Tank Foundation- Civil Input

NIGEL

28/02/13

MD1-0-V-181-11-00008

Foundation Arrangement of Chemical & Sampling

NIGEL

28/02/13

MD1-0-V-181-11-00009

Auxiliary Boiler Package Steel Stack Foundation- Civil Input

NIGEL

28/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-V-181-11-00010

Foundation Arrangement of Steel Structure with Loading Data

NIGEL

28/02/13

MD1-0-V-182-01-10002

General foundation arrangement for emergency diesel generator

IC

NIGEL

13/05/13

MD1-0-V-182-06-05001

Wind & Seismic Load Calculation for Emergency Diesel Generator

IC

NIGEL

20/06/13

MD1-0-V-218-54-00002

Coal Dry Storage Shed/ Anchor Bolt Plan & Details

NIGEL

07/02/13

MD1-0-V-218-54-00003

Coal Dry Storage Shed/ Template Details

NIGEL

07/02/13

MD1-0-V-218-54-00005

Coal Dry Storage Shed/ Cross Section

NIGEL

07/02/13

MD1-0-V-218-54-00006

Coal Dry Storage Shed/ Sidewall Framing & Details

NIGEL

07/02/13

MD1-0-V-218-54-00007

Coal Dry Storage Shed/ Eave Gutter & Valley Gutter Details

NIGEL

07/02/13

MD1-0-V-219-54-00001

Lime stone storage shed - specification

AC

NIGEL

06/05/13

MD1-0-V-219-54-00002

Lime stone storage shed - anchor bolt plan & details

AC

NIGEL

06/05/13

MD1-0-V-219-54-00003

Lime stone storage shed - template details

AC

NIGEL

06/05/13

MD1-0-V-219-54-00004

Lime stone storage shed - roof framing plan & details

AC

NIGEL

06/05/13

MD1-0-V-219-54-00005

Lime stone storage shed - cross section

AC

NIGEL

06/05/13

MD1-0-V-219-54-00006

Lime stone storage shed - sidewall framing & details

AC

NIGEL

06/05/13

MD1-0-V-219-54-00007

Lime stone storage shed - endwall framing @ gl.1

AC

NIGEL

06/05/13

MD1-0-V-219-54-00008

Lime stone storage shed - endwall framing @ gl.12

AC

NIGEL

06/05/13

MD1-0-V-360-01-00001

Chimney General Layout

NIGEL

25/04/13

MD1-0-V-360-04-00700

Chimney Design Criteria

NIGEL

15/03/13

MD1-0-V-360-05-00810

R.C Windshield- Construction Procedure

IC

NIGEL

10/06/13

MD1-0-V-360-05-00820

Chimney #1 & #2 Steel Platforms Erection Procedure

IC

NIGEL

12/06/13

MD1-0-V-360-05-00840

Chimney #1 & #2 Steel Liners Erection Procedure

IC

NIGEL

12/06/13

MD1-0-V-360-05-00860

Chimney #1 & #2 R.C. Windshield - External Painting Procedure

IC

NIGEL

12/06/13

MD1-0-V-360-07-00705

Chimney #1 Foundation Calculation Report

NIGEL

02/05/13

MD1-0-V-360-07-00706

Chimney #2 Foundation Calculation Report

NIGEL

02/05/13

MD1-0-V-360-07-00710

R.C Windshield- calculation Report

NIGEL

29/04/13

MD1-0-V-360-07-00741

Steel Liners Erection Calculation Report

NIGEL

29/04/13

MD1-0-V-360-07-00750

CHIMNEY #1 & #2 STAIRS - CALCULATION REPORT

NIGEL

26/04/13

MD1-0-V-360-08-00900

Project Quality Plan

IC

NIGEL

20/06/13

MD1-0-V-360-08-00910

Inspection and Test Plan- Construction Of R.C Windshield

RT

NIGEL

19/07/13

MD1-0-V-360-08-00920

Inspection and Test Plan - Steel Platforms Erection

RT

NIGEL

19/07/13

MD1-0-V-360-08-00921

Inspection and Test Plan - Steel Platforms Fabrication

RT

NIGEL

19/07/13

MD1-0-V-360-08-00940

Inspection and Test Plan - Steel Liners Erection

RT

NIGEL

19/07/13

MD1-0-V-360-08-00941

Inspection and Test Plan - Steel Liners Fabrication

RT

NIGEL

19/07/13

MD1-0-V-360-08-00960

Inspection and Test Plan - External Painting of R.C. Windshield

RT

NIGEL

19/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-V-360-10-00250

Chimney #1 & # 2 Stairs- General Arrangement

AUTHORISED
NIGEL

RECEIVED
26/04/13

MD1-0-V-360-10-00300

Chimney #1 & # 2 Ladders and Rest Platforms General Arrangement

NIGEL

26/04/13

MD1-0-V-360-10-00310

Chimney #1 & # 2 Rest Platforms- Layout and details

NIGEL

26/04/13

MD1-0-V-360-12-00105

Chimney #2- R.C Foundation- Bar Bending Schedule

NIGEL

26/09/12

MD1-0-V-360-51-00355

Chimney #1 & #2 inspection doors and supports for aircraft warning lights

NIGEL

02/05/13

MD1-0-V-360-51-00610

Chimney #1 & #2 Concrete Floor at Ground Level

AC

NIGEL

02/05/13

MD1-0-V-360-52-00100

Chimney #1- R.C Foundation and Piles- General Arrangement

NIGEL

02/05/13

MD1-0-V-360-52-00101

Chimney #2- R.C Foundation- General Arrangement

NIGEL

02/05/13

MD1-0-V-360-53-00102

Chimney #1- R.C Foundation and Piles- General Arrangement

NIGEL

02/05/13

MD1-0-V-360-53-00104

Chimney #2- R.C Foundation- Reinforcement

NIGEL

02/05/13

MD1-0-V-360-53-00111

R.c. windshield - reinforcement details

NIGEL

29/04/13

MD1-0-V-360-53-00116

R.C. Windshield - Corbels for Inlet Ducts

AC

NIGEL

10/06/13

MD1-0-V-360-54-00251

CHIMNEY #1 & #2 STAIRS - DETAILS

NIGEL

26/04/13

MD1-0-V-360-54-00255

CHIMNEY #1 & #2 STAIRS - HANDRAILS

NIGEL

26/04/13

MD1-0-V-360-54-00259

CHIMNEY #1 & #2 STAIRS - GRATINGS

NIGEL

26/04/13

MD1-0-V-360-54-00301

Chimney #1 & # 2 Ladders Details

NIGEL

26/04/13

MD1-0-V-360-54-00403

Chimney #1 & #2 Steel Liners - Nozzle for CEMS & Temp. Elements

AC

NIGEL

24/07/13

MD1-0-V-360-54-00420

Inlet Ducts - General Arrangement

AC

NIGEL

10/06/13

MD1-0-V-360-54-00421

Inlet Ducts - Details

AC

NIGEL

10/06/13

MD1-0-V-360-57-00430

Steel Liners Drainage System

AC

NIGEL

10/06/13

MD1-0-V-505-02-00002

Loading Data for Generator Transformer

IC

NIGEL

28/02/13

MD1-0-V-505-02-00102

Loading Data for Station Transformer

NIGEL

14/01/13

MD1-0-V-505-02-00202

Loading Data for Unit Auxiliary Transformer

NIGEL

14/01/13

MD1-0-V-505-07-00001

Seismic verification report for generator transformer

NIGEL

05/04/13

MD1-0-V-505-07-00101

Seismic Verification Report for Transformer Fixing for Station Transformer

NIGEL

14/01/13

MD1-0-V-505-07-00201

Seismic Verification Report for Transformer fixing for Unit Auxiliary Transformr

NIGEL

14/01/13

MD1-0-V-515-10-20001

Loading Data for all Foundation and Grounding Pad Location for NSPB

NIGEL

27/05/13

MD1-0-V-515-10-20002

Seismic Verification Report for NSPB

NIGEL

27/05/13

MD1-0-V-570-05-00033

Inspection and Test Plan for Steel Structure-110KV Switchyard

MAX

22/01/13

MD1-0-V-570-05-00034

Inspection and Test Procedure for Steel Structure-110KV Switchyard

NIGEL

24/01/13

MD1-0-V-570-05-00035

Inspection and Test Plan for Steel Structure-500KV Switchyard

MAX

22/01/13

MD1-0-V-570-05-00036

Inspection and Test Procedure for Steel Structure-500KV Switchyard

NIGEL

24/01/13

MD1-0-V-570-06-00001

500KV & 110KV Switchyard Loading Calculation

NIGEL

17/12/12

MD1-0-V-570-11-00001

500KV & 110KV Switchyard Civil Work Guideline

NIGEL

09/10/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-805-01-00010

Civil Structure- Requirements & Loading

IC

AUTHORISED
NIGEL

RECEIVED
16/10/12

MD1-0-V-805-08-00008

Sea Water Intake Facility Equipment Data Sheet

AC

NIGEL

02/11/12

MD1-0-V-805-11-06001

Foundation Plan DWG for WT & WWT

IC

NIGEL

03/07/13

MD1-0-V-805-11-06101

Foundation DWG & Load Table (Foundation Detail)

IC

NIGEL

03/07/13

MD1-1-V-161-11-00001

U1AT1 Steel Structure Shop Detailings & Member List

NIGEL

20/12/12

MD1-1-V-161-11-00009

U1AT1 Handrail Shop Detailings & Member List

NIGEL

20/12/12

MD1-1-V-161-12-00001

Bolt List_ U1AT1

IC

NIGEL

01/02/13

MD1-1-V-161-54-11110

U1AT1_Erect. Drawings for Steel Framing

NIGEL

07/02/13

MD1-1-V-161-54-21110

U1AT1_Handrail Erection Drawing

NIGEL

07/02/13

MD1-1-V-161-54-41110

U1AT1_Grating Erection Drawing

NIGEL

07/02/13

MD1-0-E-182-06-00001

Emergency Diesel Generator Sizing Calculation

MARK

31/10/12

MD1-0-E-500-01-00101

Electrical equipment layout - central control bldg 1st floor

MARK

01/07/13

MD1-0-E-500-01-00102

Electrical equipment layout - central control bldg 2nd floor & lower roof

MARK

01/07/13

MD1-0-E-500-01-00201

Electrical equipment layout - local electrical room

MARK

01/07/13

MD1-0-E-500-01-00202

Electrical Equipment Layout - Admin BLDG

MARK

01/07/13

MD1-0-E-500-04-00001

Synchronization Philosophy

MARK

14/11/12

MD1-0-E-500-06-00001

Calculation for Short Circuit Current

AC

MARK

07/11/12

MD1-0-E-500-06-00002

Calculation for Load Flow

AC

MARK

07/11/12

MD1-0-E-500-08-00001

Electrical Equipment List

IC

MARK

17/09/12

MD1-0-E-500-08-00002

Electrical Load List

IC

MARK

24/10/12

MD1-0-E-500-31-00001

Single Line Diagram Symbol & Legend

MARK

22/03/12

MD1-0-E-500-31-00002

Key Single Line Diagram

MARK

30/01/13

MD1-0-E-500-31-00041

Single Line Diagram- Typical Protection & Metering

MARK

17/07/12

MD1-0-E-500-33-00001

Elec.Logic Diagram- Symbol & Legend

MARK

23/08/12

MD1-0-E-505-06-00001

Calculation for Generator Transformer Sizing

MARK

22/05/12

MD1-0-E-505-06-00002

Calcualtion For Auxiliary Transformer Sizing

MARK

01/03/13

MD1-0-E-505-33-00001

Elec. Logic Diagram- Station Transformer

MARK

29/05/13

MD1-0-E-520-31-00101

Single Line Diagram-10 KV Station Switchgear 06BBA/06BBB

MARK

14/09/12

MD1-0-E-520-31-00201

Single Line Diagram-10KV Cooling Water Switchgear 06BBG/06BBH

MARK

14/09/12

MD1-0-E-520-33-00001

Elec.Logic Diagram- 10KV Switchgear XFMR Incoming Feeder (1/4)

MARK

23/08/12

MD1-0-E-520-33-00002

Elec. Logic Diagram- 10KV Switchgear XFMR Incoming Feeder (2/4)

MARK

23/08/12

MD1-0-E-520-33-00003

Elec.Logic Diagram- 10KV Switchgear XFMR Imcoming Feeder (3/4)

MARK

23/08/12

MD1-0-E-520-33-00004

Elec. Logic Diagram- 10KV Switchgear XFMR Incoming Feeder (4/4)

MARK

23/08/12

DISCIPLINE = ELEC, Electrical

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-E-520-33-00005

Elec. Logic Diagram- 10KV Switchgear Bus Tie Feeder (1/2)

AUTHORISED
MARK

RECEIVED
23/08/12

MD1-0-E-520-33-00006

Elec. Logic Diagram- 10KV Switchgear Bus Tie Feeder (2/2)

MARK

23/08/12

MD1-0-E-520-33-00007

Elec. Logic Diagram- 10KV Switchgear Plain Incoming Feeder (1/2)

MARK

23/08/12

MD1-0-E-520-33-00008

Elec. Logic Diagram- 10KV Switchgear Plain Incoming Feeder (2/2)

MARK

23/08/12

MD1-0-E-520-33-00009

Elec. Logic Diagram- 10KV Switchgear Bus Tie Feeder (Plain Incoming)

MARK

23/08/12

MD1-0-E-520-33-00010

Elec. Logic Diagram- 10KV Switchgear Outgoing Feeder For Non-Motor

MARK

23/08/12

MD1-0-E-520-33-00011

Elec. Logic Diagram- 10KV Switchgear Outgoing Feeder For Motor

MARK

23/08/12

MD1-0-E-525-31-00001

Single Line Diagram- 400V Station Switchgear-1 06BFA/06BFB

MARK

25/10/12

MD1-0-E-525-31-00002

Single Line Diagram- 400V Station Switchgear-2 06BFC/06BFD

MARK

25/10/12

MD1-0-E-525-31-00003

Single Line Diagram- 400V Station Switchgear-3 06BFE/06BFF

MARK

25/10/12

MD1-0-E-525-31-00004

Single Line Diagram- 400V Admin. Bldg. Switchgear 06BFI/06BFJ

MARK

25/10/12

MD1-0-E-525-31-00005

Single Line Diagram- 400V CWP Switchgear 06BFG/06BFH

MARK

25/10/12

MD1-0-E-525-31-00011

Single Line Diagram- 400V Essential Switchgear 06BMA/06BMB

MARK

25/10/12

MD1-0-E-525-31-00101

Single Line Diagram-400V Station MCC-1 06JBA

MARK

08/03/13

MD1-0-E-525-31-00201

Single Line Diagram-400V Station MCC-2 06BJB

MARK

08/03/13

MD1-0-E-525-31-00301

Single Line Diagram-400VAux. Boiler MCC 06BJC

MARK

08/03/13

MD1-0-E-525-31-00401

Single Line Diagram-400V Limestone Grinding House MCC 06BJD

AC

MARK

14/11/12

MD1-0-E-525-31-00501

Single Line Diagram-400V CWP MCC 06BJE

MARK

08/03/13

MD1-0-E-525-31-00601

Single Line Diagram-400V General Service MCC-1 06BLA

MARK

08/03/13

MD1-0-E-525-31-00701

Single Line Diagram-400V General Service MCC-2 06BLB

MARK

08/03/13

MD1-0-E-525-31-00801

Single Line Diagram-400V General Service MCC-3 06BLC

MARK

08/03/13

MD1-0-E-525-31-00901

Single Line Diagram-400V General Service MCC-4 06BLD

MARK

08/03/13

MD1-0-E-525-31-01001

Single Line Diagram-400V Workshop MCC 06BLE

MARK

08/03/13

MD1-0-E-525-31-01101

Single Line Diagram-400V ST Bldg. HVAC MCC 06BLF

MARK

08/03/13

MD1-0-E-525-31-01201

Single Line Diagram-400V CCB HVAC MCC-1 06BLG

MARK

08/03/13

MD1-0-E-525-31-01301

Single Line Diagram-400V CCB HVAC MCC-2 06BLL

MARK

08/03/13

MD1-0-E-525-31-01401

Single Line Diagram-400V ADMIN. BLDG HVAC MCC-1 06BLH

MARK

08/03/13

MD1-0-E-525-31-01501

Single Line Diagram-400V Admin BLDG HVAC MCC-2 06BLI

MARK

08/03/13

MD1-0-E-525-31-01601

Single Line Diagram-400V Admin BLDG MCC 06BLJ

MARK

08/03/13

MD1-0-E-525-31-01701

Single Line Diagram-400V SWYD HVAC MCC 06BLK

MARK

08/03/13

MD1-0-E-525-31-03101

Single Line Diagram-400V Essential MCC-1 06BME

MARK

08/03/13

MD1-0-E-525-31-03201

Single Line Diagram-400V Essential MCC-2 06BMF

MARK

08/03/13

MD1-0-E-525-33-00001

Elec. Logic Diagram-400V Switchgear Incoming Feeder

MARK

13/09/12

MD1-0-E-525-33-00002

Elec. Logic Diagram-400V Switchgear Outgoing Feeder

MARK

13/09/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-E-525-33-00010

Elec. Logic Diagram-400V Switchgear Bus Tie Feeder

AUTHORISED
MARK

RECEIVED
13/09/12

MD1-0-E-535-06-00001

Calculation for DC and UPS System Sizing

MARK

01/03/13

MD1-0-E-535-31-00001

Single line diagram - 220v dc system for units and common

MARK

07/05/13

MD1-0-E-535-31-00002

Single line diagram - 220v dc system for cooling water system

MARK

07/05/13

MD1-0-E-540-31-00001

Single line diagram - 400/230v ups system

MARK

07/05/13

MD1-0-E-560-01-00101

Overall Layout for Tank Bottom for Cathodic Protection System

MARK

08/01/13

MD1-0-E-590-01-00001

Earthing and Lightning Protection Layout- Symbol and Legend

MARK

31/07/12

MD1-0-E-590-01-00002

Earthing and Lightening Protection Layout- Overall Area

MARK

30/01/13

MD1-0-E-590-01-00201

Earthing and Lightning Protection Layout- Installation Details (1/3)

MARK

22/11/12

MD1-0-E-590-01-00202

Earthing and Lightning Protection Layout- Installation Details (2/3)

MARK

22/11/12

MD1-0-E-590-01-00203

Earthing and Lightning Protection Layout- Installation Details (3/3)

MARK

31/07/12

MD1-0-E-590-01-01001

Earthing and Lightning Protection Layout-Boiler Unit 1A & 1B EL+0.0M

IC

MARK

26/07/13

MD1-0-E-590-01-01501

Earthing and lightning protection layout - boiler unit 2a & 2b el.+0.0m

IC

MARK

26/07/13

MD1-0-E-590-01-02001

Earthing and Lightning Protection Layout- Turbine Bldg. Ground Floor

MARK

02/04/13

MD1-0-E-590-01-02002

Earthing and Lightning Protection Layout- Turbine Mezzanine Floor

MARK

02/04/13

MD1-0-E-590-01-02003

Earthing and Lightning Protection Layout- Turbine Operating Floor

MARK

02/04/13

MD1-0-E-590-01-02004

Earthing & Lightning Protection Layout- Turbine Bldg. Lower Roof & Crane Runaway

MARK

02/04/13

MD1-0-E-590-01-02005

Earthing & Lightning Protection Layout- Turbine Bldg. Lower Roof & Crane Runaway

MARK

02/04/13

MD1-0-E-590-01-03001

Earthing and Lightning Protection Layout- Central control Bldg Ground Floor

MARK

02/04/13

MD1-0-E-590-01-03002

Earthing and Lightning Protection Layout- Central control Bldg 1st Floor

MARK

02/04/13

MD1-0-E-590-01-03003

Earthing and Lightning Protection Layout- Central control Bldg 2nd Floor

MARK

02/04/13

MD1-0-E-590-01-03004

Earthing and Lightning Protection Layout- Central control Bldg 3rd Floor

MARK

14/05/13

MD1-0-E-590-01-03005

Earthing and Lightning Protection Layout- Central control Bldg Roof Floor

MARK

14/05/13

MD1-0-E-590-01-03006

Earthing and Lightning Protection Layout- Central control Bldg Higher Roof Floor

MARK

02/04/13

MD1-0-E-590-01-04201

Earthing and lightning protection layout - fuel oil pump house

MARK

16/04/13

MD1-0-E-590-01-04401

Earthing and Lightning Protection Layout- Fire Protection Pump House

MARK

14/05/13

MD1-0-E-590-01-04601

Earthing and lightning protection layout - esp control house no.1

MARK

08/05/13

MD1-0-E-590-01-04701

Earthing and lightning protection layout - esp control house no.2

MARK

08/05/13

MD1-0-E-590-01-04801

Earthing and lightning protection layout - diesel generator house

MARK

16/04/13

MD1-0-E-590-01-04901

Earthing and lightning protection layout - cooling water pump house

MARK

21/06/13

MD1-0-E-590-01-05401

Earthing and lighting Protection Layout- Switchyard Control Bldg. Ground Floor

MARK

04/10/12

MD1-0-E-590-01-05402

Earthing and lighting Protection Layout- Switchyard Control Bldg. 1st Floor

MARK

04/10/12

MD1-0-E-590-01-05501

Earthing and Lighting Protection Layout- Water treatment BLDG Ground Floor

MARK

23/04/13

MD1-0-E-590-01-05503

Earthing and Lighting Protection Layout- Water treatment BLDG Roof Floor

MARK

23/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-E-590-01-05521

Earthing Lighting Protection Layout- Waste Water Treatment Plant Area

AUTHORISED
MARK

RECEIVED
23/04/13

MD1-0-E-590-01-05551

Earthing and Lighting Protection Layout- Water Storage Tank Area

MARK

23/04/13

MD1-0-E-590-01-06301

Earthing and Lightning Protection Layout- Coal Yard Area (1)

MARK

10/04/13

MD1-0-E-590-01-06302

Earthing and Lightning Protection Layout- Coal Yard Area (2)

MARK

10/04/13

MD1-0-E-590-01-06303

Earthing and Lightning Protection Layout- Coal Yard Area (3)

MARK

10/04/13

MD1-0-E-590-01-06304

Earthing and Lightning Protection Layout- Coal Yard Area (4)

MARK

10/04/13

MD1-0-E-590-01-06305

Earthing and Lightning Protection Layout- Coal Yard dry Storage Shed Roof

MARK

14/05/13

MD1-0-E-590-01-06401

Earthing and lightning protection layout - limestone storage shed

IC

MARK

26/07/13

MD1-0-E-590-01-06901

Earthing and Lightning Protection Layout - Transformer Area (Unit 1)

MARK

11/06/13

MD1-0-E-590-01-06902

Earthing and Lightning Protection Layout - Transformer Area (Unit 2)

MARK

11/06/13

MD1-0-E-590-01-07001

Earthing and lightning protection layout - aux. boiler area

MARK

10/05/13

MD1-0-E-590-01-07101

Earthing and lightning protection layout - condensate storage tank area

MARK

10/05/13

MD1-0-E-590-01-07201

Earthing and Lightning Protection Layout - Fuel Oil Tank Area

MARK

11/06/13

MD1-0-E-590-01-07301

Earthing and Lightning Protection Layout - ESP Area (Unit 1)

MARK

11/06/13

MD1-0-E-590-01-07302

Earthing and Lightning Protection Layout - ESP Area (Unit 2)

MARK

11/06/13

MD1-0-E-590-01-07401

Earthing and Lightning Protection Layout - Stack Area (Unit 1)

MARK

11/06/13

MD1-0-E-590-01-07402

Earthing and Lightning Protection Layout - Stack Area (Unit 2)

MARK

11/06/13

MD1-0-E-590-01-07501

Earthing and Lightning Protection Layout - CWP Area

MARK

11/06/13

MD1-0-E-590-01-07801

Earthing and Lightning Protection Layout - Sleeper Area (1)

MARK

26/07/13

MD1-0-E-590-01-07802

Earthing and Lightning Protection Layout - Sleeper Area (2)

MARK

26/07/13

MD1-0-E-590-01-07803

Earthing and Lightning Protection Layout - Sleeper Area (3)

MARK

26/07/13

MD1-0-E-590-01-07804

Earthing and Lightning Protection Layout - Sleeper Area (4)

MARK

26/07/13

MD1-0-E-590-01-08401

Earthing and lightning protection layout - bulldozer garage

MARK

26/04/13

MD1-0-E-590-01-08501

Earthing and Lighting Protection layout- I&C Elec & Mech Warehouse Ground Flr

MARK

29/01/13

MD1-0-E-590-01-08502

Earthing and Lighting Protection layout- I&C Elec & Mech Warehouse Roof Flr

MARK

01/03/13

MD1-0-E-590-01-08601

Earthing and Lightning Protection Layout- Admin. BLDG Ground Floor

MARK

30/01/13

MD1-0-E-590-01-08602

Earthing and Lightning Protection Layout- Admin. BLDG 1st Floor

MARK

30/01/13

MD1-0-E-590-01-08603

Earthing and Lightning Protection Layout- Admin. BLDG 2nd Floor

MARK

30/01/13

MD1-0-E-590-01-08604

Earthing and Lightning Protection Layout- Admin. BLDG 3rd Floor

MARK

30/01/13

MD1-0-E-590-01-08605

Earthing and Lightning Protection Layout- Admin. BLDG 4th Floor

MARK

30/01/13

MD1-0-E-590-01-08606

Earthing and Lightning Protection Layout- Admin. BLDG Roof Floor

MARK

30/01/13

MD1-0-E-590-01-08901

Earthing and Lighting Protection layout- Common Service Bldg Ground Flr

MARK

01/03/13

MD1-0-E-590-01-08902

Earthing and Lighting Protection layout- Common Service Bldg Roof Flr

MARK

01/03/13

MD1-0-E-590-01-09203

Earthing and lightning protection layout - car garage 3

MARK

26/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-E-590-06-00001

Earthing System Calculation

AUTHORISED
MARK

RECEIVED
25/04/12

MD1-0-E-590-32-00001

Earthing and Lightning Protection System Schematic Diagram

MARK

22/08/12

MD1-0-E-591-04-00001

Cable and cable Raceway Identification & Numbering System

MARK

01/07/13

MD1-0-E-591-06-00001

Power Cable Sizing Calculation

MARK

16/04/13

MD1-0-E-591-08-00001

Power Cable Schedule

MARK

26/07/13

MD1-0-E-591-08-00002

Control Cable Schedule

MARK

26/07/13

MD1-0-E-592-01-00001

Lighting Layout- Symbol and Legend

MARK

31/01/13

MD1-0-E-592-01-00101

Lighting Layout- Lightning Fixture (1/2)

MARK

31/01/13

MD1-0-E-592-01-00102

Lighting Layout- Lighting Fixture (2/2)

MARK

31/01/13

MD1-0-E-592-01-00201

Lighting Layout- Installation Details (1/3)

MARK

31/01/13

MD1-0-E-592-01-00202

Lighting Layout- Installation Details (2/3)

MARK

31/01/13

MD1-0-E-592-01-00203

Lighting Layout- Installation Details (3/3)

MARK

31/01/13

MD1-0-E-592-01-02001

Lighting Layout- Turbine BLDG Ground Floor

MARK

19/12/12

MD1-0-E-592-01-02002

Lighting Layout- Turbine BLDG Mez. Floor

MARK

19/12/12

MD1-0-E-592-01-02003

Lighting Layout- Turbine BLDG Operating Floor

MARK

19/12/12

MD1-0-E-592-01-02004

Lighting Layout- Turbine BLDG Lower Roof & Crane Runway

MARK

19/12/12

MD1-0-E-592-01-02051

Receptacle Layout- Turbine BLDG Ground Floor

MARK

19/12/12

MD1-0-E-592-01-02052

Receptacle Layout- Turbine BLDG Mez. Floor

MARK

19/12/12

MD1-0-E-592-01-02053

Receptacle Layout- Turbine BLDG Operating Floor

MARK

19/12/12

MD1-0-E-592-01-02054

Receptacle Layout- Turbine BLDG Lower Roof & Crane Runway

MARK

19/12/12

MD1-0-E-592-01-03001

Lighting Layout- Central Control BLDG Ground Floor

MARK

26/12/12

MD1-0-E-592-01-03002

Lighting Layout- Central Control BLDG 1st Floor

MARK

26/12/12

MD1-0-E-592-01-03003

Lighting Layout- Central Control BLDG 2nd Floor

MARK

26/12/12

MD1-0-E-592-01-03004

Lighting Layout- Central Control BLDG 3rd Floor

MARK

26/12/12

MD1-0-E-592-01-03005

Lighting Layout- Central Control BLDG Roof Floor

MARK

26/12/12

MD1-0-E-592-01-03051

Receptacle Layout- Central Control BLDG Ground Floor

MARK

26/12/12

MD1-0-E-592-01-03052

Receptacle Layout- Central Control BLDG 1st Floor

MARK

26/12/12

MD1-0-E-592-01-03053

Receptacle Layout- Central Control BLDG 2nd Floor

MARK

26/12/12

MD1-0-E-592-01-03054

Receptacle Layout- Central Control BLDG 3rd Floor

MARK

26/12/12

MD1-0-E-592-01-03055

Receptacle Layout- Central Control BLDG Roof Floor

MARK

26/12/12

MD1-0-E-592-01-04101

Lighting and Receptacle Layout - Coal Handling Control BLDG

MARK

26/07/13

MD1-0-E-592-01-04201

Lighting and receptacle layout - fuel oil pump house

MARK

08/03/13

MD1-0-E-592-01-04401

LIGHTING LAYOUT - FIRE PROTECTION PUMP HOUSE GROUND FLOOR

MARK

01/03/13

MD1-0-E-592-01-04501

Lighting Layout - Ash Slurry Pump House Ground Floor

IC

MARK

26/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-E-592-01-04502

Lighting Layout - Ash Slurry Pump House 1st Floor

IC

AUTHORISED
MARK

RECEIVED
26/07/13

MD1-0-E-592-01-04551

Receptacle Layout - Ash Slurry Pump House Ground Floor

IC

MARK

26/07/13

MD1-0-E-592-01-04552

Receptacle Layout - Ash Slurry Pump House 1st Floor

IC

MARK

26/07/13

MD1-0-E-592-01-04601

Lighting Layout - ESP Control & Ash Elec. BLDG

MARK

14/05/13

MD1-0-E-592-01-04651

Receptacle Layout - ESP Control & Ash Elec. BLDG

MARK

14/05/13

MD1-0-E-592-01-04801

Lighting Layout - Diesel Generator House

MARK

04/06/13

MD1-0-E-592-01-04901

Lighting and Receptacle Layout - Cooling Water Pump House

MARK

10/07/13

MD1-0-E-592-01-05101

Lighting Layout - Gaseous Chlorination BLDG

MARK

29/05/13

MD1-0-E-592-01-05151

Receptacle Layout - Gaseous Chlorination BLDG

MARK

29/05/13

MD1-0-E-592-01-05201

Lighting and Receptacle Layout - Fuel Oil Unloading Pump House

MARK

11/06/13

MD1-0-E-592-01-05301

Lighting Layout - Return Water Pump House

MARK

26/07/13

MD1-0-E-592-01-05351

Receptacle Layout - Return Water Pump House

MARK

26/07/13

MD1-0-E-592-01-05401

Lighting Layout-Switchyard Control Bldg Ground Floor

MARK

08/03/13

MD1-0-E-592-01-05402

Lighting Layout-Switchyard Control Bldg 1st Floor

MARK

20/02/13

MD1-0-E-592-01-05403

Lighting Layout-Switchyard Control Bldg Roof Floor

MARK

20/02/13

MD1-0-E-592-01-05451

Receptacle Layout- Switchyard Control BLDG Ground Floor

MARK

11/12/12

MD1-0-E-592-01-05452

Receptacle Layout- Switchyard Control BLDG 1st Floor

MARK

11/12/12

MD1-0-E-592-01-05501

Lighting Layout- Water Treatment BLDG Ground Floor

MARK

25/03/13

MD1-0-E-592-01-05551

Receiptacle Layout- Water Treatment BLDG Ground Floor

MARK

25/03/13

MD1-0-E-592-01-06201

Lighting Layout - Coal Yard Dry Storage Shed

MARK

21/06/13

MD1-0-E-592-01-08301

Lighting Layout - Workshop BLDG

MARK

25/06/13

MD1-0-E-592-01-08351

Receptacle Layout - Workshop BLDG

MARK

25/06/13

MD1-0-E-592-01-08401

Lighting layout - bulldozer garage

MARK

30/05/13

MD1-0-E-592-01-08501

Lighting Layout - I&C Electrical and Mechanical Warehouse

MARK

08/05/13

MD1-0-E-592-01-08551

Receptacle Layout - I&C Electrical and Mechanical Warehouse

MARK

08/05/13

MD1-0-E-592-01-08601

Lighting Layout- Administration BLDG Ground Floor

MARK

19/12/12

MD1-0-E-592-01-08602

Lighting Layout- Administration BLDG 1st Floor

MARK

19/12/12

MD1-0-E-592-01-08603

Lighting Layout- Administration BLDG 2nd Floor

MARK

19/12/12

MD1-0-E-592-01-08604

Lighting Layout- Administration BLDG 3rd Floor

MARK

19/12/12

MD1-0-E-592-01-08605

Lighting Layout- Administration BLDG 4th Floor

MARK

19/12/12

MD1-0-E-592-01-08651

Receptacle Layout- Administration Bldg Ground Floor

MARK

19/12/12

MD1-0-E-592-01-08652

Receptacle Layout- Administration Bldg 1st Floor

MARK

19/12/12

MD1-0-E-592-01-08653

Receptacle Layout- Administration Bldg 2nd Floor

MARK

19/12/12

MD1-0-E-592-01-08654

Receptacle Layout- Administration Bldg 3rd Floor

MARK

19/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-E-592-01-08655

Receptacle Layout- Administration Bldg 4th Floor

MARK

19/12/12

MD1-0-E-592-01-08901

Lighting Layout- Common Service BLDG

MARK

28/03/13

MD1-0-E-592-01-08951

Receptacle Layout- Common Service BLDG

MARK

28/03/13

MD1-0-E-592-01-09203

Lighting layout - car garage 3

MARK

14/03/13

MD1-0-E-592-01-09253

Receptacle layout - car garage 3

MARK

14/03/13

MD1-0-E-592-01-10020

Lighting panel Schedule- Turbine BLDG

MARK

19/12/12

MD1-0-E-592-01-10030

Lighting Panel Schedule- Central Control BLDG

MARK

26/12/12

MD1-0-E-592-01-10040

Lighting Panel Schedule- Administration Bldg

MARK

26/12/12

MD1-0-E-592-01-10050

Lighting Panel Schedule- Switchyard Control Bldg

MARK

03/01/13

MD1-0-E-592-01-14101

Lighting Panel Schedule - Coal Handling Control BLDG

MARK

04/06/13

MD1-0-E-592-01-14501

Lighting Panel Schedule - Ash Slurry Pump House

MARK

26/07/13

MD1-0-E-592-01-14601

Lighting Panel Schedule - ESP Control & Ash Elec. BLDG

MARK

14/05/13

MD1-0-E-592-01-14901

Lighting Panel Schedule - Cooling Water Pump House

MARK

10/07/13

MD1-0-E-592-01-15101

Lighting Panel Schedule - Gaseous Chlorination BLDG

MARK

29/05/13

MD1-0-E-592-01-15301

Lighting Panel Schedule - Return Water Pump House

MARK

26/07/13

MD1-0-E-592-01-15501

Lighting Panel Schedule- Water Treatment BLDG

MARK

25/03/13

MD1-0-E-592-01-16201

Lighting Panel Schedule - Coal Yard Dry Storage Shed

MARK

21/06/13

MD1-0-E-592-01-16501

Lighting Panel Schedule - Limestone Handling Control BLDG

MARK

04/06/13

MD1-0-E-592-01-18051

Lighting Panel Schedule - I&C Electrical and Mechanical Warehouse

MARK

08/05/13

MD1-0-E-592-01-18301

Lighting Panel Schedule - Workshop BLDG

MARK

14/05/13

MD1-0-E-592-01-18401

Lighting panel schedule - bulldozer garage

MARK

30/05/13

MD1-0-E-592-01-18901

Lighting Panel Schedule- Common Service BLDG

MARK

28/03/13

MD1-0-E-592-01-19203

Lighting panel schedule - car garage 3

MARK

14/03/13

MD1-0-E-592-06-02001

Lighting Calculation- Turbine BLDG

MARK

19/12/12

MD1-0-E-592-06-03001

Lighting Calculation- Central Control BLDG

MARK

26/12/12

MD1-0-E-592-06-04101

Lighting Calculation - Coal Handling Control BLDG

MARK

04/06/13

MD1-0-E-592-06-04201

Lighting calculation - fuel oil pump house

MARK

08/03/13

MD1-0-E-592-06-04401

LIGHTING CALCULATION - FIRE PROTECTION PUMP HOUSE

MARK

01/03/13

MD1-0-E-592-06-04501

Lighting Calculation - ASH Slurry Pump House

MARK

26/07/13

MD1-0-E-592-06-04601

Lighting Calculation - ESP Control & ASH Elec. BLDG

MARK

14/05/13

MD1-0-E-592-06-04801

Lighting Calculation - Diesel Generator House

MARK

04/06/13

MD1-0-E-592-06-04901

Lighting Calculation - Cooling Water Pump House

MARK

10/07/13

MD1-0-E-592-06-05101

Lighting Calculation - Gaseous Chlorination BLDG

MARK

29/05/13

MD1-0-E-592-06-05201

Lighting Calculation - Fuel Oil Unloading Pump House

MARK

11/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-E-592-06-05301

Lighting Calculation - Return Water Pump House

STS
I

AUTHORISED
MARK

RECEIVED
26/07/13

MD1-0-E-592-06-05401

Lighting Calculation- Switchyard Control Bldg

MARK

19/12/12

MD1-0-E-592-06-05501

Lighting Calculation- Water Treatment BLDG

MARK

25/03/13

MD1-0-E-592-06-06201

Lighting Calculation - Coal Yard Dry Storage Shed

MARK

21/06/13

MD1-0-E-592-06-06501

Lighting Calculation - Limestone Handling Control BLDG

MARK

04/06/13

MD1-0-E-592-06-08301

Lighting Calculation - Workshop BLDG

MARK

14/05/13

MD1-0-E-592-06-08401

Lighting calculation - bulldozer garage

MARK

30/05/13

MD1-0-E-592-06-08501

Lighting Calculation - I&C Electrical and Mechanical Warehouse

MARK

08/05/13

MD1-0-E-592-06-08601

Lighting Calculation- Administration Bldg

MARK

11/12/12

MD1-0-E-592-06-08901

Lighting Calculation- Common Service BLDG

MARK

28/03/13

MD1-0-E-592-06-09203

Lighting calculation - car garage 3

MARK

14/03/13

MD1-0-E-592-31-00002

Single line diagram - lighting system

MARK

01/07/13

MD1-0-E-593-01-10001

Cable Raceway Plan- Symbol and Legend

MARK

03/06/13

MD1-0-E-593-01-10101

Cable Raceway Plan- Cable Tray Assembly Detail (1/2)

MARK

22/08/12

MD1-0-E-593-01-10102

Cable Raceway Plan- Cable Tray Assembly Detail (2/2)

MARK

03/05/12

MD1-0-E-593-01-10201

Cable Raceway Plan- General Details (1/2)

MARK

03/06/13

MD1-0-E-593-01-10202

Cable Raceway Plan- General Details (2/2)

MARK

03/06/13

MD1-0-E-593-01-10301

Cable Raceway Plan- Installation Details (1/3)

MARK

03/06/13

MD1-0-E-593-01-10302

Cable Raceway Plan- Installation Details (2/3)

MARK

03/06/13

MD1-0-E-593-01-10303

Cable Raceway Plan- Installation Details (3/3)

MARK

03/06/13

MD1-0-E-593-01-11001

Cable Raceway Plan - Boiler Area Unit-1 EL.+4,115

MARK

18/06/13

MD1-0-E-593-01-11002

Cable Raceway Plan - Boiler Area Unit-1 EL.+7,315

MARK

18/06/13

MD1-0-E-593-01-11003

Cable Raceway Plan - Boiler Area Unit-1 EL.+10,365

MARK

18/06/13

MD1-0-E-593-01-11004

Cable Raceway Plan - Boiler Area Unit-1 PLATE EL.+12,600

MARK

18/06/13

MD1-0-E-593-01-11005

Cable Raceway Plan - Boiler Area Unit-1 EL.+19,787

MARK

18/06/13

MD1-0-E-593-01-11006

Cable Raceway Plan - Boiler Area Unit-1 EL.+26,970

MARK

18/06/13

MD1-0-E-593-01-11007

Cable Raceway Plan - Boiler Area Unit-1 EL.+32,300

MARK

18/06/13

MD1-0-E-593-01-11008

Cable Raceway Plan - Boiler Area Unit-1 EL.+35,600

MARK

18/06/13

MD1-0-E-593-01-11009

Cable Raceway Plan - Boiler Area Unit-1 EL.+43,850

MARK

18/06/13

MD1-0-E-593-01-11010

Cable Raceway Plan - Boiler Area Unit-1 EL.+46,480

MARK

18/06/13

MD1-0-E-593-01-11011

Cable Raceway Plan - Boiler Area Unit-1 EL.+51,572

MARK

18/06/13

MD1-0-E-593-01-11012

Cable Raceway Plan - Boiler Area Unit-1 EL.+55,753

MARK

18/06/13

MD1-0-E-593-01-12001

Cable Raceway Plan- Turbine BLDG Ground Floor

IC

MARK

14/05/13

MD1-0-E-593-01-12002

Cable Raceway Plan- Turbine BLDG Mez. Floor

IC

MARK

14/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-E-593-01-12003

Cable Raceway Plan- Turbine BLDG Operating Floor

STS
I

AUTHORISED
MARK

RECEIVED
14/05/13

MD1-0-E-593-01-12004

Cable Raceway Plan- Turbine BLDG Lower Roof and Crane Runway

IC

MARK

17/09/12

MD1-0-E-593-01-13001

Cable Raceway Plan- Central Control BLDG Ground Floor

MARK

10/05/13

MD1-0-E-593-01-13002

Cable Raceway Plan- Central Control BLDG 1st Floor

MARK

10/05/13

MD1-0-E-593-01-13003

Cable Raceway Plan- Central Control BLDG 2nd Floor

MARK

10/05/13

MD1-0-E-593-01-13004

Cable Raceway Plan- Central Control BLDG 3rd Floor

MARK

10/05/13

MD1-0-E-593-01-13005

Cable Raceway Plan- Central Control BLDG Roof Floor

MARK

10/05/13

MD1-0-E-593-01-13101

Cable Raceway Support Plan - Central Control BLDG Ground Floor

MARK

10/05/13

MD1-0-E-593-01-13102

Cable Raceway Support Plan - Central Control BLDG First Floor

MARK

10/05/13

MD1-0-E-593-01-13103

Cable Raceway Support Plan - Central Control BLDG Second Floor

MARK

10/05/13

MD1-0-E-593-01-13104

Cable Raceway Support Plan - Central Control BLDG Third Floor

MARK

10/05/13

MD1-0-E-593-01-19300

Cable raceway plan overall index plan

MARK

26/04/13

MD1-0-E-593-01-19301

Cable raceway plan pipe rack area (1)

MARK

08/03/13

MD1-0-E-593-01-19302

Cable raceway plan pipe rack area (2)

MARK

08/03/13

MD1-0-E-593-01-19303

Cable raceway plan pipe rack area (3)

MARK

08/03/13

MD1-0-E-593-01-19304

Cable raceway plan pipe rack area (4)

MARK

08/03/13

MD1-0-E-593-01-19305

Cable raceway plan pipe rack area (5)

MARK

08/03/13

MD1-0-E-593-01-19306

Cable raceway plan pipe sleeper(1)

MARK

26/04/13

MD1-0-E-593-01-19307

Cable raceway plan pipe sleeper(2)

MARK

26/04/13

MD1-0-E-593-01-19308

Cable raceway plan pipe sleeper(3)

MARK

26/04/13

MD1-0-E-593-01-19309

Cable raceway plan pipe sleeper(4)

MARK

26/04/13

MD1-0-E-593-01-19310

Cable raceway plan pipe sleeper(5)

MARK

26/04/13

MD1-0-E-593-01-19311

Cable raceway plan pipe sleeper(6)

MARK

26/07/13

MD1-0-E-593-01-19312

Cable raceway plan pipe sleeper(7)

MARK

26/04/13

MD1-0-E-593-01-19313

Cable raceway plan pipe sleeper(8)

MARK

26/04/13

MD1-0-E-593-01-19314

Cable raceway plan pipe sleeper(9)

MARK

26/04/13

MD1-0-E-593-01-19315

Cable raceway plan pipe sleeper(10)

MARK

26/04/13

MD1-0-E-593-01-19316

Cable raceway plan pipe sleeper(11)

MARK

26/04/13

MD1-0-E-593-01-19317

Cable raceway plan pipe sleeper(12)

MARK

26/04/13

MD1-0-E-593-01-19318

Cable raceway plan pipe sleeper(13)

MARK

26/04/13

MD1-0-E-593-01-19319

Cable raceway plan pipe sleeper(14)

MARK

26/04/13

MD1-0-E-593-01-19320

Cable raceway plan pipe sleeper(15)

MARK

26/04/13

MD1-0-E-593-01-19321

Cable raceway plan pipe sleeper(16)

MARK

26/04/13

MD1-0-E-593-01-19322

Cable raceway plan pipe sleeper(17)

MARK

26/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-E-593-01-19323

Cable raceway plan pipe sleeper(18)

STS
I

AUTHORISED
MARK

RECEIVED
26/04/13

MD1-0-E-593-01-19324

Cable raceway plan pipe sleeper(19)

MARK

26/04/13

MD1-0-E-593-01-19325

Cable raceway plan pipe sleeper(20)

MARK

26/04/13

MD1-0-E-593-01-19326

Cable raceway plan pipe sleeper(21)

MARK

26/04/13

MD1-0-E-593-01-19327

Cable raceway plan pipe sleeper(22)

MARK

26/04/13

MD1-0-E-593-01-19328

Cable raceway plan pipe sleeper(23)

MARK

26/04/13

MD1-0-E-593-01-19329

Cable raceway plan pipe sleeper(24)

MARK

26/04/13

MD1-0-E-593-01-19330

Cable Raceway Plan - Pipe Sleeper(25)

MARK

26/07/13

MD1-0-E-593-01-20001

Cable Route Plan- Symbol and Legend

MARK

03/06/13

MD1-0-E-593-01-20102

Cable Route Plan- Installation Details (2/3)

MARK

11/12/12

MD1-0-E-593-01-20103

Cable Route Plan- Installation Details (3/3)

MARK

11/12/12

MD1-0-E-593-01-20201

Main cable Route Plan (1)

IC

MARK

11/12/12

MD1-0-E-593-01-20202

Main cable Route Plan (2)

IC

MARK

11/12/12

MD1-0-E-593-01-20203

Main cable Route Plan (3)

IC

MARK

11/12/12

MD1-0-E-593-01-20204

Main cable Route Plan (4)

IC

MARK

11/12/12

MD1-0-E-593-01-20205

Main cable Route Plan Section & Detail

MARK

11/12/12

MD1-0-E-593-01-22001

Cable Route Plan - Turbine Bldg Unit 1 Below Ground FL.(1)

IC

MARK

18/03/13

MD1-0-E-593-01-22002

Cable Route Plan - Turbine Bldg Unit 1 Below Ground FL.(2)

IC

MARK

18/03/13

MD1-0-E-593-01-22003

Cable Route Plan - Turbine Bldg Unit 2 Below Ground FL.(1)

IC

MARK

18/03/13

MD1-0-E-593-01-22004

Cable Route Plan - Turbine Bldg Unit 2 Below Ground FL.(2)

IC

MARK

18/03/13

MD1-0-E-593-01-23001

Cable route plan - central control bldg ground floor

IC

MARK

26/04/13

MD1-0-E-593-01-23002

Cable route plan - central control bldg 1st floor

IC

MARK

26/04/13

MD1-0-E-593-01-23003

Cable route plan - central control bldg 2nd floor

IC

MARK

26/04/13

MD1-0-E-593-01-23004

Cable route plan - central control bldg 3rd floor

IC

MARK

26/04/13

MD1-0-E-593-01-23005

Cable route plan - central control bldg roof

IC

MARK

26/04/13

MD1-0-E-593-01-24201

Cable route plan - fuel oil pump house

IC

MARK

27/02/13

MD1-0-E-593-01-24401

Cable route plan - fire protection pump house

IC

MARK

27/02/13

MD1-0-E-593-01-25501

Cable route plan (building service) - water treatment bldg ground floor

IC

MARK

26/04/13

MD1-0-E-593-01-25502

Cable route plan (building service) - water treatment bldg roof

IC

MARK

26/04/13

MD1-0-E-593-01-25503

Cable route plan (building service) - waste water pond pump room

IC

MARK

26/04/13

MD1-0-E-593-01-26901

Cable Route Plan - Transformer Area(Unit1)

MARK

04/06/13

MD1-0-E-593-01-26902

Cable Route Plan - Transformer Area(Unit2)

MARK

04/06/13

MD1-0-E-593-01-26905

Cable route plan - station transformer area

MARK

02/04/13

MD1-0-E-593-01-28601

Cable Route Plan- Admin. BLDG Ground Floor

MARK

27/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-E-593-01-28602

Cable Route Plan- Admin. BLDG 1st Floor

MARK

27/02/13

MD1-0-E-593-01-28603

Cable Route Plan- Admin. BLDG 2nd Floor

MARK

27/02/13

MD1-0-E-593-01-28604

Cable Route Plan- Admin. BLDG 3rd Floor

MARK

27/02/13

MD1-0-E-593-01-28605

Cable Route Plan- Admin. BLDG 4th Floor

MARK

26/12/12

MD1-0-E-593-01-28606

Cable Route Plan- Admin. BLDG Roof Floor

MARK

26/12/12

MD1-0-E-593-01-28901

Cable route plan - common service bldg ground floor

MARK

01/03/13

MD1-0-E-593-01-28902

Cable route plan - common service bldg roof

MARK

01/03/13

MD1-0-T-030-05-00118

Inspection Test Plan for Earthing & Lightning protection installation

MARK

13/09/12

MD1-0-T-030-05-00150

ITP for Cable Raceway Work

MARK

26/10/12

MD1-0-T-030-05-00188

Inspection test Plan for Cable Installation

MARK

11/12/12

MD1-0-T-030-05-00194

ITP for Electrical Equipment Installation

MARK

22/03/13

MD1-0-T-030-05-00220

ITP for Cathodic Protection System

MARK

26/10/12

MD1-0-T-055-05-00115

Method Statemnt for Earthing & Lightning Protection

MARK

11/09/12

MD1-0-T-055-05-00133

Method statement for Raceway Work

MARK

05/10/12

MD1-0-T-055-05-00143

Method Statement for Lighting and Small Power System

MARK

23/10/12

MD1-0-T-055-05-00201

Method Statement for Installation of Cathodic Protection

MARK

23/10/12

MD1-0-T-055-05-00202

Method Statement for Electrical Panel Board

MARK

28/11/12

MD1-0-T-055-05-00203

Method Statement For Cable Installation

MARK

27/02/13

MD1-0-T-055-05-00204

Method Statement for Electrical Heat tracing

MARK

27/02/13

MD1-0-T-055-05-00210

Method statement for dc_ups

MARK

08/03/13

MD1-0-T-055-05-00211

Method Statement for GCB installation

MARK

26/07/13

MD1-0-T-060-05-01001

PROCEDURE FOR PERMIT TO WORK DURING COMMISSIONING

IC

MARK

25/07/13

MD1-0-V-111-01-00013

Inspection and Test Plan for Generator

MARK

04/01/13

MD1-0-V-111-01-00408

Generator Electrical Outline (1/4)

MARK

25/03/13

MD1-0-V-111-01-00409

Generator Electrical Outline (2/4)

MARK

25/03/13

MD1-0-V-111-01-00410

Generator Electrical Outline (3/4)

MARK

25/03/13

MD1-0-V-111-01-00411

Generator Electrical Outline (4/4)

MARK

25/03/13

MD1-0-V-111-01-00412

Neutral Tie & Enclosure Assembly

MARK

24/10/12

MD1-0-V-111-01-00421

Generator On-Line Monitoring System Arrangement (1/2)

IC

MARK

10/05/13

MD1-0-V-111-01-00422

Generator On-Line Monitoring System Arrangement (2/2)

IC

MARK

10/05/13

MD1-0-V-111-05-00018

Long term storage instruction for generator

MARK

23/04/13

MD1-0-V-111-05-00400

Method Statement for Generator Installation

MARK

31/10/12

MD1-0-V-111-05-00431

Test procedure for generator rotor balancing

MARK

22/03/13

MD1-0-V-111-05-00432

Test procedure for generator rotor assembly

MARK

22/03/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-111-05-00433

Test Procedure for Generator Running Behavior

STS
I

AUTHORISED
MARK

RECEIVED
26/07/13

MD1-0-V-111-06-00850

Calculation and Specification of Neutral Grounding Transformer for STG

MARK

31/10/12

MD1-0-V-111-07-00758

AC/DC Bus Duct Sizing Calculation Report

IC

MARK

04/06/13

MD1-0-V-111-08-00718

Excitation system external i/o list

MARK

16/04/13

MD1-0-V-111-09-00400

Generator Reactive Capability Curve

MARK

06/03/13

MD1-0-V-111-09-00401

Estimated Vee Curves

MARK

06/03/13

MD1-0-V-111-09-00402

Estimated Saturation and Synchronous Impedance Curve

MARK

06/03/13

MD1-0-V-111-09-00403

Estimated Generator Loss Curve

MARK

06/03/13

MD1-0-V-111-09-00404

Estimated Three-Phase Short Circuit Decrement Curve

MARK

06/03/13

MD1-0-V-111-09-00405

Estimated Line-Line Short Circuit Decrement Curve

MARK

06/03/13

MD1-0-V-111-09-00406

Generator Design Data For Station Service

MARK

06/03/13

MD1-0-V-111-09-00754

Excitation recommended parameter for generator protection

MARK

26/07/13

MD1-0-V-111-10-00766

AVR Room Layout Drawings

MARK

31/10/12

MD1-0-V-111-10-00767

AVR Room Layout Drawing (2 of 2)

MARK

19/12/12

MD1-0-V-111-10-00768

Excitation transformer outline drawing (1of4)

MARK

18/03/13

MD1-0-V-111-10-00769

Excitation transformer outline drawing (2of4)

MARK

18/03/13

MD1-0-V-111-10-00770

Excitation transformer outline drawing (3of4)

MARK

18/03/13

MD1-0-V-111-10-00771

Excitation transformer outline drawing (4of4)

MARK

18/03/13

MD1-0-V-111-11-00751

Ac busduct layout drawings

MARK

18/03/13

MD1-0-V-111-11-00752

Dc busduct layout drawings

MARK

18/03/13

MD1-0-V-111-11-00759

Excitation system elementary diagram

MARK

18/03/13

MD1-0-V-111-11-00850

Schematic Diagrams of NGR & NGTR Panel

IC

MARK

18/03/13

MD1-0-V-111-11-00852

Schematic diagrams for generator protection relay panel

IC

MARK

02/04/13

MD1-0-V-111-11-00854

Generator Fault Recorder Panel

IC

MARK

26/07/13

MD1-0-V-111-32-00400

Emerg. Seal Oil Pump Motor Starter (1/4)

MARK

28/11/12

MD1-0-V-111-32-00401

Emerg. Seal Oil Pump Motor Starter (2/4)

MARK

28/11/12

MD1-0-V-111-32-00402

Emerg. Seal Oil Pump Motor Starter (3/4)

MARK

28/11/12

MD1-0-V-111-32-00403

Emerg. Seal Oil Pump Motor Starter (4/4)

MARK

28/11/12

MD1-0-V-111-32-00755

Schematic diagram of excitation system

MARK

18/03/13

MD1-0-V-111-33-00850

Generator overall protection logic diagram

IC

MARK

02/04/13

MD1-0-V-111-35-00422

Stator Winding Diagram

MARK

22/08/12

MD1-0-V-111-55-00761

Excitation Transformer Calculation Report

IC

MARK

11/06/13

MD1-0-V-111-57-00407

Shaft Grounding Brush Rigging Assembly

MARK

26/07/13

MD1-0-V-111-57-00750

AC/DC Busduct Miscellaneous Drawings

IC

MARK

11/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-113-08-00047

Condenser - Electrical Load List

STS
I

AUTHORISED
MARK

RECEIVED
11/06/13

MD1-0-V-113-10-00063

Steam surface condenser - cathodic protection system

MARK

23/04/13

MD1-0-V-113-32-00027

Schematic Diagram of Cathodic Protection System

MARK

27/02/13

MD1-0-V-113-35-00028

Wiring Diagram of Cathodic Protection System

MARK

27/02/13

MD1-0-V-113-35-00029

Connection Diagram of Cathodic Protection System

MARK

27/02/13

MD1-0-V-113-55-00026

Design Analysis for Cathodic Protection System

MARK

27/02/13

MD1-0-V-121-01-00004

Motor sectional drawing for boiler feed pump and booster pump

MARK

26/07/13

MD1-0-V-121-02-00002

Motor Characteristic Curves for BFP & BFBP

MARK

26/12/12

MD1-0-V-121-05-00008

Motor Shop Inspection and Test Plan BFP & BFBP

MARK

29/05/13

MD1-0-V-121-05-00009

Shop Inspection and Test Procedure for Motor of BFBP & BFP

MARK

19/12/12

MD1-0-V-121-09-00002

Motor Datasheet for BFP & BFBP

MARK

26/07/13

MD1-0-V-121-10-00001

Motor Outline Drawing (for BFP & BFBP)

MARK

26/07/13

MD1-0-V-121-11-00012

Motor Main Terminal Box Drawing for BFP & BFBP

MARK

26/07/13

MD1-0-V-121-11-00014

Motor Acc'y Terminal Box Drawing for BFP & BFBP

MARK

26/07/13

MD1-0-V-121-11-00015

Motor Acc'y Terminal Box Wiring Diagram for BFP & BFBP

MARK

26/07/13

MD1-0-V-121-11-00016

Motor Space Heater Terminal Box Drawing for BFP & BFBP

MARK

26/07/13

MD1-0-V-121-11-00018

Mortor Name Plate Drawing for BFP & BFBP

IC

MARK

26/12/12

MD1-0-V-121-11-00019

Mortor Leakage Detector Drawing for BFP & BFBP

MARK

26/12/12

MD1-0-V-122-01-00003

Motor Sectional Drawing for Condenstat Extraction pump

MARK

29/05/13

MD1-0-V-122-02-00002

Motor Characteristic Curve for Condenstate Extraction Pump

MARK

07/01/13

MD1-0-V-122-05-00008

MOTOR SHOP INSPECTION AND TEST PLAN FOR CONDENSATE EXTRACTION PUMP

MARK

26/06/13

MD1-0-V-122-05-00009

Motor Shop Inspection and Test Procedure for Condensate Extraction

MARK

26/12/12

MD1-0-V-122-05-00010

Motor painting procedure for condensate extraction pump

MARK

23/04/13

MD1-0-V-122-09-00002

Motor Data Sheet for Condensate Extraction Pump

MARK

29/05/13

MD1-0-V-122-10-00001

Motor Outline Drawing for Condenstate Extraction Pump

MARK

29/05/13

MD1-0-V-122-11-00004

Motor Name Plate for Condenstate Extraction Pump

MARK

29/05/13

MD1-0-V-122-11-00006

Motor Main Terminal Box Drawing for Condensate Extraction Pump

MARK

10/04/13

MD1-0-V-122-11-00007

Motor Ass'y Terminal Box Drawing for Condensate Extraction Pump

MARK

10/04/13

MD1-0-V-122-11-00008

Motor Space Heater Terminal Box Drawing for Condensate Extraction Pump

MARK

10/04/13

MD1-0-V-122-11-00009

Motor Neutral Terminal Box Drawing for Condensate Extraction Pump

MARK

10/04/13

MD1-0-V-122-35-00001

Motor Ass'y T/Box Wiring Diagram DWG for Condensate Extraction Pump

MARK

10/04/13

MD1-0-V-123-09-00008

Condenser Vacuum Pump- Motor Data Sheet

MARK

18/03/13

MD1-0-V-123-09-00009

Condenser Vacuum Pump- Recir Pump & Motor Data Sheet

MARK

18/03/13

MD1-0-V-131-01-00005

Motor sectional drawings

IC

MARK

28/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-131-02-00002

Inspection and test plan for motor

STS
I

AUTHORISED
MARK

RECEIVED
10/07/13

MD1-0-V-131-08-00021

Electrical Load Lists for Circulating Water Pump

MARK

26/07/13

MD1-0-V-131-08-00026

Utility consumption list

MARK

27/02/13

MD1-0-V-131-08-00027

Lubrication list for motor

MARK

27/02/13

MD1-0-V-131-08-00028

Auxiliary power consumption list

MARK

27/02/13

MD1-0-V-131-09-00006

Motor data sheets and curves

AC

MARK

28/02/13

MD1-0-V-131-10-00003

Outline and dimensional drawing of motors and motor terminal box

MARK

28/02/13

MD1-0-V-131-10-00006

Outline and dimensional drawing of motor main terminal box

MARK

28/02/13

MD1-0-V-131-10-00007

Outline and dimensional drawing of motor neutral terminal box

MARK

28/02/13

MD1-0-V-131-10-00008

Outline and dimensional drawing of motor heater terminal box

MARK

28/02/13

MD1-0-V-131-11-00005

Current Transformer Drawing

MARK

26/07/13

MD1-0-V-131-11-00007

Name plate drawing for motor

IC

MARK

26/02/13

MD1-0-V-131-11-00009

Arrangement drawing for the electrical cathodic protection system

IC

MARK

23/04/13

MD1-0-V-131-11-00010

Wiring diagram for the electrical cathodic protection system

IC

MARK

23/04/13

MD1-0-V-131-11-00011

Mechanical drawing for the electrical cathodic protection system

IC

MARK

23/04/13

MD1-0-V-131-11-00012

Control panel drawing for the electrical cathodic protection system

IC

MARK

23/04/13

MD1-0-V-131-11-00013

Distribution panel drawing for the electrical cathodic protection system

IC

MARK

23/04/13

MD1-0-V-131-35-00001

Wiring diagrmas for circulating water pumps

IC

MARK

27/03/13

MD1-0-V-131-35-00002

Wiring diagram for motor

MARK

27/02/13

MD1-0-V-132-01-00056

Sea water intake facility - electrical panel layout

IC

MARK

23/04/13

MD1-0-V-132-10-00017

Sea water intake facility - stop log cathodic protection

MARK

27/02/13

MD1-0-V-132-31-00055

Sea Water Intake Facility - Single Line Diagram

IC

MARK

23/04/13

MD1-0-V-132-35-00054

Sea Water Intake Facility - Electrical Wired Diagram

IC

MARK

23/04/13

MD1-0-V-133-02-00015

Motor Data Sheet & Curve With Drawing

MARK

03/06/13

MD1-0-V-133-08-00014

Electrical load list

MARK

26/04/13

MD1-0-V-133-11-00041

Water Box Vacuum Pump Earthing Drawing

MARK

25/06/13

MD1-0-V-134-08-00018

Electrical load list for control panel (condenser tube cleaning system)

MARK

21/03/13

MD1-0-V-134-09-00013

Motor & characteristic curves & electrical equipment data sheet for ctcs

MARK

26/04/13

MD1-0-V-134-09-00053

Technical data sheet & drawings for cathodic protection (ctcs & df)

RT

MARK

19/02/13

MD1-0-V-135-09-00007

Electrical equipment data sheet - df

AC

MARK

04/04/13

MD1-0-V-142-73-00001

Motor data & drawing for service water pump

AC

MARK

22/03/13

MD1-0-V-142-73-10001

Motor data & drawing for closed cooling water pump

AC

MARK

22/03/13

MD1-0-V-142-73-20001

Motor data & drawing for demi. water transfer pump

AC

MARK

22/03/13

MD1-0-V-142-73-30001

Motor data & drawing for condensate make-up pump

AC

MARK

22/03/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-142-73-40001

Motor data & drawing for auxiliary cooling water booster pump

AC

AUTHORISED
MARK

RECEIVED
22/03/13

MD1-0-V-142-73-50001

Motor data & drawing for steam coil air heater drain pump

AC

MARK

22/03/13

MD1-0-V-142-73-60001

Motor data & drawing for diesel oil drain pump

AC

MARK

22/03/13

MD1-0-V-142-73-70001

Motor data & drawing for deaerator recirculation pump

AC

MARK

22/03/13

MD1-0-V-142-73-80001

Motor data & drawing for dirty oil transfer pump

AC

MARK

22/03/13

MD1-0-V-142-73-90001

Motor data & drawing for dirty oil drain pump

AC

MARK

22/03/13

MD1-0-V-151-08-00024

Air Compressor - Electrical Load Lists

MARK

17/04/13

MD1-0-V-151-09-00016

Air Compressor - Motor Data Sheet

AC

MARK

17/04/13

MD1-0-V-151-10-00005

AIR COMPRESSOR - DIMENSION DRAWING FOR STARTER PANEL

IC

MARK

23/05/13

MD1-0-V-151-35-00011

AIR COMPRESSOR - WIRING DIAGRAM FOR AIR COMPRESSOR

IC

MARK

23/05/13

MD1-0-V-151-35-00013

AIR COMPRESSOR - WIRING DIAGRAM FOR STATER PANEL

IC

MARK

23/05/13

MD1-0-V-151-35-00035

AIR COMPRESSOR - WIRING DIAGRAM FOR COMMON CONTROL PANEL

IC

MARK

23/05/13

MD1-0-V-161-09-00003

MV MOTOR DATA SHEET AND CURVE

AC

MARK

04/02/13

MD1-0-V-161-09-00004

MD1 LV MOTOR DATA SHEET

AC

MARK

04/02/13

MD1-0-V-161-73-07901

Electrical Location Plan Drawing Index

MARK

26/10/12

MD1-0-V-161-73-07903

Electrical Location Plan at EL. 12115

MARK

26/10/12

MD1-0-V-161-73-07904

Electrical Location Plan at EL. 15315 THR EL. 15700

MARK

26/10/12

MD1-0-V-161-73-07905

Electrical Location Plan at EL. 18365 THR EL. 19700

MARK

26/10/12

MD1-0-V-161-73-07907

Electrical Location Plan at EL. 27787 THR EL. 28800

MARK

26/10/12

MD1-0-V-161-73-07908

Electrical Location Plan at EL. 32060 THR EL. 34970 Key Level

MARK

26/10/12

MD1-0-V-161-73-07909

Electrical Location Plan at EL 37600

MARK

26/10/12

MD1-0-V-161-73-07910

Electrical Location Plan at EL 40300

MARK

26/10/12

MD1-0-V-161-73-07911

Electrical Location Plan at EL 43600 THR EL 43890

MARK

26/10/12

MD1-0-V-161-73-07912

Electrical Location Plan at EL 46700

MARK

26/10/12

MD1-0-V-161-73-07914

Electrical Location Plan at EL 51850 Key Level

MARK

26/10/12

MD1-0-V-161-73-07915

Electrical Location Plan at EL 54005 THR EL 56515

MARK

26/10/12

MD1-0-V-161-73-07917

Electrical Location Plan at EL 58400 THR EL59572

MARK

26/10/12

MD1-0-V-161-73-07918

Electrical Location Plan at EL 61213 THR EL 62703

MARK

26/10/12

MD1-0-V-162-01-00002

Esp cabinets arrangement diagram

MARK

11/06/13

MD1-0-V-162-03-00003

Characteristics of Rectifier & Thyrister

MARK

10/07/13

MD1-0-V-162-06-00003

System Calculation for within Supplier's Scope of Supply(Illumination Calculati)

MARK

10/07/13

MD1-0-V-162-08-00009

Electrical Load Lists

IC

MARK

30/01/13

MD1-0-V-162-08-00010

Electrical heat loss list

MARK

27/02/13

MD1-0-V-162-11-00008

Details of Key Interlock

RT

MARK

26/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-162-11-00018

Cable Trench Arrangement Drawing

IC

AUTHORISED
MARK

RECEIVED
10/05/13

MD1-0-V-162-31-00001

Single Line Diagram

RT

MARK

26/07/13

MD1-0-V-163-09-00006

Motor Data

MARK

26/04/13

MD1-0-V-163-09-00007

Motor Terminal Box Drawing

MARK

26/04/13

MD1-0-V-167-05-00002

Fuel oil pump inspection & test procedure for motor

IC

MARK

01/03/13

MD1-0-V-167-09-00003

Motor Data Sheet

MARK

21/06/13

MD1-0-V-167-09-00004

Motor Performance Curve

MARK

02/04/13

MD1-0-V-167-09-00005

Lcp tech. data & dwg

MARK

14/05/13

MD1-0-V-167-10-00002

Motor Outline Drawing & Terminal Box Drawing

MARK

21/06/13

MD1-0-V-171-01-02005

Equipment List for Coal Handling System

MARK

03/06/13

MD1-0-V-171-01-02012

Cabling, earthing & lightning protection layout tt-06

IC

MARK

27/02/13

MD1-0-V-171-01-02013

Cabling, earthing & lightning protection layout tt-05

IC

MARK

27/02/13

MD1-0-V-171-01-02014

CABLING, EARTHING & LIGHTNING PROTECTION LAYOUT TT-04

IC

MARK

30/01/13

MD1-0-V-171-01-02015

Cabling, earthing & lightning protection layout tt-03

IC

MARK

27/02/13

MD1-0-V-171-01-02016

Cabling, earthing & lightning protection layout tt-02

IC

MARK

27/02/13

MD1-0-V-171-01-02018

CABLING, EARTHING & LIGHTNING PROTECTION LAYOUT BC-6A/B

IC

MARK

03/06/13

MD1-0-V-171-01-02019

CABLING, EARTHING & LIGHTNING PROTECTION LAYOUT OF BCN-5A/5B

IC

MARK

30/01/13

MD1-0-V-171-01-02020

CABLING, EARTHING & LIGHTNING PROTECTION LAYOUT OF BCN-3A/3B

IC

MARK

30/01/13

MD1-0-V-171-01-02021

CABLING, EARTHING & LIGHTNING PROTECTION LAYOUT OF BCN-2A/2B

IC

MARK

30/01/13

MD1-0-V-171-01-02022

CABLING, EARTHING & LIGHTNING PROTECTION LAYOUT BC-1A/B

IC

MARK

30/01/13

MD1-0-V-171-01-02027

Illumination layout for transfer tower no.tt-06 for chs

IC

MARK

25/03/13

MD1-0-V-171-01-02028

Illumination layout for transfer tower no.tt-05 for chs

IC

MARK

25/03/13

MD1-0-V-171-01-02029

Illumination layout for transfer tower no.tt-04 for chs

IC

MARK

25/03/13

MD1-0-V-171-01-02030

Illumination layout for transfer tower no.tt-03 for chs

IC

MARK

25/03/13

MD1-0-V-171-01-02031

llumination layout for transfer tower no.tt-02 for chs

IC

MARK

25/03/13

MD1-0-V-171-01-02032

Illumination layout for transfer tower no.tt-01 for chs

IC

MARK

30/05/13

MD1-0-V-171-01-02033

Illumination layout for transfer conveyor no.bc-06a/b for chs

MARK

26/07/13

MD1-0-V-171-01-02034

Illumination layout for transfer conveyor no.bc-05a/b for chs

MARK

26/07/13

MD1-0-V-171-01-02035

Illumination layout for transfer conveyor no.bc-03a/b for chs

IC

MARK

25/03/13

MD1-0-V-171-06-02003

Transformer sizing calculation for chs

IC

MARK

10/07/13

MD1-0-V-171-08-02006

Equipment List for Coal Handling System

IC

MARK

24/01/13

MD1-0-V-171-08-02007

Power cable schedule for chs

MARK

10/07/13

MD1-0-V-171-08-02063

Peak Power Demand for CHS

MARK

08/05/13

MD1-0-V-171-09-02211

Power Cable Data Sheet(CHS)

MARK

26/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-171-09-02218

GA & BOM for LPBS(CHS)

IC

AUTHORISED
MARK

RECEIVED
26/07/13

MD1-0-V-171-09-02226

GA of Lighting Junction Box(CHS)

MARK

26/07/13

MD1-0-V-171-11-02201

Ga & data sheet for 10kv motors for chs

IC

MARK

06/03/13

MD1-0-V-171-31-02004

Single line diagram for chs

IC

MARK

06/03/13

MD1-0-V-172-01-02004

Electrical equipment layout for lhs electrical & control building

MARK

03/06/13

MD1-0-V-172-01-02014

Cabling, earthing & lightning protection layout for lt-04

IC

MARK

01/03/13

MD1-0-V-172-01-02017

Cabling, earthing & lightning protection layout for belt conveyor l-01

IC

MARK

01/03/13

MD1-0-V-172-01-02018

Cabling, earthing & lightning protection layout for belt conveyor l-02

IC

MARK

01/03/13

MD1-0-V-172-01-02019

Cabling, earthing & lightning protection layout for belt conveyor l-03

IC

MARK

01/03/13

MD1-0-V-172-01-02020

Cabling, earthing & lightning protection layout for belt conveyor l-04

IC

MARK

01/03/13

MD1-0-V-172-01-02021

Cabling, earthing & lightning protection layout for belt conveyor l-05

IC

MARK

01/03/13

MD1-0-V-172-01-02029

Illumination layout for transfer tower lt-01 for lhs

IC

MARK

16/04/13

MD1-0-V-172-01-02030

Illumination layout for transfer tower lt-02 for lhs

IC

MARK

16/04/13

MD1-0-V-172-01-02031

Illumination layout for transfer tower lt-03 for lhs

IC

MARK

16/04/13

MD1-0-V-172-01-02032

Illumination layout for transfer tower lt-04 for lhs

IC

MARK

16/04/13

MD1-0-V-172-01-02035

Illumination layout for transfer conveyor no. bc l-01a/b for lhs

IC

MARK

16/04/13

MD1-0-V-172-01-02036

Illumination layout for transfer conveyor no. bc l-02 for lhs

IC

MARK

16/04/13

MD1-0-V-172-01-02037

Illumination layout for transfer conveyor no. bc l-03 for lhs

IC

MARK

16/04/13

MD1-0-V-172-01-02038

Illumination layout for transfer conveyor no. bc l-04 for lhs

IC

MARK

16/04/13

MD1-0-V-172-01-02039

Illumination layout for transfer conveyotno.bc l-05 for lhs

IC

MARK

16/04/13

MD1-0-V-172-06-02002

Transformer Sizing Calculation for LHS

IC

MARK

10/07/13

MD1-0-V-172-06-02008

Cable Sizing Calculation for LHS

RT

MARK

06/11/12

MD1-0-V-172-08-02001

Electrical Load List for LHS

MARK

28/02/13

MD1-0-V-172-08-02005

Equipment List for Limestone Handling System

IC

MARK

07/01/13

MD1-0-V-172-08-02006

Power cable schedule for lhs

IC

MARK

06/03/13

MD1-0-V-172-08-02062

Peak power demand for lhs

MARK

16/04/13

MD1-0-V-172-11-02224

GA of Lighting junction Box(LHS)

MARK

26/07/13

MD1-0-V-172-31-02003

Single line diagram for limestone handling system

IC

MARK

06/03/13

MD1-0-V-173-01-02543

Fly Ash Silo Earthing Layout

MARK

04/06/13

MD1-0-V-173-01-02551

ESP Control Building UNIT-1 & 2 ASH Handling System Electrical Equipment Layout

MARK

04/06/13

MD1-0-V-173-06-02513

Transformer sizing calculation for 400v return water mcc

IC

MARK

18/03/13

MD1-0-V-173-06-02519

Transformer sizing calculation for 400v ash slurry - fa silo pmcc

IC

MARK

18/03/13

MD1-0-V-173-32-02501

Key sld for ahs power distribution scheme

IC

MARK

18/03/13

MD1-0-V-182-01-10001

General arrangement for emergency diesel generator

MARK

10/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-182-08-31001

Electric Load List for Emergency Diesel Generator

STS
I

AUTHORISED
MARK

RECEIVED
10/07/13

MD1-0-V-182-09-00102

Emergency Diesel Generator Set Generator Data Sheet

MARK

10/07/13

MD1-0-V-182-32-30011

Single line diagram (1) for no.1 d/g control panel

MARK

02/04/13

MD1-0-V-182-35-30000

Generator Wiring Diagram for Emergency Diesel Generator

IC

MARK

10/07/13

MD1-0-V-186-11-00733

Fuel oil storage tank cable support detail

MARK

21/02/13

MD1-0-V-186-11-00822

Diesel oil storage tank cable support detail

MARK

21/02/13

MD1-0-V-191-01-30001

Electric Construction Drawings for STG Building EOT Crane

IC

MARK

04/06/13

MD1-0-V-191-01-30009

Electric Construction Drawings for Boiler Feedwater Pump Crane

IC

MARK

04/06/13

MD1-0-V-191-01-30101

Electric Construction Drawings for Chlorination Building Hoist Crane

IC

MARK

04/06/13

MD1-0-V-191-01-30107

Electric Construction Drawings for Water Treatment Building Hoist Crane

IC

MARK

04/06/13

MD1-0-V-191-01-30117

Electric Construction Drawings for Fire Protection Pump House Hoist Crane

IC

MARK

04/06/13

MD1-0-V-191-01-30118

Electric Construction Drawings for Waste Water Area Pump Room Hoist Crane

IC

MARK

04/06/13

MD1-0-V-191-01-30119

Electric Construction Drawings for Chlorination Building Vaporizer Hoist Crane

IC

MARK

04/06/13

MD1-0-V-191-32-30001

Schematic Diagram for STG Building EOT Crane

IC

MARK

04/06/13

MD1-0-V-191-32-30009

Schematic Diagram for Boiler Feedwater Pump EOT Crane

IC

MARK

04/06/13

MD1-0-V-191-32-30101

Schematic Diagram for Chlorination Building Hoist Crane

IC

MARK

04/06/13

MD1-0-V-191-32-30107

Schematic Diagram for Water Treatment Building Hoist Crane

IC

MARK

04/06/13

MD1-0-V-191-32-30117

Schematic Diagram for Fire Protection Pump House Hoist Crane

IC

MARK

04/06/13

MD1-0-V-191-32-30118

Schematic Diagram for Waste Water Area Pump Room Hoist Crane

IC

MARK

04/06/13

MD1-0-V-191-32-30119

Schematic Diagram for Chlorination Building Vaporizer Hoist Crane

IC

MARK

04/06/13

MD1-0-V-360-10-00550

LIGHTNING PROTECTION SYSTEM AND GROUNDING - GENERAL ARRANGEMENT

IC

MARK

26/07/13

MD1-0-V-360-11-00551

LIGHTING PROTECTION SYSTEM AND GROUNDING - DETAILS

MARK

26/07/13

MD1-0-V-500-05-00001

Technical data for mv/lv swgr, mv/lv transformer

MARK

18/06/13

MD1-0-V-500-05-10001

Technical data for mcc

MARK

18/06/13

MD1-0-V-505-01-00102

Legend for Definite Dimension Drawing for Station Transformer

MARK

06/03/13

MD1-0-V-505-01-00103

Definite Demension Drawing for Station Trnasformer

MARK

06/03/13

MD1-0-V-505-01-00201

Preliminary Dimensional Outline Drawing for Unit Auxiliary Transformer

MARK

03/01/13

MD1-0-V-505-01-00202

LEGEND FOR DEFINITE DIMENSION DRAWING FOR UNIT AUXILIARY TRANSFORMER

MARK

05/02/13

MD1-0-V-505-01-00203

DEFINITE DIMENSION DRAWING FOR UNIT AUXILIARY TRANSFORMER

MARK

08/03/13

MD1-0-V-505-01-00205

PART LIST OF LV1,2 NEUTRAL CABLE JUNCTION BOX FOR UNIT AUXILIARY TRANSFORMER I

MARK

05/02/13

MD1-0-V-505-02-00001

Technical Specification for Generator Transformer

AC

MARK

29/05/13

MD1-0-V-505-02-00101

Tech. Spec. for Station Transformer

MARK

07/01/13

MD1-0-V-505-05-00001

Factory Acceptance Test and Inspection Plan for Generator Transformer

MARK

07/01/13

MD1-0-V-505-05-00004

Cleaning, Coating and Painting Procedures for Generator Transformer

MARK

10/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-505-05-00005

Welding Procedure Specification for Generator Transformer

STS
I

AUTHORISED
MARK

RECEIVED
29/05/13

MD1-0-V-505-05-00006

Quality Assurance Program Manual for Generator Transformer

MARK

26/12/12

MD1-0-V-505-05-00007

Factory acceptance test and inspection procedure for generator transformer

MARK

04/04/13

MD1-0-V-505-05-00101

FACTORY ACCEPTANCE TEST AND INSPECTION PLAN FOR STATION TRANSFORMER

MARK

05/02/13

MD1-0-V-505-05-00103

Instruction and maintenance manual for station transformer

IC

MARK

06/03/13

MD1-0-V-505-05-00104

Cleaning Coating and Painting Procedures for Station Transformer

MARK

07/01/13

MD1-0-V-505-05-00105

Welding Procedure Spec. For Station Transformer

MARK

07/01/13

MD1-0-V-505-05-00106

Quality assurance program manual for station transformer

IC

MARK

28/01/13

MD1-0-V-505-05-00201

FACTORY ACCEPTANCE TEST AND INSPECTION PLAN FOR UNIT AUXILIARY TRANSFORMER I

MARK

05/02/13

MD1-0-V-505-05-00203

Instruction and maintenance manual for unit auxiliary transformer

IC

MARK

06/03/13

MD1-0-V-505-05-50001

Shop Test and Inspection Procedure for Auxiliary(10/0.42kV) Transformer

IC

MARK

26/07/13

MD1-0-V-505-07-00002

Bct overexcitation characteristic curves for generator transformer

MARK

06/03/13

MD1-0-V-505-07-00003

Loading Curve with Site Ambient Temperatures for Generator Transformer

MARK

29/05/13

MD1-0-V-505-07-00102

BCT Overexitaion Characteristic Curves for Station Transformer

MARK

26/12/12

MD1-0-V-505-07-00103

Loading Curve with Site Ambient Temperatures for Station Transformer

MARK

26/12/12

MD1-0-V-505-07-00111

Factory acceptance test and inspection report for station transformer

MARK

26/04/13

MD1-0-V-505-07-00202

BTC Overexcitation Characteristic Curves for Unit Auxiliary Transformer

MARK

07/01/13

MD1-0-V-505-08-00112

List of Essential Spare Parts Station Transformer

IC

MARK

23/04/13

MD1-0-V-505-08-50001

Shop Test and Inspection Plan for Auxiliary(10/0.42kV) Transformer

MARK

26/07/13

MD1-0-V-505-10-00001

Name Plate Drawing for Generator Trnasformer

MARK

26/12/12

MD1-0-V-505-10-00002

Bushing Drawings for Generator Transformer

MARK

26/12/12

MD1-0-V-505-10-00101

Connection Diagram and Rating Plate for Station Transformer

MARK

08/03/13

MD1-0-V-505-10-00102

LV1,2 Cable Junction Box for Station Transformer

MARK

06/03/13

MD1-0-V-505-10-00103

Part List of LV1,2 Cable Junction Box for Station Transformer

MARK

06/03/13

MD1-0-V-505-10-00104

LV1,2 Neutral Cable Junction Box for Station Transformer

MARK

16/11/12

MD1-0-V-505-10-00105

Part List of LV1,2 Neutral Cable Junction Box for Station Transformer

MARK

16/11/12

MD1-0-V-505-10-00106

On-Load tap Changer Motor Drive Unit for Station Transformer

MARK

14/01/13

MD1-0-V-505-10-00107

Layout of marshalling kiosk for station transformer

MARK

08/03/13

MD1-0-V-505-10-00108

Bushing Drawings for Station Transformer

MARK

26/12/12

MD1-0-V-505-10-00109

Circuit diagram of marshalling kiosk for station transformer

MARK

08/03/13

MD1-0-V-505-10-00204

LV1,2 NEUTRAL CABLE JUNCTION BOX FOR UNIT AUXILIARY TRANSFORMER

MARK

05/02/13

MD1-0-V-505-10-00208

Bushing Drawings for Unit Auxiliary Transformer

MARK

06/03/13

MD1-0-V-505-11-00001

Detailed Outline Drawing Including Installation Details for Generator Transformr

MARK

21/06/13

MD1-0-V-505-11-00002

List of Items to Detailed Outline Drawing for Generator Transformer

MARK

21/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-505-11-00005

Transport Drawing for Generator Transformer

STS
I

AUTHORISED
MARK

RECEIVED
29/05/13

MD1-0-V-505-11-00101

Transport Drawing for Station Transformer

MARK

03/01/13

MD1-0-V-505-11-00201

TRANSPORT DRAWING FOR UNIT AUXILIARY TRANSFORMER

MARK

05/02/13

MD1-0-V-510-03-00002

Brochure

MARK

14/03/13

MD1-0-V-510-05-00012

Generator circuit-breaker system hec 7b : operating manual

MARK

14/03/13

MD1-0-V-510-05-00013

Treatment and storage instructions he

MARK

14/03/13

MD1-0-V-510-05-00014

Hydraulic spring operating mechanism hmb-4/-8 operation and maintenance

MARK

14/03/13

MD1-0-V-510-05-00015

Transport instructions hec 7/8

MARK

14/03/13

MD1-0-V-510-07-00007

Painting instruction

MARK

14/03/13

MD1-0-V-510-10-00008

Generator circuit breaker outline drawing

MARK

14/03/13

MD1-0-V-510-32-00010

Schematic diagram

MARK

14/03/13

MD1-0-V-510-36-00011

Name plate drawing

MARK

14/03/13

MD1-0-V-510-55-00004

Data sheet

MARK

14/03/13

MD1-0-V-510-55-00005

Normal current carrying capability curve

MARK

14/03/13

MD1-0-V-515-01-00001

Isolated Phase Busduct Layout & Support Structure Detail(Unit-1&2)

IC

MARK

30/05/13

MD1-0-V-515-01-00002

Isolated Phase Busduct - Sub Assembly Drawing

MARK

30/05/13

MD1-0-V-515-01-00003

IPB Termination at Generator End

MARK

30/05/13

MD1-0-V-515-01-00004

IPB Termination at GCB

MARK

30/05/13

MD1-0-V-515-01-00005

IPB Termination at Gen. Transformer

MARK

30/05/13

MD1-0-V-515-01-00006

IPB Termination at UAT

MARK

30/05/13

MD1-0-V-515-01-00007

IPB Termination at Excitation Transformer end

MARK

30/05/13

MD1-0-V-515-01-00008

Pressurization System

IC

MARK

30/05/13

MD1-0-V-515-01-00009

Component Drawings

MARK

30/05/13

MD1-0-V-515-05-00001

Ipb shop test procedure

MARK

30/05/13

MD1-0-V-515-05-00002

Ipb site test procedure

MARK

30/05/13

MD1-0-V-515-05-00004

Welding book(wps, wpq, pqr)

MARK

27/02/13

MD1-0-V-515-05-00005

Ipb painting procedure for isolated phase busduct

MARK

30/05/13

MD1-0-V-515-05-10002

Shop Test and Inspection Procedure for NSPB

MARK

10/04/13

MD1-0-V-515-07-00001

Isolated phase busduct co-relation with type tested design

MARK

27/02/13

MD1-0-V-515-08-10001

Shop Test and Inspection Plan for NSPB

MARK

10/04/13

MD1-0-V-515-09-00001

Technical particulars for isolated phase busduct & accessories

MARK

30/05/13

MD1-0-V-515-09-10001

Technical data for non-segregated phase busduct

MARK

18/06/13

MD1-0-V-515-55-00001

Design calculations for isolated phase busduct

MARK

27/02/13

MD1-0-V-515-55-00002

IPB Support Steel Structure Analysis

MARK

30/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-515-57-00001

Inspection & test plan for isolated phase busduct & accessories

STS
I

AUTHORISED
MARK

RECEIVED
30/05/13

MD1-0-V-520-05-00001

Catalogue and Instruction Manual for MV SWGR Equipements

MARK

10/07/13

MD1-0-V-520-05-00002

Shop Test & Inspection Procedure for MV SWGR

MARK

10/04/13

MD1-0-V-520-05-00003

Field Test & Inspection Procedure for MV SWGR

MARK

10/07/13

MD1-0-V-520-05-00101

Maintenance Recommendations for MV SWGR

MARK

10/07/13

MD1-0-V-520-08-00002

Field Test & Inspection Plan for MV SWGR

MARK

10/07/13

MD1-0-V-520-08-10001

Shop Test & Inspection Plan for MV SWGR

MARK

10/04/13

MD1-0-V-525-01-10001

Arrangement and layout drawing for mcc(for 06blk)

MARK

26/07/13

MD1-0-V-525-05-00001

Catalogue and Instruction Manual for LV SWGR and MCC Equipements

MARK

10/07/13

MD1-0-V-525-05-00002

Shop Test & Inspection Procedure for LV SWGR

MARK

10/04/13

MD1-0-V-525-05-00003

Field Test & Inspection Procedure for LV SWGR

MARK

10/07/13

MD1-0-V-525-05-00101

Maintenance Recommendations for LV SWGR and MCC

MARK

10/07/13

MD1-0-V-525-05-10002

Shop Test & Inspection Procedure for MCC

MARK

10/04/13

MD1-0-V-525-05-10003

Field Test & Inspection Procedure for MCC

MARK

10/07/13

MD1-0-V-525-08-00002

Field Test & Inspection Plan for LV SWGR

MARK

10/07/13

MD1-0-V-525-08-10002

Field Test & Inspection Plan for MCC

MARK

10/07/13

MD1-0-V-525-08-20001

Shop Test & Inspection Plan for LV SWGR

MARK

10/04/13

MD1-0-V-525-08-30001

Shop Test & Inspection Plan for MCC

MARK

10/04/13

MD1-0-V-525-31-10001

Electrical One-Line and Three-Line Diagram for MCC(for 06BLK)

MARK

26/07/13

MD1-0-V-525-32-00001

Complete Schematic Wiring Diagram for LV Switchgears(06BFA, 06BFB, 06BFC, 06BFD,

MARK

18/06/13

MD1-0-V-525-32-00002

Complete Schematic Wiring Diagram for LV Switchgears(Others)

MARK

18/06/13

MD1-0-V-525-32-10001

Complete Schematic Wiring Diagram for MCC(for 06BLK)

MARK

26/07/13

MD1-0-V-530-01-20001

Arrangement and Layout Drawing for Lighting Panel

MARK

26/07/13

MD1-0-V-530-05-00001

Catalogue and Instruction Manual for DB

MARK

10/07/13

MD1-0-V-530-05-00002

Shop Test & Inspection Procedure for DB

MARK

10/04/13

MD1-0-V-530-05-00003

Field Test & Inspection Procedure for DB

MARK

10/07/13

MD1-0-V-530-05-00101

Maintenance Recommendations for DB

MARK

10/07/13

MD1-0-V-530-08-00001

Shop Test & Inspection Plan for DB

MARK

10/04/13

MD1-0-V-530-08-00002

Field Test & Inspection Plan for DB

MARK

10/07/13

MD1-0-V-530-31-20001

Electrical Three-line Diagram for Lighting Panel

MARK

26/07/13

MD1-0-V-535-05-00012

Inspection and test plan (itp) for dc and ups system

MARK

26/04/13

MD1-0-V-535-05-00014

Fat procedure for dc and ups system

MARK

26/04/13

MD1-0-V-535-05-00017

Quality manual for dc and ups system

MARK

26/04/13

MD1-0-V-535-09-00005

Technical data for 220v dc system - units & common (16btl01 / 16btl02 / 26btl01)

MARK

11/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-V-535-09-00006

Technical data for 220v dc system - cooling water system (06blt01 / 06blt02)

AUTHORISED
MARK

RECEIVED
11/06/13

MD1-0-V-535-11-00001

Layout and single line diagram for 220v dc system - units & common (16btl01 / 1)

IC

MARK

11/06/13

MD1-0-V-535-11-00002

Layout and single line diagram for 220v dc systme - units & common (26btl01 / 2)

IC

MARK

11/06/13

MD1-0-V-535-11-00003

Layout and single line diagram for 220v dc system - cooling water system (06blt)

IC

MARK

11/06/13

MD1-0-V-540-09-00007

Technical data for 230v ups system (16bru01 / 26bru01)

MARK

11/06/13

MD1-0-V-540-11-00004

Layout and single line diagram for 230v ups system (16bru01/26bru01)

IC

MARK

11/06/13

MD1-0-V-560-03-00001

Equipment Description and Catalogues for Equipment Cathodic Protection

MARK

11/12/12

MD1-0-V-560-05-00004

Quality Assurance Manual For Cathodic Protection System

MARK

24/10/12

MD1-0-V-560-05-00005

Inspection & Test Plan For Cathodic Protection System

MARK

24/10/12

MD1-0-V-560-05-00006

Inspection & Test Procedure for Cathodic Protection System

MARK

24/10/12

MD1-0-V-560-06-00001

Design Calculation for Tank Bottom Cathodic Protection System

MARK

11/12/12

MD1-0-V-565-02-00001

PD Monitoring System- Technical Specification for Motor Monitoring

MARK

27/02/13

MD1-0-V-565-02-00002

PD Monitoring System- Technical Specification for 10KV SWGR Monitoring

MARK

27/02/13

MD1-0-V-565-02-00003

PD Monitoring System- Technical Specification for IPB Monitoring

MARK

27/02/13

MD1-0-V-565-02-00004

PD Monitoring System- Technical Specification for Transformer

MARK

27/02/13

MD1-0-V-565-02-00005

PD Monitoring System Technical Specification for Server Cubicle and Workstation

MARK

28/06/13

MD1-0-V-565-05-00001

Pd monitoring system quality assurance program

MARK

27/02/13

MD1-0-V-565-05-00002

Pd monitoring system shop inspection and test plan

MARK

27/02/13

MD1-0-V-565-05-00003

Pd monitoring system shop inspection and test procedure

MARK

27/02/13

MD1-0-V-565-05-00004

Pd monitoring system site inspection and test plan

MARK

27/02/13

MD1-0-V-565-05-00005

Pd monitoring system site inspection and test procedure

MARK

27/02/13

MD1-0-V-565-05-00006

Pd monitoring system packing procedure

MARK

27/02/13

MD1-0-V-565-05-00011

Pd moinitoring system operation manual for motor monitoring

MARK

27/02/13

MD1-0-V-565-05-00012

Pd monitoring system operation manual for 10kv swgr monitoring

MARK

27/02/13

MD1-0-V-565-05-00013

Pd monitoring system operation manual for ipb monitoring

MARK

27/02/13

MD1-0-V-565-05-00014

Pd monitoring system operation manual for transformer monitoring

MARK

27/02/13

MD1-0-V-565-32-00002

Pd Monitoring System Schematic Diagram for 10kv SWGR Monitoring

MARK

18/03/13

MD1-0-V-565-32-00003

Pd Monitoring System Schematic Diagram for IPB Monitoring

MARK

18/03/13

MD1-0-V-565-32-00004

Pd monitoring system schematic diagram for transformer monitoring

MARK

27/02/13

MD1-0-V-570-01-00009

500kV & 110kV Switchyard Control Building Cable Raceway

MARK

19/03/13

MD1-0-V-570-02-00006

500kv and 110kv switchyard technical specification for telecommunication equipt

MARK

04/04/13

MD1-0-V-570-02-00008

500kv and 110kv switchyard technical specification for 48vdc battery and batterr

MARK

25/06/13

MD1-0-V-570-05-00071

110KV Switchyard Energizing Procedure

IC

MARK

26/07/13

MD1-0-V-570-05-00074

110KV Switchyard Equipment Operation and Maintenance Manual

MARK

26/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-570-05-00075

500KV Switchyard Equipment Operation and Maintenance Manual

STS
I

AUTHORISED
MARK

RECEIVED
26/07/13

MD1-0-V-570-05-00078

500KV and 110KV Switchyard AC/DC System Operation and Maintenance Manual

MARK

26/07/13

MD1-0-V-570-06-00009

500kv and 110kv switchyard 48vdc system sizing calculation

MARK

02/04/13

MD1-0-V-580-01-00001

Shop test and inspection plan for transformer protection system

MARK

08/03/13

MD1-0-V-580-01-00002

Field Test and Inspection Plan for Transformer Protection System

MARK

26/07/13

MD1-0-V-580-02-00001

Technical data and information for transformer protection system and tariff metl

MARK

26/07/13

MD1-0-V-580-05-00001

Shop test and inspection procedure for transformer protection system

MARK

02/04/13

MD1-0-V-580-05-00002

Field Test and Inspection Procedure for Transformer Protection System

MARK

26/07/13

MD1-0-V-580-05-00003

Qa manual for transformer protection system

MARK

08/03/13

MD1-0-V-580-05-00005

Operation & Maintenace Manual for Transformer Protection and Metering System

MARK

18/06/13

MD1-0-V-580-06-00001

Protection Relay Setting Calculation and List for Transformer Protection and Mem

MARK

26/07/13

MD1-0-V-580-08-00002

Essential Spare Parts List for Transformer Protection System

IC

MARK

08/05/13

MD1-0-V-580-10-00001

Layout & Arrangement Drawing for Transformer Protecion System Protecion System

MARK

26/07/13

MD1-0-V-580-31-00001

Single line diagram for transformer protection system

IC

MARK

26/07/13

MD1-0-V-580-32-00001

Schematic diagram for transformer protection system(generator tr unit.1 prot. p)

MARK

29/05/13

MD1-0-V-580-32-00002

Schematic diagram for transformer protection system(unit aux. tr unit.1 prot. p)

MARK

29/05/13

MD1-0-V-580-32-00003

Schematic diagram for transformer protection system(genarator tr unit.2 prot. p)

MARK

29/05/13

MD1-0-V-580-32-00004

Schematic diagram for transformer protection system(unit aux. tr unit.2 prot. p)

MARK

29/05/13

MD1-0-V-580-32-00005

Schematic diagram for transformer protection system(station tr prot. panel)

MARK

29/05/13

MD1-0-V-580-33-00001

Functional logic diagram for transformer protection system

MARK

30/05/13

MD1-0-V-585-32-00001

Schematic diagram for tariff meter panel

MARK

29/05/13

MD1-0-V-590-02-00001

Earthing & Lighting Protection material Catalogue

MARK

02/07/12

MD1-0-V-590-02-50001

Earthing Conductor Specification

MARK

02/07/12

MD1-0-V-590-05-00001

Inspection & Test Plan

MARK

28/09/12

MD1-0-V-590-05-00002

Inspection & Test Procedure

MARK

28/09/12

MD1-0-V-590-05-00003

QA/QC Manual

MARK

28/09/12

MD1-0-V-590-05-50001

Earthing Conductor Inspection and Test Plan

MARK

04/09/12

MD1-0-V-591-05-00001

Cables inspection & test plan

IC

MARK

22/03/13

MD1-0-V-591-05-00002

Cables inspection & test procedure

MARK

22/03/13

MD1-0-V-591-05-00003

Cables qa/qc manual

IC

MARK

22/03/13

MD1-0-V-591-05-20001

Inspection & Test Procedure for Cable Accessories

MARK

11/06/13

MD1-0-V-591-05-20003

Inspection & Test Plan for Cable Accessories

MARK

11/06/13

MD1-0-V-592-05-50001

Lighting & accessories inspection and test plan

MARK

27/02/13

MD1-0-V-592-05-50002

Lighting & accessories packing procedure

MARK

27/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-592-11-50001

Lighting & accessories outline drawing

STS
I

AUTHORISED
MARK

RECEIVED
30/05/13

MD1-0-V-592-11-50002

Lighting dist. board outline drawing

MARK

10/04/13

MD1-0-V-592-11-50003

Lighting dist. board outline Diagram for Admin. Bldg

MARK

10/04/13

MD1-0-V-592-11-50004

Lighting DIST. Board Outline Diagram for CCB and MISC. BLDG

MARK

30/05/13

MD1-0-V-593-05-00001

Cable Tray, Inspection and Test Plan

MARK

16/11/12

MD1-0-V-593-05-00002

Cable Tray, Inspection and Test Procedure

MARK

16/11/12

MD1-0-V-593-05-00003

Cable Tray, Quality Control Plan (QM Manual)

MARK

16/11/12

MD1-0-V-593-05-50001

Conduit & Accessories Inspection and Test Plan

MARK

16/11/12

MD1-0-V-593-11-00001

Cable Tray, Outline Drawing

MARK

16/11/12

MD1-0-V-593-11-50001

Conduit & Accessories Outline Drawing

MARK

26/12/12

MD1-0-V-751-02-00204

Motor Data Sheet & Drawing for Electric Fire Water Pump

MARK

07/05/13

MD1-0-V-751-02-00304

Motor Data sheet & Drawing for Jockey Pump

MARK

26/07/13

MD1-0-V-751-07-00405

Controller Functional Test Record for Diesel Fire Pump

MARK

03/06/13

MD1-0-V-751-07-00413

Motor Test Report for Electric Fire Pump

MARK

03/06/13

MD1-0-V-751-07-00414

Controller Functional Test Record for Electric Fire Pump

MARK

03/06/13

MD1-0-V-805-01-00100

Cable Tray Conduit Arrangement for WT & WWT System

IC

MARK

25/06/13

MD1-0-V-805-01-02001

General arrangement of electrical equipment for wt&wwt

MARK

26/07/13

MD1-0-V-805-08-00007

Electrical Load List for WT & WWT System

DAVID

29/05/13

MD1-0-V-805-08-00030

Electrical equipment list for wt & wwt

IC

MARK

01/07/13

MD1-0-V-805-09-00003

Cable schedule for wt&wwt

IC

MARK

10/07/13

MD1-0-V-805-09-00044

Equipment List

IC

MARK

23/10/12

MD1-0-V-805-09-00051

Motor Data Sheet

IC

MARK

24/10/12

MD1-0-V-805-31-00001

Single Line Diagram for WT & WWT

RT

MARK

28/06/13

MD1-0-V-850-31-00001

Single line diagram for chemical dosing system

MARK

26/04/13

MD1-0-V-850-32-00001

Schematic diagram for chemical dosing system

MARK

26/04/13

MD1-0-V-860-01-00004

Cabling, tray and tray support for gaseous chlorination system

MARK

16/04/13

MD1-0-V-860-08-00015

Wiring and cabling Requirement for Gaseous Chlorination System

IC

MARK

10/07/13

MD1-0-V-860-11-00002

Motor control center(mcc) outline drawing for gaseous chlorination system

MARK

04/06/13

MD1-0-V-860-11-00003

Local control panel outline drawing for gaseous chlorination system

MARK

04/06/13

MD1-0-V-860-31-00001

Single Line diagram for Gasous Chlorination System

MARK

23/05/13

MD1-0-V-870-08-00007

Electrical load list for sewage treatment system

MARK

26/04/13

MD1-0-V-870-09-00001

Electrical Equipment and System Design Specification and Data Sheet for Sewage m

AC

MARK

07/05/13

MD1-0-V-870-31-00001

Single line diagram for sewage treatment system

IC

MARK

01/03/13

MD1-1-E-500-31-00011

Single Line Diagr.- Gen. Main & Aux. Transformer Relay & Meter (U.1)

AC

MARK

30/01/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-1-E-505-33-00001

Elec. Logic Diagram- Generator Transformer (Unit 1)

AC

MARK

29/05/13

MD1-1-E-505-33-00002

Elec. Logic Diagram- Unit Aux. Transformer (Unit 1)

MARK

29/05/13

MD1-1-E-520-31-00101

Single Line Diagram- 10KV Unit Switchgear 16BBA (1/2)

MARK

14/09/12

MD1-1-E-520-31-00102

Single Line Diagram- 10KV Unit Switchgear 16BBA (2/2)

MARK

14/09/12

MD1-1-E-520-31-00201

Single Line Diagram- 10KV Unit Switchgear 16BBB (1/2)

MARK

14/09/12

MD1-1-E-520-31-00202

Single Line Diagram- 10KV Unit Switchgear 16BBB (2/2)

MARK

14/09/12

MD1-1-E-525-31-00001

Single Line Diagram- 400V Unit Switchgear 16BFA/16BFB

MARK

25/10/12

MD1-1-E-525-31-00101

Single Line Diagram-400V Boilder #1 MCC-1 16BJA

MARK

01/03/13

MD1-1-E-525-31-00201

Single Line Diagram-400V Boilder #1 MCC-2 16BJB

MARK

01/03/13

MD1-1-E-525-31-00301

Single Line Diagram-400V Boilder #2 MCC-1 16BJC

MARK

01/03/13

MD1-1-E-525-31-00401

Single Line Diagram-400V Boilder #2 MCC-2 16BJD

MARK

01/03/13

MD1-1-E-525-31-00501

Single Line Diagram- 400V STG #1 MCC-1 16BJE

MARK

01/03/13

MD1-1-E-525-31-00601

Single Line Diagram- 400V STG #1 MCC-2 16BJF

MARK

01/03/13

MD1-1-E-593-01-21001

Cable Route Plan Boiler Area Unit 1A El.+0.0m

IC

MARK

28/03/13

MD1-1-E-593-01-21002

Cable Route Plan Boiler Area Unit 1B El.+0.0m

IC

MARK

28/03/13

MD1-1-V-173-06-02511

Transformer sizing calculation for 400v fa/ba pmcc u#1

IC

MARK

18/03/13

MD1-2-E-500-31-00011

Single Line Diagr.- Gen. Main & Aux. Transformer Relay & Meter (U.2)

AC

MARK

30/01/13

MD1-2-E-505-33-00001

Elec. Logic Diagram- Generator Transformer (Unit 2)

AC

MARK

29/05/13

MD1-2-E-505-33-00002

Elec. Logic Diagram- Unit Aux. Transformer (Unit 2)

MARK

29/05/13

MD1-2-E-520-31-00101

Single Line Diagram- 10KV Unit Switchgear 26BBA (1/2)

MARK

14/09/12

MD1-2-E-520-31-00102

Single Line Diagram- 10KV Unit Switchgear 26BBA (2/2)

MARK

14/09/12

MD1-2-E-520-31-00201

Single Line Diagram- 10KV Unit Switchgear 26BBB (1/2)

MARK

14/09/12

MD1-2-E-520-31-00202

Single Line Diagram- 10KV Unit Switchgear 26BBB (2/2)

MARK

14/09/12

MD1-2-E-525-31-00001

Single Line Diagram- 400V Unit Switchgear 26BFA/26BFB

MARK

25/10/12

MD1-2-E-525-31-00101

Single Line Diagram- 400V Boiler #3 MCC-1 26BJA

MARK

01/03/13

MD1-2-E-525-31-00201

Single Line Diagram- 400V Boiler #3 MCC-2 26BJB

MARK

01/03/13

MD1-2-E-525-31-00301

Single Line Diagram- 400V Boiler #4 MCC-1 26BJC

MARK

01/03/13

MD1-2-E-525-31-00401

Single Line Diagram- 400V Boiler #4 MCC-2 26BJD

MARK

01/03/13

MD1-2-E-525-31-00501

Single Line Diagram- 400V STG #2 MCC-1 26 BJE

MARK

01/03/13

MD1-2-E-525-31-00601

Single Line Diagram- 400V Boiler #2 MCC-2 26BJF

MARK

01/03/13

MD1-2-E-593-01-21001

Cable Route Plan Boiler Area Unit 2A El.+0.0m

IC

MARK

28/03/13

MD1-2-E-593-01-21002

Cable Route Plan Boiler Area Unit 2B El.+0.0m

IC

MARK

28/03/13

MD1-2-V-173-06-02512

Transformer sizing calculation for 400v fa/ba pmcc u#2

IC

MARK

18/03/13

DISCIPLINE = G, General

REV

Report No : 1D1 - STD

AUTHORISED

RECEIVED

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-M-120-03-00002

System Description- Feedwater System

AUTHORISED
DAVID

RECEIVED
12/07/13

MD1-0-P-400-02-00001

Piping Material Classification

DAVID

25/02/13

MD1-0-P-400-02-00011

Technical Specification for Insulation

DAVID

13/09/12

MD1-0-T-030-05-00051

Method Statement of General Welding

DAVID

27/07/12

MD1-0-T-030-05-00052

Method Statement for Welder and Welding Operator Qualification

DAVID

27/07/12

MD1-0-T-030-05-001

Project Quality Assurance Plan

DAVID

14/08/12

MD1-0-T-030-05-002

Site Inspection and Test Plan

DAVID

13/07/12

MD1-0-T-030-05-00221

ITP for Lighting & Small Power Installation

MARK

26/10/12

MD1-0-T-030-05-003

Document and Data Control

DAVID

13/07/12

MD1-0-T-030-05-004

Quality Records Control

DAVID

07/08/12

MD1-0-T-030-05-005

Training

DAVID

13/07/12

MD1-0-T-030-05-006

Purchase Control

DAVID

07/08/12

MD1-0-T-030-05-007

Material & Equipment Receiving, Handling, Storage and Maintenance

DAVID

13/07/12

MD1-0-T-030-05-008

Nonconformance Control

DAVID

19/11/12

MD1-0-T-030-05-009

Corrective & Preventive Action

DAVID

07/08/12

MD1-0-T-030-05-010

Internal Quality Audit

AC

DAVID

21/11/12

MD1-0-T-030-05-011

Process Map Control

DAVID

13/07/12

MD1-0-T-030-05-012

Monitoring & Measurement

DAVID

14/08/12

MD1-0-T-030-05-013

Supplier Workshop Inspection and Test Plan

DAVID

13/07/12

MD1-0-T-070-01-00021

Environmental Management Plan

HANU

26/12/12

MD1-0-T-070-01-00023

Health & Safety Management Plan

DAVID

26/03/13

MD1-0-T-070-01-00028

Security Plan

MARK

21/05/12

MD1-0-T-070-01-00038

Emergency Response Plan

IC

MARK

03/05/12

MD1-0-T-070-05-00019

Project Execution Plan

IC

MARK

10/12/12

MD1-0-V-360-07-00760

Exhaust Gas Plume Dispersion and Air Quality Study

AC

HANU

11/06/13

MD1-0-M-100-02-00001

Technical Specification- Painting Specification

AC

DAVID

02/05/13

MD1-0-M-100-03-00001

Plant overall description

RT

DAVID

03/05/13

MD1-0-M-100-21-00001

P & I Diagram- Symbol & Legend (1/5)

DAVID

21/08/12

MD1-0-M-100-21-00002

P & I Diagram- Symbol & Legend (2/5)

DAVID

11/05/12

MD1-0-M-100-21-00003

P & I Diagram- Symbol & Legend (3/5)

DAVID

11/05/12

MD1-0-M-100-21-00004

P & I Diagram- Symbol & Legend (4/5)

DAVID

21/08/12

MD1-0-M-100-21-00005

P & I Diagram- Symbol & Legend (5/5)

DAVID

26/04/13

MD1-0-M-100-57-00001

Heat Balance Diagrams (VWO)

DAVID

20/12/12

DISCIPLINE = MBLR, Mechanical Boiler

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-M-100-57-00002

Heat Balance Diagrams (TCC)

AUTHORISED
DAVID

RECEIVED
18/12/12

MD1-0-M-100-57-00003

Heat Balance Diagram (RO)

DAVID

18/12/12

MD1-0-M-100-57-00004

Heat Balance Diagrams (75% of RO)

DAVID

18/12/12

MD1-0-M-100-57-00005

Heat Balance Diagrams (60% of RO)

DAVID

18/12/12

MD1-0-M-100-57-00006

Heat Balance Diagrams (50% of RO)

DAVID

18/12/12

MD1-0-M-100-57-00007

Heat Balance Diagrams (40% of RO)

DAVID

18/12/12

MD1-0-M-100-57-00008

Heat Balance Diagrams (THO)

DAVID

18/12/12

MD1-0-M-110-03-00001

System Description- Main and Reheat Steam System

AC

DAVID

09/07/13

MD1-0-M-110-03-00004

System Description- FWH Vent and Drain System

AC

DAVID

18/05/12

MD1-0-M-110-03-00005

System Discription-Aux. Steam System

DAVID

18/07/13

MD1-0-M-110-21-00011

P & I Diagram- Main and Reheat Steam System (1/3)

DAVID

13/09/12

MD1-0-M-110-21-00012

P & I Diagram- Main and Reheat Steam System (2/3)

DAVID

13/09/12

MD1-0-M-110-21-00013

P & I Diagram- Main and Reheat Steam System (3/3)

DAVID

13/09/12

MD1-0-M-110-21-00031

P & I Diagram- FWH Extraction Steam System (1/3)

DAVID

13/09/12

MD1-0-M-110-21-00032

P & I Diagram- FWH Extraction Steam System (2/3)

DAVID

19/11/12

MD1-0-M-110-21-00033

P & I Diagram- FWH Extraction Steam System (3/3)

DAVID

21/06/13

MD1-0-M-110-21-00034

P & I Diagram- FWH Extraction Steam System (4/4)

DAVID

17/07/13

MD1-0-M-110-21-00041

P & I Diagram- FWH Vent and Drain System (1/3)

DAVID

13/09/12

MD1-0-M-110-21-00042

P & I Diagram- FWH Vent and Drain System (2/3)

DAVID

19/11/12

MD1-0-M-110-21-00043

P & I Diagram- FWH Vent and Drain System (3/3)

DAVID

19/11/12

MD1-0-M-110-21-00044

P & I Diagram- Condensate Drain System

DAVID

19/11/12

MD1-0-M-110-22-00011

Flow Diagram- Main and Reheat Steam System

DAVID

09/01/13

MD1-0-M-110-22-00021

Flow Diagram- FWH Extraction Steam System

DAVID

17/05/13

MD1-0-M-110-22-00022

Flow Diagram- FWH Drain System

DAVID

17/05/13

MD1-0-M-110-22-00031

Flow Diagram- Auxiliary Steam System

IC

DAVID

28/05/13

MD1-0-M-120-06-00001

Calculation- Condensate System

DAVID

21/02/13

MD1-0-M-120-06-00002

Calculation- Feed Water System

DAVID

07/02/13

MD1-0-M-120-06-00003

Transient Analysis for Boiler Feed Pump

DAVID

25/02/13

MD1-0-M-120-21-00031

P & I Diagram- Feed Water System (1/2)

AC

DAVID

04/04/13

MD1-0-M-120-21-00032

P & I Diagram- Feed Water System (2/2)

DAVID

19/11/12

MD1-0-M-120-22-00011

Flow Diagram- Condensate System

DAVID

03/04/13

MD1-0-M-120-22-00021

Flow Diagram- Feed Water System

DAVID

21/01/13

MD1-0-P-400-08-00001

Pipe Line List for BOP

DAVID

06/02/13

MD1-0-P-400-08-00002

Valve List for BOP

DAVID

06/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-P-411-23-00001

Pipe arrangement & support location drawing - boiler area (section view)

IC

AUTHORISED
DAVID

RECEIVED
23/07/13

MD1-0-T-030-05-000494

WPS(U1A-ASME PRESSURE PART)

DAVID

29/07/13

MD1-0-T-030-05-00072

ITP for Above Ground Piping

DAVID

23/07/13

MD1-0-T-030-05-00083

Welding Procedure Specification Summary Status

DAVID

10/10/12

MD1-0-T-030-05-00084

Welding Procedure Specification (HD-WPS-ASME-A001)

DAVID

05/09/12

MD1-0-T-030-05-00085

Welding Procedure Specification (HD-WPS-ASME-A002)

DAVID

11/09/12

MD1-0-T-030-05-00086

Welding Procedure Specification (HD-WPS-ASME-A003)

DAVID

11/09/12

MD1-0-T-030-05-00087

Welding Procedure Specification (HD-WPS-ASME-A004)

DAVID

11/09/12

MD1-0-T-030-05-00088

Welding Procedure Specification (HD-WPS-ASME-A005)

DAVID

20/12/12

MD1-0-T-030-05-00089

Welding Procedure Specification (HD-WPS-ASME-A006)

DAVID

11/09/12

MD1-0-T-030-05-00090

Welding Procedure Specification (HD-WPS-ASME-A007)

DAVID

21/09/12

MD1-0-T-030-05-00091

Welding Procedure Specification (HD-WPS-ASME-A008)

DAVID

21/09/12

MD1-0-T-030-05-00092

Welding Procedure Specification (HD-WPS-ASME-A009)

DAVID

11/09/12

MD1-0-T-030-05-00093

Welding Procedure Specification (HD-WPS-ASME-A010)

DAVID

10/10/12

MD1-0-T-030-05-00094

Welding Procedure Specification (HD-WPS-ASME-A011)

DAVID

21/09/12

MD1-0-T-030-05-00095

Welding Procedure Specification (HD-WPS-ASME-A012)

DAVID

21/09/12

MD1-0-T-030-05-00096

Welding Procedure Specification (HD-WPS-ASME-A013)

DAVID

11/09/12

MD1-0-T-030-05-00097

Welding Procedure Specification (HD-WPS-ASME-A014)

DAVID

11/09/12

MD1-0-T-030-05-00098

Welding Procedure Specification (HD-WPS-ASME-A015)

DAVID

11/09/12

MD1-0-T-030-05-00099

Welding Procedure Specification (HD-WPS-ASME-A016)

DAVID

11/09/12

MD1-0-T-030-05-00100

Welding Procedure Specification (HD-WPS-ASME-A017)

DAVID

11/09/12

MD1-0-T-030-05-00101

Welding Procedure Specification (HD-WPS-ASME-A018)

DAVID

11/09/12

MD1-0-T-030-05-00102

Welding Procedure Specification (HD-WPS-ASME-A019)

DAVID

11/09/12

MD1-0-T-030-05-00103

Welding Procedure Specification (HD-WPS-ASME-A020)

DAVID

23/07/13

MD1-0-T-030-05-00104

Welding Procedure Specification (HD-WPS-ASME-A021)

DAVID

23/07/13

MD1-0-T-030-05-00105

Welding Procedure Specification (HD-WPS-AWS-001)

DAVID

05/09/12

MD1-0-T-030-05-00106

Welding Procedure Specification (HD-WPS-AWS-002)

DAVID

05/09/12

MD1-0-T-030-05-00107

Welding Procedure Specification (HD-WPS-AWS-003)

DAVID

05/09/12

MD1-0-T-030-05-00119

ITP for AG Piping of Carbon Steel

DAVID

23/07/13

MD1-0-T-030-05-00130

Method Statement for Welding Repair

DAVID

23/07/13

MD1-0-T-030-05-00132

Method Statement for Welding Material Control

DAVID

06/11/12

MD1-0-T-030-05-00323

Method Statement for Radiographic Examination

IC

DAVID

21/06/13

MD1-0-T-030-05-00324

Method Statement for Ultrasonic Examination

IC

DAVID

21/06/13

MD1-0-T-030-05-00325

Method Statement for Particle Examination

DAVID

21/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-T-030-05-00326

Method Statement for Liquid penatrant Examination

STS
I

AUTHORISED
DAVID

RECEIVED
21/06/13

MD1-0-T-030-05-00327

Method Statement for Heat Treatment

DAVID

22/07/13

MD1-0-T-030-05-00350

Welding procedure specification(hd-wps-asme-a022)

DAVID

28/03/13

MD1-0-T-030-05-00369

Welding procedure specification (hd-wps- asme-a023)

DAVID

17/05/13

MD1-0-T-030-05-00370

Itp for cfbc boiler installation

IC

DAVID

18/06/13

MD1-0-T-030-05-00408

Welding procedure specification(HD-WPS-ASME-A024)

DAVID

22/07/13

MD1-0-T-053-05-00122

Method Statement for General Equipment Installation

DAVID

21/09/12

MD1-0-T-053-05-00144

WPS & PQR (DAEJOO)

AC

DAVID

22/02/13

MD1-0-T-053-05-00177

Method Statement for Steam Drum of CFBC Boiler

IC

DAVID

08/07/13

MD1-0-T-053-05-00178

Method statement for cfbc boiler installation work

IC

DAVID

18/07/13

MD1-0-T-053-05-00237

Method Statement for CEP Casing Setting

DAVID

30/11/12

MD1-0-T-053-05-00261

WPS & PQR (For Steel Structure PEB Fabrication)

DAVID

20/03/13

MD1-0-T-053-05-00360

Site safety procedure for mechanical erection by subcontractor of boiler

DAVID

18/07/13

MD1-0-T-053-05-00415

Method Statement for Condenser Lifting

RT

DAVID

22/07/13

MD1-0-T-053-07-00289

Material Approval Request for Welding Rod (Hyundai Welding) Welding)

DAVID

20/02/13

MD1-0-T-054-05-00110

Method Statement For Pipe Spool Fabrication

DAVID

10/01/13

MD1-0-T-054-05-00111

Method Statement For Piping Installation

DAVID

15/01/13

MD1-0-T-054-05-00193

Method Statement for Piping Color Coding

IC

DAVID

22/02/13

MD1-0-T-054-05-00195

Method Statement for Pressure Test

AC

DAVID

22/07/13

MD1-0-T-054-07-00248

Material Approval Request for Alloy 3D Bend

RJ

DAVID

13/11/12

MD1-0-T-057-07-00277

Material Approval Request for Pipe Insulation (HI Korea)

RT

LINH

15/11/12

MD1-0-V-111-01-00030

Piping arrangement of valve leak-off (1/2)

IC

DAVID

03/04/13

MD1-0-V-111-01-00031

Piping arrangement of valve leak-off (2/2)

IC

DAVID

03/04/13

MD1-0-V-111-01-00032

Piping arrangement of steam drain (1/2)

IC

DAVID

03/04/13

MD1-0-V-111-01-00033

Piping arrangement of steam drain (2/2)

IC

DAVID

03/04/13

MD1-0-V-111-01-00038

Piping arragement of steam seal piping (1/6)

IC

DAVID

03/04/13

MD1-0-V-111-01-00039

Piping arragement of steam seal piping (2/6)

IC

DAVID

03/04/13

MD1-0-V-111-01-00040

Piping arragement of steam seal piping (3/6)

IC

DAVID

03/04/13

MD1-0-V-111-01-00041

Piping arragement of steam seal piping (4/6)

IC

DAVID

03/04/13

MD1-0-V-111-01-00042

Piping arragement of steam seal piping (5/6)

IC

DAVID

03/04/13

MD1-0-V-111-01-00043

Piping arragement of steam seal piping (6/6)

IC

DAVID

03/04/13

MD1-0-V-111-01-00044

Piping arragement of condenser neck piping

IC

DAVID

03/04/13

MD1-0-V-111-04-00031

Steam Purity Recommendation

IC

DAVID

02/04/13

MD1-0-V-111-04-00032

Steam blowing requirement

IC

DAVID

08/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-111-24-00400

Generator Piping FAB ISO Drawings

IC

AUTHORISED
DAVID

RECEIVED
12/07/13

MD1-0-V-111-25-00400

Generator Pipe Support Drawings

DAVID

12/07/13

MD1-0-V-112-05-00001

Inspection test plan (qcp) for lp steam stop valve (vs) for turbine bypass systm

DAVID

17/07/13

MD1-0-V-112-05-00002

Inspection test plan (qcp) for hp bypass valve(vlb) & lp bypass valve(vlr)

DAVID

17/07/13

MD1-0-V-112-05-00003

Inspection test plan (qcp) for lp desuperheater(dam) for turbine bypass system

DAVID

17/07/13

MD1-0-V-112-05-00004

Inspection test plan (qcp) for hp/lp spray valve & isolation valve (840h/g) form

DAVID

17/07/13

MD1-0-V-112-05-00008

Welding Book(WPS/PQR, Welding Map) for Turbine Bypass System

DAVID

17/07/13

MD1-0-V-113-05-00033

Condenser- Welding Procedure

DAVID

11/03/13

MD1-0-V-113-05-00036

Procedure for Radiographic Examination

DAVID

03/04/13

MD1-0-V-113-05-00037

Procedure for Ultrasonic Examination

DAVID

26/03/13

MD1-0-V-113-05-00038

Procedure for Magnetic particle Examination

DAVID

26/03/13

MD1-0-V-113-05-00039

Procedure for Liquid Penetrant Examination

DAVID

26/03/13

MD1-0-V-114-01-00001

Outline Drawing for LP-3 Low Pressure Feedwater Heater

DAVID

05/03/13

MD1-0-V-114-01-00002

Outline Drawing for LP-4 Low Pressure Feedwater Heater

DAVID

05/03/13

MD1-0-V-114-01-00003

Outline Drawing for HP-6 High Pressure Feedwater Heater

DAVID

05/03/13

MD1-0-V-114-01-00004

Outline Drawing for HP-7 High Pressure Feedwater Heater

DAVID

05/03/13

MD1-0-V-114-01-00005

Outline Drawing for HP-8 High Pressure Feedwater Heater

DAVID

05/03/13

MD1-0-V-114-05-00009

Work test and inspection plan

IC

DAVID

22/07/13

MD1-0-V-114-05-00010

Work test and inspection procedure

IC

DAVID

22/07/13

MD1-0-V-114-05-00013

WPS & PQR for Feedwater Heater

DAVID

12/07/13

MD1-0-V-114-05-00017

Painting Procedure for Feedwater Heater No's 3,4,6,7,8

DAVID

04/07/13

MD1-0-V-114-05-00018

Hydrostatic Test Procedure

AC

DAVID

06/06/13

MD1-0-V-114-05-00019

Heat Treatment Procedure

AC

DAVID

06/06/13

MD1-0-V-114-05-50016

LP#1 & LP#2 Feedwater Operation & Maintenance Manual

RT

DAVID

04/07/13

MD1-0-V-114-06-00002

Thermal Calculation with Hydraulic Loss Calculation For Feedwater Heater (LP-3)

DAVID

18/03/13

MD1-0-V-114-06-00004

Strength Calculation of Feedwater Heater

DAVID

10/06/13

MD1-0-V-114-07-00005

NDE Procedure(Feedwater Heater)

DAVID

06/06/13

MD1-0-V-114-09-00002

Feed Water Heater Vendor Technical Data

DAVID

23/05/13

MD1-0-V-114-09-00006

Orifice Data Sheet & Drawing for Feedwater Heater

DAVID

29/05/13

MD1-0-V-114-09-00007

Safety valve data sheet & drawing for feedwater heater

AC

DAVID

10/06/13

MD1-0-V-114-09-50011

LP#1 & LP#2 Feedwater Heater Data Sheet (Customer's Form)

AC

DAVID

22/02/13

MD1-0-V-114-09-50012

LP#1 & LP#2 Feedwater Heater Data Sheet (Supplier's Form)

AC

DAVID

22/02/13

MD1-0-V-114-09-50031

Lp#1 & lp#2 feedwater heater performance curves

IC

DAVID

06/03/13

MD1-0-V-114-10-50001

LP#1A Feedwater Heater Outline Drawing

AC

DAVID

16/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-114-10-50002

LP#1B Feedwater Heater Outline Drawing

AC

AUTHORISED
DAVID

RECEIVED
16/07/13

MD1-0-V-114-10-50003

LP#2 Feedwater Heater Outline Drawing

AC

DAVID

16/07/13

MD1-0-V-114-11-00302

Name Plate Drawing for LP-3 Low Pressure Feedwater Heater

IC

DAVID

12/07/13

MD1-0-V-114-11-00402

Name Plate Drawing for LP-4 Low Pressure Feedwater Heater

IC

DAVID

12/07/13

MD1-0-V-114-11-00602

Name Plate Drawing for HP-6 High Pressure Feedwater Heater

IC

DAVID

12/07/13

MD1-0-V-114-11-00702

Name Plate Drawing for HP-7 High Pressure Feedwater Heater

IC

DAVID

12/07/13

MD1-0-V-114-11-00802

Name Plate Drawing for HP-8 High Pressure Feedwater Heater

IC

DAVID

12/07/13

MD1-0-V-114-11-50005

Lp#1a/1b lagging spacer & plate detail drawing

DAVID

20/02/13

MD1-0-V-114-11-50009

Lp#1a/1b feedwater heater insulation detail drawing

DAVID

20/02/13

MD1-0-V-114-11-50010

Lp#2 feedwater heater insulation detail drawing

DAVID

20/02/13

MD1-0-V-114-11-50020

Lp#1 & lp#2 feedwater heater name plate drawing

IC

DAVID

20/02/13

MD1-0-V-114-11-50022

Lp#2 feedwater heater rail and channel leg & roller support drawing

DAVID

22/02/13

MD1-0-V-114-11-50023

Lp#1 feedwater heater tube to tubesheet joint detail & tube layout drawing

IC

DAVID

20/02/13

MD1-0-V-114-11-50024

Lp#2 feedwater heater tube to tubesheet joint detail & tube layout drawing

IC

DAVID

20/02/13

MD1-0-V-114-55-50013

Lp#1 feedwater heater strength calculation

IC

DAVID

22/02/13

MD1-0-V-114-55-50014

Lp#2 feedwater heater strength calculation

IC

DAVID

22/02/13

MD1-0-V-114-55-50027

Lp#1 & lp#2 feedwater heater thermal calculation

IC

DAVID

06/03/13

MD1-0-V-115-01-00001

Deaerator and storage tank- general arrangement (assembly & outline)

IC

DAVID

28/02/13

MD1-0-V-115-05-00001

Deaerator and storage tank, inspection and test procedure

IC

DAVID

20/03/13

MD1-0-V-115-05-00002

Deaerator and Storage Tank - Painting Procedure

IC

DAVID

29/05/13

MD1-0-V-115-05-00003

Deaerator and storage tank, wps & pqr

IC

DAVID

26/03/13

MD1-0-V-115-05-00004

Deaerator and storage tank, pwht procedure

IC

DAVID

20/03/13

MD1-0-V-115-05-00006

Deaerator and storage tank, quality control procedure

IC

DAVID

26/03/13

MD1-0-V-115-05-00007

Deaerator and storage tank, hydrotest procedure

IC

DAVID

26/03/13

MD1-0-V-115-06-00002

Sizing calculation for deaerator and feedwater tank

DAVID

25/02/13

MD1-0-V-115-09-00001

Deaerator and Storage Tank- Technical Data Sheet

AC

DAVID

25/02/13

MD1-0-V-115-09-00003

Deaerator and Storage Tank, Performance Curve

DAVID

25/02/13

MD1-0-V-115-11-00001

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank-Detail of Heater

DAVID

25/02/13

MD1-0-V-115-11-00002

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank-Detail of Storage Tank

DAVID

25/02/13

MD1-0-V-115-11-00003

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle Detail (1/9)

IC

DAVID

25/02/13

MD1-0-V-115-11-00004

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle Detail (2/9)

DAVID

25/02/13

MD1-0-V-115-11-00005

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle Detail (3/9)

IC

DAVID

25/02/13

MD1-0-V-115-11-00006

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle Detail (4/9)

DAVID

25/02/13

MD1-0-V-115-11-00007

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle Detail (5/9)

DAVID

25/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-115-11-00008

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle Detail (6/9)

STS
I

AUTHORISED
DAVID

RECEIVED
25/02/13

MD1-0-V-115-11-00009

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle Detail (7/9)

IC

DAVID

25/02/13

MD1-0-V-115-11-00010

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle Detail (8/9)

DAVID

25/02/13

MD1-0-V-115-11-00011

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle Detail (9/9)

IC

DAVID

04/10/12

MD1-0-V-115-11-00012

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Insul. Support Detail

IC

DAVID

04/10/12

MD1-0-V-115-11-00013

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- NamePlate Detail

IC

DAVID

04/10/12

MD1-0-V-121-01-00001

General Arrangement Drawing for Boiler Feed Pump and Booster Pump

DAVID

28/06/13

MD1-0-V-121-01-00002

Sectional Drawing for Boiler Feed Pump

DAVID

10/12/12

MD1-0-V-121-01-00003

Sectional Drawing for Booster Pump

DAVID

10/12/12

MD1-0-V-121-03-00001

System Description for BFP & BFBP

RT

DAVID

22/07/13

MD1-0-V-121-05-00001

Quality Management Mannual For BFP & BFBP

DAVID

14/01/13

MD1-0-V-121-05-00002

Shop Inspection and Test Plan for BFP & BFBP

IC

DAVID

23/07/13

MD1-0-V-121-05-00003

Shop Inspection and Test Procedure for BFP & BFBP

IC

DAVID

23/07/13

MD1-0-V-121-05-00004

Pt procedure for bfp & bfbp

DAVID

05/07/13

MD1-0-V-121-05-00005

Ut procedure for bfp & bfbp

DAVID

05/07/13

MD1-0-V-121-05-00006

Wps & pqr for bfp & bfbp

DAVID

27/06/13

MD1-0-V-121-05-00007

Painting specification and procedure for bfp & bfbp

DAVID

03/05/13

MD1-0-V-121-05-00019

Mt procedure for bfp & bfbp

DAVID

17/07/13

MD1-0-V-121-05-00020

Rt procedure for bfp & bfbp

DAVID

17/07/13

MD1-0-V-121-05-00022

PerformanceTest Procedure for BFP & BFBP

IC

DAVID

24/07/13

MD1-0-V-121-05-00023

UT Procedure for Impeller for BFP & BFBP

DAVID

12/07/13

MD1-0-V-121-08-00003

Utility consumption list for boiler feedwater pump & boiler feedwater booster pp

IC

DAVID

02/04/13

MD1-0-V-121-08-00004

Lubricant list for bfbp & bfp

DAVID

23/07/13

MD1-0-V-121-08-00012

Sub-Supplier List for BFP & BFBP

DAVID

21/06/13

MD1-0-V-121-09-00001

Technical data sheet for bfp & bfbp

AC

DAVID

05/04/13

MD1-0-V-121-10-00002

Assembly plan for fluid coupling for bfp & bfbp

DAVID

09/04/13

MD1-0-V-121-11-00001

Working and lube oil heat exchanger of fluid coupling for bfp & bfbp

DAVID

09/04/13

MD1-0-V-121-11-00004

Mechanical Seal Drawing for BFP

IC

DAVID

22/07/13

MD1-0-V-121-11-00005

Mechanical Seal Cooler Drawing for BFP

IC

DAVID

22/07/13

MD1-0-V-121-11-00006

Mechanical Seal Drawing for BFBP

DAVID

22/07/13

MD1-0-V-121-11-00007

Flexible Disk Coupling Drawing for BFP and Fluid Coupling

IC

DAVID

22/07/13

MD1-0-V-121-11-00008

Flexible Disk Coupling Drawing for Motor and Fluid Coupling

DAVID

22/07/13

MD1-0-V-121-11-00009

Flexible Disk Coupling Drawing for Motor and BFBP

DAVID

22/07/13

MD1-0-V-121-11-00010

Name plate for boiler feedwater pump & boiler feedwater booster pump

IC

DAVID

04/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-121-11-00022

Mechanical Seal Cooler Drawing for BFBP

IC

AUTHORISED
DAVID

RECEIVED
22/07/13

MD1-0-V-121-21-00001

P&I Diagram for Boiler Feedwater Pump & Boiler Feedwater Booster Pump

IC

DAVID

04/07/13

MD1-0-V-121-21-00002

Oil circuit and measuring point scheme for fluid coupling for bfp & bfbp

IC

DAVID

23/07/13

MD1-0-V-121-23-00001

Auxiliary piping drawing for boiler feed pump and booster pump

IC

DAVID

09/04/13

MD1-0-V-121-23-00002

Cross Over Piping Drawing for Boiler Feed Pump and Booster Pump

IC

DAVID

28/06/13

MD1-0-V-121-33-00001

Start-up and shut-down block diagram for boiler feed pump and booster pump

DAVID

09/04/13

MD1-0-V-122-01-00001

General Arrangement Drawing of CEP

DAVID

28/01/13

MD1-0-V-122-01-00002

Sectional Drawing of CEP

DAVID

28/01/13

MD1-0-V-122-02-00001

Pump Performance Curves for Condensate Extraction Pump

DAVID

22/01/13

MD1-0-V-122-05-00001

Quality Management Mannual For Condensate Extraction Pump

MD1-0-V-122-05-00002

SHOP INSPECTION & TEST PLAN FOR CEP

MD1-0-V-122-05-00003

MD1-0-V-122-05-00017
MD1-0-V-122-08-00005

DAVID

15/01/13

AC

DAVID

04/07/13

SHOP INSPECTION & TEST PROCEDURE FOR CEP

DAVID

08/07/13

Shop performance test procedure for condensate extraction pump

IC

DAVID

28/06/13

Spare Parts List for Start-up & Commissioning for CEP

DAVID

05/07/13

MD1-0-V-122-09-00001

Pump Data Sheet for CEP

DAVID

28/01/13

MD1-0-V-122-11-00002

Mechanical Seal Drawing for CEP

DAVID

10/07/13

MD1-0-V-122-11-00003

Gear Coupling Drawing for CEP

DAVID

10/07/13

MD1-0-V-122-21-00001

P&I Diagram of CEP

AC

DAVID

28/01/13

MD1-0-V-122-52-00001

Foundation Drawing of CEP

DAVID

28/01/13

MD1-0-V-161-01-00002

Part Number Arrangement

IC

DAVID

22/02/13

MD1-0-V-161-01-00004

Main Terminal Point (scope of supply)

DAVID

21/02/13

MD1-0-V-161-01-00020

Steam Generator General Arrangement Cross Section

IC

DAVID

26/12/12

MD1-0-V-161-01-00021

Steam Generator General Arrangement Longit. Section A-A

IC

DAVID

26/12/12

MD1-0-V-161-01-00022

Steam Generator General Arrangement Longit. Section B-B

IC

DAVID

26/12/12

MD1-0-V-161-01-00023

Steam Generator General Arrangement Longit. Section C-C

IC

DAVID

26/12/12

MD1-0-V-161-01-00024

Steam Generator General Arrangement Longit. Section D-D

IC

DAVID

26/12/12

MD1-0-V-161-01-00025

Steam Generator General Arrangement Plan Section E-E

IC

DAVID

26/12/12

MD1-0-V-161-01-00026

Steam Generator General Arrangement Plan Section F-F

IC

DAVID

26/12/12

MD1-0-V-161-01-00060

General Arrangement Isometric View

DAVID

21/02/13

MD1-0-V-161-01-00061

General Arrangement Side Elevation

IC

DAVID

21/02/13

MD1-0-V-161-01-00062

General Arrangement Plan View

DAVID

21/02/13

MD1-0-V-161-01-00100

Boiler Hangers Assembly and Details in Furnace Front Wall

IC

DAVID

11/03/13

MD1-0-V-161-01-00101

Boiler Hangers Assembly and Details in Furnace Rear Wall and Roof

DAVID

11/03/13

MD1-0-V-161-01-00102

Boiler Hangers Assembly and Details in Furnace Side Wall

DAVID

11/03/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-161-01-00103

Boiler Hangers Assembly and Details in ISH & FSH Wing Wall

STS
I

AUTHORISED
DAVID

RECEIVED
11/03/13

MD1-0-V-161-01-00104

Boiler Hangers Assembly and Details in Cyclone Area and EVAP WW HDR

DAVID

11/03/13

MD1-0-V-161-01-00105

Boiler Hangers Assembly and Details in CrossOver Flue

DAVID

11/03/13

MD1-0-V-161-01-00106

Boiler Hangers Assembly and Details in HRA Area

DAVID

11/03/13

MD1-0-V-161-01-00107

Boiler Hangers Assembly and Details in Economizer Area

DAVID

11/03/13

MD1-0-V-161-01-00108

Boiler Hangers Assembly and Details in HRA Roof and ECON HGR #4

DAVID

11/03/13

MD1-0-V-161-01-00109

Boiler Hangers Assembly and Details in Cyclone Collector Beam

DAVID

11/03/13

MD1-0-V-161-01-00110

BUCKSTAY SYSTEM FURNACE & HRA SIDE WALL

IC

DAVID

10/01/13

MD1-0-V-161-01-00111

BUCKSTAY SYSTEM FURNACE FRONT & REAR

IC

DAVID

10/01/13

MD1-0-V-161-01-00112

BUCKSTAY SYSTEM HRA FRONT & REAR WALL

IC

DAVID

10/01/13

MD1-0-V-161-01-00113

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00114

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00115

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00116

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00117

BUCKSTAY SYSTEM GAS INLET TO CYCLONE

DAVID

10/01/13

MD1-0-V-161-01-00118

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00119

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00120

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00121

BUCKSTAY SYSTEM ISH TO FSH TRANS. LINE

DAVID

10/01/13

MD1-0-V-161-01-00123

CROSS OVER FLUE BUCKSTAYS PART NO. 2586-

DAVID

10/01/13

MD1-0-V-161-01-00124

CROSS OVER FLUE BUCKSTAYS SECTIONS &

DAVID

10/01/13

MD1-0-V-161-01-00125

CROSS OVER FLUE BUCKSTAYS SECTIONS &

DAVID

10/01/13

MD1-0-V-161-01-00130

WINDBOX TRUSS ASSEMBLY PART NO. 2586-6410

DAVID

10/01/13

MD1-0-V-161-01-00131

WINDBOX TRUSS SECTIONS & DETAILS PART NO.

DAVID

01/02/13

MD1-0-V-161-01-00132

WINDBOX TRUSS SECTIONS & DETAILS PART NO.

DAVID

10/01/13

MD1-0-V-161-01-00133

CYCLONE RING BUMPERS ARRANGEMENT PART

DAVID

01/02/13

MD1-0-V-161-01-00134

CYCLONE RING BUMPERS SECTIONS AND

DAVID

01/02/13

MD1-0-V-161-01-00163

Drum strap hanger arrangement & detail

IC

DAVID

22/02/13

MD1-0-V-161-01-00170

Riser & Seam Supply Pipe Isometric Arrangement

IC

DAVID

08/05/13

MD1-0-V-161-01-00171

Riser & Seam Supply Pipe Arrangement Plan & Elevation View

IC

DAVID

08/05/13

MD1-0-V-161-01-00172

Cyclone & Cyclone Inlet Riser Arrangement

IC

DAVID

08/05/13

MD1-0-V-161-01-00174

Furnace FW| & SW Riser Arrangment

IC

DAVID

08/05/13

MD1-0-V-161-01-00175

Steam Supply Pipe Arrangement

IC

DAVID

08/05/13

MD1-0-V-161-01-00176

Riser & Steam Supply Hanger Details

IC

DAVID

08/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-01-00177

Riser & Steam Supply Hanger Details

IC

AUTHORISED
DAVID

RECEIVED
08/05/13

MD1-0-V-161-01-00179

Typical Details for Field Welding Panel Joints

IC

DAVID

25/02/13

MD1-0-V-161-01-00180

HRA COILS - GENERAL ARRANGEMENT

DAVID

12/06/13

MD1-0-V-161-01-00181

SECTIONS AND DETAILS IN HEAT RECOVERY AREA

DAVID

21/01/13

MD1-0-V-161-01-00184

SECTIONS AND DETAILS IN HEAT RECOVERY AREA PRIMARY SUPERHEATER PART NO. 2528I

DAVID

21/01/13

MD1-0-V-161-01-00188

Economizer lower module arragement part no. 2528-0100

IC

DAVID

06/06/13

MD1-0-V-161-01-00191

EROSION SHIELD(FIELD INSTALLED) ARRANGEMENT PART NO. 2538-7600A, B, C, D, E, F,H

DAVID

21/01/13

MD1-0-V-161-01-00192

EROSION SHIELDS SECTIONS & DETAILS

DAVID

21/01/13

MD1-0-V-161-01-00193

EROSION SHIELD(SHOP INSTALLED) ARRANGEMENT

DAVID

21/01/13

MD1-0-V-161-01-00197

FURNACE ROOF PANEL PLAN ARRAGEMENT

DAVID

12/06/13

MD1-0-V-161-01-00226

VORTEX FINDER ARRANGEMENT PART NO.2529-5105

DAVID

21/01/13

MD1-0-V-161-01-00250

Penthouse Enclosure Arrangement

DAVID

11/01/13

MD1-0-V-161-01-00251

Penthouse Enclosure Sections & Details

DAVID

11/01/13

MD1-0-V-161-01-00297

ACOUSTIC BAFFLES PART NO. 2538-7500A, B, C

IC

DAVID

31/01/13

MD1-0-V-161-01-00300

Arrangement of Auxiliary Equipment-Overall Plat Flues & Duct-Isometric View

DAVID

26/12/12

MD1-0-V-161-01-00301

Arrangement of Auxiliary Equipment-Overall Plant Flues & Duct- Plan View

IC

DAVID

26/12/12

MD1-0-V-161-01-00302

Arrangement of Auxiliary Equipment-Overall Plant Flues & Duct- Right Side Elev.

IC

DAVID

26/12/12

MD1-0-V-161-01-00303

Arrangement of Auxiliary Equipment-P.A Ducts from Air Heater to Furnace Plenum

IC

DAVID

26/12/12

MD1-0-V-161-01-00304

Arrangement of Auxiliary Equipment-Flues from Boiler Exit to Air Heater-Plan

IC

DAVID

26/12/12

MD1-0-V-161-01-00305

Arrangement of Auxiliary Equipment-S.A Ducts-from Air Heater to Furnace-Plan

IC

DAVID

26/12/12

MD1-0-V-161-01-00306

Arrangement of Auxiliary Equipment- S.A Ducts-from Windbox to Furnace Section

IC

DAVID

26/12/12

MD1-0-V-161-01-00307

Arrangement of Auxiliary Equipment- S.A & P.A Ducts-from Fans to Air Heater Plan

IC

DAVID

26/12/12

MD1-0-V-161-01-00310

BOILER EXIT FLUE TO AH ASSEMBLY PART NO. 2529-6100

IC

DAVID

08/02/13

MD1-0-V-161-01-00311

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(1)

DAVID

08/02/13

MD1-0-V-161-01-00312

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(2)

DAVID

08/02/13

MD1-0-V-161-01-00313

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(3)

DAVID

08/02/13

MD1-0-V-161-01-00314

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(4)

DAVID

08/02/13

MD1-0-V-161-01-00315

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(5)

DAVID

08/02/13

MD1-0-V-161-01-00316

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(6)

IC

DAVID

08/02/13

MD1-0-V-161-01-00317

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(7)

DAVID

08/02/13

MD1-0-V-161-01-00318

AIR HEATER OUTLET TO TERMINAL FLUE ASSEMBLY PART NO.2529-6200

IC

DAVID

08/02/13

MD1-0-V-161-01-00319

AIR HEATER OUTLET TO TERMINAL SECTION & DETAIL PART NO.2529-6200 (1)

IC

DAVID

08/02/13

MD1-0-V-161-01-00320

AIR HEATER OUTLET TO TERMINAL SECTION & DETAIL PART NO.2529-6200 (2)

IC

DAVID

08/02/13

MD1-0-V-161-01-00321

AIR HEATER OUTLET TO TERMINAL SECTION & DETAIL PART NO.2529-6200 (3)

IC

DAVID

08/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

MD1-0-V-161-01-00322

AIR HEATER OUTLET TO TERMINAL SECTION & DETAIL PART NO.2529-6200 (4)

MD1-0-V-161-01-00330

Winbox Ring Duct Assembly- Arrangement Part No.2529-4000

MD1-0-V-161-01-00331

MD1-0-V-161-01-00332
MD1-0-V-161-01-00333

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

DAVID

08/02/13

AC

DAVID

17/01/13

Winbox Ring Duct Assembly- Section & Detail Part No.2529-4000

DAVID

17/01/13

SA Winbox at Furnace Section & Detail Part No.2529-4000

DAVID

17/01/13

SA Winbox at Furnace Section & Detail Part No.2529-4000

DAVID

17/01/13

MD1-0-V-161-01-00334

SA Winbox at Furnace Section & Detail Part No.2529-4000

DAVID

17/01/13

MD1-0-V-161-01-00335

PA FAN TO A.H. DUCT ASSEMBLY PART NO. 2529-

IC

DAVID

11/01/13

MD1-0-V-161-01-00336

PA FAN TO A.H. DUCT SECTIONS & DETAILS PART

IC

DAVID

11/01/13

MD1-0-V-161-01-00340

SA FAN TO A.H. DUCT ASSY. PART NO. 2529-7100

IC

DAVID

11/01/13

MD1-0-V-161-01-00341

SA FAN TO A.H. DUCT SUPPORT PART NO. 2529-

IC

DAVID

11/01/13

MD1-0-V-161-01-00342

SA FAN TO A.H. DUCT SUPPORT PART NO. 2529-

IC

DAVID

11/01/13

MD1-0-V-161-01-00350

SA DUCT FROM AH TO WINDBOX ASSEMBLY

IC

DAVID

11/01/13

MD1-0-V-161-01-00351

SA DUCT FROM AH TO WINDBOX SECTION &

IC

DAVID

11/01/13

MD1-0-V-161-01-00352

SA DUCT FROM AH TO WINDBOX SECTION &

IC

DAVID

11/01/13

MD1-0-V-161-01-00353

SA DUCT FROM AH TO WINDBOX SECTION &

IC

DAVID

11/01/13

MD1-0-V-161-01-00354

SA DUCT FROM AH TO WINDBOX SECTION &

IC

DAVID

11/01/13

MD1-0-V-161-01-00355

SA DUCT FROM WINBOX TO START UP BURNER PART NO. 2529-7220

IC

DAVID

11/01/13

MD1-0-V-161-01-00356

SA DUCT FROM WINBOX TO START UP BURNER DETAIL PART NO.2529-7220

IC

DAVID

11/01/13

MD1-0-V-161-01-00360

PRIMARY AIR DUCT ASSEMBLY FROM AH TO FURNACE PART NO. 2529-7400

IC

DAVID

11/01/13

MD1-0-V-161-01-00361

PA DUCT FROM AH TO FURNACE SECTIONS AND DETAILS PART NO. 2529-7400 (1)

IC

DAVID

11/01/13

MD1-0-V-161-01-00362

PA DUCT FROM AH TO FURNACE SECTIONS AND DETAILS PART NO. 2529-7400 (2)

IC

DAVID

11/01/13

MD1-0-V-161-01-00363

PA DUCT FROM AH TO FURNACE SECTIONS AND DETAILS PART NO. 2529-7400 (3)

IC

DAVID

11/01/13

MD1-0-V-161-01-00364

PA DUCT FROM AH TO FURNACE SECTIONS AND DETAILS PART NO. 2529-7400 (4)

IC

DAVID

11/01/13

MD1-0-V-161-01-00365

PA DUCT FROM AH TO FURNACE SECTIONS AND DETAILS PART NO. 2529-7400 (5)

IC

DAVID

11/01/13

MD1-0-V-161-01-00368

FABRIC EXPANSION JOINTS SCH FOR FLUES AND DUCTS

IC

DAVID

11/01/13

MD1-0-V-161-01-00369

METALLIC EXPANSION JOINTS SCH FOR FLUES AND DUCTS

IC

DAVID

11/01/13

MD1-0-V-161-01-00370

METALLIC EXPANSION JOINTS DETAILS FOR BOILER

IC

DAVID

11/01/13

MD1-0-V-161-01-00371

EXPANSION JOINT DETAILS FOR STRIPPER COOLER

IC

DAVID

11/01/13

MD1-0-V-161-01-00380

Cyclone Loopseal Arrangement & Details Part No. 2543-8400

DAVID

05/04/13

MD1-0-V-161-01-00381

Cyclone Loopseals Section and Details (1)

DAVID

05/04/13

MD1-0-V-161-01-00382

Cyclone Loopseal Sections and Details (2)

DAVID

05/04/13

MD1-0-V-161-01-00386

EXPANSION JOINT DETAILS FOR CYCLONE LOOPSEAL

IC

DAVID

11/01/13

MD1-0-V-161-01-00390

FURNACE GRID PLENUM ARRANGEMENT DRAWING

IC

DAVID

11/01/13

MD1-0-V-161-01-00391

FURNACE PRIMARY AIR PLENUM SECTS & DETAILS (1)

IC

DAVID

11/01/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-01-00392

FURNACE PRIMARY AIR PLENUM SECTS & DETAILS (2)

IC

AUTHORISED
DAVID

RECEIVED
11/01/13

MD1-0-V-161-01-00393

FURNACE PRIMARY AIR PLENUM SECTS & DETAILS (3)

IC

DAVID

11/01/13

MD1-0-V-161-01-00394

FURNACE PRIMARY AIR PLENUM VERTICAL TURNING VANES SECTS & DETAILS

IC

DAVID

11/01/13

MD1-0-V-161-01-00400

Downcomers Arrangement

IC

DAVID

17/01/13

MD1-0-V-161-01-00401

Downcomers Sections & Details

IC

DAVID

17/01/13

MD1-0-V-161-01-00402

Feedline to Drum Arrangement

IC

DAVID

17/01/13

MD1-0-V-161-01-00403

Transfer Lines PSH to ISH & ISH to FSH & Manfolds

IC

DAVID

17/01/13

MD1-0-V-161-01-00404

Transfer Lines PSH to ISH & ISH to FSH & Manfolds Details

IC

DAVID

17/01/13

MD1-0-V-161-01-00405

Furnace Feeder Arrangement

IC

DAVID

17/01/13

MD1-0-V-161-01-00408

Reheater By-Pass Arrangement

IC

DAVID

17/01/13

MD1-0-V-161-01-00409

Reheater By-Pass Sections & Details

IC

DAVID

17/01/13

MD1-0-V-161-01-00410

Feeders to Lower Cyclone & Gas Inlet

IC

DAVID

17/01/13

MD1-0-V-161-01-00411

HRA Lower & HRA To PSH Transfer Line Part No.2575 & 2575-2110

IC

DAVID

17/01/13

MD1-0-V-161-01-00425

Soot blower supports arrangment and details

IC

DAVID

11/03/13

MD1-0-V-161-01-00426

SOOTBLOWER SUPPORTS DETAILS(2)

DAVID

01/02/13

MD1-0-V-161-01-00427

SOOTBLOWER SUPPORTS DETAILS(3)

DAVID

01/02/13

MD1-0-V-161-01-00430

Stripper Cooler Arrang.- Plan & Elevations

DAVID

26/03/13

MD1-0-V-161-01-00431

Stripper Cooler Arrang.- Elevations & Details

DAVID

26/03/13

MD1-0-V-161-01-00432

Stripper Cooler Grid and Plenum, Sect. and Details

DAVID

10/01/13

MD1-0-V-161-01-00433

Stripper Cooler Air Nozzle- Layout and Details

DAVID

10/01/13

MD1-0-V-161-01-00434

Stripper Cooler Cooling Chambers- Section & Details

DAVID

10/01/13

MD1-0-V-161-01-00435

Stripper Cooler Ash Drain and Spray Nozzle Layout & Details

DAVID

10/01/13

MD1-0-V-161-01-00436

Stripper Cooler Solids Transfer Duct Sections and Details

DAVID

10/01/13

MD1-0-V-161-01-00437

Stripper Cooler Rod Out Details

DAVID

26/03/13

MD1-0-V-161-01-00438

Stripper Cooler Air/Solids Return- Sections and Details

DAVID

19/03/13

MD1-0-V-161-01-00439

Stripper Cooler Arrangement- Elevations and Sections

DAVID

19/03/13

MD1-0-V-161-01-00440

Stripper Cooler Arrangement- Sections

DAVID

26/03/13

MD1-0-V-161-01-00480

1524 ID Drum and External Arrangement

IC

DAVID

22/02/13

MD1-0-V-161-01-00481

Forming & Machinning Diagram for 1524 ID Drum

DAVID

04/03/13

MD1-0-V-161-01-00482

1524 ID Drum Internal Attachments Arrangement and Detail detail

DAVID

04/03/13

MD1-0-V-161-01-00490

1524 ID Drum Internals Arrangement Sheet 1 of 2

IC

DAVID

12/12/12

MD1-0-V-161-01-00491

1524 ID Drum Internals Attachments Sheet 2 of 2

DAVID

04/03/13

MD1-0-V-161-01-00492

Vortex Elminator

IC

DAVID

01/02/13

MD1-0-V-161-01-00493

Drum Internals Details

DAVID

04/03/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-01-00600

General Arrangement Isometric View

IC

AUTHORISED
DAVID

RECEIVED
22/08/12

MD1-0-V-161-01-00880

Crossover Flue Arrangement

DAVID

30/05/13

MD1-0-V-161-01-00881

Crossover Flue Sections and Details

DAVID

21/02/13

MD1-0-V-161-01-00882

Crossover Flue Upper Expansion Joint Collar Arrangement

IC

DAVID

04/02/13

MD1-0-V-161-01-00900

FURNACE UPPER FRONT WALL ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00919

FURNACE LOWER FRONT WALL ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00920

FURNACE WALL OPENING FOR SECONDARY AIRPORT

DAVID

08/02/13

MD1-0-V-161-01-00921

WALL OPENING FOR 762 X 914 ACCESS DOOR 50.8 O.D. TUBES ON 76.2 CTRS.

DAVID

08/02/13

MD1-0-V-161-01-00922

FURNACE LOWER FRONT WALL SECTIONS AND DETAILS

DAVID

08/02/13

MD1-0-V-161-01-00924

FUEL INLET OPENING 50.8 O.D. TUBES ON 76.2 CTRS.

DAVID

08/02/13

MD1-0-V-161-01-00926

FURNACE UPPER REAR WALL ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00927

FURNACE UPPER REAR WALL GAS OUTLET TO CYCLONE A & C

DAVID

08/02/13

MD1-0-V-161-01-00928

FURNACE UPPER REAR WALL GAS OUTLET TO CYCLONE B

DAVID

08/02/13

MD1-0-V-161-01-00951

FURNACE LOWER REAR WALL ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00952

FURNACE REAR WALL LOOPSEAL OPENING 50.8 O.D. TUBES ON 76.2 CTRS

DAVID

08/02/13

MD1-0-V-161-01-00953

WALL OPENING FOR 670 DIA THROAT FRONT AND REAL WALL START-UP BURNER

DAVID

08/02/13

MD1-0-V-161-01-00958

FURNACE UPPER SIDE WALL ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00973

FURNACE LOWER SIDE WALL ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00974

FURNACE LOWER SIDE WALL PANELS SECTIONS & DETAILS

IC

DAVID

08/02/13

MD1-0-V-161-01-00976

WALL OPENING FOR COOLER AIR/SOLIDS INLET

DAVID

08/02/13

MD1-0-V-161-01-00981

FURNACE GRID FLOOR ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00982

FURNACE LOWER REAR WALL SECTIONS AND DETAILS

DAVID

08/02/13

MD1-0-V-161-01-00984

FURNACE GRID FLOOR NOZZLE DETAILS AT BED TRANSFER & PURGE AIR ARRANGEMENT I

DAVID

08/02/13

MD1-0-V-161-01-00985

FURNACE GRID FLOOR AIR NOZZLE ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00986

FLUID BED SOLIDS DRAIN OPENING FOR 50.8 OD TUBES ON 76.2 CTRS(1)

DAVID

08/02/13

MD1-0-V-161-01-00987

FLUID BED SOLIDS DRAIN OPENING FOR 50.8 OD TUBES ON 76.2 CTRS(2)

DAVID

08/02/13

MD1-0-V-161-01-00988

FURNACE LOWER SIDE WALL SEAL BOX FOR FW & RW HEADERS

DAVID

08/02/13

MD1-0-V-161-01-09001

Key Plan Silo, Boiler and Air Heater Area

IC

DAVID

26/12/12

MD1-0-V-161-01-09185

Equipment Maintenance Monorails

IC

DAVID

25/02/13

MD1-0-V-161-01-09186

Equipment maintenance hook locations

IC

DAVID

10/05/13

MD1-0-V-161-01-14102

Blowdown Tank General Arrangement Drawing

DAVID

04/02/13

MD1-0-V-161-01-23401

General Arrangement of PA SCAH

IC

DAVID

09/11/12

MD1-0-V-161-01-23402

General Arrangement of PA SCAH

IC

DAVID

09/11/12

MD1-0-V-161-01-32511

PA Fan-Fan General Arrangement Drawing with Loading and Foundation

IC

DAVID

22/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-01-32521

SA Fan-Fan General Arrangement Drawing with Loading and Foundation

IC

AUTHORISED
DAVID

RECEIVED
22/02/13

MD1-0-V-161-01-36502

Limestone Blower Outline Drawing

DAVID

04/03/13

MD1-0-V-161-01-36503

General Arrangement Drawing for Limestone Feed System

IC

DAVID

24/01/13

MD1-0-V-161-02-01009

Surface Preparation and Painting Requirements

IC

DAVID

15/01/13

MD1-0-V-161-02-01020

Piping Material Class

DAVID

11/01/13

MD1-0-V-161-03-00001

Steam Generation System Description

AC

DAVID

13/11/12

MD1-0-V-161-05-00001

Quality assurance plan

IC

DAVID

22/02/13

MD1-0-V-161-05-00002

Quality control manual

DAVID

22/02/13

MD1-0-V-161-05-00003

Inspection and test plan(for boiler major parts)

IC

DAVID

22/02/13

MD1-0-V-161-05-25102

Code piping welder qualification list & applicable code used

IC

DAVID

06/03/13

MD1-0-V-161-05-25105

Code piping alloy material verification(pmi) procedure

IC

DAVID

06/03/13

MD1-0-V-161-05-25115

FWPML ALLOY MATERIAL VERIFICATION(PMI)

IC

DAVID

04/02/13

MD1-0-V-161-05-25116

FWPML WELD REPAIR PROCEDURE

RJ

DAVID

04/02/13

MD1-0-V-161-05-25121

Sunco wps and pqr

IC

DAVID

22/03/13

MD1-0-V-161-05-25123

Sunco post weld heat treatment procedurement

IC

DAVID

26/03/13

MD1-0-V-161-05-25124

Sunco nde procedure and operator qualification list

IC

DAVID

22/03/13

MD1-0-V-161-05-25125

Sunco alloy material verification(pmi) procedure

IC

DAVID

22/03/13

MD1-0-V-161-05-25126

Sunco weld repair procedure

IC

DAVID

22/03/13

MD1-0-V-161-05-25133

HUADIAN POST WELD HEAT TREATMENT PROCEDUREMENT

RJ

DAVID

04/02/13

MD1-0-V-161-05-25135

HUADIAN ALLOY MATERIAL VERIFICATION(PMI) PROCEDURE

IC

DAVID

04/02/13

MD1-0-V-161-05-25141

Hailu wps and pqr

IC

DAVID

22/03/13

MD1-0-V-161-05-25142

HAILU WELDER QUALIFICATION LIST & APPLICABLE CODE USED

IC

DAVID

04/02/13

MD1-0-V-161-05-25143

Hailu post weld heat treatment procedurement

IC

DAVID

22/03/13

MD1-0-V-161-05-25144

Hailu nde procedure and operator qualification list

IC

DAVID

22/03/13

MD1-0-V-161-05-25145

Hailu alloy material verification(pmi) procedure

IC

DAVID

22/03/13

MD1-0-V-161-05-25146

HAILU WELD REPAIR PROCEDURE

IC

DAVID

04/02/13

MD1-0-V-161-05-25151

Gl wps and pqr

IC

DAVID

22/03/13

MD1-0-V-161-05-25152

Gl welder qualification list & applicable code used

IC

DAVID

22/03/13

MD1-0-V-161-05-25153

Gl post weld heat treatment procedurement

IC

DAVID

06/03/13

MD1-0-V-161-05-25154

Gl nde procedure and operator qualification list

IC

DAVID

22/03/13

MD1-0-V-161-05-25155

Gl alloy material verification(pmi) procedure

IC

DAVID

22/03/13

MD1-0-V-161-05-25191

FWST WPS AND PQR

DAVID

04/02/13

MD1-0-V-161-05-25192

FWST WELDER QUALIFICATION LIST & APPLICABLE CODE USED

DAVID

04/02/13

MD1-0-V-161-05-25193

FWST POST WELD HEAT TREATMENT PROCEDUREMENT

IC

DAVID

04/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-05-25195

FWST ALLOY MATERIAL VERIFICATION (PMI) PROCEDURE

IC

AUTHORISED
DAVID

RECEIVED
04/02/13

MD1-0-V-161-05-25196

FWST WELD REPAIR PROCEDURE

IC

DAVID

04/02/13

MD1-0-V-161-05-25801

Sbwl wps and pqr

IC

DAVID

10/05/13

MD1-0-V-161-05-25803

Sbwl post weld heat treatment procedurement

RJ

DAVID

09/05/13

MD1-0-V-161-05-25804

Sbwl nde procedure and operator qualification list

IC

DAVID

29/05/13

MD1-0-V-161-05-25807

Sbwl drum hydrotest procedure

DAVID

11/06/13

MD1-0-V-161-06-00001

ASME Code Calculation For Pressure Parts

DAVID

04/04/13

MD1-0-V-161-06-00002

Description of pressure part code calculation - asme section I

DAVID

06/06/13

MD1-0-V-161-06-00003

Critical Pipe Terminal Allowable Reactions

IC

DAVID

22/02/13

MD1-0-V-161-06-00031

Boiler Proper Hanger Load Calculation Summary

DAVID

11/03/13

MD1-0-V-161-06-00104

Economizer Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-00107

Intermediate Superhtr Inlet Manifold

IC

DAVID

03/07/12

MD1-0-V-161-06-00508

Economizer Intermediate Support Header

IC

DAVID

03/07/12

MD1-0-V-161-06-00811

Intermediate Superhtr Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-00911

Economizer Outlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-01000

Economizer Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-01141

Calculation Sheet for Blowdown Tank

IC

DAVID

04/02/13

MD1-0-V-161-06-01213

Economizer Feed Line to Drum

IC

DAVID

03/07/12

MD1-0-V-161-06-01217

Intermediate Superhtr Outlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-01400

Pipe before Stop & Check Valve and Pipe between Stop & Check Valve

IC

DAVID

03/07/12

MD1-0-V-161-06-01500

Econ Inlet Extension Pipe

IC

DAVID

03/07/12

MD1-0-V-161-06-01823

Intermediate Superhtr Outlet Manifold

IC

DAVID

03/07/12

MD1-0-V-161-06-02000

Economizer Lower Hanger Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-03000

Economizer Upper Hanger Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-04000

Stripper Cooler Coil Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-05080

Furnace Front Wall Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-09100

Furnace Grid Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-10102

TP WW2 to FSH

IC

DAVID

03/07/12

MD1-0-V-161-06-10104

Header Calculation for 60' I.D.Drum

IC

DAVID

03/07/12

MD1-0-V-161-06-10310

Superhtr 2nd Spray HDR

IC

DAVID

03/07/12

MD1-0-V-161-06-10506

Header Calculation for 18" Downcomer Nozzle on Drum

IC

DAVID

03/07/12

MD1-0-V-161-06-10708

Header Calculation for 12" Downcomer Nozzle on Drum

IC

DAVID

03/07/12

MD1-0-V-161-06-10910

Header Calculation for 10" Downcomer Nozzle on Drum

IC

DAVID

03/07/12

MD1-0-V-161-06-11112

Header Calculation for 6" Riser Nozzle on Drum

IC

DAVID

03/07/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-06-11140

Furnace Side Wall Tube

IC

AUTHORISED
DAVID

RECEIVED
03/07/12

MD1-0-V-161-06-11300

Header Calculation for 60" I.D.Drum

IC

DAVID

03/07/12

MD1-0-V-161-06-11400

Header Calculation for Drum Head Reinforcement

IC

DAVID

03/07/12

MD1-0-V-161-06-11500

Header Calculation for Drum Nozzle for Feedline

IC

DAVID

03/07/12

MD1-0-V-161-06-11600

Header Calculation for Drum Nozzle End for 18" Downcomer

IC

DAVID

03/07/12

MD1-0-V-161-06-11700

Header Calculation for Drum Nozzle End for 12" Downcomer

IC

DAVID

03/07/12

MD1-0-V-161-06-11800

Header Calculation for Drum Nozzle End for 10" Downcomer and Feedline

IC

DAVID

03/07/12

MD1-0-V-161-06-11900

Header Calculation for Drum Nozzle End for 6" Riser

IC

DAVID

03/07/12

MD1-0-V-161-06-15180

Furnace Rear & Roof Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-19000

Eva WW Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-20104

Downcomer to Lower Furnace

IC

DAVID

03/07/12

MD1-0-V-161-06-20106

Finishing Superhtr Inlet Manifold

IC

DAVID

03/07/12

MD1-0-V-161-06-20210

Cyclone Inckt Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-20510

Furnace Downcomer Bottle

IC

DAVID

03/07/12

MD1-0-V-161-06-20710

Finishing Superhtr Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-21112

Downcomer to Cyclone

IC

DAVID

03/07/12

MD1-0-V-161-06-21116

Finishing Superheater WW Outlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-21317

Cyclone Manifold- Part of DWNCMR

IC

DAVID

03/07/12

MD1-0-V-161-06-21722

Finishing Superhtr Outlet Manifold

IC

DAVID

03/07/12

MD1-0-V-161-06-21823

FFW Feeders to Diaphragmed Circuit

IC

DAVID

03/07/12

MD1-0-V-161-06-22000

Cyclone Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-22429

FSW Feeders to Diaphragmed Circuit

IC

DAVID

03/07/12

MD1-0-V-161-06-23031

Downcomer to EVAP WW

IC

DAVID

03/07/12

MD1-0-V-161-06-23240

HRA Side Wall Lower Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-25260

HRA Side Wall Upper Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-27280

HRA Front Wall Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-29300

HRA RW Upper Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-30104

RHTR-1 Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-30106

Furnace FW Lower Header

IC

DAVID

03/07/12

MD1-0-V-161-06-30508

RHTR-1 Outlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-30712

Furnace SW Lower Header

IC

DAVID

03/07/12

MD1-0-V-161-06-30912

RHTR-2 Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-31316

Furnace RW Lower Header

IC

DAVID

03/07/12

MD1-0-V-161-06-31320

HRA Roof Tube

IC

DAVID

03/07/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-06-31718

RH1 Inlet & Bypass Pipe

IC

AUTHORISED
DAVID

RECEIVED
03/07/12

MD1-0-V-161-06-31722

Furnace Upper SW Headers

IC

DAVID

03/07/12

MD1-0-V-161-06-31920

By-pass Inlet Tee

IC

DAVID

03/07/12

MD1-0-V-161-06-32100

By-pass Inlet 22" End of Reducer

IC

DAVID

03/07/12

MD1-0-V-161-06-32223

RH1 22" OD Inlet Pipe

IC

DAVID

03/07/12

MD1-0-V-161-06-32328

Furnace Upper FW Headers

IC

DAVID

03/07/12

MD1-0-V-161-06-32425

Mixing Tee at Reheater Bypass SA-182-F22

IC

DAVID

03/07/12

MD1-0-V-161-06-32600

RH1 Outlet Pipe to Mixing Tee

IC

DAVID

03/07/12

MD1-0-V-161-06-32728

32" OD Transfer Pipe to RH2 Inlet

IC

DAVID

03/07/12

MD1-0-V-161-06-32900

32" OD Spool Piece From Mixer Out

IC

DAVID

03/07/12

MD1-0-V-161-06-32932

EVAP Wingwall Lower HDR

IC

DAVID

03/07/12

MD1-0-V-161-06-33000

Flanged Transition Piece From valve to Mixing Tee

IC

DAVID

03/07/12

MD1-0-V-161-06-33338

EVAP Wingwall Upper HDR

IC

DAVID

03/07/12

MD1-0-V-161-06-33340

HRA Rear Wall Lower Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-35360

HRAXOD Top Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-37380

HRAXOD Side Wall Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-39400

HRAXOD Bottom Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-40106

Cycl Inckt Lower Header

IC

DAVID

03/07/12

MD1-0-V-161-06-40712

Cycl Inckt Upper Header

IC

DAVID

03/07/12

MD1-0-V-161-06-41000

Primary Superheater Inlet Stubs

IC

DAVID

03/07/12

MD1-0-V-161-06-41317

Cyc. Upper Ring Header

IC

DAVID

03/07/12

MD1-0-V-161-06-41823

Cyc. Lower Ring Header

IC

DAVID

03/07/12

MD1-0-V-161-06-42000

Primary Superheater Horizontal Legs/Outlet Stubs

IC

DAVID

03/07/12

MD1-0-V-161-06-42426

XOD Posts SW Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-42729

XOD Posts SW Outlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-43000

RH 1 Inlet Leg

IC

DAVID

03/07/12

MD1-0-V-161-06-43032

XOD Bottom Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-43335

XOD Top Outlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-43637

XOD Transfer Pipe Top To Bottom

IC

DAVID

03/07/12

MD1-0-V-161-06-44000

RH1 Heating Elements Leg 1 to Leg 5

IC

DAVID

03/07/12

MD1-0-V-161-06-45000

RH1 Heating Elements Leg 5 to Leg 6

IC

DAVID

03/07/12

MD1-0-V-161-06-46000

RH1 Heating Elements Leg 7 to Leg 8

IC

DAVID

03/07/12

MD1-0-V-161-06-47000

RH1 Outlet Leg

IC

DAVID

03/07/12

MD1-0-V-161-06-48000

RH2 Outlet Leg

IC

DAVID

03/07/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-06-49000

RH 2 Heating Element Leg 1 to Leg 4

IC

AUTHORISED
DAVID

RECEIVED
03/07/12

MD1-0-V-161-06-50000

RH 2 Heating Element Leg 5 to Leg 6

IC

DAVID

03/07/12

MD1-0-V-161-06-50109

HRA Front Wall Upper Header

IC

DAVID

03/07/12

MD1-0-V-161-06-51000

RH 2 Outlet Legs

IC

DAVID

03/07/12

MD1-0-V-161-06-51015

HRA Front Wall intermediate Header

IC

DAVID

03/07/12

MD1-0-V-161-06-51622

HRA Side Wall Upper Header

IC

DAVID

03/07/12

MD1-0-V-161-06-52000

3" Long Spool Piece @ RH II Heating Leg 6 & RH II Outlet Legs

IC

DAVID

03/07/12

MD1-0-V-161-06-52326

HRA Side Wall Lower Header

IC

DAVID

03/07/12

MD1-0-V-161-06-52730

HRA Front Wall Lower (Outlet) Header

IC

DAVID

03/07/12

MD1-0-V-161-06-53000

ISH Unheated & Lower Tubes

IC

DAVID

03/07/12

MD1-0-V-161-06-53137

HRA RW Lower (Outlet) Header

IC

DAVID

04/07/12

MD1-0-V-161-06-53839

Tee on HRA RW Lower (Outlet) Header

IC

DAVID

04/07/12

MD1-0-V-161-06-54000

ISH Upper Tubes

IC

DAVID

04/07/12

MD1-0-V-161-06-55000

FSH WW Unheater and Lower Tube

IC

DAVID

04/07/12

MD1-0-V-161-06-56000

FSH WW Upper Tubes

IC

DAVID

04/07/12

MD1-0-V-161-06-57000

FSH WW Upper Unheated Tubes

IC

DAVID

04/07/12

MD1-0-V-161-06-58000

8" Evaporative WW Feeder-BR

IC

DAVID

04/07/12

MD1-0-V-161-06-59000

10" Furnace Feeder-BS

IC

DAVID

04/07/12

MD1-0-V-161-06-60000

3" FSW Feeder to Diaphragmed Circult-BT

IC

DAVID

04/07/12

MD1-0-V-161-06-60104

SC/ Cooling Coil Inlet HDRS

IC

DAVID

04/07/12

MD1-0-V-161-06-60508

SC/ Cooling Coil Outlet HDRS

IC

DAVID

04/07/12

MD1-0-V-161-06-60900

SC/ Cooling Coil Transfer Pipe

IC

DAVID

04/07/12

MD1-0-V-161-06-61000

4" FFW Feeder to Diaphragmed Circult-BU

IC

DAVID

04/07/12

MD1-0-V-161-06-62000

6" Furnace & Evaporative WW Risers-BW

IC

DAVID

04/07/12

MD1-0-V-161-06-63000

Drum Head Recirculating Pipe -BX

IC

DAVID

04/07/12

MD1-0-V-161-06-64000

6" Cyclone & Cyclone INCKT Risers-CA

IC

DAVID

04/07/12

MD1-0-V-161-06-65000

6" Cyclone & Cyclone INCKT Feeder- CB

IC

DAVID

04/07/12

MD1-0-V-161-06-66000

SS Pipes From Drum To HRA FW/SW-CH

IC

DAVID

04/07/12

MD1-0-V-161-06-67000

Transfer-HRA FW To HRA RW Lower- CJ

IC

DAVID

04/07/12

MD1-0-V-161-06-68000

Transfer-HRA RW Lowr HDR To PSH Inlet-CM

IC

DAVID

04/07/12

MD1-0-V-161-06-80106

Primary Superheater Inlet Header

IC

DAVID

04/07/12

MD1-0-V-161-06-80710

Primary Superheater Outlet Header

IC

DAVID

04/07/12

MD1-0-V-161-06-81112

TP PSH To WW2

IC

DAVID

04/07/12

MD1-0-V-161-06-81320

1st Spray Header

IC

DAVID

04/07/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-161-07-00001

Fuel Silo Flowability Analysis

STS
I

AUTHORISED
DAVID

RECEIVED
06/11/12

MD1-0-V-161-07-00002

Evaluation of Limestones for the Mong Duong 1 Thermal Power Plant

DAVID

03/04/13

MD1-0-V-161-08-06006

Equipment List

IC

DAVID

25/09/12

MD1-0-V-161-08-06007

Valve List

IC

DAVID

15/11/12

MD1-0-V-161-08-06008

Boiler Line List

IC

DAVID

21/02/13

MD1-0-V-161-08-06009

Piping Terminal Point List

DAVID

28/06/13

MD1-0-V-161-08-06010

Utility Consumption List for Boiler

IC

DAVID

22/02/13

MD1-0-V-161-08-10000

Boiler Master Documents & Drawing List

IC

DAVID

20/03/13

MD1-0-V-161-08-2000

Engineering abbreviations and acronyms for boiler

DAVID

26/03/13

MD1-0-V-161-09-00002

MATERIAL COMPARISON TABLE FOR NON-PRESSURE PARTS

IC

DAVID

28/01/13

MD1-0-V-161-09-00010

Limestone Requirements for Boiler

DAVID

25/01/13

MD1-0-V-161-09-14610

Boiler Steel Structure Paint MSDS

DAVID

17/12/12

MD1-0-V-161-09-23401

Data Sheet for Steam Coil Air Heater

IC

DAVID

03/10/12

MD1-0-V-161-09-24701

Data Sheet for Air Preheater

IC

DAVID

06/11/12

MD1-0-V-161-09-24901

Data Sheet for Sootblower System

AC

DAVID

26/12/12

MD1-0-V-161-09-25401

Data Sheet for Damper and Actuator

AC

DAVID

26/12/12

MD1-0-V-161-09-25402

Data Sheet of Fabric Expansion Joint

RT

DAVID

26/12/12

MD1-0-V-161-09-25501

Data Sheet of Metal Expansion Joint

RT

DAVID

26/12/12

MD1-0-V-161-09-25701

Data Sheet for Start up Burner System

IC

DAVID

06/11/12

MD1-0-V-161-09-32501

Data Sheet for Primary Air Fan and Secondary Air Fan

IC

DAVID

03/10/12

MD1-0-V-161-09-32502

Technical Data Sheet for Stripper Cooler Blowers

DAVID

03/10/12

MD1-0-V-161-09-32505

Data Sheet for Loop Seal Blower

IC

DAVID

06/11/12

MD1-0-V-161-09-32511

Opearational Curves at Various Inlet Vanes Opening

IC

DAVID

06/11/12

MD1-0-V-161-09-36101

Data Sheet for Chain Conveyor System

IC

DAVID

03/10/12

MD1-0-V-161-09-36102

Data Sheet for Belt Feeder System

IC

DAVID

03/10/12

MD1-0-V-161-09-36103

Technical Data Sheet for Bed Ash Cooling System Rotary Valve

AC

DAVID

26/12/12

MD1-0-V-161-09-36501

Data Sheet for Limestone Feed System

DAVID

22/02/13

MD1-0-V-161-09-62101

Technical Data Sheet for RH Balancing Valve

AC

DAVID

26/12/12

MD1-0-V-161-09-62102

Technical Data Sheet for SC Outlet Knife Gate

AC

DAVID

26/12/12

MD1-0-V-161-09-62104

Data Sheet for Miscellaneous Control Valve

DAVID

25/02/13

MD1-0-V-161-10-00001

Boiler standard drawings package

DAVID

22/03/13

MD1-0-V-161-10-12470

Boiler Tri-sector Air-Heater Vendor Drawings

RT

DAVID

20/05/13

MD1-0-V-161-10-12490

Boiler sootblower vendor drawings

IC

DAVID

25/02/13

MD1-0-V-161-10-12552

Boiler Hanger Workpackage Vendor Drawings

RJ

DAVID

28/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-161-10-12570

Boiler Burner System Workpackage Vendor Documents & Drawings

STS
I

AUTHORISED
DAVID

RECEIVED
01/07/13

MD1-0-V-161-10-13250

Boiler Pa/Sa Fan Vendor Drawings

IC

DAVID

12/04/13

MD1-0-V-161-10-13251

Boiler S/C Blower System Vendor Drawings

IC

DAVID

12/04/13

MD1-0-V-161-10-13252

Boiler Loopseal Blower System Vendor Drawings

IC

DAVID

12/04/13

MD1-0-V-161-10-13612

Stripper cooler rotary valve workpackage vendor documents & drawings

IC

DAVID

25/02/13

MD1-0-V-161-10-16210

MS-FW Stop & Check Valves_ Pentair Valves & Controls Vendor Drawings

IC

DAVID

17/01/13

MD1-0-V-161-10-16211

Boiler Large Bore Valves Vendor Drawings

IC

DAVID

20/05/13

MD1-0-V-161-10-16215

RH-By pass Control Valve Workpackage Vendor Documents & Drawings

IC

DAVID

04/02/13

MD1-0-V-161-14-00080

Fuel Feed System Equipment Arrangement From Fuel Silos to Boiler

DAVID

20/03/13

MD1-0-V-161-14-00081

Fuel Feed Chute System Arrangement of Front Wall

DAVID

20/03/13

MD1-0-V-161-14-00082

FUEL FEED CHUTE SYSTEM ARRANGMENT OF

DAVID

20/03/13

MD1-0-V-161-14-00083

Fuel Feed Chute System Arrangement Sections & Details

DAVID

20/03/13

MD1-0-V-161-14-00084

EXPANSION JOINTS FOR FUEL FEED CHUTE

IC

DAVID

10/01/13

MD1-0-V-161-14-01095

Fuel & lime silos sections & details stainless steel liner plates

DAVID

25/02/13

MD1-0-V-161-21-06124

P&ID Stripper Cooler Blowers

AC

DAVID

05/03/13

MD1-0-V-161-21-06135

P&ID Nitrogen System

AC

DAVID

05/03/13

MD1-0-V-161-23-03980

SOOTBLOWER PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-03981

SOOTBLOWER PIPING PLAN VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-03982

SOOTBLOWER PIPING ELEVATION VIEW - RIGHT SIDE

IC

DAVID

21/02/13

MD1-0-V-161-23-03983

SOOTBLOWER PIPING ELEVATION VIEW - LEFT SIDE

IC

DAVID

21/02/13

MD1-0-V-161-23-03984

SOOTBLOWER PIPING SUPPORT DETAIL

IC

DAVID

21/02/13

MD1-0-V-161-23-03985

SOOTBLOWER PIPING SUPPORT LIST

IC

DAVID

21/02/13

MD1-0-V-161-23-04000

BOILER DRAIN PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04001

BOILER DRAIN PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04002

BOILER DRAIN PIPING ELEVATION VIEW - RIGHT SIDE

IC

DAVID

21/02/13

MD1-0-V-161-23-04003

BOILER DRAIN PIPING ELEVATION VIEW - LEFT SIDE

IC

DAVID

21/02/13

MD1-0-V-161-23-04004

BOILER VENT PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04005

BOILER VENT PIPING PLAN VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04006

BOILER VENT PIPING ELEVATION VIEW

DAVID

21/02/13

MD1-0-V-161-23-04007

BOILER DRAIN PIPING SUPPORTS DETAIL(1)

DAVID

21/02/13

MD1-0-V-161-23-04008

BOILER DRAIN PIPING SUPPORTS DETAIL(2)

DAVID

21/02/13

MD1-0-V-161-23-04009

BOILER VENT PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04010

BOILER DRAIN PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04011

BOILER VENT PIPING SUPPORT LIST

IC

DAVID

21/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-23-04020

SPRAY WATER PIPING ISOMETRIC VIEW

IC

AUTHORISED
DAVID

RECEIVED
21/02/13

MD1-0-V-161-23-04021

SPRAY WATER PIPING PLAN VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04022

SPRAY WATER PIPING ELEVATION VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04023

SPRAY WATER PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04024

SPRAY WATER PIPING SUPPORTS LIST

IC

DAVID

21/02/13

MD1-0-V-161-23-04050

CLOSED COOLING WATER PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04051

CLOSED COOLING WATER PIPING PLAN VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04052

CLOSED COOLING WATER PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04060

INTER & CONT BLOWDOWN PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04061

INTER & CONT BLOWDOWN PIPING PLAN VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04062

INTER & CONT BLOWDOWN PIPING ELEVATION VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04063

INTER & CONT BLOWDOWN PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04064

INTER & CONT BLOWDOWN PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04065

INTER & CONT BLOWDOWN PIPING SUPPORTS LIST

IC

DAVID

21/02/13

MD1-0-V-161-23-04076

SAMPLING PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04077

SAMPLING PIPING ARRANGEMENT ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04078

SAMPLING PIPING ARRANGEMENT PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04079

SAMPLING PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04080

PLANT/SERVICE AIR PIPING ARRANGEMENT ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04081

PLANT/SERVICE AIR PIPING ARRANGEMENT PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04082

PLANT/SERVICE AIR PIPING ARRANGEMENT ELEVATION VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04083

PLANT/SERVICE AIR PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04100

INSTRUMENT AIR PIPING ARRANGEMENT ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04101

INSTRUMENT AIR PIPING ARRANGEMENT PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04102

INSTRUMENT AIR PIPING ARRANGEMENT ELEVATION VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04103

INSTRUMENT AIR PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04170

NITROGEN PIPING ARRANGEMENT ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04171

NITROGEN PIPING ARRANGEMENT PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04172

NITROGEN PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04200

STEAM COIL AIR HEATER STEAM PIPING ARRANGEMENT ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04201

STEAM COIL AIR HEATER STEAM PIPING PLAN AND SECTIONS

DAVID

21/02/13

MD1-0-V-161-23-04202

SCAH STEAM PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04250

CHEMICAL FEED PIPING PLAN AND ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04251

CHEMICAL FEED PIPING SUPPORT DETAIL

DAVID

21/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-161-23-04252

CHEMICAL FEED PIPING SUPPORT LIST

STS
I

AUTHORISED
DAVID

RECEIVED
21/02/13

MD1-0-V-161-23-04300

WATER WASH DRAIN PIPING PLAN VIEW AND ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04301

WATER WASH DRAIN PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04330

SAFETY VALVE VENT & DRAIN PIPING ARRANGMENT ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04331

SAFETY VALVE VENT & DRAIN PIPING ARRANGEMENT PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04332

SAFETY VALVE VENT & DRAIN PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04370

SEAL AIR PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04371

SEAL AIR PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04372

SEAL AIR PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04373

SEAL AIR PIPING SUPPORTS LIST

DAVID

21/02/13

MD1-0-V-161-23-04390

STRIPPER COOLER AIR PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04391

STRIPPER COOLER AIR PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04392

STRIPPER COOLER AIR PIPING SUPPORT DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04393

STRIPPER COOLER AIR PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04410

LOOPSEAL AIR PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04411

LOOPSEAL AIR PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04412

LOOPSEAL AIR PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04413

LOOPSEAL AIR PIPING SUPPORTS LIST

DAVID

21/02/13

MD1-0-V-161-23-04450

STRIPPER COOLER ATTEMPERATOR PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04451

STRIPPER COOLER ATTEMPERATOR PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04452

STRIPPER COOLER ATTEMPERATOR PIPING SUPPORT DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04453

STRIPPER COOLER ATTEMPERATOR PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04480

OIL PIPING FO OVERBED BURNER ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04481

OIL PIPING FO OVERBED BURNER ARRANGEMENT PLAN REVIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04482

OIL PIPING FO OVERBED BURNER SECTION VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04483

OIL PIPING FO OVERBED BURNER SUPPORT DETAIL

IC

DAVID

21/02/13

MD1-0-V-161-23-04484

OIL PIPING FO OVERBED BURNER SUPPORT LIST

IC

DAVID

21/02/13

MD1-0-V-161-23-04560

SERVICE WATER PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04561

SERVICE WATER PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04562

SERVICE WATER PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04580

LIMESTONE FEED PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04581

LIMESTONE FEED PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04582

LIMESTONE FEED PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04583

LIMESTONE FEED PIPING EXPANSION JOINT

IC

DAVID

21/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-161-24-00001

Piping Isometric Drawing

IC

AUTHORISED
DAVID

RECEIVED
06/02/13

MD1-0-V-161-56-32501

Loopseal Blower Foundation Layout Plan Drawing

IC

DAVID

24/01/13

MD1-0-V-161-56-32502

Stripper Blower Foundation Layout Plan Drawing

IC

DAVID

24/01/13

MD1-0-V-161-73-07200

Above Ground Grounding at Grade Major Mechanical Equipment

IC

DAVID

22/08/12

MD1-0-V-161-82-00001

Insulation for cfb type steam generator

IC

DAVID

21/02/13

MD1-0-V-161-87-00810

Refractory Setting for Cyclone

DAVID

02/04/13

MD1-0-V-161-87-00811

Refractory Setting Upper Furnace & Cyclone Entrance

DAVID

02/04/13

MD1-0-V-161-87-00812

REFRACTORY SETTINGS FOR CROSSOVER FLUE

DAVID

02/04/13

MD1-0-V-161-87-00813

FURNACE GRID FLOOR REFRACTORY SETTINGS

IC

DAVID

02/04/13

MD1-0-V-161-87-00814

REFRACTORY SETTING FOR UPPER WING WALLS & FURNACE FW

DAVID

02/04/13

MD1-0-V-161-87-00815

REFRACTORY SETTING FOR LOWER FURNACE AREA

DAVID

02/04/13

MD1-0-V-161-87-00816

REFRACTORY SETTING SECTIONS & DETAILS(1)

DAVID

02/04/13

MD1-0-V-161-87-00817

REFRACTORY SETTING SECTIONS & DETAILS(2)

IC

DAVID

02/04/13

MD1-0-V-161-87-00818

REFRACTORY SETTING FOR CYCLONE OUTLET/ CROSSOVER FLUE INLET

IC

DAVID

02/04/13

MD1-0-V-161-87-00819

REFRACTORY SETTING STRIPPER COOLER PLAN VIEW, SECTION & DETAILS

DAVID

02/04/13

MD1-0-V-161-87-00820

REFRACTORY SETTING FOR S/C AIR/SOLIDS RETURN DUCT DETAILS

DAVID

02/04/13

MD1-0-V-161-87-00821

REFRACTORY SETTING FOR LOOP SEAL

DAVID

02/04/13

MD1-0-V-161-87-00822

REFRACTORY SETTING FOR LOOP SEAL SECTIONS AND DETAILS(1)

DAVID

02/04/13

MD1-0-V-161-87-00823

REFRACTORY SETTING FOR LOOP SEAL SECTIONS AND DETAILS(2)

DAVID

02/04/13

MD1-0-V-161-87-00824

REFRACTORY SETTINGS GENERAL ARRANGEMENT STEAM GENERATOR

IC

DAVID

02/04/13

MD1-0-V-161-87-00825

REFRACTORY DRY-OUT & CURING CURVE - FURNACE

IC

DAVID

02/04/13

MD1-0-V-162-01-00004

Section Drawing of ESP

IC

DAVID

16/07/13

MD1-0-V-162-05-00001

Inspection Test Plan for ESP

RT

DAVID

12/07/13

MD1-0-V-162-05-00002

Cleaning & Painting Procedure ESP System

DAVID

09/04/13

MD1-0-V-162-05-00005

Quality assurance manual

IC

DAVID

08/03/13

MD1-0-V-162-06-00005

ESP Hopper Sizing Calcuation

DAVID

16/07/13

MD1-0-V-162-09-00001

Electrostatic Precipitator Technical Data Sheet

AC

DAVID

05/06/13

MD1-0-V-162-09-00005

Performance Curve

DAVID

18/03/13

MD1-0-V-162-11-00014

Thermal Insulation Drawing with BM and Calculation

IC

DAVID

16/07/13

MD1-0-V-162-11-00017

Purge Air System Drawing

IC

DAVID

22/07/13

MD1-0-V-163-01-00001

I.D Fan Layout Drawing

IC

DAVID

05/04/13

MD1-0-V-163-01-00002

I.D Fan Sectional Drawing

IC

DAVID

06/02/13

MD1-0-V-163-01-00004

I.d. fan inlet damper drawing

IC

DAVID

05/04/13

MD1-0-V-163-01-00006

I.d. fan name plate drawing

IC

DAVID

05/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-163-06-00010

Motor power calculation sheet for i.d. fan

IC

AUTHORISED
DAVID

RECEIVED
09/04/13

MD1-0-V-163-08-00003

Equipments list for id fan(11hnc15an001)

IC

DAVID

09/04/13

MD1-0-V-163-09-00001

Technical Data Sheet

AC

DAVID

21/06/13

MD1-0-V-163-09-00002

Estimated Performance Curve

IC

DAVID

12/03/13

MD1-0-V-163-09-00003

Speed Torque Curve

IC

DAVID

12/03/13

MD1-0-V-163-09-00004

Estimated Noise Data

RT

DAVID

12/03/13

MD1-0-V-163-09-00005

Painting Specification

IC

DAVID

11/01/13

MD1-0-V-163-21-00001

Fan p&i diagram

IC

DAVID

05/04/13

MD1-0-V-163-82-00001

Id fan technical information for acoustic insulation drawing

IC

DAVID

05/04/13

MD1-0-V-181-01-00002

Auxiliary Boiler Package Layout of Boiler Plan View

DAVID

21/02/13

MD1-0-V-181-01-00003

Auxiliary Boiler Package Layout of Boiler Front View

DAVID

21/02/13

MD1-0-V-181-01-00004

Layout of Boiler Side View

DAVID

21/02/13

MD1-0-V-181-03-00001

Auxiliary Boiler Package System Description

AC

DAVID

08/05/13

MD1-0-V-181-05-00001

NSPECTION & TEST PROCEDURE

DAVID

12/06/13

MD1-0-V-181-05-00002

NSPECTION & TEST PLAN

DAVID

12/06/13

MD1-0-V-181-05-00003

WPS & PQR FOR AUX. BOILER

DAVID

25/06/13

MD1-0-V-181-05-00004

NDE Procedure

DAVID

03/04/13

MD1-0-V-181-05-00005

WELD & NDE MAP FOR AUX. BOILER

DAVID

25/06/13

MD1-0-V-181-05-00006

PWHT PROCEDURE

DAVID

29/04/13

MD1-0-V-181-05-00007

Auxiliary boiler package shop pressure test procedure

IC

DAVID

25/06/13

MD1-0-V-181-05-00008

Surface preparation & painting procedure

IC

DAVID

04/07/13

MD1-0-V-181-05-00010

Method statement for aux. boiler installation work

IC

DAVID

19/06/13

MD1-0-V-181-06-00001

Auxiliary Boiler Package Heat Balance for Auxiliary Boiler

DAVID

22/02/13

MD1-0-V-181-06-00002

Auxiliary Boiler Package Boiler Strength Calculation

DAVID

22/02/13

MD1-0-V-181-06-00003

Auxiliary Boiler Package Boiler Thermal Calculation

IC

DAVID

22/03/13

MD1-0-V-181-06-00004

Auxiliary Boiler Package Superheater Strength Calculation

DAVID

22/02/13

MD1-0-V-181-06-00005

Auxiliary Boiler Package Deaerator Strength Calculation

IC

DAVID

22/03/13

MD1-0-V-181-06-00006

Auxiliary Boiler Package Economizer Strength Calculation

IC

DAVID

22/03/13

MD1-0-V-181-06-00007

Blowdown Tank Strength Calculation

IC

DAVID

22/03/13

MD1-0-V-181-06-00008

Auxiliary Boiler Package Diesel Oil Tank Strength Calculation

DAVID

22/02/13

MD1-0-V-181-06-00009

Heavy Oil Tank Strength Calculation

DAVID

22/02/13

MD1-0-V-181-06-00010

Steel Stack Strength Calculation

IC

DAVID

22/03/13

MD1-0-V-181-06-00011

Calculation Sheet of Piping's Diameter

DAVID

22/02/13

MD1-0-V-181-06-00020

Auxiliary Boiler Package Thermal Expansion Calculation of Duct

DAVID

08/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-V-181-08-00006

Auxiliary Boiler package lubricate Schedule

IC

AUTHORISED
DAVID

RECEIVED
04/03/13

MD1-0-V-181-08-00007

Auxiliary Boiler Package Utility Consumption List

IC

DAVID

04/03/13

MD1-0-V-181-08-00011

Auxiliary boiler package line list

IC

DAVID

28/06/13

MD1-0-V-181-08-00012

Auxiliary Boiler package Valve List

DAVID

28/06/13

MD1-0-V-181-08-00013

Auxiliary Boiler Package Electronic Load List

DAVID

04/03/13

MD1-0-V-181-08-00021

Auxiliary boiler package Piping Material Class

DAVID

22/02/13

MD1-0-V-181-09-00001

Auxiliary Boiler Package Burner (Include BSP)

IC

DAVID

12/12/12

MD1-0-V-181-09-00003

Boiler Feed Water & Sumpt Pump (Include Motor Drawing & Data)

IC

DAVID

21/11/12

MD1-0-V-181-09-00005

Chemical Dosing System & Sampling System

IC

DAVID

21/11/12

MD1-0-V-181-09-00008

Auxiliary Boiler Package Safety Valve

DAVID

04/03/13

MD1-0-V-181-10-00001

Auxiliary Boiler Package Boiler Assembly Drawing (1 of 2)

DAVID

21/02/13

MD1-0-V-181-10-00002

Auxiliary Boiler Package Boiler Assembly Drawing (2 of 2)

DAVID

21/02/13

MD1-0-V-181-10-00003

Auxiliary Boiler Package Super Assembly

DAVID

21/02/13

MD1-0-V-181-10-00005

Auxiliary Boiler Package Economizer Assembly Drawing

IC

DAVID

26/03/13

MD1-0-V-181-10-00006

Auxiliary Boiler Package Blowdown Tank Assembly Drawing

DAVID

21/02/13

MD1-0-V-181-10-00007

Auxiliary Boiler Package Diesel Oil Tank Assembly

DAVID

21/02/13

MD1-0-V-181-10-00008

Auxiliary Boiler Package Heavy Oil Tank Assembly

IC

DAVID

21/02/13

MD1-0-V-181-10-00009

Auxiliary Boiler Package Steel Stack

IC

DAVID

21/02/13

MD1-0-V-181-10-00010

Auxiliary boiler package arrangement of ducts

DAVID

17/05/13

MD1-0-V-181-11-00101

Auxiliary Boiler Package Steam Drum for Auxiliary Boiler

DAVID

21/02/13

MD1-0-V-181-11-00102

Auxiliary Boiler Package Tube Arrangement of Steam Drum

DAVID

21/02/13

MD1-0-V-181-11-00103

Auxiliary Boiler Package Steam Drum Nozzle Detail (1/2)

DAVID

21/02/13

MD1-0-V-181-11-00104

Auxiliary Boiler Package Steam Drum Nozzle Detail (2/2)

DAVID

21/02/13

MD1-0-V-181-11-00105

Auxiliary Boiler Package Steam Drum Manhole Detail

DAVID

21/02/13

MD1-0-V-181-11-00106

Auxiliary Boiler Package Internal Arrangement of STE Drum

DAVID

21/02/13

MD1-0-V-181-11-00107

Auxiliary Boiler Package Detail of Main Steam Connection

DAVID

21/02/13

MD1-0-V-181-11-00111

Auxiliary Boiler Package Water Drum for Auxiliary Boiler

DAVID

21/02/13

MD1-0-V-181-11-00112

Auxiliary Boiler Package Tube Arrangement of Water Drum

DAVID

21/02/13

MD1-0-V-181-11-00113

Auxiliary Boiler Package Water Drum Nozzle Detail

DAVID

21/02/13

MD1-0-V-181-11-00114

Auxiliary Boiler Package Water Drum Manhole Detail

DAVID

21/02/13

MD1-0-V-181-11-00115

Auxiliary Boiler Package Water Drum Internal

DAVID

21/02/13

MD1-0-V-181-11-00116

Auxiliary Boiler Package Water Drum Saddle Detail

DAVID

21/02/13

MD1-0-V-181-11-00121

Auxiliary Boiler Package Arrangement of Panel Tube

DAVID

21/02/13

MD1-0-V-181-11-00131

Auxiliary Boiler Package Water Column (1/2)

DAVID

21/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-V-181-11-00132

Auxiliary Boiler Package Water Column (2/2)

DAVID

21/02/13

MD1-0-V-181-11-00151

Auxiliary Boiler Package Outer Casing of Front & Rear Side (1 of 3)

DAVID

21/02/13

MD1-0-V-181-11-00152

Auxiliary Boiler Package Outer Casing of Front & Rear Side (2 of 3)

DAVID

21/02/13

MD1-0-V-181-11-00153

Auxiliary Boiler Package Outer Casing of Front & Rear Side (3 of 3)

DAVID

21/02/13

MD1-0-V-181-11-00191

Auxiliary boiler package name plate for boiler

IC

DAVID

25/06/13

MD1-0-V-181-11-00201

Auxiliary Boiler Package Tube Detail of Superheater

DAVID

21/02/13

MD1-0-V-181-11-00211

Auxiliary Boiler Package Inlet Header Detail of Superheater

DAVID

21/02/13

MD1-0-V-181-11-00212

Auxiliary Boiler Package Outlet Header Detail of Superheater

DAVID

21/02/13

MD1-0-V-181-11-00301

Auxiliary Boiler Package Shell Detail of Deaerator(Storage Tank)

IC

DAVID

11/01/13

MD1-0-V-181-11-00302

Auxiliary Boiler Package Shell Detail of Deaerator(Deaerator Tank)

IC

DAVID

11/01/13

MD1-0-V-181-11-00311

Auxiliary Boiler Package Nozzle Detail of Deaerator

IC

DAVID

11/01/13

MD1-0-V-181-11-00312

Auxiliary Boiler Package Manhole Detail of Deaerator

DAVID

11/01/13

MD1-0-V-181-11-00321

Auxiliary Boiler Package Saddle Detail of Deaerator

DAVID

11/01/13

MD1-0-V-181-11-00331

Auxiliary Boiler Package Platform Detail of Deaerator (1 of 2)

IC

DAVID

11/01/13

MD1-0-V-181-11-00332

Auxiliary Boiler Package Platform Detail of Deaerator (2 of 2)

IC

DAVID

11/01/13

MD1-0-V-181-11-00391

Auxiliary boiler package name plate for deaerator

IC

DAVID

25/06/13

MD1-0-V-181-11-00401

Auxiliary Boiler Package Detail of Economizer (Header and Nozzle Detail)

DAVID

21/02/13

MD1-0-V-181-11-00411

Auxiliary boiler package platform detail of economizer

IC

DAVID

08/07/13

MD1-0-V-181-11-00412

Auxiliary boiler package platform detail of economizer

IC

DAVID

08/07/13

MD1-0-V-181-11-00491

Auxiliary boiler package name plate for economizer

IC

DAVID

25/06/13

MD1-0-V-181-11-00501

Auxiliary Boiler Package Nozzle Detail of Blowdown Tank

DAVID

21/02/13

MD1-0-V-181-11-00511

Auxiliary Boiler Package Manhole Detail of Blowdown Tank

DAVID

21/02/13

MD1-0-V-181-11-00591

Auxiliary boiler package name plate for blowdown tank

IC

DAVID

25/06/13

MD1-0-V-181-11-00601

Auxiliary Boiler Package Nozzle Detail of Diesel Oil Tank

DAVID

21/02/13

MD1-0-V-181-11-00611

Auxiliary boiler package manhole detail oil tank

DAVID

25/02/13

MD1-0-V-181-11-00621

Auxiliary Boiler Package Platform Detail of Diesel Oil Tank

DAVID

21/02/13

MD1-0-V-181-11-00622

Platform & Ladder Detail of Diesel Oil Tank (2 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00691

Auxiliary boiler package name plate for diesel oil tank

IC

DAVID

25/06/13

MD1-0-V-181-11-00701

Auxiliary Boiler Package Nozzle Detail of Heavy Oil Tank (1 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00702

Auxiliary Boiler Package Nozzle Detail of Heavy Oil Tank (2 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00711

Auxiliary Boiler Package Manhole Detail of Heavy Oil Tank (1 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00721

Auxiliary boiler package ladder & handrail detail of heavy oil tank

IC

DAVID

08/07/13

MD1-0-V-181-11-00791

Auxiliary boiler package name plate for heavy oil tank

IC

DAVID

25/06/13

MD1-0-V-181-11-00801

Auxiliary Boiler Package Template of Stack

DAVID

21/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-V-181-11-00802

Auxiliary Boiler Package Shell Detail of Stack (1 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00803

Auxiliary Boiler Package Shell Detail of Stack (2 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00811

Auxiliary Boiler Package Nozzle Detail of Stack

DAVID

21/02/13

MD1-0-V-181-11-00821

Attachment Detail of Stack

IC

DAVID

21/02/13

MD1-0-V-181-11-00831

Platform Detail of Stack (1 of 3)

IC

DAVID

21/02/13

MD1-0-V-181-11-00832

Platform Detail of Stack (2 of 3)

DAVID

21/02/13

MD1-0-V-181-11-00833

Platform Detail of Stack (3 of 3)

DAVID

21/02/13

MD1-0-V-181-11-00841

Auxiliary Boiler Package Ladder Detail of Stack (1 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00842

Auxiliary Boiler Package Ladder Detail of Stack (2 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00891

Auxiliary boiler package name plate for stack

IC

DAVID

25/06/13

MD1-0-V-181-11-00901

Auxiliary boiler package air duct detail(1of4)

IC

DAVID

08/07/13

MD1-0-V-181-11-00902

Auxiliary boiler package air duct detail(2of4)

DAVID

17/05/13

MD1-0-V-181-11-00903

Auxiliary boiler package air duct detail(3of4)

DAVID

17/05/13

MD1-0-V-181-11-00904

Auxiliary boiler package air duct detail(4of4)

DAVID

17/05/13

MD1-0-V-181-11-00905

Auxiliary boiler package gas duct detail(1of4)

DAVID

08/07/13

MD1-0-V-181-11-00906

Auxiliary boiler package gas duct detail(2of4)

DAVID

17/05/13

MD1-0-V-181-11-00907

Auxiliary boiler package gas duct detail(3of4)

DAVID

17/05/13

MD1-0-V-181-11-00908

Auxiliary boiler package gas duct detail(4of4)

DAVID

17/05/13

MD1-0-V-181-11-00909

Auxiliary boiler package common detail of duct

DAVID

25/02/13

MD1-0-V-181-11-00910

Auxiliary boiler package manhole detail of duct

DAVID

25/02/13

MD1-0-V-181-11-00911

Auxiliary boiler package expansion joint detail of duct

DAVID

08/07/13

MD1-0-V-181-11-00912

Auxiliary boiler package nozzle detail of duct

DAVID

25/02/13

MD1-0-V-181-21-00001

Auxiliary boiler pacakge p&id diagram deaerator system

AC

DAVID

22/02/13

MD1-0-V-181-21-00002

Auxiliary boiler pacakge p&id diagram boiler feed water & steam system

DAVID

22/02/13

MD1-0-V-181-21-00003

Auxiliary boiler pacakge p&id diagram blowdown system

DAVID

22/02/13

MD1-0-V-181-21-00004

Auxiliary boiler pacakge p&id diagram air & flue gas system

DAVID

22/02/13

MD1-0-V-181-21-00005

Auxiliary boiler pacakge p&id diagram oil pumping system

AC

DAVID

22/02/13

MD1-0-V-181-21-00006

Auxiliary boiler pacakge p&id diagram burning system

DAVID

22/02/13

MD1-0-V-181-21-00007

Auxiliary boiler pacakge p&id diagram instrument & cooling & sealing air

DAVID

22/02/13

MD1-0-V-181-21-00008

Auxiliary boiler pacakge p&id diagram soot blower system

DAVID

22/02/13

MD1-0-V-181-21-00009

Auxiliary boiler pacakge p&id diagram chemical dosing system

AC

DAVID

22/02/13

MD1-0-V-181-21-00010

P&ID Diagram Sampling System

DAVID

22/02/13

MD1-0-V-181-23-00001

General Piping Arrangement Drawing (1 of 3) (EL.0-4000)

IC

DAVID

04/07/13

MD1-0-V-181-23-00002

General Piping Arrangement Drawing (2 of 3) (EL.4000-8590)

IC

DAVID

04/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-181-23-00003

General Piping Arrangement Drawing (3 of 3) (EL.8590-Above)

IC

AUTHORISED
DAVID

RECEIVED
04/07/13

MD1-0-V-181-24-00002

Auxiliary Boiler Package Isometric Drawing

IC

DAVID

17/05/13

MD1-0-V-181-25-00001

Auxiliary Boiler Package Piping Support Plan(1of3) EL.0 ~ EL.4000

IC

DAVID

04/07/13

MD1-0-V-181-25-00002

Auxiliary Boiler Package Piping Support Plan(2of3) EL.8590 ~ ABOVE

IC

DAVID

04/07/13

MD1-0-V-181-25-00003

Auxiliary Boiler Package Piping Support Plan(3of3) EL.8590 ~ ABOVE

IC

DAVID

04/07/13

MD1-0-V-185-05-00015

PMI Procedure

IC

DAVID

31/05/13

MD1-0-V-185-05-00016

Inspection & Test Plan(ITP) for Shop Fabrication Tank

IC

DAVID

12/07/13

MD1-0-V-185-05-00017

Inspection & Test Procedure

IC

DAVID

31/05/13

MD1-0-V-185-05-00018

Hydro Test Procedure

IC

DAVID

31/05/13

MD1-0-V-185-05-00019

NDE Procedure

IC

DAVID

31/05/13

MD1-0-V-185-10-33001

Steam Vent Silencer for Start-up Flash Tank

IC

DAVID

06/06/13

MD1-0-V-185-10-44001

Steam Vent Silencer for Condensate Return Tank

IC

DAVID

06/06/13

MD1-0-V-191-01-10009

Boiler Feedwater Pump EOT Crane General Arrangement Drawings

DAVID

11/01/13

MD1-0-V-360-07-00701

Thermofluodynamic Calculation Report

DAVID

03/05/13

MD1-0-V-360-08-00942

Welding Procedure Specification(Type "1")

DAVID

12/06/13

MD1-0-V-360-08-00943

Welding Procedure Specification(Type "2")

IC

DAVID

12/06/13

MD1-0-V-360-08-00944

Welding Procedure Specification(Type "3")

DAVID

12/06/13

MD1-0-V-360-08-00945

Welding Procedure Specification(Type "4")

DAVID

12/06/13

MD1-0-V-360-08-00946

Welding Procedure Specification(Type "5")

DAVID

12/06/13

MD1-0-V-360-08-00947

Welding Procedure Specification(Type "6")

DAVID

12/06/13

MD1-0-V-360-08-00948

Welding Procedure Specification(Type "7")

DAVID

12/06/13

MD1-0-V-360-08-00949

Welding Procedure Specification(Type "8")

DAVID

12/06/13

MD1-0-V-400-05-00121

Shop Inspection and Test Plan for Alloy Pipe

DAVID

22/02/13

MD1-0-V-400-05-00127

WPS & PQR for Alloy Welded Pipe

DAVID

04/07/13

MD1-0-V-400-05-00521

Inspection & Test Plan For Alloy Wrought Fitting

DAVID

06/06/13

MD1-0-V-400-05-00523

Inspection and test plan for alloy 3d bend

IC

DAVID

23/05/13

MD1-0-V-400-05-00527

Inspection and Test Procedure for Alloy Forged Fitting

IC

DAVID

28/06/13

MD1-0-V-400-05-00529

Inspection and test procedure for carbon forged fitting

DAVID

05/06/13

MD1-0-V-400-05-00530

Inspection and Test Plan for Carbon Forged & Wrought Fitting

IC

DAVID

23/07/13

MD1-0-V-400-05-00531

Inspection and Test Procedure for Carbon Forged & Wrought Fitting

IC

DAVID

23/07/13

MD1-0-V-400-05-00533

Inspection and Test Plan for Stainless Steel Forged Fitting

IC

DAVID

23/07/13

MD1-0-V-400-05-00534

Inspection and Test Procedure for Stainless Steel Forged Fitting

IC

DAVID

23/07/13

MD1-0-V-400-05-01122

Inspection and Test Procedure for Groove Coupling & Fitting

IC

DAVID

17/01/13

MD1-0-V-400-05-01321

Inspection and Test Plan for Forged Valves (Manual & Auto)

IC

DAVID

16/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-400-05-02121

Inspection and Test Plan for Strainers

IC

AUTHORISED
DAVID

RECEIVED
23/05/13

MD1-0-V-400-10-02311

Outline Drawing for Flexible & Expansion Joint

DAVID

28/06/13

MD1-0-V-805-05-00024

Weld Procedures Specification (WPS) and Qualification Records (PQR)

DAVID

02/04/13

MD1-1-P-111-24-00001

Piping Isometric Drawing- Main Steam System (Unit #1)

DAVID

08/07/13

MD1-1-P-111-24-00011

Piping Isometric Drawing- Cold Reheat Steam System (Unit #1)

DAVID

08/07/13

MD1-1-P-111-24-00021

Piping Isometric Drawing- Hot Reheat Steam System (Unit #1)

DAVID

08/07/13

MD1-1-P-111-24-00031

Piping Isometric Drawing- Extraction Steam System (Unit #1)

DAVID

17/05/13

MD1-1-P-111-24-00041

Piping Isometric Drawing- Auxiliary Steam System (Unit #!1)

DAVID

25/06/13

MD1-1-P-112-24-00001

Piping Isometric Drawing- Steam Bypass System (Unit #1)

DAVID

08/07/13

MD1-1-P-114-24-00001

Piping Isometric Drawing- Feed Water Heater Drain & Vent System (Unit #1)

DAVID

17/05/13

MD1-1-P-121-24-00001

Piping Isometric Drawing- Feed Water System (Unit #1)

DAVID

17/05/13

MD1-1-P-122-24-00001

Piping Isometric Drawing- Condensate System (Unit #1)

DAVID

25/06/13

MD1-1-P-400-07-00001

Piping Stress Analysis Report- Main & Cold Reheat Steam with HP Bypass Sys-Unit1

DAVID

19/06/13

MD1-1-P-400-07-00002

Piping Stress Analysis Report- hot Reheat Steam with LP Bypass Sys.-Unit1

DAVID

19/06/13

MD1-1-P-400-07-00003

Piping Stress Analysis Report - Feed Water System

DAVID

29/05/13

MD1-1-P-411-23-00001

Pipe arrangement & support location drawing - boiler #1 area (1/5)

IC

DAVID

23/07/13

MD1-1-P-411-23-00002

Pipe arrangement & support location drawing - boiler #1 area (2/5)

IC

DAVID

23/07/13

MD1-1-P-411-23-00003

Pipe arrangement & support location drawing - boiler #1 area (3/5)

IC

DAVID

23/07/13

MD1-1-P-411-23-00004

Pipe arrangement & support location drawing - boiler #1 area (4/5)

IC

DAVID

23/07/13

MD1-1-P-411-23-00005

Pipe arrangement & support location drawing - boiler #1 area (5/5)

IC

DAVID

23/07/13

MD1-1-V-161-11-00005

U1bt1 steel structure shop detailings & member list

DAVID

25/02/13

MD1-1-V-161-11-00010

U1at2 handrail shop detailings & member list

DAVID

25/02/13

MD1-1-V-161-11-00013

U1bt1 handrail shop detailings & member list

DAVID

25/02/13

MD1-1-V-161-12-00002

Bolt List_u1at2

IC

DAVID

25/02/13

MD1-1-V-161-12-00003

Bolt list_u1at3

IC

DAVID

25/02/13

MD1-1-V-161-12-00005

Bolt list_u1bt1

IC

DAVID

25/02/13

MD1-1-V-161-54-41130

U1at3_grating erection drawing

IC

DAVID

25/02/13

MD1-1-V-161-54-42110

U1bt1_grating erection drawing

IC

DAVID

25/02/13

MD1-2-P-111-24-00001

Piping Isometric Drawing- Main & Reheat Steam System (Unit #2)

DAVID

08/07/13

MD1-2-P-111-24-00011

Piping Isometric Drawing- Cold Reheat Steam System (Unit #2)

DAVID

08/07/13

MD1-2-P-111-24-00021

Piping Isometric Drawing- Hot Reheat Steam System (Unit #2)

DAVID

08/07/13

MD1-2-P-111-24-00031

Piping Isometric Drawing- Extraction Steam System (Unit #2)

DAVID

17/05/13

MD1-2-P-111-24-00041

Piping Isometric Drawing- Auxiliary Steam System (Unit #2)

DAVID

25/06/13

MD1-2-P-112-24-00001

Piping Isometric Drawing- Steam Bypass System (Unit #2)

DAVID

08/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-2-P-114-24-00001

Piping Isometric Drawing- Feed Water Heater Drain & Vent System (Unit #2)

STS
I

AUTHORISED
DAVID

RECEIVED
17/05/13

MD1-2-P-121-24-00001

Piping Isometric Drawing- Feed Water System (Unit #2)

DAVID

17/05/13

MD1-2-P-122-24-00001

Piping Isometric Drawing- Condensate System (Unit #2)

DAVID

25/06/13

MD1-2-P-400-07-00001

Piping Stress Analysis Report- Main and cold Reheater Steam with HP Bypass Systm

DAVID

19/06/13

MD1-2-P-400-07-00002

Piping Stress Analysis Report- Hot Reheat Steam with LP Bypass System (Unit #2)

DAVID

19/06/13

MD1-2-P-400-07-00003

Piping Stress Analysis Report - Feed Water System

DAVID

29/05/13

MD1-2-P-411-23-00001

Pipe arrangement & support location drawing - boiler #2 area (1/5)

IC

DAVID

23/07/13

MD1-2-P-411-23-00002

Pipe arrangement & support location drawing - boiler #2 area (2/5)

IC

DAVID

23/07/13

MD1-2-P-411-23-00003

Pipe arrangement & support location drawing - boiler #2 area (3/5)

IC

DAVID

23/07/13

MD1-2-P-411-23-00004

Pipe arrangement & support location drawing - boiler #2 area (4/5)

IC

DAVID

23/07/13

MD1-2-P-411-23-00005

Pipe arrangement & support location drawing - boiler #2 area (5/5)

IC

DAVID

23/07/13

DISCIPLINE = MBOP, Mechanical Balance of Plant


MD1-0-C-370-06-00010

Hydraulic Calculation for C.W System

SUDIN

02/11/12

MD1-0-D-201-01-00201

Drainage Plan for Steam Turbine Building (1/2)

SUDIN

26/03/13

MD1-0-D-201-01-00202

Drainage Plan for Steam Turbine Building (2/2)

SUDIN

26/03/13

MD1-0-D-203-01-00201

Plumbing Plan for Central Control Building Ground Floor

SUDIN

01/03/13

MD1-0-D-203-01-00202

Plumbing Plan for Central Control Building 1st Floor

SUDIN

01/03/13

MD1-0-D-203-01-00203

Plumbing Plan for Central Control Building 2nd Floor

SUDIN

01/03/13

MD1-0-D-203-01-00204

Plumbing Plan for Central Control Building 3rd Floor

SUDIN

01/03/13

MD1-0-D-203-01-00205

Plumbing Plan for Central Control Building Roof

SUDIN

01/03/13

MD1-0-D-203-01-00301

Toilet Enlarged Plan for Central Control BLDG 2nd floor

SUDIN

01/03/13

MD1-0-D-203-01-00302

Toilet Enlarged Plan for Central Control BLDG 3rd floor

SUDIN

01/03/13

MD1-0-D-203-01-00303

Enlarged Plumbing Plan for Central Control Building Laboratory Room

SUDIN

01/03/13

MD1-0-D-203-21-00201

Plumbing P&I Diagram for Central Control Building

SUDIN

01/03/13

MD1-0-D-204-01-00201

Plumbing Plan for Coal Handling Control Building

SUDIN

12/07/13

MD1-0-D-204-01-00301

Enlarged Plumbing Plan for Coal Handling Control Building

SUDIN

12/07/13

MD1-0-D-205-01-00201

Plumbing Plan for Fuel Oil Pump House

SUDIN

14/05/13

MD1-0-D-205-01-00301

Enlarged Plumbing Plan for Fuel Oil Pump House

SUDIN

14/05/13

MD1-0-D-208-01-00201

Plumbing Plan for Ash Slurry Pump House

IC

SUDIN

17/07/13

MD1-0-D-208-01-00301

Enlarged Plumbing Plan for Ash Slurry Pump House

IC

SUDIN

17/07/13

MD1-0-D-212-01-00201

Plumbing plan for gaseous chlorination building

SUDIN

08/05/13

MD1-0-D-212-01-00301

Enlarged plumbing plan for gaseous chlorination building

SUDIN

08/05/13

MD1-0-D-215-21-00201

Plumbing P&I Diagram for Switchyard Control Building

SUDIN

16/11/12

MD1-0-D-216-01-00201

Plumbing Plan for Water Treatment BLDG

SUDIN

22/01/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-D-216-01-00301

Enlarged Plumbing Plan for Water Treatment BLDG

SUDIN

22/01/13

MD1-0-D-216-21-00201

Plumbing P&I Diagram for Water Treatment BLDG

SUDIN

22/01/13

MD1-0-D-250-01-00201

Plumbing Plan for Workshop Building

SUDIN

08/03/13

MD1-0-D-250-01-00301

Enlarged Plumbing Plan for Workshop Building

SUDIN

08/03/13

MD1-0-D-250-21-00201

Plumbing P&I Diagram for Workshop Building

SUDIN

08/03/13

MD1-0-D-252-01-00201

Plumbing Plan for I&C Electrical and Mechanical Warehouse

SUDIN

08/02/13

MD1-0-D-252-01-00301

Toilet Enlarged Plan for I&C Electrical and Mechanical Warehouse

SUDIN

08/02/13

MD1-0-D-252-21-00201

Plumbing P&I Diagram for I&C Electrical and Mechanical Warehouse

SUDIN

26/04/13

MD1-0-D-254-01-00201

Plumbing Plan for Administration Building Ground Floor

SUDIN

22/02/13

MD1-0-D-254-01-00202

Plumbing Plan for Administration Building 1st Floor

SUDIN

22/02/13

MD1-0-D-254-01-00203

Plumbing Plan for Administration Building 2nd Floor

SUDIN

22/02/13

MD1-0-D-254-01-00204

Plumbing Plan for Administration Building 3rd Floor

SUDIN

22/02/13

MD1-0-D-254-01-00205

Plumbing Plan for Administration Building Roof

SUDIN

04/01/13

MD1-0-D-254-01-00301

Enlarged Plumbing Plan for Administration Building Ground Floor (1/8)

SUDIN

22/02/13

MD1-0-D-254-01-00302

Enlarged Plumbing Plan for Administration Building Ground Floor (2/8)

SUDIN

22/02/13

MD1-0-D-254-01-00303

Enlarged Plumbing Plan for Administration Building 1st Floor (3/8)

SUDIN

22/02/13

MD1-0-D-254-01-00304

Enlarged Plumbing Plan for Administration Building 1st Floor (4/8)

SUDIN

22/02/13

MD1-0-D-254-01-00305

Enlarged Plumbing Plan for Administration Building 2nd Floor (5/8)

SUDIN

22/02/13

MD1-0-D-254-01-00306

Enlarged Plumbing Plan for Administration Building 2nd Floor (6/8)

SUDIN

22/02/13

MD1-0-D-254-01-00307

Enlarged Plumbing Plan for Administration Building 3rd Floor (7/8)

SUDIN

22/02/13

MD1-0-D-254-01-00308

Enlarged Plumbing Plan for Administration Building 3rd Floor (8/8)

SUDIN

22/02/13

MD1-0-D-254-21-00201

Plumbing P&I Diagram for Administration Building-1 (1 of 2)

SUDIN

22/02/13

MD1-0-D-254-21-00202

Plumbing P&I Diagram for Administration Building-1 (2 of 2)

SUDIN

22/02/13

MD1-0-D-254-21-00203

Plumbing P&I Diagram for Administration Building-2 (1 of 2)

SUDIN

22/02/13

MD1-0-D-254-21-00204

Plumbing P&I Diagram for Administration Building-2 (2 of 2)

SUDIN

22/02/13

MD1-0-D-255-01-00201

Portable Water Piping Plan for Common Service Building

SUDIN

06/03/13

MD1-0-D-255-01-00202

Sanitary Sewer & Vent Piping Plan for Common Service Building

SUDIN

06/03/13

MD1-0-D-255-21-00201

Plumbing P&I Diagram for Common Service Building

SUDIN

06/03/13

MD1-0-F-750-04-00001

Design Criteria for Fire Fighting & Fire Alarm System

SUDIN

14/09/12

MD1-0-F-750-06-00001

Fire Pump Sizing Calculation

SUDIN

14/09/12

MD1-0-F-750-06-00003

Clean Agent System hydraulic Calculation

SUDIN

13/06/13

MD1-0-F-750-21-00001

Drawing List for Fire Fighting System

SUDIN

14/09/12

MD1-0-F-750-21-00003

P&ID- Fire Water Distribution System

SUDIN

14/09/12

MD1-0-F-750-21-00004

P&ID- Indoor Hydrant System (Turbine Building)

SUDIN

14/09/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-F-750-21-00005

P&ID- Indoor Hydrant System (Unit 1A Boiler)

AUTHORISED
SUDIN

RECEIVED
14/09/12

MD1-0-F-750-21-00006

P&ID- Indoor Hydrant System (Unit 1B Boiler)

SUDIN

14/09/12

MD1-0-F-750-21-00007

P&ID- Indoor Hydrant System (Unit 2A Boiler)

SUDIN

14/09/12

MD1-0-F-750-21-00008

P&ID- Indoor Hydrant System (Unit 2B Boiler)

SUDIN

14/09/12

MD1-0-F-750-21-00009

P&ID- Indoor Hydrant & Hose Reel System

SUDIN

14/09/12

MD1-0-F-750-21-00010

P&ID- Indoor Hydrant System (Coal Transfer tower)

SUDIN

14/09/12

MD1-0-F-750-21-00011

P&ID- Indoor Hydrant & Hose Reel System (Car Garage)

SUDIN

14/09/12

MD1-0-F-750-21-00012

P&ID- Indoor Hydrant & Hose Reel System (Switchyard Control House)

SUDIN

14/09/12

MD1-0-F-750-21-00013

P&ID- Sprinkler & Indoor Hydrant System (Control Bldg)

SUDIN

14/09/12

MD1-0-F-750-21-00014

P&ID- Sprinkler & Indoor Hydrant System (Administration Bldg)

SUDIN

14/09/12

MD1-0-F-750-21-00015

P&ID- Sprinkler & Indoor Hydrant & Hose Reel System (I&C Electrical & Mech.)

SUDIN

14/09/12

MD1-0-F-750-21-00016

P&ID- Water Spray & Sprinkler System (Turbine Bldg)

SUDIN

14/09/12

MD1-0-F-750-21-00017

P&ID- Water Spray System (Boiler Air Heaters)

SUDIN

14/09/12

MD1-0-F-750-21-00018

P&ID- Water Spray System (Boiler Burners)

SUDIN

14/09/12

MD1-0-F-750-21-00019

P&ID- Water Spray, Sprinkler & Hose Reel Sys. (Hydrogent Plant Building)

SUDIN

26/09/12

MD1-0-F-750-21-00020

P&ID- Water Spray System (Unit 1 Transformer Area)

SUDIN

26/09/12

MD1-0-F-750-21-00021

P&ID- Water Spray System (Unit 2 Transformer Area)

SUDIN

26/09/12

MD1-0-F-750-21-00022

P&ID- Water Spray System (Station Aux. Transfermer (110KV Switchyard area)

SUDIN

26/09/12

MD1-0-F-750-21-00023

P&ID- Water Spray System (Fuel Oil Storage & Diesel Oil Storage Tank)

SUDIN

26/09/12

MD1-0-F-750-21-00024

P&ID- Foam & Hose Reel System

SUDIN

26/09/12

MD1-0-F-750-21-00025

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys.

SUDIN

04/01/13

MD1-0-F-750-21-00026

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Control Bldg, Electronic)

SUDIN

04/01/13

MD1-0-F-750-21-00027

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Coal Handling Control)

SUDIN

04/01/13

MD1-0-F-750-21-00028

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Coal Handling Control & Equi

SUDIN

26/09/12

MD1-0-F-750-21-00029

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Hydrogen Plant)

SUDIN

26/09/12

MD1-0-F-750-21-00030

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Unit 1 ESP Control House)

SUDIN

26/09/12

MD1-0-F-750-21-00031

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Unit 2 ESP Control House)

SUDIN

26/09/12

MD1-0-F-750-23-00001

Fire Fighting Layout For Underground Piping (Overall)

SUDIN

22/11/12

MD1-0-F-750-23-00002

Fire Fighting Layout For Underground Piping (1/17)

SUDIN

22/11/12

MD1-0-F-750-23-00003

Fire Fighting Layout For Underground Piping (2/17)

SUDIN

22/11/12

MD1-0-F-750-23-00004

Fire Fighting Layout For Underground Piping (3/17)

SUDIN

22/11/12

MD1-0-F-750-23-00005

Fire Fighting Layout For Underground Piping (4/17)

SUDIN

22/11/12

MD1-0-F-750-23-00006

Fire Fighting Layout For Underground Piping (5/17)

SUDIN

22/11/12

MD1-0-F-750-23-00007

Fire Fighting Layout For Underground Piping (6/17)

SUDIN

22/11/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-F-750-23-00008

Fire Fighting Layout For Underground Piping (7/17)

AUTHORISED
SUDIN

RECEIVED
22/11/12

MD1-0-F-750-23-00009

Fire Fighting Layout For Underground Piping (8/17)

SUDIN

22/11/12

MD1-0-F-750-23-00010

Fire Fighting Layout For Underground Piping (9/17)

SUDIN

22/11/12

MD1-0-F-750-23-00011

Fire Fighting Layout For Underground Piping (10/17)

SUDIN

22/11/12

MD1-0-F-750-23-00012

Fire Fighting Layout For Underground Piping (11/17)

SUDIN

22/11/12

MD1-0-F-750-23-00013

Fire Fighting Layout For Underground Piping (12/17)

SUDIN

22/11/12

MD1-0-F-750-23-00014

Fire Fighting Layout For Underground Piping (13/17)

SUDIN

22/11/12

MD1-0-F-750-23-00015

Fire Fighting Layout For Underground Piping (14/17)

SUDIN

22/11/12

MD1-0-F-750-23-00016

Fire Fighting Layout For Underground Piping (15/17)

SUDIN

22/11/12

MD1-0-F-750-23-00017

Fire Fighting Layout For Underground Piping (16/17)

SUDIN

22/11/12

MD1-0-F-750-23-00018

Fire Fighting Layout For Underground Piping (17/17)

SUDIN

22/11/12

MD1-0-F-750-23-00101

Fire Fighting Piping Plan for Steam Turbine Building (Ground Floor-1)

SUDIN

05/12/12

MD1-0-F-750-23-00102

Fire Fighting Piping Plan for Steam Turbine Building (Ground Floor-2)

SUDIN

05/12/12

MD1-0-F-750-23-00103

Fire Fighting Piping Plan for Steam Turbine Building (Mez Floor-1)

SUDIN

05/12/12

MD1-0-F-750-23-00104

Fire Fighting Piping Plan for Steam Turbine Building (Mez Floor-2)

SUDIN

05/12/12

MD1-0-F-750-23-00105

Fire Fighting Piping Plan for Steam Turbine Building (Operating Floor-1)

SUDIN

05/12/12

MD1-0-F-750-23-00106

Fire Fighting Piping Plan for Steam Turbine Building (Operating Floor-2)

SUDIN

05/12/12

MD1-0-F-750-23-00107

Fire Fighting Piping Plan for Boiler Unit 1A, 1B & 2B - 1

AC

SUDIN

26/06/13

MD1-0-F-750-23-00108

Fire Fighting Piping Plan for Boiler Unit 1A, 1B & 2B - 2

AC

SUDIN

26/06/13

MD1-0-F-750-23-00109

Fire Fighting Piping Plan for Boiler Unit 1A, 1B & 2B - 3

AC

SUDIN

26/06/13

MD1-0-F-750-23-00110

Fire Fighting Piping Plan for Boiler Unit 1A, 1B & 2B - 4

AC

SUDIN

26/06/13

MD1-0-F-750-23-00111

Fire Fighting Piping Plan for Boiler Unit 2A - 1

AC

SUDIN

26/06/13

MD1-0-F-750-23-00112

Fire Fighting Piping Plan for Boiler Unit 2A - 2

AC

SUDIN

26/06/13

MD1-0-F-750-23-00113

Fire Fighting Piping Plan for Boiler Unit 2A - 3

AC

SUDIN

26/06/13

MD1-0-F-750-23-00114

Fire Fighting Piping Plan for Boiler Unit 2A - 4

AC

SUDIN

26/06/13

MD1-0-F-750-23-00117

Fire Fighting Piping Plan for Central Control Building-Ground Floor

SUDIN

05/12/12

MD1-0-F-750-23-00118

Fire Fighting Piping Plan for Central Control Building- 1st Floor

SUDIN

05/12/12

MD1-0-F-750-23-00119

Fire Fighting Piping Plan for Central Control Building- 2nd Floor

SUDIN

05/12/12

MD1-0-F-750-23-00120

Fire Fighting Piping Plan for Central Control Building- 3rd Floor

SUDIN

05/12/12

MD1-0-F-750-23-00121

Fire Fighting Piping Plan for Central Control Bulding- Roof Floor

SUDIN

05/12/12

MD1-0-F-750-23-00122

Fire Fighting Piping Plan for Central ControlBuilding (Clean Agent System-1)

SUDIN

05/12/12

MD1-0-F-750-23-00123

Fire Fighting Piping Plan for Central Control Building (Clean Agent System-2)

SUDIN

05/12/12

MD1-0-F-750-23-00124

Fire Fighting Piping Plan for Central Control Building (Clean Agent System-3)

SUDIN

05/12/12

MD1-0-F-750-23-00125

Fire Fighting Piping Plan for Unit 1 Transformer

SUDIN

13/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-F-750-23-00126

Fire Fighting Piping Plan for Unit 1 Main Transformer-1

AUTHORISED
SUDIN

RECEIVED
13/06/13

MD1-0-F-750-23-00127

Fire Fighting Piping Plan for Unit 1 Main Transformer-2

SUDIN

13/06/13

MD1-0-F-750-23-00128

Fire Fighting Piping Plan for Unit 1 Main Transformer-3

SUDIN

13/06/13

MD1-0-F-750-23-00129

Fire Fighting Piping Plan for Unit 1 Unit Aux, Transformer

SUDIN

13/06/13

MD1-0-F-750-23-00130

Fire Fighting Piping Plan for Unit 2 Transformer

SUDIN

13/06/13

MD1-0-F-750-23-00131

Fire Fighting Piping Plan for Unit 2 Main Transformer-1

SUDIN

13/06/13

MD1-0-F-750-23-00132

Fire Fighting Piping Plan for Unit 2 Main Transformer-2

SUDIN

13/06/13

MD1-0-F-750-23-00133

Fire Fighting Piping Plan for Unit 2 Main Transformer-3

SUDIN

13/06/13

MD1-0-F-750-23-00134

Fire Fighting Piping Plan for Unit 2 Unit Aux. Transformer

SUDIN

13/06/13

MD1-0-F-750-23-00135

Fire Fighting Piping Plan for Steam Turbine Building (Dirty Lube Oil Tank)

SUDIN

05/12/12

MD1-0-F-750-23-00136

Fire Fighting Piping Plan for Unit 1 esp Control & ash elec. Building

SUDIN

10/07/13

MD1-0-F-750-23-00137

Fire Fighting Piping Plan for Unit 2 esp Control & ash elec. Building

SUDIN

10/07/13

MD1-0-F-750-23-00138

Fire fighting piping plan for ash slurry pump house(ground floor)

SUDIN

28/06/13

MD1-0-F-750-23-00143

Fire Fighting Piping Plan for Water Treatment Building

SUDIN

07/03/13

MD1-0-F-750-23-00145

Fire Fighting Piping Plan for Fire Protection Pump House-1

SUDIN

24/01/13

MD1-0-F-750-23-00146

Fire Fighting Piping Plan for Fire Protection Pump House-2

SUDIN

24/01/13

MD1-0-F-750-23-00148

Fire Fighting Piping Plan for Limestone Storage Building

SUDIN

17/07/13

MD1-0-F-750-23-00149

Fire fighting piping plan for fuel oil pump house

SUDIN

14/06/13

MD1-0-F-750-23-00150

Fire fighting piping plan for fuel oil storage tank-1

SUDIN

14/06/13

MD1-0-F-750-23-00151

Fire fighting piping plan for fuel oil storage tank-2

SUDIN

14/06/13

MD1-0-F-750-23-00152

Fire fighting piping plan for diesel oil storage tank

SUDIN

14/06/13

MD1-0-F-750-23-00153

Fire fighting piping section & detail for fuel oil and diesel oil storage tank

SUDIN

14/06/13

MD1-0-F-750-23-00154

Fire fighting piping plan for dike area(air foam system)

SUDIN

14/06/13

MD1-0-F-750-23-00155

Fire fighting piping plan for fuel oil storage tank-1(air foam system)

SUDIN

14/06/13

MD1-0-F-750-23-00156

Fire fighting piping plan for fuel oil storage tank-2(air foam system)

SUDIN

14/06/13

MD1-0-F-750-23-00157

Fire fighting piping plan for diesel oil storage tank(air foam system)

SUDIN

14/06/13

MD1-0-F-750-23-00159

Fire fighting piping plan for workshop building

SUDIN

10/06/13

MD1-0-F-750-23-00160

Fire Extinguisher Location Plan for Bulldozer Garage

SUDIN

13/03/13

MD1-0-F-750-23-00161

Fire extinguisher location plan for coal handling control building

SUDIN

17/07/13

MD1-0-F-750-23-00162

Fire fighting piping plan for coal handling control building(clean agent system)

SUDIN

17/07/13

MD1-0-F-750-23-00163

Fire Fighting Piping Plan for Coal Receiving Tower TT-01

RT

SUDIN

11/06/13

MD1-0-F-750-23-00164

Fire Fighting Piping Plan for Coal Transfer Tower TT-02

RT

SUDIN

11/06/13

MD1-0-F-750-23-00165

Fire Fighting Piping Plan for Coal Transfer Tower TT-03

RT

SUDIN

11/06/13

MD1-0-F-750-23-00166

Fire Fighting Piping Plan for Coal Transfer Tower TT-04

RT

SUDIN

11/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-F-750-23-00167

Fire Fighting Piping Plan for Coal Crusher Tower TT-05

RT

AUTHORISED
SUDIN

RECEIVED
11/06/13

MD1-0-F-750-23-00168

Fire Fighting Piping Plan for Coal Transfer Tower TT-06

RT

SUDIN

11/06/13

MD1-0-F-750-23-00169

Fire Fighting Piping Plan For I&C Electrical & Mechanical Warehouse

SUDIN

27/06/13

MD1-0-F-750-23-00170

Fire Fighting Piping Plan For Common Service Building

SUDIN

17/07/13

MD1-0-F-750-23-00171

Fire Fighting Piping Plan for Administration Building (Ground Floor)

SUDIN

05/12/12

MD1-0-F-750-23-00172

Fire Fighting Piping Plan for Administration Building (1st Floor)

SUDIN

05/12/12

MD1-0-F-750-23-00173

Fire Fighting Piping Plan for Administration Building (2nd Floor)

SUDIN

05/12/12

MD1-0-F-750-23-00174

Fire Fighting Piping Plan for Administration Building (3rd Floor)

SUDIN

05/12/12

MD1-0-F-750-23-00175

Fire Fighting Piping Plan for Administration Building (4th Floor)

SUDIN

05/12/12

MD1-0-F-750-23-00178

Fire Fighting Piping Plan for car Garage-3

SUDIN

13/03/13

MD1-0-F-750-23-00179

Fire Extinguisher Location Plan for Motorcycle & Bicycle Shed

SUDIN

30/07/13

MD1-0-F-750-23-00181

Fire Fighting Piping Plan for Switchyard Control House (Ground Floor)

SUDIN

07/03/13

MD1-0-F-750-23-00182

Fire Fighting Piping Plan for Switchyard Control House (1st Floor)

SUDIN

07/03/13

MD1-0-F-750-23-00183

Fire Fighting Piping Plan for Switchyard Control House (Clean Agent System-1)

SUDIN

07/03/13

MD1-0-F-750-23-00184

Fire Fighting Piping Plan for Switchyard Control House (Clean Agent System-2)

SUDIN

07/03/13

MD1-0-F-750-23-00185

Fire Fighting Piping Plan for Station Aux. Transformer (110KV Switchyard Area)

SUDIN

13/06/13

MD1-0-F-750-23-00186

Fire Extinguisher Location Plan for Cooling Water Pump House

SUDIN

24/04/13

MD1-0-F-750-23-00187

Fire Extinguisher Location Plan for Gasous Chlorination Building

SUDIN

07/03/13

MD1-0-F-750-23-00189

Fire Extinguisher Location Plan for Fuel Oil Unloading Pump House

SUDIN

13/06/13

MD1-0-F-750-23-00190

Fire Extinguisher Location Plan for Return Water Pump House

SUDIN

13/06/13

MD1-0-F-750-23-00191

Fire fighting piping plan for diesel generator house

SUDIN

19/06/13

MD1-0-F-750-23-00192

Fire Fighting Piping Plan for Unit 1 esp Control & ash elec. bldg(Clean agent)

SUDIN

10/07/13

MD1-0-F-750-23-00193

Fire Fighting Piping Plan for Unit 2 esp Control & ash elec. bldg(Clean agent)

SUDIN

10/07/13

MD1-0-F-750-23-00196

Standard Detail-1

AC

SUDIN

13/06/13

MD1-0-F-750-23-00197

Standard Detail-2

AC

SUDIN

13/06/13

MD1-0-F-750-23-00198

Pipe support detail

SUDIN

08/05/13

MD1-0-F-750-23-00199

Fire extinguisher location plan for ash slurry pump house(first floor)

SUDIN

28/06/13

MD1-0-F-750-24-00101

Fire Fighting Piping Isometric drawing for Underground Piping

SUDIN

08/02/13

MD1-0-F-750-24-00107

Fire Fighting Piping Isometric drawing for Central Control Building

SUDIN

25/06/13

MD1-0-F-750-24-00128

Fire Fighting Piping Isometric drawing for Common Service Building

SUDIN

25/06/13

MD1-0-F-750-24-00129

Fire Fighting Piping Isometric drawing for Administration Building

SUDIN

25/06/13

MD1-0-F-750-24-00134

Fire Fighting Piping Isometric drawing for Switchyard Control House

SUDIN

25/06/13

MD1-0-H-201-01-00201

HVAC Plan for Steam Turbine Building Ground Floor (1/2)

SUDIN

23/05/13

MD1-0-H-201-01-00202

HVAC Plan for Steam Turbine Building Ground Floor (2/2)

SUDIN

23/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-H-201-01-00203

HVAC Plan for Steam Turbine Building Mezzanine Floor (1/2)

SUDIN

23/05/13

MD1-0-H-201-01-00204

HVAC Plan for Steam Turbine Building Mezzanine Floor (2/2)

SUDIN

23/05/13

MD1-0-H-201-01-00205

HVAC Plan for Steam Turbine Building Operation Floor (1/2)

SUDIN

23/05/13

MD1-0-H-201-01-00206

HVAC Plan for Steam Turbine Building Operation Floor (2/2)

SUDIN

23/05/13

MD1-0-H-201-01-00207

HVAC Plan for Steam Turbine Building Roof (1/2)

SUDIN

23/05/13

MD1-0-H-201-01-00208

HVAC Plan for Steam Turbine Building Roof (2/2)

SUDIN

23/05/13

MD1-0-H-201-01-00209

Enlarged HVAC Plan for Steam Turbine Building AVR Room-1,2

SUDIN

23/05/13

MD1-0-H-201-01-00210

Enlarged HVAC Plan for Steam Turbine Building Sampling Room-1,2

SUDIN

23/05/13

MD1-0-H-201-08-00101

Equipment List for Steam Turbine Building

SUDIN

23/05/13

MD1-0-H-201-21-00201

HVAC P&I Diagram for Steam Turbine Building

SUDIN

10/12/12

MD1-0-H-203-01-00201

HVAC Plan for Central Control Building Ground Floor- Duct

SUDIN

01/03/13

MD1-0-H-203-01-00202

HVAC Plan for Central Control Building 1st Floor- Duct

SUDIN

01/03/13

MD1-0-H-203-01-00203

HVAC Plan for Central Control Building 2nd Floor- Duct

SUDIN

01/03/13

MD1-0-H-203-01-00204

HVAC Plan for Central Control Building 3rd Floor- Duct

SUDIN

01/03/13

MD1-0-H-203-01-00205

HVAC Plan for Central Control Building Roof- Duct

SUDIN

01/03/13

MD1-0-H-203-01-00206

HVAC Enlarged Plan for Central Control Building HVAC Room-1

SUDIN

01/03/13

MD1-0-H-203-01-00207

HVAC Enlarged Plan for Central Control Building HVAC Room-2

SUDIN

01/03/13

MD1-0-H-203-01-00208

HVAC Enlarged Plan for Central Control Building 2nd Floor-Piping

SUDIN

01/03/13

MD1-0-H-203-01-00209

HVAC Plan for Central Control Building 3rd Floor- Piping

SUDIN

01/03/13

MD1-0-H-203-01-00210

HVAC Plan for Central Control Building Roof- Piping

SUDIN

01/03/13

MD1-0-H-203-08-00101

Equipment List for Central Control Building-1

SUDIN

01/03/13

MD1-0-H-203-08-00102

Equipment List for Central Control Building-2

SUDIN

01/03/13

MD1-0-H-203-21-00201

HVAC P&I Diagram for Central Control Building-Duct (1/4)

SUDIN

22/01/13

MD1-0-H-203-21-00202

HVAC P&I Diagram for Central Control Building-Duct (2/4)

SUDIN

22/01/13

MD1-0-H-203-21-00203

HVAC P&I Diagram for Central Control Building-Duct (3/4)

SUDIN

22/01/13

MD1-0-H-203-21-00204

HVAC P&I Diagram for Central Control Building-Duct (4/4)

SUDIN

22/01/13

MD1-0-H-203-21-00205

HVAC P&I Diagram for Central Control Building-Piping

SUDIN

22/01/13

MD1-0-H-204-01-00201

HVAC Plan for Coal Handling Control Building Ground Floor

SUDIN

27/05/13

MD1-0-H-204-08-00101

Equipment List for Coal Handling Control Building

SUDIN

27/05/13

MD1-0-H-204-21-00201

HVAC P&I Diagram for Coal handling Control Building

SUDIN

19/06/13

MD1-0-H-205-01-00201

HVAC Plan for Fuel Oil Pump House Ground Floor

SUDIN

08/02/13

MD1-0-H-205-01-00202

HVAC Plan for Fuel Oil Pump House Ground Floor

SUDIN

08/02/13

MD1-0-H-205-08-00101

Equipment List for Fuel Oil Pump House

SUDIN

08/02/13

MD1-0-H-205-21-00201

HVAC P&I Diagram for Fuel Oil Pump House

SUDIN

02/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-H-207-01-00201

HVAC P&I Diagram for Fire Protection Pump House Ground Floor Duct Plan

SUDIN

05/02/13

MD1-0-H-207-08-00101

Equipment List for Fire Protection Pump House

SUDIN

05/02/13

MD1-0-H-207-21-00201

HVAC P&I Diagram for Fire Protection Pump House

SUDIN

05/02/13

MD1-0-H-208-01-00201

Hvac plan for ash slurry pump house ground floor

SUDIN

22/03/13

MD1-0-H-208-01-00202

Hvac plan for ash slurry pump house crane runway floor

SUDIN

22/03/13

MD1-0-H-208-01-00203

Hvac plan for ash slurry pump house first floor

SUDIN

22/03/13

MD1-0-H-208-08-00101

Equipment list for ash slurry pump house

SUDIN

22/03/13

MD1-0-H-208-21-00201

Hvac p&i diagram for ash slurry pump house

SUDIN

26/04/13

MD1-0-H-209-01-00201

HVAC Plan for ESP Control & ASH Elec. Building-1 Ground Floor

SUDIN

02/04/13

MD1-0-H-209-01-00202

HVAC Plan for ESP Control & ASH Elec. Building-1 First Floor

SUDIN

02/04/13

MD1-0-H-209-01-00203

HVAC Plan for ESP Control & ASH Elec. Building-1 Roof

SUDIN

02/04/13

MD1-0-H-209-01-00204

HVAC Plan for ESP Control & ASH Elec. Building-2 Ground Floor

SUDIN

02/04/13

MD1-0-H-209-01-00205

HVAC Plan for ESP Control & ASH Elec. Building-2 First Floor

SUDIN

02/04/13

MD1-0-H-209-01-00206

HVAC Plan for ESP Control & ASH Elec. Building-2 Roof

SUDIN

02/04/13

MD1-0-H-209-08-00101

Equipment List for ESP Control & ASH Elec. Building-1

SUDIN

02/04/13

MD1-0-H-209-08-00102

Equipment List for ESP Control & ASH Elec. Building-2

SUDIN

02/04/13

MD1-0-H-209-21-00201

HVAC P&I Diagram for ESP Control & ASH Elec.Building-1

SUDIN

02/04/13

MD1-0-H-209-21-00202

HVAC P&I Diagram for ESP Control & ASH Elec. Building-2

SUDIN

02/04/13

MD1-0-H-210-01-00201

Hvac plan for diesel generator house ground floor

SUDIN

22/03/13

MD1-0-H-210-01-00202

Hvac plan for diesel generator house roof

SUDIN

22/03/13

MD1-0-H-210-08-00101

Equipment list for diesel generator house

SUDIN

22/03/13

MD1-0-H-210-21-00201

Hvac p&i diagram for diesel generator house

SUDIN

26/04/13

MD1-0-H-211-01-00201

Hvac plan for cooling water pump house ground floor

SUDIN

22/03/13

MD1-0-H-211-01-00202

Hvac plan for cooling water pump house roof

SUDIN

22/03/13

MD1-0-H-211-08-00101

Equipment list for cooling water pump house

SUDIN

22/03/13

MD1-0-H-211-21-00201

Hvac p&i diagram for cooling water pump house

SUDIN

26/04/13

MD1-0-H-212-01-00201

HVAC Plan for Gaseous Chlorination Building Ground Floor

SUDIN

02/04/13

MD1-0-H-212-01-00202

HVAC Plan for Gaseous Chlorination Building Roof

SUDIN

02/04/13

MD1-0-H-212-08-00101

Equipment List for Gaseous Chlorination Building

SUDIN

02/04/13

MD1-0-H-212-21-00201

HVAC P&I Diagram for Gaseous Chlorination Building

SUDIN

02/04/13

MD1-0-H-213-01-00201

Hvac plan for fuel unloading pump house ground floor

SUDIN

11/04/13

MD1-0-H-213-01-00202

Hvac plan for fuel unloading pump house roof

SUDIN

11/04/13

MD1-0-H-213-08-00101

Equipment list for fuel oil unloading pump house

SUDIN

11/04/13

MD1-0-H-213-21-00201

Hvac p&i diagram for fuel oil unloading pump house

SUDIN

14/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-H-215-01-00201

HVAC Plan for Switchyard Control Building Ground Floor

AUTHORISED
SUDIN

RECEIVED
17/12/12

MD1-0-H-215-01-00202

HVAC Plan for Switchyard Control Building 1st Floor

SUDIN

17/12/12

MD1-0-H-215-01-00203

HVAC Plan for Switchyard Control Building Roof

SUDIN

17/12/12

MD1-0-H-215-08-00101

Equipment List for Switchyard Control Building

SUDIN

17/12/12

MD1-0-H-215-21-00201

HVAC P&I Diagram for Switchyard Control Building

SUDIN

01/10/12

MD1-0-H-216-01-00201

HVAC Plan for Water Treatment BLDG Ground Floor

SUDIN

20/03/13

MD1-0-H-216-01-00202

HVAC Plan for Water Treatment BLDG Roof

SUDIN

22/01/13

MD1-0-H-216-01-00203

HVAC Plan for Water Treatment Area Waste Water Pond Pump Room

SUDIN

20/03/13

MD1-0-H-216-08-00101

Equipment List for Water Treatment Building

SUDIN

20/03/13

MD1-0-H-216-21-00201

HVAC P&I Diagram for Water Treatment Building

SUDIN

22/01/13

MD1-0-H-217-01-00201

HVAC Plan for Limestone Handling SYS. Control Building Ground Floor

SUDIN

23/05/13

MD1-0-H-217-08-00101

Equipment List for Limestone Handling SYS. Control Building

SUDIN

23/05/13

MD1-0-H-217-21-00201

HVAC P&I Diagram for Limestone Handling SYS. Control Building

SUDIN

19/06/13

MD1-0-H-219-01-00201

Hvac plan for limestorne storage shed. ground floor

SUDIN

02/04/13

MD1-0-H-219-01-00202

Hvac plan for limestorne storage shed. roof

SUDIN

02/04/13

MD1-0-H-219-08-00101

Equipment list for limestorne storage shed

SUDIN

02/04/13

MD1-0-H-219-21-00201

Hvac p&i diagram for limestorne storage shed

SUDIN

02/04/13

MD1-0-H-250-01-00201

HVAC Plan for Workshop Building Ground Floor

SUDIN

08/03/13

MD1-0-H-250-01-00202

HVAC Plan for Workshop Building Roof

SUDIN

08/03/13

MD1-0-H-250-08-00101

Equipment List for Workshop Building

SUDIN

08/03/13

MD1-0-H-250-21-00201

HVAC P&I Diagram for Workshop Building

SUDIN

08/03/13

MD1-0-H-251-01-00201

HVAC Plan for Bulldozer Garage

SUDIN

27/03/13

MD1-0-H-252-01-00201

HVAC Plan for I&C Electrical and Mechnical Warehouse Ground Floor

SUDIN

08/02/13

MD1-0-H-252-01-00202

HVAC Plan for I&C Electrical and Mechnical Warehouse Roof Plan

SUDIN

08/02/13

MD1-0-H-252-08-00101

Equipment List for I&C Electrical & Mechnical Warehouse

SUDIN

08/02/13

MD1-0-H-252-21-00201

HVAC P&I Diagram for I&C Electrical & Mechanical Warehouse

SUDIN

26/04/13

MD1-0-H-254-01-00201

HVAC Plan for Administration Building Ground Floor- Duct

SUDIN

27/03/13

MD1-0-H-254-01-00202

HVAC Plan for Administration Building 1st Floor- Duct

SUDIN

27/03/13

MD1-0-H-254-01-00203

HVAC Plan for Administration Building 2nd Floor- Duct

SUDIN

27/03/13

MD1-0-H-254-01-00204

HVAC Plan for Administration Building 3rd Floor- Duct

SUDIN

27/03/13

MD1-0-H-254-01-00205

HVAC Plan for Administration Building 4th Floor- Duct

SUDIN

19/12/12

MD1-0-H-254-01-00206

HVAC Plan for Administration Building Roof- Duct

SUDIN

19/12/12

MD1-0-H-254-01-00207

HVAC Plan for Administration Building Auditorium Floor- Duct

SUDIN

22/02/13

MD1-0-H-254-01-00208

HVAC Plan for Administration Building Auditorium Roof- Duct

SUDIN

22/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-H-254-01-00301

HVAC Plan for Administration Building Ground Floor- Piping

AUTHORISED
SUDIN

RECEIVED
22/02/13

MD1-0-H-254-01-00302

HVAC Plan for Administration Building 1st Floor- Piping

SUDIN

19/12/12

MD1-0-H-254-01-00303

HVAC Plan for Administration Building 2nd Floor- Piping

SUDIN

22/02/13

MD1-0-H-254-01-00304

HVAC Plan for Administration Building 3rd Floor- Piping

SUDIN

19/12/12

MD1-0-H-254-01-00305

HVAC Plan for Administration Building 4th Floor- Piping

SUDIN

19/12/12

MD1-0-H-254-01-00306

HVAC Plan for Administration Building Auditorium Floor- Piping

SUDIN

22/02/13

MD1-0-H-254-01-00307

HVAC Plan for Administration Building Auditorium Roof- Piping

SUDIN

19/12/12

MD1-0-H-254-01-00401

HVAC Room-1 Enlarged Duct Plan for Administration Building

SUDIN

22/02/13

MD1-0-H-254-01-00402

HVAC Room-2 Enlarged Duct Plan for Administration Building

SUDIN

22/02/13

MD1-0-H-254-01-00501

HVAC Room-1 Enlarged Piping Plan for Administration Building

SUDIN

22/02/13

MD1-0-H-254-01-00502

HVAC Room-2 Enlarged Piping Plan for Administration Building

SUDIN

22/02/13

MD1-0-H-254-08-00101

Equipment List for Administration Building-1

SUDIN

19/12/12

MD1-0-H-254-08-00102

Equipment List for Administration Building-2

SUDIN

22/02/13

MD1-0-H-254-08-00103

Equipment List for Administration Building-3

SUDIN

22/02/13

MD1-0-H-254-21-00201

HVAC P&I Diagram for Administration Building- Duct (1/5)

SUDIN

19/12/12

MD1-0-H-254-21-00202

HVAC P&I Diagram for Administration Building- Duct (2/5)

SUDIN

19/12/12

MD1-0-H-254-21-00203

HVAC P&I Diagram for Administration Building- Duct (3/5)

SUDIN

19/12/12

MD1-0-H-254-21-00204

HVAC P&I Diagram for Administration Building- Duct (4/5)

SUDIN

19/12/12

MD1-0-H-254-21-00205

HVAC P&I Diagram for Administration Building- Duct (5/5)

SUDIN

19/12/12

MD1-0-H-254-21-00206

HVAC P&I Diagram for Administration Building- Piping

SUDIN

19/12/12

MD1-0-H-255-01-00201

HVAC Plan for Common Service Building Ground Floor

SUDIN

06/03/13

MD1-0-H-255-01-00202

HVAC Plan for Common Service Building Roof

SUDIN

06/03/13

MD1-0-H-255-08-00201

Equipment List 1- for Common Service Building

SUDIN

06/03/13

MD1-0-H-255-08-00202

Equipment List 2- for Common Service Building

SUDIN

06/03/13

MD1-0-H-255-21-00201

HVAC P&I Diagram for Common Service Building

SUDIN

25/04/13

MD1-0-H-257-01-00201

HVAC Plan for Car Garage-1,2,3

SUDIN

27/03/13

MD1-0-H-710-04-00101

Design Criteria for HVAC system

SUDIN

20/11/12

MD1-0-H-710-06-00201

HVAC Load Calculation for Steam Turbine Building

SUDIN

25/01/13

MD1-0-H-710-06-00204

HVAC Load Calculation for Coal Handling Control Building

SUDIN

27/05/13

MD1-0-H-710-06-00205

HVAC Load Calculation for Fuel Oil Pump House

SUDIN

08/02/13

MD1-0-H-710-06-00208

Hvac load calculation for diesel generator house

SUDIN

22/03/13

MD1-0-H-710-06-00209

HVAC Load Calculation for ESP Control & ASH Elec. Building-1,2

SUDIN

02/04/13

MD1-0-H-710-06-00210

Hvac load calculation for ash slurry pump hosue

SUDIN

22/03/13

MD1-0-H-710-06-00211

HVAC Load Calculation for Central Control Building

SUDIN

01/03/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-H-710-06-00212

HVAC Load Calculation for Gaseous Chlorination Building

SUDIN

02/04/13

MD1-0-H-710-06-00215

HVAC Load Calculation for Switchyard Control House

SUDIN

07/02/13

MD1-0-H-710-06-00217

HVAC Load Calculation for Limestone Handling SYS. Control Building

SUDIN

23/05/13

MD1-0-H-710-06-00221

HVAC Load Calculation for Water Treatment Building

SUDIN

22/01/13

MD1-0-H-710-06-00250

HVAC Load Calculation for Workshop Building

SUDIN

08/03/13

MD1-0-H-710-06-00254

HVAC Load Calculation for Administration Building

SUDIN

22/02/13

MD1-0-H-710-06-00255

HVAC Load Calculation for Common Service Building

SUDIN

31/01/13

MD1-0-H-710-06-00256

HVAC Load Calculation for I&C Electrical & Mechanical Warehouse

SUDIN

08/02/13

MD1-0-H-710-08-00001

Drawing List for HVAC & Plumbing System

SUDIN

23/04/12

MD1-0-H-710-08-00002

Symbol & Legend & Abbreviation for HVAC System

SUDIN

31/01/13

MD1-0-H-710-08-00003

Symbol & Legend & Abbreviation for Plumbing System

SUDIN

31/01/13

MD1-0-H-710-11-00001

General Standard Detail for HVAC Duct (1/4)

SUDIN

27/12/12

MD1-0-H-710-11-00002

General Standard Detail for HVAC Duct (2/4)

SUDIN

27/12/12

MD1-0-H-710-11-00003

General Standard Detail for HVAC Duct (3/4)

SUDIN

27/12/12

MD1-0-H-710-11-00004

General Standard Detail for HVAC Duct (4/4)

SUDIN

19/06/13

MD1-0-H-710-11-00011

General Standard Detail for HVAC Piping (1/2)

SUDIN

27/12/12

MD1-0-H-710-11-00012

General Standard Detail for HVAC Piping (2/2)

SUDIN

08/03/13

MD1-0-H-710-11-00021

General Standard Detail for Plumbing

SUDIN

27/12/12

MD1-0-M-130-03-00001

System Description- Circulating Water System

SUDIN

30/07/13

MD1-0-M-130-06-00001

Calculation- Circulating Water System

SUDIN

25/02/13

MD1-0-M-130-07-00001

Report for CW System Surge Analysis

SUDIN

14/03/13

MD1-0-M-130-21-00011

P & I Diagram- Circulating Water System (1/4)

SUDIN

04/01/13

MD1-0-M-130-21-00012

P & I Diagram- Circulating Water System (2/4)

SUDIN

04/01/13

MD1-0-M-130-21-00013

P & I Diagram- Circulating Water System (3/4)

SUDIN

04/01/13

MD1-0-M-130-21-00014

P & I Diagram- Circulating Water System (4/4)

SUDIN

04/01/13

MD1-0-M-130-22-00011

Flow Diagram- Circulating Water System (1/2)

SUDIN

22/02/13

MD1-0-M-130-22-00012

Flow Diagram- Circulating Water System (2/2)

SUDIN

22/02/13

MD1-0-M-130-22-00021

Flow Diagram- Aux. Cooling Water System

SUDIN

04/03/13

MD1-0-M-140-06-00001

Calculation- Closed Cooling Water System

SUDIN

06/02/13

MD1-0-M-140-21-00011

P & I Diagram- Closed Cooling Water System(1/4)

RT

SUDIN

26/04/13

MD1-0-M-140-21-00012

P & I diagram - closed cooling water system (2/4)

SUDIN

26/04/13

MD1-0-M-140-21-00013

P & I diagram - closed cooling water system (3/4)

SUDIN

26/04/13

MD1-0-M-140-21-00014

P & I diagram - closed cooling water system (4/4)

SUDIN

26/04/13

MD1-0-M-140-21-00021

P & I Diagram- Service Water Distribution System

SUDIN

10/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-M-140-21-00022

P & I Diagram- Demin. Water Distribution System

AUTHORISED
SUDIN

RECEIVED
10/12/12

MD1-0-M-140-21-00023

P & I Diagram- Filtered Water Distribution System

SUDIN

12/04/13

MD1-0-M-140-22-00011

Flow Diagram- Closed Cooling NG Water System

SUDIN

03/04/13

MD1-0-M-150-06-00001

Calculation- Compressed Air System

SUDIN

18/12/12

MD1-0-M-150-21-00021

P & I Diagram- Instrument Air Distribution System

SUDIN

19/12/12

MD1-0-M-150-21-00031

P & I Diagram- Service Air Distribution System

SUDIN

19/12/12

MD1-0-M-150-21-00051

P & I Diagram- N2 Gas System

SUDIN

13/03/13

MD1-0-M-150-22-00011

Flow Diagram- Compressed Air Supply System

SUDIN

06/02/13

MD1-0-M-160-21-00011

P & I Diagram- Heavy Fuel Oil Unloading System

SUDIN

13/03/13

MD1-0-M-160-21-00012

P & I Diagram- Heavy Fuel Oil Supply System (1/2)

SUDIN

19/12/12

MD1-0-M-160-21-00013

P & I Diagram- Heavy Fuel Oil Supply System (2/2)

AC

SUDIN

08/05/12

MD1-0-M-160-21-00014

P & I Diagram- Heavy Fuel Oil Drain System

SUDIN

19/12/12

MD1-0-M-160-21-00015

P & I Diagram- HFO Heating Steam System

SUDIN

19/12/12

MD1-0-M-160-21-00021

P & I Diagram- Diesel Oil System

SUDIN

19/12/12

MD1-0-M-160-21-00030

P & I Diagram - Steam Coil Air Heater Drain System (1/2)

SUDIN

30/07/13

MD1-0-M-160-21-00031

P & I Diagram- Steam Coil Air Heater System (2/2)

SUDIN

11/04/13

MD1-0-M-160-22-00011

Flow Diagram- Heavy Fuel Oil Unloading System

SUDIN

13/03/13

MD1-0-M-160-22-00012

Flow Diagram- Heavy Fuel Oil Supply System

SUDIN

06/02/13

MD1-0-M-160-22-00013

Flow Diagram- HFO Heating Steam System

SUDIN

06/02/13

MD1-0-M-160-22-00021

Flow Diagram- Diesel Oil System

SUDIN

06/02/13

MD1-0-M-170-22-00011

Flow Diagram- Coal handling System

SUDIN

27/12/12

MD1-0-M-170-22-00021

Flow Diagram- Bottom Ash Handling System

SUDIN

21/01/13

MD1-0-M-170-22-00022

Flow Diagram- Fly Ash Handling System

SUDIN

21/01/13

MD1-0-M-170-22-00023

Flow Diagram- Ash Slurry Disposal and Water Return System

SUDIN

21/01/13

MD1-0-M-170-22-00024

Flow Diagram- Sand Filling and Bed Ash Rebedding System

SUDIN

27/03/13

MD1-0-M-170-22-00031

Flow Diagram- Limestone Handling System

DAVID

23/01/13

MD1-0-M-170-22-00032

Flow Diagram- Limestone Grinding System

DAVID

23/01/13

MD1-0-M-171-06-00001

Calculation- Coal Handling System

SUDIN

22/02/13

MD1-0-M-172-06-00001

Calculation- Limestone Handling System

SUDIN

22/02/13

MD1-0-M-173-06-00001

Calculation- Ash Handling System

SUDIN

25/02/13

MD1-0-M-180-06-00001

Calculation for Field Erected Tank Capacity

SUDIN

10/12/12

MD1-0-M-180-21-00011

P & I Diagram- Oily Waste Drainage System

SUDIN

28/06/13

MD1-0-M-180-21-00012

P & I Diagram- Oily Waste Drainage System (2 of 2)

SUDIN

12/04/13

MD1-0-M-180-21-00021

P & I Diagram- Chemical Waste Drainage System (1/3)

SUDIN

12/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-M-180-21-00022

P & I Diagram- Chemical Waste Drainage System (2/3)

AUTHORISED
SUDIN

RECEIVED
12/04/13

MD1-0-M-180-21-00023

P & I Diagram- Chemical Waste Drainage System (3/3)

SUDIN

12/04/13

MD1-0-M-180-21-00024

P & i diagram - coal transfer tower area drainage system

SUDIN

08/07/13

MD1-0-M-180-21-00025

P & i diagram - limestone transfer tower area drainage system

SUDIN

08/07/13

MD1-0-M-180-21-00031

P & I Diagram- Seawater Drainage System

SUDIN

12/04/13

MD1-0-M-180-21-00041

P & I Diagram- Dirty Oil Transfer System

SUDIN

19/12/12

MD1-0-P-151-24-00001

Piping Isometric Drawing - Instrument Air System

SUDIN

31/01/12

MD1-0-P-151-24-00011

Piping Isometric Drawing - Service Air System

SUDIN

31/01/13

MD1-0-P-153-24-00001

Piping Isometric Drawing - N2 Gas Distribution System

SUDIN

25/06/13

MD1-0-P-165-24-00001

Piping isometric drawing - fuel oil system

SUDIN

22/02/13

MD1-0-P-400-23-00001

Pipe Arrangement & Support Location Drawing Index

SUDIN

26/04/13

MD1-0-P-413-01-00001

General Arrangement Drawing- Ash Slurry Pump House & Ash Silo, Mixing Tanks Area

SUDIN

11/04/13

MD1-0-P-413-23-00001

Pipe Arrangement & Support Location Drawing - Fly Ash Silo and Mixing Tank Area

SUDIN

19/06/13

MD1-0-P-415-01-00001

General Arrangement Drawing-Aux. Boiler & Service Gas(CO2/N2) Storage Shelter

SUDIN

21/02/13

MD1-0-P-425-01-00001

General Arrangement Drawing- Diesel Generator House

SUDIN

11/04/13

MD1-0-P-435-01-00001

General Arrangement Drawing- Coal Yard Area

SUDIN

11/04/13

MD1-0-P-440-01-00001

General Arrangement Drawing- Water Treatment & Water Storage Tanks Area

SUDIN

21/02/13

MD1-0-P-440-23-00001

Pipe arrangement & support location drawing - water treatment area (1/2)

IC

SUDIN

17/07/13

MD1-0-P-440-23-00002

Pipe arrangement & support location drawing - water treatment area (2/2)

IC

SUDIN

17/07/13

MD1-0-P-445-01-00001

General Arrangement Drawing- Fuel Oil Tanks Area

SUDIN

21/02/13

MD1-0-P-445-23-00001

Pipe arrangement & support location drawing - fuel oil storage tanks & transfer)

SUDIN

28/05/13

MD1-0-P-445-23-00002

Pipe arrangement & support location drawing - fuel oil storage tanks & transfer)

SUDIN

28/05/13

MD1-0-P-450-01-00001

General Arrangement Drawing- Cooling Water Pump House & Gaseous Chlorination BLG

SUDIN

11/04/13

MD1-0-P-470-01-00001

General Arrang. Drawing- Fuel Oil Unload. Pump House & Limestone Unload Jetty

SUDIN

11/04/13

MD1-0-P-475-07-00001

Stress Analysis Report - Ash Slurry Pipe for MD2 Discharge Canal

SUDIN

12/06/13

MD1-0-P-475-23-00001

Pipe arrangement & support location drawing - yard area (1)

SUDIN

10/05/13

MD1-0-P-475-23-00002

Pipe arrangement & support location drawing - yard area (2)

SUDIN

10/05/13

MD1-0-P-475-23-00003

Pipe arrangement & support location drawing - yard area (3)

SUDIN

10/05/13

MD1-0-P-475-23-00004

Pipe arrangement & support location drawing - yard area (4)

SUDIN

10/05/13

MD1-0-P-475-23-00005

Pipe arrangement & support location drawing - yard area (5)

SUDIN

10/05/13

MD1-0-P-475-23-00006

Pipe arrangement & support location drawing - yard area (6)

SUDIN

10/05/13

MD1-0-P-475-23-00007

Pipe arrangement & support location drawing - yard area (7)

SUDIN

10/05/13

MD1-0-P-475-23-00008

Pipe arrangement & support location drawing - yard area (8)

SUDIN

10/05/13

MD1-0-P-475-23-00009

Pipe arrangement & support location drawing - yard area (9)

SUDIN

10/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-P-475-23-00010

Pipe arrangement & support location drawing - yard area (10)

STS
I

AUTHORISED
SUDIN

RECEIVED
10/05/13

MD1-0-P-475-23-00011

Pipe Arrangement & Support Location Drawing - Yard Area (11)

SUDIN

10/05/13

MD1-0-P-475-23-00012

Pipe Arrangement & Support Location Drawing - Yard Area (12)

SUDIN

19/06/13

MD1-0-P-475-23-00013

Pipe Arrangement & Support Location Drawing - Yard Area (13)

SUDIN

19/06/13

MD1-0-P-475-57-00001

Pipe loading for sleeper(1/14)

SUDIN

26/04/13

MD1-0-P-475-57-00002

Pipe loading for sleeper(2/14)

SUDIN

26/04/13

MD1-0-P-475-57-00003

Pipe loading for sleeper(3/14)

SUDIN

26/04/13

MD1-0-P-475-57-00004

Pipe loading for sleeper(4/14)

SUDIN

26/04/13

MD1-0-P-475-57-00005

Pipe loading for sleeper(5/14)

SUDIN

26/04/13

MD1-0-P-475-57-00006

Pipe loading for sleeper(6/14)

SUDIN

26/04/13

MD1-0-P-475-57-00007

Pipe loading for sleeper(7/14)

SUDIN

26/04/13

MD1-0-P-475-57-00008

Pipe loading for sleeper(8/14)

SUDIN

26/04/13

MD1-0-P-475-57-00009

Pipe loading for sleeper(9/14)

SUDIN

26/04/13

MD1-0-P-475-57-00010

Pipe loading for sleeper(10/14)

SUDIN

26/04/13

MD1-0-P-475-57-00011

Pipe loading for sleeper(11/14)

SUDIN

26/04/13

MD1-0-P-475-57-00012

Pipe loading for sleeper(12/14)

SUDIN

26/04/13

MD1-0-P-475-57-00013

Pipe loading for sleeper(13/14)

SUDIN

26/04/13

MD1-0-P-475-57-00014

Pipe loading for sleeper(14/14)

SUDIN

26/04/13

MD1-0-P-480-23-00001

Pipe Arrangement & Support Location Drawing - Yard Pipe Rack (1/5)

SUDIN

02/05/13

MD1-0-P-480-23-00002

Pipe Arrangement & Support Location Drawing - Yard Pipe Rack (2/5)

SUDIN

02/05/13

MD1-0-P-480-23-00003

Pipe Arrangement & Support Location Drawing - Yard Pipe Rack (3/5)

SUDIN

02/05/13

MD1-0-P-480-23-00004

Pipe Arrangement & Support Location Drawing - Yard Pipe Rack (4/5)

SUDIN

02/05/13

MD1-0-P-480-23-00005

Pipe Arrangement & Support Location Drawing - Yard Pipe Rack (5/5)

SUDIN

02/05/13

MD1-0-P-480-57-00001

Pipe loading for pipe rack(1/2)

SUDIN

26/04/13

MD1-0-P-480-57-00002

Pipe loading for pipe rack(2/2)

SUDIN

26/04/13

MD1-0-P-490-23-00001

Pipe arrangement & support location drawing - diesel oil storage tank area

SUDIN

28/05/13

MD1-0-P-821-24-00001

Piping Isometric Drawing - Demi Water System

SUDIN

31/01/13

MD1-0-P-831-24-00001

Piping Isometric Drawing - Potable Water System

SUDIN

31/01/13

MD1-0-P-832-24-00001

Piping Isometric Drawing - Service Water System

SUDIN

31/01/13

MD1-0-P-861-24-00001

Piping Isometric Drawing - Gaseous Chlorination System

SUDIN

01/07/13

MD1-0-P-871-24-00001

Piping Isometric Drawing - Sewage Treatment System

SUDIN

25/06/13

MD1-0-T-030-05-00070

ITP for Field Erected Tank

SUDIN

03/10/12

MD1-0-T-030-05-00071

ITP for Steel Structure Erection

SUDIN

03/10/12

MD1-0-T-030-05-00073

ITP for Under Ground Piping

SUDIN

03/10/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-T-030-05-00120

ITP for UG Piping of HDPE

AUTHORISED
SUDIN

RECEIVED
03/10/12

MD1-0-T-030-05-00241

Inspection & Test Plan for HVAC Duct Works

SUDIN

05/12/12

MD1-0-T-030-05-00242

Inspection & Test Plan for Plumbing and Piping of Building

SUDIN

22/11/12

MD1-0-T-030-05-00458

ITP for Bulk Handling system

AC

SUDIN

19/06/13

MD1-0-T-052-07-00257

Material Approval Request for Paint (KCC)

RT

BINH

15/11/12

MD1-0-T-053-05-00121

Method Statement for Field erected tank

SUDIN

02/11/12

MD1-0-T-053-05-00126

Method Statement for Crane & Hoist

SUDIN

18/01/13

MD1-0-T-053-05-00146

Method Statement for Steel Structure Packing (DAEJOO)

IC

BINH

28/12/12

MD1-0-T-053-05-00147

Method Statement for Inspection & Test (DAEJOO)

BINH

28/12/12

MD1-0-T-053-05-00175

Method statement for tower crane

SUDIN

22/02/13

MD1-0-T-053-05-00185

Method statement for coal handling system

IC

SUDIN

28/03/13

MD1-0-T-053-05-00256

Method Statement for Steel Structure Galvanizing (DAEJOO)

IC

SUDIN

24/12/12

MD1-0-T-053-05-00267

Method Statement for Bolt Tightening

SUDIN

24/01/13

MD1-0-T-053-05-00372

Method statement for field erected tank painting work

SUDIN

29/05/13

MD1-0-T-053-07-00231

Material Approval Request for Steel Structure Paint (International Paint Korea)

AC

BINH

25/02/13

MD1-0-T-053-07-00253

Material Approval Request for Bolt

AC

BINH

06/12/12

MD1-0-T-053-07-00265

Material Approval Request for PEB Paint

RT

BINH

06/02/13

MD1-0-T-053-07-00281

Material Approval Request for PEB Steel Plate (Kirby)

RT

BINH

25/12/12

MD1-0-T-053-07-00282

Material Approval Request for PEB Cold Formed Sections (Kirby)

AC

BINH

25/12/12

MD1-0-T-053-07-00284

Material Approval Request for PEB Circular Hollow Section (Kirby)

RT

BINH

25/12/12

MD1-0-T-053-07-00336

Material Approval Request for Paint (Underside Surface of Tank Bottom Plate)

MAX

14/01/13

MD1-0-T-054-05-00270

Procedure of Job Site Lamination Joint For GRP Pipes

SUDIN

10/12/12

MD1-0-T-054-05-00335

NSTRUCITON For GRP MATERIAL INDUCTION AND LAMINATION TRAINING

SUDIN

21/02/13

MD1-0-T-054-05-00434

painting packing and transportation of pipe spool

IC

SUDIN

31/05/13

MD1-0-T-054-07-00371

Material approval request for paint (ag fire fighting piping system)

SUDIN

27/03/13

MD1-0-T-057-05-00216

Method Statement of HVAC Duct Works

SUDIN

12/11/12

MD1-0-T-057-05-00217

Method Statement of Plumbing Work

SUDIN

06/06/13

MD1-0-T-057-05-00218

Method Statement of Refrigerant Piping Works

SUDIN

27/12/12

MD1-0-T-057-07-00153

Material Approval Request for U-PVC (BINH MINH)

AC

BINH

28/12/12

MD1-0-T-057-07-00235

Material Approval Request for Duct Fiture (HVAC, Samkwang)

RT

BINH

19/12/12

MD1-0-T-057-07-00236

Material Approval Request for SR Joint (HVAC, Seowon)

AC

BINH

11/12/12

MD1-0-T-057-07-00239

Material Approval Request for Pipe Fitting (HVAC, Hanwool)

RT

SUDIN

05/11/12

MD1-0-T-057-07-00271

Material Approval Request for Copper Tube Pipe (Nung Won)

BINH

30/11/12

MD1-0-T-057-07-00272

Material Approval Request for Copper Tube Pipe Fitting (Jung Woo)

SUDIN

30/11/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-T-057-07-00274

Material Approval Request for Galvanized Steel Sheet (POSCO)

AC

AUTHORISED
BINH

RECEIVED
11/12/12

MD1-0-T-057-07-00293

Material Approval Request for Insulation (KCC)

AC

BINH

05/12/12

MD1-0-T-057-07-00299

Material Approval Request for HVAC Valve (HS VALVE)

RT

BINH

05/12/12

MD1-0-T-057-07-00317

Material Approval Request for HVAC Butterfly Valve (Jeong Do)

RT

SUDIN

18/12/12

MD1-0-T-057-07-00318

Material Appoval Request for Sound Attenuator (NSV)

SUDIN

04/02/13

MD1-0-T-057-07-00319

Material Approval Request for U-PVC (Tien Phong)

RT

BINH

11/12/12

MD1-0-T-057-07-00322

Material Approval Request for Flexible Duct Hose (DAEHAN F&S)

RT

BINH

19/12/12

MD1-0-T-750-04-00041

Fire Fighting System & Fire Alarm System Design Basis

SUDIN

08/06/12

MD1-0-V-111-09-00407

H2&CO2 Gas System Design Data

SUDIN

07/11/12

MD1-0-V-113-10-00045

Condenser - cw expansion joint datasheet

SUDIN

10/06/13

MD1-0-V-115-05-00009

Deaerator and storage tank, nde procedure

SUDIN

23/04/13

MD1-0-V-121-05-00012

Inspection and Test Procedure for Fluid Coupling

SUDIN

18/01/13

MD1-0-V-122-08-00014

Sub-Supplier List for Condensate Extraction Pump

SUDIN

28/05/13

MD1-0-V-131-01-00001

Mechanical Outline Drawing For CWP

SUDIN

14/11/12

MD1-0-V-131-01-00003

Sectional Drawing

SUDIN

14/11/12

MD1-0-V-131-01-00004

Piping Arrangement Drawing for Circulating Water Pumps

SUDIN

13/06/13

MD1-0-V-131-02-00001

Shop test and inspection plan for circulating water pumps

SUDIN

10/04/13

MD1-0-V-131-03-00001

System Design and Operational Description

RT

SUDIN

13/06/13

MD1-0-V-131-05-00002

Hydrostatic Test Procedure for Circulating Water Pumps

SUDIN

05/12/12

MD1-0-V-131-05-00004

Liquid Penetrant Examination Procedure for Welds

SUDIN

17/07/13

MD1-0-V-131-05-00005

Site Installtion Procedure

IC

SUDIN

30/07/13

MD1-0-V-131-05-00006

Factory acceptance test procedures

SUDIN

02/05/13

MD1-0-V-131-05-00007

Quality assurance manual for circulating water pumps

SUDIN

07/03/13

MD1-0-V-131-05-00008

Painting procedure

SUDIN

22/02/13

MD1-0-V-131-05-00009

Circulating Water Pumphouse Hydraulic Model Test Procedure

SUDIN

27/12/12

MD1-0-V-131-05-00010

WPS and PQR for Circulating Water Pumps

SUDIN

22/02/13

MD1-0-V-131-05-00011

Liquid Penetrant Examination Procedure for Castings

SUDIN

08/02/13

MD1-0-V-131-05-00015

Repair Welding Procedure for Casings

SUDIN

17/07/13

MD1-0-V-131-07-00005

Circulating Water Pumphouse Hydraulic Model Test Report

IC

SUDIN

29/05/13

MD1-0-V-131-08-00002

Sub-Supplier List for Circulating Water Pumps

SUDIN

26/06/13

MD1-0-V-131-08-00015

Welder Qualification Record for Circulating Water Pumps

SUDIN

22/02/13

MD1-0-V-131-08-00029

Packing Procedure

IC

SUDIN

06/06/13

MD1-0-V-131-09-00002

Technical data sheet for circulating water pump

SUDIN

13/06/13

MD1-0-V-131-10-00001

Mechanical Outline Drawing for CWP

SUDIN

16/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-131-10-00009

Site Erection and Installtion Drawing

IC

AUTHORISED
SUDIN

RECEIVED
08/07/13

MD1-0-V-131-11-00001

Name plate drawing with engraving details

SUDIN

26/02/13

MD1-0-V-131-11-00004

Bearing drawing with cooling water system technical data

SUDIN

22/02/13

MD1-0-V-131-11-00006

Detail of coupling parts

SUDIN

22/02/13

MD1-0-V-131-21-00001

Piping and Instrument Diagram for CWP

SUDIN

14/11/12

MD1-0-V-132-02-00063

Sea water intake facility - piping material classification

SUDIN

25/04/13

MD1-0-V-132-03-00009

Sea water intake facility - system description

AC

SUDIN

25/02/13

MD1-0-V-132-05-00037

Welding Book for Seawater Intake Facilities

SUDIN

30/07/13

MD1-0-V-132-05-00038

Quality inspection and test plan for seawater intake facilities

SUDIN

03/04/13

MD1-0-V-132-05-00041

Sea Water Intake Facility - Method Statement for Sea Water Intake Facility

SUDIN

16/07/13

MD1-0-V-132-08-00002

Sea water intake facility - utility consumption list

SUDIN

10/04/13

MD1-0-V-132-08-00005

Sea Water Intake Facility - Supplier List

SUDIN

17/07/13

MD1-0-V-132-08-00032

Sea water intake facility - valve list

SUDIN

02/05/13

MD1-0-V-132-08-00040

Sea water intake facility - painting procedure

SUDIN

24/04/13

MD1-0-V-132-08-00050

Sea Water Intake Facility - Commissioning Spare Parts List

SUDIN

27/06/13

MD1-0-V-132-09-00008

Sea water intake facility - equipment data sheet

SUDIN

02/05/13

MD1-0-V-132-09-00084

Sea Water Intake Facility - Screen Wash Pump Curves & Data Sheet

SUDIN

19/06/13

MD1-0-V-132-10-00012

Travelling trash rack rake - monorail assembly

SUDIN

29/04/13

MD1-0-V-132-10-00018

Sea water intake facility - stop log guide scraper assembly

SUDIN

29/04/13

MD1-0-V-132-10-00021

Trash and waste transport system assembly

SUDIN

29/04/13

MD1-0-V-132-10-00022

Stop logs storage assembly

SUDIN

29/04/13

MD1-0-V-132-10-00023

Sea water intake facility - trash and waste water transport system, trash contay

SUDIN

29/04/13

MD1-0-V-132-11-00013

Travelling trash rack rake - rake assembly

SUDIN

29/04/13

MD1-0-V-132-11-00014

Travelling trash rack rake - ele. wire rope hoist ass.y

SUDIN

29/04/13

MD1-0-V-132-11-00025

Travelling band screen - chain guide assembly

SUDIN

29/04/13

MD1-0-V-132-11-00027

Travelling band screen - filtering panel assembly

SUDIN

29/04/13

MD1-0-V-132-11-00028

Travelling band screen - internal washing plant assembly

SUDIN

29/04/13

MD1-0-V-132-11-00029

Travelling band screen - cover & hopper assembly

SUDIN

29/04/13

MD1-0-V-132-11-00030

Travelling band screen - driving group assembly

SUDIN

29/04/13

MD1-0-V-132-11-00031

Sea Water Intake Facility - External Washing Plant Assembly

SUDIN

19/06/13

MD1-0-V-132-21-00006

Sea Water Intake Facility P & ID

SUDIN

09/04/13

MD1-0-V-133-01-00001

Water box vacuum pump ganeral arrangement drawing

SUDIN

17/05/13

MD1-0-V-133-02-00010

Water Box Vacuum Pump Performance Curve

SUDIN

10/04/13

MD1-0-V-133-02-00012

Heat Exchanger Data Sheet and Drawing

SUDIN

10/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-133-03-00004

Water Box Vacuum Pump System Description

RT

AUTHORISED
SUDIN

RECEIVED
13/06/13

MD1-0-V-133-05-00025

Water Box Vacuum Pump Painting Procedure

SUDIN

17/05/13

MD1-0-V-133-05-00026

Water box vacuum pump packing procedure

SUDIN

23/05/13

MD1-0-V-133-05-00027

Water box vacuum pump hydro test procedure

SUDIN

23/05/13

MD1-0-V-133-05-00028

Water Box Vacuum Pump PKG Performance Test Procedure

SUDIN

30/07/13

MD1-0-V-133-05-00031

Water Box Vacuum Pump WPS & PQR

SUDIN

28/05/13

MD1-0-V-133-05-00033

Operation & maintenance manual

SUDIN

17/05/13

MD1-0-V-133-05-00043

Water Box Vacuum Pump Site Testing and Commissioning Procedure

SUDIN

17/05/13

MD1-0-V-133-06-00013

Water box vacuum pump strength calculation sheet

SUDIN

17/05/13

MD1-0-V-133-08-00007

Water box vacuum pump equipment list

SUDIN

17/05/13

MD1-0-V-133-08-00017

Water box vacuum pump valve list

SUDIN

25/04/13

MD1-0-V-133-08-00029

Lubrication List

SUDIN

12/07/13

MD1-0-V-133-08-00030

Utility consumption list

SUDIN

14/05/13

MD1-0-V-133-08-00035

Spare Parts List (2Years)

IC

SUDIN

08/07/13

MD1-0-V-133-08-00042

Water Box Vacuum Pump Sub Vender List

SUDIN

10/07/13

MD1-0-V-133-09-00009

Water box vacuum pump data sheet

SUDIN

28/05/13

MD1-0-V-133-11-00008

Water box vacuum pump name plate drawing

SUDIN

25/04/13

MD1-0-V-133-11-00011

Water Box Vacuum Pump Sectional Drawing

SUDIN

28/05/13

MD1-0-V-134-01-00015

Piping layout drawing of ball strainer (dn 1650)

SUDIN

13/06/13

MD1-0-V-134-01-00022

Inspection and Test Plan for Workshop - Tube Cleaning System

SUDIN

23/05/13

MD1-0-V-134-02-00041

Painting Schedule - Condenser Tube Cleaning System

SUDIN

28/05/13

MD1-0-V-134-05-00023

Quality Assurance Manual - Tube Cleaning System

SUDIN

23/05/13

MD1-0-V-134-05-00024

Inspection and Test Procedure - Tube Cleaning System

SUDIN

23/05/13

MD1-0-V-134-05-00025

NDT Procedures - Tube Cleaning System

SUDIN

23/05/13

MD1-0-V-134-08-00037

Equipment List for Condenser Tube Cleaning System

SUDIN

28/05/13

MD1-0-V-134-09-00012

Ball Recirculation pump data & Characteristic Curves

SUDIN

16/05/13

MD1-0-V-134-11-00006

Equipment Outline Drawng of Ball Strainer (DN 1650)

SUDIN

02/11/12

MD1-0-V-134-11-00008

Equipment Outline Drawng of Ball Recirculating Pump Skid, Ball Vessel & Ball Skd

SUDIN

02/11/12

MD1-0-V-134-11-00010

Equipment outline drawing of ball injection nozzle & v-piece

SUDIN

06/06/13

MD1-0-V-134-21-00005

P&I Diagram, Condenser Tube Cleaning System

SUDIN

13/06/13

MD1-0-V-135-01-00010

Piping layout drawing of debris filter (dn 1650)

SUDIN

06/06/13

MD1-0-V-135-01-00015

Inspection & Test Plan for Workshop - Debris Filter

SUDIN

22/05/13

MD1-0-V-135-05-00016

Quality Assurance Manual - Debris Filter

SUDIN

22/05/13

MD1-0-V-135-05-00017

Inspection Test Procedure - Debris Filter

SUDIN

22/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-135-05-00018

NDT Procedures - Debris Filter

STS
I

AUTHORISED
SUDIN

RECEIVED
22/05/13

MD1-0-V-135-08-00030

Equipment List for Debris Filter

SUDIN

28/05/13

MD1-0-V-135-09-00022

Technical data sheet for df

AC

SUDIN

06/06/13

MD1-0-V-135-11-00006

Equipment Outline Drawing of Debris Filter- DN 1650

SUDIN

10/04/13

MD1-0-V-135-21-00005

P&I Diaram, Debris Filter

SUDIN

06/06/13

MD1-0-V-141-01-00001

Assembly Drawing

SUDIN

26/11/12

MD1-0-V-141-01-00002

General Arrangement Drawing for Self Cleanning Filter

SUDIN

26/11/12

MD1-0-V-141-03-00001

Control System Description, Autho Filter

SUDIN

06/11/12

MD1-0-V-141-05-00001

Operation and Maintenance Manuals, CCW Cooler

SUDIN

02/05/13

MD1-0-V-141-05-00002

Quality assurance manual, ccw cooler

SUDIN

22/02/13

MD1-0-V-141-05-00003

Inspection test plan, ccw cooler

SUDIN

22/02/13

MD1-0-V-141-05-00004

Inspection test procedure, ccw cooler

SUDIN

22/02/13

MD1-0-V-141-05-00006

Painting schedule, ccw cooler

SUDIN

22/02/13

MD1-0-V-141-05-00007

Welding book(wps/pqr/wqr/weld map), ccw cooler

SUDIN

22/02/13

MD1-0-V-141-05-00009

Manufacturing Quality Control Procedures for Auto Filter of CCWC

SUDIN

23/05/13

MD1-0-V-141-05-00010

Hydrotest procedure, auto filter

SUDIN

22/02/13

MD1-0-V-141-05-00012

Painting schedule, auto filter

SUDIN

22/02/13

MD1-0-V-141-05-00013

Rubber-lining Procedure and Data Sheets, Auto Filter

SUDIN

23/05/13

MD1-0-V-141-05-00015

Operation and Maintenance Manual for Auto Filter

SUDIN

02/05/13

MD1-0-V-141-08-00003

Master Spare Parts List (Contract & Recommended), CCW Cooler

SUDIN

23/11/12

MD1-0-V-141-08-00004

Master Special Tools List, CCW Cooler

SUDIN

23/11/12

MD1-0-V-141-08-00006

Closed Cooling Water Cooler- Equipment List

SUDIN

06/11/12

MD1-0-V-141-08-00008

Auto Filter- Equipment List

SUDIN

06/11/12

MD1-0-V-141-08-00009

Erection & Commissioning Spare Parts, Auto Filter

IC

SUDIN

23/11/12

MD1-0-V-141-08-00011

Inspection & Test Plan, Auto Filter

SUDIN

23/05/13

MD1-0-V-141-08-00012

Loading data for auto filter

SUDIN

02/04/13

MD1-0-V-141-08-00017

Valve list for auto filter

SUDIN

22/02/13

MD1-0-V-141-08-00020

Utilities Consumptions- Auto Filter

SUDIN

08/11/12

MD1-0-V-141-09-00001

Technical Data According to the Contractor's Form, CCW Cooler

SUDIN

15/03/13

MD1-0-V-141-09-00002

Valve data, ccw cooler

SUDIN

22/02/13

MD1-0-V-141-09-00004

Technical Data Sheet for Self Cleaning Filter

SUDIN

26/04/13

MD1-0-V-141-11-00001

Name plate drawings for ccw cooler

SUDIN

22/02/13

MD1-0-V-141-11-00002

Name plate drawing, auto filter

SUDIN

03/04/13

MD1-0-V-141-21-00001

Piping & Instrumentation Diagram for Self Cleaning Filter

SUDIN

07/11/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-141-32-00001

Start up & Shut Down Block Diagram, Auto Filter

STS
I

AUTHORISED
SUDIN

RECEIVED
06/11/12

MD1-0-V-141-55-00001

Strength Calculations

SUDIN

07/11/12

MD1-0-V-141-55-00002

Calculation notes for auto filter

SUDIN

02/04/13

MD1-0-V-141-55-00003

Thermal calculation sheet, ccw cooler

SUDIN

13/03/13

MD1-0-V-142-01-00001

General arrangement drawing for service water pump

SUDIN

27/03/13

MD1-0-V-142-01-00002

Sectional drawing for service water pump

SUDIN

27/03/13

MD1-0-V-142-01-10001

General arrangement drawing for closed cooling water pump

SUDIN

27/03/13

MD1-0-V-142-01-10002

Sectional drawing for closed cooling water pump

SUDIN

27/03/13

MD1-0-V-142-01-20002

Sectional drawing for demi. water transfer pump

SUDIN

27/03/13

MD1-0-V-142-01-30001

General arrangement drawing for condensate make up pump

SUDIN

27/03/13

MD1-0-V-142-01-30002

Sectional drawing for condensate make-up pump

SUDIN

27/03/13

MD1-0-V-142-01-40001

General arrangement drawing for auxiliary cooling water booster pump

SUDIN

27/03/13

MD1-0-V-142-01-40002

Sectional drawing for auxiliary cooling water booster pump

SUDIN

27/03/13

MD1-0-V-142-01-50001

General arrangement drawing for steam coil air heater drain pump

IC

SUDIN

27/03/13

MD1-0-V-142-01-50002

Sectional drawing for steam coil air heater drain pump

SUDIN

27/03/13

MD1-0-V-142-01-60001

General arrangement drawing for diesel oil drain pump

SUDIN

27/03/13

MD1-0-V-142-01-60002

Sectional drawing for diesel oil drain pump

SUDIN

27/03/13

MD1-0-V-142-01-70001

General arrangement drawing for boiler initial filling & warm-up recirculation p

SUDIN

27/03/13

MD1-0-V-142-01-70002

Sectional drawing for boiler initial filling & warm-up recirculation pump

SUDIN

27/03/13

MD1-0-V-142-01-80001

General arrangement drawing for dirty oil transfer pump

SUDIN

27/03/13

MD1-0-V-142-01-80002

Sectional drawing for dirty oil transfer pump

SUDIN

27/03/13

MD1-0-V-142-01-90001

General arrangement drawing for dirty oil drain pump

SUDIN

27/03/13

MD1-0-V-142-01-90002

Sectional drawing for dirty oil drain pump

SUDIN

27/03/13

MD1-0-V-142-05-00003

Quality manual

IC

SUDIN

10/04/13

MD1-0-V-142-05-00005

Painting procedure for general service pumps(horizontal)

SUDIN

08/05/13

MD1-0-V-142-06-00001

Calculation Sheet for Service Water Pump

SUDIN

25/04/13

MD1-0-V-142-06-10001

Calculation Sheet for Closed Cooling Water Pump

SUDIN

25/04/13

MD1-0-V-142-06-20001

Calculation Sheet for Demi. Water Transfer Pump

SUDIN

25/04/13

MD1-0-V-142-06-30001

Calculation Sheet for Condensate Make-up Pump

SUDIN

25/04/13

MD1-0-V-142-06-40001

Calculation Sheet for Auxiliary Cooling Water Booster Pump

SUDIN

25/04/13

MD1-0-V-142-06-50001

Calculation Sheet for Steam Coil Air Heater Drain Pump

IC

SUDIN

25/04/13

MD1-0-V-142-06-60001

Calculation Sheet for Diesel Oil Drain Pump

SUDIN

25/04/13

MD1-0-V-142-06-70001

Calculation Sheet for Deaerator Recirculation Pump

SUDIN

25/04/13

MD1-0-V-142-06-80001

Calculation Sheet for Dirty Oil Transfer Pump

SUDIN

25/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

MD1-0-V-142-06-90001

Calculation Sheet for Dirty Oil Drain Pump

MD1-0-V-142-09-00004

MD1-0-V-142-09-10004

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

SUDIN

25/04/13

Pump data sheet & performance curve for service water pump

AC

SUDIN

22/03/13

Pump data sheet & performance curve for closed cooling water pump

AC

SUDIN

22/03/13

MD1-0-V-142-09-20004

Pump data sheet & performance curve for demi. water transfer pump

AC

SUDIN

22/03/13

MD1-0-V-142-09-30004

Pump data sheet & performance curve for condensate make-up pump

AC

SUDIN

22/03/13

MD1-0-V-142-09-40004

Pump data sheet & performance curve for auxiliary cooling water booster pump

AC

SUDIN

22/03/13

MD1-0-V-142-09-50004

Pump data sheet & performance curve for steam coil air heater drain pump

AC

SUDIN

22/03/13

MD1-0-V-142-09-60004

Pump data sheet & performance curve for diesel oil drain pump

AC

SUDIN

22/03/13

MD1-0-V-142-09-70004

Pump data sheet & performance curve for boiler initial filling & warm-up recircp

AC

SUDIN

22/03/13

MD1-0-V-142-09-80004

Pump data sheet & performance curve for dirty oil transfer pump

AC

SUDIN

22/03/13

MD1-0-V-142-09-90004

Pump data sheet & performance curve for dirty oil drain pump

AC

SUDIN

22/03/13

MD1-0-V-142-11-00001

Name Plate Drawings

SUDIN

11/04/13

MD1-0-V-151-01-00006

Air Compressor- General Arangement Drawing

IC

SUDIN

16/11/12

MD1-0-V-151-05-00028

Air Compressor - Inspection and Test Procedure

SUDIN

28/06/13

MD1-0-V-151-08-00021

Air Compressor - Equipment List

SUDIN

13/06/13

MD1-0-V-151-08-00022

Air compressor - utility consumption list

SUDIN

12/04/13

MD1-0-V-151-08-00027

AIR COMPRESSOR, INSPECTION AND TEST PLAN

SUDIN

10/07/13

MD1-0-V-151-09-00015

Air Compressor - Technical Data Sheet

SUDIN

13/06/13

MD1-0-V-151-21-00008

Air Compressor- Overall P&I Diagram

IC

SUDIN

03/04/13

MD1-0-V-151-21-00009

Air Compressor- P&ID For Air Compressor

IC

SUDIN

03/04/13

MD1-0-V-151-21-00010

Air Compressor- P&ID For Air Dryer

IC

SUDIN

03/04/13

MD1-0-V-151-21-00033

Air Compressor- Symbol & Legend For P&I Diagram

SUDIN

03/04/13

MD1-0-V-151-57-00026

Air Compressor - Name Plates Drawing

SUDIN

13/06/13

MD1-0-V-153-01-00001

General Arrangement DWG for N2 Supply System

IC

SUDIN

04/12/12

MD1-0-V-153-01-00003

Test and Inspection Plan for Service Gas System

SUDIN

25/06/13

MD1-0-V-153-02-00001

Valve Specification for Service Gas System

AC

SUDIN

13/06/13

MD1-0-V-153-02-00002

Cylinder specification for service gas system

AC

SUDIN

25/02/13

MD1-0-V-153-05-00001

Packing Procedure for Service Gas System

SUDIN

13/06/13

MD1-0-V-153-05-00002

NDE(PT)Procedure for Service Gas System

SUDIN

25/06/13

MD1-0-V-153-05-00004

Test and inspection procedure for service gas system

IC

SUDIN

25/04/13

MD1-0-V-153-08-00003

Sub Supplier List for Service Gas System

SUDIN

13/06/13

MD1-0-V-153-08-00004

Instrument List For Service Gas System

SUDIN

13/06/13

MD1-0-V-153-08-00005

Valve List for Service Gas System

SUDIN

13/06/13

MD1-0-V-153-08-00007

Painting Schedule for Service Gas System

SUDIN

25/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-153-08-00010

Terminal point list for service gas system

STS
I

AUTHORISED
SUDIN

RECEIVED
25/02/13

MD1-0-V-153-09-00001

Technical bid data for service gas system

AC

SUDIN

25/02/13

MD1-0-V-153-10-00001

Assembly DRWG for N2 Supply System

IC

SUDIN

03/12/12

MD1-0-V-153-10-00002

Assembly DRWG for N2 Supply System

IC

SUDIN

03/12/12

MD1-0-V-153-10-00003

Assembly DRWG for N2 Supply System

IC

SUDIN

03/12/12

MD1-0-V-153-10-00004

Name Plate for Service Gas System

SUDIN

13/06/13

MD1-0-V-153-21-00001

Others (P&ID For N2 Supply System)

IC

SUDIN

03/12/12

MD1-0-V-161-01-19185

Equipment Maintenance Monorail

IC

SUDIN

30/07/13

MD1-0-V-161-06-01104

Calculation Report- Tripper Bridge

IC

SUDIN

22/11/12

MD1-0-V-166-05-00001

Inspection & test procedure for fuel oil heater

SUDIN

08/05/13

MD1-0-V-166-05-00002

Inspection & Test Plan for Fuel Oil Heater

SUDIN

12/07/13

MD1-0-V-166-05-00003

WPS & PQR

SUDIN

12/07/13

MD1-0-V-166-05-00004

Nde procedure for fuel oil heater

SUDIN

08/05/13

MD1-0-V-166-06-00001

Strength calculation for fuel unloading heater

SUDIN

14/03/13

MD1-0-V-166-06-00002

Strength calculation for fuel oil heater level 1

SUDIN

14/03/13

MD1-0-V-166-06-00003

Strength calculation for fuel oil heater level 2

SUDIN

14/03/13

MD1-0-V-166-06-00004

Strength calculation for fuel oil cooler

SUDIN

14/03/13

MD1-0-V-166-09-00001

Technical Data Sheet

SUDIN

18/01/13

MD1-0-V-166-10-00101

General Assembly for Fuel Oil Unloading Heater

SUDIN

18/01/13

MD1-0-V-166-10-00201

General Assembly for Fuel Oil Heater Level 1

SUDIN

18/01/13

MD1-0-V-166-10-00301

General Assembly for Fuel Oil Heater Level 2

SUDIN

18/01/13

MD1-0-V-166-10-00401

General Assembly for Fuel Oil Cooler

SUDIN

18/01/13

MD1-0-V-167-05-00003

Painting Procedure

SUDIN

25/06/13

MD1-0-V-167-09-00001

Equipment data sheet for fo pump

AC

SUDIN

22/02/13

MD1-0-V-167-09-00002

Performance curve for fo pump

SUDIN

22/02/13

MD1-0-V-167-10-00003

Coupling drawing

SUDIN

22/02/13

MD1-0-V-167-10-00004

Name plate drawing

SUDIN

11/04/13

MD1-0-V-171-01-00001

Plot Plan for Coal Handling System

SUDIN

08/05/13

MD1-0-V-171-01-00002

Typical Cross Section of Conveyor Galleries for CHS

SUDIN

01/03/13

MD1-0-V-171-01-00003

Elevation & Profile for CHS

SUDIN

08/05/13

MD1-0-V-171-01-00004

Stockyard Layout For Coal Handling System

SUDIN

17/12/12

MD1-0-V-171-01-00005

Rail Fixing Arrangement of Stockyard Layout For Stacker

SUDIN

02/05/13

MD1-0-V-171-01-00006

Bunker House Load Data at Tripper Floor & Tripper Floor Roof

SUDIN

10/10/12

MD1-0-V-171-01-00007

Rail Fixing Arrangement of Stockyard Layout For Reclaimer

SUDIN

02/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-171-01-00008

Sprinkler Fixing Arrangement For Stockyard Layout With Load Data

STS
I

AUTHORISED
SUDIN

RECEIVED
20/12/12

MD1-0-V-171-01-00011

General Arrangement of Transfer Tower No.TT-01 for CHS

IC

SUDIN

28/05/13

MD1-0-V-171-01-00012

General Arrangement of Transfer Tower No.TT-02 for CHS

SUDIN

10/12/12

MD1-0-V-171-01-00013

General Arrangement of Transfer Tower No.TT-03 for CHS

SUDIN

10/12/12

MD1-0-V-171-01-00014

General Arrangement of Transfer Tower No.TT-04 for CHS

SUDIN

10/12/12

MD1-0-V-171-01-00015

General Arrangement of Crusher House for CHS

SUDIN

10/12/12

MD1-0-V-171-01-00016

General Arrangement of Transfer Tower No.TT-06 for CHS

SUDIN

10/12/12

MD1-0-V-171-01-00021

Mechanical General Arrangment of Belt Conveyor BC-01A/B for CHS

SUDIN

10/12/12

MD1-0-V-171-01-00022

Mechanical General Arrangement of Belt Conveyor BC-02AB for CHS

SUDIN

10/12/12

MD1-0-V-171-01-00023

Mechanical General Arrangement of Belt Conveyor BC-03AB for CHS

SUDIN

10/12/12

MD1-0-V-171-01-00024

Mechanical General Arrangement of Belt Conveyor BC-05A/B for CHS

SUDIN

10/12/12

MD1-0-V-171-01-00025

Mechanical General Arrangement of Belt Conveyor BC-06A/B for CHS

IC

SUDIN

10/04/13

MD1-0-V-171-01-00026

Mechanical General Arrangement of Belt Conveyor BC-08 for CHS

IC

SUDIN

10/06/13

MD1-0-V-171-01-00027

Mechanical General Arrangement of Belt Conveyor BC-09 for CHS

IC

SUDIN

10/06/13

MD1-0-V-171-01-00028

Mechanical General Arrangement of Belt Conveyor BC-10 for CHS

IC

SUDIN

10/06/13

MD1-0-V-171-01-00029

Mechanical General Arrangement of Belt Conveyor BC-11 for CHS

IC

SUDIN

10/06/13

MD1-0-V-171-01-00030

GENERAL ARRANGEMENT OF BELT FEEDER BFD-01 FOR CHS

SUDIN

08/02/13

MD1-0-V-171-01-00031

GENERAL ARRANGEMENT OF BELT FEEDER BFD-02A/B FOR CHS

SUDIN

08/02/13

MD1-0-V-171-01-00041

General Arrangement of Idlers for Coal Handling System (Impact Idlers)-8 Sheets

SUDIN

10/12/12

MD1-0-V-171-01-00042

General Arrangement of Pulley For Coal Handling System

SUDIN

10/12/12

MD1-0-V-171-01-00043

General Arrangement of Travelling Tripper for Coal Handling System

SUDIN

17/12/12

MD1-0-V-171-01-00044

General Arangement of Flap Gate With Schedule for Coal Handling System

SUDIN

10/12/12

MD1-0-V-171-01-00045

General Arangement of Internal Scrapper with Schedule for Coal Handling System

SUDIN

10/12/12

MD1-0-V-171-01-00046

Typical General Arangement of Skirt Board for Coal Handling System

SUDIN

10/12/12

MD1-0-V-171-01-00047

General arrangement of rcc plat form for crusher in tt-05

SUDIN

04/03/13

MD1-0-V-171-01-00048

General Arrangement Drawing of Rack & Pinion Gate for Coal Handling System

SUDIN

14/06/13

MD1-0-V-171-01-00051

Gen. Arrang. Drwg & Data for Reversible Hammer Crusher 2000 mm Dia x 2800 mm LG

SUDIN

04/03/13

MD1-0-V-171-01-00052

Gen. Arrang. Drwg & Data Sheet for Vibrating Grizzy IN FOR TT-01

SUDIN

17/12/12

MD1-0-V-171-01-00053

Gen. Arrang. Drwg & Data Sheet for Vibrating Screen IN TT-05

SUDIN

17/12/12

MD1-0-V-171-01-00071

General arrangement and data sheet of belt scale for chs

AC

SUDIN

25/04/13

MD1-0-V-171-01-00072

General arrangement of metal detector for chs

IC

SUDIN

08/05/13

MD1-0-V-171-01-00073

GENERAL ARRANGEMENT OF INLINE MAGNETIC SEPARATOR FOR CHS

SUDIN

08/02/13

MD1-0-V-171-01-00075

General Arrangement and Data Sheet of Coal Sampling Unit for Coal Handling Systm

IC

SUDIN

27/06/13

MD1-0-V-171-01-00079

TECHNICAL DATA SHEET OF BELT FOR BUNKER SEALING FOR CHS

SUDIN

13/03/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-171-01-00084

General Arrangement of Gear Box for Coal Handling System

IC

AUTHORISED
SUDIN

RECEIVED
26/06/13

MD1-0-V-171-01-00101

General Arrangement of Luffing Travelling Stacker for CHS

SUDIN

17/12/12

MD1-0-V-171-01-00105

Wheel Load Data for Linear Stacker

SUDIN

25/09/12

MD1-0-V-171-01-00121

General Arrangement of Bridge Type Reclaimer for Coal Handling System

SUDIN

17/12/12

MD1-0-V-171-01-00122

Technical Specification of Bridge Type Reclaimer For CHS

SUDIN

17/12/12

MD1-0-V-171-01-00123

Wheel Load data for Bridge Type Reclaimer

SUDIN

25/09/12

MD1-0-V-171-01-00151

General Arrangement of Centrifugal Fan for the Dust Collection System for CHS

SUDIN

26/03/13

MD1-0-V-171-01-00152

General Arrangement of Bag Filter for the Dist Collection System for CHS

SUDIN

26/03/13

MD1-0-V-171-01-00155

Ducting Layout for Dust Collection System for Tower TT-03 for CHS

SUDIN

12/07/13

MD1-0-V-171-01-00156

Ducting layout for dust collection system for transfer tower tt-04

SUDIN

22/02/13

MD1-0-V-171-01-00158

Ducting Layout for Dust Collectlon System for Tower TT-06 for CHS

SUDIN

12/07/13

MD1-0-V-171-02-00001

Technical Specification of Luffing Travelling Stacker For CHS

SUDIN

17/12/12

MD1-0-V-171-04-00001

Design basis report dust supression,service water & service air system

IC

SUDIN

26/03/13

MD1-0-V-171-04-00011

Design Basis Report For Dust Extraction System

SUDIN

10/12/12

MD1-0-V-171-04-01002

Acceptance Of Indian Standard Materials(Mechanical)In Place Of ASTM Standars Ma

SUDIN

26/04/13

MD1-0-V-171-05-02044

Start-up & Shut-down Procedure for CHS

IC

SUDIN

08/07/13

MD1-0-V-171-05-40001

Wps / pqr(steel structure)

IC

SUDIN

07/03/13

MD1-0-V-171-05-40002

Welder Qualification Records

SUDIN

02/05/13

MD1-0-V-171-05-40003

Quality Assurance Plan

IC

SUDIN

21/01/13

MD1-0-V-171-05-40005

NDE Procedure for CHS

SUDIN

27/06/13

MD1-0-V-171-05-40008

Welding consumable control procedure of chs

SUDIN

22/02/13

MD1-0-V-171-05-40010

INSPECTION AND TEST PLAN FOR IDLERS

IC

SUDIN

08/02/13

MD1-0-V-171-05-40011

INSPECTION AND TEST PLAN FOR CONVEYOR PULLEY ASSEMBLY

IC

SUDIN

08/02/13

MD1-0-V-171-05-40012

INSPECTION AND TEST PLAN FOR TECHNOLOGICAL STRUCTURES

IC

SUDIN

08/02/13

MD1-0-V-171-05-40013

INSPECTION AND TEST PLAN FOR DISCHAGE CHUTES

IC

SUDIN

08/02/13

MD1-0-V-171-05-40014

Itp for steel structure(tower)

SUDIN

08/07/13

MD1-0-V-171-05-40015

Itp for steel structure(gallery)

SUDIN

08/07/13

MD1-0-V-171-05-40016

Itp for trevelling tripper

SUDIN

08/07/13

MD1-0-V-171-05-40017

Itp for reversible hammer mill crusher

IC

SUDIN

21/02/13

MD1-0-V-171-05-40018

Itp for vibrating grizzly feeder

SUDIN

08/07/13

MD1-0-V-171-05-40019

Itp for liner motion screen

IC

SUDIN

21/02/13

MD1-0-V-171-05-40020

ltp for skirt board

SUDIN

08/07/13

MD1-0-V-171-05-40021

Itp for internal scrapper

SUDIN

08/07/13

MD1-0-V-171-05-40022

Itp for non-slewing travelling luffing stacker

IC

SUDIN

21/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-171-05-40023

Itp for bridge type relaimer

IC

AUTHORISED
SUDIN

RECEIVED
21/02/13

MD1-0-V-171-05-40031

ITP for sprocket for reclimer for CHS

SUDIN

25/04/13

MD1-0-V-171-05-40032

ITP for chain for reclaimer for CHS

SUDIN

25/04/13

MD1-0-V-171-06-00001

Volumetric Capacity Calculation of Surge Bin for Coal Handling System

SUDIN

13/03/13

MD1-0-V-171-06-00002

Stockpile Capacity Calculation for Coal Handling System

SUDIN

02/11/12

MD1-0-V-171-06-00006

Power & Tension Calc. for Belt Conveyor BC-01A/B for CHS

SUDIN

04/12/12

MD1-0-V-171-06-00007

Power & Tension Calc. for Belt Conveyor BC-02A/B for CHS

SUDIN

04/12/12

MD1-0-V-171-06-00008

Power & Tension Calc. for Belt Conveyor BC-03A/B for CHS

SUDIN

04/12/12

MD1-0-V-171-06-00009

Power & Tension Calc. for Belt Conveyor BC-05A/B for CHS

SUDIN

04/12/12

MD1-0-V-171-06-00010

Power & Tension Calc. for Belt Conveyor BC-06A/B for CHS

SUDIN

04/12/12

MD1-0-V-171-06-00011

Power & Tension Calc. for Belt Conveyor BC-08 & BC-11 for CHS

SUDIN

04/12/12

MD1-0-V-171-06-00012

Power & Tension Calc. for Belt Conveyor BC-09 & BC-10 for CHS

SUDIN

04/12/12

MD1-0-V-171-06-00013

Power and tension calculation for belt feeder bfd-01 for chs

SUDIN

12/04/13

MD1-0-V-171-06-00014

Power and tension calculation for belt feeder bfd-02a/b for chs

SUDIN

12/04/13

MD1-0-V-171-06-00015

Derivation for Stacker Wheel load

SUDIN

02/05/13

MD1-0-V-171-06-00016

Derivation for reclaimer Wheel load

SUDIN

02/05/13

MD1-0-V-171-08-00001

HOIST SCHEDULE FOR COAL HANDLING SYSTEM

SUDIN

10/04/13

MD1-0-V-171-08-00002

IDLER SCHEDULE FOR COAL HANDLING SYSTEM

SUDIN

10/04/13

MD1-0-V-171-08-00102

Master Spare Parts List for Coal Handling System

RT

SUDIN

13/06/13

MD1-0-V-171-21-00001

P & id for dust suppression, service water & service air system for chs(dust su)

IC

SUDIN

26/03/13

MD1-0-V-171-21-00011

P & id for de system for coal handling system(for tt-01)

IC

SUDIN

15/04/13

MD1-0-V-171-21-02101

P & id for coal handling system

SUDIN

25/02/13

MD1-0-V-171-57-00001

Operation and Control Philosophy of Dust Suppression System for Coal Handling Sm

IC

SUDIN

08/07/13

MD1-0-V-172-01-00002

Plot Plan for Limestone Handling System

SUDIN

14/05/13

MD1-0-V-172-01-00003

Typical cross-sections of conveyor galleries for lhs

SUDIN

14/05/13

MD1-0-V-172-01-00004

Elevation & Profile For Limestone Handling System

SUDIN

14/05/13

MD1-0-V-172-01-00005

Stockyard Layout for Limestone Handling System

SUDIN

31/01/13

MD1-0-V-172-01-00011

General Arrangement of Transfer Tower No.LT-01 for LHS

SUDIN

28/02/13

MD1-0-V-172-01-00012

General Arrangement of Transfer Tower No.LT-02 for LHS

SUDIN

28/02/13

MD1-0-V-172-01-00013

General Arrangement of Transfer Tower No.LT-03 for LHS

SUDIN

28/02/13

MD1-0-V-172-01-00014

General Arrangement of Transfer Tower No.LT-04 for LHS

SUDIN

28/02/13

MD1-0-V-172-01-00020

Mechanical foundation load data of grinding house

SUDIN

10/07/13

MD1-0-V-172-01-00031

General Arrangement of Belt Conveyor L-01 for LHS

SUDIN

22/02/13

MD1-0-V-172-01-00032

General Arrangement of Belt Conveyor L-02 for LHS

SUDIN

22/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-172-01-00033

General Arrangement of Belt Conveyor L-03 for LHS

STS
I

AUTHORISED
SUDIN

RECEIVED
22/02/13

MD1-0-V-172-01-00034

General Arrangement of Belt Conveyor BC-L-04 for LHS

SUDIN

22/02/13

MD1-0-V-172-01-00035

General Arrangement of Belt Conveyor L-05 for LHS

SUDIN

22/02/13

MD1-0-V-172-01-00036

General arrangement of belt feeder bf-02 for lhs

SUDIN

08/05/13

MD1-0-V-172-01-00037

General arrangement of reversible belt feeder rbf-01 for lhs

SUDIN

08/05/13

MD1-0-V-172-01-00051

General Arrangement of Idlers for Limestone handling System

SUDIN

08/02/13

MD1-0-V-172-01-00052

General Arrangement of Pulley For Limestone Handling System

SUDIN

08/02/13

MD1-0-V-172-01-00053

General Arrangement of Travelling Tripper for Limestone Handling System

SUDIN

12/12/12

MD1-0-V-172-01-00054

GENERAL ARRANGEMENT DRAWING OF RACK &

SUDIN

08/02/13

MD1-0-V-172-01-00055

General Arrangement Drawing of Internal Scrapper for Limestone Handling Sys.

SUDIN

08/02/13

MD1-0-V-172-01-00056

Typical General Arrangement of Skirt Board for Limestone Handling System

SUDIN

08/02/13

MD1-0-V-172-01-00057

General Arrangement of Telescopic Chute for Limestone Handling System

SUDIN

12/12/12

MD1-0-V-172-01-00073

General Arrangement of Screw Conveyor SC-02A/B for LHS

SUDIN

10/07/13

MD1-0-V-172-01-00074

General Arangement Drawing & Data Sheet for Vibrating Feeder Below Receiv. Hoppe

SUDIN

06/11/12

MD1-0-V-172-01-00075

General Arangement Drawing & Data Sheet for Vibrating Feeder Below Surge Bin

SUDIN

06/11/12

MD1-0-V-172-01-00086

General arrangement of receiving hopper for lhs

SUDIN

13/03/13

MD1-0-V-172-01-00101

Ga and Stack-up Drawing for Limestone Handling System Below Limestone Silo

IC

SUDIN

11/04/13

MD1-0-V-172-01-00102

Ga and Piping Layout for Pneumatic Limestone Handling System

IC

SUDIN

27/06/13

MD1-0-V-172-01-00103

Ga of fluidizing arrangement(ls silo)

SUDIN

08/05/13

MD1-0-V-172-01-00105

Ga of air lock vessel(alv) - 0.75m3(for limestone silo)

SUDIN

08/05/13

MD1-0-V-172-01-00109

Ga of vent filter for ls silo

SUDIN

08/05/13

MD1-0-V-172-01-00123

General Arrangement and Data Sheet of Magenet for Limestone Handling System

SUDIN

10/07/13

MD1-0-V-172-01-00124

General arrangement and data sheet of rod mill for lhs

IC

SUDIN

15/03/13

MD1-0-V-172-01-00126

Technical data sheet of conveyor belting for lhs

SUDIN

12/04/13

MD1-0-V-172-01-00128

General Arrangement of Gear Box for LHS

IC

SUDIN

26/06/13

MD1-0-V-172-01-00133

General Arrangement for Grab Bucket Type Barge Unloader

AC

SUDIN

10/12/12

MD1-0-V-172-01-00171

General Arrangement of Centrifugal Fan for Dust Collection System for LHS

SUDIN

15/03/13

MD1-0-V-172-01-00172

General Arrangement of Bag Filter for the Dist Collection System for LHS

SUDIN

15/03/13

MD1-0-V-172-01-00174

General Arrangement & Ducting Layout of Dust Collection System LT01 Transfer LHS

SUDIN

10/07/13

MD1-0-V-172-01-00175

General Arrangement & Ducting Layout of Dust Collection System LT02 Transfer LHS

SUDIN

10/07/13

MD1-0-V-172-01-00176

General Arrangement & Ducting Layout of Dust Collection System LT03 Transfer LHS

SUDIN

10/07/13

MD1-0-V-172-01-00177

General Arrangement & Ducting Layout of Dust Collection System LT04 Transfer LHS

SUDIN

10/07/13

MD1-0-V-172-02-00133

Technical Specification for Grab Bucket Type Barge Unloader

AC

SUDIN

10/12/12

MD1-0-V-172-03-02102

System Description & Operational Description FO LHS

SUDIN

19/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-172-04-00021

Design Basic Report for Dist Extraction System for Limesone Handling System

AUTHORISED
SUDIN

RECEIVED
21/02/13

MD1-0-V-172-04-00031

Design basis report for service water ,service air & instrument air system

AC

SUDIN

15/03/13

MD1-0-V-172-05-02046

Start-up & Shut-down Procedure for Limestone Handling System

IC

SUDIN

13/06/13

MD1-0-V-172-05-40001

Wps / pqr(steel structure)

IC

SUDIN

07/03/13

MD1-0-V-172-05-40002

Welder Qualification Records

SUDIN

14/05/13

MD1-0-V-172-05-40003

Quality Assurance Plan

IC

SUDIN

21/01/13

MD1-0-V-172-05-40005

NDE Procedure for LHS

SUDIN

27/06/13

MD1-0-V-172-05-40008

Welding consumable control procedure of lhs

SUDIN

22/02/13

MD1-0-V-172-05-40010

INSPECTION AND TEST PLAN FOR IDLERS

IC

SUDIN

08/02/13

MD1-0-V-172-05-40011

INSPECTION AND TEST PLAN FOR CONVEYOR PULLEY ASSEMBLY

SUDIN

08/07/13

MD1-0-V-172-05-40012

INSPECTION AND TEST PLAN FOR TECHNOLOGICAL STRUCTURES

SUDIN

08/07/13

MD1-0-V-172-05-40013

INSPECTION AND TEST PLAN FOR DISCHARGE CHUTES

SUDIN

08/07/13

MD1-0-V-172-05-40014

Itp for steel structure(tower) for l.h.s

SUDIN

08/07/13

MD1-0-V-172-05-40015

Itp for steel structure(gallery) for l.h.s

SUDIN

08/07/13

MD1-0-V-172-05-40016

Itp for travelling tripper for l.h.s

SUDIN

08/07/13

MD1-0-V-172-05-40017

Itp for skirt board for l.h.s

SUDIN

08/07/13

MD1-0-V-172-05-40018

Itp for internal scrapper for l.h.s

SUDIN

08/07/13

MD1-0-V-172-06-00001

Volumetric Capacity Calculation for Surge Bin in LT-05 for LHS

SUDIN

07/12/12

MD1-0-V-172-06-00002

Volumetric Capacity Calculation of Limestone Storage Silo

SUDIN

07/12/12

MD1-0-V-172-06-00003

Volumetric Capacity Calculation of Reclaim Hopper For LHS

SUDIN

07/12/12

MD1-0-V-172-06-00004

Stockpile Capacity Calculation for Limestone Handling System

SUDIN

27/12/12

MD1-0-V-172-06-00007

Power and Tension Calculation For Belt Conveyor L-01 For LHS

SUDIN

10/12/12

MD1-0-V-172-06-00008

Power and Tension Calculation For Belt Conveyor L-02 For LHS

SUDIN

10/12/12

MD1-0-V-172-06-00009

Power and Tension Calculation For Belt Conveyor L-03 For LHS

SUDIN

10/12/12

MD1-0-V-172-06-00010

Power and Tension Calculation For Belt Conveyor L-04 For LHS

SUDIN

10/12/12

MD1-0-V-172-06-00011

Power and Tension Calculation For Belt Conveyor L-05 For LHS

SUDIN

10/12/12

MD1-0-V-172-06-00012

Power and Tension Calculation For Belt Conveyor No. L-06A/B

IC

SUDIN

12/10/12

MD1-0-V-172-06-00021

Sizing Calculation for Conveying Air for LHS

SUDIN

14/06/13

MD1-0-V-172-08-00001

Hoist Schedule For Limestone Handling System

SUDIN

19/02/13

MD1-0-V-172-08-00002

IDLER SCHEDULE FOR LIMESTONE HANDLING

SUDIN

19/02/13

MD1-0-V-172-08-00005

Conveyor belt schedule for limestone handling system

MD1-0-V-172-08-00102

Master Spare Parts List for Limestone Handling System

MD1-0-V-172-08-00523

MD1-0-V-172-11-02110

SUDIN

12/04/13

RT

SUDIN

13/06/13

Schedule for Technological Foundation Bolt for LHS

SUDIN

25/06/13

GA of Junction Box for LHS

SUDIN

12/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-172-21-00001

P & ID of Pneumatic Conveying System for Limestone Handling

STS
I

AUTHORISED
SUDIN

RECEIVED
12/12/12

MD1-0-V-172-21-00002

P & ID Limestone Storage Silo Fluidzing System

SUDIN

12/12/12

MD1-0-V-172-21-00003

P & ID For Limestone Conveying Air Blower

SUDIN

12/12/12

MD1-0-V-172-21-00021

P & ID Diagram for De System for Lime Handing System

AC

SUDIN

15/03/13

MD1-0-V-172-21-00031

P & ID Diagram for Service Water, Service Air & Instrument Air System

AC

SUDIN

15/03/13

MD1-0-V-172-21-02101

P & i diagram for limestone handling system

IC

SUDIN

15/04/13

MD1-0-V-173-01-00030

Layout of Dry Flight Conveyor below Bottom Ash Cooler Area (Unit #1 & Unit #2)

IC

SUDIN

18/12/12

MD1-0-V-173-01-00031

Layout of Dry Flight Conveyor from Boiler to Bottom Ash Silo (U1 & U2)

SUDIN

25/02/13

MD1-0-V-173-01-00032

GA of Bottom Ash Silo (BAS-2B)

SUDIN

12/12/12

MD1-0-V-173-01-00033

Ga of ash slurry & ash water pump house

SUDIN

03/04/13

MD1-0-V-173-01-00034

Ga of return water pump arrangement

IC

SUDIN

12/04/13

MD1-0-V-173-01-00036

General Arrangement of Fly Ash Silos

SUDIN

22/01/13

MD1-0-V-173-01-00043

GA of Vacuum Pump(for Unit #1)

IC

SUDIN

12/06/13

MD1-0-V-173-01-00044

GA of FA Conveying Blower

IC

SUDIN

12/06/13

MD1-0-V-173-01-00045

GA of Buffer Hopper Fluidizing Blower For Unit #1

IC

SUDIN

12/06/13

MD1-0-V-173-01-00051

General Layout of Ash Handling System

SUDIN

22/01/13

MD1-0-V-173-01-00053

Equipment & piping layout in eco & aph hopper area

SUDIN

02/04/13

MD1-0-V-173-01-00054

Fly ash conveying piping layout from esp to buffer hopper

SUDIN

02/04/13

MD1-0-V-173-01-00055

Fly ash conveying piping layout from buffer hopper to fa silo

SUDIN

02/04/13

MD1-0-V-173-01-00056

Ash slurry piping from silo to ash slurry sump

IC

SUDIN

27/03/13

MD1-0-V-173-01-00057

Layout of ash disposal & return water piping

IC

SUDIN

27/03/13

MD1-0-V-173-01-02531

Ash slurry pump house electrical equipment layout

IC

SUDIN

25/02/13

MD1-0-V-173-03-00281

Design Basic Report & System Description

AC

SUDIN

22/02/13

MD1-0-V-173-05-40001

Wps / pqr(steel structure)

IC

SUDIN

07/03/13

MD1-0-V-173-05-40002

Welder Qualification Records

SUDIN

02/05/13

MD1-0-V-173-05-40003

Quality Assurance Plan

IC

SUDIN

21/01/13

MD1-0-V-173-05-40005

NDE Procedure for AHS

SUDIN

27/06/13

MD1-0-V-173-05-40008

Welding consumable control procedure of ahs

SUDIN

22/02/13

MD1-0-V-173-06-00201

Ash Slurry Pump Sizing Calculation

SUDIN

14/05/13

MD1-0-V-173-06-00202

HP Water Pump Sizing Calculation

SUDIN

14/05/13

MD1-0-V-173-06-00203

Seal Water Pump Sizing Calculation

SUDIN

14/05/13

MD1-0-V-173-06-00204

Return Water Pump Sizing Calculation

SUDIN

14/05/13

MD1-0-V-173-06-00205

Ash Water Pump Sizing Calculation

SUDIN

14/05/13

MD1-0-V-173-06-00206

Ash Slurry Sump Sizing Calculation

SUDIN

14/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-173-06-00207

Vacuum Pump Sizing Calculation

STS
I

AUTHORISED
SUDIN

RECEIVED
14/05/13

MD1-0-V-173-06-00208

Transport Air Blower for Rebedding Sizing Calculation

SUDIN

14/05/13

MD1-0-V-173-06-00211

Silo Fluidising Blower Sizing Calculation

SUDIN

14/05/13

MD1-0-V-173-06-00212

Silo Fluidising Blower Heater Sizing Calculation

SUDIN

14/05/13

MD1-0-V-173-06-00213

Air Lock Vessel for Re-Bedding Sizing Calculation

SUDIN

14/05/13

MD1-0-V-173-06-00214

Silo Volume Calculation

SUDIN

14/05/13

MD1-0-V-173-06-00215

Fly Ash Silo Vent Filter & Vent Fan Sizing Calculation

SUDIN

14/05/13

MD1-0-V-173-06-00216

Bottom Ash Silo Vent Filter and Vent Fan Sizing Calculation

SUDIN

14/01/05

MD1-0-V-173-06-00217

Silo Jet Pump Sizing Calculation

SUDIN

14/05/13

MD1-0-V-173-06-00218

Fly Ash Conveying Blower Sizing Calculation

SUDIN

14/05/13

MD1-0-V-173-08-00266

Piping Material Classification for ASH Handling System

SUDIN

19/06/13

MD1-0-V-173-10-00071

GA of Adaptor Below ESP Hopper

SUDIN

25/02/13

MD1-0-V-173-10-00072

GA of Adaptor Below ECO & APH Hopper

SUDIN

25/02/13

MD1-0-V-173-10-00073

Ga ash intake valve (dn 200)

SUDIN

25/02/13

MD1-0-V-173-10-00074

Ga of air intake valve (dn 200)

SUDIN

25/02/13

MD1-0-V-173-10-00076

GA of Vacuum Breaker

SUDIN

14/05/13

MD1-0-V-173-10-00077

GA of Branch Isolation Valve

SUDIN

25/02/13

MD1-0-V-173-10-00078

GA of Adaptor Coupling - Vacuum System

SUDIN

14/05/13

MD1-0-V-173-10-00085

GA of Air Lock Vessel for Bed Ash

SUDIN

14/05/13

MD1-0-V-173-10-00087

GA of Vent Filter for F.A Silo

SUDIN

12/12/12

MD1-0-V-173-10-00088

GA of Vent Filter for B.A Silo

SUDIN

12/12/12

MD1-0-V-173-10-00089

GA of Pressure Vacuum Relief Valve

IC

SUDIN

25/02/13

MD1-0-V-173-10-00090

GA of Fluidizing Pad for Silo

SUDIN

14/05/13

MD1-0-V-173-10-00092

GA of Slurrifier

SUDIN

12/12/12

MD1-0-V-173-10-00093

GA of Jet Pump

SUDIN

12/12/12

MD1-0-V-173-10-00094

GA of Mixing / Transfer Tank

SUDIN

05/07/13

MD1-0-V-173-10-00097

GA of Manual Plug Gate

SUDIN

14/05/13

MD1-0-V-173-21-00005

Legend & Symbol for P&I Diagram

SUDIN

12/12/12

MD1-0-V-173-21-00006

P&ID- Bottom Ash Handling System for Boiler 1A & 2B

IC

SUDIN

12/07/13

MD1-0-V-173-21-00007

P&ID- Bottom Ash Handling System for Boiler 1B & 2A

IC

SUDIN

12/07/13

MD1-0-V-173-21-00008

P&ID- Bottom Ash Handling System - Bottom Ash Silo Unloading & Fludizing

SUDIN

12/12/12

MD1-0-V-173-21-00009

P&ID- Fly Ash System- Hopper Area

SUDIN

12/12/12

MD1-0-V-173-21-00010

P&ID- Fly Ash System- Silo Roof

SUDIN

12/12/12

MD1-0-V-173-21-00011

P&ID- Fly Ash System- Vacuum Blower

IC

SUDIN

12/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-173-21-00012

P&ID- Fly Ash System- Silo Unloading

STS
I

AUTHORISED
SUDIN

RECEIVED
12/12/12

MD1-0-V-173-21-00013

P&ID Diagram of Fludizing Air Distribution for Fly Ash Silo

SUDIN

12/12/12

MD1-0-V-173-21-00014

P&ID- HP Water & Return Water System

SUDIN

12/12/12

MD1-0-V-173-21-00015

P&ID-Ash Slurry Transfer System

SUDIN

12/12/12

MD1-0-V-173-21-00016

P&ID-Fly Ash System- Vacuum Pressure Transfer Area

SUDIN

12/12/12

MD1-0-V-173-21-00017

P&ID-Fly Ash System- Conveying Blower

IC

SUDIN

12/07/13

MD1-0-V-173-21-00018

P&ID-Fly Ash System- Buffer Hopper Aeration

SUDIN

12/12/12

MD1-0-V-173-21-00019

P&ID - Instrument Air Distribution

SUDIN

12/07/13

MD1-0-V-173-22-00002

Single Line Flow Diagram- Bottom Ash Handling System

IC

SUDIN

22/02/13

MD1-0-V-173-22-00003

Single Line Flow Diagram- ECO. APH and Fly Handling System

IC

SUDIN

22/02/13

MD1-0-V-173-22-00004

Single Line Flow Diagram- Water and Slurry System

IC

SUDIN

22/02/13

MD1-0-V-173-55-00899

Conveyor Supporting Structure- Calculation of Foundation Load Data (Vol 1)

SUDIN

01/10/12

MD1-0-V-182-02-00011

Emergency Diesel Generator Set Diesel Engine Generator Specification

SUDIN

12/07/13

MD1-0-V-182-02-03001

Emergency Diesel Generator Set Equipment Painting Specification

SUDIN

12/07/13

MD1-0-V-182-02-11002

Motor Driven Air Compressor Outline Drawing for Emergency Diesel Generator

SUDIN

23/05/13

MD1-0-V-182-02-11003

Engine Driven Air Compressor Outline Drawing for Emergency Diesel Generator

SUDIN

16/05/13

MD1-0-V-182-06-04001

Auxiliary Equipment Capacity Calculation Sheet for Emergency Diesel Generator

SUDIN

10/05/13

MD1-0-V-182-08-20006

Piping Specification for Emergency Diesel Generator

SUDIN

14/05/13

MD1-0-V-182-08-40001

DCS I/O List for Emergency Diesel Generator

SUDIN

14/05/13

MD1-0-V-182-09-00002

Teachnical Data and Specification for emergency diesel Generator

RT

SUDIN

29/04/13

MD1-0-V-182-09-02001

Emergency diesel generator set equipment heat emmission sheet

SUDIN

22/02/13

MD1-0-V-182-10-10011

Diesel Engine and Generator Assembly Outline Drawing for Emergency Diesel Generr

SUDIN

23/05/13

MD1-0-V-182-10-10012

Engine Outline Drawing for Emergency Diesel Generator

SUDIN

23/05/13

MD1-0-V-182-10-10013

Generator Outline Drawing for Emergency Diesel Generator

SUDIN

23/05/13

MD1-0-V-182-10-11001

Remote radiator outline drawing for emergency diesel generator

IC

SUDIN

10/05/13

MD1-0-V-182-10-11004

Air Receiver Tank for Emergency Diesel Generator

SUDIN

23/05/13

MD1-0-V-182-21-12001

Symbol & Legend P&ID for Emergency Diesel Generator

IC

SUDIN

24/05/13

MD1-0-V-182-21-12002

Cooling Water System P&ID for Emergency Diesel Generator

IC

SUDIN

24/05/13

MD1-0-V-182-21-12003

Diesel Oil System P&ID for Emergency Diesel Generator

IC

SUDIN

24/05/13

MD1-0-V-182-21-12004

Lube Oil System P&ID for Emergency Diesel Generator

IC

SUDIN

24/05/13

MD1-0-V-182-21-12005

Exhaust Gas System P&ID for Emergency Diesel Generator

IC

SUDIN

24/05/13

MD1-0-V-182-21-12006

Air System P&ID for Emergency Diesel Generator

IC

SUDIN

24/05/13

MD1-0-V-182-21-12007

Motor Driven Air Compressor P&ID for Emergency Diesel Generator

IC

SUDIN

24/05/13

MD1-0-V-182-21-12008

Engine Driven Air Compressor P&ID for Emergency Diesel Generator

IC

SUDIN

24/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-183-01-12101

Outline Drawing for GSP(Vertical and Submersible)_Lubrication Oil Storage Area

STS
I

AUTHORISED
SUDIN

RECEIVED
30/07/13

MD1-0-V-183-01-12102

Outline Drawing for GSP(Vertical and Submersible)_Boiler Blowdown Sump Pump

SUDIN

30/07/13

MD1-0-V-183-01-12103

Outline Drawing for GSP(Vertical and Submersible)_Maintenance Wastewater Basin

SUDIN

30/07/13

MD1-0-V-183-01-12104

Outline Drawing for GSP(Vertical and Submersible)_Coal Handling Transfer Tower

SUDIN

30/07/13

MD1-0-V-183-01-12105

Outline Drawing for GSP(Vertical and Submersible)_Transfer Tower Area Sump Pump

SUDIN

30/07/13

MD1-0-V-183-01-12107

Outline Drawing for GSP(Vertical and Submersible)_Cooling Water Filling Pump

SUDIN

30/07/13

MD1-0-V-183-01-12108

Outline Drawing for GSP(Vertical and Submersible)_Fuel Oil System Area Oily Sump

SUDIN

30/07/13

MD1-0-V-183-01-12112

Outline Drawing for GSP(Vertical and Submersible)_Transformer Area Sump Pump

SUDIN

30/07/13

MD1-0-V-183-01-12113

Outline Drawing for GSP(Vertical and Submersible)_Auxiliary Transformer Area Su

SUDIN

30/07/13

MD1-0-V-183-01-12201

Outline Drawing for GSP(Vertical and Submersible)_Lubrication Oil Storage Area

SUDIN

30/07/13

MD1-0-V-183-01-12202

Outline Drawing for GSP(Vertical and Submersible)_STG Building Chemical Sump Pup

SUDIN

30/07/13

MD1-0-V-183-01-12203

Outline Drawing for GSP(Vertical and Submersible)_Gas Chlorination Area Sump Pup

SUDIN

30/07/13

MD1-0-V-183-01-12204

Outline Drawing for GSP(Vertical and Submersible)_WWT Underground Sump Pump

SUDIN

30/07/13

MD1-0-V-183-01-12205

Outline Drawing for GSP(Vertical and Submersible)_STG Building Seawater Sump Pum

SUDIN

30/07/13

MD1-0-V-183-01-12206

Outline Drawing for GSP(Vertical and Submersible)_CWP Discharge Valve pit

SUDIN

30/07/13

MD1-0-V-183-01-12207

Outline Drawing for GSP(Vertical and Submersible)_Central Control Building Sewap

SUDIN

30/07/13

MD1-0-V-183-01-12208

Outline Drawing for GSP(Vertical and Submersible)_Switchyard Control Building

SUDIN

30/07/13

MD1-0-V-183-01-12209

Outline Drawing for GSP(Vertical and Submersible)_Water Treatment Building Seweg

SUDIN

30/07/13

MD1-0-V-183-01-12210

Outline Drawing for GSP(Vertical and Submersible)_Warehouse & Workshop Building

SUDIN

30/07/13

MD1-0-V-183-01-12211

Outline Drawing for GSP(Vertical and Submersible)_Administration Building(North)

SUDIN

30/07/13

MD1-0-V-183-01-12212

Outline Drawing for GSP(Vertical and Submersible)_Administration Building(South)

SUDIN

30/07/13

MD1-0-V-183-01-12213

Outline Drawing for GSP(Vertical and Submersible)_Guard House Sewage Pump

SUDIN

30/07/13

MD1-0-V-183-01-12214

Outline Drawing for GSP(Vertical and Submersible)_Coal Handling Control Building

SUDIN

30/07/13

MD1-0-V-183-01-12215

Outline Drawing for GSP(Vertical and Submersible)_STG Building Oily Sump Pump

SUDIN

30/07/13

MD1-0-V-183-01-12216

Outline Drawing for GSP(Vertical and Submersible)_Ammonia Storage Area Sump Pump

SUDIN

30/07/13

MD1-0-V-183-01-12217

Outline Drawing for GSP(Vertical and Submersible)_Dewatering Portable Pump

SUDIN

30/07/13

MD1-0-V-183-01-12218

Outline Drawing for GSP(Vertical and Submersible)_Fire Protection Pump House

SUDIN

30/07/13

MD1-0-V-183-01-12219

Outline Drawing for GSP(Vertical and Submersible)_Central Control Building Sewag

SUDIN

30/07/13

MD1-0-V-183-01-13101

Pump Sectional Drawing for GSP(Vertical and Submersible)_Start-up Flash Tank Arp

SUDIN

30/07/13

MD1-0-V-183-01-13102

Pump Sectional Drawing for GSP(Vertical and Submersible)_Boiler Blowdown Sump Pp

SUDIN

30/07/13

MD1-0-V-183-01-13103

Pump Sectional Drawing for GSP(Vertical and Submersible)_Maintenance Wastewatern

SUDIN

30/07/13

MD1-0-V-183-01-13104

Pump Sectional Drawing for GSP(Vertical and Submersible)_Coal Handling Transfer

SUDIN

30/07/13

MD1-0-V-183-01-13105

Pump Sectional Drawing for GSP(Vertical and Submersible)_Limestone Handling Trar

SUDIN

30/07/13

MD1-0-V-183-01-13107

Pump Sectional Drawing for GSP(Vertical and Submersible)_Cooling Water Filling p

SUDIN

30/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-183-01-13108

Pump Sectional Drawing for GSP(Vertical and Submersible)_Fuel Oil System Area Op

STS
I

AUTHORISED
SUDIN

RECEIVED
30/07/13

MD1-0-V-183-01-13112

Pump Sectional Drawing for GSP(Vertical and Submersible)_Transformer Area Sump p

SUDIN

30/07/13

MD1-0-V-183-01-13113

Pump Sectional Drawing for GSP(Vertical and Submersible)_Auxiliary Transformer

SUDIN

30/07/13

MD1-0-V-183-05-00005

Inspection Test Plan for GSP(Vertical and Submersible)

SUDIN

08/07/13

MD1-0-V-183-05-00006

Inspection and Test Procedure for GSP(Vertical and Submersible)

IC

SUDIN

08/07/13

MD1-0-V-183-05-00008

Painting Procedure for GSP(Vertical and Submersible)

IC

SUDIN

28/06/13

MD1-0-V-183-09-11101

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Stat

SUDIN

30/07/13

MD1-0-V-183-09-11102

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-BLR

SUDIN

30/07/13

MD1-0-V-183-09-11103

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Main

SUDIN

30/07/13

MD1-0-V-183-09-11104

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Coal

SUDIN

30/07/13

MD1-0-V-183-09-11105

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Lime

SUDIN

30/07/13

MD1-0-V-183-09-11107

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Cool

SUDIN

30/07/13

MD1-0-V-183-09-11108

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Fuel

SUDIN

30/07/13

MD1-0-V-183-09-11112

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Tras

SUDIN

30/07/13

MD1-0-V-183-09-11113

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Aux.

SUDIN

30/07/13

MD1-0-V-183-09-11201

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible) _Lubrica

SUDIN

30/07/13

MD1-0-V-183-09-11202

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible) STG Buil

SUDIN

30/07/13

MD1-0-V-183-09-11203

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Gas

SUDIN

30/07/13

MD1-0-V-183-09-11204

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_WWT Undd

SUDIN

30/07/13

MD1-0-V-183-09-11205

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_STG Bui

SUDIN

30/07/13

MD1-0-V-183-09-11206

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_CWP Disc

SUDIN

30/07/13

MD1-0-V-183-09-11207

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Central

SUDIN

30/07/13

MD1-0-V-183-09-11208

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Switch

SUDIN

30/07/13

MD1-0-V-183-09-11209

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Water Tr

SUDIN

30/07/13

MD1-0-V-183-09-11210

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Warehous

SUDIN

30/07/13

MD1-0-V-183-09-11211

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Admin

SUDIN

30/07/13

MD1-0-V-183-09-11212

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Admin.

SUDIN

30/07/13

MD1-0-V-183-09-11213

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Guard

WITTAYA

30/07/13

MD1-0-V-183-09-11214

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Coal

SUDIN

30/07/13

MD1-0-V-183-09-11215

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_STG Buil

SUDIN

30/07/13

MD1-0-V-183-09-11216

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Ammonia

SUDIN

30/07/13

MD1-0-V-183-09-11217

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Dewater

SUDIN

30/07/13

MD1-0-V-183-09-11218

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Fire

SUDIN

30/07/13

MD1-0-V-183-09-11219

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Central

SUDIN

30/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-185-06-10100

Closed cooling water head tank strength calculation sheet

STS
I

AUTHORISED
SUDIN

RECEIVED
09/04/13

MD1-0-V-185-06-20100

Closed cooling water chemical injection cylinder strength calculation sheet

SUDIN

09/04/13

MD1-0-V-185-06-30100

Start-up flash tank strength calculation sheet

SUDIN

09/04/13

MD1-0-V-185-06-40100

Condensate return tank strength calculation sheet

SUDIN

09/04/13

MD1-0-V-185-06-80100

Dirty oil tank strength calculation sheet

SUDIN

09/04/13

MD1-0-V-185-06-90100

Steam coil air heater drain tank strength calculation sheet

SUDIN

09/04/13

MD1-0-V-185-10-10001

Closed cooling water head tank general assembly

IC

SUDIN

03/04/13

MD1-0-V-185-10-20001

Closed cooling water chemical injection cylinder general assembly

IC

SUDIN

03/04/13

MD1-0-V-185-10-30001

Start-up flash tank general assembly

IC

SUDIN

03/04/13

MD1-0-V-185-10-40001

Condensate return tank general assembly

IC

SUDIN

03/04/13

MD1-0-V-185-10-80001

Dirty oil tank general assembly

IC

SUDIN

03/04/13

MD1-0-V-185-10-90001

Steam coil air heater drain tank general assembly

IC

SUDIN

03/04/13

MD1-0-V-186-01-00101

Shop Inspection and Test Plan

SUDIN

22/02/13

MD1-0-V-186-05-00101

WPS & PQR for Field Erected Tank

SUDIN

22/02/13

MD1-0-V-186-05-00102

Painting Specification and Procedures

SUDIN

22/02/13

MD1-0-V-186-05-00103

Shop ndt procedures

SUDIN

22/02/13

MD1-0-V-186-05-00104

Quality Assurance Program & Manual (Field Erected Tank)

SUDIN

22/02/13

MD1-0-V-186-06-00101

Strength Calculation for Raw Water Storage Tank

SUDIN

12/11/12

MD1-0-V-186-06-00201

Strength Calculation for Filtered Water Storage Tank

SUDIN

12/11/12

MD1-0-V-186-06-00301

Strength Calculation for Demi. Water Storage Tank

SUDIN

12/11/12

MD1-0-V-186-06-00401

Strength Calculation for Fire Water Storage Tank

SUDIN

12/11/12

MD1-0-V-186-06-00501

Strength Calculation for Condensate Water Storage Tank

SUDIN

12/11/12

MD1-0-V-186-06-00601

Strength Calculation for Portable Water Storage Tank

SUDIN

12/11/12

MD1-0-V-186-06-00701

Strength Calculation for Fuel Oil Storage Tank

SUDIN

12/11/12

MD1-0-V-186-06-00702

Fuel Oil Storage Tank Thermal Design Report of Bottom Heater

SUDIN

14/11/12

MD1-0-V-186-06-00801

Strength Calculation for Diesel Oil Storage Tank

SUDIN

12/11/12

MD1-0-V-186-10-00101

General Assembly for Raw Water Storage Tank

SUDIN

05/02/13

MD1-0-V-186-10-00102

Raw Water Storage Tank Nozzle Orientation (1/2)

SUDIN

05/02/13

MD1-0-V-186-10-00103

Raw Water Storage Tank Nozzle Orientation (2/2)

SUDIN

05/02/13

MD1-0-V-186-10-00201

General Assembly for Filtered Water Storage Tank

SUDIN

05/02/13

MD1-0-V-186-10-00202

Filtered Water Storage Tank Nozzle Orientation (1/2)

SUDIN

05/02/13

MD1-0-V-186-10-00203

Filtered Water Storage Tank Nozzle Orientation (2/2)

SUDIN

05/02/13

MD1-0-V-186-10-00301

General Assembly for Demi. Water Storage Tank

SUDIN

05/02/13

MD1-0-V-186-10-00302

Demi Water Storage Tank Nozzle Orientation (1/2)

SUDIN

05/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-V-186-10-00303

Demi Water Storage Tank Nozzle Orientation (2/2)

AUTHORISED
SUDIN

RECEIVED
05/02/13

MD1-0-V-186-10-00401

General Assembly for Fire Water Storage Tank

SUDIN

05/02/13

MD1-0-V-186-10-00402

Fire Water Storage Tank Nozzle Orientation (1/2)

SUDIN

05/02/13

MD1-0-V-186-10-00403

Fire Water Storage Tank Nozzle Orientation (2/2)

SUDIN

05/02/13

MD1-0-V-186-10-00501

General Assembly for Condensate Water Storage Tank

SUDIN

21/02/13

MD1-0-V-186-10-00502

Condensate Storage Tank Nozzle Orientation (1/2)

SUDIN

21/02/13

MD1-0-V-186-10-00503

Condensate Storage Tank Nozzle Orientation (2/2)

SUDIN

21/02/13

MD1-0-V-186-10-00601

General Assembly for Portable Water Storage Tank

SUDIN

31/01/13

MD1-0-V-186-10-00602

Portable Water Storage Tank Nozzle Orientation

SUDIN

31/01/13

MD1-0-V-186-10-00701

FUEL OIL STORAGE TANK GENERAL ASSEMBLY

SUDIN

05/02/13

MD1-0-V-186-10-00702

Fuel Oil Storage Tank Nozzle Orientation (1/2)

SUDIN

05/02/13

MD1-0-V-186-10-00703

Fuel Oil Storage Tank Nozzle Orientation (2/2)

SUDIN

05/02/13

MD1-0-V-186-10-00801

General Assembly for Diesel Oil Tank

SUDIN

05/02/13

MD1-0-V-186-10-00802

Diesel Oil Storage Tank Nozzle Orientation

SUDIN

05/02/13

MD1-0-V-186-11-00119

Raw Water Storage Tank Spiral Stairway (1/4)

SUDIN

06/02/13

MD1-0-V-186-11-00120

Raw Water Storage Tank Spiral Stairway (2/4)

SUDIN

06/02/13

MD1-0-V-186-11-00121

Raw Water Storage Tank Spiral Stairway (3/4)

SUDIN

06/02/13

MD1-0-V-186-11-00122

Raw Water Storage Tank Spiral Stairway (4/4)

SUDIN

06/02/13

MD1-0-V-186-11-00123

Raw Water Storage Tank Spiral Stairway (1/3)

SUDIN

06/02/13

MD1-0-V-186-11-00124

Raw Water Storage Tank Spiral Stairway (2/3)

SUDIN

06/02/13

MD1-0-V-186-11-00125

Raw Water Storage Tank Spiral Stairway (3/3)

SUDIN

06/02/13

MD1-0-V-186-11-00127

Raw Water Storage Tank Name Plate Detail

SUDIN

05/02/13

MD1-0-V-186-11-00201

Filtered Water Storage Tank Shell Plate Detail

SUDIN

04/02/13

MD1-0-V-186-11-00202

Filtered Water Storage Tank 1st Course Shell Plate Arrangement (1/2)

SUDIN

04/02/13

MD1-0-V-186-11-00203

Filtered Water Storage Tank 1st Course Shell Plate Arrangement (2/2)

SUDIN

04/02/13

MD1-0-V-186-11-00204

Filtered Water Storage Tank Bottom Plate Arrangement (1/3)

SUDIN

04/02/13

MD1-0-V-186-11-00205

Filtered Water Storage Tank Bottom Plate Arrangement (2/3)

SUDIN

04/02/13

MD1-0-V-186-11-00206

Filtered Water Storage Tank Bottom Plate Arrangement (3/3)

SUDIN

04/02/13

MD1-0-V-186-11-00207

Filtered Water Storage Tank Roof Plate Arrangement (1/3)

SUDIN

04/02/13

MD1-0-V-186-11-00208

Filtered Water Storage Tank Roof Plate Arrangement (2/3)

SUDIN

04/02/13

MD1-0-V-186-11-00209

Filtered Water Storage Tank Roof Plate Arrangement (3/3)

SUDIN

04/02/13

MD1-0-V-186-11-00210

Filtered Water Storage Tank Roof Structure Detail (1/3)

SUDIN

04/02/13

MD1-0-V-186-11-00211

Filtered Water Storage Tank Roof Structure Detail (2/3)

SUDIN

04/02/13

MD1-0-V-186-11-00212

Filtered Water Storage Tank Roof Structure Detail (3/3)

SUDIN

04/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-V-186-11-00213

Filtered Water Storage Tank Shell Manhole Detail

AUTHORISED
SUDIN

RECEIVED
04/02/13

MD1-0-V-186-11-00214

Filtered Water Storage Tank Roof Manhole Detail

SUDIN

04/02/13

MD1-0-V-186-11-00215

Filtered Water Storage Tank Shell Nozzle Detail (1/3)

SUDIN

04/02/13

MD1-0-V-186-11-00216

Filtered Water Storage Tank Shell Nozzle Detail (2/3)

SUDIN

04/02/13

MD1-0-V-186-11-00217

Filtered Water Storage Tank Shell Nozzle Detail (3/3)

SUDIN

04/02/13

MD1-0-V-186-11-00218

Filtered Water Storage Tank Roof Nozzle Detail

SUDIN

04/02/13

MD1-0-V-186-11-00219

Filtered Water Storage Tank Spiral Stairway (1/4)

SUDIN

06/02/13

MD1-0-V-186-11-00220

Filtered Water Storage Tank Spiral Stairway (2/4)

SUDIN

06/02/13

MD1-0-V-186-11-00221

Filtered Water Storage Tank Spiral Stairway (3/4)

SUDIN

06/02/13

MD1-0-V-186-11-00222

Filtered Water Storage Tank Spiral Stairway (4/4)

SUDIN

06/02/13

MD1-0-V-186-11-00223

Filtered Water Storage Tank Spiral Stairway (1/3)

SUDIN

06/02/13

MD1-0-V-186-11-00224

Filtered Water Storage Tank Spiral Stairway (2/3)

SUDIN

06/02/13

MD1-0-V-186-11-00225

Filtered Water Storage Tank Spiral Stairway (3/3)

SUDIN

06/02/13

MD1-0-V-186-11-00226

Filtered Water Storage Tank Rainwater Down Pipe Detail

SUDIN

04/02/13

MD1-0-V-186-11-00227

Filtered Water Storage Tank Name Plate Detail

SUDIN

05/02/13

MD1-0-V-186-11-00301

Demi. Water Storage Tank Shell Plate Detail

SUDIN

05/02/13

MD1-0-V-186-11-00302

Demi. Water Storage Tank 1st Course Shell Plate Arrangement (1/2)

SUDIN

05/02/13

MD1-0-V-186-11-00303

Demi. Water Storage Tank 1st Course Shell Plate Arrangement (2/2)

SUDIN

05/02/13

MD1-0-V-186-11-00304

Demi. Water Storage Tank Bottom Plate Arrangement (1/3)

SUDIN

05/02/13

MD1-0-V-186-11-00305

Demi. Water Storage Tank Bottom Plate Arrangement (2/3)

SUDIN

05/02/13

MD1-0-V-186-11-00306

Demi. Water Storage Tank Bottom Plate Arrangement (3/3)

SUDIN

05/02/13

MD1-0-V-186-11-00307

Demi. Water Storage Tank Roof Plate Arrangement (1/3)

SUDIN

05/02/13

MD1-0-V-186-11-00308

Demi. Water Storage Tank Roof Plate Arrangement (2/3)

SUDIN

05/02/13

MD1-0-V-186-11-00309

Demi. Water Storage Tank Roof Plate Arrangement (3/3)

SUDIN

05/02/13

MD1-0-V-186-11-00310

Demi. Water Storage Tank Roof Structure Detail (1/3)

SUDIN

05/02/13

MD1-0-V-186-11-00311

Demi. Water Storage Tank Roof Structure Detail (2/3)

SUDIN

05/02/13

MD1-0-V-186-11-00312

Demi. Water Storage Tank Roof Structure Detail (3/3)

SUDIN

05/02/13

MD1-0-V-186-11-00313

Demi. Water Storage Tank Shell Manhole Detail

SUDIN

05/02/13

MD1-0-V-186-11-00314

Demi. Water Storage Tank Roof Manhole Detail

SUDIN

05/02/13

MD1-0-V-186-11-00315

Demi. Water Storage Tank Shell Nozzle Detail (1/3)

SUDIN

05/02/13

MD1-0-V-186-11-00316

Demi. Water Storage Tank Shell Nozzle Detail (2/3)

SUDIN

05/02/13

MD1-0-V-186-11-00317

Demi. Water Storage Tank Shell Nozzle Detail (3/3)

SUDIN

05/02/13

MD1-0-V-186-11-00318

Demi. Water Storage Tank Roof Nozzle Detail

SUDIN

05/02/13

MD1-0-V-186-11-00319

Demi. Water Storage Tank (A) Spiral Stairway (1/4)

SUDIN

06/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-V-186-11-00320

Demi. Water Storage Tank (A) Spiral Stairway (2/4)

SUDIN

06/02/13

MD1-0-V-186-11-00321

Demi. Water Storage Tank (A) Spiral Stairway (3/4)

SUDIN

06/02/13

MD1-0-V-186-11-00322

Demi. Water Storage Tank (A) Spiral Stairway (4/4)

SUDIN

06/02/13

MD1-0-V-186-11-00323

Demi. Water Storage Tank (B) Spiral Stairway (1/4)

SUDIN

06/02/13

MD1-0-V-186-11-00324

Demi. Water Storage Tank (B) Spiral Stairway (2/4)

SUDIN

06/02/13

MD1-0-V-186-11-00325

Demi. Water Storage Tank (B) Spiral Stairway (3/4)

SUDIN

06/02/13

MD1-0-V-186-11-00326

Demi. Water Storage Tank (B) Spiral Stairway (4/4)

SUDIN

23/11/12

MD1-0-V-186-11-00327

Demi. Water Storage Tank Rainwater Down Pipe Detail

SUDIN

05/02/13

MD1-0-V-186-11-00328

Demi Water Storage Tank Name Plate Detail

SUDIN

05/02/13

MD1-0-V-186-11-00401

Fire Water Storage Tank Shell Plate Detail

SUDIN

04/02/13

MD1-0-V-186-11-00402

Fire Water Storage Tank 1st course shell plate arrangement (1/2)

SUDIN

04/02/13

MD1-0-V-186-11-00403

Fire water storage tank 1st course shell plate arrangement (2/2)

SUDIN

04/02/13

MD1-0-V-186-11-00404

Fire Water Storage Tank bottom plate arrangement (1/3)

SUDIN

04/02/13

MD1-0-V-186-11-00405

Fire Water Storage Tank bottom plate arrangement (2/3)

SUDIN

04/02/13

MD1-0-V-186-11-00406

Fire water storage tank bottom plate arrangement (3/3)

SUDIN

04/02/13

MD1-0-V-186-11-00407

Fire Water Storage Tank Roof plate arrangement (1/3)

SUDIN

04/02/13

MD1-0-V-186-11-00408

Fire Water Storage Tank Roof plate arrangement (2/3)

SUDIN

04/02/13

MD1-0-V-186-11-00409

Fire Water Storage Tank Roof plate arrangement (3/3)

SUDIN

04/02/13

MD1-0-V-186-11-00410

Fire Water Storage Tank Roof Structure Detail (1/3)

SUDIN

04/02/13

MD1-0-V-186-11-00411

Fire Water Storage Tank Roof Structure Detail (2/3)

SUDIN

04/02/13

MD1-0-V-186-11-00412

Fire Water Storage Tank Roof Structure Detail (3/3)

SUDIN

04/02/13

MD1-0-V-186-11-00413

Fire Water Storage Tank Shell Manhole Detail

SUDIN

04/02/13

MD1-0-V-186-11-00414

Fire Water Storage Tank Roof Manhole Detail

SUDIN

04/02/13

MD1-0-V-186-11-00415

Fire Water Storage Tank Shell Nozzle Detail (1/3)

SUDIN

04/02/13

MD1-0-V-186-11-00416

Fire Water Storage Tank Shell Nozzle Detail (2/3)

SUDIN

04/02/13

MD1-0-V-186-11-00417

Fire Water Storage Tank Shell Nozzle Detail (3/3)

SUDIN

04/02/13

MD1-0-V-186-11-00418

Fire Water Storage Tank Roof Nozzle Detail

SUDIN

04/02/13

MD1-0-V-186-11-00419

Fire Water Storage Tank (A) Spiral Stairway (1/4)

SUDIN

06/02/13

MD1-0-V-186-11-00420

Fire Water Storage Tank (A) Spiral Stairway (2/4)

SUDIN

06/02/13

MD1-0-V-186-11-00421

Fire Water Storage Tank (A) Spiral Stairway (3/4)

SUDIN

06/02/13

MD1-0-V-186-11-00422

Fire Water Storage Tank (A) Spiral Stairway (4/4)

SUDIN

06/02/13

MD1-0-V-186-11-00423

Fire Water Storage Tank (B) Spiral Stairway (1/3)

SUDIN

06/02/13

MD1-0-V-186-11-00424

Fire Water Storage Tank (B) Spiral Stairway (2/3)

SUDIN

06/02/13

MD1-0-V-186-11-00425

Fire Water Storage Tank (B) Spiral Stairway (3/3)

SUDIN

06/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-V-186-11-00426

Fire Water Storage Tank Rainwater Down Pipe Detail

AUTHORISED
SUDIN

RECEIVED
04/02/13

MD1-0-V-186-11-00427

Fire Water Storage Tank Name Plate Detail

SUDIN

05/02/13

MD1-0-V-186-11-00501

Condensate Storage Tank Shell Plate Detail

SUDIN

31/01/13

MD1-0-V-186-11-00502

Condensate Storage Tank 1st Course Shell Plate Arrangement (1/2)

SUDIN

31/01/13

MD1-0-V-186-11-00503

Condensate Storage Tank 1st Course Shell Plate Arrangement (2/2)

SUDIN

31/01/13

MD1-0-V-186-11-00504

Condensate Storage Tank Bottom Plate Arrangement (1/2)

SUDIN

31/01/13

MD1-0-V-186-11-00505

Condensate Storage Tank Bottom Plate Arrangement (2/2)

SUDIN

31/01/13

MD1-0-V-186-11-00506

Condensate Storage Tank Roof Plate Arrangement (1/2)

SUDIN

31/01/13

MD1-0-V-186-11-00507

Condensate Storage Tank Roof Plate Arrangement (2/2)

SUDIN

31/01/13

MD1-0-V-186-11-00508

Condensate Storage Tank Roof Structural Detail (1/2)

SUDIN

31/01/13

MD1-0-V-186-11-00509

Condensate Storage Tank Roof Structure Detail (2/2)

SUDIN

31/01/13

MD1-0-V-186-11-00510

Condensate Storage Tank Shell Manhole Detail

SUDIN

31/01/13

MD1-0-V-186-11-00511

Condensate Storage Tank Roof Manhole Detail

SUDIN

31/01/13

MD1-0-V-186-11-00512

Condensate Storage Tank Shell Nozzle Detail (1/2)

SUDIN

31/01/13

MD1-0-V-186-11-00513

Condensate Storage Tank Shell Nozzle Detail (2/2)

SUDIN

31/01/13

MD1-0-V-186-11-00514

Condensate Storage Tank Roof Nozzle Detail (1/2)

SUDIN

31/01/13

MD1-0-V-186-11-00515

Condensate Storage Tank (A) Spiral Stairway (1/3)

SUDIN

06/02/13

MD1-0-V-186-11-00516

Condensate Storage Tank (A) Spiral Stairway (2/3

SUDIN

06/02/13

MD1-0-V-186-11-00517

Condensate Storage Tank (A) Spiral Stairway (3/3)

SUDIN

06/02/13

MD1-0-V-186-11-00518

Condensate Storage Tank (B) Spiral Stairway (1/3)

SUDIN

06/02/13

MD1-0-V-186-11-00519

Condensate Storage Tank (B) Spiral Stairway (2/3)

SUDIN

06/02/13

MD1-0-V-186-11-00520

Condensate Storage Tank (B) Spiral Stairway (3/3)

SUDIN

06/02/13

MD1-0-V-186-11-00521

Condensate Storage Tank Roof Nozzle Detail (2/2)

SUDIN

31/01/13

MD1-0-V-186-11-00522

Condensate Storage Tank Rainwater Down Pipe Detail

SUDIN

31/01/13

MD1-0-V-186-11-00523

Condensate Storage Tank Name Plate Detail

SUDIN

05/02/13

MD1-0-V-186-11-00601

Potable Water Storage Tank Shell Plate Detail

SUDIN

31/01/13

MD1-0-V-186-11-00602

Potable Water Storage Tank 1st Course Shell Plate Arrangement

SUDIN

31/01/13

MD1-0-V-186-11-00603

Potable Water Storage Tank Bottom Plate Arrangement

SUDIN

31/01/13

MD1-0-V-186-11-00604

Potable Water Storage Tank Roof Plate Arrangement

SUDIN

31/01/13

MD1-0-V-186-11-00605

Potable Water Storage Tank Roof Structure Detail

SUDIN

31/01/13

MD1-0-V-186-11-00606

Potable Water Storage Tank Shell Manhole Detail

SUDIN

31/01/13

MD1-0-V-186-11-00607

Potable Water Storage Tank Roof Manhole Detail

SUDIN

31/01/13

MD1-0-V-186-11-00608

Potable Water Storage Tank Shell Nozzle Detail (1/2)

SUDIN

31/01/13

MD1-0-V-186-11-00609

Potable Water Storage Tank Shell Nozzle Detail (2/2)

SUDIN

31/01/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-V-186-11-00610

Potable Water Storage Tank Roof Nozzle Detail

SUDIN

31/01/13

MD1-0-V-186-11-00611

Potable Water Storage Tank Spiral Stairway (1/3)

SUDIN

06/02/13

MD1-0-V-186-11-00612

Potable Water Storage Tank Spiral Stairway (2/3)

SUDIN

06/02/13

MD1-0-V-186-11-00613

Potable Water Storage Tank Spiral Stairway (3/3)

SUDIN

06/02/13

MD1-0-V-186-11-00614

Potable Water Storage Tank Rainwater Down Pipe Detail

SUDIN

31/01/13

MD1-0-V-186-11-00615

Portable Water Storage Tank Name Plate Detail

SUDIN

05/02/13

MD1-0-V-186-11-00616

Potable water storage tank internal ladder detail

SUDIN

22/02/13

MD1-0-V-186-11-00701

Fuel Oil Storage Tank Shell Plate Detail

SUDIN

21/02/13

MD1-0-V-186-11-00702

Fuel Oil Storage Tank 1st Course Shell Plate Arrangement (1/2)

SUDIN

21/02/13

MD1-0-V-186-11-00703

Fuel Oil Storage Tank 1st Course Shell Plate Arrangement (2/2)

SUDIN

21/02/13

MD1-0-V-186-11-00704

Fuel Oil Storage Tank Bottom Plate Arrangement (1/2)

SUDIN

21/02/13

MD1-0-V-186-11-00705

Fuel Oil Storage Tank Bottom Plate Arrangement (2/2)

SUDIN

21/02/13

MD1-0-V-186-11-00706

Fuel Oil Storage Tank Roof Plate Arrangement (1/2)

SUDIN

01/02/13

MD1-0-V-186-11-00707

Fuel Oil Storage Tank Roof Plate Arrangement (2/2)

SUDIN

22/02/13

MD1-0-V-186-11-00708

Fuel Oil Storage Tank Roof Structure Detail (1/2)

SUDIN

22/02/13

MD1-0-V-186-11-00709

Fuel Oil Storage Tank Roof Structure Detail (2/2)

SUDIN

22/02/13

MD1-0-V-186-11-00710

Fuel Oil Storage Tank Shell Manhole Detail (1/2)

SUDIN

22/02/13

MD1-0-V-186-11-00711

Fuel Oil Storage Tank Shell Manhole Detail (2/2)

SUDIN

22/02/13

MD1-0-V-186-11-00712

Fuel Oil Storage Tank Roof Manhole Detail

SUDIN

22/02/13

MD1-0-V-186-11-00713

Fuel Oil Storage Tank Shell Nozzle Detail (1/2)

SUDIN

22/02/13

MD1-0-V-186-11-00714

Fuel Oil Storage Tank Shell Nozzle Detail (2/2)

SUDIN

22/02/13

MD1-0-V-186-11-00715

Fuel Oil Storage Tank Roof Nozzle Detail

SUDIN

22/02/13

MD1-0-V-186-11-00716

Fuel Oil Storage Tank Heating Coil Detail

SUDIN

22/02/13

MD1-0-V-186-11-00717

Fuel Oil Storage Tank (A) Spiral Stairway (1/3)

SUDIN

06/02/13

MD1-0-V-186-11-00718

Fuel Oil Storage Tank (A) Spiral Stairway (2/3)

SUDIN

06/02/13

MD1-0-V-186-11-00719

Fuel Oil Storage Tank (A) Spiral Stairway (3/3)

SUDIN

06/02/13

MD1-0-V-186-11-00720

Fuel Oil Storage Tank Foam Chamber Platform Detail

SUDIN

22/02/13

MD1-0-V-186-11-00721

Fuel Oil Storage Tank (B) Spiral Stairway (1/3)

SUDIN

06/02/13

MD1-0-V-186-11-00722

Fuel Oil Storage Tank (B) Spiral Stairway (2/3)

SUDIN

06/02/13

MD1-0-V-186-11-00723

Fuel Oil Storage Tank (B) Spiral Stairway (3/3)

SUDIN

06/02/13

MD1-0-V-186-11-00724

Fuel Oil Storage Tank Rainwater Down Pipe Detail

SUDIN

22/02/13

MD1-0-V-186-11-00725

Fuel Oil Storage Tank Level Gauge Detail

SUDIN

22/02/13

MD1-0-V-186-11-00726

Fuel Oil Storage Tank Floating Suction Detail (1/2)

SUDIN

26/11/12

MD1-0-V-186-11-00727

Fuel Oil Storage Tank Floating Suction Detail (2/2)

SUDIN

26/11/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-V-186-11-00728

Fuel Storage Tank Name Plate Detail

SUDIN

05/02/13

MD1-0-V-186-11-00729

Fuel oil storage tank insulation detail

IC

SUDIN

22/02/13

MD1-0-V-186-11-00730

Fuel oil storage tank internal ladder detail

SUDIN

21/02/13

MD1-0-V-186-11-00731

Fuel oil storage tank pipe support detail(a)

SUDIN

21/02/13

MD1-0-V-186-11-00732

Fuel oil storage tank pipe support detail(b)

SUDIN

21/02/13

MD1-0-V-186-11-00801

Diesel Oil Storage Tank Shell Plate Detail

SUDIN

31/01/13

MD1-0-V-186-11-00802

Diesel Oil Storage Tank 1st Course Shell Plate Arrangement

SUDIN

31/01/13

MD1-0-V-186-11-00803

Diesel Oil Storage Tank Bottom Plate Arrangement

SUDIN

31/01/13

MD1-0-V-186-11-00804

Diesel Oil Storage Tank Roof Plate Arrangement

SUDIN

31/01/13

MD1-0-V-186-11-00805

Diesel Oil Storage Tank Roof Structure Detail

SUDIN

31/01/13

MD1-0-V-186-11-00806

Diesel Oil Storage Tank Shell Manhole Detail

SUDIN

31/01/13

MD1-0-V-186-11-00807

Diesel Oil Storage Tank Roof Manhole Detail

SUDIN

31/01/13

MD1-0-V-186-11-00808

Diesel Oil Storage Tank Shell Nozzle Detail (1/2)

SUDIN

31/01/13

MD1-0-V-186-11-00809

Diesel Oil Storage Tank Shell Nozzle Detail (2/2)

SUDIN

31/01/13

MD1-0-V-186-11-00810

Diesel Oil Storage Tank Roof Nozzle Detail

SUDIN

31/01/13

MD1-0-V-186-11-00811

Diesel Oil Storage Tank Spiral Staiway (1/3)

SUDIN

06/02/13

MD1-0-V-186-11-00812

Diesel Oil Storage Tank Spiral Staiway (2/3)

SUDIN

06/02/13

MD1-0-V-186-11-00813

Diesel Oil Storage Tank Spiral Staiway (3/3)

SUDIN

06/02/13

MD1-0-V-186-11-00814

Diesel Oil Storage Tank Foam Chamber Platform Detail

SUDIN

31/01/13

MD1-0-V-186-11-00815

Diesel Oil Storage Tank Rainwater Down Pipe Detail

SUDIN

31/01/13

MD1-0-V-186-11-00816

Diesel Oil Storage Tank Level Gauge Detail

SUDIN

31/01/13

MD1-0-V-186-11-00817

Diesel Oil Storage Tank Floating Suction Detail (1/2)

SUDIN

31/01/13

MD1-0-V-186-11-00818

Diesel Oil Storage Tank Floating Suction Detail (2/2)

SUDIN

31/01/13

MD1-0-V-186-11-00819

Diesel Oil Storage Tank Name Plate Detail

SUDIN

05/02/13

MD1-0-V-186-11-00820

Diesel oil storage tank internal ladder detail

SUDIN

21/02/13

MD1-0-V-186-11-00821

Diesel oil storage tank pipe support detail

SUDIN

21/02/13

MD1-0-V-191-01-10001

STG Building EOT Crane General Arrangement Drawings

SUDIN

02/04/13

MD1-0-V-191-01-10002

Cw pump house eot crane general arrangement drawings

IC

SUDIN

21/02/13

MD1-0-V-191-01-10005

Warehouse EOT Crane General Arrangement Drawings

SUDIN

04/03/13

MD1-0-V-191-01-10006

Fuel oil pump house hoist general arrangement drawings

SUDIN

13/03/13

MD1-0-V-191-01-10008

Fuel oil unloading jetty jib crane general arrangement drawings

SUDIN

08/05/13

MD1-0-V-191-01-10101

Chlorination building hoist general arrangement drawings

SUDIN

13/03/13

MD1-0-V-191-01-10102

Diesel Generator House Hoist General Arrangement Drawings

SUDIN

16/05/13

MD1-0-V-191-01-10105

Return Water Pump House Hoist General Arrangement Drawings

SUDIN

12/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-191-01-10106

Compressed Air System Monorail Hoist General Arrangement Drawings

STS
I

AUTHORISED
SUDIN

RECEIVED
21/01/13

MD1-0-V-191-01-10107

Water treatment building hoist general arrangement drawings

SUDIN

13/03/13

MD1-0-V-191-01-10108

Pa fan rotor hoist general arrangement drawings

IC

SUDIN

20/03/13

MD1-0-V-191-01-10109

Pa fan motor hoist general arrangement drawings

IC

SUDIN

20/03/13

MD1-0-V-191-01-10110

Sa fan rotor hoist general arrangement drawings

IC

SUDIN

20/03/13

MD1-0-V-191-01-10111

Sa fan motor hoist general arrangement drawings

IC

SUDIN

20/03/13

MD1-0-V-191-01-10112

Aph basket hoist general arrangement drawings

IC

SUDIN

20/03/13

MD1-0-V-191-01-10113

Boiler area hoist general arrangement drawings

IC

SUDIN

20/03/13

MD1-0-V-191-01-10114

Stripper cooler hoist general arrangement drawings

IC

SUDIN

20/03/13

MD1-0-V-191-01-10115

Loopseal blower hoist general arrangement drawings

IC

SUDIN

20/03/13

MD1-0-V-191-01-10116

Stripper cooler blower hoist general arrangement drawings

IC

SUDIN

20/03/13

MD1-0-V-191-01-10117

Fire protection pump house general arrangement drawings

SUDIN

13/03/13

MD1-0-V-191-01-10118

Waste water area pump room hoist general arrangement drawings

SUDIN

13/03/13

MD1-0-V-191-01-10119

Chlorination building vaporizer hoist general arrangement drawings

SUDIN

13/03/13

MD1-0-V-191-01-10120

CCWC Monorail Hoist General Arrangement Drawings

SUDIN

06/02/13

MD1-0-V-191-01-10124

Hydrogen Seal Oil Unit Monorail Hoist General Arrangement Drawings

SUDIN

28/01/13

MD1-0-V-191-01-10125

Stator Winding Liquid Cooling Unit Monoral Hoist General Arrangement

SUDIN

04/03/13

MD1-0-V-191-01-10207

ACWP Manual Hoist General Arrangement Drawings

SUDIN

04/03/13

MD1-0-V-191-01-10208

FWH Manual Hoist General Arrangement Drawings

SUDIN

04/03/13

MD1-0-V-191-01-10209

Condenser Manual Hoist General Arrangement Drawings

SUDIN

04/03/13

MD1-0-V-191-01-60001

Foundation Information Drawing for CW Intake Screen Plant Gantry Crane

SUDIN

31/05/13

MD1-0-V-191-05-00001

Inspection test plan for cranes & hoists

SUDIN

23/05/13

MD1-0-V-191-05-00002

Inspection Test Procedure for Cranes & Hoists

SUDIN

23/05/13

MD1-0-V-191-05-00003

WPS & PQR for Cranes & Hoists

SUDIN

23/05/13

MD1-0-V-191-05-10000

Painting specification & procedure for crane & hoist

SUDIN

08/07/13

MD1-0-V-191-05-40000

Packing Procedure for Crane & Hoist

IC

SUDIN

08/07/13

MD1-0-V-191-09-10001

Technical Data Sheet for Cranes & Hoists

RT

SUDIN

22/11/12

MD1-0-V-400-05-00221

Inspection and Test Plan for CS Pipes (Seamless)

SUDIN

25/02/13

MD1-0-V-400-05-00222

Inspection test procedure for cs pipes (seamless)

SUDIN

21/02/13

MD1-0-V-400-05-00226

Inspection and test plan for cs pipes(seam)

SUDIN

03/05/13

MD1-0-V-400-05-00227

Inspection and test procedure for cs pipes(seam)

SUDIN

03/05/13

MD1-0-V-400-05-00326

Inspection and test plan for ss pipes(seam)

SUDIN

08/05/13

MD1-0-V-400-05-00327

Inspection and test procedure for ss pipes(seam)

SUDIN

26/03/13

MD1-0-V-400-05-00421

Inspection and Test Plan for GRP Pipe

SUDIN

10/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-400-05-00422

Inspection and Test Procedure for GRP Pipes

AUTHORISED
SUDIN

RECEIVED
16/11/12

MD1-0-V-400-05-00423

Approved shop test & inspection report for grp pipes

SUDIN

03/05/13

MD1-0-V-400-05-00528

Inspection and test plan for carbon forged fitting

SUDIN

20/03/13

MD1-0-V-400-05-00621

Inspection and test plan for cs / ss fitting

SUDIN

12/06/13

MD1-0-V-400-05-00623

ITP for CS / SS Fitting

SUDIN

12/06/13

MD1-0-V-400-05-00624

Pmi procedure for cs / ss fitting

IC

SUDIN

27/03/13

MD1-0-V-400-05-00625

Wps & pqr for cs / ss fitting

IC

SUDIN

27/03/13

MD1-0-V-400-05-00626

Marking procedure for cs / ss fitting

SUDIN

12/06/13

MD1-0-V-400-05-00627

Rust prevention procedure for cs / ss fitting

SUDIN

27/03/13

MD1-0-V-400-05-00628

Packing procedure for cs / ss fitting

SUDIN

20/03/13

MD1-0-V-400-05-00821

Inspection & test plan for cs & ss flanges

SUDIN

13/03/13

MD1-0-V-400-05-01011

Handling & Storage Instruction for HDE Piping

SUDIN

19/02/13

MD1-0-V-400-05-01012

Instruction of Underground Installation

SUDIN

08/11/12

MD1-0-V-400-05-01013

Heat Fusion Joining Instruction

SUDIN

08/11/12

MD1-0-V-400-05-01014

Leak Testing Instruction

SUDIN

08/11/12

MD1-0-V-400-05-01015

Maintenance & Repair Instruction

SUDIN

08/11/12

MD1-0-V-400-05-01021

Inspection & Test Plan

SUDIN

14/11/12

MD1-0-V-400-05-01022

Inspection & Test Procedure

SUDIN

04/03/13

MD1-0-V-400-05-01121

Inspection and Test Plan for Groove Coupling Fitting

SUDIN

21/02/13

MD1-0-V-400-05-01151

Inspection and Test Plan for Bolt & Nuts

SUDIN

14/06/13

MD1-0-V-400-05-01152

Inspection and Test Procedure for Bolt & Nuts

SUDIN

13/06/13

MD1-0-V-400-05-01161

Inspection and Test Plan for Gasket

SUDIN

06/06/13

MD1-0-V-400-05-01221

Inspection and Test Plan for Cast Valves

SUDIN

19/06/13

MD1-0-V-400-05-01222

Inspection and test procedure for cast valves (manual & auto)

IC

SUDIN

25/03/13

MD1-0-V-400-05-01233

Operation & maintenance manual for cast valves

SUDIN

20/03/13

MD1-0-V-400-05-01322

Inspection and test procedure for forged valves (manual & auto)

IC

SUDIN

26/03/13

MD1-0-V-400-05-01333

Operation & maintenance manual for forged valves

SUDIN

02/05/13

MD1-0-V-400-05-01521

Shop inspection and test plan for safety and relief valve

SUDIN

14/03/13

MD1-0-V-400-05-01522

Inspection and test procedure for safety valve

SUDIN

27/05/13

MD1-0-V-400-05-01622

Inspection and test procedure for butterfly & check valves

SUDIN

02/05/13

MD1-0-V-400-05-01721

Inspection and test plan for non-return check valves

SUDIN

02/05/13

MD1-0-V-400-05-01722

Inspection and Test Procedure for Combined NRV

IC

SUDIN

28/03/13

MD1-0-V-400-05-01733

Operation & maintenance manual for combined nrv dn2400

SUDIN

02/05/13

MD1-0-V-400-05-02122

Inspection and test procedure for strainers

SUDIN

25/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-400-05-02133

Operation and maintenance manual for strainers

STS
I

AUTHORISED
SUDIN

RECEIVED
25/02/13

MD1-0-V-400-05-02221

Inspection and test plan for traps(steam/air)

SUDIN

13/03/13

MD1-0-V-400-05-02222

Inspection and test procedure for traps(steam/air)

SUDIN

26/03/13

MD1-0-V-400-05-02233

Operation & maintenance manual for traps(steam/air)

SUDIN

04/03/13

MD1-0-V-400-05-02321

Inspection and Test Plan for Flexible & Expansion Joint

SUDIN

28/05/13

MD1-0-V-400-05-02322

Inspection and test procedure for flexible & expansion joint

SUDIN

25/02/13

MD1-0-V-400-05-02333

Operation & maintenance manual for flexible & expansion joint

SUDIN

25/02/13

MD1-0-V-400-07-00411

Stress analysis report for grp pipes

SUDIN

17/07/13

MD1-0-V-400-09-01211

Data sheet for motor operated cast valves

SUDIN

26/03/13

MD1-0-V-400-09-01212

Data Sheet for Power Assisted Non Return Valves

AC

SUDIN

11/04/13

MD1-0-V-400-09-01611

Datasheet for motor operated butterfly valve

SUDIN

13/06/13

MD1-0-V-400-09-01711

Datasheet for combined nrv dn2400

SUDIN

11/03/13

MD1-0-V-400-09-02111

Datasheet for Strainers

SUDIN

10/06/13

MD1-0-V-400-09-02211

DataSheet for Traps(steam/air)

SUDIN

19/06/13

MD1-0-V-400-10-00411

Component Dimension Table For GRP Pipes

SUDIN

22/11/12

MD1-0-V-400-10-01211

Outline drawing for manual cast valves

SUDIN

26/03/13

MD1-0-V-400-10-01212

Outline drawing for motor operated cast valves

SUDIN

26/03/13

MD1-0-V-400-10-01213

Outline Drawing for Power Assisted Non Return Valves

IC

SUDIN

11/04/13

MD1-0-V-400-10-01711

Outline drawing for combined nrv dn2400

SUDIN

02/04/13

MD1-0-V-400-10-02111

Outline drawing for strainers

SUDIN

10/06/13

MD1-0-V-400-10-02211

Outline Drawing for Traps(steam/air)

SUDIN

19/06/13

MD1-0-V-400-23-00411

Piping Arrangement Drawing for GRP Pipes (1 of 2)

SUDIN

18/12/12

MD1-0-V-400-23-00412

Piping Arrangement Drawing for GRP Pipes (2 of 2)

SUDIN

18/12/12

MD1-0-V-400-25-02421

Painting procedure at shop for hanger & support

SUDIN

04/03/13

MD1-0-V-400-25-02422

Material handling & packing procedure for hanger & support

IC

SUDIN

04/03/13

MD1-0-V-400-25-02423

Heat treatment procedure for hanger & support

SUDIN

13/03/13

MD1-0-V-400-25-02424

Wps & pqr for hanger & support

SUDIN

13/03/13

MD1-0-V-400-25-02425

Inspection and test plan for hanger & support

SUDIN

03/04/13

MD1-0-V-400-25-02426

Inspection and test procedure for hanger & support

SUDIN

13/03/13

MD1-0-V-400-25-02427

Non destructive examination procedure for hanger & support

SUDIN

13/03/13

MD1-0-V-400-25-02428

Function test procedure for hanger & support

SUDIN

13/03/13

MD1-0-V-560-01-00003

Anode Arrangement Drawings for Cathodic Protection System

SUDIN

24/01/13

MD1-0-V-560-11-00001

Layout & Circuit Diagrams for Cathodic Protection System

SUDIN

24/01/13

MD1-0-V-594-02-00001

Technical Specification & Drawing of Boiler Elevator

SUDIN

06/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-V-594-02-00002

Technical Specification & Drawing of Administration Building Elevator

AUTHORISED
SUDIN

RECEIVED
06/06/13

MD1-0-V-594-02-00003

Catalogue for Elevator(Boiler & Admin. Building)

SUDIN

06/06/13

MD1-0-V-594-05-00002

Shop Test and Inspection Plan for Elevator (Boiler & Admin. Building)

SUDIN

12/07/13

MD1-0-V-594-05-00003

Field Test and Inspection Plan for Elevator (Boiler & Admin. Building)

SUDIN

12/07/13

MD1-0-V-594-05-00004

Inspection & Test Procedure for Elevator (Boiler & Admin. Building)

SUDIN

12/07/13

MD1-0-V-594-05-00005

Manual for Installation, Erection, Operation & Maintenance for Elevator

SUDIN

12/07/13

MD1-0-V-594-08-00002

Spare Part and Special Tool List for Elevator (Boiler & Admin. Building)

SUDIN

12/07/13

MD1-0-V-660-09-30001

Datasheet and Catalog for Pressure and Temperature Indicator (BOP)

SUDIN

25/06/13

MD1-0-V-660-11-30001

Dimensional Drawing for Pressure and Temperature Indicator (BOP)

SUDIN

25/06/13

MD1-0-V-710-57-10001

Material Approval Request Air Conditioning System

SUDIN

19/06/13

MD1-0-V-710-57-10002

Inspection and test plan & inspection and test procedure

SUDIN

02/05/13

MD1-0-V-710-57-20001

Material Approval Request of Ventilation Fans

SUDIN

28/06/13

MD1-0-V-710-57-20002

Inspection and Test Plan & Inspection Test Procedure of Ventilation Fans

SUDIN

06/06/13

MD1-0-V-750-01-00121

General Arrangement Drawing for Fix Foam Unit

SUDIN

08/03/13

MD1-0-V-750-05-00137

PROJECT QUALITY PLAN FOR FIRE FIGHTING

SUDIN

08/02/13

MD1-0-V-750-05-00138

INSPECTION AND TEST PLAN FOR FIRE FIGHTING

SUDIN

08/02/13

MD1-0-V-750-05-00139

SHOP INSPECTION & TEST PROCEDURE FOR FIRE FIGHTING

SUDIN

08/02/13

MD1-0-V-750-05-00140

Field Commissioning and Test Procedure for Clean Agent Fire Extinguishing Syste)

SUDIN

01/08/13

MD1-0-V-750-05-00401

Operation and Maintenance Manual for Fire Protection System

IC

SUDIN

30/07/13

MD1-0-V-750-08-00005

Sub-Vendor List

IC

SUDIN

28/01/13

MD1-0-V-750-09-00006

Equipment Data Sheet: Outdoor Hydrant

SUDIN

19/06/13

MD1-0-V-750-09-00007

Equipment Data Sheet: Hose Cabinet

SUDIN

08/05/13

MD1-0-V-750-09-00008

Equipment Data Sheet: Isolation Valve for Hydrant

SUDIN

08/05/13

MD1-0-V-750-09-00009

Equipment Data Sheet: Valve Box for Gate Valve for Hydrant

SUDIN

08/05/13

MD1-0-V-750-09-00010

Equipment Data Sheet: Post Indicator Valve

SUDIN

08/05/13

MD1-0-V-750-09-00011

Equipment Data Sheet: Guard Post for Fire Hydrant & PIV (Quotation Item A-7.0)

SUDIN

08/05/13

MD1-0-V-750-09-00012

Equipment Data Sheet: Indoor Hydrant (Quotation Item No.B-1.0)

SUDIN

08/05/13

MD1-0-V-750-09-00013

Equipment Data Sheet: Hose Reel

SUDIN

08/05/13

MD1-0-V-750-09-00014

Equipment Data Sheet: Pressure Guage (Quotation Item No.B-3.0 and E-11.0)

SUDIN

11/04/13

MD1-0-V-750-09-00015

Equipment Data Sheet: Fire Department Connection (Quot No.B-4.0, C-8.0 and E-10)

SUDIN

08/05/13

MD1-0-V-750-09-00016

Equipment Data Sheet: Check Valve

SUDIN

08/05/13

MD1-0-V-750-09-00017

Equipment Data Sheet: OS&Y Gate Valve (Blass Material)

SUDIN

11/04/13

MD1-0-V-750-09-00018

Equipment Data Sheet: Prossure Transmitter

SUDIN

08/05/13

MD1-0-V-750-09-00019

Equipment Data Sheet: Deluge Valve

AC

SUDIN

19/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

TITLE

STS

MD1-0-V-750-09-00020

Equipment Data Sheet: Water Spray Nozzle

AUTHORISED
SUDIN

RECEIVED
19/06/13

MD1-0-V-750-09-00021

Equipment Data Sheet: Y Strainer

SUDIN

11/04/13

MD1-0-V-750-09-00022

Equipment Data Sheet: Alarm Check Valve

SUDIN

11/04/13

MD1-0-V-750-09-00023

Equipment Data Sheet: Sprinkler Head

SUDIN

19/06/13

MD1-0-V-750-09-00024

Equipment Data Sheet: Flexible Sprinkler Hose

AC

SUDIN

04/12/12

MD1-0-V-750-09-00025

Equipment Data Sheet: Test Valve

SUDIN

08/05/13

MD1-0-V-750-09-00026

Equipment Data Sheet: Bladder Foam Tank Skid

SUDIN

08/05/13

MD1-0-V-750-09-00027

Equipment Data Sheet: Foam Monitor

SUDIN

19/06/13

MD1-0-V-750-09-00028

Equipment Data Sheet: Foam Chamber

SUDIN

11/04/13

MD1-0-V-750-09-00029

Equipment Data Sheet: Low Expansion Foam Concentrate

SUDIN

11/04/13

MD1-0-V-750-09-00030

Equipment data sheet : fix foam unit

SUDIN

10/04/13

MD1-0-V-750-09-00031

Equipment Data Sheet: FM-200 Fire Suppresion System

SUDIN

08/05/13

MD1-0-V-750-09-00032

Equipment Data Sheet: Portable ABC Dry Chemical Fire Extinguisher

SUDIN

08/05/13

MD1-0-V-750-09-00033

Equipment Data Sheet: Portable CO2 Fire Extinguisher

SUDIN

08/05/13

MD1-0-V-750-09-00034

Equipment Data Sheet: Mobile Dry Powder Extinguisher

SUDIN

08/05/13

MD1-0-V-750-09-00035

Equipment Data Sheet: Mobile CO2 Extinguisher

SUDIN

08/05/13

MD1-0-V-750-09-00036

Equipment Data Sheet: Rescue and Salvage Equipment

SUDIN

08/05/13

MD1-0-V-750-12-00004

Bill of materials

IC

SUDIN

28/01/13

MD1-0-V-750-21-00065

Clean Agent Fire Extinguishing Sytem for Main Control Room (Control BLDG)

SUDIN

11/03/13

MD1-0-V-750-21-00073

Clean Agent Fire Extinguishing Sytem for Electronic Equip. Room (Control BLDG)

SUDIN

11/03/13

MD1-0-V-750-21-00081

Clean Agent Fire Extinguishing Sytem for Control & Protection Room (SWYD Control

SUDIN

11/03/13

MD1-0-V-750-21-00089

Clean agent fire extinguishing system piping & instrumentation drawing for esp

SUDIN

11/03/13

MD1-0-V-750-21-00097

Clean agent fire extinguishing system piping & instrumentation drawing for esp

SUDIN

11/03/13

MD1-0-V-750-21-00105

Clean agent fire extinguishing system piping & instrumentation drawing for cont

SUDIN

08/05/13

MD1-0-V-750-23-00066

Clean Agent Fire Extinguishing System General Drawing for Main Control Room

SUDIN

11/03/13

MD1-0-V-750-23-00074

Clean Agent Fire Extinguishing System Piping General Drawing for Electronic Room

SUDIN

11/03/13

MD1-0-V-750-23-00082

Clean Agent Fire Exting. Syst Piping General Drawing for Control & Protection Rm

SUDIN

11/03/13

MD1-0-V-750-23-00090

Clean agent fire extinguishing system piping & instrumentation drawing for esp

SUDIN

11/03/13

MD1-0-V-750-23-00098

Clean agent fire extinguishing system piping general arrangement drawing for es

SUDIN

11/03/13

MD1-0-V-750-23-00106

Clean agent fire extinguishing system piping general arrang drawing for control

SUDIN

08/05/13

MD1-0-V-750-23-00143

Vesda System Piping General Arrangement Drawing

SUDIN

23/04/13

MD1-0-V-750-24-00068

Clean agent fire extinguishing system piping iso metric drawing for main contro)

SUDIN

21/02/13

MD1-0-V-750-24-00076

Clean agent fire extinguishing system piping iso metric drawing for electronic )

SUDIN

21/02/13

MD1-0-V-750-24-00084

Clean agent fire extinguishing system piping iso metric drawing for control)

SUDIN

21/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-750-24-00092

Clean agent fire extinguishing system piping iso metric drawing for esp controlc

STS
I

AUTHORISED
SUDIN

RECEIVED
11/03/13

MD1-0-V-750-24-00100

Calculation sheets for clean agent fire extinguishing system:esp control room (c

SUDIN

11/03/13

MD1-0-V-750-24-00108

Clean agent fire extinguishing system piping iso metric drawing for control & eq

SUDIN

08/05/13

MD1-0-V-750-25-00067

Clean Agent Fire Exting. Syst Cylinder Install for Main Control Room (SWYD)

SUDIN

11/03/13

MD1-0-V-750-25-00075

Clean Agent Fire Exting. Syst Cylinder Install for Electronic Equip Room

SUDIN

11/03/13

MD1-0-V-750-25-00083

Clean Agent Fire Exting. Syst Cylinder Install for Control & Protection room

SUDIN

11/03/13

MD1-0-V-750-25-00091

Clean agent fire extinguishing system cylinder installation & pipe support deta

SUDIN

11/03/13

MD1-0-V-750-25-00099

Clean agent fire extinguishing system cylinder installation & pipe support deta

SUDIN

11/03/13

MD1-0-V-750-25-00107

Clean agent fire extinguishing system cylinder installation & pipe support detai

SUDIN

08/05/13

MD1-0-V-750-55-00058

Calculation Sheet for Clean Agent Fire Exting. Sys: Main Control Room

SUDIN

11/04/13

MD1-0-V-750-55-00059

Calculation Sheet for Clean Agent Fire Exting. Sys: Electronic Equip. Room

SUDIN

11/04/13

MD1-0-V-750-55-00060

Calculation Sheet for Clean Agent Fire Exting. Sys: Control & Protection Room

SUDIN

11/04/13

MD1-0-V-750-55-00061

Calculation sheets for clean agent fire extinguishing system : esp control room

SUDIN

11/03/13

MD1-0-V-750-55-00062

Calculation sheets for clean agent fire extinguishing system : esp control room

SUDIN

11/03/13

MD1-0-V-750-55-00063

Calculation sheets for clean agent fire extinguishing system : control & equip

SUDIN

08/05/13

MD1-0-V-750-55-00144

Calculation Sheets for Vesda System

SUDIN

23/04/13

MD1-0-V-751-02-00012

Suction & Discharge Pressure Gauge for Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-02-00013

Air Release Valve Data for Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-02-00014

Flow Meter Data for Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-02-00015

Gate Valve & Check Valve Data for Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-02-00105

Engine Data for Diesel Fire Water Pump

SUDIN

09/04/13

MD1-0-V-751-02-00111

Coupling Data for Diesel Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-02-00113

Nose Data Sheet for Diesel Fire Water Pump

SUDIN

09/04/13

MD1-0-V-751-02-00206

Coupling Data for Electric Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-02-00208

Nose Data sheet Electric Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-02-00305

Coupling Data for Jockey Pump

SUDIN

04/12/12

MD1-0-V-751-02-00306

Nose Data sheet for Jockey Pump

SUDIN

04/12/12

MD1-0-V-751-03-00003

Cause & Effect Chart for Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-03-00004

Phylosophy of Operation for Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-05-00016

Inspection & test plan for fire water pumps

SUDIN

22/03/13

MD1-0-V-751-05-00017

Hydrostatic test procedure for fire water pumps

AC

SUDIN

22/02/13

MD1-0-V-751-07-00401

Mechanical Run Test Report for Diesel Fire Pump

SUDIN

06/06/13

MD1-0-V-751-07-00402

Hydrostatic Test Report for Diesel Fire Pump

SUDIN

06/06/13

MD1-0-V-751-07-00403

Performance Test Report for Diesel Fire Pump

SUDIN

06/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-751-07-00404

Engine Test Record for Diesel Fire Pump

STS
I

AUTHORISED
SUDIN

RECEIVED
06/06/13

MD1-0-V-751-07-00406

Impeller Balance Record for Diesel Fire Pump

SUDIN

06/06/13

MD1-0-V-751-07-00408

NDE Test Report for Diesel Fire Pump

SUDIN

06/06/13

MD1-0-V-751-07-00409

Visual & Dimension Inspection Report for Diesel Fire Pump

SUDIN

06/06/13

MD1-0-V-751-07-00410

Painting Inspection Report for Diesel Fire Pump

SUDIN

06/06/13

MD1-0-V-751-07-00411

Hydrostatic Test Report for Electric Fire Pump

SUDIN

06/06/13

MD1-0-V-751-07-00412

Performance Test Report for Electric Fire Pump

SUDIN

06/06/13

MD1-0-V-751-07-00415

Impeller Balance Record for Electric Fire Pump

SUDIN

06/06/13

MD1-0-V-751-07-00417

NDE Test Report for Electric Fire Pump

SUDIN

06/06/13

MD1-0-V-751-07-00418

Visual & Dimension Inspection Report for Electric Fire Pump

SUDIN

06/06/13

MD1-0-V-751-07-00419

Painting Inspection Report for Electric Fire Pump

SUDIN

06/06/13

MD1-0-V-751-07-00420

Hydrostatic Test Report for Jockey Pumps

SUDIN

06/06/13

MD1-0-V-751-07-00421

Performance Test Report for Jockey Pumps

SUDIN

06/06/13

MD1-0-V-751-07-00422

Motor Test Report for Jockey Pumps

SUDIN

06/06/13

MD1-0-V-751-07-00423

Controller Functional Test Record for Jockey Pumps

SUDIN

06/06/13

MD1-0-V-751-07-00425

Visual & Dimension Inspection Report for Jockey Pumps

SUDIN

06/06/13

MD1-0-V-751-07-00426

Painting Inspection Report for Jockey Pumps

IC

SUDIN

06/06/13

MD1-0-V-751-07-00427

NDE Test Report for Jockey Pumps

SUDIN

06/06/13

MD1-0-V-751-09-00101

Pump Data Sheet & Performance Curve for Diesel Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-09-00201

Pump Data Sheet & Performance Curve for Electric Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-09-00301

Pump Data Sheet & Performance Curve for Jockey Pump

SUDIN

04/12/12

MD1-0-V-751-10-00102

General Arrangement Drawing for Diesel Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-10-00107

Fuel Tank Drawing for Diesel Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-10-00110

Muffler Drawing for Diesel Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-10-00112

Pressure Relief Valve Drawing with Waste Cone for Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-10-00202

General Arrangement Drawing for Electric Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-10-00207

Casing Relief Valve Drawing for Electric Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-10-00302

General Arrangement Drawing for Jockey Pump

SUDIN

04/12/12

MD1-0-V-751-11-00103

Cross Sectional Drwg & BOM for Diesel Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-11-00104

Sound Enclosure Dwg for Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-11-00108

High & Lowe Fuel Level Switch Drwg for Jockey Pump

SUDIN

04/12/12

MD1-0-V-751-11-00203

Pump Cross Sectional Drwg & BOM for Electric Fire Water Pump

SUDIN

04/12/12

MD1-0-V-751-11-00303

Pump Cross Sectional Drwg & BOM for Jockey Pump

SUDIN

04/12/12

MD1-0-V-751-21-00002

Piping & Instrument Diagram for Fire Water Pump

SUDIN

27/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-751-34-00109

Cooling Loop Drawing for Diesel Fire Water Pump

STS
I

AUTHORISED
SUDIN

RECEIVED
04/12/12

MD1-0-V-751-35-00106

Controller Date for Diesel Fire Water Pump

SUDIN

30/07/13

MD1-0-V-751-35-00205

Controller Date for Electric Fire Water Pump

SUDIN

30/07/13

MD1-0-V-751-35-00307

Controller Date for Jockey Pump

SUDIN

04/12/12

MD1-0-V-805-01-00001

General Arrangement Drawing for Water Treatment (1 of 7)

SUDIN

22/01/13

MD1-0-V-805-01-00002

General Arrangement Drawing for Water Treatment (2 of 7)

SUDIN

22/01/13

MD1-0-V-805-01-00003

General Arrangement Drawing for Water Treatment (3 of 7)

SUDIN

22/01/13

MD1-0-V-805-01-00004

General Arrangement Drawing for Water Treatment (4 of 7)

SUDIN

22/01/13

MD1-0-V-805-01-00005

General Arrangement Drawing for Water Treatment (5 of 7)

SUDIN

22/01/13

MD1-0-V-805-01-00006

General Arrangement Drawing for Water Treatment (6 of 7)

SUDIN

22/01/13

MD1-0-V-805-01-00007

General Arrangement Drawing for Water Treatment (7 of 7)

SUDIN

22/01/13

MD1-0-V-805-02-00004

Piping material classification for wt & wwt system

SUDIN

28/06/13

MD1-0-V-805-05-00001

Project Quality Assurance Plan

SUDIN

08/02/13

MD1-0-V-805-05-00002

Inspection and Test Plan (ITP)

SUDIN

02/04/13

MD1-0-V-805-05-00003

Inspection and test procedure

SUDIN

28/06/13

MD1-0-V-805-05-00005

Method Statement for WT & WWT System Installation Work

IC

SUDIN

28/03/13

MD1-0-V-805-05-00021

Painting specification and procedure for wt & wwt

SUDIN

21/02/13

MD1-0-V-805-05-00022

Lining specification for wt&wwt system

SUDIN

28/06/13

MD1-0-V-805-05-00025

Non destructive examination(nde) procedures

SUDIN

02/04/13

MD1-0-V-805-06-10000

Seismic & Wind Load Calculation for WT & WWT

SUDIN

06/06/13

MD1-0-V-805-08-00003

Equipment list for wt & wwt

SUDIN

10/07/13

MD1-0-V-805-08-00011

Travelling Trashrack Rake Assembly

SUDIN

07/11/12

MD1-0-V-805-08-00015

Lubricant list for wt & wwt system

SUDIN

22/02/13

MD1-0-V-805-08-00020

Piping Line List for WT & WWT System

SUDIN

10/07/13

MD1-0-V-805-08-00038

Quality Inspection and Test Plan for Seawater Intake Facilities

IC

SUDIN

23/10/12

MD1-0-V-805-08-00039

NDE procedure for Seawater Intake Facilities

SUDIN

08/11/12

MD1-0-V-805-08-00068

Test Procedure (at Factory) for Seawater Intake Facilities

SUDIN

15/03/13

MD1-0-V-805-08-00069

Control Procedure (at Factory) for Seawater Intake Facilities

IC

SUDIN

23/11/12

MD1-0-V-805-09-01001

Centrifugal pump & motor data sheet for wt & wwt

RT

SUDIN

12/04/13

MD1-0-V-805-09-01002

Diaphragm pump & motor data sheet for wt & wwt system

AC

SUDIN

28/06/13

MD1-0-V-805-09-01003

Agitator with motor data sheet for wt & wwt system

AC

SUDIN

28/06/13

MD1-0-V-805-09-01004

Blower with motor data sheet for wt & wwt system

AC

SUDIN

28/06/13

MD1-0-V-805-09-01005

Heater exchanger data sheet for wt system

AC

SUDIN

28/06/13

MD1-0-V-805-09-01006

Line mixer data sheet for wt & wwt system

AC

SUDIN

28/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-805-09-01007

Safety shower & eye washer data sheet for wt & wwt system

AC

AUTHORISED
SUDIN

RECEIVED
28/06/13

MD1-0-V-805-09-01008

Pipe oil skimmer for api & cpi for wwt system

AC

SUDIN

28/06/13

MD1-0-V-805-09-01009

Booster pump with motor data sheet for wt system

AC

SUDIN

12/04/13

MD1-0-V-805-09-02001

Electric heater data sheet for wt & wwt system

SUDIN

28/06/13

MD1-0-V-805-10-00015

Sea Water Intake Facility Travelling Band Screen

SUDIN

07/11/12

MD1-0-V-805-10-00016

Sea Water Intake Facility Stop Log & Lifting Beam & Guide Ways

SUDIN

07/11/12

MD1-0-V-805-10-00019

Sea Water Intake Facility Fine Bar Screen-Assembly

SUDIN

07/11/12

MD1-0-V-805-10-00020

Sea Water Intake Facility Coarse Bar Screen-Assembly

SUDIN

07/11/12

MD1-0-V-805-21-00001

Piping & Instrument Diagram for WT & WWT

SUDIN

15/11/12

MD1-0-V-805-21-00002

Nameplate drawing for wt & wwt

SUDIN

07/03/13

MD1-0-V-805-21-00006

Sea Water Intake Facility P&ID

AC

SUDIN

02/11/12

MD1-0-V-810-10-01001

Clarifier Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-810-10-01002

Automatic Gravity Filter Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-810-10-01003

Polymer solution tank assembly & detail drawing for wt

SUDIN

22/02/13

MD1-0-V-810-10-01004

Coagulant solution tank assembly & detail drawing for wt

SUDIN

22/02/13

MD1-0-V-810-10-01005

Caustic solution tank assembly & detail drawing for wt

SUDIN

22/02/13

MD1-0-V-810-10-01006

Naocl dosing tank assembly & detail drawing for wt

SUDIN

22/02/13

MD1-0-V-820-10-01001

Activated Carbon Filter Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-820-10-01002

Carbon Exchanger Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-820-10-01003

Defasifier & Degasified Water Tank Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-820-10-01004

Anion Exchanger Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-820-10-01005

Mixed Bed Polisher Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-820-10-01006

Acid Storage Tank Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-820-10-01007

Caustic Storage Tank Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-820-10-01008

Resin Trap for Ion Exchanger Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-820-10-01009

Instrument Air Receiver Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-820-10-01010

Service Air Receiver Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-820-10-01011

Fume scrubber assembly & detail drawing for wt & wwt

SUDIN

22/02/13

MD1-0-V-820-10-01012

Salt dissolving tank for anion assembly & detail drawing for wt

SUDIN

22/02/13

MD1-0-V-820-10-01013

Mobile Equipment Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-820-10-01014

Acid Measuring Tank for Cation & MB Ex. Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-820-10-01015

Caustic Measuring Tank for Anion & M.B Ex. Assembly & Detail Drawing for WT

SUDIN

10/12/12

MD1-0-V-830-10-01001

Naocl dosing tank for potable assembly & detail drawing for wt

SUDIN

22/02/13

MD1-0-V-830-10-01002

Activated Carbon Filter for Potable Assembly & Detail Drawing for WT

SUDIN

10/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-840-10-01001

Clarifer Assembly & Detail Drawing for WWT

STS
I

AUTHORISED
SUDIN

RECEIVED
10/12/12

MD1-0-V-840-10-01002

Activated Carbon Filter Assembly & Detail Drawing for WWT

SUDIN

10/12/12

MD1-0-V-840-10-01003

Sludge Thickner Assembly & Detail Drawing for WWT

SUDIN

10/12/12

MD1-0-V-840-10-01004

Acid Sotrage Tank Assembly & Detail Drawing for WWT

SUDIN

10/12/12

MD1-0-V-840-10-01005

Caustic Sotrage Tank Assembly & Detail Drawing for WWT

SUDIN

10/12/12

MD1-0-V-840-10-01006

Acid Measuring Tank Assembly & Detail Drawing for WWT

SUDIN

10/12/12

MD1-0-V-840-10-01007

Caustic Dilution Tank Assembly & Detail Drawing for WWT

SUDIN

10/12/12

MD1-0-V-840-10-01008

Caustic Measuring Tank Assembly & Detail Drawing for WWT

SUDIN

10/12/12

MD1-0-V-840-10-01009

Caustic Dilution Tank Assembly & Detail Drawing for WWT

SUDIN

10/12/12

MD1-0-V-840-10-01010

Polymer solution tank assembly & detail drawing for wwt

SUDIN

22/02/13

MD1-0-V-840-10-01011

Coagulant solution tank assembly & detail drawing for wwt

SUDIN

22/02/13

MD1-0-V-840-10-01012

Pressure Filter Assembly & Detail Drawing for WWT

SUDIN

10/12/12

MD1-0-V-840-10-01013

Walkway assembly & detail drawing for wwt

SUDIN

22/02/13

MD1-0-V-850-01-00001

General Arrangement for Chemical Dosing System

SUDIN

05/12/12

MD1-0-V-850-02-00001

Piping Material Specification for Boiler Chemical Dosing System

SUDIN

27/03/13

MD1-0-V-850-02-00002

Painting specification and procedure for boiler chemical dosing system

SUDIN

15/03/13

MD1-0-V-850-03-00001

System description for boiler chemical dosing system

SUDIN

06/05/13

MD1-0-V-850-04-00001

Code and Standard for Boiler Chemical Dosing System

SUDIN

04/03/13

MD1-0-V-850-05-00002

Inspection Test Report for Boiler Chemical Dosing System

SUDIN

28/06/13

MD1-0-V-850-05-00005

Weld procedures specification(wps) and qualification records(pqr) for all tank

IC

SUDIN

12/04/13

MD1-0-V-850-05-00006

Non-Destructive Examination(NDE) Procedures for Boiler Chemical Dosing System

SUDIN

27/06/13

MD1-0-V-850-05-00007

Inspection and test plan(itp) for boiler chemical dosing system

IC

SUDIN

12/04/13

MD1-0-V-850-05-00008

Inspection and test procedure for boiler chemical dosing system

IC

SUDIN

12/04/13

MD1-0-V-850-08-00003

Equipment List for Boiler Chemical Dosing System

SUDIN

24/01/13

MD1-0-V-850-08-00014

Utility and Chemical Consumption List for Chemical Dosing System

SUDIN

27/03/13

MD1-0-V-850-08-00015

Lubricant List for Boiler Chemical Dosing System

SUDIN

04/03/13

MD1-0-V-850-08-00016

Valve List for Boiler Chemical Dosing System

SUDIN

04/03/13

MD1-0-V-850-08-00017

Pipe Line List for Boiler Chemical Dosing System

SUDIN

31/01/13

MD1-0-V-850-09-00001

Motor Data Sheet for Boiler Chemical Dosing System

SUDIN

24/04/13

MD1-0-V-850-09-00003

Equipment Date Sheet for Boiler Chemical Dosing System

SUDIN

10/05/13

MD1-0-V-850-09-00004

Pump Data Sheet for Boiler Chemical Dosing System

SUDIN

24/04/13

MD1-0-V-850-21-00001

Piping and Instrument Diagram Chemical Dosing System

SUDIN

03/04/13

MD1-0-V-860-01-00005

General Arrangement for Gaseous Chlorination System

SUDIN

19/02/13

MD1-0-V-860-01-00006

Piping Arrangement Drawing for Gaseous Chlorination System

SUDIN

12/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-V-860-02-00001

Code and Standard for Gaseous Chlorination System

SUDIN

11/01/13

MD1-0-V-860-02-00002

Weld Procedures Spec.(WPS)& Qualification Records(QPR) Gaseous Chlorinations Sys

SUDIN

11/04/13

MD1-0-V-860-02-00008

Piping material classification for gaseous chlorination

SUDIN

11/01/13

MD1-0-V-860-03-00002

System Design and Operational Description For Gaseous Chlorination System

SUDIN

21/02/13

MD1-0-V-860-03-00004

System Description for Gaseous Chlorination System

SUDIN

26/04/13

MD1-0-V-860-05-00011

Non-Destructive Examination (NDE) Procedures Gasous Chlorination

SUDIN

22/01/13

MD1-0-V-860-05-00012

Project Quality Assurance Plan for Gaseous Chlorination System

SUDIN

22/01/13

MD1-0-V-860-05-00013

Inspection and Test Plan(ITP) for Gaseous Chlorination System

SUDIN

13/06/13

MD1-0-V-860-05-00014

Inspection and Test Procedure for Gaseous Chlorination System

SUDIN

27/06/13

MD1-0-V-860-05-00020

Painting Specification and Procedure for Gaseous Chlorination System

SUDIN

29/05/13

MD1-0-V-860-08-00003

Equipment List for Gaseous Chlorination System

SUDIN

05/12/12

MD1-0-V-860-08-00017

Control Valve List for Gaseous Chlorination System

SUDIN

19/02/13

MD1-0-V-860-08-00021

Utility and chemical Consumption List for Gaseous Chlorination System

SUDIN

05/02/13

MD1-0-V-860-08-00022

Lubricanting List for Gaseous Chlorination System

SUDIN

12/07/13

MD1-0-V-860-08-00023

Valve List for Gaseous Chlorination System

SUDIN

29/05/13

MD1-0-V-860-09-00004

Equipment data sheet for gaseous Chlorination System

SUDIN

15/03/13

MD1-0-V-860-09-00005

Pump Data Sheet and performance Curves Characteristic Gaseous Chlorination

SUDIN

05/02/13

MD1-0-V-860-09-00006

Blower Data Sheet and Performance Curves Characteristic Gaseous

SUDIN

05/02/13

MD1-0-V-860-21-00001

P & I Diagram for Gaseous Chlorination System (1 of 2)

SUDIN

14/03/13

MD1-0-V-860-21-00002

P & I Diagram for Gaseous Chlorination System (2 of 2)

SUDIN

14/03/13

MD1-0-V-860-21-00003

P & I Diagram for Chlorine Gas Neutralizing System

SUDIN

14/03/13

MD1-0-V-860-21-00004

P & I Diagram for Chlorine Gas Analysis System

SUDIN

14/03/13

MD1-0-V-860-21-00005

P & I Diagram for Gaseous Chlorination System (interlock) (1 of 3)

SUDIN

14/03/13

MD1-0-V-860-21-00006

P & I Diagram for Gaseous Chlorination System (interlock) (2 of 3)

SUDIN

14/03/13

MD1-0-V-860-21-00007

P & I Diagram for Gaseous Chlorination System (interlock) (3 of 3)

SUDIN

14/03/13

MD1-0-V-870-01-00005

General arrangement for sewage treatment system

IC

SUDIN

04/03/13

MD1-0-V-870-02-00004

Piping material classification for sewage treatment system

SUDIN

13/03/13

MD1-0-V-870-03-00003

System Description for Sewage Treatment System

SUDIN

28/05/13

MD1-0-V-870-05-00007

Project Quality Assurance Plan for Sewage Treatment System

SUDIN

21/01/13

MD1-0-V-870-05-00008

Inspection and Test Plan for Sewage Treatment System

SUDIN

10/04/13

MD1-0-V-870-05-00009

Inspection and Test Procedure for Sewage Treatment System

IC

SUDIN

04/07/13

MD1-0-V-870-05-00014

Painting specification and procedure for sewage treatment system

SUDIN

07/03/13

MD1-0-V-870-08-00003

Equipment list for sewage treatment system

SUDIN

14/03/13

MD1-0-V-870-08-00015

Utility and Chemical Consumption List for Sewage Treatment System

SUDIN

02/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-870-09-00004

Equipment data sheet for sewage treatment system

AUTHORISED
SUDIN

RECEIVED
03/05/13

MD1-0-V-870-11-00003

Equipment sizing details for sewage treatment system

SUDIN

14/03/13

MD1-0-V-870-21-00001

P&i diagram for sewage treatment system

SUDIN

07/03/13

MD1-0-W-800-57-00001

Water Balance Diagram

SUDIN

04/03/13

MD1-0-W-810-21-00001

P & I Diagram for Preliminary Raw Water Treatment System

SUDIN

30/07/13

MD1-0-W-810-22-00001

Flow Diagram for Preliminary Raw Water Treatment System

SUDIN

04/01/13

MD1-0-W-820-03-00001

System Description for Water Treatment System

SUDIN

06/06/13

MD1-0-W-820-06-00001

Calculation Sheet for Water Treatment System

SUDIN

19/12/12

MD1-0-W-820-21-00001

P & I Diagram for Demineralized Water Treatment System (1)

SUDIN

30/07/13

MD1-0-W-820-21-00002

P & I Diagram for Demineralized Water Treatment System (2)

SUDIN

30/07/13

MD1-0-W-820-22-00001

Flow Diagram for Demineralized Water Treatment System

SUDIN

04/01/13

MD1-0-W-830-21-00001

P & I Diagram for Portable Water Treatment System

SUDIN

30/07/13

MD1-0-W-830-22-00001

Flow Diagram for Portable Water Treatment System

SUDIN

04/01/13

MD1-0-W-840-03-00001

System Description for Waste Water Treatment System

SUDIN

03/04/13

MD1-0-W-840-06-00001

Calculation Sheet for Waste Water Treatment System

SUDIN

19/12/12

MD1-0-W-840-21-00001

P & I Diagram for Waste Water Treatment System (1)

SUDIN

30/07/13

MD1-0-W-840-21-00002

P & I Diagram for Waste Water Treatment System (2)

SUDIN

30/07/13

MD1-0-W-840-22-00001

Flow Diagram for Waste Water Treatment System

SUDIN

04/01/13

MD1-0-W-850-06-00001

Calculation Sheet for Boiler Chemical Dosing System

SUDIN

13/03/13

MD1-0-W-850-21-00001

P & I Diagram Chemical Dosing System

SUDIN

30/07/13

MD1-0-W-850-22-00001

Flow Diagram for Chemical Dosing System

SUDIN

04/01/13

MD1-0-W-860-03-00001

System Description for Gaseous Chlorination System

SUDIN

03/04/13

MD1-0-W-860-06-00001

Calculation Sheet for Gaseous Chlorination System

SUDIN

19/12/12

MD1-0-W-860-21-00001

P & I Diagram for Gaseous Chlorination System

SUDIN

30/07/13

MD1-0-W-860-22-00001

Flow Diagram for Gaseous Chlorination System

SUDIN

04/01/13

MD1-0-W-870-21-00001

P & I Diagram for Sewage Treatment System

SUDIN

30/07/13

MD1-0-W-870-22-00001

Flow Diagram for Sewage Treatment System

SUDIN

04/01/13

MD1-1-P-122-24-00011

Piping Isometric Drawing - Valve Sealing Water System (Unit #1)

SUDIN

10/06/13

MD1-1-P-131-24-00001

Piping Isometric Drawing- Steam Circulating Water System (Unit #1)

SUDIN

20/12/12

MD1-1-P-131-24-00011

Piping Isometric Drawing- Aux. Cooling Water System (Unit #1)

SUDIN

16/07/13

MD1-1-P-141-24-00001

Piping Isometric Drawing- Closed Cooling Water System (Unit #1)

SUDIN

19/06/13

MD1-1-P-411-01-00001

General Arrangement Drawing- Unit #1 Boiler Area

SUDIN

21/02/13

MD1-1-P-412-01-00001

General Arrangement Drawing- Unit #1 ESP & Main Stack Area

SUDIN

11/04/13

MD1-1-P-412-23-00001

Pipe Arrangement & Support Location Drawing - Electrostatic Precipitator #1A Ara

SUDIN

28/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-1-P-412-23-00002

Pipe Arrangement & Support Location Drawing - Electrostatic Precipitator #1B Ara

STS
I

AUTHORISED
SUDIN

RECEIVED
28/05/13

MD1-1-P-841-24-00001

Piping Isometric Drawing - Waste Water System (Unit #1)

SUDIN

16/07/13

MD1-1-P-851-24-00001

Piping Isometric Drawing - Chemical Dosing System (Unit #1)

SUDIN

10/06/13

MD1-2-P-122-24-00011

Piping Isometric Drawing - Valve Sealing Water System (Unit #2)

SUDIN

10/06/13

MD1-2-P-131-24-00001

Piping Isometric Drawing- Circulating Water System (Unit #2)

SUDIN

20/12/12

MD1-2-P-131-24-00011

Piping Isometric Drawing- Aux. Cooling Water System (Unit #2)

SUDIN

16/07/13

MD1-2-P-141-24-00001

Piping Isometric Drawing- Closed Cooling Water System (Unit #2)

SUDIN

19/06/13

MD1-2-P-411-01-00001

General Arrangement Drawing- Unit # 2 Boiler Area

SUDIN

21/02/13

MD1-2-P-412-01-00001

General Arrangement Drawing- Unit # 2 ESP & Main Stack Area

SUDIN

11/04/13

MD1-2-P-412-23-00001

Pipe Arrangement & Support Location Drawing - Electrostatic Precipitator #2A Ara

SUDIN

28/05/13

MD1-2-P-412-23-00002

Pipe Arrangement & Support Location Drawing - Electrostatic Precipitator #2B Ara

SUDIN

28/05/13

MD1-2-P-841-24-00001

Piping Isometric Drawing - Waste Water System (Unit #2)

SUDIN

16/07/13

MD1-2-P-851-24-00001

Piping Isometric Drawing - Chemical Dosing System (Unit #2)

SUDIN

10/06/13

MD1-V-171-01-00078

Technical Data Sheet for Conveyor Belting for Chs

SUDIN

11/04/13

MD1-V-171-08-00005

Conveyor Belt Schedule for Coal handling System

SUDIN

11/04/13

MD1-V-850-11-00002

Name Plate Drawing and List of all Equipment in KKS Sys for Chemical Dosing Sys

SUDIN

03/04/13

MD1-V-850-23-00001

Pipimg Arrangement Drawings Chemical Dosing System

SUDIN

03/04/13

DISCIPLINE = MTBN, Mechanical Turbine


MD1-0-M-110-03-00002

System Discription- Turbine Bypass System

DAVID

19/06/13

MD1-0-M-110-21-00021

P & I Diagram- Turbine Bypass System (1/2)

DAVID

19/06/13

MD1-0-M-110-21-00022

P & I Diagram - Turbine Bypass System (2/2)

DAVID

19/06/13

MD1-0-M-110-21-00051

P & I Diagram- Aux. Steam System (1/2)

DAVID

19/06/13

MD1-0-M-110-21-00052

P & I Diagram- Aux. Steam System (2/2)

DAVID

19/06/13

MD1-0-P-420-01-00001

General Arrangement Drawing-Steam Turbine Building Plan Section (A-A)

DAVID

02/04/13

MD1-0-P-420-01-00011

General Arrangement Drawing-Steam Turbine Building Plan Section (B-B)

DAVID

02/04/13

MD1-0-T-030-05-00397

ITP for Steam Turbine-Generator Installation

AC

DAVID

02/05/13

MD1-0-T-053-05-00451

Method Statement for Condenser Lifting

IC

ALAN

31/07/13

MD1-0-V-111-01-00001

Steam Turbine Mechanical Outline (1/2)

SOUMEN

02/11/12

MD1-0-V-111-01-00002

Steam Turbine Mechanical Outline (2/2)

SOUMEN

02/11/12

MD1-0-V-111-01-00003

Arrangement of Steam Pipes & Valves

IC

DAVID

27/03/13

MD1-0-V-111-01-00012

Inspection and Test Plan for Turbine

DAVID

22/07/13

MD1-0-V-111-01-00014

Major Turbine Components Lift & Laydown (1/2)

SOUMEN

05/11/12

MD1-0-V-111-01-00015

Major Turbine Components Lift & Laydown (2/2)

SOUMEN

05/11/12

MD1-0-V-111-01-00018

Piping arrangement of lube oil system (1/4)

IC

DAVID

03/04/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-111-01-00019

Piping arrangement of lube oil system (2/4)

IC

AUTHORISED
DAVID

RECEIVED
03/04/13

MD1-0-V-111-01-00020

Piping arrangement of lube oil system (3/4)

IC

DAVID

03/04/13

MD1-0-V-111-01-00021

Piping arrangement of lube oil system (4/4)

IC

DAVID

03/04/13

MD1-0-V-111-01-00022

Steam Turbine & Generator Anchor Bolt Plan

MARK

11/10/12

MD1-0-V-111-01-00023

Arrangement of Grout Pads & Foundation Plates for Steam Turbine (1/2)

MARK

11/10/12

MD1-0-V-111-01-00024

Arrangement of Grout Pads & Foundation Plates for Steam Turbine (2/2)

MARK

11/10/12

MD1-0-V-111-01-00025

Turbine Conduit Location

MARK

11/10/12

MD1-0-V-111-01-00034

Steam Turbine Foundation Interface (1/3)

DAVID

02/04/13

MD1-0-V-111-01-00035

Steam Turbine Foundation Interface (2/3)

DAVID

02/04/13

MD1-0-V-111-01-00036

Steam Turbine Foundation Interface (3/3)

DAVID

02/04/13

MD1-0-V-111-01-00037

Arrangement- Turbine Lagging Support

DAVID

02/04/13

MD1-0-V-111-01-00045

Piping arrangement of generator end shield(turbine end)

IC

DAVID

03/04/13

MD1-0-V-111-01-00046

Piping arrangement of generator end shield(collector end)

IC

DAVID

03/04/13

MD1-0-V-111-01-00047

Guidance for Maintenance Disassembly Area of Unit 1 Steam Turbine and Generator)

RJ

DAVID

24/05/13

MD1-0-V-111-01-00048

Guidance for Maintenance Disassembly Area of Unit 2 Steam Turbine and Generator)

RJ

DAVID

24/05/13

MD1-0-V-111-01-00230

Turbine Air Piping (1/2)

DAVID

16/07/13

MD1-0-V-111-01-00231

Turbine Air Piping (2/2)

DAVID

16/07/13

MD1-0-V-111-01-00400

Generator Mechanical Outline (1/2)

SOUMEN

02/11/12

MD1-0-V-111-01-00401

Generator Mechanical Outline (2/2)

SOUMEN

02/11/12

MD1-0-V-111-01-00402

Arrange of Grout Pads & FDN Plates For Gen.

MARK

11/10/12

MD1-0-V-111-01-00403

Suggested Side Thrust Support For Foundation Plate and Location of Jacking Posts

MARK

11/10/12

MD1-0-V-111-01-00404

Stator Lifting Arrangement

IC

SOUMEN

11/10/12

MD1-0-V-111-01-00405

Generator & Exciter Lagging Supports

DAVID

08/03/13

MD1-0-V-111-01-00406

Stator Frame Feet and Hardware (1/2)

MARK

11/10/12

MD1-0-V-111-01-00407

Stator Frame Feet and Hardware (2/2)

MARK

11/10/12

MD1-0-V-111-01-00414

Generator Foundation Interface (1/2)

SOUMEN

25/06/12

MD1-0-V-111-01-00415

Generator Foundation Interface (2/2)

SOUMEN

25/06/12

MD1-0-V-111-01-00419

Piping Connections Generator (1of2)

DAVID

12/06/13

MD1-0-V-111-01-00420

Piping Connections Generator (2of2)

DAVID

12/06/13

MD1-0-V-111-03-00001

System Description of Steam Turbine and Generator

SOUMEN

20/12/12

MD1-0-V-111-03-00400

System Description of Stator Winding Liquid Cooling System

AC

DAVID

04/04/13

MD1-0-V-111-03-00401

System Description of Generator Shaft Seal System

AC

DAVID

04/04/13

MD1-0-V-111-03-00402

System Description of Gas Control System

AC

DAVID

04/04/13

MD1-0-V-111-05-00001

Turbine Startup and Shutdown Curves

RT

SOUMEN

15/10/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-111-05-00002

Lube Oil Flushing Schmatic & Connection

IC

AUTHORISED
SOUMEN

RECEIVED
01/11/12

MD1-0-V-111-05-00003

Turbine Startup and Shutdown Procedure

DAVID

28/03/13

MD1-0-V-111-05-00004

Method Statement for Steam Turbine Installation Work

SOUMEN

11/10/12

MD1-0-V-111-05-00010

Quality Assurance Program and Procedure Manual

SOUMEN

13/09/12

MD1-0-V-111-05-00016

Packing Prodcedure

DAVID

04/03/13

MD1-0-V-111-05-00017

Long Term Storage Instruction for Steam Turbine & Auxiliary System

IC

DAVID

08/07/13

MD1-0-V-111-05-00022

Specification of ASME PTC 6 Flow Section

AC

DAVID

12/06/13

MD1-0-V-111-05-00031

Hydrostatic Test Procedure for Turbine HIP Casing

IC

DAVID

01/07/13

MD1-0-V-111-05-00032

Leak Test Procedure for Turbine LP Casing

DAVID

02/04/13

MD1-0-V-111-05-00033

Pressure Test Procedure for Turbine HIP Casing

AC

DAVID

24/05/13

MD1-0-V-111-05-00034

Over Speed & Balancing Test Procedure for Turbine HIP & LP Rotor

DAVID

02/04/13

MD1-0-V-111-05-00035

Function test procedure for hydraulic power unit

IC

DAVID

08/05/13

MD1-0-V-111-05-00100

Welding Procedure For Generator Stator Frame

SOUMEN

14/09/12

MD1-0-V-111-05-00150

WPS/PQR for Turbine LP Casing

SOUMEN

28/01/13

MD1-0-V-111-05-00151

Qualified welder table for turbine lp inner casing

DAVID

26/03/13

MD1-0-V-111-05-00152

Post Weld Heat Treatment Procedure for Turbine LP Casing

IC

DAVID

23/07/13

MD1-0-V-111-05-00153

WPS & PQR for Turbine LP Inner Casing

DAVID

11/06/13

MD1-0-V-111-05-00154

Qualified welder table for turbine lp inner casing

DAVID

08/05/13

MD1-0-V-111-05-00155

Post weld heat treatment procedure for turbine lp inner casing

IC

DAVID

08/05/13

MD1-0-V-111-05-00156

WPS & PQR for Turbine & Generator Piping(MSP, LOP, GSP)

IC

DAVID

08/07/13

MD1-0-V-111-05-00158

Qualified Welder Table for Turbine & Generator Piping

DAVID

08/07/13

MD1-0-V-111-05-00159

WPS & PQR for Crossover Pipe

DAVID

12/07/13

MD1-0-V-111-05-00160

Post Weld Heat Treatment Procedure for Crossover Pipe

IC

DAVID

12/07/13

MD1-0-V-111-05-00161

WPS & PQR for Lube Oil Tank

DAVID

10/07/13

MD1-0-V-111-05-00162

WPS & PQR for Lagging

DAVID

10/07/13

MD1-0-V-111-05-00163

WPS & PQR for Seal Oil System

DAVID

10/07/13

MD1-0-V-111-06-00001

Performance Test Steam Seal Flow Calculations

SOUMEN

30/07/12

MD1-0-V-111-06-00002

Steam Turbine Overspeed Calculation

IC

SOUMEN

02/04/13

MD1-0-V-111-07-00001

Rotor Dynamics Report

SOUMEN

05/11/12

MD1-0-V-111-07-00002

Campbell Diagram of Blades

SOUMEN

05/11/12

MD1-0-V-111-08-00002

Line list of steam turbine

IC

DAVID

04/03/13

MD1-0-V-111-08-00006

Equipment List for Steam Turbine & Generator

IC

SOUMEN

04/04/13

MD1-0-V-111-08-00007

Electrical Load List for Steam Turbine & Generator

DAVID

22/03/13

MD1-0-V-111-08-00402

Terminal Point List for Generator System

IC

SOUMEN

15/11/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-111-09-00001

Valve Characteristic Curve (MSV,CV,RSV,CIV)

STS
I

AUTHORISED
SOUMEN

RECEIVED
27/07/12

MD1-0-V-111-09-00002

Foundation Loading Data for STG

DAVID

24/04/13

MD1-0-V-111-09-00003

Turbine Generator Foundation

DAVID

24/04/13

MD1-0-V-111-09-00004

Misalignment Tolerance Matrix (MTM)

SOUMEN

12/07/12

MD1-0-V-111-09-00005

Extraction System Data Sheet- SE 11/39

IC

SOUMEN

27/07/12

MD1-0-V-111-09-00007

HVAC Data for Steam Turbine & Generator

SOUMEN

26/10/12

MD1-0-V-111-09-00008

Extraction System Requirements

SOUMEN

27/07/12

MD1-0-V-111-09-00010

Utility Consumption List for Steam Turbine & Generator

IC

SOUMEN

04/04/13

MD1-0-V-111-10-00001

Outline-Main Stop & control Valve (1/2)

DAVID

27/03/13

MD1-0-V-111-10-00002

Outline-Main Stop & control Valve (2/2)

IC

DAVID

27/03/13

MD1-0-V-111-10-00003

Outline- Combined Reheat Valve Outline (1/2)

DAVID

27/03/13

MD1-0-V-111-10-00004

Outline- Combined Reheat Valve Outline (2/2)

IC

DAVID

27/03/13

MD1-0-V-111-10-00005

Turbine Cross Section Assembly (1 of 2)

SOUMEN

05/11/12

MD1-0-V-111-10-00006

Turbine Cross Section Assembly (2 of 2)

SOUMEN

05/11/12

MD1-0-V-111-10-00007

Outline of S/T Hydraulic Power Unit (1/2)

SOUMEN

02/04/13

MD1-0-V-111-10-00008

Outline of S/T Hydraulic Power Unit (2/2)

SOUMEN

02/04/13

MD1-0-V-111-10-00009

Outline Lube Oil Conditioner

IC

DAVID

02/05/13

MD1-0-V-111-10-00012

Gland Steam Condenser Outline

IC

DAVID

23/04/13

MD1-0-V-111-10-00013

Assembly of Tubine Exhausted Hood To Condenser (1/4)

DAVID

24/08/12

MD1-0-V-111-10-00014

Assembly of Tubine Exhausted Hood To Condenser (2/4)

DAVID

24/08/12

MD1-0-V-111-10-00015

Assembly of Tubine Exhausted Hood To Condenser (3/4)

DAVID

24/08/12

MD1-0-V-111-10-00016

Assembly of Tubine Exhausted Hood To Condenser (4/4)

DAVID

24/08/12

MD1-0-V-111-10-00017

Turbine Exhaust Hood Anchor & Guide Bracket Ass'y (1/3)

DAVID

24/08/12

MD1-0-V-111-10-00018

Turbine Exhaust Hood Anchor & Guide Bracket Ass'y (2/3)

DAVID

24/08/12

MD1-0-V-111-10-00019

Turbine Exhaust Hood Anchor & Guide Bracket Ass'y (3/3)

DAVID

24/08/12

MD1-0-V-111-10-00020

Temporary Device for Steam Blowing Out-MSV

SOUMEN

18/02/13

MD1-0-V-111-10-00021

Temporary Device for Steam Blowing Out-CRV

SOUMEN

18/02/13

MD1-0-V-111-10-00022

Outline- Ventilator Valve

SOUMEN

05/11/12

MD1-0-V-111-10-00023

Outline of Reverse Flow Valve

SOUMEN

05/11/12

MD1-0-V-111-10-00024

Outline-turbine lagging enclosure (1/2)

DAVID

02/04/13

MD1-0-V-111-10-00030

Outline of Relief Valve for Steam Turbine

SOUMEN

05/11/12

MD1-0-V-111-10-00032

Lube oil cooler outline

IC

DAVID

29/04/13

MD1-0-V-111-10-00033

Flow diagram for lube oil conditioner

IC

DAVID

02/05/13

MD1-0-V-111-10-00400

Stator Winding Liquid Cooling Unit Outline

DAVID

24/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-111-10-00401

H2 & CO2 Control Valve Outline (1/2)

STS
I

AUTHORISED
SOUMEN

RECEIVED
02/11/12

MD1-0-V-111-10-00402

H2 & CO2 Control Valve Outline (2/2)

SOUMEN

02/11/12

MD1-0-V-111-10-00403

Hydrogent Manifold Outline

DAVID

24/08/12

MD1-0-V-111-10-00404

CO2 Manifold Outline

SOUMEN

02/11/12

MD1-0-V-111-10-00405

Liquid Detector Outline

SOUMEN

02/11/12

MD1-0-V-111-10-00406

Hydrogent Gas Dryer (1/2)

DAVID

24/08/12

MD1-0-V-111-10-00407

Hydrogent Gas Dryer (2/2)

DAVID

24/08/12

MD1-0-V-111-10-00408

Hydrogent Control Cabinet Outline

DAVID

24/08/12

MD1-0-V-111-10-00409

Hydrogent Seal Oil Supply Unit Outline

IC

DAVID

04/04/13

MD1-0-V-111-10-00410

Float Trap Outline

DAVID

23/04/13

MD1-0-V-111-10-00411

Hydrogen Cooler Outline

SOUMEN

18/10/12

MD1-0-V-111-10-00412

Auxiliary Detraining Section Outline

SOUMEN

20/12/12

MD1-0-V-111-10-00414

Generator Seal Oil Drain Enlargement

SOUMEN

20/12/12

MD1-0-V-111-10-00415

Hydrogen Gas Dryer (3/3)

IC

DAVID

24/04/13

MD1-0-V-111-11-0000

Bearing alignment diagram

SOUMEN

31/01/13

MD1-0-V-111-11-00001

Typical Sections for Cont. Thermowells

SOUMEN

25/09/12

MD1-0-V-111-11-00002

Turbine Casing Nozzle Weld Preparation Information for Fields Connection

IC

SOUMEN

06/11/12

MD1-0-V-111-11-00003

Bearing Alignment Diagram

SOUMEN

08/03/13

MD1-0-V-111-11-00004

Weld Preparations Information for Valve

IC

SOUMEN

06/11/12

MD1-0-V-111-21-00003

P&ID Steam (Cold Reheat Steam & Steam Extractions System)

SOUMEN

17/12/12

MD1-0-V-111-21-00011

P&ID Lube Oil Tank (2/2)

IC

SOUMEN

17/12/12

MD1-0-V-111-21-00012

P&ID Hydraulic Fluid System (Symbol & Legend) (1/7)

SOUMEN

17/12/12

MD1-0-V-111-21-00402

P&ID Generator Shalft Seal System Schematic (1/2)

DAVID

02/05/13

MD1-0-V-111-21-00403

P&ID Generator Shalft Seal System Schematic (2/2)

DAVID

02/05/13

MD1-0-V-111-21-00404

H2 & CO2 Control Piping Diagram (1/2)

SOUMEN

16/11/12

MD1-0-V-111-21-00405

H2 & CO2 Control Piping Diagram (2/2)

SOUMEN

16/11/12

MD1-0-V-111-22-00001

Flow Diagram for TBN Lube Oil Purification System

AC

SOUMEN

27/07/12

MD1-0-V-111-23-00001

Piping Arrangement of Lube Oil Conditioner System

SOUMEN

20/12/12

MD1-0-V-111-23-00002

Piping Arangement for Hydraulic Fluid Piping

SOUMEN

27/07/12

MD1-0-V-111-23-00400

Piping arrangement for generator

DAVID

02/05/13

MD1-0-V-111-55-00004

Steam Turbine Supplementary Design Data

DAVID

30/08/12

MD1-0-V-112-05-00007

Nde procedure for turbine bypass system

DAVID

02/04/13

MD1-0-V-112-09-00001

Technical specification(data) sheet for hp bypass valve (vlb-160btc) for turbinm

AC

DAVID

26/02/13

MD1-0-V-112-09-00002

Technical specification(data) sheet for hp spray water valve (840h) for turbinem

AC

DAVID

26/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-112-09-00003

Technical specification(data) sheet for hp spray water isolation valve (840h) fm

AC

AUTHORISED
DAVID

RECEIVED
26/02/13

MD1-0-V-112-09-00004

Technical specification(data) sheet for lp steam stop valve (vs-500bt) for turbm

AC

DAVID

26/02/13

MD1-0-V-112-09-00005

Technical specification(data) sheet for lp bypass valve (vlr-500btc) and lp des

AC

DAVID

26/02/13

MD1-0-V-112-09-00006

Technical specification(data) sheet for lp spray water valve (840h) for turbinem

AC

DAVID

26/02/13

MD1-0-V-112-09-00007

Technical specification(data) sheet for lp spray water isolation valve (840g)

AC

DAVID

26/02/13

MD1-0-V-113-01-00001

Steam Surface Condenser- General Layout (Condenser "A" & "B")

SOUMEN

04/02/13

MD1-0-V-113-01-00002

Condenser-General-Arrangement (Plan View) (Condenser "A")

SOUMEN

04/02/13

MD1-0-V-113-01-00003

Condenser-General-Arrangement (Side Elevation) (Condenser "A")

SOUMEN

04/02/13

MD1-0-V-113-01-00004

Condenser-General-Arrangement (Inlet/Outlet End View) (Condenser "A")

SOUMEN

04/02/13

MD1-0-V-113-01-00005

Condenser-General Arrangement (Reversing End View) (Condenser "A")

SOUMEN

04/02/13

MD1-0-V-113-01-00006

Condenser-General Arrangement (Plan View) (Condenser "B")

SOUMEN

04/02/13

MD1-0-V-113-01-00007

Condenser-General Arrangement (Side Elevation) (Condenser "B")

SOUMEN

04/02/13

MD1-0-V-113-01-00008

Condenser-General Arrangement (Inlet/Outlet End View) (Condenser B)

SOUMEN

04/02/13

MD1-0-V-113-01-00009

Condenser-General Arrangement (Reversing End View) (Condenser "B")

SOUMEN

04/02/13

MD1-0-V-113-04-00017

Condenser- Design Report

DAVID

08/07/13

MD1-0-V-113-05-00022

Condenser-Instruction Manuals for Erection Installation Operation and

SOUMEN

11/01/13

MD1-0-V-113-05-00023

Condenser - performance test procedure

IC

DAVID

26/04/13

MD1-0-V-113-05-00030

Condenser- Quality Inspection Plan

DAVID

21/06/13

MD1-0-V-113-05-00040

Painting Specification and Procedure for Condenser and Auxiliaries

IC

DAVID

23/07/13

MD1-0-V-113-05-00051

Rubber lining procedure

IC

DAVID

29/05/13

MD1-0-V-113-05-00070

Inspection and Test Procedure for Condenser Accessory

IC

DAVID

29/05/13

MD1-0-V-113-08-00010

Steam Surface Condenser- Connection List

SOUMEN

19/12/12

MD1-0-V-113-08-00048

Condenser - Special Tool List

DAVID

12/07/13

MD1-0-V-113-08-00056

Condenser - valve list

DAVID

21/06/13

MD1-0-V-113-09-00014

Condenser- Data Sheet

DAVID

02/05/13

MD1-0-V-113-09-00016

Condenser- Performance Curves

DAVID

23/04/13

MD1-0-V-113-09-00019

Condenser- Equalizing Duct Sizing Datasheet

DAVID

24/04/13

MD1-0-V-113-10-00012

Steam Surface Condenser- Support Pad Arrangement (Condenser "A" & "B")

SOUMEN

19/12/12

MD1-0-V-113-10-00043

Condenser - tubesheet stress analysis report

IC

DAVID

25/06/13

MD1-0-V-113-10-00044

Condenser - main expansion joint datasheet

DAVID

10/06/13

MD1-0-V-113-11-00021

Steam Surface Condenser- Support Pad Arrangement (Condenser "A" & "B")

SOUMEN

19/12/12

MD1-0-V-113-11-00057

Condenser - main expansion joint assembly

DAVID

12/07/13

MD1-0-V-113-11-00058

Condenser - cw expansion joint drawing

DAVID

02/05/13

MD1-0-V-113-55-00015

Condenser- Allowable Nozzle Load

SOUMEN

19/12/12

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project
DOCUMENT NUMBER

REV

TITLE

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

STS

AUTHORISED

RECEIVED

MD1-0-V-113-55-00018

Condenser- Strength Calculation

SOUMEN

06/02/13

MD1-0-V-113-55-00042

Condenser- Thermal Calculation

SOUMEN

04/01/13

MD1-0-V-114-05-00011

Quality assurance program/manual, quality control procedure for the workshop ae

SOUMEN

26/02/13

MD1-0-V-114-06-00001

Forces and Moments Imposed on Nozzle Connections, terminal Points for

IC

DAVID

06/06/13

MD1-0-V-122-03-00001

System description for condensate extraction pump

AC

DAVID

09/04/13

MD1-0-V-122-05-00004

PT proceduce for condensate extraction pump

DAVID

21/06/13

MD1-0-V-122-05-00005

UT proceduce for condensate extraction pump

IC

DAVID

21/06/13

MD1-0-V-122-05-00006

Wps & pqr for cep

DAVID

09/04/13

MD1-0-V-122-11-00001

Suction strainer outline drawing for cep

IC

DAVID

24/04/13

MD1-0-V-123-03-00026

Condenser Vacuum Pump - System Description

AC

DAVID

30/07/13

MD1-0-V-123-05-00016

Condenser Vacuum Pump - Instruction Manuals For Erection, Installation

DAVID

04/03/13

MD1-0-V-123-05-00018

Condenser vaccum pump - quality inspection plan

DAVID

12/06/13

MD1-0-V-123-05-00019

Condenser vaccum pump - inspection and test procedure

DAVID

12/06/13

MD1-0-V-123-08-00012

Condenser Vacuum Pump- Lubricant List

SOUMEN

18/12/12

MD1-0-V-123-08-00017

Condenser Vacuum Pump- Spare Parts List

DAVID

25/02/13

MD1-0-V-123-09-00003

Condenser Vacuum Pump- Data Sheet

DAVID

16/05/13

MD1-0-V-123-09-00004

Condenser Vacuum Pump- Heat Exchanger Data Sheet

DAVID

16/05/13

MD1-0-V-123-09-00010

Condenser Vacuum Pump- Performance Curve

DAVID

07/03/13

MD1-0-V-123-10-00001

Condenser Vacuum Pump- Sectional Drawing

DAVID

07/03/13

MD1-0-V-123-11-00015

Condenser Vacuum Pump- Installation Drawing

DAVID

04/03/13

MD1-0-V-123-21-00002

Condenser Vacuum Pump- P&ID

DAVID

30/07/13

MD1-0-V-123-57-00013

Condenser Vacuum Pump- Valve Data With Drawing

DAVID

07/03/13

MD1-0-V-132-08-00007

Installation Layout

SUDIN

04/04/13

MD1-0-V-134-08-00035

Valve list for tcs

IC

DAVID

26/02/13

MD1-0-V-134-09-00029

Technical data sheet for tcs

DAVID

06/05/13

MD1-0-V-134-11-00009

Equipment outline drawing of ball recirculating monitor

DAVID

02/05/13

MD1-0-V-134-55-00027

Strength calculation sheet for tcs

DAVID

02/05/13

MD1-0-V-134-55-00028

Nozzle calculation sheet for tcs

DAVID

02/05/13

MD1-0-V-135-08-00028

Valve list for df

IC

DAVID

26/02/13

MD1-0-V-135-55-00020

Strength calculation sheet - debris filter

DAVID

06/05/13

MD1-0-V-135-55-00021

Nozzle calculation sheet - debris filter

DAVID

06/05/13

MD1-0-V-185-05-00006

Flash Tank- Size Calculation

IC

DAVID

18/03/13

MD1-0-V-185-10-00001

Flash Tank- "B" Outline Drawing

IC

DAVID

08/05/13

MD1-0-V-185-10-00002

Flash Tank- "A" Outline Drawing

IC

DAVID

08/05/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-185-10-00007

Vent & vent duct detail for flash tank "b"

IC

AUTHORISED
DAVID

RECEIVED
08/07/13

MD1-0-V-185-10-00009

Vent pipe ass'y for flash tank "a"

IC

DAVID

08/07/13

MD1-0-V-185-10-00010

Drain pipe ass'y for flash tank "b"

DAVID

08/07/13

MD1-0-V-185-10-00011

Drain pipe ass'y for flash tank "a"

DAVID

08/07/13

MD1-0-V-870-08-00016

Line list for Sewage Treatment System

SUDIN

25/04/13

MD1-0-V-870-08-00019

Valve list for Sewage Treatment System

SUDIN

25/04/13

MD1-0-V-870-08-00020

Specialty list for Sewage Treatment System

SUDIN

25/04/13

MD1-1-P-420-01-00001

General Arrangement Drawing- Unit#1 Steam Turbine Building Plan (Ground Floor)

DAVID

02/04/13

MD1-1-P-420-01-00002

General Arrangement Drawing- Unit#1 Steam Turbine Building Plan (Mezzanine Fl

DAVID

02/04/13

MD1-1-P-420-01-00003

General Arrangement Drawing- Unit#1 Steam Turbine Building Plan (Operating Floor

DAVID

02/04/13

MD1-1-P-420-01-00004

General Arrangement Drawing- Unit#1 Steam Turbine Building Plan (Roof)

DAVID

02/04/13

MD1-1-P-420-23-00001

Pipe arrangement & support location drwg - unit #1 steam turbine building (1/4)

IC

DAVID

26/06/13

MD1-1-P-420-23-00002

Pipe arrangement & support location drwg - unit #1 steam turbine building (2/4)

DAVID

26/06/13

MD1-1-P-420-23-00003

Pipe arrangement & support location drwg - unit #1 steam turbine building (3/4)

IC

DAVID

26/06/13

MD1-1-P-420-23-00004

Pipe arrangement & support location drwg - unit #1 steam turbine building (4/4)

DAVID

26/06/13

MD1-1-P-420-23-00011

Pipe arrang & support location drwg- unit #1 ST building mezzanine plan (1/2)

IC

DAVID

27/06/13

MD1-1-P-420-23-00012

Pipe arrang & support location drwg- unit #1 ST building mezzanine plan (2/2)

IC

DAVID

27/06/13

MD1-1-P-420-23-00021

Pipe arrangement & support location drawing - unit #1 steam turbine building op)

DAVID

27/06/13

MD1-1-P-420-23-00022

Pipe arrangement & support location drawing - unit #1 steam turbine building op)

IC

DAVID

27/06/13

MD1-1-P-420-23-00031

Pipe arrangement & support location drawing - unit #1 steam turbine building hen

IC

DAVID

27/06/13

MD1-1-P-420-23-00041

Pipe arrangement & support location drawing - unit #1 steam turbine building ron

DAVID

27/06/13

MD1-1-V-411-10-02411

Support Detail Drawing for Main Steam System (Boiler Area #1)

DAVID

08/07/13

MD1-1-V-411-10-02412

Support Detail Drawing for CRH Steam System (Boiler Area #1)

DAVID

08/07/13

MD1-1-V-411-10-02413

Support Detail Drawing for HRH Steam System (Boiler Area #1)

DAVID

08/07/13

MD1-1-V-411-10-02414

Support Detail Drawing for Bypass Steam System (Boiler Area #1)

DAVID

08/07/13

MD1-1-V-411-10-02415

Support Detail Drawing for Feed Water System (Boiler Area #1)

DAVID

08/07/13

MD1-2-P-420-01-00001

General Arrangement Drawing- Unit#2 Steam Turbine Building Plan (Ground Floor)

DAVID

02/04/13

MD1-2-P-420-01-00002

General Arrangement Drawing- Unit#2 Steam Turbine Building Plan (Mezzanine Floor

DAVID

02/04/13

MD1-2-P-420-01-00003

General Arrangement Drawing- Unit#2 Steam Turbine Building Plan (Operating Floor

DAVID

02/04/13

MD1-2-P-420-01-00004

General Arrangement Drawing- Unit#2 Steam Turbine Building Plan (Roof)

DAVID

02/04/13

MD1-2-V-411-10-02411

Support Detail Drawing for Main Steam System (Boiler Area #2)

DAVID

08/07/13

MD1-2-V-411-10-02412

Support Detail Drawing for CRH Steam System (Boiler Area #2)

DAVID

08/07/13

MD1-2-V-411-10-02413

Support Detail Drawing for HRH Steam System (Boiler Area #2)

DAVID

08/07/13

MD1-2-V-411-10-02414

Support Detail Drawing for bypass Steam System (Boiler Area #2)

DAVID

08/07/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-2-V-411-10-02415

Support Detail Drawing for Feed Water System (Boiler Area #2)

STS
I

AUTHORISED
DAVID

RECEIVED
08/07/13

MD1-0-E-500-31-00003

Electrical Phase Diagram

WITTAYA

15/03/13

MD1-0-E-500-31-00021

Single Line Diagram Gen. & SWYD Synchronizing

WITTAYA

14/05/13

MD1-0-E-570-01-00101

General Arrangement Drawing-500KV and 110KV SWYD

WITTAYA

14/05/13

MD1-0-E-570-01-00201

General Arrangement Drawing-110KV SWYD

WITTAYA

14/05/13

MD1-0-E-570-31-00101

Single Line Diagram 500KV SWYD

WITTAYA

10/05/13

MD1-0-E-570-31-00102

Relay Protection & Measurement Diagram 500KV SWYD (B10)

WITTAYA

06/05/13

MD1-0-E-570-31-00103

Relay Protection & Measurement Diagram 500KV SWYD (B20)

WITTAYA

06/05/13

MD1-0-E-570-31-00104

Relay Protection & Measurement Diagram 500KV SWYD (B30)

WITTAYA

06/05/13

MD1-0-E-570-31-00201

Single Line Diagram 110KV SWYD

WITTAYA

22/07/13

MD1-0-E-570-31-00202

Relay Protection & Measurement Diagram 110KV SWYD

WITTAYA

06/05/13

MD1-0-E-590-01-00500

Earthing and Lightning Protection Layout-500KV and 110KV SWYD Index Plan

WITTAYA

28/02/13

MD1-0-E-590-01-00501

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (1)

WITTAYA

11/01/13

MD1-0-E-590-01-00502

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (2)

WITTAYA

11/01/13

MD1-0-E-590-01-00503

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (3)

WITTAYA

28/02/13

MD1-0-E-590-01-00504

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (4)

WITTAYA

11/01/13

MD1-0-E-590-01-00505

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (5)

WITTAYA

11/01/13

MD1-0-E-590-01-00506

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (6)

WITTAYA

28/02/13

MD1-0-E-590-01-00507

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (7)

WITTAYA

28/02/13

MD1-0-E-593-01-25401

Cable Route Plan- Switchyard Control Bldg Ground Floor

WITTAYA

19/12/12

MD1-0-E-593-01-25402

Cable Route Plan- Switchyard Control Bldg 1st Floor

WITTAYA

19/12/12

MD1-0-E-593-01-25403

Cable Route Plan- Switchyard Control Bldg Roof Floor

WITTAYA

19/12/12

MD1-0-V-570-01-00001

500KV and 100KV Switchyard Layout and Section Drawing

WITTAYA

19/11/12

MD1-0-V-570-01-00002

500KV and 110KV Switchyard Lighning System

WITTAYA

04/04/13

MD1-0-V-570-01-00004

500KV and 110KV Switchyard Control & Protection System Panel Layout

WITTAYA

20/12/12

MD1-0-V-570-01-00005

500KV & 110KV Switchyard Control Building Panel Arrangement

WITTAYA

14/03/13

MD1-0-V-570-01-00006

500kV and 110kV Switchyard AC and DC System Panel Layout

WITTAYA

31/01/13

MD1-0-V-570-01-00008

500KV & 110KV Switchyard Cable Raceway Plan

WITTAYA

24/01/13

MD1-0-V-570-01-00010

110KV Switchyard Cable Route Plan

WITTAYA

22/07/13

MD1-0-V-570-02-00001

500kV and 110kV Switchyard Tech. Spec. for Busbar Conductor

WITTAYA

19/12/12

MD1-0-V-570-02-00002

500KV and 110KV Switchyard Technical Specifications for Control and Protection t

WITTAYA

23/07/13

MD1-0-V-570-02-00003

500KV & 110KV Switchyard Technical Specifications for AC and DC System

WITTAYA

22/07/13

MD1-0-V-570-02-00004

500KV & 110KV Switchyard Technical Specification of Computerized Control System

WITTAYA

05/07/13

DISCIPLINE = SWYD, Switchyard

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

STS

MD1-0-V-570-02-00005

500kV and 110kV Switchyard Tech. Spec. for Cable

AUTHORISED
WITTAYA

RECEIVED
22/04/13

MD1-0-V-570-02-00007

500kv and 110kv switchyard technical specification for 220v DC battery

WITTAYA

03/04/13

MD1-0-V-570-05-00008

500KV AND 110KV SWITCHYARD QUALITY ASSURANCE PROGRAM

WITTAYA

08/03/13

MD1-0-V-570-05-00009

Inspection and Test Plan for 123KV Circuit Breaker

WITTAYA

27/02/13

MD1-0-V-570-05-00010

Inspection and test procedure for 123kv circuit breaker

WITTAYA

10/05/13

MD1-0-V-570-05-00011

Inspection and Test Plan for 550KV Circuit Breaker

WITTAYA

27/02/13

MD1-0-V-570-05-00012

Inspection and test procedure for 550kv circuit breaker

WITTAYA

23/05/13

MD1-0-V-570-05-00013

Inspection and Test Plan for 123KV Disconnecting Switch

WITTAYA

22/04/13

MD1-0-V-570-05-00014

Inspection and test procedure for 123kv diconnecting switch

WITTAYA

03/04/13

MD1-0-V-570-05-00015

Inspection and Test Plan for 550KV Disconnecting Switch

WITTAYA

22/04/13

MD1-0-V-570-05-00016

Inspection and test procedure for 550kv disconnecting switch

WITTAYA

03/04/13

MD1-0-V-570-05-00017

Inspection and Test Plan for 123KV Current Transformer

WITTAYA

25/04/13

MD1-0-V-570-05-00018

Inspection and test procedure for 123kv current transformer

WITTAYA

03/04/13

MD1-0-V-570-05-00019

Inspection and Test Plan for 550KV Current Transformer

WITTAYA

25/04/13

MD1-0-V-570-05-00020

Inspection and test procedure for 550kv current transformer

WITTAYA

03/04/13

MD1-0-V-570-05-00021

Inspection and Test Plan for 123KV Voltage Transformer

WITTAYA

25/04/13

MD1-0-V-570-05-00022

Inspection and test procedure for 123KV Voltage Transformer

WITTAYA

25/04/13

MD1-0-V-570-05-00023

Inspection and Test Plan for 550KV Voltage Transformer

WITTAYA

25/04/13

MD1-0-V-570-05-00024

Inspection and test procedure for 550kv voltage transformer

WITTAYA

25/04/13

MD1-0-V-570-05-00025

Inspection and Test Plan for 96KV Surge Arrester

WITTAYA

06/05/13

MD1-0-V-570-05-00026

Inspection and test procedure for 96kv surge arrester

WITTAYA

06/05/13

MD1-0-V-570-05-00027

Inspection and Test Plan for 438KV Surge Arrester

WITTAYA

06/05/13

MD1-0-V-570-05-00028

Inspection and test procedure for 438kv surge arrester

WITTAYA

06/05/13

MD1-0-V-570-05-00029

Inspection and test plan for 123kv post and disc insulator

WITTAYA

03/04/13

MD1-0-V-570-05-00030

Inspection and test procedure for 123kv post and disc insulator

WITTAYA

08/03/13

MD1-0-V-570-05-00031

Inspection and test plan for 550kv post and disc insulator

WITTAYA

03/04/13

MD1-0-V-570-05-00032

Inspection and test procedure for 550kv post and disc insulator

WITTAYA

08/03/13

MD1-0-V-570-05-00037

Inspection and test plan for control and protection panel

WITTAYA

27/02/13

MD1-0-V-570-05-00038

Inspection and test procedure for control and protection panel - 110kv swyd

WITTAYA

06/05/13

MD1-0-V-570-05-00039

Inspection and test plan for control and protection panel - 500kv swyd

WITTAYA

27/02/13

MD1-0-V-570-05-00040

Inspection and test procedure for control and protection panel - 500kv swyd

WITTAYA

06/05/13

MD1-0-V-570-05-00041

Inspection and Test Plan for Switchyard Computerized Control System

WITTAYA

06/05/13

MD1-0-V-570-05-00042

Inspection and Test Procedure for Switchyard Computerized Control System

WITTAYA

06/05/13

MD1-0-V-570-05-00043

Inspection and test plan for ac and dc distribution panel - 110kv swyd

WITTAYA

27/02/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-570-05-00044

Inspection and test procedure for ac and dc distribution panel - 110kv swyd

STS
I

AUTHORISED
WITTAYA

RECEIVED
06/05/13

MD1-0-V-570-05-00045

Inspection and test plan for ac and dc distribution panel-500kv swyd

WITTAYA

27/02/13

MD1-0-V-570-05-00046

Inspection and test procedure for ac and dc distribution panel - 500kv swyd

WITTAYA

06/05/13

MD1-0-V-570-05-00047

Inspection and test plan for switchyard 220v dc battery and battery charger

WITTAYA

06/05/13

MD1-0-V-570-05-00048

Inspection and test procedure for switchyard 220v dc battery and battery charger

WITTAYA

04/03/13

MD1-0-V-570-05-00051

Inspection and test plan for busbar and lightning conductor

WITTAYA

28/02/13

MD1-0-V-570-05-00052

Inspection and test procedure for busbar and lightning conductor

WITTAYA

28/02/13

MD1-0-V-570-05-00053

Inspection and test plan for switchyard cable

WITTAYA

06/05/13

MD1-0-V-570-05-00054

Inspection and test procedure for switchyard cable

WITTAYA

28/02/13

MD1-0-V-570-05-00055

Inspection and test plan for terminal connector and busbar material and accessos

WITTAYA

03/04/13

MD1-0-V-570-05-00056

Inspection and test procedure for terminal connector and busbar material and acs

WITTAYA

27/02/13

MD1-0-V-570-05-00057

Inspection and test plan for communication system

WITTAYA

22/04/13

MD1-0-V-570-05-00058

Inspection and test procedure for communication system

WITTAYA

22/04/13

MD1-0-V-570-05-00059

Site inspection and test plan for switchyard primary equipment

WITTAYA

22/04/13

MD1-0-V-570-05-00061

500kv and 110kv switchyard working method statement

WITTAYA

28/02/13

MD1-0-V-570-05-00062

Site inspection and test procedure for switchyard rocedure for switchyard

WITTAYA

22/04/13

MD1-0-V-570-05-00063

Site Inspection and Test Plan for Switchyard Secondary Equipment

WITTAYA

12/07/13

MD1-0-V-570-05-00064

Site Inspection and Test Procedure for Switchtard Secondary Equipment

WITTAYA

12/07/13

MD1-0-V-570-05-00065

Site inspection and test plan for telecommunication equipment

WITTAYA

22/04/13

MD1-0-V-570-05-00066

Site inspection and test procedure for telecommunication equipment

WITTAYA

22/04/13

MD1-0-V-570-05-00069

Site inspection and test plan for switchyard installation

WITTAYA

06/05/13

MD1-0-V-570-05-00076

500KV and 110KV Switchyard Control and Protection System Operation and Maintenal

WITTAYA

05/07/13

MD1-0-V-570-06-00002

500KV and 110KV Switchyard Lighning Protection Calculation

WITTAYA

31/01/13

MD1-0-V-570-06-00003

500KV and 110KV Switchyard Flood Lighting Calculation

WITTAYA

31/01/13

MD1-0-V-570-06-00004

500kv and 110kv switchyard ct calculation

WITTAYA

02/04/13

MD1-0-V-570-06-00005

500kv and 110kv switchyard vt calculation

WITTAYA

02/04/13

MD1-0-V-570-06-00007

500kv and 110kv switchyard 220v dc system sizing calculation

WITTAYA

03/04/13

MD1-0-V-570-07-00001

110KV Switchyard Equipment Shop Test and Inspection Report

WITTAYA

05/07/13

MD1-0-V-570-07-00003

500KV Switchyard AC/DC System Shop Test and Inspection Report

WITTAYA

08/07/13

MD1-0-V-570-07-00004

110KV Switchyard Control and Protection System Shop Test and Inspection Report

WITTAYA

08/07/13

MD1-0-V-570-08-00006

500KV and 110KV Switchyard Spare Parts and Special Tools List

WITTAYA

21/06/13

MD1-0-V-570-08-00008

110kv switchyard cable schedule

WITTAYA

21/06/13

MD1-0-V-570-08-00009

500kV and 110kV Switchyard Cable Schedule for Computerized Control System

WITTAYA

22/07/13

MD1-0-V-570-08-00012

500kv switchyard cable schedule

WITTAYA

21/06/13

Outgoing document- (latest revision)


2 x 500 MW Mong Duong 1 Thermal Power Plant Project

Report No : 1D1 - STD


Run Date : Thursday, 01 August 13 Time : 09:30:18

DOCUMENT NUMBER

REV

TITLE

MD1-0-V-570-10-00001

500KV & 110KV Switchyard Tech. Specification, Steel Supporting Structure Drwg

WITTAYA

12/10/12

MD1-0-V-570-10-00002

500KV & 110KV Switchyard Tech. Specification, Steel Tower Structr. Drwgs

WITTAYA

12/10/12

MD1-0-V-570-11-00002

500kV and 110kV Switchyard Mounting Guideline

WITTAYA

24/12/12

MD1-0-V-570-11-00003

500KV & 110KV Switchyard Technical Specification, Terminal Connector

WITTAYA

04/04/13

MD1-0-V-570-11-00004

500kV and 110kV Switchyard Earthing Material

WITTAYA

19/12/12

MD1-0-V-570-11-00005

500kV and 110kV Switchyard Lightning Material

WITTAYA

04/04/13

MD1-0-V-570-11-00007

500KV & 110KV Switchyard Technical Specification, Busbar Material- Accessories

WITTAYA

04/04/13

MD1-0-V-570-11-00008

110kV Switchyard Computerized Control System Graphics

IC

WITTAYA

21/06/13

MD1-0-V-570-31-00003

500kV and 110kV Switchyard AC and DC System Single Line Diagram

WITTAYA

31/01/13

MD1-0-V-570-32-00001

500KV & 110KV SWITCHYARD TECHNICAL SPECIFICATION, 500KV CIRCUIT BREAKER

WITTAYA

15/03/13

MD1-0-V-570-32-00002

500KV & 110KV Switchyard Technical Specification, 123 KV Circuit Breaker

WITTAYA

30/01/13

MD1-0-V-570-32-00003

500KV & 110KV Switchyard Technical Specification, 550KV Disconnect Switch

WITTAYA

31/01/13

MD1-0-V-570-32-00004

500KV & 110KV Switchyard Technical Specification, 123KV Disconnect Switch

WITTAYA

31/01/13

MD1-0-V-570-32-00005

500KV & 110KV Switchyard Technical Specification, 550KV Current Transformer

WITTAYA

15/03/13

MD1-0-V-570-32-00006

500KV & 110KV Switchyard Technical Specification, 123KV Current Transformer

WITTAYA

15/03/13

MD1-0-V-570-32-00007

500KV & 110KV Switchyard Tech. Spec, 550KV Capacitive Voltage Transformer

WITTAYA

30/01/13

MD1-0-V-570-32-00008

500KV & 110KV Switchyard Tech. Spec, 123KV Capacitive Voltage Transformer

WITTAYA

30/01/13

MD1-0-V-570-32-00009

500KV & 110KV Switchyard Tech. Spec, 420 KV Surge Arrester

WITTAYA

30/01/13

MD1-0-V-570-32-00010

500KV & 110KV Switchyard Tech. Spec, 96 KV Surge Arrester

WITTAYA

30/01/13

MD1-0-V-570-32-00011

500KV & 110KV Switchyard Tech. Spec, 550KV Post & Disc Insulator

WITTAYA

06/02/13

MD1-0-V-570-32-00012

500KV & 110KV Switchyard Tech. Spec, 123KV Post & Disc Insulator

WITTAYA

14/03/13

MD1-0-V-570-32-00013

500kV and 110kV Switchyard Power Supply Principle for Control

WITTAYA

31/01/13

MD1-0-V-570-32-00015

500kv and 110kv switchyard schematic diagram for ac and dc system

WITTAYA

10/05/13

MD1-0-V-570-32-00017

500KV & 110KV Switchyard Schematic Diagram for Computerized Control System

WITTAYA

05/07/13

MD1-0-V-570-33-00001

500KV and 110KV Switchyard Tripping Matrix

WITTAYA

15/03/13

MD1-0-V-570-33-00002

500KV & 110KV Switchyard Logic Control Diagram

WITTAYA

15/03/13

MD1-0-V-570-36-00001

500KV and 110KV Switchyard Computerized Control System General Configuration

WITTAYA

15/03/13

MD1-0-V-570-36-00004

500kv and 110kv switchyard automatic data collecting and transmitting system gen

WITTAYA

06/05/13

No of Records: 6786

STS

AUTHORISED

RECEIVED

DISCIPLINE = C&I, Control & Instrument


rev

status

MD-0-V-111-31-00714

Panel Outline Drawing for Turbine Control System (1 of 3)

MD-0-V-111-31-00715

Panel Outline Drawing for Turbine Control System (2 of 3)

MD-0-V-111-31-00716

Panel Outline Drawing for Turbine Control System (3 of 3)

MD-0-V-111-31-00732

Panel Outline Drawing for Turbine Control System (1 of 18)

MD-0-V-111-31-00733

Panel Outline Drawing for Turbine Control System (2 of 18)

MD-0-V-111-31-00734

Panel Outline Drawing for Turbine Control System (3 of 18)

MD1-0-E-545-01-00001

Communication Layout-Symbol and Legend

MD1-0-E-545-01-00101

Communication Layout- Installation Details (1)

MD1-0-E-545-01-00102

Communication Layout- Installation Details (2)

MD1-0-E-545-01-00201

Communication Layout- Riser Diagram Telephone System

MD1-0-E-545-01-00301

Communication Layout- Riser Diagram Public Address System

MD1-0-E-545-01-00401

Communication Layout- Riser Diagram CCTV System

MD1-0-E-545-01-00501

Communication Layout- Riser Diagram Lan System

MD1-0-E-545-01-02001

Communication Layout- Turbine BLDG Ground Floor

MD1-0-E-545-01-02002

Communication Layout- Turbine BLDG Mez. Floor

MD1-0-E-545-01-02003

Communication Layout- Turbine BLDG Operating Floor

MD1-0-E-545-01-03001

Communication Layout- Central Control BLDG Ground Floor

MD1-0-E-545-01-03002

Communication Layout- Central Control BLDG 1st Floor

MD1-0-E-545-01-03003

Communication Layout- Central Control BLDG 2nd Floor

MD1-0-E-545-01-03004

Communication Layout- Central Control BLDG 3rd Floor

MD1-0-E-545-01-04101

Communication Layout - Coal Handling Control BLDG

MD1-0-E-545-01-04201

Communication layout - fuel oil pump house

MD1-0-E-545-01-04401

COMMUNICATION LAYOUT - FIRE PROTECTION PUMP HOUSE

MD1-0-E-545-01-04501

Communication Layout - Ash Slurry Pump House Ground Floor

MD1-0-E-545-01-04502

Communication Layout - Ash Slurry Pump House 1st Floor

MD1-0-E-545-01-04601

Communication Layout - ESP Control & Ash Elec. BLDG

MD1-0-E-545-01-04801

Communication Layout - Diesel Generator House

MD1-0-E-545-01-04901

Communication Layout - Cooling Water Pump House

MD1-0-E-545-01-05101

Communication Layout - Gaseous Chlorination BLDG

MD1-0-E-545-01-05201

Communication Layout - Fuel Oil Unloading Pump House

MD1-0-E-545-01-05301

Communication Layout - Return Water Pump House

MD1-0-E-545-01-05401

Communication Layoout-Switchyard Control BLDG Ground Floor

MD1-0-E-545-01-05402

Communication Layoout-Switchyard Control BLDG 1st Floor

MD1-0-E-545-01-05501

COMMUNICATION LAYOUT - WATER TREATMENT BLDG GROUND FLOOR

MD1-0-E-545-01-06401

Communication Layout - Limestone Storage BLDG

MD1-0-E-545-01-06501

Communication Layout - Limestone Handling Control BLDG

MD1-0-E-545-01-06901

Communication Layout - Main Transformer Area Unit1

MD1-0-E-545-01-06902

Communication Layout - Main Transformer Area Unit2

MD1-0-E-545-01-08301

Communication Layout - Workshop BLDG

MD1-0-E-545-01-08401

Communication layout - bulldozer garage

MD1-0-E-545-01-08501

Communication Layout - I&C Electrical and Mechamical Warehouse

MD1-0-E-545-01-08601

Communication Layout- Admin. Bldg Ground Floor

MD1-0-E-545-01-08602

Communication Layout- Admin. Bldg 1st Floor

MD1-0-E-545-01-08603

Communication Layout- Admin. Bldg 2nd Floor

MD1-0-E-545-01-08604

Communication Layout- Admin. Bldg 3rd Floor

MD1-0-E-545-01-08901

Communication Layout- Common Service BLDG

MD1-0-E-750-01-00001

Fire Detection & Alarm System- Symbol and Legend

MD1-0-E-750-01-00051

FIRE DETECTION & ALARM SYSTEM - INSTALLATION DETAIL (1)

MD1-0-E-750-01-00052

FIRE DETECTION & ALARM SYSTEM - INSTALLATION DETAIL (2)

MD1-0-E-750-01-00053

FIRE DETECTION & ALARM SYSTEM - INSTALLATION DETAIL (3)

MD1-0-E-750-01-00061

FIRE DETECTION & ALARM SYSTEM - EQUIPMENT DETAIL (1)

MD1-0-E-750-01-00062

FIRE DETECTION & ALARM SYSTEM - EQUIPMENT DETAIL (2)

MD1-0-E-750-01-00101

Fire Detection & Alarm Layout- Block Diagram

MD1-0-E-750-01-00102

Fire Detection & Alarm Layout- Block Diagram (2)

AC

MD1-0-E-750-01-00151

Fire Detection & Alarm System- Interface Diagram

MD1-0-E-750-01-00201

Fire Detection & Alarm Layout- Riser Diagram (1)

MD1-0-E-750-01-00202

Fire Detection & Alarm Layout- Riser Diagram Steam Turbine BLDG

MD1-0-E-750-01-00203

Fire Detection & Alarm Layout- Riser Diagram (3)

RT

MD1-0-E-750-01-00204

Fire Detection & Alarm Layout- Riser Diagram (4)

MD1-0-E-750-01-00205

Fire Detection & Alarm Layout- Riser Diagram (5)

RT

MD1-0-E-750-01-00206

Fire Detection & Alarm Layout- Riser Diagram (6)

MD1-0-E-750-01-00207

Fire Detection & Alarm System - Riser Diagram Coal Handling Control BLDG.

MD1-0-E-750-01-00208

Fire Detection & Alarm Layout- Riser Diagram (8)

MD1-0-E-750-01-00209

Fire Detection & Alarm Layout- Riser Diagram (9)

MD1-0-E-750-01-00210

Fire Detection & Alarm Layout- Riser Diagram (10)

MD1-0-E-750-01-00212

Fire Detection & Alarm System- Riser Diagram Fire Protection Pump- House

MD1-0-E-750-01-00213

Fire Detection & Alarm Sys-Riser Diagram Gaseous Chlorination bldg.

MD1-0-E-750-01-00215

Fire Detection & Alarm System - Riser Diagram Limestone Handling System Control.

AC

MD1-0-E-750-01-02001

Fire Detection & Alarm Layout- Turbine BLDG Ground Floor

MD1-0-E-750-01-02002

Fire Detection & Alarm Layout- Turbine BLDG Mez Floor

MD1-0-E-750-01-02003

Fire Detection & Alarm Layout- Turbine BLDG Operating Floor

MD1-0-E-750-01-02004

Fire Detection & Alarm Layout- Turbine BLDG Lower Roof & Crane Ruway

MD1-0-E-750-01-03001

Fire Detection & Alarm Layout- Central Control BLDG Ground Floor

MD1-0-E-750-01-03002

Fire Detection & Alarm Layout- Central Control BLDG 1st Floor

MD1-0-E-750-01-03003

Fire Detection & Alarm Layout- Central Control BLDG 2nd Floor

MD1-0-E-750-01-03004

Fire Detection & Alarm Layout- Central Control BLDG 3rd Floor

MD1-0-E-750-01-03005

Fire Detection & Alarm Layout- Central Control BLDG Roof Floor

MD1-0-E-750-01-04101

Fire Detection & Alarm Layout - Coal Handling System Control BLDG

MD1-0-E-750-01-04201

Fire detection & alarm layout - fuel oil pump house

MD1-0-E-750-01-04251

Fire detection & alarm layout - diesel oil storage tank, fuel oil storage tank-2

MD1-0-E-750-01-04401

Fire Detection & Alarm System- Fire Protection Pump House Ground Floor

MD1-0-E-750-01-04501

Fire Detection & Alarm layout-ash Slurry Pump House Ground floor

MD1-0-E-750-01-04502

Fire Detection & Alarm layout-ash Slurry Pump House First floor

MD1-0-E-750-01-04601

Fire Detection & Alarm layout-esp Control House No.1

MD1-0-E-750-01-04701

Fire Detection & Alarm layout-esp Control House No.2

MD1-0-E-750-01-04801

Fire Detection & Alarm layout- Diesel Generator House

RT

MD1-0-E-750-01-04901

Fire Detection & Alarm layout - Cooling Water Pump House

MD1-0-E-750-01-05101

Fire Detection & Alarm layout - Gaseous Chlorination bldg

MD1-0-E-750-01-05201

Fire Detection & Alarm Layout - Fuel Oil Unloading Pump House

MD1-0-E-750-01-05301

Fire Detection & Alarm layout - Return Water Pump House

MD1-0-E-750-01-05401

Fire Detection & Alarm layout- Switchyard Control Bldg Ground Floor

MD1-0-E-750-01-05402

Fire Detection & Alarm layout- Switchyard Control Bldg 1st Floor

MD1-0-E-750-01-05451

Fire detection & alarm layout - station transformer

MD1-0-E-750-01-05501

Fire detection & alarm layout - water treatment bldg.

MD1-0-E-750-01-06201

Fire detection & alarm layout - coal yard dry storage shed

MD1-0-E-750-01-06401

Fire Detection & Alarm Layout - Limestone Storage Shed

MD1-0-E-750-01-06501

Fire Detection & Alarm Layout - Limestone Handling System Control Building

MD1-0-E-750-01-06701

Fire Detection & Alarm Layout - Limestone Grinding House Ground Floor

MD1-0-E-750-01-06702

Fire Detection & Alarm Layout - Limestone Grinding House EL.+7,130 & EL.+17,4908

MD1-0-E-750-01-07001

Fire Detection & Alarm Layout - Aux. Boiler Area

MD1-0-E-750-01-08301

Fire detection & alarm layout - workshop bldg

MD1-0-E-750-01-08401

Fire detection & alarm layout - bulldozer garage

MD1-0-E-750-01-08501

Fire detection & alarm layout - i&c electrical and mecahnical warehouse

MD1-0-E-750-01-08601

Fire Detection & Alarm Layout- Administration BLDG Ground Floor

MD1-0-E-750-01-08602

Fire Detection & Alarm Layout- Administration BLDG 1st Floor

MD1-0-E-750-01-08603

Fire Detection & Alarm Layout- Administration BLDG 2nd Floor

MD1-0-E-750-01-08604

Fire Detection & Alarm Layout- Administration BLDG 3rd Floor

MD1-0-E-750-01-08605

Fire Detection & Alarm Layout- Administration BLDG 4th Floor

MD1-0-E-750-01-08901

Fire Detection & Alarm Layout- Riser Diagram (11)

MD1-0-E-750-01-09203

Fire detection & alarm layout - car garage 3

MD1-0-F-750-03-00001

System Discription for Fire Fighting System & Fire Alarm System

RT

MD1-0-F-750-07-00001

Fire Risk Assessment

MD1-0-F-750-07-00002

Fire Safety Report

MD1-0-F-750-23-00200

Fire Extinguisher Location Plan for Limestone Handling System Control Building

MD1-0-H-201-01-00901

HVAC Control Wiring Plan for Steam Turbine Building Ground Floor (1/2)

MD1-0-H-201-01-00902

HVAC Control Wiring Plan for Steam Turbine Building Ground Floor (2/2)

MD1-0-H-201-01-00903

HVAC Control Wiring Plan for Steam Turbine Building Mezzanine Floor (1/2)

MD1-0-H-201-01-00904

HVAC Control Wiring Plan for Steam Turbine Building Mezzanine Floor (2/2)

MD1-0-H-201-01-00905

HVAC Control Wiring Plan for Steam Turbine Building Operation Floor (1/2)

MD1-0-H-201-01-00906

HVAC Control Wiring Plan for Steam Turbine Building Operation Floor (2/2)

MD1-0-H-201-01-00907

HVAC Enlarged Control Wiring Plan for AVR Room-1.2

MD1-0-H-201-01-00908

HVAC Enlarged Control Wiring Plan for Sampling Room 1,2

MD1-0-H-201-03-00901

HVAC Control Sequence of Operation for Steam Tubine Building

MD1-0-H-201-08-00901

HVAC Control Equipment Schedule for Steam Turbine Building

MD1-0-H-201-08-00902

HVAC Control I/O Schedule for Steam Turbine Building

MD1-0-H-201-32-00901

HVAC Control Block Diagram for Steam Turbine Building

MD1-0-H-203-01-00901

HVAC Control Wiring Plan for Central Control Building 2nd Floor

MD1-0-H-203-01-00902

HVAC Control Wiring Plan for Central Control Building 3rd Floor

MD1-0-H-203-01-00903

HVAC Control Wiring Plan for Central Control Building Roof

MD1-0-H-203-01-00904

HVAC Room Enlarged HVAC Control Wiring Plan-1

MD1-0-H-203-01-00905

HVAC Room Enlarged HVAC Control Wiring Plan-2

MD1-0-H-203-03-00901

HVAC Control Sequence of Operation for Central Control Building-1

MD1-0-H-203-03-00902

HVAC Control Sequence of Operation for Central Control Building-2

MD1-0-H-203-08-00901

HVAC Control Equipment Schedule for Central Control Building-1

MD1-0-H-203-08-00902

HVAC Control Equipment Schedule for Central Control Building-2

MD1-0-H-203-08-00903

HVAC Control Equipment Schedule for Central Control Building-3

MD1-0-H-203-08-00904

HVAC Control I/O Schedule for Central Control Building-1

MD1-0-H-203-08-00905

HVAC Control I/O Schedule for Central Control Building-2

MD1-0-H-203-32-00901

HVAC Control Block Diagram for Central Control Building (1/5)

MD1-0-H-203-32-00902

HVAC Control Block Diagram for Central Control Building (2/5)

MD1-0-H-203-32-00903

HVAC Control Block Diagram for Central Control Building (3/5)

MD1-0-H-203-32-00904

HVAC Control Block Diagram for Central Control Building (4/5)

MD1-0-H-203-32-00905

HVAC Control Block Diagram for Central Control Building (5/5)

MD1-0-H-203-35-00901

Configuration Diagram for Hvac Control BMS System

MD1-0-H-204-01-00901

HVAC Control Wiring Plan for Coal Handling Control Building Ground Floor

MD1-0-H-204-03-00901

HVAC Control Sequence of Operation for Coal Handling Control Building

MD1-0-H-204-08-00901

HVAC Control Equipment Schedule for Coal Handling Control Building

MD1-0-H-204-08-00902

HVAC Control I/O Schedule for Coal Handling Control Building

MD1-0-H-204-32-00901

HVAC Control Block Diagram for Coal Handling Control Building

MD1-0-H-205-01-00901

Hvac control wiring plan for fuel oil pump house ground floor

MD1-0-H-205-03-00901

Hvac control sequence of operation for fuel oil pump house

MD1-0-H-205-08-00901

Hvac control equipment schedule for fuel oil pump house

AC

MD1-0-H-205-08-00902

Hvac control i/o point schedule for fuel oil pump house

MD1-0-H-205-32-00901

Hvac control block diagrma for fuel oil pump house

MD1-0-H-207-01-00901

Hvac control wiring plan for fire protection pump house gound floor

MD1-0-H-207-03-00901

Hvac control sequence of operation for fire protection pump house

MD1-0-H-207-08-00901

Hvac control equipment schedule for fire protection pump house

AC

MD1-0-H-207-08-00902

Hvac control i/o point schedule for fire protection pump house

MD1-0-H-207-32-00901

Hvac control block diagram for fire protection pump house

MD1-0-H-208-01-00901

Hvac control wiring plan for ash slurry pump house first floor

MD1-0-H-208-03-00901

Hvac control sequence of operation for ash slurry pump house

MD1-0-H-208-08-00901

Hvac control equipment schedule for ash slurry pump house

MD1-0-H-208-08-00902

Hvac control i/o schedule for ash slurry pump house

MD1-0-H-208-32-00901

Hvac control block diagram for ash slurry pump house

MD1-0-H-209-01-00901

Hvac control wiring plan for esp control & ash elec.building-1 ground floor

MD1-0-H-209-01-00902

Hvac control wiring plan for esp control & ash elec.building-1 first floor

MD1-0-H-209-01-00903

Hvac control wiring plan for esp control & ash elec.building-1 roof

MD1-0-H-209-01-00904

Hvac control wiring plan for esp control & ash elec.building-2 ground floor

MD1-0-H-209-01-00905

Hvac control wiring plan for esp control & ash elec.building-2 first floor

MD1-0-H-209-01-00906

Hvac control wiring plan for esp control & ash elec.building-2 roof

MD1-0-H-209-03-00901

Hvac control sequence of operation for esp control & ash elec. building-1

MD1-0-H-209-03-00902

Hvac control sequence of operation for esp control & ash elec. building-2

MD1-0-H-209-08-00901

Hvac control equipment schedule for esp control & ash elec. building-1

AC

MD1-0-H-209-08-00902

Hvac control i/o point schedule for esp control & ash elec. building-1

MD1-0-H-209-08-00903

Hvac control equipment schedule for esp control & ash elec. building-2

AC

MD1-0-H-209-08-00904

Hvac control i/o point schedule for esp control & ash elec. building-2

MD1-0-H-209-32-00901

Hvac control block diagram for esp control & ash elec. building-1

MD1-0-H-209-32-00902

Hvac control block diagram for esp control & ash elec. building-2

MD1-0-H-210-01-00901

Hvac control wiring plan for diesel generator house ground floor

MD1-0-H-210-03-00901

Hvac control sequence of operation for diesel generator house

MD1-0-H-210-08-00901

Hvac control equipment schedule for diesel generator

MD1-0-H-210-08-00902

Hvac control i/o point schedule for diesel generator house

MD1-0-H-210-32-00901

Hvac control block diagram for diesel generator house

MD1-0-H-211-01-00901

Hvac control wiring plan for cooling water pump house ground floor

MD1-0-H-211-03-00901

Hvac control sequence of operation for cooling water pump house

MD1-0-H-211-08-00901

Hvac control equipment schedule for cooling water pump house

MD1-0-H-211-08-00902

Hvac control i/o schedule for cooling water pump house

MD1-0-H-211-32-00901

Hvac control block diagram for cooling water pump house

MD1-0-H-212-01-00901

Hvac control wiring plan for gaseous chlorination building ground floor

MD1-0-H-212-01-00902

Hvac control wiring plan for gaseous chlorination building roof

MD1-0-H-212-03-00901

Hvac control sequence of operation for gaseous chlorination building

MD1-0-H-212-08-00901

Hvac control equipment schedule for gaseous chlorination building

AC

MD1-0-H-212-08-00902

Hvac control i/o point schedule for gaseous chlorination building

MD1-0-H-212-32-00901

Hvac control block diagram for gaseous chlorination building

MD1-0-H-213-01-00901

Hvac control wiring plan for fuel oil unloading pump house ground floor

MD1-0-H-213-03-00901

Hvac control sequnece of operation for fuel oil unloading pump house

MD1-0-H-213-08-00901

Hvac control equipment for fuel oil unloading pump house

MD1-0-H-213-08-00902

Hvac control i/o schedule for fuel oil unloading pump house

MD1-0-H-213-32-00901

Hvac control block diagram for fuel oil unloading pump house

MD1-0-H-215-01-00901

HVAC Control Wiring Plan for Switchyard Control Building Ground Floor

MD1-0-H-215-01-00902

HVAC Control Wiring Plan for Switchyard Control Building 1st Floor

MD1-0-H-215-01-00903

Hvac control wiring plan for switchyard control building roof

MD1-0-H-215-03-00901

HVAC Control Sequence of Operation for Switchyard Control Building

MD1-0-H-215-08-00901

HVAC Control Equipment Schedule for Switchyard Control Building

MD1-0-H-215-08-00902

HVAC Control I/O Schedule for Switchyard Control Building

MD1-0-H-215-32-00901

HVAC Control Block Diagram for Switchyard Control Building

MD1-0-H-216-01-00901

HVAC Control Wiring Plan for Water Treatment Building Ground Floor

MD1-0-H-216-01-00902

Hvac control wiring plan for waste water pond pump room

MD1-0-H-216-03-00901

HVAC Control Sequence of Operation for Water Treatment Building

MD1-0-H-216-08-00901

HVAC Control Equipment Schedule for Water Treatment Building

MD1-0-H-216-08-00902

HVAC Control I/O Point Schedule for Water Treatment Building

MD1-0-H-216-08-00903

Hvac control i/o point schedule for waste water pond pump room

MD1-0-H-216-32-00901

HVAC Control Block Diagram for Water Treatment Building

MD1-0-H-217-01-00901

HVAC Control Wiring Plan for Limestone Handling SYS. Control Building

MD1-0-H-217-03-00901

HVAC Control Sequence of Operation for Limestone Handling SYS. Control Building

MD1-0-H-217-08-00901

HVAC Control Equipment Schedule for Limestone Handling SYS. Control Building

MD1-0-H-217-08-00902

HVAC Control I/O Schedule for Limestone Handling SYS. Control Building

MD1-0-H-217-32-00901

HVAC Control Block Diagram for Limestone Handling SYS. Control Building

MD1-0-H-219-01-00901

Hvac control wiring plan for limestorne storage shed ground floor

MD1-0-H-219-03-00901

Hvac control sequence of operation for limestorne storage shed

MD1-0-H-219-08-00901

Hvac control equipment for limestorne storage shed

MD1-0-H-219-08-00902

Hvac control i/o schedule for limestorne storage shed

MD1-0-H-219-32-00901

Hvac control block diagram for limestorne storage shed

MD1-0-H-250-01-00901

Hvac control wiring plan for workshop building ground floor

MD1-0-H-250-03-00901

Hvac control sequence of operation for workshop building

MD1-0-H-250-08-00901

Hvac control equipment schedule for workshop building

AC

MD1-0-H-250-08-00902

Hvac control i/o point schedule for workshop building

MD1-0-H-250-32-00901

Hvac control block diagram for workshop building

MD1-0-H-252-01-00901

Hvac control wiring plan for i&c electrical & mechanical warehouse ground floor

MD1-0-H-252-03-00901

Hvac control sequence of operation for i&c electrical & mechnical warehouse

MD1-0-H-252-08-00901

Hvac control equipment schedule for i&c electrical & mechanical warehouse

MD1-0-H-252-08-00902

Hvac control i/o point schedule for i&c electrical & mechanical warehouse

MD1-0-H-252-32-00901

Hvac control block diagram for i&c electrical & mechanical warehouse

MD1-0-H-254-01-00901

HVAC Control Wiring Plan for Administration Building Ground Floor

MD1-0-H-254-01-00902

HVAC Control Wiring Plan for Administration Building 2nd Floor

MD1-0-H-254-01-00903

HVAC Control Wiring Plan for Administration Building Roof

MD1-0-H-254-01-00904

HVAC Control Wiring Plan for Administration Auditorium Area

MD1-0-H-254-01-00905

HVAC Control Wiring Plan for Administration Auditorium Roof

MD1-0-H-254-01-00906

HVAC Room Enlarged HVAC Control Wiring Plan for Admin BLDG HVAC Room-1&2

MD1-0-H-254-01-00907

HVAC Room Enlarged HVAC Control Wiring Plan for Admin BLDG HVAC Room-3&4

MD1-0-H-254-03-00901

HVAC Control Sequence of Operation for Admin. BLDG (1/3)

MD1-0-H-254-03-00902

HVAC Control Sequence of Operation for Admin. BLDG (2/3)

MD1-0-H-254-03-00903

HVAC Control Sequence of Operation for Admin. BLDG (3/3)

MD1-0-H-254-08-00901

HVAC Control Equipment Schedule for Admin. Bldg (1/4)

MD1-0-H-254-08-00902

HVAC Control Equipment Schedule for Admin. Bldg (2/4)

MD1-0-H-254-08-00903

HVAC Control Equipment Schedule for Admin. Bldg (3/4)

MD1-0-H-254-08-00904

HVAC Control Equipment Schedule for Admin. Bldg (4/4)

MD1-0-H-254-08-00905

HVAC Control I/O Schedule for Admin. Bldg (1/6)

MD1-0-H-254-08-00906

HVAC Control I/O Schedule for Admin. Bldg (2/6)

MD1-0-H-254-08-00907

HVAC Control I/O Schedule for Admin. Bldg (3/6)

MD1-0-H-254-08-00908

HVAC Control I/O Schedule for Admin. Bldg (4/6)

MD1-0-H-254-08-00909

HVAC Control I/O Schedule for Admin. Bldg (5/6)

MD1-0-H-254-08-00910

HVAC Control I/O Schedule for Admin. Bldg (6/6)

MD1-0-H-254-32-00901

HVAC Control Block Diagram for Admin. BLDG (1/6)

MD1-0-H-254-32-00902

HVAC Control Block Diagram for Admin. BLDG (2/6)

MD1-0-H-254-32-00903

HVAC Control Block Diagram for Admin. BLDG (3/6)

MD1-0-H-254-32-00904

HVAC Control Block Diagram for Admin. BLDG (4/6)

MD1-0-H-254-32-00905

HVAC Control Block Diagram for Admin. BLDG (5/6)

MD1-0-H-254-32-00906

HVAC Control Block Diagram for Admin. BLDG (6/6)

MD1-0-H-255-01-00901

Hvac control wiring plan for common service building ground floor

MD1-0-H-255-01-00902

Hvac control wiring plan for common service building roof plan

MD1-0-H-255-03-00901

Hvac control sequence of operation for common service building

MD1-0-H-255-08-00901

Hvac control equipment & i/o schedule for common service building

AC

MD1-0-H-255-08-00902

Hvac control equipment & i/o schedule for common service building

MD1-0-H-255-08-00903

Hvac control i/o point schedule for common service building (2/2)

MD1-0-H-255-32-00901

Hvac control block diagram for common service building

MD1-0-J-600-01-00001

Central Control Room Layout

MD1-0-J-600-01-00002

Electronic Equipment Room Layout

MD1-0-J-600-01-00003

Local control room layout for gaseous chlorination building

MD1-0-J-600-01-00011

Instrument Location Drawing fro BOP

IC

MD1-0-J-600-02-00001

Technical Specification and Datasheet for Pressure Gauges (BOP)

AC

MD1-0-J-600-04-00001

Design criteria for control and instrumentation

MD1-0-J-600-08-00001

Control Valve List

MD1-0-J-600-08-00003

Instrument Set Point & Alarm List

MD1-0-J-600-08-00004

DCS Input/Output List

MD1-0-J-600-33-00001

Typical Drive Control Logic Diagram

MD1-0-J-600-33-00002

Control Logic Diagram

MD1-0-J-600-34-00001

Control Loop Diagram

MD1-0-J-600-35-00001

Instrument Interconnection Wiring Diagram for BOP

IC

MD1-0-J-600-35-00002

Instrument Interconnection Wiring Diagram for Boiler

MD1-0-J-600-36-00001

Overall control configuration diagram

MD1-0-J-620-03-00001

System Description- Sampling and Analysis System

AC

MD1-0-J-620-21-00001

P & I Diagram- Sampling and Analysis System

AC

MD1-0-M-010-05-00001

Procedure for Plant Identification (KKS numbering)

MD1-0-M-100-07-00001

Classification- Hazardous Areas

MD1-0-T-030-05-00189

Inspection test Plan for Communication System Installation

MD1-0-T-030-05-00190

Inspection Test Plan for Fire Detection & Alarm Installation

MD1-0-T-055-05-00205

Method statement for communication

MD1-0-T-055-05-00206

Method statement for fire alarm

MD1-0-T-056-05-00001

Method Statement for Calibration of instruments

MD1-0-T-056-05-00002

Method Statement for Installation of Control & Instrumentation

MD1-0-V-111-01-00028

Turbine Instrument Location Drawing- Steam Valve (1/2)

MD1-0-V-111-01-00029

Turbine Instrument Location Drawing- Steam Valve (2/2)

MD1-0-V-111-01-00417

Generator Sensor Location (1/2)

MD1-0-V-111-01-00418

Generator Sensor Location (2/2)

MD1-0-V-111-02-00400

Hazardous Area Classification for Generator

MD1-0-V-111-03-00701

Description of Mark Vie Control System

MD1-0-V-111-03-00705

Screen Design for Turbine Control System

MD1-0-V-111-04-00022

Installation Guideline of High Pressure Control System for STG

MD1-0-V-111-04-00400

Gas Detector Location

MD1-0-V-111-05-00702

Mark VIe Control System Guide (GEH-6721)

MD1-0-V-111-05-00706

Automatic Turbine Start-up Procedure

MD1-0-V-111-05-00712

HMI Operator Guide

MD1-0-V-111-08-00707

Software List for Turbine Control System

MD1-0-V-111-08-00708

Alarm List for Turbine Control System

MD1-0-V-111-08-00710

Turbine Control System io List

MD1-0-V-111-08-00711

Setpoint List for Turbine Control System

IC

MD1-0-V-111-08-00717

DCS Interface Signal Database for Turbine Control System

MD1-0-V-111-09-00703

Instrument & Equipment List for Steam Turbine and Generator

MD1-0-V-111-10-00413

Generator Local Gauge Board For Seal Oil Feed Line

MD1-0-V-111-11-00017

Performance test instrumentation for steam turbine

IC

MD1-0-V-111-12-00722

Network Topology for Turbine Control System

MD1-0-V-111-31-00714

Panel Outline Drawing for Turbine Control system (1 of 3)

MD1-0-V-111-31-00715

Panel Outline Drawing for Turbine Control system (2 of 3)

MD1-0-V-111-31-00716

Panel Outline Drawing for Turbine Control system (3 of 3)

MD1-0-V-111-31-00732

Panel Layout Drawing for Turbine Control System (1 of 18)

MD1-0-V-111-31-00733

Panel Layout Drawing for Turbine Control System (2 of 18)

MD1-0-V-111-31-00734

Panel Layout Drawing for Turbine Control System (3 of 18)

MD1-0-V-111-31-00735

Panel Layout Drawing for Turbine Control System (4 of 18)

MD1-0-V-111-31-00736

Panel Layout Drawing for Turbine Control System (5 of 18)

MD1-0-V-111-31-00737

Panel Layout Drawing for Turbine Control System (6 of 18)

MD1-0-V-111-31-00738

Panel Layout Drawing for Turbine Control System (7 of 18)

MD1-0-V-111-31-00739

Panel Layout Drawing for Turbine Control System (8 of 18)

MD1-0-V-111-31-00740

Panel Layout Drawing for Turbine Control System (9 of 18)

MD1-0-V-111-31-00741

Panel Layout Drawing for Turbine Control System (10 of 18)

MD1-0-V-111-31-00742

Panel Layout Drawing for Turbine Control System (11 of 18)

I
RT

MD1-0-V-111-31-00743

Panel Layout Drawing for Turbine Control System (12 of 18)

MD1-0-V-111-31-00744

Panel Layout Drawing for Turbine Control System (13 of 18)

MD1-0-V-111-31-00745

Panel Layout Drawing for Turbine Control System (14 of 18)

MD1-0-V-111-31-00746

Panel Layout Drawing for Turbine Control System (15 of 18)

MD1-0-V-111-31-00747

Panel Layout Drawing for Turbine Control System (16 of 18)

MD1-0-V-111-31-00748

Panel Layout Drawing for Turbine Control System (17 of 18)

MD1-0-V-111-31-00749

Panel Layout Drawing for Turbine Control System (18 of 18)

MD1-0-V-111-31-00761

Panel layout drawing for steam turbine vms(vibration monitoring system) (1 of 3)

MD1-0-V-111-31-00762

Panel layout drawing for steam turbine vms(vibration monitoring system) (2 of 3)

MD1-0-V-111-31-00763

Panel layout drawing for steam turbine vms(vibration monitoring system) (3 of 3)

MD1-0-V-111-35-00001

Wiring Diag. Lube Oil Tank (1/2)

MD1-0-V-111-35-00002

Wiring Diag. Lube Oil Tank (2/2)

MD1-0-V-111-35-00003

Wiring Diagram- MOB For steam TBN Piping

IC

MD1-0-V-111-35-00004

Steam turbine and generator wiring diagram - hydraulic power unit (1/3)

MD1-0-V-111-35-00005

Steam turbine and generator wiring diagram - hydraulic power unit (2/3)

MD1-0-V-111-35-00006

Steam turbine and generator wiring diagram - hydraulic power unit (3/3)

MD1-0-V-111-35-00007

Wiring Diagram- Lube Oil Conditioner- Main (1/3)

IC

MD1-0-V-111-35-00008

Wiring Diagram- Lube Oil Conditioner- Main (2/3)

IC

MD1-0-V-111-35-00009

Wiring Diagram- Lube Oil Conditioner- Main (3/3)

IC

MD1-0-V-111-35-00010

Steam turbine and generator wiring diagram - turning gear (1/2)

MD1-0-V-111-35-00011

Steam turbine and generator wiring diagram - turning gear (2/2)

MD1-0-V-111-35-00400

Electrical Connection Diagram (Stator Cooling Water System) (1/8)

MD1-0-V-111-35-00402

Electrical Connection Diagram (Stator Cooling Water System) (3/8)

MD1-0-V-111-35-00403

Electrical Connection Diagram (Stator Cooling Water System) (4/8)

MD1-0-V-111-35-00404

Electrical Connection Diagram (Stator Cooling Water System) (5/8)

MD1-0-V-111-35-00406

Electrical Connection Diagram (Stator Cooling Water System) (7/8)

MD1-0-V-111-35-00408

Electrical Connection Diagram (Gas Control System) (1/8)

MD1-0-V-111-35-00409

Electrical Connection Diagram (Gas Control System) (2/8)

MD1-0-V-111-35-00411

Electrical Connection Diagram (Gas Control System) (4/8)

MD1-0-V-111-35-00412

Electrical Connection Diagram (Gas Control System) (5/8)

MD1-0-V-111-35-00416

Electrical Connection Diagram (Seal Oil System) (1/6)

MD1-0-V-111-35-00418

Electrical Connection Diagram (Seal Oil System) (3/6)

MD1-0-V-111-35-00419

Electrical Connection Diagram (Seal Oil System) (4/6)

MD1-0-V-111-35-00421

Electrical Connection Diagram (Seal Oil System) (6/6)

MD1-0-V-111-35-00718

Control Systems Overall Block Diagrams

MD1-0-V-111-35-00719

Turbine & Generator Protection & Interlock Diagram

MD1-0-V-111-36-00715

TCS Control System Configuration Drawing

MD1-0-V-111-36-00716

VMS Control System Configuration Drawing

MD1-0-V-112-08-00004

Hp/Lp i/o List for Turbine bypass System

MD1-0-V-112-08-00005

Hpu, Hvp-Hp/Lp Load List for Turbine bypass System

MD1-0-V-112-35-00005

Hpu, Hp/Lp, System Layout for Turbine bypass System

MD1-0-V-112-35-00006

Hpu, Hp/Lp, Electrical System ak Layout for Turbine bypass System

MD1-0-V-112-35-00007

Hpu, Hp/Lp, ak1-1 and ak 1-2, Smartrak for Turbine bypass System

MD1-0-V-113-08-00053

Condenser leak detection system instrument list

MD1-0-V-113-09-00020

Condenser - Instrument Data Sheet

MD1-0-V-113-09-00025

Condenser leak detection system technical data sheet

MD1-0-V-113-10-00054

Condenser leak detection system local control panel with installation drawing

MD1-0-V-113-35-00055

Condenser leak detection system wiring diagram

MD1-0-V-114-08-00001

Instrument List for Feedwater Heater

IC

MD1-0-V-114-09-50021

Lp#1 & lp#2 feedwater heater level gauge data sheet

AC

MD1-0-V-114-09-50025

Lp#1 & lp#2 feedwater heater safety & relief valve data sheet

AC

MD1-0-V-121-09-00003

Instrument data sheet and catalog for bfp & bfbp

MD1-0-V-121-09-00004

[BFBP] Flow Element Specification of Discharge Line

RT

MD1-0-V-121-09-00005

[BFP] Flow Element Specification of Balance Line

RT

MD1-0-V-121-33-00002

Logic Flow Chart for Fluid Coupling for BFP & BFBP

MD1-0-V-121-35-00001

Temperature Sensor Terminal Box Drawing for Boiler Feed Pump and Booster Pump

IC

MD1-0-V-121-35-00002

Vibration Sensor Terminal Box Drawing for Boiler Feed Pump and Booster Pump

MD1-0-V-121-35-00003

Pressure Switch Terminal Box Drawing for Boiler Feed Pump and Booster Pump

IC

MD1-0-V-121-35-00004

Reverse Switch Terminal Box Diagram for Boiler Feed Pump and Booster Pump

IC

MD1-0-V-121-35-00005

Wiring diagram for hydraulic coupling for bfp & bfbp

MD1-0-V-121-35-00006

Flow Transmitter(BP Discharge) Stand Drawing for Booster Pump

IC

MD1-0-V-121-35-00007

Flow Transmitter(Balance Line) Stand for Main Boiler Feedwater Pump

IC

MD1-0-V-122-09-00003

Instrument Data Sheet and Catalogue for CEP

AC

MD1-0-V-123-08-00011

Condenser Vacuum Pump- Instrument Data

MD1-0-V-123-08-00014

Condenser vaccum pump - i/o list

MD1-0-V-123-08-00022

Condenser vacuum pump instrument set point and alarm list

MD1-0-V-123-10-00007

Condenser Vacuum Pump- Terminal Box Drawing

MD1-0-V-123-22-00021

Condenser vaccum pump - flow chart

MD1-0-V-123-33-00005

Condenser Vacuum Pump- Recommended Logic Diagram

MD1-0-V-123-35-00006

Condenser Vacuum Pump- Wiring Diagram

MD1-0-V-123-57-00023

Condenser vacuum pump control valve list with catalog

MD1-0-V-123-57-00024

Condenser vacuum pump safety valve data with catalog

MD1-0-V-123-57-00025

Condenser Vacuum Pump - Solenoid Valve Data With Catalog

MD1-0-V-131-08-00011

Instrument list for circulating water pumps

MD1-0-V-131-08-00024

Setpoint and alarm list for motor

MD1-0-V-131-08-00025

Instrument list for motor

MD1-0-V-131-09-00007

Instrument specification and data sheets for motor

IC

MD1-0-V-131-10-00004

Motor instrument junction box drawing

IC

MD1-0-V-131-11-00003

Instrument Installation detail Drawing with Bill of Materials

MD1-0-V-131-11-00008

Instrument installation detail drawing for motor

IC

MD1-0-V-132-08-00047

Sea Water Intake Facility - PLC I/O List

IC

MD1-0-V-132-08-00067

DCS Interface I/O Communications

IC

MD1-0-V-132-09-00071

Sea Water Intake Facility - Pressure Transmitter Technical Data Sheet.

MD1-0-V-132-09-00073

Sea Water Intake Facility - Level Transmitter Data

AC

MD1-0-V-132-09-00074

Sea Water Intake Facility - Pressure Indicator Data Sheet

MD1-0-V-132-09-00075

Sea Water Intake Facility - Differential Pressure Switch Data Sheet

MD1-0-V-132-33-00078

Sea water intake facility - control logic diagram

MD1-0-V-133-09-00016

Water box vacuum pump instrument data sheet & catalogue

MD1-0-V-134-03-00044

Control philosophy (condenser tube cleaning system)

MD1-0-V-134-09-00033

Instrument list & data sheet for ctcs

MD1-0-V-134-09-00051

Technical data sheet for control panel (condenser tube cleaning system)

MD1-0-V-134-34-00021

Control logic diagram (condenser tube cleaning system)

MD1-0-V-135-03-00037

Control philosophy(debris filter)

MD1-0-V-135-08-00011

Electrical load list for control panel(debris filter)

MD1-0-V-135-09-00026

Instrument list & data sheet - df

MD1-0-V-135-09-00043

Technical data sheet for control panel(debris filter)

MD1-0-V-135-34-00014

Control logic diagram(debris filter)

MD1-0-V-141-08-00013

Electrical Load List

MD1-0-V-141-08-00014

Equipment List of All the Electrical Equipment

MD1-0-V-141-08-00015

Cable List

MD1-0-V-141-08-00016

Auto Filter- Instrumentation List

IC

MD1-0-V-141-08-00018

Auto Filter- DCS Interface I/O List

IC

MD1-0-V-141-08-00019

Set Point & Alarm List, Auto Filter

IC

MD1-0-V-141-31-00001

Single Line Diagram

MD1-0-V-141-33-00001

Control Logic Diagram, Auto Filter

IC

MD1-0-V-141-34-00001

Control LOOP Diagram, Auto Filter

IC

MD1-0-V-141-35-00001

Electrical Connection and Wiring Diagram

MD1-0-V-142-08-00005

Electrical load list

MD1-0-V-142-08-00007

Instrument list

MD1-0-V-142-09-00003

Instrument data

MD1-0-V-142-11-00002

Instrument hook-up drawings

MD1-0-V-142-11-00003

Junction box drawing for service water pump

MD1-0-V-142-11-10003

Junction box drawing for closed cooling water pump

MD1-0-V-142-11-20003

Junction box drawing for condensate make-up pump

MD1-0-V-142-11-30003

Junction box drawing for auxiliary cooling water booster pump

MD1-0-V-142-11-40003

Junction box drawing for demi. water transfer pump

MD1-0-V-151-08-00029

Air Compressor-DCS Interface I/O List (Hardwired)

IC

MD1-0-V-151-08-00030

Air Compressor-DCS Interface I/O List (Communication)

IC

MD1-0-V-161-08-06000

Instrument Index

MD1-0-V-161-08-06001

I/O List

MD1-0-V-161-08-06003

Set Point List for Alarm & Interlocking

MD1-0-V-161-09-16111

Instrument Data Sheets, Temperature Gauges

MD1-0-V-161-09-16121

Instrument Data Sheets, Orifice Plates and Flanges

MD1-0-V-161-09-16124

Instrument Data Sheets, Rotameters (Variable Area Flowmeters)

IC

MD1-0-V-161-09-62105

Data Sheet for Feed Water Regulating Valve

AC

MD1-0-V-161-09-62106

Data Sheet for Spray Control Valves

AC

MD1-0-V-161-10-16131

Boiler drum level indicator workpackage vendor documents & drawings

IC

MD1-0-V-161-10-16140

Boiler pressure gauge workpackage vendor documents & drawings

MD1-0-V-161-10-16190

Boiler cctv workpackage vendor documents & drawings

MD1-0-V-161-10-16212

Boiler Feedwater Regulating Valves Vendor Drawings & Documents

MD1-0-V-161-10-16250

Blowdown & Blow-off Valve Workpackage Vendor Documents & Drawings

IC

MD1-0-V-161-33-06002

Control Narrative

IC

MD1-0-V-161-33-06200

Logic Diagram. Drawing Index

MD1-0-V-161-33-06201

Logic Diagram. Symbol & Legend

MD1-0-V-161-33-06202

Logic Diagram. Main Interlocks, Master Fuel Trip

MD1-0-V-161-33-06203

Logic Diagram. Hardwired Trip Relays For Mater Fuel Trip 1

MD1-0-V-161-33-06204

Logic Diagram. Hardwired Trip Relays For Mater Fuel Trip 2

MD1-0-V-161-33-06205

Logic Diagram. Hardwired Trip Relays For Mater Fuel Trip 3

MD1-0-V-161-33-06206

Logic Diagram. Hardwired Trip Relays For Mater Fuel Trip 4

MD1-0-V-161-33-06207

Logic Diagram. Main Interlocks, Furnace Purge

MD1-0-V-161-33-06208

Logic Diagram. Main Interlocks, Loss of Fuel Trips

MD1-0-V-161-33-06209

Logic Diagram. Main Interlocks, Drum Level Trips

MD1-0-V-161-33-06210

Logic Diagram. Main Interlocks, Furnace Pressure Trips

MD1-0-V-161-33-06211

Logic Diagram. Main Interlocks, Total Air Flow Trips

MD1-0-V-161-33-06212

Logic Diagram. Main Interlocks, Loop Seal Air Pressure Trips

MD1-0-V-161-33-06213

Logic Diagram. Main Interlocks, Loss of Fan Trips

MD1-0-V-161-33-06214

Logic Diagram. Main Interlocks, Cyclone Flue Gas Temperaute Trips

MD1-0-V-161-33-06215

Logic Diagram. Main Interlocks, Bed Temperature 1

MD1-0-V-161-33-06216

Logic Diagram. Main Interlocks, Bed Temperature 2

MD1-0-V-161-33-06217

Logic Diagram. Main Interlocks, Solid Fuel Feed Permissive

MD1-0-V-161-33-06218

Logic Diagram. Main Interlocks, Oil Fuel Permissive

MD1-0-V-161-33-06219

Logic Diagram. Main Interlocks, Superheater Protection Trips

MD1-0-V-161-33-06220

Logic Diagram. Air Paths in Purge Position

MD1-0-V-161-33-06221

Logic Diagram. MFT to Trips

MD1-0-V-161-33-06222

Logic Diagram. Fuel Feeder "1" (Typical for No. 1-6)

MD1-0-V-161-33-06223

Logic Diagram. Fuel Feeder "7"

MD1-0-V-161-33-06224

Logic Diagram. Fuel Feeder "8"

MD1-0-V-161-33-06225

Logic Diagram. Fuel Chain Conveyor "1"

MD1-0-V-161-33-06226

Logic Diagram. Fuel Chain Conveyor "2"

MD1-0-V-161-33-06227

Logic Diagram. Fuel Oil Header Trip Valve

MD1-0-V-161-33-06228

Logic Diagram. Fuel Oil Leak Test

MD1-0-V-161-33-06229

Logic Diagram. Heavy Oil Circulating

MD1-0-V-161-33-06230

Logic Diagram. Start-up Burner "1" Start Sequence (Typical)

MD1-0-V-161-33-06231

Logic Diagram. Start-up Burner "1" Proven/Failure (Typical)

MD1-0-V-161-33-06232

Logic Diagram. Start-up Burner "1" Oil Gun Scavence (Typical)

MD1-0-V-161-33-06233

Logic Diagram. Pilot Burner "1" Start Sequence (Typical)

MD1-0-V-161-33-06234

Logic Diagram. Pilot Burner "1" Oil Gun Scavence (Typical)

MD1-0-V-161-33-06235

Logic Diagram. Cyclone Flue Gas Temperature Monitoring

MD1-0-V-161-33-06236

Logic Diagram. Furnace Bed Temperature Monitoring

MD1-0-V-161-33-06237

Logic Diagram. Induced Draft Fan A

MD1-0-V-161-33-06238

Logic Diagram. Induced Draft Fan B

MD1-0-V-161-33-06239

Logic Diagram. I.D Fan Damper & Vanes

MD1-0-V-161-33-06240

Logic Diagram. Loop Seal Blower A

MD1-0-V-161-33-06241

Logic Diagram. Loop Seal Blower B

MD1-0-V-161-33-06242

Logic Diagram. Loop Seal Blower C

MD1-0-V-161-33-06243

Logic Diagram. Secondary Air Fan A

MD1-0-V-161-33-06244

Logic Diagram. Secondary Air Fan B

MD1-0-V-161-33-06245

Logic Diagram. S.A Fan Damper & Vanes

MD1-0-V-161-33-06246

Logic Diagram. Primary Fan A

MD1-0-V-161-33-06247

Logic Diagram. Primary Fan B

MD1-0-V-161-33-06248

Logic Diagram. P.A Fan Damper & Vanes

MD1-0-V-161-33-06249

Logic Diagram. Air Heater Main Motor

MD1-0-V-161-33-06250

Logic Diagram. Air Heater Aux. Motor

MD1-0-V-161-33-06251

Logic Diagram. Limestone Injection Blower "A" Control

MD1-0-V-161-33-06252

Logic Diagram. Limestone Injection Blower "B" Control

MD1-0-V-161-33-06253

Logic Diagram. Limestone Injection Blower "C" Control

MD1-0-V-161-33-06254

Logic Diagram. Limestone Feed Rotary Valve "A1"

MD1-0-V-161-33-06255

Logic Diagram. Limestone Feed Rotary Valve "A2"

MD1-0-V-161-33-06256

Logic Diagram. Limestone Feed Rotary Feeder 'A"

MD1-0-V-161-33-06257

Logic Diagram. Limestone Feed Rotary Valve "B1"

MD1-0-V-161-33-06258

Logic Diagram. Limestone Feed Rotary Valve "B2"

MD1-0-V-161-33-06259

Logic Diagram. Limestone Feed Rotary Feeder "B"

MD1-0-V-161-33-06260

Logic Diagram. Stripper Cooler "A" Blower (Typical)

MD1-0-V-161-33-06261

Logic Diagram. S/C A Stripper Spray Valves (Typical)

MD1-0-V-161-33-06262

Logic Diagram. S/C A Cooler 1 Spray Valves (Typical)

MD1-0-V-161-33-06263

Logic Diagram. Stripper/Cooler a Rotary Valve (Typical)

MD1-0-V-161-33-06264

Logic Diagram. SH Attemp. Spraywater Block Valves

MD1-0-V-161-33-06265

Logic Diagram. RH Attemp. Spraywater Block Valves

MD1-0-V-161-33-06266

Logic Diagram. MFT To DCS Controls

MD1-0-V-161-33-06267

Logic Diagram. ERV Open/Close

MD1-0-V-161-33-06268

Logic Diagram. MOV Template

MD1-0-V-161-33-06269

Logic Diagram. Motorized Dampers-1

MD1-0-V-161-33-06270

Logic Diagram. Motorized Dampers-2

MD1-0-V-161-33-06271

Logic Diagram. Motorized Valve-1

MD1-0-V-161-33-06272

Logic Diagram. Motorized Valve-2

MD1-0-V-161-33-06273

Logic Diagram. Motorized Valve-3

MD1-0-V-161-33-06274

Logic Diagram. Motorized Valve-4

MD1-0-V-161-33-06275

Logic Diagram. Motorized Valve-5

MD1-0-V-161-33-06276

Logic Diagram. Motorized Valve-6

MD1-0-V-161-33-06277

Logic Diagram. Motorized Valve-7

MD1-0-V-161-33-06278

Logic Diagram. Motorized Valve-8

MD1-0-V-161-33-06279

Logic Diagram. Motorized Valve-9

MD1-0-V-161-33-06280

Logic Diagram. Motorized Valve-10

MD1-0-V-161-33-06281

Logic Diagram. Limestone Silo Vent Fan

MD1-0-V-161-33-06282

Logic Diagram. Limestone Silo Vent Pulse Control

MD1-0-V-161-33-06283

Logic Diagram. AH Oil Pumps

MD1-0-V-161-33-06284

Logic Diagram. SA Fan a Lube Oil Pumps-1

MD1-0-V-161-33-06285

Logic Diagram. SA Fan a Lube Oil Pumps-2

MD1-0-V-161-33-06286

Logic Diagram. SA Fan B Lube Oil Pumps-1

MD1-0-V-161-33-06287

Logic Diagram. SA Fan B Lube Oil Pumps-2

MD1-0-V-161-33-06288

Logic Diagram. PA Fan A Lube Oil Pumps-1

MD1-0-V-161-33-06289

Logic Diagram. PA Fan A Lube Oil Pumps-2

MD1-0-V-161-33-06290

Logic Diagram. PA Fan B Lube Oil Pumps-1

MD1-0-V-161-33-06291

Logic Diagram. PA Fan B Lube Oil Pumps-2

MD1-0-V-161-33-06300

Sama Diagram. Drawing Index

MD1-0-V-161-33-06301

Sama Diagram. Symbols and Legend

MD1-0-V-161-33-06302

Sama Diagram. Boiller Master

MD1-0-V-161-33-06303

Sama Diagram. Total Air Flow

MD1-0-V-161-33-06304

Sama Diagram, Primary Air Flow & Pressure

MD1-0-V-161-33-06305

Sama Diagram, Secondary Air Flow & Pressure

MD1-0-V-161-33-06306

Sama Diagram, Ring Duc Air Flow

MD1-0-V-161-33-06307

Sama Diagram, BTU Compensation

MD1-0-V-161-33-06308

Sama Diagram, Fuel Feeders Front Wall

IC

MD1-0-V-161-33-06309

Sama Diagram, Fuel Feeders Rear Wall

MD1-0-V-161-33-06310

Sama Diagram, Oil Master

MD1-0-V-161-33-06311

Sama Diagram, Start-up Burner 1 Control

IC

MD1-0-V-161-33-06312

Sama Diagram, Drum Level

MD1-0-V-161-33-06313

Sama Diagram, Furnace Pressure

MD1-0-V-161-33-06314

Sama Diagram, First Stage Superheater Temperature

MD1-0-V-161-33-06315

Sama Diagram, Second Stage Superheater Temperature

MD1-0-V-161-33-06316

Sama Diagram, Reheater Temperature

MD1-0-V-161-33-06317

Sama Diagram, Loop Seal Air Pressure

MD1-0-V-161-33-06318

Sama Diagram, Bed Pressure Control

MD1-0-V-161-33-06319

Sama Diagram, Stripper/Cooler a Air Flow and Pressure

MD1-0-V-161-33-06320

Sama Diagram, Stripper/Cooler a Ash Drain and Spray Flow

MD1-0-V-161-33-06321

Sama Diagram, Stripper/Cooler B Air Flow and Pressure

MD1-0-V-161-33-06322

Sama Diagram, Stripper/Cooler B Ash Drain and Spray Flow

MD1-0-V-161-33-06323

Sama Diagram, Stripper/Cooler C Air Flow and Pressure

MD1-0-V-161-33-06324

Sama Diagram, Stripper/Cooler C Ash Drain and Spray Flow

MD1-0-V-161-33-06325

Sama Diagram, Stripper/Cooler D Air Flow and Pressure

MD1-0-V-161-33-06326

Sama Diagram, Stripper/Cooler D Ash Drain and Spray Flow

MD1-0-V-161-33-06327

Sama Diagram, Limestone Feed

MD1-0-V-161-33-06328

Sama Diagram, Scah Control

MD1-0-V-161-33-06329

Sama Diagram, Main Steam Vent Valve

MD1-0-V-161-33-06330

Sama Diagram, Blowdown Tank Drain Dischage Temp.

MD1-0-V-161-33-06331

Sama Diagram, Fuel Gas and Seperators Monitoring

MD1-0-V-161-33-06332

Sama Diagram, Drum Metal Temperature Monitoring

MD1-0-V-161-33-06333

Sama Diagram, Tube Metal Temperature Monitoring

MD1-0-V-161-33-06334

Sama Diagram, S.A Fan and Motor BRG/WDG Temp. & VIB. Monitoring

MD1-0-V-161-33-06335

Sama Diagram, P.A Fan and Motor BRG/WDG Temp. & VIB Monitoring

MD1-0-V-161-33-06336

Sama Diagram, Loop Seal Blower and Motor Temp. Monitoring

MD1-0-V-161-33-06337

Sama Diagram, S/C Blowers and Motor BRG/WDG temp. Monitoring (Typical)

MD1-0-V-161-33-06338

Sama Diagram, Reheater Temperature

MD1-0-V-161-33-06339

Sama Diagram Drum Level Control, Three Element Selection

MD1-0-V-161-33-06340

Sama Diagram Drum Level Control, Blower Surge (Typic For Loop (A, B, C)

MD1-0-V-161-33-06341

Sama Diagram Drum Level Control, Blower Surge (Typic For SC Blower (A-D)

MD1-0-V-161-33-06342

Sama Diagram, Air Heater Temperature Monitoring

MD1-0-V-161-33-06343

Sama Diagram, SA Fan Lube Oil Monitoring

MD1-0-V-161-33-06344

Sama Diagram, FA Fan Lube Oil Monitoring

MD1-0-V-161-57-00031

Instrument Connection Arrangement- Furnace and HRA

MD1-0-V-161-57-00032

Instrument Connection Arrangement- Furnace and HRA

MD1-0-V-161-57-00033

Metal Temp Thermocouple Arrangement

MD1-0-V-161-57-00034

IN-BED Thermocouples Arrangement

MD1-0-V-161-57-00035

IN-BED Thermocouples Arrangement

MD1-0-V-161-57-00036

Instrument Connection Sects & Details

MD1-0-V-161-57-00037

Metal Temp Thermocouple Arrangement and Details

MD1-0-V-161-57-00038

Instrument Connections Bill of Quantities

MD1-0-V-161-57-00039

Instrument Connections Bill of Quantities

MD1-0-V-161-57-00040

Instrument Connection Arrangement- Aux Equipment

MD1-0-V-161-57-06401

Instrument Location Plan Drawing Index

MD1-0-V-161-57-06403

Instrument Location Plan at EL 12115

MD1-0-V-161-57-06404

Instrument Location Plan at EL 15315 THR EL 15700

MD1-0-V-161-57-06405

Instrument Location Plan at EL 18365 THR EL 19700

MD1-0-V-161-57-06406

Instrument Location Plan at EL 22865 Key Level

MD1-0-V-161-57-06407

Instrument Location Plan at EL 27787 THR EL 28800

MD1-0-V-161-57-06408

Instrument Location Plan at EL 32060 THR EL 34970 Key Level

MD1-0-V-161-57-06409

Instrument Location Plan at EL 37600

MD1-0-V-161-57-06410

Instrument Location Plan at EL 40300

MD1-0-V-161-57-06411

Instrument Location Plan at EL 43600 THR EL 43890

MD1-0-V-161-57-06412

Instrument Location Plan at EL 46700

MD1-0-V-161-57-06413

Instrument Location Plan at EL 49077 THR EL 49275

MD1-0-V-161-57-06414

Instrument Location Plan at EL 51850 Key Level

MD1-0-V-161-57-06415

Instrument Location Plan at EL 54005 THR EL 56575

MD1-0-V-161-57-06416

Instrument Location Plan at EL 57026

MD1-0-V-161-57-06417

Instrument Location Plan at EL 58400 THR EL 59572

MD1-0-V-161-57-06418

Instrument Location Plan at EL 61213 THR EL 62703

MD1-0-V-161-57-06419

Instrument Location Plan- Instrument Enclosure Details

MD1-0-V-161-57-06420

Instrument Location Plan- Local Control Box Details

MD1-0-V-161-57-06421

Instrument Location Plan- Local Control Box Details

MD1-0-V-161-57-06500

Instrument Installation Details, Cover Sheet & Notes

IC

MD1-0-V-161-57-06501

Instrument Installation Details, Drawing Index

MD1-0-V-161-57-06502

Instrument Installation Details, Material List Summary

MD1-0-V-161-57-06503

Instrument Installation Details, Pressure Transmitter, Feed Water & Spray Water

IC

MD1-0-V-161-57-06504

Instrument Installation Details, Pressure & Level Transmitters, Steam Drum Right

IC

MD1-0-V-161-57-06505

Instrument Installation Details, Pressure & Level Transmitters, Steam Drum Left

IC

MD1-0-V-161-57-06506

Instrument Installation Details Pressure & Flow Transmitters, Sootblower Steam

IC

MD1-0-V-161-57-06507

Instrument Installation Details, Pressure Transmitters, PSH Outlet

IC

MD1-0-V-161-57-06508

Instrument Installation Details, Pressure Gauge, Steam Drum

IC

MD1-0-V-161-57-06509

Instrument Installation Details, Pressure Transmitter, SB Auxiliary Steam

IC

MD1-0-V-161-57-06510

Instrument Installation Details, Flow Transmitter, Spary & Blowdown Water

IC

MD1-0-V-161-57-06511

Instrument Installation Details, Pressure Switch, Main Steam ERV

IC

MD1-0-V-161-57-06512

Instrument Installation Details, Pressure Gauge, Blowdown Tank

IC

MD1-0-V-161-57-06513

Instrument Installation Details, Pressure Gauge, PA & SA SCAH Steam

IC

MD1-0-V-161-57-06514

Instrument Installation Details, O2 Analyzer

IC

MD1-0-V-161-57-06515

Instrument Installation Details, Pressure Transmitter, Air Service

IC

MD1-0-V-161-57-06516

Instrument Installation Details, Diff. Pressure Transmitter, Air Service

IC

MD1-0-V-161-57-06517

Instrument Installation Details, Flow Transmitter, SC Air Service

IC

MD1-0-V-161-57-06518

Instrument Installation Details, Flow Transmitter, LS Air Service

IC

MD1-0-V-161-57-06519

Instrument Installation Details, Pressure Transmitter, Flue Gas Service

IC

MD1-0-V-161-57-06520

Instrument Installation Details, Diff. Pressure Transmitter, Flue Gas Service(1)

IC

MD1-0-V-161-57-06521

Instrument Installation Details, Diff. Pressure Transmitter, Flue Gas Service(2)

IC

MD1-0-V-161-57-06522

Instrument Installation Details, Diff. Pressure Transmitter, Flue Gas Service(3)

IC

MD1-0-V-161-57-06523

Instrument Installation Details, Pressure Transmitter, Furnace Bed Pressure

IC

MD1-0-V-161-57-06524

Instrument Installation Details, Diff. Pressure Transmitter, Furnace Bed Density

IC

MD1-0-V-161-57-06525

Instrument Installation Details, Diff. Pressure Transmitter, Cyclone Return Leg

IC

MD1-0-V-161-57-06526

Instrument Installation Details, Diff. Pressure Transmitter, Stripper Cooler Bey

IC

MD1-0-V-161-57-06527

Instrument Installation Details, Flow Transmitter, Primary Air to Plenum

IC

MD1-0-V-161-57-06528

Instrument Installation Details, Flow Transmitter, Secondary Air to Ring Duct

IC

MD1-0-V-161-57-06529

Instrument Installation Details, Flow Transmitter, Secondary Air to Start-up Bur

IC

MD1-0-V-161-57-06530

Instrument Installation Details, Flow Transmitter, Secondary Air to Air Bustle

IC

MD1-0-V-161-57-06531

Instrument Installation Details, Instrument Air Supply, Pneumatic Valve & Damper

IC

MD1-0-V-161-57-06532

Instrument Installation Details, Instrument Support Details

IC

MD1-0-V-161-57-06533

Instrument Installation Details, Instrument Air Supply Pneumatic Valve & Damper

IC

MD1-0-V-161-57-06551

Instrument Installation Details, Instrument Enclosure Outline Drawing - Type A

MD1-0-V-161-57-06552

Instrument Installation Details, Instrument Enclosure Layout Drawing - Type A

IC

MD1-0-V-161-57-06553

Instrument Installation Details, Instrument Enclosure - Assignment List

MD1-0-V-161-57-06554

Instrument Installation Details, Instrument Enclosure Outline Drawing - Type B

IC

MD1-0-V-161-57-06555

Instrument Installation Details, Instrument Enclosure Layout Drawing - Type B

IC

MD1-0-V-161-57-06556

Instrument Installation Details, Instrument Enclosure Outline & Layout Drawing C

IC

MD1-0-V-162-01-00003

Instrument Arrangement Plot Plan

IC

MD1-0-V-162-11-00011

Instrument Installation Drawing

IC

MD1-0-V-162-11-00012

Graphic Display Requirement and Drawing

IC

MD1-0-V-162-36-00001

Control system configuration diagram

MD1-0-V-163-09-00009

Actuator Data for IDF Inlet Damper

AC

MD1-0-V-167-09-00006

Instrument Data & Dwg

RT

MD1-0-V-171-01-00077

GENERAL ARRANGEMENT AND DATA SHEET OF LINEAR ACTUATOR FOR CHS

MD1-0-V-171-01-02123

INSTRUMENT & CONTROL SYSTEM EARTHING & SCREENING SYSTEM FOR COAL HANDLING

IC

MD1-0-V-171-03-02102

Control Write-up/Control Philosophy for Coal Handling System

AC

MD1-0-V-171-06-02009

Cable Sizing Calculation for CHS

RT

MD1-0-V-171-06-02116

Instrument data & calculation details for chs

MD1-0-V-171-08-02001

Electrical Load List for Coal Handling System

MD1-0-V-171-08-02025

Lighting Schedule fof CHS

MD1-0-V-171-08-02105

Instrument List for Coal Handling System

MD1-0-V-171-08-02107

I/O List of for Coal Handling System

MD1-0-V-171-08-02120

Control systems overall block diagram for chs

MD1-0-V-171-08-02122

Interface Signals List for Coal Handling System

MD1-0-V-171-08-02124

Alarm List & Set Point List for Coal Handling System

MD1-0-V-171-08-02139

Communication IO List for Coal Handling System

MD1-0-V-171-09-02118

GA & BOM & System Architecture for CCTV System For CHS

MD1-0-V-171-11-02113

GA of Junction Box for CHS

MD1-0-V-172-01-00121

General Arrangement and Data Sheet of Belt Scale for Limestone Handling System

AC

MD1-0-V-172-01-00122

General Arrangement and Data Sheet of Metal Detector for Limestone Handling Sysm

AC

MD1-0-V-172-06-02113

Instrument data & calculation detail for lhs

MD1-0-V-172-08-02105

Instrument List for Limestone Handling System

RT

MD1-0-V-172-08-02107

I/O List for Limestone Handling System

MD1-0-V-172-08-02117

Interface Signals List for Limestone Handling System

MD1-0-V-172-08-02138

Communication IO List for Limestone Handling System

MD1-0-V-172-51-02108

PLC ARCHITECTURE DIAGRAM FOR LIMESTONE HANDLING SYSTEM

MD1-0-V-181-01-00005

Cable Tray & Conduit Lay Out for AUX. Boiler Area

MD1-0-V-181-02-00001

Auxiliary Boiler Package Cable Specification

MD1-0-V-181-05-00012

Operation Control Philosophy

MD1-0-V-181-08-00014

Auxiliary Boiler Package Cable Schedule

MD1-0-V-181-08-00015

AUXILIARY BOILER PACKAGE INSTRUMENT LIST

MD1-0-V-181-08-00016

Auxiliary boiler pacakge terminal point list

IC

MD1-0-V-181-08-00017

Auxiliary boiler package control valve list

AC

MD1-0-V-181-08-00018

Auxiliary package mov list

RT

AC

MD1-0-V-181-08-00019

AUXILIARY BOILER PACKAGE PLC I.O LIST

IC

MD1-0-V-181-09-00011

Auxiliary boiler package level gauge

IC

MD1-0-V-181-09-00012

AUXILIARY BOILER PACKAGE MANUAL VALVE

MD1-0-V-181-09-00013

AUXILIARY BOILER PACKAGE STEAM & AIR TRAP

AC

MD1-0-V-181-09-00014

AUXILIARY BOILER PACKAGE INSTRUMENT DATA

AC

MD1-0-V-181-09-00015

AUXILIARY BOILER PACKAGE CONTROL VALVE

MD1-0-V-181-09-00016

Auxiliary Boiler Package CCTV Data Sheet

MD1-0-V-181-10-00024

Auxiliary boiler package lighting & small power system

MD1-0-V-181-10-00025

Auxiliary boiler package electric heat tracing system dwg

MD1-0-V-181-10-00026

Auxiliary Boiler Package GA Drawing for PLC Cabinet

MD1-0-V-181-10-00027

Auxiliary boiler package instrument installation hook-up drawing

MD1-0-V-181-10-00028

Auxiliary Boiler Package General Arrangement Drawing for Porta Cabin

MD1-0-V-181-32-00001

Auxiliary boiler package schematics of plc

MD1-0-V-181-36-00001

AUXILIARY BOILER PACKAGE CONTROL SYSTEM

MD1-0-V-181-56-00001

Auxiliary Boiler Package Stack Lightning System Drawing

MD1-0-V-181-57-00004

Auxiliary boiler package sump pump control panel & local push botton switch

MD1-0-V-182-09-11011

Instrument Data Sheet and Catalog for Air Receiver Tank of EDG

MD1-0-V-182-10-11009

Flow Meter Outline for Emergency Diesel Generator

MD1-0-V-182-33-32002

Control logic diagram

MD1-0-V-182-35-30002

Flow Meter Wiring Diagram for Emergency Diesel Generator

MD1-0-V-182-36-32001

Control philosophy

MD1-0-V-186-08-00104

Instrument & Equipment List

MD1-0-V-186-08-00105

Instrument list for field erected tank

MD1-0-V-186-08-00107

Drawing of instrument & equipment for field erected tank

IC

MD1-0-V-186-08-00108

Data sheet of instrument & equipment for field erected tank

MD1-0-V-400-10-01712

Hyd. unit & control panel drawing for combined nrv dn2400

MD1-0-V-400-32-01211

Schematic & wiring diagram for motor operated cast valves

MD1-0-V-400-32-01611

WIRING DIAGRRAM & ACTUATOR DRAWING FOR MOTOR OPERATED BUTTERFLY VALVE

MD1-0-V-400-32-01711

Schematic & wiring diagram for combined nrv dn2400

MD1-0-V-545-05-00001

Inspection and test plan

MD1-0-V-545-05-00002

Qa/qc manual

MD1-0-V-545-05-00004

FAT Procedure for Communication System

MD1-0-V-545-05-00005

SAT Procedure for Communication System

MD1-0-V-545-09-00001

Technical Datasheet for Communication System

MD1-0-V-550-09-00001

Technical Datasheet for CCTV System

MD1-0-V-610-01-00002

Distributed Control System Power and Ground Plan

RT

MD1-0-V-610-01-00003

Power Consumption & Heat Dissipation

MD1-0-V-610-02-00004

Distributed Control System Planing Installation Specification

MD1-0-V-610-02-00005

Distributed control system online performance monitoring system specification

MD1-0-V-610-03-00003

Dcs design & function description

MD1-0-V-610-05-00002

Distributed control system inspection and test procedure

MD1-0-V-610-07-00002

Distributed Control System FAT Report

MD1-0-V-610-08-00007

Distributed Control System Bill of Material

MD1-0-V-610-08-00008

Distributed control system quality inspection and test plan

MD1-0-V-610-10-00001

Equipment outline detail for distributed control system

MD1-0-V-610-10-00002

Distributed control system name plate list

MD1-0-V-610-11-00001

Distributed Control System Ovation Graphic Diagram

AC

RT

MD1-0-V-610-11-00002

Distributed control system io summary and assignment table

MD1-0-V-610-11-00003

Distributed control system io list

MD1-0-V-610-35-00001

Distributed control system internal connection and wiring diagram

MD1-0-V-610-36-00001

Distributed control system system configuration

MD1-0-V-620-09-00001

Datasheet and Catalog for SWAS

MD1-0-V-620-10-00001

Panel Layout Drawing for SWAS

MD1-0-V-620-21-00001

P&I Diagram for SWAS

MD1-0-V-620-32-00001

Schematic and Wiring Diagram for SWAS

MD1-0-V-620-35-00001

Interconnection Wiring Diagram for SWAS

IC

MD1-0-V-630-02-00001

Equipment and System Specification for CEMS

MD1-0-V-630-09-00001

Instrument Data Sheet for CEMS

MD1-0-V-630-09-00002

Technical Catalog and Brochure for CEMS

MD1-0-V-630-10-00001

Panel Arrangement Drawing for CEMS

MD1-0-V-630-11-00001

Instrument and Analyzer Installation Detail Drawing for CEMS

MD1-0-V-630-21-00001

P&I Diagram for CEMS

MD1-0-V-630-32-00001

Schematic & Wiring Diagram for CEMS

MD1-0-V-630-35-00001

Interconnection Wiring Diagram for CEMS

IC

MD1-0-V-630-36-00001

System Configuration Diagram for CEMS

MD1-0-V-640-03-00001

System overview for vibration monitoring system(bop)

MD1-0-V-640-08-00001

Signal list for vibration monitoring system(bop)

MD1-0-V-640-08-00003

Sub-supplier's list for vibration monitoring system(bop)

IC

MD1-0-V-640-08-00007

Code and standards for vibration monitoring system(bop)

MD1-0-V-640-08-00009

Cable list for vibration monitoring system(bop)

IC

MD1-0-V-640-08-00011

Technical catalog and brochure for vibration monitoring system(bop)

IC

MD1-0-V-640-10-00001

Panel equipment installation drawings for vibration monitoring system(bop)

MD1-0-V-640-35-00002

Interconnection wiring diagram for vibration monitoring system(bop)

MD1-0-V-640-36-00001

System configuration diagram for vibration monitoring system(bop)

MD1-0-V-650-05-00003

Technical catalog and brochure for control valve & regulating valve (bop)

MD1-0-V-650-05-00004

O&m manual for control valve & regulating valve (bop)

MD1-0-V-650-05-10003

Technical catalog and brochure for pneumatic operated shut-off valve (bop)

MD1-0-V-650-05-10004

O&m manual for pneumatic operated shut-off valve (bop)

MD1-0-V-650-09-00001

Data sheets for control valve & regulating valve(bop)

MD1-0-V-650-09-10001

Data sheets for pneumatic operated shut-off valve (bop)

MD1-0-V-650-10-00001

Assembly drawing for control valve & regulating valve(bop)

MD1-0-V-650-10-10001

Assembly drawing for pneumatic operated shut-off valve (bop)

MD1-0-V-660-01-40001

Inspection Test Plan for Level Gauge and Switch (BOP)

MD1-0-V-660-05-40001

Inspection Test Procedure for Level Gauge and Switch (BOP)

MD1-0-V-660-06-00001

Thermowell stress calculation report for field transmitter (bop)

MD1-0-V-660-09-00001

Datasheet and catalogue for field transmitter (bop)

MD1-0-V-660-09-10001

Data Sheet and Catalogue for Displacer Level Transmitter (BOP)

MD1-0-V-660-09-40001

Data Sheet and Catalogue for Level Gauge and Switch (BOP)

MD1-0-V-660-11-00001

Dimensional drawings for field transmitter (bop)

MD1-0-V-660-11-10001

Dimensional Drawing for Displacer Level Transmitter (BOP)

MD1-0-V-660-11-20001

Dimensional Drawing for Coriolis Flowmeter(BOP)

MD1-0-V-660-11-20002

Dimensional Drawing for Radar Level Transmitter(BOP)

MD1-0-V-660-11-40001

Dimensional Drawing for Level Gauge and Switch (BOP)

MD1-0-V-750-09-00037

Equipment Data Sheet: Main Fire Alarm Control Panel

MD1-0-V-750-09-00038

Equipment Data Sheet: Local Fire Alarm Control Panel

MD1-0-V-750-09-00039

Equipment Data Sheet: Annunciator Panel

MD1-0-V-750-09-00040

Equipment Data Sheet: Manual Call Point

MD1-0-V-750-09-00041

Equipment Data Sheet: Horn & Strobe

MD1-0-V-750-09-00042

Equipment Data Sheet: Fire Detectors

MD1-0-V-750-09-00043

Equipment Data Sheet: Module

MD1-0-V-750-09-00044

Equipment Data Sheet: Module Box

MD1-0-V-750-09-00045

Equipment Data Sheet: Manual Release Station for Water Spray

MD1-0-V-750-09-00046

Equipment Data Sheet: Manual Release Station for Foam Water Spray

MD1-0-V-750-09-00047

Equipment Data Sheet: Local Fire Suppression Panel

MD1-0-V-750-09-00048

Equipment Data Sheet: Discharge Lamp

MD1-0-V-750-09-00049

Equipment Data Sheet: Manual Release Station for Gas Suppression

MD1-0-V-750-09-00050

Equipment Data Sheet: Led Indicator

MD1-0-V-750-09-00051

Equipment Data Sheet: Isolator

MD1-0-V-750-09-00052

Equipment Data Sheet: Terminal Box

MD1-0-V-750-09-00053

Equipment Data Sheet: Power Supply Panel

MD1-0-V-750-09-00055

Equipment Data Sheet: Mimic Panel for Main Fire Alarm Panel

MD1-0-V-750-09-00056

Equipment Data Sheet: Mimic Panel for Sub-Fire Alarm Panel

MD1-0-V-750-09-00057

Equipment Data Sheet: Transponder Panel

MD1-0-V-750-10-00123

Main fire alarm system panel assembly and outline dimension drawing

MD1-0-V-750-10-00124

Main fire alarm system panel internal / external connection drawing

MD1-0-V-750-10-00125

Local fire alarm system panel assembly and outline Local fire alarm system pane

MD1-0-V-750-10-00126

Local fire alarm system panel internal / external connection drawing

MD1-0-V-750-10-00127

Fire alarm system typical wiring diagram

MD1-0-V-750-10-00128

Fire alarm system graphic annunciator panel outline dimension drawing

MD1-0-V-750-10-00130

Fire Alarm Sys Mimic Panel Outline Dimension Drawing for Main Fire Alarm Panel

MD1-0-V-750-10-00132

Fire alarm system mimic panel outline dimension drawing for sub-fire alarm pane

MD1-0-V-750-10-00141

Fire alarm system transponder panel assembly and outline dimension drawing

MD1-0-V-750-10-00142

Fire alarm system transponder panel internal / external connection drawing

MD1-0-V-750-32-00069

Clean agent fire extinguishing system electrical schematic drawing for main con)

MD1-0-V-750-32-00077

Clean agent fire extinguishing system electrical schematic drawing for electron)

MD1-0-V-750-32-00085

Clean agent fire extinguishing system electrical schematic drawing for control )

MD1-0-V-750-32-00093

Clean agent fire extinguishing system electrical schematic drawing for esp contd

MD1-0-V-750-32-00101

Clean agent fire extinguishing system electrical schematic drawing for esp cont

MD1-0-V-750-33-00072

Clean agent fire extinguishing system cause and effect diagram for main control)

MD1-0-V-750-33-00080

Clean agent fire extinguishing system cause and effect diagram for electronic e)

MD1-0-V-750-33-00088

Clean agent fire extinguishing system cause and effect diagram for control & pr)

MD1-0-V-750-33-00096

Clean agent fire extinguishing system cause and effect diagram for esp control c

MD1-0-V-750-33-00104

Clean agent fire extinguishing system cause and effect diagram for esp control m

MD1-0-V-750-33-00134

Fire Alarm System Cause and Effect Chart Local Fire Alarm Control Panel-2(SWYD)

MD1-0-V-750-35-00070

Clean agent fire extinguishing system electrical terminal & wiring diagram for )

MD1-0-V-750-35-00078

Clean agent fire extinguishing system electrical terminal & wiring diagram

MD1-0-V-750-35-00086

Clean agent fire extinguishing system electrical terminal & wiring diagram for )

MD1-0-V-750-35-00094

Clean agent fire extinguishing system electrical terminal & writing diagram

MD1-0-V-750-35-00102

Clean agent fire extinguishing system electrical terminal & wiring diagram for

MD1-0-V-750-55-00122

Battery Calculation Local Fire Alarm Control Panel-2(SWYD Control Building)

MD1-0-V-805-01-00101

Instrument Location Drawing for WT & WWT System

MD1-0-V-805-02-00001

Instrument data sheet for wt & wwt

MD1-0-V-805-02-00002

Plc & hmi specification for wt & wwt

MD1-0-V-805-03-00003

HMI Graphics for WT & WWT System

IC

MD1-0-V-805-08-00009

Instrument list for wt & wwt

IC

MD1-0-V-805-08-00010

Set-point list for alarm and interlocking for wt & wwt

MD1-0-V-805-08-00012

I/o list for plant dcs for wt&wwt

MD1-0-V-805-08-00031

I/o list for plc for wt & wwt system

MD1-0-V-805-11-00006

Outline and dimensional drawings identifying components and name plates inclusi

MD1-0-V-805-32-00001

Schematic diagram for wt & wwt

MD1-0-V-805-33-00002

Control logic diagram with description

MD1-0-V-805-34-00002

Control loop diagram for wt & wwt

MD1-0-V-805-35-00001

Interconnection wiring diagrams for wt & wwt

MD1-0-V-805-36-00002

Configulation drawing for control system for wt & wwt

MD1-0-V-850-08-00008

ELECTRICAL LOAD LIST FOR BOILER CHEMICAL DOSING SYSTEM

MD1-0-V-850-08-00011

Instrument list for boiler chemical dosing system

MD1-0-V-850-08-00012

Io list for plc for boiler chemical dosing system

MD1-0-V-850-08-00013

Io list for plc for boiler chemical dosing system chemical dosing system

MD1-0-V-850-09-00002

Instrument data sheet for boiler chemical dosing system

MD1-0-V-850-33-00001

Control logic diagram for chemical dosing system

MD1-0-V-850-34-00001

Control loop diagram for ammonia storage system

MD1-0-V-850-36-00001

Configuration drawing for control system chemical dosing system cover

MD1-0-V-850-73-00002

Dimensional outline drawing for control panel chemical dosing system cover

MD1-0-V-850-73-00003

Instrument Installtion Detail Drawing with Bill of Materials for Chemical Dosinm

MD1-0-V-850-73-00004

Interconnection wiring diagram for boiler chemical dosing system

IC

MD1-0-V-860-02-00004

Technical specification of control system and peripheral equipment for gaseous m

MD1-0-V-860-02-00006

System Software and Sofware Application Specification Gaseous

MD1-0-V-860-08-00009

Cable Schedule for Gaseous Chlorination System

MD1-0-V-860-08-00010

Electrical Load List for Gaseous Chlorination System

MD1-0-V-860-08-00011

Electrical Equipment List (Panel, J/B), LCP, etc) for Gaseous Chlorination Systm

MD1-0-V-860-08-00016

Instrument List for Gaseous Chlorination System

MD1-0-V-860-08-00018

Set-point List for Alarm and Interlocking for Chemical Dosing System (Chlorine)

MD1-0-V-860-08-00019

IO List for PLC Gaseous Chlorination System

MD1-0-V-860-08-00020

IO List for Plant DCS for Gaseous Chlorination System

MD1-0-V-860-09-00003

Instrument and Control Valve Specification and Data Sheet Gaseous

MD1-0-V-860-11-00011

Detailed sectional drawings for control valves and other types of valves gaseoum

MD1-0-V-860-33-00001

Control Logic Diagram for Gaseous Chlorination System

MD1-0-V-860-35-00001

Wiring Diagams Gaseous Chlorination System

MD1-0-V-860-57-00001

Electrical hook-up drawing for gaseous chlorination system

MD1-0-V-860-57-00002

Configuration drawing for control system. gaseous chlorination system

MD1-0-V-860-57-00003

Instrument location drawing for gaseous chlorination system

MD1-0-V-870-08-00012

Instrument list for Sewage Treatment System

MD1-0-V-870-08-00013

Set-Point for Alarm and Interlocking List for Sewage Treatment System

BILL

25/10/12

BILL

25/10/12

BILL

25/10/12

BILL

25/10/12

BILL

25/10/12

BILL

25/10/12

BILL

12/12/12

BILL

12/12/12

BILL

12/12/12

BILL

12/12/12

10

BILL

12/12/12

11

BILL

12/12/12

12

BILL

12/12/12

13

BILL

24/12/12

14

BILL

24/12/12

15

BILL

24/12/12

16

BILL

14/09/12

17

BILL

14/09/12

18

BILL

14/09/12

19

BILL

14/09/12

20

BILL

29/05/13

21

BILL

08/03/13

22

BILL

04/03/13

23

BILL

05/07/13

24

BILL

05/07/13

25

BILL

20/05/13

26

BILL

30/05/13

27

BILL

05/07/13

28

BILL

19/07/13

29

BILL

12/06/13

30

BILL

16/07/13

31

BILL

11/03/13

32

BILL

11/03/13

33

BILL

04/03/13

34

BILL

16/07/13

35

BILL

29/05/13

36

BILL

16/07/13

37

BILL

16/07/13

38

BILL

27/05/13

39

BILL

23/04/13

40

BILL

16/07/13

41

BILL

19/12/12

42

BILL

19/12/12

43

BILL

19/12/12

44

BILL

19/12/12

45

BILL

25/01/13

46

BILL

07/03/13

47

BILL

07/03/13

48

BILL

07/03/13

49

BILL

07/03/13

50

BILL

07/03/13

51

BILL

07/03/13

52

BILL

08/07/13

53

BILL

07/01/13

54

BILL

08/07/13

55

BILL

12/03/13

56

BILL

28/02/13

57

BILL

15/10/12

58

BILL

06/03/13

59

BILL

02/07/13

60

BILL

02/07/13

61

BILL

11/07/13

62

BILL

28/05/13

63

BILL

16/07/13

64

BILL

16/05/13

65

BILL

25/03/13

66

BILL

02/07/13

67

BILL

11/07/13

68

BILL

28/02/13

69

BILL

28/02/13

70

BILL

28/02/13

71

BILL

28/02/13

72

BILL

12/03/13

73

BILL

12/03/13

74

BILL

12/03/13

75

BILL

12/03/13

76

BILL

12/03/13

77

BILL

11/07/13

78

BILL

28/05/13

79

BILL

28/05/13

80

BILL

25/03/13

81

BILL

17/07/13

82

BILL

17/07/13

83

BILL

02/07/13

84

BILL

02/07/13

85

BILL

02/07/13

86

BILL

02/07/13

87

BILL

02/07/13

88

BILL

02/07/13

89

BILL

02/07/13

90

BILL

06/03/13

91

BILL

06/03/13

92

BILL

27/05/13

93

BILL

28/05/13

94

BILL

28/05/13

95

BILL

11/07/13

96

BILL

11/07/13

97

BILL

11/07/13

98

BILL

11/07/13

99

BILL

16/07/13

100

BILL

28/05/13

101

BILL

28/05/13

102

BILL

28/05/13

103

BILL

16/05/13

104

BILL

25/03/13

105

BILL

25/03/13

106

BILL

25/03/13

107

BILL

16/05/13

108

BILL

28/05/13

109

BILL

28/05/13

110

BILL

24/04/13

111

BILL

03/07/13

112

BILL

03/07/13

113

BILL

08/07/13

114

BILL

31/01/13

115

BILL

31/01/13

116

BILL

31/01/13

117

BILL

31/01/13

118

BILL

31/01/13

119

BILL

31/01/13

120

BILL

31/01/13

121

BILL

31/01/13

122

BILL

31/01/13

123

BILL

31/01/13

124

BILL

31/01/13

125

BILL

31/01/13

126

BILL

19/12/12

127

BILL

19/12/12

128

BILL

19/12/12

129

BILL

19/12/12

130

BILL

19/12/12

131

BILL

19/12/12

132

BILL

19/12/12

133

BILL

19/12/12

134

BILL

19/12/12

135

BILL

19/12/12

136

BILL

19/12/12

137

BILL

19/12/12

138

BILL

19/12/12

139

BILL

19/12/12

140

BILL

19/12/12

141

BILL

19/12/12

142

BILL

19/12/12

143

BILL

20/05/13

144

BILL

03/07/13

145

BILL

03/07/13

146

BILL

03/07/13

147

BILL

03/07/13

148

BILL

03/07/13

149

BILL

04/04/13

150

BILL

04/04/13

151

BILL

04/04/13

152

BILL

04/04/13

153

BILL

04/04/13

154

BILL

04/04/13

155

BILL

04/04/13

156

BILL

04/04/13

157

BILL

04/04/13

158

BILL

04/04/13

159

BILL

26/04/13

160

BILL

26/04/13

161

BILL

26/04/13

162

BILL

26/04/13

163

BILL

26/04/13

164

BILL

03/04/13

165

BILL

03/04/13

166

BILL

03/04/13

167

BILL

03/04/13

168

BILL

03/04/13

169

BILL

03/04/13

170

BILL

03/04/13

171

BILL

03/04/13

172

BILL

03/04/13

173

BILL

03/04/13

174

BILL

03/04/13

175

BILL

03/04/13

176

BILL

03/04/13

177

BILL

03/04/13

178

BILL

13/05/13

179

BILL

13/05/13

180

BILL

13/05/13

181

BILL

13/05/13

182

BILL

13/05/13

183

BILL

23/04/13

184

BILL

23/04/13

185

BILL

23/04/13

186

BILL

23/04/13

187

BILL

23/04/13

188

BILL

04/04/13

189

BILL

04/04/13

190

BILL

04/04/13

191

BILL

04/04/13

192

BILL

04/04/13

193

BILL

04/04/13

194

BILL

17/05/13

195

BILL

17/05/13

196

BILL

17/05/13

197

BILL

17/05/13

198

BILL

17/05/13

199

BILL

04/03/13

200

BILL

04/03/13

201

BILL

04/03/13

202

BILL

04/12/12

203

BILL

04/03/13

204

BILL

04/12/12

205

BILL

04/12/12

206

BILL

11/03/13

207

BILL

30/05/13

208

BILL

11/03/13

209

BILL

11/03/13

210

BILL

11/03/13

211

BILL

30/05/13

212

BILL

11/03/13

213

BILL

03/07/13

214

BILL

03/07/13

215

BILL

03/07/13

216

BILL

03/07/13

217

BILL

03/07/13

218

BILL

23/04/13

219

BILL

23/04/13

220

BILL

23/04/13

221

BILL

23/04/13

222

BILL

23/04/13

223

BILL

04/04/13

224

BILL

04/04/13

225

BILL

04/04/13

226

BILL

04/04/13

227

BILL

04/04/13

228

BILL

29/03/13

229

BILL

29/03/13

230

BILL

29/03/13

231

BILL

29/03/13

232

BILL

29/03/13

233

BILL

08/01/13

234

BILL

08/01/13

235

BILL

08/01/13

236

BILL

08/01/13

237

BILL

08/01/13

238

BILL

08/01/13

239

BILL

08/01/13

240

BILL

08/01/13

241

BILL

08/01/13

242

BILL

08/01/13

243

BILL

08/01/13

244

BILL

08/01/13

245

BILL

08/01/13

246

BILL

08/01/13

247

BILL

08/01/13

248

BILL

08/01/13

249

BILL

08/01/13

250

BILL

08/01/13

251

BILL

08/01/13

252

BILL

08/01/13

253

BILL

08/01/13

254

BILL

08/01/13

255

BILL

08/01/13

256

BILL

08/01/13

257

BILL

08/01/13

258

BILL

08/01/13

259

BILL

04/04/13

260

BILL

04/04/13

261

BILL

04/04/13

262

BILL

04/04/13

263

BILL

04/04/13

264

BILL

04/04/13

265

BILL

04/04/13

266

BILL

26/03/13

267

BILL

15/03/13

268

BILL

25/03/13

269

BILL

19/07/13

270

BILL

05/02/13

271

BILL

26/07/12

272

BILL

16/08/12

273

BILL

03/05/13

274

BILL

08/04/13

275

BILL

05/09/12

276

BILL

12/06/13

277

BILL

12/06/13

278

BILL

11/06/13

279

BILL

29/05/13

280

BILL

07/08/12

281

BILL

18/07/13

282

BILL

18/07/13

283

BILL

30/07/13

284

BILL

22/11/12

285

BILL

27/12/12

286

BILL

27/12/12

287

BILL

23/05/13

288

BILL

28/05/13

289

BILL

19/07/13

290

BILL

19/07/13

291

BILL

26/09/12

292

BILL

26/09/12

293

BILL

07/08/12

294

BILL

07/08/12

295

BILL

23/10/12

296

BILL

26/10/12

297

BILL

24/07/13

298

BILL

11/03/13

299

BILL

23/10/12

300

BILL

25/10/12

301

BILL

20/12/12

302

BILL

25/10/12

303

BILL

20/12/12

304

BILL

11/07/13

305

BILL

12/04/13

306

BILL

16/07/13

307

BILL

20/12/12

308

BILL

28/03/13

309

BILL

20/12/12

310

BILL

28/03/13

311

BILL

10/07/13

312

BILL

25/10/12

313

BILL

25/10/12

314

BILL

25/10/12

315

BILL

25/10/12

316

BILL

25/10/12

317

BILL

25/10/12

318

BILL

25/10/12

319

BILL

25/10/12

320

BILL

25/10/12

321

BILL

25/10/12

322

BILL

25/10/12

323

BILL

25/10/12

324

BILL

25/10/12

325

BILL

25/10/12

326

BILL

25/10/12

327

BILL

25/10/12

328

BILL

25/10/12

329

BILL

25/10/12

330

BILL

25/10/12

331

BILL

25/10/12

332

BILL

25/10/12

333

BILL

21/03/13

334

BILL

21/03/13

335

BILL

21/03/13

336

BILL

05/03/13

337

BILL

05/03/13

338

BILL

27/11/12

339

BILL

24/01/13

340

BILL

20/03/13

341

BILL

20/03/13

342

BILL

27/11/12

343

BILL

27/11/12

344

BILL

27/11/12

345

BILL

24/01/13

346

BILL

24/01/13

347

BILL

26/07/12

348

BILL

05/03/13

349

BILL

05/03/13

350

BILL

05/03/13

351

BILL

05/03/13

352

BILL

05/03/13

353

BILL

05/03/13

354

BILL

05/03/13

355

BILL

05/03/13

356

BILL

05/03/13

357

BILL

05/03/13

358

BILL

05/03/13

359

BILL

05/03/13

360

BILL

20/12/12

361

BILL

20/12/12

362

BILL

11/03/13

363

BILL

11/07/13

364

BILL

15/04/13

365

BILL

15/04/13

366

BILL

15/04/13

367

BILL

15/04/13

368

BILL

15/04/13

369

BILL

22/04/13

370

BILL

10/07/13

371

BILL

22/04/13

372

BILL

22/04/13

373

BILL

28/02/13

374

BILL

17/05/13

375

BILL

18/04/13

376

BILL

18/04/13

377

BILL

08/04/13

378

BILL

11/07/13

379

BILL

11/07/13

380

BILL

12/07/13

381

BILL

16/07/13

382

BILL

16/07/13

383

BILL

16/07/13

384

BILL

16/07/13

385

BILL

08/04/13

386

BILL

18/07/13

387

BILL

18/07/13

388

BILL

04/07/13

389

BILL

12/06/13

390

BILL

04/04/13

391

BILL

16/04/13

392

BILL

06/03/13

393

BILL

04/04/13

394

BILL

06/03/13

395

BILL

06/03/13

396

BILL

16/04/13

397

BILL

15/05/13

398

BILL

15/05/13

399

BILL

06/02/13

400

BILL

06/02/13

401

BILL

06/02/13

402

BILL

06/02/13

403

BILL

06/02/13

404

BILL

22/04/13

405

BILL

06/02/13

406

BILL

19/07/13

407

BILL

19/07/13

408

BILL

18/04/13

409

BILL

06/06/13

410

BILL

06/06/13

411

BILL

06/06/13

412

BILL

13/05/13

413

BILL

29/05/13

414

BILL

20/02/13

415

BILL

02/04/13

416

BILL

19/02/13

417

BILL

20/02/13

418

BILL

11/03/13

419

BILL

20/02/13

420

BILL

02/04/13

421

BILL

11/03/13

422

BILL

11/03/13

423

BILL

01/11/12

424

BILL

01/11/12

425

BILL

01/11/12

426

BILL

07/05/13

427

BILL

12/11/12

428

BILL

12/11/12

429

BILL

01/11/12

430

BILL

31/10/12

431

BILL

31/10/12

432

BILL

01/11/12

433

BILL

19/03/13

434

BILL

19/03/13

435

BILL

19/03/13

436

BILL

19/03/13

437

BILL

19/03/13

438

BILL

19/03/13

439

BILL

19/03/13

440

BILL

19/03/13

441

BILL

19/03/13

442

BILL

15/11/12

443

BILL

15/11/12

444

BILL

06/02/13

445

BILL

06/02/13

446

BILL

06/02/13

447

BILL

31/10/12

448

BILL

31/10/12

449

BILL

31/10/12

450

BILL

26/03/13

451

BILL

26/03/13

452

BILL

24/04/13

453

BILL

24/04/13

454

BILL

24/04/13

455

BILL

24/07/13

456

BILL

24/07/13

457

BILL

10/07/12

458

BILL

24/12/12

459

BILL

24/12/12

460

BILL

24/12/12

461

BILL

24/12/12

462

BILL

24/12/12

463

BILL

10/07/12

464

BILL

24/12/12

465

BILL

24/12/12

466

BILL

24/12/12

467

BILL

10/07/12

468

BILL

10/07/12

469

BILL

10/07/12

470

BILL

24/12/12

471

BILL

24/12/12

472

BILL

24/12/12

473

BILL

24/12/12

474

BILL

10/07/12

475

BILL

24/12/12

476

BILL

24/12/12

477

BILL

24/12/12

478

BILL

10/07/12

479

BILL

24/12/12

480

BILL

10/07/12

481

BILL

10/07/12

482

BILL

10/07/12

483

BILL

24/12/12

484

BILL

24/12/12

485

BILL

24/12/12

486

BILL

24/12/12

487

BILL

24/12/12

488

BILL

24/12/12

489

BILL

24/12/12

490

BILL

24/12/12

491

BILL

24/12/12

492

BILL

24/12/12

493

BILL

24/12/12

494

BILL

10/07/12

495

BILL

24/12/12

496

BILL

24/12/12

497

BILL

24/12/12

498

BILL

24/12/12

499

BILL

24/12/12

500

BILL

24/12/12

501

BILL

24/12/12

502

BILL

24/12/12

503

BILL

10/07/12

504

BILL

24/12/12

505

BILL

24/12/12

506

BILL

10/07/12

507

BILL

24/12/12

508

BILL

24/12/12

509

BILL

10/07/12

510

BILL

10/07/12

511

BILL

10/07/12

512

BILL

10/07/12

513

BILL

10/07/12

514

BILL

10/07/12

515

BILL

10/07/12

516

BILL

10/07/12

517

BILL

10/07/12

518

BILL

24/12/12

519

BILL

10/07/12

520

BILL

10/07/12

521

BILL

10/07/12

522

BILL

10/07/12

523

BILL

10/07/12

524

BILL

10/07/12

525

BILL

24/12/12

526

BILL

10/07/12

527

BILL

10/07/12

528

BILL

10/07/12

529

BILL

10/07/12

530

BILL

10/07/12

531

BILL

10/07/12

532

BILL

10/07/12

533

BILL

10/07/12

534

BILL

10/07/12

535

BILL

10/07/12

536

BILL

10/07/12

537

BILL

10/07/12

538

BILL

10/07/12

539

BILL

10/07/12

540

BILL

24/12/12

541

BILL

24/12/12

542

BILL

24/12/12

543

BILL

24/12/12

544

BILL

24/12/12

545

BILL

24/12/12

546

BILL

24/12/12

547

BILL

24/12/12

548

BILL

24/12/12

549

BILL

24/12/12

550

BILL

24/12/12

551

BILL

10/07/12

552

BILL

24/12/12

553

BILL

24/12/12

554

BILL

24/12/12

555

BILL

24/12/12

556

BILL

24/12/12

557

BILL

24/12/12

558

BILL

24/12/12

559

BILL

10/07/12

560

BILL

24/12/12

561

BILL

24/12/12

562

BILL

24/12/12

563

BILL

24/12/12

564

BILL

24/12/12

565

BILL

24/12/12

566

BILL

24/12/12

567

BILL

24/12/12

568

BILL

24/12/12

569

BILL

24/12/12

570

BILL

24/12/12

571

BILL

24/12/12

572

BILL

24/12/12

573

BILL

24/12/12

574

BILL

24/12/12

575

BILL

24/12/12

576

BILL

24/12/12

577

BILL

24/12/12

578

BILL

10/07/12

579

BILL

24/12/12

580

BILL

10/07/12

581

BILL

24/12/12

582

BILL

10/07/12

583

BILL

24/12/12

584

BILL

24/12/12

585

BILL

24/12/12

586

BILL

10/07/12

587

BILL

10/07/12

588

BILL

24/12/12

589

BILL

24/12/12

590

BILL

24/12/12

591

BILL

24/12/12

592

BILL

24/12/12

593

BILL

24/12/12

594

BILL

24/12/12

595

BILL

25/01/13

596

BILL

25/01/13

597

BILL

25/01/13

598

BILL

25/01/13

599

BILL

25/01/13

600

BILL

25/01/13

601

BILL

25/01/13

602

BILL

25/01/13

603

BILL

25/01/13

604

BILL

25/01/13

605

BILL

07/02/13

606

BILL

07/02/13

607

BILL

07/02/13

608

BILL

07/02/13

609

BILL

07/02/13

610

BILL

07/02/13

611

BILL

07/02/13

612

BILL

31/10/12

613

BILL

07/02/13

614

BILL

31/10/12

615

BILL

07/02/13

616

BILL

07/02/13

617

BILL

07/02/13

618

BILL

07/02/13

619

BILL

07/02/13

620

BILL

07/02/13

621

BILL

07/02/13

622

BILL

31/10/12

623

BILL

31/10/12

624

BILL

31/10/12

625

BILL

18/07/13

626

BILL

18/07/13

627

BILL

18/07/13

628

BILL

18/07/13

629

BILL

18/07/13

630

BILL

18/07/13

631

BILL

18/07/13

632

BILL

18/07/13

633

BILL

18/07/13

634

BILL

18/07/13

635

BILL

18/07/13

636

BILL

18/07/13

637

BILL

18/07/13

638

BILL

18/07/13

639

BILL

18/07/13

640

BILL

18/07/13

641

BILL

18/07/13

642

BILL

18/07/13

643

BILL

18/07/13

644

BILL

18/07/13

645

BILL

18/07/13

646

BILL

18/07/13

647

BILL

18/07/13

648

BILL

18/07/13

649

BILL

18/07/13

650

BILL

18/07/13

651

BILL

18/07/13

652

BILL

18/07/13

653

BILL

18/07/13

654

BILL

18/07/13

655

BILL

18/07/13

656

BILL

18/07/13

657

BILL

18/07/13

658

BILL

18/07/13

659

BILL

18/07/13

660

BILL

18/07/13

661

BILL

18/07/13

662

BILL

18/07/13

663

BILL

18/07/13

664

BILL

18/07/13

665

BILL

11/06/13

666

BILL

11/06/13

667

BILL

11/06/13

668

BILL

05/03/13

669

BILL

27/05/13

670

BILL

19/07/13

671

BILL

25/01/13

672

BILL

11/03/13

673

BILL

03/07/13

674

BILL

08/10/12

675

BILL

08/04/13

676

BILL

10/07/13

677

BILL

08/10/12

678

BILL

09/05/13

679

BILL

08/07/13

680

BILL

06/03/13

681

BILL

14/03/13

682

BILL

08/07/13

683

BILL

04/07/13

684

BILL

04/07/13

685

BILL

04/07/13

686

BILL

11/06/13

687

BILL

11/06/13

688

BILL

28/03/13

689

BILL

06/11/12

690

BILL

08/07/13

691

BILL

08/07/13

692

BILL

03/07/13

693

BILL

16/01/13

694

BILL

23/05/13

695

BILL

23/05/13

696

BILL

28/12/12

697

BILL

23/05/13

698

BILL

01/03/13

699

BILL

01/03/13

700

BILL

23/05/13

701

BILL

23/05/13

702

BILL

01/03/13

703

BILL

04/03/13

704

BILL

28/12/12

705

BILL

28/12/12

706

BILL

28/12/12

707

BILL

28/12/12

708

BILL

23/05/13

709

BILL

12/03/13

710

BILL

01/03/13

711

BILL

23/05/13

712

BILL

12/03/13

713

BILL

23/05/13

714

BILL

12/03/13

715

BILL

12/03/13

716

BILL

23/05/13

717

BILL

01/03/13

718

BILL

04/07/13

719

BILL

10/07/13

720

BILL

03/04/13

721

BILL

04/07/13

722

BILL

03/04/13

723

BILL

18/04/13

724

BILL

06/03/13

725

BILL

18/04/13

726

BILL

18/04/13

727

BILL

11/03/13

728

BILL

29/03/13

729

BILL

22/03/13

730

BILL

11/03/13

731

BILL

12/07/13

732

BILL

24/04/13

733

BILL

12/07/13

734

BILL

12/07/13

735

BILL

12/07/13

736

BILL

12/07/13

737

BILL

16/07/13

738

BILL

07/05/13

739

BILL

27/05/13

740

BILL

07/05/13

741

BILL

20/02/13

742

BILL

29/05/13

743

BILL

16/07/13

744

BILL

11/06/13

745

BILL

29/05/13

746

BILL

27/05/13

747

BILL

07/05/13

748

BILL

17/04/13

749

BILL

07/05/13

750

BILL

07/05/13

751

BILL

07/05/13

752

BILL

07/05/13

753

BILL

13/05/13

754

BILL

13/05/13

755

BILL

13/05/13

756

BILL

13/05/13

757

BILL

13/05/13

758

BILL

09/05/13

759

BILL

09/05/13

760

BILL

09/05/13

761

BILL

09/05/13

762

BILL

09/05/13

763

BILL

09/05/13

764

BILL

09/05/13

765

BILL

09/05/13

766

BILL

09/05/13

767

BILL

25/03/13

768

BILL

25/03/13

769

BILL

25/03/13

770

BILL

25/03/13

771

BILL

25/03/13

772

BILL

25/03/13

773

BILL

25/03/13

774

BILL

25/03/13

775

BILL

25/03/13

776

BILL

29/04/13

777

BILL

29/04/13

778

BILL

02/05/13

779

BILL

02/05/13

780

BILL

29/04/13

781

BILL

02/05/13

782

BILL

29/04/13

783

BILL

02/05/13

784

BILL

05/07/13

785

BILL

05/07/13

786

BILL

12/04/13

787

BILL

12/07/13

788

BILL

27/05/13

789

BILL

07/05/13

790

BILL

12/07/13

791

BILL

27/05/13

792

BILL

27/05/13

793

BILL

27/05/13

794

BILL

07/05/13

795

BILL

23/04/13

796

BILL

23/04/13

797

BILL

18/03/13

798

BILL

18/03/13

799

BILL

18/03/13

800

BILL

18/03/13

801

BILL

18/03/13

802

BILL

18/03/13

803

BILL

18/03/13

804

BILL

18/03/13

805

BILL

23/04/13

806

BILL

18/03/13

807

BILL

18/03/13

808

BILL

18/03/13

809

BILL

18/03/13

810

BILL

18/03/13

811

BILL

18/03/13

812

BILL

18/03/13

813

BILL

18/03/13

814

BILL

23/04/13

815

BILL

20/02/13

816

BILL

20/02/13

817

BILL

20/02/13

818

BILL

20/02/13

819

BILL

20/02/13

820

BILL

20/02/13

821

BILL

18/03/13

822

BILL

28/02/13

823

BILL

20/02/13

824

BILL

20/02/13

825

BILL

20/02/13

826

BILL

20/02/13

827

BILL

20/02/13

828

BILL

28/02/13

829

BILL

28/02/13

830

BILL

20/02/13

831

BILL

20/02/13

832

BILL

20/02/13

833

BILL

28/02/13

834

BILL

28/02/13

835

BILL

18/03/13

836

BILL

20/02/13

837

BILL

20/02/13

838

BILL

20/02/13

839

BILL

28/02/13

840

BILL

28/02/13

841

BILL

18/03/13

842

BILL

02/07/13

843

BILL

18/04/13

844

BILL

17/04/13

845

BILL

16/07/13

846

BILL

25/04/13

847

BILL

25/04/13

848

BILL

25/04/13

849

BILL

25/04/13

850

BILL

02/07/13

851

BILL

17/05/13

852

BILL

17/04/13

853

BILL

17/04/13

854

BILL

17/04/13

855

BILL

17/04/13

856

BILL

18/01/13

857

BILL

08/04/13

858

BILL

08/03/13

859

BILL

08/03/13

860

BILL

08/04/13

861

BILL

25/04/13

862

BILL

25/04/13

863

BILL

08/03/13

864

BILL

15/03/13

865

BILL

09/05/13

866

BILL

04/07/13

867

BILL

27/03/13

868

BILL

05/02/13

869

BILL

18/07/13

870

BILL

18/07/13

871

BILL

18/07/13

872

BILL

10/07/13

873

BILL

10/07/13

874

BILL

10/07/13

875

BILL

10/07/13

876

BILL

10/07/13

877

BILL

02/07/13

878

BILL

11/06/13

879

BILL

12/12/12

880

BILL

23/05/13

881

BILL

20/02/13

882

BILL

10/07/13

883

BILL

18/04/13

884

BILL

18/04/13

885

MD1-0-E-545-01-000010

Communication Layout-Symbol
A
and Legend

MD1-0-E-545-01-044010

COMMUNICATION LAYOUT
I
- FIRE PROTECTION PUMP HOUS

MD1-0-E-545-01-001010

Communication Layout-AInstallation Details (1)

MD1-0-E-545-01-055010

COMMUNICATION LAYOUT
I
- WATER TREATMENT BLDG GR

MD1-0-E-545-01-001020

Communication Layout-AInstallation Details (2)

MD1-0-H-211-01-009010

Hvac control wiring planI for cooling water pump house ground flo

MD1-0-E-545-01-002010

Communication Layout-ARiser Diagram Telephone MD1-0-H-211-32-00901


System
0

Hvac control block diagram


I
for cooling water pump house

MD1-0-E-545-01-003010

Communication Layout-ARiser Diagram Public Address


MD1-0-V-161-57-00031
System
0

Instrument Connection ArrangementI


Furnace and HRA

MD1-0-E-545-01-004010

Communication Layout-ARiser Diagram CCTV System


MD1-0-V-161-57-000320

Instrument Connection ArrangementI


Furnace and HRA

MD1-0-E-545-01-005010

Communication Layout-ARiser Diagram Lan SystemMD1-0-V-161-57-000330

Metal Temp Thermocouple


I
Arrangement

MD1-0-E-545-01-020010

Communication Layout-ATurbine BLDG Ground Floor


MD1-0-V-161-57-000340

IN-BED ThermocouplesI Arrangement

MD1-0-E-545-01-020020

Communication Layout-ATurbine BLDG Mez. Floor MD1-0-V-161-57-000350

IN-BED ThermocouplesI Arrangement

MD1-0-E-545-01-020030

Communication Layout-ATurbine BLDG Operating Floor


MD1-0-V-161-57-000360

Instrument Connection Sects


I
& Details

MD1-0-E-545-01-054011

Communication Layoout-Switchyard
A
Control BLDGMD1-0-V-161-57-00037
Ground Floor
0

Metal Temp Thermocouple


I
Arrangement and Details

MD1-0-E-545-01-054021

Communication Layoout-Switchyard
A
Control BLDGMD1-0-V-161-57-00038
1st Floor
0

Instrument ConnectionsI Bill of Quantities

MD1-0-E-545-01-086010

Communication Layout-AAdmin. Bldg Ground FloorMD1-0-V-161-57-000390

Instrument ConnectionsI Bill of Quantities

MD1-0-E-545-01-086020

Communication Layout-AAdmin. Bldg 1st Floor

MD1-0-V-161-57-000400

Instrument Connection ArrangementI


Aux Equipment

MD1-0-E-545-01-086030

Communication Layout-AAdmin. Bldg 2nd Floor

MD1-0-V-161-57-064010

Instrument Location Plan


I Drawing Index

MD1-0-E-545-01-086040

Communication Layout-AAdmin. Bldg 3rd Floor

MD1-0-V-161-57-064030

Instrument Location Plan


I at EL 12115

MD1-0-E-750-01-000010

Fire Detection & Alarm ASystem- Symbol and Legend


MD1-0-V-161-57-064040

Instrument Location Plan


I at EL 15315 THR EL 15700

MD1-0-E-750-01-000510

FIRE DETECTION & ALARM


A
SYSTEM - INSTALLATION
MD1-0-V-161-57-06405
DETAIL (1)
0

Instrument Location Plan


I at EL 18365 THR EL 19700

MD1-0-E-750-01-000520

FIRE DETECTION & ALARM


A
SYSTEM - INSTALLATION
MD1-0-V-161-57-06406
DETAIL (2)
0

Instrument Location Plan


I at EL 22865 Key Level

MD1-0-E-750-01-000530

FIRE DETECTION & ALARM


A
SYSTEM - INSTALLATION
MD1-0-V-161-57-06407
DETAIL (3)
0

Instrument Location Plan


I at EL 27787 THR EL 28800

MD1-0-E-750-01-000610

FIRE DETECTION & ALARM


A
SYSTEM - EQUIPMENT
MD1-0-V-161-57-06408
DETAIL (1)
0

Instrument Location Plan


I at EL 32060 THR EL 34970 Key Level

MD1-0-E-750-01-000620

FIRE DETECTION & ALARM


A
SYSTEM - EQUIPMENT
MD1-0-V-161-57-06410
DETAIL (2)
0

Instrument Location Plan


I at EL 40300

MD1-0-E-750-01-001012

Fire Detection & Alarm ALayout- Block Diagram

Instrument Location Plan


I at EL 46700

MD1-0-E-750-01-001510

Fire Detection & Alarm ASystem- Interface Diagram MD1-0-V-161-57-064130

Instrument Location Plan


I at EL 49077 THR EL 49275

MD1-0-E-750-01-002010

Fire Detection & Alarm ALayout- Riser Diagram (1) MD1-0-V-161-57-064140

Instrument Location Plan


I at EL 51850 Key Level

MD1-0-E-750-01-002020

Fire Detection & Alarm ALayout- Riser Diagram Steam


MD1-0-V-161-57-06415
Turbine BLDG
0

Instrument Location Plan


I at EL 54005 THR EL 56575

MD1-0-E-750-01-002041

Fire Detection & Alarm ALayout- Riser Diagram (4) MD1-0-V-161-57-064160

Instrument Location Plan


I at EL 57026

MD1-0-E-750-01-002060

Fire Detection & Alarm ALayout- Riser Diagram (6) MD1-0-V-161-57-064170

Instrument Location Plan


I at EL 58400 THR EL 59572

MD1-0-E-750-01-002080

Fire Detection & Alarm ALayout- Riser Diagram (8) MD1-0-V-161-57-064180

Instrument Location Plan


I at EL 61213 THR EL 62703

MD1-0-E-750-01-002091

Fire Detection & Alarm ALayout- Riser Diagram (9)

MD1-0-E-750-01-002100

Fire Detection & Alarm ALayout- Riser Diagram (10)

MD1-0-E-750-01-002120

Fire Detection & Alarm ASystem- Riser Diagram Fire Protection Pump- House

MD1-0-E-750-01-002130

Fire Detection & Alarm ASys-Riser Diagram Gaseous Chlorination bldg.

MD1-0-E-750-01-020011

Fire Detection & Alarm ALayout- Turbine BLDG Ground Floor

MD1-0-E-750-01-020021

Fire Detection & Alarm ALayout- Turbine BLDG Mez Floor

MD1-0-E-750-01-020031

Fire Detection & Alarm ALayout- Turbine BLDG Operating Floor

MD1-0-E-750-01-020041

Fire Detection & Alarm ALayout- Turbine BLDG Lower Roof & Crane Ruway

MD1-0-E-750-01-030011

Fire Detection & Alarm ALayout- Central Control BLDG Ground Floor

MD1-0-E-750-01-030021

Fire Detection & Alarm ALayout- Central Control BLDG 1st Floor

MD1-0-E-750-01-030031

Fire Detection & Alarm ALayout- Central Control BLDG 2nd Floor

MD1-0-E-750-01-030041

Fire Detection & Alarm ALayout- Central Control BLDG 3rd Floor

MD1-0-E-750-01-030051

Fire Detection & Alarm ALayout- Central Control BLDG Roof Floor

MD1-0-E-750-01-042010

Fire detection & alarm layout


A
- fuel oil pump house

MD1-0-E-750-01-042510

Fire detection & alarm layout


A
- diesel oil storage tank, fuel oil storage tank-2

MD1-0-E-750-01-044010

Fire Detection & Alarm ASystem- Fire Protection Pump House Ground Floor

MD1-0-E-750-01-045010

Fire Detection & Alarm Alayout-ash Slurry Pump House Ground floor

MD1-0-E-750-01-046010

Fire Detection & Alarm Alayout-esp Control House No.1

MD1-0-V-161-57-064120

MD1-0-E-750-01-047010

Fire Detection & Alarm Alayout-esp Control House No.2

MD1-0-E-750-01-049010

Fire Detection & Alarm Alayout - Cooling Water Pump House

MD1-0-E-750-01-051010

Fire Detection & Alarm Alayout - Gaseous Chlorination bldg

MD1-0-E-750-01-053010

Fire Detection & Alarm Alayout - Return Water Pump House

MD1-0-E-750-01-054012

Fire Detection & Alarm Alayout- Switchyard Control Bldg Ground Floor

MD1-0-E-750-01-054022

Fire Detection & Alarm Alayout- Switchyard Control Bldg 1st Floor

MD1-0-E-750-01-054510

Fire detection & alarm layout


A
- station transformer

MD1-0-E-750-01-055010

Fire detection & alarm layout


A
- water treatment bldg.

MD1-0-E-750-01-062010

Fire detection & alarm layout


A
- coal yard dry storage shed

MD1-0-E-750-01-083010

Fire detection & alarm layout


A
- workshop bldg

MD1-0-E-750-01-084010

Fire detection & alarm layout


A
- bulldozer garage

MD1-0-E-750-01-085010

Fire detection & alarm layout


A
- i&c electrical and mecahnical warehouse

MD1-0-E-750-01-086012

Fire Detection & Alarm ALayout- Administration BLDG Ground Floor

MD1-0-E-750-01-086021

Fire Detection & Alarm ALayout- Administration BLDG 1st Floor

MD1-0-E-750-01-086031

Fire Detection & Alarm ALayout- Administration BLDG 2nd Floor

MD1-0-E-750-01-086041

Fire Detection & Alarm ALayout- Administration BLDG 3rd Floor

MD1-0-E-750-01-086052

Fire Detection & Alarm ALayout- Administration BLDG 4th Floor

MD1-0-E-750-01-089010

Fire Detection & Alarm ALayout- Riser Diagram (11)

MD1-0-E-750-01-092030

Fire detection & alarm layout


A
- car garage 3

MD1-0-F-750-07-000010

Fire Risk Assessment A

MD1-0-F-750-07-000020

Fire Safety Report

MD1-0-F-750-23-002000

Fire Extinguisher Location


A Plan for Limestone Handling System Control Building

MD1-0-H-201-01-009010

HVAC Control Wiring Plan


A for Steam Turbine Building Ground Floor (1/2)

MD1-0-H-201-01-009020

HVAC Control Wiring Plan


A for Steam Turbine Building Ground Floor (2/2)

MD1-0-H-201-01-009030

HVAC Control Wiring Plan


A for Steam Turbine Building Mezzanine Floor (1/2)

MD1-0-H-201-01-009040

HVAC Control Wiring Plan


A for Steam Turbine Building Mezzanine Floor (2/2)

MD1-0-H-201-01-009050

HVAC Control Wiring Plan


A for Steam Turbine Building Operation Floor (1/2)

MD1-0-H-201-01-009060

HVAC Control Wiring Plan


A for Steam Turbine Building Operation Floor (2/2)

MD1-0-H-201-01-009070

HVAC Enlarged ControlA Wiring Plan for AVR Room-1.2

MD1-0-H-201-01-009080

HVAC Enlarged ControlA Wiring Plan for Sampling Room 1,2

MD1-0-H-201-03-009010

HVAC Control Sequence


A of Operation for Steam Tubine Building

MD1-0-H-201-08-009010

HVAC Control Equipment


A Schedule for Steam Turbine Building

MD1-0-H-201-08-009020

HVAC Control I/O Schedule


A
for Steam Turbine Building

MD1-0-H-201-32-009010

HVAC Control Block Diagram


A
for Steam Turbine Building

MD1-0-H-203-01-009010

HVAC Control Wiring Plan


A for Central Control Building 2nd Floor

MD1-0-H-203-01-009020

HVAC Control Wiring Plan


A for Central Control Building 3rd Floor

MD1-0-H-203-01-009030

HVAC Control Wiring Plan


A for Central Control Building Roof

MD1-0-H-203-01-009040

HVAC Room Enlarged AHVAC Control Wiring Plan-1

MD1-0-H-203-01-009050

HVAC Room Enlarged AHVAC Control Wiring Plan-2

MD1-0-H-203-03-009010

HVAC Control Sequence


A of Operation for Central Control Building-1

MD1-0-H-203-03-009020

HVAC Control Sequence


A of Operation for Central Control Building-2

MD1-0-H-203-08-009010

HVAC Control Equipment


A Schedule for Central Control Building-1

MD1-0-H-203-08-009020

HVAC Control Equipment


A Schedule for Central Control Building-2

MD1-0-H-203-08-009030

HVAC Control Equipment


A Schedule for Central Control Building-3

MD1-0-H-203-08-009040

HVAC Control I/O Schedule


A
for Central Control Building-1

MD1-0-H-203-08-009050

HVAC Control I/O Schedule


A
for Central Control Building-2

MD1-0-H-203-32-009010

HVAC Control Block Diagram


A
for Central Control Building (1/5)

MD1-0-H-203-32-009020

HVAC Control Block Diagram


A
for Central Control Building (2/5)

MD1-0-H-203-32-009030

HVAC Control Block Diagram


A
for Central Control Building (3/5)

MD1-0-H-203-32-009040

HVAC Control Block Diagram


A
for Central Control Building (4/5)

MD1-0-H-203-32-009050

HVAC Control Block Diagram


A
for Central Control Building (5/5)

MD1-0-H-203-35-009010

Configuration Diagram A
for Hvac Control BMS System

MD1-0-H-204-01-009010

HVAC Control Wiring Plan


A for Coal Handling Control Building Ground Floor

MD1-0-H-204-03-009010

HVAC Control Sequence


A of Operation for Coal Handling Control Building

MD1-0-H-204-08-009010

HVAC Control Equipment


A Schedule for Coal Handling Control Building

MD1-0-H-204-08-009020

HVAC Control I/O Schedule


A
for Coal Handling Control Building

MD1-0-H-204-32-009010

HVAC Control Block Diagram


A
for Coal Handling Control Building

MD1-0-H-205-01-009010

Hvac control wiring planA for fuel oil pump house ground floor

MD1-0-H-205-03-009010

Hvac control sequenceAof operation for fuel oil pump house

MD1-0-H-205-08-009020

Hvac control i/o point schedule


A
for fuel oil pump house

MD1-0-H-205-32-009010

Hvac control block diagrma


A
for fuel oil pump house

MD1-0-H-207-01-009010

Hvac control wiring planA for fire protection pump house gound floor

MD1-0-H-207-03-009010

Hvac control sequenceAof operation for fire protection pump house

MD1-0-H-207-08-009020

Hvac control i/o point schedule


A
for fire protection pump house

MD1-0-H-207-32-009010

Hvac control block diagram


A
for fire protection pump house

MD1-0-H-208-01-009010

Hvac control wiring planA for ash slurry pump house first floor

MD1-0-H-208-03-009010

Hvac control sequenceAof operation for ash slurry pump house

MD1-0-H-208-08-009010

Hvac control equipmentAschedule for ash slurry pump house

MD1-0-H-208-08-009020

Hvac control i/o schedule


A for ash slurry pump house

MD1-0-H-208-32-009010

Hvac control block diagram


A
for ash slurry pump house

MD1-0-H-209-01-009010

Hvac control wiring planA for esp control & ash elec.building-1 ground floor

MD1-0-H-209-01-009020

Hvac control wiring planA for esp control & ash elec.building-1 first floor

MD1-0-H-209-01-009030

Hvac control wiring planA for esp control & ash elec.building-1 roof

MD1-0-H-209-01-009040

Hvac control wiring planA for esp control & ash elec.building-2 ground floor

MD1-0-H-209-01-009050

Hvac control wiring planA for esp control & ash elec.building-2 first floor

MD1-0-H-209-01-009060

Hvac control wiring planA for esp control & ash elec.building-2 roof

MD1-0-H-209-03-009010

Hvac control sequenceAof operation for esp control & ash elec. building-1

MD1-0-H-209-03-009020

Hvac control sequenceAof operation for esp control & ash elec. building-2

MD1-0-H-209-08-009020

Hvac control i/o point schedule


A
for esp control & ash elec. building-1

MD1-0-H-209-08-009040

Hvac control i/o point schedule


A
for esp control & ash elec. building-2

MD1-0-H-209-32-009010

Hvac control block diagram


A
for esp control & ash elec. building-1

MD1-0-H-209-32-009020

Hvac control block diagram


A
for esp control & ash elec. building-2

MD1-0-H-210-01-009010

Hvac control wiring planA for diesel generator house ground floor

MD1-0-H-210-03-009010

Hvac control sequenceAof operation for diesel generator house

MD1-0-H-210-08-009010

Hvac control equipmentAschedule for diesel generator

MD1-0-H-210-08-009020

Hvac control i/o point schedule


A
for diesel generator house

MD1-0-H-210-32-009010

Hvac control block diagram


A
for diesel generator house

MD1-0-H-211-03-009010

Hvac control sequenceAof operation for cooling water pump house

MD1-0-H-211-08-009010

Hvac control equipmentAschedule for cooling water pump house

MD1-0-H-211-08-009020

Hvac control i/o schedule


A for cooling water pump house

MD1-0-H-212-01-009010

Hvac control wiring planA for gaseous chlorination building ground floor

MD1-0-H-212-01-009020

Hvac control wiring planA for gaseous chlorination building roof

MD1-0-H-212-03-009010

Hvac control sequenceAof operation for gaseous chlorination building

MD1-0-H-212-08-009020

Hvac control i/o point schedule


A
for gaseous chlorination building

MD1-0-H-212-32-009010

Hvac control block diagram


A
for gaseous chlorination building

MD1-0-H-213-01-009010

Hvac control wiring planA for fuel oil unloading pump house ground floor

MD1-0-H-213-03-009010

Hvac control sequneceAof operation for fuel oil unloading pump house

MD1-0-H-213-08-009010

Hvac control equipmentAfor fuel oil unloading pump house

MD1-0-H-213-08-009020

Hvac control i/o schedule


A for fuel oil unloading pump house

MD1-0-H-213-32-009010

Hvac control block diagram


A
for fuel oil unloading pump house

MD1-0-H-215-01-009011

HVAC Control Wiring Plan


A for Switchyard Control Building Ground Floor

MD1-0-H-215-01-009021

HVAC Control Wiring Plan


A for Switchyard Control Building 1st Floor

MD1-0-H-215-01-009031

Hvac control wiring planA for switchyard control building roof

MD1-0-H-215-03-009010

HVAC Control Sequence


A of Operation for Switchyard Control Building

MD1-0-H-215-08-009011

HVAC Control Equipment


A Schedule for Switchyard Control Building

MD1-0-H-215-08-009020

HVAC Control I/O Schedule


A
for Switchyard Control Building

MD1-0-H-215-32-009010

HVAC Control Block Diagram


A
for Switchyard Control Building

MD1-0-H-216-01-009010

HVAC Control Wiring Plan


A for Water Treatment Building Ground Floor

MD1-0-H-216-01-009020

Hvac control wiring planA for waste water pond pump room

MD1-0-H-216-03-009010

HVAC Control Sequence


A of Operation for Water Treatment Building

MD1-0-H-216-08-009010

HVAC Control Equipment


A Schedule for Water Treatment Building

MD1-0-H-216-08-009020

HVAC Control I/O PointASchedule for Water Treatment Building

MD1-0-H-216-08-009030

Hvac control i/o point schedule


A
for waste water pond pump room

MD1-0-H-216-32-009010

HVAC Control Block Diagram


A
for Water Treatment Building

MD1-0-H-217-01-009010

HVAC Control Wiring Plan


A for Limestone Handling SYS. Control Building

MD1-0-H-217-03-009010

HVAC Control Sequence


A of Operation for Limestone Handling SYS. Control Building

MD1-0-H-217-08-009010

HVAC Control Equipment


A Schedule for Limestone Handling SYS. Control Building

MD1-0-H-217-08-009020

HVAC Control I/O Schedule


A
for Limestone Handling SYS. Control Building

MD1-0-H-217-32-009010

HVAC Control Block Diagram


A
for Limestone Handling SYS. Control Building

MD1-0-H-219-01-009010

Hvac control wiring planA for limestorne storage shed ground floor

MD1-0-H-219-03-009010

Hvac control sequenceAof operation for limestorne storage shed

MD1-0-H-219-08-009010

Hvac control equipmentAfor limestorne storage shed

MD1-0-H-219-08-009020

Hvac control i/o schedule


A for limestorne storage shed

MD1-0-H-219-32-009010

Hvac control block diagram


A
for limestorne storage shed

MD1-0-H-250-01-009010

Hvac control wiring planA for workshop building ground floor

MD1-0-H-250-03-009010

Hvac control sequenceAof operation for workshop building

MD1-0-H-250-08-009020

Hvac control i/o point schedule


A
for workshop building

MD1-0-H-250-32-009010

Hvac control block diagram


A
for workshop building

MD1-0-H-252-01-009010

Hvac control wiring planA for i&c electrical & mechanical warehouse ground floor

MD1-0-H-252-03-009010

Hvac control sequenceAof operation for i&c electrical & mechnical warehouse

MD1-0-H-252-08-009010

Hvac control equipmentAschedule for i&c electrical & mechanical warehouse

MD1-0-H-252-08-009020

Hvac control i/o point schedule


A
for i&c electrical & mechanical warehouse

MD1-0-H-252-32-009010

Hvac control block diagram


A
for i&c electrical & mechanical warehouse

MD1-0-H-254-01-009010

HVAC Control Wiring Plan


A for Administration Building Ground Floor

MD1-0-H-254-01-009020

HVAC Control Wiring Plan


A for Administration Building 2nd Floor

MD1-0-H-254-01-009030

HVAC Control Wiring Plan


A for Administration Building Roof

MD1-0-H-254-01-009040

HVAC Control Wiring Plan


A for Administration Auditorium Area

MD1-0-H-254-01-009050

HVAC Control Wiring Plan


A for Administration Auditorium Roof

MD1-0-H-254-01-009060

HVAC Room Enlarged AHVAC Control Wiring Plan for Admin BLDG HVAC Room-1&2

MD1-0-H-254-01-009070

HVAC Room Enlarged AHVAC Control Wiring Plan for Admin BLDG HVAC Room-3&4

MD1-0-H-254-03-009010

HVAC Control Sequence


A of Operation for Admin. BLDG (1/3)

MD1-0-H-254-03-009020

HVAC Control Sequence


A of Operation for Admin. BLDG (2/3)

MD1-0-H-254-03-009030

HVAC Control Sequence


A of Operation for Admin. BLDG (3/3)

MD1-0-H-254-08-009010

HVAC Control Equipment


A Schedule for Admin. Bldg (1/4)

MD1-0-H-254-08-009020

HVAC Control Equipment


A Schedule for Admin. Bldg (2/4)

MD1-0-H-254-08-009030

HVAC Control Equipment


A Schedule for Admin. Bldg (3/4)

MD1-0-H-254-08-009040

HVAC Control Equipment


A Schedule for Admin. Bldg (4/4)

MD1-0-H-254-08-009050

HVAC Control I/O Schedule


A
for Admin. Bldg (1/6)

MD1-0-H-254-08-009060

HVAC Control I/O Schedule


A
for Admin. Bldg (2/6)

MD1-0-H-254-08-009070

HVAC Control I/O Schedule


A
for Admin. Bldg (3/6)

MD1-0-H-254-08-009080

HVAC Control I/O Schedule


A
for Admin. Bldg (4/6)

MD1-0-H-254-08-009090

HVAC Control I/O Schedule


A
for Admin. Bldg (5/6)

MD1-0-H-254-08-009100

HVAC Control I/O Schedule


A
for Admin. Bldg (6/6)

MD1-0-H-254-32-009010

HVAC Control Block Diagram


A
for Admin. BLDG (1/6)

MD1-0-H-254-32-009020

HVAC Control Block Diagram


A
for Admin. BLDG (2/6)

MD1-0-H-254-32-009030

HVAC Control Block Diagram


A
for Admin. BLDG (3/6)

MD1-0-H-254-32-009040

HVAC Control Block Diagram


A
for Admin. BLDG (4/6)

MD1-0-H-254-32-009050

HVAC Control Block Diagram


A
for Admin. BLDG (5/6)

MD1-0-H-254-32-009060

HVAC Control Block Diagram


A
for Admin. BLDG (6/6)

MD1-0-H-255-01-009010

Hvac control wiring planA for common service building ground floor

MD1-0-H-255-01-009020

Hvac control wiring planA for common service building roof plan

MD1-0-H-255-03-009010

Hvac control sequenceAof operation for common service building

MD1-0-H-255-08-009020

Hvac control equipmentA& i/o schedule for common service building

MD1-0-H-255-08-009030

Hvac control i/o point schedule


A
for common service building (2/2)

MD1-0-H-255-32-009010

Hvac control block diagram


A
for common service building

MD1-0-J-600-01-000010

Central Control Room Layout


A

MD1-0-J-600-01-000020

Electronic Equipment Room


A
Layout

MD1-0-J-600-01-000030

Local control room layout


A for gaseous chlorination building

MD1-0-J-600-04-000010

Design criteria for control


A and instrumentation

MD1-0-J-600-33-000010

Typical Drive Control Logic


A Diagram

MD1-0-J-600-33-000021

Control Logic Diagram A

MD1-0-J-600-34-000011

Control Loop Diagram A

MD1-0-J-600-36-000011

Overall control configuration


A
diagram

MD1-0-M-010-05-000011

Procedure for Plant Identification


A
(KKS numbering)

MD1-0-M-100-07-000010

Classification- Hazardous
A Areas

MD1-0-T-030-05-001891

Inspection test Plan forACommunication System Installation

MD1-0-T-030-05-001901

Inspection Test Plan forAFire Detection & Alarm Installation

MD1-0-V-181-08-000181

Auxiliary package movAlist

MD1-0-V-181-36-000010

AUXILIARY BOILER PACKAGE


A
CONTROL SYSTEM

MD1-0-V-545-09-000010

Technical Datasheet forA Communication System

MD1-0-V-550-09-000010

Technical Datasheet forA CCTV System

MD1-0-V-660-09-000010

Datasheet and catalogue


A for field transmitter (bop)

MD1-0-V-750-09-000370

Equipment Data Sheet:AMain Fire Alarm Control Panel

MD1-0-V-750-09-000380

Equipment Data Sheet:ALocal Fire Alarm Control Panel

MD1-0-V-750-09-000390

Equipment Data Sheet:AAnnunciator Panel

MD1-0-V-750-09-000400

Equipment Data Sheet:AManual Call Point

MD1-0-V-750-09-000410

Equipment Data Sheet:AHorn & Strobe

MD1-0-V-750-09-000420

Equipment Data Sheet:AFire Detectors

MD1-0-V-750-09-000430

Equipment Data Sheet:AModule

MD1-0-V-750-09-000440

Equipment Data Sheet:AModule Box

MD1-0-V-750-09-000450

Equipment Data Sheet:AManual Release Station for Water Spray

MD1-0-V-750-09-000460

Equipment Data Sheet:AManual Release Station for Foam Water Spray

MD1-0-V-750-09-000470

Equipment Data Sheet:ALocal Fire Suppression Panel

MD1-0-V-750-09-000480

Equipment Data Sheet:ADischarge Lamp

MD1-0-V-750-09-000490

Equipment Data Sheet:AManual Release Station for Gas Suppression

MD1-0-V-750-09-000500

Equipment Data Sheet:ALed Indicator

MD1-0-V-750-09-000510

Equipment Data Sheet:AIsolator

MD1-0-V-750-09-000520

Equipment Data Sheet:ATerminal Box

MD1-0-V-750-09-000530

Equipment Data Sheet:APower Supply Panel

MD1-0-V-750-09-000550

Equipment Data Sheet:AMimic Panel for Main Fire Alarm Panel

MD1-0-V-750-09-000560

Equipment Data Sheet:AMimic Panel for Sub-Fire Alarm Panel

MD1-0-V-750-09-000570

Equipment Data Sheet:ATransponder Panel

MD1-0-V-860-02-000040

Technical specification Aof control system and peripheral equipment for gaseous m

MD1-0-V-860-02-000060

System Software and Sofware


A
Application Specification Gaseous

MD1-0-E-750-01-00207C

Fire Detection & Alarm ASystem - Riser Diagram Coal


MD-0-V-111-31-00714
Handling Control BLDG.
A

Panel Outline Drawing for Turbine Control Syste

MD1-0-E-750-01-04101A

Fire Detection & Alarm ALayout - Coal Handling System


MD-0-V-111-31-00715
Control BLDG
A

Panel Outline Drawing for Turbine Control Syste

MD1-0-E-750-01-04502B

Fire Detection & Alarm Alayout-ash Slurry Pump House


MD-0-V-111-31-00716
First floor
A

Panel Outline Drawing for Turbine Control Syste

MD1-0-E-750-01-05201A

Fire Detection & Alarm ALayout - Fuel Oil UnloadingMD-0-V-111-31-00732


Pump House
A

Panel Outline Drawing for Turbine Control Syste

MD1-0-E-750-01-06401A

Fire Detection & Alarm ALayout - Limestone StorageMD-0-V-111-31-00733


Shed
A

Panel Outline Drawing for Turbine Control Syste

MD1-0-E-750-01-06501A

Fire Detection & Alarm ALayout - Limestone Handling


MD-0-V-111-31-00734
System Control Building
A

Panel Outline Drawing for Turbine Control Syste

MD1-0-E-750-01-06701A

Fire Detection & Alarm ALayout - Limestone Grinding


MD1-0-E-545-01-03001
House Ground Floor A

Communication Layout- Central Control BLDG G

MD1-0-E-750-01-06702A

Fire Detection & Alarm ALayout - Limestone Grinding


MD1-0-E-545-01-03002
House EL.+7,130 & EL.+17,4908
A
Communication Layout- Central Control BLDG 1

MD1-0-E-750-01-07001B

Fire Detection & Alarm ALayout - Aux. Boiler Area MD1-0-E-545-01-03003A

Communication Layout- Central Control BLDG 2

MD1-0-V-111-36-00715B

TCS Control System Configuration


A
Drawing

MD1-0-E-545-01-03004A

Communication Layout- Central Control BLDG 3

MD1-0-V-111-36-00716B

VMS Control System Configuration


A
Drawing

MD1-0-E-545-01-04101A

Communication Layout - Coal Handling Control B

MD1-0-V-113-09-00020B

Condenser - InstrumentAData Sheet

MD1-0-E-545-01-04201A

Communication layout - fuel oil pump house

MD1-0-V-113-09-00025B

Condenser leak detection


A system technical data sheet
MD1-0-E-545-01-04501A

Communication Layout - Ash Slurry Pump Hous

MD1-0-V-121-09-00003A

Instrument data sheet and


A catalog for bfp & bfbp MD1-0-E-545-01-04502A

Communication Layout - Ash Slurry Pump Hous

MD1-0-V-121-35-00005A

Wiring diagram for hydraulic


A
coupling for bfp & bfbpMD1-0-E-545-01-04601A

Communication Layout - ESP Control & Ash Ele

MD1-0-V-123-57-00024B

Condenser vacuum pump


A safety valve data with catalog
MD1-0-E-545-01-04801A

Communication Layout - Diesel Generator Hous

MD1-0-V-123-57-00025A

Condenser Vacuum Pump


A - Solenoid Valve Data With
MD1-0-E-545-01-04901
Catalog
A

Communication Layout - Cooling Water Pump H

MD1-0-V-132-09-00071A

Sea Water Intake Facility


A - Pressure Transmitter Technical
MD1-0-E-545-01-05101
Data Sheet. B

Communication Layout - Gaseous Chlorination B

MD1-0-V-132-09-00074A

Sea Water Intake Facility


A - Pressure Indicator DataMD1-0-E-545-01-05201
Sheet
A

Communication Layout - Fuel Oil Unloading Pum

MD1-0-V-132-09-00075A

Sea Water Intake Facility


A - Differential Pressure Switch
MD1-0-E-545-01-05301
Data Sheet
A

Communication Layout - Return Water Pump Ho

MD1-0-V-133-09-00016B

Water box vacuum pump


A instrument data sheet & catalogue
MD1-0-E-545-01-06401A

Communication Layout - Limestone Storage BLD

MD1-0-V-134-09-00033A

Instrument list & data sheet


A
for ctcs

MD1-0-E-545-01-06501A

Communication Layout - Limestone Handling Co

MD1-0-V-134-09-00051A

Technical data sheet for


A control panel (condenser tube
MD1-0-E-545-01-06901
cleaning system) A

Communication Layout - Main Transformer Area

MD1-0-V-135-09-00026A

Instrument list & data sheet


A
- df

Communication Layout - Main Transformer Area

MD1-0-V-135-09-00043A

Technical data sheet for


A control panel(debris filter) MD1-0-E-545-01-08301A

Communication Layout - Workshop BLDG

MD1-0-V-135-34-00014A

Control logic diagram(debris


A
filter)

MD1-0-E-545-01-08401A

Communication layout - bulldozer garage

MD1-0-V-161-33-06200B

Logic Diagram. Drawing


A Index

MD1-0-E-545-01-08501B

Communication Layout - I&C Electrical and Mec

MD1-0-V-161-33-06201B

Logic Diagram. SymbolA& Legend

MD1-0-E-545-01-08901A

Communication Layout- Common Service BLDG

MD1-0-V-161-33-06202B

Logic Diagram. Main Interlocks,


A
Master Fuel Trip MD1-0-J-600-08-00001B

Control Valve List

MD1-0-V-161-33-06203B

Logic Diagram. Hardwired


A Trip Relays For Mater Fuel
MD1-0-J-600-08-00003
Trip 1
B

Instrument Set Point & Alarm List

MD1-0-V-161-33-06204B

Logic Diagram. Hardwired


A Trip Relays For Mater Fuel
MD1-0-J-600-08-00004
Trip 2
D

DCS Input/Output List

MD1-0-V-161-33-06205A

Logic Diagram. Hardwired


A Trip Relays For Mater Fuel
MD1-0-J-600-35-00002
Trip 3
A

Instrument Interconnection Wiring Diagram for B

MD1-0-V-161-33-06206B

Logic Diagram. Hardwired


A Trip Relays For Mater Fuel
MD1-0-T-055-05-00205
Trip 4
B

Method statement for communication

MD1-0-V-161-33-06207B

Logic Diagram. Main Interlocks,


A
Furnace Purge

Method statement for fire alarm

MD1-0-V-161-33-06208B

Logic Diagram. Main Interlocks,


A
Loss of Fuel Trips MD1-0-T-056-05-00001A

Method Statement for Calibration of instruments

MD1-0-V-161-33-06209A

Logic Diagram. Main Interlocks,


A
Drum Level Trips MD1-0-T-056-05-00002A

Method Statement for Installation of Control & In

MD1-0-V-161-33-06210A

Logic Diagram. Main Interlocks,


A
Furnace Pressure MD1-0-V-111-01-00028
Trips
A

Turbine Instrument Location Drawing- Steam Va

MD1-0-V-161-33-06211A

Logic Diagram. Main Interlocks,


A
Total Air Flow Trips
MD1-0-V-111-01-00029A

Turbine Instrument Location Drawing- Steam Va

MD1-0-V-161-33-06212B

Logic Diagram. Main Interlocks,


A
Loop Seal Air Pressure
MD1-0-V-111-01-00417
Trips
A

Generator Sensor Location (1/2)

MD1-0-V-161-33-06215B

Logic Diagram. Main Interlocks,


A
Bed Temperature 1
MD1-0-V-111-01-00418A

Generator Sensor Location (2/2)

MD1-0-V-161-33-06216A

Logic Diagram. Main Interlocks,


A
Bed Temperature 2
MD1-0-V-111-02-00400A

Hazardous Area Classification for Generator

MD1-0-V-161-33-06217B

Logic Diagram. Main Interlocks,


A
Solid Fuel Feed Permissive
MD1-0-V-111-03-00701A

Description of Mark Vie Control System

MD1-0-V-161-33-06218B

Logic Diagram. Main Interlocks,


A
Oil Fuel Permissive
MD1-0-V-111-03-00705B

Screen Design for Turbine Control System

MD1-0-V-161-33-06220A

Logic Diagram. Air Paths


A in Purge Position

MD1-0-V-111-04-00022B

Installation Guideline of High Pressure Control S

MD1-0-V-161-33-06221B

Logic Diagram. MFT toATrips

MD1-0-V-111-04-00400A

Gas Detector Location

MD1-0-V-161-33-06222A

Logic Diagram. Fuel Feeder


A
"1" (Typical for No. 1-6)
MD1-0-V-111-05-00702A

Mark VIe Control System Guide (GEH-6721)

MD1-0-V-161-33-06223A

Logic Diagram. Fuel Feeder


A
"7"

Automatic Turbine Start-up Procedure

MD1-0-E-545-01-06902A

MD1-0-T-055-05-00206B

MD1-0-V-111-05-00706A

MD1-0-V-161-33-06224A

Logic Diagram. Fuel Feeder


A
"8"

MD1-0-V-111-05-00712A

HMI Operator Guide

MD1-0-V-161-33-06225B

Logic Diagram. Fuel Chain


A Conveyor "1"

MD1-0-V-111-08-00707A

Software List for Turbine Control System

MD1-0-V-161-33-06227B

Logic Diagram. Fuel OilAHeader Trip Valve

MD1-0-V-111-08-00708A

Alarm List for Turbine Control System

MD1-0-V-161-33-06228B

Logic Diagram. Fuel OilALeak Test

MD1-0-V-111-08-00710A

Turbine Control System io List

MD1-0-V-161-33-06229B

Logic Diagram. Heavy Oil


A Circulating

MD1-0-V-111-08-00717A

DCS Interface Signal Database for Turbine Cont

MD1-0-V-161-33-06230B

Logic Diagram. Start-upA Burner "1" Start SequenceMD1-0-V-111-10-00413


(Typical)
A

Generator Local Gauge Board For Seal Oil Feed

MD1-0-V-161-33-06231B

Logic Diagram. Start-upA Burner "1" Proven/Failure MD1-0-V-111-12-00722


(Typical)
A

Network Topology for Turbine Control System

MD1-0-V-161-33-06232B

Logic Diagram. Start-upA Burner "1" Oil Gun Scavence


MD1-0-V-111-31-00714
(Typical)
A

Panel Outline Drawing for Turbine Control system

MD1-0-V-161-33-06233B

Logic Diagram. Pilot Burner


A
"1" Start Sequence (Typical)
MD1-0-V-111-31-00715A

Panel Outline Drawing for Turbine Control system

MD1-0-V-161-33-06234B

Logic Diagram. Pilot Burner


A
"1" Oil Gun Scavence MD1-0-V-111-31-00716
(Typical)
A

Panel Outline Drawing for Turbine Control system

MD1-0-V-161-33-06236A

Logic Diagram. Furnace


A Bed Temperature Monitoring
MD1-0-V-111-31-00732A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06240B

Logic Diagram. Loop Seal


A Blower A

MD1-0-V-111-31-00733A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06245A

Logic Diagram. S.A FanA Damper & Vanes

MD1-0-V-111-31-00734A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06246B

Logic Diagram. PrimaryAFan A

MD1-0-V-111-31-00735A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06247B

Logic Diagram. PrimaryAFan B

MD1-0-V-111-31-00736A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06248A

Logic Diagram. P.A FanA Damper & Vanes

MD1-0-V-111-31-00737A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06249B

Logic Diagram. Air Heater


A Main Motor

MD1-0-V-111-31-00738A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06250B

Logic Diagram. Air Heater


A Aux. Motor

MD1-0-V-111-31-00739A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06251A

Logic Diagram. Limestone


A Injection Blower "A" Control
MD1-0-V-111-31-00740A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06252A

Logic Diagram. Limestone


A Injection Blower "B" Control
MD1-0-V-111-31-00741A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06253A

Logic Diagram. Limestone


A Injection Blower "C" Control
MD1-0-V-111-31-00742A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06254A

Logic Diagram. Limestone


A Feed Rotary Valve "A1"MD1-0-V-111-31-00743A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06255A

Logic Diagram. Limestone


A Feed Rotary Valve "A2"MD1-0-V-111-31-00744A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06256A

Logic Diagram. Limestone


A Feed Rotary Feeder 'A" MD1-0-V-111-31-00745A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06257A

Logic Diagram. Limestone


A Feed Rotary Valve "B1"MD1-0-V-111-31-00746A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06258A

Logic Diagram. Limestone


A Feed Rotary Valve "B2"MD1-0-V-111-31-00747A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06259A

Logic Diagram. Limestone


A Feed Rotary Feeder "B"MD1-0-V-111-31-00748A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06260B

Logic Diagram. StripperACooler "A" Blower (Typical)MD1-0-V-111-31-00749A

Panel Layout Drawing for Turbine Control System

MD1-0-V-161-33-06261A

Logic Diagram. S/C A Stripper


A
Spray Valves (Typical)
MD1-0-V-111-31-00761A

Panel layout drawing for steam turbine vms(vibra

MD1-0-V-161-33-06262A

Logic Diagram. S/C A Cooler


A
1 Spray Valves (Typical)
MD1-0-V-111-31-00762A

Panel layout drawing for steam turbine vms(vibra

MD1-0-V-161-33-06263A

Logic Diagram. Stripper/Cooler


A
a Rotary Valve (Typical)
MD1-0-V-111-31-00763A

Panel layout drawing for steam turbine vms(vibra

MD1-0-V-161-33-06264A

Logic Diagram. SH Attemp.


A
Spraywater Block Valves
MD1-0-V-111-35-00001B

Wiring Diag. Lube Oil Tank (1/2)

MD1-0-V-161-33-06265A

Logic Diagram. RH Attemp.


A
Spraywater Block Valves
MD1-0-V-111-35-00002B

Wiring Diag. Lube Oil Tank (2/2)

MD1-0-V-161-33-06266A

Logic Diagram. MFT ToADCS Controls

MD1-0-V-111-35-00004B

Steam turbine and generator wiring diagram - hy

MD1-0-V-161-33-06267B

Logic Diagram. ERV Open/Close


A

MD1-0-V-111-35-00005C

Steam turbine and generator wiring diagram - hy

MD1-0-V-161-33-06268A

Logic Diagram. MOV Template


A

MD1-0-V-111-35-00006C

Steam turbine and generator wiring diagram - hy

MD1-0-V-161-33-06269A

Logic Diagram. Motorized


A Dampers-1

MD1-0-V-111-35-00010B

Steam turbine and generator wiring diagram - tu

MD1-0-V-161-33-06270A

Logic Diagram. Motorized


A Dampers-2

MD1-0-V-111-35-00011B

Steam turbine and generator wiring diagram - tu

MD1-0-V-161-33-06271A

Logic Diagram. Motorized


A Valve-1

MD1-0-V-111-35-00400A

Electrical Connection Diagram (Stator Cooling W

MD1-0-V-161-33-06272A

Logic Diagram. Motorized


A Valve-2

MD1-0-V-111-35-00402B

Electrical Connection Diagram (Stator Cooling W

MD1-0-V-161-33-06273A

Logic Diagram. Motorized


A Valve-3

MD1-0-V-111-35-00403B

Electrical Connection Diagram (Stator Cooling W

MD1-0-V-161-33-06274A

Logic Diagram. Motorized


A Valve-4

MD1-0-V-111-35-00404B

Electrical Connection Diagram (Stator Cooling W

MD1-0-V-161-33-06275A

Logic Diagram. Motorized


A Valve-5

MD1-0-V-111-35-00406B

Electrical Connection Diagram (Stator Cooling W

MD1-0-V-161-33-06276A

Logic Diagram. Motorized


A Valve-6

MD1-0-V-111-35-00408B

Electrical Connection Diagram (Gas Control Sys

MD1-0-V-161-33-06277A

Logic Diagram. Motorized


A Valve-7

MD1-0-V-111-35-00409B

Electrical Connection Diagram (Gas Control Sys

MD1-0-V-161-33-06278A

Logic Diagram. Motorized


A Valve-8

MD1-0-V-111-35-00411B

Electrical Connection Diagram (Gas Control Sys

MD1-0-V-161-33-06279A

Logic Diagram. Motorized


A Valve-9

MD1-0-V-111-35-00412B

Electrical Connection Diagram (Gas Control Sys

MD1-0-V-161-33-06280A

Logic Diagram. Motorized


A Valve-10

MD1-0-V-111-35-00416B

Electrical Connection Diagram (Seal Oil System

MD1-0-V-161-33-06281A

Logic Diagram. Limestone


A Silo Vent Fan

MD1-0-V-111-35-00418B

Electrical Connection Diagram (Seal Oil System

MD1-0-V-161-33-06300B

Sama Diagram. Drawing


A Index

MD1-0-V-111-35-00419B

Electrical Connection Diagram (Seal Oil System

MD1-0-V-161-33-06301A

Sama Diagram. Symbols


A and Legend

MD1-0-V-111-35-00421B

Electrical Connection Diagram (Seal Oil System

MD1-0-V-161-33-06305B

Sama Diagram, Secondary


A Air Flow & Pressure

MD1-0-V-111-35-00718A

Control Systems Overall Block Diagrams

MD1-0-V-161-33-06306B

Sama Diagram, Ring Duc


A Air Flow

MD1-0-V-111-35-00719A

Turbine & Generator Protection & Interlock Diag

MD1-0-V-161-33-06309A

Sama Diagram, Fuel Feeders


A
Rear Wall

MD1-0-V-112-08-00004A

Hp/Lp i/o List for Turbine bypass System

MD1-0-V-161-33-06310B

Sama Diagram, Oil Master


A

MD1-0-V-112-08-00005A

Hpu, Hvp-Hp/Lp Load List for Turbine bypass Sy

MD1-0-V-161-33-06312B

Sama Diagram, Drum Level


A

MD1-0-V-112-35-00005A

Hpu, Hp/Lp, System Layout for Turbine bypass S

MD1-0-V-161-33-06313B

Sama Diagram, Furnace


A Pressure

MD1-0-V-112-35-00006A

Hpu, Hp/Lp, Electrical System ak Layout for Turb

MD1-0-V-161-33-06314B

Sama Diagram, First Stage


A
Superheater Temperature
MD1-0-V-112-35-00007A

Hpu, Hp/Lp, ak1-1 and ak 1-2, Smartrak for Turb

MD1-0-V-161-33-06317B

Sama Diagram, Loop Seal


A Air Pressure

MD1-0-V-113-08-00053B

Condenser leak detection system instrument list

MD1-0-V-161-33-06319B

Sama Diagram, Stripper/Cooler


A
a Air Flow and Pressure
MD1-0-V-113-10-00054B

Condenser leak detection system local control p

MD1-0-V-161-33-06320B

Sama Diagram, Stripper/Cooler


A
a Ash Drain and Spray
MD1-0-V-113-35-00055
Flow
A

Condenser leak detection system wiring diagram

MD1-0-V-161-33-06321B

Sama Diagram, Stripper/Cooler


A
B Air Flow and Pressure
MD1-0-V-121-33-00002A

Logic Flow Chart for Fluid Coupling for BFP & BF

MD1-0-V-161-33-06322B

Sama Diagram, Stripper/Cooler


A
B Ash Drain and Spray
MD1-0-V-121-35-00002
Flow
A

Vibration Sensor Terminal Box Drawing for Boile

MD1-0-V-161-33-06323B

Sama Diagram, Stripper/Cooler


A
C Air Flow and Pressure
MD1-0-V-123-08-00011C

Condenser Vacuum Pump- Instrument Data

MD1-0-V-161-33-06324B

Sama Diagram, Stripper/Cooler


A
C Ash Drain and Spray
MD1-0-V-123-08-00014
Flow
A

Condenser vaccum pump - i/o list

MD1-0-V-161-33-06325B

Sama Diagram, Stripper/Cooler


A
D Air Flow and Pressure
MD1-0-V-123-08-00022A

Condenser vacuum pump instrument set point a

MD1-0-V-161-33-06327B

Sama Diagram, Limestone


A Feed

MD1-0-V-123-10-00007B

Condenser Vacuum Pump- Terminal Box Drawin

MD1-0-V-161-33-06328A

Sama Diagram, Scah Control


A

MD1-0-V-123-22-00021A

Condenser vaccum pump - flow chart

MD1-0-V-161-33-06329B

Sama Diagram, Main Steam


A
Vent Valve

MD1-0-V-123-33-00005B

Condenser Vacuum Pump- Recommended Logi

MD1-0-V-161-33-06330A

Sama Diagram, Blowdown


A Tank Drain Dischage Temp.
MD1-0-V-123-35-00006B

Condenser Vacuum Pump- Wiring Diagram

MD1-0-V-161-33-06331B

Sama Diagram, Fuel Gas


A and Seperators Monitoring
MD1-0-V-123-57-00023A

Condenser vacuum pump control valve list with c

MD1-0-V-161-33-06332A

Sama Diagram, Drum Metal


A
Temperature Monitoring
MD1-0-V-131-08-00011A

Instrument list for circulating water pumps

MD1-0-V-161-33-06333B

Sama Diagram, Tube Metal


A
Temperature Monitoring
MD1-0-V-131-08-00024A

Setpoint and alarm list for motor

MD1-0-V-161-33-06334B

Sama Diagram, S.A Fan


A and Motor BRG/WDG Temp.
MD1-0-V-131-08-00025
& VIB. Monitoring A

Instrument list for motor

MD1-0-V-161-33-06335B

Sama Diagram, P.A Fan


A and Motor BRG/WDG Temp.
MD1-0-V-131-11-00003
& VIB Monitoring A

Instrument Installation detail Drawing with Bill of

MD1-0-V-161-33-06336A

Sama Diagram, Loop Seal


A Blower and Motor Temp.
MD1-0-V-132-33-00078
Monitoring
A

Sea water intake facility - control logic diagram

MD1-0-V-161-33-06337A

Sama Diagram, S/C Blowers


A
and Motor BRG/WDGMD1-0-V-134-03-00044
temp. Monitoring (Typical)
A

Control philosophy (condenser tube cleaning sy

MD1-0-V-171-06-02116A

Instrument data & calculation


A
details for chs

MD1-0-V-134-34-00021A

Control logic diagram (condenser tube cleaning

MD1-0-V-172-06-02113A

Instrument data & calculation


A
detail for lhs

MD1-0-V-135-03-00037A

Control philosophy(debris filter)

MD1-0-V-181-02-00001A

Auxiliary Boiler Package


A Cable Specification

MD1-0-V-135-08-00011A

Electrical load list for control panel(debris filter)

MD1-0-V-181-09-00012A

AUXILIARY BOILER PACKAGE


A
MANUAL VALVE MD1-0-V-141-08-00013A

Electrical Load List

MD1-0-V-181-09-00015A

AUXILIARY BOILER PACKAGE


A
CONTROL VALVE
MD1-0-V-141-08-00014A

Equipment List of All the Electrical Equipment

MD1-0-V-181-09-00016A

Auxiliary Boiler Package


A CCTV Data Sheet

Cable List

MD1-0-V-400-10-01712A

Hyd. unit & control panel


A drawing for combined nrvMD1-0-V-141-31-00001
dn2400
A

Single Line Diagram

MD1-0-V-545-05-00005A

SAT Procedure for Communication


A
System

Electrical Connection and Wiring Diagram

MD1-0-V-610-02-00005A

Distributed control system


A online performance monitoring
MD1-0-V-142-08-00005
system specification
A

Electrical load list

MD1-0-V-610-05-00002B

Distributed control system


A inspection and test procedure
MD1-0-V-142-08-00007A

Instrument list

MD1-0-V-610-08-00008B

Distributed control system


A quality inspection and test
MD1-0-V-142-09-00003
plan
A

Instrument data

MD1-0-V-620-09-00001A

Datasheet and CatalogAfor SWAS

MD1-0-V-142-11-00002A

Instrument hook-up drawings

MD1-0-V-630-02-00001A

Equipment and SystemASpecification for CEMS

MD1-0-V-142-11-00003A

Junction box drawing for service water pump

MD1-0-V-630-09-00001A

Instrument Data SheetAfor CEMS

MD1-0-V-142-11-10003A

Junction box drawing for closed cooling water pu

MD1-0-V-650-09-00001B

Data sheets for control Avalve & regulating valve(bop)


MD1-0-V-142-11-20003A

Junction box drawing for condensate make-up p

MD1-0-V-650-09-10001B

Data sheets for pneumatic


A operated shut-off valve MD1-0-V-142-11-30003
(bop)
A

Junction box drawing for auxiliary cooling water b

MD1-0-V-660-09-10001A

Data Sheet and Catalogue


A for Displacer Level Transmitter
MD1-0-V-142-11-40003
(BOP)
A

Junction box drawing for demi. water transfer pu

MD1-0-V-141-08-00015A

MD1-0-V-141-35-00001A

MD1-0-V-660-09-40001A

Data Sheet and Catalogue


A for Level Gauge and Switch
MD1-0-V-161-08-06000
(BOP)
B

Instrument Index

MD1-0-V-805-02-00001A

Instrument data sheet for


A wt & wwt

MD1-0-V-161-08-06001B

I/O List

MD1-0-V-805-02-00002A

Plc & hmi specificationAfor wt & wwt

MD1-0-V-161-08-06003B

Set Point List for Alarm & Interlocking

MD1-0-V-850-09-00002A

Instrument data sheet for


A boiler chemical dosing system
MD1-0-V-161-09-16111A

Instrument Data Sheets, Temperature Gauges

MD1-0-V-860-09-00003C

Instrument and ControlAValve Specification and Data


MD1-0-V-161-09-16121
Sheet Gaseous
A

Instrument Data Sheets, Orifice Plates and Flang

MD1-0-V-161-10-16140A

Boiler pressure gauge workpackage vendor docu

MD1-0-V-161-10-16190A

Boiler cctv workpackage vendor documents & dr

MD1-0-V-161-10-16212A

Boiler Feedwater Regulating Valves Vendor Dra

MD1-0-V-161-33-06213B

Logic Diagram. Main Interlocks, Loss of Fan Trip

MD1-0-V-161-33-06214B

Logic Diagram. Main Interlocks, Cyclone Flue Ga

MD1-0-V-161-33-06219B

Logic Diagram. Main Interlocks, Superheater Pro

MD1-0-V-161-33-06226B

Logic Diagram. Fuel Chain Conveyor "2"

MD1-0-V-161-33-06235B

Logic Diagram. Cyclone Flue Gas Temperature

MD1-0-V-161-33-06237B

Logic Diagram. Induced Draft Fan A

MD1-0-V-161-33-06238B

Logic Diagram. Induced Draft Fan B

MD1-0-V-161-33-06239B

Logic Diagram. I.D Fan Damper & Vanes

MD1-0-V-161-33-06241B

Logic Diagram. Loop Seal Blower B

MD1-0-V-161-33-06242B

Logic Diagram. Loop Seal Blower C

MD1-0-V-161-33-06243B

Logic Diagram. Secondary Air Fan A

MD1-0-V-161-33-06244B

Logic Diagram. Secondary Air Fan B

MD1-0-V-161-33-06282B

Logic Diagram. Limestone Silo Vent Pulse Contr

MD1-0-V-161-33-06283A

Logic Diagram. AH Oil Pumps

MD1-0-V-161-33-06284A

Logic Diagram. SA Fan a Lube Oil Pumps-1

MD1-0-V-161-33-06285A

Logic Diagram. SA Fan a Lube Oil Pumps-2

MD1-0-V-161-33-06286A

Logic Diagram. SA Fan B Lube Oil Pumps-1

MD1-0-V-161-33-06287A

Logic Diagram. SA Fan B Lube Oil Pumps-2

MD1-0-V-161-33-06288A

Logic Diagram. PA Fan A Lube Oil Pumps-1

MD1-0-V-161-33-06289A

Logic Diagram. PA Fan A Lube Oil Pumps-2

MD1-0-V-161-33-06290A

Logic Diagram. PA Fan B Lube Oil Pumps-1

MD1-0-V-161-33-06291A

Logic Diagram. PA Fan B Lube Oil Pumps-2

MD1-0-V-161-33-06302B

Sama Diagram. Boiller Master

MD1-0-V-161-33-06303B

Sama Diagram. Total Air Flow

MD1-0-V-161-33-06304B

Sama Diagram, Primary Air Flow & Pressure

MD1-0-V-161-33-06307B

Sama Diagram, BTU Compensation

MD1-0-V-161-33-06315B

Sama Diagram, Second Stage Superheater Tem

MD1-0-V-161-33-06316B

Sama Diagram, Reheater Temperature

MD1-0-V-161-33-06318B

Sama Diagram, Bed Pressure Control

MD1-0-V-161-33-06326B

Sama Diagram, Stripper/Cooler D Ash Drain and

MD1-0-V-161-33-06338B

Sama Diagram, Reheater Temperature

MD1-0-V-161-33-06339A

Sama Diagram Drum Level Control, Three Elem

MD1-0-V-161-33-06340A

Sama Diagram Drum Level Control, Blower Surg

MD1-0-V-161-33-06341A

Sama Diagram Drum Level Control, Blower Surg

MD1-0-V-161-33-06342A

Sama Diagram, Air Heater Temperature Monitor

MD1-0-V-161-33-06343A

Sama Diagram, SA Fan Lube Oil Monitoring

MD1-0-V-161-33-06344A

Sama Diagram, FA Fan Lube Oil Monitoring

MD1-0-V-161-57-06409A

Instrument Location Plan at EL 37600

MD1-0-V-161-57-06411A

Instrument Location Plan at EL 43600 THR EL 4

MD1-0-V-161-57-06419A

Instrument Location Plan- Instrument Enclosure

MD1-0-V-161-57-06420A

Instrument Location Plan- Local Control Box Det

MD1-0-V-161-57-06421A

Instrument Location Plan- Local Control Box Det

MD1-0-V-161-57-06501A

Instrument Installation Details, Drawing Index

MD1-0-V-161-57-06502A

Instrument Installation Details, Material List Sum

MD1-0-V-161-57-06551A

Instrument Installation Details, Instrument Enclos

MD1-0-V-161-57-06553A

Instrument Installation Details, Instrument Enclos

MD1-0-V-162-36-00001A

Control system configuration diagram

MD1-0-V-171-01-00077A

GENERAL ARRANGEMENT AND DATA SHEE

MD1-0-V-171-08-02001B

Electrical Load List for Coal Handling System

MD1-0-V-171-08-02105C

Instrument List for Coal Handling System

MD1-0-V-171-08-02107C

I/O List of for Coal Handling System

MD1-0-V-171-08-02120A

Control systems overall block diagram for chs

MD1-0-V-171-08-02122B

Interface Signals List for Coal Handling System

MD1-0-V-171-08-02124C

Alarm List & Set Point List for Coal Handling Sys

MD1-0-V-171-08-02139A

Communication IO List for Coal Handling System

MD1-0-V-171-09-02118A

GA & BOM & System Architecture for CCTV Sys

MD1-0-V-171-11-02113A

GA of Junction Box for CHS

MD1-0-V-172-08-02107B

I/O List for Limestone Handling System

MD1-0-V-172-08-02117B

Interface Signals List for Limestone Handling Sy

MD1-0-V-172-08-02138A

Communication IO List for Limestone Handling S

MD1-0-V-172-51-02108A

PLC ARCHITECTURE DIAGRAM FOR LIMEST

MD1-0-V-181-01-00005A

Cable Tray & Conduit Lay Out for AUX. Boiler Ar

MD1-0-V-181-05-00012A

Operation Control Philosophy

MD1-0-V-181-08-00014A

Auxiliary Boiler Package Cable Schedule

MD1-0-V-181-10-00024A

Auxiliary boiler package lighting & small power s

MD1-0-V-181-10-00025A

Auxiliary boiler package electric heat tracing sys

MD1-0-V-181-10-00026A

Auxiliary Boiler Package GA Drawing for PLC C

MD1-0-V-181-10-00027A

Auxiliary boiler package instrument installation h

MD1-0-V-181-10-00028A

Auxiliary Boiler Package General Arrangement D

MD1-0-V-181-32-00001A

Auxiliary boiler package schematics of plc

MD1-0-V-181-56-00001A

Auxiliary Boiler Package Stack Lightning System

MD1-0-V-181-57-00004A

Auxiliary boiler package sump pump control pan

MD1-0-V-182-10-11009A

Flow Meter Outline for Emergency Diesel Gener

MD1-0-V-182-33-32002A

Control logic diagram

MD1-0-V-182-36-32001A

Control philosophy

MD1-0-V-186-08-00104C

Instrument & Equipment List

MD1-0-V-186-08-00105A

Instrument list for field erected tank

MD1-0-V-186-08-00108B

Data sheet of instrument & equipment for field er

MD1-0-V-400-32-01211A

Schematic & wiring diagram for motor operated c

MD1-0-V-400-32-01611B

WIRING DIAGRRAM & ACTUATOR DRAWING

MD1-0-V-400-32-01711A

Schematic & wiring diagram for combined nrv dn

MD1-0-V-545-05-00001B

Inspection and test plan

MD1-0-V-545-05-00002A

Qa/qc manual

MD1-0-V-545-05-00004A

FAT Procedure for Communication System

MD1-0-V-610-01-00003B

Power Consumption & Heat Dissipation

MD1-0-V-610-02-00004A

Distributed Control System Planing Installation S

MD1-0-V-610-03-00003A

Dcs design & function description

MD1-0-V-610-07-00002A

Distributed Control System FAT Report

MD1-0-V-610-08-00007A

Distributed Control System Bill of Material

MD1-0-V-610-10-00001C

Equipment outline detail for distributed control

MD1-0-V-610-10-00002A

Distributed control system name plate list

MD1-0-V-610-11-00001A

Distributed Control System Ovation Graphic Diag

MD1-0-V-610-11-00002B

Distributed control system io summary and assig

MD1-0-V-610-11-00003B

Distributed control system io list

MD1-0-V-610-35-00001B

Distributed control system internal connection an

MD1-0-V-610-36-00001C

Distributed control system system configuration

MD1-0-V-620-10-00001A

Panel Layout Drawing for SWAS

MD1-0-V-620-21-00001A

P&I Diagram for SWAS

MD1-0-V-620-32-00001A

Schematic and Wiring Diagram for SWAS

MD1-0-V-630-09-00002A

Technical Catalog and Brochure for CEMS

MD1-0-V-630-10-00001A

Panel Arrangement Drawing for CEMS

MD1-0-V-630-11-00001A

Instrument and Analyzer Installation Detail Draw

MD1-0-V-630-21-00001A

P&I Diagram for CEMS

MD1-0-V-630-32-00001A

Schematic & Wiring Diagram for CEMS

MD1-0-V-630-36-00001A

System Configuration Diagram for CEMS

MD1-0-V-640-03-00001A

System overview for vibration monitoring system

MD1-0-V-640-08-00001A

Signal list for vibration monitoring system(bop)

MD1-0-V-640-08-00007A

Code and standards for vibration monitoring syst

MD1-0-V-640-10-00001A

Panel equipment installation drawings for vibratio

MD1-0-V-640-35-00002A

Interconnection wiring diagram for vibration mon

MD1-0-V-640-36-00001A

System configuration diagram for vibration monit

MD1-0-V-650-05-00003A

Technical catalog and brochure for control valve

MD1-0-V-650-05-00004A

O&m manual for control valve & regulating valve

MD1-0-V-650-05-10003A

Technical catalog and brochure for pneumatic op

MD1-0-V-650-05-10004A

O&m manual for pneumatic operated shut-off va

MD1-0-V-650-10-00001B

Assembly drawing for control valve & regulating

MD1-0-V-650-10-10001B

Assembly drawing for pneumatic operated shut-o

MD1-0-V-660-01-40001A

Inspection Test Plan for Level Gauge and Switch

MD1-0-V-660-05-40001A

Inspection Test Procedure for Level Gauge and

MD1-0-V-660-06-00001A

Thermowell stress calculation report for field tran

MD1-0-V-660-11-00001B

Dimensional drawings for field transmitter (bop)

MD1-0-V-660-11-10001A

Dimensional Drawing for Displacer Level Transm

MD1-0-V-660-11-20001A

Dimensional Drawing for Coriolis Flowmeter(BO

MD1-0-V-660-11-20002A

Dimensional Drawing for Radar Level Transmitte

MD1-0-V-660-11-40001A

Dimensional Drawing for Level Gauge and Switc

MD1-0-V-750-10-00123A

Main fire alarm system panel assembly and outli

MD1-0-V-750-10-00124A

Main fire alarm system panel internal / external c

MD1-0-V-750-10-00125A

Local fire alarm system panel assembly and outl

MD1-0-V-750-10-00126A

Local fire alarm system panel internal / external c

MD1-0-V-750-10-00127A

Fire alarm system typical wiring diagram

MD1-0-V-750-10-00128A

Fire alarm system graphic annunciator panel out

MD1-0-V-750-10-00130A

Fire Alarm Sys Mimic Panel Outline Dimension D

MD1-0-V-750-10-00132A

Fire alarm system mimic panel outline dimension

MD1-0-V-750-10-00141A

Fire alarm system transponder panel assembly a

MD1-0-V-750-10-00142A

Fire alarm system transponder panel internal / ex

MD1-0-V-750-32-00069A

Clean agent fire extinguishing system electrical s

MD1-0-V-750-32-00077A

Clean agent fire extinguishing system electrical s

MD1-0-V-750-32-00085A

Clean agent fire extinguishing system electrical s

MD1-0-V-750-32-00093A

Clean agent fire extinguishing system electrical s

MD1-0-V-750-32-00101A

Clean agent fire extinguishing system electrical s

MD1-0-V-750-33-00072A

Clean agent fire extinguishing system cause and

MD1-0-V-750-33-00080A

Clean agent fire extinguishing system cause and

MD1-0-V-750-33-00088A

Clean agent fire extinguishing system cause and

MD1-0-V-750-33-00096A

Clean agent fire extinguishing system cause and

MD1-0-V-750-33-00104A

Clean agent fire extinguishing system cause and

MD1-0-V-750-33-00134A

Fire Alarm System Cause and Effect Chart Loca

MD1-0-V-750-35-00070A

Clean agent fire extinguishing system electrical t

MD1-0-V-750-35-00078A

Clean agent fire extinguishing system electrical t

MD1-0-V-750-35-00086A

Clean agent fire extinguishing system electrical t

MD1-0-V-750-35-00094A

Clean agent fire extinguishing system electrical t

MD1-0-V-750-35-00102A

Clean agent fire extinguishing system electrical t

MD1-0-V-750-55-00122A

Battery Calculation Local Fire Alarm Control Pan

MD1-0-V-805-01-00101A

Instrument Location Drawing for WT & WWT Sy

MD1-0-V-805-08-00010A

Set-point list for alarm and interlocking for wt & w

MD1-0-V-805-08-00012A

I/o list for plant dcs for wt&wwt

MD1-0-V-805-08-00031A

I/o list for plc for wt & wwt system

MD1-0-V-805-11-00006A

Outline and dimensional drawings identifying com

MD1-0-V-805-32-00001A

Schematic diagram for wt & wwt

MD1-0-V-805-33-00002A

Control logic diagram with description

MD1-0-V-805-34-00002A

Control loop diagram for wt & wwt

MD1-0-V-805-35-00001A

Interconnection wiring diagrams for wt & wwt

MD1-0-V-805-36-00002A

Configulation drawing for control system for wt &

MD1-0-V-850-08-00008A

ELECTRICAL LOAD LIST FOR BOILER CHEMI

MD1-0-V-850-08-00011A

Instrument list for boiler chemical dosing system

MD1-0-V-850-08-00012A

Io list for plc for boiler chemical dosing system

MD1-0-V-850-08-00013A

Io list for plc for boiler chemical dosing system c

MD1-0-V-850-33-00001A

Control logic diagram for chemical dosing system

MD1-0-V-850-34-00001A

Control loop diagram for ammonia storage syste

MD1-0-V-850-36-00001A

Configuration drawing for control system chemic

MD1-0-V-850-73-00002A

Dimensional outline drawing for control panel ch

MD1-0-V-850-73-00003A

Instrument Installtion Detail Drawing with Bill of M

MD1-0-V-860-08-00009B

Cable Schedule for Gaseous Chlorination System

MD1-0-V-860-08-00010B

Electrical Load List for Gaseous Chlorination Sys

MD1-0-V-860-08-00011C

Electrical Equipment List (Panel, J/B), LCP, etc)

MD1-0-V-860-08-00016C

Instrument List for Gaseous Chlorination System

MD1-0-V-860-08-00018D

Set-point List for Alarm and Interlocking for Chem

MD1-0-V-860-08-00019B

IO List for PLC Gaseous Chlorination System

MD1-0-V-860-08-00020B

IO List for Plant DCS for Gaseous Chlorination S

MD1-0-V-860-11-00011B

Detailed sectional drawings for control valves an

MD1-0-V-860-33-00001A

Control Logic Diagram for Gaseous Chlorination

MD1-0-V-860-35-00001A

Wiring Diagams Gaseous Chlorination System

MD1-0-V-860-57-00001B

Electrical hook-up drawing for gaseous chlorinat

MD1-0-V-860-57-00002A

Configuration drawing for control system. gaseou

MD1-0-V-860-57-00003B

Instrument location drawing for gaseous chlorina

MD1-0-V-870-08-00012A

Instrument list for Sewage Treatment System

MD1-0-V-870-08-00013A

Set-Point for Alarm and Interlocking List for Sew

MD1-0-E-750-01-00102A

Fire Detection & AlarmAC


Layout- Block Diagram (2) MD1-0-J-600-01-00011B

MD1-0-E-750-01-00215A

Fire Detection & AlarmAC


System - Riser Diagram Limestone
MD1-0-J-600-35-00001
Handling System
A Control.

MD1-0-H-205-08-009010

Hvac control equipment


AC
schedule for fuel oil pump MD1-0-V-111-08-00711
house
A

MD1-0-H-207-08-009010

Hvac control equipment


AC
schedule for fire protectionMD1-0-V-111-11-00017
pump house
A

MD1-0-H-209-08-009010

Hvac control equipment


AC
schedule for esp control &MD1-0-V-111-35-00003
ash elec. building-1 A

MD1-0-H-209-08-009030

Hvac control equipment


AC
schedule for esp control &MD1-0-V-111-35-00007
ash elec. building-2 A

MD1-0-H-212-08-009010

Hvac control equipment


AC
schedule for gaseous chlorination
MD1-0-V-111-35-00008
building
A

MD1-0-H-250-08-009010

Hvac control equipment


AC
schedule for workshop building
MD1-0-V-111-35-00009A

MD1-0-H-255-08-009010

Hvac control equipment


AC
& i/o schedule for commonMD1-0-V-114-08-00001
service building
A

MD1-0-J-600-02-000010

Technical SpecificationAC
and Datasheet for PressureMD1-0-V-121-35-00001
Gauges (BOP)
A

MD1-0-J-620-03-000013

System Description- Sampling


AC
and Analysis System
MD1-0-V-121-35-00003A

MD1-0-J-620-21-000013

P & I Diagram- Sampling


ACand Analysis System

MD1-0-V-114-09-50021B

Lp#1 & lp#2 feedwaterAC


heater level gauge data sheet
MD1-0-V-121-35-00006A

MD1-0-V-114-09-50025A

Lp#1 & lp#2 feedwaterAC


heater safety & relief valve data
MD1-0-V-121-35-00007
sheet
A

MD1-0-V-122-09-00003A

Instrument Data SheetAC


and Catalogue for CEP

MD1-0-V-132-09-00073A

Sea Water Intake Facility


AC - Level Transmitter Data MD1-0-V-131-10-00004A

MD1-0-V-161-09-62105A

Data Sheet for Feed Water


AC Regulating Valve

MD1-0-V-131-11-00008A

MD1-0-V-161-09-62106A

Data Sheet for Spray Control


AC
Valves

MD1-0-V-132-08-00047B

MD1-0-V-163-09-00009A

Actuator Data for IDF AC


Inlet Damper

MD1-0-V-132-08-00067B

MD1-0-V-171-03-02102C

Control Write-up/Control
ACPhilosophy for Coal Handling
MD1-0-V-141-08-00016
System
B

MD1-0-V-172-01-00121A

General Arrangement and


AC Data Sheet of Belt ScaleMD1-0-V-141-08-00018
for Limestone Handling
A System

MD1-0-V-172-01-00122A

General Arrangement and


AC Data Sheet of Metal Detector
MD1-0-V-141-08-00019
for Limestone Handling
A
Sysm

MD1-0-V-181-08-00015B

AUXILIARY BOILER PACKAGE


AC
INSTRUMENT LIST
MD1-0-V-141-33-00001A

MD1-0-V-181-08-000171

Auxiliary boiler package


ACcontrol valve list

MD1-0-V-181-09-00013A

AUXILIARY BOILER PACKAGE


AC
STEAM & AIR TRAP
MD1-0-V-151-08-00029A

MD1-0-V-181-09-00014A

AUXILIARY BOILER PACKAGE


AC
INSTRUMENT DATA
MD1-0-V-151-08-00030A

MD1-0-V-182-09-11011A

Instrument Data SheetAC


and Catalog for Air ReceiverMD1-0-V-161-09-16124
Tank of EDG
A

MD1-0-V-121-35-00004A

MD1-0-V-131-09-00007A

MD1-0-V-141-34-00001A

MD1-0-V-161-10-16131A

MD1-0-V-161-10-16250A

MD1-0-V-161-33-06002A

MD1-0-V-161-33-06308B

MD1-0-V-161-33-06311B

MD1-0-V-161-57-06500A

MD1-0-V-161-57-06503A

MD1-0-V-161-57-06504A

MD1-0-V-161-57-06505A

MD1-0-V-161-57-06506A

MD1-0-V-161-57-06507A

MD1-0-V-161-57-06508A

MD1-0-V-161-57-06509A

MD1-0-V-161-57-06510A

MD1-0-V-161-57-06511A

MD1-0-V-161-57-06512A

MD1-0-V-161-57-06513A

MD1-0-V-161-57-06514A

MD1-0-V-161-57-06515A

MD1-0-V-161-57-06516A

MD1-0-V-161-57-06517A

MD1-0-V-161-57-06518A

MD1-0-V-161-57-06519A

MD1-0-V-161-57-06520A

MD1-0-V-161-57-06521A

MD1-0-V-161-57-06522A

MD1-0-V-161-57-06523A

MD1-0-V-161-57-06524A

MD1-0-V-161-57-06525A

MD1-0-V-161-57-06526A

MD1-0-V-161-57-06527A

MD1-0-V-161-57-06528A

MD1-0-V-161-57-06529A

MD1-0-V-161-57-06530A

MD1-0-V-161-57-06531A

MD1-0-V-161-57-06532A

MD1-0-V-161-57-06533A

MD1-0-V-161-57-06552A

MD1-0-V-161-57-06554A

MD1-0-V-161-57-06555A

MD1-0-V-161-57-06556A

MD1-0-V-162-01-00003A

MD1-0-V-162-11-00011A

MD1-0-V-162-11-00012A

MD1-0-V-171-01-02123B

MD1-0-V-181-08-00016A

MD1-0-V-181-08-00019B

MD1-0-V-181-09-000110

MD1-0-V-186-08-00107B

MD1-0-V-620-35-00001A

MD1-0-V-630-35-00001A

MD1-0-V-640-08-00003A

MD1-0-V-640-08-00009A

MD1-0-V-640-08-00011A

MD1-0-V-805-03-00003A

MD1-0-V-805-08-00009A

MD1-0-V-850-73-00004B

I
I
I
I
I
I
I
I
I
I

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

I
I
I
I
I
I

Instrument Location Drawing


IC
fro BOP

MD1-0-E-750-01-00203

Instrument Interconnection
IC Wiring Diagram for BOP
MD1-0-E-750-01-00205

Setpoint List for Turbine


ICControl System

MD1-0-E-750-01-04801

Performance test instrumentation


IC
for steam turbineMD1-0-F-750-03-00001

Wiring Diagram- MOB For


IC steam TBN Piping

MD1-0-V-111-09-00703

Wiring Diagram- Lube Oil


IC Conditioner- Main (1/3) MD1-0-V-121-09-00004

Wiring Diagram- Lube Oil


IC Conditioner- Main (2/3) MD1-0-V-121-09-00005

Wiring Diagram- Lube Oil


IC Conditioner- Main (3/3) MD1-0-V-167-09-00006

Instrument List for Feedwater


IC
Heater

MD1-0-V-171-06-02009

Temperature Sensor Terminal


IC
Box Drawing for Boiler
MD1-0-V-171-08-02025
Feed Pump and Booster PumpA
Pressure Switch Terminal
IC Box Drawing for Boiler Feed
MD1-0-V-172-08-02105
Pump and Booster Pump

Reverse Switch Terminal


IC Box Diagram for Boiler Feed
MD1-0-V-182-35-30002
Pump and Booster Pump

Flow Transmitter(BP Discharge)


IC
Stand Drawing forMD1-0-V-610-01-00002
Booster Pump

Flow Transmitter(Balance
IC Line) Stand for Main Boiler Feedwater Pump
Instrument specificationICand data sheets for motor
Motor instrument junction
IC box drawing
Instrument installation detail
IC
drawing for motor
Sea Water Intake Facility
IC - PLC I/O List
DCS Interface I/O Communications
IC
Auto Filter- Instrumentation
IC List
Auto Filter- DCS Interface
IC I/O List
Set Point & Alarm List, IC
Auto Filter
Control Logic Diagram,IC
Auto Filter
Control LOOP Diagram,
ICAuto Filter
Air Compressor-DCS Interface
IC
I/O List (Hardwired)
Air Compressor-DCS Interface
IC
I/O List (Communication)
Instrument Data Sheets,
ICRotameters (Variable Area Flowmeters)
Boiler drum level indicator
IC workpackage vendor documents & drawings
Blowdown & Blow-off Valve
IC Workpackage Vendor Documents & Drawings
Control Narrative

IC

Sama Diagram, Fuel Feeders


IC
Front Wall
Sama Diagram, Start-up
ICBurner 1 Control
Instrument Installation Details,
IC
Cover Sheet & Notes
Instrument Installation Details,
IC
Pressure Transmitter, Feed Water & Spray Water
Instrument Installation Details,
IC
Pressure & Level Transmitters, Steam Drum Right
Instrument Installation Details,
IC
Pressure & Level Transmitters, Steam Drum Left
Instrument Installation Details
IC
Pressure & Flow Transmitters, Sootblower Steam
Instrument Installation Details,
IC
Pressure Transmitters, PSH Outlet
Instrument Installation Details,
IC
Pressure Gauge, Steam Drum
Instrument Installation Details,
IC
Pressure Transmitter, SB Auxiliary Steam
Instrument Installation Details,
IC
Flow Transmitter, Spary & Blowdown Water
Instrument Installation Details,
IC
Pressure Switch, Main Steam ERV
Instrument Installation Details,
IC
Pressure Gauge, Blowdown Tank
Instrument Installation Details,
IC
Pressure Gauge, PA & SA SCAH Steam
Instrument Installation Details,
IC
O2 Analyzer
Instrument Installation Details,
IC
Pressure Transmitter, Air Service
Instrument Installation Details,
IC
Diff. Pressure Transmitter, Air Service

Instrument Installation Details,


IC
Flow Transmitter, SC Air Service
Instrument Installation Details,
IC
Flow Transmitter, LS Air Service
Instrument Installation Details,
IC
Pressure Transmitter, Flue Gas Service
Instrument Installation Details,
IC
Diff. Pressure Transmitter, Flue Gas Service(1)
Instrument Installation Details,
IC
Diff. Pressure Transmitter, Flue Gas Service(2)
Instrument Installation Details,
IC
Diff. Pressure Transmitter, Flue Gas Service(3)
Instrument Installation Details,
IC
Pressure Transmitter, Furnace Bed Pressure
Instrument Installation Details,
IC
Diff. Pressure Transmitter, Furnace Bed Density
Instrument Installation Details,
IC
Diff. Pressure Transmitter, Cyclone Return Leg
Instrument Installation Details,
IC
Diff. Pressure Transmitter, Stripper Cooler Bey
Instrument Installation Details,
IC
Flow Transmitter, Primary Air to Plenum
Instrument Installation Details,
IC
Flow Transmitter, Secondary Air to Ring Duct
Instrument Installation Details,
IC
Flow Transmitter, Secondary Air to Start-up Bur
Instrument Installation Details,
IC
Flow Transmitter, Secondary Air to Air Bustle
Instrument Installation Details,
IC
Instrument Air Supply, Pneumatic Valve & Damper
Instrument Installation Details,
IC
Instrument Support Details
Instrument Installation Details,
IC
Instrument Air Supply Pneumatic Valve & Damper
Instrument Installation Details,
IC
Instrument Enclosure Layout Drawing - Type A
Instrument Installation Details,
IC
Instrument Enclosure Outline Drawing - Type B
Instrument Installation Details,
IC
Instrument Enclosure Layout Drawing - Type B
Instrument Installation Details,
IC
Instrument Enclosure Outline & Layout Drawing C
Instrument Arrangement
ICPlot Plan
Instrument Installation Drawing
IC
Graphic Display Requirement
IC
and Drawing
INSTRUMENT & CONTROL
IC
SYSTEM EARTHING & SCREENING SYSTEM FOR COAL HANDLING
Auxiliary boiler pacakgeICterminal point list
AUXILIARY BOILER PACKAGE
IC
PLC I.O LIST
Auxiliary boiler package
IClevel gauge
Drawing of instrument &
ICequipment for field erected tank
Interconnection Wiring IC
Diagram for SWAS
Interconnection WiringIC
Diagram for CEMS
Sub-supplier's list for vibration
IC
monitoring system(bop)
Cable list for vibration monitoring
IC
system(bop)
Technical catalog and brochure
IC
for vibration monitoring system(bop)
HMI Graphics for WT &ICWWT System
Instrument list for wt &IC
wwt
Interconnection wiring diagram
IC
for boiler chemical dosing system

Fire Detection & Alarm Layout- Riser Diagram (3)

RT

BILL

15/10/12

Fire Detection & Alarm Layout- Riser Diagram (5)

RT

BILL

02/07/13

Fire Detection & Alarm layout- Diesel Generator House

RT

BILL

02/07/13

System Discription for Fire Fighting System & Fire Alarm System

RT

BILL

24/04/13

Instrument & Equipment List for Steam Turbine and Generator

RT

BILL

28/03/13

[BFBP] Flow Element Specification of Discharge Line

RT

BILL

11/07/13

[BFP] Flow Element Specification of Balance Line

RT

BILL

11/07/13

Instrument Data & Dwg

RT

BILL

19/07/13

Cable Sizing Calculation for CHS

RT

BILL

08/10/12

Lighting Schedule fof CHS

RT

BILL

08/10/12

Instrument List for Limestone Handling System

RT

BILL

06/11/12

Flow Meter Wiring Diagram for Emergency Diesel Generator

RT

BILL

04/07/13

Distributed Control System Power and Ground Plan

RT

BILL

16/07/13

DISCIPLINE = CIV, Civil & Architecture


revision
MD1-0-A-200-51-00001

MD1-0-A-200-51-00002

MD1-0-A-200-51-00003

MD1-0-A-200-51-00004

MD1-0-A-200-51-00005

MD1-0-A-200-51-00006

MD1-0-A-200-51-00007

MD1-0-A-200-51-00008

MD1-0-A-200-51-00009

MD1-0-A-200-51-00010

MD1-0-A-200-51-00011

MD1-0-A-200-51-00012

MD1-0-A-200-52-00001

MD1-0-A-200-52-00002

MD1-0-A-200-52-00003

MD1-0-A-200-52-00004

MD1-0-A-200-52-00005

MD1-0-A-200-54-00001

MD1-0-A-200-54-00002

MD1-0-A-200-54-00003

MD1-0-A-200-54-00004

MD1-0-A-200-54-00005

MD1-0-A-200-54-00006

MD1-0-A-200-54-00007

MD1-0-A-200-54-00008

MD1-0-A-200-55-00001

MD1-0-A-200-55-00002

MD1-0-A-200-55-00003

MD1-0-A-200-55-00004

MD1-0-A-201-51-00001

MD1-0-A-201-51-00002

MD1-0-A-201-51-00003

MD1-0-A-201-51-00004

MD1-0-A-201-51-00005

MD1-0-A-201-51-00006

MD1-0-A-201-51-00007

MD1-0-A-201-51-00008

MD1-0-A-201-51-00009

MD1-0-A-201-51-00010

MD1-0-A-201-51-00011

MD1-0-A-201-51-00012

MD1-0-A-201-52-00001

MD1-0-A-201-52-00002

MD1-0-A-201-52-00003

MD1-0-A-201-52-00004

MD1-0-A-201-52-00005

MD1-0-A-201-52-00006

MD1-0-A-201-52-00007

MD1-0-A-201-52-00008

MD1-0-A-201-52-00009

MD1-0-A-201-52-00010

MD1-0-A-201-52-00011

MD1-0-A-201-52-00012

MD1-0-A-201-52-00013

MD1-0-A-201-52-00014

MD1-0-A-201-52-00015

MD1-0-A-201-52-00016

MD1-0-A-201-52-00017

MD1-0-A-201-52-00018

MD1-0-A-201-52-00019

MD1-0-A-201-52-00020

MD1-0-A-201-52-00021

MD1-0-A-201-53-00001

MD1-0-A-201-53-00002

MD1-0-A-201-53-00003

MD1-0-A-201-53-00004

MD1-0-A-201-53-00005

MD1-0-A-201-53-00006

MD1-0-A-201-53-00007

MD1-0-A-201-53-00008

MD1-0-A-201-53-00009

MD1-0-A-201-53-00010

MD1-0-A-201-53-00015

MD1-0-A-201-53-00020

MD1-0-A-201-53-00021

MD1-0-A-201-53-00022

MD1-0-A-201-53-00023

MD1-0-A-201-53-00024

MD1-0-A-201-53-00025

MD1-0-A-201-53-00026

MD1-0-A-201-53-00027

MD1-0-A-201-53-00028

MD1-0-A-201-53-00031

MD1-0-A-201-53-00032

MD1-0-A-201-53-00033

MD1-0-A-201-53-00034

MD1-0-A-201-53-00035

MD1-0-A-201-53-00036

MD1-0-A-201-53-00037

MD1-0-A-201-53-00038

MD1-0-A-201-53-00039

MD1-0-A-201-53-00040

MD1-0-A-201-53-00041

MD1-0-A-201-53-00042

MD1-0-A-201-53-00043

MD1-0-A-201-53-00065

MD1-0-A-201-53-00066

MD1-0-A-201-54-00001

MD1-0-A-201-54-00002

MD1-0-A-201-54-00003

MD1-0-A-201-54-00004

MD1-0-A-201-54-00005

MD1-0-A-201-54-00006

MD1-0-A-201-54-00007

MD1-0-A-201-54-00010

MD1-0-A-201-54-00011

MD1-0-A-201-54-00012

MD1-0-A-201-54-00013

MD1-0-A-201-54-00014

MD1-0-A-201-54-00015

MD1-0-A-201-54-00016

MD1-0-A-201-54-00017

MD1-0-A-201-54-00020

MD1-0-A-201-54-00021

MD1-0-A-201-54-00022

MD1-0-A-201-54-00023

MD1-0-A-201-54-00024

MD1-0-A-201-54-00025

MD1-0-A-201-54-00026

MD1-0-A-201-54-00027

MD1-0-A-201-54-00028

MD1-0-A-201-54-00029

MD1-0-A-201-54-00030

MD1-0-A-201-54-00031

MD1-0-A-201-54-00032

MD1-0-A-201-54-00033

MD1-0-A-201-54-00034

MD1-0-A-201-54-00035

MD1-0-A-201-54-00036

MD1-0-A-201-54-00037

MD1-0-A-201-54-00038

MD1-0-A-201-54-00039

MD1-0-A-201-54-00050

MD1-0-A-201-54-00051

MD1-0-A-201-54-00052

MD1-0-A-201-54-00053

MD1-0-A-201-54-00054

MD1-0-A-201-54-00056

MD1-0-A-201-54-00057

MD1-0-A-201-54-00058

MD1-0-A-201-54-00059

MD1-0-A-201-54-00065

MD1-0-A-201-54-00066

MD1-0-A-201-54-00067

MD1-0-A-201-54-00068

MD1-0-A-201-54-00069

MD1-0-A-201-54-00080

MD1-0-A-201-54-00081

MD1-0-A-201-54-00082

MD1-0-A-201-54-00083

MD1-0-A-201-54-00084

MD1-0-A-201-54-00085

MD1-0-A-201-54-00086

MD1-0-A-201-54-00090

MD1-0-A-201-54-00091

MD1-0-A-201-54-00100

MD1-0-A-201-54-00101

MD1-0-A-201-54-00110

MD1-0-A-201-54-00111

MD1-0-A-201-54-00120

MD1-0-A-201-54-00121

MD1-0-A-201-54-00130

MD1-0-A-201-54-00131

MD1-0-A-201-54-00132

MD1-0-A-201-54-00137

MD1-0-A-201-54-00139

MD1-0-A-201-54-00140

MD1-0-A-201-54-00141

MD1-0-A-201-54-00142

MD1-0-A-202-51-00001

MD1-0-A-202-51-00002

MD1-0-A-202-51-00003

MD1-0-A-202-51-00004

MD1-0-A-202-51-00005

MD1-0-A-202-51-00006

MD1-0-A-202-51-00007

MD1-0-A-202-51-00008

MD1-0-A-202-53-00001

MD1-0-A-202-53-00002

MD1-0-A-202-53-00003

MD1-0-A-202-53-00004

MD1-0-A-202-53-00005

MD1-0-A-202-53-00006

MD1-0-A-202-53-00007

MD1-0-A-202-53-00008

MD1-0-A-202-53-00009

MD1-0-A-202-53-00010

MD1-0-A-202-53-00011

MD1-0-A-202-53-00012

MD1-0-A-202-53-00013

MD1-0-A-202-53-00014

MD1-0-A-202-53-00015

MD1-0-A-202-53-00016

MD1-0-A-202-53-00017

MD1-0-A-202-55-00001

MD1-0-A-203-51-00001

MD1-0-A-203-51-00002

MD1-0-A-203-51-00003

MD1-0-A-203-51-00004

MD1-0-A-203-51-00009

MD1-0-A-203-51-00010

MD1-0-A-203-51-00011

MD1-0-A-203-51-00012

MD1-0-A-203-51-00013

MD1-0-A-203-51-00020

MD1-0-A-203-51-00021

MD1-0-A-203-51-00022

MD1-0-A-203-51-00023

MD1-0-A-203-51-00024

MD1-0-A-203-51-00025

MD1-0-A-203-51-00026

MD1-0-A-203-51-00027

MD1-0-A-203-51-00040

MD1-0-A-203-51-00041

MD1-0-A-203-53-00001

MD1-0-A-203-53-00002

MD1-0-A-203-53-00003

MD1-0-A-203-53-00004

MD1-0-A-203-53-00006

MD1-0-A-203-53-00007

MD1-0-A-203-53-00008

MD1-0-A-203-53-00011

MD1-0-A-203-53-00028

MD1-0-A-203-53-00029

MD1-0-A-203-53-00030

MD1-0-A-203-53-00031

MD1-0-A-203-53-00032

MD1-0-A-203-53-00033

MD1-0-A-203-53-00041

MD1-0-A-203-53-00042

MD1-0-A-203-53-00043

MD1-0-A-203-54-00001

MD1-0-A-203-54-00002

MD1-0-A-203-54-00003

MD1-0-A-203-54-00005

MD1-0-A-203-54-00006

MD1-0-A-203-54-00007

MD1-0-A-203-54-00008

MD1-0-A-203-54-00009

MD1-0-A-203-54-00010

MD1-0-A-203-54-00011

MD1-0-A-203-54-00012

MD1-0-A-203-54-00013

MD1-0-A-203-54-00014

MD1-0-A-203-54-00015

MD1-0-A-203-54-00016

MD1-0-A-203-54-00017

MD1-0-A-203-54-00018

MD1-0-A-203-54-00021

MD1-0-A-203-54-00022

MD1-0-A-203-54-00023

MD1-0-A-203-54-00024

MD1-0-A-203-54-00025

MD1-0-A-203-54-00026

MD1-0-A-203-54-00027

MD1-0-A-203-54-00028

MD1-0-A-203-54-00031

MD1-0-A-203-54-00032

MD1-0-A-203-54-00033

MD1-0-A-203-54-00034

MD1-0-A-203-54-00035

MD1-0-A-203-54-00036

MD1-0-A-203-55-00001

MD1-0-A-204-51-00003

MD1-0-A-204-53-00002

MD1-0-A-205-51-00002

MD1-0-A-205-51-00003

MD1-0-A-205-52-00001

MD1-0-A-205-52-00004

MD1-0-A-205-53-00001

MD1-0-A-205-53-00003

MD1-0-A-205-53-00004

MD1-0-A-207-51-00001

MD1-0-A-207-51-00002

MD1-0-A-207-51-00003

MD1-0-A-207-51-00004

MD1-0-A-207-51-00011

MD1-0-A-207-52-00001

MD1-0-A-207-52-00002

MD1-0-A-207-52-00003

MD1-0-A-207-52-00004

MD1-0-A-207-53-00001

MD1-0-A-207-53-00002

MD1-0-A-207-53-00003

MD1-0-A-207-53-00004

MD1-0-A-207-53-00005

MD1-0-A-207-55-00001

MD1-0-A-208-52-00001

MD1-0-A-208-52-00002

MD1-0-A-208-52-00003

MD1-0-A-208-52-00004

MD1-0-A-208-52-00005

MD1-0-A-208-52-00006

MD1-0-A-208-53-00001

MD1-0-A-208-53-00002

MD1-0-A-208-53-00003

MD1-0-A-208-53-00004

MD1-0-A-208-53-00005

MD1-0-A-208-53-00006

MD1-0-A-208-53-00007

MD1-0-A-208-53-00010

MD1-0-A-208-53-00011

MD1-0-A-208-53-00012

MD1-0-A-208-53-00013

MD1-0-A-208-54-00001

MD1-0-A-208-54-00002

MD1-0-A-208-54-00003

MD1-0-A-208-54-00004

MD1-0-A-208-54-00005

MD1-0-A-208-54-00006

MD1-0-A-208-54-00007

MD1-0-A-208-54-00008

MD1-0-A-208-54-00009

MD1-0-A-208-54-00010

MD1-0-A-208-55-00001

MD1-0-A-209-51-00001

MD1-0-A-209-51-00002

MD1-0-A-209-51-00003

MD1-0-A-209-51-00004

MD1-0-A-209-51-00005

MD1-0-A-209-52-00001

MD1-0-A-209-52-00002

MD1-0-A-209-52-00003

MD1-0-A-209-52-00004

MD1-0-A-209-52-00005

MD1-0-A-209-52-00006

MD1-0-A-209-52-00007

MD1-0-A-209-53-00001

MD1-0-A-209-53-00002

MD1-0-A-209-53-00003

MD1-0-A-209-53-00004

MD1-0-A-209-53-00005

MD1-0-A-209-53-00006

MD1-0-A-209-53-00007

MD1-0-A-209-53-00008

MD1-0-A-209-53-00009

MD1-0-A-209-55-00001

MD1-0-A-210-52-00001

MD1-0-A-210-52-00002

MD1-0-A-210-52-00003

MD1-0-A-210-53-00001

MD1-0-A-210-53-00002

MD1-0-A-210-53-00003

MD1-0-A-210-53-00004

MD1-0-A-210-53-00005

MD1-0-A-210-53-00006

MD1-0-A-210-54-00001

MD1-0-A-210-54-00002

MD1-0-A-210-54-00003

MD1-0-A-210-54-00004

MD1-0-A-210-54-00005

MD1-0-A-210-55-00001

MD1-0-A-212-51-00001

MD1-0-A-212-51-00002

MD1-0-A-212-51-00003

MD1-0-A-212-51-00004

MD1-0-A-212-51-00005

MD1-0-A-212-52-00001

MD1-0-A-212-52-00002

MD1-0-A-212-52-00003

MD1-0-A-212-52-00004

MD1-0-A-212-52-00005

MD1-0-A-212-52-00006

MD1-0-A-212-53-00001

MD1-0-A-212-53-00002

MD1-0-A-212-53-00003

MD1-0-A-212-53-00004

MD1-0-A-212-53-00005

MD1-0-A-212-53-00006

MD1-0-A-212-53-00007

MD1-0-A-212-55-00001

MD1-0-A-213-51-00001

MD1-0-A-213-51-00002

MD1-0-A-213-51-00003

MD1-0-A-213-51-00004

MD1-0-A-213-52-00001

MD1-0-A-213-52-00002

MD1-0-A-214-52-00001

MD1-0-A-214-55-00001

MD1-0-A-215-51-00001

MD1-0-A-215-51-00002

MD1-0-A-215-51-00003

MD1-0-A-215-51-00004

MD1-0-A-215-51-00005

MD1-0-A-215-51-00006

MD1-0-A-215-51-00007

MD1-0-A-215-51-00008

MD1-0-A-215-51-00011

MD1-0-A-215-51-00012

MD1-0-A-215-51-00013

MD1-0-A-215-51-00014

MD1-0-A-215-51-00015

MD1-0-A-215-51-00016

MD1-0-A-215-52-00001

MD1-0-A-215-52-00002

MD1-0-A-215-52-00003

MD1-0-A-215-52-00004

MD1-0-A-215-52-00005

MD1-0-A-215-52-00006

MD1-0-A-215-52-00007

MD1-0-A-215-53-00001

MD1-0-A-215-53-00002

MD1-0-A-215-53-00003

MD1-0-A-215-53-00004

MD1-0-A-215-53-00005

MD1-0-A-215-53-00006

MD1-0-A-215-53-00010

MD1-0-A-215-53-00011

MD1-0-A-215-53-00012

MD1-0-A-215-53-00020

MD1-0-A-215-53-00021

MD1-0-A-215-53-00022

MD1-0-A-215-53-00023

MD1-0-A-215-53-00024

MD1-0-A-215-53-00025

MD1-0-A-215-53-00026

MD1-0-A-215-53-00030

MD1-0-A-215-53-00031

MD1-0-A-215-53-00032

MD1-0-A-215-53-00033

MD1-0-A-215-53-00040

MD1-0-A-215-53-00041

MD1-0-A-215-53-00042

MD1-0-A-215-53-00043

MD1-0-A-215-53-00050

MD1-0-A-215-53-00051

MD1-0-A-215-53-00052

MD1-0-A-215-53-00053

MD1-0-A-215-53-00054

MD1-0-A-215-53-00055

MD1-0-A-215-53-00056

MD1-0-A-215-53-00057

MD1-0-A-215-53-00058

MD1-0-A-215-55-00001

MD1-0-A-216-51-00001

MD1-0-A-216-51-00003

MD1-0-A-216-51-00004

MD1-0-A-216-51-00005

MD1-0-A-216-51-00006

MD1-0-A-216-51-00007

MD1-0-A-216-51-00011

MD1-0-A-216-51-00012

MD1-0-A-216-51-00013

MD1-0-A-216-51-00014

MD1-0-A-216-53-00001

MD1-0-A-216-53-00002

MD1-0-A-216-53-00003

MD1-0-A-216-53-00004

MD1-0-A-216-53-00005

MD1-0-A-216-53-00006

MD1-0-A-216-53-00007

MD1-0-A-216-53-00008

MD1-0-A-216-53-00009

MD1-0-A-216-53-00010

MD1-0-A-216-53-00013

MD1-0-A-216-53-00020

MD1-0-A-216-54-00001

MD1-0-A-216-54-00002

MD1-0-A-216-54-00003

MD1-0-A-216-54-00004

MD1-0-A-216-54-00005

MD1-0-A-216-54-00007

MD1-0-A-216-54-00008

MD1-0-A-216-54-00009

MD1-0-A-216-54-00010

MD1-0-A-216-55-00001

MD1-0-A-218-53-00001

MD1-0-A-218-53-00002

MD1-0-A-218-53-00003

MD1-0-A-218-53-00004

MD1-0-A-218-55-00001

MD1-0-A-218-55-00003

MD1-0-A-218-55-00004

MD1-0-A-219-51-00002

MD1-0-A-219-51-00003

MD1-0-A-219-51-00004

MD1-0-A-219-51-00005

MD1-0-A-219-51-00006

MD1-0-A-219-51-00007

MD1-0-A-219-51-00008

MD1-0-A-219-51-00009

MD1-0-A-219-51-00010

MD1-0-A-219-51-00011

MD1-0-A-219-55-00002

MD1-0-A-219-55-00004

MD1-0-A-221-51-00001

MD1-0-A-221-51-00002

MD1-0-A-221-51-00003

MD1-0-A-221-51-00004

MD1-0-A-250-51-00001

MD1-0-A-250-51-00002

MD1-0-A-250-51-00003

MD1-0-A-250-51-00004

MD1-0-A-250-51-00005

MD1-0-A-250-51-00006

MD1-0-A-250-51-00007

MD1-0-A-250-51-00008

MD1-0-A-250-51-00009

MD1-0-A-250-51-00010

MD1-0-A-250-51-00011

MD1-0-A-250-52-00001

MD1-0-A-250-52-00002

MD1-0-A-250-52-00003

MD1-0-A-250-52-00004

MD1-0-A-250-53-00001

MD1-0-A-250-53-00002

MD1-0-A-250-53-00003

MD1-0-A-250-53-00004

MD1-0-A-250-53-00005

MD1-0-A-250-53-00006

MD1-0-A-250-53-00007

MD1-0-A-250-54-00001

MD1-0-A-250-54-00002

MD1-0-A-250-54-00003

MD1-0-A-250-54-00004

MD1-0-A-250-54-00005

MD1-0-A-250-54-00006

MD1-0-A-250-54-00007

MD1-0-A-250-54-00008

MD1-0-A-250-54-00009

MD1-0-A-250-54-00010

MD1-0-A-250-54-00011

MD1-0-A-250-54-00012

MD1-0-A-250-54-00013

MD1-0-A-250-54-00014

MD1-0-A-250-54-00015

MD1-0-A-250-54-00016

MD1-0-A-250-54-00017

MD1-0-A-250-54-00018

MD1-0-A-250-54-00019

MD1-0-A-250-54-00020

MD1-0-A-251-51-00001

MD1-0-A-251-51-00002

MD1-0-A-251-51-00003

MD1-0-A-251-51-00004

MD1-0-A-251-51-00005

MD1-0-A-251-52-00001

MD1-0-A-251-52-00002

MD1-0-A-251-53-00001

MD1-0-A-251-53-00002

MD1-0-A-251-53-00003

MD1-0-A-251-54-00001

MD1-0-A-251-54-00002

MD1-0-A-251-54-00003

MD1-0-A-251-54-00004

MD1-0-A-251-54-00005

MD1-0-A-251-55-00001

MD1-0-A-252-51-00001

MD1-0-A-252-51-00006

MD1-0-A-252-51-00008

MD1-0-A-252-51-00009

MD1-0-A-252-51-00010

MD1-0-A-252-51-00011

MD1-0-A-252-54-00001

MD1-0-A-252-54-00002

MD1-0-A-252-54-00003

MD1-0-A-252-54-00004

MD1-0-A-252-54-00005

MD1-0-A-252-54-00007

MD1-0-A-252-54-00008

MD1-0-A-252-54-00009

MD1-0-A-252-54-00010

MD1-0-A-252-54-00011

MD1-0-A-252-54-00012

MD1-0-A-252-54-00013

MD1-0-A-252-54-00014

MD1-0-A-252-54-00015

MD1-0-A-252-54-00016

MD1-0-A-252-54-00017

MD1-0-A-252-54-00018

MD1-0-A-252-54-00019

MD1-0-A-252-54-00020

MD1-0-A-252-54-00021

MD1-0-A-252-54-00022

MD1-0-A-252-54-00023

MD1-0-A-252-55-00002

MD1-0-A-254-51-00001

MD1-0-A-254-51-00002

MD1-0-A-254-51-00003

MD1-0-A-254-51-00004

MD1-0-A-254-51-00005

MD1-0-A-254-51-00006

MD1-0-A-254-51-00007

MD1-0-A-254-51-00008

MD1-0-A-254-51-00009

MD1-0-A-254-51-00010

MD1-0-A-254-51-00011

MD1-0-A-254-51-00012

MD1-0-A-254-51-00013

MD1-0-A-254-51-00014

MD1-0-A-254-51-00015

MD1-0-A-254-51-00016

MD1-0-A-254-51-00017

MD1-0-A-254-51-00018

MD1-0-A-254-51-00034

MD1-0-A-254-52-00002

MD1-0-A-254-52-00004

MD1-0-A-254-52-00005

MD1-0-A-254-52-00006

MD1-0-A-254-52-00007

MD1-0-A-254-52-00020

MD1-0-A-254-52-00021

MD1-0-A-254-52-00022

MD1-0-A-254-52-00030

MD1-0-A-254-53-00001

MD1-0-A-254-53-00002

MD1-0-A-254-53-00003

MD1-0-A-254-53-00004

MD1-0-A-254-53-00005

MD1-0-A-254-53-00006

MD1-0-A-254-53-00007

MD1-0-A-254-53-00008

MD1-0-A-254-53-00009

MD1-0-A-254-53-00010

MD1-0-A-254-53-00011

MD1-0-A-254-53-00012

MD1-0-A-254-53-00013

MD1-0-A-254-53-00014

MD1-0-A-254-53-00015

MD1-0-A-254-53-00016

MD1-0-A-254-53-00020

MD1-0-A-254-53-00021

MD1-0-A-254-53-00022

MD1-0-A-254-53-00023

MD1-0-A-254-53-00024

MD1-0-A-254-53-00025

MD1-0-A-254-53-00026

MD1-0-A-254-53-00027

MD1-0-A-254-53-00030

MD1-0-A-254-53-00031

MD1-0-A-254-53-00032

MD1-0-A-254-53-00033

MD1-0-A-254-53-00034

MD1-0-A-254-53-00035

MD1-0-A-254-53-00036

MD1-0-A-254-53-00037

MD1-0-A-254-53-00038

MD1-0-A-254-53-00039

MD1-0-A-254-53-00040

MD1-0-A-254-53-00041

MD1-0-A-254-53-00042

MD1-0-A-254-53-00043

MD1-0-A-254-53-00044

MD1-0-A-254-53-00045

MD1-0-A-254-53-00046

MD1-0-A-254-53-00050

MD1-0-A-254-53-00051

MD1-0-A-254-53-00052

MD1-0-A-254-53-00053

MD1-0-A-254-53-00054

MD1-0-A-254-53-00055

MD1-0-A-254-53-00056

MD1-0-A-254-53-00057

MD1-0-A-254-53-00058

MD1-0-A-254-53-00062

MD1-0-A-254-53-00063

MD1-0-A-254-53-00064

MD1-0-A-254-53-00065

MD1-0-A-254-53-00066

MD1-0-A-254-53-00067

MD1-0-A-254-53-00068

MD1-0-A-254-53-00069

MD1-0-A-254-53-00071

MD1-0-A-254-53-00072

MD1-0-A-254-53-00073

MD1-0-A-254-53-00074

MD1-0-A-254-53-00075

MD1-0-A-254-53-00076

MD1-0-A-254-53-00079

MD1-0-A-254-53-00080

MD1-0-A-254-53-00081

MD1-0-A-254-53-00082

MD1-0-A-254-53-00083

MD1-0-A-254-53-00084

MD1-0-A-254-53-00087

MD1-0-A-254-53-00088

MD1-0-A-254-53-00089

MD1-0-A-254-53-00090

MD1-0-A-254-53-00091

MD1-0-A-254-53-00092

MD1-0-A-254-53-00093

MD1-0-A-254-53-00096

MD1-0-A-254-53-00097

MD1-0-A-254-53-00098

MD1-0-A-254-53-00099

MD1-0-A-254-53-00100

MD1-0-A-254-53-00101

MD1-0-A-254-53-00102

MD1-0-A-254-53-00103

MD1-0-A-254-53-00104

MD1-0-A-254-53-00105

MD1-0-A-254-53-00106

MD1-0-A-254-53-00107

MD1-0-A-254-53-00108

MD1-0-A-254-53-00109

MD1-0-A-254-53-00110

MD1-0-A-254-53-00111

MD1-0-A-254-53-00112

MD1-0-A-254-53-00113

MD1-0-A-254-53-00114

MD1-0-A-254-53-00115

MD1-0-A-254-53-00116

MD1-0-A-254-53-00117

MD1-0-A-254-53-00118

MD1-0-A-254-53-00120

MD1-0-A-254-53-00121

MD1-0-A-254-53-00122

MD1-0-A-254-53-00130

MD1-0-A-254-54-00002

MD1-0-A-254-54-00003

MD1-0-A-254-54-00004

MD1-0-A-254-55-00001

MD1-0-A-255-53-00022

MD1-0-A-255-55-00001

MD1-0-A-257-51-00004

MD1-0-A-258-51-00001

MD1-0-A-258-51-00002

MD1-0-A-258-51-00003

MD1-0-A-258-51-00004

MD1-0-A-259-51-00001

MD1-0-A-259-51-00002

MD1-0-A-259-51-00003

MD1-0-A-259-51-00004

MD1-0-A-259-51-00005

MD1-0-A-259-52-00001

MD1-0-A-259-52-00002

MD1-0-A-259-52-00003

MD1-0-A-259-52-00004

MD1-0-A-259-52-00005

MD1-0-A-259-53-00001

MD1-0-A-259-53-00002

MD1-0-A-259-53-00003

MD1-0-A-259-53-00004

MD1-0-A-259-53-00005

MD1-0-A-259-53-00006

MD1-0-A-259-53-00008

MD1-0-A-259-53-00009

MD1-0-C-070-06-00010

MD1-0-C-070-06-00020

MD1-0-C-070-07-00010

MD1-0-C-160-01-00010

MD1-0-C-160-01-00011

MD1-0-C-160-01-00020

MD1-0-C-160-01-00021

MD1-0-C-160-01-00022

MD1-0-C-160-01-00023

MD1-0-C-160-01-00040

MD1-0-C-160-01-00041

MD1-0-C-160-01-00090

MD1-0-C-160-01-00100

MD1-0-C-160-01-00140

MD1-0-C-160-01-00150

MD1-0-C-160-01-00240

MD1-0-C-160-01-00250

MD1-0-C-160-01-00300

MD1-0-C-160-01-00350

MD1-0-C-160-11-00010

MD1-0-C-160-11-00011

MD1-0-C-160-11-00012

MD1-0-C-160-11-00013

MD1-0-C-160-11-00014

MD1-0-C-160-11-00015

MD1-0-C-160-11-00020

MD1-0-C-160-11-00021

MD1-0-C-160-11-00022

MD1-0-C-160-11-00023

MD1-0-C-160-11-00024

MD1-0-C-160-11-00025

MD1-0-C-160-53-00010

MD1-0-C-160-53-00011

MD1-0-C-160-53-00012

MD1-0-C-160-53-00020

MD1-0-C-160-53-00021

MD1-0-C-160-53-00022

MD1-0-C-160-53-00023

MD1-0-C-160-53-00030

MD1-0-C-160-53-00032

MD1-0-C-160-53-00033

MD1-0-C-160-53-00034

MD1-0-C-160-53-00035

MD1-0-C-160-53-00036

MD1-0-C-160-53-00037

MD1-0-C-160-53-00038

MD1-0-C-160-53-00039

MD1-0-C-160-53-00042

MD1-0-C-160-53-00043

MD1-0-C-160-53-00044

MD1-0-C-160-53-00045

MD1-0-C-160-53-00046

MD1-0-C-160-53-00047

MD1-0-C-160-53-00048

MD1-0-C-160-53-00049

MD1-0-C-160-53-00100

MD1-0-C-160-53-00101

MD1-0-C-160-53-00110

MD1-0-C-160-53-00111

MD1-0-C-160-53-00150

MD1-0-C-160-53-00151

MD1-0-C-160-53-00160

MD1-0-C-160-53-00161

MD1-0-C-160-53-00250

MD1-0-C-160-53-00251

MD1-0-C-163-01-00010

MD1-0-C-163-01-00011

MD1-0-C-163-01-00012

MD1-0-C-163-01-00013

MD1-0-C-163-01-00014

MD1-0-C-163-01-00015

MD1-0-C-163-06-00010

MD1-0-C-163-06-00020

MD1-0-C-163-11-00010

MD1-0-C-163-11-00011

MD1-0-C-163-11-00012

MD1-0-C-163-11-00013

MD1-0-C-163-53-00010

MD1-0-C-163-53-00011

MD1-0-C-163-53-00012

MD1-0-C-163-53-00013

MD1-0-C-163-53-00014

MD1-0-C-163-53-00020

MD1-0-C-163-53-00021

MD1-0-C-163-53-00022

MD1-0-C-163-53-00023

MD1-0-C-163-53-00024

MD1-0-C-163-53-00030

MD1-0-C-163-53-00031

MD1-0-C-163-53-00032

MD1-0-C-163-53-00033

MD1-0-C-163-53-00034

MD1-0-C-171-01-00100

MD1-0-C-171-01-00150

MD1-0-C-171-01-00151

MD1-0-C-171-01-00152

MD1-0-C-171-01-00153

MD1-0-C-171-01-00155

MD1-0-C-171-01-00156

MD1-0-C-171-01-00157

MD1-0-C-171-01-00158

MD1-0-C-171-01-00160

MD1-0-C-171-01-00161

MD1-0-C-171-01-00162

MD1-0-C-171-01-00163

MD1-0-C-171-01-00165

MD1-0-C-171-01-00166

MD1-0-C-171-01-00167

MD1-0-C-171-01-00170

MD1-0-C-171-01-00171

MD1-0-C-171-01-00173

MD1-0-C-171-01-00200

MD1-0-C-171-01-00201

MD1-0-C-171-01-00202

MD1-0-C-171-01-00203

MD1-0-C-171-01-00204

MD1-0-C-171-01-00205

MD1-0-C-171-01-00206

MD1-0-C-171-01-00207

MD1-0-C-171-01-00208

MD1-0-C-171-01-00209

MD1-0-C-171-01-00210

MD1-0-C-171-01-00211

MD1-0-C-171-06-00010

MD1-0-C-171-06-00020

MD1-0-C-171-06-00030

MD1-0-C-171-06-00040

MD1-0-C-171-11-00075

MD1-0-C-171-11-00105

MD1-0-C-171-11-00106

MD1-0-C-171-11-00310

MD1-0-C-171-11-00311

MD1-0-C-171-11-00312

MD1-0-C-171-11-00313

MD1-0-C-171-11-00314

MD1-0-C-171-11-00315

MD1-0-C-171-11-00316

MD1-0-C-171-11-00320

MD1-0-C-171-11-00321

MD1-0-C-171-11-00322

MD1-0-C-171-11-00330

MD1-0-C-171-11-00331

MD1-0-C-171-11-00332

MD1-0-C-171-11-00333

MD1-0-C-171-11-00334

MD1-0-C-171-11-00335

MD1-0-C-171-11-00340

MD1-0-C-171-11-00341

MD1-0-C-171-11-00350

MD1-0-C-171-11-00351

MD1-0-C-171-11-00352

MD1-0-C-171-11-00360

MD1-0-C-171-11-00361

MD1-0-C-171-11-00370

MD1-0-C-171-11-00371

MD1-0-C-171-53-00110

MD1-0-C-171-53-00111

MD1-0-C-171-53-00150

MD1-0-C-171-53-00151

MD1-0-C-171-53-00152

MD1-0-C-171-53-00153

MD1-0-C-171-53-00155

MD1-0-C-171-53-00156

MD1-0-C-171-53-00157

MD1-0-C-171-53-00208

MD1-0-C-171-53-00209

MD1-0-C-171-53-00310

MD1-0-C-171-53-00311

MD1-0-C-171-53-00312

MD1-0-C-171-53-00313

MD1-0-C-171-53-00314

MD1-0-C-171-53-00315

MD1-0-C-171-53-00320

MD1-0-C-171-53-00330

MD1-0-C-171-53-00331

MD1-0-C-171-53-00332

MD1-0-C-171-53-00333

MD1-0-C-171-53-00340

MD1-0-C-171-53-00350

MD1-0-C-171-53-00370

MD1-0-C-172-01-00010

MD1-0-C-172-01-00011

MD1-0-C-172-01-00020

MD1-0-C-172-01-00030

MD1-0-C-172-01-00040

MD1-0-C-172-01-00041

MD1-0-C-172-01-00042

MD1-0-C-172-01-00043

MD1-0-C-172-01-00044

MD1-0-C-172-01-00045

MD1-0-C-172-01-00046

MD1-0-C-172-01-00047

MD1-0-C-172-01-00048

MD1-0-C-172-01-00049

MD1-0-C-172-01-00050

MD1-0-C-172-01-00051

MD1-0-C-172-01-00052

MD1-0-C-172-01-00053

MD1-0-C-172-01-00054

MD1-0-C-172-01-00055

MD1-0-C-172-01-00056

MD1-0-C-172-01-00057

MD1-0-C-172-01-00058

MD1-0-C-172-01-00059

MD1-0-C-172-01-00060

MD1-0-C-172-01-00061

MD1-0-C-172-01-00062

MD1-0-C-172-01-00063

MD1-0-C-172-06-00010

MD1-0-C-172-06-00011

MD1-0-C-172-06-00013

MD1-0-C-172-06-00014

MD1-0-C-172-06-00015

MD1-0-C-172-06-00016

MD1-0-C-172-06-00020

MD1-0-C-172-06-00030

MD1-0-C-172-11-00030

MD1-0-C-172-11-00031

MD1-0-C-172-11-00032

MD1-0-C-172-11-00040

MD1-0-C-172-11-00041

MD1-0-C-172-11-00042

MD1-0-C-172-11-00043

MD1-0-C-172-11-00044

MD1-0-C-172-11-00050

MD1-0-C-172-11-00051

MD1-0-C-172-11-00052

MD1-0-C-172-11-00053

MD1-0-C-172-11-00054

MD1-0-C-172-53-00010

MD1-0-C-172-53-00011

MD1-0-C-172-53-00012

MD1-0-C-172-53-00013

MD1-0-C-172-53-00030

MD1-0-C-172-53-00031

MD1-0-C-172-53-00032

MD1-0-C-172-53-00033

MD1-0-C-172-53-00034

MD1-0-C-172-53-00035

MD1-0-C-172-53-00036

MD1-0-C-172-53-00040

MD1-0-C-172-53-00041

MD1-0-C-172-53-00042

MD1-0-C-172-53-00043

MD1-0-C-172-53-00044

MD1-0-C-172-53-00045

MD1-0-C-173-01-00010

MD1-0-C-173-01-00011

MD1-0-C-173-01-00012

MD1-0-C-173-01-00013

MD1-0-C-173-01-00142

MD1-0-C-173-01-00143

MD1-0-C-173-01-00182

MD1-0-C-173-01-00183

MD1-0-C-173-01-00184

MD1-0-C-173-01-00185

MD1-0-C-173-01-00186

MD1-0-C-173-01-00187

MD1-0-C-173-01-00188

MD1-0-C-173-01-00189

MD1-0-C-173-01-00190

MD1-0-C-173-01-00191

MD1-0-C-173-01-00192

MD1-0-C-173-01-00193

MD1-0-C-173-01-00197

MD1-0-C-173-01-00198

MD1-0-C-173-06-00010

MD1-0-C-173-06-00011

MD1-0-C-173-06-00012

MD1-0-C-173-06-00013

MD1-0-C-173-06-00040

MD1-0-C-173-06-00050

MD1-0-C-173-11-00020

MD1-0-C-173-11-00021

MD1-0-C-173-11-00022

MD1-0-C-173-11-00023

MD1-0-C-173-11-00024

MD1-0-C-173-11-00025

MD1-0-C-173-11-00026

MD1-0-C-173-11-00027

MD1-0-C-173-11-00028

MD1-0-C-173-11-00029

MD1-0-C-173-11-00030

MD1-0-C-173-11-00031

MD1-0-C-173-11-00032

MD1-0-C-173-11-00033

MD1-0-C-173-11-00140

MD1-0-C-173-11-00141

MD1-0-C-173-53-00180

MD1-0-C-173-53-00181

MD1-0-C-173-53-00182

MD1-0-C-180-01-00010

MD1-0-C-180-01-00020

MD1-0-C-180-01-00021

MD1-0-C-180-01-00030

MD1-0-C-180-01-00031

MD1-0-C-180-01-00032

MD1-0-C-180-06-00010

MD1-0-C-180-11-00010

MD1-0-C-180-11-00011

MD1-0-C-180-11-00012

MD1-0-C-180-11-00013

MD1-0-C-181-01-00011

MD1-0-C-181-01-00012

MD1-0-C-181-01-00014

MD1-0-C-181-01-00016

MD1-0-C-184-01-00010

MD1-0-C-184-06-00010

MD1-0-C-184-53-00010

MD1-0-C-184-53-00011

MD1-0-C-185-01-00030

MD1-0-C-185-01-00031

MD1-0-C-185-01-00080

MD1-0-C-185-06-00010

MD1-0-C-185-11-00030

MD1-0-C-185-11-00080

MD1-0-C-186-01-00010

MD1-0-C-186-01-00011

MD1-0-C-186-01-00012

MD1-0-C-186-01-00013

MD1-0-C-186-01-00020

MD1-0-C-186-01-00021

MD1-0-C-186-01-00022

MD1-0-C-186-01-00023

MD1-0-C-186-01-00030

MD1-0-C-186-01-00031

MD1-0-C-186-01-00032

MD1-0-C-186-01-00033

MD1-0-C-186-01-00080

MD1-0-C-186-01-00090

MD1-0-C-186-01-00091

MD1-0-C-186-01-00092

MD1-0-C-186-01-00093

MD1-0-C-186-01-00100

MD1-0-C-186-01-00120

MD1-0-C-186-01-00121

MD1-0-C-186-01-00122

MD1-0-C-186-01-00132

MD1-0-C-186-01-00140

MD1-0-C-186-01-00141

MD1-0-C-186-01-00142

MD1-0-C-186-01-00143

MD1-0-C-186-01-00144

MD1-0-C-186-01-00145

MD1-0-C-186-01-00146

MD1-0-C-186-01-00147

MD1-0-C-186-01-00148

MD1-0-C-186-06-00010

MD1-0-C-186-06-00011

MD1-0-C-186-06-00012

MD1-0-C-186-06-00013

MD1-0-C-186-06-00014

MD1-0-C-186-06-00017

MD1-0-C-186-06-00018

MD1-0-C-186-06-00019

MD1-0-C-186-06-00021

MD1-0-C-186-06-00023

MD1-0-C-186-06-00024

MD1-0-C-186-12-00030

MD1-0-C-186-53-00010

MD1-0-C-186-53-00011

MD1-0-C-186-53-00020

MD1-0-C-186-53-00040

MD1-0-C-186-53-00050

MD1-0-C-186-53-00100

MD1-0-C-186-53-00140

MD1-0-C-300-01-00100

MD1-0-C-300-01-00110

MD1-0-C-300-01-00111

MD1-0-C-300-01-00112

MD1-0-C-300-01-00150

MD1-0-C-300-01-00200

MD1-0-C-300-01-00201

MD1-0-C-300-02-00010

MD1-0-C-300-02-00011

MD1-0-C-300-02-00015

MD1-0-C-300-02-00016

MD1-0-C-300-02-00017

MD1-0-C-300-02-00018

MD1-0-C-300-04-00010

MD1-0-C-300-06-00010

MD1-0-C-300-11-00121

MD1-0-C-340-01-00020

MD1-0-C-340-01-00100

MD1-0-C-340-01-00101

MD1-0-C-340-01-00102

MD1-0-C-340-01-00110

MD1-0-C-340-01-00200

MD1-0-C-340-06-00010

MD1-0-C-340-11-00010

MD1-0-C-350-01-00150

MD1-0-C-350-01-00151

MD1-0-C-350-01-00200

MD1-0-C-350-06-00001

MD1-0-C-350-06-00010

MD1-0-C-350-11-00010

MD1-0-C-350-11-00011

MD1-0-C-350-11-00020

MD1-0-C-350-11-00021

MD1-0-C-350-11-00022

MD1-0-C-350-11-00030

MD1-0-C-350-11-00031

MD1-0-C-370-01-00050

MD1-0-C-370-01-00051

MD1-0-C-370-01-00052

MD1-0-C-370-01-00053

MD1-0-C-370-01-00054

MD1-0-C-370-01-00055

MD1-0-C-370-01-00056

MD1-0-C-370-01-00057

MD1-0-C-370-01-00070

MD1-0-C-370-01-00100

MD1-0-C-370-01-00101

MD1-0-C-370-01-00102

MD1-0-C-370-01-00107

MD1-0-C-370-01-00108

MD1-0-C-370-01-00109

MD1-0-C-370-01-00130

MD1-0-C-370-01-00131

MD1-0-C-370-01-00132

MD1-0-C-370-01-00150

MD1-0-C-370-01-00151

MD1-0-C-370-01-00170

MD1-0-C-370-01-00171

MD1-0-C-370-01-00200

MD1-0-C-370-01-00205

MD1-0-C-370-01-00206

MD1-0-C-370-06-00030

MD1-0-C-370-06-00040

MD1-0-C-370-06-00061

MD1-0-C-370-06-00070

MD1-0-C-370-06-00080

MD1-0-C-370-06-00130

MD1-0-C-370-11-00050

MD1-0-C-370-11-00051

MD1-0-C-370-11-00052

MD1-0-C-370-11-00053

MD1-0-C-370-11-00054

MD1-0-C-370-11-00055

MD1-0-C-370-53-00050

MD1-0-C-370-53-00051

MD1-0-C-370-53-00052

MD1-0-C-370-53-00053

MD1-0-C-370-53-00054

MD1-0-C-370-53-00055

MD1-0-C-370-53-00056

MD1-0-C-370-53-00057

MD1-0-C-370-53-00058

MD1-0-C-370-53-00059

MD1-0-C-370-53-00060

MD1-0-C-370-53-00061

MD1-0-C-370-53-00062

MD1-0-C-370-53-00063

MD1-0-C-370-53-00064

MD1-0-C-370-53-00065

MD1-0-C-370-53-00100

MD1-0-C-370-53-00101

MD1-0-C-370-53-00102

MD1-0-C-370-53-00103

MD1-0-C-370-53-00104

MD1-0-C-370-53-00105

MD1-0-C-370-53-00106

MD1-0-C-370-53-00107

MD1-0-C-370-53-00108

MD1-0-C-370-53-00109

MD1-0-C-370-53-00130

MD1-0-C-370-53-00131

MD1-0-C-370-53-00150

MD1-0-C-370-53-00151

MD1-0-C-370-53-00200

MD1-0-C-370-53-00201

MD1-0-C-370-53-00202

MD1-0-C-370-53-00203

MD1-0-C-370-53-00204

MD1-0-C-370-53-00205

MD1-0-C-370-53-00207

MD1-0-C-370-56-00150

MD1-0-C-370-56-00151

MD1-0-C-370-56-00152

MD1-0-C-370-56-00153

MD1-0-C-370-56-00154

MD1-0-C-370-56-00155

MD1-0-C-370-56-00156

MD1-0-C-370-56-00200

MD1-0-C-370-56-00250

MD1-0-C-370-56-00251

MD1-0-C-370-56-00252

MD1-0-C-370-56-00253

MD1-0-C-370-56-00254

MD1-0-C-370-56-00255

MD1-0-C-370-56-00256

MD1-0-C-370-56-00257

MD1-0-C-370-56-00258

MD1-0-C-370-56-00259

MD1-0-C-370-56-00260

MD1-0-C-370-56-00261

MD1-0-C-505-01-00010

MD1-0-C-505-01-00011

MD1-0-C-505-01-00012

MD1-0-C-505-01-00013

MD1-0-C-505-01-00020

MD1-0-C-505-01-00021

MD1-0-C-505-06-00010

MD1-0-C-505-11-00010

MD1-0-C-505-11-00011

MD1-0-C-505-11-00012

MD1-0-C-505-11-00013

MD1-0-C-505-11-00020

MD1-0-C-505-11-00021

MD1-0-C-505-53-00010

MD1-0-C-505-53-00011

MD1-0-C-505-53-00012

MD1-0-C-505-53-00013

MD1-0-C-505-53-00014

MD1-0-C-505-53-00020

MD1-0-C-505-53-00021

MD1-0-C-505-53-00022

MD1-0-C-505-53-00023

MD1-0-C-505-53-00024

MD1-0-C-505-53-00030

MD1-0-C-505-53-00031

MD1-0-C-560-11-00010

MD1-0-C-570-01-00010

MD1-0-C-570-01-00019

MD1-0-C-570-01-00020

MD1-0-C-570-01-00021

MD1-0-C-570-01-00022

MD1-0-C-570-01-00060

MD1-0-C-570-01-00061

MD1-0-C-570-01-00062

MD1-0-C-570-01-00063

MD1-0-C-570-01-00064

MD1-0-C-570-01-00065

MD1-0-C-570-01-00066

MD1-0-C-570-01-00067

MD1-0-C-570-01-00068

MD1-0-C-570-01-00069

MD1-0-C-570-01-00070

MD1-0-C-570-01-00071

MD1-0-C-570-01-00072

MD1-0-C-570-01-00080

MD1-0-C-570-01-00081

MD1-0-C-570-01-00100

MD1-0-C-570-01-00150

MD1-0-C-570-01-00200

MD1-0-C-570-01-00250

MD1-0-C-570-01-00251

MD1-0-C-570-01-00252

MD1-0-C-570-01-00253

MD1-0-C-570-01-00254

MD1-0-C-570-01-00255

MD1-0-C-570-06-00010

MD1-0-C-570-06-00011

MD1-0-C-570-06-00020

MD1-0-C-570-11-00010

MD1-0-C-570-11-00020

MD1-0-C-570-53-00010

MD1-0-C-570-53-00011

MD1-0-C-570-53-00012

MD1-0-C-570-53-00013

MD1-0-C-570-53-00015

MD1-0-C-570-53-00016

MD1-0-C-570-53-00017

MD1-0-C-570-53-00018

MD1-0-C-570-53-00019

MD1-0-C-570-53-00020

MD1-0-C-570-53-00021

MD1-0-C-570-53-00022

MD1-0-C-570-53-00030

MD1-0-C-570-53-00100

MD1-0-C-570-53-00101

MD1-0-C-591-01-00030

MD1-0-C-591-01-00031

MD1-0-C-591-01-00032

MD1-0-C-591-01-00033

MD1-0-C-591-01-00034

MD1-0-C-591-01-00035

MD1-0-C-591-01-00036

MD1-0-C-591-01-00037

MD1-0-C-591-01-00100

MD1-0-C-591-01-00200

MD1-0-C-591-06-00030

MD1-0-C-591-06-00100

MD1-0-C-591-06-00200

MD1-0-C-591-11-00012

MD1-0-C-591-11-00070

MD1-0-C-591-11-00071

MD1-0-C-591-11-00100

MD1-0-C-591-11-00200

MD1-0-C-840-01-00010

MD1-0-C-840-01-00011

MD1-0-C-840-01-00012

MD1-0-C-840-06-00020

MD1-0-C-840-06-00030

MD1-0-C-840-06-00100

MD1-0-C-840-11-00020

MD1-0-C-840-11-00021

MD1-0-C-840-11-00022

MD1-0-C-840-11-00051

MD1-0-C-840-11-00052

MD1-0-C-840-11-00053

MD1-0-C-840-11-00054

MD1-0-C-840-11-00250

MD1-0-C-840-11-00251

MD1-0-C-840-11-00260

MD1-0-C-840-11-00270

MD1-0-C-840-11-00271

MD1-0-C-840-11-00272

MD1-0-C-840-11-00280

MD1-0-C-840-11-00281

MD1-0-C-840-11-00282

MD1-0-C-840-11-00283

MD1-0-C-840-11-00284

MD1-0-C-840-11-00285

MD1-0-C-840-11-00290

MD1-0-C-840-11-00300

MD1-0-C-840-11-00301

MD1-0-C-840-11-00302

MD1-0-C-840-11-00310

MD1-0-C-840-11-00311

MD1-0-C-840-11-00320

MD1-0-C-840-53-00250

MD1-0-C-840-53-00260

MD1-0-C-840-53-00270

MD1-0-C-840-53-00271

MD1-0-C-840-53-00272

MD1-0-C-840-53-00280

MD1-0-C-840-53-00282

MD1-0-C-840-53-00283

MD1-0-C-840-53-00284

MD1-0-C-840-53-00285

MD1-0-C-840-53-00290

MD1-0-C-840-53-00300

MD1-0-C-840-53-00301

MD1-0-C-840-53-00302

MD1-0-C-840-53-00310

MD1-0-C-840-53-00311

MD1-0-C-840-53-00320

MD1-0-C-870-01-00050

MD1-0-C-870-06-00050

MD1-0-C-870-53-00050

MD1-0-D-215-01-00201

MD1-0-D-215-01-00202

MD1-0-D-215-01-00301

MD1-0-D-215-01-00302

MD1-0-P-010-01-00002

MD1-0-T-030-01-00045

MD1-0-T-030-01-00046

MD1-0-T-030-05-00027

MD1-0-T-030-05-00047

MD1-0-T-030-05-00191

MD1-0-T-030-05-00192

MD1-0-T-030-05-00343

MD1-0-T-030-05-00348

MD1-0-T-030-05-00368

MD1-0-T-030-07-00045

MD1-0-T-040-07-00031

MD1-0-T-040-07-00032

MD1-0-T-040-07-00033

MD1-0-T-040-07-00034

MD1-0-T-040-07-00035

MD1-0-T-040-07-00036

MD1-0-T-040-07-00042

MD1-0-T-040-07-00055

MD1-0-T-040-07-00057

MD1-0-T-040-07-00079

MD1-0-T-040-07-00116

MD1-0-T-040-07-00117

MD1-0-T-040-07-00137

MD1-0-T-050-01-00048

MD1-0-T-050-05-00026

MD1-0-T-050-05-015

MD1-0-T-050-05-016

MD1-0-T-051-04-00067

MD1-0-T-051-04-00155

MD1-0-T-051-04-00363

MD1-0-T-051-05-00050

MD1-0-T-051-05-00058

MD1-0-T-051-05-00063

MD1-0-T-051-05-00065

MD1-0-T-051-05-00077

MD1-0-T-051-05-00109

MD1-0-T-051-05-00123

MD1-0-T-051-05-00222

MD1-0-T-051-06-00125

MD1-0-T-051-07-00151

MD1-0-T-051-07-00232

MD1-0-T-051-07-00233

MD1-0-T-051-07-00234

MD1-0-T-051-07-00238

MD1-0-T-051-07-00245

MD1-0-T-051-07-00254

MD1-0-T-051-07-00255

MD1-0-T-051-07-00258

MD1-0-T-051-07-00268

MD1-0-T-051-07-00269

MD1-0-T-051-07-00278

MD1-0-T-051-07-00286

MD1-0-T-051-07-00291

MD1-0-T-051-07-00292

MD1-0-T-051-07-00320

MD1-0-T-051-07-00321

MD1-0-T-051-07-00329

MD1-0-T-051-07-00330

MD1-0-T-051-07-00331

MD1-0-T-051-07-00332

MD1-0-T-051-07-00333

MD1-0-T-051-07-00334

MD1-0-T-051-07-00337

MD1-0-T-051-07-00338

MD1-0-T-051-07-00339

MD1-0-T-051-07-00341

MD1-0-T-051-07-00345

MD1-0-T-051-07-00351

MD1-0-T-051-07-00353

MD1-0-T-051-07-00355

MD1-0-T-051-07-00356

MD1-0-T-051-07-00358

MD1-0-T-051-07-00359

MD1-0-T-051-07-00376

MD1-0-T-051-07-00377

MD1-0-T-051-07-00378

MD1-0-T-051-07-00379

MD1-0-T-051-07-00380

MD1-0-T-051-07-00381

MD1-0-T-051-07-00383

MD1-0-T-051-07-00384

MD1-0-T-051-07-00385

MD1-0-T-051-07-00386

MD1-0-T-051-07-00391

MD1-0-T-051-07-00395

MD1-0-T-051-07-00396

MD1-0-T-051-07-00402

MD1-0-T-051-07-00403

MD1-0-T-051-07-00407

MD1-0-T-051-07-00413

MD1-0-T-051-07-00414

MD1-0-T-051-07-00416

MD1-0-T-051-07-00417

MD1-0-T-051-07-00419

MD1-0-T-051-07-00420

MD1-0-T-051-07-00421

MD1-0-T-051-07-00422

MD1-0-T-051-07-00425

MD1-0-T-051-07-00430

MD1-0-T-051-07-00431

MD1-0-T-051-07-00433

MD1-0-T-051-07-00435

MD1-0-T-051-07-00436

MD1-0-T-051-07-00437

MD1-0-T-051-07-00438

MD1-0-T-051-07-00439

MD1-0-T-051-07-00440

MD1-0-T-051-07-00441

MD1-0-T-051-07-00443

MD1-0-T-051-07-00444

MD1-0-T-051-07-00446

MD1-0-T-051-07-00447

MD1-0-T-051-07-00454

MD1-0-T-051-07-00456

MD1-0-T-051-07-00459

MD1-0-T-051-07-00462

MD1-0-T-051-07-00463

MD1-0-T-051-07-00467

MD1-0-T-051-07-00469

MD1-0-T-051-07-00470

MD1-0-T-051-07-00471

MD1-0-T-051-07-00472

MD1-0-T-051-07-00473

MD1-0-T-051-07-00474

MD1-0-T-051-07-00477

MD1-0-T-051-11-00039

MD1-0-T-051-11-00061

MD1-0-T-052-05-00054

MD1-0-T-052-05-00066

MD1-0-T-052-05-00075

MD1-0-T-052-05-00078

MD1-0-T-052-05-00108

MD1-0-T-052-05-00112

MD1-0-T-052-05-00114

MD1-0-T-052-05-00135

MD1-0-T-052-05-00138

MD1-0-T-052-05-00157

MD1-0-T-052-05-00159

MD1-0-T-052-05-00161

MD1-0-T-052-05-00163

MD1-0-T-052-05-00280

MD1-0-T-052-05-00366

MD1-0-T-052-05-00367

MD1-0-T-052-05-00468

MD1-0-T-052-07-00064

MD1-0-T-052-07-00080

MD1-0-T-052-07-00081

MD1-0-T-052-07-00127

MD1-0-T-052-07-00128

MD1-0-T-052-07-00129

MD1-0-T-052-07-00134

MD1-0-T-052-07-00139

MD1-0-T-052-07-00140

MD1-0-T-052-07-00141

MD1-0-T-052-07-00142

MD1-0-T-052-07-00154

MD1-0-T-052-07-00160

MD1-0-T-052-07-00162

MD1-0-T-052-07-00245

MD1-0-T-052-07-00276

MD1-0-T-052-07-00283

MD1-0-T-052-07-00287

MD1-0-T-052-07-00288

MD1-0-T-052-07-00290

MD1-0-T-052-07-00294

MD1-0-T-052-07-00296

MD1-0-T-052-07-00297

MD1-0-T-052-07-00298

MD1-0-T-052-07-00349

MD1-0-T-052-07-00373

MD1-0-T-052-07-00374

MD1-0-T-052-07-00388

MD1-0-T-052-07-00389

MD1-0-T-052-07-00393

MD1-0-T-052-07-00398

MD1-0-T-052-07-00475

MD1-0-T-053-05-00145

MD1-0-T-053-05-00148

MD1-0-T-053-05-00250

MD1-0-T-053-05-00251

MD1-0-T-053-05-00259

MD1-0-T-053-05-00260

MD1-0-T-053-05-00262

MD1-0-T-053-05-00263

MD1-0-T-053-05-00264

MD1-0-T-053-05-00362

MD1-0-T-053-07-00240

MD1-0-T-053-07-00252

MD1-0-T-053-07-00266

MD1-0-T-053-07-00279

MD1-0-T-053-07-00315

MD1-0-T-053-07-00347

MD1-0-T-053-07-00357

MD1-0-T-053-07-00387

MD1-0-T-054-05-00082

MD1-0-T-054-07-00400

MD1-0-T-054-07-00401

MD1-0-T-054-07-00432

MD1-0-T-054-07-00466

MD1-0-T-055-05-00346

MD1-0-T-057-07-00152

MD1-0-T-057-08-00316

MD1-0-T-070-07-00018

MD1-0-T-070-07-00024

MD1-0-T-070-07-00025

MD1-0-T-070-07-00029

MD1-0-T-070-07-00059

MD1-0-T-070-07-00060

MD1-0-T-300-04-00010

MD1-0-T-370-56-00100

MD1-0-T-370-56-00101

MD1-0-T-370-56-00103

MD1-0-T-370-56-00104

MD1-0-T-370-56-00106

MD1-0-T-370-56-00107

MD1-0-T-370-56-00108

MD1-0-T-370-56-00109

MD1-0-T-370-56-00110

MD1-0-T-370-56-00111

MD1-0-T-370-56-00112

MD1-0-T-370-56-00113

MD1-0-T-370-56-00114

MD1-0-T-370-56-00200

MD1-0-T-370-56-00201

MD1-0-T-370-56-00202

MD1-0-T-370-56-00203

MD1-0-T-370-56-00204

MD1-0-T-370-56-00205

MD1-0-T-370-56-00206

MD1-0-T-370-56-00219

MD1-0-T-370-56-00220

MD1-0-T-370-56-00221

MD1-0-T-370-56-00222

MD1-0-T-370-56-00225

MD1-0-T-370-56-00226

MD1-0-T-370-56-00227

MD1-0-T-370-56-00228

MD1-0-T-370-56-00229

MD1-0-T-370-56-00230

MD1-0-T-370-56-00231

MD1-0-T-370-56-00232

MD1-0-T-370-56-00233

MD1-0-T-370-56-00234

MD1-0-T-370-56-00235

MD1-0-T-370-56-00236

MD1-0-T-370-56-00237

MD1-0-T-370-56-00238

MD1-0-T-370-56-00239

MD1-0-T-370-56-00240

MD1-0-T-370-56-00301

MD1-0-T-370-56-00302

MD1-0-T-370-56-00303

MD1-0-T-370-56-00304

MD1-0-T-370-56-00305

MD1-0-T-370-56-00306

MD1-0-T-370-56-00307

MD1-0-T-370-56-00308

MD1-0-T-370-56-00309

MD1-0-T-370-56-00310

MD1-0-T-370-56-00311

MD1-0-T-370-56-00312

MD1-0-T-370-56-00313

MD1-0-T-370-56-00404

MD1-0-T-370-56-00405

MD1-0-T-470-01-10001

MD1-0-T-470-01-10002

MD1-0-T-470-01-10003

MD1-0-T-470-01-10004

MD1-0-T-470-01-10005

MD1-0-T-470-01-10006

MD1-0-T-470-01-10007

MD1-0-T-470-01-10008

MD1-0-T-470-01-20001

MD1-0-T-470-01-20002

MD1-0-T-470-01-20003

MD1-0-T-470-01-20004

MD1-0-T-470-01-20005

MD1-0-T-470-01-20006

MD1-0-T-470-04-00001

MD1-0-T-470-53-10001

MD1-0-T-470-53-10002

MD1-0-T-470-53-10003

MD1-0-T-470-53-10004

MD1-0-T-470-53-10005

MD1-0-T-470-53-10006

MD1-0-T-470-53-20001

MD1-0-T-470-53-20002

MD1-0-T-470-53-20003

MD1-0-T-470-53-20004

MD1-0-T-470-53-20005

MD1-0-T-470-53-20006

MD1-0-T-470-53-20007

MD1-0-T-470-53-20008

MD1-0-T-470-53-20009

MD1-0-T-470-53-20010

MD1-0-T-470-53-20011

MD1-0-T-470-53-20012

MD1-0-T-470-53-20013

MD1-0-T-470-53-20014

MD1-0-T-470-53-20015

MD1-0-T-470-53-20016

MD1-0-T-470-53-20017

MD1-0-T-470-53-20018

MD1-0-T-470-53-20019

MD1-0-T-470-53-20020

MD1-0-T-470-53-20021

MD1-0-T-470-53-20022

MD1-0-T-470-53-20023

MD1-0-T-470-55-00001

MD1-0-V-114-06-00005

MD1-0-V-114-09-00005

MD1-0-V-115-09-00002

MD1-0-V-121-52-00001

MD1-0-V-133-11-00002

MD1-0-V-151-10-00002

MD1-0-V-151-10-00003

MD1-0-V-151-10-00004

MD1-0-V-161-01-01005

MD1-0-V-161-01-04101

MD1-0-V-161-01-32531

MD1-0-V-161-01-32532

MD1-0-V-161-01-32541

MD1-0-V-161-01-32542

MD1-0-V-161-06-01107

MD1-0-V-161-09-14611

MD1-0-V-161-09-16125

MD1-0-V-161-09-16131

MD1-0-V-161-09-16133

MD1-0-V-161-09-16134

MD1-0-V-161-09-16135

MD1-0-V-161-09-16141

MD1-0-V-161-09-16142

MD1-0-V-161-09-16161

MD1-0-V-161-10-14340

MD1-0-V-161-12-00003

MD1-0-V-161-12-00004

MD1-0-V-161-12-00005

MD1-0-V-161-54-01100

MD1-0-V-161-54-01101

MD1-0-V-161-54-01102

MD1-0-V-161-54-01103

MD1-0-V-161-54-01104

MD1-0-V-161-54-01105

MD1-0-V-161-54-01106

MD1-0-V-161-54-01107

MD1-0-V-161-54-01110

MD1-0-V-161-54-01111

MD1-0-V-161-54-01112

MD1-0-V-161-54-01113

MD1-0-V-161-54-01114

MD1-0-V-161-54-01115

MD1-0-V-161-54-01120

MD1-0-V-161-54-01121

MD1-0-V-161-54-01122

MD1-0-V-161-54-01123

MD1-0-V-161-54-01130

MD1-0-V-161-54-01131

MD1-0-V-161-54-01132

MD1-0-V-161-54-01133

MD1-0-V-161-54-01134

MD1-0-V-161-54-01135

MD1-0-V-161-54-01140

MD1-0-V-161-54-01141

MD1-0-V-161-54-01142

MD1-0-V-161-54-01143

MD1-0-V-161-54-01144

MD1-0-V-161-54-01145

MD1-0-V-161-54-01146

MD1-0-V-161-54-01147

MD1-0-V-161-54-01148

MD1-0-V-161-54-01149

MD1-0-V-161-54-01150

MD1-0-V-161-54-01160

MD1-0-V-161-54-01161

MD1-0-V-161-54-01162

MD1-0-V-161-54-01200

MD1-0-V-161-54-01201

MD1-0-V-161-54-01202

MD1-0-V-161-54-01203

MD1-0-V-161-54-01204

MD1-0-V-161-54-01205

MD1-0-V-161-54-01206

MD1-0-V-161-54-01207

MD1-0-V-161-54-01208

MD1-0-V-161-54-01209

MD1-0-V-161-54-01210

MD1-0-V-161-54-01211

MD1-0-V-161-54-01212

MD1-0-V-161-54-01213

MD1-0-V-161-54-01214

MD1-0-V-161-54-01216

MD1-0-V-161-54-01217

MD1-0-V-161-54-01218

MD1-0-V-161-54-01219

MD1-0-V-161-54-01220

MD1-0-V-161-54-01300

MD1-0-V-161-54-01301

MD1-0-V-161-54-01302

MD1-0-V-161-54-01303

MD1-0-V-161-54-01304

MD1-0-V-161-54-01305

MD1-0-V-161-54-01306

MD1-0-V-161-54-01309

MD1-0-V-161-54-01310

MD1-0-V-161-54-01311

MD1-0-V-161-54-01312

MD1-0-V-161-54-01313

MD1-0-V-161-54-01315

MD1-0-V-161-54-11103

MD1-0-V-161-56-36501

MD1-0-V-162-06-00006

MD1-0-V-162-06-00007

MD1-0-V-162-55-00001

MD1-0-V-162-55-00002

MD1-0-V-163-06-00001

MD1-0-V-171-01-00032

MD1-0-V-171-01-00033

MD1-0-V-171-01-00034

MD1-0-V-171-01-00035

MD1-0-V-171-01-00036

MD1-0-V-171-01-00037

MD1-0-V-171-01-00080

MD1-0-V-171-01-01004

MD1-0-V-171-01-01017

MD1-0-V-171-01-01027

MD1-0-V-171-01-01028

MD1-0-V-171-51-02111

MD1-0-V-171-55-01017

MD1-0-V-171-55-01022

MD1-0-V-171-55-01023

MD1-0-V-171-55-01024

MD1-0-V-171-55-01025

MD1-0-V-171-55-01027

MD1-0-V-171-55-01028

MD1-0-V-172-01-00087

MD1-0-V-172-01-01002

MD1-0-V-172-01-01016

MD1-0-V-172-01-01017

MD1-0-V-172-55-01011

MD1-0-V-172-55-01013

MD1-0-V-172-55-01014

MD1-0-V-172-55-01016

MD1-0-V-172-55-01017

MD1-0-V-173-54-00801

MD1-0-V-173-54-00802

MD1-0-V-173-54-00803

MD1-0-V-173-54-00812

MD1-0-V-173-54-00813

MD1-0-V-173-54-00873

MD1-0-V-173-54-00874

MD1-0-V-173-54-00875

MD1-0-V-173-54-00877

MD1-0-V-173-54-00878

MD1-0-V-173-54-00879

MD1-0-V-173-54-00880

MD1-0-V-173-54-00881

MD1-0-V-173-54-00882

MD1-0-V-173-54-00883

MD1-0-V-173-54-00884

MD1-0-V-173-54-00885

MD1-0-V-173-55-00901

MD1-0-V-173-55-00902

MD1-0-V-173-55-00905

MD1-0-V-173-55-00906

MD1-0-V-173-55-00907

MD1-0-V-173-55-00908

MD1-0-V-181-01-00001

MD1-0-V-181-06-00012

MD1-0-V-181-06-00013

MD1-0-V-181-06-00014

MD1-0-V-181-06-00015

MD1-0-V-181-06-00016

MD1-0-V-181-06-00017

MD1-0-V-181-06-00018

MD1-0-V-181-06-00019

MD1-0-V-181-11-00001

MD1-0-V-181-11-00002

MD1-0-V-181-11-00003

MD1-0-V-181-11-00004

MD1-0-V-181-11-00005

MD1-0-V-181-11-00006

MD1-0-V-181-11-00007

MD1-0-V-181-11-00008

MD1-0-V-181-11-00009

MD1-0-V-181-11-00010

MD1-0-V-182-01-10002

MD1-0-V-182-06-05001

MD1-0-V-218-54-00002

MD1-0-V-218-54-00003

MD1-0-V-218-54-00005

MD1-0-V-218-54-00006

MD1-0-V-218-54-00007

MD1-0-V-219-54-00001

MD1-0-V-219-54-00002

MD1-0-V-219-54-00003

MD1-0-V-219-54-00004

MD1-0-V-219-54-00005

MD1-0-V-219-54-00006

MD1-0-V-219-54-00007

MD1-0-V-219-54-00008

MD1-0-V-360-01-00001

MD1-0-V-360-04-00700

MD1-0-V-360-05-00810

MD1-0-V-360-05-00820

MD1-0-V-360-05-00840

MD1-0-V-360-05-00860

MD1-0-V-360-07-00705

MD1-0-V-360-07-00706

MD1-0-V-360-07-00710

MD1-0-V-360-07-00741

MD1-0-V-360-07-00750

MD1-0-V-360-08-00900

MD1-0-V-360-08-00910

MD1-0-V-360-08-00920

MD1-0-V-360-08-00921

MD1-0-V-360-08-00940

MD1-0-V-360-08-00941

MD1-0-V-360-08-00960

MD1-0-V-360-10-00250

MD1-0-V-360-10-00300

MD1-0-V-360-10-00310

MD1-0-V-360-12-00105

MD1-0-V-360-51-00355

MD1-0-V-360-51-00610

MD1-0-V-360-52-00100

MD1-0-V-360-52-00101

MD1-0-V-360-53-00102

MD1-0-V-360-53-00104

MD1-0-V-360-53-00111

MD1-0-V-360-53-00116

MD1-0-V-360-54-00251

MD1-0-V-360-54-00255

MD1-0-V-360-54-00259

MD1-0-V-360-54-00301

MD1-0-V-360-54-00403

MD1-0-V-360-54-00420

MD1-0-V-360-54-00421

MD1-0-V-360-57-00430

MD1-0-V-505-02-00002

MD1-0-V-505-02-00102

MD1-0-V-505-02-00202

MD1-0-V-505-07-00001

MD1-0-V-505-07-00101

MD1-0-V-505-07-00201

MD1-0-V-515-10-20001

MD1-0-V-515-10-20002

MD1-0-V-570-05-00033

MD1-0-V-570-05-00034

MD1-0-V-570-05-00035

MD1-0-V-570-05-00036

MD1-0-V-570-06-00001

MD1-0-V-570-11-00001

MD1-0-V-805-01-00010

MD1-0-V-805-08-00008

MD1-0-V-805-11-06001

MD1-0-V-805-11-06101

MD1-1-V-161-11-00001

MD1-1-V-161-11-00009

MD1-1-V-161-12-00001

MD1-1-V-161-54-11110

MD1-1-V-161-54-21110

MD1-1-V-161-54-41110

status
Architectural Details/ Abbreviation, Legend & symbols

NIGEL

01/06/12

Architectural Details/ Floor & Wall Junction Details

NIGEL

01/06/12

Architectural Details/ Ceiling & Wall Junction Details

NIGEL

01/06/12

Architectural Details/ Roof Details-1

AC

NIGEL

02/10/12

Architectural Details/ Roof Details-2

AC

NIGEL

02/10/12

Architectural Details/ Wall & Roof Penetration Details

AC

NIGEL

02/10/12

Architectural Details/ Block Wall Details

AC

NIGEL

02/10/12

Architectural Details/ Stair & Handrail Details

AC

NIGEL

02/10/12

Architectural Details/ Door Head Details

NIGEL

01/06/12

Architectural Details/ Door Jamb Details

NIGEL

01/06/12

Architectural Details/ Door Sill Details

NIGEL

01/06/12

Architectural Details/ Window Details

NIGEL

02/10/12

Architectural Details/ General Notes (R.C)

AC

NIGEL

10/08/12

Architectural Details/ Re-bar Details-1

NIGEL

01/06/12

Architectural Details/ Re-bar Details-2

NIGEL

02/10/12

Architectural Details/ Concrete Structure Joint Details

AC

NIGEL

02/10/12

Architectural Details/ P.C Concrete CHK'DPL & Grating Cover Details

AC

NIGEL

02/10/12

Architectural Details/ General Notes Steel

NIGEL

01/06/12

Architectural Details/ Steel Stair Details

NIGEL

02/10/12

Architectural Details/ Steel Handrail Details

AC

NIGEL

02/10/12

Architectural Details/ Steel Ladder Details

AC

NIGEL

02/10/12

Architectural Details/ Steel Connection Details-1

AC

NIGEL

02/10/12

Architectural Details/ Steel Connection Details-2

AC

NIGEL

02/10/12

Architectural Details/ Steel Connection Details-3

AC

NIGEL

02/10/12

Architectural Details/ Steel Connection Details-4

AC

NIGEL

02/10/12

Design Calculation for Steel Connection

AC

NIGEL

02/10/12

Design Calculation for Miscelleneous Steel and Connection Details

AC

NIGEL

02/10/12

Design Calculation for Miscelleneous Concrete and Masonry Details

AC

NIGEL

02/10/12

Exterior Color Schedule for Overall View

MARK

11/10/12

Turbine Building/ Ground Floor Plan

AC

NIGEL

07/02/13

Turbine Building/ Mezzanine Floor Plan

NIGEL

07/02/13

Turbine Building/ Operating Floor Plan

NIGEL

07/02/13

Turbine Building/ Lower Roof & Crane Runway Plan

NIGEL

07/02/13

Turbine Building/ Higher Roof Plan

NIGEL

07/02/13

Turbine Building/ South Elevation

NIGEL

07/02/13

Turbine Building/ North Elevation

NIGEL

07/02/13

Turbine Building/ East & West Elevation

NIGEL

07/02/13

Turbine Building/ Main Section 1 & 2

AC

NIGEL

07/02/13

Turbine Building/ Main Section 3

AC

NIGEL

07/02/13

Turbine Building/ Interior Finish Schedule

NIGEL

07/02/13

Turbine Building/ Door & Window Schedule

IC

NIGEL

07/02/13

Turbine Building/ Pile & Foundation Plan-1

NIGEL

29/11/12

Turbine Building/ Pile & Foundation Plan-2

NIGEL

27/12/12

Turbine Building/ C.E.P & C.W.P PIT Framing Plan

AC

NIGEL

16/07/13

Turbine Building/ C.E.P & C.W.P PIT Details-1

AC

NIGEL

16/07/13

Turbine Building/ C.E.P & C.W.P PIT Details-2

AC

NIGEL

16/07/13

Turbine Building/ Ground Floor Framing Plan-1

NIGEL

12/12/12

Turbine Building/ Ground Floor Framing Plan-2

NIGEL

12/12/12

Turbine Building / Mezzanine Floor Framing Plan-1

NIGEL

16/07/13

Turbine Building / Mezzanine Floor Framing Plan-2

NIGEL

16/07/13

Turbine Building / Mezzanine Floor Framing Plan-3

NIGEL

16/07/13

Turbine Building / Operating Floor Framing Plan-1

NIGEL

16/07/13

Turbine Building / Operating Floor Framing Plan-2

NIGEL

16/07/13

Turbine Building / Operating Floor Framing Plan-3

NIGEL

16/07/13

Turbine Building / Heater Floor Framing Plan-1

AC

NIGEL

16/07/13

Turbine Building / Heater Floor Framing Plan-2

RT

NIGEL

16/07/13

Turbine Building / Lower Roof Framing Plan-1

AC

NIGEL

16/07/13

Turbine Building / Lower Roof Framing Plan-2

AC

NIGEL

16/07/13

Turbine Building / Framing Section-1

AC

NIGEL

16/07/13

Turbine Building / Framing Section-2

AC

NIGEL

16/07/13

Turbine Building / Deck Slab Section Details-1

IC

NIGEL

16/07/13

Turbine Building / Deck Slab Section Details-2

IC

NIGEL

16/07/13

Turbine Building/ Foundation Re-bar Details-1

NIGEL

26/12/12

Turbine Building/ Foundation Re-bar Details-2

AC

NIGEL

05/02/13

Turbine Building/ Foundation Re-bar Details-3

NIGEL

26/12/12

Turbine Building/ Foundation Re-bar Details-4

NIGEL

26/12/12

Turbine Building/ Foundation Re-bar Details-5

NIGEL

26/12/12

Turbine Building/ Foundation Re-bar Details-6

NIGEL

26/12/12

Turbine Building/ Foundation Re-bar Details-7

NIGEL

26/12/12

Turbine Building/ Foundation Re-bar Details-8

AC

NIGEL

05/02/13

Turbine Building/ Foundation Re-bar Details-9

NIGEL

26/12/12

Turbine Building/ Foundation Re-bar Details-10

AC

NIGEL

05/02/13

Valve Box Rebar Details-1

NIGEL

01/03/13

Turbine Building/ Tie Girder Re-bar Details-1

NIGEL

05/02/13

Turbine Building/ Tie Girder Re-bar Details-2

NIGEL

05/02/13

Turbine Building/ Tie Girder Re-bar Details-3

NIGEL

05/02/13

Turbine building / manhole re-bar details-1

NIGEL

15/05/13

Turbine building / manhole re-bar details-2

NIGEL

15/05/13

Turbine building / manhole re-bar details-3

NIGEL

15/05/13

Turbine building / manhole re-bar details-4

NIGEL

15/05/13

Turbine building / manhole re-bar details-5

NIGEL

15/05/13

Turbine building / manhole re-bar details-6

NIGEL

15/05/13

Turbine Building / Ground Floor Slab Re-Bar Details-1

AC

NIGEL

24/07/13

Turbine Building / Ground Floor Slab Re-Bar Details-2

AC

NIGEL

24/07/13

Turbine Building / Ground Floor Slab Re-Bar Details-3

AC

NIGEL

24/07/13

Turbine Building / Mezzanine Floor Slab Re-Bar Details-1

AC

NIGEL

24/07/13

Turbine Building / Mezzanine Floor Slab Re-Bar Details-2

AC

NIGEL

24/07/13

Turbine Building / Mezzanine Floor Slab Re-Bar Details-3

AC

NIGEL

24/07/13

Turbine Building / Operating Floor Slab Re-Bar Details-1

AC

NIGEL

24/07/13

Turbine Building / Operating Floor Slab Re-Bar Details-2

AC

NIGEL

24/07/13

Turbine Building / Operating Floor Slab Re-Bar Details-3

AC

NIGEL

24/07/13

Turbine Building / Heater Floor Slab Re-Bar Details-1

AC

NIGEL

24/07/13

Turbine Building / Heater Floor Slab Re-Bar Details-2

AC

NIGEL

24/07/13

Turbine Building / Lower Roof Slab Re-Bar Details-1

AC

NIGEL

24/07/13

Turbine Building / Lower Roof Slab Re-Bar Details-2

AC

NIGEL

24/07/13

Turbine Building / Equip. Foundation Plan & Section, Re-Bar Details-6

AC

NIGEL

24/07/13

Turbine Building / Equip. Foundation Plan & Section, Re-Bar Details-7

AC

NIGEL

24/07/13

Turbine Building/ Steel Column Location Plan-1

AC

NIGEL

07/02/13

Turbine Building/ Steel Column Location Plan-2

AC

NIGEL

07/02/13

Turbine Building/ Base Plate Details-1

AC

NIGEL

07/02/13

Turbine Building/ Base Plate Details-2

AC

NIGEL

07/02/13

Turbine Building/ Base Plate Details-3

AC

NIGEL

07/02/13

Turbine Building/ Base Plate Details-4

AC

NIGEL

07/02/13

Turbine Building/ Base Plate Details-5

AC

NIGEL

07/02/13

Turbine Building/ Mezzanine Floor Steel Framing Plan-1

AC

NIGEL

07/02/13

Turbine Building/ Mezzanine Floor Steel Framing Plan-2

AC

NIGEL

07/02/13

Turbine Building/ Operating Floor Steel Framing Plan-1

AC

NIGEL

07/02/13

Turbine Building/ Operating Floor Steel Framing Plan-2

AC

NIGEL

07/02/13

Turbine Building/ Heater Floor Steel Framing Plan-1

AC

NIGEL

07/02/13

Turbine Building/ Heater Floor Steel Framing Plan-2

AC

NIGEL

07/02/13

Turbine Building/ Lower Roof Steel Framing Plan-1

AC

NIGEL

07/02/13

Turbine Building/ Lower Roof Steel Framing Plan-2

AC

NIGEL

07/02/13

Turbine Building/ Higher Roof Steel Framing Plan-1

AC

NIGEL

07/02/13

Turbine Building/ Higher Roof Steel Framing Plan-2

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-1

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-2

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-3

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-4

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-5

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-6

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-7

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-8

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-9

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-10

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-11

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-12

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-13

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-14

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-15

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-16

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-17

AC

NIGEL

07/02/13

Turbine Building/ Steel Framing Elevation-18

AC

NIGEL

07/02/13

Turbine Building/ Steel Column Details

AC

NIGEL

10/04/13

Turbine Building/ Crane Girder Details-1

AC

NIGEL

10/04/13

Turbine Building/ Crane Girder Details-2

AC

NIGEL

10/04/13

Turbine Building/ Crane Girder Details-3

AC

NIGEL

10/04/13

Turbine Building/ Roof Frame Details

AC

NIGEL

10/04/13

Turbine Building/ Wall Frame Details-2

AC

NIGEL

10/04/13

Turbine Building/ Wall Frame Details-3

AC

NIGEL

10/04/13

Turbine Building/ Roof Truss Details-1

AC

NIGEL

10/04/13

Turbine Building/ Roof Truss Details-2

AC

NIGEL

10/04/13

Turbine Building/ Steel Stair Plan & Section-1

AC

NIGEL

10/04/13

Turbine Building/ Steel Stair Plan & Section-2

AC

NIGEL

10/04/13

Turbine Building/ Steel Stair Plan & Section-3

AC

NIGEL

10/04/13

Turbine Building/ Steel Stair Plan & Section-4

AC

NIGEL

10/04/13

Turbine Building/ Steel Stair Plan & Section-5

AC

NIGEL

10/04/13

Turbine Building/ Girth Elevation-1

AC

NIGEL

10/04/13

Turbine Building/ Girth Elevation-2

AC

NIGEL

10/04/13

Turbine Building/ Girth Elevation-3

AC

NIGEL

10/04/13

Turbine Building/ Girth Elevation-4

AC

NIGEL

10/04/13

Turbine Building/ Girth Elevation-5

AC

NIGEL

10/04/13

Turbine Building/ Girth Elevation-6

AC

NIGEL

10/04/13

Turbine Building/ Girth Elevation-7

AC

NIGEL

10/04/13

Turbine Building/ Purlin Plan-1

AC

NIGEL

10/04/13

Turbine Building/ Purlin Plan-2

AC

NIGEL

10/04/13

Turbine Building/ Roof Walkaway Framing Plan & Detail-1

AC

NIGEL

10/04/13

Turbine Building/ Roof Walkaway Framing Plan & Detail-2

AC

NIGEL

10/04/13

Turbine Building/ Girth Detail-1

AC

NIGEL

10/04/13

Turbine Building/ Girth Detail-2

AC

NIGEL

10/04/13

Turbine Building/ Removable Hatch Details-1

AC

NIGEL

10/04/13

Turbine Building/ Removable Hatch Details-2

AC

NIGEL

10/04/13

Turbine Building/ Steel Connection Details-1

AC

NIGEL

10/04/13

Turbine Building/ Steel Connection Details-2

AC

NIGEL

10/04/13

Turbine Building/ Steel Connection Details-3

AC

NIGEL

10/04/13

Turbine Building/ Misc. Steel Details-1

AC

NIGEL

10/04/13

Turbine Building/ Misc. Steel Details-3

AC

NIGEL

10/04/13

Turbine Building/ Misc. Steel Details-4

AC

NIGEL

10/04/13

Turbine Building/ Misc. Steel Details-5

AC

NIGEL

10/04/13

Turbine Building/ Misc. Steel Details-6

AC

NIGEL

10/04/13

Turbine Foundation/Pile Arrangement Plan

NIGEL

26/11/12

Turbine Foundation/ Plan 1

NIGEL

09/04/13

Turbine Foundation/ Plan-2

NIGEL

09/04/13

Turbine Foundation/ Plan-3

NIGEL

09/04/13

Turbine Foundation/ Section-1

NIGEL

09/04/13

Turbine Foundation/ Section-2

NIGEL

09/04/13

Turbine Foundation/ Section-3

NIGEL

09/04/13

Turbine Foundation/ Section-4

NIGEL

09/04/13

Turbine Foundation/Re-bar Detail-1

AC

NIGEL

09/04/13

Turbine Foundation/Re-bar Detail-2

AC

NIGEL

09/04/13

Turbine Foundation/Re-bar Detail-3

AC

NIGEL

09/04/13

Turbine Foundation/Re-bar Detail-4

AC

NIGEL

09/04/13

Turbine Foundation/Re-bar Detail-5

AC

NIGEL

09/04/13

Turbine Foundation/Re-bar Detail-6

AC

NIGEL

09/04/13

Turbine Foundation/Re-bar Detail-7

AC

NIGEL

09/04/13

Turbine Foundation/ Re-bar Detail-8

AC

NIGEL

09/04/13

Turbine Foundation/ Re-bar Detail-9

AC

NIGEL

09/04/13

Turbine Foundation/ Re-bar Detail-10

AC

NIGEL

09/04/13

Turbine Foundation/ Re-bar Detail-11

AC

NIGEL

09/04/13

Turbine Foundation/ Re-bar Detail-12

AC

NIGEL

09/04/13

Turbine Foundation/ Re-bar Detail-13

AC

NIGEL

09/04/13

Turbine Foundation/ Re-bar Detail-14

AC

NIGEL

09/04/13

Turbine Foundation/ Re-bar Detail-15

AC

NIGEL

09/04/13

Turbine Foundation/ Re-bar Detail-16

AC

NIGEL

09/04/13

Turbine Foundation/ Re-bar Detail-17

AC

NIGEL

09/04/13

Turbine Foundation/ Structural Calculation Sheets

AC

NIGEL

20/11/12

Central Control Building/ Ground Floor Plan

NIGEL

29/11/12

Central Control Building/ 1st Floor Plan

NIGEL

29/11/12

Central Control Building/ 2nd Floor Plan

NIGEL

29/11/12

Central Control Building/ 3rd Floor Plan

NIGEL

29/11/12

Central Control Building/ South Elevation

NIGEL

29/11/12

Central Control Building/ Main Section 1

NIGEL

29/11/12

Central Control Building/ Main Section 2

NIGEL

29/11/12

Central Control Building/ Interior Finish Schedule

NIGEL

14/11/12

Central Control Building/ Door & Window Schedule

NIGEL

23/07/12

Central Control Building / Wall Section-1

IC

NIGEL

16/07/13

Central Control Building / Wall Section-2

IC

NIGEL

16/07/13

Central Control Building / Wall Section-3

IC

NIGEL

16/07/13

Central Control Building / Stair Plan & Section-1

IC

NIGEL

16/07/13

Central Control Building / Stair Plan & Section-2

IC

NIGEL

16/07/13

Central Control Building / Stair Plan & Section-3

IC

NIGEL

16/07/13

Central Control Building / Stair Plan & Section-4

IC

NIGEL

16/07/13

Central Control Building / Toilet & Shower Room Enlarged Plan & Details-2

IC

NIGEL

16/07/13

Central Control Building / Ceiling Plan-1

IC

NIGEL

16/07/13

Central Control Building / Ceiling Plan-2

IC

NIGEL

16/07/13

Central Control Building/ Foundation Re-bar Details-1

AC

NIGEL

05/12/12

Central Control Building/ Foundation Re-bar Details-2

AC

NIGEL

05/12/12

Central Control Building/ Foundation Re-bar Details-3

AC

NIGEL

05/12/12

Central Control Building/ Foundation Re-bar Details-4

AC

NIGEL

05/12/12

Central Control Building/ Tie Girder Re-bar Details-1

AC

NIGEL

05/12/12

Central Control Building/ Tie Girder Re-bar Details-2

AC

NIGEL

05/12/12

Central Control Building/ Tie Girder Re-bar Details-3

AC

NIGEL

05/12/12

Central Control Building/ Ground Floor Slab Re-bar Details-1

NIGEL

28/02/13

Central Control Building/ Manhole Re-bar Detail-1

NIGEL

28/02/13

Central Control Building/ Manhole Re-bar Detail-2

NIGEL

28/02/13

Central Control Building/ Manhole Re-bar Detail-3

NIGEL

28/02/13

Central Control Building/ Manhole Re-bar Detail-4

NIGEL

28/02/13

Central Control Building/ Manhole Re-bar Detail-5

NIGEL

28/02/13

Central Control Building/ Manhole Re-bar Detail-6

NIGEL

28/02/13

Central Control Building/ Trench Rebar Details-1

NIGEL

28/02/13

Central Control Building/ Trench Rebar Details-2

NIGEL

28/02/13

Central Control Building/ Trench Rebar Details-3

NIGEL

28/02/13

Central Control Building/Steel Column Location Plan

AC

NIGEL

09/11/12

Central Control Building/ Base Plate Details-1

AC

NIGEL

09/11/12

Central Control Building/ Base Plate Details-2

AC

NIGEL

09/11/12

Central Control Building/ 1st Floor Steel Framing Plan

AC

NIGEL

09/11/12

Central Control Building/ 2nd Floor Steel Framing Plan

AC

NIGEL

09/11/12

Central Control Building/ 3rd Floor Steel Framing Plan

AC

NIGEL

09/11/12

Central Control Building/ Roof Steel Framing Plan

AC

NIGEL

09/11/12

Central Control Building/ Steel Framing Elevation-1

AC

NIGEL

09/11/12

Central Control Building/ Steel Framing Elevation-2

AC

NIGEL

09/11/12

Central Control Building/ Steel Framing Elevation-3

AC

NIGEL

09/11/12

Central Control Building/ Steel Framing Elevation-4

AC

NIGEL

09/11/12

Central Control Building/ Steel Framing Elevation-5

AC

NIGEL

09/11/12

Central Control Building/ Steel Framing Elevation-6

AC

NIGEL

09/11/12

Central Control Building/ Steel Framing Elevation-7

AC

NIGEL

09/11/12

Central Control Building/ Steel Framing Elevation-8

AC

NIGEL

09/11/12

Central Control Building/ Steel Framing Elevation-9

AC

NIGEL

09/11/12

Central Control Building/ Steel Framing Elevation-10

AC

NIGEL

09/11/12

Central Control Building/ Steel Wall Frame Details-1

AC

NIGEL

22/11/12

Central Control Building/ Steel Wall Frame Details-2

AC

NIGEL

22/11/12

Central Control Building/ Steel Wall Frame Details-3

AC

NIGEL

22/11/12

Central Control Building/ Steel Wall Frame Details-4

AC

NIGEL

22/11/12

Central Control Building/ Steel Stair Details-1

AC

NIGEL

22/11/12

Central Control Building/ Steel Stair Details-2

AC

NIGEL

22/11/12

Central Control Building/ Steel Stair Details-3

AC

NIGEL

22/11/12

Central Control Building/ Steel Stair Details-4

AC

NIGEL

22/11/12

Central Control Building/ Girth Details

AC

NIGEL

22/11/12

Central Control Building/ Steel Connection Details-1

AC

NIGEL

22/11/12

Central Control Building/ Steel Connection Details-2

AC

NIGEL

22/11/12

Central Control Building/ Steel Connection Details-3

AC

NIGEL

22/11/12

Central Control Building/ Steel Connection Details-4

AC

NIGEL

22/11/12

Central Control Building/ Steel Misc. Details

AC

NIGEL

22/11/12

Central Control Building/ Structural Calculation Sheets

NIGEL

04/04/13

Coal handling system control building / main sections

NIGEL

18/06/13

Coal Handling System Control Building / Girder Rebar Details-1

NIGEL

18/06/13

Fuel Oil Pump House/ Elevation

NIGEL

27/12/12

Fuel Oil Pump House/ Main Section

NIGEL

27/12/12

Fuel Oil Pump House/ Foundation Plan

AC

NIGEL

07/03/13

Fuel Oil Pump House/ Misc Details

AC

NIGEL

07/03/13

FUEL OIL PUMP HOUSE / FOUNDATION & COLUMN REBAR DETAILS-1

IC

NIGEL

01/03/13

FUEL OIL PUMP HOUSE / GIRDER REBAR DETAILS

IC

NIGEL

01/03/13

FUEL OIL PUMP HOUSE / WALL REBAR DETAILS

IC

NIGEL

01/03/13

Fire Protection Pump House/ Ground Floor Plan & Roof Plan, Interior Finish

NIGEL

27/12/12

Fire Protection Pump House/ Elevation

NIGEL

27/12/12

Fire Protection Pump House/ Main Section

NIGEL

26/11/12

Fire Protection Pump House/ Interior Finishing, Door & Window Schedule

NIGEL

27/12/12

Fire protection pump house / wall sections

NIGEL

18/06/13

Fire Protection pump House/Foundation Plan

NIGEL

07/02/13

Fire Protection pump House/Framing Plan-1

NIGEL

07/02/13

Fire Protection pump House/Framing Plan-2

NIGEL

07/02/13

Fire Protection pump House/Framing Elevation

NIGEL

07/02/13

Fire Protection Pump House/ Foundation & Column Rebar Details

NIGEL

08/02/13

Fire Protection Pump House/ Girder Rebar Details

NIGEL

08/02/13

Fire Protection Pump House/ Ground Slab & Sump PIT Rebar Details

NIGEL

08/02/13

Fire Protection Pump House/ Roof Slab Rebar Details

NIGEL

08/02/13

Fire Protection Pump House/ Equipment Foundation Rebar Details

NIGEL

08/02/13

Fire Protection Pump House/ Structural Calculation Sheets

NIGEL

08/02/13

Ash slurry pump house / foundation plan

RT

NIGEL

10/06/13

Ash slurry pump house / ground floor framing plan

RT

NIGEL

10/06/13

Ash slurry pump house / 1st floor framing plan

RT

NIGEL

10/06/13

Ash slurry pump house / framing elevation-1

RT

NIGEL

10/06/13

Ash slurry pump house / framing elevation-2

RT

NIGEL

10/06/13

Ash slurry pump house / framing elevation-3

RT

NIGEL

10/06/13

Ash Slurry Pump House / Foundation Re-bar Detail-1

RT

NIGEL

10/06/13

Ash Slurry Pump House / Foundation Re-bar Detail-2

RT

NIGEL

10/06/13

Ash Slurry Pump House / Foundation Re-bar Detail-3

RT

NIGEL

10/06/13

Ash Slurry Pump House / Foundation Re-bar Detail-4

RT

NIGEL

10/06/13

Ash Slurry Pump House / Foundation Re-bar Detail-5

RT

NIGEL

10/06/13

Ash Slurry Pump House / Ground Floor Girder Re-bar Detail-1

RT

NIGEL

10/06/13

Ash Slurry Pump House / Ground Floor Girder Re-bar Detail-2

RT

NIGEL

10/06/13

Ash Slurry Pump House / Wall Re-bar Detail-1

RT

NIGEL

10/06/13

Ash Slurry Pump House / Wall Re-bar Detail-2

RT

NIGEL

10/06/13

Ash Slurry Pump House / Wall Re-bar Detail-3

RT

NIGEL

10/06/13

Ash Slurry Pump House / Wall Re-bar Detail-4

RT

NIGEL

10/06/13

Ash Slurry Pump House / Steel Column Location Plan

RT

NIGEL

10/06/13

Ash Slurry Pump House / Base Plate Details-1

RT

NIGEL

10/06/13

Ash Slurry Pump House / Base Plate Details-2

RT

NIGEL

10/06/13

Ash Slurry Pump House / Base Plate Details-3

RT

NIGEL

10/06/13

Ash Slurry Pump House / Roof Steel Framing Plan

RT

NIGEL

10/06/13

Ash Slurry Pump House / First Floor And Roof Steel Framing Plan

RT

NIGEL

10/06/13

Ash Slurry Pump House / Steel Framing Elevation-1

RT

NIGEL

10/06/13

Ash Slurry Pump House / Steel Framing Elevation-2

RT

NIGEL

10/06/13

Ash Slurry Pump House / Steel Framing Elevation-3

RT

NIGEL

10/06/13

Ash Slurry Pump House / Steel Framing Elevation-4

RT

NIGEL

10/06/13

Ash slurry pump house / structural calculation sheets

RT

NIGEL

06/06/13

ESP Control & Ash Elec. Bulding/Ground & First Floor Plan

AC

NIGEL

26/06/13

ESP Control & Ash Elec. Bulding/ Roof Plan

AC

NIGEL

26/06/13

ESP Control & Ash Elec. Bulding/ Elevation

AC

NIGEL

26/06/13

ESP Control & Ash Elec. Bulding/ Main Section

AC

NIGEL

26/06/13

ESP Control & Ash Elec. Bulding/ Interior Finishing Door & Window Schedule

IC

NIGEL

26/06/13

ESP Control & Ash Elec. Building/Foundation Plan

AC

NIGEL

26/06/13

ESP Control & Ash Elec. Building/ Ground & First Floor Framing Plan

AC

NIGEL

26/06/13

ESP Control & Ash Elec. Building/ Roof Framing Plan

AC

NIGEL

26/06/13

ESP Control & Ash Elec. Building/ Framing Elevation-1 (Unit 1)

AC

NIGEL

26/06/13

ESP Control & Ash Elec. Building/ Framing Elevation-2 (Unit 1)

AC

NIGEL

26/06/13

ESP Control & Ash Elec. Building/ Framing Elevation-3 (Unit 2)

AC

NIGEL

26/06/13

ESP Control & Ash Elec. Building/ Framing Elevation-4 (Unit 2)

AC

NIGEL

26/06/13

Esp control & ash elec.building/ foundation & column

NIGEL

15/05/13

Esp control & ash elec.building / girder rebar details-1

NIGEL

15/05/13

Esp control & ash elec.building / girder rebar details-2

NIGEL

15/05/13

Esp control & ash elec. building / girder rebar details-3

IC

NIGEL

26/06/13

ESP Control & Ash Elec. Building / Ground Floor Slab Rebar Details (Unit 1&2)

IC

NIGEL

26/06/13

ESP Control & Ash Elec. Building / First Floor Slab Rebar Details (Unit 1&2)

IC

NIGEL

26/06/13

ESP Control & Ash Elec. Building / Roof Slab Rebar Details (Unit 1&2)

IC

NIGEL

26/06/13

ESP Control & Ash Elec. Building / Trench Rebar Details-1 (Unit 1)

IC

NIGEL

26/06/13

ESP Control & Ash Elec. Building / Trench Rebar Details-2 (Unit 2)

IC

NIGEL

26/06/13

EPS Control Building/ Structural Calculation Sheets

AC

NIGEL

26/06/13

Diesel generator house / foundation plan

AC

NIGEL

25/06/13

Diesel generator house / ground floor framing plan

AC

NIGEL

25/06/13

Diesel generator house / framing section

RT

NIGEL

25/06/13

Diesel Generator House / Foundation Rebar Detail

IC

NIGEL

25/06/13

Diesel Generator House / Ground Floor Girder Rebar Detail

IC

NIGEL

25/06/13

Diesel Generator House / Ground Floor Slab Rebar Detail

IC

NIGEL

25/06/13

Diesel Generator House /Trench Rebar Detail-1

IC

NIGEL

25/06/13

Diesel Generator House / Trench Rebar Detail-2

IC

NIGEL

25/06/13

Diesel Generator House / Equipment Foundation Rebar Detail

RT

NIGEL

25/06/13

Diesel Generator House / Steel Column Location Plan

AC

NIGEL

25/06/13

Diesel Generator House / Base Plate Detail

AC

NIGEL

25/06/13

Diesel Generator House / Roof Framing Plan

AC

NIGEL

25/06/13

Diesel Generator House / Framing Elevation-1

AC

NIGEL

25/06/13

Diesel Generator House / Framing Elevation-2

AC

NIGEL

25/06/13

Diesel generator house / structural calculation sheets

RT

NIGEL

25/06/13

Gaseous Chlorination Building/ Ground Floor Plan

RT

NIGEL

10/07/13

Gaseous Chlorination Building/ Roof Plan

RT

NIGEL

10/07/13

Gaseous Chlorination Building/ Elevation

RT

NIGEL

10/07/13

Gaseous Chlorination Building/ Main Section

RT

NIGEL

10/07/13

Gaseous Chlorination Building / Interior Finishing, Door & Window Schedule

IC

NIGEL

10/07/13

Gaseous Chlorination Building/ Pile & Foundation Plan

AC

NIGEL

10/07/13

Gaseous Chlorination Building/ Ground Floor Framing Plan

AC

NIGEL

10/07/13

Gaseous Chlorination Building/ Roof Floor Framing Plan

AC

NIGEL

10/07/13

Gaseous chlorination building / framing elevation-1

AC

NIGEL

10/07/13

Gaseous Chlorination Building/ Framing Elevation-2

AC

NIGEL

10/07/13

Gaseous Chlorination Building/ Framing Elevation-3

AC

NIGEL

10/07/13

Gaseous chlorination building / foundation & column rebar details

IC

NIGEL

16/07/13

Gaseous chlorination building / girder rebar details-1

IC

NIGEL

16/07/13

Gaseous chlorination building / girder rebar details-2

IC

NIGEL

16/07/13

Gaseous Chlorination Building / Ground Floor Slab Rebar Details

IC

NIGEL

16/07/13

Gaseous chlorination building / roof floor slab rebar detail

IC

NIGEL

16/07/13

Gaseous Chlorination Building / Equipment Foundation Rebar Details

IC

NIGEL

16/07/13

Gaseous Chlorination Building / Trench Rebar Details

IC

NIGEL

16/07/13

Gaseous Chlorination Builing/ Structural Calculation Sheets

AC

NIGEL

10/07/13

Fuel Oil Unloading Pump House/ Ground Floor & Roof Plan

AC

NIGEL

10/06/13

Fuel Oil Unloading Pump House/ Elevations

AC

NIGEL

10/06/13

Fuel Oil Unloading Pump House/ Main Sections

AC

NIGEL

10/06/13

Fuel Oil Unloading Pump House/ Interior Finish & Door Schedule

IC

NIGEL

10/06/13

Fuel oil unloading pump house / ground floor & roof framing plan

AC

NIGEL

10/06/13

Fuel oil unloading pump house / framing sections

AC

NIGEL

10/06/13

RT

NIGEL

26/03/13

Return Water Pump House / Stuctural Calulation Sheet

Return water pump house / pile & foundation plan

RT

NIGEL

26/03/13

Switchyard Control Building/ Ground Floor Plan

NIGEL

22/11/12

Switchyard Control Building/ 1st Floor Plan

NIGEL

22/11/12

Switchyard Control Building/ Roof Plan

NIGEL

22/11/12

Switchyard Control Building/ Elevation-1

NIGEL

22/11/12

Switchyard Control Building/ Elevation-2

NIGEL

22/11/12

Switchyard Control Building/ Main Sections

NIGEL

22/11/12

Switchyard Control Building/ Interior Finish Schedule

AC

NIGEL

09/08/12

Switchyard Control Building/ Door & Window Schedule

AC

NIGEL

09/08/12

Switchyard Control Building/ Wall Section-1

NIGEL

11/03/13

Switchyard Control Building/ Wall Section-2

NIGEL

11/03/13

Switchyard Control Building/ Ceiling Plan-1

NIGEL

11/03/13

Switchyard Control Building/ Ceiling Plan-2

NIGEL

11/03/13

Switchyard Control Building/ Toilet Enlarged Plan & Details

NIGEL

11/03/13

Switchyard Control Building/ Stair Plan & Section

NIGEL

11/03/13

Switchyard Control Building/ Foundation Plan

NIGEL

27/07/12

Switchyard Control Building/ Ground Floor Framing Plan

NIGEL

22/11/12

Switchyard Control Building/ 1st Floor Framing Plan

NIGEL

22/11/12

Switchyard Control Building/ Roof Framing Plan

NIGEL

22/11/12

Switchyard Control Building/ Framing Section-1

NIGEL

10/08/12

Switchyard Control Building/ Framing Section-2

NIGEL

10/08/12

Switchyard Control Building/ Framing Section-3

NIGEL

10/08/12

Switchyard Control Building/Foundation Rebar Detail-1

NIGEL

31/07/12

Switchyard Control Building/Foundation Rebar Detail-2

NIGEL

31/07/12

Switchyard Control Building/Foundation Rebar Detail-3

NIGEL

31/07/12

Switchyard Control Building/ Column Rebar Detail-1

NIGEL

09/10/12

Switchyard Control Building/ Column Rebar Detail-2

NIGEL

09/10/12

Switchyard Control Building/ Column Rebar Detail-3

NIGEL

09/10/12

Switchyard Control Building/ Ground Floor Girder Rebar Detail-1

NIGEL

22/11/12

Switchyard Control Building/ Ground Floor Girder Rebar Detail-2

NIGEL

22/11/12

Switchyard Control Building/ Ground Floor Girder Rebar Detail-3

NIGEL

22/11/12

Switchyard Control Building/ 1st Floor Girder Rebar Detail-1

NIGEL

09/10/12

Switchyard Control Building/ 1st Floor Girder Rebar Detail-2

NIGEL

09/10/12

Switchyard Control Building/ 1st Floor Girder Rebar Detail-3

NIGEL

09/10/12

Switchyard Control Building/ 1st Floor Girder Rebar Detail-4

NIGEL

09/10/12

Switchyard Control Building/ 1st Floor Girder Rebar Detail-5

NIGEL

09/10/12

Switchyard Control Building/ 1st Floor Girder Rebar Detail-6

NIGEL

09/10/12

Switchyard Control Building/ 1st Floor Girder Rebar Detail-7

NIGEL

09/10/12

Switchyard Control Building/ Roof Girder Rebar Detail-1

NIGEL

09/10/12

Switchyard Control Building/ Roof Girder Rebar Detail-2

NIGEL

09/10/12

Switchyard Control Building/ Roof Girder Rebar Detail-3

NIGEL

09/10/12

Switchyard Control Building/ Roof Girder Rebar Detail-4

NIGEL

09/10/12

Switchyard Control Building/Ground Floor Slab Rebar Detail

NIGEL

04/12/12

Switchyard Control Building/1st Floor Slab Rebar Detail

NIGEL

16/11/12

Switchyard Control Building/Roof Slab Rebar Detail

AC

NIGEL

04/12/12

Switchyard Control Building/Stair Rebar Detail

NIGEL

16/11/12

Switchyard Control Building/Wall Re-bar Detail-1

NIGEL

03/10/12

Switchyard Control Building/Wall Re-bar Detail-2

NIGEL

03/10/12

Switchyard Control Building/ Trench Rebar Detail-1

AC

NIGEL

04/12/12

Switchyard Control Building/ Trench Rebar Detail-2

AC

NIGEL

04/12/12

Switchyard Control Building/Misc. Rebar Detail-1

AC

NIGEL

04/12/12

Switchyard Control Building/Misc. Rebar Detail-2

NIGEL

16/11/12

Switchyard Control Building/Misc. Rebar Detail-3

NIGEL

16/11/12

Switchyard Control Building/Misc. Rebar Detail-4

NIGEL

16/11/12

Switchyard Control Building/Misc. Rebar Detail-5

NIGEL

16/11/12

Switchyard Control Building/ Structural Calculation Sheets

AC

NIGEL

09/10/12

Water Treatment Building/ Ground Floor Plan

NIGEL

07/02/13

Water Treatment Building/ Roof Plan

NIGEL

07/02/13

Water Treatment Building/ Elevation-1

NIGEL

07/02/13

Water Treatment Building/ Elevation-2

NIGEL

07/02/13

Water Treatment Building/ Main Sections

NIGEL

07/02/13

Water Treatment Building/ Interior Finishing Schedule

IC

NIGEL

17/12/12

Water treatment building / wall section -1

NIGEL

21/06/13

Water treatment building / wall section -2

NIGEL

21/06/13

Water treatment building / ceiling plan

NIGEL

21/06/13

Water treatment building / toilet detail

NIGEL

21/06/13

Water Treatment Bulding/Foundation Rebar Detail-1

NIGEL

28/03/13

Water Treatment Bulding/Foundation Rebar Detail-2

NIGEL

28/03/13

Water Treatment Bulding/Foundation Rebar Detail-3

NIGEL

28/03/13

Water Treatment Bulding/Foundation Rebar Detail-4

NIGEL

28/03/13

Water Treatment Bulding/ Ground Floor Girder Rebar Detail-1

NIGEL

28/03/13

Water Treatment Bulding/ Ground Floor Girder Rebar Detail-2

NIGEL

28/03/13

Water Treatment Bulding/ Ground Floor Girder Rebar Detail-3

NIGEL

28/03/13

Water Treatment Bulding/ Ground Floor Girder Rebar Detail-4

NIGEL

28/03/13

WATER TREATMENT BUILDING / GROUND FLOOR SLAB REBAR DETAIL-1

NIGEL

28/03/13

WATER TREATMENT BUILDING / GROUND FLOOR SLAB REBAR DETAIL-2

NIGEL

28/03/13

WATER TREATMENT BUILDING / MISC. REBAR DETAIL

NIGEL

28/03/13

Water treatment building / foundation re-bar detail-5

NIGEL

28/03/13

Water Treatment Building/ Steel Column Location Plan

NIGEL

28/12/12

Water Treatment Building/ Base Plate Detail-1

NIGEL

04/03/13

Water Treatment Building/ Base Plate Detail-2

NIGEL

04/03/13

Water Treatment Building/ Base Plate Detail-3

NIGEL

04/03/13

Water Treatment Building/ Lower Roof Steel Framing Plan

NIGEL

04/03/13

Water Treatment Building/ Steel Framing Elevation-1

NIGEL

04/03/13

Water Treatment Building/ Steel Framing Elevation-2

NIGEL

04/03/13

Water Treatment Building/ Steel Framing Elevation-3

NIGEL

04/03/13

Water Treatment Building/ Steel Framing Elevation-4

NIGEL

04/03/13

Water Treatment Building/ Structural Calculation Sheets

AC

NIGEL

28/03/13

Coal Yard Dry Storage Shed/ Foundation Rebar Detail

NIGEL

21/03/13

Coal Yard Dry Storage Shed/ Ground Floor Girder Rebar Detail-1

NIGEL

21/03/13

Coal Yard Dry Storage Shed/ Ground Floor Girder Rebar Detail-2

AC

NIGEL

21/03/13

Coal Yard Dry Storage Shed/ Foundation Rebar Detail-2

RT

NIGEL

21/03/13

Coal Yard Dry Storage shed/ Structural Calculation Sheets (for Sub-Structure)

RT

NIGEL

21/03/13

Coal Yard Dry Storage Shed/ Design Calculation For Roof Drain

NIGEL

14/01/13

Coal yard dry storage shed / design calculation for roof gutter

AC

NIGEL

03/05/13

Limestone storage shed / roof plan

NIGEL

05/03/13

Limestone storage shed / elevations-1

NIGEL

03/04/13

Limestone storage shed / elevations-2

NIGEL

03/04/13

Limestone storage shed / main sections

NIGEL

28/06/13

Limestone storage shed / interior finish schedule, door & window schedule

IC

NIGEL

03/04/13

Limestone Storage Shed / W All Section

IC

NIGEL

22/03/13

Limestone Storage Shed / Ladder Detail

IC

NIGEL

22/03/13

Limestone Storage Shed / Roof Walkway Framing Plan

IC

NIGEL

22/03/13

Limestone Storage Shed / Roof Walkway Detail

IC

NIGEL

22/03/13

Limestone Storage Shed / Shutter Door Detail

IC

NIGEL

22/03/13

Limestone storage shed / structural calculation sheets(for super-structure)

AC

NIGEL

26/03/13

Limestone storage shed/ design calculation for roof drain

NIGEL

26/03/13

Lubrication Oil Storage Shelter / Ground Floor Plan & Roof Plan

RT

NIGEL

12/07/13

Lubrication Oil Storage Shelter / Elevations

RT

NIGEL

12/07/13

Lubrication Oil Storage Shelter / Main Sections

RT

NIGEL

12/07/13

Lubrication Oil Storage Shelter / Interior Finish Schedule

IC

NIGEL

12/07/13

Workshop building / ground floor

AC

NIGEL

10/07/13

Workshop building / roof plan

NIGEL

10/07/13

Workshop building / elevations

AC

NIGEL

10/07/13

Workshop building / main section-1 & main section-2

AC

NIGEL

10/07/13

Workshop building / main section-3

AC

NIGEL

10/07/13

Workshop building / interior finish schedule, door & window schedule

IC

NIGEL

10/07/13

Workshop Building / Wall Section Detail-1

IC

NIGEL

11/07/13

Workshop Building / Wall Section Detail-2

IC

NIGEL

11/07/13

Workshop Building / Ground Floor Ceiling Plan

IC

NIGEL

11/07/13

Workshop Building / Toilet Enlarged Plan

IC

NIGEL

11/07/13

Workshop Building / Shower Enlarged Plan

IC

NIGEL

11/07/13

Workshop building / pile & foundation plan

AC

NIGEL

11/07/13

Workshop Building / Ground Floor Framing Plan

AC

NIGEL

11/07/13

Workshop Building / Framing Section-1

AC

NIGEL

11/07/13

Workshop Building / Framing Section-2

AC

NIGEL

11/07/13

Workshop building / foundation rebar detail-1

AC

NIGEL

11/07/13

Workshop building / foundation rebar detail-2

AC

NIGEL

11/07/13

Workshop building / foundation rebar detail-3

AC

NIGEL

11/07/13

Workshop building / ground floor girder rebar detail-1

AC

NIGEL

11/07/13

Workshop building / ground floor girder rebar detail-2

AC

NIGEL

11/07/13

Workshop building / ground floor girder rebar detail-3

AC

NIGEL

11/07/13

Workshop building / ground floor girder rebar detail-4

AC

NIGEL

11/07/13

Workshop Building / Steel Column Location Plan

AC

NIGEL

11/07/13

Workshop Building / Base Plate Details - 1

AC

NIGEL

11/07/13

Workshop Building / Base Plate Details - 2

AC

NIGEL

11/07/13

Workshop Building / Base Plate Details - 3

AC

NIGEL

11/07/13

Workshop Building / Steel Framing Plan

AC

NIGEL

11/07/13

Workshop Building / Crane Girder Steel Framing Plan

AC

NIGEL

11/07/13

Workshop Building / Roof Steel Framing Plan

AC

NIGEL

11/07/13

Workshop Building / Steel Framing Elevation - 1

AC

NIGEL

11/07/13

Workshop Building / Steel Framing Elevation - 2

AC

NIGEL

11/07/13

Workshop Building / Steel Framing Elevation - 3

AC

NIGEL

11/07/13

Workshop Building / Roof Purlin Plan

IC

NIGEL

11/07/13

Workshop Building / Girth Elevation-1

IC

NIGEL

11/07/13

Workshop Building / Girth Elevation-2

IC

NIGEL

11/07/13

Workshop Building / Girth Detail

IC

NIGEL

11/07/13

Workshop Building / Roof Walkway Framing Plan & Section

IC

NIGEL

11/07/13

Workshop Building / Roof Walkway Detail

IC

NIGEL

11/07/13

Workshop Building / Ladder Detail

IC

NIGEL

11/07/13

Workshop Building / Steel Connection Detail - 1

IC

NIGEL

11/07/13

Workshop Building / Steel Connection Detail - 2

IC

NIGEL

11/07/13

Workshop Building / Steel Connection Detail - 3

IC

NIGEL

11/07/13

Bulldozer Garage/ Ground Floor Plan

NIGEL

25/06/13

Bulldozer Garage/ Roof Plan

NIGEL

05/03/13

Bulldozer Garage/ Elevations

NIGEL

05/03/13

Bulldozer Garage/ Main Sections

NIGEL

25/06/13

Bulldozer Garage/ Interior Finish Schedule, Door & Window Schedule

IC

NIGEL

25/06/13

Bulldozer garage / foundation plan

RT

NIGEL

25/06/13

Bulldozer garage / ground floor framing plan & section

RT

NIGEL

25/06/13

Bulldozer Garage / Foundation Rebar Detail

IC

NIGEL

16/07/13

Bulldozer Garage / Ground Floor Girder Rebar Details

IC

NIGEL

16/07/13

Bulldozer Garage / Ground Floor Slab Rebar & Section

IC

NIGEL

16/07/13

Bulldozer garage / steel column location plan & roof steel framing plan

NIGEL

25/06/13

Bulldozer garage / base plate details

AC

NIGEL

25/06/13

Bulldozer garage / steel framing elevations

NIGEL

25/06/13

Bulldozer Garage / Roof Purlin Plan

AC

NIGEL

25/06/13

Bulldozer Garage / Steel Connection Details

NIGEL

25/06/13

Bulldozer garage / structural calculation sheets

RT

NIGEL

25/06/13

I&C Electrical and Mechanical Warehouse/ Ground Floor Plan

NIGEL

10/07/13

I&C Electrical and Mechanical Warehouse/ Interior Finish Schedule

NIGEL

28/02/13

I&C Electrical and Mechanical Warehouse / Wall Sections-1

IC

NIGEL

10/07/13

I&C Electrical and Mechanical Warehouse / Wall Sections-2

IC

NIGEL

10/07/13

I&C Electrical and Mechanical Warehouse / Ceiling Plan

IC

NIGEL

10/07/13

I&C Electrical and Mechanical Warehouse / Toile Enlarged Plan

IC

NIGEL

10/07/13

I&c electrical and mechanical warehouse / steel column location plan

AC

NIGEL

10/07/13

I&c electrical and mechanical warehouse / base plate details-1

AC

NIGEL

10/07/13

I&c electrical and mechanical warehouse / base plate details-2

AC

NIGEL

10/07/13

I&c electrical and mechanical warehouse / base plate details-3

AC

NIGEL

10/07/13

I&c electrical and mechanical warehouse / base plate details-4

AC

NIGEL

10/07/13

I&c electrical and mechanical warehouse / lower roof steel framing plan

AC

NIGEL

10/07/13

I&c electrical and mechanical warehouse / higher roof steel framing plan

AC

NIGEL

10/07/13

I&c electrical and mechanical warehouse / crane girder steel framing plan

AC

NIGEL

10/07/13

I&c electrical and mechanical warehouse / steel framing I&c electrical and mech

AC

NIGEL

10/07/13

I&c electrical and mechanical warehouse / steel framing elevation-2

AC

NIGEL

10/07/13

I&C Electrical and Mechanical Warehouse / Lower Roof Purlin Plan

IC

NIGEL

11/07/13

I&C Electrical and Mechanical Warehouse / Higher Roof Purlin Plan

IC

NIGEL

11/07/13

I&C Electrical and Mechanical Warehouse / Girth Elevation-1

IC

NIGEL

11/07/13

I&C Electrical and Mechanical Warehouse / Girth Elevation-2

IC

NIGEL

11/07/13

I&C Electrical and Mechanical Warehouse / Girth Details

IC

NIGEL

11/07/13

I&C Electrical and Mechanical Warehouse / Roof Walkway Framing Plan & Section

IC

NIGEL

11/07/13

I&C Electrical and Mechanical Warehouse / Roof Walkway Detail

IC

NIGEL

11/07/13

I&C Electrical and Mechanical Warehouse / Ladder Detail

IC

NIGEL

11/07/13

I&C Electrical and Mechanical Warehouse / Steel Connection Detail-1

AC

NIGEL

11/07/13

I&C Electrical and Mechanical Warehouse / Steel Connection Detail-2

AC

NIGEL

11/07/13

I&C Electrical and Mechanical Warehouse / Steel Connection Detail-3

AC

NIGEL

11/07/13

I&C Electrical and Mechanical Warehouse / Steel Connection Detail-4

AC

NIGEL

11/07/13

I&C Electrical and Mechanical Warehouse/Design Calculation for Roof Drain

NIGEL

21/03/13

Administration Building/ Ground Floor Plan

NIGEL

28/11/12

Administration Building/ 1st Floor Plan

NIGEL

28/11/12

Administration Building/ 2nd Floor Plan

NIGEL

28/11/12

Administration Building/ 3rd Floor Plan

NIGEL

28/11/12

Administration Building/ 4th Floor Plan

NIGEL

28/11/12

Administration Building/ Roof Floor Plan

NIGEL

28/11/12

Administration Building/ East Elevation

NIGEL

28/11/12

Administration Building/ West Elevation

NIGEL

28/11/12

Administration Building/ South Elevation

NIGEL

28/11/12

Administration Building/ North Elevation

NIGEL

28/11/12

Administration Building/ Main Section-1

AC

NIGEL

24/10/12

Administration Building/ Main Section-2

NIGEL

28/11/12

Administration Building/ Main Section-3

AC

NIGEL

24/10/12

Administration Building/ Interior Finish Schedule-1

NIGEL

28/11/12

Administration Building/ Interior Finish Schedule-2

NIGEL

10/09/12

Administration Building/ Interior Finish Schedule-3

NIGEL

10/09/12

Administration Building/ Door Schedule

IC

NIGEL

28/11/12

Administration Building/ Door & Window Schedule

IC

NIGEL

13/11/12

Administration Building / Steel Ladder Detail

IC

NIGEL

17/07/13

Administration Building/ Ground Floor Framing Plan

AC

NIGEL

28/01/13

Administration Building/ 2nd Floor Framing Plan

AC

NIGEL

28/01/13

Administration Building/ 3rd Floor Framing Plan

AC

NIGEL

28/01/13

Administration Building/ 4th Floor Framing Plan

AC

NIGEL

28/01/13

Administration Building/ Roof Framing Plan

AC

NIGEL

28/01/13

Administration Building/ Stair Framing Plan & Detail-1

AC

NIGEL

23/10/12

Administration Building/ Stair Framing Plan & Detail-2

AC

NIGEL

28/01/13

Administration Building/ Stair Framing Plan & Detail-3

AC

NIGEL

23/10/12

Administration Building/ Cable Trench Details

NIGEL

27/12/12

Administration Building/ Foundation Rebar Detail-1

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-2

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-3

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-4

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-5

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-6

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-7

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-8

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-9

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-10

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-11

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-12

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-13

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-14

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-15

AC

NIGEL

25/10/12

Administration Building/ Foundation Rebar Detail-15

AC

NIGEL

25/10/12

Administration Building/ Column Rebar Detail-1

AC

NIGEL

25/10/12

Administration Building/ Column Rebar Detail-2

AC

NIGEL

25/10/12

Administration Building/ Column Rebar Detail-3

AC

NIGEL

25/10/12

Administration Building/ Column Rebar Details-4

AC

NIGEL

25/10/12

Administration Building/ Column Rebar Details-5

AC

NIGEL

25/10/12

Administration Building/ Column Rebar Details-6

AC

NIGEL

25/10/12

Administration Building/ Column Rebar Details-7

AC

NIGEL

25/10/12

Administration Building/ Colum Rebar Detail-8

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-1

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-2

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-3

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-4

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-5

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-6

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-7

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-8

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-9

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-10

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-11

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-12

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-13

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-14

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-15

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-16

NIGEL

31/01/13

Administration Building/ Wall Rebar Details-17

NIGEL

31/01/13

Administration Building/ Ground Floor Girder Rebar Details-1

AC

NIGEL

06/12/12

Administration Building/ Ground Floor Girder Rebar Details-2

AC

NIGEL

06/12/12

Administration Building/ Ground Floor Girder Rebar Details-3

AC

NIGEL

06/12/12

Administration Building/ Ground Floor Girder Rebar Details-4

AC

NIGEL

25/10/12

Administration Building/ Ground Floor Girder Rebar Details-5

NIGEL

31/01/13

Administration Building/ Ground Floor Girder Rebar Details-6

AC

NIGEL

25/10/12

Administration Building/ Ground Floor Girder Rebar Details-7

AC

NIGEL

25/10/12

Administration Building/ Ground Floor Girder Rebar Details-8

AC

NIGEL

06/12/12

Administration Building/ Ground Floor Girder Rebar Details-9

AC

NIGEL

06/12/12

Administration Building/ 1st Floor Girder Rebar Details-1

AC

NIGEL

25/10/12

Administration Building/ 1st Floor Girder Rebar Details-2

AC

NIGEL

06/12/12

Administration Building/ 1st Floor Girder Rebar Details-3

AC

NIGEL

06/12/12

Administration Building/ 1st Floor Girder Rebar Details-4

AC

NIGEL

06/12/12

Administration Building/ 1st Floor Girder Rebar Details-5

AC

NIGEL

25/10/12

Administration Building/ 1st Floor Girder Rebar Details-6

AC

NIGEL

25/10/12

Administration Building/ 1st Floor Girder Rebar Details-7

AC

NIGEL

25/10/12

Administration Building/ 1st Floor Girder Rebar Details-8

NIGEL

31/01/13

Administration Building/ 2nd Floor Girder Rebar Details-1

AC

NIGEL

06/12/12

Administration Building/ 2nd Floor Girder Rebar Details-2

AC

NIGEL

06/12/12

Administration Building/ 2nd Floor Girder Rebar Details-3

AC

NIGEL

06/12/12

Administration Building/ 2nd Floor Girder Rebar Details-4

AC

NIGEL

06/12/12

Administration Building/ 2nd Floor Girder Rebar Details-5

AC

NIGEL

06/12/12

Administration Building/ 2nd Floor Girder Rebar Details-6

AC

NIGEL

25/10/12

Administration Building/ 3rd Floor Girder Rebar Details-1

AC

NIGEL

25/10/12

Administration Building/ 3rd Floor Girder Rebar Details-2

AC

NIGEL

25/10/12

Administration Building/ 3rd Floor Girder Rebar Details-3

AC

NIGEL

25/10/12

Administration Building/ 3rd Floor Girder Rebar Details-4

AC

NIGEL

06/12/12

Administration Building/ 3rd Floor Girder Rebar Details-5

AC

NIGEL

25/10/12

Administration Building/ 3rd Floor Girder Rebar Details-6

AC

NIGEL

25/10/12

Administration Building/ 4th Floor Girder Rebar Details-1

AC

NIGEL

25/10/12

Administration Building/ 4th Floor Girder Rebar Details-2

AC

NIGEL

25/10/12

Administration Building/ 4th Floor Girder Rebar Details-3

AC

NIGEL

25/10/12

Administration Building/ 4th Floor Girder Rebar Details-4

AC

NIGEL

06/12/12

Administration Building/ 4th Floor Girder Rebar Details-5

AC

NIGEL

06/12/12

Administration Building/ 4th Floor Girder Rebar Details-6

AC

NIGEL

25/10/12

Administration Building/ 4th Floor Girder Rebar Details-7

AC

NIGEL

25/10/12

Administration Building/ Roof Floor Girder Rebar Details-1

AC

NIGEL

25/10/12

Administration Building/ Roof Floor Girder Rebar Details-2

AC

NIGEL

25/10/12

Administration Building/ Roof Floor Girder Rebar Details-3

AC

NIGEL

25/10/12

Administration Building/ Roof Floor Girder Rebar Details-4

AC

NIGEL

25/10/12

Administration Building/ Ground Floor Slab Rebar Details-1 (T.O.C EL +0.750)

NIGEL

31/01/13

Administration Building/ Ground Floor Slab Rebar Details-2 (T.O.C EL +0.750)

NIGEL

31/01/13

Administration Building/ Ground Floor Slab Rebar Details-3 (T.O.C EL +0.750)

NIGEL

31/01/13

Administration Building/ Ground Floor Slab Rebar Details-4 (T.O.C EL +0.450)

NIGEL

31/01/13

Administration Building/ 1st Floor Slab Rebar Details-1 (T.O.C EL +5.250)

AC

NIGEL

25/10/12

Administration Building/ 1st Floor Slab Rebar Details-2 (T.O.C EL +5.250)

NIGEL

31/01/13

Administration Building/ 1st Floor Slab Rebar Details-3 (T.O.C EL +5.250)

AC

NIGEL

25/10/12

Administration Building/ 1st Floor Slab Rebar Details-4 (T.O.C EL +6.250)

NIGEL

31/01/13

Administration Building/ 2nd Floor Slab Rebar Details-1 (T.O.C EL +9.450)

NIGEL

31/01/13

Administration Building/ 2nd Floor Slab Rebar Details-2 (T.O.C EL +9.450)

NIGEL

31/01/13

Administration Building/ 2nd Floor Slab Rebar Details-3 (T.O.C EL +9.450)

NIGEL

31/01/13

Administration Building/ 3rd Floor Slab Rebar Details-1 (T.O.C EL +13.650)

AC

NIGEL

25/10/12

Administration Building/ 3rd Floor Slab Rebar Details-2 (T.O.C EL +13.650)

NIGEL

31/01/13

Administration Building/ 3rd Floor Slab Rebar Details-3 (T.O.C EL +13.650)

NIGEL

31/01/13

Administration Building/ 4th Floor Slab Rebar Details-1 (T.O.C EL +17.850)

NIGEL

31/01/13

Administration Building/ 4th Floor Slab Rebar Details-2 (T.O.C EL +17.850)

NIGEL

31/01/13

Administration Building/ 4th Floor Slab Rebar Details-3 (T.O.C EL +17.850)

NIGEL

31/01/13

Administration Building/ Roof Floor Slab Rebar Details-1 (T.O.C EL +21.450)

NIGEL

31/01/13

Administration Building/ Roof Floor Slab Rebar Details-2 (T.O.C EL +21.450)

NIGEL

31/01/13

Administration Building/ Stair Rebar Detail-1

NIGEL

31/01/13

Administration Building/ Stair Rebar Detail-2

NIGEL

31/01/13

Administration Building/ Stair Rebar Detail-3

NIGEL

31/01/13

Administration Building/ Cable Trench Rebar Details

IC

NIGEL

07/03/13

Administration Building/ "SB1" Steel Structural Detail-2

NIGEL

27/12/12

Administration Building/ "SB1" Steel Structural Detail-3

NIGEL

27/12/12

Administration Building/ "SB1" Steel Structural Detail-4

NIGEL

27/12/12

Administration Building/ Structurual Calculation Sheets

NIGEL

30/01/13

Common Service Building / Equipment Foundation Rebar Details

IC

NIGEL

16/07/13

Common Service Building/ Structural Calculation Sheets

AC

NIGEL

28/01/13

Car Garage-1 / Interior Finish Schedule

NIGEL

11/07/13

Car Garage-2 / Ground Floor Plan & Roof Plan

AC

NIGEL

11/07/13

Car Garage-2 / Elevations

AC

NIGEL

11/07/13

Car Garage-2 / Main Sections

AC

NIGEL

11/07/13

Car Garage-2 / Interior Finish Schedule

NIGEL

11/07/13

Car Garage-3/ Ground Floor Plan

NIGEL

04/03/13

Car Garage-3/ Roof Plan

NIGEL

04/03/13

Car Garage-3/ Elevations

NIGEL

04/03/13

Car Garage-3/ Main Sections

NIGEL

04/03/13

Car Garage-3/ Interior Finish Schedule, Door & Window Schedule

IC

NIGEL

04/03/13

Car garage-3 / foundation & column plan

AC

NIGEL

25/06/13

Car garage-3 / ground floor framing plan & details

NIGEL

25/06/13

Car garage-3 / roof floor framing plan

NIGEL

25/06/13

Car garage-3 / framing sections-1

NIGEL

25/06/13

Car garage-3 / framing sections-2

NIGEL

25/06/13

Car Garage-3 / Foundation Rebar Details-1

NIGEL

25/06/13

Car Garage-3 / Foundation Rebar Details-2

NIGEL

25/06/13

Car Garage-3 / Column Rebar Details

NIGEL

25/06/13

Car Garage-3 / Girder Rebar Details-1

NIGEL

25/06/13

Car Garage-3 / Girder Rebar Details-2

NIGEL

25/06/13

Car Garage-3 / Girder Rebar Details-3

NIGEL

25/06/13

Car Garage-3 / Ground Floor Slab Rebar Plan & Section

IC

NIGEL

25/06/13

Car Garage-3 / Roof Floor Slab Rebar Plan & Section

IC

NIGEL

25/06/13

Calculation for Geotechnical and Structural Capacity of Bored Pile (D=800)

NIGEL

31/10/12

Calculation for Geotechnical and Structural Capacity of PC Pile (D=400)

AC

NIGEL

26/11/12

Site Classification Report for Seismic Design

NIGEL

28/11/12

Boiler Unit#1 Foundation Arrangement Plan

NIGEL

08/01/13

Boiler Unit #2 Foundation Arrangement Plan

NIGEL

08/01/13

Boiler Unit#1 Pile Arrangement Plan

NIGEL

08/01/13

Boiler Unit #2 Soil Replacement Plan & Section (1)

NIGEL

08/01/13

Boiler Unit #2 Soil Replacement Plan & Section (2)

NIGEL

08/01/13

Boiler Unit #2 Soil Replacement Plan & Section (3)

NIGEL

08/01/13

Boiler Unit#1 Construction Joint Plan

NIGEL

08/01/13

Boiler Unit #2 Construction Joint Plan

NIGEL

08/01/13

Boiler Unit#1 S.A Fan Foundation Plan & Section

NIGEL

08/01/13

Boiler Unit #2 S.A Fan Foundation Plan & Section

NIGEL

08/01/13

Boiler Unit#1 P.A Fan Foundation Plan & Section

NIGEL

08/01/13

Boiler Unit #2 P.A Fan Foundation Plan & Section

NIGEL

08/01/13

Boiler Unit#1 Miscellaneous Equipment Foundation Plan & Section

NIGEL

08/01/13

Boiler Unit #2 Miscellaneous Equipment Foundation Plan & Section

NIGEL

08/01/13

Boiler Unit#1 PA and SA Ducts Foundation Plan & Section

NIGEL

08/01/13

Boiler Unit #2 PA and SA Ducts Foundation Plan & Section

NIGEL

08/01/13

Boiler Unit #1 Foundation Detail (1)

NIGEL

08/01/13

Boiler Unit #1 Foundation Detail (2)

NIGEL

08/01/13

Boiler Unit #1 Foundation Detail (3)

NIGEL

08/01/13

Boiler Unit #1 Foundation Detail (4)

NIGEL

08/01/13

Boiler Unit #1 Foundation Detail (5)

NIGEL

08/01/13

Boiler Unit #1 Foundation Detail (6)

NIGEL

08/01/13

Boiler Unit #2 Foundation Detail (1)

NIGEL

08/01/13

Boiler Unit #2 Foundation Detail (2)

NIGEL

08/01/13

Boiler Unit #2 Foundation Detail (3)

NIGEL

08/01/13

Boiler Unit #2 Foundation Detail (4)

NIGEL

08/01/13

Boiler Unit #2 Foundation Detail (5)

NIGEL

08/01/13

Boiler Unit #2 Foundation Detail (6)

NIGEL

08/01/13

Boiler Unit #1 Foundation Reinforcement Plan (1)

NIGEL

08/01/13

Boiler Unit #1 Foundation Reinforcement Plan (2)

NIGEL

08/01/13

Boiler Unit #1 Foundation Reinforcement Plan (3)

NIGEL

08/01/13

Boiler Unit #2 Foundation Reinforcement Plan(1)

NIGEL

08/01/13

Boiler Unit #2 Foundation Reinforcement Plan(2)

NIGEL

08/01/13

Boiler Unit #2 Foundation Reinforcement Plan(3)

NIGEL

08/01/13

Boiler Unit #2 Foundation Reinforcement Plan(4)

NIGEL

08/01/13

Boiler Unit #1 Foundation Reinforcement Section & Detail (1)

NIGEL

08/01/13

Boiler Unit #1 Foundation Reinforcement Section & Detail (3)

NIGEL

08/01/13

Boiler Unit #1 Foundation Reinforcement Section & Detail (4)

NIGEL

08/01/13

Boiler Unit #1 Foundation Reinforcement Section & Detail (5)

NIGEL

08/01/13

Boiler Unit #1 Foundation Reinforcement Section & Detail (6)

NIGEL

08/01/13

Boiler Unit #1 Foundation Reinforcement Section & Detail (7)

NIGEL

08/01/13

Boiler Unit #1 Foundation Reinforcement Section & Detail (8)

NIGEL

08/01/13

Boiler Unit #1 Foundation Reinforcement Section & Detail (9)

NIGEL

08/01/13

Boiler Unit #1 Foundation Reinforcement Section & Detail (10)

NIGEL

08/01/13

Boiler Unit #2 Foundation Reinforcement Section & Detail (3)

NIGEL

08/01/13

Boiler Unit #2 Foundation Reinforcement Section & Detail (4)

NIGEL

08/01/13

Boiler Unit #2 Foundation Reinforcement Section & Detail (5)

NIGEL

08/01/13

Boiler Unit #2 Foundation Reinforcement Section & Detail (6)

NIGEL

08/01/13

Boiler Unit #2 Foundation Reinforcement Section & Detail (7)

NIGEL

08/01/13

Boiler Unit #2 Foundation Reinforcement Section & Detail (8)

NIGEL

08/01/13

Boiler Unit #2 Foundation Reinforcement Section & Detail (9)

NIGEL

08/01/13

Boiler Unit #2 Foundation Reinforcement Section & Detail (10)

NIGEL

08/01/13

Boiler Unit #1 S.A Fan Foundation Reinforcement Detail (1)

NIGEL

08/01/13

Boiler Unit #1 S.A Fan Foundation Reinforcement Detail (2)

NIGEL

08/01/13

Boiler Unit #2 S.A Fan Foundation Reinforcement Detail(1)

NIGEL

08/01/13

Boiler Unit #2 S.A Fan Foundation Reinforcement Detail (2)

NIGEL

08/01/13

Boiler Unit #1 P.A Fan Foundation Reinforcement Detail (1)

NIGEL

08/01/13

Boiler Unit #1 P.A Fan Foundation Reinforcement Detail (2)

NIGEL

08/01/13

Boiler Unit #2 P.A Fan Foundation Reinforcement Detail (1)

NIGEL

08/01/13

Boiler Unit #2 P.A Fan Foundation Reinforcement Detail (2)

NIGEL

08/01/13

Boiler Unit #1 Miscellaneous Equipment Foundation Reinforcement Detail

NIGEL

08/01/13

Boiler Unit #2 Miscellaneous Equipment foundation Reinforcement Detail

NIGEL

08/01/13

I.D FAN UNIT#1A PILE ARRANGEMENT PLAN

RT

NIGEL

27/05/13

I.D FAN UNIT#1B PILE ARRANGEMENT PLAN

RT

NIGEL

06/03/13

I.D FAN UNIT#1A FOUNDATION PLAN

RT

NIGEL

27/05/13

I.D FAN UNIT#1B FOUNDATION PLAN

RT

NIGEL

06/05/13

I.D FAN UNIT#1B FOUNDATION PLAN

RT

NIGEL

06/05/13

I.d fan unit#2b foundation plan & section

RT

NIGEL

06/05/13

CALCULATION FOR I.D FAN FOUNDATION

RT

NIGEL

27/05/13

Calculation for i.d fan unit#1b, #2(a,b) foundation

RT

NIGEL

06/05/13

I.D FAN FOUNDATION SECTION & DETAIL

RT

NIGEL

27/05/13

I.d fan unit#1b foundation section & detail

RT

NIGEL

06/05/13

I.d fan unit#2a foundation section & detail

RT

NIGEL

06/05/13

I.d fan unit#2b foundation section & detail

RT

NIGEL

06/05/13

I.d fan unit#1a foundation reinforcement detail (1)

RT

NIGEL

27/05/13

I.d fan unit#1a foundation reinforcement detail (2)

RT

NIGEL

27/05/13

I.d fan unit#1a foundation reinforcement detail (3)

RT

NIGEL

27/05/13

I.d fan unit#1a foundation reinforcement detail (4)

RT

NIGEL

27/05/13

I.d fan unit#1a foundation reinforcement detail (5)

RT

NIGEL

27/05/13

I.d fan unit#2a foundation reinforcement detail (1)

RT

NIGEL

27/05/13

I.d fan unit#2a foundation reinforcement detail (2)

RT

NIGEL

27/05/13

I.d fan unit#2a foundation reinforcement detail (3)

RT

NIGEL

27/05/13

I.d fan unit#2a foundation reinforcement detail (4)

RT

NIGEL

27/05/13

I.d fan unit#2a foundation reinforcement detail (5)

RT

NIGEL

27/05/13

I.d fan unit#1b, #2b foundation reinforcement detail (1)

RT

NIGEL

27/05/13

I.d fan unit#1b, #2b foundation reinforcement detail (2)

RT

NIGEL

27/05/13

I.d fan unit#1b, #2b foundation reinforcement detail (3)

RT

NIGEL

27/05/13

I.d fan unit#1b, #2b foundation reinforcement detail (4)

RT

NIGEL

27/05/13

I.d fan unit#1b, #2b foundation reinforcement detail (5)

RT

NIGEL

27/05/13

Coal runoff pond plan & section

AC

NIGEL

03/07/13

Coal Stock Area (No.1-1) Pile Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.1-2) Pile Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.2-1) Pile Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.2-2) Pile Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.3-2) Pile Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.4-1) Pile Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.4-2) Pile Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.1-4) Pile & Pile Load Test Schedule

NIGEL

05/03/13

Coal Stock Area (No.1-1) Pile Cap Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.1-2) Pile Cap Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.2-1) Pile Cap Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.2-2) Pile Cap Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.3-2) Pile Cap Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.4-1) Pile Cap Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.4-2) Pile Cap Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.1) Construction Joint Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.2) Construction Joint Arrangement Plan

NIGEL

05/03/13

Coal Stock Area (No.4) Construction Joint Arrangement Plan

NIGEL

05/03/13

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Overall Plan

NIGEL

27/06/13

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Plan(1)

NIGEL

27/06/13

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Plan(2)

NIGEL

27/06/13

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Plan(3)

NIGEL

27/06/13

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Plan(4)

NIGEL

27/06/13

Coal Stock Area Equipment FDN Pile Schedule & Pile Load Test Schedule

NIGEL

27/06/13

Coal Stock Area Stacker/ Reclaimer Pile Arrangement Detail-1

NIGEL

27/06/13

Coal Stock Area Stacker/ Reclaimer Pile Arrangement Detail-2

NIGEL

27/06/13

Coal Stock Area Stacker/ Reclaimer Pile Arrangement Section-1

NIGEL

27/06/13

Coal Stock Area Stacker/ Reclaimer Pile Arrangement Section-2

NIGEL

27/06/13

Coal stock belt conveyor end of bc08, bc11 pile arrangement plan & section

AC

NIGEL

19/03/13

Coal stock belt conveyor end of bc09, bc10 pile arrangement plan & section

AC

NIGEL

19/03/13

Calculation for Coal Stock Area Foundation

NIGEL

05/03/13

Calculation for coal runoff pond structure

AC

NIGEL

03/07/13

Calculation for Coal Stock Area Equipment Foundation

NIGEL

27/06/13

Calculation for coal belt conveyor foundation

AC

NIGEL

02/07/13

Coal Stock Area FDN Shear Reinforcement Detail

NIGEL

05/03/13

Coal stock belt conveyor end of bc08, bc11 foundation plan, section & detail

AC

NIGEL

19/03/13

Coal stock belt conveyor end of bc09, bc10 foundation plan, section & detail

AC

NIGEL

19/03/13

Belt conveyor bc-01a/b pile arrangement plan

AC

NIGEL

02/07/13

Belt conveyor bc-01a/b foundation detail-1

AC

NIGEL

02/07/13

Belt conveyor bc-01a/b foundation detail-2

AC

NIGEL

02/07/13

Belt conveyor bc-01a/b foundation detail-3

AC

NIGEL

02/07/13

Belt conveyor bc-01a/b foundation detail-4

AC

NIGEL

02/07/13

Belt conveyor bc-01a/b foundation detail-5

AC

NIGEL

02/07/13

Belt conveyor bc-01a/b foundation detail-6

AC

NIGEL

02/07/13

Belt conveyor bc-02a/b foundation plan

NIGEL

02/07/13

Belt conveyor bc-02a/b foundation detail-1

NIGEL

02/07/13

Belt conveyor bc-02a/b foundation detail-2

NIGEL

02/07/13

Belt conveyor bc-03a/b pile arrangement plan

NIGEL

02/07/13

Belt conveyor bc-03a/b foundation detail-1

NIGEL

02/07/13

Belt conveyor bc-03a/b foundation detail-2

NIGEL

02/07/13

Belt conveyor bc-03a/b foundation detail-3

NIGEL

02/07/13

Belt conveyor bc-03a/b foundation detail-4

NIGEL

02/07/13

Belt conveyor bc-03a/b foundation detail-5

AC

NIGEL

02/07/13

Belt conveyor bc-05a/b foundation plan

NIGEL

02/07/13

Belt conveyor bc-05a/b foundation detail

NIGEL

02/07/13

Belt conveyor bc-06a/b foundation plan

NIGEL

02/07/13

Belt conveyor bc-06a/b foundation detail-1

NIGEL

02/07/13

Belt conveyor bc-06a/b foundation detail-2

NIGEL

02/07/13

Belt conveyor bc-08 & bc-11 foundation plan

NIGEL

02/07/13

Belt conveyor bc-08 & bc-11 foundation detail

AC

NIGEL

02/07/13

Belt conveyor bc-09 & bc-10 foundation plan

NIGEL

02/07/13

Belt conveyor bc-09 & bc-10 foundation detail

AC

NIGEL

02/07/13

Coal runoff pond re-bar plan & section (1)

RT

NIGEL

03/07/13

Coal runoff pond re-bar plan & section (2)

RT

NIGEL

03/07/13

Coal Stock Area FDN. (No.1-1) Slab Rebar Plan

NIGEL

05/03/13

Coal Stock Area FDN. (No.1-2) Slab Re-bar Plan

NIGEL

05/03/13

Coal Stock Area FDN. (No.2-1) Reinforcement Plan

NIGEL

05/03/13

Coal Stock Area FDN. (No.2-2) Reinforcement Plan

NIGEL

05/03/13

Coal Stock Area FDN. (No.3-1) Reinforcement Plan

NIGEL

05/03/13

Coal Stock Area FDN. (No.4-1) Reinforcement Plan

NIGEL

05/03/13

Coal Stock Area FDN. (No.4-2) Reinforcement Plan

NIGEL

05/03/13

Coal stock belt conveyor end of bc08, bc11 foundation re-bar plan & section

RT

NIGEL

06/05/13

Coal stock belt conveyor end of bc09, bc10 foundation re-bar plan & section

RT

NIGEL

06/05/13

Belt conveyor bc-01 a/b foundation re-bar detail -1

AC

NIGEL

02/07/13

Belt conveyor bc-01 a/b foundation re-bar detail -2

AC

NIGEL

02/07/13

Belt conveyor bc-01 a/b foundation re-bar detail -3

AC

NIGEL

02/07/13

Belt conveyor bc-01 a/b foundation re-bar detail -4

AC

NIGEL

02/07/13

Belt conveyor bc-01 a/b foundation re-bar detail -5

AC

NIGEL

02/07/13

Belt conveyor bc-01 a/b foundation re-bar detail-6

AC

NIGEL

02/07/13

Belt conveyor bc-02 a/b foundation re-bar detail -1

NIGEL

02/07/13

Belt conveyor bc-03 a/b foundation re-bar detail -1

NIGEL

02/07/13

Belt conveyor bc-03 a/b foundation re-bar detail -2

NIGEL

02/07/13

Belt conveyor bc-03 a/b foundation re-bar detail -3

NIGEL

02/07/13

Belt conveyor bc-03 a/b foundation re-bar detail -4

NIGEL

02/07/13

Belt conveyor bc-05 a/b foundation re-bar detail -1

NIGEL

02/07/13

Belt conveyor bc-06 a/b foundation re-bar detail -1

NIGEL

02/07/13

Belt conveyor bc-09 & bc-10 foundation re-bar detail -1

NIGEL

02/07/13

Limestone Grinding House Mechanical FDN. Pile Arragement Plan

AC

NIGEL

10/06/13

Limestone Grinding House Mechanical Foundation Plan

AC

NIGEL

10/06/13

Limestone grinding house steel structure pile arrangement plan

AC

NIGEL

26/07/13

Limestone Grinding House Pit Structure Plan

AC

NIGEL

28/06/13

Limestone handling system tower lt-01 & conveyor l-02 fdn. & pile arrange plan

RT

NIGEL

27/05/13

Limestone handling system tower lt-02 & conveyor l-03 fdn. & pile arrange plan

RT

NIGEL

27/05/13

Limestone handling system tower lt-03 & conveyor l-04 fdn. & pile arrange plan

RT

NIGEL

27/05/13

Limestone handling system tower lt-04 & conveyor l-05 fdn. & pile arrange plan

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-01 foundation details (1)

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-02 foundation details (1)

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-03 foundation details (1)

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-04 foundation details (1)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-02 foudation details (1)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-02 foudation details (2)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-02 foudation details (3)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-02 foudation details (4)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-02 foudation details (5)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-03 foudation details (1)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-03 foudation details (2)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-03 foudation details (3)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-03 foudation details (4)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-04 foudation details (1)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-04 foudation details (2)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-04 foudation details (3)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-04 foudation details (4)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-05 foudation details (1)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-05 foudation details (2)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-05 foudation details (3)

RT

NIGEL

27/05/13

Calculation for Limestone Grinding House Pit Structure

AC

NIGEL

28/06/13

Calculation for limestone transfer tower foundation lt-01, lt-02, lt-03 and lt-4

RT

NIGEL

27/05/13

Calculation for limestone belt conveyor foundation bc-02

RT

NIGEL

27/05/13

Calculation for limestone belt conveyor foundation bc-03

RT

NIGEL

27/05/13

Calculation for limestone belt conveyor foundation bc-04

RT

NIGEL

27/05/13

Calculation for limestone belt conveyor l-05 foundation

RT

NIGEL

27/05/13

Calculation for limestone grinding house steel structure foundation

AC

NIGEL

26/07/13

Calculation for Limestone Grinding House Mechanical Foundation

RT

NIGEL

10/06/13

Limestone Grinding House Pit Structure Section & Detail (1)

AC

NIGEL

28/06/13

Limestone Grinding House Pit Structure Section & Detail (2)

AC

NIGEL

28/06/13

Limestone Grinding House Pit Structure Section & Detail (3)

AC

NIGEL

28/06/13

Limestone grinding house steel structure foundation detail (1)

RT

NIGEL

26/07/13

Limestone grinding house steel structure foundation detail (2)

RT

NIGEL

26/07/13

Limestone grinding house steel structure foundation detail (3)

AC

NIGEL

26/07/13

Limestone grinding house steel structure foundation detail (4)

AC

NIGEL

26/07/13

Limestone grinding house steel structure foundation detail (5)

AC

NIGEL

26/07/13

Limestone Grinding House Mechanical Foundation Detail (1)

AC

NIGEL

10/06/13

Limestone Grinding House Mechanical Foundation Detail (2)

AC

NIGEL

10/06/13

Limestone Grinding House Mechanical Foundation Detail (3)

AC

NIGEL

10/06/13

Limestone Grinding House Mechanical Foundation Detail (4)

AC

NIGEL

10/06/13

Limestone Grinding House Mechanical Foundation Detail (5)

AC

NIGEL

10/06/13

Limestone handling system transfer tower lt-01 foundation details (2)

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-02 foundation details (2)

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-03 foundation details (2)

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-04 foundation details (2)

RT

NIGEL

27/05/13

Limestone grinding house pit reinforcement detail (1)

AC

NIGEL

28/06/13

Limestone grinding house pit reinforcement detail (2)

AC

NIGEL

28/06/13

Limestone grinding house pit reinforcement detail (3)

AC

NIGEL

28/06/13

Limestone grinding house pit reinforcement detail (4)

AC

NIGEL

28/06/13

Limestone grinding house pit reinforcement detail (5)

AC

NIGEL

28/06/13

Limestone grinding house pit reinforcement detail (6)

AC

NIGEL

28/06/13

Limestone Grinding House Pit Reinforcement Detail (7)

AC

NIGEL

28/06/13

Limestone Grinding House Steel Str. Foundation Re-bar Detail (1)

RT

NIGEL

26/07/13

Limestone Grinding House Steel Str. Foundation Re-bar Detail (2)

RT

NIGEL

26/07/13

Limestone Grinding House Steel Str. Foundation Re-bar Detail (3)

RT

NIGEL

26/07/13

Limestone Grinding House Steel Str. Foundation Re-bar Detail (4)

RT

NIGEL

26/07/13

Limestone Grinding House Steel Str. Foundation Re-bar Detail (5)

RT

NIGEL

26/07/13

Limestone Grinding House Steel Str. Foundation Re-bar Detail (6)

RT

NIGEL

26/07/13

Dry Flight Conveyor Support Foundation Plan (1)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Plan (2)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Plan (3)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Plan (4)

RT

NIGEL

18/07/13

Bottom ash silo unit #1b foundation plan

RT

NIGEL

27/05/13

Bottom ash silo unit #2a foundation plan

RT

NIGEL

27/05/13

Ash pipe lines pipe rack - 1 fdn & pile arrangement plan

NIGEL

26/07/13

Ash pipe lines pipe rack - 1 foundation details

NIGEL

26/07/13

Ash pipe lines pipe rack - 1 structure details

AC

NIGEL

26/07/13

Ash pipe lines pipe rack - 2 (discharge canal) fdn & pile

NIGEL

24/07/13

Ash pipe lines pipe rack-2 overpassing md2 discharge canal foundation details

NIGEL

24/07/13

Ash pipe lines pipe rack-2 overpassing md2 discharge canal structure details (1)

NIGEL

24/07/13

Ash pipe lines pipe rack-2 overpassing md2 discharge canal structure details (2)

NIGEL

24/07/13

Ash pipe lines pipe rack-2 overpassing md2 discharge canal structure details (3)

NIGEL

24/07/13

Ash pipe lines pipe rack - 2 overpassing md2 discharge canal connection details

NIGEL

24/07/13

Ash pipe lines pipe rack - 3 fdn & pile arrangement plan

NIGEL

26/07/13

Ash pipe lines pipe rack - 3 foundation details

NIGEL

26/07/13

Ash pipe lines pipe rack - 3 structure details

AC

NIGEL

26/07/13

Ash Pipe Lines Trench Details (1)

RT

NIGEL

30/05/13

Ash Pipe Lines Trench Details (2)

RT

NIGEL

30/05/13

Calculation for ash piperack structure and foundation (pr-2) overpassing md2 dl

NIGEL

24/07/13

Calculation for ash pipe rack-1,3 steel structure and foundation

NIGEL

26/07/13

Calculation for ASH Pipe Lines Sleeper Foundation

NIGEL

09/05/13

Calculation for ASH Pipe Lines Trench

AC

NIGEL

30/05/13

Calculation for bottom ash silo foundation (shallow)

RT

NIGEL

27/05/13

Calculation For Dry Flight Conveyor Support Foundation

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (1)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (2)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (3)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (4)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (5)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (6)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (7)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (8)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (9)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (10)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (11)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (12)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (13)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (14)

RT

NIGEL

18/07/13

Bottom ash silo unit #1b,2a foundation section

RT

NIGEL

27/05/13

Bottom ash silo unit #1b,2a foundation detail

RT

NIGEL

27/05/13

Ash pipe lines pipe rack-2 overpassing md2 discharge canal foundation reinf. des

NIGEL

24/07/13

Ash Pipe Lines Trench Reinf. Details(1)

RT

NIGEL

30/05/13

Ash Pipe Lines Trench Reinf. Details(2)

RT

NIGEL

30/05/13

FLUE GAS DUCT FOR UNIT#1 FOUNDATION PLAN & SECTION (1)

RT

NIGEL

09/05/13

Flue gas duct for unit#1 foundation plan

RT

NIGEL

09/05/13

Flue gas duct for unit#2 foundation plan

RT

NIGEL

09/05/13

Flue gas duct for unit#1b soil replacement plan

RT

NIGEL

09/05/13

Flue gas duct for unit#2a soil replacement plan

RT

NIGEL

09/05/13

Flue gas duct for unit#2b soil replacement plan

RT

NIGEL

09/05/13

Calculation for flue gas duct foundation

RT

NIGEL

09/05/13

Flue gas duct foundation detail(1)

RT

NIGEL

09/05/13

Flue gas duct foundation detail(2)

RT

NIGEL

09/05/13

Flue gas duct foundation detail(3)

RT

NIGEL

09/05/13

Flue gas duct foundation detail(4)

RT

NIGEL

09/05/13

Auxiliary Boiler Pile Foundation Plan & Detail

NIGEL

28/02/13

Auxiliary Boiler Foundation Plan & Section(1)

NIGEL

28/02/13

Auxiliary Boiler Foundation Plan & Section(3)

NIGEL

28/02/13

Auxiliary Boiler Foundation Plan & Section(5)

NIGEL

28/02/13

Station Auxiliary Transformer Area Sump Pump Pit Plan & Section

IC

NIGEL

31/05/13

Calculation For Sump Pump Pit

IC

NIGEL

31/05/13

Station Auxiliary Transformer Area Sump Pump Pit Rebar plan

IC

NIGEL

31/05/13

Station Auxiliary Transformer Area Sump Pump Pit Rebar Section & Detail

IC

NIGEL

31/05/13

Start Up Flash Tank Unit#1 Foundation Plan & Section

RT

NIGEL

24/07/13

Start Up Flash Tank Unit#2 Foundation Plan & Section

RT

NIGEL

24/07/13

Dirty Oil Tank Foundation Plan & Section

RT

NIGEL

24/07/13

Calculation for Shop Fabricated Tank Foundation (Dirty Oil & Start Up Flash Tan)

RT

NIGEL

24/07/13

Start Up Flash Tank Unit#1,2 Foundation Detail

RT

NIGEL

24/07/13

Dirty Oil Tank Foundation Detail

RT

NIGEL

24/07/13

Raw Water Storage Tank Pile Location Plan & Section(1)

NIGEL

24/10/12

Raw Water Storage Tank Pile Location Plan & Section(2)

NIGEL

24/10/12

Raw Water Storage Tank (1) Foundation Plan & Section

NIGEL

24/10/12

Raw Water Storage Tank (2) Foundation Plan & Section

NIGEL

24/10/12

Filtered Water Storage Tank (1) Pile Location Plan & Section

NIGEL

05/10/12

Filtered Water Storage Tank (2) Pile Location Plan & Section

NIGEL

05/10/12

Filtered Water Storage Tank (1) Foundation Plan & Section

NIGEL

05/10/12

Filtered Water Storage Tank (2) Foundation Plan & Section

NIGEL

05/10/12

Demi Water Storage Tank Pile Location Plan & Section (1)

NIGEL

22/10/12

Demi Water Storage Tank Pile Location Plan & Section (2)

NIGEL

22/10/12

Demi Water Storage Tank (1) Foundation Plan & Section

NIGEL

28/11/12

Demi Water Storage Tank (2) Foundation Plan & Section

NIGEL

28/11/12

Portable Water Storage Tank Foundation Plan & Section

NIGEL

11/01/13

Fire Water Storage Tank (1) Pile Location Plan & Section

NIGEL

24/10/12

Fire Water Storage Tank (2) Pile Location Plan & Section

NIGEL

24/10/12

Fire Water Storage Tank (1) Foundation Plan & Section

NIGEL

28/11/12

Fire Water Storage Tank (2) Foundation Plan & Section

NIGEL

28/11/12

Diesel Oil Storage Tank Foundation Plan & Section

NIGEL

11/01/13

Fuel Oil Storage Tank (1) Foundation Plan & Section

AC

NIGEL

13/11/12

Fuel Oil Storage Tank (2) Foundation Plan & Section

AC

NIGEL

13/11/12

Fuel Oil Storage Tank (1), (2) Soil Replacement Plan

AC

NIGEL

13/11/12

Fuel Oil Area Oil Separator FDN. & Valve Pit FDN. Plan Sections & Details

RT

NIGEL

08/07/13

Fuel Oil Pipe Lines Foundation Arrangement Plan(1)

IC

NIGEL

14/06/13

Fuel Oil Pipe Lines Foundation Arrangement Plan(2)

IC

NIGEL

10/05/13

Fuel oil pipe lines pipe rack - 1 fdn & pile arrangement plan

NIGEL

26/07/13

Fuel oil pipe lines pipe rack - 1 foundation details

NIGEL

26/07/13

Fuel oil pipe lines pipe rack - 1 structure details

AC

NIGEL

26/07/13

Fuel oil pipe lines pipe rack - 2 fdn & pile arrangement plan

NIGEL

26/07/13

Fuel oil pipe lines pipe rack - 2 foundation details

NIGEL

26/07/13

Fuel oil pipe lines pipe rack - 2 structure details

AC

NIGEL

26/07/13

Fuel Oil Pipe Lines Sleeper Foudation Details

IC

NIGEL

14/06/13

Calculation for Diesel Oil Storage Tank Foundation

NIGEL

13/11/12

Calculation for Raw Water Storage Tank Foundation

NIGEL

28/11/12

Calculation for Filtered Water Storage Tank Foundation

NIGEL

28/11/12

Calculation for Demi Water Storage Tank Foundation

NIGEL

28/11/12

Calculation For Condensate Water Storage Tank Foundation

NIGEL

19/12/12

Calculation for Portable Water Storage Tank Foundation

NIGEL

11/01/13

Calculation for Fire Water Storage Tank Foundation

NIGEL

28/11/12

Calculation for Fuel Oil Storage Tank Foundation

AC

NIGEL

13/11/12

Calculation for Fuel Oile Pipe Line Sleeper Foundation

IC

NIGEL

14/06/13

Calculation for fuel oil pipe rack-1,2 steel structure and foundation

NIGEL

26/07/13

Calculation for Fuel Oil Separator Structure

RT

NIGEL

08/07/13

Demi Water Storage Tank Foundation Bar Bending Schedule

IC

NIGEL

22/10/12

Raw Water Storage Tank (1) Foundation Reinforcement Detail

NIGEL

24/10/12

Raw Water Storage Tank (2) Foundation Reinforcement Detail

NIGEL

24/10/12

Filtered Water Storage Tank (1), (2) Foundation Reinforcement Detail

NIGEL

05/10/12

Condensate Water Storage Tank (1), (2) Foundation Reinforcement Detail

NIGEL

19/12/12

Fuel Oil Storage Tank (1), (2) Foundation Reinforcement Detail

AC

NIGEL

13/11/12

Diesel Oil Storage Tank Foundation Reinforcement Detail

NIGEL

13/11/12

Fire Water Storage Tank (1), (2) Foundation Reinforcement Detail

NIGEL

24/10/12

PERIMETER FENCE AND GATE OVERALL LAYOUT PLAN

AC

NIGEL

28/02/13

PERIMETER FENCE PLAN & SECTIONS

AC

NIGEL

28/02/13

PERIMETER FENCE DETAILS

AC

NIGEL

28/02/13

NIGEL

28/02/13

AC

NIGEL

28/02/13

NIGEL

02/07/12

PERIMETER FENCE REBAR DETAILS


PERIMETER FENCE AND GATE MAIN GATE PLAN, ELEVATION & SECTION
Borehole Location Plan
Rock Bed Contour Plan

NIGEL

02/07/12

General Notes (1)

RT

NIGEL

13/08/12

General Notes

NIGEL

14/09/12

Standard Details: Reinforcing Bar

RT

NIGEL

02/07/12

Standard Details: Ladder Details

RT

NIGEL

02/07/12

Standard Details: Handrail Details

RT

NIGEL

02/07/12

Standard Details: Bored Pile Details

NIGEL

28/12/12

Design Criteria- Civil & Architecture

AC

NIGEL

13/07/12

CALCULATON FOR FOUNDATIONS OF PERIMETER FENCE

AC

NIGEL

28/02/13

NIGEL

06/06/13

Perimeter Asphalt Road Paving Plan(1)

AC

NIGEL

28/01/13

Coal storage yard paving layout plan (1)

RT

NIGEL

05/07/13

Coal Storage Yard Paving Layout Plan (2)

RT

NIGEL

05/07/13

Coal Storage Yard Paving Layout Plan (3)

RT

NIGEL

05/07/13

Coal storage yard paving plan & section

RT

NIGEL

05/07/13

Perimeter Asphalt Road Longitudinal Profile (1)

RT

NIGEL

28/01/13

Calculation for Perimeter Asphalt Road Paving

NIGEL

28/01/13

Switchyard Fence & Gate - Section & Detail (2)

Perimeter Asphalt Road Paving Section & Detail(1)

AC

NIGEL

28/01/13

550KV Switchyard Area Storm Drainage Layout Plan

RT

NIGEL

12/06/13

110KV Switchyard Area Storm Drainage Layout Plan

RT

NIGEL

12/06/13

Coal storage yard drain ditch layout plan

RT

NIGEL

05/07/13

Hydraulic calculaton for storm water drainage system

RT

NIGEL

12/06/13

Calculation for Storm Water Drainage System

IC

NIGEL

12/06/13

Perimeter Asphalt Road Storm Drainage Detail(1)

AC

NIGEL

28/01/13

Perimeter Asphalt Road Storm Drainage Detail(2)

AC

NIGEL

28/01/13

Switchyard Area Storm Drainage Details (1)

IC

NIGEL

12/06/13

Switchyard Area Storm Drainage Details (2)

RT

NIGEL

12/06/13

Switchyard Area Storm Drainage Detail (3)

IC

NIGEL

12/06/13

Coal Storage Yard Drainage Detail (1)

IC

NIGEL

05/07/13

Coal Storage Yard Drainage Detail (2)

IC

NIGEL

05/07/13

C.W Intake Pump Station Plan & Section (1)

AC

NIGEL

06/06/13

C.W Intake Pump Station Plan & Section (2)

RT

NIGEL

06/06/13

C.W Intake Pump Station Plan & Section (3)

AC

NIGEL

06/06/13

C.W Intake Pump Station Plan & Section (4)

AC

NIGEL

06/06/13

C.W Intake Pump Station Plan & Section (5)

RT

NIGEL

06/06/13

C.W Intake Pump Station Plan & Section (6)

AC

NIGEL

06/06/13

C.W Intake Pump Station Plan & Section (7)

AC

NIGEL

06/06/13

C.W Intake Pump Station Plan & Section (8)

AC

NIGEL

06/06/13

C.W Intake Pump Station Pile Arrangement Plan & Section

RT

NIGEL

06/06/13

C.W Inlet & Discharge Pipe Bedding Plan (1)

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Bedding Plan (2)

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Bedding Plan (3)

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Bedding Cross Section Detail (1)

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Bedding Cross Section Detail (2)

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Bedding Cross Section Detail (3)

AC

NIGEL

22/04/13

C.W Pipe Valve Pit Structure Plan & Section (1)

RT

NIGEL

12/07/13

C.W Pipe Valve Pit Structure Plan & Section (2)

RT

NIGEL

12/07/13

C.W Pipe Valve Pit Structure Plan & Section (3)

AC

NIGEL

12/07/13

Seal PIT Structure (Type A) Plan & Section

AC

NIGEL

27/05/13

Seal PIT Structure (Type B) Plan & Section

AC

NIGEL

27/05/13

SEAL PIT STRUCTURE (TYPE-A) PILE ARRANGEMENT PLAN & SECTION

AC

NIGEL

27/05/13

SEAL PIT STRUCTURE (TYPE-B) PILE ARRANGEMENT PLAN & SECTION

AC

NIGEL

27/05/13

C.W Discharge Culvert Plan & Profile

NIGEL

26/02/13

C.W Discharge Culvert Plan & Section (1)

NIGEL

26/02/13

C.W Discharge Culvert Plan & Section (2)

NIGEL

26/02/13

Calculation for C.W Intake Pump Station

RT

NIGEL

06/06/13

Calculation for Seal PIT Structure

AC

NIGEL

27/05/13

NIGEL

21/06/13

Calculation for Temporary Work- Seal PIT Structure

NIGEL

11/01/13

Calculation for C.W Pipe Bedding

NIGEL

22/04/13

Calculation for C.W Pipe Valve Pit Structure

AC

NIGEL

12/07/13

C.W Intake Pump Station Detail (1)

AC

NIGEL

06/06/13

C.W Intake Pump Station Detail (2)

AC

NIGEL

06/06/13

C.W Intake Pump Station Detail (3)

AC

NIGEL

06/06/13

Calculation for Temporary Slope Stability - C.W Outfall

C.W Intake Pump Station Detail (4)

AC

NIGEL

06/06/13

C.W Intake Pump Station Detail (5)

AC

NIGEL

06/06/13

C.W Intake Pump Station Detail (6)

RT

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (1)

RT

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (2)

RT

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (3)

AC

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (4)

AC

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (5)

AC

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (6)

AC

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (7)

AC

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (8)

AC

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (9)

AC

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (10)

AC

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (11)

AC

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (12)

AC

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (13)

RT

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (14)

RT

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (15)

RT

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (16)

RT

NIGEL

06/06/13

C.W Inlet & Discharge Pipe Incasement (Type-1) Detail

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Incasement (Type-2) Detail

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Incasement (Type-3) Detail

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Incasement (Type-4) Detail

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Incasement (Type-5) Detail

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Incasement (Type-6) Detail

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Incasement (Type-7) Detail

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Incasement (Type-8) Detail

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Incasement (Type-9) Detail

AC

NIGEL

22/04/13

C.W Inlet & Discharge Pipe Incasement (Type-10) Detail

AC

NIGEL

22/04/13

C.W Pipe Valve Pit Structure Rebar Detail (1)

AC

NIGEL

12/07/13

C.W Pipe Valve Pit Structure Rebar Detail (2)

AC

NIGEL

12/07/13

Seal PIT Structure (Type A-B) Reinforcement Detail (1)

AC

NIGEL

27/05/13

Seal PIT Structure (Type A-B) Reinforcement Detail (2)

AC

NIGEL

27/05/13

C.W Discharge Culvert- Rebar Detail (1)

NIGEL

26/02/13

C.W Discharge Culvert- Rebar Detail (2)

NIGEL

26/02/13

C.W Discharge Culvert- Re-bar Detail (3)

NIGEL

26/02/13

C.W Discharge Culvert- Re-bar Detail (4)

NIGEL

26/02/13

C.W Discharge Culvert- Re-bar Detail (5)

NIGEL

26/02/13

C.W Discharge Culvert- Re-bar Detail (6)

NIGEL

26/02/13

C.W Discharge Culvert- Re-bar Detail (8)

NIGEL

26/02/13

Seal PIT Structure (Type-A)- Temporary Work Plan & Section (1)

IC

NIGEL

11/01/13

Seal PIT Structure (Type-A)- Temporary Work Plan & Section (2)

IC

NIGEL

11/01/13

Seal PIT Structure (Type-B)- Temporary Work Plan & Section (1)

IC

NIGEL

11/01/13

Seal PIT Structure (Type-B)- Temporary Work Plan & Section (2)

IC

NIGEL

11/01/13

Seal PIT Structure-Temporary Work Diesel (1)

IC

NIGEL

11/01/13

Seal PIT Structure-Temporary Work Diesel (2)

IC

NIGEL

11/01/13

Seal PIT Structure-Temporary Work Diesel (3)

IC

NIGEL

11/01/13

C.W Discharge Culvert Temporary Work Plan & Section

AC

NIGEL

08/11/12

C.w outfall structure temporary coffer dam plan & Sec(1)

NIGEL

21/06/13

C.w outfall structure temporary coffer dam plan & Sec(2)

NIGEL

21/06/13

C.w outfall structure temporary coffer dam plan & Sec(3)

NIGEL

21/06/13

C.w outfall structure temporary coffer dam plan & Sec(4)

NIGEL

21/06/13

C.w outfall structure temporary coffer dam plan & Sec(5)

NIGEL

21/06/13

C.w outfall structure temporary coffer dam plan & Sec(6)

NIGEL

21/06/13

C.w outfall structure temporary coffer dam plan & Sec(7)

NIGEL

21/06/13

C.w outfall structure temporary coffer dam plan & Sec(8)

NIGEL

21/06/13

C.w outfall structure temporary coffer dam plan & Sec(9)

NIGEL

21/06/13

C.w outfall structure temporary coffer dam plan & Sec(10)

NIGEL

21/06/13

C.w outfall structure temporary coffer dam plan & Sec(11)

NIGEL

21/06/13

C.w outfall structure temporary coffer dam plan & Sec(12)

NIGEL

21/06/13

Main & Unit Aux. Transformer Unit #1 Pile Arrangement Plan

NIGEL

27/05/13

Main & Unit Aux. Transformer Unit #2 Pile Arrangement Plan

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #1 Foundation Plan

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #2 Foundation Plan

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #1 Grating & support Beam Arrangement Plan&Sec

NIGEL

27/05/13

Main & Unit Aux. Transformer Unit #2 Grating & support Beam Arrangement Plan&Sec

NIGEL

27/05/13

Calculation for Main & Unit Aux. Transformer Foundation

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #1 Foundation Section(1)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #1 Foundation Section(2)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #2 Foundation Section(1)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #2 Foundation Section(2)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit # 1,2 Foundation Section(1)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit # 1,2 Foundation Section(2)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Plan (1)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Plan (2)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Plan (3)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Section (1)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Section (2)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Plan (1)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Plan (2)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Plan (3)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Section (1)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Section (2)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #1, #2 Foundation Reinforcement Detail (1)

NIGEL

24/07/13

Main & Unit Aux. Transformer Unit #1, #2 Foundation Reinforcement Detail (2)

AC

NIGEL

24/07/13

Cathodic protection system foundation detail

IC

NIGEL

20/06/13

Switchyard Overall Foundation Layout Plan

NIGEL

03/04/13

Switchyard Foundation Layout Plan (500KV Area) (1)

NIGEL

03/04/13

Switchyard Foundation Layout Plan (500KV Area) (2)

NIGEL

03/04/13

Switchyard Foundation Layout Plan (110KV Area)

NIGEL

03/04/13

Switchyard Foundation Layout Plan (Power Block Area)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (1)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (2)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (3)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (4)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (5)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (6)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (7)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (8)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (9)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (10)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (11)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (12)

NIGEL

03/04/13

Switchyard Foundation Plan & Section (13)

NIGEL

03/04/13

Station Aux. Transformer Foundaion Plan & Sections

NIGEL

05/02/13

STATION AUX. TRANSFORMER GRATING,

NIGEL

14/05/13

Switchyard Area (500KV) Cable Trench Layout Plan

RT

NIGEL

06/11/12

Switchyard Area (110KV) Cable Trench Layout Plan

RT

NIGEL

06/11/12

Switchyard Area Cable Trench Section

NIGEL

03/04/13

Switchyard Area Cable Trench Cover Plan (1)

AC

NIGEL

03/04/13

Switchyard Area Cable Trench Cover Plan (2)

AC

NIGEL

03/04/13

Switchyard Area Cable Trench Cover Plan (3)

AC

NIGEL

03/04/13

Switchyard Area Cable Trench Cover Plan (4)

AC

NIGEL

03/04/13

Switchyard Area Cable Trench Cover Plan (5)

AC

NIGEL

03/04/13

Switchyard Area Cable Trench Cover Plan (6)

AC

NIGEL

03/04/13

Calculation for Foundation of Switchyard

NIGEL

03/04/13

Calculation for Foundations of Station Aux. Transformer

NIGEL

05/02/13

Calculation for Switchyard Area Cable Trench

NIGEL

03/04/13

Switchyard Area Duct Bank Detail

NIGEL

03/04/13

Switchyard Area Cable Trench Cover Detail

AC

NIGEL

03/04/13

Switchyard Foundation Re-bar Plan & Section (1)

NIGEL

03/04/13

Switchyard Foundation Re-bar Plan & Section (2)

NIGEL

03/04/13

Switchyard Foundation Re-bar Plan & Section (3)

NIGEL

03/04/13

Switchyard Foundation Re-bar Plan & Section (4)

NIGEL

03/04/13

Switchyard Foundation Re-bar Plan & Section (6)

NIGEL

03/04/13

Switchyard Foundation Re-bar Plan & Section (7)

NIGEL

03/04/13

Switchyard Foundation Re-bar Plan & Section (8)

NIGEL

03/04/13

Switchyard Foundation Re-bar Plan & Section (9)

NIGEL

03/04/13

Switchyard Foundation Re-bar Plan & Section (10)

NIGEL

03/04/13

Switchyard Foundation Re-bar Plan & Section (11)

NIGEL

03/04/13

Switchyard Foundation Re-bar Plan & Section (12)

NIGEL

03/04/13

Switchyard Foundation Re-bar Plan & Section (13)

NIGEL

03/04/13

Station Aux. Transformer Foundaion Rebar Details

NIGEL

05/02/13

Switchyard Area Cable Trench Reinforcement Detail

NIGEL

03/04/13

Switchyard Area Marshalling Kiosk Reinforement Detail

NIGEL

03/04/13

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (1)

IC

NIGEL

20/06/13

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (2)

IC

NIGEL

20/06/13

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (3)

IC

NIGEL

20/06/13

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (4)

IC

NIGEL

20/06/13

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (5)

IC

NIGEL

20/06/13

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (6)

IC

NIGEL

20/06/13

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (7)

IC

NIGEL

20/06/13

Electrical Duct Bank & Manhole Arrangement Plan (CCB~Admin. Bldg.&WWT) (8)

IC

NIGEL

20/06/13

Cable Trench Plan (Station Aux. TR. Area)

IC

NIGEL

03/06/13

Cable Tray Sleeper Foundation Plan (Station Aux. TR.Area)

IC

NIGEL

03/06/13

Calculation for Electrical Manhole (CCB~Admin. Bldg.&WWT)

IC

NIGEL

20/06/13

Caculation for Cable Trench Structure

IC

NIGEL

03/06/13

Calculation for Cable Tray Sleeper Foundation

IC

NIGEL

03/06/13

Electrical Duct Bank Detail (CCB~Admin. Bldg.&WWT)

IC

NIGEL

20/06/13

Electrical Manhole Detail (CCB~Admin. Bldg.&WWT) (1)

IC

NIGEL

20/06/13

Electrical Manhole Detail (CCB~Admin. Bldg.&WWT) (2)

NIGEL

20/06/13

Cable Trench Structure Detail (Station Aux. TR. Area)

IC

NIGEL

03/06/13

Cable Tray Sleeper Foundation Detail (Station Aux. TR.Area)

IC

NIGEL

03/06/13

Waste water treatment area layout plan (1)

AC

NIGEL

25/03/13

Waste water treatment area layout plan (2)

AC

NIGEL

25/03/13

Waste water treatment area layout plan (3)

AC

NIGEL

25/03/13

Calculation for filter, tank and Pump Mat Foundation of WT and WWT Area

NIGEL

03/07/13

Calculation for box culvert & trench structure, pipe support foundation of wt &a

RT

NIGEL

25/03/13

Calculation for Clarifer Concrete Structure, pH Adjust Pond and Mixing Pond

NIGEL

12/04/13

Wt & wwt area trench details

RT

NIGEL

25/03/03

Wt & wwt area stair & pipe support fdn. details (1)

RT

NIGEL

25/03/13

Wt & wwt area stair & pipe support fdn. details (2)

RT

NIGEL

25/03/13

WT & WWT Area Clarifier and Clarifier Internal PDN. Plan & Sections

NIGEL

12/04/13

WT & WWT Area Clarifier and Clarifier Internal PDN. Sections & Details

NIGEL

12/04/13

WT & WWT Area Clarifier Pile Arrangement Plan & Details

NIGEL

12/04/13

WT & WWT Area Clarifier & Clarifier Internal FDN. Pile Arrangement Plan

NIGEL

12/04/13

Waste Water Treatment Activated Carbon Filter FDN Detail

AC

NIGEL

03/07/13

WT & WWT Area pressure Filter & Activated Carbon Filter FDN Details

AC

NIGEL

03/07/13

WT & WWT Area Grativity Filter FDN. Plan & Sections

AC

NIGEL

03/07/13

WT & WWT Area Acid Caustic Storage Tank FDN. Plan & Sections

AC

NIGEL

03/07/13

WT & WWT Area Acid Caustic Storage Tank FDN. Detail (1)

AC

NIGEL

03/07/13

WT & WWT Area Acid Caustic Storage Tank FDN. Detail (2)

AC

NIGEL

03/07/13

WT & WWT Area Acid Caustic & Polymer FDN. Plan & Sections

AC

NIGEL

03/07/13

WT & WWT Area Acid Caustic & Polymer FDN. Sections

AC

NIGEL

03/07/13

WT & WWT Area Acid Caustic & Polymer FDN. Details (1)

AC

NIGEL

03/07/13

WT & WWT Area Acid Caustic & Polymer FDN. Details (2)

AC

NIGEL

03/07/13

WT & WWT Area Acid Caustic & Polymer FDN. Details (3)

AC

NIGEL

03/07/13

WT & WWT Area Acid Caustic & Polymer FDN. Details (4)

AC

NIGEL

03/07/13

WT & WWT Area Regeneration Pump FDN. Plan & Sections

AC

NIGEL

03/07/13

Waste Water Treatment CPI Oil Separator FDN. Detail

AC

NIGEL

03/07/13

WT & WWT Area Oily Wastewater, recovered Oil Transfer & Oil Sludge Pump FDN. Des

AC

NIGEL

03/07/13

WT & WWT Area Mixing Blower CPI Oil Water Separator FDN. Details

AC

NIGEL

03/07/13

WT & WWT Area Filter Backwash, Demin Plant Feed Water & Filtered Water

AC

NIGEL

03/07/13

WT & WWT Area Filter Backwash, Demin Plant Feed Water & Filtered Water

AC

NIGEL

03/07/13

WT & WWT Area Raw Water & Mudded Pump FDN. Plan & Sections

AC

NIGEL

03/07/13

WT & WWT Area Pressure Filter & Activated Carbon Filter FDN Reinf. Plan & Secti

NIGEL

03/07/13

WT & WWT Area Gravity Filter FDN Reinforcement Plan & Sections

NIGEL

03/07/13

WT & WWT Area Acid Caustic Storage Tank FDN Reinf. Plan & Sections

NIGEL

03/07/13

WT & WWT Area Acid Caustic Storage Tank FDN Reinf. Details (1)

NIGEL

03/07/13

WT & WWT Area Acid Caustic Storage Tank FDN Reinf. Details (2)

NIGEL

03/07/13

WT & WWT Area Acid Caustic & Polymer FDN Plan & Sections

NIGEL

03/07/13

WT & WWT Area Acid Caustic & Polymer FDN Details (1)

NIGEL

03/07/13

WT & WWT Area Acid Caustic & Polymer FDN Reinf. Details (2)

NIGEL

03/07/13

WT & WWT Area Acid Caustic & Polymer FDN Reinf. Details (3)

NIGEL

03/07/13

WT & WWT Area Acid Caustic & Polymer FDN Reinf. Details (4)

NIGEL

03/07/13

WT & WWT Area Regeneration Pump FDN Reinf. Plan & Sections

NIGEL

03/07/13

Wastewater Recovered Oil, CIP Oil Water Separator, Mixing Blower FDN

NIGEL

03/07/13

WT & WWT Area Oily Wasterwater, Recovered Oil Transfer & Oil Sludge Pump FDN Rel

NIGEL

03/07/13

WT & WWT Area Mixing Blower, CIP Oil Water Separator FDN Reinf. Details

NIGEL

03/07/13

WT & WWT Area Filter Backwash, Demin Plant Feed Water & Filtered Water Transfer

NIGEL

03/07/13

WT & WWT Area Filter Backwash, Demin Plant Feed Water & Filtered Water Transfer

NIGEL

03/07/13

WT & WWT Area Raw Water & Mudded Pump FDN Reinf. Plan & Sections

NIGEL

03/07/13

Sanitary Sewer System Sump Pit (Admin. Bldg. North) Detail

RT

NIGEL

18/07/13

Calculation for Sanitary Sump Pit

RT

NIGEL

18/07/13

Sanitary Sewer System Sump Pit (Admin. Bldg. North) Re-Bar Detail

IC

NIGEL

18/07/13

Plumbing Plan for Switchyard Control Building Ground Floor

NIGEL

12/12/12

Plumbing Plan for Switchyard Control Building 1st Floor

NIGEL

12/12/12

Enlarged Plumbing Plan for Switchyard Control Building Ground Floor

NIGEL

12/12/12

Enlarged Plumbing Plan for Switchyard Control Building, 1st Floor

NIGEL

12/12/12

Construction Temporary Facility Plan

NIGEL

30/11/12

Inspection & Test Plan for Site Preparation & Earth Work

NIGEL

23/07/12

Inspection & Test Plan for Reinforced Concrete Work

NIGEL

23/07/12

Inspection & Test Plan of PC Spun Piling Work

NIGEL

10/08/12

Inspection & Test Plan for Bored Cast-In-Situ Piling Work

NIGEL

04/07/12

Inspection & Test Plan for masonry & Plastering Work

MAX

12/12/12

ITP for Roof Waterproofing Work

MAX

14/01/13

Inspection & Test Plan for Painting

AC

MAX

22/03/13

ITP for the Permanent Ground Anchor of Intake Structure

NIGEL

06/05/13

Itp for roof and wall cladding installation

MAX

18/03/13

Welder qualification test report for pile splicing

NIGEL

06/06/12

Material Approval Request for Civil and Architecture Work

NIGEL

25/07/12

Material Approval Request for Bored Pile

NIGEL

06/06/12

Material Approval Request for pc pile (Vinaincon)

RT

NIGEL

20/04/12

Material Approval Request for PC pile (Fecon)

NIGEL

01/08/12

Material Approval Request for Electorodes of PC piles (Kiswel)

NIGEL

09/05/12

Material Approval Request for steel bars for concrete reinforcement

NIGEL

14/06/12

Material Approval Request for Paint around the Splicing joint of PC spun piles

RT

NIGEL

09/05/12

Material Approval Request for Steel Pipe

AC

NIGEL

14/06/12

Material Approval Request for cement (Thang Long)

NIGEL

10/09/12

Material Approval Request for P.C Stand and HDPE hose

NIGEL

23/07/12

Material Approval Request for Concrete Aggregate (Vina Fly Ash)

NIGEL

26/09/12

Material Approval Request for Concrete Admixture (Sika)

NIGEL

27/08/12

Material Approval Request for Concrete Works

AC

NIGEL

27/09/12

Preliminary Design of Coffer Dam

AC

NIGEL

22/06/12

NIGEL

28/01/13

Method Statement of PC Spun Piling Work

Method Statement of Concrete Trial Mix Design & Batch Plant Test Plan

NIGEL

11/06/12

Method Statement of Pile Load Test

IC

NIGEL

06/04/12

Concrete Mix Design

NIGEL

17/07/12

Additional Concrete Mix Design

NIGEL

13/11/12

Additional Concrete Mix Design (Ha Long cement)

AC

NIGEL

19/02/13

Method Statement of bored piling works

NIGEL

28/01/13

Method Statement of Ground-water Monitoring wells

NIGEL

03/07/12

Method statement Trial for Water Tightness on Contiguous Pile Walls by C-Jet

NIGEL

29/10/12

Method Statement of Concrete and Formworks

NIGEL

06/08/12

Method Statement of Earth & Contiguous Pile Wall Work

IC

NIGEL

23/08/12

Method Statement of Mass Concreting for Stack Foundation

NIGEL

06/11/12

Method Statement for Working Pile Load Test of Bored Pile

NIGEL

06/11/12

Method Statement of Concreteing for Boiler Foundation

MAX

05/12/12

Structural Calculation of Temp. Sheet- Pile Cofferdam for CW Intake P.Station

IC

NIGEL

09/11/12

Interpretation Report for the Preliminary Tensile Pile Load Test of Bored Pile

NIGEL

20/11/12

Dynamic Load Test Report for Filtered, Fire, Demi, Raw Water Storage Tanks

RT

NIGEL

28/01/13

NIGEL

05/04/13

Static Load Test Report for Filtered, Fire, Demi, Raw Water Storage Tanks

RT

NIGEL

22/11/12

Material Approval Request for Non-Shrinkage Concrete

AC

NIGEL

06/11/12

Static Load Test Report for Pile No. 22 & 29- Turbine #1

NIGEL

28/01/13

Evaluation of Working Pile Load Test in Water Storage Tanks Area

RT

NIGEL

12/11/12

Water Test Result for Ground Water Monitoring Wells

IC

NIGEL

14/01/13

Static Load Test Report for Pile No.67-Turbine #1

NIGEL

13/11/12

Interpretation & Counterm Easure Report of Working Pile Load Tests in Boiler 1

NIGEL

18/12/12

Interpretation & Counterm Easure Report of W. Pile Load Test in Turbine Bldg

NIGEL

22/11/12

Material Approval Request for Asphalt Premix

MAX

27/02/13

Static Load Test Report for Pile No.374, 455, 378 & 200- Boiler #1

NIGEL

28/11/12

Material Approval Request for Sand & Crushed Stone

RT

NIGEL

21/11/12

Correlation of DPLT and SPLT for Bored Piles

Pile Load Test Report for Stack

RT

NIGEL

14/12/12

Interpretation Report for Plate Load Test at Chimney Foundation #2

NIGEL

19/12/12

Bored Pile Sonic Test Report in Boiler 1- Part 1

NIGEL

17/01/13

Static Load Test Report for Pile No.34-Boiler #1

NIGEL

14/01/13

Bored Pile Sonic Test Report in Boiler 1- Part 2

NIGEL

17/01/13

Dynamic Load Test Report For Boiler 1-Part 1

NIGEL

28/01/13

Dynamic Load Test Report For Boiler 1-Part 2

NIGEL

28/01/13

Static Load Test Report for Pile No.81&87- Turbine #2

NIGEL

28/01/13

Additional Soil Investigation Report (2nd)

IC

NIGEL

28/01/13

Material Approval Request Ground Anchor for Intake

NIGEL

10/05/13

Static Load Test Report for Pile No.184- Turbine Building #1

NIGEL

28/02/13

Static Pile Load Test Report for Coal Yard No.1&3 and Common Service Building

NIGEL

01/03/13

AC

NIGEL

01/03/13

Bored Pile Sonic Test Report in Boiler 1- Part 3

NIGEL

05/03/13

Dynamic load test report for coal stock area no.1

NIGEL

28/02/13

Dynamic load test report for coal stock area no.3

NIGEL

28/02/13

Dynamic load test report for common service building

IC

NIGEL

28/02/13

Dynamic load test report for esp unit #1a

IC

NIGEL

28/02/13

Material approval request for chemical-oil resistant paint (fosroc)

AC

NIGEL

28/02/13

Material Approval Request For Non-Shrink Concrete (SACA Grout)

Bored pile sonic test report for stg #1

NIGEL

04/04/13

Static load test report for pile no.462-turbine building#2

IC

NIGEL

04/04/13

Static load test report for pile no.25-stack#1

IC

NIGEL

04/04/13

Static load test report for pile no.14-aux. boiler

IC

NIGEL

04/04/13

Dynamic load test report for turbine building #1

IC

NIGEL

04/04/13

Dynamic load test report for stack #1

IC

NIGEL

04/04/13

Bored pile sonic test report for turbine building#1-part 1

NIGEL

04/04/13

Static load test report for pile no.74-esp

IC

NIGEL

04/04/13

Dynamic load test report for fuel oil tanks

IC

NIGEL

04/04/13

Dynamic load test report for aux. boiler

IC

NIGEL

04/04/13

Bored pile sonic test report for stack 1

NIGEL

26/03/13

Water Test Result For Ground Water Monitoring Wells (2nd)

IC

MAX

04/04/13

Material approval request for pha lai fly ash

AC

NIGEL

23/04/13

Material approval request for reinforcement (kyoei)

RT

NIGEL

13/05/13

Material approval request for manhole cover (thien phat) (rev a)

MAX

14/06/13

Permanent ground anchor testing report (rev.a)

RT

NIGEL

20/06/13

Material Approval Request for Oil Containment Facilities (Rev.A)

MAX

14/05/13

Material Approval Request for Reinforced Concrete

AC

NIGEL

28/05/13

Material Approval Request for Steel Grating (KINH'S GRATING)

MAX

10/06/13

MAR for R.C.W. External Painting (chimney)

AC

NIGEL

13/05/13

MAR for External Insulation for Steel Liners(Chimney)

NIGEL

13/05/13

MAR for Acid Resistant Protection(Chimney)

NIGEL

13/05/13

MAR for Corrugated Steel Sheet(Chimney)

NIGEL

13/05/13

MAR for Steel Structure Painting(Chimney)

NIGEL

13/05/13

MAR for Expansion Joints(Chimney)

NIGEL

13/05/13

Material Approval Request For Chain Link Fence ( An Toan Thang )

AC

BAO

12/07/13

Bored Pile Sonic Test Report for Turbine Building #2-Part 1

NIGEL

29/05/13

Bored Pile Sonic Test Report in Boiler #1 - Part 4 (Rev.A)

NIGEL

29/05/13

Material Approval Request For Steel Grating (CKV)

RT

MAX

11/06/13

Dynamic Load Test Report for PC Pile in Belt Conveyor BC- 01A - Park 2 (Rev.A)

RT

NIGEL

19/07/13

Dynamic Load Test Report for PC Pile in Bottom Ash Silo Unit #2B (Rev.A)

RT

NIGEL

19/07/13

Dynamic Load Test Report for PC Pile in Coal Stock Area No.2 - Part 4 (Rev.A)

RT

NIGEL

19/07/13

Dynamic Load Test Report for PC Pile in Coal Stock Belt Conveyor BC 09 (Rev.A)

IC

NIGEL

24/07/13

Dynamic Load Test Report for PC Pile in Coal Stock Belt Conveyor BC 11 (Rev.A)

IC

NIGEL

24/07/13

Dynamic Load Test Report for PC Pile in Limestone Handing System (Rev.A)

RT

NIGEL

24/07/13

Dynamic Load Test Report for PC Pile in Stacker Reclaimer 1&2-Part 4 (Rev.A)

RT

NIGEL

24/07/13

Dynamic Load Test Report for PC Pile in Condensate Water Storage Tank (1)

RT

NIGEL

24/07/13

Dynamic Load Test Report for PC Pile in Gaseous Chlorination Building

RT

NIGEL

24/07/13

Dynamic Load Test Report for PC Pile in Main & Unit Aux.Transformer Unit #2

RT

NIGEL

24/07/13

Dynamic Load Test Report for PC Pile in Ash Pipe Lines Pipe Rack #2

RT

NIGEL

24/07/13

NIGEL

26/06/13

Static Load Test Report for Pile No.124 in Gaseous Chlorination Building

IC

NIGEL

10/07/13

Material Approval Request For Chemical - Oil Resistant Paint (KCC)

RT

MAX

24/07/13

Dynamic Load Test Report For Coal Stock Belt Conveyor BC-08

IC

NIGEL

27/06/13

Dynamic Load Test Report For Seal Pit Structure

Static Load Test Report for PC Pile No P73 in Ash Pipe Lines Pipe Rack -2

RT

NIGEL

27/06/13

Static Load Test Report for PC Pile No.02 in Clarifier - WT & WWT Area

NIGEL

24/07/13

Static Load Test Report for PC Pile No.73 in Belt Conveyor BC-01A

NIGEL

24/07/13

Lateral Load Test Report for Pile No T-01 in Limestone Unloading Jetty

RT

NIGEL

26/07/13

Static Load Test Report for Pile No.T-02 in Limestone Unloading Jetty

RT

NIGEL

26/07/13

Dynamic Load Test Report for PC Pile in Ash Pipe Lines Pipe Rack - 1

IC

NIGEL

26/07/13

Dynamic Load Test Report for PC Pile in Coal Stock Belt Conveyor BC-10

IC

NIGEL

26/07/13

Dynamic Load Test Report for PC Pile in Belt Conveyor BC-03A

RT

NIGEL

26/07/13

Water Test Result for Ground Water Monitoring Wells (3rd)

IC

MAX

22/07/13

PC Spun Pile Design (Minh Duc)

NIGEL

26/09/12

PC Spun Pile Design (Fecon)

NIGEL

26/09/12

Method Statement of Earth Works

NIGEL

10/07/12

Method Statement for the installation of Roof and Wall Cladding System

IC

NIGEL

24/09/12

Concrete Testing Plan

AC

NIGEL

20/11/12

Method Statement for Reinforcement

IC

NIGEL

02/11/12

Method Statement for Undergeround Waterproofing Works

IC

NIGEL

27/09/12

Method Statement for Anti Termite Soil Treatment Works

IC

NIGEL

13/11/12

Method Statement for STG Foundation Concrete Works

NIGEL

06/12/12

Inspection & Test Plan for Steel Structure (DAEJOO)

MAX

05/02/13

RT

NIGEL

28/09/12

Method Statement for Masonry & Plastering Works

NIGEL

06/11/12

Method statement for painting works

IC

NIGEL

20/03/13

Method statement for tile installation works

IC

NIGEL

20/03/13

Method statement for waterproofing system to concrete roof slab

IC

NIGEL

20/03/13

Method Statement for Settlement Monitoring Works

IC

NIGEL

11/03/13

Method statement for raised access floor works

IC

NIGEL

19/03/13

Method statement for suspended ceiling works

IC

NIGEL

20/03/13

Method Statement for STG Top Table Concrete Works

IC

ALAN

26/07/13

Material Approval Request for Waterproofing to Underground Concrete Structure

NIGEL

07/08/12

Material Approval Request for Anti Termite Soil Treatment (Hockley Internationa)

NIGEL

27/08/12

Material Approval Request for Anti Termite Soil Treatment (Sichuan Province )

RT

NIGEL

25/07/12

Material Approval Request for Doors

AC

NIGEL

17/09/12

Material Approval Request for Joint Materias & Waterproofing (FOSROC)

AC

NIGEL

07/11/12

Material Approval Request for Windows and Glass

AC

NIGEL

05/04/13

Material Approval Request for Doors (SINH SUNG)

AC

NIGEL

26/09/12

Material Approval Request for Joint Materials & Waterproofing (SIKA)

MAX

21/06/13

Material Approval Request for Doors (VIET JAPAN)

AC

MAX

05/07/13

Material Approval Request for Protection Board (VIET THAI)

RT

NIGEL

12/10/12

Material Information for Hollow Concrete Block (DONG TAM)

NIGEL

19/03/13

Material Approval Request for Ceramic Tile (Dongtam)

AC

NIGEL

26/03/13

Material approval request for wooden door (sagaco)

AC

NIGEL

04/04/13

Material approval request for vinyl tile (gerflor)

AC

NIGEL

04/04/13

Material Approval Request Metal Roof & Wall Cladding

MAX

28/01/13

Material Approval Request for Ceiling (Austrong)

MAX

05/07/13

Material Approval Request for Hardener (FOSROC)

AC

NIGEL

26/11/12

Material Approval Request for Hollow Concrete Block (Khang Minh)

MAX

05/07/13

Material Approval Request for Hollow Concrete Block (BUT SON)

AC

NIGEL

26/11/12

Material Approval Request for Paint (Jotun)

RT

MAX

16/07/13

Material Approval Request for Weldmesh (Song Hop Luc)

MAX

05/07/13

Material Approval Request for Access Floor (XIANGLI Floor)

AC

MAX

05/02/13

Method Statement for Concrete Repair Works

Material Approval Request for Ceiling (USG)

AC

NIGEL

05/03/13

Material Approval Request for Vinyl & Carpet Tile (TOLI)

AC

NIGEL

26/11/12

Material approval request for insulation board (lemax)

AC

NIGEL

28/02/13

Material Approval Request for Clinker Brick (Viglacera Halong)

AC

NIGEL

26/03/13

Material approval request for metal roller shutter door (vina sanwa)

AC

NIGEL

26/03/13

Material Approval Request for Terrazzo Tile (Secoin)

AC

NIGEL

26/03/13

Material Approval Request for Toilet Cubicle (Shengzhen)

AC

NIGEL

26/03/13

Material approval request for access floor (mero)

MAX

11/06/13

Material approval request for paint (international)

AC

NIGEL

14/05/13

Material Approval Request for Joint Materials (X-CALIBUR)

AC

MAX

18/07/13

Method Statement for Steel Structure Painting (DAEJOO)

IC

NIGEL

28/12/12

Method Statement for Steel Structure Shop Fabrication

NIGEL

25/10/12

Method Statement for Grouting

IC

NIGEL

05/12/12

Method Statement for Erection of Steel Structure

IC

NIGEL

05/12/12

Inspection & Test Plan for Steel Structure PEB (Kirby)

MAX

12/12/12

Method Statement for Inspection & Testing

IC

NIGEL

09/01/13

Method Statement for PEB Fabrication

IC

NIGEL

09/01/13

Method Statement for PEB Painting

IC

NIGEL

09/01/13

Method Statement for PEP Packing (Kirby)

MAX

12/12/12

Method statement for steel structure repair works

IC

NIGEL

04/03/13

Material Approval Request for Non Shrink Mortar

AC

NIGEL

12/12/12

Material Approval Request for Deck Plate

AC

NIGEL

12/12/12

Material Approval Request for PEB Bolt

AC

NIGEL

26/12/12

Material Approval Request for Grating

RT

NIGEL

26/11/12

Material Approval Request for Asphalt Impregnated Board

NIGEL

27/12/12

Material Approval Request for Grouting Material (SIKA)

MAX

14/05/13

Material approval request for boiler steel structure paint(international paint)

MAX

11/06/13

Material approval request for grouting material (sika 318vn)

AC

NIGEL

26/03/13

Method Statement for Underground Piping (GRP)

NIGEL

01/10/12

Material approval request for hdpe pipes and fittings (ug fire fighting piping )

BAO

21/06/13

Material approval request for paint (ag fire fighting piping system)-hai phong t

RT

BAO

18/04/13

Material Apporval Request For Paint(international Paint Singapore)

AC

MAX

24/07/13

Material Approval Request for Paint(HEMPEL)

AC

MAX

09/07/13

Method Statement For Switchyard Steel Structure Installation

MAX

22/01/13

Material Approval Request for U-PVC (DE NHAT)

RT

NIGEL

12/10/12

Common service building kitchen facilites specification

IC

NIGEL

21/06/13

Soil Investigation Report

NIGEL

06/07/12

Interpretation Report for the PDA tests and Dynamic Load Tests of PC Spun Pile

NIGEL

05/07/12

Interpretation Report for the Preliminary Pile Load Test of PC Spun Pile

NIGEL

05/07/12

Interpretation Report for the Preliminary Pile Load Test adjacent Turbine

NIGEL

05/07/12

Bored Pile Capacity Analysis

IC

NIGEL

02/07/12

Additional Soil Investigation Report

NIGEL

01/10/12

Structurual calculation of Earth Retaining structures for CW Intake Pump Station

NIGEL

20/11/12

Temporary Earth Retaining Structures for CW Intake Pump Station of Excavation

IC

NIGEL

20/11/12

Temporary Earth Retain. Structures for C.W Intake P.Station of Ground- Stage

IC

NIGEL

20/11/12

Temporary Earth Retaining Structure for C.W Intake Pump Station of Side Plan (1)

IC

NIGEL

20/11/12

Temporary Earth Retaining Structures for C.W Intake Pump Station of Side Plan (2

IC

NIGEL

20/11/12

Temporary Earth Retaining Structures for C.W Intake Pump Station-Typical Sec. (1

IC

NIGEL

20/11/12

Temp. Earth Retain. Structures for C.W Intake Pump Sta. of Geo Tech. Instr. Plan

IC

NIGEL

20/11/12

Temporay Earth Retaining structures for C.W Intake Pump Sta. of Detail Geo Tech.

IC

NIGEL

20/11/12

Temp. Earth Retain. Structure for C.W Intake Pump Sta. of Anchor Detail

IC

NIGEL

20/11/12

Temp. Earth Retain. Structur. for C.W Intake Pump Station of Guide Beam for bore

IC

NIGEL

20/11/12

Temp. Earth Retain. Structure For C.W Intake Pump Sta. of Re-bar Cage

IC

NIGEL

20/11/12

Temp. Earth Retain. Structure for C.W Intake Pump Sta. of Cap Beam of Continguos

IC

NIGEL

20/11/12

Temp. Earth Retain. Struct. for C.W Intake Pump Sta. of Dewatering Plan

IC

NIGEL

20/11/12

Temp. Earth Retain. Structure for C.W Intake Pump Station of Dewatering Section

IC

NIGEL

20/11/12

Permanent Bay Wall Structure for C.W Intake Pump Station- Layout Plan (1)

NIGEL

31/05/13

Permanent Bay Wall Structure for C.W Intake Pump Station- Layout Plan (2)

NIGEL

31/05/13

Permanent Bay Wall Structure for C.W Intake Pump Station- Pile Arrang. Plan

NIGEL

31/05/13

Permanent Bay Wall Structure for C.W Intake Pump Station- Ground Anchor Stage 1

NIGEL

31/05/13

Permanent Bay Wall Structure for C.W Intake Pump Station- Ground Anchor Stage 2

NIGEL

31/05/13

Permanent Bay Wall Structure for C.W Intake Pump Station- Ground Anchor Stage 3

NIGEL

31/05/13

Permanent Bay Wall Structure for C.W Intake Pump Station- Tie Cable Arrang.

NIGEL

31/05/13

Permanent Bay Wall Str. for C.W Intake P.Station- Const. Sequence- Type W1(1)

NIGEL

31/05/13

Permanent Bay Wall Str. for C.W Intake P.Station- Const. Sequence- Type W1(2)

NIGEL

31/05/13

Permanent Bay Wall Str. for C.W Intake P.Station- Const. Sequence- Type W5

NIGEL

31/05/13

Permanent Bay Wall Str. for C.W Intake P.Station- Geotech. Instruments Plan

NIGEL

31/05/13

Permanent Bay Wall Str. for C.W Intake P.Station- Re-bar Cage For Contig. Bore 1

NIGEL

31/05/13

Permanent Bay Wall Str. for C.W Intake P.Station- Re-bar Cage For Contig. Bore 2

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 3

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 4

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 5

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 6

RT

NIGEL

16/11/12

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 7

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 8

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 9

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Rear Bore Pile

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station- RC Bond Beam Detail

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station- Facial Concrete Detail

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station-Cap Beam Detail (1)

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station-Cap Beam Detail (2)

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station-Cap Beam Detail of Rear Bore

NIGEL

31/05/13

Permanent Bay Wall Str. for CW Intake P.Station-Connection Detail

NIGEL

31/05/13

Temp. Sheet- Pile Cofferdam for CW Intake P.Station: Excav. Plan (1)

IC

NIGEL

22/10/12

Temp. Sheet- Pile Cofferdam for CW Intake P.Station: Excav. Plan (2)

IC

NIGEL

22/10/12

Temp. Sheet- Pile Cofferdam for CW Intake P.Station: Excav. Section (1)

IC

NIGEL

22/10/12

Temp. Sheet- Pile Cofferdam for CW Intake P.Station: Excav. Section (2)

IC

NIGEL

22/10/12

Temp. Sheet- Pile Cofferdam for CW Intake P.Station: Excav. Section (3)

IC

NIGEL

22/10/12

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Side Plan Detail of Sheet Pile (1

IC

NIGEL

22/10/12

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Side Plan Detail of Sheet Pile (2

IC

NIGEL

22/10/12

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Geo Tech. Instruments Plan

IC

NIGEL

22/10/12

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Geo Tech. Instruments Detail

IC

NIGEL

22/10/12

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Wale & Struts Joint Detail

IC

NIGEL

22/10/12

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Tie Cable Detail

IC

NIGEL

22/10/12

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Sheet Pile Detail (1)

IC

NIGEL

22/10/12

Temp. Sheet- Pile Cofferdam for CW Intake P.S: Sheet Pile Detail (2)

IC

NIGEL

22/10/12

PERMANENT BAY WALL STRUCTURES FOR C.W INTAKE PUMP STATION OF MD-1_EXCAVATION PL)

NIGEL

31/05/13

PERMANENT BAY WALL STRUCTURES FOR C.W INTAKE PUMP STATION OF MD-1_EXCAVATION PL)

NIGEL

31/05/13

GENERAL PLAN OF LIMESTONE & FUEL OIL UNLOADING JETTY

RT

NIGEL

15/03/13

TYPICAL SECTION OF LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

PILE ARRANGEMENT OF LIMESTONE UNLOADING JETTY

AC

NIGEL

10/04/13

GENERAL PLAN OF LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

SECTION & DETAIL OF LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

FOOTING GENERAL OF CONVEYOR BASE

RT

NIGEL

15/03/13

HANDRAIL PLAN & SECTION OF LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

P.C PILE HEAD DETAILS LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

TYPICAL SECTION(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

PILE ARRANGEMENT(FUEL OIL UNLOADING PUMP HOUSE)

AC

NIGEL

10/04/13

PUMP HOUSE PLAN & SECTION(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

PUMP HOUSE SECTION & STAIR DETAIL(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

HANDRAIL PLAN & SECTION(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

P.C PILE HEAD DETAILS(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

Unloading jetty design criteria

RT

NIGEL

14/03/13

LIMESTONE BAR ARRANGEMENT(1)

RT

NIGEL

15/03/13

LIMESTONE BAR ARRANGEMENT(2)

RT

NIGEL

15/03/13

LIMESTONE BAR ARRANGEMENT(3)

RT

NIGEL

15/03/13

CONVEYOR BASE BAR ARRANGEMENT

RT

NIGEL

15/03/13

ACCESS BRIDGE BAR ARRANGEMENT(1)

RT

NIGEL

15/03/13

ACCESS BRIDGE BAR ARRANGEMENT(2)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(1)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(2)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(3)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(4)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(5)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(6)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(7)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(8)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(9)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(10)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(11)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(12)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(13)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(14)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(15)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(16)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(17)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(18)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(19)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(20)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(21)

RT

NIGEL

15/03/13

TRESTLE BAR ARRANGEMENT(1)

RT

NIGEL

15/03/13

TRESTLE BAR ARRANGEMENT(2)

RT

NIGEL

15/03/13

CALCULATION OF LIMESTONE UNLOADING JETTY AND FUEL OIL UNLOADING PUMP HOUSE

RT

NIGEL

15/03/13

Calculation of Anchor Bolt Sizing

IC

NIGEL

04/12/12

Load Information for Static Load and Thermal Expansion and Sliding Friction

IC

NIGEL

04/12/12

Foundation & Loading Data

IC

NIGEL

14/09/12

Foundation drawing for boiler feedwater pump & boiler feedwater booster pump

IC

NIGEL

03/05/13

Water box vacuum pump foundation drawing

NIGEL

20/06/13

Air Compressor- Dimension & Foundation Drawing for Air-Compressor

IC

NIGEL

22/11/12

Air Compressor- Dimension & Foundation Drawing for Air Dryer

IC

NIGEL

22/11/12

Air Compressor- Dimension & Foundation Drawing for IA/SA Receiver Tank (1 of 2)

IC

NIGEL

22/11/12

SA and PA Fan to AH Duct Loads to Steel Plan and Elevation

IC

NIGEL

03/10/12

Blowndown Tank Load and Foundation Drawing

IC

NIGEL

24/10/12

Anchor Bolt Drawing & Hilti Anchor Literature for Loop Seal Blower

NIGEL

06/02/13

Loop Seal Blower General Arrangement

IC

NIGEL

24/10/12

Anchor Bolt Drawing & Hilti Anchor Literature for Stripper Cooler Blower

NIGEL

06/02/13

Stripper Cooler Blower General Arrangement

IC

NIGEL

24/10/12

Base Plate & Anchor Bolt Design (Metric)

IC

NIGEL

06/12/12

Boiler structure handrail paint msds

NIGEL

04/04/13

Instrument Data Sheets, Avaraging Pitot Tubes

RT

NIGEL

19/12/12

Instrument Data Sheets, Gauge Glasses and Gauge Valves

RT

NIGEL

19/12/12

Instrument Data Sheets, Silo Level Detectors (Radar type)

AC

NIGEL

19/12/12

Instrument Data Sheets, Level Switches

AC

NIGEL

19/12/12

Instrument Data Sheets, Level Instruments (Conductivity Type)

AC

NIGEL

19/12/12

Instrument Data Sheets, Pressure Gauges

AC

NIGEL

19/12/12

Instrument Data Sheets, Pressure Transmitters

AC

NIGEL

19/12/12

Instrument Data Sheets, Flue Gas O2 Analyzers

NIGEL

19/12/12

Anchor Bolts Shop Details

NIGEL

28/11/12

Steel Structure MTO of Base Plate for Boiler

IC

NIGEL

06/12/12

Steel Structure MTO of Base Plate for Bridge

IC

NIGEL

06/12/12

Steel Structure MTO of Anchor Rod

IC

NIGEL

06/12/12

Column Base Load Plan

IC

NIGEL

06/12/12

Column Base Load Table (1)

IC

NIGEL

06/12/12

Column Base Load Table (2)

IC

NIGEL

06/12/12

Anchor Bolt Location Plan

IC

NIGEL

06/12/12

Column Base Plate Detail Table

IC

NIGEL

06/12/12

Anchor Rod Schedule and Detail for Columns

IC

NIGEL

06/12/12

Standard Base Plate Details

IC

NIGEL

06/12/12

Column Schedule

IC

NIGEL

28/12/12

Steel Framing Plan (Lev A) TOS EL.10030, 12077 & 13100

NIGEL

28/12/12

Steel Framing Plan (Lev B) TOS EL. 15277, 15662

IC

NIGEL

28/12/12

Steel Framing Plan (Lev C) TOS EL. 17790, 18327, 19377, 19662 & 20562

NIGEL

28/12/12

Steel Framing Plan (Lev D) TOS EL. 22827, 23030 & 25167

NIGEL

28/12/12

Steel Framing Plan (Lev A1) TOS EL. 18650 & 20150

NIGEL

28/12/12

STEEL FRAMING PLAN(LEVEL B1) TOS EL 9592

NIGEL

19/03/13

Steel Framing Plan (Level E) TOS EL25725, 25288, 26899

NIGEL

28/12/12

Steel Framing Plan (Level F) TOS EL27587, 27749, 28762 & 30282

NIGEL

19/03/13

Steel Framing Plan (Level G) TOS EL32022 & 33129

NIGEL

19/03/13

Steel Framing Plan (Level H) TOS EL34932

NIGEL

19/03/13

Steel Framing Plan (Level I) TOS EL.37562

NIGEL

19/03/13

Steel Framing Plan (Level J) TOS EL.40262

NIGEL

19/03/13

Steel Framing Plan (Level K) TOS EL.43852

NIGEL

19/03/13

Steel Framing Plan (Level L) TOS EL.46662

NIGEL

19/03/13

Steel Framing Plan (Level M) TOS EL.49039, 49237

NIGEL

19/03/13

Steel Framing Plan (Level N) TOS EL 51812

NIGEL

19/03/13

Steel Framing Plan (Level O) TOS EL.53967, 54442, 55042

NIGEL

28/12/12

Steel Framing Plan (Level P) TOS EL.55050, 55662, 56477

NIGEL

19/03/13

Steel Framing Plan (Level Q) TOS EL.55050, 55662, 56477

NIGEL

28/12/12

Steel Framing Plan (Level R) TOS EL.59534, 59566

NIGEL

19/03/13

Steel Framing Plan (Level S) TOS EL. 61175 & 62665

NIGEL

28/12/12

Steel Framing Plan (Level T) TOS EL. 65555

NIGEL

19/03/13

Roof Plan (Level U)

NIGEL

28/12/12

Girts Section (Level V)-RD1146 Section

NIGEL

28/12/12

STEEL FRAMING PLAN - RD 1143 FOR U2A & U2B

NIGEL

28/12/12

ROOF PLAN (FOR U1B & U2B)

NIGEL

28/12/12

STEEL FRAMING - FOR BRIGE TOP EL.51812,

NIGEL

19/03/13

Steel Framing Plan Support Beam for Hook

IC

NIGEL

03/05/13

Elevator Tower Framing

IC

NIGEL

03/05/13

Elevator Tower Girt - Rd 1161

IC

NIGEL

03/05/13

STEEL FRAMING BENT G

IC

NIGEL

28/12/12

Steel Framing Bent H

NIGEL

19/03/13

BENT J & J4

NIGEL

28/12/12

BENT K

NIGEL

28/12/12

BENT L

NIGEL

28/12/12

BENT K4, L6, L9, N & P

NIGEL

28/12/12

BENT M

NIGEL

28/12/12

BENT 1, 3 & 4 (#1A) 14, 16 &17(#2A), 7.1, 9 & 10 (#1B) 20.1, 22&23 (#2B)

NIGEL

28/12/12

BENT 2 (#1A), 15 (#2A), 8 (#1B), 21 (#2B)

NIGEL

28/12/12

BENT 7 (#1A), 20 (#2A), 13 (#1B), 26 (#2B)

NIGEL

28/12/12

BENT 5&6 (#1A), 18&19 (#2A), 11&12 (#1B), 24&25 (#2B)

NIGEL

28/12/12

BENT 3.2 (#1A), 16.2 (#2A), 9.2 (#1B), 22.2 (#2B)

NIGEL

28/12/12

BENT 5.8 (#1A), 18.8 (#2A), 11.8 (#1B), 24.8 (#2B)

NIGEL

28/12/12

BENT 1.8 & 7.3(#1A), 14.8 & 20.3(#2A), 7.6 & 13.3 (#1B), 20.6 & 26.3 (#2B)

NIGEL

28/12/12

BENT 3.8 & 5.2(#1A), 16.8 & 18.2(#2A), 9.8 & 11.2 (#1B), 22.8 & 24.2 (#2B)

NIGEL

28/12/12

STEEL FRAMING - FOR BRIGE BENT 13.1, 13.2, 13.8, 13.9

NIGEL

19/03/13

Steel Framing - For Bride Bent G & CCB Egress Platform

NIGEL

19/03/13

Steel Framing - for Brige Bent H

NIGEL

19/03/13

West Stair Tower for 4 Units

IC

NIGEL

28/12/12

East Stair Tower for 4 Units

NIGEL

28/12/12

GENERAL NOTES

NIGEL

28/12/12

Standard Beam, End PL, Field & Column Splice Details

IC

NIGEL

28/12/12

Standard Horizontal Bracing Details

NIGEL

28/12/12

Standard Vertical Bracing Details & Wing Plate Connections

IC

NIGEL

28/12/12

Typical Wide Flange Vertical Bracing connections

NIGEL

28/12/12

Standard Vertical Bracing Details & Typical Hanger Details

NIGEL

28/12/12

Standard Beam Connection

NIGEL

28/12/12

Steel Framing Details and Girder Schedule

IC

NIGEL

28/12/12

Standard Steel Framing Details for Stairs

IC

NIGEL

28/12/12

Standard Handrail and Grating Details

IC

NIGEL

28/12/12

Standard Checkered Plate Details

IC

NIGEL

28/12/12

Typical Ladder Details

IC

NIGEL

28/12/12

PLAN OF BOX GIRDERS AT SILO SUPT LEVEL

IC

NIGEL

07/01/13

Anchor Bolts Erection Drawing

NIGEL

07/02/13

Limestone Blower Foundation Drawing

IC

NIGEL

24/10/12

Esp Foundation loading Calculation

NIGEL

25/04/13

Duct Foundation Loading Calculation

IC

NIGEL

29/05/13

Foundation Loading of ESP

NIGEL

25/04/13

Loading Data for Duct

IC

NIGEL

04/12/12

Wind load, seismic load & chemical anchor calculation for i.d. fan

RT

NIGEL

13/05/13

Mechanical Load Data of Transfer Tower No.TT-01 for Coal Handling System

IC

NIGEL

16/07/13

Mechanical Load Data of Transfer Tower No.TT-02

IC

NIGEL

16/07/13

Mechanical Load Data of Transfer Tower No.TT-03

IC

NIGEL

16/07/13

Mechanical Load Data of Transfer Tower No.TT-04

IC

NIGEL

16/07/13

Mechanical Load Data of Transfer Tower No.TT-05

IC

NIGEL

16/07/13

Mechanical Load Data of Transfer Tower No.TT-06

IC

NIGEL

16/07/13

Typical standard drawing for technological anchor bolt for chs

IC

NIGEL

03/05/13

Typical Standard Drawing for Anchor Bolt For CHS

IC

NIGEL

03/05/13

Structural GA Drawing & Loading Data of HGTU Tower for Conv. BC-8, 9, 10&11 forS

IC

NIGEL

16/07/13

Structural General Arrangement for Belt Conveyor No. BC-09 for CHS

NIGEL

02/07/13

Structural General Arrangement of Belt Conveyor BC-10 for CHS

NIGEL

02/07/13

Plc configuration diagram for coal handling system

BILL

20/02/13

Structural Design Calculation for HGTU Tower for Conveyor BC-08, 09, 10&11

IC

NIGEL

16/07/13

Structural Design Calculation for Belt Conveyor BC-02A/B for CHS

NIGEL

17/05/13

Structural Design Calculation for Belt Conveyor BC-03A/B for CHS

NIGEL

17/05/13

Structural Design Calculation for Belt Conveyor BC-05A/B for CHS

NIGEL

17/05/13

STRUCTURAL DESIGN CALCULATION FOR BELT CONVEYOR NO. BC-06A/B FOR CHS

NIGEL

17/05/13

Structural Design Calculation for Belt Conveyor No. BC-09 for CHS

NIGEL

02/07/13

Structural Design Calculation for Belt Conveyor No. BC-10 for CHS

NIGEL

02/07/13

Typical standard drawing for technological anchor bolt for lhs

RT

NIGEL

25/07/13

Typical Standard Drawing for Anchor Bolt For LHS

RT

NIGEL

25/07/13

Structural general arrangement and loading data grinding house

NIGEL

28/06/13

STRL. General Arrangement of Shed Attached to Grinding House

NIGEL

28/06/13

Structural Design Calculation for Transfer Tower LT-01

NIGEL

27/05/13

Structural Design Calculation for Transfer Tower LT-03

NIGEL

27/05/13

Structural Design Calculation for Transfer Tower LT-04

NIGEL

27/05/13

Structural design calculation for grinding house

NIGEL

28/06/13

Structural Design Calculation For Shed Attached to Grinding House

NIGEL

28/06/13

Conveyor Supporting Structure- Foundation Load Data (1 of 5)

IC

NIGEL

12/07/13

Conveyor Supporting Structure- Foundation Load Data (2 of 5)

IC

NIGEL

12/07/13

Conveyor Supporting Structure- Foundation Load Data (3 of 5)

IC

NIGEL

12/07/13

Conveyor Supporting Structure- Foundation Load Data (4 of 5)

IC

NIGEL

12/07/13

Conveyor Supporting Structure- Foundation Load Data (5 of 5)

IC

NIGEL

12/07/13

Buffer Hopper Tower - Foundation Load Data

IC

NIGEL

16/07/13

Buffer Hopper Support Structure - Structural GA - Plan

IC

NIGEL

16/07/13

Buffer Hopper Support Structure - Structural GA - Elevation

IC

NIGEL

16/07/13

Pipe Rack from Fly Ash Silo-1 Foundation Load Data

IC

NIGEL

08/07/13

Pipe Rack Near FA Silo 2 - Foundation Load Data

IC

NIGEL

08/07/13

Pipe Rack from Ash Slurry Pump House to FA Silo - Foundation Load Data

IC

NIGEL

08/07/13

Pipe Rack Near F.A Silo - 1 Structural GA - Plan

IC

NIGEL

08/07/13

Pipe Rack Near F.A Silo - 1 Structural GA - Elevation

IC

NIGEL

08/07/13

Pipe Rack Near F.A Silo - 2 Structural GA - Plan

IC

NIGEL

08/07/13

Pipe Rack Near F.A Silo - 2 Structural GA - Elevation

IC

NIGEL

08/07/13

Pipe Rack from Ash Slurry Ash Water Pump House to FA Silo - Structural GA - Plan

IC

NIGEL

08/07/13

Pipe Rack from Ash Slurry Ash Water Pump House to FA Silo - Structural GA - Elen

IC

NIGEL

08/07/13

Conveyor Supporting Structure- Design of Superstructure (Vol 1)

IC

NIGEL

07/12/12

Conveyor Supporting Structure- Design of Superstructure (Vol 2)

IC

NIGEL

07/12/12

Buffer Hopper Support Structure - Design of Superstructure

IC

NIGEL

16/07/13

Pipe Rack near FA Silo 1 - Calculation of Foundation Load Data & Design of Supee

IC

NIGEL

08/07/13

Pipe Rack near FA Silo 2 - Calculation of Foundation Load Data & Design of Supee

IC

NIGEL

08/07/13

Pipe Rack from Ash Slurry ash water pump house to FA Silo - Design of Superstrue

IC

NIGEL

08/07/13

Auxiliary Boiler Package General Arrangement of Foundation

NIGEL

28/02/13

Auxiliary Boiler Package Boiler Loading Calcuation

NIGEL

28/02/13

Auxiliary Boiler Package Economizer Loading Calculation

NIGEL

28/02/13

Auxiliary Boiler Package Steel Structure Loading Calculation

NIGEL

28/02/13

Auxiliary Boiler Package P.D Fan Loading Calculation

NIGEL

28/02/13

Auxiliary Boiler Package Boiler Feed Water Pump Loading Calcuation

NIGEL

28/02/13

Auxiliary Boiler Package Blowdown Tank Loading Calculation

NIGEL

28/02/13

Auxiliary Boiler Package Diesel Oil Tank Loading Calculation

NIGEL

28/02/13

Auxiliary Boiler Package Heavy Oil Tank Loading Calculation

NIGEL

28/02/13

Auxliary Boiler Foundation- Civil Input

NIGEL

28/02/13

Auxiliary Boiler package Foundation Arrangement of F.D Fan with Loading Data

NIGEL

28/02/13

Package Boiler Feed Water Pump Foundation-Civil Input

NIGEL

28/02/13

Auxiliary Boiler Package Economizer Foundation-Civil Input

NIGEL

28/02/13

Auxiliary Boiler Package Blowdown Tank Foundation- Civil Input

NIGEL

28/02/13

Diesel Oil Tank -Civil Input

NIGEL

28/02/13

Auxliary Boiler Package Heavy Oil Tank Foundation- Civil Input

NIGEL

28/02/13

Foundation Arrangement of Chemical & Sampling

NIGEL

28/02/13

Auxiliary Boiler Package Steel Stack Foundation- Civil Input

NIGEL

28/02/13

Foundation Arrangement of Steel Structure with Loading Data

NIGEL

28/02/13

General foundation arrangement for emergency diesel generator

IC

NIGEL

13/05/13

Wind & Seismic Load Calculation for Emergency Diesel Generator

IC

NIGEL

20/06/13

Coal Dry Storage Shed/ Anchor Bolt Plan & Details

NIGEL

07/02/13

Coal Dry Storage Shed/ Template Details

NIGEL

07/02/13

Coal Dry Storage Shed/ Cross Section

NIGEL

07/02/13

Coal Dry Storage Shed/ Sidewall Framing & Details

NIGEL

07/02/13

Coal Dry Storage Shed/ Eave Gutter & Valley Gutter Details

NIGEL

07/02/13

Lime stone storage shed - specification

AC

NIGEL

06/05/13

Lime stone storage shed - anchor bolt plan & details

AC

NIGEL

06/05/13

Lime stone storage shed - template details

AC

NIGEL

06/05/13

Lime stone storage shed - roof framing plan & details

AC

NIGEL

06/05/13

Lime stone storage shed - cross section

AC

NIGEL

06/05/13

Lime stone storage shed - sidewall framing & details

AC

NIGEL

06/05/13

Lime stone storage shed - endwall framing @ gl.1

AC

NIGEL

06/05/13

Lime stone storage shed - endwall framing @ gl.12

AC

NIGEL

06/05/13

Chimney General Layout

NIGEL

25/04/13

Chimney Design Criteria

NIGEL

15/03/13

R.C Windshield- Construction Procedure

IC

NIGEL

10/06/13

Chimney #1 & #2 Steel Platforms Erection Procedure

IC

NIGEL

12/06/13

Chimney #1 & #2 Steel Liners Erection Procedure

IC

NIGEL

12/06/13

Chimney #1 & #2 R.C. Windshield - External Painting Procedure

IC

NIGEL

12/06/13

Chimney #1 Foundation Calculation Report

NIGEL

02/05/13

Chimney #2 Foundation Calculation Report

NIGEL

02/05/13

R.C Windshield- calculation Report

NIGEL

29/04/13

Steel Liners Erection Calculation Report

NIGEL

29/04/13

CHIMNEY #1 & #2 STAIRS - CALCULATION REPORT

NIGEL

26/04/13

Project Quality Plan

IC

NIGEL

20/06/13

Inspection and Test Plan- Construction Of R.C Windshield

RT

NIGEL

19/07/13

Inspection and Test Plan - Steel Platforms Erection

RT

NIGEL

19/07/13

Inspection and Test Plan - Steel Platforms Fabrication

RT

NIGEL

19/07/13

Inspection and Test Plan - Steel Liners Erection

RT

NIGEL

19/07/13

Inspection and Test Plan - Steel Liners Fabrication

RT

NIGEL

19/07/13

Inspection and Test Plan - External Painting of R.C. Windshield

RT

NIGEL

19/07/13

Chimney #1 & # 2 Stairs- General Arrangement

NIGEL

26/04/13

Chimney #1 & # 2 Ladders and Rest Platforms General Arrangement

NIGEL

26/04/13

Chimney #1 & # 2 Rest Platforms- Layout and details

NIGEL

26/04/13

Chimney #2- R.C Foundation- Bar Bending Schedule

NIGEL

26/09/12

Chimney #1 & #2 inspection doors and supports for aircraft warning lights

NIGEL

02/05/13

Chimney #1 & #2 Concrete Floor at Ground Level

AC

NIGEL

02/05/13

Chimney #1- R.C Foundation and Piles- General Arrangement

NIGEL

02/05/13

Chimney #2- R.C Foundation- General Arrangement

NIGEL

02/05/13

Chimney #1- R.C Foundation and Piles- General Arrangement

NIGEL

02/05/13

Chimney #2- R.C Foundation- Reinforcement

NIGEL

02/05/13

R.c. windshield - reinforcement details

NIGEL

29/04/13

R.C. Windshield - Corbels for Inlet Ducts

AC

NIGEL

10/06/13

CHIMNEY #1 & #2 STAIRS - DETAILS

NIGEL

26/04/13

CHIMNEY #1 & #2 STAIRS - HANDRAILS

NIGEL

26/04/13

CHIMNEY #1 & #2 STAIRS - GRATINGS

NIGEL

26/04/13

Chimney #1 & # 2 Ladders Details

NIGEL

26/04/13

Chimney #1 & #2 Steel Liners - Nozzle for CEMS & Temp. Elements

AC

NIGEL

24/07/13

Inlet Ducts - General Arrangement

AC

NIGEL

10/06/13

Inlet Ducts - Details

AC

NIGEL

10/06/13

Steel Liners Drainage System

AC

NIGEL

10/06/13

Loading Data for Generator Transformer

IC

NIGEL

28/02/13

Loading Data for Station Transformer

NIGEL

14/01/13

Loading Data for Unit Auxiliary Transformer

NIGEL

14/01/13

Seismic verification report for generator transformer

NIGEL

05/04/13

Seismic Verification Report for Transformer Fixing for Station Transformer

NIGEL

14/01/13

Seismic Verification Report for Transformer fixing for Unit Auxiliary Transformr

NIGEL

14/01/13

Loading Data for all Foundation and Grounding Pad Location for NSPB

NIGEL

27/05/13

Seismic Verification Report for NSPB

NIGEL

27/05/13

Inspection and Test Plan for Steel Structure-110KV Switchyard

MAX

22/01/13

Inspection and Test Procedure for Steel Structure-110KV Switchyard

NIGEL

24/01/13

Inspection and Test Plan for Steel Structure-500KV Switchyard

MAX

22/01/13

Inspection and Test Procedure for Steel Structure-500KV Switchyard

NIGEL

24/01/13

500KV & 110KV Switchyard Loading Calculation

NIGEL

17/12/12

500KV & 110KV Switchyard Civil Work Guideline

NIGEL

09/10/12

Civil Structure- Requirements & Loading

IC

NIGEL

16/10/12

Sea Water Intake Facility Equipment Data Sheet

AC

NIGEL

02/11/12

Foundation Plan DWG for WT & WWT

IC

NIGEL

03/07/13

Foundation DWG & Load Table (Foundation Detail)

IC

NIGEL

03/07/13

U1AT1 Steel Structure Shop Detailings & Member List

NIGEL

20/12/12

U1AT1 Handrail Shop Detailings & Member List

NIGEL

20/12/12

Bolt List_ U1AT1

IC

NIGEL

01/02/13

U1AT1_Erect. Drawings for Steel Framing

NIGEL

07/02/13

U1AT1_Handrail Erection Drawing

NIGEL

07/02/13

U1AT1_Grating Erection Drawing

NIGEL

07/02/13

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92

93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139

140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186

187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233

234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280

281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327

328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374

375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421

422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468

469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515

516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562

563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609

610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656

657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703

704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750

751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797

798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844

845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891

892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938

939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985

986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032

1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079

1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126

1127
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
1171
1172
1173

1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220

1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267

1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314

1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361

1362
1363
1364
1365
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404
1405
1406
1407
1408

1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455

1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500
1501
1502

1503
1504
1505
1506
1507
1508
1509
1510
1511
1512
1513
1514
1515
1516
1517
1518
1519
1520
1521
1522
1523
1524
1525
1526
1527
1528
1529
1530
1531
1532
1533
1534
1535
1536
1537
1538
1539
1540
1541
1542
1543
1544
1545
1546
1547
1548
1549

1550
1551
1552
1553
1554
1555
1556
1557
1558
1559
1560
1561
1562
1563
1564
1565
1566
1567
1568
1569
1570
1571
1572
1573
1574
1575
1576
1577
1578
1579
1580
1581
1582
1583
1584
1585
1586
1587
1588
1589
1590
1591
1592
1593
1594
1595
1596

1597
1598
1599
1600
1601
1602
1603
1604
1605
1606
1607
1608
1609
1610
1611
1612
1613
1614
1615
1616
1617
1618
1619
1620
1621
1622
1623
1624
1625
1626
1627
1628
1629
1630
1631
1632
1633
1634
1635
1636
1637
1638
1639
1640
1641
1642
1643

1644
1645
1646
1647
1648
1649
1650
1651
1652
1653
1654
1655
1656
1657
1658
1659
1660
1661
1662
1663
1664
1665
1666
1667
1668
1669
1670
1671
1672
1673
1674
1675
1676
1677
1678
1679
1680
1681
1682
1683
1684
1685
1686
1687
1688
1689
1690

1691
1692
1693
1694
1695
1696
1697
1698
1699
1700
1701
1702
1703
1704
1705
1706
1707
1708
1709
1710
1711
1712
1713
1714
1715
1716
1717
1718
1719
1720
1721
1722
1723
1724
1725
1726
1727
1728
1729
1730
1731
1732
1733
1734
1735
1736
1737

1738
1739
1740
1741
1742
1743
1744
1745
1746
1747
1748
1749
1750
1751
1752
1753
1754
1755
1756
1757
1758
1759
1760
1761
1762
1763
1764
1765
1766
1767
1768
1769
1770
1771
1772
1773
1774
1775
1776
1777
1778
1779
1780
1781
1782
1783
1784

1785
1786
1787
1788
1789
1790
1791
1792
1793
1794
1795
1796
1797
1798
1799
1800
1801
1802
1803
1804
1805
1806
1807
1808
1809
1810
1811
1812
1813
1814
1815
1816
1817
1818
1819
1820
1821
1822
1823
1824
1825
1826
1827
1828
1829
1830
1831

1832
1833
1834
1835
1836
1837
1838
1839
1840
1841
1842
1843
1844
1845
1846
1847
1848
1849
1850
1851
1852
1853
1854
1855
1856
1857
1858
1859
1860
1861
1862
1863
1864
1865
1866
1867
1868
1869
1870
1871
1872
1873
1874
1875
1876
1877
1878

1879
1880
1881
1882
1883
1884
1885
1886
1887
1888
1889
1890
1891
1892
1893
1894
1895
1896
1897
1898
1899
1900
1901
1902
1903
1904
1905
1906
1907
1908
1909
1910
1911
1912
1913
1914
1915
1916
1917
1918
1919
1920
1921
1922
1923
1924
1925

1926
1927
1928
1929
1930
1931
1932
1933
1934
1935
1936
1937
1938
1939
1940
1941
1942
1943
1944
1945

MD1-0-A-200-51-00001

Architectural Details/ Abbreviation, Legend & symbols

MD1-0-A-200-51-00002

Architectural Details/ Floor & Wall Junction Details

MD1-0-A-200-51-00003

Architectural Details/ Ceiling & Wall Junction Details

MD1-0-A-200-51-00009

Architectural Details/ Door Head Details

MD1-0-A-200-51-00010

Architectural Details/ Door Jamb Details

MD1-0-A-200-51-00011

Architectural Details/ Door Sill Details

MD1-0-A-200-51-00012

Architectural Details/ Window Details

MD1-0-A-200-52-00002

Architectural Details/ Re-bar Details-1

MD1-0-A-200-52-00003

Architectural Details/ Re-bar Details-2

MD1-0-A-200-54-00001

Architectural Details/ General Notes Steel

MD1-0-A-200-54-00002

Architectural Details/ Steel Stair Details

MD1-0-A-200-55-00004

Exterior Color Schedule for Overall View

MD1-0-A-201-51-00002

Turbine Building/ Mezzanine Floor Plan

MD1-0-A-201-51-00003

Turbine Building/ Operating Floor Plan

MD1-0-A-201-51-00004

Turbine Building/ Lower Roof & Crane Runway Plan

MD1-0-A-201-51-00005

Turbine Building/ Higher Roof Plan

MD1-0-A-201-51-00006

Turbine Building/ South Elevation

MD1-0-A-201-51-00007

Turbine Building/ North Elevation

MD1-0-A-201-51-00008

Turbine Building/ East & West Elevation

MD1-0-A-201-52-00001

Turbine Building/ Pile & Foundation Plan-1

MD1-0-A-201-52-00002

Turbine Building/ Pile & Foundation Plan-2

MD1-0-A-201-52-00006

Turbine Building/ Ground Floor Framing Plan-1

MD1-0-A-201-52-00007

Turbine Building/ Ground Floor Framing Plan-2

MD1-0-A-201-53-00001

Turbine Building/ Foundation Re-bar Details-1

MD1-0-A-201-53-00003

Turbine Building/ Foundation Re-bar Details-3

MD1-0-A-201-53-00004

Turbine Building/ Foundation Re-bar Details-4

MD1-0-A-201-53-00005

Turbine Building/ Foundation Re-bar Details-5

MD1-0-A-201-53-00006

Turbine Building/ Foundation Re-bar Details-6

MD1-0-A-201-53-00007

Turbine Building/ Foundation Re-bar Details-7

MD1-0-A-201-53-00009

Turbine Building/ Foundation Re-bar Details-9

MD1-0-A-201-53-00015

Valve Box Rebar Details-1

MD1-0-A-201-53-00020

Turbine Building/ Tie Girder Re-bar Details-1

MD1-0-A-201-53-00021

Turbine Building/ Tie Girder Re-bar Details-2

MD1-0-A-201-53-00022

Turbine Building/ Tie Girder Re-bar Details-3

MD1-0-A-201-53-00023

Turbine building / manhole re-bar details-1

MD1-0-A-201-53-00024

Turbine building / manhole re-bar details-2

MD1-0-A-201-53-00025

Turbine building / manhole re-bar details-3

MD1-0-A-201-53-00026

Turbine building / manhole re-bar details-4

MD1-0-A-201-53-00027

Turbine building / manhole re-bar details-5

MD1-0-A-201-53-00028

Turbine building / manhole re-bar details-6

MD1-0-A-202-51-00001

Turbine Foundation/Pile Arrangement Plan

MD1-0-A-202-51-00002

Turbine Foundation/ Plan 1

MD1-0-A-202-51-00003

Turbine Foundation/ Plan-2

MD1-0-A-202-51-00004

Turbine Foundation/ Plan-3

MD1-0-A-202-51-00005

Turbine Foundation/ Section-1

MD1-0-A-202-51-00006

Turbine Foundation/ Section-2

MD1-0-A-202-51-00007

Turbine Foundation/ Section-3

MD1-0-A-202-51-00008

Turbine Foundation/ Section-4

MD1-0-A-203-51-00001

Central Control Building/ Ground Floor Plan

MD1-0-A-203-51-00002

Central Control Building/ 1st Floor Plan

MD1-0-A-203-51-00003

Central Control Building/ 2nd Floor Plan

MD1-0-A-203-51-00004

Central Control Building/ 3rd Floor Plan

MD1-0-A-203-51-00009

Central Control Building/ South Elevation

MD1-0-A-203-51-00010

Central Control Building/ Main Section 1

MD1-0-A-203-51-00011

Central Control Building/ Main Section 2

MD1-0-A-203-51-00013

Central Control Building/ Door & Window Schedule

MD1-0-A-203-53-00011

Central Control Building/ Ground Floor Slab Re-bar Details-1

MD1-0-A-203-53-00028

Central Control Building/ Manhole Re-bar Detail-1

MD1-0-A-203-53-00029

Central Control Building/ Manhole Re-bar Detail-2

MD1-0-A-203-53-00030

Central Control Building/ Manhole Re-bar Detail-3

MD1-0-A-203-53-00031

Central Control Building/ Manhole Re-bar Detail-4

MD1-0-A-203-53-00032

Central Control Building/ Manhole Re-bar Detail-5

MD1-0-A-203-53-00033

Central Control Building/ Manhole Re-bar Detail-6

MD1-0-A-203-53-00041

Central Control Building/ Trench Rebar Details-1

MD1-0-A-203-53-00042

Central Control Building/ Trench Rebar Details-2

MD1-0-A-203-53-00043

Central Control Building/ Trench Rebar Details-3

MD1-0-A-203-55-00001

Central Control Building/ Structural Calculation Sheets

MD1-0-A-204-51-00003

Coal handling system control building / main sections

MD1-0-A-205-51-00002

Fuel Oil Pump House/ Elevation

MD1-0-A-205-51-00003

Fuel Oil Pump House/ Main Section

MD1-0-A-207-51-00001

Fire Protection Pump House/ Ground Floor Plan & Roof Plan, Interior Finish

MD1-0-A-207-51-00002

Fire Protection Pump House/ Elevation

MD1-0-A-207-51-00003

Fire Protection Pump House/ Main Section

MD1-0-A-207-52-00001

Fire Protection pump House/Foundation Plan

MD1-0-A-207-52-00002

Fire Protection pump House/Framing Plan-1

MD1-0-A-207-52-00003

Fire Protection pump House/Framing Plan-2

MD1-0-A-207-52-00004

Fire Protection pump House/Framing Elevation

MD1-0-A-207-55-00001

Fire Protection Pump House/ Structural Calculation Sheets

MD1-0-A-215-51-00001

Switchyard Control Building/ Ground Floor Plan

MD1-0-A-215-51-00002

Switchyard Control Building/ 1st Floor Plan

MD1-0-A-215-51-00003

Switchyard Control Building/ Roof Plan

MD1-0-A-215-51-00004

Switchyard Control Building/ Elevation-1

MD1-0-A-215-51-00005

Switchyard Control Building/ Elevation-2

MD1-0-A-215-51-00006

Switchyard Control Building/ Main Sections

MD1-0-A-215-52-00001

Switchyard Control Building/ Foundation Plan

MD1-0-A-215-52-00002

Switchyard Control Building/ Ground Floor Framing Plan

MD1-0-A-215-52-00003

Switchyard Control Building/ 1st Floor Framing Plan

MD1-0-A-215-52-00004

Switchyard Control Building/ Roof Framing Plan

MD1-0-A-215-52-00005

Switchyard Control Building/ Framing Section-1

MD1-0-A-215-52-00006

Switchyard Control Building/ Framing Section-2

MD1-0-A-215-52-00007

Switchyard Control Building/ Framing Section-3

MD1-0-A-215-53-00001

Switchyard Control Building/Foundation Rebar Detail-1

MD1-0-A-215-53-00002

Switchyard Control Building/Foundation Rebar Detail-2

MD1-0-A-215-53-00003

Switchyard Control Building/Foundation Rebar Detail-3

MD1-0-A-215-53-00004

Switchyard Control Building/ Column Rebar Detail-1

MD1-0-A-215-53-00005

Switchyard Control Building/ Column Rebar Detail-2

MD1-0-A-215-53-00006

Switchyard Control Building/ Column Rebar Detail-3

MD1-0-A-215-53-00010

Switchyard Control Building/ Ground Floor Girder Rebar Detail-1

MD1-0-A-215-53-00011

Switchyard Control Building/ Ground Floor Girder Rebar Detail-2

MD1-0-A-215-53-00012

Switchyard Control Building/ Ground Floor Girder Rebar Detail-3

MD1-0-A-215-53-00020

Switchyard Control Building/ 1st Floor Girder Rebar Detail-1

MD1-0-A-215-53-00021

Switchyard Control Building/ 1st Floor Girder Rebar Detail-2

MD1-0-A-215-53-00022

Switchyard Control Building/ 1st Floor Girder Rebar Detail-3

MD1-0-A-215-53-00023

Switchyard Control Building/ 1st Floor Girder Rebar Detail-4

MD1-0-A-215-53-00024

Switchyard Control Building/ 1st Floor Girder Rebar Detail-5

MD1-0-A-215-53-00025

Switchyard Control Building/ 1st Floor Girder Rebar Detail-6

MD1-0-A-215-53-00026

Switchyard Control Building/ 1st Floor Girder Rebar Detail-7

MD1-0-A-215-53-00030

Switchyard Control Building/ Roof Girder Rebar Detail-1

MD1-0-A-215-53-00031

Switchyard Control Building/ Roof Girder Rebar Detail-2

MD1-0-A-215-53-00032

Switchyard Control Building/ Roof Girder Rebar Detail-3

MD1-0-A-215-53-00033

Switchyard Control Building/ Roof Girder Rebar Detail-4

MD1-0-A-215-53-00040

Switchyard Control Building/Ground Floor Slab Rebar Detail

MD1-0-A-215-53-00041

Switchyard Control Building/1st Floor Slab Rebar Detail

MD1-0-A-215-53-00043

Switchyard Control Building/Stair Rebar Detail

MD1-0-A-215-53-00050

Switchyard Control Building/Wall Re-bar Detail-1

MD1-0-A-215-53-00051

Switchyard Control Building/Wall Re-bar Detail-2

MD1-0-A-215-53-00055

Switchyard Control Building/Misc. Rebar Detail-2

MD1-0-A-215-53-00056

Switchyard Control Building/Misc. Rebar Detail-3

MD1-0-A-215-53-00057

Switchyard Control Building/Misc. Rebar Detail-4

MD1-0-A-215-53-00058

Switchyard Control Building/Misc. Rebar Detail-5

MD1-0-A-216-51-00001

Water Treatment Building/ Ground Floor Plan

MD1-0-A-216-51-00003

Water Treatment Building/ Roof Plan

MD1-0-A-216-51-00004

Water Treatment Building/ Elevation-1

MD1-0-A-216-51-00005

Water Treatment Building/ Elevation-2

MD1-0-A-216-51-00006

Water Treatment Building/ Main Sections

MD1-0-A-216-53-00001

Water Treatment Bulding/Foundation Rebar Detail-1

MD1-0-A-216-53-00002

Water Treatment Bulding/Foundation Rebar Detail-2

MD1-0-A-216-53-00003

Water Treatment Bulding/Foundation Rebar Detail-3

MD1-0-A-216-53-00004

Water Treatment Bulding/Foundation Rebar Detail-4

MD1-0-A-216-53-00005

Water Treatment Bulding/ Ground Floor Girder Rebar Detail-1

MD1-0-A-216-53-00006

Water Treatment Bulding/ Ground Floor Girder Rebar Detail-2

MD1-0-A-216-53-00007

Water Treatment Bulding/ Ground Floor Girder Rebar Detail-3

MD1-0-A-216-53-00008

Water Treatment Bulding/ Ground Floor Girder Rebar Detail-4

MD1-0-A-216-53-00009

WATER TREATMENT BUILDING / GROUND FLOOR SLAB REBAR DETAIL-1

MD1-0-A-216-53-00010

WATER TREATMENT BUILDING / GROUND FLOOR SLAB REBAR DETAIL-2

MD1-0-A-216-53-00013

WATER TREATMENT BUILDING / MISC. REBAR DETAIL

MD1-0-A-216-53-00020

Water treatment building / foundation re-bar detail-5

MD1-0-A-216-54-00001

Water Treatment Building/ Steel Column Location Plan

MD1-0-A-216-54-00002

Water Treatment Building/ Base Plate Detail-1

MD1-0-A-216-54-00003

Water Treatment Building/ Base Plate Detail-2

MD1-0-A-216-54-00004

Water Treatment Building/ Base Plate Detail-3

MD1-0-A-216-54-00005

Water Treatment Building/ Lower Roof Steel Framing Plan

MD1-0-A-216-54-00007

Water Treatment Building/ Steel Framing Elevation-1

MD1-0-A-216-54-00008

Water Treatment Building/ Steel Framing Elevation-2

MD1-0-A-216-54-00009

Water Treatment Building/ Steel Framing Elevation-3

MD1-0-A-216-54-00010

Water Treatment Building/ Steel Framing Elevation-4

MD1-0-A-218-53-00001

Coal Yard Dry Storage Shed/ Foundation Rebar Detail

MD1-0-A-218-53-00002

Coal Yard Dry Storage Shed/ Ground Floor Girder Rebar Detail-1

MD1-0-A-218-55-00003

Coal Yard Dry Storage Shed/ Design Calculation For Roof Drain

MD1-0-A-219-51-00002

Limestone storage shed / roof plan

MD1-0-A-219-51-00003

Limestone storage shed / elevations-1

MD1-0-A-219-51-00004

Limestone storage shed / elevations-2

MD1-0-A-219-51-00005

Limestone storage shed / main sections

MD1-0-A-219-55-00004

Limestone storage shed/ design calculation for roof drain

MD1-0-A-250-51-00002

Workshop building / roof plan

MD1-0-A-251-51-00001

Bulldozer Garage/ Ground Floor Plan

MD1-0-A-251-51-00002

Bulldozer Garage/ Roof Plan

MD1-0-A-251-51-00003

Bulldozer Garage/ Elevations

MD1-0-A-251-51-00004

Bulldozer Garage/ Main Sections

MD1-0-A-251-54-00001

Bulldozer garage / steel column location plan & roof steel framing plan

MD1-0-A-251-54-00003

Bulldozer garage / steel framing elevations

MD1-0-A-252-51-00001

I&C Electrical and Mechanical Warehouse/ Ground Floor Plan

MD1-0-A-252-55-00002

I&C Electrical and Mechanical Warehouse/Design Calculation for Roof Drain

MD1-0-A-254-51-00001

Administration Building/ Ground Floor Plan

MD1-0-A-254-51-00002

Administration Building/ 1st Floor Plan

MD1-0-A-254-51-00003

Administration Building/ 2nd Floor Plan

MD1-0-A-254-51-00004

Administration Building/ 3rd Floor Plan

MD1-0-A-254-51-00005

Administration Building/ 4th Floor Plan

MD1-0-A-254-51-00006

Administration Building/ Roof Floor Plan

MD1-0-A-254-51-00007

Administration Building/ East Elevation

MD1-0-A-254-51-00008

Administration Building/ West Elevation

MD1-0-A-254-51-00009

Administration Building/ South Elevation

MD1-0-A-254-51-00010

Administration Building/ North Elevation

MD1-0-A-254-51-00012

Administration Building/ Main Section-2

MD1-0-A-254-51-00015

Administration Building/ Interior Finish Schedule-2

MD1-0-A-254-51-00016

Administration Building/ Interior Finish Schedule-3

MD1-0-A-254-53-00027

Administration Building/ Colum Rebar Detail-8

MD1-0-A-254-53-00030

Administration Building/ Wall Rebar Details-1

MD1-0-A-254-53-00031

Administration Building/ Wall Rebar Details-2

MD1-0-A-254-53-00032

Administration Building/ Wall Rebar Details-3

MD1-0-A-254-53-00033

Administration Building/ Wall Rebar Details-4

MD1-0-A-254-53-00034

Administration Building/ Wall Rebar Details-5

MD1-0-A-254-53-00035

Administration Building/ Wall Rebar Details-6

MD1-0-A-254-53-00036

Administration Building/ Wall Rebar Details-7

MD1-0-A-254-53-00037

Administration Building/ Wall Rebar Details-8

MD1-0-A-254-53-00038

Administration Building/ Wall Rebar Details-9

MD1-0-A-254-53-00039

Administration Building/ Wall Rebar Details-10

MD1-0-A-254-53-00040

Administration Building/ Wall Rebar Details-11

MD1-0-A-254-53-00041

Administration Building/ Wall Rebar Details-12

MD1-0-A-254-53-00042

Administration Building/ Wall Rebar Details-13

MD1-0-A-254-53-00043

Administration Building/ Wall Rebar Details-14

MD1-0-A-254-53-00044

Administration Building/ Wall Rebar Details-15

MD1-0-A-254-53-00045

Administration Building/ Wall Rebar Details-16

MD1-0-A-254-53-00046

Administration Building/ Wall Rebar Details-17

MD1-0-A-254-53-00054

Administration Building/ Ground Floor Girder Rebar Details-5

MD1-0-A-254-53-00069

Administration Building/ 1st Floor Girder Rebar Details-8

MD1-0-A-254-53-00100

Administration Building/ Ground Floor Slab Rebar Details-1 (T.O.C EL +0.750)

MD1-0-A-254-53-00101

Administration Building/ Ground Floor Slab Rebar Details-2 (T.O.C EL +0.750)

MD1-0-A-254-53-00102

Administration Building/ Ground Floor Slab Rebar Details-3 (T.O.C EL +0.750)

MD1-0-A-254-53-00103

Administration Building/ Ground Floor Slab Rebar Details-4 (T.O.C EL +0.450)

MD1-0-A-254-53-00105

Administration Building/ 1st Floor Slab Rebar Details-2 (T.O.C EL +5.250)

MD1-0-A-254-53-00107

Administration Building/ 1st Floor Slab Rebar Details-4 (T.O.C EL +6.250)

MD1-0-A-254-53-00108

Administration Building/ 2nd Floor Slab Rebar Details-1 (T.O.C EL +9.450)

MD1-0-A-254-53-00109

Administration Building/ 2nd Floor Slab Rebar Details-2 (T.O.C EL +9.450)

MD1-0-A-254-53-00110

Administration Building/ 2nd Floor Slab Rebar Details-3 (T.O.C EL +9.450)

MD1-0-A-254-53-00112

Administration Building/ 3rd Floor Slab Rebar Details-2 (T.O.C EL +13.650)

MD1-0-A-254-53-00113

Administration Building/ 3rd Floor Slab Rebar Details-3 (T.O.C EL +13.650)

MD1-0-A-254-53-00114

Administration Building/ 4th Floor Slab Rebar Details-1 (T.O.C EL +17.850)

MD1-0-A-254-53-00115

Administration Building/ 4th Floor Slab Rebar Details-2 (T.O.C EL +17.850)

MD1-0-A-254-53-00116

Administration Building/ 4th Floor Slab Rebar Details-3 (T.O.C EL +17.850)

MD1-0-A-254-53-00117

Administration Building/ Roof Floor Slab Rebar Details-1 (T.O.C EL +21.450)

MD1-0-A-254-53-00118

Administration Building/ Roof Floor Slab Rebar Details-2 (T.O.C EL +21.450)

MD1-0-A-254-53-00120

Administration Building/ Stair Rebar Detail-1

MD1-0-A-254-53-00121

Administration Building/ Stair Rebar Detail-2

MD1-0-A-254-53-00122

Administration Building/ Stair Rebar Detail-3

MD1-0-A-254-55-00001

Administration Building/ Structurual Calculation Sheets

MD1-0-A-259-51-00001

Car Garage-3/ Ground Floor Plan

MD1-0-A-259-51-00002

Car Garage-3/ Roof Plan

MD1-0-A-259-51-00003

Car Garage-3/ Elevations

MD1-0-A-259-51-00004

Car Garage-3/ Main Sections

MD1-0-A-259-52-00002

Car garage-3 / ground floor framing plan & details

MD1-0-A-259-52-00003

Car garage-3 / roof floor framing plan

MD1-0-A-259-52-00004

Car garage-3 / framing sections-1

MD1-0-A-259-52-00005

Car garage-3 / framing sections-2

MD1-0-C-070-06-00010

Calculation for Geotechnical and Structural Capacity of Bored Pile (D=800)

MD1-0-C-070-07-00010

Site Classification Report for Seismic Design

MD1-0-C-160-01-00010

Boiler Unit#1 Foundation Arrangement Plan

MD1-0-C-160-01-00011

Boiler Unit #2 Foundation Arrangement Plan

MD1-0-C-160-01-00020

Boiler Unit#1 Pile Arrangement Plan

MD1-0-C-160-01-00021

Boiler Unit #2 Soil Replacement Plan & Section (1)

MD1-0-C-160-01-00022

Boiler Unit #2 Soil Replacement Plan & Section (2)

MD1-0-C-160-01-00023

Boiler Unit #2 Soil Replacement Plan & Section (3)

MD1-0-C-160-01-00040

Boiler Unit#1 Construction Joint Plan

MD1-0-C-160-01-00041

Boiler Unit #2 Construction Joint Plan

MD1-0-C-160-01-00090

Boiler Unit#1 S.A Fan Foundation Plan & Section

MD1-0-C-160-01-00100

Boiler Unit #2 S.A Fan Foundation Plan & Section

MD1-0-C-160-01-00140

Boiler Unit#1 P.A Fan Foundation Plan & Section

MD1-0-C-160-01-00150

Boiler Unit #2 P.A Fan Foundation Plan & Section

MD1-0-C-160-01-00240

Boiler Unit#1 Miscellaneous Equipment Foundation Plan & Section

MD1-0-C-160-01-00250

Boiler Unit #2 Miscellaneous Equipment Foundation Plan & Section

MD1-0-C-160-01-00300

Boiler Unit#1 PA and SA Ducts Foundation Plan & Section

MD1-0-C-160-01-00350

Boiler Unit #2 PA and SA Ducts Foundation Plan & Section

MD1-0-C-160-11-00010

Boiler Unit #1 Foundation Detail (1)

MD1-0-C-160-11-00011

Boiler Unit #1 Foundation Detail (2)

MD1-0-C-160-11-00012

Boiler Unit #1 Foundation Detail (3)

MD1-0-C-160-11-00013

Boiler Unit #1 Foundation Detail (4)

MD1-0-C-160-11-00014

Boiler Unit #1 Foundation Detail (5)

MD1-0-C-160-11-00015

Boiler Unit #1 Foundation Detail (6)

MD1-0-C-160-11-00020

Boiler Unit #2 Foundation Detail (1)

MD1-0-C-160-11-00021

Boiler Unit #2 Foundation Detail (2)

MD1-0-C-160-11-00022

Boiler Unit #2 Foundation Detail (3)

MD1-0-C-160-11-00023

Boiler Unit #2 Foundation Detail (4)

MD1-0-C-160-11-00024

Boiler Unit #2 Foundation Detail (5)

MD1-0-C-160-11-00025

Boiler Unit #2 Foundation Detail (6)

MD1-0-C-160-53-00010

Boiler Unit #1 Foundation Reinforcement Plan (1)

MD1-0-C-160-53-00011

Boiler Unit #1 Foundation Reinforcement Plan (2)

MD1-0-C-160-53-00012

Boiler Unit #1 Foundation Reinforcement Plan (3)

MD1-0-C-160-53-00020

Boiler Unit #2 Foundation Reinforcement Plan(1)

MD1-0-C-160-53-00021

Boiler Unit #2 Foundation Reinforcement Plan(2)

MD1-0-C-160-53-00022

Boiler Unit #2 Foundation Reinforcement Plan(3)

MD1-0-C-160-53-00023

Boiler Unit #2 Foundation Reinforcement Plan(4)

MD1-0-C-160-53-00030

Boiler Unit #1 Foundation Reinforcement Section & Detail (1)

MD1-0-C-160-53-00032

Boiler Unit #1 Foundation Reinforcement Section & Detail (3)

MD1-0-C-160-53-00033

Boiler Unit #1 Foundation Reinforcement Section & Detail (4)

MD1-0-C-160-53-00034

Boiler Unit #1 Foundation Reinforcement Section & Detail (5)

MD1-0-C-160-53-00035

Boiler Unit #1 Foundation Reinforcement Section & Detail (6)

MD1-0-C-160-53-00036

Boiler Unit #1 Foundation Reinforcement Section & Detail (7)

MD1-0-C-160-53-00037

Boiler Unit #1 Foundation Reinforcement Section & Detail (8)

MD1-0-C-160-53-00038

Boiler Unit #1 Foundation Reinforcement Section & Detail (9)

MD1-0-C-160-53-00039

Boiler Unit #1 Foundation Reinforcement Section & Detail (10)

MD1-0-C-160-53-00042

Boiler Unit #2 Foundation Reinforcement Section & Detail (3)

MD1-0-C-160-53-00043

Boiler Unit #2 Foundation Reinforcement Section & Detail (4)

MD1-0-C-160-53-00044

Boiler Unit #2 Foundation Reinforcement Section & Detail (5)

MD1-0-C-160-53-00045

Boiler Unit #2 Foundation Reinforcement Section & Detail (6)

MD1-0-C-160-53-00046

Boiler Unit #2 Foundation Reinforcement Section & Detail (7)

MD1-0-C-160-53-00047

Boiler Unit #2 Foundation Reinforcement Section & Detail (8)

MD1-0-C-160-53-00048

Boiler Unit #2 Foundation Reinforcement Section & Detail (9)

MD1-0-C-160-53-00049

Boiler Unit #2 Foundation Reinforcement Section & Detail (10)

MD1-0-C-160-53-00100

Boiler Unit #1 S.A Fan Foundation Reinforcement Detail (1)

MD1-0-C-160-53-00101

Boiler Unit #1 S.A Fan Foundation Reinforcement Detail (2)

MD1-0-C-160-53-00110

Boiler Unit #2 S.A Fan Foundation Reinforcement Detail(1)

MD1-0-C-160-53-00111

Boiler Unit #2 S.A Fan Foundation Reinforcement Detail (2)

MD1-0-C-160-53-00150

Boiler Unit #1 P.A Fan Foundation Reinforcement Detail (1)

MD1-0-C-160-53-00151

Boiler Unit #1 P.A Fan Foundation Reinforcement Detail (2)

MD1-0-C-160-53-00160

Boiler Unit #2 P.A Fan Foundation Reinforcement Detail (1)

MD1-0-C-160-53-00161

Boiler Unit #2 P.A Fan Foundation Reinforcement Detail (2)

MD1-0-C-160-53-00250

Boiler Unit #1 Miscellaneous Equipment Foundation Reinforcement Detail

MD1-0-C-160-53-00251

Boiler Unit #2 Miscellaneous Equipment foundation Reinforcement Detail

MD1-0-C-171-01-00150

Coal Stock Area (No.1-1) Pile Arrangement Plan

MD1-0-C-171-01-00151

Coal Stock Area (No.1-2) Pile Arrangement Plan

MD1-0-C-171-01-00152

Coal Stock Area (No.2-1) Pile Arrangement Plan

MD1-0-C-171-01-00153

Coal Stock Area (No.2-2) Pile Arrangement Plan

MD1-0-C-171-01-00155

Coal Stock Area (No.3-2) Pile Arrangement Plan

MD1-0-C-171-01-00156

Coal Stock Area (No.4-1) Pile Arrangement Plan

MD1-0-C-171-01-00157

Coal Stock Area (No.4-2) Pile Arrangement Plan

MD1-0-C-171-01-00158

Coal Stock Area (No.1-4) Pile & Pile Load Test Schedule

MD1-0-C-171-01-00160

Coal Stock Area (No.1-1) Pile Cap Arrangement Plan

MD1-0-C-171-01-00161

Coal Stock Area (No.1-2) Pile Cap Arrangement Plan

MD1-0-C-171-01-00162

Coal Stock Area (No.2-1) Pile Cap Arrangement Plan

MD1-0-C-171-01-00163

Coal Stock Area (No.2-2) Pile Cap Arrangement Plan

MD1-0-C-171-01-00165

Coal Stock Area (No.3-2) Pile Cap Arrangement Plan

MD1-0-C-171-01-00166

Coal Stock Area (No.4-1) Pile Cap Arrangement Plan

MD1-0-C-171-01-00167

Coal Stock Area (No.4-2) Pile Cap Arrangement Plan

MD1-0-C-171-01-00170

Coal Stock Area (No.1) Construction Joint Arrangement Plan

MD1-0-C-171-01-00171

Coal Stock Area (No.2) Construction Joint Arrangement Plan

MD1-0-C-171-01-00173

Coal Stock Area (No.4) Construction Joint Arrangement Plan

MD1-0-C-171-01-00200

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Overall Plan

MD1-0-C-171-01-00201

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Plan(1)

MD1-0-C-171-01-00202

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Plan(2)

MD1-0-C-171-01-00203

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Plan(3)

MD1-0-C-171-01-00204

Coal Stock Area Stacker/Reclaimer Pile & Foundation Arrangement Plan(4)

MD1-0-C-171-01-00205

Coal Stock Area Equipment FDN Pile Schedule & Pile Load Test Schedule

MD1-0-C-171-01-00206

Coal Stock Area Stacker/ Reclaimer Pile Arrangement Detail-1

MD1-0-C-171-01-00207

Coal Stock Area Stacker/ Reclaimer Pile Arrangement Detail-2

MD1-0-C-171-01-00208

Coal Stock Area Stacker/ Reclaimer Pile Arrangement Section-1

MD1-0-C-171-01-00209

Coal Stock Area Stacker/ Reclaimer Pile Arrangement Section-2

MD1-0-C-171-06-00010

Calculation for Coal Stock Area Foundation

MD1-0-C-171-06-00030

Calculation for Coal Stock Area Equipment Foundation

MD1-0-C-171-11-00075

Coal Stock Area FDN Shear Reinforcement Detail

MD1-0-C-171-11-00320

Belt conveyor bc-02a/b foundation plan

MD1-0-C-171-11-00321

Belt conveyor bc-02a/b foundation detail-1

MD1-0-C-171-11-00322

Belt conveyor bc-02a/b foundation detail-2

MD1-0-C-171-11-00330

Belt conveyor bc-03a/b pile arrangement plan

MD1-0-C-171-11-00331

Belt conveyor bc-03a/b foundation detail-1

MD1-0-C-171-11-00332

Belt conveyor bc-03a/b foundation detail-2

MD1-0-C-171-11-00333

Belt conveyor bc-03a/b foundation detail-3

MD1-0-C-171-11-00334

Belt conveyor bc-03a/b foundation detail-4

MD1-0-C-171-11-00340

Belt conveyor bc-05a/b foundation plan

MD1-0-C-171-11-00341

Belt conveyor bc-05a/b foundation detail

MD1-0-C-171-11-00350

Belt conveyor bc-06a/b foundation plan

MD1-0-C-171-11-00351

Belt conveyor bc-06a/b foundation detail-1

MD1-0-C-171-11-00352

Belt conveyor bc-06a/b foundation detail-2

MD1-0-C-171-11-00360

Belt conveyor bc-08 & bc-11 foundation plan

MD1-0-C-171-53-00150

Coal Stock Area FDN. (No.1-1) Slab Rebar Plan

MD1-0-C-171-53-00151

Coal Stock Area FDN. (No.1-2) Slab Re-bar Plan

MD1-0-C-171-53-00152

Coal Stock Area FDN. (No.2-1) Reinforcement Plan

MD1-0-C-171-53-00153

Coal Stock Area FDN. (No.2-2) Reinforcement Plan

MD1-0-C-171-53-00155

Coal Stock Area FDN. (No.3-1) Reinforcement Plan

MD1-0-C-171-53-00156

Coal Stock Area FDN. (No.4-1) Reinforcement Plan

MD1-0-C-171-53-00157

Coal Stock Area FDN. (No.4-2) Reinforcement Plan

MD1-0-C-171-53-00320

Belt conveyor bc-02 a/b foundation re-bar detail -1

MD1-0-C-171-53-00330

Belt conveyor bc-03 a/b foundation re-bar detail -1

MD1-0-C-171-53-00331

Belt conveyor bc-03 a/b foundation re-bar detail -2

MD1-0-C-171-53-00332

Belt conveyor bc-03 a/b foundation re-bar detail -3

MD1-0-C-171-53-00333

Belt conveyor bc-03 a/b foundation re-bar detail -4

MD1-0-C-171-53-00340

Belt conveyor bc-05 a/b foundation re-bar detail -1

MD1-0-C-171-53-00350

Belt conveyor bc-06 a/b foundation re-bar detail -1

MD1-0-C-173-01-00182

Ash pipe lines pipe rack - 1 fdn & pile arrangement plan

MD1-0-C-173-01-00183

Ash pipe lines pipe rack - 1 foundation details

MD1-0-C-173-01-00185

Ash pipe lines pipe rack - 2 (discharge canal) fdn & pile

MD1-0-C-173-01-00186

Ash pipe lines pipe rack-2 overpassing md2 discharge canal foundation details

MD1-0-C-173-01-00187

Ash pipe lines pipe rack-2 overpassing md2 discharge canal structure details (1)

MD1-0-C-173-01-00188

Ash pipe lines pipe rack-2 overpassing md2 discharge canal structure details (2)

MD1-0-C-173-01-00189

Ash pipe lines pipe rack-2 overpassing md2 discharge canal structure details (3)

MD1-0-C-173-01-00190

Ash pipe lines pipe rack - 2 overpassing md2 discharge canal connection details

MD1-0-C-173-01-00191

Ash pipe lines pipe rack - 3 fdn & pile arrangement plan

MD1-0-C-173-01-00192

Ash pipe lines pipe rack - 3 foundation details

MD1-0-C-173-06-00010

Calculation for ash piperack structure and foundation (pr-2) overpassing md2 dl

MD1-0-C-173-06-00011

Calculation for ash pipe rack-1,3 steel structure and foundation

MD1-0-C-173-53-00180

Ash pipe lines pipe rack-2 overpassing md2 discharge canal foundation reinf. des

MD1-0-C-181-01-00011

Auxiliary Boiler Pile Foundation Plan & Detail

MD1-0-C-181-01-00012

Auxiliary Boiler Foundation Plan & Section(1)

MD1-0-C-181-01-00014

Auxiliary Boiler Foundation Plan & Section(3)

MD1-0-C-181-01-00016

Auxiliary Boiler Foundation Plan & Section(5)

MD1-0-C-186-01-00010

Raw Water Storage Tank Pile Location Plan & Section(1)

MD1-0-C-186-01-00011

Raw Water Storage Tank Pile Location Plan & Section(2)

MD1-0-C-186-01-00012

Raw Water Storage Tank (1) Foundation Plan & Section

MD1-0-C-186-01-00013

Raw Water Storage Tank (2) Foundation Plan & Section

MD1-0-C-186-01-00020

Filtered Water Storage Tank (1) Pile Location Plan & Section

MD1-0-C-186-01-00021

Filtered Water Storage Tank (2) Pile Location Plan & Section

MD1-0-C-186-01-00022

Filtered Water Storage Tank (1) Foundation Plan & Section

MD1-0-C-186-01-00023

Filtered Water Storage Tank (2) Foundation Plan & Section

MD1-0-C-186-01-00030

Demi Water Storage Tank Pile Location Plan & Section (1)

MD1-0-C-186-01-00031

Demi Water Storage Tank Pile Location Plan & Section (2)

MD1-0-C-186-01-00032

Demi Water Storage Tank (1) Foundation Plan & Section

MD1-0-C-186-01-00033

Demi Water Storage Tank (2) Foundation Plan & Section

MD1-0-C-186-01-00080

Portable Water Storage Tank Foundation Plan & Section

MD1-0-C-186-01-00090

Fire Water Storage Tank (1) Pile Location Plan & Section

MD1-0-C-186-01-00091

Fire Water Storage Tank (2) Pile Location Plan & Section

MD1-0-C-186-01-00092

Fire Water Storage Tank (1) Foundation Plan & Section

MD1-0-C-186-01-00093

Fire Water Storage Tank (2) Foundation Plan & Section

MD1-0-C-186-01-00100

Diesel Oil Storage Tank Foundation Plan & Section

MD1-0-C-186-01-00142

Fuel oil pipe lines pipe rack - 1 fdn & pile arrangement plan

MD1-0-C-186-01-00143

Fuel oil pipe lines pipe rack - 1 foundation details

MD1-0-C-186-01-00145

Fuel oil pipe lines pipe rack - 2 fdn & pile arrangement plan

MD1-0-C-186-01-00146

Fuel oil pipe lines pipe rack - 2 foundation details

MD1-0-C-186-06-00010

Calculation for Diesel Oil Storage Tank Foundation

MD1-0-C-186-06-00011

Calculation for Raw Water Storage Tank Foundation

MD1-0-C-186-06-00012

Calculation for Filtered Water Storage Tank Foundation

MD1-0-C-186-06-00013

Calculation for Demi Water Storage Tank Foundation

MD1-0-C-186-06-00014

Calculation For Condensate Water Storage Tank Foundation

MD1-0-C-186-06-00017

Calculation for Portable Water Storage Tank Foundation

MD1-0-C-186-06-00018

Calculation for Fire Water Storage Tank Foundation

MD1-0-C-186-06-00023

Calculation for fuel oil pipe rack-1,2 steel structure and foundation

MD1-0-C-186-53-00010

Raw Water Storage Tank (1) Foundation Reinforcement Detail

MD1-0-C-186-53-00011

Raw Water Storage Tank (2) Foundation Reinforcement Detail

MD1-0-C-186-53-00020

Filtered Water Storage Tank (1), (2) Foundation Reinforcement Detail

MD1-0-C-186-53-00040

Condensate Water Storage Tank (1), (2) Foundation Reinforcement Detail

MD1-0-C-186-53-00100

Diesel Oil Storage Tank Foundation Reinforcement Detail

MD1-0-C-186-53-00140

Fire Water Storage Tank (1), (2) Foundation Reinforcement Detail

MD1-0-C-300-02-00011

General Notes

MD1-0-C-300-02-00018

Standard Details: Bored Pile Details

MD1-0-C-370-01-00200

C.W Discharge Culvert Plan & Profile

MD1-0-C-370-01-00205

C.W Discharge Culvert Plan & Section (1)

MD1-0-C-370-01-00206

C.W Discharge Culvert Plan & Section (2)

MD1-0-C-370-06-00080

Calculation for C.W Pipe Bedding

MD1-0-C-370-53-00200

C.W Discharge Culvert- Rebar Detail (1)

MD1-0-C-370-53-00201

C.W Discharge Culvert- Rebar Detail (2)

MD1-0-C-370-53-00202

C.W Discharge Culvert- Re-bar Detail (3)

MD1-0-C-370-53-00203

C.W Discharge Culvert- Re-bar Detail (4)

MD1-0-C-370-53-00204

C.W Discharge Culvert- Re-bar Detail (5)

MD1-0-C-370-53-00205

C.W Discharge Culvert- Re-bar Detail (6)

MD1-0-C-370-53-00207

C.W Discharge Culvert- Re-bar Detail (8)

MD1-0-C-505-01-00010

Main & Unit Aux. Transformer Unit #1 Pile Arrangement Plan

MD1-0-C-505-01-00011

Main & Unit Aux. Transformer Unit #2 Pile Arrangement Plan

MD1-0-C-505-01-00012

Main & Unit Aux. Transformer Unit #1 Foundation Plan

MD1-0-C-505-01-00013

Main & Unit Aux. Transformer Unit #2 Foundation Plan

MD1-0-C-505-01-00020

Main & Unit Aux. Transformer Unit #1 Grating & support Beam Arrangement Plan&Sec

MD1-0-C-505-01-00021

Main & Unit Aux. Transformer Unit #2 Grating & support Beam Arrangement Plan&Sec

MD1-0-C-505-06-00010

Calculation for Main & Unit Aux. Transformer Foundation

MD1-0-C-505-11-00010

Main & Unit Aux. Transformer Unit #1 Foundation Section(1)

MD1-0-C-505-11-00011

Main & Unit Aux. Transformer Unit #1 Foundation Section(2)

MD1-0-C-505-11-00012

Main & Unit Aux. Transformer Unit #2 Foundation Section(1)

MD1-0-C-505-11-00013

Main & Unit Aux. Transformer Unit #2 Foundation Section(2)

MD1-0-C-505-11-00020

Main & Unit Aux. Transformer Unit # 1,2 Foundation Section(1)

MD1-0-C-505-11-00021

Main & Unit Aux. Transformer Unit # 1,2 Foundation Section(2)

MD1-0-C-505-53-00010

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Plan (1)

MD1-0-C-505-53-00011

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Plan (2)

MD1-0-C-505-53-00012

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Plan (3)

MD1-0-C-505-53-00013

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Section (1)

MD1-0-C-505-53-00014

Main & Unit Aux. Transformer Unit #1 Foundation Reinforcement Section (2)

MD1-0-C-505-53-00020

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Plan (1)

MD1-0-C-505-53-00021

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Plan (2)

MD1-0-C-505-53-00022

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Plan (3)

MD1-0-C-505-53-00023

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Section (1)

MD1-0-C-505-53-00024

Main & Unit Aux. Transformer Unit #2 Foundation Reinforcement Section (2)

MD1-0-C-505-53-00030

Main & Unit Aux. Transformer Unit #1, #2 Foundation Reinforcement Detail (1)

MD1-0-C-570-01-00010

Switchyard Overall Foundation Layout Plan

MD1-0-C-570-01-00019

Switchyard Foundation Layout Plan (500KV Area) (1)

MD1-0-C-570-01-00020

Switchyard Foundation Layout Plan (500KV Area) (2)

MD1-0-C-570-01-00021

Switchyard Foundation Layout Plan (110KV Area)

MD1-0-C-570-01-00022

Switchyard Foundation Layout Plan (Power Block Area)

MD1-0-C-570-01-00060

Switchyard Foundation Plan & Section (1)

MD1-0-C-570-01-00061

Switchyard Foundation Plan & Section (2)

MD1-0-C-570-01-00062

Switchyard Foundation Plan & Section (3)

MD1-0-C-570-01-00063

Switchyard Foundation Plan & Section (4)

MD1-0-C-570-01-00064

Switchyard Foundation Plan & Section (5)

MD1-0-C-570-01-00065

Switchyard Foundation Plan & Section (6)

MD1-0-C-570-01-00066

Switchyard Foundation Plan & Section (7)

MD1-0-C-570-01-00067

Switchyard Foundation Plan & Section (8)

MD1-0-C-570-01-00068

Switchyard Foundation Plan & Section (9)

MD1-0-C-570-01-00069

Switchyard Foundation Plan & Section (10)

MD1-0-C-570-01-00070

Switchyard Foundation Plan & Section (11)

MD1-0-C-570-01-00071

Switchyard Foundation Plan & Section (12)

MD1-0-C-570-01-00072

Switchyard Foundation Plan & Section (13)

MD1-0-C-570-01-00080

Station Aux. Transformer Foundaion Plan & Sections

MD1-0-C-570-01-00081

STATION AUX. TRANSFORMER GRATING,

MD1-0-C-570-01-00200

Switchyard Area Cable Trench Section

MD1-0-C-570-06-00010

Calculation for Foundation of Switchyard

MD1-0-C-570-06-00011

Calculation for Foundations of Station Aux. Transformer

MD1-0-C-570-06-00020

Calculation for Switchyard Area Cable Trench

MD1-0-C-570-11-00010

Switchyard Area Duct Bank Detail

MD1-0-C-570-53-00010

Switchyard Foundation Re-bar Plan & Section (1)

MD1-0-C-570-53-00011

Switchyard Foundation Re-bar Plan & Section (2)

MD1-0-C-570-53-00012

Switchyard Foundation Re-bar Plan & Section (3)

MD1-0-C-570-53-00013

Switchyard Foundation Re-bar Plan & Section (4)

MD1-0-C-570-53-00015

Switchyard Foundation Re-bar Plan & Section (6)

MD1-0-C-570-53-00016

Switchyard Foundation Re-bar Plan & Section (7)

MD1-0-C-570-53-00017

Switchyard Foundation Re-bar Plan & Section (8)

MD1-0-C-570-53-00018

Switchyard Foundation Re-bar Plan & Section (9)

MD1-0-C-570-53-00019

Switchyard Foundation Re-bar Plan & Section (10)

MD1-0-C-570-53-00020

Switchyard Foundation Re-bar Plan & Section (11)

MD1-0-C-570-53-00021

Switchyard Foundation Re-bar Plan & Section (12)

MD1-0-C-570-53-00022

Switchyard Foundation Re-bar Plan & Section (13)

MD1-0-C-570-53-00030

Station Aux. Transformer Foundaion Rebar Details

MD1-0-C-570-53-00100

Switchyard Area Cable Trench Reinforcement Detail

MD1-0-C-570-53-00101

Switchyard Area Marshalling Kiosk Reinforement Detail

MD1-0-C-840-06-00020

Calculation for filter, tank and Pump Mat Foundation of WT and WWT Area

MD1-0-C-840-06-00100

Calculation for Clarifer Concrete Structure, pH Adjust Pond and Mixing Pond

MD1-0-C-840-11-00051

WT & WWT Area Clarifier and Clarifier Internal PDN. Plan & Sections

MD1-0-C-840-11-00052

WT & WWT Area Clarifier and Clarifier Internal PDN. Sections & Details

MD1-0-C-840-11-00053

WT & WWT Area Clarifier Pile Arrangement Plan & Details

MD1-0-C-840-11-00054

WT & WWT Area Clarifier & Clarifier Internal FDN. Pile Arrangement Plan

MD1-0-C-840-53-00250

WT & WWT Area Pressure Filter & Activated Carbon Filter FDN Reinf. Plan & Secti

MD1-0-C-840-53-00260

WT & WWT Area Gravity Filter FDN Reinforcement Plan & Sections

MD1-0-C-840-53-00270

WT & WWT Area Acid Caustic Storage Tank FDN Reinf. Plan & Sections

MD1-0-C-840-53-00271

WT & WWT Area Acid Caustic Storage Tank FDN Reinf. Details (1)

MD1-0-C-840-53-00272

WT & WWT Area Acid Caustic Storage Tank FDN Reinf. Details (2)

MD1-0-C-840-53-00280

WT & WWT Area Acid Caustic & Polymer FDN Plan & Sections

MD1-0-C-840-53-00282

WT & WWT Area Acid Caustic & Polymer FDN Details (1)

MD1-0-C-840-53-00283

WT & WWT Area Acid Caustic & Polymer FDN Reinf. Details (2)

MD1-0-C-840-53-00284

WT & WWT Area Acid Caustic & Polymer FDN Reinf. Details (3)

MD1-0-C-840-53-00285

WT & WWT Area Acid Caustic & Polymer FDN Reinf. Details (4)

MD1-0-C-840-53-00290

WT & WWT Area Regeneration Pump FDN Reinf. Plan & Sections

MD1-0-C-840-53-00300

Wastewater Recovered Oil, CIP Oil Water Separator, Mixing Blower FDN

MD1-0-C-840-53-00301

WT & WWT Area Oily Wasterwater, Recovered Oil Transfer & Oil Sludge Pump FDN Rel

MD1-0-C-840-53-00302

WT & WWT Area Mixing Blower, CIP Oil Water Separator FDN Reinf. Details

MD1-0-C-840-53-00310

WT & WWT Area Filter Backwash, Demin Plant Feed Water & Filtered Water Transfer

MD1-0-C-840-53-00311

WT & WWT Area Filter Backwash, Demin Plant Feed Water & Filtered Water Transfer

MD1-0-C-840-53-00320

WT & WWT Area Raw Water & Mudded Pump FDN Reinf. Plan & Sections

MD1-0-D-215-01-00201

Plumbing Plan for Switchyard Control Building Ground Floor

MD1-0-D-215-01-00202

Plumbing Plan for Switchyard Control Building 1st Floor

MD1-0-D-215-01-00301

Enlarged Plumbing Plan for Switchyard Control Building Ground Floor

MD1-0-D-215-01-00302

Enlarged Plumbing Plan for Switchyard Control Building, 1st Floor

MD1-0-T-030-01-00045

Inspection & Test Plan for Site Preparation & Earth Work

MD1-0-T-030-01-00046

Inspection & Test Plan for Reinforced Concrete Work

MD1-0-T-030-05-00027

Inspection & Test Plan of PC Spun Piling Work

MD1-0-T-030-05-00047

Inspection & Test Plan for Bored Cast-In-Situ Piling Work

MD1-0-T-030-05-00191

Inspection & Test Plan for masonry & Plastering Work

MD1-0-T-030-05-00192

ITP for Roof Waterproofing Work

MD1-0-T-030-05-00348

ITP for the Permanent Ground Anchor of Intake Structure

MD1-0-T-030-05-00368

Itp for roof and wall cladding installation

MD1-0-T-051-11-00039

PC Spun Pile Design (Minh Duc)

MD1-0-T-051-11-00061

PC Spun Pile Design (Fecon)

MD1-0-T-070-07-00024

Interpretation Report for the PDA tests and Dynamic Load Tests of PC Spun Pile

MD1-0-T-070-07-00025

Interpretation Report for the Preliminary Pile Load Test of PC Spun Pile

MD1-0-T-070-07-00029

Interpretation Report for the Preliminary Pile Load Test adjacent Turbine

MD1-0-T-370-56-00200

Permanent Bay Wall Structure for C.W Intake Pump Station- Layout Plan (1)

MD1-0-T-370-56-00201

Permanent Bay Wall Structure for C.W Intake Pump Station- Layout Plan (2)

MD1-0-T-370-56-00202

Permanent Bay Wall Structure for C.W Intake Pump Station- Pile Arrang. Plan

MD1-0-T-370-56-00203

Permanent Bay Wall Structure for C.W Intake Pump Station- Ground Anchor Stage 1

MD1-0-T-370-56-00204

Permanent Bay Wall Structure for C.W Intake Pump Station- Ground Anchor Stage 2

MD1-0-T-370-56-00205

Permanent Bay Wall Structure for C.W Intake Pump Station- Ground Anchor Stage 3

MD1-0-T-370-56-00206

Permanent Bay Wall Structure for C.W Intake Pump Station- Tie Cable Arrang.

MD1-0-T-370-56-00219

Permanent Bay Wall Str. for C.W Intake P.Station- Const. Sequence- Type W1(1)

MD1-0-T-370-56-00220

Permanent Bay Wall Str. for C.W Intake P.Station- Const. Sequence- Type W1(2)

MD1-0-T-370-56-00221

Permanent Bay Wall Str. for C.W Intake P.Station- Const. Sequence- Type W5

MD1-0-T-370-56-00222

Permanent Bay Wall Str. for C.W Intake P.Station- Geotech. Instruments Plan

MD1-0-T-370-56-00225

Permanent Bay Wall Str. for C.W Intake P.Station- Re-bar Cage For Contig. Bore 1

MD1-0-T-370-56-00226

Permanent Bay Wall Str. for C.W Intake P.Station- Re-bar Cage For Contig. Bore 2

MD1-0-T-370-56-00227

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 3

MD1-0-T-370-56-00228

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 4

MD1-0-T-370-56-00229

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 5

MD1-0-T-370-56-00231

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 7

MD1-0-T-370-56-00232

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 8

MD1-0-T-370-56-00233

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. Bore 9

MD1-0-T-370-56-00234

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Rear Bore Pile

MD1-0-T-370-56-00235

Permanent Bay Wall Str. for CW Intake P.Station- RC Bond Beam Detail

MD1-0-T-370-56-00236

Permanent Bay Wall Str. for CW Intake P.Station- Facial Concrete Detail

MD1-0-T-370-56-00237

Permanent Bay Wall Str. for CW Intake P.Station-Cap Beam Detail (1)

MD1-0-T-370-56-00238

Permanent Bay Wall Str. for CW Intake P.Station-Cap Beam Detail (2)

MD1-0-T-370-56-00239

Permanent Bay Wall Str. for CW Intake P.Station-Cap Beam Detail of Rear Bore

MD1-0-T-370-56-00240

Permanent Bay Wall Str. for CW Intake P.Station-Connection Detail

MD1-0-V-218-54-00002

Coal Dry Storage Shed/ Anchor Bolt Plan & Details

MD1-0-V-218-54-00003

Coal Dry Storage Shed/ Template Details

MD1-0-V-218-54-00005

Coal Dry Storage Shed/ Cross Section

MD1-0-V-218-54-00006

Coal Dry Storage Shed/ Sidewall Framing & Details

MD1-0-V-218-54-00007

Coal Dry Storage Shed/ Eave Gutter & Valley Gutter Details

MD1-0-V-360-01-00001

Chimney General Layout

MD1-0-V-360-04-00700

Chimney Design Criteria

MD1-0-V-360-07-00705

Chimney #1 Foundation Calculation Report

MD1-0-V-360-07-00706

Chimney #2 Foundation Calculation Report

MD1-0-V-360-07-00710

R.C Windshield- calculation Report

MD1-0-V-360-07-00750

CHIMNEY #1 & #2 STAIRS - CALCULATION REPORT

MD1-0-V-360-10-00250

Chimney #1 & # 2 Stairs- General Arrangement

MD1-0-V-360-10-00300

Chimney #1 & # 2 Ladders and Rest Platforms General Arrangement

MD1-0-V-360-10-00310

Chimney #1 & # 2 Rest Platforms- Layout and details

MD1-0-V-360-52-00100

Chimney #1- R.C Foundation and Piles- General Arrangement

MD1-0-V-360-52-00101

Chimney #2- R.C Foundation- General Arrangement

MD1-0-V-360-53-00102

Chimney #1- R.C Foundation and Piles- General Arrangement

MD1-0-V-360-53-00104

Chimney #2- R.C Foundation- Reinforcement

MD1-0-V-360-53-00111

R.c. windshield - reinforcement details

MD1-0-V-360-54-00251

CHIMNEY #1 & #2 STAIRS - DETAILS

MD1-0-V-360-54-00255

CHIMNEY #1 & #2 STAIRS - HANDRAILS

MD1-0-V-360-54-00259

CHIMNEY #1 & #2 STAIRS - GRATINGS

MD1-0-V-360-54-00301

Chimney #1 & # 2 Ladders Details

NIGEL

01/06/12

MD1-0-A-201-51-00011

NIGEL

01/06/12

MD1-0-A-203-51-00012

NIGEL

01/06/12

MD1-0-A-207-51-00004

NIGEL

01/06/12

MD1-0-A-207-53-00001

NIGEL

01/06/12

10

MD1-0-A-207-53-00002

NIGEL

01/06/12

11

MD1-0-A-207-53-00003

NIGEL

02/10/12

12

MD1-0-A-207-53-00004

NIGEL

01/06/12

14

MD1-0-A-207-53-00005

NIGEL

02/10/12

15

MD1-0-A-252-51-00006

NIGEL

01/06/12

18

MD1-0-A-254-51-00014

NIGEL

02/10/12

19

MD1-0-A-254-52-00030

MARK

11/10/12

29

MD1-0-A-254-54-00002

NIGEL

07/02/13

31

MD1-0-A-254-54-00003

NIGEL

07/02/13

32

MD1-0-A-254-54-00004

NIGEL

07/02/13

33

MD1-0-C-300-01-00200

NIGEL

07/02/13

34

MD1-0-C-300-01-00201

NIGEL

07/02/13

35

MD1-0-V-161-01-32531

NIGEL

07/02/13

36

MD1-0-V-161-01-32541

NIGEL

07/02/13

37

MD1-0-V-161-54-01115

NIGEL

29/11/12

42

MD1-0-V-161-54-01121

NIGEL

27/12/12

43

MD1-0-V-161-54-01122

NIGEL

12/12/12

47

MD1-0-V-161-54-01123

NIGEL

12/12/12

48

MD1-0-V-161-54-01130

NIGEL

26/12/12

63

MD1-0-V-161-54-01131

NIGEL

26/12/12

65

MD1-0-V-161-54-01132

NIGEL

26/12/12

66

MD1-0-V-161-54-01133

NIGEL

26/12/12

67

MD1-0-V-161-54-01134

NIGEL

26/12/12

68

MD1-0-V-161-54-01135

NIGEL

26/12/12

69

MD1-0-V-161-54-01141

NIGEL

26/12/12

71

MD1-0-V-161-54-01143

NIGEL

01/03/13

73

MD1-0-V-161-54-01145

NIGEL

05/02/13

74

MD1-0-V-161-54-01150

NIGEL

05/02/13

75

MD1-0-V-161-54-01201

NIGEL

05/02/13

76

MD1-0-V-161-54-01216

NIGEL

15/05/13

77

MD1-0-V-161-54-01217

NIGEL

15/05/13

78

MD1-0-V-161-54-01218

NIGEL

15/05/13

79

MD1-0-V-181-01-00001

NIGEL

15/05/13

80

MD1-0-V-181-06-00012

NIGEL

15/05/13

81

MD1-0-V-181-06-00013

NIGEL

15/05/13

82

MD1-0-V-181-06-00014

NIGEL

26/11/12

170

MD1-0-V-181-06-00015

NIGEL

09/04/13

171

MD1-0-V-181-06-00016

NIGEL

09/04/13

172

MD1-0-V-181-06-00017

NIGEL

09/04/13

173

MD1-0-V-181-06-00018

NIGEL

09/04/13

174

MD1-0-V-181-06-00019

NIGEL

09/04/13

175

MD1-0-V-181-11-00001

NIGEL

09/04/13

176

MD1-0-V-181-11-00002

NIGEL

09/04/13

177

MD1-0-V-181-11-00003

NIGEL

29/11/12

196

MD1-0-V-181-11-00004

NIGEL

29/11/12

197

MD1-0-V-181-11-00005

NIGEL

29/11/12

198

MD1-0-V-181-11-00006

NIGEL

29/11/12

199

MD1-0-V-181-11-00007

NIGEL

29/11/12

200

MD1-0-V-181-11-00008

NIGEL

29/11/12

201

MD1-0-V-181-11-00009

NIGEL

29/11/12

202

MD1-0-V-181-11-00010

NIGEL

23/07/12

204

MD1-1-V-161-54-11110

NIGEL

28/02/13

222

MD1-1-V-161-54-21110

NIGEL

28/02/13

223

MD1-1-V-161-54-41110

NIGEL

28/02/13

224

NIGEL

28/02/13

225

NIGEL

28/02/13

226

NIGEL

28/02/13

227

NIGEL

28/02/13

228

NIGEL

28/02/13

229

NIGEL

28/02/13

230

NIGEL

28/02/13

231

NIGEL

04/04/13

263

NIGEL

18/06/13

264

NIGEL

27/12/12

266

NIGEL

27/12/12

267

NIGEL

27/12/12

273

NIGEL

27/12/12

274

NIGEL

26/11/12

275

NIGEL

07/02/13

278

NIGEL

07/02/13

279

NIGEL

07/02/13

280

NIGEL

07/02/13

281

NIGEL

08/02/13

287

NIGEL

22/11/12

380

NIGEL

22/11/12

381

NIGEL

22/11/12

382

NIGEL

22/11/12

383

NIGEL

22/11/12

384

NIGEL

22/11/12

385

NIGEL

27/07/12

394

NIGEL

22/11/12

395

NIGEL

22/11/12

396

NIGEL

22/11/12

397

NIGEL

10/08/12

398

NIGEL

10/08/12

399

NIGEL

10/08/12

400

NIGEL

31/07/12

401

NIGEL

31/07/12

402

NIGEL

31/07/12

403

NIGEL

09/10/12

404

NIGEL

09/10/12

405

NIGEL

09/10/12

406

NIGEL

22/11/12

407

NIGEL

22/11/12

408

NIGEL

22/11/12

409

NIGEL

09/10/12

410

NIGEL

09/10/12

411

NIGEL

09/10/12

412

NIGEL

09/10/12

413

NIGEL

09/10/12

414

NIGEL

09/10/12

415

NIGEL

09/10/12

416

NIGEL

09/10/12

417

NIGEL

09/10/12

418

NIGEL

09/10/12

419

NIGEL

09/10/12

420

NIGEL

04/12/12

421

NIGEL

16/11/12

422

NIGEL

16/11/12

424

NIGEL

03/10/12

425

NIGEL

03/10/12

426

NIGEL

16/11/12

430

NIGEL

16/11/12

431

NIGEL

16/11/12

432

NIGEL

16/11/12

433

NIGEL

07/02/13

435

NIGEL

07/02/13

436

NIGEL

07/02/13

437

NIGEL

07/02/13

438

NIGEL

07/02/13

439

NIGEL

28/03/13

445

NIGEL

28/03/13

446

NIGEL

28/03/13

447

NIGEL

28/03/13

448

NIGEL

28/03/13

449

NIGEL

28/03/13

450

NIGEL

28/03/13

451

NIGEL

28/03/13

452

NIGEL

28/03/13

453

NIGEL

28/03/13

454

NIGEL

28/03/13

455

NIGEL

28/03/13

456

NIGEL

28/12/12

457

NIGEL

04/03/13

458

NIGEL

04/03/13

459

NIGEL

04/03/13

460

NIGEL

04/03/13

461

NIGEL

04/03/13

462

NIGEL

04/03/13

463

NIGEL

04/03/13

464

NIGEL

04/03/13

465

NIGEL

21/03/13

467

NIGEL

21/03/13

468

NIGEL

14/01/13

472

NIGEL

05/03/13

474

NIGEL

03/04/13

475

NIGEL

03/04/13

476

NIGEL

28/06/13

477

NIGEL

26/03/13

485

NIGEL

10/07/13

491

NIGEL

25/06/13

532

NIGEL

05/03/13

533

NIGEL

05/03/13

534

NIGEL

25/06/13

535

NIGEL

25/06/13

542

NIGEL

25/06/13

544

NIGEL

10/07/13

548

NIGEL

21/03/13

576

NIGEL

28/11/12

577

NIGEL

28/11/12

578

NIGEL

28/11/12

579

NIGEL

28/11/12

580

NIGEL

28/11/12

581

NIGEL

28/11/12

582

NIGEL

28/11/12

583

NIGEL

28/11/12

584

NIGEL

28/11/12

585

NIGEL

28/11/12

586

NIGEL

28/11/12

588

NIGEL

10/09/12

591

NIGEL

10/09/12

592

NIGEL

31/01/13

628

NIGEL

31/01/13

629

NIGEL

31/01/13

630

NIGEL

31/01/13

631

NIGEL

31/01/13

632

NIGEL

31/01/13

633

NIGEL

31/01/13

634

NIGEL

31/01/13

635

NIGEL

31/01/13

636

NIGEL

31/01/13

637

NIGEL

31/01/13

638

NIGEL

31/01/13

639

NIGEL

31/01/13

640

NIGEL

31/01/13

641

NIGEL

31/01/13

642

NIGEL

31/01/13

643

NIGEL

31/01/13

644

NIGEL

31/01/13

645

NIGEL

31/01/13

650

NIGEL

31/01/13

662

NIGEL

31/01/13

686

NIGEL

31/01/13

687

NIGEL

31/01/13

688

NIGEL

31/01/13

689

NIGEL

31/01/13

691

NIGEL

31/01/13

693

NIGEL

31/01/13

694

NIGEL

31/01/13

695

NIGEL

31/01/13

696

NIGEL

31/01/13

698

NIGEL

31/01/13

699

NIGEL

31/01/13

700

NIGEL

31/01/13

701

NIGEL

31/01/13

702

NIGEL

31/01/13

703

NIGEL

31/01/13

704

NIGEL

31/01/13

705

NIGEL

31/01/13

706

NIGEL

31/01/13

707

NIGEL

30/01/13

712

NIGEL

04/03/13

720

NIGEL

04/03/13

721

NIGEL

04/03/13

722

NIGEL

04/03/13

723

NIGEL

25/06/13

726

NIGEL

25/06/13

727

NIGEL

25/06/13

728

NIGEL

25/06/13

729

NIGEL

31/10/12

738

NIGEL

28/11/12

740

NIGEL

08/01/13

741

NIGEL

08/01/13

742

NIGEL

08/01/13

743

NIGEL

08/01/13

744

NIGEL

08/01/13

745

NIGEL

08/01/13

746

NIGEL

08/01/13

747

NIGEL

08/01/13

748

NIGEL

08/01/13

749

NIGEL

08/01/13

750

NIGEL

08/01/13

751

NIGEL

08/01/13

752

NIGEL

08/01/13

753

NIGEL

08/01/13

754

NIGEL

08/01/13

755

NIGEL

08/01/13

756

NIGEL

08/01/13

757

NIGEL

08/01/13

758

NIGEL

08/01/13

759

NIGEL

08/01/13

760

NIGEL

08/01/13

761

NIGEL

08/01/13

762

NIGEL

08/01/13

763

NIGEL

08/01/13

764

NIGEL

08/01/13

765

NIGEL

08/01/13

766

NIGEL

08/01/13

767

NIGEL

08/01/13

768

NIGEL

08/01/13

769

NIGEL

08/01/13

770

NIGEL

08/01/13

771

NIGEL

08/01/13

772

NIGEL

08/01/13

773

NIGEL

08/01/13

774

NIGEL

08/01/13

775

NIGEL

08/01/13

776

NIGEL

08/01/13

777

NIGEL

08/01/13

778

NIGEL

08/01/13

779

NIGEL

08/01/13

780

NIGEL

08/01/13

781

NIGEL

08/01/13

782

NIGEL

08/01/13

783

NIGEL

08/01/13

784

NIGEL

08/01/13

785

NIGEL

08/01/13

786

NIGEL

08/01/13

787

NIGEL

08/01/13

788

NIGEL

08/01/13

789

NIGEL

08/01/13

790

NIGEL

08/01/13

791

NIGEL

08/01/13

792

NIGEL

08/01/13

793

NIGEL

08/01/13

794

NIGEL

08/01/13

795

NIGEL

08/01/13

796

NIGEL

08/01/13

797

NIGEL

08/01/13

798

NIGEL

08/01/13

799

NIGEL

08/01/13

800

NIGEL

08/01/13

801

NIGEL

08/01/13

802

NIGEL

05/03/13

831

NIGEL

05/03/13

832

NIGEL

05/03/13

833

NIGEL

05/03/13

834

NIGEL

05/03/13

835

NIGEL

05/03/13

836

NIGEL

05/03/13

837

NIGEL

05/03/13

838

NIGEL

05/03/13

839

NIGEL

05/03/13

840

NIGEL

05/03/13

841

NIGEL

05/03/13

842

NIGEL

05/03/13

843

NIGEL

05/03/13

844

NIGEL

05/03/13

845

NIGEL

05/03/13

846

NIGEL

05/03/13

847

NIGEL

05/03/13

848

NIGEL

27/06/13

849

NIGEL

27/06/13

850

NIGEL

27/06/13

851

NIGEL

27/06/13

852

NIGEL

27/06/13

853

NIGEL

27/06/13

854

NIGEL

27/06/13

855

NIGEL

27/06/13

856

NIGEL

27/06/13

857

NIGEL

27/06/13

858

NIGEL

05/03/13

861

NIGEL

27/06/13

863

NIGEL

05/03/13

865

NIGEL

02/07/13

875

NIGEL

02/07/13

876

NIGEL

02/07/13

877

NIGEL

02/07/13

878

NIGEL

02/07/13

879

NIGEL

02/07/13

880

NIGEL

02/07/13

881

NIGEL

02/07/13

882

NIGEL

02/07/13

884

NIGEL

02/07/13

885

NIGEL

02/07/13

886

NIGEL

02/07/13

887

NIGEL

02/07/13

888

NIGEL

02/07/13

889

NIGEL

05/03/13

895

NIGEL

05/03/13

896

NIGEL

05/03/13

897

NIGEL

05/03/13

898

NIGEL

05/03/13

899

NIGEL

05/03/13

900

NIGEL

05/03/13

901

NIGEL

02/07/13

910

NIGEL

02/07/13

911

NIGEL

02/07/13

912

NIGEL

02/07/13

913

NIGEL

02/07/13

914

NIGEL

02/07/13

915

NIGEL

02/07/13

916

NIGEL

26/07/13

990

NIGEL

26/07/13

991

NIGEL

24/07/13

993

NIGEL

24/07/13

994

NIGEL

24/07/13

995

NIGEL

24/07/13

996

NIGEL

24/07/13

997

NIGEL

24/07/13

998

NIGEL

26/07/13

999

NIGEL

26/07/13

1000

NIGEL

24/07/13

1004

NIGEL

26/07/13

1005

NIGEL

24/07/13

1026

NIGEL

28/02/13

1040

NIGEL

28/02/13

1041

NIGEL

28/02/13

1042

NIGEL

28/02/13

1043

NIGEL

24/10/12

1054

NIGEL

24/10/12

1055

NIGEL

24/10/12

1056

NIGEL

24/10/12

1057

NIGEL

05/10/12

1058

NIGEL

05/10/12

1059

NIGEL

05/10/12

1060

NIGEL

05/10/12

1061

NIGEL

22/10/12

1062

NIGEL

22/10/12

1063

NIGEL

28/11/12

1064

NIGEL

28/11/12

1065

NIGEL

11/01/13

1066

NIGEL

24/10/12

1067

NIGEL

24/10/12

1068

NIGEL

28/11/12

1069

NIGEL

28/11/12

1070

NIGEL

11/01/13

1071

NIGEL

26/07/13

1078

NIGEL

26/07/13

1079

NIGEL

26/07/13

1081

NIGEL

26/07/13

1082

NIGEL

13/11/12

1085

NIGEL

28/11/12

1086

NIGEL

28/11/12

1087

NIGEL

28/11/12

1088

NIGEL

19/12/12

1089

NIGEL

11/01/13

1090

NIGEL

28/11/12

1091

NIGEL

26/07/13

1094

NIGEL

24/10/12

1097

NIGEL

24/10/12

1098

NIGEL

05/10/12

1099

NIGEL

19/12/12

1100

NIGEL

13/11/12

1102

NIGEL

24/10/12

1103

NIGEL

14/09/12

1112

NIGEL

28/12/12

1116

NIGEL

26/02/13

1162

NIGEL

26/02/13

1163

NIGEL

26/02/13

1164

NIGEL

22/04/13

1169

NIGEL

26/02/13

1207

NIGEL

26/02/13

1208

NIGEL

26/02/13

1209

NIGEL

26/02/13

1210

NIGEL

26/02/13

1211

NIGEL

26/02/13

1212

NIGEL

26/02/13

1213

NIGEL

27/05/13

1234

NIGEL

24/07/13

1235

NIGEL

24/07/13

1236

NIGEL

24/07/13

1237

NIGEL

27/05/13

1238

NIGEL

27/05/13

1239

NIGEL

24/07/13

1240

NIGEL

24/07/13

1241

NIGEL

24/07/13

1242

NIGEL

24/07/13

1243

NIGEL

24/07/13

1244

NIGEL

24/07/13

1245

NIGEL

24/07/13

1246

NIGEL

24/07/13

1247

NIGEL

24/07/13

1248

NIGEL

24/07/13

1249

NIGEL

24/07/13

1250

NIGEL

24/07/13

1251

NIGEL

24/07/13

1252

NIGEL

24/07/13

1253

NIGEL

24/07/13

1254

NIGEL

24/07/13

1255

NIGEL

24/07/13

1256

NIGEL

24/07/13

1257

NIGEL

03/04/13

1260

NIGEL

03/04/13

1261

NIGEL

03/04/13

1262

NIGEL

03/04/13

1263

NIGEL

03/04/13

1264

NIGEL

03/04/13

1265

NIGEL

03/04/13

1266

NIGEL

03/04/13

1267

NIGEL

03/04/13

1268

NIGEL

03/04/13

1269

NIGEL

03/04/13

1270

NIGEL

03/04/13

1271

NIGEL

03/04/13

1272

NIGEL

03/04/13

1273

NIGEL

03/04/13

1274

NIGEL

03/04/13

1275

NIGEL

03/04/13

1276

NIGEL

03/04/13

1277

NIGEL

05/02/13

1278

NIGEL

14/05/13

1279

NIGEL

03/04/13

1282

NIGEL

03/04/13

1289

NIGEL

05/02/13

1290

NIGEL

03/04/13

1291

NIGEL

03/04/13

1292

NIGEL

03/04/13

1294

NIGEL

03/04/13

1295

NIGEL

03/04/13

1296

NIGEL

03/04/13

1297

NIGEL

03/04/13

1298

NIGEL

03/04/13

1299

NIGEL

03/04/13

1300

NIGEL

03/04/13

1301

NIGEL

03/04/13

1302

NIGEL

03/04/13

1303

NIGEL

03/04/13

1304

NIGEL

03/04/13

1305

NIGEL

05/02/13

1306

NIGEL

03/04/13

1307

NIGEL

03/04/13

1308

NIGEL

03/07/13

1330

NIGEL

12/04/13

1332

NIGEL

12/04/13

1336

NIGEL

12/04/13

1337

NIGEL

12/04/13

1338

NIGEL

12/04/13

1339

NIGEL

03/07/13

1359

NIGEL

03/07/13

1360

NIGEL

03/07/13

1361

NIGEL

03/07/13

1362

NIGEL

03/07/13

1363

NIGEL

03/07/13

1364

NIGEL

03/07/13

1365

NIGEL

03/07/13

1366

NIGEL

03/07/13

1367

NIGEL

03/07/13

1368

NIGEL

03/07/13

1369

NIGEL

03/07/13

1370

NIGEL

03/07/13

1371

NIGEL

03/07/13

1372

NIGEL

03/07/13

1373

NIGEL

03/07/13

1374

NIGEL

03/07/13

1375

NIGEL

12/12/12

1379

NIGEL

12/12/12

1380

NIGEL

12/12/12

1381

NIGEL

12/12/12

1382

NIGEL

23/07/12

1384

NIGEL

23/07/12

1385

NIGEL

10/08/12

1386

NIGEL

04/07/12

1387

MAX

12/12/12

1388

MAX

14/01/13

1389

NIGEL

06/05/13

1391

MAX

18/03/13

1392

NIGEL

26/09/12

1509

NIGEL

26/09/12

1510

NIGEL

05/07/12

1587

NIGEL

05/07/12

1588

NIGEL

05/07/12

1589

NIGEL

31/05/13

1606

NIGEL

31/05/13

1607

NIGEL

31/05/13

1608

NIGEL

31/05/13

1609

NIGEL

31/05/13

1610

NIGEL

31/05/13

1611

NIGEL

31/05/13

1612

NIGEL

31/05/13

1613

NIGEL

31/05/13

1614

NIGEL

31/05/13

1615

NIGEL

31/05/13

1616

NIGEL

31/05/13

1617

NIGEL

31/05/13

1618

NIGEL

31/05/13

1619

NIGEL

31/05/13

1620

NIGEL

31/05/13

1621

NIGEL

31/05/13

1623

NIGEL

31/05/13

1624

NIGEL

31/05/13

1625

NIGEL

31/05/13

1626

NIGEL

31/05/13

1627

NIGEL

31/05/13

1628

NIGEL

31/05/13

1629

NIGEL

31/05/13

1630

NIGEL

31/05/13

1631

NIGEL

31/05/13

1632

NIGEL

07/02/13

1871

NIGEL

07/02/13

1872

NIGEL

07/02/13

1873

NIGEL

07/02/13

1874

NIGEL

07/02/13

1875

NIGEL

25/04/13

1884

NIGEL

15/03/13

1885

NIGEL

02/05/13

1890

NIGEL

02/05/13

1891

NIGEL

29/04/13

1892

NIGEL

26/04/13

1894

NIGEL

26/04/13

1902

NIGEL

26/04/13

1903

NIGEL

26/04/13

1904

NIGEL

02/05/13

1908

NIGEL

02/05/13

1909

NIGEL

02/05/13

1910

NIGEL

02/05/13

1911

NIGEL

29/04/13

1912

NIGEL

26/04/13

1914

NIGEL

26/04/13

1915

NIGEL

26/04/13

1916

NIGEL

26/04/13

1917

Turbine Building/ Interior Finish Schedule

MD1-0-A-201-52-00008A

Central Control Building/ Interior Finish Schedule

MD1-0-A-201-52-00009A

Fire Protection Pump House/ Interior Finishing, Door & Window Schedule

MD1-0-A-201-52-00010A

Fire Protection Pump House/ Foundation & Column Rebar Details

MD1-0-A-201-52-00011A

Fire Protection Pump House/ Girder Rebar Details

MD1-0-A-201-52-00012A

Fire Protection Pump House/ Ground Slab & Sump PIT Rebar Details

MD1-0-A-201-52-00013A

Fire Protection Pump House/ Roof Slab Rebar Details

MD1-0-A-251-54-00005A

Fire Protection Pump House/ Equipment Foundation Rebar Details

MD1-0-C-171-11-00370B

I&C Electrical and Mechanical Warehouse/ Interior Finish Schedule

MD1-0-C-171-53-00370B

Administration Building/ Interior Finish Schedule-1

MD1-0-C-340-06-00010B

Administration Building/ Cable Trench Details

MD1-0-T-030-07-00045B

Administration Building/ "SB1" Steel Structural Detail-2

MD1-0-T-040-07-00031F

Administration Building/ "SB1" Steel Structural Detail-3

MD1-0-T-040-07-00032C

Administration Building/ "SB1" Steel Structural Detail-4

MD1-0-T-040-07-00034C

Borehole Location Plan

MD1-0-T-040-07-00035B

Rock Bed Contour Plan

MD1-0-T-040-07-00036C

Anchor Bolt Drawing & Hilti Anchor Literature for Loop Seal Blower

MD1-0-T-040-07-00057C

Anchor Bolt Drawing & Hilti Anchor Literature for Stripper Cooler Blower

MD1-0-T-040-07-00079A

STEEL FRAMING PLAN(LEVEL B1) TOS EL 9592

MD1-0-T-040-07-00116B

Steel Framing Plan (Level F) TOS EL27587, 27749, 28762 & 30282

MD1-0-T-040-07-00117A

Steel Framing Plan (Level G) TOS EL32022 & 33129

MD1-0-T-051-04-00067C

Steel Framing Plan (Level H) TOS EL34932

MD1-0-T-051-04-00155B

Steel Framing Plan (Level I) TOS EL.37562

MD1-0-T-051-07-00151C

Steel Framing Plan (Level J) TOS EL.40262

MD1-0-T-051-07-00268C

Steel Framing Plan (Level K) TOS EL.43852

MD1-0-T-051-07-00269B

Steel Framing Plan (Level L) TOS EL.46662

MD1-0-T-051-07-00278D

Steel Framing Plan (Level M) TOS EL.49039, 49237

MD1-0-T-051-07-00402B

Steel Framing Plan (Level N) TOS EL 51812

MD1-0-T-051-07-00407A

Steel Framing Plan (Level P) TOS EL.55050, 55662, 56477

MD1-0-T-051-07-00414B

Steel Framing Plan (Level R) TOS EL.59534, 59566

MD1-0-T-051-07-00417A

Steel Framing Plan (Level T) TOS EL. 65555

MD1-0-T-051-07-00419A

STEEL FRAMING - FOR BRIGE TOP EL.51812,

MD1-0-T-051-07-00420A

Steel Framing Bent H

MD1-0-T-051-07-00421A

STEEL FRAMING - FOR BRIGE BENT 13.1, 13.2, 13.8, 13.9

MD1-0-T-051-07-00422A

Steel Framing - For Bride Bent G & CCB Egress Platform

MD1-0-T-052-07-00064B

Steel Framing - for Brige Bent H

MD1-0-T-052-07-00080B

Auxiliary Boiler Package General Arrangement of Foundation

MD1-0-T-052-07-00139B

Auxiliary Boiler Package Boiler Loading Calcuation

MD1-0-T-052-07-00142C

Auxiliary Boiler Package Economizer Loading Calculation

MD1-0-T-052-07-00245D

Auxiliary Boiler Package Steel Structure Loading Calculation

MD1-0-T-052-07-00276C

Auxiliary Boiler Package P.D Fan Loading Calculation

MD1-0-T-052-07-00287C

Auxiliary Boiler Package Boiler Feed Water Pump Loading Calcuation

MD1-0-T-052-07-00294C

Auxiliary Boiler Package Blowdown Tank Loading Calculation

MD1-0-T-052-07-00393B

Auxiliary Boiler Package Diesel Oil Tank Loading Calculation

MD1-0-T-053-05-00259A

Auxiliary Boiler Package Heavy Oil Tank Loading Calculation

MD1-0-T-053-07-00315B

Auxliary Boiler Foundation- Civil Input

MD1-0-T-053-07-00347B

Auxiliary Boiler package Foundation Arrangement of F.D Fan with Loading Data

MD1-0-T-053-07-00357C

Package Boiler Feed Water Pump Foundation-Civil Input

MD1-0-T-054-07-00400B

Auxiliary Boiler Package Economizer Foundation-Civil Input

MD1-0-V-161-09-16161A

Auxiliary Boiler Package Blowdown Tank Foundation- Civil Input

Diesel Oil Tank -Civil Input

Auxliary Boiler Package Heavy Oil Tank Foundation- Civil Input

Foundation Arrangement of Chemical & Sampling

Auxiliary Boiler Package Steel Stack Foundation- Civil Input

Foundation Arrangement of Steel Structure with Loading Data

U1AT1_Erect. Drawings for Steel Framing

U1AT1_Handrail Erection Drawing

U1AT1_Grating Erection Drawing

Turbine Building / Mezzanine


A
Floor Framing Plan-1MD1-0-A-204-53-00002

Turbine Building / Mezzanine


A
Floor Framing Plan-2MD1-0-A-207-51-00011

Turbine Building / Mezzanine


A
Floor Framing Plan-3MD1-0-A-209-53-00001

Turbine Building / Operating


A
Floor Framing Plan-1 MD1-0-A-209-53-00002

Turbine Building / Operating


A
Floor Framing Plan-2 MD1-0-A-209-53-00003

Turbine Building / Operating


A
Floor Framing Plan-3 MD1-0-A-215-51-00011

Bulldozer Garage / Steel


A Connection Details

MD1-0-A-215-51-00012

Belt conveyor bc-09 & bc-10


A
foundation plan

MD1-0-A-215-51-00013

Belt conveyor bc-09 & bc-10


A
foundation re-bar detail
MD1-0-A-215-51-00014
-1

Calculation for Perimeter


A Asphalt Road Paving

MD1-0-A-215-51-00015

Welder qualification test


A report for pile splicing

MD1-0-A-215-51-00016

Material Approval Request


A for Civil and Architecture
MD1-0-A-216-51-00011
Work

Material Approval Request


A for Bored Pile

MD1-0-A-216-51-00012

Material Approval Request


A for PC pile (Fecon)

MD1-0-A-216-51-00013

Material Approval Request


A for Electorodes of PC piles
MD1-0-A-216-51-00014
(Kiswel)

Material Approval Request


A for steel bars for concrete
MD1-0-A-257-51-00004
reinforcement

Material Approval Request


A for cement (Thang Long)
MD1-0-A-258-51-00004

Material Approval Request


A for P.C Stand and HDPE
MD1-0-A-259-53-00001
hose

Material Approval Request


A for Concrete AggregateMD1-0-A-259-53-00002
(Vina Fly Ash)

Material Approval Request


A for Concrete AdmixtureMD1-0-A-259-53-00003
(Sika)

Concrete Mix Design A

MD1-0-A-259-53-00004

Additional Concrete MixADesign

MD1-0-A-259-53-00005

Interpretation Report forA the Preliminary Tensile Pile


MD1-0-A-259-53-00006
Load Test of Bored Pile

Interpretation & Counterm


A Easure Report of Working
MD1-0-C-173-06-00012
Pile Load Tests in Boiler 1

Interpretation & Counterm


A Easure Report of W. PileMD1-0-C-300-01-00112
Load Test in Turbine Bldg

Material Approval Request


A for Asphalt Premix

MD1-0-C-300-11-00121

Material approval request


A for manhole cover (thien MD1-0-C-370-06-00061
phat) (rev a)

Material Approval Request


A for Oil Containment Facilities
MD1-0-C-370-06-00070
(Rev.A)

Material Approval Request


A for Steel Grating (KINH'S
MD1-0-C-370-56-00250
GRATING)

MAR for External Insulation


A
for Steel Liners(Chimney)
MD1-0-C-370-56-00251

MAR for Acid ResistantAProtection(Chimney)

MD1-0-C-370-56-00252

MAR for Corrugated Steel


A Sheet(Chimney)

MD1-0-C-370-56-00253

MAR for Steel StructureAPainting(Chimney)

MD1-0-C-370-56-00254

MAR for Expansion Joints(Chimney)


A

MD1-0-C-370-56-00255

Material Approval Request


A for Waterproofing to Underground
MD1-0-C-370-56-00256
Concrete Structure

Material Approval Request


A for Anti Termite Soil Treatment
MD1-0-C-370-56-00257
(Hockley Internationa)

Material Approval Request


A for Joint Materials & Waterproofing
MD1-0-C-370-56-00258
(SIKA)

Material Information forAHollow Concrete Block (DONG


MD1-0-C-370-56-00259
TAM)

Material Approval Request


A Metal Roof & Wall Cladding
MD1-0-C-370-56-00260

Material Approval Request


A for Ceiling (Austrong) MD1-0-C-370-56-00261

Material Approval Request


A for Hollow Concrete Block
MD1-0-C-591-11-00071
(Khang Minh)

Material Approval Request


A for Weldmesh (Song Hop
MD1-0-P-010-01-00002
Luc)

Material approval request


A for access floor (mero) MD1-0-T-050-05-00026

Inspection & Test Plan A


for Steel Structure PEB (Kirby)
MD1-0-T-050-05-015

Material Approval Request


A for Asphalt ImpregnatedMD1-0-T-051-05-00050
Board

Material Approval Request


A for Grouting Material (SIKA)
MD1-0-T-051-05-00058

Material approval request


A for boiler steel structure paint(international
MD1-0-T-051-05-00063
paint)

Material approval request


A for hdpe pipes and fittings
MD1-0-T-051-05-00065
(ug fire fighting piping )
Instrument Data Sheets,
A Flue Gas O2 Analyzers

MD1-0-T-051-05-00109

MD1-0-T-051-05-00123

MD1-0-T-051-05-00222

MD1-0-T-051-07-00233

MD1-0-T-051-07-00245

MD1-0-T-051-07-00258

MD1-0-T-051-07-00286

MD1-0-T-051-07-00320

MD1-0-T-051-07-00321

MD1-0-T-051-07-00329

MD1-0-T-051-07-00330

MD1-0-T-051-07-00331

MD1-0-T-051-07-00332

MD1-0-T-051-07-00333

MD1-0-T-051-07-00337

MD1-0-T-051-07-00338

MD1-0-T-051-07-00339

MD1-0-T-051-07-00345

MD1-0-T-051-07-00351

MD1-0-T-051-07-00353

MD1-0-T-051-07-00359

MD1-0-T-051-07-00381

MD1-0-T-051-07-00386

MD1-0-T-051-07-00430

MD1-0-T-051-07-00431

MD1-0-T-051-07-00454

MD1-0-T-051-07-00467

MD1-0-T-051-07-00469

MD1-0-T-052-05-00054

MD1-0-T-052-05-00114

MD1-0-T-052-05-00135

MD1-0-T-052-05-00157

MD1-0-T-053-05-00148

MD1-0-T-053-05-00264

MD1-0-T-054-05-00082

MD1-0-T-055-05-00346

MD1-0-T-070-07-00018

MD1-0-T-070-07-00060

MD1-0-T-300-04-00010

MD1-0-T-370-56-00404

MD1-0-T-370-56-00405

MD1-0-V-133-11-00002

MD1-0-V-161-09-14611

MD1-0-V-161-10-14340

MD1-0-V-161-54-01110

MD1-0-V-161-54-01112

MD1-0-V-161-54-01113

MD1-0-V-161-54-01114

MD1-0-V-161-54-01120

MD1-0-V-161-54-01140

MD1-0-V-161-54-01142

MD1-0-V-161-54-01144

MD1-0-V-161-54-01146

MD1-0-V-161-54-01147

MD1-0-V-161-54-01148

MD1-0-V-161-54-01149

MD1-0-V-161-54-01202

MD1-0-V-161-54-01203

MD1-0-V-161-54-01204

MD1-0-V-161-54-01205

MD1-0-V-161-54-01206

MD1-0-V-161-54-01207

MD1-0-V-161-54-01208

MD1-0-V-161-54-01209

MD1-0-V-161-54-01210

MD1-0-V-161-54-01211

MD1-0-V-161-54-01212

MD1-0-V-161-54-01213

MD1-0-V-161-54-01214

MD1-0-V-161-54-01220

MD1-0-V-161-54-01300

MD1-0-V-161-54-01302

MD1-0-V-161-54-01304

MD1-0-V-161-54-01305

MD1-0-V-161-54-01306

MD1-0-V-161-54-11103

MD1-0-V-162-06-00006

MD1-0-V-162-55-00001

MD1-0-V-171-01-01027

MD1-0-V-171-01-01028

MD1-0-V-171-51-02111

MD1-0-V-171-55-01022

MD1-0-V-171-55-01023

MD1-0-V-171-55-01024

MD1-0-V-171-55-01025

MD1-0-V-171-55-01027

MD1-0-V-171-55-01028

MD1-0-V-172-01-01016

MD1-0-V-172-01-01017

MD1-0-V-172-55-01011

MD1-0-V-172-55-01013

MD1-0-V-172-55-01014

MD1-0-V-172-55-01016

MD1-0-V-172-55-01017

MD1-0-V-360-07-00741

MD1-0-V-360-12-00105

MD1-0-V-360-51-00355

MD1-0-V-505-02-00102

MD1-0-V-505-02-00202

MD1-0-V-505-07-00001

MD1-0-V-505-07-00101

MD1-0-V-505-07-00201

MD1-0-V-515-10-20001

MD1-0-V-515-10-20002

MD1-0-V-570-05-00033

MD1-0-V-570-05-00034

MD1-0-V-570-05-00035

MD1-0-V-570-05-00036

MD1-0-V-570-06-00001

MD1-0-V-570-11-00001

MD1-1-V-161-11-00001

MD1-1-V-161-11-00009

Coal Handling System Control Building / Girder Rebar Details-1

Fire protection pump house / wall sections

Esp control & ash elec.building/ foundation & column

Esp control & ash elec.building / girder rebar details-1

Esp control & ash elec.building / girder rebar details-2

Switchyard Control Building/ Wall Section-1

Switchyard Control Building/ Wall Section-2

Switchyard Control Building/ Ceiling Plan-1

Switchyard Control Building/ Ceiling Plan-2

Switchyard Control Building/ Toilet Enlarged Plan & Details

Switchyard Control Building/ Stair Plan & Section

Water treatment building / wall section -1

Water treatment building / wall section -2

Water treatment building / ceiling plan

Water treatment building / toilet detail

Car Garage-1 / Interior Finish Schedule

Car Garage-2 / Interior Finish Schedule

Car Garage-3 / Foundation Rebar Details-1

Car Garage-3 / Foundation Rebar Details-2

Car Garage-3 / Column Rebar Details

Car Garage-3 / Girder Rebar Details-1

Car Garage-3 / Girder Rebar Details-2

Car Garage-3 / Girder Rebar Details-3

Calculation for ASH Pipe Lines Sleeper Foundation

PERIMETER FENCE REBAR DETAILS

Switchyard Fence & Gate - Section & Detail (2)

Calculation for Temporary Slope Stability - C.W Outfall

Calculation for Temporary Work- Seal PIT Structure

C.w outfall structure temporary coffer dam plan & Sec(1)

C.w outfall structure temporary coffer dam plan & Sec(2)

C.w outfall structure temporary coffer dam plan & Sec(3)

C.w outfall structure temporary coffer dam plan & Sec(4)

C.w outfall structure temporary coffer dam plan & Sec(5)

C.w outfall structure temporary coffer dam plan & Sec(6)

C.w outfall structure temporary coffer dam plan & Sec(7)

C.w outfall structure temporary coffer dam plan & Sec(8)

C.w outfall structure temporary coffer dam plan & Sec(9)

C.w outfall structure temporary coffer dam plan & Sec(10)

C.w outfall structure temporary coffer dam plan & Sec(11)

C.w outfall structure temporary coffer dam plan & Sec(12)

Electrical Manhole Detail (CCB~Admin. Bldg.&WWT) (2)

Construction Temporary Facility Plan

Method Statement of PC Spun Piling Work

Method Statement of Concrete Trial Mix Design & Batch Plant Test Plan

Method Statement of bored piling works

Method Statement of Ground-water Monitoring wells

Method statement Trial for Water Tightness on Contiguous Pile Walls by C-Jet

Method Statement of Concrete and Formworks

Method Statement of Mass Concreting for Stack Foundation

Method Statement for Working Pile Load Test of Bored Pile

Method Statement of Concreteing for Boiler Foundation

Pile Load Test Report for Stack

Static Load Test Report for Pile No. 22 & 29- Turbine #1

Static Load Test Report for Pile No.67-Turbine #1

Static Load Test Report for Pile No.374, 455, 378 & 200- Boiler #1

Interpretation Report for Plate Load Test at Chimney Foundation #2

Bored Pile Sonic Test Report in Boiler 1- Part 1

Static Load Test Report for Pile No.34-Boiler #1

Bored Pile Sonic Test Report in Boiler 1- Part 2

Dynamic Load Test Report For Boiler 1-Part 1

Dynamic Load Test Report For Boiler 1-Part 2

Static Load Test Report for Pile No.81&87- Turbine #2

Material Approval Request Ground Anchor for Intake

Static Load Test Report for Pile No.184- Turbine Building #1

Static Pile Load Test Report for Coal Yard No.1&3 and Common Service Building

Bored Pile Sonic Test Report in Boiler 1- Part 3

Dynamic load test report for coal stock area no.1

Dynamic load test report for coal stock area no.3

Bored pile sonic test report for stg #1

Bored pile sonic test report for turbine building#1-part 1

Bored pile sonic test report for stack 1

Bored Pile Sonic Test Report for Turbine Building #2-Part 1

Bored Pile Sonic Test Report in Boiler #1 - Part 4 (Rev.A)

Static Load Test Report for PC Pile No P73 in Ash Pipe Lines Pipe Rack -2

Static Load Test Report for PC Pile No.02 in Clarifier - WT & WWT Area

Static Load Test Report for PC Pile No.73 in Belt Conveyor BC-01A

Method Statement of Earth Works

Method Statement for STG Foundation Concrete Works

Inspection & Test Plan for Steel Structure (DAEJOO)

Method Statement for Masonry & Plastering Works

Method Statement for Steel Structure Shop Fabrication

Method Statement for PEP Packing (Kirby)

Method Statement for Underground Piping (GRP)

Method Statement For Switchyard Steel Structure Installation

Soil Investigation Report

Additional Soil Investigation Report

Structurual calculation of Earth Retaining structures for CW Intake Pump Station

PERMANENT BAY WALL STRUCTURES FOR C.W INTAKE PUMP STATION OF MD-1_EXCAVATION PL)

PERMANENT BAY WALL STRUCTURES FOR C.W INTAKE PUMP STATION OF MD-1_EXCAVATION PL)

Water box vacuum pump foundation drawing

Boiler structure handrail paint msds

Anchor Bolts Shop Details

Steel Framing Plan (Lev A) TOS EL.10030, 12077 & 13100

Steel Framing Plan (Lev C) TOS EL. 17790, 18327, 19377, 19662 & 20562

Steel Framing Plan (Lev D) TOS EL. 22827, 23030 & 25167

Steel Framing Plan (Lev A1) TOS EL. 18650 & 20150

Steel Framing Plan (Level E) TOS EL25725, 25288, 26899

Steel Framing Plan (Level O) TOS EL.53967, 54442, 55042

Steel Framing Plan (Level Q) TOS EL.55050, 55662, 56477

Steel Framing Plan (Level S) TOS EL. 61175 & 62665

Roof Plan (Level U)

Girts Section (Level V)-RD1146 Section

STEEL FRAMING PLAN - RD 1143 FOR U2A & U2B

ROOF PLAN (FOR U1B & U2B)

BENT J & J4

BENT K

BENT L

BENT K4, L6, L9, N & P

BENT M

BENT 1, 3 & 4 (#1A) 14, 16 &17(#2A), 7.1, 9 & 10 (#1B) 20.1, 22&23 (#2B)

BENT 2 (#1A), 15 (#2A), 8 (#1B), 21 (#2B)

BENT 7 (#1A), 20 (#2A), 13 (#1B), 26 (#2B)

BENT 5&6 (#1A), 18&19 (#2A), 11&12 (#1B), 24&25 (#2B)

BENT 3.2 (#1A), 16.2 (#2A), 9.2 (#1B), 22.2 (#2B)

BENT 5.8 (#1A), 18.8 (#2A), 11.8 (#1B), 24.8 (#2B)

BENT 1.8 & 7.3(#1A), 14.8 & 20.3(#2A), 7.6 & 13.3 (#1B), 20.6 & 26.3 (#2B)

BENT 3.8 & 5.2(#1A), 16.8 & 18.2(#2A), 9.8 & 11.2 (#1B), 22.8 & 24.2 (#2B)

East Stair Tower for 4 Units

GENERAL NOTES

Standard Horizontal Bracing Details

Typical Wide Flange Vertical Bracing connections

Standard Vertical Bracing Details & Typical Hanger Details

Standard Beam Connection

Anchor Bolts Erection Drawing

Esp Foundation loading Calculation

Foundation Loading of ESP

Structural General Arrangement for Belt Conveyor No. BC-09 for CHS

Structural General Arrangement of Belt Conveyor BC-10 for CHS

Plc configuration diagram for coal handling system

Structural Design Calculation for Belt Conveyor BC-02A/B for CHS

Structural Design Calculation for Belt Conveyor BC-03A/B for CHS

Structural Design Calculation for Belt Conveyor BC-05A/B for CHS

STRUCTURAL DESIGN CALCULATION FOR BELT CONVEYOR NO. BC-06A/B FOR CHS

Structural Design Calculation for Belt Conveyor No. BC-09 for CHS

Structural Design Calculation for Belt Conveyor No. BC-10 for CHS

Structural general arrangement and loading data grinding house

STRL. General Arrangement of Shed Attached to Grinding House

Structural Design Calculation for Transfer Tower LT-01

Structural Design Calculation for Transfer Tower LT-03

Structural Design Calculation for Transfer Tower LT-04

Structural design calculation for grinding house

Structural Design Calculation For Shed Attached to Grinding House

Steel Liners Erection Calculation Report

Chimney #2- R.C Foundation- Bar Bending Schedule

Chimney #1 & #2 inspection doors and supports for aircraft warning lights

Loading Data for Station Transformer

Loading Data for Unit Auxiliary Transformer

Seismic verification report for generator transformer

Seismic Verification Report for Transformer Fixing for Station Transformer

Seismic Verification Report for Transformer fixing for Unit Auxiliary Transformr

Loading Data for all Foundation and Grounding Pad Location for NSPB

Seismic Verification Report for NSPB

Inspection and Test Plan for Steel Structure-110KV Switchyard

Inspection and Test Procedure for Steel Structure-110KV Switchyard

Inspection and Test Plan for Steel Structure-500KV Switchyard

Inspection and Test Procedure for Steel Structure-500KV Switchyard

500KV & 110KV Switchyard Loading Calculation

500KV & 110KV Switchyard Civil Work Guideline

U1AT1 Steel Structure Shop Detailings & Member List

U1AT1 Handrail Shop Detailings & Member List

MD1-0-A-201-51-00012

Turbine Building/ Door IC


& Window Schedule
NIGEL

07/02/13

MD1-0-A-201-52-00015

MD1-0-A-201-52-00020

Turbine Building / DeckICSlab SectionNIGEL


Details-1

16/07/13

MD1-0-A-208-52-00001

MD1-0-A-201-52-00021

Turbine Building / DeckICSlab SectionNIGEL


Details-2

16/07/13

MD1-0-A-208-52-00002

MD1-0-A-203-51-00020

Central Control BuildingIC/ Wall Section-1


NIGEL

16/07/13

MD1-0-A-208-52-00003

MD1-0-A-203-51-00021

Central Control BuildingIC/ Wall Section-2


NIGEL

16/07/13

MD1-0-A-208-52-00004

MD1-0-A-203-51-00022

Central Control BuildingIC/ Wall Section-3


NIGEL

16/07/13

MD1-0-A-208-52-00005

MD1-0-A-203-51-00023

Central Control BuildingIC/ Stair Plan &NIGEL


Section-1

16/07/13

MD1-0-A-208-52-00006

MD1-0-A-203-51-00024

Central Control BuildingIC/ Stair Plan &NIGEL


Section-2

16/07/13

MD1-0-A-208-53-00001

MD1-0-A-203-51-00025

Central Control BuildingIC/ Stair Plan &NIGEL


Section-3

16/07/13

MD1-0-A-208-53-00002

MD1-0-A-203-51-00026

Central Control BuildingIC/ Stair Plan &NIGEL


Section-4

16/07/13

MD1-0-A-208-53-00003

MD1-0-A-203-51-00027

Central Control BuildingIC/ Toilet & Shower


NIGEL
Room Enlarged
16/07/13
Plan & Details-2

MD1-0-A-208-53-00004

MD1-0-A-203-51-00040

Central Control BuildingIC/ Ceiling Plan-1


NIGEL

16/07/13

MD1-0-A-208-53-00005

MD1-0-A-203-51-00041

Central Control BuildingIC/ Ceiling Plan-2


NIGEL

16/07/13

MD1-0-A-208-53-00006

MD1-0-A-205-53-00001

FUEL OIL PUMP HOUSE


IC / FOUNDATION
NIGEL& COLUMN01/03/13
REBAR DETAILS-1

MD1-0-A-208-53-00007

MD1-0-A-205-53-00003

FUEL OIL PUMP HOUSE


IC / GIRDER NIGEL
REBAR DETAILS01/03/13

MD1-0-A-208-53-00010

MD1-0-A-205-53-00004

FUEL OIL PUMP HOUSE


IC / WALL REBAR
NIGELDETAILS 01/03/13

MD1-0-A-208-53-00011

MD1-0-A-209-51-00005

ESP Control & Ash Elec.


IC Bulding/ Interior
NIGEL
Finishing Door
26/06/13
& Window Schedule

MD1-0-A-208-53-00012

MD1-0-A-209-53-00004

Esp control & ash elec.IC


building / girder
NIGEL
rebar details-326/06/13

MD1-0-A-208-53-00013

MD1-0-A-209-53-00005

ESP Control & Ash Elec.


IC Building / Ground
NIGELFloor Slab 26/06/13
Rebar Details (Unit 1&2)

MD1-0-A-208-54-00001

MD1-0-A-209-53-00006

ESP Control & Ash Elec.


IC Building / First
NIGEL
Floor Slab Rebar
26/06/13
Details (Unit 1&2)

MD1-0-A-208-54-00002

MD1-0-A-209-53-00007

ESP Control & Ash Elec.


IC Building / Roof
NIGEL
Slab Rebar Details
26/06/13
(Unit 1&2)

MD1-0-A-208-54-00003

MD1-0-A-209-53-00008

ESP Control & Ash Elec.


IC Building / Trench
NIGELRebar Details-1
26/06/13
(Unit 1)

MD1-0-A-208-54-00004

MD1-0-A-209-53-00009

ESP Control & Ash Elec.


IC Building / Trench
NIGELRebar Details-2
26/06/13
(Unit 2)

MD1-0-A-208-54-00005

MD1-0-A-210-53-00001

Diesel Generator House


IC/ FoundationNIGEL
Rebar Detail

25/06/13

MD1-0-A-208-54-00006

MD1-0-A-210-53-00002

Diesel Generator House


IC/ Ground Floor
NIGEL
Girder Rebar Detail
25/06/13

MD1-0-A-208-54-00007

MD1-0-A-210-53-00003

Diesel Generator House


IC/ Ground Floor
NIGEL
Slab Rebar Detail
25/06/13

MD1-0-A-208-54-00008

MD1-0-A-210-53-00004

Diesel Generator House


IC/Trench Rebar
NIGEL
Detail-1

25/06/13

MD1-0-A-208-54-00009

MD1-0-A-210-53-00005

Diesel Generator House


IC/ Trench Rebar
NIGEL
Detail-2

25/06/13

MD1-0-A-208-54-00010

MD1-0-A-212-51-00005

Gaseous Chlorination Building


IC
/ Interior
NIGEL
Finishing, Door10/07/13
& Window Schedule

MD1-0-A-208-55-00001

MD1-0-A-212-53-00001

Gaseous chlorination building


IC
/ foundation
NIGEL& column rebar
16/07/13
details

MD1-0-A-210-52-00003

MD1-0-A-212-53-00002

Gaseous chlorination building


IC
/ girderNIGEL
rebar details-1 16/07/13

MD1-0-A-210-53-00006

MD1-0-A-212-53-00003

Gaseous chlorination building


IC
/ girderNIGEL
rebar details-2 16/07/13

MD1-0-A-210-55-00001

MD1-0-A-212-53-00004

Gaseous Chlorination Building


IC
/ Ground
NIGEL
Floor Slab Rebar
16/07/13
Details

MD1-0-A-212-51-00001

MD1-0-A-212-53-00005

Gaseous chlorination building


IC
/ roof floor
NIGEL
slab rebar detail
16/07/13

MD1-0-A-212-51-00002

MD1-0-A-212-53-00006

Gaseous Chlorination Building


IC
/ Equipment
NIGEL Foundation16/07/13
Rebar Details

MD1-0-A-212-51-00003

MD1-0-A-212-53-00007

Gaseous Chlorination Building


IC
/ Trench
NIGEL
Rebar Details 16/07/13

MD1-0-A-212-51-00004

MD1-0-A-213-51-00004

Fuel Oil Unloading Pump


IC House/ Interior
NIGEL
Finish & Door10/06/13
Schedule

MD1-0-A-214-52-00001

MD1-0-A-216-51-00007

Water Treatment Building/


IC Interior Finishing
NIGEL Schedule 17/12/12

MD1-0-A-214-55-00001

MD1-0-A-219-51-00006

Limestone storage shed


IC/ interior finish
NIGEL
schedule, door03/04/13
& window schedule

MD1-0-A-218-53-00004

MD1-0-A-219-51-00007

Limestone Storage Shed


IC / W All Section
NIGEL

22/03/13

MD1-0-A-218-55-00001

MD1-0-A-219-51-00008

Limestone Storage Shed


IC / Ladder Detail
NIGEL

22/03/13

MD1-0-A-221-51-00001

MD1-0-A-219-51-00009

Limestone Storage Shed


IC / Roof Walkway
NIGEL
Framing Plan
22/03/13

MD1-0-A-221-51-00002

MD1-0-A-219-51-00010

Limestone Storage Shed


IC / Roof Walkway
NIGEL
Detail

22/03/13

MD1-0-A-221-51-00003

MD1-0-A-219-51-00011

Limestone Storage Shed


IC / Shutter Door
NIGEL
Detail

22/03/13

MD1-0-A-251-52-00001

MD1-0-A-221-51-00004

Lubrication Oil StorageIC


Shelter / Interior
NIGEL
Finish Schedule
12/07/13

MD1-0-A-251-52-00002

MD1-0-A-250-51-00006

Workshop building / interior


IC finish schedule,
NIGEL door & window
10/07/13
schedule

MD1-0-A-251-55-00001

MD1-0-A-250-51-00007

Workshop Building / Wall


IC Section Detail-1
NIGEL

MD1-0-C-163-01-00010

11/07/13

MD1-0-A-250-51-00008

Workshop Building / Wall


IC Section Detail-2
NIGEL

11/07/13

MD1-0-C-163-01-00011

MD1-0-A-250-51-00009

Workshop Building / Ground


IC
Floor Ceiling
NIGEL
Plan

11/07/13

MD1-0-C-163-01-00012

MD1-0-A-250-51-00010

Workshop Building / Toilet


IC Enlarged Plan
NIGEL

11/07/13

MD1-0-C-163-01-00013

MD1-0-A-250-51-00011

Workshop Building / Shower


IC
Enlarged
NIGEL
Plan

11/07/13

MD1-0-C-163-01-00014

MD1-0-A-250-54-00011

Workshop Building / Roof


IC Purlin PlanNIGEL

11/07/13

MD1-0-C-163-01-00015

MD1-0-A-250-54-00012

Workshop Building / Girth


IC Elevation-1NIGEL

11/07/13

MD1-0-C-163-06-00010

MD1-0-A-250-54-00013

Workshop Building / Girth


IC Elevation-2NIGEL

11/07/13

MD1-0-C-163-06-00020

MD1-0-A-250-54-00014

Workshop Building / Girth


IC Detail

11/07/13

MD1-0-C-163-11-00010

MD1-0-A-250-54-00015

Workshop Building / Roof


IC Walkway Framing
NIGEL Plan & Section
11/07/13

MD1-0-C-163-11-00011

MD1-0-A-250-54-00016

Workshop Building / Roof


IC Walkway Detail
NIGEL

11/07/13

MD1-0-C-163-11-00012

MD1-0-A-250-54-00017

Workshop Building / Ladder


IC
Detail

11/07/13

MD1-0-C-163-11-00013

MD1-0-A-250-54-00018

Workshop Building / Steel


IC Connection
NIGEL
Detail - 1

11/07/13

MD1-0-C-163-53-00010

MD1-0-A-250-54-00019

Workshop Building / Steel


IC Connection
NIGEL
Detail - 2

11/07/13

MD1-0-C-163-53-00011

MD1-0-A-250-54-00020

Workshop Building / Steel


IC Connection
NIGEL
Detail - 3

11/07/13

MD1-0-C-163-53-00012

MD1-0-A-251-51-00005

Bulldozer Garage/ Interior


IC Finish Schedule,
NIGEL Door & Window
25/06/13
Schedule

MD1-0-C-163-53-00013

MD1-0-A-251-53-00001

Bulldozer Garage / Foundation


IC
RebarNIGEL
Detail

16/07/13

MD1-0-C-163-53-00014

MD1-0-A-251-53-00002

Bulldozer Garage / Ground


IC Floor Girder
NIGEL
Rebar Details 16/07/13

MD1-0-C-163-53-00020

MD1-0-A-251-53-00003

Bulldozer Garage / Ground


IC Floor SlabNIGEL
Rebar & Section16/07/13

MD1-0-C-163-53-00021

MD1-0-A-252-51-00008

I&C Electrical and Mechanical


IC
Warehouse
NIGEL/ Wall Sections-1
10/07/13

MD1-0-C-163-53-00022

MD1-0-A-252-51-00009

I&C Electrical and Mechanical


IC
Warehouse
NIGEL/ Wall Sections-2
10/07/13

MD1-0-C-163-53-00023

MD1-0-A-252-51-00010

I&C Electrical and Mechanical


IC
Warehouse
NIGEL/ Ceiling Plan
10/07/13

MD1-0-C-163-53-00024

MD1-0-A-252-51-00011

I&C Electrical and Mechanical


IC
Warehouse
NIGEL/ Toile Enlarged
10/07/13
Plan

MD1-0-C-163-53-00030

MD1-0-A-252-54-00012

I&C Electrical and Mechanical


IC
Warehouse
NIGEL/ Lower Roof
11/07/13
Purlin Plan

MD1-0-C-163-53-00031

MD1-0-A-252-54-00013

I&C Electrical and Mechanical


IC
Warehouse
NIGEL/ Higher Roof
11/07/13
Purlin Plan

MD1-0-C-163-53-00032

MD1-0-A-252-54-00014

I&C Electrical and Mechanical


IC
Warehouse
NIGEL/ Girth Elevation-1
11/07/13

MD1-0-C-163-53-00033

MD1-0-A-252-54-00015

I&C Electrical and Mechanical


IC
Warehouse
NIGEL/ Girth Elevation-2
11/07/13

MD1-0-C-163-53-00034

MD1-0-A-252-54-00016

I&C Electrical and Mechanical


IC
Warehouse
NIGEL/ Girth Details
11/07/13

MD1-0-C-171-53-00110

MD1-0-A-252-54-00017

I&C Electrical and Mechanical


IC
Warehouse
NIGEL/ Roof Walkway
11/07/13
Framing Plan & Section MD1-0-C-171-53-00111

MD1-0-A-252-54-00018

I&C Electrical and Mechanical


IC
Warehouse
NIGEL/ Roof Walkway
11/07/13
Detail

MD1-0-C-171-53-00208

MD1-0-A-252-54-00019

I&C Electrical and Mechanical


IC
Warehouse
NIGEL/ Ladder Detail
11/07/13

MD1-0-C-171-53-00209

MD1-0-A-254-51-00017

Administration Building/ICDoor Schedule


NIGEL

28/11/12

MD1-0-C-172-01-00040

MD1-0-A-254-51-00018

Administration Building/ICDoor & Window


NIGEL
Schedule

13/11/12

MD1-0-C-172-01-00041

MD1-0-A-254-51-00034

Administration BuildingIC
/ Steel LadderNIGEL
Detail

17/07/13

MD1-0-C-172-01-00042

MD1-0-A-254-53-00130

Administration Building/ICCable TrenchNIGEL


Rebar Details 07/03/13

MD1-0-C-172-01-00043

MD1-0-A-255-53-00022

Common Service Building


IC / Equipment
NIGEL
Foundation Rebar
16/07/13
Details

MD1-0-C-172-01-00044

MD1-0-A-259-51-00005

Car Garage-3/ Interior Finish


IC
Schedule,
NIGEL
Door & Window
04/03/13
Schedule

MD1-0-C-172-01-00045

MD1-0-A-259-53-00008

Car Garage-3 / GroundIC


Floor Slab Rebar
NIGEL
Plan & Section
25/06/13

MD1-0-C-172-01-00046

MD1-0-A-259-53-00009

Car Garage-3 / Roof Floor


IC Slab Rebar
NIGEL
Plan & Section 25/06/13

MD1-0-C-172-01-00047

MD1-0-C-184-01-00010

Station Auxiliary Transformer


IC
Area Sump
NIGEL
Pump Pit Plan
31/05/13
& Section

MD1-0-C-172-01-00048

MD1-0-C-184-06-00010

Calculation For Sump Pump


IC
Pit

31/05/13

MD1-0-C-172-01-00049

MD1-0-C-184-53-00010

Station Auxiliary Transformer


IC
Area Sump
NIGEL
Pump Pit Rebar
31/05/13
plan

MD1-0-C-172-01-00050

MD1-0-C-184-53-00011

Station Auxiliary Transformer


IC
Area Sump
NIGEL
Pump Pit Rebar
31/05/13
Section & Detail

MD1-0-C-172-01-00051

MD1-0-C-186-01-00140

Fuel Oil Pipe Lines Foundation


IC
Arrangement
NIGEL Plan(1) 14/06/13

MD1-0-C-172-01-00052

MD1-0-C-186-01-00141

Fuel Oil Pipe Lines Foundation


IC
Arrangement
NIGEL Plan(2) 10/05/13

MD1-0-C-172-01-00053

MD1-0-C-186-01-00148

Fuel Oil Pipe Lines Sleeper


IC Foudation
NIGEL
Details

14/06/13

MD1-0-C-172-01-00054

MD1-0-C-186-06-00021

Calculation for Fuel Oile


ICPipe Line Sleeper
NIGELFoundation14/06/13

MD1-0-C-172-01-00055

MD1-0-C-186-12-00030

Demi Water Storage Tank


IC Foundation
NIGEL
Bar Bending Schedule
22/10/12

MD1-0-C-172-01-00056

NIGEL

NIGEL

NIGEL

MD1-0-C-350-06-00010

Calculation for Storm Water


IC
DrainageNIGEL
System

12/06/13

MD1-0-C-172-01-00057

MD1-0-C-350-11-00020

Switchyard Area StormIC


Drainage Details
NIGEL
(1)

12/06/13

MD1-0-C-172-01-00058

MD1-0-C-350-11-00022

Switchyard Area StormIC


Drainage Detail
NIGEL
(3)

12/06/13

MD1-0-C-172-01-00059

MD1-0-C-350-11-00030

Coal Storage Yard Drainage


IC
Detail (1)
NIGEL

05/07/13

MD1-0-C-172-01-00060

MD1-0-C-350-11-00031

Coal Storage Yard Drainage


IC
Detail (2)
NIGEL

05/07/13

MD1-0-C-172-01-00061

MD1-0-C-370-56-00150

Seal PIT Structure (Type-A)IC


Temporary
NIGEL
Work Plan & Section
11/01/13(1)

MD1-0-C-172-01-00062

MD1-0-C-370-56-00151

Seal PIT Structure (Type-A)IC


Temporary
NIGEL
Work Plan & Section
11/01/13(2)

MD1-0-C-172-01-00063

MD1-0-C-370-56-00152

Seal PIT Structure (Type-B)IC


Temporary
NIGEL
Work Plan & Section
11/01/13(1)

MD1-0-C-172-06-00011

MD1-0-C-370-56-00153

Seal PIT Structure (Type-B)IC


Temporary
NIGEL
Work Plan & Section
11/01/13(2)

MD1-0-C-172-06-00013

MD1-0-C-370-56-00154

Seal PIT Structure-Temporary


IC
Work Diesel
NIGEL (1)

11/01/13

MD1-0-C-172-06-00014

MD1-0-C-370-56-00155

Seal PIT Structure-Temporary


IC
Work Diesel
NIGEL (2)

11/01/13

MD1-0-C-172-06-00015

MD1-0-C-370-56-00156

Seal PIT Structure-Temporary


IC
Work Diesel
NIGEL (3)

11/01/13

MD1-0-C-172-06-00016

MD1-0-C-560-11-00010

Cathodic protection system


IC foundation
NIGEL
detail

20/06/13

MD1-0-C-172-06-00030

MD1-0-C-591-01-00030

Electrical Duct Bank & IC


Manhole Arrangement
NIGEL Plan (CCB~Admin.
20/06/13 Bldg.&WWT) (1) MD1-0-C-172-11-00040

MD1-0-C-591-01-00031

Electrical Duct Bank & IC


Manhole Arrangement
NIGEL Plan (CCB~Admin.
20/06/13 Bldg.&WWT) (2) MD1-0-C-172-11-00041

MD1-0-C-591-01-00032

Electrical Duct Bank & IC


Manhole Arrangement
NIGEL Plan (CCB~Admin.
20/06/13 Bldg.&WWT) (3) MD1-0-C-172-53-00010

MD1-0-C-591-01-00033

Electrical Duct Bank & IC


Manhole Arrangement
NIGEL Plan (CCB~Admin.
20/06/13 Bldg.&WWT) (4) MD1-0-C-172-53-00011

MD1-0-C-591-01-00034

Electrical Duct Bank & IC


Manhole Arrangement
NIGEL Plan (CCB~Admin.
20/06/13 Bldg.&WWT) (5) MD1-0-C-172-53-00012

MD1-0-C-591-01-00035

Electrical Duct Bank & IC


Manhole Arrangement
NIGEL Plan (CCB~Admin.
20/06/13 Bldg.&WWT) (6) MD1-0-C-172-53-00013

MD1-0-C-591-01-00036

Electrical Duct Bank & IC


Manhole Arrangement
NIGEL Plan (CCB~Admin.
20/06/13 Bldg.&WWT) (7) MD1-0-C-172-53-00040

MD1-0-C-591-01-00037

Electrical Duct Bank & IC


Manhole Arrangement
NIGEL Plan (CCB~Admin.
20/06/13 Bldg.&WWT) (8) MD1-0-C-172-53-00041

MD1-0-C-591-01-00100

Cable Trench Plan (Station


IC Aux. TR. NIGEL
Area)

03/06/13

MD1-0-C-172-53-00042

MD1-0-C-591-01-00200

Cable Tray Sleeper Foundation


IC
Plan NIGEL
(Station Aux. TR.Area)
03/06/13

MD1-0-C-172-53-00043

MD1-0-C-591-06-00030

Calculation for Electrical


ICManhole (CCB~Admin.
NIGEL
Bldg.&WWT)
20/06/13

MD1-0-C-172-53-00044

MD1-0-C-591-06-00100

Caculation for Cable Trench


IC
Structure
NIGEL

03/06/13

MD1-0-C-172-53-00045

MD1-0-C-591-06-00200

Calculation for Cable Tray


IC Sleeper Foundation
NIGEL

03/06/13

MD1-0-C-173-01-00010

MD1-0-C-591-11-00012

Electrical Duct Bank Detail


IC (CCB~Admin.
NIGEL
Bldg.&WWT)20/06/13

MD1-0-C-173-01-00011

MD1-0-C-591-11-00070

Electrical Manhole Detail


IC (CCB~Admin.
NIGEL
Bldg.&WWT) (1)
20/06/13

MD1-0-C-173-01-00012

MD1-0-C-591-11-00100

Cable Trench StructureICDetail (Station


NIGEL
Aux. TR. Area) 03/06/13

MD1-0-C-173-01-00013

MD1-0-C-591-11-00200

Cable Tray Sleeper Foundation


IC
DetailNIGEL
(Station Aux. TR.Area)
03/06/13

MD1-0-C-173-01-00142

MD1-0-C-870-53-00050

Sanitary Sewer SystemICSump Pit (Admin.


NIGEL
Bldg. North)18/07/13
Re-Bar Detail

MD1-0-C-173-01-00143

MD1-0-T-050-05-016

Method Statement of Pile


IC Load Test NIGEL

06/04/12

MD1-0-C-173-01-00197

MD1-0-T-051-05-00077

Method Statement of Earth


IC & Contiguous
NIGEL
Pile Wall Work
23/08/12

MD1-0-C-173-01-00198

MD1-0-T-051-06-00125

Structural Calculation ofICTemp. SheetNIGEL


Pile Cofferdam 09/11/12
for CW Intake P.Station

MD1-0-C-173-06-00040

MD1-0-T-051-07-00255

Water Test Result for Ground


IC
Water NIGEL
Monitoring Wells 14/01/13

MD1-0-C-173-06-00050

MD1-0-T-051-07-00334

Additional Soil Investigation


IC Report (2nd)
NIGEL

28/01/13

MD1-0-C-173-11-00020

MD1-0-T-051-07-00355

Dynamic load test report


ICfor commonNIGEL
service building 28/02/13

MD1-0-C-173-11-00021

MD1-0-T-051-07-00356

Dynamic load test report


ICfor esp unit NIGEL
#1a

28/02/13

MD1-0-C-173-11-00022

MD1-0-T-051-07-00376

Static load test report for


IC pile no.462-turbine
NIGEL building#204/04/13

MD1-0-C-173-11-00023

MD1-0-T-051-07-00377

Static load test report for


IC pile no.25-stack#1
NIGEL

04/04/13

MD1-0-C-173-11-00024

MD1-0-T-051-07-00378

Static load test report for


IC pile no.14-aux.
NIGEL
boiler

04/04/13

MD1-0-C-173-11-00025

MD1-0-T-051-07-00379

Dynamic load test report


ICfor turbine building
NIGEL #1

04/04/13

MD1-0-C-173-11-00026

MD1-0-T-051-07-00380

Dynamic load test report


ICfor stack #1NIGEL

04/04/13

MD1-0-C-173-11-00027

MD1-0-T-051-07-00383

Static load test report for


IC pile no.74-esp
NIGEL

04/04/13

MD1-0-C-173-11-00028

MD1-0-T-051-07-00384

Dynamic load test report


ICfor fuel oil tanks
NIGEL

04/04/13

MD1-0-C-173-11-00029

MD1-0-T-051-07-00385

Dynamic load test report


ICfor aux. boiler
NIGEL

04/04/13

MD1-0-C-173-11-00030

MD1-0-T-051-07-00391

Water Test Result For Ground


IC
WaterMAX
Monitoring Wells04/04/13
(2nd)

MD1-0-C-173-11-00031

MD1-0-T-051-07-00438

Dynamic Load Test Report


IC for PC Pile
NIGEL
in Coal Stock Belt
24/07/13
Conveyor BC 09 (Rev.A) MD1-0-C-173-11-00032

MD1-0-T-051-07-00439

Dynamic Load Test Report


IC for PC Pile
NIGEL
in Coal Stock Belt
24/07/13
Conveyor BC 11 (Rev.A) MD1-0-C-173-11-00033

MD1-0-T-051-07-00456

Static Load Test ReportICfor Pile No.124


NIGEL
in Gaseous Chlorination
10/07/13 Building

MD1-0-C-173-11-00140

MD1-0-T-051-07-00462

Dynamic Load Test Report


IC For Coal Stock
NIGELBelt Conveyor
27/06/13
BC-08

MD1-0-C-173-11-00141

MD1-0-T-051-07-00472

Dynamic Load Test Report


IC for PC Pile
NIGEL
in Ash Pipe Lines
26/07/13
Pipe Rack - 1

MD1-0-C-173-53-00181

MD1-0-T-051-07-00473

Dynamic Load Test Report


IC for PC Pile
NIGEL
in Coal Stock Belt
26/07/13
Conveyor BC-10

MD1-0-C-173-53-00182

MD1-0-T-051-07-00477

Water Test Result for Ground


IC
Water Monitoring
MAX
Wells 22/07/13
(3rd)

MD1-0-C-180-01-00010

MD1-0-T-052-05-00066

Method Statement for the


IC installationNIGEL
of Roof and Wall24/09/12
Cladding System

MD1-0-C-180-01-00020

MD1-0-T-052-05-00078

Method Statement for IC


ReinforcementNIGEL

02/11/12

MD1-0-C-180-01-00021

MD1-0-T-052-05-00108

Method Statement for Undergeround


IC
NIGEL
Waterproofing Works
27/09/12

MD1-0-C-180-01-00030

MD1-0-T-052-05-00112

Method Statement for Anti


IC Termite Soil
NIGEL
Treatment Works
13/11/12

MD1-0-C-180-01-00031

MD1-0-T-052-05-00159

Method statement for painting


IC
works NIGEL

20/03/13

MD1-0-C-180-01-00032

MD1-0-T-052-05-00161

Method statement for tile


IC installation works
NIGEL

20/03/13

MD1-0-C-180-06-00010

MD1-0-T-052-05-00163

Method statement for waterproofing


IC
system
NIGEL to concrete20/03/13
roof slab

MD1-0-C-180-11-00010

MD1-0-T-052-05-00280

Method Statement for Settlement


IC
Monitoring
NIGEL Works

11/03/13

MD1-0-C-180-11-00011

MD1-0-T-052-05-00366

Method statement for raised


IC
access floor
NIGEL
works

19/03/13

MD1-0-C-180-11-00012

MD1-0-T-052-05-00367

Method statement for suspended


IC
ceiling
NIGEL
works

20/03/13

MD1-0-C-180-11-00013

MD1-0-T-052-05-00468

Method Statement for STG


IC Top TableALAN
Concrete Works26/07/13

MD1-0-C-185-01-00030

MD1-0-T-053-05-00145

Method Statement for Steel


IC StructureNIGEL
Painting (DAEJOO)
28/12/12

MD1-0-C-185-01-00031

MD1-0-T-053-05-00250

Method Statement for Grouting


IC

05/12/12

MD1-0-C-185-01-00080

MD1-0-T-053-05-00251

Method Statement for Erection


IC
of Steel
NIGEL
Structure

05/12/12

MD1-0-C-185-06-00010

MD1-0-T-053-05-00260

Method Statement for Inspection


IC
& Testing
NIGEL

09/01/13

MD1-0-C-185-11-00030

MD1-0-T-053-05-00262

Method Statement for PEB


IC Fabrication
NIGEL

09/01/13

MD1-0-C-185-11-00080

MD1-0-T-053-05-00263

Method Statement for PEB


IC Painting NIGEL

09/01/13

MD1-0-C-186-01-00132

MD1-0-T-053-05-00362

Method statement for steel


IC structure repair
NIGELworks

04/03/13

MD1-0-C-186-06-00024

MD1-0-T-057-08-00316

Common service building


IC kitchen facilites
NIGEL
specification21/06/13

MD1-0-C-300-02-00010

MD1-0-T-070-07-00059

Bored Pile Capacity Analysis


IC

MD1-0-C-300-02-00015

MD1-0-T-370-56-00100

Temporary Earth Retaining


IC Structures
NIGEL
for CW Intake Pump
20/11/12
Station of Excavation

MD1-0-C-300-02-00016

MD1-0-T-370-56-00101

Temporary Earth Retain.


IC Structures for
NIGEL
C.W Intake P.Station
20/11/12
of Ground- Stage

MD1-0-C-300-02-00017

MD1-0-T-370-56-00103

Temporary Earth Retaining


IC StructureNIGEL
for C.W Intake Pump
20/11/12
Station of Side Plan (1) MD1-0-C-340-01-00100

MD1-0-T-370-56-00104

Temporary Earth Retaining


IC Structures
NIGEL
for C.W Intake Pump
20/11/12
Station of Side Plan (2 MD1-0-C-340-01-00101

MD1-0-T-370-56-00106

Temporary Earth Retaining


IC Structures
NIGEL
for C.W Intake Pump
20/11/12
Station-Typical Sec. (1 MD1-0-C-340-01-00102

MD1-0-T-370-56-00107

Temp. Earth Retain. Structures


IC
for C.W
NIGEL
Intake Pump Sta.
20/11/12
of Geo Tech. Instr. Plan MD1-0-C-340-01-00110

MD1-0-T-370-56-00108

Temporay Earth Retaining


IC structuresNIGEL
for C.W Intake Pump
20/11/12
Sta. of Detail Geo Tech. MD1-0-C-340-01-00200

MD1-0-T-370-56-00109

Temp. Earth Retain. Structure


IC
for C.W
NIGEL
Intake Pump Sta.
20/11/12
of Anchor Detail

MD1-0-T-370-56-00110

Temp. Earth Retain. Structur.


IC
for C.WNIGEL
Intake Pump Station
20/11/12
of Guide Beam for bore MD1-0-C-350-01-00151

MD1-0-T-370-56-00111

Temp. Earth Retain. Structure


IC
For C.W
NIGEL
Intake Pump Sta.
20/11/12
of Re-bar Cage

MD1-0-T-370-56-00112

Temp. Earth Retain. Structure


IC
for C.W
NIGEL
Intake Pump Sta.
20/11/12
of Cap Beam of ContinguosMD1-0-C-350-06-00001

MD1-0-T-370-56-00113

Temp. Earth Retain. Struct.


IC for C.W Intake
NIGELPump Sta. 20/11/12
of Dewatering Plan

MD1-0-T-370-56-00114

Temp. Earth Retain. Structure


IC
for C.W
NIGEL
Intake Pump Station
20/11/12
of Dewatering Section MD1-0-C-370-01-00051

MD1-0-T-370-56-00301

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.Station:22/10/12
Excav. Plan (1)

MD1-0-C-370-01-00054

MD1-0-T-370-56-00302

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.Station:22/10/12
Excav. Plan (2)

MD1-0-C-370-01-00070

MD1-0-T-370-56-00303

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.Station:22/10/12
Excav. Section (1)

MD1-0-C-370-01-00130

MD1-0-T-370-56-00304

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.Station:22/10/12
Excav. Section (2)

MD1-0-C-370-01-00131

MD1-0-T-370-56-00305

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.Station:22/10/12
Excav. Section (3)

MD1-0-C-370-06-00030

MD1-0-T-370-56-00306

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.S: Side 22/10/12
Plan Detail of Sheet Pile (1

MD1-0-C-370-11-00055

MD1-0-T-370-56-00307

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.S: Side 22/10/12
Plan Detail of Sheet Pile (2

MD1-0-C-370-53-00050

NIGEL

NIGEL

02/07/12

MD1-0-C-350-01-00150

MD1-0-C-350-01-00200

MD1-0-C-350-11-00021

MD1-0-T-370-56-00308

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.S: Geo 22/10/12
Tech. Instruments Plan

MD1-0-C-370-53-00051

MD1-0-T-370-56-00309

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.S: Geo 22/10/12
Tech. Instruments Detail

MD1-0-C-370-53-00062

MD1-0-T-370-56-00310

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.S: Wale22/10/12
& Struts Joint Detail

MD1-0-C-370-53-00063

MD1-0-T-370-56-00311

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.S: Tie Cable
22/10/12
Detail

MD1-0-C-370-53-00064

MD1-0-T-370-56-00312

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.S: Sheet
22/10/12
Pile Detail (1)

MD1-0-C-370-53-00065

MD1-0-T-370-56-00313

Temp. Sheet- Pile Cofferdam


IC
for CWNIGEL
Intake P.S: Sheet
22/10/12
Pile Detail (2)

MD1-0-C-570-01-00100

MD1-0-V-114-06-00005

Calculation of Anchor Bolt


IC Sizing

MD1-0-C-570-01-00150

MD1-0-V-114-09-00005

Load Information for Static


IC Load and NIGEL
Thermal Expansion
04/12/12
and Sliding Friction

MD1-0-C-840-06-00030

MD1-0-V-115-09-00002

Foundation & Loading Data


IC

MD1-0-C-840-11-00020

MD1-0-V-121-52-00001

Foundation drawing forIC


boiler feedwater
NIGEL
pump & boiler03/05/13
feedwater booster pump

MD1-0-C-840-11-00021

MD1-0-V-151-10-00002

Air Compressor- Dimension


IC & Foundation
NIGELDrawing for 22/11/12
Air-Compressor

MD1-0-C-840-11-00022

MD1-0-V-151-10-00003

Air Compressor- Dimension


IC & Foundation
NIGELDrawing for 22/11/12
Air Dryer

MD1-0-C-870-01-00050

MD1-0-V-151-10-00004

Air Compressor- Dimension


IC & Foundation
NIGELDrawing for 22/11/12
IA/SA Receiver Tank (1 of 2) MD1-0-C-870-06-00050

MD1-0-V-161-01-01005

SA and PA Fan to AH Duct


IC Loads to NIGEL
Steel Plan and Elevation
03/10/12

MD1-0-T-040-07-00033

MD1-0-V-161-01-04101

Blowndown Tank LoadIC


and Foundation
NIGEL
Drawing

24/10/12

MD1-0-T-040-07-00042

MD1-0-V-161-01-32532

Loop Seal Blower General


IC Arrangement
NIGEL

24/10/12

MD1-0-T-051-07-00232

MD1-0-V-161-01-32542

Stripper Cooler Blower IC


General Arrangement
NIGEL

24/10/12

MD1-0-T-051-07-00234

MD1-0-V-161-06-01107

Base Plate & Anchor Bolt


IC Design (Metric)
NIGEL

06/12/12

MD1-0-T-051-07-00254

MD1-0-V-161-12-00003

Steel Structure MTO ofIC


Base Plate forNIGEL
Boiler

06/12/12

MD1-0-T-051-07-00291

MD1-0-V-161-12-00004

Steel Structure MTO ofIC


Base Plate forNIGEL
Bridge

06/12/12

MD1-0-T-051-07-00292

MD1-0-V-161-12-00005

Steel Structure MTO ofIC


Anchor Rod NIGEL

06/12/12

MD1-0-T-051-07-00396

MD1-0-V-161-54-01100

Column Base Load Plan


IC

NIGEL

06/12/12

MD1-0-T-051-07-00403

MD1-0-V-161-54-01101

Column Base Load Table


IC (1)

NIGEL

06/12/12

MD1-0-T-051-07-00433

MD1-0-V-161-54-01102

Column Base Load Table


IC (2)

NIGEL

06/12/12

MD1-0-T-051-07-00435

MD1-0-V-161-54-01103

Anchor Bolt Location Plan


IC

NIGEL

06/12/12

MD1-0-T-051-07-00436

MD1-0-V-161-54-01104

Column Base Plate Detail


IC Table

NIGEL

06/12/12

MD1-0-T-051-07-00437

MD1-0-V-161-54-01105

Anchor Rod Schedule and


IC Detail for Columns
NIGEL

06/12/12

MD1-0-T-051-07-00440

MD1-0-V-161-54-01106

Standard Base Plate Details


IC

NIGEL

06/12/12

MD1-0-T-051-07-00441

MD1-0-V-161-54-01107

Column Schedule

NIGEL

28/12/12

MD1-0-T-051-07-00443

MD1-0-V-161-54-01111

Steel Framing Plan (Lev


ICB) TOS EL. NIGEL
15277, 15662

28/12/12

MD1-0-T-051-07-00444

MD1-0-V-161-54-01160

Steel Framing Plan Support


IC Beam forNIGEL
Hook

03/05/13

MD1-0-T-051-07-00446

MD1-0-V-161-54-01161

Elevator Tower Framing


IC

NIGEL

03/05/13

MD1-0-T-051-07-00447

MD1-0-V-161-54-01162

Elevator Tower Girt - Rd


IC1161

NIGEL

03/05/13

MD1-0-T-051-07-00459

MD1-0-V-161-54-01200

STEEL FRAMING BENT


IC G

NIGEL

28/12/12

MD1-0-T-051-07-00463

MD1-0-V-161-54-01219

West Stair Tower for 4 IC


Units

NIGEL

28/12/12

MD1-0-T-051-07-00470

MD1-0-V-161-54-01301

Standard Beam, End PL,


IC Field & Column
NIGEL
Splice Details
28/12/12

MD1-0-T-051-07-00471

MD1-0-V-161-54-01303

Standard Vertical Bracing


IC Details & Wing
NIGEL
Plate Connections
28/12/12

MD1-0-T-051-07-00474

MD1-0-V-161-54-01309

Steel Framing Details and


IC Girder Schedule
NIGEL

28/12/12

MD1-0-T-052-05-00138

MD1-0-V-161-54-01310

Standard Steel FramingICDetails for Stairs


NIGEL

28/12/12

MD1-0-T-052-07-00081

MD1-0-V-161-54-01311

Standard Handrail and IC


Grating Details
NIGEL

28/12/12

MD1-0-T-052-07-00141

MD1-0-V-161-54-01312

Standard Checkered Plate


IC Details

NIGEL

28/12/12

MD1-0-T-052-07-00290

MD1-0-V-161-54-01313

Typical Ladder Details IC

NIGEL

28/12/12

MD1-0-T-053-07-00279

MD1-0-V-161-54-01315

PLAN OF BOX GIRDERS


IC AT SILO SUPT
NIGELLEVEL

07/01/13

MD1-0-T-054-07-00401

MD1-0-V-161-56-36501

Limestone Blower Foundation


IC
Drawing
NIGEL

24/10/12

MD1-0-T-057-07-00152

MD1-0-V-162-06-00007

Duct Foundation Loading


IC CalculationNIGEL

29/05/13

MD1-0-T-370-56-00230

MD1-0-V-162-55-00002

Loading Data for Duct IC

04/12/12

MD1-0-T-470-01-10001

MD1-0-V-171-01-00032

Mechanical Load Data IC


of Transfer Tower
NIGEL
No.TT-01 for16/07/13
Coal Handling System

IC

NIGEL

NIGEL

NIGEL

04/12/12

14/09/12

MD1-0-T-470-01-10002

MD1-0-V-171-01-00033

Mechanical Load Data IC


of Transfer Tower
NIGEL
No.TT-02

16/07/13

MD1-0-T-470-01-10004

MD1-0-V-171-01-00034

Mechanical Load Data IC


of Transfer Tower
NIGEL
No.TT-03

16/07/13

MD1-0-T-470-01-10005

MD1-0-V-171-01-00035

Mechanical Load Data IC


of Transfer Tower
NIGEL
No.TT-04

16/07/13

MD1-0-T-470-01-10006

MD1-0-V-171-01-00036

Mechanical Load Data IC


of Transfer Tower
NIGEL
No.TT-05

16/07/13

MD1-0-T-470-01-10007

MD1-0-V-171-01-00037

Mechanical Load Data IC


of Transfer Tower
NIGEL
No.TT-06

16/07/13

MD1-0-T-470-01-10008

MD1-0-V-171-01-00080

Typical standard drawing


IC for technological
NIGELanchor bolt 03/05/13
for chs

MD1-0-T-470-01-20001

MD1-0-V-171-01-01004

Typical Standard Drawing


IC for AnchorNIGEL
Bolt For CHS

MD1-0-T-470-01-20003

MD1-0-V-171-01-01017

Structural GA Drawing IC
& Loading Data
NIGEL
of HGTU Tower16/07/13
for Conv. BC-8, 9, 10&11 forS
MD1-0-T-470-01-20004

MD1-0-V-171-55-01017

Structural Design Calculation


IC
for HGTU
NIGEL
Tower for Conveyor
16/07/13
BC-08, 09, 10&11

MD1-0-T-470-01-20005

MD1-0-V-173-54-00801

Conveyor Supporting StructureIC


Foundation
NIGEL Load Data12/07/13
(1 of 5)

MD1-0-T-470-01-20006

MD1-0-V-173-54-00802

Conveyor Supporting StructureIC


Foundation
NIGEL Load Data12/07/13
(2 of 5)

MD1-0-T-470-04-00001

MD1-0-V-173-54-00803

Conveyor Supporting StructureIC


Foundation
NIGEL Load Data12/07/13
(3 of 5)

MD1-0-T-470-53-10001

MD1-0-V-173-54-00812

Conveyor Supporting StructureIC


Foundation
NIGEL Load Data12/07/13
(4 of 5)

MD1-0-T-470-53-10002

MD1-0-V-173-54-00813

Conveyor Supporting StructureIC


Foundation
NIGEL Load Data12/07/13
(5 of 5)

MD1-0-T-470-53-10003

MD1-0-V-173-54-00873

Buffer Hopper Tower - IC


Foundation Load
NIGEL
Data

16/07/13

MD1-0-T-470-53-10004

MD1-0-V-173-54-00874

Buffer Hopper Support IC


Structure - Structural
NIGEL GA - Plan16/07/13

MD1-0-T-470-53-10005

MD1-0-V-173-54-00875

Buffer Hopper Support IC


Structure - Structural
NIGEL GA - Elevation
16/07/13

MD1-0-T-470-53-10006

MD1-0-V-173-54-00877

Pipe Rack from Fly AshICSilo-1 Foundation


NIGELLoad Data 08/07/13

MD1-0-T-470-53-20001

MD1-0-V-173-54-00878

Pipe Rack Near FA SiloIC2 - Foundation


NIGEL
Load Data

MD1-0-T-470-53-20002

MD1-0-V-173-54-00879

Pipe Rack from Ash Slurry


IC Pump House
NIGEL
to FA Silo - Foundation
08/07/13 Load Data

MD1-0-T-470-53-20003

MD1-0-V-173-54-00880

Pipe Rack Near F.A Silo


IC- 1 Structural
NIGEL
GA - Plan

08/07/13

MD1-0-T-470-53-20004

MD1-0-V-173-54-00881

Pipe Rack Near F.A Silo


IC - 1 Structural
NIGEL
GA - Elevation 08/07/13

MD1-0-T-470-53-20005

MD1-0-V-173-54-00882

Pipe Rack Near F.A Silo


IC - 2 Structural
NIGEL
GA - Plan

08/07/13

MD1-0-T-470-53-20006

MD1-0-V-173-54-00883

Pipe Rack Near F.A Silo


IC- 2 Structural
NIGEL
GA - Elevation 08/07/13

MD1-0-T-470-53-20007

MD1-0-V-173-54-00884

Pipe Rack from Ash Slurry


IC Ash WaterNIGEL
Pump House to 08/07/13
FA Silo - Structural GA - PlanMD1-0-T-470-53-20008

MD1-0-V-173-54-00885

Pipe Rack from Ash Slurry


IC Ash WaterNIGEL
Pump House to 08/07/13
FA Silo - Structural GA - ElenMD1-0-T-470-53-20009

MD1-0-V-173-55-00901

Conveyor Supporting StructureIC


Design
NIGEL
of Superstructure
07/12/12
(Vol 1)

MD1-0-T-470-53-20010

MD1-0-V-173-55-00902

Conveyor Supporting StructureIC


Design
NIGEL
of Superstructure
07/12/12
(Vol 2)

MD1-0-T-470-53-20011

MD1-0-V-173-55-00905

Buffer Hopper Support IC


Structure - Design
NIGEL
of Superstructure
16/07/13

MD1-0-T-470-53-20012

MD1-0-V-173-55-00906

Pipe Rack near FA SiloIC1 - Calculation


NIGEL
of Foundation Load
08/07/13
Data & Design of Supee MD1-0-T-470-53-20013

MD1-0-V-173-55-00907

Pipe Rack near FA SiloIC2 - Calculation


NIGEL
of Foundation Load
08/07/13
Data & Design of Supee MD1-0-T-470-53-20014

MD1-0-V-173-55-00908

Pipe Rack from Ash Slurry


IC ash waterNIGEL
pump house to FA
08/07/13
Silo - Design of Superstrue MD1-0-T-470-53-20015

MD1-0-V-182-01-10002

General foundation arrangement


IC
for emergency
NIGEL
diesel 13/05/13
generator

MD1-0-T-470-53-20016

MD1-0-V-182-06-05001

Wind & Seismic Load Calculation


IC
forNIGEL
Emergency Diesel
20/06/13
Generator

MD1-0-T-470-53-20017

MD1-0-V-360-05-00810

R.C Windshield- Construction


IC
Procedure
NIGEL

10/06/13

MD1-0-T-470-53-20018

MD1-0-V-360-05-00820

Chimney #1 & #2 SteelIC


Platforms Erection
NIGELProcedure 12/06/13

MD1-0-T-470-53-20019

MD1-0-V-360-05-00840

Chimney #1 & #2 SteelIC


Liners Erection
NIGEL
Procedure

MD1-0-T-470-53-20020

MD1-0-V-360-05-00860

Chimney #1 & #2 R.C. IC


Windshield - External
NIGEL Painting Procedure
12/06/13

MD1-0-T-470-53-20021

MD1-0-V-360-08-00900

Project Quality Plan

NIGEL

20/06/13

MD1-0-T-470-53-20022

MD1-0-V-505-02-00002

Loading Data for Generator


IC Transformer
NIGEL

28/02/13

MD1-0-T-470-53-20023

MD1-0-V-805-01-00010

Civil Structure- Requirements


IC
& Loading
NIGEL

16/10/12

MD1-0-T-470-55-00001

MD1-0-V-805-11-06001

Foundation Plan DWG IC


for WT & WWT
NIGEL

03/07/13

MD1-0-V-161-09-16125

MD1-0-V-805-11-06101

Foundation DWG & Load


IC Table (Foundation
NIGEL Detail)

03/07/13

MD1-0-V-161-09-16131

MD1-1-V-161-12-00001

Bolt List_ U1AT1

01/02/13

MD1-0-V-163-06-00001

IC

IC

NIGEL

03/05/13

08/07/13

12/06/13

MD1-0-V-172-01-00087
MD1-0-V-172-01-01002
MD1-0-V-360-08-00910

MD1-0-V-360-08-00920
MD1-0-V-360-08-00921
MD1-0-V-360-08-00940
MD1-0-V-360-08-00941
MD1-0-V-360-08-00960

Turbine Building / Heater Floor Framing Plan-2

RT

NIGEL

16/07/13

Ash slurry pump house / foundation plan

RT

NIGEL

10/06/13

Ash slurry pump house / ground floor framing plan

RT

NIGEL

10/06/13

Ash slurry pump house / 1st floor framing plan

RT

NIGEL

10/06/13

Ash slurry pump house / framing elevation-1

RT

NIGEL

10/06/13

Ash slurry pump house / framing elevation-2

RT

NIGEL

10/06/13

Ash slurry pump house / framing elevation-3

RT

NIGEL

10/06/13

Ash Slurry Pump House / Foundation Re-bar Detail-1

RT

NIGEL

10/06/13

Ash Slurry Pump House / Foundation Re-bar Detail-2

RT

NIGEL

10/06/13

Ash Slurry Pump House / Foundation Re-bar Detail-3

RT

NIGEL

10/06/13

Ash Slurry Pump House / Foundation Re-bar Detail-4

RT

NIGEL

10/06/13

Ash Slurry Pump House / Foundation Re-bar Detail-5

RT

NIGEL

10/06/13

Ash Slurry Pump House / Ground Floor Girder Re-bar Detail-1

RT

NIGEL

10/06/13

Ash Slurry Pump House / Ground Floor Girder Re-bar Detail-2

RT

NIGEL

10/06/13

Ash Slurry Pump House / Wall Re-bar Detail-1

RT

NIGEL

10/06/13

Ash Slurry Pump House / Wall Re-bar Detail-2

RT

NIGEL

10/06/13

Ash Slurry Pump House / Wall Re-bar Detail-3

RT

NIGEL

10/06/13

Ash Slurry Pump House / Wall Re-bar Detail-4

RT

NIGEL

10/06/13

Ash Slurry Pump House / Steel Column Location Plan

RT

NIGEL

10/06/13

Ash Slurry Pump House / Base Plate Details-1

RT

NIGEL

10/06/13

Ash Slurry Pump House / Base Plate Details-2

RT

NIGEL

10/06/13

Ash Slurry Pump House / Base Plate Details-3

RT

NIGEL

10/06/13

Ash Slurry Pump House / Roof Steel Framing Plan

RT

NIGEL

10/06/13

Ash Slurry Pump House / First Floor And Roof Steel Framing Plan

RT

NIGEL

10/06/13

Ash Slurry Pump House / Steel Framing Elevation-1

RT

NIGEL

10/06/13

Ash Slurry Pump House / Steel Framing Elevation-2

RT

NIGEL

10/06/13

Ash Slurry Pump House / Steel Framing Elevation-3

RT

NIGEL

10/06/13

Ash Slurry Pump House / Steel Framing Elevation-4

RT

NIGEL

10/06/13

Ash slurry pump house / structural calculation sheets

RT

NIGEL

06/06/13

Diesel generator house / framing section

RT

NIGEL

25/06/13

Diesel Generator House / Equipment Foundation Rebar Detail

RT

NIGEL

25/06/13

Diesel generator house / structural calculation sheets

RT

NIGEL

25/06/13

Gaseous Chlorination Building/ Ground Floor Plan

RT

NIGEL

10/07/13

Gaseous Chlorination Building/ Roof Plan

RT

NIGEL

10/07/13

Gaseous Chlorination Building/ Elevation

RT

NIGEL

10/07/13

Gaseous Chlorination Building/ Main Section

RT

NIGEL

10/07/13

RT

NIGEL

26/03/13

Return Water Pump House / Stuctural Calulation Sheet

Return water pump house / pile & foundation plan

RT

NIGEL

26/03/13

Coal Yard Dry Storage Shed/ Foundation Rebar Detail-2

RT

NIGEL

21/03/13

Coal Yard Dry Storage shed/ Structural Calculation Sheets (for Sub-Structure) RT

NIGEL

21/03/13

Lubrication Oil Storage Shelter / Ground Floor Plan & Roof Plan

RT

NIGEL

12/07/13

Lubrication Oil Storage Shelter / Elevations

RT

NIGEL

12/07/13

Lubrication Oil Storage Shelter / Main Sections

RT

NIGEL

12/07/13

Bulldozer garage / foundation plan

RT

NIGEL

25/06/13

Bulldozer garage / ground floor framing plan & section

RT

NIGEL

25/06/13

Bulldozer garage / structural calculation sheets

RT

NIGEL

25/06/13

I.D FAN UNIT#1A PILE ARRANGEMENT PLAN

RT

NIGEL

27/05/13

I.D FAN UNIT#1B PILE ARRANGEMENT PLAN

RT

NIGEL

06/03/13

I.D FAN UNIT#1A FOUNDATION PLAN

RT

NIGEL

27/05/13

I.D FAN UNIT#1B FOUNDATION PLAN

RT

NIGEL

06/05/13

I.D FAN UNIT#1B FOUNDATION PLAN

RT

NIGEL

06/05/13

I.d fan unit#2b foundation plan & section

RT

NIGEL

06/05/13

CALCULATION FOR I.D FAN FOUNDATION

RT

NIGEL

27/05/13

Calculation for i.d fan unit#1b, #2(a,b) foundation

RT

NIGEL

06/05/13

I.D FAN FOUNDATION SECTION & DETAIL

RT

NIGEL

27/05/13

I.d fan unit#1b foundation section & detail

RT

NIGEL

06/05/13

I.d fan unit#2a foundation section & detail

RT

NIGEL

06/05/13

I.d fan unit#2b foundation section & detail

RT

NIGEL

06/05/13

I.d fan unit#1a foundation reinforcement detail (1)

RT

NIGEL

27/05/13

I.d fan unit#1a foundation reinforcement detail (2)

RT

NIGEL

27/05/13

I.d fan unit#1a foundation reinforcement detail (3)

RT

NIGEL

27/05/13

I.d fan unit#1a foundation reinforcement detail (4)

RT

NIGEL

27/05/13

I.d fan unit#1a foundation reinforcement detail (5)

RT

NIGEL

27/05/13

I.d fan unit#2a foundation reinforcement detail (1)

RT

NIGEL

27/05/13

I.d fan unit#2a foundation reinforcement detail (2)

RT

NIGEL

27/05/13

I.d fan unit#2a foundation reinforcement detail (3)

RT

NIGEL

27/05/13

I.d fan unit#2a foundation reinforcement detail (4)

RT

NIGEL

27/05/13

I.d fan unit#2a foundation reinforcement detail (5)

RT

NIGEL

27/05/13

I.d fan unit#1b, #2b foundation reinforcement detail (1)

RT

NIGEL

27/05/13

I.d fan unit#1b, #2b foundation reinforcement detail (2)

RT

NIGEL

27/05/13

I.d fan unit#1b, #2b foundation reinforcement detail (3)

RT

NIGEL

27/05/13

I.d fan unit#1b, #2b foundation reinforcement detail (4)

RT

NIGEL

27/05/13

I.d fan unit#1b, #2b foundation reinforcement detail (5)

RT

NIGEL

27/05/13

Coal runoff pond re-bar plan & section (1)

RT

NIGEL

03/07/13

Coal runoff pond re-bar plan & section (2)

RT

NIGEL

03/07/13

Coal stock belt conveyor end of bc08, bc11 foundation re-bar plan & section

RT

NIGEL

06/05/13

Coal stock belt conveyor end of bc09, bc10 foundation re-bar plan & section

RT

NIGEL

06/05/13

Limestone handling system tower lt-01 & conveyor l-02 fdn. & pile arrange plan RT

NIGEL

27/05/13

Limestone handling system tower lt-02 & conveyor l-03 fdn. & pile arrange plan RT

NIGEL

27/05/13

Limestone handling system tower lt-03 & conveyor l-04 fdn. & pile arrange plan RT

NIGEL

27/05/13

Limestone handling system tower lt-04 & conveyor l-05 fdn. & pile arrange plan RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-01 foundation details (1)

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-02 foundation details (1)

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-03 foundation details (1)

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-04 foundation details (1)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-02 foudation details (1)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-02 foudation details (2)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-02 foudation details (3)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-02 foudation details (4)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-02 foudation details (5)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-03 foudation details (1)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-03 foudation details (2)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-03 foudation details (3)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-03 foudation details (4)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-04 foudation details (1)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-04 foudation details (2)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-04 foudation details (3)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-04 foudation details (4)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-05 foudation details (1)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-05 foudation details (2)

RT

NIGEL

27/05/13

Limestone handling system belt conveyor l-05 foudation details (3)

RT

NIGEL

27/05/13

Calculation for limestone transfer tower foundation lt-01, lt-02, lt-03 and lt-4

RT

NIGEL

27/05/13

Calculation for limestone belt conveyor foundation bc-02

RT

NIGEL

27/05/13

Calculation for limestone belt conveyor foundation bc-03

RT

NIGEL

27/05/13

Calculation for limestone belt conveyor foundation bc-04

RT

NIGEL

27/05/13

Calculation for limestone belt conveyor l-05 foundation

RT

NIGEL

27/05/13

Calculation for Limestone Grinding House Mechanical Foundation

RT

NIGEL

10/06/13

Limestone grinding house steel structure foundation detail (1)

RT

NIGEL

26/07/13

Limestone grinding house steel structure foundation detail (2)

RT

NIGEL

26/07/13

Limestone handling system transfer tower lt-01 foundation details (2)

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-02 foundation details (2)

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-03 foundation details (2)

RT

NIGEL

27/05/13

Limestone handling system transfer tower lt-04 foundation details (2)

RT

NIGEL

27/05/13

Limestone Grinding House Steel Str. Foundation Re-bar Detail (1)

RT

NIGEL

26/07/13

Limestone Grinding House Steel Str. Foundation Re-bar Detail (2)

RT

NIGEL

26/07/13

Limestone Grinding House Steel Str. Foundation Re-bar Detail (3)

RT

NIGEL

26/07/13

Limestone Grinding House Steel Str. Foundation Re-bar Detail (4)

RT

NIGEL

26/07/13

Limestone Grinding House Steel Str. Foundation Re-bar Detail (5)

RT

NIGEL

26/07/13

Limestone Grinding House Steel Str. Foundation Re-bar Detail (6)

RT

NIGEL

26/07/13

Dry Flight Conveyor Support Foundation Plan (1)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Plan (2)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Plan (3)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Plan (4)

RT

NIGEL

18/07/13

Bottom ash silo unit #1b foundation plan

RT

NIGEL

27/05/13

Bottom ash silo unit #2a foundation plan

RT

NIGEL

27/05/13

Ash Pipe Lines Trench Details (1)

RT

NIGEL

30/05/13

Ash Pipe Lines Trench Details (2)

RT

NIGEL

30/05/13

Calculation for bottom ash silo foundation (shallow)

RT

NIGEL

27/05/13

Calculation For Dry Flight Conveyor Support Foundation

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (1)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (2)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (3)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (4)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (5)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (6)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (7)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (8)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (9)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (10)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (11)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (12)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (13)

RT

NIGEL

18/07/13

Dry Flight Conveyor Support Foundation Detail (14)

RT

NIGEL

18/07/13

Bottom ash silo unit #1b,2a foundation section

RT

NIGEL

27/05/13

Bottom ash silo unit #1b,2a foundation detail

RT

NIGEL

27/05/13

Ash Pipe Lines Trench Reinf. Details(1)

RT

NIGEL

30/05/13

Ash Pipe Lines Trench Reinf. Details(2)

RT

NIGEL

30/05/13

FLUE GAS DUCT FOR UNIT#1 FOUNDATION PLAN & SECTION (1)

RT

NIGEL

09/05/13

Flue gas duct for unit#1 foundation plan

RT

NIGEL

09/05/13

Flue gas duct for unit#2 foundation plan

RT

NIGEL

09/05/13

Flue gas duct for unit#1b soil replacement plan

RT

NIGEL

09/05/13

Flue gas duct for unit#2a soil replacement plan

RT

NIGEL

09/05/13

Flue gas duct for unit#2b soil replacement plan

RT

NIGEL

09/05/13

Calculation for flue gas duct foundation

RT

NIGEL

09/05/13

Flue gas duct foundation detail(1)

RT

NIGEL

09/05/13

Flue gas duct foundation detail(2)

RT

NIGEL

09/05/13

Flue gas duct foundation detail(3)

RT

NIGEL

09/05/13

Flue gas duct foundation detail(4)

RT

NIGEL

09/05/13

Start Up Flash Tank Unit#1 Foundation Plan & Section

RT

NIGEL

24/07/13

Start Up Flash Tank Unit#2 Foundation Plan & Section

RT

NIGEL

24/07/13

Dirty Oil Tank Foundation Plan & Section

RT

NIGEL

24/07/13

Calculation for Shop Fabricated Tank Foundation (Dirty Oil & Start Up Flash Tan)
RT

NIGEL

24/07/13

Start Up Flash Tank Unit#1,2 Foundation Detail

RT

NIGEL

24/07/13

Dirty Oil Tank Foundation Detail

RT

NIGEL

24/07/13

Fuel Oil Area Oil Separator FDN. & Valve Pit FDN. Plan Sections & Details

RT

NIGEL

08/07/13

Calculation for Fuel Oil Separator Structure

RT

NIGEL

08/07/13

General Notes (1)

RT

NIGEL

13/08/12

Standard Details: Reinforcing Bar

RT

NIGEL

02/07/12

Standard Details: Ladder Details

RT

NIGEL

02/07/12

Standard Details: Handrail Details

RT

NIGEL

02/07/12

Coal storage yard paving layout plan (1)

RT

NIGEL

05/07/13

Coal Storage Yard Paving Layout Plan (2)

RT

NIGEL

05/07/13

Coal Storage Yard Paving Layout Plan (3)

RT

NIGEL

05/07/13

Coal storage yard paving plan & section

RT

NIGEL

05/07/13

Perimeter Asphalt Road Longitudinal Profile (1)

RT

NIGEL

28/01/13

550KV Switchyard Area Storm Drainage Layout Plan

RT

NIGEL

12/06/13

110KV Switchyard Area Storm Drainage Layout Plan

RT

NIGEL

12/06/13

Coal storage yard drain ditch layout plan

RT

NIGEL

05/07/13

Hydraulic calculaton for storm water drainage system

RT

NIGEL

12/06/13

Switchyard Area Storm Drainage Details (2)

RT

NIGEL

12/06/13

C.W Intake Pump Station Plan & Section (2)

RT

NIGEL

06/06/13

C.W Intake Pump Station Plan & Section (5)

RT

NIGEL

06/06/13

C.W Intake Pump Station Pile Arrangement Plan & Section

RT

NIGEL

06/06/13

C.W Pipe Valve Pit Structure Plan & Section (1)

RT

NIGEL

12/07/13

C.W Pipe Valve Pit Structure Plan & Section (2)

RT

NIGEL

12/07/13

Calculation for C.W Intake Pump Station

RT

NIGEL

06/06/13

C.W Intake Pump Station Detail (6)

RT

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (1)

RT

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (2)

RT

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (13)

RT

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (14)

RT

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (15)

RT

NIGEL

06/06/13

C.W Intake Pump Station- Re-bar Detail (16)

RT

NIGEL

06/06/13

Switchyard Area (500KV) Cable Trench Layout Plan

RT

NIGEL

06/11/12

Switchyard Area (110KV) Cable Trench Layout Plan

RT

NIGEL

06/11/12

Calculation for box culvert & trench structure, pipe support foundation of wt &a RT

NIGEL

25/03/13

Wt & wwt area trench details

RT

NIGEL

25/03/03

Wt & wwt area stair & pipe support fdn. details (1)

RT

NIGEL

25/03/13

Wt & wwt area stair & pipe support fdn. details (2)

RT

NIGEL

25/03/13

Sanitary Sewer System Sump Pit (Admin. Bldg. North) Detail

RT

NIGEL

18/07/13

Calculation for Sanitary Sump Pit

RT

NIGEL

18/07/13

Material Approval Request for pc pile (Vinaincon)

RT

NIGEL

20/04/12

Material Approval Request for Paint around the Splicing joint of PC spun piles

RT

NIGEL

09/05/12

Dynamic Load Test Report for Filtered, Fire, Demi, Raw Water Storage Tanks RT

NIGEL

28/01/13

Static Load Test Report for Filtered, Fire, Demi, Raw Water Storage Tanks

RT

NIGEL

22/11/12

Evaluation of Working Pile Load Test in Water Storage Tanks Area

RT

NIGEL

12/11/12

Material Approval Request for Sand & Crushed Stone

RT

NIGEL

21/11/12

Correlation of DPLT and SPLT for Bored Piles

RT

NIGEL

14/12/12

Material approval request for reinforcement (kyoei)

RT

NIGEL

13/05/13

Permanent ground anchor testing report (rev.a)

RT

NIGEL

20/06/13

Material Approval Request For Steel Grating (CKV)

RT

MAX

11/06/13

Dynamic Load Test Report for PC Pile in Belt Conveyor BC- 01A - Park 2 (Rev.A)
RT

NIGEL

19/07/13

Dynamic Load Test Report for PC Pile in Bottom Ash Silo Unit #2B (Rev.A)

RT

NIGEL

19/07/13

Dynamic Load Test Report for PC Pile in Coal Stock Area No.2 - Part 4 (Rev.A) RT

NIGEL

19/07/13

Dynamic Load Test Report for PC Pile in Limestone Handing System (Rev.A)

RT

NIGEL

24/07/13

Dynamic Load Test Report for PC Pile in Stacker Reclaimer 1&2-Part 4 (Rev.A)RT

NIGEL

24/07/13

Dynamic Load Test Report for PC Pile in Condensate Water Storage Tank (1) RT

NIGEL

24/07/13

Dynamic Load Test Report for PC Pile in Gaseous Chlorination Building

RT

NIGEL

24/07/13

Dynamic Load Test Report for PC Pile in Main & Unit Aux.Transformer Unit #2 RT

NIGEL

24/07/13

Dynamic Load Test Report for PC Pile in Ash Pipe Lines Pipe Rack #2

RT

NIGEL

24/07/13

Material Approval Request For Chemical - Oil Resistant Paint (KCC)

RT

MAX

24/07/13

Dynamic Load Test Report For Seal Pit Structure

RT

NIGEL

27/06/13

Lateral Load Test Report for Pile No T-01 in Limestone Unloading Jetty

RT

NIGEL

26/07/13

Static Load Test Report for Pile No.T-02 in Limestone Unloading Jetty

RT

NIGEL

26/07/13

Dynamic Load Test Report for PC Pile in Belt Conveyor BC-03A

RT

NIGEL

26/07/13

Method Statement for Concrete Repair Works

RT

NIGEL

28/09/12

Material Approval Request for Anti Termite Soil Treatment (Sichuan Province ) RT

NIGEL

25/07/12

Material Approval Request for Protection Board (VIET THAI)

RT

NIGEL

12/10/12

Material Approval Request for Paint (Jotun)

RT

MAX

16/07/13

Material Approval Request for Grating

RT

NIGEL

26/11/12

Material approval request for paint (ag fire fighting piping system)-hai phong t

RT

BAO

18/04/13

Material Approval Request for U-PVC (DE NHAT)

RT

NIGEL

12/10/12

Permanent Bay Wall Str. for CW Intake P.Station- Re-bar Cage For Contig. BoreRT
6

NIGEL

16/11/12

GENERAL PLAN OF LIMESTONE & FUEL OIL UNLOADING JETTY

RT

NIGEL

15/03/13

TYPICAL SECTION OF LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

GENERAL PLAN OF LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

SECTION & DETAIL OF LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

FOOTING GENERAL OF CONVEYOR BASE

RT

NIGEL

15/03/13

HANDRAIL PLAN & SECTION OF LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

P.C PILE HEAD DETAILS LIMESTONE UNLOADING JETTY

RT

NIGEL

15/03/13

TYPICAL SECTION(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

PUMP HOUSE PLAN & SECTION(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

PUMP HOUSE SECTION & STAIR DETAIL(FUEL OIL UNLOADING PUMP HOUSE)
RT

NIGEL

15/03/13

HANDRAIL PLAN & SECTION(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

P.C PILE HEAD DETAILS(FUEL OIL UNLOADING PUMP HOUSE)

RT

NIGEL

15/03/13

Unloading jetty design criteria

RT

NIGEL

14/03/13

LIMESTONE BAR ARRANGEMENT(1)

RT

NIGEL

15/03/13

LIMESTONE BAR ARRANGEMENT(2)

RT

NIGEL

15/03/13

LIMESTONE BAR ARRANGEMENT(3)

RT

NIGEL

15/03/13

CONVEYOR BASE BAR ARRANGEMENT

RT

NIGEL

15/03/13

ACCESS BRIDGE BAR ARRANGEMENT(1)

RT

NIGEL

15/03/13

ACCESS BRIDGE BAR ARRANGEMENT(2)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(1)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(2)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(3)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(4)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(5)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(6)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(7)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(8)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(9)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(10)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(11)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(12)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(13)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(14)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(15)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(16)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(17)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(18)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(19)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(20)

RT

NIGEL

15/03/13

FUEL OIL UNLOADING PUMP HOUSE BAR ARRANGEMENT(21)

RT

NIGEL

15/03/13

TRESTLE BAR ARRANGEMENT(1)

RT

NIGEL

15/03/13

TRESTLE BAR ARRANGEMENT(2)

RT

NIGEL

15/03/13

CALCULATION OF LIMESTONE UNLOADING JETTY AND FUEL OIL UNLOADING


RT PUMP HOUSE
NIGEL

15/03/13

Instrument Data Sheets, Avaraging Pitot Tubes

RT

NIGEL

19/12/12

Instrument Data Sheets, Gauge Glasses and Gauge Valves

RT

NIGEL

19/12/12

Wind load, seismic load & chemical anchor calculation for i.d. fan

RT

NIGEL

13/05/13

Typical standard drawing for technological anchor bolt for lhs

RT

NIGEL

25/07/13

Typical Standard Drawing for Anchor Bolt For LHS

RT

NIGEL

25/07/13

Inspection and Test Plan- Construction Of R.C Windshield

RT

NIGEL

19/07/13

Inspection and Test Plan - Steel Platforms Erection

RT

NIGEL

19/07/13

Inspection and Test Plan - Steel Platforms Fabrication

RT

NIGEL

19/07/13

Inspection and Test Plan - Steel Liners Erection

RT

NIGEL

19/07/13

Inspection and Test Plan - Steel Liners Fabrication

RT

NIGEL

19/07/13

Inspection and Test Plan - External Painting of R.C. Windshield

RT

NIGEL

19/07/13

MD1-0-A-200-51-00004

Architectural Details/ Roof Details-1


AC

NIGEL

02/10/12

MD1-0-A-200-51-00005

Architectural Details/ Roof Details-2


AC

NIGEL

02/10/12

MD1-0-A-200-51-00006

Architectural Details/ Wall & RoofAC


Penetration Details
NIGEL

02/10/12

MD1-0-A-200-51-00007

Architectural Details/ Block Wall Details


AC

NIGEL

02/10/12

MD1-0-A-200-51-00008

Architectural Details/ Stair & Handrail


AC Details

NIGEL

02/10/12

MD1-0-A-200-52-00001

Architectural Details/ General Notes


AC(R.C)

NIGEL

10/08/12

MD1-0-A-200-52-00004

Architectural Details/ Concrete Structure


AC
Joint Details
NIGEL

02/10/12

MD1-0-A-200-52-00005

Architectural Details/ P.C Concrete


ACCHK'DPL & NIGEL
Grating Cover Details
02/10/12

MD1-0-A-200-54-00003

Architectural Details/ Steel Handrail


ACDetails

NIGEL

02/10/12

MD1-0-A-200-54-00004

Architectural Details/ Steel LadderAC


Details

NIGEL

02/10/12

MD1-0-A-200-54-00005

Architectural Details/ Steel Connection


AC Details-1NIGEL

02/10/12

MD1-0-A-200-54-00006

Architectural Details/ Steel Connection


AC Details-2NIGEL

02/10/12

MD1-0-A-200-54-00007

Architectural Details/ Steel Connection


AC Details-3NIGEL

02/10/12

MD1-0-A-200-54-00008

Architectural Details/ Steel Connection


AC Details-4NIGEL

02/10/12

MD1-0-A-200-55-00001

Design Calculation for Steel Connection


AC

02/10/12

MD1-0-A-200-55-00002

Design Calculation for Miscelleneous


AC Steel and NIGEL
Connection Details
02/10/12

MD1-0-A-200-55-00003

Design Calculation for Miscelleneous


AC Concrete and
NIGEL
Masonry Details
02/10/12

MD1-0-A-201-51-00001

Turbine Building/ Ground Floor Plan


AC

NIGEL

07/02/13

MD1-0-A-201-51-00009

Turbine Building/ Main Section 1 &


AC
2

NIGEL

07/02/13

MD1-0-A-201-51-00010

Turbine Building/ Main Section 3 AC

NIGEL

07/02/13

MD1-0-A-201-52-00003

Turbine Building/ C.E.P & C.W.P AC


PIT Framing Plan
NIGEL

16/07/13

MD1-0-A-201-52-00004

Turbine Building/ C.E.P & C.W.P AC


PIT Details-1 NIGEL

16/07/13

MD1-0-A-201-52-00005

Turbine Building/ C.E.P & C.W.P AC


PIT Details-2 NIGEL

16/07/13

MD1-0-A-201-52-00014

Turbine Building / Heater Floor Framing


AC
Plan-1 NIGEL

16/07/13

MD1-0-A-201-52-00016

Turbine Building / Lower Roof Framing


AC Plan-1 NIGEL

16/07/13

MD1-0-A-201-52-00017

Turbine Building / Lower Roof Framing


AC Plan-2 NIGEL

16/07/13

MD1-0-A-201-52-00018

Turbine Building / Framing Section-1


AC

NIGEL

16/07/13

MD1-0-A-201-52-00019

Turbine Building / Framing Section-2


AC

NIGEL

16/07/13

MD1-0-A-201-53-00002

Turbine Building/ Foundation Re-bar


AC Details-2 NIGEL

05/02/13

MD1-0-A-201-53-00008

Turbine Building/ Foundation Re-bar


AC Details-8 NIGEL

05/02/13

MD1-0-A-201-53-00010

Turbine Building/ Foundation Re-bar


AC Details-10 NIGEL

05/02/13

MD1-0-A-201-53-00031

Turbine Building / Ground Floor Slab


AC Re-Bar Details-1
NIGEL

24/07/13

MD1-0-A-201-53-00032

Turbine Building / Ground Floor Slab


AC Re-Bar Details-2
NIGEL

24/07/13

MD1-0-A-201-53-00033

Turbine Building / Ground Floor Slab


AC Re-Bar Details-3
NIGEL

24/07/13

MD1-0-A-201-53-00034

Turbine Building / Mezzanine Floor


AC
Slab Re-Bar NIGEL
Details-1

24/07/13

MD1-0-A-201-53-00035

Turbine Building / Mezzanine Floor


AC
Slab Re-Bar NIGEL
Details-2

24/07/13

MD1-0-A-201-53-00036

Turbine Building / Mezzanine Floor


AC
Slab Re-Bar NIGEL
Details-3

24/07/13

MD1-0-A-201-53-00037

Turbine Building / Operating FloorAC


Slab Re-Bar Details-1
NIGEL

24/07/13

MD1-0-A-201-53-00038

Turbine Building / Operating FloorAC


Slab Re-Bar Details-2
NIGEL

24/07/13

MD1-0-A-201-53-00039

Turbine Building / Operating FloorAC


Slab Re-Bar Details-3
NIGEL

24/07/13

MD1-0-A-201-53-00040

Turbine Building / Heater Floor Slab


ACRe-Bar Details-1
NIGEL

24/07/13

MD1-0-A-201-53-00041

Turbine Building / Heater Floor Slab


ACRe-Bar Details-2
NIGEL

24/07/13

MD1-0-A-201-53-00042

Turbine Building / Lower Roof Slab


ACRe-Bar Details-1
NIGEL

24/07/13

MD1-0-A-201-53-00043

Turbine Building / Lower Roof Slab


ACRe-Bar Details-2
NIGEL

24/07/13

MD1-0-A-201-53-00065

Turbine Building / Equip. Foundation


AC Plan & Section,
NIGEL
Re-Bar Details-6
24/07/13

MD1-0-A-201-53-00066

Turbine Building / Equip. Foundation


AC Plan & Section,
NIGEL
Re-Bar Details-7
24/07/13

MD1-0-A-201-54-00001

Turbine Building/ Steel Column Location


AC
Plan-1 NIGEL

NIGEL

07/02/13

MD1-0-A-201-54-00002

Turbine Building/ Steel Column Location


AC
Plan-2 NIGEL

07/02/13

MD1-0-A-201-54-00003

Turbine Building/ Base Plate Details-1


AC

NIGEL

07/02/13

MD1-0-A-201-54-00004

Turbine Building/ Base Plate Details-2


AC

NIGEL

07/02/13

MD1-0-A-201-54-00005

Turbine Building/ Base Plate Details-3


AC

NIGEL

07/02/13

MD1-0-A-201-54-00006

Turbine Building/ Base Plate Details-4


AC

NIGEL

07/02/13

MD1-0-A-201-54-00007

Turbine Building/ Base Plate Details-5


AC

NIGEL

07/02/13

MD1-0-A-201-54-00010

Turbine Building/ Mezzanine FloorAC


Steel FramingNIGEL
Plan-1

07/02/13

MD1-0-A-201-54-00011

Turbine Building/ Mezzanine FloorAC


Steel FramingNIGEL
Plan-2

07/02/13

MD1-0-A-201-54-00012

Turbine Building/ Operating Floor AC


Steel FramingNIGEL
Plan-1

07/02/13

MD1-0-A-201-54-00013

Turbine Building/ Operating Floor AC


Steel FramingNIGEL
Plan-2

07/02/13

MD1-0-A-201-54-00014

Turbine Building/ Heater Floor Steel


ACFraming Plan-1
NIGEL

07/02/13

MD1-0-A-201-54-00015

Turbine Building/ Heater Floor Steel


ACFraming Plan-2
NIGEL

07/02/13

MD1-0-A-201-54-00016

Turbine Building/ Lower Roof Steel


ACFraming Plan-1
NIGEL

07/02/13

MD1-0-A-201-54-00017

Turbine Building/ Lower Roof Steel


ACFraming Plan-2
NIGEL

07/02/13

MD1-0-A-201-54-00020

Turbine Building/ Higher Roof Steel


ACFraming Plan-1
NIGEL

07/02/13

MD1-0-A-201-54-00021

Turbine Building/ Higher Roof Steel


ACFraming Plan-2
NIGEL

07/02/13

MD1-0-A-201-54-00022

Turbine Building/ Steel Framing Elevation-1


AC

NIGEL

07/02/13

MD1-0-A-201-54-00023

Turbine Building/ Steel Framing Elevation-2


AC

NIGEL

07/02/13

MD1-0-A-201-54-00024

Turbine Building/ Steel Framing Elevation-3


AC

NIGEL

07/02/13

MD1-0-A-201-54-00025

Turbine Building/ Steel Framing Elevation-4


AC

NIGEL

07/02/13

MD1-0-A-201-54-00026

Turbine Building/ Steel Framing Elevation-5


AC

NIGEL

07/02/13

MD1-0-A-201-54-00027

Turbine Building/ Steel Framing Elevation-6


AC

NIGEL

07/02/13

MD1-0-A-201-54-00028

Turbine Building/ Steel Framing Elevation-7


AC

NIGEL

07/02/13

MD1-0-A-201-54-00029

Turbine Building/ Steel Framing Elevation-8


AC

NIGEL

07/02/13

MD1-0-A-201-54-00030

Turbine Building/ Steel Framing Elevation-9


AC

NIGEL

07/02/13

MD1-0-A-201-54-00031

Turbine Building/ Steel Framing Elevation-10


AC

NIGEL

07/02/13

MD1-0-A-201-54-00032

Turbine Building/ Steel Framing Elevation-11


AC

NIGEL

07/02/13

MD1-0-A-201-54-00033

Turbine Building/ Steel Framing Elevation-12


AC

NIGEL

07/02/13

MD1-0-A-201-54-00034

Turbine Building/ Steel Framing Elevation-13


AC

NIGEL

07/02/13

MD1-0-A-201-54-00035

Turbine Building/ Steel Framing Elevation-14


AC

NIGEL

07/02/13

MD1-0-A-201-54-00036

Turbine Building/ Steel Framing Elevation-15


AC

NIGEL

07/02/13

MD1-0-A-201-54-00037

Turbine Building/ Steel Framing Elevation-16


AC

NIGEL

07/02/13

MD1-0-A-201-54-00038

Turbine Building/ Steel Framing Elevation-17


AC

NIGEL

07/02/13

MD1-0-A-201-54-00039

Turbine Building/ Steel Framing Elevation-18


AC

NIGEL

07/02/13

MD1-0-A-201-54-00050

Turbine Building/ Steel Column Details


AC

NIGEL

10/04/13

MD1-0-A-201-54-00051

Turbine Building/ Crane Girder Details-1


AC

NIGEL

10/04/13

MD1-0-A-201-54-00052

Turbine Building/ Crane Girder Details-2


AC

NIGEL

10/04/13

MD1-0-A-201-54-00053

Turbine Building/ Crane Girder Details-3


AC

NIGEL

10/04/13

MD1-0-A-201-54-00054

Turbine Building/ Roof Frame Details


AC

NIGEL

10/04/13

MD1-0-A-201-54-00056

Turbine Building/ Wall Frame Details-2


AC

NIGEL

10/04/13

MD1-0-A-201-54-00057

Turbine Building/ Wall Frame Details-3


AC

NIGEL

10/04/13

MD1-0-A-201-54-00058

Turbine Building/ Roof Truss Details-1


AC

NIGEL

10/04/13

MD1-0-A-201-54-00059

Turbine Building/ Roof Truss Details-2


AC

NIGEL

10/04/13

MD1-0-A-201-54-00065

Turbine Building/ Steel Stair Plan AC


& Section-1

NIGEL

10/04/13

MD1-0-A-201-54-00066

Turbine Building/ Steel Stair Plan AC


& Section-2

NIGEL

10/04/13

MD1-0-A-201-54-00067

Turbine Building/ Steel Stair Plan AC


& Section-3

NIGEL

10/04/13

MD1-0-A-201-54-00068

Turbine Building/ Steel Stair Plan AC


& Section-4

NIGEL

10/04/13

MD1-0-A-201-54-00069

Turbine Building/ Steel Stair Plan AC


& Section-5

NIGEL

10/04/13

MD1-0-A-201-54-00080

Turbine Building/ Girth Elevation-1AC

NIGEL

10/04/13

MD1-0-A-201-54-00081

Turbine Building/ Girth Elevation-2AC

NIGEL

10/04/13

MD1-0-A-201-54-00082

Turbine Building/ Girth Elevation-3AC

NIGEL

10/04/13

MD1-0-A-201-54-00083

Turbine Building/ Girth Elevation-4AC

NIGEL

10/04/13

MD1-0-A-201-54-00084

Turbine Building/ Girth Elevation-5AC

NIGEL

10/04/13

MD1-0-A-201-54-00085

Turbine Building/ Girth Elevation-6AC

NIGEL

10/04/13

MD1-0-A-201-54-00086

Turbine Building/ Girth Elevation-7AC

NIGEL

10/04/13

MD1-0-A-201-54-00090

Turbine Building/ Purlin Plan-1

AC

NIGEL

10/04/13

MD1-0-A-201-54-00091

Turbine Building/ Purlin Plan-2

AC

NIGEL

10/04/13

MD1-0-A-201-54-00100

Turbine Building/ Roof WalkawayAC


Framing Plan NIGEL
& Detail-1

10/04/13

MD1-0-A-201-54-00101

Turbine Building/ Roof WalkawayAC


Framing Plan NIGEL
& Detail-2

10/04/13

MD1-0-A-201-54-00110

Turbine Building/ Girth Detail-1

AC

NIGEL

10/04/13

MD1-0-A-201-54-00111

Turbine Building/ Girth Detail-2

AC

NIGEL

10/04/13

MD1-0-A-201-54-00120

Turbine Building/ Removable Hatch


ACDetails-1

NIGEL

10/04/13

MD1-0-A-201-54-00121

Turbine Building/ Removable Hatch


ACDetails-2

NIGEL

10/04/13

MD1-0-A-201-54-00130

Turbine Building/ Steel Connection


ACDetails-1

NIGEL

10/04/13

MD1-0-A-201-54-00131

Turbine Building/ Steel Connection


ACDetails-2

NIGEL

10/04/13

MD1-0-A-201-54-00132

Turbine Building/ Steel Connection


ACDetails-3

NIGEL

10/04/13

MD1-0-A-201-54-00137

Turbine Building/ Misc. Steel Details-1


AC

NIGEL

10/04/13

MD1-0-A-201-54-00139

Turbine Building/ Misc. Steel Details-3


AC

NIGEL

10/04/13

MD1-0-A-201-54-00140

Turbine Building/ Misc. Steel Details-4


AC

NIGEL

10/04/13

MD1-0-A-201-54-00141

Turbine Building/ Misc. Steel Details-5


AC

NIGEL

10/04/13

MD1-0-A-201-54-00142

Turbine Building/ Misc. Steel Details-6


AC

NIGEL

10/04/13

MD1-0-A-202-53-00001

Turbine Foundation/Re-bar Detail-1


AC

NIGEL

09/04/13

MD1-0-A-202-53-00002

Turbine Foundation/Re-bar Detail-2


AC

NIGEL

09/04/13

MD1-0-A-202-53-00003

Turbine Foundation/Re-bar Detail-3


AC

NIGEL

09/04/13

MD1-0-A-202-53-00004

Turbine Foundation/Re-bar Detail-4


AC

NIGEL

09/04/13

MD1-0-A-202-53-00005

Turbine Foundation/Re-bar Detail-5


AC

NIGEL

09/04/13

MD1-0-A-202-53-00006

Turbine Foundation/Re-bar Detail-6


AC

NIGEL

09/04/13

MD1-0-A-202-53-00007

Turbine Foundation/Re-bar Detail-7


AC

NIGEL

09/04/13

MD1-0-A-202-53-00008

Turbine Foundation/ Re-bar Detail-8


AC

NIGEL

09/04/13

MD1-0-A-202-53-00009

Turbine Foundation/ Re-bar Detail-9


AC

NIGEL

09/04/13

MD1-0-A-202-53-00010

Turbine Foundation/ Re-bar Detail-10


AC

NIGEL

09/04/13

MD1-0-A-202-53-00011

Turbine Foundation/ Re-bar Detail-11


AC

NIGEL

09/04/13

MD1-0-A-202-53-00012

Turbine Foundation/ Re-bar Detail-12


AC

NIGEL

09/04/13

MD1-0-A-202-53-00013

Turbine Foundation/ Re-bar Detail-13


AC

NIGEL

09/04/13

MD1-0-A-202-53-00014

Turbine Foundation/ Re-bar Detail-14


AC

NIGEL

09/04/13

MD1-0-A-202-53-00015

Turbine Foundation/ Re-bar Detail-15


AC

NIGEL

09/04/13

MD1-0-A-202-53-00016

Turbine Foundation/ Re-bar Detail-16


AC

NIGEL

09/04/13

MD1-0-A-202-53-00017

Turbine Foundation/ Re-bar Detail-17


AC

NIGEL

09/04/13

MD1-0-A-202-55-00001

Turbine Foundation/ Structural Calculation


AC
Sheets
NIGEL

20/11/12

MD1-0-A-203-53-00001

Central Control Building/ Foundation


AC Re-bar Details-1
NIGEL

05/12/12

MD1-0-A-203-53-00002

Central Control Building/ Foundation


AC Re-bar Details-2
NIGEL

05/12/12

MD1-0-A-203-53-00003

Central Control Building/ Foundation


AC Re-bar Details-3
NIGEL

05/12/12

MD1-0-A-203-53-00004

Central Control Building/ Foundation


AC Re-bar Details-4
NIGEL

05/12/12

MD1-0-A-203-53-00006

Central Control Building/ Tie Girder


ACRe-bar Details-1
NIGEL

05/12/12

MD1-0-A-203-53-00007

Central Control Building/ Tie Girder


ACRe-bar Details-2
NIGEL

05/12/12

MD1-0-A-203-53-00008

Central Control Building/ Tie Girder


ACRe-bar Details-3
NIGEL

05/12/12

MD1-0-A-203-54-00001

Central Control Building/Steel Column


AC Location NIGEL
Plan

09/11/12

MD1-0-A-203-54-00002

Central Control Building/ Base Plate


AC Details-1 NIGEL

09/11/12

MD1-0-A-203-54-00003

Central Control Building/ Base Plate


AC Details-2 NIGEL

09/11/12

MD1-0-A-203-54-00005

Central Control Building/ 1st FloorAC


Steel FramingNIGEL
Plan

09/11/12

MD1-0-A-203-54-00006

Central Control Building/ 2nd Floor


AC
Steel Framing
NIGEL
Plan

09/11/12

MD1-0-A-203-54-00007

Central Control Building/ 3rd FloorAC


Steel FramingNIGEL
Plan

09/11/12

MD1-0-A-203-54-00008

Central Control Building/ Roof Steel


ACFraming Plan
NIGEL

09/11/12

MD1-0-A-203-54-00009

Central Control Building/ Steel Framing


AC Elevation-1
NIGEL

09/11/12

MD1-0-A-203-54-00010

Central Control Building/ Steel Framing


AC Elevation-2
NIGEL

09/11/12

MD1-0-A-203-54-00011

Central Control Building/ Steel Framing


AC Elevation-3
NIGEL

09/11/12

MD1-0-A-203-54-00012

Central Control Building/ Steel Framing


AC Elevation-4
NIGEL

09/11/12

MD1-0-A-203-54-00013

Central Control Building/ Steel Framing


AC Elevation-5
NIGEL

09/11/12

MD1-0-A-203-54-00014

Central Control Building/ Steel Framing


AC Elevation-6
NIGEL

09/11/12

MD1-0-A-203-54-00015

Central Control Building/ Steel Framing


AC Elevation-7
NIGEL

09/11/12

MD1-0-A-203-54-00016

Central Control Building/ Steel Framing


AC Elevation-8
NIGEL

09/11/12

MD1-0-A-203-54-00017

Central Control Building/ Steel Framing


AC Elevation-9
NIGEL

09/11/12

MD1-0-A-203-54-00018

Central Control Building/ Steel Framing


AC Elevation-10
NIGEL

09/11/12

MD1-0-A-203-54-00021

Central Control Building/ Steel Wall


ACFrame Details-1
NIGEL

22/11/12

MD1-0-A-203-54-00022

Central Control Building/ Steel Wall


ACFrame Details-2
NIGEL

22/11/12

MD1-0-A-203-54-00023

Central Control Building/ Steel Wall


ACFrame Details-3
NIGEL

22/11/12

MD1-0-A-203-54-00024

Central Control Building/ Steel Wall


ACFrame Details-4
NIGEL

22/11/12

MD1-0-A-203-54-00025

Central Control Building/ Steel Stair


ACDetails-1

NIGEL

22/11/12

MD1-0-A-203-54-00026

Central Control Building/ Steel Stair


ACDetails-2

NIGEL

22/11/12

MD1-0-A-203-54-00027

Central Control Building/ Steel Stair


ACDetails-3

NIGEL

22/11/12

MD1-0-A-203-54-00028

Central Control Building/ Steel Stair


ACDetails-4

NIGEL

22/11/12

MD1-0-A-203-54-00031

Central Control Building/ Girth Details


AC

NIGEL

22/11/12

MD1-0-A-203-54-00032

Central Control Building/ Steel Connection


AC
Details-1
NIGEL

22/11/12

MD1-0-A-203-54-00033

Central Control Building/ Steel Connection


AC
Details-2
NIGEL

22/11/12

MD1-0-A-203-54-00034

Central Control Building/ Steel Connection


AC
Details-3
NIGEL

22/11/12

MD1-0-A-203-54-00035

Central Control Building/ Steel Connection


AC
Details-4
NIGEL

22/11/12

MD1-0-A-203-54-00036

Central Control Building/ Steel Misc.


AC Details

NIGEL

22/11/12

MD1-0-A-205-52-00001

Fuel Oil Pump House/ FoundationAC


Plan

NIGEL

07/03/13

MD1-0-A-205-52-00004

Fuel Oil Pump House/ Misc Details


AC

NIGEL

07/03/13

MD1-0-A-209-51-00001

ESP Control & Ash Elec. Bulding/Ground


AC
& FirstNIGEL
Floor Plan

26/06/13

MD1-0-A-209-51-00002

ESP Control & Ash Elec. Bulding/AC


Roof Plan

NIGEL

26/06/13

MD1-0-A-209-51-00003

ESP Control & Ash Elec. Bulding/AC


Elevation

NIGEL

26/06/13

MD1-0-A-209-51-00004

ESP Control & Ash Elec. Bulding/AC


Main Section NIGEL

26/06/13

MD1-0-A-209-52-00001

ESP Control & Ash Elec. Building/Foundation


AC
Plan
NIGEL

26/06/13

MD1-0-A-209-52-00002

ESP Control & Ash Elec. Building/AC


Ground & First
NIGEL
Floor Framing 26/06/13
Plan

MD1-0-A-209-52-00003

ESP Control & Ash Elec. Building/AC


Roof FramingNIGEL
Plan

MD1-0-A-209-52-00004

ESP Control & Ash Elec. Building/AC


Framing Elevation-1
NIGEL (Unit 1) 26/06/13

MD1-0-A-209-52-00005

ESP Control & Ash Elec. Building/AC


Framing Elevation-2
NIGEL (Unit 1) 26/06/13

MD1-0-A-209-52-00006

ESP Control & Ash Elec. Building/AC


Framing Elevation-3
NIGEL (Unit 2) 26/06/13

MD1-0-A-209-52-00007

ESP Control & Ash Elec. Building/AC


Framing Elevation-4
NIGEL (Unit 2) 26/06/13

MD1-0-A-209-55-00001

EPS Control Building/ Structural Calculation


AC
Sheets
NIGEL

26/06/13

26/06/13

MD1-0-A-210-52-00001

Diesel generator house / foundation


ACplan

NIGEL

25/06/13

MD1-0-A-210-52-00002

Diesel generator house / ground floor


AC framing plan
NIGEL

25/06/13

MD1-0-A-210-54-00001

Diesel Generator House / Steel Column


AC
LocationNIGEL
Plan

25/06/13

MD1-0-A-210-54-00002

Diesel Generator House / Base Plate


AC Detail

NIGEL

25/06/13

MD1-0-A-210-54-00003

Diesel Generator House / Roof Framing


AC
Plan

NIGEL

25/06/13

MD1-0-A-210-54-00004

Diesel Generator House / FramingAC


Elevation-1 NIGEL

25/06/13

MD1-0-A-210-54-00005

Diesel Generator House / FramingAC


Elevation-2 NIGEL

25/06/13

MD1-0-A-212-52-00001

Gaseous Chlorination Building/ Pile


AC& Foundation
NIGEL
Plan

10/07/13

MD1-0-A-212-52-00002

Gaseous Chlorination Building/ Ground


AC Floor Framing
NIGELPlan

10/07/13

MD1-0-A-212-52-00003

Gaseous Chlorination Building/ Roof


AC Floor Framing
NIGEL
Plan

10/07/13

MD1-0-A-212-52-00004

Gaseous chlorination building / framing


AC elevation-1
NIGEL

10/07/13

MD1-0-A-212-52-00005

Gaseous Chlorination Building/ Framing


AC
Elevation-2
NIGEL

10/07/13

MD1-0-A-212-52-00006

Gaseous Chlorination Building/ Framing


AC
Elevation-3
NIGEL

10/07/13

MD1-0-A-212-55-00001

Gaseous Chlorination Builing/ Structural


AC
Calculation
NIGEL
Sheets

10/07/13

MD1-0-A-213-51-00001

Fuel Oil Unloading Pump House/ AC


Ground Floor &
NIGEL
Roof Plan

10/06/13

MD1-0-A-213-51-00002

Fuel Oil Unloading Pump House/ AC


Elevations

NIGEL

10/06/13

MD1-0-A-213-51-00003

Fuel Oil Unloading Pump House/ AC


Main Sections NIGEL

10/06/13

MD1-0-A-213-52-00001

Fuel oil unloading pump house / ground


AC
floor & roof
NIGEL
framing plan 10/06/13

MD1-0-A-213-52-00002

Fuel oil unloading pump house / framing


AC
sections
NIGEL

10/06/13

MD1-0-A-215-51-00007

Switchyard Control Building/ Interior


ACFinish Schedule
NIGEL

09/08/12

MD1-0-A-215-51-00008

Switchyard Control Building/ DoorAC


& Window Schedule
NIGEL

09/08/12

MD1-0-A-215-53-00042

Switchyard Control Building/Roof AC


Slab Rebar Detail
NIGEL

04/12/12

MD1-0-A-215-53-00052

Switchyard Control Building/ Trench


ACRebar Detail-1
NIGEL

04/12/12

MD1-0-A-215-53-00053

Switchyard Control Building/ Trench


ACRebar Detail-2
NIGEL

04/12/12

MD1-0-A-215-53-00054

Switchyard Control Building/Misc.AC


Rebar Detail-1NIGEL

04/12/12

MD1-0-A-215-55-00001

Switchyard Control Building/ Structural


AC Calculation
NIGEL
Sheets

09/10/12

MD1-0-A-216-55-00001

Water Treatment Building/ Structural


AC CalculationNIGEL
Sheets

28/03/13

MD1-0-A-218-53-00003

Coal Yard Dry Storage Shed/ Ground


AC Floor Girder
NIGEL
Rebar Detail-2 21/03/13

MD1-0-A-218-55-00004

Coal yard dry storage shed / design


ACcalculation for
NIGEL
roof gutter

MD1-0-A-219-55-00002

Limestone storage shed / structural


ACcalculation sheets(for
NIGEL super-structure)
26/03/13

MD1-0-A-250-51-00001

Workshop building / ground floor AC

NIGEL

10/07/13

MD1-0-A-250-51-00003

Workshop building / elevations

NIGEL

10/07/13

MD1-0-A-250-51-00004

Workshop building / main section-1


AC& main section-2
NIGEL

10/07/13

MD1-0-A-250-51-00005

Workshop building / main section-3


AC

NIGEL

10/07/13

MD1-0-A-250-52-00001

Workshop building / pile & foundation


AC plan

NIGEL

11/07/13

MD1-0-A-250-52-00002

Workshop Building / Ground Floor


AC
Framing PlanNIGEL

11/07/13

MD1-0-A-250-52-00003

Workshop Building / Framing Section-1


AC

NIGEL

11/07/13

MD1-0-A-250-52-00004

Workshop Building / Framing Section-2


AC

NIGEL

11/07/13

MD1-0-A-250-53-00001

Workshop building / foundation rebar


AC detail-1

NIGEL

11/07/13

MD1-0-A-250-53-00002

Workshop building / foundation rebar


AC detail-2

NIGEL

11/07/13

MD1-0-A-250-53-00003

Workshop building / foundation rebar


AC detail-3

NIGEL

11/07/13

MD1-0-A-250-53-00004

Workshop building / ground floor girder


AC rebar detail-1
NIGEL

11/07/13

MD1-0-A-250-53-00005

Workshop building / ground floor girder


AC rebar detail-2
NIGEL

11/07/13

MD1-0-A-250-53-00006

Workshop building / ground floor girder


AC rebar detail-3
NIGEL

11/07/13

MD1-0-A-250-53-00007

Workshop building / ground floor girder


AC rebar detail-4
NIGEL

11/07/13

MD1-0-A-250-54-00001

Workshop Building / Steel ColumnAC


Location PlanNIGEL

11/07/13

MD1-0-A-250-54-00002

Workshop Building / Base Plate Details


AC
-1

11/07/13

AC

NIGEL

03/05/13

MD1-0-A-250-54-00003

Workshop Building / Base Plate Details


AC
-2

NIGEL

11/07/13

MD1-0-A-250-54-00004

Workshop Building / Base Plate Details


AC
-3

NIGEL

11/07/13

MD1-0-A-250-54-00005

Workshop Building / Steel Framing


ACPlan

NIGEL

11/07/13

MD1-0-A-250-54-00006

Workshop Building / Crane GirderAC


Steel FramingNIGEL
Plan

11/07/13

MD1-0-A-250-54-00007

Workshop Building / Roof Steel Framing


AC
Plan

NIGEL

11/07/13

MD1-0-A-250-54-00008

Workshop Building / Steel Framing


ACElevation - 1NIGEL

11/07/13

MD1-0-A-250-54-00009

Workshop Building / Steel Framing


ACElevation - 2NIGEL

11/07/13

MD1-0-A-250-54-00010

Workshop Building / Steel Framing


ACElevation - 3NIGEL

11/07/13

MD1-0-A-251-54-00002

Bulldozer garage / base plate details


AC

NIGEL

25/06/13

MD1-0-A-251-54-00004

Bulldozer Garage / Roof Purlin Plan


AC

NIGEL

25/06/13

MD1-0-A-252-54-00001

I&c electrical and mechanical warehouse


AC
/ steel NIGEL
column location plan
10/07/13

MD1-0-A-252-54-00002

I&c electrical and mechanical warehouse


AC
/ base NIGEL
plate details-1

10/07/13

MD1-0-A-252-54-00003

I&c electrical and mechanical warehouse


AC
/ base NIGEL
plate details-2

10/07/13

MD1-0-A-252-54-00004

I&c electrical and mechanical warehouse


AC
/ baseNIGEL
plate details-3 10/07/13

MD1-0-A-252-54-00005

I&c electrical and mechanical warehouse


AC
/ baseNIGEL
plate details-4 10/07/13

MD1-0-A-252-54-00007

I&c electrical and mechanical warehouse


AC
/ lowerNIGEL
roof steel framing10/07/13
plan

MD1-0-A-252-54-00008

I&c electrical and mechanical warehouse


AC
/ higher
NIGEL
roof steel framing
10/07/13
plan

MD1-0-A-252-54-00009

I&c electrical and mechanical warehouse


AC
/ craneNIGEL
girder steel framing
10/07/13
plan

MD1-0-A-252-54-00010

I&c electrical and mechanical warehouse


AC
/ steel NIGEL
framing I&c electrical
10/07/13
and mech

MD1-0-A-252-54-00011

I&c electrical and mechanical warehouse


AC
/ steel NIGEL
framing elevation-2
10/07/13

MD1-0-A-252-54-00020

I&C Electrical and Mechanical Warehouse


AC
/ Steel
NIGEL
Connection Detail-1
11/07/13

MD1-0-A-252-54-00021

I&C Electrical and Mechanical Warehouse


AC
/ Steel
NIGEL
Connection Detail-2
11/07/13

MD1-0-A-252-54-00022

I&C Electrical and Mechanical Warehouse


AC
/ Steel
NIGEL
Connection Detail-3
11/07/13

MD1-0-A-252-54-00023

I&C Electrical and Mechanical Warehouse


AC
/ Steel
NIGEL
Connection Detail-4
11/07/13

MD1-0-A-254-51-00011

Administration Building/ Main Section-1


AC

NIGEL

24/10/12

MD1-0-A-254-51-00013

Administration Building/ Main Section-3


AC

NIGEL

24/10/12

MD1-0-A-254-52-00002

Administration Building/ Ground Floor


AC Framing Plan
NIGEL

28/01/13

MD1-0-A-254-52-00004

Administration Building/ 2nd FloorAC


Framing PlanNIGEL

28/01/13

MD1-0-A-254-52-00005

Administration Building/ 3rd Floor AC


Framing Plan NIGEL

28/01/13

MD1-0-A-254-52-00006

Administration Building/ 4th Floor AC


Framing Plan NIGEL

28/01/13

MD1-0-A-254-52-00007

Administration Building/ Roof Framing


AC Plan

NIGEL

28/01/13

MD1-0-A-254-52-00020

Administration Building/ Stair Framing


AC Plan & Detail-1
NIGEL

23/10/12

MD1-0-A-254-52-00021

Administration Building/ Stair Framing


AC Plan & Detail-2
NIGEL

28/01/13

MD1-0-A-254-52-00022

Administration Building/ Stair Framing


AC Plan & Detail-3
NIGEL

23/10/12

MD1-0-A-254-53-00001

Administration Building/ Foundation


ACRebar Detail-1
NIGEL

25/10/12

MD1-0-A-254-53-00002

Administration Building/ Foundation


ACRebar Detail-2
NIGEL

25/10/12

MD1-0-A-254-53-00003

Administration Building/ Foundation


ACRebar Detail-3
NIGEL

25/10/12

MD1-0-A-254-53-00004

Administration Building/ Foundation


ACRebar Detail-4
NIGEL

25/10/12

MD1-0-A-254-53-00005

Administration Building/ Foundation


ACRebar Detail-5
NIGEL

25/10/12

MD1-0-A-254-53-00006

Administration Building/ Foundation


ACRebar Detail-6
NIGEL

25/10/12

MD1-0-A-254-53-00007

Administration Building/ Foundation


ACRebar Detail-7
NIGEL

25/10/12

MD1-0-A-254-53-00008

Administration Building/ Foundation


ACRebar Detail-8
NIGEL

25/10/12

MD1-0-A-254-53-00009

Administration Building/ Foundation


ACRebar Detail-9
NIGEL

25/10/12

MD1-0-A-254-53-00010

Administration Building/ Foundation


ACRebar Detail-10
NIGEL

25/10/12

MD1-0-A-254-53-00011

Administration Building/ Foundation


ACRebar Detail-11
NIGEL

25/10/12

MD1-0-A-254-53-00012

Administration Building/ Foundation


ACRebar Detail-12
NIGEL

25/10/12

MD1-0-A-254-53-00013

Administration Building/ Foundation


ACRebar Detail-13
NIGEL

25/10/12

MD1-0-A-254-53-00014

Administration Building/ Foundation


ACRebar Detail-14
NIGEL

25/10/12

MD1-0-A-254-53-00015

Administration Building/ Foundation


ACRebar Detail-15
NIGEL

25/10/12

MD1-0-A-254-53-00016

Administration Building/ Foundation


ACRebar Detail-15
NIGEL

25/10/12

MD1-0-A-254-53-00020

Administration Building/ Column Rebar


AC Detail-1 NIGEL

25/10/12

MD1-0-A-254-53-00021

Administration Building/ Column Rebar


AC Detail-2 NIGEL

25/10/12

MD1-0-A-254-53-00022

Administration Building/ Column Rebar


AC Detail-3 NIGEL

25/10/12

MD1-0-A-254-53-00023

Administration Building/ Column Rebar


AC Details-4NIGEL

25/10/12

MD1-0-A-254-53-00024

Administration Building/ Column Rebar


AC Details-5NIGEL

25/10/12

MD1-0-A-254-53-00025

Administration Building/ Column Rebar


AC Details-6NIGEL

25/10/12

MD1-0-A-254-53-00026

Administration Building/ Column Rebar


AC Details-7NIGEL

25/10/12

MD1-0-A-254-53-00050

Administration Building/ Ground Floor


AC Girder Rebar
NIGEL
Details-1

06/12/12

MD1-0-A-254-53-00051

Administration Building/ Ground Floor


AC Girder Rebar
NIGEL
Details-2

06/12/12

MD1-0-A-254-53-00052

Administration Building/ Ground Floor


AC Girder Rebar
NIGEL
Details-3

06/12/12

MD1-0-A-254-53-00053

Administration Building/ Ground Floor


AC Girder Rebar
NIGEL
Details-4

25/10/12

MD1-0-A-254-53-00055

Administration Building/ Ground Floor


AC Girder Rebar
NIGEL
Details-6

25/10/12

MD1-0-A-254-53-00056

Administration Building/ Ground Floor


AC Girder Rebar
NIGEL
Details-7

25/10/12

MD1-0-A-254-53-00057

Administration Building/ Ground Floor


AC Girder Rebar
NIGEL
Details-8

06/12/12

MD1-0-A-254-53-00058

Administration Building/ Ground Floor


AC Girder Rebar
NIGEL
Details-9

06/12/12

MD1-0-A-254-53-00062

Administration Building/ 1st Floor AC


Girder Rebar Details-1
NIGEL

25/10/12

MD1-0-A-254-53-00063

Administration Building/ 1st Floor AC


Girder Rebar Details-2
NIGEL

06/12/12

MD1-0-A-254-53-00064

Administration Building/ 1st Floor AC


Girder Rebar Details-3
NIGEL

06/12/12

MD1-0-A-254-53-00065

Administration Building/ 1st Floor AC


Girder Rebar Details-4
NIGEL

06/12/12

MD1-0-A-254-53-00066

Administration Building/ 1st Floor AC


Girder Rebar Details-5
NIGEL

25/10/12

MD1-0-A-254-53-00067

Administration Building/ 1st Floor AC


Girder Rebar Details-6
NIGEL

25/10/12

MD1-0-A-254-53-00068

Administration Building/ 1st Floor AC


Girder Rebar Details-7
NIGEL

25/10/12

MD1-0-A-254-53-00071

Administration Building/ 2nd FloorAC


Girder Rebar NIGEL
Details-1

06/12/12

MD1-0-A-254-53-00072

Administration Building/ 2nd FloorAC


Girder Rebar NIGEL
Details-2

06/12/12

MD1-0-A-254-53-00073

Administration Building/ 2nd FloorAC


Girder Rebar NIGEL
Details-3

06/12/12

MD1-0-A-254-53-00074

Administration Building/ 2nd FloorAC


Girder Rebar NIGEL
Details-4

06/12/12

MD1-0-A-254-53-00075

Administration Building/ 2nd FloorAC


Girder Rebar NIGEL
Details-5

06/12/12

MD1-0-A-254-53-00076

Administration Building/ 2nd FloorAC


Girder Rebar NIGEL
Details-6

25/10/12

MD1-0-A-254-53-00079

Administration Building/ 3rd Floor AC


Girder Rebar Details-1
NIGEL

25/10/12

MD1-0-A-254-53-00080

Administration Building/ 3rd Floor AC


Girder Rebar Details-2
NIGEL

25/10/12

MD1-0-A-254-53-00081

Administration Building/ 3rd Floor AC


Girder Rebar Details-3
NIGEL

25/10/12

MD1-0-A-254-53-00082

Administration Building/ 3rd Floor AC


Girder Rebar Details-4
NIGEL

06/12/12

MD1-0-A-254-53-00083

Administration Building/ 3rd Floor AC


Girder Rebar Details-5
NIGEL

25/10/12

MD1-0-A-254-53-00084

Administration Building/ 3rd Floor AC


Girder Rebar Details-6
NIGEL

25/10/12

MD1-0-A-254-53-00087

Administration Building/ 4th Floor AC


Girder Rebar Details-1
NIGEL

25/10/12

MD1-0-A-254-53-00088

Administration Building/ 4th Floor AC


Girder Rebar Details-2
NIGEL

25/10/12

MD1-0-A-254-53-00089

Administration Building/ 4th Floor AC


Girder Rebar Details-3
NIGEL

25/10/12

MD1-0-A-254-53-00090

Administration Building/ 4th Floor AC


Girder Rebar Details-4
NIGEL

06/12/12

MD1-0-A-254-53-00091

Administration Building/ 4th Floor AC


Girder Rebar Details-5
NIGEL

06/12/12

MD1-0-A-254-53-00092

Administration Building/ 4th Floor AC


Girder Rebar Details-6
NIGEL

25/10/12

MD1-0-A-254-53-00093

Administration Building/ 4th Floor AC


Girder Rebar Details-7
NIGEL

25/10/12

MD1-0-A-254-53-00096

Administration Building/ Roof Floor


AC
Girder RebarNIGEL
Details-1

25/10/12

MD1-0-A-254-53-00097

Administration Building/ Roof Floor


AC
Girder RebarNIGEL
Details-2

25/10/12

MD1-0-A-254-53-00098

Administration Building/ Roof Floor


AC
Girder RebarNIGEL
Details-3

25/10/12

MD1-0-A-254-53-00099

Administration Building/ Roof Floor


AC
Girder RebarNIGEL
Details-4

MD1-0-A-254-53-00104

Administration Building/ 1st Floor AC


Slab Rebar Details-1
NIGEL (T.O.C EL25/10/12
+5.250)

MD1-0-A-254-53-00106

Administration Building/ 1st Floor AC


Slab Rebar Details-3
NIGEL (T.O.C EL25/10/12
+5.250)

MD1-0-A-254-53-00111

Administration Building/ 3rd Floor AC


Slab Rebar Details-1
NIGEL (T.O.C EL25/10/12
+13.650)

MD1-0-A-255-55-00001

Common Service Building/ Structural


AC CalculationNIGEL
Sheets

28/01/13

MD1-0-A-258-51-00001

Car Garage-2 / Ground Floor PlanAC


& Roof Plan NIGEL

11/07/13

MD1-0-A-258-51-00002

Car Garage-2 / Elevations

AC

NIGEL

11/07/13

MD1-0-A-258-51-00003

Car Garage-2 / Main Sections

AC

NIGEL

11/07/13

MD1-0-A-259-52-00001

Car garage-3 / foundation & column


ACplan

NIGEL

25/06/13

MD1-0-C-070-06-00020

Calculation for Geotechnical and Structural


AC
Capacity
NIGEL
of PC Pile (D=400)
26/11/12

MD1-0-C-171-01-00100

Coal runoff pond plan & section AC

MD1-0-C-171-01-00210

Coal stock belt conveyor end of bc08,


AC bc11 pile NIGEL
arrangement plan19/03/13
& section

MD1-0-C-171-01-00211

Coal stock belt conveyor end of bc09,


AC bc10 pile NIGEL
arrangement plan19/03/13
& section

MD1-0-C-171-06-00020

Calculation for coal runoff pond structure


AC

NIGEL

03/07/13

MD1-0-C-171-06-00040

Calculation for coal belt conveyor AC


foundation

NIGEL

02/07/13

MD1-0-C-171-11-00105

Coal stock belt conveyor end of bc08,


AC bc11 foundation
NIGEL plan, section
19/03/13
& detail

MD1-0-C-171-11-00106

Coal stock belt conveyor end of bc09,


AC bc10 foundation
NIGEL plan, section
19/03/13
& detail

MD1-0-C-171-11-00310

Belt conveyor bc-01a/b pile arrangement


AC
plan

NIGEL

02/07/13

MD1-0-C-171-11-00311

Belt conveyor bc-01a/b foundationAC


detail-1

NIGEL

02/07/13

MD1-0-C-171-11-00312

Belt conveyor bc-01a/b foundationAC


detail-2

NIGEL

02/07/13

MD1-0-C-171-11-00313

Belt conveyor bc-01a/b foundationAC


detail-3

NIGEL

02/07/13

MD1-0-C-171-11-00314

Belt conveyor bc-01a/b foundationAC


detail-4

NIGEL

02/07/13

MD1-0-C-171-11-00315

Belt conveyor bc-01a/b foundationAC


detail-5

NIGEL

02/07/13

MD1-0-C-171-11-00316

Belt conveyor bc-01a/b foundationAC


detail-6

NIGEL

02/07/13

MD1-0-C-171-11-00335

Belt conveyor bc-03a/b foundationAC


detail-5

NIGEL

02/07/13

MD1-0-C-171-11-00361

Belt conveyor bc-08 & bc-11 foundation


AC
detail

NIGEL

02/07/13

MD1-0-C-171-11-00371

Belt conveyor bc-09 & bc-10 foundation


AC
detail

NIGEL

02/07/13

MD1-0-C-171-53-00310

Belt conveyor bc-01 a/b foundation


AC
re-bar detail NIGEL
-1

02/07/13

MD1-0-C-171-53-00311

Belt conveyor bc-01 a/b foundation


AC
re-bar detail NIGEL
-2

02/07/13

MD1-0-C-171-53-00312

Belt conveyor bc-01 a/b foundation


AC
re-bar detail NIGEL
-3

02/07/13

MD1-0-C-171-53-00313

Belt conveyor bc-01 a/b foundation


AC
re-bar detailNIGEL
-4

02/07/13

MD1-0-C-171-53-00314

Belt conveyor bc-01 a/b foundation


AC
re-bar detail NIGEL
-5

02/07/13

MD1-0-C-171-53-00315

Belt conveyor bc-01 a/b foundation


AC
re-bar detail-6
NIGEL

02/07/13

MD1-0-C-172-01-00010

Limestone Grinding House Mechanical


AC FDN. Pile
NIGEL
Arragement Plan
10/06/13

MD1-0-C-172-01-00011

Limestone Grinding House Mechanical


AC Foundation
NIGEL
Plan

MD1-0-C-172-01-00020

Limestone grinding house steel structure


AC
pile arrangement
NIGEL
plan 26/07/13

MD1-0-C-172-01-00030

Limestone Grinding House Pit Structure


AC
Plan

NIGEL

28/06/13

MD1-0-C-172-06-00010

Calculation for Limestone Grinding


AC
House Pit Structure
NIGEL

28/06/13

MD1-0-C-172-06-00020

Calculation for limestone grindingAC


house steel structure
NIGEL foundation26/07/13

MD1-0-C-172-11-00030

Limestone Grinding House Pit Structure


AC
SectionNIGEL
& Detail (1)

28/06/13

MD1-0-C-172-11-00031

Limestone Grinding House Pit Structure


AC
SectionNIGEL
& Detail (2)

28/06/13

MD1-0-C-172-11-00032

Limestone Grinding House Pit Structure


AC
SectionNIGEL
& Detail (3)

28/06/13

MD1-0-C-172-11-00042

Limestone grinding house steel structure


AC
foundation
NIGEL
detail (3)

26/07/13

MD1-0-C-172-11-00043

Limestone grinding house steel structure


AC
foundation
NIGEL
detail (4)

26/07/13

MD1-0-C-172-11-00044

Limestone grinding house steel structure


AC
foundation
NIGEL
detail (5)

26/07/13

MD1-0-C-172-11-00050

Limestone Grinding House Mechanical


AC Foundation
NIGEL
Detail (1)

10/06/13

MD1-0-C-172-11-00051

Limestone Grinding House Mechanical


AC Foundation
NIGEL
Detail (2)

10/06/13

NIGEL

25/10/12

03/07/13

10/06/13

MD1-0-C-172-11-00052

Limestone Grinding House Mechanical


AC Foundation
NIGEL
Detail (3)

10/06/13

MD1-0-C-172-11-00053

Limestone Grinding House Mechanical


AC Foundation
NIGEL
Detail (4)

10/06/13

MD1-0-C-172-11-00054

Limestone Grinding House Mechanical


AC Foundation
NIGEL
Detail (5)

10/06/13

MD1-0-C-172-53-00030

Limestone grinding house pit reinforcement


AC
detail
NIGEL
(1)

28/06/13

MD1-0-C-172-53-00031

Limestone grinding house pit reinforcement


AC
detail
NIGEL
(2)

28/06/13

MD1-0-C-172-53-00032

Limestone grinding house pit reinforcement


AC
detail
NIGEL
(3)

28/06/13

MD1-0-C-172-53-00033

Limestone grinding house pit reinforcement


AC
detail
NIGEL
(4)

28/06/13

MD1-0-C-172-53-00034

Limestone grinding house pit reinforcement


AC
detail
NIGEL
(5)

28/06/13

MD1-0-C-172-53-00035

Limestone grinding house pit reinforcement


AC
detail
NIGEL
(6)

28/06/13

MD1-0-C-172-53-00036

Limestone Grinding House Pit Reinforcement


AC
Detail
NIGEL
(7)

28/06/13

MD1-0-C-173-01-00184

Ash pipe lines pipe rack - 1 structure


AC details

NIGEL

26/07/13

MD1-0-C-173-01-00193

Ash pipe lines pipe rack - 3 structure


AC details

NIGEL

26/07/13

MD1-0-C-173-06-00013

Calculation for ASH Pipe Lines Trench


AC

NIGEL

30/05/13

MD1-0-C-186-01-00120

Fuel Oil Storage Tank (1) Foundation


AC Plan & Section
NIGEL

13/11/12

MD1-0-C-186-01-00121

Fuel Oil Storage Tank (2) Foundation


AC Plan & Section
NIGEL

13/11/12

MD1-0-C-186-01-00122

Fuel Oil Storage Tank (1), (2) SoilAC


ReplacementNIGEL
Plan

13/11/12

MD1-0-C-186-01-00144

Fuel oil pipe lines pipe rack - 1 structure


AC
details NIGEL

26/07/13

MD1-0-C-186-01-00147

Fuel oil pipe lines pipe rack - 2 structure


AC
details NIGEL

26/07/13

MD1-0-C-186-06-00019

Calculation for Fuel Oil Storage Tank


AC Foundation
NIGEL

13/11/12

MD1-0-C-186-53-00050

Fuel Oil Storage Tank (1), (2) Foundation


AC
Reinforcement
NIGEL Detail 13/11/12

MD1-0-C-300-01-00100

PERIMETER FENCE AND GATEAC


OVERALL LAYOUT
NIGEL PLAN

28/02/13

MD1-0-C-300-01-00110

PERIMETER FENCE PLAN & SECTIONS


AC

NIGEL

28/02/13

MD1-0-C-300-01-00111

PERIMETER FENCE DETAILS AC

NIGEL

28/02/13

MD1-0-C-300-01-00150

PERIMETER FENCE AND GATEAC


MAIN GATE PLAN,
NIGEL ELEVATION
28/02/13
& SECTION

MD1-0-C-300-04-00010

Design Criteria- Civil & Architecture


AC

MD1-0-C-300-06-00010

CALCULATON FOR FOUNDATIONS


AC OF PERIMETER
NIGEL FENCE 28/02/13

MD1-0-C-340-01-00020

Perimeter Asphalt Road Paving Plan(1)


AC

NIGEL

28/01/13

MD1-0-C-340-11-00010

Perimeter Asphalt Road Paving Section


AC
& Detail(1)
NIGEL

28/01/13

MD1-0-C-350-11-00010

Perimeter Asphalt Road Storm Drainage


AC
Detail(1)
NIGEL

28/01/13

MD1-0-C-350-11-00011

Perimeter Asphalt Road Storm Drainage


AC
Detail(2)
NIGEL

28/01/13

MD1-0-C-370-01-00050

C.W Intake Pump Station Plan & AC


Section (1)

NIGEL

06/06/13

MD1-0-C-370-01-00052

C.W Intake Pump Station Plan & AC


Section (3)

NIGEL

06/06/13

MD1-0-C-370-01-00053

C.W Intake Pump Station Plan & AC


Section (4)

NIGEL

06/06/13

MD1-0-C-370-01-00055

C.W Intake Pump Station Plan & AC


Section (6)

NIGEL

06/06/13

MD1-0-C-370-01-00056

C.W Intake Pump Station Plan & AC


Section (7)

NIGEL

06/06/13

MD1-0-C-370-01-00057

C.W Intake Pump Station Plan & AC


Section (8)

NIGEL

06/06/13

MD1-0-C-370-01-00100

C.W Inlet & Discharge Pipe Bedding


AC Plan (1)

NIGEL

22/04/13

MD1-0-C-370-01-00101

C.W Inlet & Discharge Pipe Bedding


AC Plan (2)

NIGEL

22/04/13

MD1-0-C-370-01-00102

C.W Inlet & Discharge Pipe Bedding


AC Plan (3)

NIGEL

22/04/13

MD1-0-C-370-01-00107

C.W Inlet & Discharge Pipe Bedding


AC Cross Section
NIGEL
Detail (1)

22/04/13

MD1-0-C-370-01-00108

C.W Inlet & Discharge Pipe Bedding


AC Cross Section
NIGEL
Detail (2)

22/04/13

MD1-0-C-370-01-00109

C.W Inlet & Discharge Pipe Bedding


AC Cross Section
NIGEL
Detail (3)

22/04/13

MD1-0-C-370-01-00132

C.W Pipe Valve Pit Structure PlanAC


& Section (3)NIGEL

12/07/13

MD1-0-C-370-01-00150

Seal PIT Structure (Type A) Plan AC


& Section

NIGEL

27/05/13

MD1-0-C-370-01-00151

Seal PIT Structure (Type B) Plan AC


& Section

NIGEL

27/05/13

MD1-0-C-370-01-00170

SEAL PIT STRUCTURE (TYPE-A)


ACPILE ARRANGEMENT
NIGEL
PLAN27/05/13
& SECTION

MD1-0-C-370-01-00171

SEAL PIT STRUCTURE (TYPE-B)


ACPILE ARRANGEMENT
NIGEL
PLAN27/05/13
& SECTION

NIGEL

13/07/12

MD1-0-C-370-06-00040

Calculation for Seal PIT StructureAC

NIGEL

27/05/13

MD1-0-C-370-06-00130

Calculation for C.W Pipe Valve PitAC


Structure

NIGEL

12/07/13

MD1-0-C-370-11-00050

C.W Intake Pump Station Detail (1)


AC

NIGEL

06/06/13

MD1-0-C-370-11-00051

C.W Intake Pump Station Detail (2)


AC

NIGEL

06/06/13

MD1-0-C-370-11-00052

C.W Intake Pump Station Detail (3)


AC

NIGEL

06/06/13

MD1-0-C-370-11-00053

C.W Intake Pump Station Detail (4)


AC

NIGEL

06/06/13

MD1-0-C-370-11-00054

C.W Intake Pump Station Detail (5)


AC

NIGEL

06/06/13

MD1-0-C-370-53-00052

C.W Intake Pump Station- Re-barAC


Detail (3)

NIGEL

06/06/13

MD1-0-C-370-53-00053

C.W Intake Pump Station- Re-barAC


Detail (4)

NIGEL

06/06/13

MD1-0-C-370-53-00054

C.W Intake Pump Station- Re-barAC


Detail (5)

NIGEL

06/06/13

MD1-0-C-370-53-00055

C.W Intake Pump Station- Re-barAC


Detail (6)

NIGEL

06/06/13

MD1-0-C-370-53-00056

C.W Intake Pump Station- Re-barAC


Detail (7)

NIGEL

06/06/13

MD1-0-C-370-53-00057

C.W Intake Pump Station- Re-barAC


Detail (8)

NIGEL

06/06/13

MD1-0-C-370-53-00058

C.W Intake Pump Station- Re-barAC


Detail (9)

NIGEL

06/06/13

MD1-0-C-370-53-00059

C.W Intake Pump Station- Re-barAC


Detail (10)

NIGEL

06/06/13

MD1-0-C-370-53-00060

C.W Intake Pump Station- Re-barAC


Detail (11)

NIGEL

06/06/13

MD1-0-C-370-53-00061

C.W Intake Pump Station- Re-barAC


Detail (12)

NIGEL

06/06/13

MD1-0-C-370-53-00100

C.W Inlet & Discharge Pipe Incasement


AC
(Type-1)NIGEL
Detail

22/04/13

MD1-0-C-370-53-00101

C.W Inlet & Discharge Pipe Incasement


AC
(Type-2)NIGEL
Detail

22/04/13

MD1-0-C-370-53-00102

C.W Inlet & Discharge Pipe Incasement


AC
(Type-3)NIGEL
Detail

22/04/13

MD1-0-C-370-53-00103

C.W Inlet & Discharge Pipe Incasement


AC
(Type-4)NIGEL
Detail

22/04/13

MD1-0-C-370-53-00104

C.W Inlet & Discharge Pipe Incasement


AC
(Type-5)NIGEL
Detail

22/04/13

MD1-0-C-370-53-00105

C.W Inlet & Discharge Pipe Incasement


AC
(Type-6)NIGEL
Detail

22/04/13

MD1-0-C-370-53-00106

C.W Inlet & Discharge Pipe Incasement


AC
(Type-7)NIGEL
Detail

22/04/13

MD1-0-C-370-53-00107

C.W Inlet & Discharge Pipe Incasement


AC
(Type-8)NIGEL
Detail

22/04/13

MD1-0-C-370-53-00108

C.W Inlet & Discharge Pipe Incasement


AC
(Type-9)NIGEL
Detail

22/04/13

MD1-0-C-370-53-00109

C.W Inlet & Discharge Pipe Incasement


AC
(Type-10)
NIGEL
Detail

22/04/13

MD1-0-C-370-53-00130

C.W Pipe Valve Pit Structure Rebar


ACDetail (1) NIGEL

12/07/13

MD1-0-C-370-53-00131

C.W Pipe Valve Pit Structure Rebar


ACDetail (2) NIGEL

12/07/13

MD1-0-C-370-53-00150

Seal PIT Structure (Type A-B) Reinforcement


AC
Detail
NIGEL
(1)

27/05/13

MD1-0-C-370-53-00151

Seal PIT Structure (Type A-B) Reinforcement


AC
Detail
NIGEL
(2)

27/05/13

MD1-0-C-370-56-00200

C.W Discharge Culvert Temporary


AC
Work Plan &NIGEL
Section

08/11/12

MD1-0-C-505-53-00031

Main & Unit Aux. Transformer UnitAC


#1, #2 Foundation
NIGELReinforcement
24/07/13
Detail (2)

MD1-0-C-570-01-00250

Switchyard Area Cable Trench Cover


AC Plan (1) NIGEL

03/04/13

MD1-0-C-570-01-00251

Switchyard Area Cable Trench Cover


AC Plan (2) NIGEL

03/04/13

MD1-0-C-570-01-00252

Switchyard Area Cable Trench Cover


AC Plan (3) NIGEL

03/04/13

MD1-0-C-570-01-00253

Switchyard Area Cable Trench Cover


AC Plan (4) NIGEL

03/04/13

MD1-0-C-570-01-00254

Switchyard Area Cable Trench Cover


AC Plan (5) NIGEL

03/04/13

MD1-0-C-570-01-00255

Switchyard Area Cable Trench Cover


AC Plan (6) NIGEL

03/04/13

MD1-0-C-570-11-00020

Switchyard Area Cable Trench Cover


AC Detail

NIGEL

03/04/13

MD1-0-C-840-01-00010

Waste water treatment area layoutAC


plan (1)

NIGEL

25/03/13

MD1-0-C-840-01-00011

Waste water treatment area layoutAC


plan (2)

NIGEL

25/03/13

MD1-0-C-840-01-00012

Waste water treatment area layoutAC


plan (3)

NIGEL

25/03/13

MD1-0-C-840-11-00250

Waste Water Treatment ActivatedAC


Carbon FilterNIGEL
FDN Detail

MD1-0-C-840-11-00251

WT & WWT Area pressure Filter AC


& Activated Carbon
NIGELFilter FDN Details
03/07/13

MD1-0-C-840-11-00260

WT & WWT Area Grativity Filter FDN.


AC Plan & Sections
NIGEL

MD1-0-C-840-11-00270

WT & WWT Area Acid Caustic Storage


AC
Tank FDN.
NIGEL
Plan & Sections
03/07/13

03/07/13

03/07/13

MD1-0-C-840-11-00271

WT & WWT Area Acid Caustic Storage


AC
Tank FDN.
NIGEL
Detail (1)

03/07/13

MD1-0-C-840-11-00272

WT & WWT Area Acid Caustic Storage


AC
Tank FDN.
NIGEL
Detail (2)

03/07/13

MD1-0-C-840-11-00280

WT & WWT Area Acid Caustic & AC


Polymer FDN.NIGEL
Plan & Sections 03/07/13

MD1-0-C-840-11-00281

WT & WWT Area Acid Caustic & AC


Polymer FDN.NIGEL
Sections

03/07/13

MD1-0-C-840-11-00282

WT & WWT Area Acid Caustic & AC


Polymer FDN.NIGEL
Details (1)

03/07/13

MD1-0-C-840-11-00283

WT & WWT Area Acid Caustic & AC


Polymer FDN.NIGEL
Details (2)

03/07/13

MD1-0-C-840-11-00284

WT & WWT Area Acid Caustic & AC


Polymer FDN.NIGEL
Details (3)

03/07/13

MD1-0-C-840-11-00285

WT & WWT Area Acid Caustic & AC


Polymer FDN.NIGEL
Details (4)

03/07/13

MD1-0-C-840-11-00290

WT & WWT Area Regeneration Pump


AC FDN. Plan
NIGEL
& Sections

03/07/13

MD1-0-C-840-11-00300

Waste Water Treatment CPI Oil Separator


AC
FDN.NIGEL
Detail

03/07/13

MD1-0-C-840-11-00301

WT & WWT Area Oily Wastewater,


ACrecovered Oil
NIGEL
Transfer & Oil Sludge
03/07/13
Pump FDN. Des

MD1-0-C-840-11-00302

WT & WWT Area Mixing Blower CPI


AC Oil Water Separator
NIGEL
FDN. Details
03/07/13

MD1-0-C-840-11-00310

WT & WWT Area Filter Backwash,


ACDemin PlantNIGEL
Feed Water & Filtered
03/07/13
Water

MD1-0-C-840-11-00311

WT & WWT Area Filter Backwash,


ACDemin PlantNIGEL
Feed Water & Filtered
03/07/13
Water

MD1-0-C-840-11-00320

WT & WWT Area Raw Water & Mudded


AC
Pump FDN.
NIGELPlan & Sections
03/07/13

MD1-0-T-030-05-00343

Inspection & Test Plan for Painting


AC

MAX

22/03/13

MD1-0-T-040-07-00055

Material Approval Request for Steel


ACPipe

NIGEL

14/06/12

MD1-0-T-040-07-00137

Material Approval Request for Concrete


AC
Works NIGEL

27/09/12

MD1-0-T-050-01-00048

Preliminary Design of Coffer DamAC

NIGEL

22/06/12

MD1-0-T-051-04-00363

Additional Concrete Mix Design (Ha


ACLong cement)
NIGEL

19/02/13

MD1-0-T-051-07-00238

Material Approval Request for Non-Shrinkage


AC
Concrete
NIGEL

06/11/12

MD1-0-T-051-07-00341

Material Approval Request For Non-Shrink


AC
Concrete
NIGEL
(SACA Grout)
01/03/13

MD1-0-T-051-07-00358

Material approval request for chemical-oil


AC
resistant
NIGEL
paint (fosroc) 28/02/13

MD1-0-T-051-07-00395

Material approval request for pha AC


lai fly ash

NIGEL

23/04/13

MD1-0-T-051-07-00413

Material Approval Request for Reinforced


AC
Concrete
NIGEL

28/05/13

MD1-0-T-051-07-00416

MAR for R.C.W. External PaintingAC


(chimney)

13/05/13

MD1-0-T-051-07-00425

Material Approval Request For Chain


AC Link FenceBAO
( An Toan Thang
12/07/13
)

MD1-0-T-052-05-00075

Concrete Testing Plan

AC

NIGEL

20/11/12

MD1-0-T-052-07-00127

Material Approval Request for Doors


AC

NIGEL

17/09/12

MD1-0-T-052-07-00128

Material Approval Request for Joint


ACMaterias & Waterproofing
NIGEL
(FOSROC)
07/11/12

MD1-0-T-052-07-00129

Material Approval Request for Windows


AC
and Glass
NIGEL

05/04/13

MD1-0-T-052-07-00134

Material Approval Request for Doors


AC (SINH SUNG)
NIGEL

26/09/12

MD1-0-T-052-07-00140

Material Approval Request for Doors


AC (VIET JAPAN)
MAX

05/07/13

MD1-0-T-052-07-00154

Material Approval Request for Ceramic


AC Tile (Dongtam)
NIGEL

26/03/13

MD1-0-T-052-07-00160

Material approval request for wooden


AC door (sagaco)
NIGEL

04/04/13

MD1-0-T-052-07-00162

Material approval request for vinylAC


tile (gerflor) NIGEL

04/04/13

MD1-0-T-052-07-00283

Material Approval Request for Hardener


AC
(FOSROC)
NIGEL

26/11/12

MD1-0-T-052-07-00288

Material Approval Request for Hollow


AC Concrete Block
NIGEL(BUT SON)26/11/12

MD1-0-T-052-07-00296

Material Approval Request for Access


AC Floor (XIANGLI
MAX Floor)

05/02/13

MD1-0-T-052-07-00297

Material Approval Request for Ceiling


AC (USG)

05/03/13

MD1-0-T-052-07-00298

Material Approval Request for Vinyl


AC& Carpet Tile
NIGEL
(TOLI)

26/11/12

MD1-0-T-052-07-00349

Material approval request for insulation


AC board (lemax)
NIGEL

28/02/13

MD1-0-T-052-07-00373

Material Approval Request for Clinker


AC Brick (Viglacera
NIGELHalong)

26/03/13

MD1-0-T-052-07-00374

Material approval request for metal


ACroller shutterNIGEL
door (vina sanwa)
26/03/13

MD1-0-T-052-07-00388

Material Approval Request for Terrazzo


AC Tile (Secoin)
NIGEL

26/03/13

MD1-0-T-052-07-00389

Material Approval Request for Toilet


ACCubicle (Shengzhen)
NIGEL

26/03/13

MD1-0-T-052-07-00398

Material approval request for paintAC


(international)NIGEL

14/05/13

NIGEL

NIGEL

MD1-0-T-052-07-00475

Material Approval Request for Joint


ACMaterials (X-CALIBUR)
MAX

18/07/13

MD1-0-T-053-07-00240

Material Approval Request for Non


AC
Shrink MortarNIGEL

12/12/12

MD1-0-T-053-07-00252

Material Approval Request for Deck


ACPlate

NIGEL

12/12/12

MD1-0-T-053-07-00266

Material Approval Request for PEB


ACBolt

NIGEL

26/12/12

MD1-0-T-053-07-00387

Material approval request for grouting


AC material (sika
NIGEL
318vn)

MD1-0-T-054-07-00432

Material Apporval Request For Paint(international


AC
MAX
Paint Singapore)
24/07/13

MD1-0-T-054-07-00466

Material Approval Request for Paint(HEMPEL)


AC
MAX

09/07/13

MD1-0-T-470-01-10003

PILE ARRANGEMENT OF LIMESTONE


AC
UNLOADING
NIGEL JETTY

10/04/13

MD1-0-T-470-01-20002

PILE ARRANGEMENT(FUEL OILAC


UNLOADINGNIGEL
PUMP HOUSE) 10/04/13

MD1-0-V-161-09-16133

Instrument Data Sheets, Silo Level


AC
Detectors (Radar
NIGEL
type)

19/12/12

MD1-0-V-161-09-16134

Instrument Data Sheets, Level Switches


AC

19/12/12

MD1-0-V-161-09-16135

Instrument Data Sheets, Level Instruments


AC
(Conductivity
NIGEL Type)

19/12/12

MD1-0-V-161-09-16141

Instrument Data Sheets, PressureAC


Gauges

NIGEL

19/12/12

MD1-0-V-161-09-16142

Instrument Data Sheets, PressureAC


Transmitters NIGEL

19/12/12

MD1-0-V-219-54-00001

Lime stone storage shed - specification


AC

NIGEL

06/05/13

MD1-0-V-219-54-00002

Lime stone storage shed - anchorAC


bolt plan & details
NIGEL

06/05/13

MD1-0-V-219-54-00003

Lime stone storage shed - template


ACdetails

NIGEL

06/05/13

MD1-0-V-219-54-00004

Lime stone storage shed - roof framing


AC plan & details
NIGEL

06/05/13

MD1-0-V-219-54-00005

Lime stone storage shed - cross section


AC

NIGEL

06/05/13

MD1-0-V-219-54-00006

Lime stone storage shed - sidewall


AC
framing & details
NIGEL

06/05/13

MD1-0-V-219-54-00007

Lime stone storage shed - endwallAC


framing @ gl.1
NIGEL

06/05/13

MD1-0-V-219-54-00008

Lime stone storage shed - endwall


ACframing @ gl.12
NIGEL

06/05/13

MD1-0-V-360-51-00610

Chimney #1 & #2 Concrete Floor AC


at Ground Level
NIGEL

02/05/13

MD1-0-V-360-53-00116

R.C. Windshield - Corbels for InletAC


Ducts

10/06/13

MD1-0-V-360-54-00403

Chimney #1 & #2 Steel Liners - Nozzle


AC for CEMS
NIGEL
& Temp. Elements
24/07/13

MD1-0-V-360-54-00420

Inlet Ducts - General ArrangementAC

NIGEL

10/06/13

MD1-0-V-360-54-00421

Inlet Ducts - Details

AC

NIGEL

10/06/13

MD1-0-V-360-57-00430

Steel Liners Drainage System

AC

NIGEL

10/06/13

MD1-0-V-805-08-00008

Sea Water Intake Facility Equipment


AC Data SheetNIGEL

02/11/12

NIGEL

NIGEL

26/03/13

revision
DISCIPLINE = ELEC, Electrical
MD1-0-E-182-06-00001

Emergency Diesel Generator Sizing Calculation

MD1-0-E-500-01-00101

Electrical equipment layout - central control bldg 1st floor

MD1-0-E-500-01-00102

Electrical equipment layout - central control bldg 2nd floor & lower roof

MD1-0-E-500-01-00201

Electrical equipment layout - local electrical room

MD1-0-E-500-01-00202

Electrical Equipment Layout - Admin BLDG

MD1-0-E-500-04-00001

Synchronization Philosophy

MD1-0-E-500-06-00001

Calculation for Short Circuit Current

MD1-0-E-500-06-00002

Calculation for Load Flow

MD1-0-E-500-08-00001

Electrical Equipment List

MD1-0-E-500-08-00002

Electrical Load List

MD1-0-E-500-31-00001

Single Line Diagram Symbol & Legend

MD1-0-E-500-31-00002

Key Single Line Diagram

MD1-0-E-500-31-00041

Single Line Diagram- Typical Protection & Metering

MD1-0-E-500-33-00001

Elec.Logic Diagram- Symbol & Legend

MD1-0-E-505-06-00001

Calculation for Generator Transformer Sizing

MD1-0-E-505-06-00002

Calcualtion For Auxiliary Transformer Sizing

MD1-0-E-505-33-00001

Elec. Logic Diagram- Station Transformer

MD1-0-E-520-31-00101

Single Line Diagram-10 KV Station Switchgear 06BBA/06BBB

MD1-0-E-520-31-00201

Single Line Diagram-10KV Cooling Water Switchgear 06BBG/06BBH

MD1-0-E-520-33-00001

Elec.Logic Diagram- 10KV Switchgear XFMR Incoming Feeder (1/4)

MD1-0-E-520-33-00002

Elec. Logic Diagram- 10KV Switchgear XFMR Incoming Feeder (2/4)

MD1-0-E-520-33-00003

Elec.Logic Diagram- 10KV Switchgear XFMR Imcoming Feeder (3/4)

MD1-0-E-520-33-00004

Elec. Logic Diagram- 10KV Switchgear XFMR Incoming Feeder (4/4)

MD1-0-E-520-33-00005

Elec. Logic Diagram- 10KV Switchgear Bus Tie Feeder (1/2)

MD1-0-E-520-33-00006

Elec. Logic Diagram- 10KV Switchgear Bus Tie Feeder (2/2)

MD1-0-E-520-33-00007

Elec. Logic Diagram- 10KV Switchgear Plain Incoming Feeder (1/2)

MD1-0-E-520-33-00008

Elec. Logic Diagram- 10KV Switchgear Plain Incoming Feeder (2/2)

MD1-0-E-520-33-00009

Elec. Logic Diagram- 10KV Switchgear Bus Tie Feeder (Plain Incoming)

MD1-0-E-520-33-00010

Elec. Logic Diagram- 10KV Switchgear Outgoing Feeder For Non-Motor

MD1-0-E-520-33-00011

Elec. Logic Diagram- 10KV Switchgear Outgoing Feeder For Motor

MD1-0-E-525-31-00001

Single Line Diagram- 400V Station Switchgear-1 06BFA/06BFB

MD1-0-E-525-31-00002

Single Line Diagram- 400V Station Switchgear-2 06BFC/06BFD

MD1-0-E-525-31-00003

Single Line Diagram- 400V Station Switchgear-3 06BFE/06BFF

MD1-0-E-525-31-00004

Single Line Diagram- 400V Admin. Bldg. Switchgear 06BFI/06BFJ

MD1-0-E-525-31-00005

Single Line Diagram- 400V CWP Switchgear 06BFG/06BFH

MD1-0-E-525-31-00011

Single Line Diagram- 400V Essential Switchgear 06BMA/06BMB

MD1-0-E-525-31-00101

Single Line Diagram-400V Station MCC-1 06JBA

MD1-0-E-525-31-00201

Single Line Diagram-400V Station MCC-2 06BJB

MD1-0-E-525-31-00301

Single Line Diagram-400VAux. Boiler MCC 06BJC

MD1-0-E-525-31-00401

Single Line Diagram-400V Limestone Grinding House MCC 06BJD

MD1-0-E-525-31-00501

Single Line Diagram-400V CWP MCC 06BJE

MD1-0-E-525-31-00601

Single Line Diagram-400V General Service MCC-1 06BLA

MD1-0-E-525-31-00701

Single Line Diagram-400V General Service MCC-2 06BLB

MD1-0-E-525-31-00801

Single Line Diagram-400V General Service MCC-3 06BLC

MD1-0-E-525-31-00901

Single Line Diagram-400V General Service MCC-4 06BLD

MD1-0-E-525-31-01001

Single Line Diagram-400V Workshop MCC 06BLE

MD1-0-E-525-31-01101

Single Line Diagram-400V ST Bldg. HVAC MCC 06BLF

MD1-0-E-525-31-01201

Single Line Diagram-400V CCB HVAC MCC-1 06BLG

MD1-0-E-525-31-01301

Single Line Diagram-400V CCB HVAC MCC-2 06BLL

MD1-0-E-525-31-01401

Single Line Diagram-400V ADMIN. BLDG HVAC MCC-1 06BLH

MD1-0-E-525-31-01501

Single Line Diagram-400V Admin BLDG HVAC MCC-2 06BLI

MD1-0-E-525-31-01601

Single Line Diagram-400V Admin BLDG MCC 06BLJ

MD1-0-E-525-31-01701

Single Line Diagram-400V SWYD HVAC MCC 06BLK

MD1-0-E-525-31-03101

Single Line Diagram-400V Essential MCC-1 06BME

MD1-0-E-525-31-03201

Single Line Diagram-400V Essential MCC-2 06BMF

MD1-0-E-525-33-00001

Elec. Logic Diagram-400V Switchgear Incoming Feeder

MD1-0-E-525-33-00002

Elec. Logic Diagram-400V Switchgear Outgoing Feeder

MD1-0-E-525-33-00010

Elec. Logic Diagram-400V Switchgear Bus Tie Feeder

MD1-0-E-535-06-00001

Calculation for DC and UPS System Sizing

MD1-0-E-535-31-00001

Single line diagram - 220v dc system for units and common

MD1-0-E-535-31-00002

Single line diagram - 220v dc system for cooling water system

MD1-0-E-540-31-00001

Single line diagram - 400/230v ups system

MD1-0-E-560-01-00101

Overall Layout for Tank Bottom for Cathodic Protection System

MD1-0-E-590-01-00001

Earthing and Lightning Protection Layout- Symbol and Legend

MD1-0-E-590-01-00002

Earthing and Lightening Protection Layout- Overall Area

MD1-0-E-590-01-00201

Earthing and Lightning Protection Layout- Installation Details (1/3)

MD1-0-E-590-01-00202

Earthing and Lightning Protection Layout- Installation Details (2/3)

MD1-0-E-590-01-00203

Earthing and Lightning Protection Layout- Installation Details (3/3)

MD1-0-E-590-01-01001

Earthing and Lightning Protection Layout-Boiler Unit 1A & 1B EL+0.0M

MD1-0-E-590-01-01501

Earthing and lightning protection layout - boiler unit 2a & 2b el.+0.0m

MD1-0-E-590-01-02001

Earthing and Lightning Protection Layout- Turbine Bldg. Ground Floor

MD1-0-E-590-01-02002

Earthing and Lightning Protection Layout- Turbine Mezzanine Floor

MD1-0-E-590-01-02003

Earthing and Lightning Protection Layout- Turbine Operating Floor

MD1-0-E-590-01-02004

Earthing & Lightning Protection Layout- Turbine Bldg. Lower Roof & Crane Runaway

MD1-0-E-590-01-02005

Earthing & Lightning Protection Layout- Turbine Bldg. Lower Roof & Crane Runaway

MD1-0-E-590-01-03001

Earthing and Lightning Protection Layout- Central control Bldg Ground Floor

MD1-0-E-590-01-03002

Earthing and Lightning Protection Layout- Central control Bldg 1st Floor

MD1-0-E-590-01-03003

Earthing and Lightning Protection Layout- Central control Bldg 2nd Floor

MD1-0-E-590-01-03004

Earthing and Lightning Protection Layout- Central control Bldg 3rd Floor

MD1-0-E-590-01-03005

Earthing and Lightning Protection Layout- Central control Bldg Roof Floor

MD1-0-E-590-01-03006

Earthing and Lightning Protection Layout- Central control Bldg Higher Roof Floor

MD1-0-E-590-01-04201

Earthing and lightning protection layout - fuel oil pump house

MD1-0-E-590-01-04401

Earthing and Lightning Protection Layout- Fire Protection Pump House

MD1-0-E-590-01-04601

Earthing and lightning protection layout - esp control house no.1

MD1-0-E-590-01-04701

Earthing and lightning protection layout - esp control house no.2

MD1-0-E-590-01-04801

Earthing and lightning protection layout - diesel generator house

MD1-0-E-590-01-04901

Earthing and lightning protection layout - cooling water pump house

MD1-0-E-590-01-05401

Earthing and lighting Protection Layout- Switchyard Control Bldg. Ground Floor

MD1-0-E-590-01-05402

Earthing and lighting Protection Layout- Switchyard Control Bldg. 1st Floor

MD1-0-E-590-01-05501

Earthing and Lighting Protection Layout- Water treatment BLDG Ground Floor

MD1-0-E-590-01-05503

Earthing and Lighting Protection Layout- Water treatment BLDG Roof Floor

MD1-0-E-590-01-05521

Earthing Lighting Protection Layout- Waste Water Treatment Plant Area

MD1-0-E-590-01-05551

Earthing and Lighting Protection Layout- Water Storage Tank Area

MD1-0-E-590-01-06301

Earthing and Lightning Protection Layout- Coal Yard Area (1)

MD1-0-E-590-01-06302

Earthing and Lightning Protection Layout- Coal Yard Area (2)

MD1-0-E-590-01-06303

Earthing and Lightning Protection Layout- Coal Yard Area (3)

MD1-0-E-590-01-06304

Earthing and Lightning Protection Layout- Coal Yard Area (4)

MD1-0-E-590-01-06305

Earthing and Lightning Protection Layout- Coal Yard dry Storage Shed Roof

MD1-0-E-590-01-06401

Earthing and lightning protection layout - limestone storage shed

MD1-0-E-590-01-06901

Earthing and Lightning Protection Layout - Transformer Area (Unit 1)

MD1-0-E-590-01-06902

Earthing and Lightning Protection Layout - Transformer Area (Unit 2)

MD1-0-E-590-01-07001

Earthing and lightning protection layout - aux. boiler area

MD1-0-E-590-01-07101

Earthing and lightning protection layout - condensate storage tank area

MD1-0-E-590-01-07201

Earthing and Lightning Protection Layout - Fuel Oil Tank Area

MD1-0-E-590-01-07301

Earthing and Lightning Protection Layout - ESP Area (Unit 1)

MD1-0-E-590-01-07302

Earthing and Lightning Protection Layout - ESP Area (Unit 2)

MD1-0-E-590-01-07401

Earthing and Lightning Protection Layout - Stack Area (Unit 1)

MD1-0-E-590-01-07402

Earthing and Lightning Protection Layout - Stack Area (Unit 2)

MD1-0-E-590-01-07501

Earthing and Lightning Protection Layout - CWP Area

MD1-0-E-590-01-07801

Earthing and Lightning Protection Layout - Sleeper Area (1)

MD1-0-E-590-01-07802

Earthing and Lightning Protection Layout - Sleeper Area (2)

MD1-0-E-590-01-07803

Earthing and Lightning Protection Layout - Sleeper Area (3)

MD1-0-E-590-01-07804

Earthing and Lightning Protection Layout - Sleeper Area (4)

MD1-0-E-590-01-08401

Earthing and lightning protection layout - bulldozer garage

MD1-0-E-590-01-08501

Earthing and Lighting Protection layout- I&C Elec & Mech Warehouse Ground Flr

MD1-0-E-590-01-08502

Earthing and Lighting Protection layout- I&C Elec & Mech Warehouse Roof Flr

MD1-0-E-590-01-08601

Earthing and Lightning Protection Layout- Admin. BLDG Ground Floor

MD1-0-E-590-01-08602

Earthing and Lightning Protection Layout- Admin. BLDG 1st Floor

MD1-0-E-590-01-08603

Earthing and Lightning Protection Layout- Admin. BLDG 2nd Floor

MD1-0-E-590-01-08604

Earthing and Lightning Protection Layout- Admin. BLDG 3rd Floor

MD1-0-E-590-01-08605

Earthing and Lightning Protection Layout- Admin. BLDG 4th Floor

MD1-0-E-590-01-08606

Earthing and Lightning Protection Layout- Admin. BLDG Roof Floor

MD1-0-E-590-01-08901

Earthing and Lighting Protection layout- Common Service Bldg Ground Flr

MD1-0-E-590-01-08902

Earthing and Lighting Protection layout- Common Service Bldg Roof Flr

MD1-0-E-590-01-09203

Earthing and lightning protection layout - car garage 3

MD1-0-E-590-06-00001

Earthing System Calculation

MD1-0-E-590-32-00001

Earthing and Lightning Protection System Schematic Diagram

MD1-0-E-591-04-00001

Cable and cable Raceway Identification & Numbering System

MD1-0-E-591-06-00001

Power Cable Sizing Calculation

MD1-0-E-591-08-00001

Power Cable Schedule

MD1-0-E-591-08-00002

Control Cable Schedule

MD1-0-E-592-01-00001

Lighting Layout- Symbol and Legend

MD1-0-E-592-01-00101

Lighting Layout- Lightning Fixture (1/2)

MD1-0-E-592-01-00102

Lighting Layout- Lighting Fixture (2/2)

MD1-0-E-592-01-00201

Lighting Layout- Installation Details (1/3)

MD1-0-E-592-01-00202

Lighting Layout- Installation Details (2/3)

MD1-0-E-592-01-00203

Lighting Layout- Installation Details (3/3)

MD1-0-E-592-01-02001

Lighting Layout- Turbine BLDG Ground Floor

MD1-0-E-592-01-02002

Lighting Layout- Turbine BLDG Mez. Floor

MD1-0-E-592-01-02003

Lighting Layout- Turbine BLDG Operating Floor

MD1-0-E-592-01-02004

Lighting Layout- Turbine BLDG Lower Roof & Crane Runway

MD1-0-E-592-01-02051

Receptacle Layout- Turbine BLDG Ground Floor

MD1-0-E-592-01-02052

Receptacle Layout- Turbine BLDG Mez. Floor

MD1-0-E-592-01-02053

Receptacle Layout- Turbine BLDG Operating Floor

MD1-0-E-592-01-02054

Receptacle Layout- Turbine BLDG Lower Roof & Crane Runway

MD1-0-E-592-01-03001

Lighting Layout- Central Control BLDG Ground Floor

MD1-0-E-592-01-03002

Lighting Layout- Central Control BLDG 1st Floor

MD1-0-E-592-01-03003

Lighting Layout- Central Control BLDG 2nd Floor

MD1-0-E-592-01-03004

Lighting Layout- Central Control BLDG 3rd Floor

MD1-0-E-592-01-03005

Lighting Layout- Central Control BLDG Roof Floor

MD1-0-E-592-01-03051

Receptacle Layout- Central Control BLDG Ground Floor

MD1-0-E-592-01-03052

Receptacle Layout- Central Control BLDG 1st Floor

MD1-0-E-592-01-03053

Receptacle Layout- Central Control BLDG 2nd Floor

MD1-0-E-592-01-03054

Receptacle Layout- Central Control BLDG 3rd Floor

MD1-0-E-592-01-03055

Receptacle Layout- Central Control BLDG Roof Floor

MD1-0-E-592-01-04101

Lighting and Receptacle Layout - Coal Handling Control BLDG

MD1-0-E-592-01-04201

Lighting and receptacle layout - fuel oil pump house

MD1-0-E-592-01-04401

LIGHTING LAYOUT - FIRE PROTECTION PUMP HOUSE GROUND FLOOR

MD1-0-E-592-01-04501

Lighting Layout - Ash Slurry Pump House Ground Floor

MD1-0-E-592-01-04502

Lighting Layout - Ash Slurry Pump House 1st Floor

MD1-0-E-592-01-04551

Receptacle Layout - Ash Slurry Pump House Ground Floor

MD1-0-E-592-01-04552

Receptacle Layout - Ash Slurry Pump House 1st Floor

MD1-0-E-592-01-04601

Lighting Layout - ESP Control & Ash Elec. BLDG

MD1-0-E-592-01-04651

Receptacle Layout - ESP Control & Ash Elec. BLDG

MD1-0-E-592-01-04801

Lighting Layout - Diesel Generator House

MD1-0-E-592-01-04901

Lighting and Receptacle Layout - Cooling Water Pump House

MD1-0-E-592-01-05101

Lighting Layout - Gaseous Chlorination BLDG

MD1-0-E-592-01-05151

Receptacle Layout - Gaseous Chlorination BLDG

MD1-0-E-592-01-05201

Lighting and Receptacle Layout - Fuel Oil Unloading Pump House

MD1-0-E-592-01-05301

Lighting Layout - Return Water Pump House

MD1-0-E-592-01-05351

Receptacle Layout - Return Water Pump House

MD1-0-E-592-01-05401

Lighting Layout-Switchyard Control Bldg Ground Floor

MD1-0-E-592-01-05402

Lighting Layout-Switchyard Control Bldg 1st Floor

MD1-0-E-592-01-05403

Lighting Layout-Switchyard Control Bldg Roof Floor

MD1-0-E-592-01-05451

Receptacle Layout- Switchyard Control BLDG Ground Floor

MD1-0-E-592-01-05452

Receptacle Layout- Switchyard Control BLDG 1st Floor

MD1-0-E-592-01-05501

Lighting Layout- Water Treatment BLDG Ground Floor

MD1-0-E-592-01-05551

Receiptacle Layout- Water Treatment BLDG Ground Floor

MD1-0-E-592-01-06201

Lighting Layout - Coal Yard Dry Storage Shed

MD1-0-E-592-01-08301

Lighting Layout - Workshop BLDG

MD1-0-E-592-01-08351

Receptacle Layout - Workshop BLDG

MD1-0-E-592-01-08401

Lighting layout - bulldozer garage

MD1-0-E-592-01-08501

Lighting Layout - I&C Electrical and Mechanical Warehouse

MD1-0-E-592-01-08551

Receptacle Layout - I&C Electrical and Mechanical Warehouse

MD1-0-E-592-01-08601

Lighting Layout- Administration BLDG Ground Floor

MD1-0-E-592-01-08602

Lighting Layout- Administration BLDG 1st Floor

MD1-0-E-592-01-08603

Lighting Layout- Administration BLDG 2nd Floor

MD1-0-E-592-01-08604

Lighting Layout- Administration BLDG 3rd Floor

MD1-0-E-592-01-08605

Lighting Layout- Administration BLDG 4th Floor

MD1-0-E-592-01-08651

Receptacle Layout- Administration Bldg Ground Floor

MD1-0-E-592-01-08652

Receptacle Layout- Administration Bldg 1st Floor

MD1-0-E-592-01-08653

Receptacle Layout- Administration Bldg 2nd Floor

MD1-0-E-592-01-08654

Receptacle Layout- Administration Bldg 3rd Floor

MD1-0-E-592-01-08655

Receptacle Layout- Administration Bldg 4th Floor

MD1-0-E-592-01-08901

Lighting Layout- Common Service BLDG

MD1-0-E-592-01-08951

Receptacle Layout- Common Service BLDG

MD1-0-E-592-01-09203

Lighting layout - car garage 3

MD1-0-E-592-01-09253

Receptacle layout - car garage 3

MD1-0-E-592-01-10020

Lighting panel Schedule- Turbine BLDG

MD1-0-E-592-01-10030

Lighting Panel Schedule- Central Control BLDG

MD1-0-E-592-01-10040

Lighting Panel Schedule- Administration Bldg

MD1-0-E-592-01-10050

Lighting Panel Schedule- Switchyard Control Bldg

MD1-0-E-592-01-14101

Lighting Panel Schedule - Coal Handling Control BLDG

MD1-0-E-592-01-14501

Lighting Panel Schedule - Ash Slurry Pump House

MD1-0-E-592-01-14601

Lighting Panel Schedule - ESP Control & Ash Elec. BLDG

MD1-0-E-592-01-14901

Lighting Panel Schedule - Cooling Water Pump House

MD1-0-E-592-01-15101

Lighting Panel Schedule - Gaseous Chlorination BLDG

MD1-0-E-592-01-15301

Lighting Panel Schedule - Return Water Pump House

MD1-0-E-592-01-15501

Lighting Panel Schedule- Water Treatment BLDG

MD1-0-E-592-01-16201

Lighting Panel Schedule - Coal Yard Dry Storage Shed

MD1-0-E-592-01-16501

Lighting Panel Schedule - Limestone Handling Control BLDG

MD1-0-E-592-01-18051

Lighting Panel Schedule - I&C Electrical and Mechanical Warehouse

MD1-0-E-592-01-18301

Lighting Panel Schedule - Workshop BLDG

MD1-0-E-592-01-18401

Lighting panel schedule - bulldozer garage

MD1-0-E-592-01-18901

Lighting Panel Schedule- Common Service BLDG

MD1-0-E-592-01-19203

Lighting panel schedule - car garage 3

MD1-0-E-592-06-02001

Lighting Calculation- Turbine BLDG

MD1-0-E-592-06-03001

Lighting Calculation- Central Control BLDG

MD1-0-E-592-06-04101

Lighting Calculation - Coal Handling Control BLDG

MD1-0-E-592-06-04201

Lighting calculation - fuel oil pump house

MD1-0-E-592-06-04401

LIGHTING CALCULATION - FIRE PROTECTION PUMP HOUSE

MD1-0-E-592-06-04501

Lighting Calculation - ASH Slurry Pump House

MD1-0-E-592-06-04601

Lighting Calculation - ESP Control & ASH Elec. BLDG

MD1-0-E-592-06-04801

Lighting Calculation - Diesel Generator House

MD1-0-E-592-06-04901

Lighting Calculation - Cooling Water Pump House

MD1-0-E-592-06-05101

Lighting Calculation - Gaseous Chlorination BLDG

MD1-0-E-592-06-05201

Lighting Calculation - Fuel Oil Unloading Pump House

MD1-0-E-592-06-05301

Lighting Calculation - Return Water Pump House

MD1-0-E-592-06-05401

Lighting Calculation- Switchyard Control Bldg

MD1-0-E-592-06-05501

Lighting Calculation- Water Treatment BLDG

MD1-0-E-592-06-06201

Lighting Calculation - Coal Yard Dry Storage Shed

MD1-0-E-592-06-06501

Lighting Calculation - Limestone Handling Control BLDG

MD1-0-E-592-06-08301

Lighting Calculation - Workshop BLDG

MD1-0-E-592-06-08401

Lighting calculation - bulldozer garage

MD1-0-E-592-06-08501

Lighting Calculation - I&C Electrical and Mechanical Warehouse

MD1-0-E-592-06-08601

Lighting Calculation- Administration Bldg

MD1-0-E-592-06-08901

Lighting Calculation- Common Service BLDG

MD1-0-E-592-06-09203

Lighting calculation - car garage 3

MD1-0-E-592-31-00002

Single line diagram - lighting system

MD1-0-E-593-01-10001

Cable Raceway Plan- Symbol and Legend

MD1-0-E-593-01-10101

Cable Raceway Plan- Cable Tray Assembly Detail (1/2)

MD1-0-E-593-01-10102

Cable Raceway Plan- Cable Tray Assembly Detail (2/2)

MD1-0-E-593-01-10201

Cable Raceway Plan- General Details (1/2)

MD1-0-E-593-01-10202

Cable Raceway Plan- General Details (2/2)

MD1-0-E-593-01-10301

Cable Raceway Plan- Installation Details (1/3)

MD1-0-E-593-01-10302

Cable Raceway Plan- Installation Details (2/3)

MD1-0-E-593-01-10303

Cable Raceway Plan- Installation Details (3/3)

MD1-0-E-593-01-11001

Cable Raceway Plan - Boiler Area Unit-1 EL.+4,115

MD1-0-E-593-01-11002

Cable Raceway Plan - Boiler Area Unit-1 EL.+7,315

MD1-0-E-593-01-11003

Cable Raceway Plan - Boiler Area Unit-1 EL.+10,365

MD1-0-E-593-01-11004

Cable Raceway Plan - Boiler Area Unit-1 PLATE EL.+12,600

MD1-0-E-593-01-11005

Cable Raceway Plan - Boiler Area Unit-1 EL.+19,787

MD1-0-E-593-01-11006

Cable Raceway Plan - Boiler Area Unit-1 EL.+26,970

MD1-0-E-593-01-11007

Cable Raceway Plan - Boiler Area Unit-1 EL.+32,300

MD1-0-E-593-01-11008

Cable Raceway Plan - Boiler Area Unit-1 EL.+35,600

MD1-0-E-593-01-11009

Cable Raceway Plan - Boiler Area Unit-1 EL.+43,850

MD1-0-E-593-01-11010

Cable Raceway Plan - Boiler Area Unit-1 EL.+46,480

MD1-0-E-593-01-11011

Cable Raceway Plan - Boiler Area Unit-1 EL.+51,572

MD1-0-E-593-01-11012

Cable Raceway Plan - Boiler Area Unit-1 EL.+55,753

MD1-0-E-593-01-12001

Cable Raceway Plan- Turbine BLDG Ground Floor

MD1-0-E-593-01-12002

Cable Raceway Plan- Turbine BLDG Mez. Floor

MD1-0-E-593-01-12003

Cable Raceway Plan- Turbine BLDG Operating Floor

MD1-0-E-593-01-12004

Cable Raceway Plan- Turbine BLDG Lower Roof and Crane Runway

MD1-0-E-593-01-13001

Cable Raceway Plan- Central Control BLDG Ground Floor

MD1-0-E-593-01-13002

Cable Raceway Plan- Central Control BLDG 1st Floor

MD1-0-E-593-01-13003

Cable Raceway Plan- Central Control BLDG 2nd Floor

MD1-0-E-593-01-13004

Cable Raceway Plan- Central Control BLDG 3rd Floor

MD1-0-E-593-01-13005

Cable Raceway Plan- Central Control BLDG Roof Floor

MD1-0-E-593-01-13101

Cable Raceway Support Plan - Central Control BLDG Ground Floor

MD1-0-E-593-01-13102

Cable Raceway Support Plan - Central Control BLDG First Floor

MD1-0-E-593-01-13103

Cable Raceway Support Plan - Central Control BLDG Second Floor

MD1-0-E-593-01-13104

Cable Raceway Support Plan - Central Control BLDG Third Floor

MD1-0-E-593-01-19300

Cable raceway plan overall index plan

MD1-0-E-593-01-19301

Cable raceway plan pipe rack area (1)

MD1-0-E-593-01-19302

Cable raceway plan pipe rack area (2)

MD1-0-E-593-01-19303

Cable raceway plan pipe rack area (3)

MD1-0-E-593-01-19304

Cable raceway plan pipe rack area (4)

MD1-0-E-593-01-19305

Cable raceway plan pipe rack area (5)

MD1-0-E-593-01-19306

Cable raceway plan pipe sleeper(1)

MD1-0-E-593-01-19307

Cable raceway plan pipe sleeper(2)

MD1-0-E-593-01-19308

Cable raceway plan pipe sleeper(3)

MD1-0-E-593-01-19309

Cable raceway plan pipe sleeper(4)

MD1-0-E-593-01-19310

Cable raceway plan pipe sleeper(5)

MD1-0-E-593-01-19311

Cable raceway plan pipe sleeper(6)

MD1-0-E-593-01-19312

Cable raceway plan pipe sleeper(7)

MD1-0-E-593-01-19313

Cable raceway plan pipe sleeper(8)

MD1-0-E-593-01-19314

Cable raceway plan pipe sleeper(9)

MD1-0-E-593-01-19315

Cable raceway plan pipe sleeper(10)

MD1-0-E-593-01-19316

Cable raceway plan pipe sleeper(11)

MD1-0-E-593-01-19317

Cable raceway plan pipe sleeper(12)

MD1-0-E-593-01-19318

Cable raceway plan pipe sleeper(13)

MD1-0-E-593-01-19319

Cable raceway plan pipe sleeper(14)

MD1-0-E-593-01-19320

Cable raceway plan pipe sleeper(15)

MD1-0-E-593-01-19321

Cable raceway plan pipe sleeper(16)

MD1-0-E-593-01-19322

Cable raceway plan pipe sleeper(17)

MD1-0-E-593-01-19323

Cable raceway plan pipe sleeper(18)

MD1-0-E-593-01-19324

Cable raceway plan pipe sleeper(19)

MD1-0-E-593-01-19325

Cable raceway plan pipe sleeper(20)

MD1-0-E-593-01-19326

Cable raceway plan pipe sleeper(21)

MD1-0-E-593-01-19327

Cable raceway plan pipe sleeper(22)

MD1-0-E-593-01-19328

Cable raceway plan pipe sleeper(23)

MD1-0-E-593-01-19329

Cable raceway plan pipe sleeper(24)

MD1-0-E-593-01-19330

Cable Raceway Plan - Pipe Sleeper(25)

MD1-0-E-593-01-20001

Cable Route Plan- Symbol and Legend

MD1-0-E-593-01-20102

Cable Route Plan- Installation Details (2/3)

MD1-0-E-593-01-20103

Cable Route Plan- Installation Details (3/3)

MD1-0-E-593-01-20201

Main cable Route Plan (1)

MD1-0-E-593-01-20202

Main cable Route Plan (2)

MD1-0-E-593-01-20203

Main cable Route Plan (3)

MD1-0-E-593-01-20204

Main cable Route Plan (4)

MD1-0-E-593-01-20205

Main cable Route Plan Section & Detail

MD1-0-E-593-01-22001

Cable Route Plan - Turbine Bldg Unit 1 Below Ground FL.(1)

MD1-0-E-593-01-22002

Cable Route Plan - Turbine Bldg Unit 1 Below Ground FL.(2)

MD1-0-E-593-01-22003

Cable Route Plan - Turbine Bldg Unit 2 Below Ground FL.(1)

MD1-0-E-593-01-22004

Cable Route Plan - Turbine Bldg Unit 2 Below Ground FL.(2)

MD1-0-E-593-01-23001

Cable route plan - central control bldg ground floor

MD1-0-E-593-01-23002

Cable route plan - central control bldg 1st floor

MD1-0-E-593-01-23003

Cable route plan - central control bldg 2nd floor

MD1-0-E-593-01-23004

Cable route plan - central control bldg 3rd floor

MD1-0-E-593-01-23005

Cable route plan - central control bldg roof

MD1-0-E-593-01-24201

Cable route plan - fuel oil pump house

MD1-0-E-593-01-24401

Cable route plan - fire protection pump house

MD1-0-E-593-01-25501

Cable route plan (building service) - water treatment bldg ground floor

MD1-0-E-593-01-25502

Cable route plan (building service) - water treatment bldg roof

MD1-0-E-593-01-25503

Cable route plan (building service) - waste water pond pump room

MD1-0-E-593-01-26901

Cable Route Plan - Transformer Area(Unit1)

MD1-0-E-593-01-26902

Cable Route Plan - Transformer Area(Unit2)

MD1-0-E-593-01-26905

Cable route plan - station transformer area

MD1-0-E-593-01-28601

Cable Route Plan- Admin. BLDG Ground Floor

MD1-0-E-593-01-28602

Cable Route Plan- Admin. BLDG 1st Floor

MD1-0-E-593-01-28603

Cable Route Plan- Admin. BLDG 2nd Floor

MD1-0-E-593-01-28604

Cable Route Plan- Admin. BLDG 3rd Floor

MD1-0-E-593-01-28605

Cable Route Plan- Admin. BLDG 4th Floor

MD1-0-E-593-01-28606

Cable Route Plan- Admin. BLDG Roof Floor

MD1-0-E-593-01-28901

Cable route plan - common service bldg ground floor

MD1-0-E-593-01-28902

Cable route plan - common service bldg roof

MD1-0-T-030-05-00118

Inspection Test Plan for Earthing & Lightning protection installation

MD1-0-T-030-05-00150

ITP for Cable Raceway Work

MD1-0-T-030-05-00188

Inspection test Plan for Cable Installation

MD1-0-T-030-05-00194

ITP for Electrical Equipment Installation

MD1-0-T-030-05-00220

ITP for Cathodic Protection System

MD1-0-T-055-05-00115

Method Statemnt for Earthing & Lightning Protection

MD1-0-T-055-05-00133

Method statement for Raceway Work

MD1-0-T-055-05-00143

Method Statement for Lighting and Small Power System

MD1-0-T-055-05-00201

Method Statement for Installation of Cathodic Protection

MD1-0-T-055-05-00202

Method Statement for Electrical Panel Board

MD1-0-T-055-05-00203

Method Statement For Cable Installation

MD1-0-T-055-05-00204

Method Statement for Electrical Heat tracing

MD1-0-T-055-05-00210

Method statement for dc_ups

MD1-0-T-055-05-00211

Method Statement for GCB installation

MD1-0-T-060-05-01001

PROCEDURE FOR PERMIT TO WORK DURING COMMISSIONING

MD1-0-V-111-01-00013

Inspection and Test Plan for Generator

MD1-0-V-111-01-00408

Generator Electrical Outline (1/4)

MD1-0-V-111-01-00409

Generator Electrical Outline (2/4)

MD1-0-V-111-01-00410

Generator Electrical Outline (3/4)

MD1-0-V-111-01-00411

Generator Electrical Outline (4/4)

MD1-0-V-111-01-00412

Neutral Tie & Enclosure Assembly

MD1-0-V-111-01-00421

Generator On-Line Monitoring System Arrangement (1/2)

MD1-0-V-111-01-00422

Generator On-Line Monitoring System Arrangement (2/2)

MD1-0-V-111-05-00018

Long term storage instruction for generator

MD1-0-V-111-05-00400

Method Statement for Generator Installation

MD1-0-V-111-05-00431

Test procedure for generator rotor balancing

MD1-0-V-111-05-00432

Test procedure for generator rotor assembly

MD1-0-V-111-05-00433

Test Procedure for Generator Running Behavior

MD1-0-V-111-06-00850

Calculation and Specification of Neutral Grounding Transformer for STG

MD1-0-V-111-07-00758

AC/DC Bus Duct Sizing Calculation Report

MD1-0-V-111-08-00718

Excitation system external i/o list

MD1-0-V-111-09-00400

Generator Reactive Capability Curve

MD1-0-V-111-09-00401

Estimated Vee Curves

MD1-0-V-111-09-00402

Estimated Saturation and Synchronous Impedance Curve

MD1-0-V-111-09-00403

Estimated Generator Loss Curve

MD1-0-V-111-09-00404

Estimated Three-Phase Short Circuit Decrement Curve

MD1-0-V-111-09-00405

Estimated Line-Line Short Circuit Decrement Curve

MD1-0-V-111-09-00406

Generator Design Data For Station Service

MD1-0-V-111-09-00754

Excitation recommended parameter for generator protection

MD1-0-V-111-10-00766

AVR Room Layout Drawings

MD1-0-V-111-10-00767

AVR Room Layout Drawing (2 of 2)

MD1-0-V-111-10-00768

Excitation transformer outline drawing (1of4)

MD1-0-V-111-10-00769

Excitation transformer outline drawing (2of4)

MD1-0-V-111-10-00770

Excitation transformer outline drawing (3of4)

MD1-0-V-111-10-00771

Excitation transformer outline drawing (4of4)

MD1-0-V-111-11-00751

Ac busduct layout drawings

MD1-0-V-111-11-00752

Dc busduct layout drawings

MD1-0-V-111-11-00759

Excitation system elementary diagram

MD1-0-V-111-11-00850

Schematic Diagrams of NGR & NGTR Panel

MD1-0-V-111-11-00852

Schematic diagrams for generator protection relay panel

MD1-0-V-111-11-00854

Generator Fault Recorder Panel

MD1-0-V-111-32-00400

Emerg. Seal Oil Pump Motor Starter (1/4)

MD1-0-V-111-32-00401

Emerg. Seal Oil Pump Motor Starter (2/4)

MD1-0-V-111-32-00402

Emerg. Seal Oil Pump Motor Starter (3/4)

MD1-0-V-111-32-00403

Emerg. Seal Oil Pump Motor Starter (4/4)

MD1-0-V-111-32-00755

Schematic diagram of excitation system

MD1-0-V-111-33-00850

Generator overall protection logic diagram

MD1-0-V-111-35-00422

Stator Winding Diagram

MD1-0-V-111-55-00761

Excitation Transformer Calculation Report

MD1-0-V-111-57-00407

Shaft Grounding Brush Rigging Assembly

MD1-0-V-111-57-00750

AC/DC Busduct Miscellaneous Drawings

MD1-0-V-113-08-00047

Condenser - Electrical Load List

MD1-0-V-113-10-00063

Steam surface condenser - cathodic protection system

MD1-0-V-113-32-00027

Schematic Diagram of Cathodic Protection System

MD1-0-V-113-35-00028

Wiring Diagram of Cathodic Protection System

MD1-0-V-113-35-00029

Connection Diagram of Cathodic Protection System

MD1-0-V-113-55-00026

Design Analysis for Cathodic Protection System

MD1-0-V-121-01-00004

Motor sectional drawing for boiler feed pump and booster pump

MD1-0-V-121-02-00002

Motor Characteristic Curves for BFP & BFBP

MD1-0-V-121-05-00008

Motor Shop Inspection and Test Plan BFP & BFBP

MD1-0-V-121-05-00009

Shop Inspection and Test Procedure for Motor of BFBP & BFP

MD1-0-V-121-09-00002

Motor Datasheet for BFP & BFBP

MD1-0-V-121-10-00001

Motor Outline Drawing (for BFP & BFBP)

MD1-0-V-121-11-00012

Motor Main Terminal Box Drawing for BFP & BFBP

MD1-0-V-121-11-00014

Motor Acc'y Terminal Box Drawing for BFP & BFBP

MD1-0-V-121-11-00015

Motor Acc'y Terminal Box Wiring Diagram for BFP & BFBP

MD1-0-V-121-11-00016

Motor Space Heater Terminal Box Drawing for BFP & BFBP

MD1-0-V-121-11-00018

Mortor Name Plate Drawing for BFP & BFBP

MD1-0-V-121-11-00019

Mortor Leakage Detector Drawing for BFP & BFBP

MD1-0-V-122-01-00003

Motor Sectional Drawing for Condenstat Extraction pump

MD1-0-V-122-02-00002

Motor Characteristic Curve for Condenstate Extraction Pump

MD1-0-V-122-05-00008

MOTOR SHOP INSPECTION AND TEST PLAN FOR CONDENSATE EXTRACTION PUMP

MD1-0-V-122-05-00009

Motor Shop Inspection and Test Procedure for Condensate Extraction

MD1-0-V-122-05-00010

Motor painting procedure for condensate extraction pump

MD1-0-V-122-09-00002

Motor Data Sheet for Condensate Extraction Pump

MD1-0-V-122-10-00001

Motor Outline Drawing for Condenstate Extraction Pump

MD1-0-V-122-11-00004

Motor Name Plate for Condenstate Extraction Pump

MD1-0-V-122-11-00006

Motor Main Terminal Box Drawing for Condensate Extraction Pump

MD1-0-V-122-11-00007

Motor Ass'y Terminal Box Drawing for Condensate Extraction Pump

MD1-0-V-122-11-00008

Motor Space Heater Terminal Box Drawing for Condensate Extraction Pump

MD1-0-V-122-11-00009

Motor Neutral Terminal Box Drawing for Condensate Extraction Pump

MD1-0-V-122-35-00001

Motor Ass'y T/Box Wiring Diagram DWG for Condensate Extraction Pump

MD1-0-V-123-09-00008

Condenser Vacuum Pump- Motor Data Sheet

MD1-0-V-123-09-00009

Condenser Vacuum Pump- Recir Pump & Motor Data Sheet

MD1-0-V-131-01-00005

Motor sectional drawings

MD1-0-V-131-02-00002

Inspection and test plan for motor

MD1-0-V-131-08-00021

Electrical Load Lists for Circulating Water Pump

MD1-0-V-131-08-00026

Utility consumption list

MD1-0-V-131-08-00027

Lubrication list for motor

MD1-0-V-131-08-00028

Auxiliary power consumption list

MD1-0-V-131-09-00006

Motor data sheets and curves

MD1-0-V-131-10-00003

Outline and dimensional drawing of motors and motor terminal box

MD1-0-V-131-10-00006

Outline and dimensional drawing of motor main terminal box

MD1-0-V-131-10-00007

Outline and dimensional drawing of motor neutral terminal box

MD1-0-V-131-10-00008

Outline and dimensional drawing of motor heater terminal box

MD1-0-V-131-11-00005

Current Transformer Drawing

MD1-0-V-131-11-00007

Name plate drawing for motor

MD1-0-V-131-11-00009

Arrangement drawing for the electrical cathodic protection system

MD1-0-V-131-11-00010

Wiring diagram for the electrical cathodic protection system

MD1-0-V-131-11-00011

Mechanical drawing for the electrical cathodic protection system

MD1-0-V-131-11-00012

Control panel drawing for the electrical cathodic protection system

MD1-0-V-131-11-00013

Distribution panel drawing for the electrical cathodic protection system

MD1-0-V-131-35-00001

Wiring diagrmas for circulating water pumps

MD1-0-V-131-35-00002

Wiring diagram for motor

MD1-0-V-132-01-00056

Sea water intake facility - electrical panel layout

MD1-0-V-132-10-00017

Sea water intake facility - stop log cathodic protection

MD1-0-V-132-31-00055

Sea Water Intake Facility - Single Line Diagram

MD1-0-V-132-35-00054

Sea Water Intake Facility - Electrical Wired Diagram

MD1-0-V-133-02-00015

Motor Data Sheet & Curve With Drawing

MD1-0-V-133-08-00014

Electrical load list

MD1-0-V-133-11-00041

Water Box Vacuum Pump Earthing Drawing

MD1-0-V-134-08-00018

Electrical load list for control panel (condenser tube cleaning system)

MD1-0-V-134-09-00013

Motor & characteristic curves & electrical equipment data sheet for ctcs

MD1-0-V-134-09-00053

Technical data sheet & drawings for cathodic protection (ctcs & df)

MD1-0-V-135-09-00007

Electrical equipment data sheet - df

MD1-0-V-142-73-00001

Motor data & drawing for service water pump

MD1-0-V-142-73-10001

Motor data & drawing for closed cooling water pump

MD1-0-V-142-73-20001

Motor data & drawing for demi. water transfer pump

MD1-0-V-142-73-30001

Motor data & drawing for condensate make-up pump

MD1-0-V-142-73-40001

Motor data & drawing for auxiliary cooling water booster pump

MD1-0-V-142-73-50001

Motor data & drawing for steam coil air heater drain pump

MD1-0-V-142-73-60001

Motor data & drawing for diesel oil drain pump

MD1-0-V-142-73-70001

Motor data & drawing for deaerator recirculation pump

MD1-0-V-142-73-80001

Motor data & drawing for dirty oil transfer pump

MD1-0-V-142-73-90001

Motor data & drawing for dirty oil drain pump

MD1-0-V-151-08-00024

Air Compressor - Electrical Load Lists

MD1-0-V-151-09-00016

Air Compressor - Motor Data Sheet

MD1-0-V-151-10-00005

AIR COMPRESSOR - DIMENSION DRAWING FOR STARTER PANEL

MD1-0-V-151-35-00011

AIR COMPRESSOR - WIRING DIAGRAM FOR AIR COMPRESSOR

MD1-0-V-151-35-00013

AIR COMPRESSOR - WIRING DIAGRAM FOR STATER PANEL

MD1-0-V-151-35-00035

AIR COMPRESSOR - WIRING DIAGRAM FOR COMMON CONTROL PANEL

MD1-0-V-161-09-00003

MV MOTOR DATA SHEET AND CURVE

MD1-0-V-161-09-00004

MD1 LV MOTOR DATA SHEET

MD1-0-V-161-73-07901

Electrical Location Plan Drawing Index

MD1-0-V-161-73-07903

Electrical Location Plan at EL. 12115

MD1-0-V-161-73-07904

Electrical Location Plan at EL. 15315 THR EL. 15700

MD1-0-V-161-73-07905

Electrical Location Plan at EL. 18365 THR EL. 19700

MD1-0-V-161-73-07907

Electrical Location Plan at EL. 27787 THR EL. 28800

MD1-0-V-161-73-07908

Electrical Location Plan at EL. 32060 THR EL. 34970 Key Level

MD1-0-V-161-73-07909

Electrical Location Plan at EL 37600

MD1-0-V-161-73-07910

Electrical Location Plan at EL 40300

MD1-0-V-161-73-07911

Electrical Location Plan at EL 43600 THR EL 43890

MD1-0-V-161-73-07912

Electrical Location Plan at EL 46700

MD1-0-V-161-73-07914

Electrical Location Plan at EL 51850 Key Level

MD1-0-V-161-73-07915

Electrical Location Plan at EL 54005 THR EL 56515

MD1-0-V-161-73-07917

Electrical Location Plan at EL 58400 THR EL59572

MD1-0-V-161-73-07918

Electrical Location Plan at EL 61213 THR EL 62703

MD1-0-V-162-01-00002

Esp cabinets arrangement diagram

MD1-0-V-162-03-00003

Characteristics of Rectifier & Thyrister

MD1-0-V-162-06-00003

System Calculation for within Supplier's Scope of Supply(Illumination Calculati)

MD1-0-V-162-08-00009

Electrical Load Lists

MD1-0-V-162-08-00010

Electrical heat loss list

MD1-0-V-162-11-00008

Details of Key Interlock

MD1-0-V-162-11-00018

Cable Trench Arrangement Drawing

MD1-0-V-162-31-00001

Single Line Diagram

MD1-0-V-163-09-00006

Motor Data

MD1-0-V-163-09-00007

Motor Terminal Box Drawing

MD1-0-V-167-05-00002

Fuel oil pump inspection & test procedure for motor

MD1-0-V-167-09-00003

Motor Data Sheet

MD1-0-V-167-09-00004

Motor Performance Curve

MD1-0-V-167-09-00005

Lcp tech. data & dwg

MD1-0-V-167-10-00002

Motor Outline Drawing & Terminal Box Drawing

MD1-0-V-171-01-02005

Equipment List for Coal Handling System

MD1-0-V-171-01-02012

Cabling, earthing & lightning protection layout tt-06

MD1-0-V-171-01-02013

Cabling, earthing & lightning protection layout tt-05

MD1-0-V-171-01-02014

CABLING, EARTHING & LIGHTNING PROTECTION LAYOUT TT-04

MD1-0-V-171-01-02015

Cabling, earthing & lightning protection layout tt-03

MD1-0-V-171-01-02016

Cabling, earthing & lightning protection layout tt-02

MD1-0-V-171-01-02018

CABLING, EARTHING & LIGHTNING PROTECTION LAYOUT BC-6A/B

MD1-0-V-171-01-02019

CABLING, EARTHING & LIGHTNING PROTECTION LAYOUT OF BCN-5A/5B

MD1-0-V-171-01-02020

CABLING, EARTHING & LIGHTNING PROTECTION LAYOUT OF BCN-3A/3B

MD1-0-V-171-01-02021

CABLING, EARTHING & LIGHTNING PROTECTION LAYOUT OF BCN-2A/2B

MD1-0-V-171-01-02022

CABLING, EARTHING & LIGHTNING PROTECTION LAYOUT BC-1A/B

MD1-0-V-171-01-02027

Illumination layout for transfer tower no.tt-06 for chs

MD1-0-V-171-01-02028

Illumination layout for transfer tower no.tt-05 for chs

MD1-0-V-171-01-02029

Illumination layout for transfer tower no.tt-04 for chs

MD1-0-V-171-01-02030

Illumination layout for transfer tower no.tt-03 for chs

MD1-0-V-171-01-02031

llumination layout for transfer tower no.tt-02 for chs

MD1-0-V-171-01-02032

Illumination layout for transfer tower no.tt-01 for chs

MD1-0-V-171-01-02033

Illumination layout for transfer conveyor no.bc-06a/b for chs

MD1-0-V-171-01-02034

Illumination layout for transfer conveyor no.bc-05a/b for chs

MD1-0-V-171-01-02035

Illumination layout for transfer conveyor no.bc-03a/b for chs

MD1-0-V-171-06-02003

Transformer sizing calculation for chs

MD1-0-V-171-08-02006

Equipment List for Coal Handling System

MD1-0-V-171-08-02007

Power cable schedule for chs

MD1-0-V-171-08-02063

Peak Power Demand for CHS

MD1-0-V-171-09-02211

Power Cable Data Sheet(CHS)

MD1-0-V-171-09-02218

GA & BOM for LPBS(CHS)

MD1-0-V-171-09-02226

GA of Lighting Junction Box(CHS)

MD1-0-V-171-11-02201

Ga & data sheet for 10kv motors for chs

MD1-0-V-171-31-02004

Single line diagram for chs

MD1-0-V-172-01-02004

Electrical equipment layout for lhs electrical & control building

MD1-0-V-172-01-02014

Cabling, earthing & lightning protection layout for lt-04

MD1-0-V-172-01-02017

Cabling, earthing & lightning protection layout for belt conveyor l-01

MD1-0-V-172-01-02018

Cabling, earthing & lightning protection layout for belt conveyor l-02

MD1-0-V-172-01-02019

Cabling, earthing & lightning protection layout for belt conveyor l-03

MD1-0-V-172-01-02020

Cabling, earthing & lightning protection layout for belt conveyor l-04

MD1-0-V-172-01-02021

Cabling, earthing & lightning protection layout for belt conveyor l-05

MD1-0-V-172-01-02029

Illumination layout for transfer tower lt-01 for lhs

MD1-0-V-172-01-02030

Illumination layout for transfer tower lt-02 for lhs

MD1-0-V-172-01-02031

Illumination layout for transfer tower lt-03 for lhs

MD1-0-V-172-01-02032

Illumination layout for transfer tower lt-04 for lhs

MD1-0-V-172-01-02035

Illumination layout for transfer conveyor no. bc l-01a/b for lhs

MD1-0-V-172-01-02036

Illumination layout for transfer conveyor no. bc l-02 for lhs

MD1-0-V-172-01-02037

Illumination layout for transfer conveyor no. bc l-03 for lhs

MD1-0-V-172-01-02038

Illumination layout for transfer conveyor no. bc l-04 for lhs

MD1-0-V-172-01-02039

Illumination layout for transfer conveyotno.bc l-05 for lhs

MD1-0-V-172-06-02002

Transformer Sizing Calculation for LHS

MD1-0-V-172-06-02008

Cable Sizing Calculation for LHS

MD1-0-V-172-08-02001

Electrical Load List for LHS

MD1-0-V-172-08-02005

Equipment List for Limestone Handling System

MD1-0-V-172-08-02006

Power cable schedule for lhs

MD1-0-V-172-08-02062

Peak power demand for lhs

MD1-0-V-172-11-02224

GA of Lighting junction Box(LHS)

MD1-0-V-172-31-02003

Single line diagram for limestone handling system

MD1-0-V-173-01-02543

Fly Ash Silo Earthing Layout

MD1-0-V-173-01-02551

ESP Control Building UNIT-1 & 2 ASH Handling System Electrical Equipment Layout

MD1-0-V-173-06-02513

Transformer sizing calculation for 400v return water mcc

MD1-0-V-173-06-02519

Transformer sizing calculation for 400v ash slurry - fa silo pmcc

MD1-0-V-173-32-02501

Key sld for ahs power distribution scheme

MD1-0-V-182-01-10001

General arrangement for emergency diesel generator

MD1-0-V-182-08-31001

Electric Load List for Emergency Diesel Generator

MD1-0-V-182-09-00102

Emergency Diesel Generator Set Generator Data Sheet

MD1-0-V-182-32-30011

Single line diagram (1) for no.1 d/g control panel

MD1-0-V-182-35-30000

Generator Wiring Diagram for Emergency Diesel Generator

MD1-0-V-186-11-00733

Fuel oil storage tank cable support detail

MD1-0-V-186-11-00822

Diesel oil storage tank cable support detail

MD1-0-V-191-01-30001

Electric Construction Drawings for STG Building EOT Crane

MD1-0-V-191-01-30009

Electric Construction Drawings for Boiler Feedwater Pump Crane

MD1-0-V-191-01-30101

Electric Construction Drawings for Chlorination Building Hoist Crane

MD1-0-V-191-01-30107

Electric Construction Drawings for Water Treatment Building Hoist Crane

MD1-0-V-191-01-30117

Electric Construction Drawings for Fire Protection Pump House Hoist Crane

MD1-0-V-191-01-30118

Electric Construction Drawings for Waste Water Area Pump Room Hoist Crane

MD1-0-V-191-01-30119

Electric Construction Drawings for Chlorination Building Vaporizer Hoist Crane

MD1-0-V-191-32-30001

Schematic Diagram for STG Building EOT Crane

MD1-0-V-191-32-30009

Schematic Diagram for Boiler Feedwater Pump EOT Crane

MD1-0-V-191-32-30101

Schematic Diagram for Chlorination Building Hoist Crane

MD1-0-V-191-32-30107

Schematic Diagram for Water Treatment Building Hoist Crane

MD1-0-V-191-32-30117

Schematic Diagram for Fire Protection Pump House Hoist Crane

MD1-0-V-191-32-30118

Schematic Diagram for Waste Water Area Pump Room Hoist Crane

MD1-0-V-191-32-30119

Schematic Diagram for Chlorination Building Vaporizer Hoist Crane

MD1-0-V-360-10-00550

LIGHTNING PROTECTION SYSTEM AND GROUNDING - GENERAL ARRANGEMENT

MD1-0-V-360-11-00551

LIGHTING PROTECTION SYSTEM AND GROUNDING - DETAILS

MD1-0-V-500-05-00001

Technical data for mv/lv swgr, mv/lv transformer

MD1-0-V-500-05-10001

Technical data for mcc

MD1-0-V-505-01-00102

Legend for Definite Dimension Drawing for Station Transformer

MD1-0-V-505-01-00103

Definite Demension Drawing for Station Trnasformer

MD1-0-V-505-01-00201

Preliminary Dimensional Outline Drawing for Unit Auxiliary Transformer

MD1-0-V-505-01-00202

LEGEND FOR DEFINITE DIMENSION DRAWING FOR UNIT AUXILIARY TRANSFORMER

MD1-0-V-505-01-00203

DEFINITE DIMENSION DRAWING FOR UNIT AUXILIARY TRANSFORMER

MD1-0-V-505-01-00205

PART LIST OF LV1,2 NEUTRAL CABLE JUNCTION BOX FOR UNIT AUXILIARY TRANSFORMER

MD1-0-V-505-02-00001

Technical Specification for Generator Transformer

MD1-0-V-505-02-00101

Tech. Spec. for Station Transformer

MD1-0-V-505-05-00001

Factory Acceptance Test and Inspection Plan for Generator Transformer

MD1-0-V-505-05-00004

Cleaning, Coating and Painting Procedures for Generator Transformer

MD1-0-V-505-05-00005

Welding Procedure Specification for Generator Transformer

MD1-0-V-505-05-00006

Quality Assurance Program Manual for Generator Transformer

MD1-0-V-505-05-00007

Factory acceptance test and inspection procedure for generator transformer

MD1-0-V-505-05-00101

FACTORY ACCEPTANCE TEST AND INSPECTION PLAN FOR STATION TRANSFORMER

MD1-0-V-505-05-00103

Instruction and maintenance manual for station transformer

MD1-0-V-505-05-00104

Cleaning Coating and Painting Procedures for Station Transformer

MD1-0-V-505-05-00105

Welding Procedure Spec. For Station Transformer

MD1-0-V-505-05-00106

Quality assurance program manual for station transformer

MD1-0-V-505-05-00201

FACTORY ACCEPTANCE TEST AND INSPECTION PLAN FOR UNIT AUXILIARY TRANSFORMER

MD1-0-V-505-05-00203

Instruction and maintenance manual for unit auxiliary transformer

MD1-0-V-505-05-50001

Shop Test and Inspection Procedure for Auxiliary(10/0.42kV) Transformer

MD1-0-V-505-07-00002

Bct overexcitation characteristic curves for generator transformer

MD1-0-V-505-07-00003

Loading Curve with Site Ambient Temperatures for Generator Transformer

MD1-0-V-505-07-00102

BCT Overexitaion Characteristic Curves for Station Transformer

MD1-0-V-505-07-00103

Loading Curve with Site Ambient Temperatures for Station Transformer

MD1-0-V-505-07-00111

Factory acceptance test and inspection report for station transformer

MD1-0-V-505-07-00202

BTC Overexcitation Characteristic Curves for Unit Auxiliary Transformer

MD1-0-V-505-08-00112

List of Essential Spare Parts Station Transformer

MD1-0-V-505-08-50001

Shop Test and Inspection Plan for Auxiliary(10/0.42kV) Transformer

MD1-0-V-505-10-00001

Name Plate Drawing for Generator Trnasformer

MD1-0-V-505-10-00002

Bushing Drawings for Generator Transformer

MD1-0-V-505-10-00101

Connection Diagram and Rating Plate for Station Transformer

MD1-0-V-505-10-00102

LV1,2 Cable Junction Box for Station Transformer

MD1-0-V-505-10-00103

Part List of LV1,2 Cable Junction Box for Station Transformer

MD1-0-V-505-10-00104

LV1,2 Neutral Cable Junction Box for Station Transformer

MD1-0-V-505-10-00105

Part List of LV1,2 Neutral Cable Junction Box for Station Transformer

MD1-0-V-505-10-00106

On-Load tap Changer Motor Drive Unit for Station Transformer

MD1-0-V-505-10-00107

Layout of marshalling kiosk for station transformer

MD1-0-V-505-10-00108

Bushing Drawings for Station Transformer

MD1-0-V-505-10-00109

Circuit diagram of marshalling kiosk for station transformer

MD1-0-V-505-10-00204

LV1,2 NEUTRAL CABLE JUNCTION BOX FOR UNIT AUXILIARY TRANSFORMER

MD1-0-V-505-10-00208

Bushing Drawings for Unit Auxiliary Transformer

MD1-0-V-505-11-00001

Detailed Outline Drawing Including Installation Details for Generator Transformr

MD1-0-V-505-11-00002

List of Items to Detailed Outline Drawing for Generator Transformer

MD1-0-V-505-11-00005

Transport Drawing for Generator Transformer

MD1-0-V-505-11-00101

Transport Drawing for Station Transformer

MD1-0-V-505-11-00201

TRANSPORT DRAWING FOR UNIT AUXILIARY TRANSFORMER

MD1-0-V-510-03-00002

Brochure

MD1-0-V-510-05-00012

Generator circuit-breaker system hec 7b : operating manual

MD1-0-V-510-05-00013

Treatment and storage instructions he

MD1-0-V-510-05-00014

Hydraulic spring operating mechanism hmb-4/-8 operation and maintenance

MD1-0-V-510-05-00015

Transport instructions hec 7/8

MD1-0-V-510-07-00007

Painting instruction

MD1-0-V-510-10-00008

Generator circuit breaker outline drawing

MD1-0-V-510-32-00010

Schematic diagram

MD1-0-V-510-36-00011

Name plate drawing

MD1-0-V-510-55-00004

Data sheet

MD1-0-V-510-55-00005

Normal current carrying capability curve

MD1-0-V-515-01-00001

Isolated Phase Busduct Layout & Support Structure Detail(Unit-1&2)

MD1-0-V-515-01-00002

Isolated Phase Busduct - Sub Assembly Drawing

MD1-0-V-515-01-00003

IPB Termination at Generator End

MD1-0-V-515-01-00004

IPB Termination at GCB

MD1-0-V-515-01-00005

IPB Termination at Gen. Transformer

MD1-0-V-515-01-00006

IPB Termination at UAT

MD1-0-V-515-01-00007

IPB Termination at Excitation Transformer end

MD1-0-V-515-01-00008

Pressurization System

MD1-0-V-515-01-00009

Component Drawings

MD1-0-V-515-05-00001

Ipb shop test procedure

MD1-0-V-515-05-00002

Ipb site test procedure

MD1-0-V-515-05-00004

Welding book(wps, wpq, pqr)

MD1-0-V-515-05-00005

Ipb painting procedure for isolated phase busduct

MD1-0-V-515-05-10002

Shop Test and Inspection Procedure for NSPB

MD1-0-V-515-07-00001

Isolated phase busduct co-relation with type tested design

MD1-0-V-515-08-10001

Shop Test and Inspection Plan for NSPB

MD1-0-V-515-09-00001

Technical particulars for isolated phase busduct & accessories

MD1-0-V-515-09-10001

Technical data for non-segregated phase busduct

MD1-0-V-515-55-00001

Design calculations for isolated phase busduct

MD1-0-V-515-55-00002

IPB Support Steel Structure Analysis

MD1-0-V-515-57-00001

Inspection & test plan for isolated phase busduct & accessories

MD1-0-V-520-05-00001

Catalogue and Instruction Manual for MV SWGR Equipements

MD1-0-V-520-05-00002

Shop Test & Inspection Procedure for MV SWGR

MD1-0-V-520-05-00003

Field Test & Inspection Procedure for MV SWGR

MD1-0-V-520-05-00101

Maintenance Recommendations for MV SWGR

MD1-0-V-520-08-00002

Field Test & Inspection Plan for MV SWGR

MD1-0-V-520-08-10001

Shop Test & Inspection Plan for MV SWGR

MD1-0-V-525-01-10001

Arrangement and layout drawing for mcc(for 06blk)

MD1-0-V-525-05-00001

Catalogue and Instruction Manual for LV SWGR and MCC Equipements

MD1-0-V-525-05-00002

Shop Test & Inspection Procedure for LV SWGR

MD1-0-V-525-05-00003

Field Test & Inspection Procedure for LV SWGR

MD1-0-V-525-05-00101

Maintenance Recommendations for LV SWGR and MCC

MD1-0-V-525-05-10002

Shop Test & Inspection Procedure for MCC

MD1-0-V-525-05-10003

Field Test & Inspection Procedure for MCC

MD1-0-V-525-08-00002

Field Test & Inspection Plan for LV SWGR

MD1-0-V-525-08-10002

Field Test & Inspection Plan for MCC

MD1-0-V-525-08-20001

Shop Test & Inspection Plan for LV SWGR

MD1-0-V-525-08-30001

Shop Test & Inspection Plan for MCC

MD1-0-V-525-31-10001

Electrical One-Line and Three-Line Diagram for MCC(for 06BLK)

MD1-0-V-525-32-00001

Complete Schematic Wiring Diagram for LV Switchgears(06BFA, 06BFB, 06BFC, 06BFD,

MD1-0-V-525-32-00002

Complete Schematic Wiring Diagram for LV Switchgears(Others)

MD1-0-V-525-32-10001

Complete Schematic Wiring Diagram for MCC(for 06BLK)

MD1-0-V-530-01-20001

Arrangement and Layout Drawing for Lighting Panel

MD1-0-V-530-05-00001

Catalogue and Instruction Manual for DB

MD1-0-V-530-05-00002

Shop Test & Inspection Procedure for DB

MD1-0-V-530-05-00003

Field Test & Inspection Procedure for DB

MD1-0-V-530-05-00101

Maintenance Recommendations for DB

MD1-0-V-530-08-00001

Shop Test & Inspection Plan for DB

MD1-0-V-530-08-00002

Field Test & Inspection Plan for DB

MD1-0-V-530-31-20001

Electrical Three-line Diagram for Lighting Panel

MD1-0-V-535-05-00012

Inspection and test plan (itp) for dc and ups system

MD1-0-V-535-05-00014

Fat procedure for dc and ups system

MD1-0-V-535-05-00017

Quality manual for dc and ups system

MD1-0-V-535-09-00005

Technical data for 220v dc system - units & common (16btl01 / 16btl02 / 26btl01)

MD1-0-V-535-09-00006

Technical data for 220v dc system - cooling water system (06blt01 / 06blt02)

MD1-0-V-535-11-00001

Layout and single line diagram for 220v dc system - units & common (16btl01 / 1)

MD1-0-V-535-11-00002

Layout and single line diagram for 220v dc systme - units & common (26btl01 / 2)

MD1-0-V-535-11-00003

Layout and single line diagram for 220v dc system - cooling water system (06blt)

MD1-0-V-540-09-00007

Technical data for 230v ups system (16bru01 / 26bru01)

MD1-0-V-540-11-00004

Layout and single line diagram for 230v ups system (16bru01/26bru01)

MD1-0-V-560-03-00001

Equipment Description and Catalogues for Equipment Cathodic Protection

MD1-0-V-560-05-00004

Quality Assurance Manual For Cathodic Protection System

MD1-0-V-560-05-00005

Inspection & Test Plan For Cathodic Protection System

MD1-0-V-560-05-00006

Inspection & Test Procedure for Cathodic Protection System

MD1-0-V-560-06-00001

Design Calculation for Tank Bottom Cathodic Protection System

MD1-0-V-565-02-00001

PD Monitoring System- Technical Specification for Motor Monitoring

MD1-0-V-565-02-00002

PD Monitoring System- Technical Specification for 10KV SWGR Monitoring

MD1-0-V-565-02-00003

PD Monitoring System- Technical Specification for IPB Monitoring

MD1-0-V-565-02-00004

PD Monitoring System- Technical Specification for Transformer

MD1-0-V-565-02-00005

PD Monitoring System Technical Specification for Server Cubicle and Workstation

MD1-0-V-565-05-00001

Pd monitoring system quality assurance program

MD1-0-V-565-05-00002

Pd monitoring system shop inspection and test plan

MD1-0-V-565-05-00003

Pd monitoring system shop inspection and test procedure

MD1-0-V-565-05-00004

Pd monitoring system site inspection and test plan

MD1-0-V-565-05-00005

Pd monitoring system site inspection and test procedure

MD1-0-V-565-05-00006

Pd monitoring system packing procedure

MD1-0-V-565-05-00011

Pd moinitoring system operation manual for motor monitoring

MD1-0-V-565-05-00012

Pd monitoring system operation manual for 10kv swgr monitoring

MD1-0-V-565-05-00013

Pd monitoring system operation manual for ipb monitoring

MD1-0-V-565-05-00014

Pd monitoring system operation manual for transformer monitoring

MD1-0-V-565-32-00002

Pd Monitoring System Schematic Diagram for 10kv SWGR Monitoring

MD1-0-V-565-32-00003

Pd Monitoring System Schematic Diagram for IPB Monitoring

MD1-0-V-565-32-00004

Pd monitoring system schematic diagram for transformer monitoring

MD1-0-V-570-01-00009

500kV & 110kV Switchyard Control Building Cable Raceway

MD1-0-V-570-02-00006

500kv and 110kv switchyard technical specification for telecommunication equipt

MD1-0-V-570-02-00008

500kv and 110kv switchyard technical specification for 48vdc battery and batterr

MD1-0-V-570-05-00071

110KV Switchyard Energizing Procedure

MD1-0-V-570-05-00074

110KV Switchyard Equipment Operation and Maintenance Manual

MD1-0-V-570-05-00075

500KV Switchyard Equipment Operation and Maintenance Manual

MD1-0-V-570-05-00078

500KV and 110KV Switchyard AC/DC System Operation and Maintenance Manual

MD1-0-V-570-06-00009

500kv and 110kv switchyard 48vdc system sizing calculation

MD1-0-V-580-01-00001

Shop test and inspection plan for transformer protection system

MD1-0-V-580-01-00002

Field Test and Inspection Plan for Transformer Protection System

MD1-0-V-580-02-00001

Technical data and information for transformer protection system and tariff metl

MD1-0-V-580-05-00001

Shop test and inspection procedure for transformer protection system

MD1-0-V-580-05-00002

Field Test and Inspection Procedure for Transformer Protection System

MD1-0-V-580-05-00003

Qa manual for transformer protection system

MD1-0-V-580-05-00005

Operation & Maintenace Manual for Transformer Protection and Metering System

MD1-0-V-580-06-00001

Protection Relay Setting Calculation and List for Transformer Protection and Mem

MD1-0-V-580-08-00002

Essential Spare Parts List for Transformer Protection System

MD1-0-V-580-10-00001

Layout & Arrangement Drawing for Transformer Protecion System Protecion System

MD1-0-V-580-31-00001

Single line diagram for transformer protection system

MD1-0-V-580-32-00001

Schematic diagram for transformer protection system(generator tr unit.1 prot. p)

MD1-0-V-580-32-00002

Schematic diagram for transformer protection system(unit aux. tr unit.1 prot. p)

MD1-0-V-580-32-00003

Schematic diagram for transformer protection system(genarator tr unit.2 prot. p)

MD1-0-V-580-32-00004

Schematic diagram for transformer protection system(unit aux. tr unit.2 prot. p)

MD1-0-V-580-32-00005

Schematic diagram for transformer protection system(station tr prot. panel)

MD1-0-V-580-33-00001

Functional logic diagram for transformer protection system

MD1-0-V-585-32-00001

Schematic diagram for tariff meter panel

MD1-0-V-590-02-00001

Earthing & Lighting Protection material Catalogue

MD1-0-V-590-02-50001

Earthing Conductor Specification

MD1-0-V-590-05-00001

Inspection & Test Plan

MD1-0-V-590-05-00002

Inspection & Test Procedure

MD1-0-V-590-05-00003

QA/QC Manual

MD1-0-V-590-05-50001

Earthing Conductor Inspection and Test Plan

MD1-0-V-591-05-00001

Cables inspection & test plan

MD1-0-V-591-05-00002

Cables inspection & test procedure

MD1-0-V-591-05-00003

Cables qa/qc manual

MD1-0-V-591-05-20001

Inspection & Test Procedure for Cable Accessories

MD1-0-V-591-05-20003

Inspection & Test Plan for Cable Accessories

MD1-0-V-592-05-50001

Lighting & accessories inspection and test plan

MD1-0-V-592-05-50002

Lighting & accessories packing procedure

MD1-0-V-592-11-50001

Lighting & accessories outline drawing

MD1-0-V-592-11-50002

Lighting dist. board outline drawing

MD1-0-V-592-11-50003

Lighting dist. board outline Diagram for Admin. Bldg

MD1-0-V-592-11-50004

Lighting DIST. Board Outline Diagram for CCB and MISC. BLDG

MD1-0-V-593-05-00001

Cable Tray, Inspection and Test Plan

MD1-0-V-593-05-00002

Cable Tray, Inspection and Test Procedure

MD1-0-V-593-05-00003

Cable Tray, Quality Control Plan (QM Manual)

MD1-0-V-593-05-50001

Conduit & Accessories Inspection and Test Plan

MD1-0-V-593-11-00001

Cable Tray, Outline Drawing

MD1-0-V-593-11-50001

Conduit & Accessories Outline Drawing

MD1-0-V-751-02-00204

Motor Data Sheet & Drawing for Electric Fire Water Pump

MD1-0-V-751-02-00304

Motor Data sheet & Drawing for Jockey Pump

MD1-0-V-751-07-00405

Controller Functional Test Record for Diesel Fire Pump

MD1-0-V-751-07-00413

Motor Test Report for Electric Fire Pump

MD1-0-V-751-07-00414

Controller Functional Test Record for Electric Fire Pump

MD1-0-V-805-01-00100

Cable Tray Conduit Arrangement for WT & WWT System

MD1-0-V-805-01-02001

General arrangement of electrical equipment for wt&wwt

MD1-0-V-805-08-00007

Electrical Load List for WT & WWT System

MD1-0-V-805-08-00030

Electrical equipment list for wt & wwt

MD1-0-V-805-09-00003

Cable schedule for wt&wwt

MD1-0-V-805-09-00044

Equipment List

MD1-0-V-805-09-00051

Motor Data Sheet

MD1-0-V-805-31-00001

Single Line Diagram for WT & WWT

MD1-0-V-850-31-00001

Single line diagram for chemical dosing system

MD1-0-V-850-32-00001

Schematic diagram for chemical dosing system

MD1-0-V-860-01-00004

Cabling, tray and tray support for gaseous chlorination system

MD1-0-V-860-08-00015

Wiring and cabling Requirement for Gaseous Chlorination System

MD1-0-V-860-11-00002

Motor control center(mcc) outline drawing for gaseous chlorination system

MD1-0-V-860-11-00003

Local control panel outline drawing for gaseous chlorination system

MD1-0-V-860-31-00001

Single Line diagram for Gasous Chlorination System

MD1-0-V-870-08-00007

Electrical load list for sewage treatment system

MD1-0-V-870-09-00001

Electrical Equipment and System Design Specification and Data Sheet for Sewage m

MD1-0-V-870-31-00001

Single line diagram for sewage treatment system

MD1-1-E-500-31-00011

Single Line Diagr.- Gen. Main & Aux. Transformer Relay & Meter (U.1)

MD1-1-E-505-33-00001

Elec. Logic Diagram- Generator Transformer (Unit 1)

MD1-1-E-505-33-00002

Elec. Logic Diagram- Unit Aux. Transformer (Unit 1)

MD1-1-E-520-31-00101

Single Line Diagram- 10KV Unit Switchgear 16BBA (1/2)

MD1-1-E-520-31-00102

Single Line Diagram- 10KV Unit Switchgear 16BBA (2/2)

MD1-1-E-520-31-00201

Single Line Diagram- 10KV Unit Switchgear 16BBB (1/2)

MD1-1-E-520-31-00202

Single Line Diagram- 10KV Unit Switchgear 16BBB (2/2)

MD1-1-E-525-31-00001

Single Line Diagram- 400V Unit Switchgear 16BFA/16BFB

MD1-1-E-525-31-00101

Single Line Diagram-400V Boilder #1 MCC-1 16BJA

MD1-1-E-525-31-00201

Single Line Diagram-400V Boilder #1 MCC-2 16BJB

MD1-1-E-525-31-00301

Single Line Diagram-400V Boilder #2 MCC-1 16BJC

MD1-1-E-525-31-00401

Single Line Diagram-400V Boilder #2 MCC-2 16BJD

MD1-1-E-525-31-00501

Single Line Diagram- 400V STG #1 MCC-1 16BJE

MD1-1-E-525-31-00601

Single Line Diagram- 400V STG #1 MCC-2 16BJF

MD1-1-E-593-01-21001

Cable Route Plan Boiler Area Unit 1A El.+0.0m

MD1-1-E-593-01-21002

Cable Route Plan Boiler Area Unit 1B El.+0.0m

MD1-1-V-173-06-02511

Transformer sizing calculation for 400v fa/ba pmcc u#1

MD1-2-E-500-31-00011

Single Line Diagr.- Gen. Main & Aux. Transformer Relay & Meter (U.2)

MD1-2-E-505-33-00001

Elec. Logic Diagram- Generator Transformer (Unit 2)

MD1-2-E-505-33-00002

Elec. Logic Diagram- Unit Aux. Transformer (Unit 2)

MD1-2-E-520-31-00101

Single Line Diagram- 10KV Unit Switchgear 26BBA (1/2)

MD1-2-E-520-31-00102

Single Line Diagram- 10KV Unit Switchgear 26BBA (2/2)

MD1-2-E-520-31-00201

Single Line Diagram- 10KV Unit Switchgear 26BBB (1/2)

MD1-2-E-520-31-00202

Single Line Diagram- 10KV Unit Switchgear 26BBB (2/2)

MD1-2-E-525-31-00001

Single Line Diagram- 400V Unit Switchgear 26BFA/26BFB

MD1-2-E-525-31-00101

Single Line Diagram- 400V Boiler #3 MCC-1 26BJA

MD1-2-E-525-31-00201

Single Line Diagram- 400V Boiler #3 MCC-2 26BJB

MD1-2-E-525-31-00301

Single Line Diagram- 400V Boiler #4 MCC-1 26BJC

MD1-2-E-525-31-00401

Single Line Diagram- 400V Boiler #4 MCC-2 26BJD

MD1-2-E-525-31-00501

Single Line Diagram- 400V STG #2 MCC-1 26 BJE

MD1-2-E-525-31-00601

Single Line Diagram- 400V Boiler #2 MCC-2 26BJF

MD1-2-E-593-01-21001

Cable Route Plan Boiler Area Unit 2A El.+0.0m

MD1-2-E-593-01-21002

Cable Route Plan Boiler Area Unit 2B El.+0.0m

MD1-2-V-173-06-02512

Transformer sizing calculation for 400v fa/ba pmcc u#2

status
A

MARK

31/10/12

MARK

01/07/13

MARK

01/07/13

MARK

01/07/13

MARK

01/07/13

MARK

14/11/12

AC

MARK

07/11/12

AC

MARK

07/11/12

IC

MARK

17/09/12

IC

MARK

24/10/12

10

MARK

22/03/12

11

MARK

30/01/13

12

MARK

17/07/12

13

MARK

23/08/12

14

MARK

22/05/12

15

MARK

01/03/13

16

MARK

29/05/13

17

MARK

14/09/12

18

MARK

14/09/12

19

MARK

23/08/12

20

MARK

23/08/12

21

MARK

23/08/12

22

MARK

23/08/12

23

MARK

23/08/12

24

MARK

23/08/12

25

MARK

23/08/12

26

MARK

23/08/12

27

MARK

23/08/12

28

MARK

23/08/12

29

MARK

23/08/12

30

MARK

25/10/12

31

MARK

25/10/12

32

MARK

25/10/12

33

MARK

25/10/12

34

MARK

25/10/12

35

MARK

25/10/12

36

MARK

08/03/13

37

MARK

08/03/13

38

MARK

08/03/13

39

AC

MARK

14/11/12

40

MARK

08/03/13

41

MARK

08/03/13

42

MARK

08/03/13

43

MARK

08/03/13

44

MARK

08/03/13

45

MARK

08/03/13

46

MARK

08/03/13

47

MARK

08/03/13

48

MARK

08/03/13

49

MARK

08/03/13

50

MARK

08/03/13

51

MARK

08/03/13

52

MARK

08/03/13

53

MARK

08/03/13

54

MARK

08/03/13

55

MARK

13/09/12

56

MARK

13/09/12

57

MARK

13/09/12

58

MARK

01/03/13

59

MARK

07/05/13

60

MARK

07/05/13

61

MARK

07/05/13

62

MARK

08/01/13

63

MARK

31/07/12

64

MARK

30/01/13

65

MARK

22/11/12

66

MARK

22/11/12

67

MARK

31/07/12

68

IC

MARK

26/07/13

69

IC

MARK

26/07/13

70

MARK

02/04/13

71

MARK

02/04/13

72

MARK

02/04/13

73

MARK

02/04/13

74

MARK

02/04/13

75

MARK

02/04/13

76

MARK

02/04/13

77

MARK

02/04/13

78

MARK

14/05/13

79

MARK

14/05/13

80

MARK

02/04/13

81

MARK

16/04/13

82

MARK

14/05/13

83

MARK

08/05/13

84

MARK

08/05/13

85

MARK

16/04/13

86

MARK

21/06/13

87

MARK

04/10/12

88

MARK

04/10/12

89

MARK

23/04/13

90

MARK

23/04/13

91

MARK

23/04/13

92

MARK

23/04/13

93

MARK

10/04/13

94

MARK

10/04/13

95

MARK

10/04/13

96

MARK

10/04/13

97

MARK

14/05/13

98

IC

MARK

26/07/13

99

MARK

11/06/13

100

MARK

11/06/13

101

MARK

10/05/13

102

MARK

10/05/13

103

MARK

11/06/13

104

MARK

11/06/13

105

MARK

11/06/13

106

MARK

11/06/13

107

MARK

11/06/13

108

MARK

11/06/13

109

MARK

26/07/13

110

MARK

26/07/13

111

MARK

26/07/13

112

MARK

26/07/13

113

MARK

26/04/13

114

MARK

29/01/13

115

MARK

01/03/13

116

MARK

30/01/13

117

MARK

30/01/13

118

MARK

30/01/13

119

MARK

30/01/13

120

MARK

30/01/13

121

MARK

30/01/13

122

MARK

01/03/13

123

MARK

01/03/13

124

MARK

26/04/13

125

MARK

25/04/12

126

MARK

22/08/12

127

MARK

01/07/13

128

MARK

16/04/13

129

MARK

26/07/13

130

MARK

26/07/13

131

MARK

31/01/13

132

MARK

31/01/13

133

MARK

31/01/13

134

MARK

31/01/13

135

MARK

31/01/13

136

MARK

31/01/13

137

MARK

19/12/12

138

MARK

19/12/12

139

MARK

19/12/12

140

MARK

19/12/12

141

MARK

19/12/12

142

MARK

19/12/12

143

MARK

19/12/12

144

MARK

19/12/12

145

MARK

26/12/12

146

MARK

26/12/12

147

MARK

26/12/12

148

MARK

26/12/12

149

MARK

26/12/12

150

MARK

26/12/12

151

MARK

26/12/12

152

MARK

26/12/12

153

MARK

26/12/12

154

MARK

26/12/12

155

MARK

26/07/13

156

MARK

08/03/13

157

MARK

01/03/13

158

IC

MARK

26/07/13

159

IC

MARK

26/07/13

160

IC

MARK

26/07/13

161

IC

MARK

26/07/13

162

MARK

14/05/13

163

MARK

14/05/13

164

MARK

04/06/13

165

MARK

10/07/13

166

MARK

29/05/13

167

MARK

29/05/13

168

MARK

11/06/13

169

MARK

26/07/13

170

MARK

26/07/13

171

MARK

08/03/13

172

MARK

20/02/13

173

MARK

20/02/13

174

MARK

11/12/12

175

MARK

11/12/12

176

MARK

25/03/13

177

MARK

25/03/13

178

MARK

21/06/13

179

MARK

25/06/13

180

MARK

25/06/13

181

MARK

30/05/13

182

MARK

08/05/13

183

MARK

08/05/13

184

MARK

19/12/12

185

MARK

19/12/12

186

MARK

19/12/12

187

MARK

19/12/12

188

MARK

19/12/12

189

MARK

19/12/12

190

MARK

19/12/12

191

MARK

19/12/12

192

MARK

19/12/12

193

MARK

19/12/12

194

MARK

28/03/13

195

MARK

28/03/13

196

MARK

14/03/13

197

MARK

14/03/13

198

MARK

19/12/12

199

MARK

26/12/12

200

MARK

26/12/12

201

MARK

03/01/13

202

MARK

04/06/13

203

MARK

26/07/13

204

MARK

14/05/13

205

MARK

10/07/13

206

MARK

29/05/13

207

MARK

26/07/13

208

MARK

25/03/13

209

MARK

21/06/13

210

MARK

04/06/13

211

MARK

08/05/13

212

MARK

14/05/13

213

MARK

30/05/13

214

MARK

28/03/13

215

MARK

14/03/13

216

MARK

19/12/12

217

MARK

26/12/12

218

MARK

04/06/13

219

MARK

08/03/13

220

MARK

01/03/13

221

MARK

26/07/13

222

MARK

14/05/13

223

MARK

04/06/13

224

MARK

10/07/13

225

MARK

29/05/13

226

MARK

11/06/13

227

MARK

26/07/13

228

MARK

19/12/12

229

MARK

25/03/13

230

MARK

21/06/13

231

MARK

04/06/13

232

MARK

14/05/13

233

MARK

30/05/13

234

MARK

08/05/13

235

MARK

11/12/12

236

MARK

28/03/13

237

MARK

14/03/13

238

MARK

01/07/13

239

MARK

03/06/13

240

MARK

22/08/12

241

MARK

03/05/12

242

MARK

03/06/13

243

MARK

03/06/13

244

MARK

03/06/13

245

MARK

03/06/13

246

MARK

03/06/13

247

MARK

18/06/13

248

MARK

18/06/13

249

MARK

18/06/13

250

MARK

18/06/13

251

MARK

18/06/13

252

MARK

18/06/13

253

MARK

18/06/13

254

MARK

18/06/13

255

MARK

18/06/13

256

MARK

18/06/13

257

MARK

18/06/13

258

MARK

18/06/13

259

IC

MARK

14/05/13

260

IC

MARK

14/05/13

261

MARK

14/05/13

262

IC

MARK

17/09/12

263

MARK

10/05/13

264

MARK

10/05/13

265

MARK

10/05/13

266

MARK

10/05/13

267

MARK

10/05/13

268

MARK

10/05/13

269

MARK

10/05/13

270

MARK

10/05/13

271

MARK

10/05/13

272

MARK

26/04/13

273

MARK

08/03/13

274

MARK

08/03/13

275

MARK

08/03/13

276

MARK

08/03/13

277

MARK

08/03/13

278

MARK

26/04/13

279

MARK

26/04/13

280

MARK

26/04/13

281

MARK

26/04/13

282

MARK

26/04/13

283

MARK

26/07/13

284

MARK

26/04/13

285

MARK

26/04/13

286

MARK

26/04/13

287

MARK

26/04/13

288

MARK

26/04/13

289

MARK

26/04/13

290

MARK

26/04/13

291

MARK

26/04/13

292

MARK

26/04/13

293

MARK

26/04/13

294

MARK

26/04/13

295

MARK

26/04/13

296

MARK

26/04/13

297

MARK

26/04/13

298

MARK

26/04/13

299

MARK

26/04/13

300

MARK

26/04/13

301

MARK

26/04/13

302

MARK

26/07/13

303

MARK

03/06/13

304

MARK

11/12/12

305

MARK

11/12/12

306

IC

MARK

11/12/12

307

IC

MARK

11/12/12

308

IC

MARK

11/12/12

309

IC

MARK

11/12/12

310

MARK

11/12/12

311

IC

MARK

18/03/13

312

IC

MARK

18/03/13

313

IC

MARK

18/03/13

314

IC

MARK

18/03/13

315

IC

MARK

26/04/13

316

IC

MARK

26/04/13

317

IC

MARK

26/04/13

318

IC

MARK

26/04/13

319

IC

MARK

26/04/13

320

IC

MARK

27/02/13

321

IC

MARK

27/02/13

322

IC

MARK

26/04/13

323

IC

MARK

26/04/13

324

IC

MARK

26/04/13

325

MARK

04/06/13

326

MARK

04/06/13

327

MARK

02/04/13

328

MARK

27/02/13

329

MARK

27/02/13

330

MARK

27/02/13

331

MARK

27/02/13

332

MARK

26/12/12

333

MARK

26/12/12

334

MARK

01/03/13

335

MARK

01/03/13

336

MARK

13/09/12

337

MARK

26/10/12

338

MARK

11/12/12

339

MARK

22/03/13

340

MARK

26/10/12

341

MARK

11/09/12

342

MARK

05/10/12

343

MARK

23/10/12

344

MARK

23/10/12

345

MARK

28/11/12

346

MARK

27/02/13

347

MARK

27/02/13

348

MARK

08/03/13

349

MARK

26/07/13

350

IC

MARK

25/07/13

351

MARK

04/01/13

352

MARK

25/03/13

353

MARK

25/03/13

354

MARK

25/03/13

355

MARK

25/03/13

356

MARK

24/10/12

357

IC

MARK

10/05/13

358

IC

MARK

10/05/13

359

MARK

23/04/13

360

MARK

31/10/12

361

MARK

22/03/13

362

MARK

22/03/13

363

MARK

26/07/13

364

MARK

31/10/12

365

IC

MARK

04/06/13

366

MARK

16/04/13

367

MARK

06/03/13

368

MARK

06/03/13

369

MARK

06/03/13

370

MARK

06/03/13

371

MARK

06/03/13

372

MARK

06/03/13

373

MARK

06/03/13

374

MARK

26/07/13

375

MARK

31/10/12

376

MARK

19/12/12

377

MARK

18/03/13

378

MARK

18/03/13

379

MARK

18/03/13

380

MARK

18/03/13

381

MARK

18/03/13

382

MARK

18/03/13

383

MARK

18/03/13

384

IC

MARK

18/03/13

385

IC

MARK

02/04/13

386

IC

MARK

26/07/13

387

MARK

28/11/12

388

MARK

28/11/12

389

MARK

28/11/12

390

MARK

28/11/12

391

MARK

18/03/13

392

IC

MARK

02/04/13

393

MARK

22/08/12

394

IC

MARK

11/06/13

395

MARK

26/07/13

396

IC

MARK

11/06/13

397

MARK

11/06/13

398

MARK

23/04/13

399

MARK

27/02/13

400

MARK

27/02/13

401

MARK

27/02/13

402

MARK

27/02/13

403

MARK

26/07/13

404

MARK

26/12/12

405

MARK

29/05/13

406

MARK

19/12/12

407

MARK

26/07/13

408

MARK

26/07/13

409

MARK

26/07/13

410

MARK

26/07/13

411

MARK

26/07/13

412

MARK

26/07/13

413

IC

MARK

26/12/12

414

MARK

26/12/12

415

MARK

29/05/13

416

MARK

07/01/13

417

MARK

26/06/13

418

MARK

26/12/12

419

MARK

23/04/13

420

MARK

29/05/13

421

MARK

29/05/13

422

MARK

29/05/13

423

MARK

10/04/13

424

MARK

10/04/13

425

MARK

10/04/13

426

MARK

10/04/13

427

MARK

10/04/13

428

MARK

18/03/13

429

MARK

18/03/13

430

IC

MARK

28/02/13

431

MARK

10/07/13

432

MARK

26/07/13

433

MARK

27/02/13

434

MARK

27/02/13

435

MARK

27/02/13

436

AC

MARK

28/02/13

437

MARK

28/02/13

438

MARK

28/02/13

439

MARK

28/02/13

440

MARK

28/02/13

441

MARK

26/07/13

442

IC

MARK

26/02/13

443

IC

MARK

23/04/13

444

IC

MARK

23/04/13

445

IC

MARK

23/04/13

446

IC

MARK

23/04/13

447

IC

MARK

23/04/13

448

IC

MARK

27/03/13

449

MARK

27/02/13

450

IC

MARK

23/04/13

451

MARK

27/02/13

452

IC

MARK

23/04/13

453

IC

MARK

23/04/13

454

MARK

03/06/13

455

MARK

26/04/13

456

MARK

25/06/13

457

MARK

21/03/13

458

MARK

26/04/13

459

RT

MARK

19/02/13

460

AC

MARK

04/04/13

461

AC

MARK

22/03/13

462

AC

MARK

22/03/13

463

AC

MARK

22/03/13

464

AC

MARK

22/03/13

465

AC

MARK

22/03/13

466

AC

MARK

22/03/13

467

AC

MARK

22/03/13

468

AC

MARK

22/03/13

469

AC

MARK

22/03/13

470

AC

MARK

22/03/13

471

MARK

17/04/13

472

AC

MARK

17/04/13

473

IC

MARK

23/05/13

474

IC

MARK

23/05/13

475

IC

MARK

23/05/13

476

IC

MARK

23/05/13

477

AC

MARK

04/02/13

478

AC

MARK

04/02/13

479

MARK

26/10/12

480

MARK

26/10/12

481

MARK

26/10/12

482

MARK

26/10/12

483

MARK

26/10/12

484

MARK

26/10/12

485

MARK

26/10/12

486

MARK

26/10/12

487

MARK

26/10/12

488

MARK

26/10/12

489

MARK

26/10/12

490

MARK

26/10/12

491

MARK

26/10/12

492

MARK

26/10/12

493

MARK

11/06/13

494

MARK

10/07/13

495

MARK

10/07/13

496

IC

MARK

30/01/13

497

MARK

27/02/13

498

RT

MARK

26/07/13

499

IC

MARK

10/05/13

500

RT

MARK

26/07/13

501

MARK

26/04/13

502

MARK

26/04/13

503

IC

MARK

01/03/13

504

MARK

21/06/13

505

MARK

02/04/13

506

MARK

14/05/13

507

MARK

21/06/13

508

MARK

03/06/13

509

IC

MARK

27/02/13

510

IC

MARK

27/02/13

511

IC

MARK

30/01/13

512

IC

MARK

27/02/13

513

IC

MARK

27/02/13

514

IC

MARK

03/06/13

515

IC

MARK

30/01/13

516

IC

MARK

30/01/13

517

IC

MARK

30/01/13

518

IC

MARK

30/01/13

519

IC

MARK

25/03/13

520

IC

MARK

25/03/13

521

IC

MARK

25/03/13

522

IC

MARK

25/03/13

523

IC

MARK

25/03/13

524

IC

MARK

30/05/13

525

MARK

26/07/13

526

MARK

26/07/13

527

IC

MARK

25/03/13

528

IC

MARK

10/07/13

529

IC

MARK

24/01/13

530

MARK

10/07/13

531

MARK

08/05/13

532

MARK

26/07/13

533

IC

MARK

26/07/13

534

MARK

26/07/13

535

IC

MARK

06/03/13

536

IC

MARK

06/03/13

537

MARK

03/06/13

538

IC

MARK

01/03/13

539

IC

MARK

01/03/13

540

IC

MARK

01/03/13

541

IC

MARK

01/03/13

542

IC

MARK

01/03/13

543

IC

MARK

01/03/13

544

IC

MARK

16/04/13

545

IC

MARK

16/04/13

546

IC

MARK

16/04/13

547

IC

MARK

16/04/13

548

IC

MARK

16/04/13

549

IC

MARK

16/04/13

550

IC

MARK

16/04/13

551

IC

MARK

16/04/13

552

IC

MARK

16/04/13

553

IC

MARK

10/07/13

554

RT

MARK

06/11/12

555

MARK

28/02/13

556

IC

MARK

07/01/13

557

IC

MARK

06/03/13

558

MARK

16/04/13

559

MARK

26/07/13

560

IC

MARK

06/03/13

561

MARK

04/06/13

562

MARK

04/06/13

563

IC

MARK

18/03/13

564

IC

MARK

18/03/13

565

IC

MARK

18/03/13

566

MARK

10/05/13

567

MARK

10/07/13

568

MARK

10/07/13

569

MARK

02/04/13

570

IC

MARK

10/07/13

571

MARK

21/02/13

572

MARK

21/02/13

573

IC

MARK

04/06/13

574

IC

MARK

04/06/13

575

IC

MARK

04/06/13

576

IC

MARK

04/06/13

577

IC

MARK

04/06/13

578

IC

MARK

04/06/13

579

IC

MARK

04/06/13

580

IC

MARK

04/06/13

581

IC

MARK

04/06/13

582

IC

MARK

04/06/13

583

IC

MARK

04/06/13

584

IC

MARK

04/06/13

585

IC

MARK

04/06/13

586

IC

MARK

04/06/13

587

IC

MARK

26/07/13

588

MARK

26/07/13

589

MARK

18/06/13

590

MARK

18/06/13

591

MARK

06/03/13

592

MARK

06/03/13

593

MARK

03/01/13

594

MARK

05/02/13

595

MARK

08/03/13

596

MARK

05/02/13

597

AC

MARK

29/05/13

598

MARK

07/01/13

599

MARK

07/01/13

600

MARK

10/05/13

601

MARK

29/05/13

602

MARK

26/12/12

603

MARK

04/04/13

604

MARK

05/02/13

605

IC

MARK

06/03/13

606

MARK

07/01/13

607

MARK

07/01/13

608

IC

MARK

28/01/13

609

MARK

05/02/13

610

IC

MARK

06/03/13

611

IC

MARK

26/07/13

612

MARK

06/03/13

613

MARK

29/05/13

614

MARK

26/12/12

615

MARK

26/12/12

616

MARK

26/04/13

617

MARK

07/01/13

618

IC

MARK

23/04/13

619

MARK

26/07/13

620

MARK

26/12/12

621

MARK

26/12/12

622

MARK

08/03/13

623

MARK

06/03/13

624

MARK

06/03/13

625

MARK

16/11/12

626

MARK

16/11/12

627

MARK

14/01/13

628

MARK

08/03/13

629

MARK

26/12/12

630

MARK

08/03/13

631

MARK

05/02/13

632

MARK

06/03/13

633

MARK

21/06/13

634

MARK

21/06/13

635

MARK

29/05/13

636

MARK

03/01/13

637

MARK

05/02/13

638

MARK

14/03/13

639

MARK

14/03/13

640

MARK

14/03/13

641

MARK

14/03/13

642

MARK

14/03/13

643

MARK

14/03/13

644

MARK

14/03/13

645

MARK

14/03/13

646

MARK

14/03/13

647

MARK

14/03/13

648

MARK

14/03/13

649

IC

MARK

30/05/13

650

MARK

30/05/13

651

MARK

30/05/13

652

MARK

30/05/13

653

MARK

30/05/13

654

MARK

30/05/13

655

MARK

30/05/13

656

IC

MARK

30/05/13

657

MARK

30/05/13

658

MARK

30/05/13

659

MARK

30/05/13

660

MARK

27/02/13

661

MARK

30/05/13

662

MARK

10/04/13

663

MARK

27/02/13

664

MARK

10/04/13

665

MARK

30/05/13

666

MARK

18/06/13

667

MARK

27/02/13

668

MARK

30/05/13

669

MARK

30/05/13

670

MARK

10/07/13

671

MARK

10/04/13

672

MARK

10/07/13

673

MARK

10/07/13

674

MARK

10/07/13

675

MARK

10/04/13

676

MARK

26/07/13

677

MARK

10/07/13

678

MARK

10/04/13

679

MARK

10/07/13

680

MARK

10/07/13

681

MARK

10/04/13

682

MARK

10/07/13

683

MARK

10/07/13

684

MARK

10/07/13

685

MARK

10/04/13

686

MARK

10/04/13

687

MARK

26/07/13

688

MARK

18/06/13

689

MARK

18/06/13

690

MARK

26/07/13

691

MARK

26/07/13

692

MARK

10/07/13

693

MARK

10/04/13

694

MARK

10/07/13

695

MARK

10/07/13

696

MARK

10/04/13

697

MARK

10/07/13

698

MARK

26/07/13

699

MARK

26/04/13

700

MARK

26/04/13

701

MARK

26/04/13

702

MARK

11/06/13

703

MARK

11/06/13

704

IC

MARK

11/06/13

705

IC

MARK

11/06/13

706

IC

MARK

11/06/13

707

MARK

11/06/13

708

IC

MARK

11/06/13

709

MARK

11/12/12

710

MARK

24/10/12

711

MARK

24/10/12

712

MARK

24/10/12

713

MARK

11/12/12

714

MARK

27/02/13

715

MARK

27/02/13

716

MARK

27/02/13

717

MARK

27/02/13

718

MARK

28/06/13

719

MARK

27/02/13

720

MARK

27/02/13

721

MARK

27/02/13

722

MARK

27/02/13

723

MARK

27/02/13

724

MARK

27/02/13

725

MARK

27/02/13

726

MARK

27/02/13

727

MARK

27/02/13

728

MARK

27/02/13

729

MARK

18/03/13

730

MARK

18/03/13

731

MARK

27/02/13

732

MARK

19/03/13

733

MARK

04/04/13

734

MARK

25/06/13

735

IC

MARK

26/07/13

736

MARK

26/07/13

737

MARK

26/07/13

738

MARK

26/07/13

739

MARK

02/04/13

740

MARK

08/03/13

741

MARK

26/07/13

742

MARK

26/07/13

743

MARK

02/04/13

744

MARK

26/07/13

745

MARK

08/03/13

746

MARK

18/06/13

747

MARK

26/07/13

748

IC

MARK

08/05/13

749

MARK

26/07/13

750

IC

MARK

26/07/13

751

MARK

29/05/13

752

MARK

29/05/13

753

MARK

29/05/13

754

MARK

29/05/13

755

MARK

29/05/13

756

MARK

30/05/13

757

MARK

29/05/13

758

MARK

02/07/12

759

MARK

02/07/12

760

MARK

28/09/12

761

MARK

28/09/12

762

MARK

28/09/12

763

MARK

04/09/12

764

IC

MARK

22/03/13

765

MARK

22/03/13

766

IC

MARK

22/03/13

767

MARK

11/06/13

768

MARK

11/06/13

769

MARK

27/02/13

770

MARK

27/02/13

771

MARK

30/05/13

772

MARK

10/04/13

773

MARK

10/04/13

774

MARK

30/05/13

775

MARK

16/11/12

776

MARK

16/11/12

777

MARK

16/11/12

778

MARK

16/11/12

779

MARK

16/11/12

780

MARK

26/12/12

781

MARK

07/05/13

782

MARK

26/07/13

783

MARK

03/06/13

784

MARK

03/06/13

785

MARK

03/06/13

786

IC

MARK

25/06/13

787

MARK

26/07/13

788

DAVID

29/05/13

789

IC

MARK

01/07/13

790

IC

MARK

10/07/13

791

IC

MARK

23/10/12

792

IC

MARK

24/10/12

793

RT

MARK

28/06/13

794

MARK

26/04/13

795

MARK

26/04/13

796

MARK

16/04/13

797

IC

MARK

10/07/13

798

MARK

04/06/13

799

MARK

04/06/13

800

MARK

23/05/13

801

MARK

26/04/13

802

AC

MARK

07/05/13

803

IC

MARK

01/03/13

804

AC

MARK

30/01/13

805

AC

MARK

29/05/13

806

MARK

29/05/13

807

MARK

14/09/12

808

MARK

14/09/12

809

MARK

14/09/12

810

MARK

14/09/12

811

MARK

25/10/12

812

MARK

01/03/13

813

MARK

01/03/13

814

MARK

01/03/13

815

MARK

01/03/13

816

MARK

01/03/13

817

MARK

01/03/13

818

IC

MARK

28/03/13

819

IC

MARK

28/03/13

820

IC

MARK

18/03/13

821

AC

MARK

30/01/13

822

AC

MARK

29/05/13

823

MARK

29/05/13

824

MARK

14/09/12

825

MARK

14/09/12

826

MARK

14/09/12

827

MARK

14/09/12

828

MARK

25/10/12

829

MARK

01/03/13

830

MARK

01/03/13

831

MARK

01/03/13

832

MARK

01/03/13

833

MARK

01/03/13

834

MARK

01/03/13

835

IC

MARK

28/03/13

836

IC

MARK

28/03/13

837

IC

MARK

18/03/13

838

MD1-0-E-182-06-00001

Emergency Diesel Generator Sizing Calculation

MD1-0-E-500-31-00001

Single Line Diagram Symbol & Legend

MD1-0-E-500-31-00002

Key Single Line Diagram

MD1-0-E-500-31-00041

Single Line Diagram- Typical Protection & Metering

MD1-0-E-500-33-00001

Elec.Logic Diagram- Symbol & Legend

MD1-0-E-505-06-00001

Calculation for Generator Transformer Sizing

MD1-0-E-505-06-00002

Calcualtion For Auxiliary Transformer Sizing

MD1-0-E-505-33-00001

Elec. Logic Diagram- Station Transformer

MD1-0-E-520-31-00101

Single Line Diagram-10 KV Station Switchgear 06BBA/06BBB

MD1-0-E-520-31-00201

Single Line Diagram-10KV Cooling Water Switchgear 06BBG/06BBH

MD1-0-E-520-33-00001

Elec.Logic Diagram- 10KV Switchgear XFMR Incoming Feeder (1/4)

MD1-0-E-520-33-00002

Elec. Logic Diagram- 10KV Switchgear XFMR Incoming Feeder (2/4)

MD1-0-E-520-33-00003

Elec.Logic Diagram- 10KV Switchgear XFMR Imcoming Feeder (3/4)

MD1-0-E-520-33-00004

Elec. Logic Diagram- 10KV Switchgear XFMR Incoming Feeder (4/4)

MD1-0-E-520-33-00005

Elec. Logic Diagram- 10KV Switchgear Bus Tie Feeder (1/2)

MD1-0-E-520-33-00006

Elec. Logic Diagram- 10KV Switchgear Bus Tie Feeder (2/2)

MD1-0-E-520-33-00007

Elec. Logic Diagram- 10KV Switchgear Plain Incoming Feeder (1/2)

MD1-0-E-520-33-00008

Elec. Logic Diagram- 10KV Switchgear Plain Incoming Feeder (2/2)

MD1-0-E-520-33-00009

Elec. Logic Diagram- 10KV Switchgear Bus Tie Feeder (Plain Incoming)

MD1-0-E-520-33-00010

Elec. Logic Diagram- 10KV Switchgear Outgoing Feeder For Non-Motor

MD1-0-E-520-33-00011

Elec. Logic Diagram- 10KV Switchgear Outgoing Feeder For Motor

MD1-0-E-525-31-00001

Single Line Diagram- 400V Station Switchgear-1 06BFA/06BFB

MD1-0-E-525-31-00002

Single Line Diagram- 400V Station Switchgear-2 06BFC/06BFD

MD1-0-E-525-31-00003

Single Line Diagram- 400V Station Switchgear-3 06BFE/06BFF

MD1-0-E-525-31-00004

Single Line Diagram- 400V Admin. Bldg. Switchgear 06BFI/06BFJ

MD1-0-E-525-31-00005

Single Line Diagram- 400V CWP Switchgear 06BFG/06BFH

MD1-0-E-525-31-00011

Single Line Diagram- 400V Essential Switchgear 06BMA/06BMB

MD1-0-E-525-31-00101

Single Line Diagram-400V Station MCC-1 06JBA

MD1-0-E-525-31-00201

Single Line Diagram-400V Station MCC-2 06BJB

MD1-0-E-525-31-00301

Single Line Diagram-400VAux. Boiler MCC 06BJC

MD1-0-E-525-31-00501

Single Line Diagram-400V CWP MCC 06BJE

MD1-0-E-525-31-00601

Single Line Diagram-400V General Service MCC-1 06BLA

MD1-0-E-525-31-00701

Single Line Diagram-400V General Service MCC-2 06BLB

MD1-0-E-525-31-00801

Single Line Diagram-400V General Service MCC-3 06BLC

MD1-0-E-525-31-00901

Single Line Diagram-400V General Service MCC-4 06BLD

MD1-0-E-525-31-01001

Single Line Diagram-400V Workshop MCC 06BLE

MD1-0-E-525-31-01101

Single Line Diagram-400V ST Bldg. HVAC MCC 06BLF

MD1-0-E-525-31-01201

Single Line Diagram-400V CCB HVAC MCC-1 06BLG

MD1-0-E-525-31-01301

Single Line Diagram-400V CCB HVAC MCC-2 06BLL

MD1-0-E-525-31-01401

Single Line Diagram-400V ADMIN. BLDG HVAC MCC-1 06BLH

MD1-0-E-525-31-01501

Single Line Diagram-400V Admin BLDG HVAC MCC-2 06BLI

MD1-0-E-525-31-01601

Single Line Diagram-400V Admin BLDG MCC 06BLJ

MD1-0-E-525-31-01701

Single Line Diagram-400V SWYD HVAC MCC 06BLK

MD1-0-E-525-31-03101

Single Line Diagram-400V Essential MCC-1 06BME

MD1-0-E-525-31-03201

Single Line Diagram-400V Essential MCC-2 06BMF

MD1-0-E-525-33-00001

Elec. Logic Diagram-400V Switchgear Incoming Feeder

MD1-0-E-525-33-00002

Elec. Logic Diagram-400V Switchgear Outgoing Feeder

MD1-0-E-525-33-00010

Elec. Logic Diagram-400V Switchgear Bus Tie Feeder

MD1-0-E-535-06-00001

Calculation for DC and UPS System Sizing

MD1-0-E-535-31-00001

Single line diagram - 220v dc system for units and common

MD1-0-E-535-31-00002

Single line diagram - 220v dc system for cooling water system

MD1-0-E-540-31-00001

Single line diagram - 400/230v ups system

MD1-0-E-590-01-00001

Earthing and Lightning Protection Layout- Symbol and Legend

MD1-0-E-590-01-00002

Earthing and Lightening Protection Layout- Overall Area

MD1-0-E-590-01-00201

Earthing and Lightning Protection Layout- Installation Details (1/3)

MD1-0-E-590-01-00202

Earthing and Lightning Protection Layout- Installation Details (2/3)

MD1-0-E-590-01-00203

Earthing and Lightning Protection Layout- Installation Details (3/3)

MD1-0-E-590-01-02001

Earthing and Lightning Protection Layout- Turbine Bldg. Ground Floor

MD1-0-E-590-01-02002

Earthing and Lightning Protection Layout- Turbine Mezzanine Floor

MD1-0-E-590-01-02003

Earthing and Lightning Protection Layout- Turbine Operating Floor

MD1-0-E-590-01-02004

Earthing & Lightning Protection Layout- Turbine Bldg. Lower Roof & Crane Runaway

MD1-0-E-590-01-02005

Earthing & Lightning Protection Layout- Turbine Bldg. Lower Roof & Crane Runaway

MD1-0-E-590-01-03001

Earthing and Lightning Protection Layout- Central control Bldg Ground Floor

MD1-0-E-590-01-03002

Earthing and Lightning Protection Layout- Central control Bldg 1st Floor

MD1-0-E-590-01-03003

Earthing and Lightning Protection Layout- Central control Bldg 2nd Floor

MD1-0-E-590-01-03004

Earthing and Lightning Protection Layout- Central control Bldg 3rd Floor

MD1-0-E-590-01-03005

Earthing and Lightning Protection Layout- Central control Bldg Roof Floor

MD1-0-E-590-01-03006

Earthing and Lightning Protection Layout- Central control Bldg Higher Roof Floor

MD1-0-E-590-01-04201

Earthing and lightning protection layout - fuel oil pump house

MD1-0-E-590-01-04401

Earthing and Lightning Protection Layout- Fire Protection Pump House

MD1-0-E-590-01-04601

Earthing and lightning protection layout - esp control house no.1

MD1-0-E-590-01-04701

Earthing and lightning protection layout - esp control house no.2

MD1-0-E-590-01-04801

Earthing and lightning protection layout - diesel generator house

MD1-0-E-590-01-04901

Earthing and lightning protection layout - cooling water pump house

MD1-0-E-590-01-05401

Earthing and lighting Protection Layout- Switchyard Control Bldg. Ground Floor

MD1-0-E-590-01-05402

Earthing and lighting Protection Layout- Switchyard Control Bldg. 1st Floor

MD1-0-E-590-01-05501

Earthing and Lighting Protection Layout- Water treatment BLDG Ground Floor

MD1-0-E-590-01-05503

Earthing and Lighting Protection Layout- Water treatment BLDG Roof Floor

MD1-0-E-590-01-05521

Earthing Lighting Protection Layout- Waste Water Treatment Plant Area

MD1-0-E-590-01-05551

Earthing and Lighting Protection Layout- Water Storage Tank Area

MD1-0-E-590-01-06301

Earthing and Lightning Protection Layout- Coal Yard Area (1)

MD1-0-E-590-01-06302

Earthing and Lightning Protection Layout- Coal Yard Area (2)

MD1-0-E-590-01-06303

Earthing and Lightning Protection Layout- Coal Yard Area (3)

MD1-0-E-590-01-06304

Earthing and Lightning Protection Layout- Coal Yard Area (4)

MD1-0-E-590-01-06305

Earthing and Lightning Protection Layout- Coal Yard dry Storage Shed Roof

MD1-0-E-590-01-06901

Earthing and Lightning Protection Layout - Transformer Area (Unit 1)

MD1-0-E-590-01-06902

Earthing and Lightning Protection Layout - Transformer Area (Unit 2)

MD1-0-E-590-01-07001

Earthing and lightning protection layout - aux. boiler area

MD1-0-E-590-01-07101

Earthing and lightning protection layout - condensate storage tank area

MD1-0-E-590-01-07201

Earthing and Lightning Protection Layout - Fuel Oil Tank Area

MD1-0-E-590-01-07301

Earthing and Lightning Protection Layout - ESP Area (Unit 1)

MD1-0-E-590-01-07302

Earthing and Lightning Protection Layout - ESP Area (Unit 2)

MD1-0-E-590-01-07401

Earthing and Lightning Protection Layout - Stack Area (Unit 1)

MD1-0-E-590-01-07402

Earthing and Lightning Protection Layout - Stack Area (Unit 2)

MD1-0-E-590-01-07501

Earthing and Lightning Protection Layout - CWP Area

MD1-0-E-590-01-08401

Earthing and lightning protection layout - bulldozer garage

MD1-0-E-590-01-08501

Earthing and Lighting Protection layout- I&C Elec & Mech Warehouse Ground Flr

MD1-0-E-590-01-08502

Earthing and Lighting Protection layout- I&C Elec & Mech Warehouse Roof Flr

MD1-0-E-590-01-08601

Earthing and Lightning Protection Layout- Admin. BLDG Ground Floor

MD1-0-E-590-01-08602

Earthing and Lightning Protection Layout- Admin. BLDG 1st Floor

MD1-0-E-590-01-08603

Earthing and Lightning Protection Layout- Admin. BLDG 2nd Floor

MD1-0-E-590-01-08604

Earthing and Lightning Protection Layout- Admin. BLDG 3rd Floor

MD1-0-E-590-01-08605

Earthing and Lightning Protection Layout- Admin. BLDG 4th Floor

MD1-0-E-590-01-08606

Earthing and Lightning Protection Layout- Admin. BLDG Roof Floor

MD1-0-E-590-01-08901

Earthing and Lighting Protection layout- Common Service Bldg Ground Flr

MD1-0-E-590-01-08902

Earthing and Lighting Protection layout- Common Service Bldg Roof Flr

MD1-0-E-590-01-09203

Earthing and lightning protection layout - car garage 3

MD1-0-E-590-06-00001

Earthing System Calculation

MD1-0-E-591-06-00001

Power Cable Sizing Calculation

MD1-0-E-592-01-04401

LIGHTING LAYOUT - FIRE PROTECTION PUMP HOUSE GROUND FLOOR

MD1-0-E-592-01-05401

Lighting Layout-Switchyard Control Bldg Ground Floor

MD1-0-E-592-01-05402

Lighting Layout-Switchyard Control Bldg 1st Floor

MD1-0-E-592-01-05403

Lighting Layout-Switchyard Control Bldg Roof Floor

MD1-0-E-592-06-04401

LIGHTING CALCULATION - FIRE PROTECTION PUMP HOUSE

MD1-0-E-592-31-00002

Single line diagram - lighting system

MD1-0-T-030-05-00118

Inspection Test Plan for Earthing & Lightning protection installation

MD1-0-T-030-05-00150

ITP for Cable Raceway Work

MD1-0-T-030-05-00188

Inspection test Plan for Cable Installation

MD1-0-T-030-05-00194

ITP for Electrical Equipment Installation

MD1-0-T-030-05-00220

ITP for Cathodic Protection System

MD1-0-V-500-05-00001

Technical data for mv/lv swgr, mv/lv transformer

MD1-0-V-500-05-10001

Technical data for mcc

MD1-0-V-515-09-00001

Technical particulars for isolated phase busduct & accessories

MD1-0-V-515-09-10001

Technical data for non-segregated phase busduct

MD1-0-V-535-09-00005

Technical data for 220v dc system - units & common (16btl01 / 16btl02 / 26btl01)

MD1-0-V-535-09-00006

Technical data for 220v dc system - cooling water system (06blt01 / 06blt02)

MD1-0-V-540-09-00007

Technical data for 230v ups system (16bru01 / 26bru01)

MD1-0-V-565-02-00001

PD Monitoring System- Technical Specification for Motor Monitoring

MD1-0-V-565-02-00002

PD Monitoring System- Technical Specification for 10KV SWGR Monitoring

MD1-0-V-565-02-00003

PD Monitoring System- Technical Specification for IPB Monitoring

MD1-0-V-565-02-00004

PD Monitoring System- Technical Specification for Transformer

MD1-0-V-570-02-00008

500kv and 110kv switchyard technical specification for 48vdc battery and batterr

MD1-0-V-580-01-00002

Field Test and Inspection Plan for Transformer Protection System

MD1-0-V-580-02-00001

Technical data and information for transformer protection system and tariff metl

MD1-0-V-580-05-00002

Field Test and Inspection Procedure for Transformer Protection System

MD1-0-V-751-02-00204

Motor Data Sheet & Drawing for Electric Fire Water Pump

MD1-0-V-751-02-00304

Motor Data sheet & Drawing for Jockey Pump

MD1-1-E-505-33-00002

Elec. Logic Diagram- Unit Aux. Transformer (Unit 1)

MD1-1-E-520-31-00101

Single Line Diagram- 10KV Unit Switchgear 16BBA (1/2)

MD1-1-E-520-31-00102

Single Line Diagram- 10KV Unit Switchgear 16BBA (2/2)

MD1-1-E-520-31-00201

Single Line Diagram- 10KV Unit Switchgear 16BBB (1/2)

MD1-1-E-520-31-00202

Single Line Diagram- 10KV Unit Switchgear 16BBB (2/2)

MD1-1-E-525-31-00001

Single Line Diagram- 400V Unit Switchgear 16BFA/16BFB

MD1-1-E-525-31-00101

Single Line Diagram-400V Boilder #1 MCC-1 16BJA

MD1-1-E-525-31-00201

Single Line Diagram-400V Boilder #1 MCC-2 16BJB

MD1-1-E-525-31-00301

Single Line Diagram-400V Boilder #2 MCC-1 16BJC

MD1-1-E-525-31-00401

Single Line Diagram-400V Boilder #2 MCC-2 16BJD

MD1-1-E-525-31-00501

Single Line Diagram- 400V STG #1 MCC-1 16BJE

MD1-1-E-525-31-00601

Single Line Diagram- 400V STG #1 MCC-2 16BJF

MD1-2-E-505-33-00002

Elec. Logic Diagram- Unit Aux. Transformer (Unit 2)

MD1-2-E-520-31-00101

Single Line Diagram- 10KV Unit Switchgear 26BBA (1/2)

MD1-2-E-520-31-00102

Single Line Diagram- 10KV Unit Switchgear 26BBA (2/2)

MD1-2-E-520-31-00201

Single Line Diagram- 10KV Unit Switchgear 26BBB (1/2)

MD1-2-E-520-31-00202

Single Line Diagram- 10KV Unit Switchgear 26BBB (2/2)

MD1-2-E-525-31-00001

Single Line Diagram- 400V Unit Switchgear 26BFA/26BFB

MD1-2-E-525-31-00101

Single Line Diagram- 400V Boiler #3 MCC-1 26BJA

MD1-2-E-525-31-00201

Single Line Diagram- 400V Boiler #3 MCC-2 26BJB

MD1-2-E-525-31-00301

Single Line Diagram- 400V Boiler #4 MCC-1 26BJC

MD1-2-E-525-31-00401

Single Line Diagram- 400V Boiler #4 MCC-2 26BJD

MD1-2-E-525-31-00501

Single Line Diagram- 400V STG #2 MCC-1 26 BJE

MD1-2-E-525-31-00601

Single Line Diagram- 400V Boiler #2 MCC-2 26BJF

MD1-0-E-560-01-00101

Overall Layout for Tank Bottom for Cathodic Protection System

MD1-0-E-592-01-00001

Lighting Layout- Symbol and Legend

MD1-0-E-592-01-00101

Lighting Layout- Lightning Fixture (1/2)

MD1-0-E-592-01-00102

Lighting Layout- Lighting Fixture (2/2)

MD1-0-E-592-01-00201

Lighting Layout- Installation Details (1/3)

MD1-0-E-592-01-00202

Lighting Layout- Installation Details (2/3)

MD1-0-E-592-01-00203

Lighting Layout- Installation Details (3/3)

MD1-0-E-592-01-02001

Lighting Layout- Turbine BLDG Ground Floor

MD1-0-E-592-01-02002

Lighting Layout- Turbine BLDG Mez. Floor

MD1-0-E-592-01-02003

Lighting Layout- Turbine BLDG Operating Floor

MD1-0-E-592-01-02004

Lighting Layout- Turbine BLDG Lower Roof & Crane Runway

MD1-0-E-592-01-02051

Receptacle Layout- Turbine BLDG Ground Floor

MD1-0-E-592-01-02052

Receptacle Layout- Turbine BLDG Mez. Floor

MD1-0-E-592-01-02053

Receptacle Layout- Turbine BLDG Operating Floor

MD1-0-E-592-01-02054

Receptacle Layout- Turbine BLDG Lower Roof & Crane Runway

MD1-0-E-592-01-03001

Lighting Layout- Central Control BLDG Ground Floor

MD1-0-E-592-01-03002

Lighting Layout- Central Control BLDG 1st Floor

MD1-0-E-592-01-03003

Lighting Layout- Central Control BLDG 2nd Floor

MD1-0-E-592-01-03004

Lighting Layout- Central Control BLDG 3rd Floor

MD1-0-E-592-01-03005

Lighting Layout- Central Control BLDG Roof Floor

MD1-0-E-592-01-03051

Receptacle Layout- Central Control BLDG Ground Floor

MD1-0-E-592-01-03053

Receptacle Layout- Central Control BLDG 2nd Floor

MD1-0-E-592-01-03054

Receptacle Layout- Central Control BLDG 3rd Floor

MD1-0-E-592-01-03055

Receptacle Layout- Central Control BLDG Roof Floor

MD1-0-E-592-01-05451

Receptacle Layout- Switchyard Control BLDG Ground Floor

MD1-0-E-592-01-05452

Receptacle Layout- Switchyard Control BLDG 1st Floor

MD1-0-E-592-01-05501

Lighting Layout- Water Treatment BLDG Ground Floor

MD1-0-E-592-01-05551

Receiptacle Layout- Water Treatment BLDG Ground Floor

MD1-0-E-592-01-08601

Lighting Layout- Administration BLDG Ground Floor

MD1-0-E-592-01-08602

Lighting Layout- Administration BLDG 1st Floor

MD1-0-E-592-01-08603

Lighting Layout- Administration BLDG 2nd Floor

MD1-0-E-592-01-08604

Lighting Layout- Administration BLDG 3rd Floor

MD1-0-E-592-01-08605

Lighting Layout- Administration BLDG 4th Floor

MD1-0-E-592-01-08651

Receptacle Layout- Administration Bldg Ground Floor

MD1-0-E-592-01-08652

Receptacle Layout- Administration Bldg 1st Floor

MD1-0-E-592-01-08653

Receptacle Layout- Administration Bldg 2nd Floor

MD1-0-E-592-01-08654

Receptacle Layout- Administration Bldg 3rd Floor

MD1-0-E-592-01-08655

Receptacle Layout- Administration Bldg 4th Floor

MD1-0-E-592-01-08901

Lighting Layout- Common Service BLDG

MD1-0-E-592-01-08951

Receptacle Layout- Common Service BLDG

MD1-0-E-592-01-10020

Lighting panel Schedule- Turbine BLDG

MD1-0-E-592-01-10030

Lighting Panel Schedule- Central Control BLDG

MD1-0-E-592-01-10040

Lighting Panel Schedule- Administration Bldg

MD1-0-E-592-01-10050

Lighting Panel Schedule- Switchyard Control Bldg

MD1-0-E-592-01-15501

Lighting Panel Schedule- Water Treatment BLDG

MD1-0-E-592-01-18901

Lighting Panel Schedule- Common Service BLDG

MD1-0-E-592-06-02001

Lighting Calculation- Turbine BLDG

MD1-0-E-592-06-03001

Lighting Calculation- Central Control BLDG

MD1-0-E-592-06-05401

Lighting Calculation- Switchyard Control Bldg

MD1-0-E-592-06-05501

Lighting Calculation- Water Treatment BLDG

MD1-0-E-592-06-08601

Lighting Calculation- Administration Bldg

MD1-0-E-592-06-08901

Lighting Calculation- Common Service BLDG

MD1-0-E-593-01-20001

Cable Route Plan- Symbol and Legend

MD1-0-E-593-01-28601

Cable Route Plan- Admin. BLDG Ground Floor

MD1-0-E-593-01-28602

Cable Route Plan- Admin. BLDG 1st Floor

MD1-0-E-593-01-28603

Cable Route Plan- Admin. BLDG 2nd Floor

MD1-0-E-593-01-28604

Cable Route Plan- Admin. BLDG 3rd Floor

MD1-0-E-593-01-28605

Cable Route Plan- Admin. BLDG 4th Floor

MD1-0-E-593-01-28606

Cable Route Plan- Admin. BLDG Roof Floor

MD1-0-V-111-01-00013

Inspection and Test Plan for Generator

MD1-0-V-111-01-00408

Generator Electrical Outline (1/4)

MD1-0-V-111-01-00409

Generator Electrical Outline (2/4)

MD1-0-V-111-01-00410

Generator Electrical Outline (3/4)

MD1-0-V-111-01-00411

Generator Electrical Outline (4/4)

MD1-0-V-113-32-00027

Schematic Diagram of Cathodic Protection System

MD1-0-V-570-01-00009

500kV & 110kV Switchyard Control Building Cable Raceway

MD1-0-E-500-06-00001

Calculation for Short Circuit Current

AC

MD1-0-E-500-06-00002

Calculation for Load Flow

AC

MD1-0-E-525-31-00401

Single Line Diagram-400V Limestone Grinding House MCC 06BJD

AC

MD1-0-V-131-09-00006

Motor data sheets and curves

AC

MD1-0-V-135-09-00007

Electrical equipment data sheet - df

AC

MD1-0-V-142-73-00001

Motor data & drawing for service water pump

AC

MD1-0-V-142-73-10001

Motor data & drawing for closed cooling water pump

AC

MD1-0-V-142-73-20001

Motor data & drawing for demi. water transfer pump

AC

MD1-0-V-142-73-30001

Motor data & drawing for condensate make-up pump

AC

MD1-0-V-142-73-40001

Motor data & drawing for auxiliary cooling water booster pump

AC

MD1-0-V-142-73-50001

Motor data & drawing for steam coil air heater drain pump

AC

MD1-0-V-142-73-60001

Motor data & drawing for diesel oil drain pump

AC

MD1-0-V-142-73-70001

Motor data & drawing for deaerator recirculation pump

AC

MD1-0-V-142-73-80001

Motor data & drawing for dirty oil transfer pump

AC

MD1-0-V-142-73-90001

Motor data & drawing for dirty oil drain pump

AC

MD1-0-V-151-09-00016

Air Compressor - Motor Data Sheet

AC

MD1-0-V-161-09-00003

MV MOTOR DATA SHEET AND CURVE

AC

MD1-0-V-161-09-00004

MD1 LV MOTOR DATA SHEET

AC

MD1-0-V-505-02-00001

Technical Specification for Generator Transformer

AC

MD1-0-V-870-09-00001

Electrical Equipment and System Design Specification and Data Sheet for Sewage m

AC

MD1-1-E-500-31-00011

Single Line Diagr.- Gen. Main & Aux. Transformer Relay & Meter (U.1)

AC

MD1-1-E-505-33-00001

Elec. Logic Diagram- Generator Transformer (Unit 1)

AC

MD1-2-E-500-31-00011

Single Line Diagr.- Gen. Main & Aux. Transformer Relay & Meter (U.2)

AC

MD1-2-E-505-33-00001

Elec. Logic Diagram- Generator Transformer (Unit 2)

AC

MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK
MARK

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

MD1-0-E-590-01-07801A

Earthing and Lightning A


Protection Layout
MARK
- Sleeper Area (1)

MD1-0-E-590-01-07802A

Earthing and Lightning A


Protection Layout
MARK
- Sleeper Area (2)

MD1-0-E-590-01-07803A

Earthing and Lightning A


Protection Layout
MARK
- Sleeper Area (3)

MD1-0-E-590-01-07804A

Earthing and Lightning A


Protection Layout
MARK
- Sleeper Area (4)

MD1-0-E-593-01-10101B

Cable Raceway Plan- Cable


A
Tray Assembly
MARK Detail (1/2)

MD1-0-E-593-01-20102C

Cable Route Plan- Installation


A
DetailsMARK
(2/3)

MD1-0-E-593-01-20103A

Cable Route Plan- Installation


A
DetailsMARK
(3/3)

MD1-0-V-111-06-00850A

Calculation and Specification


A
of Neutral
MARK
Grounding Transformer for STG

MD1-0-V-111-09-00406B

Generator Design DataAFor Station Service


MARK

MD1-0-V-121-09-00002B

Motor Datasheet for BFP


A & BFBP

MD1-0-V-122-09-00002B

Motor Data Sheet for Condensate


A
Extraction
MARK Pump

MD1-0-V-123-09-00008B

Condenser Vacuum PumpA


Motor Data
MARK
Sheet

MD1-0-V-123-09-00009B

Condenser Vacuum PumpA


Recir Pump
MARK
& Motor Data Sheet

MD1-0-V-133-02-00015B

Motor Data Sheet & Curve


A With Drawing
MARK

MD1-0-V-134-09-00013B

Motor & characteristic curves


A
& electrical
MARK
equipment data sheet for ctcs

MD1-0-V-163-09-00006B

Motor Data

MARK

MD1-0-V-167-09-00003C

Motor Data Sheet

MARK

MD1-0-V-171-09-02211A

Power Cable Data Sheet(CHS)


A

MD1-0-V-182-09-00102A

Emergency Diesel Generator


A
Set Generator
MARK Data Sheet

MD1-0-V-182-32-30011B

Single line diagram (1) A


for no.1 d/g control
MARKpanel

MD1-0-V-505-02-00101A

Tech. Spec. for StationATransformer MARK

MD1-0-V-520-05-00003A

Field Test & InspectionAProcedure forMARK


MV SWGR

MD1-0-V-520-08-00002A

Field Test & InspectionAPlan for MV SWGR


MARK

MD1-0-V-525-05-00003A

Field Test & InspectionAProcedure forMARK


LV SWGR

MD1-0-V-525-05-10003A

Field Test & InspectionAProcedure forMARK


MCC

MD1-0-V-525-08-00002A

Field Test & InspectionAPlan for LV SWGR


MARK

MD1-0-V-525-08-10002A

Field Test & InspectionAPlan for MCC


MARK

MD1-0-V-530-05-00003A

Field Test & InspectionAProcedure forMARK


DB

MD1-0-V-530-08-00002A

Field Test & InspectionAPlan for DB MARK

MD1-0-V-565-02-00005B

PD Monitoring System A
Technical Specification
MARK
for Server Cubicle and Workstation

MD1-0-V-565-05-00004A

Pd monitoring system site


A inspectionMARK
and test plan

MD1-0-V-565-05-00005A

Pd monitoring system site


A inspectionMARK
and test procedure

MD1-0-V-570-02-00006A

500kv and 110kv switchyard


A
technical
MARK
specification for telecommunication equipt

MARK

MARK

MD1-0-V-161-73-07907
MD1-0-V-161-73-07908
MD1-0-V-161-73-07909
MD1-0-V-161-73-07910
MD1-0-V-161-73-07911
MD1-0-V-161-73-07912
MD1-0-V-161-73-07914
MD1-0-V-161-73-07915
MD1-0-V-161-73-07917
MD1-0-V-161-73-07918
MD1-0-V-162-01-00002
MD1-0-V-162-03-00003
MD1-0-V-162-06-00003
MD1-0-V-162-08-00010
MD1-0-V-163-09-00007
MD1-0-V-167-09-00004
MD1-0-V-167-09-00005
MD1-0-V-167-10-00002
MD1-0-V-171-01-02005
MD1-0-V-171-01-02033
MD1-0-V-171-01-02034
MD1-0-V-171-08-02007
MD1-0-V-171-08-02063
MD1-0-V-171-09-02226
MD1-0-V-172-01-02004
MD1-0-V-172-08-02001
MD1-0-V-172-08-02062

MD1-0-V-172-11-02224
MD1-0-V-173-01-02543
MD1-0-V-173-01-02551
MD1-0-V-182-01-10001
MD1-0-V-182-08-31001
MD1-0-V-186-11-00733
MD1-0-V-186-11-00822
MD1-0-V-360-11-00551
MD1-0-V-505-01-00102
MD1-0-V-505-01-00103
MD1-0-V-505-01-00201
MD1-0-V-505-01-00202
MD1-0-V-505-01-00203
MD1-0-V-505-01-00205
MD1-0-V-505-05-00001
MD1-0-V-505-05-00004
MD1-0-V-505-05-00005
MD1-0-V-505-05-00006
MD1-0-V-505-05-00007
MD1-0-V-505-05-00101
MD1-0-V-505-05-00104
MD1-0-V-505-05-00105
MD1-0-V-505-05-00201
MD1-0-V-505-07-00002
MD1-0-V-505-07-00003
MD1-0-V-505-07-00102
MD1-0-V-505-07-00103
MD1-0-V-505-07-00111
MD1-0-V-505-07-00202
MD1-0-V-505-08-50001
MD1-0-V-505-10-00001
MD1-0-V-505-10-00002
MD1-0-V-505-10-00101
MD1-0-V-505-10-00102
MD1-0-V-505-10-00103
MD1-0-V-505-10-00104
MD1-0-V-505-10-00105
MD1-0-V-505-10-00106
MD1-0-V-505-10-00107
MD1-0-V-505-10-00108
MD1-0-V-505-10-00109
MD1-0-V-505-10-00204
MD1-0-V-505-10-00208
MD1-0-V-505-11-00001
MD1-0-V-505-11-00002
MD1-0-V-505-11-00005
MD1-0-V-505-11-00101

MD1-0-V-505-11-00201
MD1-0-V-510-03-00002
MD1-0-V-510-05-00012
MD1-0-V-510-05-00013
MD1-0-V-510-05-00014
MD1-0-V-510-05-00015
MD1-0-V-510-07-00007
MD1-0-V-510-10-00008
MD1-0-V-510-32-00010
MD1-0-V-510-36-00011
MD1-0-V-510-55-00004
MD1-0-V-510-55-00005
MD1-0-V-515-01-00002
MD1-0-V-515-01-00003
MD1-0-V-515-01-00004
MD1-0-V-515-01-00005
MD1-0-V-515-01-00006
MD1-0-V-515-01-00007
MD1-0-V-515-01-00009
MD1-0-V-515-05-00001
MD1-0-V-515-05-00002
MD1-0-V-515-05-00004
MD1-0-V-515-05-00005
MD1-0-V-515-05-10002
MD1-0-V-515-07-00001
MD1-0-V-515-08-10001
MD1-0-V-515-55-00001
MD1-0-V-515-55-00002
MD1-0-V-515-57-00001
MD1-0-V-520-05-00001
MD1-0-V-520-05-00002
MD1-0-V-520-05-00101
MD1-0-V-520-08-10001
MD1-0-V-525-01-10001
MD1-0-V-525-05-00001
MD1-0-V-525-05-00002
MD1-0-V-525-05-00101
MD1-0-V-525-05-10002
MD1-0-V-525-08-20001
MD1-0-V-525-08-30001
MD1-0-V-525-31-10001
MD1-0-V-525-32-00001
MD1-0-V-525-32-00002
MD1-0-V-525-32-10001
MD1-0-V-530-01-20001
MD1-0-V-530-05-00001
MD1-0-V-530-05-00002

MD1-0-V-530-05-00101
MD1-0-V-530-08-00001
MD1-0-V-530-31-20001
MD1-0-V-535-05-00012
MD1-0-V-535-05-00014
MD1-0-V-535-05-00017
MD1-0-V-560-03-00001
MD1-0-V-560-05-00004
MD1-0-V-560-05-00005
MD1-0-V-560-05-00006
MD1-0-V-560-06-00001
MD1-0-V-565-05-00001
MD1-0-V-565-05-00002
MD1-0-V-565-05-00003
MD1-0-V-565-05-00006
MD1-0-V-565-05-00011
MD1-0-V-565-05-00012
MD1-0-V-565-05-00013
MD1-0-V-565-05-00014
MD1-0-V-565-32-00002
MD1-0-V-565-32-00003
MD1-0-V-565-32-00004
MD1-0-V-570-05-00074
MD1-0-V-570-05-00075
MD1-0-V-570-05-00078
MD1-0-V-570-06-00009
MD1-0-V-580-01-00001
MD1-0-V-580-05-00001
MD1-0-V-580-05-00003
MD1-0-V-580-05-00005
MD1-0-V-580-06-00001
MD1-0-V-580-10-00001
MD1-0-V-580-32-00001
MD1-0-V-580-32-00002
MD1-0-V-580-32-00003
MD1-0-V-580-32-00004
MD1-0-V-580-32-00005
MD1-0-V-580-33-00001
MD1-0-V-585-32-00001
MD1-0-V-590-02-00001
MD1-0-V-590-02-50001
MD1-0-V-590-05-00001
MD1-0-V-590-05-00002
MD1-0-V-590-05-00003
MD1-0-V-590-05-50001
MD1-0-V-591-05-00002
MD1-0-V-591-05-20001

MD1-0-V-591-05-20003
MD1-0-V-592-05-50001
MD1-0-V-592-05-50002
MD1-0-V-592-11-50001
MD1-0-V-592-11-50002
MD1-0-V-592-11-50003
MD1-0-V-592-11-50004
MD1-0-V-593-05-00001
MD1-0-V-593-05-00002
MD1-0-V-593-05-00003
MD1-0-V-593-05-50001
MD1-0-V-593-11-00001
MD1-0-V-593-11-50001
MD1-0-V-751-07-00405
MD1-0-V-751-07-00413
MD1-0-V-751-07-00414
MD1-0-V-805-01-02001
MD1-0-V-805-08-00007
MD1-0-V-850-31-00001
MD1-0-V-850-32-00001
MD1-0-V-860-01-00004
MD1-0-V-860-11-00002
MD1-0-V-860-11-00003
MD1-0-V-860-31-00001
MD1-0-V-870-08-00007

MD1-0-E-500-01-00101

Electrical equipment layout


I
- central control bldg 1st
MD1-0-E-500-08-00001
floor
A

Electrical Equipment List

MD1-0-E-500-01-00102

Electrical equipment layout


I
- central control bldg 2nd
MD1-0-E-500-08-00002
floor & lower roof A

Electrical Load List

MD1-0-E-500-01-00201

Electrical equipment layout


I
- local electrical room MD1-0-E-590-01-010013

Earthing and Lightning Protection Layout-Boiler U

MD1-0-E-500-01-00202

Electrical Equipment Layout


I
- Admin BLDG

MD1-0-E-590-01-015011

Earthing and lightning protection layout - boiler un

MD1-0-E-500-04-00001

Synchronization Philosophy
I

MD1-0-E-590-01-064010

Earthing and lightning protection layout - limestone

MD1-0-E-590-32-00001

Earthing and Lightning Protection


I
System Schematic
MD1-0-E-592-01-04501
Diagram
A

Lighting Layout - Ash Slurry Pump House Ground

MD1-0-E-591-04-00001

Cable and cable Raceway


I Identification & Numbering
MD1-0-E-592-01-04502
System
A

Lighting Layout - Ash Slurry Pump House 1st Floo

MD1-0-E-591-08-00001

Power Cable Schedule I

MD1-0-E-592-01-04551A

Receptacle Layout - Ash Slurry Pump House Grou

MD1-0-E-591-08-00002

Control Cable ScheduleI

MD1-0-E-592-01-04552A

Receptacle Layout - Ash Slurry Pump House 1st F

MD1-0-E-592-01-03052

Receptacle Layout- Central


I
Control BLDG 1st FloorMD1-0-E-593-01-12001B

Cable Raceway Plan- Turbine BLDG Ground Floo

MD1-0-E-592-01-04101

Lighting and ReceptacleI Layout - Coal Handling Control


MD1-0-E-593-01-12002
BLDG
B

Cable Raceway Plan- Turbine BLDG Mez. Floor

MD1-0-E-592-01-04201

Lighting and receptacleIlayout - fuel oil pump houseMD1-0-E-593-01-12004A

Cable Raceway Plan- Turbine BLDG Lower Roof

MD1-0-E-592-01-04601

Lighting Layout - ESP Control


I
& Ash Elec. BLDG MD1-0-E-593-01-20201B

Main cable Route Plan (1)

MD1-0-E-592-01-04651

Receptacle Layout - ESP


I Control & Ash Elec. BLDG
MD1-0-E-593-01-20202B

Main cable Route Plan (2)

MD1-0-E-592-01-04801

Lighting Layout - DieselI Generator House

MD1-0-E-593-01-20203B

Main cable Route Plan (3)

MD1-0-E-592-01-04901

Lighting and ReceptacleI Layout - Cooling Water Pump


MD1-0-E-593-01-20204
House
B

Main cable Route Plan (4)

MD1-0-E-592-01-05101

Lighting Layout - Gaseous


I Chlorination BLDG

MD1-0-E-593-01-22001A

Cable Route Plan - Turbine Bldg Unit 1 Below Gro

MD1-0-E-592-01-05151

Receptacle Layout - Gaseous


I
Chlorination BLDG MD1-0-E-593-01-22002A

Cable Route Plan - Turbine Bldg Unit 1 Below Gro

MD1-0-E-592-01-05201

Lighting and ReceptacleI Layout - Fuel Oil Unloading


MD1-0-E-593-01-22003
Pump House
A

Cable Route Plan - Turbine Bldg Unit 2 Below Gro

MD1-0-E-592-01-05301

Lighting Layout - ReturnI Water Pump House

MD1-0-E-593-01-22004A

Cable Route Plan - Turbine Bldg Unit 2 Below Gro

MD1-0-E-592-01-05351

Receptacle Layout - Return


I
Water Pump House

MD1-0-E-593-01-23001A

Cable route plan - central control bldg ground floo

MD1-0-E-592-01-06201

Lighting Layout - Coal Yard


I
Dry Storage Shed

MD1-0-E-593-01-23002A

Cable route plan - central control bldg 1st floor

MD1-0-E-592-01-08301

Lighting Layout - Workshop


I
BLDG

MD1-0-E-593-01-23003A

Cable route plan - central control bldg 2nd floor

MD1-0-E-592-01-08351

Receptacle Layout - Workshop


I
BLDG

MD1-0-E-593-01-23004A

Cable route plan - central control bldg 3rd floor

MD1-0-E-592-01-08401

Lighting layout - bulldozer


I garage

MD1-0-E-593-01-23005A

Cable route plan - central control bldg roof

MD1-0-E-592-01-08501

Lighting Layout - I&C Electrical


I
and Mechanical Warehouse
MD1-0-E-593-01-24201A

Cable route plan - fuel oil pump house

MD1-0-E-592-01-08551

Receptacle Layout - I&CI Electrical and MechanicalMD1-0-E-593-01-24401


Warehouse
A

Cable route plan - fire protection pump house

MD1-0-E-592-01-09203

Lighting layout - car garage


I
3

MD1-0-E-593-01-25501A

Cable route plan (building service) - water treatme

MD1-0-E-592-01-09253

Receptacle layout - car Igarage 3

MD1-0-E-593-01-25502A

Cable route plan (building service) - water treatme

MD1-0-E-592-01-14101

Lighting Panel ScheduleI - Coal Handling Control BLDG


MD1-0-E-593-01-25503A

Cable route plan (building service) - waste water p

MD1-0-E-592-01-14501

Lighting Panel ScheduleI - Ash Slurry Pump HouseMD1-0-T-060-05-01001A

PROCEDURE FOR PERMIT TO WORK DURING

MD1-0-E-592-01-14601

Lighting Panel ScheduleI - ESP Control & Ash Elec.MD1-0-V-111-01-00421


BLDG
A

Generator On-Line Monitoring System Arrangeme

MD1-0-E-592-01-14901

Lighting Panel ScheduleI - Cooling Water Pump House


MD1-0-V-111-01-00422A

Generator On-Line Monitoring System Arrangeme

MD1-0-E-592-01-15101

Lighting Panel ScheduleI - Gaseous Chlorination BLDG


MD1-0-V-111-07-00758A

AC/DC Bus Duct Sizing Calculation Report

MD1-0-E-592-01-15301

Lighting Panel ScheduleI - Return Water Pump House


MD1-0-V-111-11-00850A

Schematic Diagrams of NGR & NGTR Panel

MD1-0-E-592-01-16201

Lighting Panel ScheduleI - Coal Yard Dry Storage Shed


MD1-0-V-111-11-00852A

Schematic diagrams for generator protection relay

MD1-0-E-592-01-16501

Lighting Panel ScheduleI - Limestone Handling Control


MD1-0-V-111-11-00854
BLDG
A

Generator Fault Recorder Panel

MD1-0-E-592-01-18051

Lighting Panel ScheduleI - I&C Electrical and Mechanical


MD1-0-V-111-33-00850
Warehouse
A

Generator overall protection logic diagram

MD1-0-E-592-01-18301

Lighting Panel ScheduleI - Workshop BLDG

MD1-0-V-111-55-00761A

Excitation Transformer Calculation Report

MD1-0-E-592-01-18401

Lighting panel scheduleI - bulldozer garage

MD1-0-V-111-57-00750A

AC/DC Busduct Miscellaneous Drawings

MD1-0-E-592-01-19203

Lighting panel scheduleI - car garage 3

MD1-0-V-121-11-00018A

Mortor Name Plate Drawing for BFP & BFBP

MD1-0-E-592-06-04101

Lighting Calculation - Coal


I Handling Control BLDGMD1-0-V-131-01-00005A

Motor sectional drawings

MD1-0-E-592-06-04201

Lighting calculation - fuel


I oil pump house

MD1-0-V-131-11-00007A

Name plate drawing for motor

MD1-0-E-592-06-04501

Lighting Calculation - ASH


I Slurry Pump House

MD1-0-V-131-11-00009A

Arrangement drawing for the electrical cathodic pr

MD1-0-E-592-06-04601

Lighting Calculation - ESP


I Control & ASH Elec. BLDG
MD1-0-V-131-11-00010A

Wiring diagram for the electrical cathodic protectio

MD1-0-E-592-06-04801

Lighting Calculation - Diesel


I
Generator House

MD1-0-V-131-11-00011A

Mechanical drawing for the electrical cathodic prot

MD1-0-E-592-06-04901

Lighting Calculation - Cooling


I
Water Pump House MD1-0-V-131-11-00012A

Control panel drawing for the electrical cathodic pr

MD1-0-E-592-06-05101

Lighting Calculation - Gaseous


I
Chlorination BLDG MD1-0-V-131-11-00013A

Distribution panel drawing for the electrical cathod

MD1-0-E-592-06-05201

Lighting Calculation - Fuel


I Oil Unloading Pump House
MD1-0-V-131-35-00001A

Wiring diagrmas for circulating water pumps

MD1-0-E-592-06-05301

Lighting Calculation - Return


I
Water Pump House MD1-0-V-132-01-00056A

Sea water intake facility - electrical panel layout

MD1-0-E-592-06-06201

Lighting Calculation - Coal


I Yard Dry Storage Shed MD1-0-V-132-31-00055A

Sea Water Intake Facility - Single Line Diagram

MD1-0-E-592-06-06501

Lighting Calculation - Limestone


I
Handling Control BLDG
MD1-0-V-132-35-00054A

Sea Water Intake Facility - Electrical Wired Diagra

MD1-0-E-592-06-08301

Lighting Calculation - Workshop


I
BLDG

MD1-0-V-151-10-00005A

AIR COMPRESSOR - DIMENSION DRAWING FO

MD1-0-E-592-06-08401

Lighting calculation - bulldozer


I
garage

MD1-0-V-151-35-00011A

AIR COMPRESSOR - WIRING DIAGRAM FOR A

MD1-0-E-592-06-08501

Lighting Calculation - I&C


I Electrical and Mechanical
MD1-0-V-151-35-00013
Warehouse
A

AIR COMPRESSOR - WIRING DIAGRAM FOR S

MD1-0-E-592-06-09203

Lighting calculation - carI garage 3

MD1-0-V-151-35-00035A

AIR COMPRESSOR - WIRING DIAGRAM FOR C

MD1-0-E-593-01-10001

Cable Raceway Plan- Symbol


I
and Legend

MD1-0-V-162-08-00009A

Electrical Load Lists

MD1-0-E-593-01-10102

Cable Raceway Plan- Cable


I
Tray Assembly Detail MD1-0-V-162-11-00018
(2/2)
A

Cable Trench Arrangement Drawing

MD1-0-E-593-01-10201

Cable Raceway Plan- General


I
Details (1/2)

MD1-0-V-167-05-00002A

Fuel oil pump inspection & test procedure for moto

MD1-0-E-593-01-10202

Cable Raceway Plan- General


I
Details (2/2)

MD1-0-V-171-01-02012A

Cabling, earthing & lightning protection layout tt-06

MD1-0-E-593-01-10301

Cable Raceway Plan- Installation


I
Details (1/3)

MD1-0-V-171-01-02013A

Cabling, earthing & lightning protection layout tt-05

MD1-0-E-593-01-10302

Cable Raceway Plan- Installation


I
Details (2/3)

MD1-0-V-171-01-02014A

CABLING, EARTHING & LIGHTNING PROTECT

MD1-0-E-593-01-10303

Cable Raceway Plan- Installation


I
Details (3/3)

MD1-0-V-171-01-02015A

Cabling, earthing & lightning protection layout tt-03

MD1-0-E-593-01-11001

Cable Raceway Plan - Boiler


I
Area Unit-1 EL.+4,115
MD1-0-V-171-01-02016A

Cabling, earthing & lightning protection layout tt-02

MD1-0-E-593-01-11002

Cable Raceway Plan - Boiler


I
Area Unit-1 EL.+7,315
MD1-0-V-171-01-02018B

CABLING, EARTHING & LIGHTNING PROTECT

MD1-0-E-593-01-11003

Cable Raceway Plan - Boiler


I
Area Unit-1 EL.+10,365
MD1-0-V-171-01-02019A

CABLING, EARTHING & LIGHTNING PROTECT

MD1-0-E-593-01-11004

Cable Raceway Plan - Boiler


I
Area Unit-1 PLATE EL.+12,600
MD1-0-V-171-01-02020A

CABLING, EARTHING & LIGHTNING PROTECT

MD1-0-E-593-01-11005

Cable Raceway Plan - Boiler


I
Area Unit-1 EL.+19,787
MD1-0-V-171-01-02021A

CABLING, EARTHING & LIGHTNING PROTECT

MD1-0-E-593-01-11006

Cable Raceway Plan - Boiler


I
Area Unit-1 EL.+26,970
MD1-0-V-171-01-02022A

CABLING, EARTHING & LIGHTNING PROTECT

MD1-0-E-593-01-11007

Cable Raceway Plan - Boiler


I
Area Unit-1 EL.+32,300
MD1-0-V-171-01-02027A

Illumination layout for transfer tower no.tt-06 for ch

MD1-0-E-593-01-11008

Cable Raceway Plan - Boiler


I
Area Unit-1 EL.+35,600
MD1-0-V-171-01-02028A

Illumination layout for transfer tower no.tt-05 for ch

MD1-0-E-593-01-11009

Cable Raceway Plan - Boiler


I
Area Unit-1 EL.+43,850
MD1-0-V-171-01-02029A

Illumination layout for transfer tower no.tt-04 for ch

MD1-0-E-593-01-11010

Cable Raceway Plan - Boiler


I
Area Unit-1 EL.+46,480
MD1-0-V-171-01-02030A

Illumination layout for transfer tower no.tt-03 for ch

MD1-0-E-593-01-11011

Cable Raceway Plan - Boiler


I
Area Unit-1 EL.+51,572
MD1-0-V-171-01-02031A

llumination layout for transfer tower no.tt-02 for ch

MD1-0-E-593-01-11012

Cable Raceway Plan - Boiler


I
Area Unit-1 EL.+55,753
MD1-0-V-171-01-02032B

Illumination layout for transfer tower no.tt-01 for ch

MD1-0-E-593-01-12003

Cable Raceway Plan- Turbine


I
BLDG Operating Floor
MD1-0-V-171-01-02035A

Illumination layout for transfer conveyor no.bc-03a

MD1-0-E-593-01-13001

Cable Raceway Plan- Central


I
Control BLDG Ground
MD1-0-V-171-06-02003
Floor
B

Transformer sizing calculation for chs

MD1-0-E-593-01-13002

Cable Raceway Plan- Central


I
Control BLDG 1st Floor
MD1-0-V-171-08-02006A

Equipment List for Coal Handling System

MD1-0-E-593-01-13003

Cable Raceway Plan- Central


I
Control BLDG 2nd Floor
MD1-0-V-171-09-02218A

GA & BOM for LPBS(CHS)

MD1-0-E-593-01-13004

Cable Raceway Plan- Central


I
Control BLDG 3rd Floor
MD1-0-V-171-11-02201A

Ga & data sheet for 10kv motors for chs

MD1-0-E-593-01-13005

Cable Raceway Plan- Central


I
Control BLDG Roof Floor
MD1-0-V-171-31-02004A

Single line diagram for chs

MD1-0-E-593-01-13101

Cable Raceway SupportI Plan - Central Control BLDG


MD1-0-V-172-01-02014
Ground Floor
A

Cabling, earthing & lightning protection layout for l

MD1-0-E-593-01-13102

Cable Raceway SupportI Plan - Central Control BLDG


MD1-0-V-172-01-02017
First Floor
A

Cabling, earthing & lightning protection layout for b

MD1-0-E-593-01-13103

Cable Raceway SupportI Plan - Central Control BLDG


MD1-0-V-172-01-02018
Second Floor
A

Cabling, earthing & lightning protection layout for b

MD1-0-E-593-01-13104

Cable Raceway SupportI Plan - Central Control BLDG


MD1-0-V-172-01-02019
Third Floor
A

Cabling, earthing & lightning protection layout for b

MD1-0-E-593-01-19300

Cable raceway plan overall


I
index plan

MD1-0-V-172-01-02020A

Cabling, earthing & lightning protection layout for b

MD1-0-E-593-01-19301

Cable raceway plan pipe


I rack area (1)

MD1-0-V-172-01-02021A

Cabling, earthing & lightning protection layout for b

MD1-0-E-593-01-19302

Cable raceway plan pipe


I rack area (2)

MD1-0-V-172-01-02029A

Illumination layout for transfer tower lt-01 for lhs

MD1-0-E-593-01-19303

Cable raceway plan pipe


I rack area (3)

MD1-0-V-172-01-02030A

Illumination layout for transfer tower lt-02 for lhs

MD1-0-E-593-01-19304

Cable raceway plan pipe


I rack area (4)

MD1-0-V-172-01-02031A

Illumination layout for transfer tower lt-03 for lhs

MD1-0-E-593-01-19305

Cable raceway plan pipe


I rack area (5)

MD1-0-V-172-01-02032A

Illumination layout for transfer tower lt-04 for lhs

MD1-0-E-593-01-19306

Cable raceway plan pipe


I sleeper(1)

MD1-0-V-172-01-02035A

Illumination layout for transfer conveyor no. bc l-01

MD1-0-E-593-01-19307

Cable raceway plan pipe


I sleeper(2)

MD1-0-V-172-01-02036A

Illumination layout for transfer conveyor no. bc l-02

MD1-0-E-593-01-19308

Cable raceway plan pipe


I sleeper(3)

MD1-0-V-172-01-02037A

Illumination layout for transfer conveyor no. bc l-03

MD1-0-E-593-01-19309

Cable raceway plan pipe


I sleeper(4)

MD1-0-V-172-01-02038A

Illumination layout for transfer conveyor no. bc l-04

MD1-0-E-593-01-19310

Cable raceway plan pipe


I sleeper(5)

MD1-0-V-172-01-02039A

Illumination layout for transfer conveyotno.bc l-05

MD1-0-E-593-01-19311

Cable raceway plan pipe


I sleeper(6)

MD1-0-V-172-06-02002A

Transformer Sizing Calculation for LHS

MD1-0-E-593-01-19312

Cable raceway plan pipe


I sleeper(7)

MD1-0-V-172-08-02005A

Equipment List for Limestone Handling System

MD1-0-E-593-01-19313

Cable raceway plan pipe


I sleeper(8)

MD1-0-V-172-08-02006A

Power cable schedule for lhs

MD1-0-E-593-01-19314

Cable raceway plan pipe


I sleeper(9)

MD1-0-V-172-31-02003A

Single line diagram for limestone handling system

MD1-0-E-593-01-19315

Cable raceway plan pipe


I sleeper(10)

MD1-0-V-173-06-02513A

Transformer sizing calculation for 400v return wate

MD1-0-E-593-01-19316

Cable raceway plan pipe


I sleeper(11)

MD1-0-V-173-06-02519A

Transformer sizing calculation for 400v ash slurry

MD1-0-E-593-01-19317

Cable raceway plan pipe


I sleeper(12)

MD1-0-V-173-32-02501A

Key sld for ahs power distribution scheme

MD1-0-E-593-01-19318

Cable raceway plan pipe


I sleeper(13)

MD1-0-V-182-35-30000A

Generator Wiring Diagram for Emergency Diesel G

MD1-0-E-593-01-19319

Cable raceway plan pipe


I sleeper(14)

MD1-0-V-191-01-30001A

Electric Construction Drawings for STG Building E

MD1-0-E-593-01-19320

Cable raceway plan pipe


I sleeper(15)

MD1-0-V-191-01-30009A

Electric Construction Drawings for Boiler Feedwat

MD1-0-E-593-01-19321

Cable raceway plan pipe


I sleeper(16)

MD1-0-V-191-01-30101A

Electric Construction Drawings for Chlorination Bu

MD1-0-E-593-01-19322

Cable raceway plan pipe


I sleeper(17)

MD1-0-V-191-01-30107A

Electric Construction Drawings for Water Treatme

MD1-0-E-593-01-19323

Cable raceway plan pipe


I sleeper(18)

MD1-0-V-191-01-30117A

Electric Construction Drawings for Fire Protection

MD1-0-E-593-01-19324

Cable raceway plan pipe


I sleeper(19)

MD1-0-V-191-01-30118A

Electric Construction Drawings for Waste Water A

MD1-0-E-593-01-19325

Cable raceway plan pipe


I sleeper(20)

MD1-0-V-191-01-30119A

Electric Construction Drawings for Chlorination Bu

MD1-0-E-593-01-19326

Cable raceway plan pipe


I sleeper(21)

MD1-0-V-191-32-30001A

Schematic Diagram for STG Building EOT Crane

MD1-0-E-593-01-19327

Cable raceway plan pipe


I sleeper(22)

MD1-0-V-191-32-30009A

Schematic Diagram for Boiler Feedwater Pump EO

MD1-0-E-593-01-19328

Cable raceway plan pipe


I sleeper(23)

MD1-0-V-191-32-30101A

Schematic Diagram for Chlorination Building Hois

MD1-0-E-593-01-19329

Cable raceway plan pipe


I sleeper(24)

MD1-0-V-191-32-30107A

Schematic Diagram for Water Treatment Building

MD1-0-E-593-01-19330

Cable Raceway Plan - Pipe


I
Sleeper(25)

MD1-0-V-191-32-30117A

Schematic Diagram for Fire Protection Pump Hou

MD1-0-E-593-01-20205

Main cable Route Plan Section


I
& Detail

MD1-0-V-191-32-30118A

Schematic Diagram for Waste Water Area Pump

MD1-0-E-593-01-26901

Cable Route Plan - Transformer


I
Area(Unit1)

MD1-0-V-191-32-30119A

Schematic Diagram for Chlorination Building Vapo

MD1-0-E-593-01-26902

Cable Route Plan - Transformer


I
Area(Unit2)

MD1-0-V-360-10-00550B

LIGHTNING PROTECTION SYSTEM AND GROU

MD1-0-E-593-01-26905

Cable route plan - station


I transformer area

MD1-0-V-505-05-00103A

Instruction and maintenance manual for station tra

MD1-0-E-593-01-28901

Cable route plan - common


I
service bldg ground floor
MD1-0-V-505-05-00106A

Quality assurance program manual for station tran

MD1-0-E-593-01-28902

Cable route plan - common


I
service bldg roof

MD1-0-V-505-05-00203A

Instruction and maintenance manual for unit auxili

MD1-0-T-055-05-00115

Method Statemnt for Earthing


I
& Lightning Protection
MD1-0-V-505-05-50001A

Shop Test and Inspection Procedure for Auxiliary(

MD1-0-T-055-05-00133

Method statement for Raceway


I
Work

MD1-0-V-505-08-00112A

List of Essential Spare Parts Station Transformer

MD1-0-T-055-05-00143

Method Statement for Lighting


I
and Small Power System
MD1-0-V-515-01-00001A

Isolated Phase Busduct Layout & Support Structu

MD1-0-T-055-05-00201

Method Statement for Installation


I
of Cathodic Protection
MD1-0-V-515-01-00008A

Pressurization System

MD1-0-T-055-05-00202

Method Statement for Electrical


I
Panel Board

MD1-0-V-535-11-00001B

Layout and single line diagram for 220v dc system

MD1-0-T-055-05-00203

Method Statement For Cable


I
Installation

MD1-0-V-535-11-00002B

Layout and single line diagram for 220v dc systme

MD1-0-T-055-05-00204

Method Statement for Electrical


I
Heat tracing

MD1-0-V-535-11-00003B

Layout and single line diagram for 220v dc system

MD1-0-T-055-05-00210

Method statement for dc_ups


I

MD1-0-V-540-11-00004B

Layout and single line diagram for 230v ups system

MD1-0-T-055-05-00211

Method Statement for GCB


I
installation

MD1-0-V-570-05-00071A

110KV Switchyard Energizing Procedure

MD1-0-V-111-01-00412

Neutral Tie & EnclosureI Assembly

MD1-0-V-580-08-00002A

Essential Spare Parts List for Transformer Protect

MD1-0-V-111-05-00018

Long term storage instruction


I
for generator

MD1-0-V-580-31-00001C

Single line diagram for transformer protection syst

MD1-0-V-111-05-00400

Method Statement for Generator


I
Installation

MD1-0-V-591-05-00001A

Cables inspection & test plan

MD1-0-V-111-05-00431

Test procedure for generator


I
rotor balancing

MD1-0-V-591-05-00003A

Cables qa/qc manual

MD1-0-V-111-05-00432

Test procedure for generator


I
rotor assembly

MD1-0-V-805-01-00100A

Cable Tray Conduit Arrangement for WT & WWT

MD1-0-V-111-05-00433

Test Procedure for Generator


I
Running Behavior

MD1-0-V-805-08-00030B

Electrical equipment list for wt & wwt

MD1-0-V-111-08-00718

Excitation system external


I i/o list

MD1-0-V-805-09-00003B

Cable schedule for wt&wwt

MD1-0-V-111-09-00400

Generator Reactive Capability


I
Curve

MD1-0-V-805-09-00044A

Equipment List

MD1-0-V-111-09-00401

Estimated Vee Curves I

MD1-0-V-805-09-00051A

Motor Data Sheet

MD1-0-V-111-09-00402

Estimated Saturation and


I Synchronous ImpedanceMD1-0-V-860-08-00015
Curve
C

Wiring and cabling Requirement for Gaseous Chlo

MD1-0-V-111-09-00403

Estimated Generator Loss


I Curve

MD1-0-V-870-31-00001A

Single line diagram for sewage treatment system

MD1-0-V-111-09-00404

Estimated Three-PhaseI Short Circuit Decrement Curve


MD1-1-E-593-01-21001A

Cable Route Plan Boiler Area Unit 1A El.+0.0m

MD1-0-V-111-09-00405

Estimated Line-Line Short


I Circuit Decrement CurveMD1-1-E-593-01-21002A

Cable Route Plan Boiler Area Unit 1B El.+0.0m

MD1-0-V-111-09-00754

Excitation recommended
I parameter for generator protection
MD1-1-V-173-06-02511A

Transformer sizing calculation for 400v fa/ba pmcc

MD1-0-V-111-10-00766

AVR Room Layout Drawings


I

MD1-2-E-593-01-21001A

Cable Route Plan Boiler Area Unit 2A El.+0.0m

MD1-0-V-111-10-00767

AVR Room Layout Drawing


I
(2 of 2)

MD1-2-E-593-01-21002A

Cable Route Plan Boiler Area Unit 2B El.+0.0m

MD1-0-V-111-10-00768

Excitation transformer outline


I
drawing (1of4)

MD1-2-V-173-06-02512A

Transformer sizing calculation for 400v fa/ba pmcc

MD1-0-V-111-10-00769

Excitation transformer outline


I
drawing (2of4)

MD1-0-V-111-10-00770

Excitation transformer outline


I
drawing (3of4)

MD1-0-V-111-10-00771

Excitation transformer outline


I
drawing (4of4)

MD1-0-V-111-11-00751

Ac busduct layout drawings


I

MD1-0-V-111-11-00752

Dc busduct layout drawings


I

MD1-0-V-111-11-00759

Excitation system elementary


I
diagram

MD1-0-V-111-32-00400

Emerg. Seal Oil Pump Motor


I
Starter (1/4)

MD1-0-V-111-32-00401

Emerg. Seal Oil Pump Motor


I
Starter (2/4)

MD1-0-V-111-32-00402

Emerg. Seal Oil Pump Motor


I
Starter (3/4)

MD1-0-V-111-32-00403

Emerg. Seal Oil Pump Motor


I
Starter (4/4)

MD1-0-V-111-32-00755

Schematic diagram of excitation


I
system

MD1-0-V-111-35-00422

Stator Winding DiagramI

MD1-0-V-111-57-00407

Shaft Grounding Brush IRigging Assembly

MD1-0-V-113-08-00047

Condenser - Electrical Load


I
List

MD1-0-V-113-10-00063

Steam surface condenser


I - cathodic protection system

MD1-0-V-113-35-00028

Wiring Diagram of Cathodic


I
Protection System

MD1-0-V-113-35-00029

Connection Diagram of ICathodic Protection System

MD1-0-V-113-55-00026

Design Analysis for Cathodic


I
Protection System

MD1-0-V-121-01-00004

Motor sectional drawingI for boiler feed pump and booster pump

MD1-0-V-121-02-00002

Motor Characteristic Curves


I
for BFP & BFBP

MD1-0-V-121-05-00008

Motor Shop Inspection and


I
Test Plan BFP & BFBP

MD1-0-V-121-05-00009

Shop Inspection and Test


I Procedure for Motor of BFBP & BFP

MD1-0-V-121-10-00001

Motor Outline Drawing (for


I BFP & BFBP)

MD1-0-V-121-11-00012

Motor Main Terminal Box


I Drawing for BFP & BFBP

MD1-0-V-121-11-00014

Motor Acc'y Terminal Box


I Drawing for BFP & BFBP

MD1-0-V-121-11-00015

Motor Acc'y Terminal Box


I Wiring Diagram for BFP & BFBP

MD1-0-V-121-11-00016

Motor Space Heater Terminal


I
Box Drawing for BFP & BFBP

MD1-0-V-121-11-00019

Mortor Leakage Detector


I Drawing for BFP & BFBP

MD1-0-V-122-01-00003

Motor Sectional Drawing


I for Condenstat Extraction pump

MD1-0-V-122-02-00002

Motor Characteristic Curve


I
for Condenstate Extraction Pump

MD1-0-V-122-05-00008

MOTOR SHOP INSPECTION


I
AND TEST PLAN FOR CONDENSATE EXTRACTION PUMP

MD1-0-V-122-05-00009

Motor Shop Inspection and


I
Test Procedure for Condensate Extraction

MD1-0-V-122-05-00010

Motor painting procedure


I for condensate extraction pump

MD1-0-V-122-10-00001

Motor Outline Drawing for


I Condenstate Extraction Pump

MD1-0-V-122-11-00004

Motor Name Plate for Condenstate


I
Extraction Pump

MD1-0-V-122-11-00006

Motor Main Terminal Box


I Drawing for Condensate Extraction Pump

MD1-0-V-122-11-00007

Motor Ass'y Terminal Box


I Drawing for Condensate Extraction Pump

MD1-0-V-122-11-00008

Motor Space Heater Terminal


I
Box Drawing for Condensate Extraction Pump

MD1-0-V-122-11-00009

Motor Neutral Terminal IBox Drawing for Condensate Extraction Pump

MD1-0-V-122-35-00001

Motor Ass'y T/Box Wiring


I Diagram DWG for Condensate Extraction Pump

MD1-0-V-131-02-00002

Inspection and test planI for motor

MD1-0-V-131-08-00021

Electrical Load Lists forICirculating Water Pump

MD1-0-V-131-08-00026

Utility consumption list I

MD1-0-V-131-08-00027

Lubrication list for motorI

MD1-0-V-131-08-00028

Auxiliary power consumption


I
list

MD1-0-V-131-10-00003

Outline and dimensionalI drawing of motors and motor terminal box

MD1-0-V-131-10-00006

Outline and dimensionalI drawing of motor main terminal box

MD1-0-V-131-10-00007

Outline and dimensionalI drawing of motor neutral terminal box

MD1-0-V-131-10-00008

Outline and dimensionalI drawing of motor heater terminal box

MD1-0-V-131-11-00005

Current Transformer Drawing


I

MD1-0-V-131-35-00002

Wiring diagram for motor


I

MD1-0-V-132-10-00017

Sea water intake facilityI - stop log cathodic protection

MD1-0-V-133-08-00014

Electrical load list

MD1-0-V-133-11-00041

Water Box Vacuum Pump


I Earthing Drawing

MD1-0-V-134-08-00018

Electrical load list for control


I
panel (condenser tube cleaning system)

MD1-0-V-151-08-00024

Air Compressor - Electrical


I
Load Lists

MD1-0-V-161-73-07901

Electrical Location PlanI Drawing Index

MD1-0-V-161-73-07903

Electrical Location PlanI at EL. 12115

MD1-0-V-161-73-07904

Electrical Location PlanI at EL. 15315 THR EL. 15700

MD1-0-V-161-73-07905

Electrical Location PlanI at EL. 18365 THR EL. 19700

MD1-0-V-161-73-07907

Electrical Location PlanI at EL. 27787 THR EL. 28800

MD1-0-V-161-73-07908

Electrical Location PlanI at EL. 32060 THR EL. 34970 Key Level

MD1-0-V-161-73-07909

Electrical Location PlanI at EL 37600

MD1-0-V-161-73-07910

Electrical Location PlanI at EL 40300

MD1-0-V-161-73-07911

Electrical Location PlanI at EL 43600 THR EL 43890

MD1-0-V-161-73-07912

Electrical Location PlanI at EL 46700

MD1-0-V-161-73-07914

Electrical Location PlanI at EL 51850 Key Level

MD1-0-V-161-73-07915

Electrical Location PlanI at EL 54005 THR EL 56515

MD1-0-V-161-73-07917

Electrical Location PlanI at EL 58400 THR EL59572

MD1-0-V-161-73-07918

Electrical Location PlanI at EL 61213 THR EL 62703

MD1-0-V-162-01-00002

Esp cabinets arrangement


I diagram

MD1-0-V-162-03-00003

Characteristics of Rectifier
I & Thyrister

MD1-0-V-162-06-00003

System Calculation for within


I
Supplier's Scope of Supply(Illumination Calculati)

MD1-0-V-162-08-00010

Electrical heat loss list I

MD1-0-V-163-09-00007

Motor Terminal Box Drawing


I

MD1-0-V-167-09-00004

Motor Performance Curve


I

MD1-0-V-167-09-00005

Lcp tech. data & dwg

MD1-0-V-167-10-00002

Motor Outline Drawing &


I Terminal Box Drawing

MD1-0-V-171-01-02005

Equipment List for CoalI Handling System

MD1-0-V-171-01-02033

Illumination layout for transfer


I
conveyor no.bc-06a/b for chs

MD1-0-V-171-01-02034

Illumination layout for transfer


I
conveyor no.bc-05a/b for chs

MD1-0-V-171-08-02007

Power cable schedule for


I chs

MD1-0-V-171-08-02063

Peak Power Demand for


I CHS

MD1-0-V-171-09-02226

GA of Lighting JunctionIBox(CHS)

MD1-0-V-172-01-02004

Electrical equipment layout


I
for lhs electrical & control building

MD1-0-V-172-08-02001

Electrical Load List for LHS


I

MD1-0-V-172-08-02062

Peak power demand forI lhs

MD1-0-V-172-11-02224

GA of Lighting junction Box(LHS)


I

MD1-0-V-173-01-02543

Fly Ash Silo Earthing Layout


I

MD1-0-V-173-01-02551

ESP Control Building UNIT-1


I
& 2 ASH Handling System Electrical Equipment Layout

MD1-0-V-182-01-10001

General arrangement for


I emergency diesel generator

MD1-0-V-182-08-31001

Electric Load List for Emergency


I
Diesel Generator

MD1-0-V-186-11-00733

Fuel oil storage tank cable


I support detail

MD1-0-V-186-11-00822

Diesel oil storage tank cable


I
support detail

MD1-0-V-360-11-00551

LIGHTING PROTECTION
I SYSTEM AND GROUNDING - DETAILS

MD1-0-V-505-01-00102

Legend for Definite Dimension


I
Drawing for Station Transformer

MD1-0-V-505-01-00103

Definite Demension Drawing


I
for Station Trnasformer

MD1-0-V-505-01-00201

Preliminary DimensionalI Outline Drawing for Unit Auxiliary Transformer

MD1-0-V-505-01-00202

LEGEND FOR DEFINITE


I DIMENSION DRAWING FOR UNIT AUXILIARY TRANSFORMER

MD1-0-V-505-01-00203

DEFINITE DIMENSIONI DRAWING FOR UNIT AUXILIARY TRANSFORMER

MD1-0-V-505-01-00205

PART LIST OF LV1,2 NEUTRAL


I
CABLE JUNCTION BOX FOR UNIT AUXILIARY TRANSFORMER

MD1-0-V-505-05-00001

Factory Acceptance Test


I and Inspection Plan for Generator Transformer

MD1-0-V-505-05-00004

Cleaning, Coating and Painting


I
Procedures for Generator Transformer

MD1-0-V-505-05-00005

Welding Procedure Specification


I
for Generator Transformer

MD1-0-V-505-05-00006

Quality Assurance Program


I
Manual for Generator Transformer

MD1-0-V-505-05-00007

Factory acceptance testI and inspection procedure for generator transformer

MD1-0-V-505-05-00101

FACTORY ACCEPTANCE
I
TEST AND INSPECTION PLAN FOR STATION TRANSFORMER

MD1-0-V-505-05-00104

Cleaning Coating and Painting


I
Procedures for Station Transformer

MD1-0-V-505-05-00105

Welding Procedure Spec.


I For Station Transformer

MD1-0-V-505-05-00201

FACTORY ACCEPTANCE
I
TEST AND INSPECTION PLAN FOR UNIT AUXILIARY TRANSFORMER

MD1-0-V-505-07-00002

Bct overexcitation characteristic


I
curves for generator transformer

MD1-0-V-505-07-00003

Loading Curve with SiteI Ambient Temperatures for Generator Transformer

MD1-0-V-505-07-00102

BCT Overexitaion Characteristic


I
Curves for Station Transformer

MD1-0-V-505-07-00103

Loading Curve with SiteI Ambient Temperatures for Station Transformer

MD1-0-V-505-07-00111

Factory acceptance testI and inspection report for station transformer

MD1-0-V-505-07-00202

BTC Overexcitation Characteristic


I
Curves for Unit Auxiliary Transformer

MD1-0-V-505-08-50001

Shop Test and Inspection


I Plan for Auxiliary(10/0.42kV) Transformer

MD1-0-V-505-10-00001

Name Plate Drawing forI Generator Trnasformer

MD1-0-V-505-10-00002

Bushing Drawings for Generator


I
Transformer

MD1-0-V-505-10-00101

Connection Diagram and


I Rating Plate for Station Transformer

MD1-0-V-505-10-00102

LV1,2 Cable Junction Box


I for Station Transformer

MD1-0-V-505-10-00103

Part List of LV1,2 CableI Junction Box for Station Transformer

MD1-0-V-505-10-00104

LV1,2 Neutral Cable Junction


I
Box for Station Transformer

MD1-0-V-505-10-00105

Part List of LV1,2 Neutral


I Cable Junction Box for Station Transformer

MD1-0-V-505-10-00106

On-Load tap Changer Motor


I
Drive Unit for Station Transformer

MD1-0-V-505-10-00107

Layout of marshalling kiosk


I
for station transformer

MD1-0-V-505-10-00108

Bushing Drawings for Station


I
Transformer

MD1-0-V-505-10-00109

Circuit diagram of marshalling


I
kiosk for station transformer

MD1-0-V-505-10-00204

LV1,2 NEUTRAL CABLE


I JUNCTION BOX FOR UNIT AUXILIARY TRANSFORMER

MD1-0-V-505-10-00208

Bushing Drawings for Unit


I Auxiliary Transformer

MD1-0-V-505-11-00001

Detailed Outline Drawing


I Including Installation Details for Generator Transformr

MD1-0-V-505-11-00002

List of Items to DetailedI Outline Drawing for Generator Transformer

MD1-0-V-505-11-00005

Transport Drawing for Generator


I
Transformer

MD1-0-V-505-11-00101

Transport Drawing for Station


I
Transformer

MD1-0-V-505-11-00201

TRANSPORT DRAWING
I FOR UNIT AUXILIARY TRANSFORMER

MD1-0-V-510-03-00002

Brochure

MD1-0-V-510-05-00012

Generator circuit-breaker
I system hec 7b : operating manual

MD1-0-V-510-05-00013

Treatment and storage Iinstructions he

MD1-0-V-510-05-00014

Hydraulic spring operating


I mechanism hmb-4/-8 operation and maintenance

MD1-0-V-510-05-00015

Transport instructions hec


I 7/8

MD1-0-V-510-07-00007

Painting instruction

MD1-0-V-510-10-00008

Generator circuit breaker


I outline drawing

MD1-0-V-510-32-00010

Schematic diagram

MD1-0-V-510-36-00011

Name plate drawing

MD1-0-V-510-55-00004

Data sheet

MD1-0-V-510-55-00005

Normal current carryingI capability curve

MD1-0-V-515-01-00002

Isolated Phase BusductI - Sub Assembly Drawing

MD1-0-V-515-01-00003

IPB Termination at Generator


I
End

MD1-0-V-515-01-00004

IPB Termination at GCBI

MD1-0-V-515-01-00005

IPB Termination at Gen.


I Transformer

MD1-0-V-515-01-00006

IPB Termination at UAT


I

MD1-0-V-515-01-00007

IPB Termination at Excitation


I
Transformer end

MD1-0-V-515-01-00009

Component Drawings I

MD1-0-V-515-05-00001

Ipb shop test procedureI

MD1-0-V-515-05-00002

Ipb site test procedure I

MD1-0-V-515-05-00004

Welding book(wps, wpq,


I pqr)

MD1-0-V-515-05-00005

Ipb painting procedure Ifor isolated phase busduct

MD1-0-V-515-05-10002

Shop Test and Inspection


I Procedure for NSPB

MD1-0-V-515-07-00001

Isolated phase busduct Ico-relation with type tested design

MD1-0-V-515-08-10001

Shop Test and Inspection


I Plan for NSPB

MD1-0-V-515-55-00001

Design calculations for Iisolated phase busduct

MD1-0-V-515-55-00002

IPB Support Steel Structure


I
Analysis

MD1-0-V-515-57-00001

Inspection & test plan for


I isolated phase busduct & accessories

MD1-0-V-520-05-00001

Catalogue and Instruction


I Manual for MV SWGR Equipements

MD1-0-V-520-05-00002

Shop Test & InspectionI Procedure for MV SWGR

MD1-0-V-520-05-00101

Maintenance Recommendations
I
for MV SWGR

MD1-0-V-520-08-10001

Shop Test & InspectionIPlan for MV SWGR

MD1-0-V-525-01-10001

Arrangement and layoutI drawing for mcc(for 06blk)

MD1-0-V-525-05-00001

Catalogue and Instruction


I Manual for LV SWGR and MCC Equipements

MD1-0-V-525-05-00002

Shop Test & InspectionIProcedure for LV SWGR

MD1-0-V-525-05-00101

Maintenance Recommendations
I
for LV SWGR and MCC

MD1-0-V-525-05-10002

Shop Test & InspectionIProcedure for MCC

MD1-0-V-525-08-20001

Shop Test & InspectionI Plan for LV SWGR

MD1-0-V-525-08-30001

Shop Test & InspectionIPlan for MCC

MD1-0-V-525-31-10001

Electrical One-Line andI Three-Line Diagram for MCC(for 06BLK)

MD1-0-V-525-32-00001

Complete Schematic Wiring


I
Diagram for LV Switchgears(06BFA, 06BFB, 06BFC, 06BFD,

MD1-0-V-525-32-00002

Complete Schematic Wiring


I
Diagram for LV Switchgears(Others)

MD1-0-V-525-32-10001

Complete Schematic Wiring


I
Diagram for MCC(for 06BLK)

MD1-0-V-530-01-20001

Arrangement and Layout


I Drawing for Lighting Panel

MD1-0-V-530-05-00001

Catalogue and Instruction


I Manual for DB

MD1-0-V-530-05-00002

Shop Test & InspectionIProcedure for DB

MD1-0-V-530-05-00101

Maintenance Recommendations
I
for DB

MD1-0-V-530-08-00001

Shop Test & InspectionI Plan for DB

MD1-0-V-530-31-20001

Electrical Three-line Diagram


I
for Lighting Panel

MD1-0-V-535-05-00012

Inspection and test planI (itp) for dc and ups system

MD1-0-V-535-05-00014

Fat procedure for dc and


I ups system

MD1-0-V-535-05-00017

Quality manual for dc and


I ups system

MD1-0-V-560-03-00001

Equipment Description Iand Catalogues for Equipment Cathodic Protection

MD1-0-V-560-05-00004

Quality Assurance Manual


I For Cathodic Protection System

MD1-0-V-560-05-00005

Inspection & Test Plan For


I Cathodic Protection System

MD1-0-V-560-05-00006

Inspection & Test Procedure


I
for Cathodic Protection System

MD1-0-V-560-06-00001

Design Calculation for Tank


I
Bottom Cathodic Protection System

MD1-0-V-565-05-00001

Pd monitoring system quality


I
assurance program

MD1-0-V-565-05-00002

Pd monitoring system shop


I
inspection and test plan

MD1-0-V-565-05-00003

Pd monitoring system shop


I
inspection and test procedure

MD1-0-V-565-05-00006

Pd monitoring system packing


I
procedure

MD1-0-V-565-05-00011

Pd moinitoring system operation


I
manual for motor monitoring

MD1-0-V-565-05-00012

Pd monitoring system operation


I
manual for 10kv swgr monitoring

MD1-0-V-565-05-00013

Pd monitoring system operation


I
manual for ipb monitoring

MD1-0-V-565-05-00014

Pd monitoring system operation


I
manual for transformer monitoring

MD1-0-V-565-32-00002

Pd Monitoring System Schematic


I
Diagram for 10kv SWGR Monitoring

MD1-0-V-565-32-00003

Pd Monitoring System Schematic


I
Diagram for IPB Monitoring

MD1-0-V-565-32-00004

Pd monitoring system schematic


I
diagram for transformer monitoring

MD1-0-V-570-05-00074

110KV Switchyard Equipment


I
Operation and Maintenance Manual

MD1-0-V-570-05-00075

500KV Switchyard Equipment


I
Operation and Maintenance Manual

MD1-0-V-570-05-00078

500KV and 110KV Switchyard


I
AC/DC System Operation and Maintenance Manual

MD1-0-V-570-06-00009

500kv and 110kv switchyard


I
48vdc system sizing calculation

MD1-0-V-580-01-00001

Shop test and inspection


I plan for transformer protection system

MD1-0-V-580-05-00001

Shop test and inspection


I procedure for transformer protection system

MD1-0-V-580-05-00003

Qa manual for transformer


I protection system

MD1-0-V-580-05-00005

Operation & MaintenaceI Manual for Transformer Protection and Metering System

MD1-0-V-580-06-00001

Protection Relay SettingI Calculation and List for Transformer Protection and Mem

MD1-0-V-580-10-00001

Layout & Arrangement Drawing


I
for Transformer Protecion System Protecion System

MD1-0-V-580-32-00001

Schematic diagram for transformer


I
protection system(generator tr unit.1 prot. p)

MD1-0-V-580-32-00002

Schematic diagram for transformer


I
protection system(unit aux. tr unit.1 prot. p)

MD1-0-V-580-32-00003

Schematic diagram for transformer


I
protection system(genarator tr unit.2 prot. p)

MD1-0-V-580-32-00004

Schematic diagram for transformer


I
protection system(unit aux. tr unit.2 prot. p)

MD1-0-V-580-32-00005

Schematic diagram for transformer


I
protection system(station tr prot. panel)

MD1-0-V-580-33-00001

Functional logic diagramI for transformer protection system

MD1-0-V-585-32-00001

Schematic diagram for tariff


I
meter panel

MD1-0-V-590-02-00001

Earthing & Lighting Protection


I
material Catalogue

MD1-0-V-590-02-50001

Earthing Conductor Specification


I

MD1-0-V-590-05-00001

Inspection & Test Plan I

MD1-0-V-590-05-00002

Inspection & Test Procedure


I

MD1-0-V-590-05-00003

QA/QC Manual

MD1-0-V-590-05-50001

Earthing Conductor Inspection


I
and Test Plan

MD1-0-V-591-05-00002

Cables inspection & testI procedure

MD1-0-V-591-05-20001

Inspection & Test Procedure


I
for Cable Accessories

MD1-0-V-591-05-20003

Inspection & Test Plan for


I Cable Accessories

MD1-0-V-592-05-50001

Lighting & accessories inspection


I
and test plan

MD1-0-V-592-05-50002

Lighting & accessories packing


I
procedure

MD1-0-V-592-11-50001

Lighting & accessories outline


I
drawing

MD1-0-V-592-11-50002

Lighting dist. board outline


I
drawing

MD1-0-V-592-11-50003

Lighting dist. board outline


I
Diagram for Admin. Bldg

MD1-0-V-592-11-50004

Lighting DIST. Board Outline


I
Diagram for CCB and MISC. BLDG

MD1-0-V-593-05-00001

Cable Tray, Inspection and


I
Test Plan

MD1-0-V-593-05-00002

Cable Tray, Inspection and


I
Test Procedure

MD1-0-V-593-05-00003

Cable Tray, Quality Control


I
Plan (QM Manual)

MD1-0-V-593-05-50001

Conduit & Accessories IInspection and Test Plan

MD1-0-V-593-11-00001

Cable Tray, Outline Drawing


I

MD1-0-V-593-11-50001

Conduit & Accessories IOutline Drawing

MD1-0-V-751-07-00405

Controller Functional Test


I Record for Diesel Fire Pump

MD1-0-V-751-07-00413

Motor Test Report for Electric


I
Fire Pump

MD1-0-V-751-07-00414

Controller Functional Test


I Record for Electric Fire Pump

MD1-0-V-805-01-02001

General arrangement ofI electrical equipment for wt&wwt

MD1-0-V-805-08-00007

Electrical Load List for WT


I & WWT System

MD1-0-V-850-31-00001

Single line diagram for chemical


I
dosing system

MD1-0-V-850-32-00001

Schematic diagram for chemical


I
dosing system

MD1-0-V-860-01-00004

Cabling, tray and tray support


I
for gaseous chlorination system

MD1-0-V-860-11-00002

Motor control center(mcc)


I outline drawing for gaseous chlorination system

MD1-0-V-860-11-00003

Local control panel outline


I drawing for gaseous chlorination system

MD1-0-V-860-31-00001

Single Line diagram for IGasous Chlorination System

MD1-0-V-870-08-00007

Electrical load list for sewage


I
treatment system

IC

MARK

MD1-0-V-134-09-00053A

Technical data sheet &RT


drawings for cathodic
MARK protection (ctcs & df)

IC

MARK

MD1-0-V-162-11-00008A

Details of Key InterlockRT

MARK

IC

MARK

MD1-0-V-162-31-00001A

Single Line Diagram RT

MARK

IC

MARK

MD1-0-V-172-06-02008A

Cable Sizing Calculation


RTfor LHS

MARK

IC

MARK

MD1-0-V-805-31-00001B

Single Line Diagram for


RT
WT & WWTMARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

1
2
3
4
5

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

IC

MARK

DISCIPLINE = G, General
MD1-0-M-120-03-00002

System Description- Feedwater System

MD1-0-P-400-02-00001

Piping Material Classification

MD1-0-P-400-02-00011

Technical Specification for Insulation

MD1-0-T-030-05-00051

Method Statement of General Welding

MD1-0-T-030-05-00052

Method Statement for Welder and Welding Operator Qualification

MD1-0-T-030-05-001

Project Quality Assurance Plan

MD1-0-T-030-05-002

Site Inspection and Test Plan

MD1-0-T-030-05-00221

ITP for Lighting & Small Power Installation

MD1-0-T-030-05-003

Document and Data Control

MD1-0-T-030-05-004

Quality Records Control

MD1-0-T-030-05-005

Training

MD1-0-T-030-05-006

Purchase Control

MD1-0-T-030-05-007

Material & Equipment Receiving, Handling, Storage and Maintenance

MD1-0-T-030-05-008

Nonconformance Control

MD1-0-T-030-05-009

Corrective & Preventive Action

MD1-0-T-030-05-010

Internal Quality Audit

AC

MD1-0-T-030-05-011

Process Map Control

MD1-0-T-030-05-012

Monitoring & Measurement

MD1-0-T-030-05-013

Supplier Workshop Inspection and Test Plan

MD1-0-T-070-01-00021

Environmental Management Plan

MD1-0-T-070-01-00023

Health & Safety Management Plan

MD1-0-T-070-01-00028

Security Plan

MD1-0-T-070-01-00038

Emergency Response Plan

IC

MD1-0-T-070-05-00019

Project Execution Plan

IC

MD1-0-V-360-07-00760

Exhaust Gas Plume Dispersion and Air Quality Study

AC

DAVID

12/07/13

DAVID

25/02/13

DAVID

13/09/12

DAVID

27/07/12

DAVID

27/07/12

DAVID

14/08/12

DAVID

13/07/12

MARK

26/10/12

DAVID

13/07/12

DAVID

07/08/12

10

DAVID

13/07/12

11

DAVID

07/08/12

12

DAVID

13/07/12

13

DAVID

19/11/12

14

DAVID

07/08/12

15

DAVID

21/11/12

16

DAVID

13/07/12

17

DAVID

14/08/12

18

DAVID

13/07/12

19

HANU

26/12/12

20

DAVID

26/03/13

21

MARK

21/05/12

22

MARK

03/05/12

23

MARK

10/12/12

24

HANU

11/06/13

25

MD1-0-P-400-02-00001

Piping Material Classification

DAVID

MD1-0-P-400-02-00011

Technical Specification for Insulation

DAVID

MD1-0-T-030-05-00051

Method Statement of General Welding

DAVID

MD1-0-T-030-05-00052

Method Statement for Welder and Welding Operator Qualification

DAVID

MD1-0-T-030-05-001

Project Quality Assurance Plan

DAVID

MD1-0-T-030-05-002

Site Inspection and Test Plan

DAVID

MD1-0-T-030-05-00221

ITP for Lighting & Small Power Installation

MARK

MD1-0-T-030-05-003

Document and Data Control

DAVID

MD1-0-T-030-05-004

Quality Records Control

DAVID

MD1-0-T-030-05-005

Training

DAVID

MD1-0-T-030-05-006

Purchase Control

DAVID

MD1-0-T-030-05-007

Material & Equipment Receiving, Handling, Storage and Maintenance

DAVID

MD1-0-T-030-05-008

Nonconformance Control

DAVID

MD1-0-T-030-05-009

Corrective & Preventive Action

DAVID

MD1-0-T-030-05-011

Process Map Control

DAVID

MD1-0-T-030-05-012

Monitoring & Measurement

DAVID

MD1-0-T-030-05-013

Supplier Workshop Inspection and Test Plan

DAVID

DISCIPLINE = MBLR, Mechanical Boiler


revision

status

MD1-0-M-100-02-00001

Technical Specification- Painting Specification

AC

DAVID

02/05/13

MD1-0-M-100-03-00001

Plant overall description

RT

DAVID

03/05/13

MD1-0-M-100-21-00001

P & I Diagram- Symbol & Legend (1/5)

DAVID

21/08/12

MD1-0-M-100-21-00002

P & I Diagram- Symbol & Legend (2/5)

DAVID

11/05/12

MD1-0-M-100-21-00003

P & I Diagram- Symbol & Legend (3/5)

DAVID

11/05/12

MD1-0-M-100-21-00004

P & I Diagram- Symbol & Legend (4/5)

DAVID

21/08/12

MD1-0-M-100-21-00005

P & I Diagram- Symbol & Legend (5/5)

DAVID

26/04/13

MD1-0-M-100-57-00001

Heat Balance Diagrams (VWO)

DAVID

20/12/12

MD1-0-M-100-57-00002

Heat Balance Diagrams (TCC)

DAVID

18/12/12

MD1-0-M-100-57-00003

Heat Balance Diagram (RO)

DAVID

18/12/12

MD1-0-M-100-57-00004

Heat Balance Diagrams (75% of RO)

DAVID

18/12/12

MD1-0-M-100-57-00005

Heat Balance Diagrams (60% of RO)

DAVID

18/12/12

MD1-0-M-100-57-00006

Heat Balance Diagrams (50% of RO)

DAVID

18/12/12

MD1-0-M-100-57-00007

Heat Balance Diagrams (40% of RO)

DAVID

18/12/12

MD1-0-M-100-57-00008

Heat Balance Diagrams (THO)

DAVID

18/12/12

MD1-0-M-110-03-00001

System Description- Main and Reheat Steam System

AC

DAVID

09/07/13

MD1-0-M-110-03-00004

System Description- FWH Vent and Drain System

AC

DAVID

18/05/12

MD1-0-M-110-03-00005

System Discription-Aux. Steam System

DAVID

18/07/13

MD1-0-M-110-21-00011

P & I Diagram- Main and Reheat Steam System (1/3)

DAVID

13/09/12

MD1-0-M-110-21-00012

P & I Diagram- Main and Reheat Steam System (2/3)

DAVID

13/09/12

MD1-0-M-110-21-00013

P & I Diagram- Main and Reheat Steam System (3/3)

DAVID

13/09/12

MD1-0-M-110-21-00031

P & I Diagram- FWH Extraction Steam System (1/3)

DAVID

13/09/12

MD1-0-M-110-21-00032

P & I Diagram- FWH Extraction Steam System (2/3)

DAVID

19/11/12

MD1-0-M-110-21-00033

P & I Diagram- FWH Extraction Steam System (3/3)

DAVID

21/06/13

MD1-0-M-110-21-00034

P & I Diagram- FWH Extraction Steam System (4/4)

DAVID

17/07/13

MD1-0-M-110-21-00041

P & I Diagram- FWH Vent and Drain System (1/3)

DAVID

13/09/12

MD1-0-M-110-21-00042

P & I Diagram- FWH Vent and Drain System (2/3)

DAVID

19/11/12

MD1-0-M-110-21-00043

P & I Diagram- FWH Vent and Drain System (3/3)

DAVID

19/11/12

MD1-0-M-110-21-00044

P & I Diagram- Condensate Drain System

DAVID

19/11/12

MD1-0-M-110-22-00011

Flow Diagram- Main and Reheat Steam System

DAVID

09/01/13

MD1-0-M-110-22-00021

Flow Diagram- FWH Extraction Steam System

DAVID

17/05/13

MD1-0-M-110-22-00022

Flow Diagram- FWH Drain System

DAVID

17/05/13

MD1-0-M-110-22-00031

Flow Diagram- Auxiliary Steam System

IC

DAVID

28/05/13

MD1-0-M-120-06-00001

Calculation- Condensate System

DAVID

21/02/13

MD1-0-M-120-06-00002

Calculation- Feed Water System

DAVID

07/02/13

MD1-0-M-120-06-00003

Transient Analysis for Boiler Feed Pump

DAVID

25/02/13

MD1-0-M-120-21-00031

P & I Diagram- Feed Water System (1/2)

AC

DAVID

04/04/13

MD1-0-M-120-21-00032

P & I Diagram- Feed Water System (2/2)

DAVID

19/11/12

MD1-0-M-120-22-00011

Flow Diagram- Condensate System

DAVID

03/04/13

MD1-0-M-120-22-00021

Flow Diagram- Feed Water System

DAVID

21/01/13

MD1-0-P-400-08-00001

Pipe Line List for BOP

DAVID

06/02/13

MD1-0-P-400-08-00002

Valve List for BOP

DAVID

06/02/13

MD1-0-P-411-23-00001

Pipe arrangement & support location drawing - boiler area (section IC


view)

DAVID

23/07/13

MD1-0-T-030-05-000494

WPS(U1A-ASME PRESSURE PART)

DAVID

29/07/13

MD1-0-T-030-05-00072

ITP for Above Ground Piping

DAVID

23/07/13

MD1-0-T-030-05-00083

Welding Procedure Specification Summary Status

DAVID

10/10/12

MD1-0-T-030-05-00084

Welding Procedure Specification (HD-WPS-ASME-A001)

DAVID

05/09/12

MD1-0-T-030-05-00085

Welding Procedure Specification (HD-WPS-ASME-A002)

DAVID

11/09/12

MD1-0-T-030-05-00086

Welding Procedure Specification (HD-WPS-ASME-A003)

DAVID

11/09/12

MD1-0-T-030-05-00087

Welding Procedure Specification (HD-WPS-ASME-A004)

DAVID

11/09/12

MD1-0-T-030-05-00088

Welding Procedure Specification (HD-WPS-ASME-A005)

DAVID

20/12/12

MD1-0-T-030-05-00089

Welding Procedure Specification (HD-WPS-ASME-A006)

DAVID

11/09/12

MD1-0-T-030-05-00090

Welding Procedure Specification (HD-WPS-ASME-A007)

DAVID

21/09/12

MD1-0-T-030-05-00091

Welding Procedure Specification (HD-WPS-ASME-A008)

DAVID

21/09/12

MD1-0-T-030-05-00092

Welding Procedure Specification (HD-WPS-ASME-A009)

DAVID

11/09/12

MD1-0-T-030-05-00093

Welding Procedure Specification (HD-WPS-ASME-A010)

DAVID

10/10/12

MD1-0-T-030-05-00094

Welding Procedure Specification (HD-WPS-ASME-A011)

DAVID

21/09/12

MD1-0-T-030-05-00095

Welding Procedure Specification (HD-WPS-ASME-A012)

DAVID

21/09/12

MD1-0-T-030-05-00096

Welding Procedure Specification (HD-WPS-ASME-A013)

DAVID

11/09/12

MD1-0-T-030-05-00097

Welding Procedure Specification (HD-WPS-ASME-A014)

DAVID

11/09/12

MD1-0-T-030-05-00098

Welding Procedure Specification (HD-WPS-ASME-A015)

DAVID

11/09/12

MD1-0-T-030-05-00099

Welding Procedure Specification (HD-WPS-ASME-A016)

DAVID

11/09/12

MD1-0-T-030-05-00100

Welding Procedure Specification (HD-WPS-ASME-A017)

DAVID

11/09/12

MD1-0-T-030-05-00101

Welding Procedure Specification (HD-WPS-ASME-A018)

DAVID

11/09/12

MD1-0-T-030-05-00102

Welding Procedure Specification (HD-WPS-ASME-A019)

DAVID

11/09/12

MD1-0-T-030-05-00103

Welding Procedure Specification (HD-WPS-ASME-A020)

DAVID

23/07/13

MD1-0-T-030-05-00104

Welding Procedure Specification (HD-WPS-ASME-A021)

DAVID

23/07/13

MD1-0-T-030-05-00105

Welding Procedure Specification (HD-WPS-AWS-001)

DAVID

05/09/12

MD1-0-T-030-05-00106

Welding Procedure Specification (HD-WPS-AWS-002)

DAVID

05/09/12

MD1-0-T-030-05-00107

Welding Procedure Specification (HD-WPS-AWS-003)

DAVID

05/09/12

MD1-0-T-030-05-00119

ITP for AG Piping of Carbon Steel

DAVID

23/07/13

MD1-0-T-030-05-00130

Method Statement for Welding Repair

DAVID

23/07/13

MD1-0-T-030-05-00132

Method Statement for Welding Material Control

DAVID

06/11/12

MD1-0-T-030-05-00323

Method Statement for Radiographic Examination

IC

DAVID

21/06/13

MD1-0-T-030-05-00324

Method Statement for Ultrasonic Examination

IC

DAVID

21/06/13

MD1-0-T-030-05-00325

Method Statement for Particle Examination

DAVID

21/06/13

MD1-0-T-030-05-00326

Method Statement for Liquid penatrant Examination

DAVID

21/06/13

MD1-0-T-030-05-00327

Method Statement for Heat Treatment

DAVID

22/07/13

MD1-0-T-030-05-00350

Welding procedure specification(hd-wps-asme-a022)

DAVID

28/03/13

MD1-0-T-030-05-00369

Welding procedure specification (hd-wps- asme-a023)

DAVID

17/05/13

MD1-0-T-030-05-00370

Itp for cfbc boiler installation

IC

DAVID

18/06/13

MD1-0-T-030-05-00408

Welding procedure specification(HD-WPS-ASME-A024)

DAVID

22/07/13

MD1-0-T-053-05-00122

Method Statement for General Equipment Installation

DAVID

21/09/12

MD1-0-T-053-05-00144

WPS & PQR (DAEJOO)

AC

DAVID

22/02/13

MD1-0-T-053-05-00177

Method Statement for Steam Drum of CFBC Boiler

IC

DAVID

08/07/13

MD1-0-T-053-05-00178

Method statement for cfbc boiler installation work

IC

DAVID

18/07/13

MD1-0-T-053-05-00237

Method Statement for CEP Casing Setting

DAVID

30/11/12

MD1-0-T-053-05-00261

WPS & PQR (For Steel Structure PEB Fabrication)

DAVID

20/03/13

MD1-0-T-053-05-00360

Site safety procedure for mechanical erection by subcontractor of boiler


I

DAVID

18/07/13

MD1-0-T-053-05-00415

Method Statement for Condenser Lifting

DAVID

22/07/13

MD1-0-T-053-07-00289

Material Approval Request for Welding Rod (Hyundai Welding) Welding)


A

DAVID

20/02/13

MD1-0-T-054-05-00110

Method Statement For Pipe Spool Fabrication

DAVID

10/01/13

RT

MD1-0-T-054-05-00111

Method Statement For Piping Installation

DAVID

15/01/13

MD1-0-T-054-05-00193

MD1-0-T-054-05-00195

Method Statement for Piping Color Coding

IC

DAVID

22/02/13

Method Statement for Pressure Test

AC

DAVID

22/07/13

MD1-0-T-054-07-00248

MD1-0-T-057-07-00277

Material Approval Request for Alloy 3D Bend

RJ

DAVID

13/11/12

Material Approval Request for Pipe Insulation (HI Korea)

RT

LINH

15/11/12

MD1-0-V-111-01-00030

Piping arrangement of valve leak-off (1/2)

IC

DAVID

03/04/13

MD1-0-V-111-01-00031

Piping arrangement of valve leak-off (2/2)

IC

DAVID

03/04/13

MD1-0-V-111-01-00032

Piping arrangement of steam drain (1/2)

IC

DAVID

03/04/13

MD1-0-V-111-01-00033

Piping arrangement of steam drain (2/2)

IC

DAVID

03/04/13

MD1-0-V-111-01-00038

Piping arragement of steam seal piping (1/6)

IC

DAVID

03/04/13

MD1-0-V-111-01-00039

Piping arragement of steam seal piping (2/6)

IC

DAVID

03/04/13

MD1-0-V-111-01-00040

Piping arragement of steam seal piping (3/6)

IC

DAVID

03/04/13

MD1-0-V-111-01-00041

Piping arragement of steam seal piping (4/6)

IC

DAVID

03/04/13

MD1-0-V-111-01-00042

Piping arragement of steam seal piping (5/6)

IC

DAVID

03/04/13

MD1-0-V-111-01-00043

Piping arragement of steam seal piping (6/6)

IC

DAVID

03/04/13

MD1-0-V-111-01-00044

Piping arragement of condenser neck piping

IC

DAVID

03/04/13

MD1-0-V-111-04-00031

Steam Purity Recommendation

IC

DAVID

02/04/13

MD1-0-V-111-04-00032

Steam blowing requirement

IC

DAVID

08/02/13

MD1-0-V-111-24-00400

Generator Piping FAB ISO Drawings

IC

DAVID

12/07/13

MD1-0-V-111-25-00400

Generator Pipe Support Drawings

DAVID

12/07/13

MD1-0-V-112-05-00001

Inspection test plan (qcp) for lp steam stop valve (vs) for turbine bypass
I
systm

DAVID

17/07/13

MD1-0-V-112-05-00002

Inspection test plan (qcp) for hp bypass valve(vlb) & lp bypass valve(vlr)
I

DAVID

17/07/13

MD1-0-V-112-05-00003

Inspection test plan (qcp) for lp desuperheater(dam) for turbine bypass


I system

DAVID

17/07/13

MD1-0-V-112-05-00004

Inspection test plan (qcp) for hp/lp spray valve & isolation valve (840h/g)
I
form

DAVID

17/07/13

MD1-0-V-112-05-00008

Welding Book(WPS/PQR, Welding Map) for Turbine Bypass System


I

DAVID

17/07/13

MD1-0-V-113-05-00033

Condenser- Welding Procedure

DAVID

11/03/13

MD1-0-V-113-05-00036

Procedure for Radiographic Examination

DAVID

03/04/13

MD1-0-V-113-05-00037

Procedure for Ultrasonic Examination

DAVID

26/03/13

MD1-0-V-113-05-00038

Procedure for Magnetic particle Examination

DAVID

26/03/13

MD1-0-V-113-05-00039

Procedure for Liquid Penetrant Examination

DAVID

26/03/13

MD1-0-V-114-01-00001

Outline Drawing for LP-3 Low Pressure Feedwater Heater

DAVID

05/03/13

MD1-0-V-114-01-00002

Outline Drawing for LP-4 Low Pressure Feedwater Heater

DAVID

05/03/13

MD1-0-V-114-01-00003

Outline Drawing for HP-6 High Pressure Feedwater Heater

DAVID

05/03/13

MD1-0-V-114-01-00004

Outline Drawing for HP-7 High Pressure Feedwater Heater

DAVID

05/03/13

MD1-0-V-114-01-00005

Outline Drawing for HP-8 High Pressure Feedwater Heater

DAVID

05/03/13

MD1-0-V-114-05-00009

Work test and inspection plan

IC

DAVID

22/07/13

MD1-0-V-114-05-00010

Work test and inspection procedure

IC

DAVID

22/07/13

MD1-0-V-114-05-00013

WPS & PQR for Feedwater Heater

DAVID

12/07/13

MD1-0-V-114-05-00017

Painting Procedure for Feedwater Heater No's 3,4,6,7,8

DAVID

04/07/13

MD1-0-V-114-05-00018

Hydrostatic Test Procedure

AC

DAVID

06/06/13

MD1-0-V-114-05-00019

Heat Treatment Procedure

AC

DAVID

06/06/13

MD1-0-V-114-05-50016

LP#1 & LP#2 Feedwater Operation & Maintenance Manual

RT

DAVID

04/07/13

MD1-0-V-114-06-00002

Thermal Calculation with Hydraulic Loss Calculation For FeedwaterIHeater (LP-3)DAVID

18/03/13

MD1-0-V-114-06-00004

Strength Calculation of Feedwater Heater

MD1-0-V-114-07-00005

MD1-0-V-114-09-00002

MD1-0-V-114-09-00006

DAVID

10/06/13

NDE Procedure(Feedwater Heater)

DAVID

06/06/13

Feed Water Heater Vendor Technical Data

DAVID

23/05/13

Orifice Data Sheet & Drawing for Feedwater Heater

DAVID

29/05/13

MD1-0-V-114-09-00007

Safety valve data sheet & drawing for feedwater heater

AC

DAVID

10/06/13

MD1-0-V-114-09-50011

LP#1 & LP#2 Feedwater Heater Data Sheet (Customer's Form)

AC

DAVID

22/02/13

MD1-0-V-114-09-50012

LP#1 & LP#2 Feedwater Heater Data Sheet (Supplier's Form)

AC

DAVID

22/02/13

MD1-0-V-114-09-50031

Lp#1 & lp#2 feedwater heater performance curves

IC

DAVID

06/03/13

MD1-0-V-114-10-50001

LP#1A Feedwater Heater Outline Drawing

AC

DAVID

16/07/13

MD1-0-V-114-10-50002

LP#1B Feedwater Heater Outline Drawing

AC

DAVID

16/07/13

MD1-0-V-114-10-50003

LP#2 Feedwater Heater Outline Drawing

AC

DAVID

16/07/13

MD1-0-V-114-11-00302

Name Plate Drawing for LP-3 Low Pressure Feedwater Heater

IC

DAVID

12/07/13

MD1-0-V-114-11-00402

Name Plate Drawing for LP-4 Low Pressure Feedwater Heater

IC

DAVID

12/07/13

MD1-0-V-114-11-00602

Name Plate Drawing for HP-6 High Pressure Feedwater Heater

IC

DAVID

12/07/13

MD1-0-V-114-11-00702

Name Plate Drawing for HP-7 High Pressure Feedwater Heater

IC

DAVID

12/07/13

MD1-0-V-114-11-00802

Name Plate Drawing for HP-8 High Pressure Feedwater Heater

IC

DAVID

12/07/13

MD1-0-V-114-11-50005

Lp#1a/1b lagging spacer & plate detail drawing

DAVID

20/02/13

MD1-0-V-114-11-50009

Lp#1a/1b feedwater heater insulation detail drawing

DAVID

20/02/13

MD1-0-V-114-11-50010

Lp#2 feedwater heater insulation detail drawing

DAVID

20/02/13

MD1-0-V-114-11-50020

Lp#1 & lp#2 feedwater heater name plate drawing

IC

DAVID

20/02/13

MD1-0-V-114-11-50022

Lp#2 feedwater heater rail and channel leg & roller support drawing I

DAVID

22/02/13

MD1-0-V-114-11-50023

Lp#1 feedwater heater tube to tubesheet joint detail & tube layout drawing
IC

DAVID

20/02/13

MD1-0-V-114-11-50024

Lp#2 feedwater heater tube to tubesheet joint detail & tube layout drawing
IC

DAVID

20/02/13

MD1-0-V-114-55-50013

Lp#1 feedwater heater strength calculation

IC

DAVID

22/02/13

MD1-0-V-114-55-50014

Lp#2 feedwater heater strength calculation

IC

DAVID

22/02/13

MD1-0-V-114-55-50027

Lp#1 & lp#2 feedwater heater thermal calculation

IC

DAVID

06/03/13

MD1-0-V-115-01-00001

Deaerator and storage tank- general arrangement (assembly & outline)


IC

DAVID

28/02/13

MD1-0-V-115-05-00001

Deaerator and storage tank, inspection and test procedure

IC

DAVID

20/03/13

MD1-0-V-115-05-00002

Deaerator and Storage Tank - Painting Procedure

IC

DAVID

29/05/13

MD1-0-V-115-05-00003

Deaerator and storage tank, wps & pqr

IC

DAVID

26/03/13

MD1-0-V-115-05-00004

Deaerator and storage tank, pwht procedure

IC

DAVID

20/03/13

MD1-0-V-115-05-00006

Deaerator and storage tank, quality control procedure

IC

DAVID

26/03/13

MD1-0-V-115-05-00007

Deaerator and storage tank, hydrotest procedure

IC

DAVID

26/03/13

MD1-0-V-115-06-00002

Sizing calculation for deaerator and feedwater tank

DAVID

25/02/13

MD1-0-V-115-09-00001

Deaerator and Storage Tank- Technical Data Sheet

AC

DAVID

25/02/13

MD1-0-V-115-09-00003

Deaerator and Storage Tank, Performance Curve

DAVID

25/02/13

MD1-0-V-115-11-00001

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank-Detail


I
of HeaterDAVID

25/02/13

MD1-0-V-115-11-00002

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank-Detail


I
of StorageDAVID
Tank

25/02/13

MD1-0-V-115-11-00003

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle


IC
Detail (1/9)
DAVID

25/02/13

MD1-0-V-115-11-00004

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle


I
Detail (2/9)
DAVID

25/02/13

MD1-0-V-115-11-00005

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle


IC
Detail (3/9)
DAVID

25/02/13

MD1-0-V-115-11-00006

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle


I
Detail (4/9)
DAVID

25/02/13

MD1-0-V-115-11-00007

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle


I
Detail (5/9)
DAVID

25/02/13

MD1-0-V-115-11-00008

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle


I
Detail (6/9)
DAVID

25/02/13

MD1-0-V-115-11-00009

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle


IC
Detail (7/9)
DAVID

25/02/13

MD1-0-V-115-11-00010

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle


I
Detail (8/9)
DAVID

25/02/13

MD1-0-V-115-11-00011

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Nozzle


IC
Detail (9/9)
DAVID

04/10/12

MD1-0-V-115-11-00012

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- Insul.


IC Support Detail
DAVID

04/10/12

MD1-0-V-115-11-00013

13LAA 10AC001, 13LAA 10BB001 Deaerator and Storage Tank- NamePlate


IC
Detail
DAVID

04/10/12

MD1-0-V-121-01-00001

General Arrangement Drawing for Boiler Feed Pump and Booster Pump
I

DAVID

28/06/13

MD1-0-V-121-01-00002

Sectional Drawing for Boiler Feed Pump

DAVID

10/12/12

MD1-0-V-121-01-00003

Sectional Drawing for Booster Pump

DAVID

10/12/12

MD1-0-V-121-03-00001

System Description for BFP & BFBP

RT

DAVID

22/07/13

MD1-0-V-121-05-00001

Quality Management Mannual For BFP & BFBP

DAVID

14/01/13

MD1-0-V-121-05-00002

Shop Inspection and Test Plan for BFP & BFBP

IC

DAVID

23/07/13

MD1-0-V-121-05-00003

Shop Inspection and Test Procedure for BFP & BFBP

IC

DAVID

23/07/13

MD1-0-V-121-05-00004

Pt procedure for bfp & bfbp

DAVID

05/07/13

MD1-0-V-121-05-00005

Ut procedure for bfp & bfbp

DAVID

05/07/13

MD1-0-V-121-05-00006

Wps & pqr for bfp & bfbp

DAVID

27/06/13

MD1-0-V-121-05-00007

Painting specification and procedure for bfp & bfbp

DAVID

03/05/13

MD1-0-V-121-05-00019

Mt procedure for bfp & bfbp

DAVID

17/07/13

MD1-0-V-121-05-00020

Rt procedure for bfp & bfbp

DAVID

17/07/13

MD1-0-V-121-05-00022

PerformanceTest Procedure for BFP & BFBP

IC

DAVID

24/07/13

MD1-0-V-121-05-00023

UT Procedure for Impeller for BFP & BFBP

DAVID

12/07/13

MD1-0-V-121-08-00003

Utility consumption list for boiler feedwater pump & boiler feedwaterICbooster pp DAVID

02/04/13

MD1-0-V-121-08-00004

Lubricant list for bfbp & bfp

DAVID

23/07/13

MD1-0-V-121-08-00012

Sub-Supplier List for BFP & BFBP

DAVID

21/06/13

MD1-0-V-121-09-00001

Technical data sheet for bfp & bfbp

AC

DAVID

05/04/13

MD1-0-V-121-10-00002

Assembly plan for fluid coupling for bfp & bfbp

DAVID

09/04/13

MD1-0-V-121-11-00001

Working and lube oil heat exchanger of fluid coupling for bfp & bfbpI

DAVID

09/04/13

MD1-0-V-121-11-00004

Mechanical Seal Drawing for BFP

IC

DAVID

22/07/13

MD1-0-V-121-11-00005

Mechanical Seal Cooler Drawing for BFP

IC

DAVID

22/07/13

MD1-0-V-121-11-00006

Mechanical Seal Drawing for BFBP

DAVID

22/07/13

MD1-0-V-121-11-00007

Flexible Disk Coupling Drawing for BFP and Fluid Coupling

IC

DAVID

22/07/13

MD1-0-V-121-11-00008

Flexible Disk Coupling Drawing for Motor and Fluid Coupling

DAVID

22/07/13

MD1-0-V-121-11-00009

Flexible Disk Coupling Drawing for Motor and BFBP

DAVID

22/07/13

MD1-0-V-121-11-00010

Name plate for boiler feedwater pump & boiler feedwater booster pump
IC

DAVID

04/07/13

MD1-0-V-121-11-00022

Mechanical Seal Cooler Drawing for BFBP

DAVID

22/07/13

MD1-0-V-121-21-00001

P&I Diagram for Boiler Feedwater Pump & Boiler Feedwater Booster
IC Pump

DAVID

04/07/13

MD1-0-V-121-21-00002

Oil circuit and measuring point scheme for fluid coupling for bfp & bfbp
IC

DAVID

23/07/13

MD1-0-V-121-23-00001

Auxiliary piping drawing for boiler feed pump and booster pump

IC

DAVID

09/04/13

MD1-0-V-121-23-00002

Cross Over Piping Drawing for Boiler Feed Pump and Booster Pump
IC

DAVID

28/06/13

MD1-0-V-121-33-00001

Start-up and shut-down block diagram for boiler feed pump and booster
I
pump

DAVID

09/04/13

MD1-0-V-122-01-00001

General Arrangement Drawing of CEP

DAVID

28/01/13

MD1-0-V-122-01-00002

Sectional Drawing of CEP

DAVID

28/01/13

MD1-0-V-122-02-00001

Pump Performance Curves for Condensate Extraction Pump

DAVID

22/01/13

MD1-0-V-122-05-00001

Quality Management Mannual For Condensate Extraction Pump

DAVID

15/01/13

AC

DAVID

04/07/13

DAVID

08/07/13

IC

MD1-0-V-122-05-00002

SHOP INSPECTION & TEST PLAN FOR CEP

MD1-0-V-122-05-00003

SHOP INSPECTION & TEST PROCEDURE FOR CEP

MD1-0-V-122-05-00017

Shop performance test procedure for condensate extraction pump IC

DAVID

28/06/13

MD1-0-V-122-08-00005

Spare Parts List for Start-up & Commissioning for CEP

DAVID

05/07/13

MD1-0-V-122-09-00001

Pump Data Sheet for CEP

DAVID

28/01/13

MD1-0-V-122-11-00002

Mechanical Seal Drawing for CEP

DAVID

10/07/13

MD1-0-V-122-11-00003

Gear Coupling Drawing for CEP

DAVID

10/07/13

MD1-0-V-122-21-00001

P&I Diagram of CEP

AC

DAVID

28/01/13

MD1-0-V-122-52-00001

Foundation Drawing of CEP

DAVID

28/01/13

MD1-0-V-161-01-00002

Part Number Arrangement

IC

DAVID

22/02/13

MD1-0-V-161-01-00004

Main Terminal Point (scope of supply)

DAVID

21/02/13

MD1-0-V-161-01-00020

Steam Generator General Arrangement Cross Section

IC

DAVID

26/12/12

MD1-0-V-161-01-00021

Steam Generator General Arrangement Longit. Section A-A

IC

DAVID

26/12/12

MD1-0-V-161-01-00022

Steam Generator General Arrangement Longit. Section B-B

IC

DAVID

26/12/12

MD1-0-V-161-01-00023

Steam Generator General Arrangement Longit. Section C-C

IC

DAVID

26/12/12

MD1-0-V-161-01-00024

Steam Generator General Arrangement Longit. Section D-D

IC

DAVID

26/12/12

MD1-0-V-161-01-00025

Steam Generator General Arrangement Plan Section E-E

IC

DAVID

26/12/12

MD1-0-V-161-01-00026

Steam Generator General Arrangement Plan Section F-F

IC

DAVID

26/12/12

MD1-0-V-161-01-00060

General Arrangement Isometric View

DAVID

21/02/13

MD1-0-V-161-01-00061

General Arrangement Side Elevation

IC

DAVID

21/02/13

MD1-0-V-161-01-00062

General Arrangement Plan View

DAVID

21/02/13

MD1-0-V-161-01-00100

Boiler Hangers Assembly and Details in Furnace Front Wall

IC

DAVID

11/03/13

MD1-0-V-161-01-00101

Boiler Hangers Assembly and Details in Furnace Rear Wall and Roof
I

DAVID

11/03/13

MD1-0-V-161-01-00102

Boiler Hangers Assembly and Details in Furnace Side Wall

DAVID

11/03/13

MD1-0-V-161-01-00103

Boiler Hangers Assembly and Details in ISH & FSH Wing Wall

DAVID

11/03/13

MD1-0-V-161-01-00104

Boiler Hangers Assembly and Details in Cyclone Area and EVAP WW


I HDR

DAVID

11/03/13

MD1-0-V-161-01-00105

Boiler Hangers Assembly and Details in CrossOver Flue

DAVID

11/03/13

MD1-0-V-161-01-00106

Boiler Hangers Assembly and Details in HRA Area

DAVID

11/03/13

MD1-0-V-161-01-00107

Boiler Hangers Assembly and Details in Economizer Area

DAVID

11/03/13

MD1-0-V-161-01-00108

Boiler Hangers Assembly and Details in HRA Roof and ECON HGRI #4

DAVID

11/03/13

MD1-0-V-161-01-00109

Boiler Hangers Assembly and Details in Cyclone Collector Beam

DAVID

11/03/13

MD1-0-V-161-01-00110

BUCKSTAY SYSTEM FURNACE & HRA SIDE WALL

IC

DAVID

10/01/13

MD1-0-V-161-01-00111

BUCKSTAY SYSTEM FURNACE FRONT & REAR

IC

DAVID

10/01/13

MD1-0-V-161-01-00112

BUCKSTAY SYSTEM HRA FRONT & REAR WALL

IC

DAVID

10/01/13

MD1-0-V-161-01-00113

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00114

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00115

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00116

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00117

BUCKSTAY SYSTEM GAS INLET TO CYCLONE

DAVID

10/01/13

MD1-0-V-161-01-00118

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00119

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00120

BUCKSTAY SYSTEM SECTIONS & DETAILS PART

DAVID

10/01/13

MD1-0-V-161-01-00121

BUCKSTAY SYSTEM ISH TO FSH TRANS. LINE

DAVID

10/01/13

MD1-0-V-161-01-00123

CROSS OVER FLUE BUCKSTAYS PART NO. 2586-

DAVID

10/01/13

MD1-0-V-161-01-00124

CROSS OVER FLUE BUCKSTAYS SECTIONS &

DAVID

10/01/13

MD1-0-V-161-01-00125

CROSS OVER FLUE BUCKSTAYS SECTIONS &

DAVID

10/01/13

MD1-0-V-161-01-00130

WINDBOX TRUSS ASSEMBLY PART NO. 2586-6410

DAVID

10/01/13

MD1-0-V-161-01-00131

WINDBOX TRUSS SECTIONS & DETAILS PART NO.

DAVID

01/02/13

MD1-0-V-161-01-00132

WINDBOX TRUSS SECTIONS & DETAILS PART NO.

DAVID

10/01/13

MD1-0-V-161-01-00133

CYCLONE RING BUMPERS ARRANGEMENT PART

DAVID

01/02/13

MD1-0-V-161-01-00134

CYCLONE RING BUMPERS SECTIONS AND

DAVID

01/02/13

MD1-0-V-161-01-00163

Drum strap hanger arrangement & detail

IC

DAVID

22/02/13

MD1-0-V-161-01-00170

Riser & Seam Supply Pipe Isometric Arrangement

IC

DAVID

08/05/13

MD1-0-V-161-01-00171

Riser & Seam Supply Pipe Arrangement Plan & Elevation View

IC

DAVID

08/05/13

MD1-0-V-161-01-00172

Cyclone & Cyclone Inlet Riser Arrangement

IC

DAVID

08/05/13

MD1-0-V-161-01-00174

Furnace FW| & SW Riser Arrangment

IC

DAVID

08/05/13

MD1-0-V-161-01-00175

Steam Supply Pipe Arrangement

IC

DAVID

08/05/13

MD1-0-V-161-01-00176

Riser & Steam Supply Hanger Details

IC

DAVID

08/05/13

MD1-0-V-161-01-00177

Riser & Steam Supply Hanger Details

IC

DAVID

08/05/13

MD1-0-V-161-01-00179

Typical Details for Field Welding Panel Joints

IC

DAVID

25/02/13

MD1-0-V-161-01-00180

HRA COILS - GENERAL ARRANGEMENT

DAVID

12/06/13

MD1-0-V-161-01-00181

SECTIONS AND DETAILS IN HEAT RECOVERY AREA

DAVID

21/01/13

MD1-0-V-161-01-00184

SECTIONS AND DETAILS IN HEAT RECOVERY AREA PRIMARYI SUPERHEATER


DAVID
PART NO. 2528
21/01/13

MD1-0-V-161-01-00188

Economizer lower module arragement part no. 2528-0100

MD1-0-V-161-01-00191

EROSION SHIELD(FIELD INSTALLED) ARRANGEMENT PART NO.


I 2538-7600A,
DAVID
B, C, D, E, F,H21/01/13

MD1-0-V-161-01-00192

EROSION SHIELDS SECTIONS & DETAILS

DAVID

21/01/13

MD1-0-V-161-01-00193

EROSION SHIELD(SHOP INSTALLED) ARRANGEMENT

DAVID

21/01/13

MD1-0-V-161-01-00197

FURNACE ROOF PANEL PLAN ARRAGEMENT

DAVID

12/06/13

MD1-0-V-161-01-00226

VORTEX FINDER ARRANGEMENT PART NO.2529-5105

DAVID

21/01/13

MD1-0-V-161-01-00250

Penthouse Enclosure Arrangement

DAVID

11/01/13

MD1-0-V-161-01-00251

Penthouse Enclosure Sections & Details

DAVID

11/01/13

MD1-0-V-161-01-00297

ACOUSTIC BAFFLES PART NO. 2538-7500A, B, C

IC

DAVID

31/01/13

MD1-0-V-161-01-00300

Arrangement of Auxiliary Equipment-Overall Plat Flues & Duct-Isometric


I
View

DAVID

26/12/12

MD1-0-V-161-01-00301

Arrangement of Auxiliary Equipment-Overall Plant Flues & Duct- Plan


IC View

DAVID

26/12/12

MD1-0-V-161-01-00302

Arrangement of Auxiliary Equipment-Overall Plant Flues & Duct- Right


IC Side Elev.DAVID

26/12/12

MD1-0-V-161-01-00303

Arrangement of Auxiliary Equipment-P.A Ducts from Air Heater to Furnace


IC
Plenum
DAVID

26/12/12

MD1-0-V-161-01-00304

Arrangement of Auxiliary Equipment-Flues from Boiler Exit to Air Heater-Plan


IC

DAVID

26/12/12

MD1-0-V-161-01-00305

Arrangement of Auxiliary Equipment-S.A Ducts-from Air Heater to Furnace-Plan


IC
DAVID

26/12/12

MD1-0-V-161-01-00306

Arrangement of Auxiliary Equipment- S.A Ducts-from Windbox to Furnace


IC
Section
DAVID

26/12/12

MD1-0-V-161-01-00307

Arrangement of Auxiliary Equipment- S.A & P.A Ducts-from Fans toICAir Heater Plan
DAVID

26/12/12

MD1-0-V-161-01-00310

BOILER EXIT FLUE TO AH ASSEMBLY PART NO. 2529-6100

DAVID

08/02/13

MD1-0-V-161-01-00311

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(1)


I

DAVID

08/02/13

MD1-0-V-161-01-00312

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(2)


I

DAVID

08/02/13

MD1-0-V-161-01-00313

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(3)


I

DAVID

08/02/13

MD1-0-V-161-01-00314

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(4)


I

DAVID

08/02/13

MD1-0-V-161-01-00315

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(5)


I

DAVID

08/02/13

MD1-0-V-161-01-00316

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(6)


IC

DAVID

08/02/13

MD1-0-V-161-01-00317

BOILER EXIT FLUE TO AH SECTIONS & DETAILS PART NO. 2529-6100(7)


I

DAVID

08/02/13

MD1-0-V-161-01-00318

AIR HEATER OUTLET TO TERMINAL FLUE ASSEMBLY PART NO.2529-6200


IC
DAVID

08/02/13

MD1-0-V-161-01-00319

AIR HEATER OUTLET TO TERMINAL SECTION & DETAIL PARTICNO.2529-6200


DAVID
(1)

08/02/13

MD1-0-V-161-01-00320

AIR HEATER OUTLET TO TERMINAL SECTION & DETAIL PARTICNO.2529-6200


DAVID
(2)

08/02/13

MD1-0-V-161-01-00321

AIR HEATER OUTLET TO TERMINAL SECTION & DETAIL PARTICNO.2529-6200


DAVID
(3)

08/02/13

MD1-0-V-161-01-00322

AIR HEATER OUTLET TO TERMINAL SECTION & DETAIL PARTINO.2529-6200


DAVID
(4)

08/02/13

MD1-0-V-161-01-00330

Winbox Ring Duct Assembly- Arrangement Part No.2529-4000

DAVID

17/01/13

MD1-0-V-161-01-00331

Winbox Ring Duct Assembly- Section & Detail Part No.2529-4000 I

DAVID

17/01/13

MD1-0-V-161-01-00332

SA Winbox at Furnace Section & Detail Part No.2529-4000

DAVID

17/01/13

MD1-0-V-161-01-00333

SA Winbox at Furnace Section & Detail Part No.2529-4000

DAVID

17/01/13

MD1-0-V-161-01-00334

SA Winbox at Furnace Section & Detail Part No.2529-4000

DAVID

17/01/13

MD1-0-V-161-01-00335

PA FAN TO A.H. DUCT ASSEMBLY PART NO. 2529-

IC

DAVID

11/01/13

MD1-0-V-161-01-00336

PA FAN TO A.H. DUCT SECTIONS & DETAILS PART

IC

DAVID

11/01/13

MD1-0-V-161-01-00340

SA FAN TO A.H. DUCT ASSY. PART NO. 2529-7100

IC

DAVID

11/01/13

MD1-0-V-161-01-00341

SA FAN TO A.H. DUCT SUPPORT PART NO. 2529-

IC

DAVID

11/01/13

MD1-0-V-161-01-00342

SA FAN TO A.H. DUCT SUPPORT PART NO. 2529-

IC

DAVID

11/01/13

MD1-0-V-161-01-00350

SA DUCT FROM AH TO WINDBOX ASSEMBLY

IC

DAVID

11/01/13

MD1-0-V-161-01-00351

SA DUCT FROM AH TO WINDBOX SECTION &

IC

DAVID

11/01/13

IC

IC

AC

DAVID

06/06/13

MD1-0-V-161-01-00352

SA DUCT FROM AH TO WINDBOX SECTION &

IC

DAVID

11/01/13

MD1-0-V-161-01-00353

SA DUCT FROM AH TO WINDBOX SECTION &

IC

DAVID

11/01/13

MD1-0-V-161-01-00354

SA DUCT FROM AH TO WINDBOX SECTION &

IC

DAVID

11/01/13

MD1-0-V-161-01-00355

SA DUCT FROM WINBOX TO START UP BURNER PART NO. 2529-7220


IC

DAVID

11/01/13

MD1-0-V-161-01-00356

SA DUCT FROM WINBOX TO START UP BURNER DETAIL PART


ICNO.2529-7220
DAVID

11/01/13

MD1-0-V-161-01-00360

PRIMARY AIR DUCT ASSEMBLY FROM AH TO FURNACE PARTICNO. 2529-7400


DAVID

11/01/13

MD1-0-V-161-01-00361

PA DUCT FROM AH TO FURNACE SECTIONS AND DETAILS PART


IC NO. 2529-7400
DAVID (1)

11/01/13

MD1-0-V-161-01-00362

PA DUCT FROM AH TO FURNACE SECTIONS AND DETAILS PART


IC NO. 2529-7400
DAVID (2)

11/01/13

MD1-0-V-161-01-00363

PA DUCT FROM AH TO FURNACE SECTIONS AND DETAILS PART


IC NO. 2529-7400
DAVID (3)

11/01/13

MD1-0-V-161-01-00364

PA DUCT FROM AH TO FURNACE SECTIONS AND DETAILS PART


IC NO. 2529-7400
DAVID (4)

11/01/13

MD1-0-V-161-01-00365

PA DUCT FROM AH TO FURNACE SECTIONS AND DETAILS PART


IC NO. 2529-7400
DAVID (5)

11/01/13

MD1-0-V-161-01-00368

FABRIC EXPANSION JOINTS SCH FOR FLUES AND DUCTS

IC

DAVID

11/01/13

MD1-0-V-161-01-00369

METALLIC EXPANSION JOINTS SCH FOR FLUES AND DUCTS IC

DAVID

11/01/13

MD1-0-V-161-01-00370

METALLIC EXPANSION JOINTS DETAILS FOR BOILER

IC

DAVID

11/01/13

MD1-0-V-161-01-00371

EXPANSION JOINT DETAILS FOR STRIPPER COOLER

IC

DAVID

11/01/13

MD1-0-V-161-01-00380

Cyclone Loopseal Arrangement & Details Part No. 2543-8400

DAVID

05/04/13

MD1-0-V-161-01-00381

Cyclone Loopseals Section and Details (1)

DAVID

05/04/13

MD1-0-V-161-01-00382

Cyclone Loopseal Sections and Details (2)

DAVID

05/04/13

MD1-0-V-161-01-00386

EXPANSION JOINT DETAILS FOR CYCLONE LOOPSEAL

IC

DAVID

11/01/13

MD1-0-V-161-01-00390

FURNACE GRID PLENUM ARRANGEMENT DRAWING

IC

DAVID

11/01/13

MD1-0-V-161-01-00391

FURNACE PRIMARY AIR PLENUM SECTS & DETAILS (1)

IC

DAVID

11/01/13

MD1-0-V-161-01-00392

FURNACE PRIMARY AIR PLENUM SECTS & DETAILS (2)

IC

DAVID

11/01/13

MD1-0-V-161-01-00393

FURNACE PRIMARY AIR PLENUM SECTS & DETAILS (3)

IC

DAVID

11/01/13

MD1-0-V-161-01-00394

FURNACE PRIMARY AIR PLENUM VERTICAL TURNING VANESICSECTS & DETAILS


DAVID

11/01/13

MD1-0-V-161-01-00400

Downcomers Arrangement

IC

DAVID

17/01/13

MD1-0-V-161-01-00401

Downcomers Sections & Details

IC

DAVID

17/01/13

MD1-0-V-161-01-00402

Feedline to Drum Arrangement

IC

DAVID

17/01/13

MD1-0-V-161-01-00403

Transfer Lines PSH to ISH & ISH to FSH & Manfolds

IC

DAVID

17/01/13

MD1-0-V-161-01-00404

Transfer Lines PSH to ISH & ISH to FSH & Manfolds Details

IC

DAVID

17/01/13

MD1-0-V-161-01-00405

Furnace Feeder Arrangement

IC

DAVID

17/01/13

MD1-0-V-161-01-00408

Reheater By-Pass Arrangement

IC

DAVID

17/01/13

MD1-0-V-161-01-00409

Reheater By-Pass Sections & Details

IC

DAVID

17/01/13

MD1-0-V-161-01-00410

Feeders to Lower Cyclone & Gas Inlet

IC

DAVID

17/01/13

MD1-0-V-161-01-00411

HRA Lower & HRA To PSH Transfer Line Part No.2575 & 2575-2110
IC

DAVID

17/01/13

MD1-0-V-161-01-00425

Soot blower supports arrangment and details

IC

DAVID

11/03/13

MD1-0-V-161-01-00426

SOOTBLOWER SUPPORTS DETAILS(2)

DAVID

01/02/13

MD1-0-V-161-01-00427

SOOTBLOWER SUPPORTS DETAILS(3)

DAVID

01/02/13

MD1-0-V-161-01-00430

Stripper Cooler Arrang.- Plan & Elevations

DAVID

26/03/13

MD1-0-V-161-01-00431

Stripper Cooler Arrang.- Elevations & Details

DAVID

26/03/13

MD1-0-V-161-01-00432

Stripper Cooler Grid and Plenum, Sect. and Details

DAVID

10/01/13

MD1-0-V-161-01-00433

Stripper Cooler Air Nozzle- Layout and Details

DAVID

10/01/13

MD1-0-V-161-01-00434

Stripper Cooler Cooling Chambers- Section & Details

DAVID

10/01/13

MD1-0-V-161-01-00435

Stripper Cooler Ash Drain and Spray Nozzle Layout & Details

DAVID

10/01/13

MD1-0-V-161-01-00436

Stripper Cooler Solids Transfer Duct Sections and Details

DAVID

10/01/13

MD1-0-V-161-01-00437

Stripper Cooler Rod Out Details

DAVID

26/03/13

MD1-0-V-161-01-00438

Stripper Cooler Air/Solids Return- Sections and Details

DAVID

19/03/13

MD1-0-V-161-01-00439

Stripper Cooler Arrangement- Elevations and Sections

DAVID

19/03/13

MD1-0-V-161-01-00440

Stripper Cooler Arrangement- Sections

DAVID

26/03/13

MD1-0-V-161-01-00480

1524 ID Drum and External Arrangement

IC

DAVID

22/02/13

MD1-0-V-161-01-00481

Forming & Machinning Diagram for 1524 ID Drum

DAVID

04/03/13

MD1-0-V-161-01-00482

1524 ID Drum Internal Attachments Arrangement and Detail detail I

DAVID

04/03/13

MD1-0-V-161-01-00490

1524 ID Drum Internals Arrangement Sheet 1 of 2

IC

DAVID

12/12/12

MD1-0-V-161-01-00491

1524 ID Drum Internals Attachments Sheet 2 of 2

DAVID

04/03/13

MD1-0-V-161-01-00492

Vortex Elminator

IC

DAVID

01/02/13

MD1-0-V-161-01-00493

Drum Internals Details

DAVID

04/03/13

MD1-0-V-161-01-00600

General Arrangement Isometric View

IC

DAVID

22/08/12

MD1-0-V-161-01-00880

Crossover Flue Arrangement

DAVID

30/05/13

MD1-0-V-161-01-00881

Crossover Flue Sections and Details

DAVID

21/02/13

MD1-0-V-161-01-00882

Crossover Flue Upper Expansion Joint Collar Arrangement

IC

DAVID

04/02/13

MD1-0-V-161-01-00900

FURNACE UPPER FRONT WALL ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00919

FURNACE LOWER FRONT WALL ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00920

FURNACE WALL OPENING FOR SECONDARY AIRPORT

DAVID

08/02/13

MD1-0-V-161-01-00921

WALL OPENING FOR 762 X 914 ACCESS DOOR 50.8 O.D. TUBES
I ON 76.2 CTRS.
DAVID

08/02/13

MD1-0-V-161-01-00922

FURNACE LOWER FRONT WALL SECTIONS AND DETAILS

MD1-0-V-161-01-00924

MD1-0-V-161-01-00926

MD1-0-V-161-01-00927

MD1-0-V-161-01-00928
MD1-0-V-161-01-00951

DAVID

08/02/13

FUEL INLET OPENING 50.8 O.D. TUBES ON 76.2 CTRS.

DAVID

08/02/13

FURNACE UPPER REAR WALL ARRANGEMENT

IC

DAVID

08/02/13

FURNACE UPPER REAR WALL GAS OUTLET TO CYCLONE A &I C

DAVID

08/02/13

FURNACE UPPER REAR WALL GAS OUTLET TO CYCLONE B I

DAVID

08/02/13

FURNACE LOWER REAR WALL ARRANGEMENT

DAVID

08/02/13

MD1-0-V-161-01-00952

FURNACE REAR WALL LOOPSEAL OPENING 50.8 O.D. TUBESION 76.2 CTRS
DAVID

08/02/13

MD1-0-V-161-01-00953

WALL OPENING FOR 670 DIA THROAT FRONT AND REAL WALL
I START-UPDAVID
BURNER

08/02/13

MD1-0-V-161-01-00958

FURNACE UPPER SIDE WALL ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00973

FURNACE LOWER SIDE WALL ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00974

FURNACE LOWER SIDE WALL PANELS SECTIONS & DETAILSIC

DAVID

08/02/13

MD1-0-V-161-01-00976

WALL OPENING FOR COOLER AIR/SOLIDS INLET

DAVID

08/02/13

MD1-0-V-161-01-00981

FURNACE GRID FLOOR ARRANGEMENT

IC

DAVID

08/02/13

MD1-0-V-161-01-00982

FURNACE LOWER REAR WALL SECTIONS AND DETAILS

DAVID

08/02/13

MD1-0-V-161-01-00984

FURNACE GRID FLOOR NOZZLE DETAILS AT BED TRANSFER I& PURGE AIR
DAVID
ARRANGEMENT
08/02/13

MD1-0-V-161-01-00985

FURNACE GRID FLOOR AIR NOZZLE ARRANGEMENT

DAVID

08/02/13

MD1-0-V-161-01-00986

FLUID BED SOLIDS DRAIN OPENING FOR 50.8 OD TUBES ON 76.2


I
CTRS(1)DAVID

08/02/13

MD1-0-V-161-01-00987

FLUID BED SOLIDS DRAIN OPENING FOR 50.8 OD TUBES ON 76.2


I
CTRS(2)DAVID

08/02/13

MD1-0-V-161-01-00988

FURNACE LOWER SIDE WALL SEAL BOX FOR FW & RW HEADERS


I

DAVID

08/02/13

MD1-0-V-161-01-09001

Key Plan Silo, Boiler and Air Heater Area

IC

DAVID

26/12/12

MD1-0-V-161-01-09185

Equipment Maintenance Monorails

IC

DAVID

25/02/13

MD1-0-V-161-01-09186

Equipment maintenance hook locations

IC

DAVID

10/05/13

MD1-0-V-161-01-14102

Blowdown Tank General Arrangement Drawing

DAVID

04/02/13

MD1-0-V-161-01-23401

General Arrangement of PA SCAH

IC

DAVID

09/11/12

MD1-0-V-161-01-23402

General Arrangement of PA SCAH

IC

DAVID

09/11/12

MD1-0-V-161-01-32511

PA Fan-Fan General Arrangement Drawing with Loading and Foundation


IC

DAVID

22/02/13

MD1-0-V-161-01-32521

SA Fan-Fan General Arrangement Drawing with Loading and Foundation


IC

DAVID

22/02/13

MD1-0-V-161-01-36502

Limestone Blower Outline Drawing

DAVID

04/03/13

MD1-0-V-161-01-36503

General Arrangement Drawing for Limestone Feed System

IC

DAVID

24/01/13

MD1-0-V-161-02-01009

Surface Preparation and Painting Requirements

IC

DAVID

15/01/13

MD1-0-V-161-02-01020

Piping Material Class

DAVID

11/01/13

IC

IC

MD1-0-V-161-03-00001

Steam Generation System Description

AC

DAVID

13/11/12

MD1-0-V-161-05-00001

Quality assurance plan

IC

DAVID

22/02/13

MD1-0-V-161-05-00002

Quality control manual

DAVID

22/02/13

MD1-0-V-161-05-00003

Inspection and test plan(for boiler major parts)

IC

DAVID

22/02/13

MD1-0-V-161-05-25102

Code piping welder qualification list & applicable code used

IC

DAVID

06/03/13

MD1-0-V-161-05-25105

Code piping alloy material verification(pmi) procedure

IC

DAVID

06/03/13

MD1-0-V-161-05-25115

FWPML ALLOY MATERIAL VERIFICATION(PMI)

IC

DAVID

04/02/13

MD1-0-V-161-05-25116

FWPML WELD REPAIR PROCEDURE

RJ

DAVID

04/02/13

MD1-0-V-161-05-25121

Sunco wps and pqr

IC

DAVID

22/03/13

MD1-0-V-161-05-25123

Sunco post weld heat treatment procedurement

IC

DAVID

26/03/13

MD1-0-V-161-05-25124

Sunco nde procedure and operator qualification list

IC

DAVID

22/03/13

MD1-0-V-161-05-25125

Sunco alloy material verification(pmi) procedure

IC

DAVID

22/03/13

MD1-0-V-161-05-25126

Sunco weld repair procedure

IC

DAVID

22/03/13

MD1-0-V-161-05-25133

HUADIAN POST WELD HEAT TREATMENT PROCEDUREMENTRJ

DAVID

04/02/13

MD1-0-V-161-05-25135

HUADIAN ALLOY MATERIAL VERIFICATION(PMI) PROCEDUREIC

DAVID

04/02/13

MD1-0-V-161-05-25141

Hailu wps and pqr

DAVID

22/03/13

MD1-0-V-161-05-25142

HAILU WELDER QUALIFICATION LIST & APPLICABLE CODE USED


IC

DAVID

04/02/13

MD1-0-V-161-05-25143

Hailu post weld heat treatment procedurement

IC

DAVID

22/03/13

MD1-0-V-161-05-25144

Hailu nde procedure and operator qualification list

IC

DAVID

22/03/13

MD1-0-V-161-05-25145

Hailu alloy material verification(pmi) procedure

IC

DAVID

22/03/13

MD1-0-V-161-05-25146

HAILU WELD REPAIR PROCEDURE

IC

DAVID

04/02/13

MD1-0-V-161-05-25151

Gl wps and pqr

IC

DAVID

22/03/13

MD1-0-V-161-05-25152

Gl welder qualification list & applicable code used

IC

DAVID

22/03/13

MD1-0-V-161-05-25153

Gl post weld heat treatment procedurement

IC

DAVID

06/03/13

MD1-0-V-161-05-25154

Gl nde procedure and operator qualification list

IC

DAVID

22/03/13

MD1-0-V-161-05-25155

Gl alloy material verification(pmi) procedure

IC

DAVID

22/03/13

MD1-0-V-161-05-25191

FWST WPS AND PQR

DAVID

04/02/13

MD1-0-V-161-05-25192

FWST WELDER QUALIFICATION LIST & APPLICABLE CODE USED


I

DAVID

04/02/13

MD1-0-V-161-05-25193

FWST POST WELD HEAT TREATMENT PROCEDUREMENT

IC

DAVID

04/02/13

MD1-0-V-161-05-25195

FWST ALLOY MATERIAL VERIFICATION (PMI) PROCEDURE

IC

DAVID

04/02/13

MD1-0-V-161-05-25196

FWST WELD REPAIR PROCEDURE

IC

DAVID

04/02/13

MD1-0-V-161-05-25801

Sbwl wps and pqr

IC

DAVID

10/05/13

MD1-0-V-161-05-25803

Sbwl post weld heat treatment procedurement

RJ

DAVID

09/05/13

MD1-0-V-161-05-25804

Sbwl nde procedure and operator qualification list

IC

DAVID

29/05/13

MD1-0-V-161-05-25807

Sbwl drum hydrotest procedure

DAVID

11/06/13

MD1-0-V-161-06-00001

ASME Code Calculation For Pressure Parts

DAVID

04/04/13

MD1-0-V-161-06-00002

Description of pressure part code calculation - asme section I

DAVID

06/06/13

MD1-0-V-161-06-00003

Critical Pipe Terminal Allowable Reactions

IC

DAVID

22/02/13

MD1-0-V-161-06-00031

Boiler Proper Hanger Load Calculation Summary

DAVID

11/03/13

MD1-0-V-161-06-00104

Economizer Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-00107

Intermediate Superhtr Inlet Manifold

IC

DAVID

03/07/12

MD1-0-V-161-06-00508

Economizer Intermediate Support Header

IC

DAVID

03/07/12

MD1-0-V-161-06-00811

Intermediate Superhtr Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-00911

Economizer Outlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-01000

Economizer Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-01141

Calculation Sheet for Blowdown Tank

IC

DAVID

04/02/13

MD1-0-V-161-06-01213

Economizer Feed Line to Drum

IC

DAVID

03/07/12

IC

MD1-0-V-161-06-01217

Intermediate Superhtr Outlet Header

MD1-0-V-161-06-01400

MD1-0-V-161-06-01500

MD1-0-V-161-06-01823
MD1-0-V-161-06-02000

IC

DAVID

03/07/12

Pipe before Stop & Check Valve and Pipe between Stop & Check Valve
IC

DAVID

03/07/12

Econ Inlet Extension Pipe

IC

DAVID

03/07/12

Intermediate Superhtr Outlet Manifold

IC

DAVID

03/07/12

Economizer Lower Hanger Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-03000

Economizer Upper Hanger Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-04000

Stripper Cooler Coil Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-05080

Furnace Front Wall Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-09100

Furnace Grid Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-10102

TP WW2 to FSH

IC

DAVID

03/07/12

MD1-0-V-161-06-10104

Header Calculation for 60' I.D.Drum

IC

DAVID

03/07/12

MD1-0-V-161-06-10310

Superhtr 2nd Spray HDR

IC

DAVID

03/07/12

MD1-0-V-161-06-10506

Header Calculation for 18" Downcomer Nozzle on Drum

IC

DAVID

03/07/12

MD1-0-V-161-06-10708

Header Calculation for 12" Downcomer Nozzle on Drum

IC

DAVID

03/07/12

MD1-0-V-161-06-10910

Header Calculation for 10" Downcomer Nozzle on Drum

IC

DAVID

03/07/12

MD1-0-V-161-06-11112

Header Calculation for 6" Riser Nozzle on Drum

IC

DAVID

03/07/12

MD1-0-V-161-06-11140

Furnace Side Wall Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-11300

Header Calculation for 60" I.D.Drum

IC

DAVID

03/07/12

MD1-0-V-161-06-11400

Header Calculation for Drum Head Reinforcement

IC

DAVID

03/07/12

MD1-0-V-161-06-11500

Header Calculation for Drum Nozzle for Feedline

IC

DAVID

03/07/12

MD1-0-V-161-06-11600

Header Calculation for Drum Nozzle End for 18" Downcomer

IC

DAVID

03/07/12

MD1-0-V-161-06-11700

Header Calculation for Drum Nozzle End for 12" Downcomer

IC

DAVID

03/07/12

MD1-0-V-161-06-11800

Header Calculation for Drum Nozzle End for 10" Downcomer and Feedline
IC

DAVID

03/07/12

MD1-0-V-161-06-11900

Header Calculation for Drum Nozzle End for 6" Riser

IC

DAVID

03/07/12

MD1-0-V-161-06-15180

Furnace Rear & Roof Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-19000

Eva WW Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-20104

Downcomer to Lower Furnace

IC

DAVID

03/07/12

MD1-0-V-161-06-20106

Finishing Superhtr Inlet Manifold

IC

DAVID

03/07/12

MD1-0-V-161-06-20210

Cyclone Inckt Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-20510

Furnace Downcomer Bottle

IC

DAVID

03/07/12

MD1-0-V-161-06-20710

Finishing Superhtr Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-21112

Downcomer to Cyclone

IC

DAVID

03/07/12

MD1-0-V-161-06-21116

Finishing Superheater WW Outlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-21317

Cyclone Manifold- Part of DWNCMR

IC

DAVID

03/07/12

MD1-0-V-161-06-21722

Finishing Superhtr Outlet Manifold

IC

DAVID

03/07/12

MD1-0-V-161-06-21823

FFW Feeders to Diaphragmed Circuit

IC

DAVID

03/07/12

MD1-0-V-161-06-22000

Cyclone Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-22429

FSW Feeders to Diaphragmed Circuit

IC

DAVID

03/07/12

MD1-0-V-161-06-23031

Downcomer to EVAP WW

IC

DAVID

03/07/12

MD1-0-V-161-06-23240

HRA Side Wall Lower Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-25260

HRA Side Wall Upper Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-27280

HRA Front Wall Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-29300

HRA RW Upper Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-30104

RHTR-1 Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-30106

Furnace FW Lower Header

IC

DAVID

03/07/12

MD1-0-V-161-06-30508

RHTR-1 Outlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-30712

Furnace SW Lower Header

IC

DAVID

03/07/12

MD1-0-V-161-06-30912

RHTR-2 Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-31316

Furnace RW Lower Header

IC

DAVID

03/07/12

MD1-0-V-161-06-31320

HRA Roof Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-31718

RH1 Inlet & Bypass Pipe

IC

DAVID

03/07/12

MD1-0-V-161-06-31722

Furnace Upper SW Headers

IC

DAVID

03/07/12

MD1-0-V-161-06-31920

By-pass Inlet Tee

IC

DAVID

03/07/12

MD1-0-V-161-06-32100

By-pass Inlet 22" End of Reducer

IC

DAVID

03/07/12

MD1-0-V-161-06-32223

RH1 22" OD Inlet Pipe

IC

DAVID

03/07/12

MD1-0-V-161-06-32328

Furnace Upper FW Headers

IC

DAVID

03/07/12

MD1-0-V-161-06-32425

Mixing Tee at Reheater Bypass SA-182-F22

IC

DAVID

03/07/12

MD1-0-V-161-06-32600

RH1 Outlet Pipe to Mixing Tee

IC

DAVID

03/07/12

MD1-0-V-161-06-32728

32" OD Transfer Pipe to RH2 Inlet

IC

DAVID

03/07/12

MD1-0-V-161-06-32900

32" OD Spool Piece From Mixer Out

IC

DAVID

03/07/12

MD1-0-V-161-06-32932

EVAP Wingwall Lower HDR

IC

DAVID

03/07/12

MD1-0-V-161-06-33000

Flanged Transition Piece From valve to Mixing Tee

IC

DAVID

03/07/12

MD1-0-V-161-06-33338

EVAP Wingwall Upper HDR

IC

DAVID

03/07/12

MD1-0-V-161-06-33340

HRA Rear Wall Lower Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-35360

HRAXOD Top Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-37380

HRAXOD Side Wall Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-39400

HRAXOD Bottom Tube

IC

DAVID

03/07/12

MD1-0-V-161-06-40106

Cycl Inckt Lower Header

IC

DAVID

03/07/12

MD1-0-V-161-06-40712

Cycl Inckt Upper Header

IC

DAVID

03/07/12

MD1-0-V-161-06-41000

Primary Superheater Inlet Stubs

IC

DAVID

03/07/12

MD1-0-V-161-06-41317

Cyc. Upper Ring Header

IC

DAVID

03/07/12

MD1-0-V-161-06-41823

Cyc. Lower Ring Header

IC

DAVID

03/07/12

MD1-0-V-161-06-42000

Primary Superheater Horizontal Legs/Outlet Stubs

IC

DAVID

03/07/12

MD1-0-V-161-06-42426

XOD Posts SW Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-42729

XOD Posts SW Outlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-43000

RH 1 Inlet Leg

IC

DAVID

03/07/12

MD1-0-V-161-06-43032

XOD Bottom Inlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-43335

XOD Top Outlet Header

IC

DAVID

03/07/12

MD1-0-V-161-06-43637

XOD Transfer Pipe Top To Bottom

IC

DAVID

03/07/12

MD1-0-V-161-06-44000

RH1 Heating Elements Leg 1 to Leg 5

IC

DAVID

03/07/12

MD1-0-V-161-06-45000

RH1 Heating Elements Leg 5 to Leg 6

IC

DAVID

03/07/12

MD1-0-V-161-06-46000

RH1 Heating Elements Leg 7 to Leg 8

IC

DAVID

03/07/12

MD1-0-V-161-06-47000

RH1 Outlet Leg

IC

DAVID

03/07/12

MD1-0-V-161-06-48000

RH2 Outlet Leg

IC

DAVID

03/07/12

MD1-0-V-161-06-49000

RH 2 Heating Element Leg 1 to Leg 4

IC

DAVID

03/07/12

MD1-0-V-161-06-50000

RH 2 Heating Element Leg 5 to Leg 6

IC

DAVID

03/07/12

MD1-0-V-161-06-50109

HRA Front Wall Upper Header

IC

DAVID

03/07/12

MD1-0-V-161-06-51000

RH 2 Outlet Legs

IC

DAVID

03/07/12

MD1-0-V-161-06-51015

HRA Front Wall intermediate Header

IC

DAVID

03/07/12

MD1-0-V-161-06-51622

HRA Side Wall Upper Header

IC

DAVID

03/07/12

MD1-0-V-161-06-52000

3" Long Spool Piece @ RH II Heating Leg 6 & RH II Outlet Legs

IC

DAVID

03/07/12

MD1-0-V-161-06-52326

HRA Side Wall Lower Header

IC

DAVID

03/07/12

MD1-0-V-161-06-52730

HRA Front Wall Lower (Outlet) Header

IC

DAVID

03/07/12

MD1-0-V-161-06-53000

ISH Unheated & Lower Tubes

IC

DAVID

03/07/12

MD1-0-V-161-06-53137

HRA RW Lower (Outlet) Header

IC

DAVID

04/07/12

MD1-0-V-161-06-53839

Tee on HRA RW Lower (Outlet) Header

IC

DAVID

04/07/12

MD1-0-V-161-06-54000

ISH Upper Tubes

IC

DAVID

04/07/12

MD1-0-V-161-06-55000

FSH WW Unheater and Lower Tube

IC

DAVID

04/07/12

MD1-0-V-161-06-56000

FSH WW Upper Tubes

IC

DAVID

04/07/12

MD1-0-V-161-06-57000

FSH WW Upper Unheated Tubes

IC

DAVID

04/07/12

MD1-0-V-161-06-58000

8" Evaporative WW Feeder-BR

IC

DAVID

04/07/12

MD1-0-V-161-06-59000

10" Furnace Feeder-BS

IC

DAVID

04/07/12

MD1-0-V-161-06-60000

3" FSW Feeder to Diaphragmed Circult-BT

IC

DAVID

04/07/12

MD1-0-V-161-06-60104

SC/ Cooling Coil Inlet HDRS

IC

DAVID

04/07/12

MD1-0-V-161-06-60508

SC/ Cooling Coil Outlet HDRS

IC

DAVID

04/07/12

MD1-0-V-161-06-60900

SC/ Cooling Coil Transfer Pipe

IC

DAVID

04/07/12

MD1-0-V-161-06-61000

4" FFW Feeder to Diaphragmed Circult-BU

IC

DAVID

04/07/12

MD1-0-V-161-06-62000

6" Furnace & Evaporative WW Risers-BW

IC

DAVID

04/07/12

MD1-0-V-161-06-63000

Drum Head Recirculating Pipe -BX

IC

DAVID

04/07/12

MD1-0-V-161-06-64000

6" Cyclone & Cyclone INCKT Risers-CA

IC

DAVID

04/07/12

MD1-0-V-161-06-65000

6" Cyclone & Cyclone INCKT Feeder- CB

IC

DAVID

04/07/12

MD1-0-V-161-06-66000

SS Pipes From Drum To HRA FW/SW-CH

IC

DAVID

04/07/12

MD1-0-V-161-06-67000

Transfer-HRA FW To HRA RW Lower- CJ

IC

DAVID

04/07/12

MD1-0-V-161-06-68000

Transfer-HRA RW Lowr HDR To PSH Inlet-CM

IC

DAVID

04/07/12

MD1-0-V-161-06-80106

Primary Superheater Inlet Header

IC

DAVID

04/07/12

MD1-0-V-161-06-80710

Primary Superheater Outlet Header

IC

DAVID

04/07/12

MD1-0-V-161-06-81112

TP PSH To WW2

IC

DAVID

04/07/12

MD1-0-V-161-06-81320

1st Spray Header

IC

DAVID

04/07/12

MD1-0-V-161-07-00001

Fuel Silo Flowability Analysis

DAVID

06/11/12

MD1-0-V-161-07-00002

Evaluation of Limestones for the Mong Duong 1 Thermal Power Plant


I

DAVID

03/04/13

MD1-0-V-161-08-06006

Equipment List

IC

DAVID

25/09/12

MD1-0-V-161-08-06007

Valve List

IC

DAVID

15/11/12

MD1-0-V-161-08-06008

Boiler Line List

IC

DAVID

21/02/13

MD1-0-V-161-08-06009

Piping Terminal Point List

DAVID

28/06/13

MD1-0-V-161-08-06010

Utility Consumption List for Boiler

IC

DAVID

22/02/13

MD1-0-V-161-08-10000

Boiler Master Documents & Drawing List

IC

DAVID

20/03/13

MD1-0-V-161-08-2000

Engineering abbreviations and acronyms for boiler

DAVID

26/03/13

MD1-0-V-161-09-00002

MATERIAL COMPARISON TABLE FOR NON-PRESSURE PARTSIC

DAVID

28/01/13

MD1-0-V-161-09-00010

Limestone Requirements for Boiler

DAVID

25/01/13

MD1-0-V-161-09-14610

Boiler Steel Structure Paint MSDS

DAVID

17/12/12

MD1-0-V-161-09-23401

Data Sheet for Steam Coil Air Heater

IC

DAVID

03/10/12

MD1-0-V-161-09-24701

Data Sheet for Air Preheater

IC

DAVID

06/11/12

MD1-0-V-161-09-24901

Data Sheet for Sootblower System

AC

DAVID

26/12/12

MD1-0-V-161-09-25401

Data Sheet for Damper and Actuator

AC

DAVID

26/12/12

MD1-0-V-161-09-25402

Data Sheet of Fabric Expansion Joint

RT

DAVID

26/12/12

MD1-0-V-161-09-25501

Data Sheet of Metal Expansion Joint

RT

DAVID

26/12/12

MD1-0-V-161-09-25701

Data Sheet for Start up Burner System

IC

DAVID

06/11/12

MD1-0-V-161-09-32501

Data Sheet for Primary Air Fan and Secondary Air Fan

IC

DAVID

03/10/12

MD1-0-V-161-09-32502

Technical Data Sheet for Stripper Cooler Blowers

DAVID

03/10/12

MD1-0-V-161-09-32505

Data Sheet for Loop Seal Blower

IC

DAVID

06/11/12

MD1-0-V-161-09-32511

Opearational Curves at Various Inlet Vanes Opening

IC

DAVID

06/11/12

MD1-0-V-161-09-36101

Data Sheet for Chain Conveyor System

IC

DAVID

03/10/12

MD1-0-V-161-09-36102

Data Sheet for Belt Feeder System

IC

DAVID

03/10/12

MD1-0-V-161-09-36103

Technical Data Sheet for Bed Ash Cooling System Rotary Valve AC

DAVID

26/12/12

MD1-0-V-161-09-36501

Data Sheet for Limestone Feed System

DAVID

22/02/13

MD1-0-V-161-09-62101

Technical Data Sheet for RH Balancing Valve

AC

DAVID

26/12/12

MD1-0-V-161-09-62102

Technical Data Sheet for SC Outlet Knife Gate

AC

DAVID

26/12/12

MD1-0-V-161-09-62104

Data Sheet for Miscellaneous Control Valve

DAVID

25/02/13

MD1-0-V-161-10-00001

Boiler standard drawings package

DAVID

22/03/13

MD1-0-V-161-10-12470

Boiler Tri-sector Air-Heater Vendor Drawings

RT

DAVID

20/05/13

MD1-0-V-161-10-12490

Boiler sootblower vendor drawings

IC

DAVID

25/02/13

MD1-0-V-161-10-12552

Boiler Hanger Workpackage Vendor Drawings

RJ

DAVID

28/05/13

MD1-0-V-161-10-12570

Boiler Burner System Workpackage Vendor Documents & DrawingsI

DAVID

01/07/13

MD1-0-V-161-10-13250

Boiler Pa/Sa Fan Vendor Drawings

IC

DAVID

12/04/13

MD1-0-V-161-10-13251

Boiler S/C Blower System Vendor Drawings

IC

DAVID

12/04/13

MD1-0-V-161-10-13252

Boiler Loopseal Blower System Vendor Drawings

IC

DAVID

12/04/13

MD1-0-V-161-10-13612

Stripper cooler rotary valve workpackage vendor documents & drawings


IC

DAVID

25/02/13

MD1-0-V-161-10-16210

MS-FW Stop & Check Valves_ Pentair Valves & Controls Vendor Drawings
IC

DAVID

17/01/13

MD1-0-V-161-10-16211

Boiler Large Bore Valves Vendor Drawings

DAVID

20/05/13

MD1-0-V-161-10-16215

RH-By pass Control Valve Workpackage Vendor Documents & Drawings


IC

DAVID

04/02/13

MD1-0-V-161-14-00080

Fuel Feed System Equipment Arrangement From Fuel Silos to Boiler


I

DAVID

20/03/13

MD1-0-V-161-14-00081

Fuel Feed Chute System Arrangement of Front Wall

DAVID

20/03/13

MD1-0-V-161-14-00082

FUEL FEED CHUTE SYSTEM ARRANGMENT OF

DAVID

20/03/13

MD1-0-V-161-14-00083

Fuel Feed Chute System Arrangement Sections & Details

DAVID

20/03/13

MD1-0-V-161-14-00084

EXPANSION JOINTS FOR FUEL FEED CHUTE

IC

DAVID

10/01/13

MD1-0-V-161-14-01095

Fuel & lime silos sections & details stainless steel liner plates

DAVID

25/02/13

MD1-0-V-161-21-06124

P&ID Stripper Cooler Blowers

AC

DAVID

05/03/13

MD1-0-V-161-21-06135

P&ID Nitrogen System

AC

DAVID

05/03/13

MD1-0-V-161-23-03980

SOOTBLOWER PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-03981

SOOTBLOWER PIPING PLAN VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-03982

SOOTBLOWER PIPING ELEVATION VIEW - RIGHT SIDE

IC

DAVID

21/02/13

MD1-0-V-161-23-03983

SOOTBLOWER PIPING ELEVATION VIEW - LEFT SIDE

IC

DAVID

21/02/13

MD1-0-V-161-23-03984

SOOTBLOWER PIPING SUPPORT DETAIL

IC

DAVID

21/02/13

MD1-0-V-161-23-03985

SOOTBLOWER PIPING SUPPORT LIST

IC

DAVID

21/02/13

MD1-0-V-161-23-04000

BOILER DRAIN PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04001

BOILER DRAIN PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04002

BOILER DRAIN PIPING ELEVATION VIEW - RIGHT SIDE

IC

DAVID

21/02/13

MD1-0-V-161-23-04003

BOILER DRAIN PIPING ELEVATION VIEW - LEFT SIDE

IC

DAVID

21/02/13

MD1-0-V-161-23-04004

BOILER VENT PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04005

BOILER VENT PIPING PLAN VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04006

BOILER VENT PIPING ELEVATION VIEW

DAVID

21/02/13

MD1-0-V-161-23-04007

BOILER DRAIN PIPING SUPPORTS DETAIL(1)

DAVID

21/02/13

MD1-0-V-161-23-04008

BOILER DRAIN PIPING SUPPORTS DETAIL(2)

DAVID

21/02/13

MD1-0-V-161-23-04009

BOILER VENT PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04010

BOILER DRAIN PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04011

BOILER VENT PIPING SUPPORT LIST

IC

DAVID

21/02/13

MD1-0-V-161-23-04020

SPRAY WATER PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04021

SPRAY WATER PIPING PLAN VIEW

IC

DAVID

21/02/13

IC

MD1-0-V-161-23-04022

SPRAY WATER PIPING ELEVATION VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04023

MD1-0-V-161-23-04024

SPRAY WATER PIPING SUPPORTS DETAIL

DAVID

21/02/13

SPRAY WATER PIPING SUPPORTS LIST

IC

DAVID

21/02/13

MD1-0-V-161-23-04050
MD1-0-V-161-23-04051

CLOSED COOLING WATER PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

CLOSED COOLING WATER PIPING PLAN VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04052

CLOSED COOLING WATER PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04060

INTER & CONT BLOWDOWN PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04061

INTER & CONT BLOWDOWN PIPING PLAN VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04062

INTER & CONT BLOWDOWN PIPING ELEVATION VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04063

INTER & CONT BLOWDOWN PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04064

INTER & CONT BLOWDOWN PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04065

INTER & CONT BLOWDOWN PIPING SUPPORTS LIST

IC

DAVID

21/02/13

MD1-0-V-161-23-04076

SAMPLING PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04077

SAMPLING PIPING ARRANGEMENT ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04078

SAMPLING PIPING ARRANGEMENT PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04079

SAMPLING PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04080

PLANT/SERVICE AIR PIPING ARRANGEMENT ISOMETRIC VIEW


IC

DAVID

21/02/13

MD1-0-V-161-23-04081

PLANT/SERVICE AIR PIPING ARRANGEMENT PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04082

PLANT/SERVICE AIR PIPING ARRANGEMENT ELEVATION VIEW


IC

DAVID

21/02/13

MD1-0-V-161-23-04083

PLANT/SERVICE AIR PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04100

INSTRUMENT AIR PIPING ARRANGEMENT ISOMETRIC VIEW IC

DAVID

21/02/13

MD1-0-V-161-23-04101

INSTRUMENT AIR PIPING ARRANGEMENT PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04102

INSTRUMENT AIR PIPING ARRANGEMENT ELEVATION VIEW IC

DAVID

21/02/13

MD1-0-V-161-23-04103

INSTRUMENT AIR PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04170

NITROGEN PIPING ARRANGEMENT ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04171

NITROGEN PIPING ARRANGEMENT PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04172

NITROGEN PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04200

STEAM COIL AIR HEATER STEAM PIPING ARRANGEMENT ISOMETRIC


IC
VIEW
DAVID

21/02/13

MD1-0-V-161-23-04201

STEAM COIL AIR HEATER STEAM PIPING PLAN AND SECTIONS


I

DAVID

21/02/13

MD1-0-V-161-23-04202

SCAH STEAM PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04250

CHEMICAL FEED PIPING PLAN AND ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04251

CHEMICAL FEED PIPING SUPPORT DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04252

CHEMICAL FEED PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04300

WATER WASH DRAIN PIPING PLAN VIEW AND ISOMETRIC VIEW


IC

DAVID

21/02/13

MD1-0-V-161-23-04301

WATER WASH DRAIN PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04330

SAFETY VALVE VENT & DRAIN PIPING ARRANGMENT ISOMETRIC


IC VIEW

DAVID

21/02/13

MD1-0-V-161-23-04331

SAFETY VALVE VENT & DRAIN PIPING ARRANGEMENT PLAN VIEW


I

DAVID

21/02/13

MD1-0-V-161-23-04332

SAFETY VALVE VENT & DRAIN PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04370

SEAL AIR PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04371

SEAL AIR PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04372

SEAL AIR PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04373

SEAL AIR PIPING SUPPORTS LIST

DAVID

21/02/13

MD1-0-V-161-23-04390

STRIPPER COOLER AIR PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04391

STRIPPER COOLER AIR PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04392

STRIPPER COOLER AIR PIPING SUPPORT DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04393

STRIPPER COOLER AIR PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04410

LOOPSEAL AIR PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04411

LOOPSEAL AIR PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04412

LOOPSEAL AIR PIPING SUPPORTS DETAIL

DAVID

21/02/13

MD1-0-V-161-23-04413

LOOPSEAL AIR PIPING SUPPORTS LIST

DAVID

21/02/13

MD1-0-V-161-23-04450

STRIPPER COOLER ATTEMPERATOR PIPING ISOMETRIC VIEW


IC

DAVID

21/02/13

MD1-0-V-161-23-04451

STRIPPER COOLER ATTEMPERATOR PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04452

STRIPPER COOLER ATTEMPERATOR PIPING SUPPORT DETAIL


I

DAVID

21/02/13

MD1-0-V-161-23-04453

STRIPPER COOLER ATTEMPERATOR PIPING SUPPORT LIST I

DAVID

21/02/13

MD1-0-V-161-23-04480

OIL PIPING FO OVERBED BURNER ISOMETRIC VIEW

DAVID

21/02/13

MD1-0-V-161-23-04481

OIL PIPING FO OVERBED BURNER ARRANGEMENT PLAN REVIEW


IC

DAVID

21/02/13

MD1-0-V-161-23-04482

OIL PIPING FO OVERBED BURNER SECTION VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04483

OIL PIPING FO OVERBED BURNER SUPPORT DETAIL

IC

DAVID

21/02/13

MD1-0-V-161-23-04484

OIL PIPING FO OVERBED BURNER SUPPORT LIST

IC

DAVID

21/02/13

MD1-0-V-161-23-04560

SERVICE WATER PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04561

SERVICE WATER PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04562

SERVICE WATER PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04580

LIMESTONE FEED PIPING ISOMETRIC VIEW

IC

DAVID

21/02/13

MD1-0-V-161-23-04581

LIMESTONE FEED PIPING PLAN VIEW

DAVID

21/02/13

MD1-0-V-161-23-04582

LIMESTONE FEED PIPING SUPPORT LIST

DAVID

21/02/13

MD1-0-V-161-23-04583

LIMESTONE FEED PIPING EXPANSION JOINT

IC

DAVID

21/02/13

MD1-0-V-161-24-00001

Piping Isometric Drawing

IC

DAVID

06/02/13

MD1-0-V-161-56-32501

Loopseal Blower Foundation Layout Plan Drawing

IC

DAVID

24/01/13

MD1-0-V-161-56-32502

Stripper Blower Foundation Layout Plan Drawing

IC

DAVID

24/01/13

MD1-0-V-161-73-07200

Above Ground Grounding at Grade Major Mechanical Equipment IC

DAVID

22/08/12

MD1-0-V-161-82-00001

Insulation for cfb type steam generator

IC

DAVID

21/02/13

MD1-0-V-161-87-00810

Refractory Setting for Cyclone

DAVID

02/04/13

MD1-0-V-161-87-00811

Refractory Setting Upper Furnace & Cyclone Entrance

DAVID

02/04/13

MD1-0-V-161-87-00812

REFRACTORY SETTINGS FOR CROSSOVER FLUE

DAVID

02/04/13

MD1-0-V-161-87-00813

FURNACE GRID FLOOR REFRACTORY SETTINGS

IC

DAVID

02/04/13

MD1-0-V-161-87-00814

REFRACTORY SETTING FOR UPPER WING WALLS & FURNACE


I FW

DAVID

02/04/13

MD1-0-V-161-87-00815

REFRACTORY SETTING FOR LOWER FURNACE AREA

DAVID

02/04/13

MD1-0-V-161-87-00816

REFRACTORY SETTING SECTIONS & DETAILS(1)

DAVID

02/04/13

MD1-0-V-161-87-00817

REFRACTORY SETTING SECTIONS & DETAILS(2)

IC

DAVID

02/04/13

MD1-0-V-161-87-00818

REFRACTORY SETTING FOR CYCLONE OUTLET/ CROSSOVER


IC FLUE INLET
DAVID

02/04/13

MD1-0-V-161-87-00819

REFRACTORY SETTING STRIPPER COOLER PLAN VIEW, SECTION


I
& DETAILS
DAVID

02/04/13

MD1-0-V-161-87-00820

REFRACTORY SETTING FOR S/C AIR/SOLIDS RETURN DUCT DETAILS


I

DAVID

02/04/13

MD1-0-V-161-87-00821

REFRACTORY SETTING FOR LOOP SEAL

DAVID

02/04/13

MD1-0-V-161-87-00822

REFRACTORY SETTING FOR LOOP SEAL SECTIONS AND DETAILS(1)


I

DAVID

02/04/13

MD1-0-V-161-87-00823

REFRACTORY SETTING FOR LOOP SEAL SECTIONS AND DETAILS(2)


I

DAVID

02/04/13

MD1-0-V-161-87-00824

REFRACTORY SETTINGS GENERAL ARRANGEMENT STEAM GENERATOR


IC
DAVID

02/04/13

MD1-0-V-161-87-00825

REFRACTORY DRY-OUT & CURING CURVE - FURNACE

IC

DAVID

02/04/13

MD1-0-V-162-01-00004

Section Drawing of ESP

IC

DAVID

16/07/13

MD1-0-V-162-05-00001

Inspection Test Plan for ESP

RT

DAVID

12/07/13

MD1-0-V-162-05-00002

Cleaning & Painting Procedure ESP System

DAVID

09/04/13

MD1-0-V-162-05-00005

Quality assurance manual

IC

DAVID

08/03/13

MD1-0-V-162-06-00005

ESP Hopper Sizing Calcuation

MD1-0-V-162-09-00001

Electrostatic Precipitator Technical Data Sheet

MD1-0-V-162-09-00005

Performance Curve

IC

DAVID

16/07/13

AC

DAVID

05/06/13

DAVID

18/03/13

MD1-0-V-162-11-00014

Thermal Insulation Drawing with BM and Calculation

IC

DAVID

16/07/13

MD1-0-V-162-11-00017

Purge Air System Drawing

IC

DAVID

22/07/13

MD1-0-V-163-01-00001

I.D Fan Layout Drawing

IC

DAVID

05/04/13

MD1-0-V-163-01-00002

I.D Fan Sectional Drawing

IC

DAVID

06/02/13

MD1-0-V-163-01-00004

I.d. fan inlet damper drawing

IC

DAVID

05/04/13

MD1-0-V-163-01-00006

I.d. fan name plate drawing

IC

DAVID

05/04/13

MD1-0-V-163-06-00010

Motor power calculation sheet for i.d. fan

IC

DAVID

09/04/13

MD1-0-V-163-08-00003

Equipments list for id fan(11hnc15an001)

IC

DAVID

09/04/13

MD1-0-V-163-09-00001

Technical Data Sheet

AC

DAVID

21/06/13

MD1-0-V-163-09-00002

Estimated Performance Curve

IC

DAVID

12/03/13

MD1-0-V-163-09-00003

Speed Torque Curve

IC

DAVID

12/03/13

MD1-0-V-163-09-00004

Estimated Noise Data

RT

DAVID

12/03/13

MD1-0-V-163-09-00005

Painting Specification

IC

DAVID

11/01/13

MD1-0-V-163-21-00001

Fan p&i diagram

IC

DAVID

05/04/13

MD1-0-V-163-82-00001

Id fan technical information for acoustic insulation drawing

IC

DAVID

05/04/13

MD1-0-V-181-01-00002

Auxiliary Boiler Package Layout of Boiler Plan View

DAVID

21/02/13

MD1-0-V-181-01-00003

Auxiliary Boiler Package Layout of Boiler Front View

DAVID

21/02/13

MD1-0-V-181-01-00004

Layout of Boiler Side View

MD1-0-V-181-03-00001

Auxiliary Boiler Package System Description

MD1-0-V-181-05-00001

MD1-0-V-181-05-00002
MD1-0-V-181-05-00003

DAVID

21/02/13

AC

DAVID

08/05/13

NSPECTION & TEST PROCEDURE

DAVID

12/06/13

NSPECTION & TEST PLAN

DAVID

12/06/13

WPS & PQR FOR AUX. BOILER

DAVID

25/06/13

MD1-0-V-181-05-00004

NDE Procedure

DAVID

03/04/13

MD1-0-V-181-05-00005

WELD & NDE MAP FOR AUX. BOILER

DAVID

25/06/13

MD1-0-V-181-05-00006

PWHT PROCEDURE

DAVID

29/04/13

MD1-0-V-181-05-00007

Auxiliary boiler package shop pressure test procedure

IC

DAVID

25/06/13

MD1-0-V-181-05-00008

Surface preparation & painting procedure

IC

DAVID

04/07/13

MD1-0-V-181-05-00010

Method statement for aux. boiler installation work

IC

DAVID

19/06/13

MD1-0-V-181-06-00001

Auxiliary Boiler Package Heat Balance for Auxiliary Boiler

DAVID

22/02/13

MD1-0-V-181-06-00002

Auxiliary Boiler Package Boiler Strength Calculation

DAVID

22/02/13

MD1-0-V-181-06-00003

Auxiliary Boiler Package Boiler Thermal Calculation

IC

DAVID

22/03/13

MD1-0-V-181-06-00004

Auxiliary Boiler Package Superheater Strength Calculation

DAVID

22/02/13

MD1-0-V-181-06-00005

Auxiliary Boiler Package Deaerator Strength Calculation

IC

DAVID

22/03/13

MD1-0-V-181-06-00006

Auxiliary Boiler Package Economizer Strength Calculation

IC

DAVID

22/03/13

MD1-0-V-181-06-00007

Blowdown Tank Strength Calculation

IC

DAVID

22/03/13

MD1-0-V-181-06-00008

Auxiliary Boiler Package Diesel Oil Tank Strength Calculation

DAVID

22/02/13

MD1-0-V-181-06-00009

Heavy Oil Tank Strength Calculation

DAVID

22/02/13

MD1-0-V-181-06-00010

Steel Stack Strength Calculation

IC

DAVID

22/03/13

MD1-0-V-181-06-00011

Calculation Sheet of Piping's Diameter

DAVID

22/02/13

MD1-0-V-181-06-00020

Auxiliary Boiler Package Thermal Expansion Calculation of Duct

DAVID

08/07/13

MD1-0-V-181-08-00006

Auxiliary Boiler package lubricate Schedule

IC

DAVID

04/03/13

MD1-0-V-181-08-00007

Auxiliary Boiler Package Utility Consumption List

IC

DAVID

04/03/13

MD1-0-V-181-08-00011

Auxiliary boiler package line list

IC

DAVID

28/06/13

MD1-0-V-181-08-00012

Auxiliary Boiler package Valve List

DAVID

28/06/13

MD1-0-V-181-08-00013

Auxiliary Boiler Package Electronic Load List

DAVID

04/03/13

MD1-0-V-181-08-00021

Auxiliary boiler package Piping Material Class

DAVID

22/02/13

MD1-0-V-181-09-00001

Auxiliary Boiler Package Burner (Include BSP)

IC

DAVID

12/12/12

MD1-0-V-181-09-00003

Boiler Feed Water & Sumpt Pump (Include Motor Drawing & Data) IC

DAVID

21/11/12

MD1-0-V-181-09-00005

Chemical Dosing System & Sampling System

IC

DAVID

21/11/12

MD1-0-V-181-09-00008

Auxiliary Boiler Package Safety Valve

DAVID

04/03/13

MD1-0-V-181-10-00001

Auxiliary Boiler Package Boiler Assembly Drawing (1 of 2)

DAVID

21/02/13

MD1-0-V-181-10-00002

Auxiliary Boiler Package Boiler Assembly Drawing (2 of 2)

DAVID

21/02/13

MD1-0-V-181-10-00003

Auxiliary Boiler Package Super Assembly

DAVID

21/02/13

MD1-0-V-181-10-00005

Auxiliary Boiler Package Economizer Assembly Drawing

IC

DAVID

26/03/13

MD1-0-V-181-10-00006

Auxiliary Boiler Package Blowdown Tank Assembly Drawing

DAVID

21/02/13

MD1-0-V-181-10-00007

Auxiliary Boiler Package Diesel Oil Tank Assembly

DAVID

21/02/13

MD1-0-V-181-10-00008

Auxiliary Boiler Package Heavy Oil Tank Assembly

IC

DAVID

21/02/13

MD1-0-V-181-10-00009

Auxiliary Boiler Package Steel Stack

IC

DAVID

21/02/13

MD1-0-V-181-10-00010

Auxiliary boiler package arrangement of ducts

DAVID

17/05/13

MD1-0-V-181-11-00101

Auxiliary Boiler Package Steam Drum for Auxiliary Boiler

DAVID

21/02/13

MD1-0-V-181-11-00102

Auxiliary Boiler Package Tube Arrangement of Steam Drum

DAVID

21/02/13

MD1-0-V-181-11-00103

Auxiliary Boiler Package Steam Drum Nozzle Detail (1/2)

DAVID

21/02/13

MD1-0-V-181-11-00104

Auxiliary Boiler Package Steam Drum Nozzle Detail (2/2)

DAVID

21/02/13

MD1-0-V-181-11-00105

Auxiliary Boiler Package Steam Drum Manhole Detail

DAVID

21/02/13

MD1-0-V-181-11-00106

Auxiliary Boiler Package Internal Arrangement of STE Drum

DAVID

21/02/13

MD1-0-V-181-11-00107

Auxiliary Boiler Package Detail of Main Steam Connection

DAVID

21/02/13

MD1-0-V-181-11-00111

Auxiliary Boiler Package Water Drum for Auxiliary Boiler

DAVID

21/02/13

MD1-0-V-181-11-00112

Auxiliary Boiler Package Tube Arrangement of Water Drum

DAVID

21/02/13

MD1-0-V-181-11-00113

Auxiliary Boiler Package Water Drum Nozzle Detail

DAVID

21/02/13

MD1-0-V-181-11-00114

Auxiliary Boiler Package Water Drum Manhole Detail

DAVID

21/02/13

MD1-0-V-181-11-00115

Auxiliary Boiler Package Water Drum Internal

DAVID

21/02/13

MD1-0-V-181-11-00116

Auxiliary Boiler Package Water Drum Saddle Detail

DAVID

21/02/13

MD1-0-V-181-11-00121

Auxiliary Boiler Package Arrangement of Panel Tube

DAVID

21/02/13

MD1-0-V-181-11-00131

Auxiliary Boiler Package Water Column (1/2)

DAVID

21/02/13

MD1-0-V-181-11-00132

Auxiliary Boiler Package Water Column (2/2)

DAVID

21/02/13

MD1-0-V-181-11-00151

Auxiliary Boiler Package Outer Casing of Front & Rear Side (1 of 3)I

DAVID

21/02/13

MD1-0-V-181-11-00152

Auxiliary Boiler Package Outer Casing of Front & Rear Side (2 of 3)I

DAVID

21/02/13

MD1-0-V-181-11-00153

Auxiliary Boiler Package Outer Casing of Front & Rear Side (3 of 3)I

DAVID

21/02/13

MD1-0-V-181-11-00191

Auxiliary boiler package name plate for boiler

IC

DAVID

25/06/13

MD1-0-V-181-11-00201

Auxiliary Boiler Package Tube Detail of Superheater

DAVID

21/02/13

MD1-0-V-181-11-00211

Auxiliary Boiler Package Inlet Header Detail of Superheater

DAVID

21/02/13

MD1-0-V-181-11-00212

Auxiliary Boiler Package Outlet Header Detail of Superheater

DAVID

21/02/13

MD1-0-V-181-11-00301

Auxiliary Boiler Package Shell Detail of Deaerator(Storage Tank) IC

DAVID

11/01/13

MD1-0-V-181-11-00302

Auxiliary Boiler Package Shell Detail of Deaerator(Deaerator Tank)IC

DAVID

11/01/13

MD1-0-V-181-11-00311

Auxiliary Boiler Package Nozzle Detail of Deaerator

IC

DAVID

11/01/13

MD1-0-V-181-11-00312

Auxiliary Boiler Package Manhole Detail of Deaerator

DAVID

11/01/13

MD1-0-V-181-11-00321

Auxiliary Boiler Package Saddle Detail of Deaerator

DAVID

11/01/13

MD1-0-V-181-11-00331

Auxiliary Boiler Package Platform Detail of Deaerator (1 of 2)

IC

DAVID

11/01/13

MD1-0-V-181-11-00332

Auxiliary Boiler Package Platform Detail of Deaerator (2 of 2)

IC

DAVID

11/01/13

MD1-0-V-181-11-00391

Auxiliary boiler package name plate for deaerator

IC

DAVID

25/06/13

MD1-0-V-181-11-00401

Auxiliary Boiler Package Detail of Economizer (Header and Nozzle Detail)


I

DAVID

21/02/13

MD1-0-V-181-11-00411

Auxiliary boiler package platform detail of economizer

IC

DAVID

08/07/13

MD1-0-V-181-11-00412

Auxiliary boiler package platform detail of economizer

IC

DAVID

08/07/13

MD1-0-V-181-11-00491

Auxiliary boiler package name plate for economizer

IC

DAVID

25/06/13

MD1-0-V-181-11-00501

Auxiliary Boiler Package Nozzle Detail of Blowdown Tank

DAVID

21/02/13

MD1-0-V-181-11-00511

MD1-0-V-181-11-00591

Auxiliary Boiler Package Manhole Detail of Blowdown Tank

DAVID

21/02/13

Auxiliary boiler package name plate for blowdown tank

IC

DAVID

25/06/13

MD1-0-V-181-11-00601
MD1-0-V-181-11-00611

Auxiliary Boiler Package Nozzle Detail of Diesel Oil Tank

DAVID

21/02/13

Auxiliary boiler package manhole detail oil tank

DAVID

25/02/13

MD1-0-V-181-11-00621

Auxiliary Boiler Package Platform Detail of Diesel Oil Tank

DAVID

21/02/13

MD1-0-V-181-11-00622

Platform & Ladder Detail of Diesel Oil Tank (2 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00691

Auxiliary boiler package name plate for diesel oil tank

IC

DAVID

25/06/13

MD1-0-V-181-11-00701

Auxiliary Boiler Package Nozzle Detail of Heavy Oil Tank (1 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00702

Auxiliary Boiler Package Nozzle Detail of Heavy Oil Tank (2 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00711

Auxiliary Boiler Package Manhole Detail of Heavy Oil Tank (1 of 2) I

DAVID

21/02/13

MD1-0-V-181-11-00721

Auxiliary boiler package ladder & handrail detail of heavy oil tank

IC

DAVID

08/07/13

MD1-0-V-181-11-00791

Auxiliary boiler package name plate for heavy oil tank

IC

DAVID

25/06/13

MD1-0-V-181-11-00801

Auxiliary Boiler Package Template of Stack

DAVID

21/02/13

MD1-0-V-181-11-00802

Auxiliary Boiler Package Shell Detail of Stack (1 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00803

Auxiliary Boiler Package Shell Detail of Stack (2 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00811

Auxiliary Boiler Package Nozzle Detail of Stack

DAVID

21/02/13

MD1-0-V-181-11-00821

Attachment Detail of Stack

IC

DAVID

21/02/13

MD1-0-V-181-11-00831

Platform Detail of Stack (1 of 3)

IC

DAVID

21/02/13

MD1-0-V-181-11-00832

Platform Detail of Stack (2 of 3)

DAVID

21/02/13

MD1-0-V-181-11-00833

Platform Detail of Stack (3 of 3)

DAVID

21/02/13

MD1-0-V-181-11-00841

Auxiliary Boiler Package Ladder Detail of Stack (1 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00842

Auxiliary Boiler Package Ladder Detail of Stack (2 of 2)

DAVID

21/02/13

MD1-0-V-181-11-00891

Auxiliary boiler package name plate for stack

IC

DAVID

25/06/13

MD1-0-V-181-11-00901

Auxiliary boiler package air duct detail(1of4)

IC

DAVID

08/07/13

MD1-0-V-181-11-00902

Auxiliary boiler package air duct detail(2of4)

DAVID

17/05/13

MD1-0-V-181-11-00903

Auxiliary boiler package air duct detail(3of4)

DAVID

17/05/13

MD1-0-V-181-11-00904

Auxiliary boiler package air duct detail(4of4)

DAVID

17/05/13

MD1-0-V-181-11-00905

Auxiliary boiler package gas duct detail(1of4)

DAVID

08/07/13

MD1-0-V-181-11-00906

Auxiliary boiler package gas duct detail(2of4)

DAVID

17/05/13

MD1-0-V-181-11-00907

Auxiliary boiler package gas duct detail(3of4)

DAVID

17/05/13

MD1-0-V-181-11-00908

Auxiliary boiler package gas duct detail(4of4)

DAVID

17/05/13

MD1-0-V-181-11-00909

Auxiliary boiler package common detail of duct

DAVID

25/02/13

MD1-0-V-181-11-00910

Auxiliary boiler package manhole detail of duct

DAVID

25/02/13

MD1-0-V-181-11-00911

Auxiliary boiler package expansion joint detail of duct

DAVID

08/07/13

MD1-0-V-181-11-00912

Auxiliary boiler package nozzle detail of duct

DAVID

25/02/13

MD1-0-V-181-21-00001

Auxiliary boiler pacakge p&id diagram deaerator system

AC

DAVID

22/02/13

MD1-0-V-181-21-00002

Auxiliary boiler pacakge p&id diagram boiler feed water & steam system
A

DAVID

22/02/13

MD1-0-V-181-21-00003

Auxiliary boiler pacakge p&id diagram blowdown system

DAVID

22/02/13

MD1-0-V-181-21-00004

Auxiliary boiler pacakge p&id diagram air & flue gas system

DAVID

22/02/13

MD1-0-V-181-21-00005

Auxiliary boiler pacakge p&id diagram oil pumping system

AC

DAVID

22/02/13

MD1-0-V-181-21-00006

Auxiliary boiler pacakge p&id diagram burning system

DAVID

22/02/13

MD1-0-V-181-21-00007

Auxiliary boiler pacakge p&id diagram instrument & cooling & sealing
A air

DAVID

22/02/13

MD1-0-V-181-21-00008

Auxiliary boiler pacakge p&id diagram soot blower system

DAVID

22/02/13

MD1-0-V-181-21-00009

Auxiliary boiler pacakge p&id diagram chemical dosing system

AC

DAVID

22/02/13

MD1-0-V-181-21-00010

P&ID Diagram Sampling System

DAVID

22/02/13

MD1-0-V-181-23-00001

General Piping Arrangement Drawing (1 of 3) (EL.0-4000)

IC

DAVID

04/07/13

MD1-0-V-181-23-00002

General Piping Arrangement Drawing (2 of 3) (EL.4000-8590)

IC

DAVID

04/07/13

MD1-0-V-181-23-00003

General Piping Arrangement Drawing (3 of 3) (EL.8590-Above)

IC

DAVID

04/07/13

MD1-0-V-181-24-00002

Auxiliary Boiler Package Isometric Drawing

IC

DAVID

17/05/13

MD1-0-V-181-25-00001

Auxiliary Boiler Package Piping Support Plan(1of3) EL.0 ~ EL.4000IC

DAVID

04/07/13

MD1-0-V-181-25-00002

Auxiliary Boiler Package Piping Support Plan(2of3) EL.8590 ~ ABOVE


IC

DAVID

04/07/13

MD1-0-V-181-25-00003

Auxiliary Boiler Package Piping Support Plan(3of3) EL.8590 ~ ABOVE


IC

DAVID

04/07/13

MD1-0-V-185-05-00015

PMI Procedure

IC

DAVID

31/05/13

MD1-0-V-185-05-00016

Inspection & Test Plan(ITP) for Shop Fabrication Tank

IC

DAVID

12/07/13

MD1-0-V-185-05-00017

Inspection & Test Procedure

IC

DAVID

31/05/13

MD1-0-V-185-05-00018

Hydro Test Procedure

IC

DAVID

31/05/13

MD1-0-V-185-05-00019

NDE Procedure

IC

DAVID

31/05/13

MD1-0-V-185-10-33001

Steam Vent Silencer for Start-up Flash Tank

IC

DAVID

06/06/13

MD1-0-V-185-10-44001

Steam Vent Silencer for Condensate Return Tank

IC

DAVID

06/06/13

MD1-0-V-191-01-10009

Boiler Feedwater Pump EOT Crane General Arrangement DrawingsI

DAVID

11/01/13

MD1-0-V-360-07-00701

Thermofluodynamic Calculation Report

DAVID

03/05/13

MD1-0-V-360-08-00942

Welding Procedure Specification(Type "1")

DAVID

12/06/13

MD1-0-V-360-08-00943

Welding Procedure Specification(Type "2")

IC

DAVID

12/06/13

MD1-0-V-360-08-00944

Welding Procedure Specification(Type "3")

DAVID

12/06/13

MD1-0-V-360-08-00945

Welding Procedure Specification(Type "4")

DAVID

12/06/13

MD1-0-V-360-08-00946

Welding Procedure Specification(Type "5")

DAVID

12/06/13

MD1-0-V-360-08-00947

Welding Procedure Specification(Type "6")

DAVID

12/06/13

MD1-0-V-360-08-00948

Welding Procedure Specification(Type "7")

DAVID

12/06/13

MD1-0-V-360-08-00949

Welding Procedure Specification(Type "8")

DAVID

12/06/13

MD1-0-V-400-05-00121

Shop Inspection and Test Plan for Alloy Pipe

DAVID

22/02/13

MD1-0-V-400-05-00127

WPS & PQR for Alloy Welded Pipe

DAVID

04/07/13

MD1-0-V-400-05-00521

Inspection & Test Plan For Alloy Wrought Fitting

DAVID

06/06/13

MD1-0-V-400-05-00523

Inspection and test plan for alloy 3d bend

IC

DAVID

23/05/13

MD1-0-V-400-05-00527

Inspection and Test Procedure for Alloy Forged Fitting

IC

DAVID

28/06/13

MD1-0-V-400-05-00529

Inspection and test procedure for carbon forged fitting

DAVID

05/06/13

MD1-0-V-400-05-00530

Inspection and Test Plan for Carbon Forged & Wrought Fitting

IC

DAVID

23/07/13

MD1-0-V-400-05-00531

Inspection and Test Procedure for Carbon Forged & Wrought Fitting
IC

DAVID

23/07/13

MD1-0-V-400-05-00533

Inspection and Test Plan for Stainless Steel Forged Fitting

IC

DAVID

23/07/13

MD1-0-V-400-05-00534

Inspection and Test Procedure for Stainless Steel Forged Fitting

IC

DAVID

23/07/13

MD1-0-V-400-05-01122

Inspection and Test Procedure for Groove Coupling & Fitting

IC

DAVID

17/01/13

MD1-0-V-400-05-01321

Inspection and Test Plan for Forged Valves (Manual & Auto)

IC

DAVID

16/07/13

MD1-0-V-400-05-02121

Inspection and Test Plan for Strainers

IC

DAVID

23/05/13

MD1-0-V-400-10-02311

Outline Drawing for Flexible & Expansion Joint

DAVID

28/06/13

MD1-0-V-805-05-00024

Weld Procedures Specification (WPS) and Qualification Records (PQR)


I

DAVID

02/04/13

MD1-1-P-111-24-00001

Piping Isometric Drawing- Main Steam System (Unit #1)

DAVID

08/07/13

MD1-1-P-111-24-00011

Piping Isometric Drawing- Cold Reheat Steam System (Unit #1)

DAVID

08/07/13

MD1-1-P-111-24-00021

Piping Isometric Drawing- Hot Reheat Steam System (Unit #1)

DAVID

08/07/13

MD1-1-P-111-24-00031

Piping Isometric Drawing- Extraction Steam System (Unit #1)

DAVID

17/05/13

MD1-1-P-111-24-00041

Piping Isometric Drawing- Auxiliary Steam System (Unit #!1)

DAVID

25/06/13

MD1-1-P-112-24-00001

Piping Isometric Drawing- Steam Bypass System (Unit #1)

DAVID

08/07/13

MD1-1-P-114-24-00001

Piping Isometric Drawing- Feed Water Heater Drain & Vent SystemI(Unit #1)

DAVID

17/05/13

MD1-1-P-121-24-00001

Piping Isometric Drawing- Feed Water System (Unit #1)

DAVID

17/05/13

MD1-1-P-122-24-00001

Piping Isometric Drawing- Condensate System (Unit #1)

DAVID

25/06/13

MD1-1-P-400-07-00001

Piping Stress Analysis Report- Main & Cold Reheat Steam with HP IBypass Sys-Unit1
DAVID

19/06/13

MD1-1-P-400-07-00002

Piping Stress Analysis Report- hot Reheat Steam with LP Bypass Sys.-Unit1
I

DAVID

19/06/13

MD1-1-P-400-07-00003

Piping Stress Analysis Report - Feed Water System

DAVID

29/05/13

MD1-1-P-411-23-00001

Pipe arrangement & support location drawing - boiler #1 area (1/5) IC

DAVID

23/07/13

MD1-1-P-411-23-00002

Pipe arrangement & support location drawing - boiler #1 area (2/5) IC

DAVID

23/07/13

MD1-1-P-411-23-00003

Pipe arrangement & support location drawing - boiler #1 area (3/5) IC

DAVID

23/07/13

MD1-1-P-411-23-00004

Pipe arrangement & support location drawing - boiler #1 area (4/5) IC

DAVID

23/07/13

MD1-1-P-411-23-00005

Pipe arrangement & support location drawing - boiler #1 area (5/5) IC

DAVID

23/07/13

MD1-1-V-161-11-00005

U1bt1 steel structure shop detailings & member list

DAVID

25/02/13

MD1-1-V-161-11-00010

U1at2 handrail shop detailings & member list

DAVID

25/02/13

MD1-1-V-161-11-00013

U1bt1 handrail shop detailings & member list

DAVID

25/02/13

MD1-1-V-161-12-00002

Bolt List_u1at2

IC

DAVID

25/02/13

MD1-1-V-161-12-00003

Bolt list_u1at3

IC

DAVID

25/02/13

MD1-1-V-161-12-00005

Bolt list_u1bt1

IC

DAVID

25/02/13

MD1-1-V-161-54-41130

U1at3_grating erection drawing

IC

DAVID

25/02/13

MD1-1-V-161-54-42110

U1bt1_grating erection drawing

IC

DAVID

25/02/13

MD1-2-P-111-24-00001

Piping Isometric Drawing- Main & Reheat Steam System (Unit #2) I

DAVID

08/07/13

MD1-2-P-111-24-00011

Piping Isometric Drawing- Cold Reheat Steam System (Unit #2)

DAVID

08/07/13

MD1-2-P-111-24-00021

Piping Isometric Drawing- Hot Reheat Steam System (Unit #2)

DAVID

08/07/13

MD1-2-P-111-24-00031

Piping Isometric Drawing- Extraction Steam System (Unit #2)

DAVID

17/05/13

MD1-2-P-111-24-00041

Piping Isometric Drawing- Auxiliary Steam System (Unit #2)

DAVID

25/06/13

MD1-2-P-112-24-00001

Piping Isometric Drawing- Steam Bypass System (Unit #2)

DAVID

08/07/13

MD1-2-P-114-24-00001

Piping Isometric Drawing- Feed Water Heater Drain & Vent SystemI(Unit #2)

DAVID

17/05/13

MD1-2-P-121-24-00001

Piping Isometric Drawing- Feed Water System (Unit #2)

DAVID

17/05/13

MD1-2-P-122-24-00001

Piping Isometric Drawing- Condensate System (Unit #2)

DAVID

25/06/13

MD1-2-P-400-07-00001

Piping Stress Analysis Report- Main and cold Reheater Steam with IHP Bypass Systm
DAVID

19/06/13

MD1-2-P-400-07-00002

Piping Stress Analysis Report- Hot Reheat Steam with LP Bypass System
I
(Unit #2)
DAVID

19/06/13

MD1-2-P-400-07-00003

Piping Stress Analysis Report - Feed Water System

DAVID

29/05/13

MD1-2-P-411-23-00001

Pipe arrangement & support location drawing - boiler #2 area (1/5) IC

DAVID

23/07/13

MD1-2-P-411-23-00002

Pipe arrangement & support location drawing - boiler #2 area (2/5) IC

DAVID

23/07/13

MD1-2-P-411-23-00003

Pipe arrangement & support location drawing - boiler #2 area (3/5) IC

DAVID

23/07/13

MD1-2-P-411-23-00004

Pipe arrangement & support location drawing - boiler #2 area (4/5) IC

DAVID

23/07/13

MD1-2-P-411-23-00005

Pipe arrangement & support location drawing - boiler #2 area (5/5) IC

DAVID

23/07/13

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92

93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139

140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186

187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233

234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280

281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327

328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374

375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421

422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468

469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515

516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562

563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609

610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656

657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703

704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750

751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797

798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844

845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891

892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938

939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971

MD1-0-M-100-21-000011

P & I Diagram- SymbolA& Legend (1/5)

MD1-0-M-120-06-000010

Calculation- Condensate
I System

MD1-0-M-100-21-000020

P & I Diagram- SymbolA& Legend (2/5)

MD1-0-M-120-06-000020

Calculation- Feed WaterI System

MD1-0-M-100-21-000030

P & I Diagram- SymbolA& Legend (3/5)

MD1-0-M-120-22-000110

Flow Diagram- Condensate


I
System

MD1-0-M-100-21-000041

P & I Diagram- SymbolA& Legend (4/5)

MD1-0-P-400-08-000011

Pipe Line List for BOP I

MD1-0-M-100-21-000053

P & I Diagram- SymbolA& Legend (5/5)

MD1-0-P-400-08-000021

Valve List for BOP

MD1-0-M-100-57-000010

Heat Balance DiagramsA (VWO)

MD1-0-V-113-05-000370

Procedure for UltrasonicI Examination

MD1-0-M-100-57-000020

Heat Balance DiagramsA (TCC)

MD1-0-V-113-05-000380

Procedure for MagneticIparticle Examination

MD1-0-M-100-57-000030

Heat Balance Diagram A(RO)

MD1-0-V-113-05-000390

Procedure for Liquid Penetrant


I
Examination

MD1-0-M-100-57-000040

Heat Balance DiagramsA (75% of RO)

MD1-0-V-161-01-004380

Stripper Cooler Air/Solids


I Return- Sections and Details

MD1-0-M-100-57-000050

Heat Balance DiagramsA (60% of RO)

MD1-0-V-161-01-004390

Stripper Cooler ArrangementI


Elevations and Sections

MD1-0-M-100-57-000060

Heat Balance DiagramsA (50% of RO)

MD1-0-V-161-01-004810

Forming & Machinning Diagram


I
for 1524 ID Drum

MD1-0-M-100-57-000070

Heat Balance DiagramsA (40% of RO)

MD1-0-V-161-01-004820

1524 ID Drum Internal Attachments


I
Arrangement and Detail deta

MD1-0-M-100-57-000080

Heat Balance DiagramsA (THO)

MD1-0-V-161-01-004910

1524 ID Drum Internals IAttachments Sheet 2 of 2

MD1-0-M-110-03-000050

System Discription-Aux.A Steam System

MD1-0-V-161-01-004930

Drum Internals Details I

MD1-0-M-110-21-000110

P & I Diagram- Main and


A Reheat Steam System (1/3)
MD1-0-V-161-01-008810

Crossover Flue Sections


I and Details

MD1-0-M-110-21-000120

P & I Diagram- Main and


A Reheat Steam System (2/3)
MD1-0-V-161-02-010200

Piping Material Class I

MD1-0-M-110-21-000130

P & I Diagram- Main and


A Reheat Steam System (3/3)
MD1-0-V-161-09-000100

Limestone Requirements
I for Boiler

MD1-0-M-110-21-000310

P & I Diagram- FWH Extraction


A
Steam System (1/3)
MD1-0-V-181-01-000020

Auxiliary Boiler PackageI Layout of Boiler Plan View

MD1-0-M-110-21-000321

P & I Diagram- FWH Extraction


A
Steam System (2/3)
MD1-0-V-181-01-000030

Auxiliary Boiler PackageI Layout of Boiler Front View

MD1-0-M-110-21-000332

P & I Diagram- FWH Extraction


A
Steam System (3/3)
MD1-0-V-181-01-000040

Layout of Boiler Side View


I

MD1-0-M-110-21-000340

P & I Diagram- FWH Extraction


A
Steam System (4/4)
MD1-0-V-181-05-000040

NDE Procedure

MD1-0-M-110-21-000410

P & I Diagram- FWH Vent


A and Drain System (1/3) MD1-0-V-181-06-000010

Auxiliary Boiler PackageI Heat Balance for Auxiliary Boiler

MD1-0-M-110-21-000420

P & I Diagram- FWH Vent


A and Drain System (2/3) MD1-0-V-181-06-000020

Auxiliary Boiler PackageI Boiler Strength Calculation

MD1-0-M-110-21-000430

P & I Diagram- FWH Vent


A and Drain System (3/3) MD1-0-V-181-06-000040

Auxiliary Boiler PackageI Superheater Strength Calculation

MD1-0-M-110-21-000440

P & I Diagram- Condensate


A
Drain System

MD1-0-V-181-06-000080

Auxiliary Boiler PackageI Diesel Oil Tank Strength Calculation

MD1-0-M-120-21-000320

P & I Diagram- Feed Water


A
System (2/2)

MD1-0-V-181-06-000090

Heavy Oil Tank Strength


I Calculation

MD1-0-T-030-05-000722

ITP for Above Ground Piping


A

MD1-0-V-181-06-000110

Calculation Sheet of Piping's


I
Diameter

MD1-0-T-030-05-000840

Welding Procedure Specification


A
(HD-WPS-ASME-A001)
MD1-0-V-181-08-000121

Auxiliary Boiler packageI Valve List

MD1-0-T-030-05-000850

Welding Procedure Specification


A
(HD-WPS-ASME-A002)
MD1-0-V-181-08-000130

Auxiliary Boiler PackageI Electronic Load List

MD1-0-T-030-05-000860

Welding Procedure Specification


A
(HD-WPS-ASME-A003)
MD1-0-V-181-08-000210

Auxiliary boiler packageI Piping Material Class

MD1-0-T-030-05-000870

Welding Procedure Specification


A
(HD-WPS-ASME-A004)
MD1-0-V-181-09-000080

Auxiliary Boiler PackageI Safety Valve

MD1-0-T-030-05-000881

Welding Procedure Specification


A
(HD-WPS-ASME-A005)
MD1-0-V-181-10-000010

Auxiliary Boiler PackageI Boiler Assembly Drawing (1 of 2)

MD1-0-T-030-05-000890

Welding Procedure Specification


A
(HD-WPS-ASME-A006)
MD1-0-V-181-10-000020

Auxiliary Boiler PackageI Boiler Assembly Drawing (2 of 2)

MD1-0-T-030-05-000900

Welding Procedure Specification


A
(HD-WPS-ASME-A007)
MD1-0-V-181-10-000030

Auxiliary Boiler PackageI Super Assembly

MD1-0-T-030-05-000910

Welding Procedure Specification


A
(HD-WPS-ASME-A008)
MD1-0-V-181-10-000060

Auxiliary Boiler PackageI Blowdown Tank Assembly Drawing

MD1-0-T-030-05-000920

Welding Procedure Specification


A
(HD-WPS-ASME-A009)
MD1-0-V-181-10-000070

Auxiliary Boiler PackageI Diesel Oil Tank Assembly

MD1-0-T-030-05-000931

Welding Procedure Specification


A
(HD-WPS-ASME-A010)
MD1-0-V-181-11-001010

Auxiliary Boiler PackageI Steam Drum for Auxiliary Boiler

MD1-0-T-030-05-000940

Welding Procedure Specification


A
(HD-WPS-ASME-A011)
MD1-0-V-181-11-001020

Auxiliary Boiler PackageI Tube Arrangement of Steam Drum

MD1-0-T-030-05-000950

Welding Procedure Specification


A
(HD-WPS-ASME-A012)
MD1-0-V-181-11-001030

Auxiliary Boiler PackageI Steam Drum Nozzle Detail (1/2)

MD1-0-T-030-05-000960

Welding Procedure Specification


A
(HD-WPS-ASME-A013)
MD1-0-V-181-11-001040

Auxiliary Boiler PackageI Steam Drum Nozzle Detail (2/2)

MD1-0-T-030-05-000970

Welding Procedure Specification


A
(HD-WPS-ASME-A014)
MD1-0-V-181-11-001050

Auxiliary Boiler PackageI Steam Drum Manhole Detail

MD1-0-T-030-05-000980

Welding Procedure Specification


A
(HD-WPS-ASME-A015)
MD1-0-V-181-11-001060

Auxiliary Boiler PackageI Internal Arrangement of STE Drum

MD1-0-T-030-05-000990

Welding Procedure Specification


A
(HD-WPS-ASME-A016)
MD1-0-V-181-11-001070

Auxiliary Boiler PackageI Detail of Main Steam Connection

MD1-0-T-030-05-001000

Welding Procedure Specification


A
(HD-WPS-ASME-A017)
MD1-0-V-181-11-001110

Auxiliary Boiler PackageI Water Drum for Auxiliary Boiler

MD1-0-T-030-05-001010

Welding Procedure Specification


A
(HD-WPS-ASME-A018)
MD1-0-V-181-11-001120

Auxiliary Boiler PackageI Tube Arrangement of Water Drum

MD1-0-T-030-05-001020

Welding Procedure Specification


A
(HD-WPS-ASME-A019)
MD1-0-V-181-11-001130

Auxiliary Boiler PackageI Water Drum Nozzle Detail

MD1-0-T-030-05-001032

Welding Procedure Specification


A
(HD-WPS-ASME-A020)
MD1-0-V-181-11-001140

Auxiliary Boiler PackageI Water Drum Manhole Detail

MD1-0-T-030-05-001042

Welding Procedure Specification


A
(HD-WPS-ASME-A021)
MD1-0-V-181-11-001150

Auxiliary Boiler PackageI Water Drum Internal

MD1-0-T-030-05-001050

Welding Procedure Specification


A
(HD-WPS-AWS-001)
MD1-0-V-181-11-001160

Auxiliary Boiler PackageI Water Drum Saddle Detail

MD1-0-T-030-05-001060

Welding Procedure Specification


A
(HD-WPS-AWS-002)
MD1-0-V-181-11-001210

Auxiliary Boiler PackageI Arrangement of Panel Tube

MD1-0-T-030-05-001070

Welding Procedure Specification


A
(HD-WPS-AWS-003)
MD1-0-V-181-11-001310

Auxiliary Boiler PackageI Water Column (1/2)

MD1-0-T-030-05-001192

ITP for AG Piping of Carbon


A
Steel

MD1-0-V-181-11-001320

Auxiliary Boiler PackageI Water Column (2/2)

MD1-0-T-030-05-001320

Method Statement for Welding


A
Material Control

MD1-0-V-181-11-001510

Auxiliary Boiler PackageI Outer Casing of Front & Rear Side (1 of

MD1-0-T-030-05-003500

Welding procedure specification(hd-wps-asme-a022)


A
MD1-0-V-181-11-001520

Auxiliary Boiler PackageI Outer Casing of Front & Rear Side (2 of

MD1-0-T-030-05-003690

Welding procedure specification


A
(hd-wps- asme-a023)
MD1-0-V-181-11-001530

Auxiliary Boiler PackageI Outer Casing of Front & Rear Side (3 of

MD1-0-T-030-05-004080

Welding procedure specification(HD-WPS-ASME-A024)


A
MD1-0-V-181-11-002010

Auxiliary Boiler PackageI Tube Detail of Superheater

MD1-0-V-181-21-000020

Auxiliary boiler pacakgeAp&id diagram boiler feed water


MD1-0-V-181-11-00211
& steam system 0

Auxiliary Boiler PackageI Inlet Header Detail of Superheater

MD1-0-V-181-21-000030

Auxiliary boiler pacakgeAp&id diagram blowdown system


MD1-0-V-181-11-002120

Auxiliary Boiler PackageI Outlet Header Detail of Superheater

MD1-0-V-181-21-000040

Auxiliary boiler pacakgeAp&id diagram air & flue gasMD1-0-V-181-11-00401


system
0

Auxiliary Boiler PackageI Detail of Economizer (Header and Nozzl

MD1-0-V-181-21-000060

Auxiliary boiler pacakgeAp&id diagram burning system


MD1-0-V-181-11-005010

Auxiliary Boiler PackageI Nozzle Detail of Blowdown Tank

MD1-0-V-181-21-000070

Auxiliary boiler pacakgeAp&id diagram instrument &MD1-0-V-181-11-00511


cooling & sealing air 0

Auxiliary Boiler PackageI Manhole Detail of Blowdown Tank

MD1-0-V-181-21-000080

Auxiliary boiler pacakgeAp&id diagram soot blower MD1-0-V-181-11-00601


system
0

Auxiliary Boiler PackageI Nozzle Detail of Diesel Oil Tank

MD1-0-V-181-21-000100

P&ID Diagram Sampling


A System

MD1-0-V-181-11-006210

Auxiliary Boiler PackageI Platform Detail of Diesel Oil Tank

MD1-0-V-360-07-007010

Thermofluodynamic Calculation
A
Report

MD1-0-V-181-11-006220

Platform & Ladder Detail


I of Diesel Oil Tank (2 of 2)

MD1-0-V-181-11-007010

Auxiliary Boiler PackageI Nozzle Detail of Heavy Oil Tank (1 of 2)

MD1-0-V-181-11-007020

Auxiliary Boiler PackageI Nozzle Detail of Heavy Oil Tank (2 of 2)

MD1-0-V-181-11-007110

Auxiliary Boiler PackageI Manhole Detail of Heavy Oil Tank (1 of 2

MD1-0-V-181-11-008010

Auxiliary Boiler PackageI Template of Stack

MD1-0-V-181-11-008020

Auxiliary Boiler PackageI Shell Detail of Stack (1 of 2)

MD1-0-V-181-11-008030

Auxiliary Boiler PackageI Shell Detail of Stack (2 of 2)

MD1-0-V-181-11-008110

Auxiliary Boiler PackageI Nozzle Detail of Stack

MD1-0-V-181-11-008320

Platform Detail of StackI (2 of 3)

MD1-0-V-181-11-008330

Platform Detail of StackI (3 of 3)

MD1-0-V-181-11-008410

Auxiliary Boiler PackageI Ladder Detail of Stack (1 of 2)

MD1-0-V-181-11-008420

Auxiliary Boiler PackageI Ladder Detail of Stack (2 of 2)

MD1-1-P-111-24-000011

Piping Isometric DrawingI Main Steam System (Unit #1)

MD1-1-P-111-24-000111

Piping Isometric DrawingI Cold Reheat Steam System (Unit #1)

MD1-1-P-111-24-000211

Piping Isometric DrawingI Hot Reheat Steam System (Unit #1)

MD1-1-P-112-24-000011

Piping Isometric DrawingI Steam Bypass System (Unit #1)

MD1-2-P-111-24-000011

Piping Isometric DrawingI Main & Reheat Steam System (Unit #2

MD1-2-P-111-24-000111

Piping Isometric DrawingI Cold Reheat Steam System (Unit #2)

MD1-2-P-111-24-000211

Piping Isometric DrawingI Hot Reheat Steam System (Unit #2)

MD1-2-P-112-24-000011

Piping Isometric DrawingI Steam Bypass System (Unit #2)

MD1-0-V-161-

MD1-0-M-110-22-00011

Flow Diagram- Main and Reheat Steam System


I

DAVID

MD1-0-T-030-05-00083

MD1-0-M-110-22-00021

Flow Diagram- FWH Extraction Steam System


I

DAVID

MD1-0-T-053-07-00289

MD1-0-M-110-22-00022

Flow Diagram- FWH Drain System

DAVID

MD1-0-V-114-09-00002

MD1-0-M-120-06-00003

Transient Analysis for Boiler Feed Pump I

DAVID

MD1-0-V-114-09-00006

MD1-0-M-120-22-00021

Flow Diagram- Feed Water System

DAVID

MD1-0-V-122-09-00001

MD1-0-T-030-05-000494

WPS(U1A-ASME PRESSURE PART)

DAVID

MD1-0-V-161-09-36501

MD1-0-T-030-05-00130

Method Statement for Welding Repair

DAVID

MD1-0-V-161-09-62104

MD1-0-T-030-05-00325

Method Statement for Particle ExaminationI

DAVID

MD1-0-T-030-05-00326

Method Statement for Liquid penatrant Examination


I

DAVID

MD1-0-T-030-05-00327

Method Statement for Heat Treatment

DAVID

MD1-0-T-053-05-00122

Method Statement for General Equipment IInstallation

DAVID

MD1-0-T-053-05-00237

Method Statement for CEP Casing SettingI

DAVID

MD1-0-T-053-05-00261

WPS & PQR (For Steel Structure PEB Fabrication)


I

DAVID

MD1-0-T-053-05-00360

Site safety procedure for mechanical erection


I by subcontractor
DAVID of boiler

MD1-0-T-054-05-00110

Method Statement For Pipe Spool Fabrication


I

DAVID

MD1-0-T-054-05-00111

Method Statement For Piping Installation I

DAVID

MD1-0-V-111-25-00400

Generator Pipe Support Drawings

DAVID

MD1-0-V-112-05-00001

Inspection test plan (qcp) for lp steam stopI valve (vs) forDAVID
turbine bypass systm

MD1-0-V-112-05-00002

Inspection test plan (qcp) for hp bypass valve(vlb)


I
& lp bypass
DAVIDvalve(vlr)

MD1-0-V-112-05-00003

Inspection test plan (qcp) for lp desuperheater(dam)


I
for DAVID
turbine bypass system

MD1-0-V-112-05-00004

Inspection test plan (qcp) for hp/lp spray valve


I
& isolation
DAVID
valve (840h/g) form

MD1-0-V-112-05-00008

Welding Book(WPS/PQR, Welding Map) for


I Turbine Bypass
DAVID
System

MD1-0-V-113-05-00033

Condenser- Welding Procedure

DAVID

MD1-0-V-113-05-00036

Procedure for Radiographic Examination I

DAVID

MD1-0-V-114-01-00001

Outline Drawing for LP-3 Low Pressure Feedwater


I
Heater
DAVID

MD1-0-V-114-01-00002

Outline Drawing for LP-4 Low Pressure Feedwater


I
Heater
DAVID

MD1-0-V-114-01-00003

Outline Drawing for HP-6 High Pressure Feedwater


I
Heater
DAVID

MD1-0-V-114-01-00004

Outline Drawing for HP-7 High Pressure Feedwater


I
Heater
DAVID

MD1-0-V-114-01-00005

Outline Drawing for HP-8 High Pressure Feedwater


I
Heater
DAVID

MD1-0-V-114-05-00013

WPS & PQR for Feedwater Heater

MD1-0-V-114-05-00017

Painting Procedure for Feedwater Heater No's


I
3,4,6,7,8DAVID

MD1-0-V-114-06-00002

Thermal Calculation with Hydraulic Loss Calculation


I
ForDAVID
Feedwater Heater (LP-3)

MD1-0-V-114-06-00004

Strength Calculation of Feedwater Heater I

DAVID

MD1-0-V-114-07-00005

NDE Procedure(Feedwater Heater)

DAVID

MD1-0-V-114-11-50005

Lp#1a/1b lagging spacer & plate detail drawing


I

DAVID

MD1-0-V-114-11-50009

Lp#1a/1b feedwater heater insulation detailI drawing

DAVID

MD1-0-V-114-11-50010

Lp#2 feedwater heater insulation detail drawing


I

DAVID

MD1-0-V-114-11-50022

Lp#2 feedwater heater rail and channel legI & roller support
DAVID
drawing

MD1-0-V-115-06-00002

Sizing calculation for deaerator and feedwater


I
tank

DAVID

MD1-0-V-115-09-00003

Deaerator and Storage Tank, PerformanceI Curve

DAVID

MD1-0-V-115-11-00001

13LAA 10AC001, 13LAA 10BB001 Deaerator


I and Storage
DAVID
Tank-Detail of Heater

MD1-0-V-115-11-00002

13LAA 10AC001, 13LAA 10BB001 Deaerator


I and Storage
DAVID
Tank-Detail of Storage Tank

MD1-0-V-115-11-00004

13LAA 10AC001, 13LAA 10BB001 Deaerator


I and Storage
DAVID
Tank- Nozzle Detail (2/9)

MD1-0-V-115-11-00006

13LAA 10AC001, 13LAA 10BB001 Deaerator


I and Storage
DAVID
Tank- Nozzle Detail (4/9)

MD1-0-V-115-11-00007

13LAA 10AC001, 13LAA 10BB001 Deaerator


I and Storage
DAVID
Tank- Nozzle Detail (5/9)

MD1-0-V-115-11-00008

13LAA 10AC001, 13LAA 10BB001 Deaerator


I and Storage
DAVID
Tank- Nozzle Detail (6/9)

MD1-0-V-115-11-00010

13LAA 10AC001, 13LAA 10BB001 Deaerator


I and Storage
DAVID
Tank- Nozzle Detail (8/9)

DAVID

MD1-0-V-121-01-00001

General Arrangement Drawing for Boiler Feed


I
Pump and
DAVID
Booster Pump

MD1-0-V-121-01-00002

Sectional Drawing for Boiler Feed Pump I

DAVID

MD1-0-V-121-01-00003

Sectional Drawing for Booster Pump

DAVID

MD1-0-V-121-05-00001

Quality Management Mannual For BFP & BFBP


I

DAVID

MD1-0-V-121-05-00004

Pt procedure for bfp & bfbp

DAVID

MD1-0-V-121-05-00005

Ut procedure for bfp & bfbp

DAVID

MD1-0-V-121-05-00006

Wps & pqr for bfp & bfbp

DAVID

MD1-0-V-121-05-00007

Painting specification and procedure for bfp


I & bfbp

DAVID

MD1-0-V-121-05-00019

Mt procedure for bfp & bfbp

DAVID

MD1-0-V-121-05-00020

Rt procedure for bfp & bfbp

DAVID

MD1-0-V-121-05-00023

UT Procedure for Impeller for BFP & BFBPI

DAVID

MD1-0-V-121-08-00004

Lubricant list for bfbp & bfp

DAVID

MD1-0-V-121-08-00012

Sub-Supplier List for BFP & BFBP

DAVID

MD1-0-V-121-10-00002

Assembly plan for fluid coupling for bfp & bfbp


I

MD1-0-V-121-11-00001

Working and lube oil heat exchanger of fluid


I coupling forDAVID
bfp & bfbp

MD1-0-V-121-11-00006

Mechanical Seal Drawing for BFBP

MD1-0-V-121-11-00008

Flexible Disk Coupling Drawing for Motor and


I Fluid Coupling
DAVID

MD1-0-V-121-11-00009

Flexible Disk Coupling Drawing for Motor and


I BFBP

MD1-0-V-121-33-00001

Start-up and shut-down block diagram for boiler


I
feed pump
DAVID
and booster pump

MD1-0-V-122-01-00001

General Arrangement Drawing of CEP

DAVID

MD1-0-V-122-01-00002

Sectional Drawing of CEP

DAVID

MD1-0-V-122-02-00001

Pump Performance Curves for CondensateI Extraction Pump


DAVID

MD1-0-V-122-05-00001

Quality Management Mannual For Condensate


I
Extraction
DAVID
Pump

MD1-0-V-122-05-00003

SHOP INSPECTION & TEST PROCEDURE


I FOR CEP DAVID

MD1-0-V-122-08-00005

Spare Parts List for Start-up & Commissioning


I
for CEP DAVID

MD1-0-V-122-11-00002

Mechanical Seal Drawing for CEP

DAVID

MD1-0-V-122-11-00003

Gear Coupling Drawing for CEP

DAVID

MD1-0-V-122-52-00001

Foundation Drawing of CEP

DAVID

MD1-0-V-161-01-00004

Main Terminal Point (scope of supply)

DAVID

MD1-0-V-161-01-00060

General Arrangement Isometric View

DAVID

MD1-0-V-161-01-00062

General Arrangement Plan View

DAVID

MD1-0-V-161-01-00101

Boiler Hangers Assembly and Details in Furnace


I
Rear Wall
DAVID
and Roof

MD1-0-V-161-01-00102

Boiler Hangers Assembly and Details in Furnace


I
Side Wall
DAVID

MD1-0-V-161-01-00103

Boiler Hangers Assembly and Details in ISH


I & FSH Wing
DAVID
Wall

MD1-0-V-161-01-00104

Boiler Hangers Assembly and Details in Cyclone


I
Area and
DAVID
EVAP WW HDR

MD1-0-V-161-01-00105

Boiler Hangers Assembly and Details in CrossOver


I
FlueDAVID

MD1-0-V-161-01-00106

Boiler Hangers Assembly and Details in HRA


I Area

MD1-0-V-161-01-00107

Boiler Hangers Assembly and Details in Economizer


I
Area
DAVID

MD1-0-V-161-01-00108

Boiler Hangers Assembly and Details in HRA


I Roof and ECON
DAVID HGR #4

MD1-0-V-161-01-00109

Boiler Hangers Assembly and Details in Cyclone


I
Collector
DAVID
Beam

MD1-0-V-161-01-00113

BUCKSTAY SYSTEM SECTIONS & DETAILS


I
PART DAVID

MD1-0-V-161-01-00114

BUCKSTAY SYSTEM SECTIONS & DETAILS


I
PART DAVID

MD1-0-V-161-01-00115

BUCKSTAY SYSTEM SECTIONS & DETAILS


I
PART DAVID

MD1-0-V-161-01-00116

BUCKSTAY SYSTEM SECTIONS & DETAILS


I
PART DAVID

MD1-0-V-161-01-00117

BUCKSTAY SYSTEM GAS INLET TO CYCLONE


I

MD1-0-V-161-01-00118

BUCKSTAY SYSTEM SECTIONS & DETAILS


I
PART DAVID

MD1-0-V-161-01-00119

BUCKSTAY SYSTEM SECTIONS & DETAILS


I
PART DAVID

DAVID

DAVID

DAVID

DAVID

DAVID

MD1-0-V-161-01-00120

BUCKSTAY SYSTEM SECTIONS & DETAILS


I
PART DAVID

MD1-0-V-161-01-00121

BUCKSTAY SYSTEM ISH TO FSH TRANS.


I LINE

MD1-0-V-161-01-00123

CROSS OVER FLUE BUCKSTAYS PARTI NO. 2586- DAVID

MD1-0-V-161-01-00124

CROSS OVER FLUE BUCKSTAYS SECTIONS


I
&

DAVID

MD1-0-V-161-01-00125

CROSS OVER FLUE BUCKSTAYS SECTIONS


I
&

DAVID

MD1-0-V-161-01-00130

WINDBOX TRUSS ASSEMBLY PART NO.


I 2586-6410 DAVID

MD1-0-V-161-01-00131

WINDBOX TRUSS SECTIONS & DETAILS


I PART NO. DAVID

MD1-0-V-161-01-00132

WINDBOX TRUSS SECTIONS & DETAILS


I PART NO. DAVID

MD1-0-V-161-01-00133

CYCLONE RING BUMPERS ARRANGEMENT


I
PART DAVID

MD1-0-V-161-01-00134

CYCLONE RING BUMPERS SECTIONS AND


I

DAVID

MD1-0-V-161-01-00180

HRA COILS - GENERAL ARRANGEMENTI

DAVID

MD1-0-V-161-01-00181

SECTIONS AND DETAILS IN HEAT RECOVERY


I
AREA
DAVID

MD1-0-V-161-01-00184

SECTIONS AND DETAILS IN HEAT RECOVERY


I
AREA
DAVID
PRIMARY SUPERHEATER PART NO. 2528

MD1-0-V-161-01-00191

EROSION SHIELD(FIELD INSTALLED) ARRANGEMENT


I
DAVID
PART NO. 2538-7600A, B, C, D, E, F,H

MD1-0-V-161-01-00192

EROSION SHIELDS SECTIONS & DETAILS


I

MD1-0-V-161-01-00193

EROSION SHIELD(SHOP INSTALLED) ARRANGEMENT


I
DAVID

MD1-0-V-161-01-00197

FURNACE ROOF PANEL PLAN ARRAGEMENT


I

MD1-0-V-161-01-00226

VORTEX FINDER ARRANGEMENT PARTI NO.2529-5105


DAVID

MD1-0-V-161-01-00250

Penthouse Enclosure Arrangement

DAVID

MD1-0-V-161-01-00251

Penthouse Enclosure Sections & Details I

DAVID

MD1-0-V-161-01-00300

Arrangement of Auxiliary Equipment-Overall


I Plat Flues &
DAVID
Duct-Isometric View

MD1-0-V-161-01-00311

BOILER EXIT FLUE TO AH SECTIONS &IDETAILS PART


DAVID
NO. 2529-6100(1)

MD1-0-V-161-01-00312

BOILER EXIT FLUE TO AH SECTIONS &IDETAILS PART


DAVID
NO. 2529-6100(2)

MD1-0-V-161-01-00313

BOILER EXIT FLUE TO AH SECTIONS &IDETAILS PART


DAVID
NO. 2529-6100(3)

MD1-0-V-161-01-00314

BOILER EXIT FLUE TO AH SECTIONS &IDETAILS PART


DAVID
NO. 2529-6100(4)

MD1-0-V-161-01-00315

BOILER EXIT FLUE TO AH SECTIONS &IDETAILS PART


DAVID
NO. 2529-6100(5)

MD1-0-V-161-01-00317

BOILER EXIT FLUE TO AH SECTIONS &IDETAILS PART


DAVID
NO. 2529-6100(7)

MD1-0-V-161-01-00322

AIR HEATER OUTLET TO TERMINAL SECTION


I
& DETAIL
DAVID
PART NO.2529-6200 (4)

MD1-0-V-161-01-00331

Winbox Ring Duct Assembly- Section & Detail


I
Part No.2529-4000
DAVID

MD1-0-V-161-01-00332

SA Winbox at Furnace Section & Detail Part


I No.2529-4000
DAVID

MD1-0-V-161-01-00333

SA Winbox at Furnace Section & Detail Part


I No.2529-4000
DAVID

MD1-0-V-161-01-00334

SA Winbox at Furnace Section & Detail Part


I No.2529-4000
DAVID

MD1-0-V-161-01-00380

Cyclone Loopseal Arrangement & Details Part


I
No. 2543-8400
DAVID

MD1-0-V-161-01-00381

Cyclone Loopseals Section and Details (1)I

DAVID

MD1-0-V-161-01-00382

Cyclone Loopseal Sections and Details (2)I

DAVID

MD1-0-V-161-01-00426

SOOTBLOWER SUPPORTS DETAILS(2)I

DAVID

MD1-0-V-161-01-00427

SOOTBLOWER SUPPORTS DETAILS(3)I

DAVID

MD1-0-V-161-01-00430

Stripper Cooler Arrang.- Plan & ElevationsI

DAVID

MD1-0-V-161-01-00431

Stripper Cooler Arrang.- Elevations & Details


I

DAVID

MD1-0-V-161-01-00432

Stripper Cooler Grid and Plenum, Sect. and


I Details

DAVID

MD1-0-V-161-01-00433

Stripper Cooler Air Nozzle- Layout and Details


I

DAVID

MD1-0-V-161-01-00434

Stripper Cooler Cooling Chambers- Section


I & Details

DAVID

MD1-0-V-161-01-00435

Stripper Cooler Ash Drain and Spray Nozzle


I Layout & Details
DAVID

MD1-0-V-161-01-00436

Stripper Cooler Solids Transfer Duct Sections


I and Details
DAVID

MD1-0-V-161-01-00437

Stripper Cooler Rod Out Details

DAVID

MD1-0-V-161-01-00440

Stripper Cooler Arrangement- Sections

DAVID

MD1-0-V-161-01-00880

Crossover Flue Arrangement

DAVID

DAVID

DAVID

DAVID

MD1-0-V-161-01-00920

FURNACE WALL OPENING FOR SECONDARY


I
AIRPORT
DAVID

MD1-0-V-161-01-00921

WALL OPENING FOR 762 X 914 ACCESS


I DOOR 50.8DAVID
O.D. TUBES ON 76.2 CTRS.

MD1-0-V-161-01-00922

FURNACE LOWER FRONT WALL SECTIONS


I
AND DETAILS
DAVID

MD1-0-V-161-01-00924

FUEL INLET OPENING 50.8 O.D. TUBESI ON 76.2 CTRS.


DAVID

MD1-0-V-161-01-00927

FURNACE UPPER REAR WALL GAS OUTLET


I
TO CYCLONE
DAVID A & C

MD1-0-V-161-01-00928

FURNACE UPPER REAR WALL GAS OUTLET


I
TO CYCLONE
DAVID B

MD1-0-V-161-01-00952

FURNACE REAR WALL LOOPSEAL OPENING


I
50.8 O.D.
DAVID
TUBES ON 76.2 CTRS

MD1-0-V-161-01-00953

WALL OPENING FOR 670 DIA THROAT FRONT


I
AND DAVID
REAL WALL START-UP BURNER

MD1-0-V-161-01-00976

WALL OPENING FOR COOLER AIR/SOLIDS


I
INLET

MD1-0-V-161-01-00982

FURNACE LOWER REAR WALL SECTIONS


I
AND DETAILS
DAVID

MD1-0-V-161-01-00984

FURNACE GRID FLOOR NOZZLE DETAILS


I AT BED TRANSFER
DAVID
& PURGE AIR ARRANGEMENT

MD1-0-V-161-01-00986

FLUID BED SOLIDS DRAIN OPENING FOR


I 50.8 OD TUBES
DAVID ON 76.2 CTRS(1)

MD1-0-V-161-01-00987

FLUID BED SOLIDS DRAIN OPENING FOR


I 50.8 OD TUBES
DAVID ON 76.2 CTRS(2)

MD1-0-V-161-01-00988

FURNACE LOWER SIDE WALL SEAL BOX


I FOR FW &DAVID
RW HEADERS

MD1-0-V-161-01-14102

Blowdown Tank General Arrangement Drawing


I

DAVID

MD1-0-V-161-01-36502

Limestone Blower Outline Drawing

DAVID

MD1-0-V-161-05-00002

Quality control manual

DAVID

MD1-0-V-161-05-25191

FWST WPS AND PQR

DAVID

MD1-0-V-161-05-25192

FWST WELDER QUALIFICATION LIST &I APPLICABLE


DAVID
CODE USED

MD1-0-V-161-05-25807

Sbwl drum hydrotest procedure

MD1-0-V-161-06-00001

ASME Code Calculation For Pressure Parts


I

MD1-0-V-161-06-00002

Description of pressure part code calculation


I - asme section
DAVID
I

MD1-0-V-161-06-00031

Boiler Proper Hanger Load Calculation Summary


I

DAVID

MD1-0-V-161-07-00001

Fuel Silo Flowability Analysis

DAVID

MD1-0-V-161-07-00002

Evaluation of Limestones for the Mong Duong


I
1 ThermalDAVID
Power Plant

MD1-0-V-161-08-06009

Piping Terminal Point List

MD1-0-V-161-08-2000

Engineering abbreviations and acronyms for


I boiler

DAVID

MD1-0-V-161-09-14610

Boiler Steel Structure Paint MSDS

DAVID

MD1-0-V-161-09-32502

Technical Data Sheet for Stripper Cooler Blowers


I

DAVID

MD1-0-V-161-10-00001

Boiler standard drawings package

DAVID

MD1-0-V-161-10-12570

Boiler Burner System Workpackage Vendor


I DocumentsDAVID
& Drawings

MD1-0-V-161-14-00080

Fuel Feed System Equipment Arrangement


I From Fuel Silos
DAVID
to Boiler

MD1-0-V-161-14-00081

Fuel Feed Chute System Arrangement of Front


I
Wall

DAVID

MD1-0-V-161-14-00082

FUEL FEED CHUTE SYSTEM ARRANGMENT


I
OF

DAVID

MD1-0-V-161-14-00083

Fuel Feed Chute System Arrangement Sections


I
& Details
DAVID

MD1-0-V-161-14-01095

Fuel & lime silos sections & details stainless


I steel liner plates
DAVID

MD1-0-V-161-23-04001

BOILER DRAIN PIPING PLAN VIEW

DAVID

MD1-0-V-161-23-04006

BOILER VENT PIPING ELEVATION VIEWI

DAVID

MD1-0-V-161-23-04007

BOILER DRAIN PIPING SUPPORTS DETAIL(1)


I

DAVID

MD1-0-V-161-23-04008

BOILER DRAIN PIPING SUPPORTS DETAIL(2)


I

DAVID

MD1-0-V-161-23-04009

BOILER VENT PIPING SUPPORTS DETAIL


I

DAVID

MD1-0-V-161-23-04010

BOILER DRAIN PIPING SUPPORT LIST I

DAVID

MD1-0-V-161-23-04023

SPRAY WATER PIPING SUPPORTS DETAIL


I

DAVID

MD1-0-V-161-23-04052

CLOSED COOLING WATER PIPING SUPPORT


I
LIST DAVID

MD1-0-V-161-23-04063

INTER & CONT BLOWDOWN PIPING SUPPORTS


I
DETAIL
DAVID

MD1-0-V-161-23-04064

INTER & CONT BLOWDOWN PIPING SUPPORTS


I
DETAIL
DAVID

MD1-0-V-161-23-04076

SAMPLING PIPING SUPPORT LIST

DAVID

DAVID
DAVID

DAVID

DAVID

MD1-0-V-161-23-04078

SAMPLING PIPING ARRANGEMENT PLAN


I VIEW

DAVID

MD1-0-V-161-23-04079

SAMPLING PIPING SUPPORTS DETAIL I

DAVID

MD1-0-V-161-23-04081

PLANT/SERVICE AIR PIPING ARRANGEMENT


I
PLAN DAVID
VIEW

MD1-0-V-161-23-04083

PLANT/SERVICE AIR PIPING SUPPORTILIST

MD1-0-V-161-23-04101

INSTRUMENT AIR PIPING ARRANGEMENT


I
PLAN VIEW
DAVID

MD1-0-V-161-23-04103

INSTRUMENT AIR PIPING SUPPORT LIST


I

DAVID

MD1-0-V-161-23-04171

NITROGEN PIPING ARRANGEMENT PLAN


I VIEW

DAVID

MD1-0-V-161-23-04172

NITROGEN PIPING SUPPORT LIST

DAVID

MD1-0-V-161-23-04201

STEAM COIL AIR HEATER STEAM PIPING


I PLAN ANDDAVID
SECTIONS

MD1-0-V-161-23-04202

SCAH STEAM PIPING SUPPORT LIST I

DAVID

MD1-0-V-161-23-04251

CHEMICAL FEED PIPING SUPPORT DETAIL


I

DAVID

MD1-0-V-161-23-04252

CHEMICAL FEED PIPING SUPPORT LIST


I

DAVID

MD1-0-V-161-23-04301

WATER WASH DRAIN PIPING SUPPORT


I LIST

DAVID

MD1-0-V-161-23-04331

SAFETY VALVE VENT & DRAIN PIPING ARRANGEMENT


I
DAVID
PLAN VIEW

MD1-0-V-161-23-04332

SAFETY VALVE VENT & DRAIN PIPING SUPPORT


I
LIST
DAVID

MD1-0-V-161-23-04371

SEAL AIR PIPING PLAN VIEW

DAVID

MD1-0-V-161-23-04372

SEAL AIR PIPING SUPPORTS DETAIL I

DAVID

MD1-0-V-161-23-04373

SEAL AIR PIPING SUPPORTS LIST

DAVID

MD1-0-V-161-23-04391

STRIPPER COOLER AIR PIPING PLAN VIEW


I

MD1-0-V-161-23-04392

STRIPPER COOLER AIR PIPING SUPPORT


I
DETAIL DAVID

MD1-0-V-161-23-04393

STRIPPER COOLER AIR PIPING SUPPORT


I
LIST

DAVID

MD1-0-V-161-23-04411

LOOPSEAL AIR PIPING PLAN VIEW

DAVID

MD1-0-V-161-23-04412

LOOPSEAL AIR PIPING SUPPORTS DETAIL


I

DAVID

MD1-0-V-161-23-04413

LOOPSEAL AIR PIPING SUPPORTS LISTI

DAVID

MD1-0-V-161-23-04451

STRIPPER COOLER ATTEMPERATOR PIPING


I
PLANDAVID
VIEW

MD1-0-V-161-23-04452

STRIPPER COOLER ATTEMPERATOR PIPING


I
SUPPORT
DAVIDDETAIL

MD1-0-V-161-23-04453

STRIPPER COOLER ATTEMPERATOR PIPING


I
SUPPORT
DAVIDLIST

MD1-0-V-161-23-04561

SERVICE WATER PIPING PLAN VIEW I

DAVID

MD1-0-V-161-23-04562

SERVICE WATER PIPING SUPPORT LIST


I

DAVID

MD1-0-V-161-23-04581

LIMESTONE FEED PIPING PLAN VIEW I

DAVID

MD1-0-V-161-23-04582

LIMESTONE FEED PIPING SUPPORT LIST


I

DAVID

MD1-0-V-161-87-00810

Refractory Setting for Cyclone

DAVID

MD1-0-V-161-87-00811

Refractory Setting Upper Furnace & Cyclone


I Entrance DAVID

MD1-0-V-161-87-00812

REFRACTORY SETTINGS FOR CROSSOVER


I
FLUE DAVID

MD1-0-V-161-87-00814

REFRACTORY SETTING FOR UPPER WING


I
WALLS DAVID
& FURNACE FW

MD1-0-V-161-87-00815

REFRACTORY SETTING FOR LOWER FURNACE


I
AREA
DAVID

MD1-0-V-161-87-00816

REFRACTORY SETTING SECTIONS & DETAILS(1)


I

MD1-0-V-161-87-00819

REFRACTORY SETTING STRIPPER COOLER


I
PLAN VIEW,
DAVID SECTION & DETAILS

MD1-0-V-161-87-00820

REFRACTORY SETTING FOR S/C AIR/SOLIDS


I
RETURN
DAVID
DUCT DETAILS

MD1-0-V-161-87-00821

REFRACTORY SETTING FOR LOOP SEAL


I

MD1-0-V-161-87-00822

REFRACTORY SETTING FOR LOOP SEAL


I SECTIONS
DAVID
AND DETAILS(1)

MD1-0-V-161-87-00823

REFRACTORY SETTING FOR LOOP SEAL


I SECTIONS
DAVID
AND DETAILS(2)

MD1-0-V-162-05-00002

Cleaning & Painting Procedure ESP System


I

DAVID

MD1-0-V-162-06-00005

ESP Hopper Sizing Calcuation

DAVID

MD1-0-V-162-09-00005

Performance Curve

DAVID

MD1-0-V-181-05-00001

NSPECTION & TEST PROCEDURE

DAVID

MD1-0-V-181-05-00002

NSPECTION & TEST PLAN

DAVID

DAVID

DAVID

DAVID

DAVID

MD1-0-V-181-05-00003

WPS & PQR FOR AUX. BOILER

DAVID

MD1-0-V-181-05-00005

WELD & NDE MAP FOR AUX. BOILER I

DAVID

MD1-0-V-181-05-00006

PWHT PROCEDURE

DAVID

MD1-0-V-181-06-00020

Auxiliary Boiler Package Thermal Expansion


I CalculationDAVID
of Duct

MD1-0-V-181-10-00010

Auxiliary boiler package arrangement of ducts


I

DAVID

MD1-0-V-181-11-00312

Auxiliary Boiler Package Manhole Detail ofI Deaerator

DAVID

MD1-0-V-181-11-00321

Auxiliary Boiler Package Saddle Detail of Deaerator


I

DAVID

MD1-0-V-181-11-00611

Auxiliary boiler package manhole detail oil Itank

DAVID

MD1-0-V-181-11-00902

Auxiliary boiler package air duct detail(2of4)


I

DAVID

MD1-0-V-181-11-00903

Auxiliary boiler package air duct detail(3of4)


I

DAVID

MD1-0-V-181-11-00904

Auxiliary boiler package air duct detail(4of4)


I

DAVID

MD1-0-V-181-11-00905

Auxiliary boiler package gas duct detail(1of4)


I

DAVID

MD1-0-V-181-11-00906

Auxiliary boiler package gas duct detail(2of4)


I

DAVID

MD1-0-V-181-11-00907

Auxiliary boiler package gas duct detail(3of4)


I

DAVID

MD1-0-V-181-11-00908

Auxiliary boiler package gas duct detail(4of4)


I

DAVID

MD1-0-V-181-11-00909

Auxiliary boiler package common detail ofIduct

DAVID

MD1-0-V-181-11-00910

Auxiliary boiler package manhole detail of duct


I

DAVID

MD1-0-V-181-11-00911

Auxiliary boiler package expansion joint detail


I of duct

DAVID

MD1-0-V-181-11-00912

Auxiliary boiler package nozzle detail of duct


I

DAVID

MD1-0-V-191-01-10009

Boiler Feedwater Pump EOT Crane General


I Arrangement
DAVID
Drawings

MD1-0-V-360-08-00942

Welding Procedure Specification(Type "1")I

DAVID

MD1-0-V-360-08-00944

Welding Procedure Specification(Type "3")I

DAVID

MD1-0-V-360-08-00945

Welding Procedure Specification(Type "4")I

DAVID

MD1-0-V-360-08-00946

Welding Procedure Specification(Type "5")I

DAVID

MD1-0-V-360-08-00947

Welding Procedure Specification(Type "6")I

DAVID

MD1-0-V-360-08-00948

Welding Procedure Specification(Type "7")I

DAVID

MD1-0-V-360-08-00949

Welding Procedure Specification(Type "8")I

DAVID

MD1-0-V-400-05-00121

Shop Inspection and Test Plan for Alloy Pipe


I

DAVID

MD1-0-V-400-05-00127

WPS & PQR for Alloy Welded Pipe

DAVID

MD1-0-V-400-05-00521

Inspection & Test Plan For Alloy Wrought Fitting


I

MD1-0-V-400-05-00529

Inspection and test procedure for carbon forged


I
fitting DAVID

MD1-0-V-400-10-02311

Outline Drawing for Flexible & Expansion Joint


I

MD1-0-V-805-05-00024

Weld Procedures Specification (WPS) andI QualificationDAVID


Records (PQR)

MD1-1-P-111-24-00031

Piping Isometric Drawing- Extraction Steam


I System (Unit
DAVID
#1)

MD1-1-P-111-24-00041

Piping Isometric Drawing- Auxiliary Steam ISystem (Unit DAVID


#!1)

MD1-1-P-114-24-00001

Piping Isometric Drawing- Feed Water Heater


I Drain & Vent
DAVID
System (Unit #1)

MD1-1-P-121-24-00001

Piping Isometric Drawing- Feed Water System


I
(Unit #1)DAVID

MD1-1-P-122-24-00001

Piping Isometric Drawing- Condensate System


I
(Unit #1)DAVID

MD1-1-P-400-07-00001

Piping Stress Analysis Report- Main & ColdI Reheat Steam


DAVID
with HP Bypass Sys-Unit1

MD1-1-P-400-07-00002

Piping Stress Analysis Report- hot Reheat ISteam with LP


DAVID
Bypass Sys.-Unit1

MD1-1-P-400-07-00003

Piping Stress Analysis Report - Feed Water


I System

DAVID

MD1-1-V-161-11-00005

U1bt1 steel structure shop detailings & member


I
list

DAVID

MD1-1-V-161-11-00010

U1at2 handrail shop detailings & member list


I

DAVID

MD1-1-V-161-11-00013

U1bt1 handrail shop detailings & member list


I

DAVID

MD1-2-P-111-24-00031

Piping Isometric Drawing- Extraction Steam


I System (Unit
DAVID
#2)

MD1-2-P-111-24-00041

Piping Isometric Drawing- Auxiliary Steam ISystem (Unit DAVID


#2)

MD1-2-P-114-24-00001

Piping Isometric Drawing- Feed Water Heater


I Drain & Vent
DAVID
System (Unit #2)

DAVID

DAVID

MD1-2-P-121-24-00001

Piping Isometric Drawing- Feed Water System


I
(Unit #2)DAVID

MD1-2-P-122-24-00001

Piping Isometric Drawing- Condensate System


I
(Unit #2)DAVID

MD1-2-P-400-07-00001

Piping Stress Analysis Report- Main and cold


I Reheater DAVID
Steam with HP Bypass Systm

MD1-2-P-400-07-00002

Piping Stress Analysis Report- Hot ReheatI Steam with LP


DAVID
Bypass System (Unit #2)

MD1-2-P-400-07-00003

Piping Stress Analysis Report - Feed Water


I System

DAVID

Welding Procedure Specification


A
Summary
DAVID Status

MD1-0-M-100-02-000011

Technical Specification- Painting Specification

Material Approval Request


A for Welding
DAVID
Rod (Hyundai Welding) Welding)

MD1-0-M-110-03-00001
E

System Description- Main and Reheat Steam Sy

Feed Water Heater Vendor


A
TechnicalDAVID
Data

MD1-0-M-110-03-00004
B

System Description- FWH Vent and Drain Syste

Orifice Data Sheet & Drawing


A
for Feedwater
DAVID Heater

MD1-0-M-120-21-000311

P & I Diagram- Feed Water System (1/2)

Pump Data Sheet for CEP


A

DAVID

MD1-0-T-053-05-00144B

WPS & PQR (DAEJOO)

Data Sheet for Limestone


A Feed System
DAVID

MD1-0-T-054-05-00195E

Method Statement for Pressure Test

Data Sheet for Miscellaneous


A
ControlDAVID
Valve

MD1-0-V-114-05-00018A

Hydrostatic Test Procedure

MD1-0-V-114-05-00019A

Heat Treatment Procedure

MD1-0-V-114-09-00007B

Safety valve data sheet & drawing for feedwater

MD1-0-V-114-09-50011B

LP#1 & LP#2 Feedwater Heater Data Sheet (Cu

MD1-0-V-114-09-50012B

LP#1 & LP#2 Feedwater Heater Data Sheet (Su

MD1-0-V-114-10-50001C

LP#1A Feedwater Heater Outline Drawing

MD1-0-V-114-10-50002C

LP#1B Feedwater Heater Outline Drawing

MD1-0-V-114-10-50003C

LP#2 Feedwater Heater Outline Drawing

MD1-0-V-115-09-00001B

Deaerator and Storage Tank- Technical Data Sh

MD1-0-V-121-09-00001A

Technical data sheet for bfp & bfbp

MD1-0-V-122-05-00002B

SHOP INSPECTION & TEST PLAN FOR CEP

MD1-0-V-122-21-00001B

P&I Diagram of CEP

MD1-0-V-161-01-00330B

Winbox Ring Duct Assembly- Arrangement Part

MD1-0-V-161-03-00001A

Steam Generation System Description

MD1-0-V-161-09-24901A

Data Sheet for Sootblower System

MD1-0-V-161-09-25401A

Data Sheet for Damper and Actuator

MD1-0-V-161-09-36103A

Technical Data Sheet for Bed Ash Cooling Syste

MD1-0-V-161-09-62101A

Technical Data Sheet for RH Balancing Valve

MD1-0-V-161-09-62102A

Technical Data Sheet for SC Outlet Knife Gate

MD1-0-V-161-21-06124B

P&ID Stripper Cooler Blowers

MD1-0-V-161-21-06135B

P&ID Nitrogen System

MD1-0-V-162-09-00001D

Electrostatic Precipitator Technical Data Sheet

MD1-0-V-163-09-00001B

Technical Data Sheet

MD1-0-V-181-03-00001B

Auxiliary Boiler Package System Description

MD1-0-V-181-21-000010

Auxiliary boiler pacakge p&id diagram deaerator

MD1-0-V-181-21-000050

Auxiliary boiler pacakge p&id diagram oil pumpin

MD1-0-V-181-21-000090

Auxiliary boiler pacakge p&id diagram chemical

AC

DAVID

MD1-0-M-110-22-00031
B

Flow Diagram- AuxiliaryICSteam System


DAVID

AC

DAVID

MD1-0-P-411-23-00001B

Pipe arrangement & support


IC
locationDAVID
drawing - boiler area (section view)

AC

DAVID

MD1-0-T-030-05-00323B

Method Statement for Radiographic


IC
Examination
DAVID

AC

DAVID

MD1-0-T-030-05-00324B

Method Statement for Ultrasonic


IC
Examination
DAVID

AC

DAVID

MD1-0-T-030-05-00370C

Itp for cfbc boiler installation


IC

AC

DAVID

MD1-0-T-053-05-00177C

Method Statement for Steam


IC
Drum ofDAVID
CFBC Boiler

AC

DAVID

MD1-0-T-053-05-00178C

Method statement for cfbc


IC boiler installation
DAVID work

AC

DAVID

MD1-0-T-054-05-00193B

Method Statement for Piping


IC
Color Coding
DAVID

AC

DAVID

MD1-0-V-111-01-00030A

Piping arrangement of valve


IC
leak-off DAVID
(1/2)

AC

DAVID

MD1-0-V-111-01-00031A

Piping arrangement ofIC


valve leak-offDAVID
(2/2)

AC

DAVID

MD1-0-V-111-01-00032A

Piping arrangement ofIC


steam drain (1/2)
DAVID

AC

DAVID

MD1-0-V-111-01-00033A

Piping arrangement of steam


IC
drain (2/2)
DAVID

AC

DAVID

MD1-0-V-111-01-00038A

Piping arragement of steam


IC seal piping
DAVID
(1/6)

AC

DAVID

MD1-0-V-111-01-00039A

Piping arragement of steam


IC seal piping
DAVID
(2/6)

AC

DAVID

MD1-0-V-111-01-00040A

Piping arragement of steam


IC seal piping
DAVID
(3/6)

AC

DAVID

MD1-0-V-111-01-00041A

Piping arragement of steam


IC seal piping
DAVID
(4/6)

AC

DAVID

MD1-0-V-111-01-00042A

Piping arragement of steam


IC seal piping
DAVID
(5/6)

AC

DAVID

MD1-0-V-111-01-00043A

Piping arragement of steam


IC
seal piping
DAVID
(6/6)

AC

DAVID

MD1-0-V-111-01-00044A

Piping arragement of condenser


IC
neck
DAVID
piping

AC

DAVID

MD1-0-V-111-04-00031B

Steam Purity Recommendation


IC

DAVID

AC

DAVID

MD1-0-V-111-04-00032A

Steam blowing requirement


IC

DAVID

AC

DAVID

MD1-0-V-111-24-00400A

Generator Piping FAB ISO


IC Drawings DAVID

AC

DAVID

MD1-0-V-114-05-00009B

Work test and inspection


IC plan

AC

DAVID

MD1-0-V-114-05-00010B

Work test and inspection


IC procedure DAVID

AC

DAVID

MD1-0-V-114-09-50031A

Lp#1 & lp#2 feedwater IC


heater performance
DAVIDcurves

AC

DAVID

MD1-0-V-114-11-00302A

Name Plate Drawing for


ICLP-3 Low Pressure
DAVID Feedwater Heater

AC

DAVID

MD1-0-V-114-11-00402A

Name Plate Drawing for


ICLP-4 Low Pressure
DAVID Feedwater Heater

AC

DAVID

MD1-0-V-114-11-00602A

Name Plate Drawing for


ICHP-6 High Pressure
DAVID Feedwater Heater

AC

DAVID

MD1-0-V-114-11-00702A

Name Plate Drawing for


ICHP-7 High Pressure
DAVID Feedwater Heater

AC

DAVID

MD1-0-V-114-11-00802A

Name Plate Drawing for


ICHP-8 High Pressure
DAVID Feedwater Heater

AC

DAVID

MD1-0-V-114-11-50020A

Lp#1 & lp#2 feedwater IC


heater name plate
DAVID
drawing

AC

DAVID

MD1-0-V-114-11-50023A

Lp#1 feedwater heater IC


tube to tubesheet
DAVID
joint detail & tube layout drawing

AC

DAVID

MD1-0-V-114-11-50024A

Lp#2 feedwater heater IC


tube to tubesheet
DAVID
joint detail & tube layout drawing

DAVID

DAVID

MD1-0-V-114-55-50013A

Lp#1 feedwater heaterIC


strength calculation
DAVID

MD1-0-V-114-55-50014A

Lp#2 feedwater heater IC


strength calculation
DAVID

MD1-0-V-114-55-50027A

Lp#1 & lp#2 feedwater IC


heater thermalDAVID
calculation

MD1-0-V-115-01-00001B

Deaerator and storage IC


tank- general DAVID
arrangement (assembly & outline)

MD1-0-V-115-05-00001A

Deaerator and storage IC


tank, inspection
DAVID
and test procedure

MD1-0-V-115-05-00002A

Deaerator and StorageICTank - Painting


DAVID
Procedure

MD1-0-V-115-05-00003A

Deaerator and storage IC


tank, wps & pqr
DAVID

MD1-0-V-115-05-00004A

Deaerator and storage IC


tank, pwht procedure
DAVID

MD1-0-V-115-05-00006A

Deaerator and storageIC


tank, quality control
DAVID procedure

MD1-0-V-115-05-00007A

Deaerator and storage IC


tank, hydrotest
DAVID
procedure

MD1-0-V-115-11-00003B

13LAA 10AC001, 13LAA


IC 10BB001 Deaerator
DAVID and Storage Tank- Nozzle Detail (1/9)

MD1-0-V-115-11-00005B

13LAA 10AC001, 13LAA


IC 10BB001 Deaerator
DAVID and Storage Tank- Nozzle Detail (3/9)

MD1-0-V-115-11-00009B

13LAA 10AC001, 13LAA


IC 10BB001 Deaerator
DAVID and Storage Tank- Nozzle Detail (7/9)

MD1-0-V-115-11-00011A

13LAA 10AC001, 13LAA


IC 10BB001 Deaerator
DAVID and Storage Tank- Nozzle Detail (9/9)

MD1-0-V-115-11-00012A

13LAA 10AC001, 13LAA


IC 10BB001 Deaerator
DAVID and Storage Tank- Insul. Support Detail

MD1-0-V-115-11-00013A

13LAA 10AC001, 13LAA


IC 10BB001 Deaerator
DAVID and Storage Tank- NamePlate Detail

MD1-0-V-121-05-00002B

Shop Inspection and Test


IC Plan for BFP
DAVID
& BFBP

MD1-0-V-121-05-00003B

Shop Inspection and Test


IC Procedure DAVID
for BFP & BFBP

MD1-0-V-121-05-00022B

PerformanceTest Procedure
IC
for BFPDAVID
& BFBP

MD1-0-V-121-08-00003A

Utility consumption list IC


for boiler feedwater
DAVIDpump & boiler feedwater booster pp

MD1-0-V-121-11-00004A

Mechanical Seal Drawing


IC for BFP

MD1-0-V-121-11-00005A

Mechanical Seal CoolerICDrawing for BFP


DAVID

MD1-0-V-121-11-00007A

Flexible Disk Coupling IC


Drawing for BFP
DAVID
and Fluid Coupling

MD1-0-V-121-11-00010B

Name plate for boiler feedwater


IC
pumpDAVID
& boiler feedwater booster pump

MD1-0-V-121-11-00022A

Mechanical Seal CoolerICDrawing for BFBP


DAVID

MD1-0-V-121-21-00001B

P&I Diagram for Boiler IC


Feedwater Pump
DAVID
& Boiler Feedwater Booster Pump

MD1-0-V-121-21-00002B

Oil circuit and measuring


IC point scheme
DAVID
for fluid coupling for bfp & bfbp

MD1-0-V-121-23-00001A

Auxiliary piping drawingICfor boiler feed


DAVID
pump and booster pump

MD1-0-V-121-23-00002B

Cross Over Piping Drawing


IC for BoilerDAVID
Feed Pump and Booster Pump

MD1-0-V-122-05-00017B

Shop performance testIC


procedure forDAVID
condensate extraction pump

MD1-0-V-161-01-00002B

Part Number Arrangement


IC

MD1-0-V-161-01-00020B

Steam Generator General


IC Arrangement
DAVID
Cross Section

MD1-0-V-161-01-00021B

Steam Generator General


IC Arrangement
DAVID
Longit. Section A-A

MD1-0-V-161-01-00022B

Steam Generator General


IC Arrangement
DAVID
Longit. Section B-B

MD1-0-V-161-01-00023B

Steam Generator General


IC Arrangement
DAVID
Longit. Section C-C

MD1-0-V-161-01-00024B

Steam Generator General


IC Arrangement
DAVID
Longit. Section D-D

MD1-0-V-161-01-00025B

Steam Generator General


IC Arrangement
DAVID
Plan Section E-E

MD1-0-V-161-01-00026B

Steam Generator General


IC Arrangement
DAVID
Plan Section F-F

MD1-0-V-161-01-00061B

General Arrangement Side


IC ElevationDAVID

MD1-0-V-161-01-00100B

Boiler Hangers Assembly


IC and DetailsDAVID
in Furnace Front Wall

MD1-0-V-161-01-00110A

BUCKSTAY SYSTEM FURNACE


IC
& HRA
DAVID
SIDE WALL

MD1-0-V-161-01-00111A

BUCKSTAY SYSTEM FURNACE


IC
FRONT
DAVID& REAR

MD1-0-V-161-01-00112A

BUCKSTAY SYSTEM HRA


IC FRONT DAVID
& REAR WALL

MD1-0-V-161-01-00163A

Drum strap hanger arrangement


IC
& detail
DAVID

MD1-0-V-161-01-00170B

Riser & Seam Supply Pipe


IC Isometric DAVID
Arrangement

MD1-0-V-161-01-00171B

Riser & Seam Supply Pipe


IC Arrangement
DAVID
Plan & Elevation View

MD1-0-V-161-01-00172B

Cyclone & Cyclone InletICRiser Arrangement


DAVID

MD1-0-V-161-01-00174B

Furnace FW| & SW Riser


IC Arrangment
DAVID

MD1-0-V-161-01-00175B

Steam Supply Pipe Arrangement


IC

MD1-0-V-161-01-00176B

Riser & Steam Supply Hanger


IC
DetailsDAVID

MD1-0-V-161-01-00177B

Riser & Steam Supply Hanger


IC
DetailsDAVID

MD1-0-V-161-01-00179C

Typical Details for FieldICWelding Panel


DAVID
Joints

MD1-0-V-161-01-00188B

Economizer lower module


IC arragement
DAVID
part no. 2528-0100

MD1-0-V-161-01-00297A

ACOUSTIC BAFFLES IC
PART NO. 2538-7500A,
DAVID
B, C

MD1-0-V-161-01-00301B

Arrangement of Auxiliary
IC Equipment-Overall
DAVID Plant Flues & Duct- Plan View

MD1-0-V-161-01-00302B

Arrangement of Auxiliary
IC Equipment-Overall
DAVID Plant Flues & Duct- Right Side Elev.

MD1-0-V-161-01-00303B

Arrangement of Auxiliary
IC Equipment-P.A
DAVID
Ducts from Air Heater to Furnace Plenum

MD1-0-V-161-01-00304B

Arrangement of Auxiliary
IC Equipment-Flues
DAVIDfrom Boiler Exit to Air Heater-Plan

MD1-0-V-161-01-00305B

Arrangement of Auxiliary
IC Equipment-S.A
DAVID
Ducts-from Air Heater to Furnace-Plan

MD1-0-V-161-01-00306B

Arrangement of Auxiliary
IC Equipment-DAVID
S.A Ducts-from Windbox to Furnace Section

MD1-0-V-161-01-00307B

Arrangement of Auxiliary
IC Equipment-DAVID
S.A & P.A Ducts-from Fans to Air Heater Plan

DAVID

DAVID

DAVID

MD1-0-V-161-01-00310A

BOILER EXIT FLUE TO


ICAH ASSEMBLY
DAVID
PART NO. 2529-6100

MD1-0-V-161-01-00316A

BOILER EXIT FLUE TO


ICAH SECTIONS
DAVID
& DETAILS PART NO. 2529-6100(6)

MD1-0-V-161-01-00318A

AIR HEATER OUTLETIC


TO TERMINAL
DAVID
FLUE ASSEMBLY PART NO.2529-6200

MD1-0-V-161-01-00319A

AIR HEATER OUTLETIC


TO TERMINAL
DAVID
SECTION & DETAIL PART NO.2529-6200 (1)

MD1-0-V-161-01-00320A

AIR HEATER OUTLETIC


TO TERMINAL
DAVID
SECTION & DETAIL PART NO.2529-6200 (2)

MD1-0-V-161-01-00321A

AIR HEATER OUTLETIC


TO TERMINAL
DAVID
SECTION & DETAIL PART NO.2529-6200 (3)

MD1-0-V-161-01-00335A

PA FAN TO A.H. DUCTICASSEMBLYDAVID


PART NO. 2529-

MD1-0-V-161-01-00336A

PA FAN TO A.H. DUCTICSECTIONS DAVID


& DETAILS PART

MD1-0-V-161-01-00340A

SA FAN TO A.H. DUCTICASSY. PART


DAVID
NO. 2529-7100

MD1-0-V-161-01-00341A

SA FAN TO A.H. DUCTICSUPPORT PART


DAVIDNO. 2529-

MD1-0-V-161-01-00342A

SA FAN TO A.H. DUCTICSUPPORT PART


DAVIDNO. 2529-

MD1-0-V-161-01-00350A

SA DUCT FROM AH TO
IC WINDBOX DAVID
ASSEMBLY

MD1-0-V-161-01-00351A

SA DUCT FROM AH TO
IC WINDBOX DAVID
SECTION &

MD1-0-V-161-01-00352A

SA DUCT FROM AH TO
IC WINDBOX DAVID
SECTION &

MD1-0-V-161-01-00353A

SA DUCT FROM AH TO
IC WINDBOX DAVID
SECTION &

MD1-0-V-161-01-00354A

SA DUCT FROM AH TO
IC WINDBOX DAVID
SECTION &

MD1-0-V-161-01-00355A

SA DUCT FROM WINBOX


IC TO START
DAVID
UP BURNER PART NO. 2529-7220

MD1-0-V-161-01-00356A

SA DUCT FROM WINBOX


IC TO START
DAVID
UP BURNER DETAIL PART NO.2529-7220

MD1-0-V-161-01-00360A

PRIMARY AIR DUCT ASSEMBLY


IC
FROM
DAVID
AH TO FURNACE PART NO. 2529-7400

MD1-0-V-161-01-00361A

PA DUCT FROM AH TO
IC FURNACE DAVID
SECTIONS AND DETAILS PART NO. 2529-7400 (1)

MD1-0-V-161-01-00362A

PA DUCT FROM AH TO
IC FURNACE DAVID
SECTIONS AND DETAILS PART NO. 2529-7400 (2)

MD1-0-V-161-01-00363A

PA DUCT FROM AH TO
IC FURNACE DAVID
SECTIONS AND DETAILS PART NO. 2529-7400 (3)

MD1-0-V-161-01-00364A

PA DUCT FROM AH TO
IC FURNACE DAVID
SECTIONS AND DETAILS PART NO. 2529-7400 (4)

MD1-0-V-161-01-00365A

PA DUCT FROM AH TO
IC FURNACE DAVID
SECTIONS AND DETAILS PART NO. 2529-7400 (5)

MD1-0-V-161-01-00368A

FABRIC EXPANSION JOINTS


IC
SCH DAVID
FOR FLUES AND DUCTS

MD1-0-V-161-01-00369A

METALLIC EXPANSION
IC JOINTS SCH
DAVID
FOR FLUES AND DUCTS

MD1-0-V-161-01-00370A

METALLIC EXPANSION
IC JOINTS DETAILS
DAVID FOR BOILER

MD1-0-V-161-01-00371A

EXPANSION JOINT DETAILS


IC
FOR STRIPPER
DAVID
COOLER

MD1-0-V-161-01-00386A

EXPANSION JOINT DETAILS


IC
FOR CYCLONE
DAVID
LOOPSEAL

MD1-0-V-161-01-00390A

FURNACE GRID PLENUM


IC ARRANGEMENT
DAVID DRAWING

MD1-0-V-161-01-00391A

FURNACE PRIMARY AIR


IC PLENUM DAVID
SECTS & DETAILS (1)

MD1-0-V-161-01-00392A

FURNACE PRIMARY AIR


IC PLENUM DAVID
SECTS & DETAILS (2)

MD1-0-V-161-01-00393A

FURNACE PRIMARY AIR


IC PLENUM DAVID
SECTS & DETAILS (3)

MD1-0-V-161-01-00394A

FURNACE PRIMARY AIR


IC PLENUM DAVID
VERTICAL TURNING VANES SECTS & DETAILS

MD1-0-V-161-01-00400A

Downcomers Arrangement
IC

DAVID

MD1-0-V-161-01-00401A

Downcomers Sections IC
& Details

DAVID

MD1-0-V-161-01-00402A

Feedline to Drum Arrangement


IC

DAVID

MD1-0-V-161-01-00403A

Transfer Lines PSH to IC


ISH & ISH to FSH
DAVID
& Manfolds

MD1-0-V-161-01-00404A

Transfer Lines PSH to IC


ISH & ISH to FSH
DAVID
& Manfolds Details

MD1-0-V-161-01-00405A

Furnace Feeder Arrangement


IC

DAVID

MD1-0-V-161-01-00408A

Reheater By-Pass Arrangement


IC

DAVID

MD1-0-V-161-01-00409A

Reheater By-Pass Sections


IC & DetailsDAVID

MD1-0-V-161-01-00410A

Feeders to Lower Cyclone


IC & Gas Inlet
DAVID

MD1-0-V-161-01-00411A

HRA Lower & HRA To IC


PSH TransferDAVID
Line Part No.2575 & 2575-2110

MD1-0-V-161-01-00425B

Soot blower supports arrangment


IC
and
DAVID
details

MD1-0-V-161-01-00480C

1524 ID Drum and External


IC Arrangement
DAVID

MD1-0-V-161-01-00490B

1524 ID Drum InternalsIC


ArrangementDAVID
Sheet 1 of 2

MD1-0-V-161-01-00492A

Vortex Elminator

IC

MD1-0-V-161-01-00600A

General Arrangement Isometric


IC
ViewDAVID

MD1-0-V-161-01-00882A

Crossover Flue Upper Expansion


IC
Joint
DAVID
Collar Arrangement

MD1-0-V-161-01-00900A

FURNACE UPPER FRONT


IC
WALL ARRANGEMENT
DAVID

MD1-0-V-161-01-00919A

FURNACE LOWER FRONT


IC
WALL ARRANGEMENT
DAVID

MD1-0-V-161-01-00926A

FURNACE UPPER REAR


IC WALL ARRANGEMENT
DAVID

MD1-0-V-161-01-00951A

FURNACE LOWER REAR


IC WALL ARRANGEMENT
DAVID

MD1-0-V-161-01-00958A

FURNACE UPPER SIDE


IC WALL ARRANGEMENT
DAVID

MD1-0-V-161-01-00973A

FURNACE LOWER SIDE


IC WALL ARRANGEMENT
DAVID

MD1-0-V-161-01-00974A

FURNACE LOWER SIDE


IC WALL PANELS
DAVIDSECTIONS & DETAILS

MD1-0-V-161-01-00981A

FURNACE GRID FLOOR


IC ARRANGEMENT
DAVID

MD1-0-V-161-01-00985A

FURNACE GRID FLOOR


IC AIR NOZZLE
DAVID
ARRANGEMENT

MD1-0-V-161-01-09001B

Key Plan Silo, Boiler and


IC Air Heater Area
DAVID

MD1-0-V-161-01-09185C

Equipment Maintenance
ICMonorails DAVID

MD1-0-V-161-01-09186A

Equipment maintenance
IChook locations
DAVID

MD1-0-V-161-01-23401A

General Arrangement of
ICPA SCAH DAVID

MD1-0-V-161-01-23402A

General Arrangement of
ICPA SCAH DAVID

MD1-0-V-161-01-32511C

PA Fan-Fan General Arrangement


IC
Drawing
DAVID with Loading and Foundation

MD1-0-V-161-01-32521C

SA Fan-Fan General Arrangement


IC
Drawing
DAVID with Loading and Foundation

MD1-0-V-161-01-36503B

General Arrangement Drawing


IC
for Limestone
DAVID Feed System

MD1-0-V-161-02-01009B

Surface Preparation and


ICPainting Requirements
DAVID

MD1-0-V-161-05-00001A

Quality assurance planIC

MD1-0-V-161-05-00003A

Inspection and test plan(for


IC boiler major
DAVID
parts)

MD1-0-V-161-05-25102A

Code piping welder qualification


IC
list &DAVID
applicable code used

MD1-0-V-161-05-25105A

Code piping alloy material


IC verification(pmi)
DAVIDprocedure

MD1-0-V-161-05-25115A

FWPML ALLOY MATERIAL


IC
VERIFICATION(PMI)
DAVID

MD1-0-V-161-05-25121A

Sunco wps and pqr

MD1-0-V-161-05-25123A

Sunco post weld heat treatment


IC
procedurement
DAVID

MD1-0-V-161-05-25124A

Sunco nde procedure and


IC operator qualification
DAVID
list

MD1-0-V-161-05-25125A

Sunco alloy material verification(pmi)


IC
DAVID
procedure

MD1-0-V-161-05-25126A

Sunco weld repair procedure


IC

MD1-0-V-161-05-25135A

HUADIAN ALLOY MATERIAL


IC
VERIFICATION(PMI)
DAVID
PROCEDURE

MD1-0-V-161-05-25141A

Hailu wps and pqr

MD1-0-V-161-05-25142A

HAILU WELDER QUALIFICATION


IC
LIST
DAVID
& APPLICABLE CODE USED

MD1-0-V-161-05-25143A

Hailu post weld heat treatment


IC
procedurement
DAVID

MD1-0-V-161-05-25144A

Hailu nde procedure and


IC operator qualification
DAVID list

MD1-0-V-161-05-25145A

Hailu alloy material verification(pmi)


IC
procedure
DAVID

MD1-0-V-161-05-25146A

HAILU WELD REPAIRICPROCEDURE


DAVID

MD1-0-V-161-05-25151A

Gl wps and pqr

MD1-0-V-161-05-25152A

Gl welder qualification list


IC & applicable
DAVID
code used

MD1-0-V-161-05-25153A

Gl post weld heat treatment


IC procedurement
DAVID

IC

IC

IC

DAVID

DAVID

DAVID

DAVID

DAVID

DAVID

MD1-0-V-161-05-25154A

Gl nde procedure and IC


operator qualification
DAVID list

MD1-0-V-161-05-25155A

Gl alloy material verification(pmi)


IC
procedure
DAVID

MD1-0-V-161-05-25193A

FWST POST WELD HEAT


IC TREATMENT
DAVIDPROCEDUREMENT

MD1-0-V-161-05-25195A

FWST ALLOY MATERIAL


IC VERIFICATION
DAVID(PMI) PROCEDURE

MD1-0-V-161-05-25196A

FWST WELD REPAIRIC


PROCEDURE
DAVID

MD1-0-V-161-05-25801B

Sbwl wps and pqr

IC

DAVID

MD1-0-V-161-05-25804B

Sbwl nde procedure and


ICoperator qualification
DAVID list

MD1-0-V-161-06-00003B

Critical Pipe Terminal Allowable


IC
Reactions
DAVID

MD1-0-V-161-06-00104A

Economizer Inlet Header


IC

MD1-0-V-161-06-00107A

Intermediate Superhtr Inlet


IC Manifold DAVID

MD1-0-V-161-06-00508A

Economizer Intermediate
IC Support Header
DAVID

MD1-0-V-161-06-00811A

Intermediate Superhtr Inlet


IC Header DAVID

MD1-0-V-161-06-00911A

Economizer Outlet Header


IC

DAVID

MD1-0-V-161-06-01000A

Economizer Tube

DAVID

MD1-0-V-161-06-01141A

Calculation Sheet for Blowdown


IC
TankDAVID

MD1-0-V-161-06-01213A

Economizer Feed Line IC


to Drum

MD1-0-V-161-06-01217A

Intermediate Superhtr Outlet


IC
Header DAVID

MD1-0-V-161-06-01400A

Pipe before Stop & Check


IC Valve andDAVID
Pipe between Stop & Check Valve

MD1-0-V-161-06-01500A

Econ Inlet Extension Pipe


IC

MD1-0-V-161-06-01823A

Intermediate Superhtr Outlet


IC
ManifoldDAVID

MD1-0-V-161-06-02000A

Economizer Lower Hanger


IC Tube

DAVID

MD1-0-V-161-06-03000A

Economizer Upper Hanger


IC Tube

DAVID

MD1-0-V-161-06-04000A

Stripper Cooler Coil Tube


IC

DAVID

MD1-0-V-161-06-05080A

Furnace Front Wall Tube


IC

DAVID

MD1-0-V-161-06-09100A

Furnace Grid Tube

IC

DAVID

MD1-0-V-161-06-10102A

TP WW2 to FSH

IC

DAVID

MD1-0-V-161-06-10104A

Header Calculation for IC


60' I.D.Drum DAVID

MD1-0-V-161-06-10310A

Superhtr 2nd Spray HDR


IC

MD1-0-V-161-06-10506A

Header Calculation for IC


18" Downcomer
DAVID
Nozzle on Drum

MD1-0-V-161-06-10708A

Header Calculation for IC


12" Downcomer
DAVID
Nozzle on Drum

MD1-0-V-161-06-10910A

Header Calculation for IC


10" Downcomer
DAVID
Nozzle on Drum

MD1-0-V-161-06-11112A

Header Calculation for IC


6" Riser Nozzle
DAVID
on Drum

MD1-0-V-161-06-11140A

Furnace Side Wall Tube


IC

MD1-0-V-161-06-11300A

Header Calculation for IC


60" I.D.Drum DAVID

MD1-0-V-161-06-11400A

Header Calculation for IC


Drum Head Reinforcement
DAVID

MD1-0-V-161-06-11500A

Header Calculation for IC


Drum Nozzle DAVID
for Feedline

MD1-0-V-161-06-11600A

Header Calculation for IC


Drum Nozzle DAVID
End for 18" Downcomer

MD1-0-V-161-06-11700A

Header Calculation for IC


Drum Nozzle DAVID
End for 12" Downcomer

MD1-0-V-161-06-11800A

Header Calculation for IC


Drum Nozzle DAVID
End for 10" Downcomer and Feedline

MD1-0-V-161-06-11900A

Header Calculation for IC


Drum Nozzle DAVID
End for 6" Riser

MD1-0-V-161-06-15180A

Furnace Rear & Roof Tube


IC

DAVID

MD1-0-V-161-06-19000A

Eva WW Tube

DAVID

MD1-0-V-161-06-20104A

Downcomer to Lower Furnace


IC

DAVID

MD1-0-V-161-06-20106A

Finishing Superhtr InletIC


Manifold

DAVID

MD1-0-V-161-06-20210A

Cyclone Inckt Tube

DAVID

MD1-0-V-161-06-20510A

Furnace Downcomer Bottle


IC

DAVID

MD1-0-V-161-06-20710A

Finishing Superhtr InletIC


Header

DAVID

MD1-0-V-161-06-21112A

Downcomer to CycloneIC

DAVID

MD1-0-V-161-06-21116A

Finishing Superheater WW
IC Outlet Header
DAVID

MD1-0-V-161-06-21317A

Cyclone Manifold- Part IC


of DWNCMR DAVID

MD1-0-V-161-06-21722A

Finishing Superhtr Outlet


IC Manifold

MD1-0-V-161-06-21823A

FFW Feeders to Diaphragmed


IC
CircuitDAVID

MD1-0-V-161-06-22000A

Cyclone Tube

IC

IC

IC

IC

DAVID

DAVID

DAVID

DAVID

DAVID

DAVID

DAVID

MD1-0-V-161-06-22429A

FSW Feeders to Diaphragmed


IC
CircuitDAVID

MD1-0-V-161-06-23031A

Downcomer to EVAP WW
IC

DAVID

MD1-0-V-161-06-23240A

HRA Side Wall Lower Tube


IC

DAVID

MD1-0-V-161-06-25260A

HRA Side Wall Upper Tube


IC

DAVID

MD1-0-V-161-06-27280A

HRA Front Wall Tube IC

DAVID

MD1-0-V-161-06-29300A

HRA RW Upper Tube IC

DAVID

MD1-0-V-161-06-30104A

RHTR-1 Inlet Header IC

DAVID

MD1-0-V-161-06-30106A

Furnace FW Lower Header


IC

DAVID

MD1-0-V-161-06-30508A

RHTR-1 Outlet HeaderIC

DAVID

MD1-0-V-161-06-30712A

Furnace SW Lower Header


IC

DAVID

MD1-0-V-161-06-30912A

RHTR-2 Inlet Header IC

DAVID

MD1-0-V-161-06-31316A

Furnace RW Lower Header


IC

DAVID

MD1-0-V-161-06-31320A

HRA Roof Tube

IC

DAVID

MD1-0-V-161-06-31718A

RH1 Inlet & Bypass Pipe


IC

DAVID

MD1-0-V-161-06-31722A

Furnace Upper SW Headers


IC

DAVID

MD1-0-V-161-06-31920A

By-pass Inlet Tee

DAVID

MD1-0-V-161-06-32100A

By-pass Inlet 22" End of


ICReducer

DAVID

MD1-0-V-161-06-32223A

RH1 22" OD Inlet Pipe IC

DAVID

MD1-0-V-161-06-32328A

Furnace Upper FW Headers


IC

DAVID

MD1-0-V-161-06-32425A

Mixing Tee at ReheaterICBypass SA-182-F22


DAVID

MD1-0-V-161-06-32600A

RH1 Outlet Pipe to Mixing


IC Tee

DAVID

MD1-0-V-161-06-32728A

32" OD Transfer Pipe to


ICRH2 Inlet

DAVID

MD1-0-V-161-06-32900A

32" OD Spool Piece From


IC Mixer Out DAVID

MD1-0-V-161-06-32932A

EVAP Wingwall Lower IC


HDR

MD1-0-V-161-06-33000A

Flanged Transition Piece


IC From valveDAVID
to Mixing Tee

MD1-0-V-161-06-33338A

EVAP Wingwall Upper IC


HDR

DAVID

MD1-0-V-161-06-33340A

HRA Rear Wall Lower Tube


IC

DAVID

MD1-0-V-161-06-35360A

HRAXOD Top Tube

DAVID

MD1-0-V-161-06-37380A

HRAXOD Side Wall Tube


IC

DAVID

MD1-0-V-161-06-39400A

HRAXOD Bottom TubeIC

DAVID

MD1-0-V-161-06-40106A

Cycl Inckt Lower Header


IC

DAVID

MD1-0-V-161-06-40712A

Cycl Inckt Upper Header


IC

DAVID

MD1-0-V-161-06-41000A

Primary Superheater Inlet


IC Stubs

DAVID

MD1-0-V-161-06-41317A

Cyc. Upper Ring Header


IC

DAVID

MD1-0-V-161-06-41823A

Cyc. Lower Ring Header


IC

DAVID

MD1-0-V-161-06-42000A

Primary Superheater Horizontal


IC
Legs/Outlet
DAVID Stubs

MD1-0-V-161-06-42426A

XOD Posts SW Inlet Header


IC

DAVID

MD1-0-V-161-06-42729A

XOD Posts SW Outlet Header


IC

DAVID

MD1-0-V-161-06-43000A

RH 1 Inlet Leg

IC

DAVID

MD1-0-V-161-06-43032A

XOD Bottom Inlet Header


IC

DAVID

MD1-0-V-161-06-43335A

XOD Top Outlet Header


IC

DAVID

MD1-0-V-161-06-43637A

XOD Transfer Pipe TopICTo Bottom DAVID

MD1-0-V-161-06-44000A

RH1 Heating ElementsIC


Leg 1 to Leg DAVID
5

MD1-0-V-161-06-45000A

RH1 Heating ElementsIC


Leg 5 to Leg DAVID
6

MD1-0-V-161-06-46000A

RH1 Heating ElementsIC


Leg 7 to Leg DAVID
8

MD1-0-V-161-06-47000A

RH1 Outlet Leg

IC

DAVID

MD1-0-V-161-06-48000A

RH2 Outlet Leg

IC

DAVID

IC

IC

DAVID

MD1-0-V-161-06-49000A

RH 2 Heating Element IC
Leg 1 to Leg 4DAVID

MD1-0-V-161-06-50000A

RH 2 Heating Element IC
Leg 5 to Leg 6DAVID

MD1-0-V-161-06-50109A

HRA Front Wall Upper IC


Header

DAVID

MD1-0-V-161-06-51000A

RH 2 Outlet Legs

DAVID

MD1-0-V-161-06-51015A

HRA Front Wall intermediate


IC
HeaderDAVID

MD1-0-V-161-06-51622A

HRA Side Wall Upper Header


IC

MD1-0-V-161-06-52000A

3" Long Spool Piece @ICRH II HeatingDAVID


Leg 6 & RH II Outlet Legs

MD1-0-V-161-06-52326A

HRA Side Wall Lower Header


IC

MD1-0-V-161-06-52730A

HRA Front Wall Lower IC


(Outlet) Header
DAVID

MD1-0-V-161-06-53000A

ISH Unheated & LowerIC


Tubes

DAVID

MD1-0-V-161-06-53137A

HRA RW Lower (Outlet)


ICHeader

DAVID

MD1-0-V-161-06-53839A

Tee on HRA RW LowerIC(Outlet) Header


DAVID

MD1-0-V-161-06-54000A

ISH Upper Tubes

MD1-0-V-161-06-55000A

FSH WW Unheater and


ICLower Tube DAVID

MD1-0-V-161-06-56000A

FSH WW Upper TubesIC

DAVID

MD1-0-V-161-06-57000A

FSH WW Upper Unheated


IC Tubes

DAVID

MD1-0-V-161-06-58000A

8" Evaporative WW Feeder-BR


IC

DAVID

MD1-0-V-161-06-59000A

10" Furnace Feeder-BSIC

DAVID

MD1-0-V-161-06-60000A

3" FSW Feeder to Diaphragmed


IC
Circult-BT
DAVID

MD1-0-V-161-06-60104A

SC/ Cooling Coil Inlet HDRS


IC

DAVID

MD1-0-V-161-06-60508A

SC/ Cooling Coil OutletIC


HDRS

DAVID

MD1-0-V-161-06-60900A

SC/ Cooling Coil Transfer


IC Pipe

DAVID

MD1-0-V-161-06-61000A

4" FFW Feeder to Diaphragmed


IC
Circult-BU
DAVID

MD1-0-V-161-06-62000A

6" Furnace & Evaporative


IC WW Risers-BW
DAVID

MD1-0-V-161-06-63000A

Drum Head Recirculating


IC Pipe -BX DAVID

MD1-0-V-161-06-64000A

6" Cyclone & Cyclone INCKT


IC
Risers-CA
DAVID

MD1-0-V-161-06-65000A

6" Cyclone & Cyclone INCKT


IC
Feeder-DAVID
CB

MD1-0-V-161-06-66000A

SS Pipes From Drum To


IC HRA FW/SW-CH
DAVID

MD1-0-V-161-06-67000A

Transfer-HRA FW To HRA
IC RW LowerDAVID
CJ

MD1-0-V-161-06-68000A

Transfer-HRA RW Lowr
ICHDR To PSH
DAVID
Inlet-CM

MD1-0-V-161-06-80106A

Primary Superheater Inlet


IC Header

MD1-0-V-161-06-80710A

Primary Superheater Outlet


IC Header DAVID

MD1-0-V-161-06-81112A

TP PSH To WW2

IC

DAVID

MD1-0-V-161-06-81320A

1st Spray Header

IC

DAVID

MD1-0-V-161-08-06006A

Equipment List

IC

DAVID

MD1-0-V-161-08-06007A

Valve List

IC

DAVID

MD1-0-V-161-08-06008B

Boiler Line List

IC

DAVID

MD1-0-V-161-08-06010B

Utility Consumption ListICfor Boiler

MD1-0-V-161-08-10000B

Boiler Master Documents


IC & Drawing DAVID
List

MD1-0-V-161-09-00002A

MATERIAL COMPARISON
IC TABLE FOR
DAVID
NON-PRESSURE PARTS

MD1-0-V-161-09-23401A

Data Sheet for Steam Coil


IC Air HeaterDAVID

MD1-0-V-161-09-24701A

Data Sheet for Air Preheater


IC

MD1-0-V-161-09-25701A

Data Sheet for Start upIC


Burner System
DAVID

MD1-0-V-161-09-32501A

Data Sheet for PrimaryIC


Air Fan and Secondary
DAVID
Air Fan

MD1-0-V-161-09-32505A

Data Sheet for Loop Seal


IC Blower

MD1-0-V-161-09-32511A

Opearational Curves atIC


Various Inlet DAVID
Vanes Opening

MD1-0-V-161-09-36101A

Data Sheet for Chain Conveyor


IC
System
DAVID

IC

IC

DAVID

DAVID

DAVID

DAVID

DAVID

DAVID

DAVID

MD1-0-V-161-09-36102A

Data Sheet for Belt Feeder


IC System DAVID

MD1-0-V-161-10-12490A

Boiler sootblower vendor


IC drawings DAVID

MD1-0-V-161-10-13250A

Boiler Pa/Sa Fan Vendor


IC Drawings DAVID

MD1-0-V-161-10-13251A

Boiler S/C Blower System


IC Vendor Drawings
DAVID

MD1-0-V-161-10-13252A

Boiler Loopseal BlowerICSystem Vendor


DAVID
Drawings

MD1-0-V-161-10-13612A

Stripper cooler rotary valve


IC workpackage
DAVID
vendor documents & drawings

MD1-0-V-161-10-16210B

MS-FW Stop & Check IC


Valves_ Pentair
DAVID
Valves & Controls Vendor Drawings

MD1-0-V-161-10-16211A

Boiler Large Bore Valves


IC Vendor Drawings
DAVID

MD1-0-V-161-10-16215A

RH-By pass Control Valve


IC Workpackage
DAVID
Vendor Documents & Drawings

MD1-0-V-161-14-00084A

EXPANSION JOINTS FOR


IC FUEL FEED
DAVID
CHUTE

MD1-0-V-161-23-03980A

SOOTBLOWER PIPING
IC ISOMETRICDAVID
VIEW

MD1-0-V-161-23-03981A

SOOTBLOWER PIPING
IC PLAN VIEWDAVID

MD1-0-V-161-23-03982A

SOOTBLOWER PIPING
IC ELEVATION
DAVID
VIEW - RIGHT SIDE

MD1-0-V-161-23-03983A

SOOTBLOWER PIPING
IC ELEVATION
DAVID
VIEW - LEFT SIDE

MD1-0-V-161-23-03984A

SOOTBLOWER PIPING
IC SUPPORT DAVID
DETAIL

MD1-0-V-161-23-03985A

SOOTBLOWER PIPING
IC SUPPORT DAVID
LIST

MD1-0-V-161-23-04000A

BOILER DRAIN PIPING


ICISOMETRICDAVID
VIEW

MD1-0-V-161-23-04002A

BOILER DRAIN PIPING


ICELEVATIONDAVID
VIEW - RIGHT SIDE

MD1-0-V-161-23-04003A

BOILER DRAIN PIPING


ICELEVATIONDAVID
VIEW - LEFT SIDE

MD1-0-V-161-23-04004A

BOILER VENT PIPINGIC


ISOMETRIC DAVID
VIEW

MD1-0-V-161-23-04005A

BOILER VENT PIPINGIC


PLAN VIEW DAVID

MD1-0-V-161-23-04011A

BOILER VENT PIPINGIC


SUPPORT LIST
DAVID

MD1-0-V-161-23-04020A

SPRAY WATER PIPING


IC ISOMETRIC
DAVID
VIEW

MD1-0-V-161-23-04021A

SPRAY WATER PIPING


IC PLAN VIEW
DAVID

MD1-0-V-161-23-04022A

SPRAY WATER PIPING


IC ELEVATION
DAVID
VIEW

MD1-0-V-161-23-04024A

SPRAY WATER PIPING


IC SUPPORTS
DAVID
LIST

MD1-0-V-161-23-04050A

CLOSED COOLING WATER


IC
PIPINGDAVID
ISOMETRIC VIEW

MD1-0-V-161-23-04051A

CLOSED COOLING WATER


IC
PIPINGDAVID
PLAN VIEW

MD1-0-V-161-23-04060A

INTER & CONT BLOWDOWN


IC
PIPING
DAVID
ISOMETRIC VIEW

MD1-0-V-161-23-04061A

INTER & CONT BLOWDOWN


IC
PIPING
DAVID
PLAN VIEW

MD1-0-V-161-23-04062A

INTER & CONT BLOWDOWN


IC
PIPING
DAVID
ELEVATION VIEW

MD1-0-V-161-23-04065A

INTER & CONT BLOWDOWN


IC
PIPING
DAVID
SUPPORTS LIST

MD1-0-V-161-23-04077A

SAMPLING PIPING ARRANGEMENT


IC
DAVID
ISOMETRIC VIEW

MD1-0-V-161-23-04080A

PLANT/SERVICE AIR IC
PIPING ARRANGEMENT
DAVID
ISOMETRIC VIEW

MD1-0-V-161-23-04082A

PLANT/SERVICE AIR IC
PIPING ARRANGEMENT
DAVID
ELEVATION VIEW

MD1-0-V-161-23-04100A

INSTRUMENT AIR PIPING


IC ARRANGEMENT
DAVID ISOMETRIC VIEW

MD1-0-V-161-23-04102A

INSTRUMENT AIR PIPING


IC ARRANGEMENT
DAVID ELEVATION VIEW

MD1-0-V-161-23-04170A

NITROGEN PIPING ARRANGEMENT


IC
DAVID
ISOMETRIC VIEW

MD1-0-V-161-23-04200A

STEAM COIL AIR HEATER


IC
STEAM DAVID
PIPING ARRANGEMENT ISOMETRIC VIEW

MD1-0-V-161-23-04250A

CHEMICAL FEED PIPING


IC PLAN AND
DAVID
ISOMETRIC VIEW

MD1-0-V-161-23-04300A

WATER WASH DRAINICPIPING PLAN


DAVID
VIEW AND ISOMETRIC VIEW

MD1-0-V-161-23-04330A

SAFETY VALVE VENTIC& DRAIN PIPING


DAVID
ARRANGMENT ISOMETRIC VIEW

MD1-0-V-161-23-04370A

SEAL AIR PIPING ISOMETRIC


IC
VIEW
DAVID

MD1-0-V-161-23-04390A

STRIPPER COOLER AIR


IC PIPING ISOMETRIC
DAVID
VIEW

MD1-0-V-161-23-04410A

LOOPSEAL AIR PIPING


IC ISOMETRIC
DAVID
VIEW

MD1-0-V-161-23-04450A

STRIPPER COOLER ATTEMPERATOR


IC
DAVID
PIPING ISOMETRIC VIEW

MD1-0-V-161-23-04480A

OIL PIPING FO OVERBED


IC BURNERDAVID
ISOMETRIC VIEW

MD1-0-V-161-23-04481A

OIL PIPING FO OVERBED


IC BURNERDAVID
ARRANGEMENT PLAN REVIEW

MD1-0-V-161-23-04482A

OIL PIPING FO OVERBED


IC BURNERDAVID
SECTION VIEW

MD1-0-V-161-23-04483A

OIL PIPING FO OVERBED


IC BURNERDAVID
SUPPORT DETAIL

MD1-0-V-161-23-04484A

OIL PIPING FO OVERBED


IC
BURNER
DAVID
SUPPORT LIST

MD1-0-V-161-23-04560A

SERVICE WATER PIPING


IC ISOMETRIC
DAVID
VIEW

MD1-0-V-161-23-04580A

LIMESTONE FEED PIPING


IC
ISOMETRIC
DAVID
VIEW

MD1-0-V-161-23-04583A

LIMESTONE FEED PIPING


IC
EXPANSION
DAVID
JOINT

MD1-0-V-161-24-00001A

Piping Isometric Drawing


IC

MD1-0-V-161-56-32501B

Loopseal Blower Foundation


IC
Layout Plan
DAVID
Drawing

MD1-0-V-161-56-32502B

Stripper Blower Foundation


IC Layout Plan
DAVID
Drawing

MD1-0-V-161-73-07200A

Above Ground Grounding


IC at Grade Major
DAVID
Mechanical Equipment

MD1-0-V-161-82-00001A

Insulation for cfb type steam


IC
generator
DAVID

MD1-0-V-161-87-00813B

FURNACE GRID FLOOR


IC REFRACTORY
DAVIDSETTINGS

MD1-0-V-161-87-00817B

REFRACTORY SETTING
IC SECTIONS
DAVID
& DETAILS(2)

MD1-0-V-161-87-00818B

REFRACTORY SETTING
IC FOR CYCLONE
DAVID OUTLET/ CROSSOVER FLUE INLET

MD1-0-V-161-87-00824B

REFRACTORY SETTINGS
IC GENERAL
DAVID
ARRANGEMENT STEAM GENERATOR

MD1-0-V-161-87-00825B

REFRACTORY DRY-OUT
IC & CURING
DAVID
CURVE - FURNACE

MD1-0-V-162-01-00004C

Section Drawing of ESP


IC

DAVID

MD1-0-V-162-05-00005A

Quality assurance manual


IC

DAVID

MD1-0-V-162-11-00014A

Thermal Insulation Drawing


IC with BM DAVID
and Calculation

MD1-0-V-162-11-00017A

Purge Air System Drawing


IC

DAVID

MD1-0-V-163-01-00001B

I.D Fan Layout DrawingIC

DAVID

MD1-0-V-163-01-00002A

I.D Fan Sectional Drawing


IC

DAVID

MD1-0-V-163-01-00004A

I.d. fan inlet damper drawing


IC

DAVID

MD1-0-V-163-01-00006A

I.d. fan name plate drawing


IC

DAVID

MD1-0-V-163-06-00010A

Motor power calculationICsheet for i.d.DAVID


fan

MD1-0-V-163-08-00003A

Equipments list for id fan(11hnc15an001)


IC
DAVID

MD1-0-V-163-09-00002A

Estimated PerformanceICCurve

DAVID

MD1-0-V-163-09-00003A

Speed Torque Curve IC

DAVID

MD1-0-V-163-09-00005A

Painting Specification IC

DAVID

MD1-0-V-163-21-00001A

Fan p&i diagram

DAVID

MD1-0-V-163-82-00001A

Id fan technical information


IC for acoustic
DAVID
insulation drawing

MD1-0-V-181-05-00007C

Auxiliary boiler packageICshop pressure


DAVID
test procedure

MD1-0-V-181-05-00008C

Surface preparation & painting


IC
procedure
DAVID

MD1-0-V-181-05-00010B

Method statement for aux.


IC boiler installation
DAVID work

MD1-0-V-181-06-000030

Auxiliary Boiler Package


ICBoiler Thermal
DAVID
Calculation

MD1-0-V-181-06-000050

Auxiliary Boiler Package


ICDeaerator Strength
DAVID Calculation

MD1-0-V-181-06-000060

Auxiliary Boiler Package


ICEconomizerDAVID
Strength Calculation

MD1-0-V-181-06-000070

Blowdown Tank Strength


IC CalculationDAVID

MD1-0-V-181-06-000100

Steel Stack Strength Calculation


IC

MD1-0-V-181-08-000060

Auxiliary Boiler package


IClubricate Schedule
DAVID

MD1-0-V-181-08-000070

Auxiliary Boiler Package


ICUtility Consumption
DAVID List

MD1-0-V-181-08-000111

Auxiliary boiler packageICline list

MD1-0-V-181-09-00001A

Auxiliary Boiler Package


ICBurner (Include
DAVID
BSP)

MD1-0-V-181-09-00003A

Boiler Feed Water & Sumpt


IC Pump (Include
DAVIDMotor Drawing & Data)

MD1-0-V-181-09-00005A

Chemical Dosing System


IC & SamplingDAVID
System

MD1-0-V-181-10-000051

Auxiliary Boiler Package


ICEconomizerDAVID
Assembly Drawing

IC

DAVID

DAVID

DAVID

MD1-0-V-181-10-000080

Auxiliary Boiler Package


ICHeavy Oil Tank
DAVID
Assembly

MD1-0-V-181-10-000090

Auxiliary Boiler Package


ICSteel Stack DAVID

MD1-0-V-181-11-00191B

Auxiliary boiler packageICname plate for


DAVID
boiler

MD1-0-V-181-11-00301B

Auxiliary Boiler Package


ICShell Detail DAVID
of Deaerator(Storage Tank)

MD1-0-V-181-11-00302B

Auxiliary Boiler Package


ICShell Detail DAVID
of Deaerator(Deaerator Tank)

MD1-0-V-181-11-00311B

Auxiliary Boiler Package


ICNozzle Detail
DAVID
of Deaerator

MD1-0-V-181-11-00331B

Auxiliary Boiler Package


ICPlatform Detail
DAVID
of Deaerator (1 of 2)

MD1-0-V-181-11-00332A

Auxiliary Boiler Package


ICPlatform Detail
DAVID
of Deaerator (2 of 2)

MD1-0-V-181-11-00391B

Auxiliary boiler packageICname plate for


DAVID
deaerator

MD1-0-V-181-11-00411C

Auxiliary boiler packageICplatform detail


DAVID
of economizer

MD1-0-V-181-11-00412A

Auxiliary boiler packageICplatform detail


DAVID
of economizer

MD1-0-V-181-11-00491B

Auxiliary boiler packageICname plate for


DAVID
economizer

MD1-0-V-181-11-00591B

Auxiliary boiler package


ICname plate DAVID
for blowdown tank

MD1-0-V-181-11-00691B

Auxiliary boiler package


ICname plate DAVID
for diesel oil tank

MD1-0-V-181-11-00721C

Auxiliary boiler packageICladder & handrail


DAVID
detail of heavy oil tank

MD1-0-V-181-11-00791B

Auxiliary boiler packageICname plate for


DAVID
heavy oil tank

MD1-0-V-181-11-008210

Attachment Detail of Stack


IC

DAVID

MD1-0-V-181-11-008310

Platform Detail of StackIC(1 of 3)

DAVID

MD1-0-V-181-11-00891B

Auxiliary boiler packageICname plate for


DAVID
stack

MD1-0-V-181-11-00901C

Auxiliary boiler packageICair duct detail(1of4)


DAVID

MD1-0-V-181-23-00001C

General Piping Arrangement


IC
DrawingDAVID
(1 of 3) (EL.0-4000)

MD1-0-V-181-23-00002C

General Piping Arrangement


IC
DrawingDAVID
(2 of 3) (EL.4000-8590)

MD1-0-V-181-23-00003C

General Piping Arrangement


IC
DrawingDAVID
(3 of 3) (EL.8590-Above)

MD1-0-V-181-24-00002A

Auxiliary Boiler Package


ICIsometric Drawing
DAVID

MD1-0-V-181-25-00001B

Auxiliary Boiler Package


ICPiping Support
DAVID
Plan(1of3) EL.0 ~ EL.4000

MD1-0-V-181-25-00002B

Auxiliary Boiler Package


ICPiping Support
DAVID
Plan(2of3) EL.8590 ~ ABOVE

MD1-0-V-181-25-00003B

Auxiliary Boiler Package


ICPiping Support
DAVID
Plan(3of3) EL.8590 ~ ABOVE

MD1-0-V-185-05-00015A

PMI Procedure

MD1-0-V-185-05-00016A

Inspection & Test Plan(ITP)


IC for ShopDAVID
Fabrication Tank

MD1-0-V-185-05-00017A

Inspection & Test Procedure


IC

DAVID

MD1-0-V-185-05-00018A

Hydro Test Procedure IC

DAVID

MD1-0-V-185-05-00019A

NDE Procedure

DAVID

MD1-0-V-185-10-33001A

Steam Vent Silencer forICStart-up Flash


DAVID
Tank

MD1-0-V-185-10-44001A

Steam Vent Silencer forICCondensateDAVID


Return Tank

MD1-0-V-360-08-00943A

Welding Procedure Specification(Type


IC
DAVID
"2")

MD1-0-V-400-05-00523B

Inspection and test plan


ICfor alloy 3d bend
DAVID

MD1-0-V-400-05-00527C

Inspection and Test Procedure


IC
for Alloy
DAVID
Forged Fitting

MD1-0-V-400-05-00530A

Inspection and Test Plan


IC for Carbon DAVID
Forged & Wrought Fitting

MD1-0-V-400-05-00531A

Inspection and Test Procedure


IC
for Carbon
DAVIDForged & Wrought Fitting

MD1-0-V-400-05-00533A

Inspection and Test Plan


IC for Stainless
DAVID
Steel Forged Fitting

MD1-0-V-400-05-00534A

Inspection and Test Procedure


IC
for Stainless
DAVID Steel Forged Fitting

MD1-0-V-400-05-01122A

Inspection and Test Procedure


IC
for Groove
DAVIDCoupling & Fitting

MD1-0-V-400-05-01321A

Inspection and Test Plan


IC for Forged Valves
DAVID (Manual & Auto)

MD1-0-V-400-05-02121A

Inspection and Test Plan


IC for StrainersDAVID

MD1-1-P-411-23-00001B

Pipe arrangement & support


IC
locationDAVID
drawing - boiler #1 area (1/5)

MD1-1-P-411-23-00002B

Pipe arrangement & support


IC
locationDAVID
drawing - boiler #1 area (2/5)

MD1-1-P-411-23-00003B

Pipe arrangement & support


IC
locationDAVID
drawing - boiler #1 area (3/5)

IC

IC

DAVID

MD1-1-P-411-23-00004B

Pipe arrangement & support


IC
locationDAVID
drawing - boiler #1 area (4/5)

MD1-1-P-411-23-00005B

Pipe arrangement & support


IC
locationDAVID
drawing - boiler #1 area (5/5)

MD1-1-V-161-12-00002A

Bolt List_u1at2

IC

DAVID

MD1-1-V-161-12-00003A

Bolt list_u1at3

IC

DAVID

MD1-1-V-161-12-00005A

Bolt list_u1bt1

IC

DAVID

MD1-1-V-161-54-41130A

U1at3_grating erectionIC
drawing

DAVID

MD1-1-V-161-54-42110A

U1bt1_grating erectionIC
drawing

DAVID

MD1-2-P-411-23-00001B

Pipe arrangement & support


IC
locationDAVID
drawing - boiler #2 area (1/5)

MD1-2-P-411-23-00002B

Pipe arrangement & support


IC
locationDAVID
drawing - boiler #2 area (2/5)

MD1-2-P-411-23-00003B

Pipe arrangement & support


IC
locationDAVID
drawing - boiler #2 area (3/5)

MD1-2-P-411-23-00004B

Pipe arrangement & support


IC
locationDAVID
drawing - boiler #2 area (4/5)

MD1-2-P-411-23-00005B

Pipe arrangement & support


IC
locationDAVID
drawing - boiler #2 area (5/5)

MD1-0-M-100-03-00001
A

Plant overall description


RT

MD1-0-T-053-05-00415B

Method Statement for Condenser


RT
Lifting

MD1-0-T-054-07-00248A

Material Approval Request


RJ for Alloy 3D Bend

MD1-0-T-057-07-00277A

Material Approval Request


RT for Pipe Insulation (HI Korea)

MD1-0-V-114-05-50016A

LP#1 & LP#2 Feedwater


RTOperation & Maintenance Manual

MD1-0-V-121-03-00001A

System Description forRT


BFP & BFBP

MD1-0-V-161-05-25116A

FWPML WELD REPAIR


RJPROCEDURE

MD1-0-V-161-05-25133A

HUADIAN POST WELD


RJHEAT TREATMENT PROCEDUREMENT

MD1-0-V-161-05-25803B

Sbwl post weld heat treatment


RJ
procedurement

MD1-0-V-161-09-25402A

Data Sheet of Fabric Expansion


RT
Joint

MD1-0-V-161-09-25501A

Data Sheet of Metal Expansion


RT
Joint

MD1-0-V-161-10-12470A

Boiler Tri-sector Air-Heater


RT Vendor Drawings

MD1-0-V-161-10-12552A

Boiler Hanger Workpackage


RJ
Vendor Drawings

MD1-0-V-162-05-00001A

Inspection Test Plan for


RT
ESP

MD1-0-V-163-09-00004A

Estimated Noise Data RT

DISCIPLINE = MBOP, Mechanical Balance of Plant


revision

status

MD1-0-C-370-06-00010

Hydraulic Calculation for C.W System

MD1-0-D-201-01-00201

Drainage Plan for Steam Turbine Building (1/2)

MD1-0-D-201-01-00202

Drainage Plan for Steam Turbine Building (2/2)

MD1-0-D-203-01-00201

Plumbing Plan for Central Control Building Ground Floor

MD1-0-D-203-01-00202

Plumbing Plan for Central Control Building 1st Floor

MD1-0-D-203-01-00203

Plumbing Plan for Central Control Building 2nd Floor

MD1-0-D-203-01-00204

Plumbing Plan for Central Control Building 3rd Floor

MD1-0-D-203-01-00205

Plumbing Plan for Central Control Building Roof

MD1-0-D-203-01-00301

Toilet Enlarged Plan for Central Control BLDG 2nd floor

MD1-0-D-203-01-00302

Toilet Enlarged Plan for Central Control BLDG 3rd floor

MD1-0-D-203-01-00303

Enlarged Plumbing Plan for Central Control Building Laboratory Room

MD1-0-D-203-21-00201

Plumbing P&I Diagram for Central Control Building

MD1-0-D-204-01-00201

Plumbing Plan for Coal Handling Control Building

MD1-0-D-204-01-00301

Enlarged Plumbing Plan for Coal Handling Control Building

MD1-0-D-205-01-00201

Plumbing Plan for Fuel Oil Pump House

MD1-0-D-205-01-00301

Enlarged Plumbing Plan for Fuel Oil Pump House

MD1-0-D-208-01-00201

Plumbing Plan for Ash Slurry Pump House

IC

MD1-0-D-208-01-00301

Enlarged Plumbing Plan for Ash Slurry Pump House

IC

MD1-0-D-212-01-00201

Plumbing plan for gaseous chlorination building

MD1-0-D-212-01-00301

Enlarged plumbing plan for gaseous chlorination building

MD1-0-D-215-21-00201

Plumbing P&I Diagram for Switchyard Control Building

MD1-0-D-216-01-00201

Plumbing Plan for Water Treatment BLDG

MD1-0-D-216-01-00301

Enlarged Plumbing Plan for Water Treatment BLDG

MD1-0-D-216-21-00201

Plumbing P&I Diagram for Water Treatment BLDG

MD1-0-D-250-01-00201

Plumbing Plan for Workshop Building

MD1-0-D-250-01-00301

Enlarged Plumbing Plan for Workshop Building

MD1-0-D-250-21-00201

Plumbing P&I Diagram for Workshop Building

MD1-0-D-252-01-00201

Plumbing Plan for I&C Electrical and Mechanical Warehouse

MD1-0-D-252-01-00301

Toilet Enlarged Plan for I&C Electrical and Mechanical Warehouse

MD1-0-D-252-21-00201

Plumbing P&I Diagram for I&C Electrical and Mechanical Warehouse

MD1-0-D-254-01-00201

Plumbing Plan for Administration Building Ground Floor

MD1-0-D-254-01-00202

Plumbing Plan for Administration Building 1st Floor

MD1-0-D-254-01-00203

Plumbing Plan for Administration Building 2nd Floor

MD1-0-D-254-01-00204

Plumbing Plan for Administration Building 3rd Floor

MD1-0-D-254-01-00205

Plumbing Plan for Administration Building Roof

MD1-0-D-254-01-00301

Enlarged Plumbing Plan for Administration Building Ground Floor (1/8)

MD1-0-D-254-01-00302

Enlarged Plumbing Plan for Administration Building Ground Floor (2/8)

MD1-0-D-254-01-00303

Enlarged Plumbing Plan for Administration Building 1st Floor (3/8)

MD1-0-D-254-01-00304

Enlarged Plumbing Plan for Administration Building 1st Floor (4/8)

MD1-0-D-254-01-00305

Enlarged Plumbing Plan for Administration Building 2nd Floor (5/8)

MD1-0-D-254-01-00306

Enlarged Plumbing Plan for Administration Building 2nd Floor (6/8)

MD1-0-D-254-01-00307

Enlarged Plumbing Plan for Administration Building 3rd Floor (7/8)

MD1-0-D-254-01-00308

Enlarged Plumbing Plan for Administration Building 3rd Floor (8/8)

MD1-0-D-254-21-00201

Plumbing P&I Diagram for Administration Building-1 (1 of 2)

MD1-0-D-254-21-00202

Plumbing P&I Diagram for Administration Building-1 (2 of 2)

MD1-0-D-254-21-00203

Plumbing P&I Diagram for Administration Building-2 (1 of 2)

MD1-0-D-254-21-00204

Plumbing P&I Diagram for Administration Building-2 (2 of 2)

MD1-0-D-255-01-00201

Portable Water Piping Plan for Common Service Building

MD1-0-D-255-01-00202

Sanitary Sewer & Vent Piping Plan for Common Service Building

MD1-0-D-255-21-00201

Plumbing P&I Diagram for Common Service Building

MD1-0-F-750-04-00001

Design Criteria for Fire Fighting & Fire Alarm System

MD1-0-F-750-06-00001

Fire Pump Sizing Calculation

MD1-0-F-750-06-00003

Clean Agent System hydraulic Calculation

MD1-0-F-750-21-00001

Drawing List for Fire Fighting System

MD1-0-F-750-21-00003

P&ID- Fire Water Distribution System

MD1-0-F-750-21-00004

P&ID- Indoor Hydrant System (Turbine Building)

MD1-0-F-750-21-00005

P&ID- Indoor Hydrant System (Unit 1A Boiler)

MD1-0-F-750-21-00006

P&ID- Indoor Hydrant System (Unit 1B Boiler)

MD1-0-F-750-21-00007

P&ID- Indoor Hydrant System (Unit 2A Boiler)

MD1-0-F-750-21-00008

P&ID- Indoor Hydrant System (Unit 2B Boiler)

MD1-0-F-750-21-00009

P&ID- Indoor Hydrant & Hose Reel System

MD1-0-F-750-21-00010

P&ID- Indoor Hydrant System (Coal Transfer tower)

MD1-0-F-750-21-00011

P&ID- Indoor Hydrant & Hose Reel System (Car Garage)

MD1-0-F-750-21-00012

P&ID- Indoor Hydrant & Hose Reel System (Switchyard Control House)

MD1-0-F-750-21-00013

P&ID- Sprinkler & Indoor Hydrant System (Control Bldg)

MD1-0-F-750-21-00014

P&ID- Sprinkler & Indoor Hydrant System (Administration Bldg)

MD1-0-F-750-21-00015

P&ID- Sprinkler & Indoor Hydrant & Hose Reel System (I&C Electrical & Mech.)

MD1-0-F-750-21-00016

P&ID- Water Spray & Sprinkler System (Turbine Bldg)

MD1-0-F-750-21-00017

P&ID- Water Spray System (Boiler Air Heaters)

MD1-0-F-750-21-00018

P&ID- Water Spray System (Boiler Burners)

MD1-0-F-750-21-00019

P&ID- Water Spray, Sprinkler & Hose Reel Sys. (Hydrogent Plant Building)

MD1-0-F-750-21-00020

P&ID- Water Spray System (Unit 1 Transformer Area)

MD1-0-F-750-21-00021

P&ID- Water Spray System (Unit 2 Transformer Area)

MD1-0-F-750-21-00022

P&ID- Water Spray System (Station Aux. Transfermer (110KV Switchyard area)

MD1-0-F-750-21-00023

P&ID- Water Spray System (Fuel Oil Storage & Diesel Oil Storage Tank)

MD1-0-F-750-21-00024

P&ID- Foam & Hose Reel System

MD1-0-F-750-21-00025

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys.

MD1-0-F-750-21-00026

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Control Bldg, Electronic)

MD1-0-F-750-21-00027

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Coal Handling Control)

MD1-0-F-750-21-00028

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Coal Handling Control & Equi

MD1-0-F-750-21-00029

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Hydrogen Plant)

MD1-0-F-750-21-00030

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Unit 1 ESP Control House)

MD1-0-F-750-21-00031

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Unit 2 ESP Control House)

MD1-0-F-750-23-00001

Fire Fighting Layout For Underground Piping (Overall)

MD1-0-F-750-23-00002

Fire Fighting Layout For Underground Piping (1/17)

MD1-0-F-750-23-00003

Fire Fighting Layout For Underground Piping (2/17)

MD1-0-F-750-23-00004

Fire Fighting Layout For Underground Piping (3/17)

MD1-0-F-750-23-00005

Fire Fighting Layout For Underground Piping (4/17)

MD1-0-F-750-23-00006

Fire Fighting Layout For Underground Piping (5/17)

MD1-0-F-750-23-00007

Fire Fighting Layout For Underground Piping (6/17)

MD1-0-F-750-23-00008

Fire Fighting Layout For Underground Piping (7/17)

MD1-0-F-750-23-00009

Fire Fighting Layout For Underground Piping (8/17)

MD1-0-F-750-23-00010

Fire Fighting Layout For Underground Piping (9/17)

MD1-0-F-750-23-00011

Fire Fighting Layout For Underground Piping (10/17)

MD1-0-F-750-23-00012

Fire Fighting Layout For Underground Piping (11/17)

MD1-0-F-750-23-00013

Fire Fighting Layout For Underground Piping (12/17)

MD1-0-F-750-23-00014

Fire Fighting Layout For Underground Piping (13/17)

MD1-0-F-750-23-00015

Fire Fighting Layout For Underground Piping (14/17)

MD1-0-F-750-23-00016

Fire Fighting Layout For Underground Piping (15/17)

MD1-0-F-750-23-00017

Fire Fighting Layout For Underground Piping (16/17)

MD1-0-F-750-23-00018

Fire Fighting Layout For Underground Piping (17/17)

MD1-0-F-750-23-00101

Fire Fighting Piping Plan for Steam Turbine Building (Ground Floor-1)

MD1-0-F-750-23-00102

Fire Fighting Piping Plan for Steam Turbine Building (Ground Floor-2)

MD1-0-F-750-23-00103

Fire Fighting Piping Plan for Steam Turbine Building (Mez Floor-1)

MD1-0-F-750-23-00104

Fire Fighting Piping Plan for Steam Turbine Building (Mez Floor-2)

MD1-0-F-750-23-00105

Fire Fighting Piping Plan for Steam Turbine Building (Operating Floor-1)

MD1-0-F-750-23-00106

Fire Fighting Piping Plan for Steam Turbine Building (Operating Floor-2)

MD1-0-F-750-23-00107

Fire Fighting Piping Plan for Boiler Unit 1A, 1B & 2B - 1

AC

MD1-0-F-750-23-00108

Fire Fighting Piping Plan for Boiler Unit 1A, 1B & 2B - 2

AC

MD1-0-F-750-23-00109

Fire Fighting Piping Plan for Boiler Unit 1A, 1B & 2B - 3

AC

MD1-0-F-750-23-00110

Fire Fighting Piping Plan for Boiler Unit 1A, 1B & 2B - 4

AC

MD1-0-F-750-23-00111

Fire Fighting Piping Plan for Boiler Unit 2A - 1

AC

MD1-0-F-750-23-00112

Fire Fighting Piping Plan for Boiler Unit 2A - 2

AC

MD1-0-F-750-23-00113

Fire Fighting Piping Plan for Boiler Unit 2A - 3

AC

MD1-0-F-750-23-00114

Fire Fighting Piping Plan for Boiler Unit 2A - 4

AC

MD1-0-F-750-23-00117

Fire Fighting Piping Plan for Central Control Building-Ground Floor

MD1-0-F-750-23-00118

Fire Fighting Piping Plan for Central Control Building- 1st Floor

MD1-0-F-750-23-00119

Fire Fighting Piping Plan for Central Control Building- 2nd Floor

MD1-0-F-750-23-00120

Fire Fighting Piping Plan for Central Control Building- 3rd Floor

MD1-0-F-750-23-00121

Fire Fighting Piping Plan for Central Control Bulding- Roof Floor

MD1-0-F-750-23-00122

Fire Fighting Piping Plan for Central ControlBuilding (Clean Agent System-1)

MD1-0-F-750-23-00123

Fire Fighting Piping Plan for Central Control Building (Clean Agent System-2)

MD1-0-F-750-23-00124

Fire Fighting Piping Plan for Central Control Building (Clean Agent System-3)

MD1-0-F-750-23-00125

Fire Fighting Piping Plan for Unit 1 Transformer

MD1-0-F-750-23-00126

Fire Fighting Piping Plan for Unit 1 Main Transformer-1

MD1-0-F-750-23-00127

Fire Fighting Piping Plan for Unit 1 Main Transformer-2

MD1-0-F-750-23-00128

Fire Fighting Piping Plan for Unit 1 Main Transformer-3

MD1-0-F-750-23-00129

Fire Fighting Piping Plan for Unit 1 Unit Aux, Transformer

MD1-0-F-750-23-00130

Fire Fighting Piping Plan for Unit 2 Transformer

MD1-0-F-750-23-00131

Fire Fighting Piping Plan for Unit 2 Main Transformer-1

MD1-0-F-750-23-00132

Fire Fighting Piping Plan for Unit 2 Main Transformer-2

MD1-0-F-750-23-00133

Fire Fighting Piping Plan for Unit 2 Main Transformer-3

MD1-0-F-750-23-00134

Fire Fighting Piping Plan for Unit 2 Unit Aux. Transformer

MD1-0-F-750-23-00135

Fire Fighting Piping Plan for Steam Turbine Building (Dirty Lube Oil Tank)

MD1-0-F-750-23-00136

Fire Fighting Piping Plan for Unit 1 esp Control & ash elec. Building

MD1-0-F-750-23-00137

Fire Fighting Piping Plan for Unit 2 esp Control & ash elec. Building

MD1-0-F-750-23-00138

Fire fighting piping plan for ash slurry pump house(ground floor)

MD1-0-F-750-23-00143

Fire Fighting Piping Plan for Water Treatment Building

MD1-0-F-750-23-00145

Fire Fighting Piping Plan for Fire Protection Pump House-1

MD1-0-F-750-23-00146

Fire Fighting Piping Plan for Fire Protection Pump House-2

MD1-0-F-750-23-00148

Fire Fighting Piping Plan for Limestone Storage Building

MD1-0-F-750-23-00149

Fire fighting piping plan for fuel oil pump house

MD1-0-F-750-23-00150

Fire fighting piping plan for fuel oil storage tank-1

MD1-0-F-750-23-00151

Fire fighting piping plan for fuel oil storage tank-2

MD1-0-F-750-23-00152

Fire fighting piping plan for diesel oil storage tank

MD1-0-F-750-23-00153

Fire fighting piping section & detail for fuel oil and diesel oil storage tank

MD1-0-F-750-23-00154

Fire fighting piping plan for dike area(air foam system)

MD1-0-F-750-23-00155

Fire fighting piping plan for fuel oil storage tank-1(air foam system)

MD1-0-F-750-23-00156

Fire fighting piping plan for fuel oil storage tank-2(air foam system)

MD1-0-F-750-23-00157

Fire fighting piping plan for diesel oil storage tank(air foam system)

MD1-0-F-750-23-00159

Fire fighting piping plan for workshop building

MD1-0-F-750-23-00160

Fire Extinguisher Location Plan for Bulldozer Garage

MD1-0-F-750-23-00161

Fire extinguisher location plan for coal handling control building

MD1-0-F-750-23-00162

Fire fighting piping plan for coal handling control building(clean agent system)

MD1-0-F-750-23-00163

Fire Fighting Piping Plan for Coal Receiving Tower TT-01

RT

MD1-0-F-750-23-00164

Fire Fighting Piping Plan for Coal Transfer Tower TT-02

RT

MD1-0-F-750-23-00165

Fire Fighting Piping Plan for Coal Transfer Tower TT-03

RT

MD1-0-F-750-23-00166

Fire Fighting Piping Plan for Coal Transfer Tower TT-04

RT

MD1-0-F-750-23-00167

Fire Fighting Piping Plan for Coal Crusher Tower TT-05

RT

MD1-0-F-750-23-00168

Fire Fighting Piping Plan for Coal Transfer Tower TT-06

RT

MD1-0-F-750-23-00169

Fire Fighting Piping Plan For I&C Electrical & Mechanical Warehouse

MD1-0-F-750-23-00170

Fire Fighting Piping Plan For Common Service Building

MD1-0-F-750-23-00171

Fire Fighting Piping Plan for Administration Building (Ground Floor)

MD1-0-F-750-23-00172

Fire Fighting Piping Plan for Administration Building (1st Floor)

MD1-0-F-750-23-00173

Fire Fighting Piping Plan for Administration Building (2nd Floor)

MD1-0-F-750-23-00174

Fire Fighting Piping Plan for Administration Building (3rd Floor)

MD1-0-F-750-23-00175

Fire Fighting Piping Plan for Administration Building (4th Floor)

MD1-0-F-750-23-00178

Fire Fighting Piping Plan for car Garage-3

MD1-0-F-750-23-00179

Fire Extinguisher Location Plan for Motorcycle & Bicycle Shed

MD1-0-F-750-23-00181

Fire Fighting Piping Plan for Switchyard Control House (Ground Floor)

MD1-0-F-750-23-00182

Fire Fighting Piping Plan for Switchyard Control House (1st Floor)

MD1-0-F-750-23-00183

Fire Fighting Piping Plan for Switchyard Control House (Clean Agent System-1)

MD1-0-F-750-23-00184

Fire Fighting Piping Plan for Switchyard Control House (Clean Agent System-2)

MD1-0-F-750-23-00185

Fire Fighting Piping Plan for Station Aux. Transformer (110KV Switchyard Area)

MD1-0-F-750-23-00186

Fire Extinguisher Location Plan for Cooling Water Pump House

MD1-0-F-750-23-00187

Fire Extinguisher Location Plan for Gasous Chlorination Building

MD1-0-F-750-23-00189

Fire Extinguisher Location Plan for Fuel Oil Unloading Pump House

MD1-0-F-750-23-00190

Fire Extinguisher Location Plan for Return Water Pump House

MD1-0-F-750-23-00191

Fire fighting piping plan for diesel generator house

MD1-0-F-750-23-00192

Fire Fighting Piping Plan for Unit 1 esp Control & ash elec. bldg(Clean agent)

MD1-0-F-750-23-00193

Fire Fighting Piping Plan for Unit 2 esp Control & ash elec. bldg(Clean agent)

MD1-0-F-750-23-00196

Standard Detail-1

AC

MD1-0-F-750-23-00197

Standard Detail-2

AC

MD1-0-F-750-23-00198

Pipe support detail

MD1-0-F-750-23-00199

Fire extinguisher location plan for ash slurry pump house(first floor)

MD1-0-F-750-24-00101

Fire Fighting Piping Isometric drawing for Underground Piping

MD1-0-F-750-24-00107

Fire Fighting Piping Isometric drawing for Central Control Building

MD1-0-F-750-24-00128

Fire Fighting Piping Isometric drawing for Common Service Building

MD1-0-F-750-24-00129

Fire Fighting Piping Isometric drawing for Administration Building

MD1-0-F-750-24-00134

Fire Fighting Piping Isometric drawing for Switchyard Control House

MD1-0-H-201-01-00201

HVAC Plan for Steam Turbine Building Ground Floor (1/2)

MD1-0-H-201-01-00202

HVAC Plan for Steam Turbine Building Ground Floor (2/2)

MD1-0-H-201-01-00203

HVAC Plan for Steam Turbine Building Mezzanine Floor (1/2)

MD1-0-H-201-01-00204

HVAC Plan for Steam Turbine Building Mezzanine Floor (2/2)

MD1-0-H-201-01-00205

HVAC Plan for Steam Turbine Building Operation Floor (1/2)

MD1-0-H-201-01-00206

HVAC Plan for Steam Turbine Building Operation Floor (2/2)

MD1-0-H-201-01-00207

HVAC Plan for Steam Turbine Building Roof (1/2)

MD1-0-H-201-01-00208

HVAC Plan for Steam Turbine Building Roof (2/2)

MD1-0-H-201-01-00209

Enlarged HVAC Plan for Steam Turbine Building AVR Room-1,2

MD1-0-H-201-01-00210

Enlarged HVAC Plan for Steam Turbine Building Sampling Room-1,2

MD1-0-H-201-08-00101

Equipment List for Steam Turbine Building

MD1-0-H-201-21-00201

HVAC P&I Diagram for Steam Turbine Building

MD1-0-H-203-01-00201

HVAC Plan for Central Control Building Ground Floor- Duct

MD1-0-H-203-01-00202

HVAC Plan for Central Control Building 1st Floor- Duct

MD1-0-H-203-01-00203

HVAC Plan for Central Control Building 2nd Floor- Duct

MD1-0-H-203-01-00204

HVAC Plan for Central Control Building 3rd Floor- Duct

MD1-0-H-203-01-00205

HVAC Plan for Central Control Building Roof- Duct

MD1-0-H-203-01-00206

HVAC Enlarged Plan for Central Control Building HVAC Room-1

MD1-0-H-203-01-00207

HVAC Enlarged Plan for Central Control Building HVAC Room-2

MD1-0-H-203-01-00208

HVAC Enlarged Plan for Central Control Building 2nd Floor-Piping

MD1-0-H-203-01-00209

HVAC Plan for Central Control Building 3rd Floor- Piping

MD1-0-H-203-01-00210

HVAC Plan for Central Control Building Roof- Piping

MD1-0-H-203-08-00101

Equipment List for Central Control Building-1

MD1-0-H-203-08-00102

Equipment List for Central Control Building-2

MD1-0-H-203-21-00201

HVAC P&I Diagram for Central Control Building-Duct (1/4)

MD1-0-H-203-21-00202

HVAC P&I Diagram for Central Control Building-Duct (2/4)

MD1-0-H-203-21-00203

HVAC P&I Diagram for Central Control Building-Duct (3/4)

MD1-0-H-203-21-00204

HVAC P&I Diagram for Central Control Building-Duct (4/4)

MD1-0-H-203-21-00205

HVAC P&I Diagram for Central Control Building-Piping

MD1-0-H-204-01-00201

HVAC Plan for Coal Handling Control Building Ground Floor

MD1-0-H-204-08-00101

Equipment List for Coal Handling Control Building

MD1-0-H-204-21-00201

HVAC P&I Diagram for Coal handling Control Building

MD1-0-H-205-01-00201

HVAC Plan for Fuel Oil Pump House Ground Floor

MD1-0-H-205-01-00202

HVAC Plan for Fuel Oil Pump House Ground Floor

MD1-0-H-205-08-00101

Equipment List for Fuel Oil Pump House

MD1-0-H-205-21-00201

HVAC P&I Diagram for Fuel Oil Pump House

MD1-0-H-207-01-00201

HVAC P&I Diagram for Fire Protection Pump House Ground Floor Duct Plan

MD1-0-H-207-08-00101

Equipment List for Fire Protection Pump House

MD1-0-H-207-21-00201

HVAC P&I Diagram for Fire Protection Pump House

MD1-0-H-208-01-00201

Hvac plan for ash slurry pump house ground floor

MD1-0-H-208-01-00202

Hvac plan for ash slurry pump house crane runway floor

MD1-0-H-208-01-00203

Hvac plan for ash slurry pump house first floor

MD1-0-H-208-08-00101

Equipment list for ash slurry pump house

MD1-0-H-208-21-00201

Hvac p&i diagram for ash slurry pump house

MD1-0-H-209-01-00201

HVAC Plan for ESP Control & ASH Elec. Building-1 Ground Floor

MD1-0-H-209-01-00202

HVAC Plan for ESP Control & ASH Elec. Building-1 First Floor

MD1-0-H-209-01-00203

HVAC Plan for ESP Control & ASH Elec. Building-1 Roof

MD1-0-H-209-01-00204

HVAC Plan for ESP Control & ASH Elec. Building-2 Ground Floor

MD1-0-H-209-01-00205

HVAC Plan for ESP Control & ASH Elec. Building-2 First Floor

MD1-0-H-209-01-00206

HVAC Plan for ESP Control & ASH Elec. Building-2 Roof

MD1-0-H-209-08-00101

Equipment List for ESP Control & ASH Elec. Building-1

MD1-0-H-209-08-00102

Equipment List for ESP Control & ASH Elec. Building-2

MD1-0-H-209-21-00201

HVAC P&I Diagram for ESP Control & ASH Elec.Building-1

MD1-0-H-209-21-00202

HVAC P&I Diagram for ESP Control & ASH Elec. Building-2

MD1-0-H-210-01-00201

Hvac plan for diesel generator house ground floor

MD1-0-H-210-01-00202

Hvac plan for diesel generator house roof

MD1-0-H-210-08-00101

Equipment list for diesel generator house

MD1-0-H-210-21-00201

Hvac p&i diagram for diesel generator house

MD1-0-H-211-01-00201

Hvac plan for cooling water pump house ground floor

MD1-0-H-211-01-00202

Hvac plan for cooling water pump house roof

MD1-0-H-211-08-00101

Equipment list for cooling water pump house

MD1-0-H-211-21-00201

Hvac p&i diagram for cooling water pump house

MD1-0-H-212-01-00201

HVAC Plan for Gaseous Chlorination Building Ground Floor

MD1-0-H-212-01-00202

HVAC Plan for Gaseous Chlorination Building Roof

MD1-0-H-212-08-00101

Equipment List for Gaseous Chlorination Building

MD1-0-H-212-21-00201

HVAC P&I Diagram for Gaseous Chlorination Building

MD1-0-H-213-01-00201

Hvac plan for fuel unloading pump house ground floor

MD1-0-H-213-01-00202

Hvac plan for fuel unloading pump house roof

MD1-0-H-213-08-00101

Equipment list for fuel oil unloading pump house

MD1-0-H-213-21-00201

Hvac p&i diagram for fuel oil unloading pump house

MD1-0-H-215-01-00201

HVAC Plan for Switchyard Control Building Ground Floor

MD1-0-H-215-01-00202

HVAC Plan for Switchyard Control Building 1st Floor

MD1-0-H-215-01-00203

HVAC Plan for Switchyard Control Building Roof

MD1-0-H-215-08-00101

Equipment List for Switchyard Control Building

MD1-0-H-215-21-00201

HVAC P&I Diagram for Switchyard Control Building

MD1-0-H-216-01-00201

HVAC Plan for Water Treatment BLDG Ground Floor

MD1-0-H-216-01-00202

HVAC Plan for Water Treatment BLDG Roof

MD1-0-H-216-01-00203

HVAC Plan for Water Treatment Area Waste Water Pond Pump Room

MD1-0-H-216-08-00101

Equipment List for Water Treatment Building

MD1-0-H-216-21-00201

HVAC P&I Diagram for Water Treatment Building

MD1-0-H-217-01-00201

HVAC Plan for Limestone Handling SYS. Control Building Ground Floor

MD1-0-H-217-08-00101

Equipment List for Limestone Handling SYS. Control Building

MD1-0-H-217-21-00201

HVAC P&I Diagram for Limestone Handling SYS. Control Building

MD1-0-H-219-01-00201

Hvac plan for limestorne storage shed. ground floor

MD1-0-H-219-01-00202

Hvac plan for limestorne storage shed. roof

MD1-0-H-219-08-00101

Equipment list for limestorne storage shed

MD1-0-H-219-21-00201

Hvac p&i diagram for limestorne storage shed

MD1-0-H-250-01-00201

HVAC Plan for Workshop Building Ground Floor

MD1-0-H-250-01-00202

HVAC Plan for Workshop Building Roof

MD1-0-H-250-08-00101

Equipment List for Workshop Building

MD1-0-H-250-21-00201

HVAC P&I Diagram for Workshop Building

MD1-0-H-251-01-00201

HVAC Plan for Bulldozer Garage

MD1-0-H-252-01-00201

HVAC Plan for I&C Electrical and Mechnical Warehouse Ground Floor

MD1-0-H-252-01-00202

HVAC Plan for I&C Electrical and Mechnical Warehouse Roof Plan

MD1-0-H-252-08-00101

Equipment List for I&C Electrical & Mechnical Warehouse

MD1-0-H-252-21-00201

HVAC P&I Diagram for I&C Electrical & Mechanical Warehouse

MD1-0-H-254-01-00201

HVAC Plan for Administration Building Ground Floor- Duct

MD1-0-H-254-01-00202

HVAC Plan for Administration Building 1st Floor- Duct

MD1-0-H-254-01-00203

HVAC Plan for Administration Building 2nd Floor- Duct

MD1-0-H-254-01-00204

HVAC Plan for Administration Building 3rd Floor- Duct

MD1-0-H-254-01-00205

HVAC Plan for Administration Building 4th Floor- Duct

MD1-0-H-254-01-00206

HVAC Plan for Administration Building Roof- Duct

MD1-0-H-254-01-00207

HVAC Plan for Administration Building Auditorium Floor- Duct

MD1-0-H-254-01-00208

HVAC Plan for Administration Building Auditorium Roof- Duct

MD1-0-H-254-01-00301

HVAC Plan for Administration Building Ground Floor- Piping

MD1-0-H-254-01-00302

HVAC Plan for Administration Building 1st Floor- Piping

MD1-0-H-254-01-00303

HVAC Plan for Administration Building 2nd Floor- Piping

MD1-0-H-254-01-00304

HVAC Plan for Administration Building 3rd Floor- Piping

MD1-0-H-254-01-00305

HVAC Plan for Administration Building 4th Floor- Piping

MD1-0-H-254-01-00306

HVAC Plan for Administration Building Auditorium Floor- Piping

MD1-0-H-254-01-00307

HVAC Plan for Administration Building Auditorium Roof- Piping

MD1-0-H-254-01-00401

HVAC Room-1 Enlarged Duct Plan for Administration Building

MD1-0-H-254-01-00402

HVAC Room-2 Enlarged Duct Plan for Administration Building

MD1-0-H-254-01-00501

HVAC Room-1 Enlarged Piping Plan for Administration Building

MD1-0-H-254-01-00502

HVAC Room-2 Enlarged Piping Plan for Administration Building

MD1-0-H-254-08-00101

Equipment List for Administration Building-1

MD1-0-H-254-08-00102

Equipment List for Administration Building-2

MD1-0-H-254-08-00103

Equipment List for Administration Building-3

MD1-0-H-254-21-00201

HVAC P&I Diagram for Administration Building- Duct (1/5)

MD1-0-H-254-21-00202

HVAC P&I Diagram for Administration Building- Duct (2/5)

MD1-0-H-254-21-00203

HVAC P&I Diagram for Administration Building- Duct (3/5)

MD1-0-H-254-21-00204

HVAC P&I Diagram for Administration Building- Duct (4/5)

MD1-0-H-254-21-00205

HVAC P&I Diagram for Administration Building- Duct (5/5)

MD1-0-H-254-21-00206

HVAC P&I Diagram for Administration Building- Piping

MD1-0-H-255-01-00201

HVAC Plan for Common Service Building Ground Floor

MD1-0-H-255-01-00202

HVAC Plan for Common Service Building Roof

MD1-0-H-255-08-00201

Equipment List 1- for Common Service Building

MD1-0-H-255-08-00202

Equipment List 2- for Common Service Building

MD1-0-H-255-21-00201

HVAC P&I Diagram for Common Service Building

MD1-0-H-257-01-00201

HVAC Plan for Car Garage-1,2,3

MD1-0-H-710-04-00101

Design Criteria for HVAC system

MD1-0-H-710-06-00201

HVAC Load Calculation for Steam Turbine Building

MD1-0-H-710-06-00204

HVAC Load Calculation for Coal Handling Control Building

MD1-0-H-710-06-00205

HVAC Load Calculation for Fuel Oil Pump House

MD1-0-H-710-06-00208

Hvac load calculation for diesel generator house

MD1-0-H-710-06-00209

HVAC Load Calculation for ESP Control & ASH Elec. Building-1,2

MD1-0-H-710-06-00210

Hvac load calculation for ash slurry pump hosue

MD1-0-H-710-06-00211

HVAC Load Calculation for Central Control Building

MD1-0-H-710-06-00212

HVAC Load Calculation for Gaseous Chlorination Building

MD1-0-H-710-06-00215

HVAC Load Calculation for Switchyard Control House

MD1-0-H-710-06-00217

HVAC Load Calculation for Limestone Handling SYS. Control Building

MD1-0-H-710-06-00221

HVAC Load Calculation for Water Treatment Building

MD1-0-H-710-06-00250

HVAC Load Calculation for Workshop Building

MD1-0-H-710-06-00254

HVAC Load Calculation for Administration Building

MD1-0-H-710-06-00255

HVAC Load Calculation for Common Service Building

MD1-0-H-710-06-00256

HVAC Load Calculation for I&C Electrical & Mechanical Warehouse

MD1-0-H-710-08-00001

Drawing List for HVAC & Plumbing System

MD1-0-H-710-08-00002

Symbol & Legend & Abbreviation for HVAC System

MD1-0-H-710-08-00003

Symbol & Legend & Abbreviation for Plumbing System

MD1-0-H-710-11-00001

General Standard Detail for HVAC Duct (1/4)

MD1-0-H-710-11-00002

General Standard Detail for HVAC Duct (2/4)

MD1-0-H-710-11-00003

General Standard Detail for HVAC Duct (3/4)

MD1-0-H-710-11-00004

General Standard Detail for HVAC Duct (4/4)

MD1-0-H-710-11-00011

General Standard Detail for HVAC Piping (1/2)

MD1-0-H-710-11-00012

General Standard Detail for HVAC Piping (2/2)

MD1-0-H-710-11-00021

General Standard Detail for Plumbing

MD1-0-M-130-03-00001

System Description- Circulating Water System

MD1-0-M-130-06-00001

Calculation- Circulating Water System

MD1-0-M-130-07-00001

Report for CW System Surge Analysis

MD1-0-M-130-21-00011

P & I Diagram- Circulating Water System (1/4)

MD1-0-M-130-21-00012

P & I Diagram- Circulating Water System (2/4)

MD1-0-M-130-21-00013

P & I Diagram- Circulating Water System (3/4)

MD1-0-M-130-21-00014

P & I Diagram- Circulating Water System (4/4)

MD1-0-M-130-22-00011

Flow Diagram- Circulating Water System (1/2)

MD1-0-M-130-22-00012

Flow Diagram- Circulating Water System (2/2)

MD1-0-M-130-22-00021

Flow Diagram- Aux. Cooling Water System

MD1-0-M-140-06-00001

Calculation- Closed Cooling Water System

MD1-0-M-140-21-00011

P & I Diagram- Closed Cooling Water System(1/4)

RT

MD1-0-M-140-21-00012

P & I diagram - closed cooling water system (2/4)

MD1-0-M-140-21-00013

P & I diagram - closed cooling water system (3/4)

MD1-0-M-140-21-00014

P & I diagram - closed cooling water system (4/4)

MD1-0-M-140-21-00021

P & I Diagram- Service Water Distribution System

MD1-0-M-140-21-00022

P & I Diagram- Demin. Water Distribution System

MD1-0-M-140-21-00023

P & I Diagram- Filtered Water Distribution System

MD1-0-M-140-22-00011

Flow Diagram- Closed Cooling NG Water System

MD1-0-M-150-06-00001

Calculation- Compressed Air System

MD1-0-M-150-21-00021

P & I Diagram- Instrument Air Distribution System

MD1-0-M-150-21-00031

P & I Diagram- Service Air Distribution System

MD1-0-M-150-21-00051

P & I Diagram- N2 Gas System

MD1-0-M-150-22-00011

Flow Diagram- Compressed Air Supply System

MD1-0-M-160-21-00011

P & I Diagram- Heavy Fuel Oil Unloading System

MD1-0-M-160-21-00012

P & I Diagram- Heavy Fuel Oil Supply System (1/2)

MD1-0-M-160-21-00013

P & I Diagram- Heavy Fuel Oil Supply System (2/2)

AC

MD1-0-M-160-21-00014

P & I Diagram- Heavy Fuel Oil Drain System

MD1-0-M-160-21-00015

P & I Diagram- HFO Heating Steam System

MD1-0-M-160-21-00021

P & I Diagram- Diesel Oil System

MD1-0-M-160-21-00030

P & I Diagram - Steam Coil Air Heater Drain System (1/2)

MD1-0-M-160-21-00031

P & I Diagram- Steam Coil Air Heater System (2/2)

MD1-0-M-160-22-00011

Flow Diagram- Heavy Fuel Oil Unloading System

MD1-0-M-160-22-00012

Flow Diagram- Heavy Fuel Oil Supply System

MD1-0-M-160-22-00013

Flow Diagram- HFO Heating Steam System

MD1-0-M-160-22-00021

Flow Diagram- Diesel Oil System

MD1-0-M-170-22-00011

Flow Diagram- Coal handling System

MD1-0-M-170-22-00021

Flow Diagram- Bottom Ash Handling System

MD1-0-M-170-22-00022

Flow Diagram- Fly Ash Handling System

MD1-0-M-170-22-00023

Flow Diagram- Ash Slurry Disposal and Water Return System

MD1-0-M-170-22-00024

Flow Diagram- Sand Filling and Bed Ash Rebedding System

MD1-0-M-170-22-00031

Flow Diagram- Limestone Handling System

MD1-0-M-170-22-00032

Flow Diagram- Limestone Grinding System

MD1-0-M-171-06-00001

Calculation- Coal Handling System

MD1-0-M-172-06-00001

Calculation- Limestone Handling System

MD1-0-M-173-06-00001

Calculation- Ash Handling System

MD1-0-M-180-06-00001

Calculation for Field Erected Tank Capacity

MD1-0-M-180-21-00011

P & I Diagram- Oily Waste Drainage System

MD1-0-M-180-21-00012

P & I Diagram- Oily Waste Drainage System (2 of 2)

MD1-0-M-180-21-00021

P & I Diagram- Chemical Waste Drainage System (1/3)

MD1-0-M-180-21-00022

P & I Diagram- Chemical Waste Drainage System (2/3)

MD1-0-M-180-21-00023

P & I Diagram- Chemical Waste Drainage System (3/3)

MD1-0-M-180-21-00024

P & i diagram - coal transfer tower area drainage system

MD1-0-M-180-21-00025

P & i diagram - limestone transfer tower area drainage system

MD1-0-M-180-21-00031

P & I Diagram- Seawater Drainage System

MD1-0-M-180-21-00041

P & I Diagram- Dirty Oil Transfer System

MD1-0-P-151-24-00001

Piping Isometric Drawing - Instrument Air System

MD1-0-P-151-24-00011

Piping Isometric Drawing - Service Air System

MD1-0-P-153-24-00001

Piping Isometric Drawing - N2 Gas Distribution System

MD1-0-P-165-24-00001

Piping isometric drawing - fuel oil system

MD1-0-P-400-23-00001

Pipe Arrangement & Support Location Drawing Index

MD1-0-P-413-01-00001

General Arrangement Drawing- Ash Slurry Pump House & Ash Silo, Mixing Tanks Area

MD1-0-P-413-23-00001

Pipe Arrangement & Support Location Drawing - Fly Ash Silo and Mixing Tank Area

MD1-0-P-415-01-00001

General Arrangement Drawing-Aux. Boiler & Service Gas(CO2/N2) Storage Shelter

MD1-0-P-425-01-00001

General Arrangement Drawing- Diesel Generator House

MD1-0-P-435-01-00001

General Arrangement Drawing- Coal Yard Area

MD1-0-P-440-01-00001

General Arrangement Drawing- Water Treatment & Water Storage Tanks Area

MD1-0-P-440-23-00001

Pipe arrangement & support location drawing - water treatment area (1/2)

IC

MD1-0-P-440-23-00002

Pipe arrangement & support location drawing - water treatment area (2/2)

IC

MD1-0-P-445-01-00001

General Arrangement Drawing- Fuel Oil Tanks Area

MD1-0-P-445-23-00001

Pipe arrangement & support location drawing - fuel oil storage tanks & transfer)

MD1-0-P-445-23-00002

Pipe arrangement & support location drawing - fuel oil storage tanks & transfer)

MD1-0-P-450-01-00001

General Arrangement Drawing- Cooling Water Pump House & Gaseous Chlorination BLG

MD1-0-P-470-01-00001

General Arrang. Drawing- Fuel Oil Unload. Pump House & Limestone Unload Jetty

MD1-0-P-475-07-00001

Stress Analysis Report - Ash Slurry Pipe for MD2 Discharge Canal

MD1-0-P-475-23-00001

Pipe arrangement & support location drawing - yard area (1)

MD1-0-P-475-23-00002

Pipe arrangement & support location drawing - yard area (2)

MD1-0-P-475-23-00003

Pipe arrangement & support location drawing - yard area (3)

MD1-0-P-475-23-00004

Pipe arrangement & support location drawing - yard area (4)

MD1-0-P-475-23-00005

Pipe arrangement & support location drawing - yard area (5)

MD1-0-P-475-23-00006

Pipe arrangement & support location drawing - yard area (6)

MD1-0-P-475-23-00007

Pipe arrangement & support location drawing - yard area (7)

MD1-0-P-475-23-00008

Pipe arrangement & support location drawing - yard area (8)

MD1-0-P-475-23-00009

Pipe arrangement & support location drawing - yard area (9)

MD1-0-P-475-23-00010

Pipe arrangement & support location drawing - yard area (10)

MD1-0-P-475-23-00011

Pipe Arrangement & Support Location Drawing - Yard Area (11)

MD1-0-P-475-23-00012

Pipe Arrangement & Support Location Drawing - Yard Area (12)

MD1-0-P-475-23-00013

Pipe Arrangement & Support Location Drawing - Yard Area (13)

MD1-0-P-475-57-00001

Pipe loading for sleeper(1/14)

MD1-0-P-475-57-00002

Pipe loading for sleeper(2/14)

MD1-0-P-475-57-00003

Pipe loading for sleeper(3/14)

MD1-0-P-475-57-00004

Pipe loading for sleeper(4/14)

MD1-0-P-475-57-00005

Pipe loading for sleeper(5/14)

MD1-0-P-475-57-00006

Pipe loading for sleeper(6/14)

MD1-0-P-475-57-00007

Pipe loading for sleeper(7/14)

MD1-0-P-475-57-00008

Pipe loading for sleeper(8/14)

MD1-0-P-475-57-00009

Pipe loading for sleeper(9/14)

MD1-0-P-475-57-00010

Pipe loading for sleeper(10/14)

MD1-0-P-475-57-00011

Pipe loading for sleeper(11/14)

MD1-0-P-475-57-00012

Pipe loading for sleeper(12/14)

MD1-0-P-475-57-00013

Pipe loading for sleeper(13/14)

MD1-0-P-475-57-00014

Pipe loading for sleeper(14/14)

MD1-0-P-480-23-00001

Pipe Arrangement & Support Location Drawing - Yard Pipe Rack (1/5)

MD1-0-P-480-23-00002

Pipe Arrangement & Support Location Drawing - Yard Pipe Rack (2/5)

MD1-0-P-480-23-00003

Pipe Arrangement & Support Location Drawing - Yard Pipe Rack (3/5)

MD1-0-P-480-23-00004

Pipe Arrangement & Support Location Drawing - Yard Pipe Rack (4/5)

MD1-0-P-480-23-00005

Pipe Arrangement & Support Location Drawing - Yard Pipe Rack (5/5)

MD1-0-P-480-57-00001

Pipe loading for pipe rack(1/2)

MD1-0-P-480-57-00002

Pipe loading for pipe rack(2/2)

MD1-0-P-490-23-00001

Pipe arrangement & support location drawing - diesel oil storage tank area

MD1-0-P-821-24-00001

Piping Isometric Drawing - Demi Water System

MD1-0-P-831-24-00001

Piping Isometric Drawing - Potable Water System

MD1-0-P-832-24-00001

Piping Isometric Drawing - Service Water System

MD1-0-P-861-24-00001

Piping Isometric Drawing - Gaseous Chlorination System

MD1-0-P-871-24-00001

Piping Isometric Drawing - Sewage Treatment System

MD1-0-T-030-05-00070

ITP for Field Erected Tank

MD1-0-T-030-05-00071

ITP for Steel Structure Erection

MD1-0-T-030-05-00073

ITP for Under Ground Piping

MD1-0-T-030-05-00120

ITP for UG Piping of HDPE

MD1-0-T-030-05-00241

Inspection & Test Plan for HVAC Duct Works

MD1-0-T-030-05-00242

Inspection & Test Plan for Plumbing and Piping of Building

MD1-0-T-030-05-00458

ITP for Bulk Handling system

AC

MD1-0-T-052-07-00257

Material Approval Request for Paint (KCC)

RT

MD1-0-T-053-05-00121

Method Statement for Field erected tank

MD1-0-T-053-05-00126

Method Statement for Crane & Hoist

MD1-0-T-053-05-00146

Method Statement for Steel Structure Packing (DAEJOO)

IC

MD1-0-T-053-05-00147

Method Statement for Inspection & Test (DAEJOO)

MD1-0-T-053-05-00175

Method statement for tower crane

MD1-0-T-053-05-00185

Method statement for coal handling system

IC

MD1-0-T-053-05-00256

Method Statement for Steel Structure Galvanizing (DAEJOO)

IC

MD1-0-T-053-05-00267

Method Statement for Bolt Tightening

MD1-0-T-053-05-00372

Method statement for field erected tank painting work

MD1-0-T-053-07-00231

Material Approval Request for Steel Structure Paint (International Paint Korea)

AC

MD1-0-T-053-07-00253

Material Approval Request for Bolt

AC

MD1-0-T-053-07-00265

Material Approval Request for PEB Paint

RT

MD1-0-T-053-07-00281

Material Approval Request for PEB Steel Plate (Kirby)

RT

MD1-0-T-053-07-00282

Material Approval Request for PEB Cold Formed Sections (Kirby)

AC

MD1-0-T-053-07-00284

Material Approval Request for PEB Circular Hollow Section (Kirby)

RT

MD1-0-T-053-07-00336

Material Approval Request for Paint (Underside Surface of Tank Bottom Plate)

MD1-0-T-054-05-00270

Procedure of Job Site Lamination Joint For GRP Pipes

MD1-0-T-054-05-00335

NSTRUCITON For GRP MATERIAL INDUCTION AND LAMINATION TRAINING

MD1-0-T-054-05-00434

painting packing and transportation of pipe spool

IC

MD1-0-T-054-07-00371

Material approval request for paint (ag fire fighting piping system)

MD1-0-T-057-05-00216

Method Statement of HVAC Duct Works

MD1-0-T-057-05-00217

Method Statement of Plumbing Work

MD1-0-T-057-05-00218

Method Statement of Refrigerant Piping Works

MD1-0-T-057-07-00153

Material Approval Request for U-PVC (BINH MINH)

MD1-0-T-057-07-00235

Material Approval Request for Duct Fiture (HVAC, Samkwang)

RT

MD1-0-T-057-07-00236

Material Approval Request for SR Joint (HVAC, Seowon)

AC

MD1-0-T-057-07-00239

Material Approval Request for Pipe Fitting (HVAC, Hanwool)

RT

MD1-0-T-057-07-00271

Material Approval Request for Copper Tube Pipe (Nung Won)

MD1-0-T-057-07-00272

Material Approval Request for Copper Tube Pipe Fitting (Jung Woo)

MD1-0-T-057-07-00274

Material Approval Request for Galvanized Steel Sheet (POSCO)

AC

MD1-0-T-057-07-00293

Material Approval Request for Insulation (KCC)

AC

MD1-0-T-057-07-00299

Material Approval Request for HVAC Valve (HS VALVE)

RT

MD1-0-T-057-07-00317

Material Approval Request for HVAC Butterfly Valve (Jeong Do)

RT

MD1-0-T-057-07-00318

Material Appoval Request for Sound Attenuator (NSV)

MD1-0-T-057-07-00319

Material Approval Request for U-PVC (Tien Phong)

RT

MD1-0-T-057-07-00322

Material Approval Request for Flexible Duct Hose (DAEHAN F&S)

RT

MD1-0-T-750-04-00041

Fire Fighting System & Fire Alarm System Design Basis

MD1-0-V-111-09-00407

H2&CO2 Gas System Design Data

MD1-0-V-113-10-00045

Condenser - cw expansion joint datasheet

MD1-0-V-115-05-00009

Deaerator and storage tank, nde procedure

MD1-0-V-121-05-00012

Inspection and Test Procedure for Fluid Coupling

MD1-0-V-122-08-00014

Sub-Supplier List for Condensate Extraction Pump

MD1-0-V-131-01-00001

Mechanical Outline Drawing For CWP

MD1-0-V-131-01-00003

Sectional Drawing

MD1-0-V-131-01-00004

Piping Arrangement Drawing for Circulating Water Pumps

MD1-0-V-131-02-00001

Shop test and inspection plan for circulating water pumps

AC

MD1-0-V-131-03-00001

System Design and Operational Description

RT

MD1-0-V-131-05-00002

Hydrostatic Test Procedure for Circulating Water Pumps

MD1-0-V-131-05-00004

Liquid Penetrant Examination Procedure for Welds

MD1-0-V-131-05-00005

Site Installtion Procedure

IC

MD1-0-V-131-05-00006

Factory acceptance test procedures

MD1-0-V-131-05-00007

Quality assurance manual for circulating water pumps

MD1-0-V-131-05-00008

Painting procedure

MD1-0-V-131-05-00009

Circulating Water Pumphouse Hydraulic Model Test Procedure

MD1-0-V-131-05-00010

WPS and PQR for Circulating Water Pumps

MD1-0-V-131-05-00011

Liquid Penetrant Examination Procedure for Castings

MD1-0-V-131-05-00015

Repair Welding Procedure for Casings

MD1-0-V-131-07-00005

Circulating Water Pumphouse Hydraulic Model Test Report

IC

MD1-0-V-131-08-00002

Sub-Supplier List for Circulating Water Pumps

MD1-0-V-131-08-00015

Welder Qualification Record for Circulating Water Pumps

MD1-0-V-131-08-00029

Packing Procedure

IC

MD1-0-V-131-09-00002

Technical data sheet for circulating water pump

MD1-0-V-131-10-00001

Mechanical Outline Drawing for CWP

MD1-0-V-131-10-00009

Site Erection and Installtion Drawing

IC

MD1-0-V-131-11-00001

Name plate drawing with engraving details

MD1-0-V-131-11-00004

Bearing drawing with cooling water system technical data

MD1-0-V-131-11-00006

Detail of coupling parts

MD1-0-V-131-21-00001

Piping and Instrument Diagram for CWP

MD1-0-V-132-02-00063

Sea water intake facility - piping material classification

MD1-0-V-132-03-00009

Sea water intake facility - system description

MD1-0-V-132-05-00037

Welding Book for Seawater Intake Facilities

MD1-0-V-132-05-00038

Quality inspection and test plan for seawater intake facilities

MD1-0-V-132-05-00041

Sea Water Intake Facility - Method Statement for Sea Water Intake Facility

MD1-0-V-132-08-00002

Sea water intake facility - utility consumption list

MD1-0-V-132-08-00005

Sea Water Intake Facility - Supplier List

MD1-0-V-132-08-00032

Sea water intake facility - valve list

MD1-0-V-132-08-00040

Sea water intake facility - painting procedure

MD1-0-V-132-08-00050

Sea Water Intake Facility - Commissioning Spare Parts List

MD1-0-V-132-09-00008

Sea water intake facility - equipment data sheet

MD1-0-V-132-09-00084

Sea Water Intake Facility - Screen Wash Pump Curves & Data Sheet

MD1-0-V-132-10-00012

Travelling trash rack rake - monorail assembly

MD1-0-V-132-10-00018

Sea water intake facility - stop log guide scraper assembly

MD1-0-V-132-10-00021

Trash and waste transport system assembly

MD1-0-V-132-10-00022

Stop logs storage assembly

MD1-0-V-132-10-00023

Sea water intake facility - trash and waste water transport system, trash contay

MD1-0-V-132-11-00013

Travelling trash rack rake - rake assembly

MD1-0-V-132-11-00014

Travelling trash rack rake - ele. wire rope hoist ass.y

MD1-0-V-132-11-00025

Travelling band screen - chain guide assembly

MD1-0-V-132-11-00027

Travelling band screen - filtering panel assembly

MD1-0-V-132-11-00028

Travelling band screen - internal washing plant assembly

MD1-0-V-132-11-00029

Travelling band screen - cover & hopper assembly

MD1-0-V-132-11-00030

Travelling band screen - driving group assembly

MD1-0-V-132-11-00031

Sea Water Intake Facility - External Washing Plant Assembly

I
AC

MD1-0-V-132-21-00006

Sea Water Intake Facility P & ID

MD1-0-V-133-01-00001
MD1-0-V-133-02-00010

Water box vacuum pump ganeral arrangement drawing

Water Box Vacuum Pump Performance Curve

MD1-0-V-133-02-00012

Heat Exchanger Data Sheet and Drawing

MD1-0-V-133-03-00004

Water Box Vacuum Pump System Description

RT

MD1-0-V-133-05-00025

Water Box Vacuum Pump Painting Procedure

MD1-0-V-133-05-00026

Water box vacuum pump packing procedure

MD1-0-V-133-05-00027

Water box vacuum pump hydro test procedure

MD1-0-V-133-05-00028

Water Box Vacuum Pump PKG Performance Test Procedure

MD1-0-V-133-05-00031

Water Box Vacuum Pump WPS & PQR

MD1-0-V-133-05-00033

Operation & maintenance manual

MD1-0-V-133-05-00043

Water Box Vacuum Pump Site Testing and Commissioning Procedure

MD1-0-V-133-06-00013

Water box vacuum pump strength calculation sheet

MD1-0-V-133-08-00007

Water box vacuum pump equipment list

MD1-0-V-133-08-00017

Water box vacuum pump valve list

MD1-0-V-133-08-00029

Lubrication List

MD1-0-V-133-08-00030

Utility consumption list

MD1-0-V-133-08-00035

Spare Parts List (2Years)

IC

MD1-0-V-133-08-00042

Water Box Vacuum Pump Sub Vender List

MD1-0-V-133-09-00009

Water box vacuum pump data sheet

MD1-0-V-133-11-00008

Water box vacuum pump name plate drawing

MD1-0-V-133-11-00011

Water Box Vacuum Pump Sectional Drawing

MD1-0-V-134-01-00015

Piping layout drawing of ball strainer (dn 1650)

MD1-0-V-134-01-00022

Inspection and Test Plan for Workshop - Tube Cleaning System

MD1-0-V-134-02-00041

Painting Schedule - Condenser Tube Cleaning System

MD1-0-V-134-05-00023

Quality Assurance Manual - Tube Cleaning System

MD1-0-V-134-05-00024

Inspection and Test Procedure - Tube Cleaning System

MD1-0-V-134-05-00025

NDT Procedures - Tube Cleaning System

MD1-0-V-134-08-00037

Equipment List for Condenser Tube Cleaning System

MD1-0-V-134-09-00012

Ball Recirculation pump data & Characteristic Curves

MD1-0-V-134-11-00006

Equipment Outline Drawng of Ball Strainer (DN 1650)

MD1-0-V-134-11-00008

Equipment Outline Drawng of Ball Recirculating Pump Skid, Ball Vessel & Ball Skd

MD1-0-V-134-11-00010

Equipment outline drawing of ball injection nozzle & v-piece

MD1-0-V-134-21-00005

P&I Diagram, Condenser Tube Cleaning System

MD1-0-V-135-01-00010

Piping layout drawing of debris filter (dn 1650)

MD1-0-V-135-01-00015

Inspection & Test Plan for Workshop - Debris Filter

MD1-0-V-135-05-00016

Quality Assurance Manual - Debris Filter

MD1-0-V-135-05-00017

Inspection Test Procedure - Debris Filter

MD1-0-V-135-05-00018

NDT Procedures - Debris Filter

MD1-0-V-135-08-00030

Equipment List for Debris Filter

MD1-0-V-135-09-00022

Technical data sheet for df

MD1-0-V-135-11-00006

Equipment Outline Drawing of Debris Filter- DN 1650

MD1-0-V-135-21-00005

P&I Diaram, Debris Filter

MD1-0-V-141-01-00001

Assembly Drawing

MD1-0-V-141-01-00002

General Arrangement Drawing for Self Cleanning Filter

MD1-0-V-141-03-00001

Control System Description, Autho Filter

MD1-0-V-141-05-00001

Operation and Maintenance Manuals, CCW Cooler

AC

MD1-0-V-141-05-00002

Quality assurance manual, ccw cooler

MD1-0-V-141-05-00003

Inspection test plan, ccw cooler

MD1-0-V-141-05-00004

Inspection test procedure, ccw cooler

MD1-0-V-141-05-00006

Painting schedule, ccw cooler

MD1-0-V-141-05-00007

Welding book(wps/pqr/wqr/weld map), ccw cooler

MD1-0-V-141-05-00009

Manufacturing Quality Control Procedures for Auto Filter of CCWC

MD1-0-V-141-05-00010

Hydrotest procedure, auto filter

MD1-0-V-141-05-00012

Painting schedule, auto filter

MD1-0-V-141-05-00013

Rubber-lining Procedure and Data Sheets, Auto Filter

MD1-0-V-141-05-00015

Operation and Maintenance Manual for Auto Filter

MD1-0-V-141-08-00003

Master Spare Parts List (Contract & Recommended), CCW Cooler

MD1-0-V-141-08-00004

Master Special Tools List, CCW Cooler

MD1-0-V-141-08-00006

Closed Cooling Water Cooler- Equipment List

MD1-0-V-141-08-00008

Auto Filter- Equipment List

MD1-0-V-141-08-00009

Erection & Commissioning Spare Parts, Auto Filter

IC

MD1-0-V-141-08-00011

Inspection & Test Plan, Auto Filter

MD1-0-V-141-08-00012

Loading data for auto filter

MD1-0-V-141-08-00017

Valve list for auto filter

MD1-0-V-141-08-00020

Utilities Consumptions- Auto Filter

MD1-0-V-141-09-00001

Technical Data According to the Contractor's Form, CCW Cooler

MD1-0-V-141-09-00002

Valve data, ccw cooler

MD1-0-V-141-09-00004

Technical Data Sheet for Self Cleaning Filter

MD1-0-V-141-11-00001

Name plate drawings for ccw cooler

MD1-0-V-141-11-00002

Name plate drawing, auto filter

MD1-0-V-141-21-00001

Piping & Instrumentation Diagram for Self Cleaning Filter

MD1-0-V-141-32-00001

Start up & Shut Down Block Diagram, Auto Filter

MD1-0-V-141-55-00001

Strength Calculations

MD1-0-V-141-55-00002

Calculation notes for auto filter

MD1-0-V-141-55-00003

Thermal calculation sheet, ccw cooler

MD1-0-V-142-01-00001

General arrangement drawing for service water pump

MD1-0-V-142-01-00002

Sectional drawing for service water pump

MD1-0-V-142-01-10001

General arrangement drawing for closed cooling water pump

MD1-0-V-142-01-10002

Sectional drawing for closed cooling water pump

MD1-0-V-142-01-20002

Sectional drawing for demi. water transfer pump

MD1-0-V-142-01-30001

General arrangement drawing for condensate make up pump

MD1-0-V-142-01-30002

Sectional drawing for condensate make-up pump

MD1-0-V-142-01-40001

General arrangement drawing for auxiliary cooling water booster pump

MD1-0-V-142-01-40002

Sectional drawing for auxiliary cooling water booster pump

MD1-0-V-142-01-50001

General arrangement drawing for steam coil air heater drain pump

IC

MD1-0-V-142-01-50002

Sectional drawing for steam coil air heater drain pump

MD1-0-V-142-01-60001

General arrangement drawing for diesel oil drain pump

MD1-0-V-142-01-60002

Sectional drawing for diesel oil drain pump

MD1-0-V-142-01-70001

General arrangement drawing for boiler initial filling & warm-up recirculation p

MD1-0-V-142-01-70002

Sectional drawing for boiler initial filling & warm-up recirculation pump

MD1-0-V-142-01-80001

General arrangement drawing for dirty oil transfer pump

MD1-0-V-142-01-80002

Sectional drawing for dirty oil transfer pump

MD1-0-V-142-01-90001

General arrangement drawing for dirty oil drain pump

MD1-0-V-142-01-90002

Sectional drawing for dirty oil drain pump

MD1-0-V-142-05-00003

Quality manual

IC

MD1-0-V-142-05-00005

Painting procedure for general service pumps(horizontal)

MD1-0-V-142-06-00001

Calculation Sheet for Service Water Pump

MD1-0-V-142-06-10001

Calculation Sheet for Closed Cooling Water Pump

MD1-0-V-142-06-20001

Calculation Sheet for Demi. Water Transfer Pump

MD1-0-V-142-06-30001

Calculation Sheet for Condensate Make-up Pump

MD1-0-V-142-06-40001

Calculation Sheet for Auxiliary Cooling Water Booster Pump

MD1-0-V-142-06-50001

Calculation Sheet for Steam Coil Air Heater Drain Pump

IC

MD1-0-V-142-06-60001

Calculation Sheet for Diesel Oil Drain Pump

MD1-0-V-142-06-70001

Calculation Sheet for Deaerator Recirculation Pump

MD1-0-V-142-06-80001

Calculation Sheet for Dirty Oil Transfer Pump

MD1-0-V-142-06-90001

Calculation Sheet for Dirty Oil Drain Pump

MD1-0-V-142-09-00004

Pump data sheet & performance curve for service water pump

AC

MD1-0-V-142-09-10004

Pump data sheet & performance curve for closed cooling water pump

AC

MD1-0-V-142-09-20004

Pump data sheet & performance curve for demi. water transfer pump

AC

MD1-0-V-142-09-30004

Pump data sheet & performance curve for condensate make-up pump

AC

MD1-0-V-142-09-40004

Pump data sheet & performance curve for auxiliary cooling water booster pump

AC

MD1-0-V-142-09-50004

Pump data sheet & performance curve for steam coil air heater drain pump

AC

MD1-0-V-142-09-60004

Pump data sheet & performance curve for diesel oil drain pump

AC

MD1-0-V-142-09-70004

Pump data sheet & performance curve for boiler initial filling & warm-up recircp

AC

MD1-0-V-142-09-80004

Pump data sheet & performance curve for dirty oil transfer pump

AC

MD1-0-V-142-09-90004

Pump data sheet & performance curve for dirty oil drain pump

AC

MD1-0-V-142-11-00001

Name Plate Drawings

MD1-0-V-151-01-00006

Air Compressor- General Arangement Drawing

IC

MD1-0-V-151-05-00028

Air Compressor - Inspection and Test Procedure

MD1-0-V-151-08-00021

Air Compressor - Equipment List

MD1-0-V-151-08-00022

Air compressor - utility consumption list

MD1-0-V-151-08-00027

AIR COMPRESSOR, INSPECTION AND TEST PLAN

MD1-0-V-151-09-00015

Air Compressor - Technical Data Sheet

MD1-0-V-151-21-00008

Air Compressor- Overall P&I Diagram

IC

MD1-0-V-151-21-00009

Air Compressor- P&ID For Air Compressor

IC

MD1-0-V-151-21-00010

Air Compressor- P&ID For Air Dryer

IC

MD1-0-V-151-21-00033

Air Compressor- Symbol & Legend For P&I Diagram

MD1-0-V-151-57-00026

Air Compressor - Name Plates Drawing

MD1-0-V-153-01-00001

General Arrangement DWG for N2 Supply System

IC

MD1-0-V-153-01-00003

Test and Inspection Plan for Service Gas System

MD1-0-V-153-02-00001

Valve Specification for Service Gas System

AC

MD1-0-V-153-02-00002

Cylinder specification for service gas system

AC

MD1-0-V-153-05-00001

Packing Procedure for Service Gas System

MD1-0-V-153-05-00002

NDE(PT)Procedure for Service Gas System

MD1-0-V-153-05-00004

Test and inspection procedure for service gas system

IC

MD1-0-V-153-08-00003

Sub Supplier List for Service Gas System

MD1-0-V-153-08-00004

Instrument List For Service Gas System

MD1-0-V-153-08-00005

Valve List for Service Gas System

MD1-0-V-153-08-00007

Painting Schedule for Service Gas System

MD1-0-V-153-08-00010

Terminal point list for service gas system

MD1-0-V-153-09-00001

Technical bid data for service gas system

AC

MD1-0-V-153-10-00001

Assembly DRWG for N2 Supply System

IC

MD1-0-V-153-10-00002

Assembly DRWG for N2 Supply System

IC

MD1-0-V-153-10-00003

Assembly DRWG for N2 Supply System

IC

MD1-0-V-153-10-00004

Name Plate for Service Gas System

MD1-0-V-153-21-00001

Others (P&ID For N2 Supply System)

IC

MD1-0-V-161-01-19185

Equipment Maintenance Monorail

IC

MD1-0-V-161-06-01104

Calculation Report- Tripper Bridge

IC

MD1-0-V-166-05-00001

Inspection & test procedure for fuel oil heater

MD1-0-V-166-05-00002

Inspection & Test Plan for Fuel Oil Heater

MD1-0-V-166-05-00003

WPS & PQR

MD1-0-V-166-05-00004

Nde procedure for fuel oil heater

MD1-0-V-166-06-00001

Strength calculation for fuel unloading heater

MD1-0-V-166-06-00002

Strength calculation for fuel oil heater level 1

MD1-0-V-166-06-00003

Strength calculation for fuel oil heater level 2

MD1-0-V-166-06-00004

Strength calculation for fuel oil cooler

MD1-0-V-166-09-00001

Technical Data Sheet

MD1-0-V-166-10-00101

General Assembly for Fuel Oil Unloading Heater

MD1-0-V-166-10-00201

General Assembly for Fuel Oil Heater Level 1

MD1-0-V-166-10-00301

General Assembly for Fuel Oil Heater Level 2

MD1-0-V-166-10-00401

General Assembly for Fuel Oil Cooler

MD1-0-V-167-05-00003

Painting Procedure

MD1-0-V-167-09-00001

Equipment data sheet for fo pump

AC

MD1-0-V-167-09-00002

Performance curve for fo pump

MD1-0-V-167-10-00003

Coupling drawing

MD1-0-V-167-10-00004

Name plate drawing

MD1-0-V-171-01-00001

Plot Plan for Coal Handling System

MD1-0-V-171-01-00002

Typical Cross Section of Conveyor Galleries for CHS

MD1-0-V-171-01-00003

Elevation & Profile for CHS

MD1-0-V-171-01-00004

Stockyard Layout For Coal Handling System

MD1-0-V-171-01-00005

Rail Fixing Arrangement of Stockyard Layout For Stacker

MD1-0-V-171-01-00006

Bunker House Load Data at Tripper Floor & Tripper Floor Roof

MD1-0-V-171-01-00007

Rail Fixing Arrangement of Stockyard Layout For Reclaimer

MD1-0-V-171-01-00008

Sprinkler Fixing Arrangement For Stockyard Layout With Load Data

MD1-0-V-171-01-00011

General Arrangement of Transfer Tower No.TT-01 for CHS

IC

MD1-0-V-171-01-00012

General Arrangement of Transfer Tower No.TT-02 for CHS

MD1-0-V-171-01-00013

General Arrangement of Transfer Tower No.TT-03 for CHS

MD1-0-V-171-01-00014

General Arrangement of Transfer Tower No.TT-04 for CHS

MD1-0-V-171-01-00015

General Arrangement of Crusher House for CHS

MD1-0-V-171-01-00016

General Arrangement of Transfer Tower No.TT-06 for CHS

MD1-0-V-171-01-00021

Mechanical General Arrangment of Belt Conveyor BC-01A/B for CHS

MD1-0-V-171-01-00022

Mechanical General Arrangement of Belt Conveyor BC-02AB for CHS

MD1-0-V-171-01-00023

Mechanical General Arrangement of Belt Conveyor BC-03AB for CHS

MD1-0-V-171-01-00024

Mechanical General Arrangement of Belt Conveyor BC-05A/B for CHS

MD1-0-V-171-01-00025

Mechanical General Arrangement of Belt Conveyor BC-06A/B for CHS

IC

MD1-0-V-171-01-00026

Mechanical General Arrangement of Belt Conveyor BC-08 for CHS

IC

MD1-0-V-171-01-00027

Mechanical General Arrangement of Belt Conveyor BC-09 for CHS

IC

MD1-0-V-171-01-00028

Mechanical General Arrangement of Belt Conveyor BC-10 for CHS

IC

MD1-0-V-171-01-00029

Mechanical General Arrangement of Belt Conveyor BC-11 for CHS

IC

MD1-0-V-171-01-00030

GENERAL ARRANGEMENT OF BELT FEEDER BFD-01 FOR CHS

MD1-0-V-171-01-00031

GENERAL ARRANGEMENT OF BELT FEEDER BFD-02A/B FOR CHS

MD1-0-V-171-01-00041

General Arrangement of Idlers for Coal Handling System (Impact Idlers)-8 Sheets

MD1-0-V-171-01-00042

General Arrangement of Pulley For Coal Handling System

MD1-0-V-171-01-00043

General Arrangement of Travelling Tripper for Coal Handling System

MD1-0-V-171-01-00044

General Arangement of Flap Gate With Schedule for Coal Handling System

MD1-0-V-171-01-00045

General Arangement of Internal Scrapper with Schedule for Coal Handling System

MD1-0-V-171-01-00046

Typical General Arangement of Skirt Board for Coal Handling System

MD1-0-V-171-01-00047

General arrangement of rcc plat form for crusher in tt-05

MD1-0-V-171-01-00048

General Arrangement Drawing of Rack & Pinion Gate for Coal Handling System

MD1-0-V-171-01-00051

Gen. Arrang. Drwg & Data for Reversible Hammer Crusher 2000 mm Dia x 2800 mm LG

MD1-0-V-171-01-00052

Gen. Arrang. Drwg & Data Sheet for Vibrating Grizzy IN FOR TT-01

MD1-0-V-171-01-00053

Gen. Arrang. Drwg & Data Sheet for Vibrating Screen IN TT-05

MD1-0-V-171-01-00071

General arrangement and data sheet of belt scale for chs

AC

MD1-0-V-171-01-00072

General arrangement of metal detector for chs

IC

MD1-0-V-171-01-00073

GENERAL ARRANGEMENT OF INLINE MAGNETIC SEPARATOR FOR CHS

MD1-0-V-171-01-00075

General Arrangement and Data Sheet of Coal Sampling Unit for Coal Handling Systm

IC

MD1-0-V-171-01-00079

TECHNICAL DATA SHEET OF BELT FOR BUNKER SEALING FOR CHS

MD1-0-V-171-01-00084

General Arrangement of Gear Box for Coal Handling System

IC

MD1-0-V-171-01-00101

General Arrangement of Luffing Travelling Stacker for CHS

MD1-0-V-171-01-00105

Wheel Load Data for Linear Stacker

MD1-0-V-171-01-00121

General Arrangement of Bridge Type Reclaimer for Coal Handling System

MD1-0-V-171-01-00122

Technical Specification of Bridge Type Reclaimer For CHS

MD1-0-V-171-01-00123

Wheel Load data for Bridge Type Reclaimer

MD1-0-V-171-01-00151

General Arrangement of Centrifugal Fan for the Dust Collection System for CHS

MD1-0-V-171-01-00152

General Arrangement of Bag Filter for the Dist Collection System for CHS

MD1-0-V-171-01-00155

Ducting Layout for Dust Collection System for Tower TT-03 for CHS

MD1-0-V-171-01-00156

Ducting layout for dust collection system for transfer tower tt-04

MD1-0-V-171-01-00158

Ducting Layout for Dust Collectlon System for Tower TT-06 for CHS

MD1-0-V-171-02-00001

Technical Specification of Luffing Travelling Stacker For CHS

MD1-0-V-171-04-00001

Design basis report dust supression,service water & service air system

IC

MD1-0-V-171-04-00011

Design Basis Report For Dust Extraction System

MD1-0-V-171-04-01002

Acceptance Of Indian Standard Materials(Mechanical)In Place Of ASTM Standars Ma

MD1-0-V-171-05-02044

Start-up & Shut-down Procedure for CHS

IC

MD1-0-V-171-05-40001

Wps / pqr(steel structure)

IC

MD1-0-V-171-05-40002

Welder Qualification Records

MD1-0-V-171-05-40003

Quality Assurance Plan

IC

MD1-0-V-171-05-40005

NDE Procedure for CHS

MD1-0-V-171-05-40008

Welding consumable control procedure of chs

MD1-0-V-171-05-40010

INSPECTION AND TEST PLAN FOR IDLERS

IC

MD1-0-V-171-05-40011

INSPECTION AND TEST PLAN FOR CONVEYOR PULLEY ASSEMBLY

IC

MD1-0-V-171-05-40012

INSPECTION AND TEST PLAN FOR TECHNOLOGICAL STRUCTURES

IC

MD1-0-V-171-05-40013

INSPECTION AND TEST PLAN FOR DISCHAGE CHUTES

IC

MD1-0-V-171-05-40014

Itp for steel structure(tower)

MD1-0-V-171-05-40015

Itp for steel structure(gallery)

MD1-0-V-171-05-40016

Itp for trevelling tripper

MD1-0-V-171-05-40017

Itp for reversible hammer mill crusher

IC

MD1-0-V-171-05-40018

Itp for vibrating grizzly feeder

MD1-0-V-171-05-40019

Itp for liner motion screen

IC

MD1-0-V-171-05-40020

ltp for skirt board

MD1-0-V-171-05-40021

Itp for internal scrapper

MD1-0-V-171-05-40022

Itp for non-slewing travelling luffing stacker

IC

MD1-0-V-171-05-40023

Itp for bridge type relaimer

IC

MD1-0-V-171-05-40031

ITP for sprocket for reclimer for CHS

MD1-0-V-171-05-40032

ITP for chain for reclaimer for CHS

MD1-0-V-171-06-00001

Volumetric Capacity Calculation of Surge Bin for Coal Handling System

MD1-0-V-171-06-00002

Stockpile Capacity Calculation for Coal Handling System

MD1-0-V-171-06-00006

Power & Tension Calc. for Belt Conveyor BC-01A/B for CHS

MD1-0-V-171-06-00007

Power & Tension Calc. for Belt Conveyor BC-02A/B for CHS

MD1-0-V-171-06-00008

Power & Tension Calc. for Belt Conveyor BC-03A/B for CHS

MD1-0-V-171-06-00009

Power & Tension Calc. for Belt Conveyor BC-05A/B for CHS

MD1-0-V-171-06-00010

Power & Tension Calc. for Belt Conveyor BC-06A/B for CHS

MD1-0-V-171-06-00011

Power & Tension Calc. for Belt Conveyor BC-08 & BC-11 for CHS

MD1-0-V-171-06-00012

Power & Tension Calc. for Belt Conveyor BC-09 & BC-10 for CHS

MD1-0-V-171-06-00013

Power and tension calculation for belt feeder bfd-01 for chs

MD1-0-V-171-06-00014

Power and tension calculation for belt feeder bfd-02a/b for chs

MD1-0-V-171-06-00015

Derivation for Stacker Wheel load

MD1-0-V-171-06-00016

Derivation for reclaimer Wheel load

MD1-0-V-171-08-00001

HOIST SCHEDULE FOR COAL HANDLING SYSTEM

MD1-0-V-171-08-00002

IDLER SCHEDULE FOR COAL HANDLING SYSTEM

MD1-0-V-171-08-00102

Master Spare Parts List for Coal Handling System

RT

MD1-0-V-171-21-00001

P & id for dust suppression, service water & service air system for chs(dust su)

IC

MD1-0-V-171-21-00011

P & id for de system for coal handling system(for tt-01)

IC

MD1-0-V-171-21-02101

P & id for coal handling system

MD1-0-V-171-57-00001

Operation and Control Philosophy of Dust Suppression System for Coal Handling Sm

IC

MD1-0-V-172-01-00002

Plot Plan for Limestone Handling System

MD1-0-V-172-01-00003

Typical cross-sections of conveyor galleries for lhs

MD1-0-V-172-01-00004

Elevation & Profile For Limestone Handling System

MD1-0-V-172-01-00005

Stockyard Layout for Limestone Handling System

MD1-0-V-172-01-00011

General Arrangement of Transfer Tower No.LT-01 for LHS

MD1-0-V-172-01-00012

General Arrangement of Transfer Tower No.LT-02 for LHS

MD1-0-V-172-01-00013

General Arrangement of Transfer Tower No.LT-03 for LHS

MD1-0-V-172-01-00014

General Arrangement of Transfer Tower No.LT-04 for LHS

MD1-0-V-172-01-00020

Mechanical foundation load data of grinding house

MD1-0-V-172-01-00031

General Arrangement of Belt Conveyor L-01 for LHS

MD1-0-V-172-01-00032

General Arrangement of Belt Conveyor L-02 for LHS

MD1-0-V-172-01-00033

General Arrangement of Belt Conveyor L-03 for LHS

MD1-0-V-172-01-00034

General Arrangement of Belt Conveyor BC-L-04 for LHS

MD1-0-V-172-01-00035

General Arrangement of Belt Conveyor L-05 for LHS

MD1-0-V-172-01-00036

General arrangement of belt feeder bf-02 for lhs

MD1-0-V-172-01-00037

General arrangement of reversible belt feeder rbf-01 for lhs

MD1-0-V-172-01-00051

General Arrangement of Idlers for Limestone handling System

MD1-0-V-172-01-00052

General Arrangement of Pulley For Limestone Handling System

MD1-0-V-172-01-00053

General Arrangement of Travelling Tripper for Limestone Handling System

MD1-0-V-172-01-00054

GENERAL ARRANGEMENT DRAWING OF RACK &

MD1-0-V-172-01-00055

General Arrangement Drawing of Internal Scrapper for Limestone Handling Sys.

MD1-0-V-172-01-00056

Typical General Arrangement of Skirt Board for Limestone Handling System

MD1-0-V-172-01-00057

General Arrangement of Telescopic Chute for Limestone Handling System

MD1-0-V-172-01-00073

General Arrangement of Screw Conveyor SC-02A/B for LHS

MD1-0-V-172-01-00074

General Arangement Drawing & Data Sheet for Vibrating Feeder Below Receiv. Hoppe

MD1-0-V-172-01-00075

General Arangement Drawing & Data Sheet for Vibrating Feeder Below Surge Bin

MD1-0-V-172-01-00086

General arrangement of receiving hopper for lhs

MD1-0-V-172-01-00101

Ga and Stack-up Drawing for Limestone Handling System Below Limestone Silo

IC

MD1-0-V-172-01-00102

Ga and Piping Layout for Pneumatic Limestone Handling System

IC

MD1-0-V-172-01-00103

Ga of fluidizing arrangement(ls silo)

MD1-0-V-172-01-00105

Ga of air lock vessel(alv) - 0.75m3(for limestone silo)

MD1-0-V-172-01-00109

Ga of vent filter for ls silo

MD1-0-V-172-01-00123

General Arrangement and Data Sheet of Magenet for Limestone Handling System

MD1-0-V-172-01-00124

General arrangement and data sheet of rod mill for lhs

IC

MD1-0-V-172-01-00126

Technical data sheet of conveyor belting for lhs

MD1-0-V-172-01-00128

General Arrangement of Gear Box for LHS

IC

MD1-0-V-172-01-00133

General Arrangement for Grab Bucket Type Barge Unloader

AC

MD1-0-V-172-01-00171

General Arrangement of Centrifugal Fan for Dust Collection System for LHS

MD1-0-V-172-01-00172

General Arrangement of Bag Filter for the Dist Collection System for LHS

MD1-0-V-172-01-00174

General Arrangement & Ducting Layout of Dust Collection System LT01 Transfer LHS

MD1-0-V-172-01-00175

General Arrangement & Ducting Layout of Dust Collection System LT02 Transfer LHS

MD1-0-V-172-01-00176

General Arrangement & Ducting Layout of Dust Collection System LT03 Transfer LHS

MD1-0-V-172-01-00177

General Arrangement & Ducting Layout of Dust Collection System LT04 Transfer LHS

MD1-0-V-172-02-00133

Technical Specification for Grab Bucket Type Barge Unloader

AC

MD1-0-V-172-03-02102

System Description & Operational Description FO LHS

MD1-0-V-172-04-00021

Design Basic Report for Dist Extraction System for Limesone Handling System

MD1-0-V-172-04-00031

Design basis report for service water ,service air & instrument air system

AC

MD1-0-V-172-05-02046

Start-up & Shut-down Procedure for Limestone Handling System

IC

MD1-0-V-172-05-40001

Wps / pqr(steel structure)

IC

MD1-0-V-172-05-40002

Welder Qualification Records

MD1-0-V-172-05-40003

Quality Assurance Plan

IC

MD1-0-V-172-05-40005

NDE Procedure for LHS

MD1-0-V-172-05-40008

Welding consumable control procedure of lhs

MD1-0-V-172-05-40010

INSPECTION AND TEST PLAN FOR IDLERS

IC

MD1-0-V-172-05-40011

INSPECTION AND TEST PLAN FOR CONVEYOR PULLEY ASSEMBLY

MD1-0-V-172-05-40012

INSPECTION AND TEST PLAN FOR TECHNOLOGICAL STRUCTURES

MD1-0-V-172-05-40013

INSPECTION AND TEST PLAN FOR DISCHARGE CHUTES

MD1-0-V-172-05-40014

Itp for steel structure(tower) for l.h.s

MD1-0-V-172-05-40015

Itp for steel structure(gallery) for l.h.s

MD1-0-V-172-05-40016

Itp for travelling tripper for l.h.s

MD1-0-V-172-05-40017

Itp for skirt board for l.h.s

MD1-0-V-172-05-40018

Itp for internal scrapper for l.h.s

MD1-0-V-172-06-00001

Volumetric Capacity Calculation for Surge Bin in LT-05 for LHS

MD1-0-V-172-06-00002

Volumetric Capacity Calculation of Limestone Storage Silo

MD1-0-V-172-06-00003

Volumetric Capacity Calculation of Reclaim Hopper For LHS

MD1-0-V-172-06-00004

Stockpile Capacity Calculation for Limestone Handling System

MD1-0-V-172-06-00007

Power and Tension Calculation For Belt Conveyor L-01 For LHS

MD1-0-V-172-06-00008

Power and Tension Calculation For Belt Conveyor L-02 For LHS

MD1-0-V-172-06-00009

Power and Tension Calculation For Belt Conveyor L-03 For LHS

MD1-0-V-172-06-00010

Power and Tension Calculation For Belt Conveyor L-04 For LHS

MD1-0-V-172-06-00011

Power and Tension Calculation For Belt Conveyor L-05 For LHS

MD1-0-V-172-06-00012

Power and Tension Calculation For Belt Conveyor No. L-06A/B

IC

MD1-0-V-172-06-00021

Sizing Calculation for Conveying Air for LHS

MD1-0-V-172-08-00001

Hoist Schedule For Limestone Handling System

MD1-0-V-172-08-00002

IDLER SCHEDULE FOR LIMESTONE HANDLING

MD1-0-V-172-08-00005

Conveyor belt schedule for limestone handling system

MD1-0-V-172-08-00102

Master Spare Parts List for Limestone Handling System

MD1-0-V-172-08-00523

Schedule for Technological Foundation Bolt for LHS

MD1-0-V-172-11-02110

GA of Junction Box for LHS

MD1-0-V-172-21-00001

P & ID of Pneumatic Conveying System for Limestone Handling

MD1-0-V-172-21-00002

P & ID Limestone Storage Silo Fluidzing System

MD1-0-V-172-21-00003

P & ID For Limestone Conveying Air Blower

MD1-0-V-172-21-00021

P & ID Diagram for De System for Lime Handing System

AC

MD1-0-V-172-21-00031

P & ID Diagram for Service Water, Service Air & Instrument Air System

AC

MD1-0-V-172-21-02101

P & i diagram for limestone handling system

IC

MD1-0-V-173-01-00030

Layout of Dry Flight Conveyor below Bottom Ash Cooler Area (Unit #1 & Unit #2)

IC

MD1-0-V-173-01-00031

Layout of Dry Flight Conveyor from Boiler to Bottom Ash Silo (U1 & U2)

MD1-0-V-173-01-00032

GA of Bottom Ash Silo (BAS-2B)

MD1-0-V-173-01-00033

Ga of ash slurry & ash water pump house

MD1-0-V-173-01-00034

Ga of return water pump arrangement

IC

MD1-0-V-173-01-00036

General Arrangement of Fly Ash Silos

MD1-0-V-173-01-00043

GA of Vacuum Pump(for Unit #1)

IC

MD1-0-V-173-01-00044

GA of FA Conveying Blower

IC

MD1-0-V-173-01-00045

GA of Buffer Hopper Fluidizing Blower For Unit #1

IC

MD1-0-V-173-01-00051

General Layout of Ash Handling System

MD1-0-V-173-01-00053

Equipment & piping layout in eco & aph hopper area

MD1-0-V-173-01-00054

Fly ash conveying piping layout from esp to buffer hopper

MD1-0-V-173-01-00055

Fly ash conveying piping layout from buffer hopper to fa silo

MD1-0-V-173-01-00056

Ash slurry piping from silo to ash slurry sump

IC

MD1-0-V-173-01-00057

Layout of ash disposal & return water piping

IC

MD1-0-V-173-01-02531

Ash slurry pump house electrical equipment layout

IC

MD1-0-V-173-03-00281

Design Basic Report & System Description

AC

MD1-0-V-173-05-40001

Wps / pqr(steel structure)

IC

MD1-0-V-173-05-40002

Welder Qualification Records

MD1-0-V-173-05-40003

Quality Assurance Plan

IC

MD1-0-V-173-05-40005

NDE Procedure for AHS

MD1-0-V-173-05-40008

Welding consumable control procedure of ahs

MD1-0-V-173-06-00201

Ash Slurry Pump Sizing Calculation

MD1-0-V-173-06-00202

HP Water Pump Sizing Calculation

MD1-0-V-173-06-00203

Seal Water Pump Sizing Calculation

MD1-0-V-173-06-00204

Return Water Pump Sizing Calculation

I
RT

MD1-0-V-173-06-00205

Ash Water Pump Sizing Calculation

MD1-0-V-173-06-00206

Ash Slurry Sump Sizing Calculation

MD1-0-V-173-06-00207

Vacuum Pump Sizing Calculation

MD1-0-V-173-06-00208

Transport Air Blower for Rebedding Sizing Calculation

MD1-0-V-173-06-00211

Silo Fluidising Blower Sizing Calculation

MD1-0-V-173-06-00212

Silo Fluidising Blower Heater Sizing Calculation

MD1-0-V-173-06-00213

Air Lock Vessel for Re-Bedding Sizing Calculation

MD1-0-V-173-06-00214

Silo Volume Calculation

MD1-0-V-173-06-00215

Fly Ash Silo Vent Filter & Vent Fan Sizing Calculation

MD1-0-V-173-06-00216

Bottom Ash Silo Vent Filter and Vent Fan Sizing Calculation

MD1-0-V-173-06-00217

Silo Jet Pump Sizing Calculation

MD1-0-V-173-06-00218

Fly Ash Conveying Blower Sizing Calculation

MD1-0-V-173-08-00266

Piping Material Classification for ASH Handling System

MD1-0-V-173-10-00071

GA of Adaptor Below ESP Hopper

MD1-0-V-173-10-00072

GA of Adaptor Below ECO & APH Hopper

MD1-0-V-173-10-00073

Ga ash intake valve (dn 200)

MD1-0-V-173-10-00074

Ga of air intake valve (dn 200)

MD1-0-V-173-10-00076

GA of Vacuum Breaker

MD1-0-V-173-10-00077

GA of Branch Isolation Valve

MD1-0-V-173-10-00078

GA of Adaptor Coupling - Vacuum System

MD1-0-V-173-10-00085

GA of Air Lock Vessel for Bed Ash

MD1-0-V-173-10-00087

GA of Vent Filter for F.A Silo

MD1-0-V-173-10-00088

GA of Vent Filter for B.A Silo

MD1-0-V-173-10-00089

GA of Pressure Vacuum Relief Valve

IC

MD1-0-V-173-10-00090

GA of Fluidizing Pad for Silo

MD1-0-V-173-10-00092

GA of Slurrifier

MD1-0-V-173-10-00093

GA of Jet Pump

MD1-0-V-173-10-00094

GA of Mixing / Transfer Tank

MD1-0-V-173-10-00097

GA of Manual Plug Gate

MD1-0-V-173-21-00005

Legend & Symbol for P&I Diagram

MD1-0-V-173-21-00006

P&ID- Bottom Ash Handling System for Boiler 1A & 2B

IC

MD1-0-V-173-21-00007

P&ID- Bottom Ash Handling System for Boiler 1B & 2A

IC

MD1-0-V-173-21-00008

P&ID- Bottom Ash Handling System - Bottom Ash Silo Unloading & Fludizing

MD1-0-V-173-21-00009

P&ID- Fly Ash System- Hopper Area

MD1-0-V-173-21-00010

P&ID- Fly Ash System- Silo Roof

MD1-0-V-173-21-00011

P&ID- Fly Ash System- Vacuum Blower

IC

MD1-0-V-173-21-00012

P&ID- Fly Ash System- Silo Unloading

MD1-0-V-173-21-00013

P&ID Diagram of Fludizing Air Distribution for Fly Ash Silo

MD1-0-V-173-21-00014

P&ID- HP Water & Return Water System

MD1-0-V-173-21-00015

P&ID-Ash Slurry Transfer System

MD1-0-V-173-21-00016

P&ID-Fly Ash System- Vacuum Pressure Transfer Area

MD1-0-V-173-21-00017

P&ID-Fly Ash System- Conveying Blower

IC

MD1-0-V-173-21-00018

P&ID-Fly Ash System- Buffer Hopper Aeration

MD1-0-V-173-21-00019

P&ID - Instrument Air Distribution

MD1-0-V-173-22-00002

Single Line Flow Diagram- Bottom Ash Handling System

IC

MD1-0-V-173-22-00003

Single Line Flow Diagram- ECO. APH and Fly Handling System

IC

MD1-0-V-173-22-00004

Single Line Flow Diagram- Water and Slurry System

IC

MD1-0-V-173-55-00899

Conveyor Supporting Structure- Calculation of Foundation Load Data (Vol 1)

MD1-0-V-182-02-00011

Emergency Diesel Generator Set Diesel Engine Generator Specification

MD1-0-V-182-02-03001

Emergency Diesel Generator Set Equipment Painting Specification

MD1-0-V-182-02-11002

Motor Driven Air Compressor Outline Drawing for Emergency Diesel Generator

MD1-0-V-182-02-11003

Engine Driven Air Compressor Outline Drawing for Emergency Diesel Generator

MD1-0-V-182-06-04001

Auxiliary Equipment Capacity Calculation Sheet for Emergency Diesel Generator

MD1-0-V-182-08-20006

Piping Specification for Emergency Diesel Generator

MD1-0-V-182-08-40001

DCS I/O List for Emergency Diesel Generator

MD1-0-V-182-09-00002

Teachnical Data and Specification for emergency diesel Generator

RT

MD1-0-V-182-09-02001

Emergency diesel generator set equipment heat emmission sheet

MD1-0-V-182-10-10011

Diesel Engine and Generator Assembly Outline Drawing for Emergency Diesel Generr

MD1-0-V-182-10-10012

Engine Outline Drawing for Emergency Diesel Generator

MD1-0-V-182-10-10013

Generator Outline Drawing for Emergency Diesel Generator

MD1-0-V-182-10-11001

Remote radiator outline drawing for emergency diesel generator

IC

MD1-0-V-182-10-11004

Air Receiver Tank for Emergency Diesel Generator

MD1-0-V-182-21-12001

Symbol & Legend P&ID for Emergency Diesel Generator

IC

MD1-0-V-182-21-12002

Cooling Water System P&ID for Emergency Diesel Generator

IC

MD1-0-V-182-21-12003

Diesel Oil System P&ID for Emergency Diesel Generator

IC

MD1-0-V-182-21-12004

Lube Oil System P&ID for Emergency Diesel Generator

IC

MD1-0-V-182-21-12005

Exhaust Gas System P&ID for Emergency Diesel Generator

IC

MD1-0-V-182-21-12006

Air System P&ID for Emergency Diesel Generator

IC

MD1-0-V-182-21-12007

Motor Driven Air Compressor P&ID for Emergency Diesel Generator

IC

MD1-0-V-182-21-12008

Engine Driven Air Compressor P&ID for Emergency Diesel Generator

IC

MD1-0-V-183-01-12101

Outline Drawing for GSP(Vertical and Submersible)_Lubrication Oil Storage Area

MD1-0-V-183-01-12102

Outline Drawing for GSP(Vertical and Submersible)_Boiler Blowdown Sump Pump

MD1-0-V-183-01-12103

Outline Drawing for GSP(Vertical and Submersible)_Maintenance Wastewater Basin

MD1-0-V-183-01-12104

Outline Drawing for GSP(Vertical and Submersible)_Coal Handling Transfer Tower

MD1-0-V-183-01-12105

Outline Drawing for GSP(Vertical and Submersible)_Transfer Tower Area Sump Pump

MD1-0-V-183-01-12107

Outline Drawing for GSP(Vertical and Submersible)_Cooling Water Filling Pump

MD1-0-V-183-01-12108

Outline Drawing for GSP(Vertical and Submersible)_Fuel Oil System Area Oily Sump

MD1-0-V-183-01-12112

Outline Drawing for GSP(Vertical and Submersible)_Transformer Area Sump Pump

MD1-0-V-183-01-12113

Outline Drawing for GSP(Vertical and Submersible)_Auxiliary Transformer Area Su

MD1-0-V-183-01-12201

Outline Drawing for GSP(Vertical and Submersible)_Lubrication Oil Storage Area

MD1-0-V-183-01-12202

Outline Drawing for GSP(Vertical and Submersible)_STG Building Chemical Sump Pup

MD1-0-V-183-01-12203

Outline Drawing for GSP(Vertical and Submersible)_Gas Chlorination Area Sump Pup

MD1-0-V-183-01-12204

Outline Drawing for GSP(Vertical and Submersible)_WWT Underground Sump Pump

MD1-0-V-183-01-12205

Outline Drawing for GSP(Vertical and Submersible)_STG Building Seawater Sump Pum

MD1-0-V-183-01-12206

Outline Drawing for GSP(Vertical and Submersible)_CWP Discharge Valve pit

MD1-0-V-183-01-12207

Outline Drawing for GSP(Vertical and Submersible)_Central Control Building Sewap

MD1-0-V-183-01-12208

Outline Drawing for GSP(Vertical and Submersible)_Switchyard Control Building

MD1-0-V-183-01-12209

Outline Drawing for GSP(Vertical and Submersible)_Water Treatment Building Seweg

MD1-0-V-183-01-12210

Outline Drawing for GSP(Vertical and Submersible)_Warehouse & Workshop Building

MD1-0-V-183-01-12211

Outline Drawing for GSP(Vertical and Submersible)_Administration Building(North)

MD1-0-V-183-01-12212

Outline Drawing for GSP(Vertical and Submersible)_Administration Building(South)

MD1-0-V-183-01-12213

Outline Drawing for GSP(Vertical and Submersible)_Guard House Sewage Pump

MD1-0-V-183-01-12214

Outline Drawing for GSP(Vertical and Submersible)_Coal Handling Control Building

MD1-0-V-183-01-12215

Outline Drawing for GSP(Vertical and Submersible)_STG Building Oily Sump Pump

MD1-0-V-183-01-12216

Outline Drawing for GSP(Vertical and Submersible)_Ammonia Storage Area Sump Pump

MD1-0-V-183-01-12217

Outline Drawing for GSP(Vertical and Submersible)_Dewatering Portable Pump

MD1-0-V-183-01-12218

Outline Drawing for GSP(Vertical and Submersible)_Fire Protection Pump House

MD1-0-V-183-01-12219

Outline Drawing for GSP(Vertical and Submersible)_Central Control Building Sewag

MD1-0-V-183-01-13101

Pump Sectional Drawing for GSP(Vertical and Submersible)_Start-up Flash Tank Arp

MD1-0-V-183-01-13102

Pump Sectional Drawing for GSP(Vertical and Submersible)_Boiler Blowdown Sump Pp

MD1-0-V-183-01-13103

Pump Sectional Drawing for GSP(Vertical and Submersible)_Maintenance Wastewatern

MD1-0-V-183-01-13104

Pump Sectional Drawing for GSP(Vertical and Submersible)_Coal Handling Transfer

MD1-0-V-183-01-13105

Pump Sectional Drawing for GSP(Vertical and Submersible)_Limestone Handling Trar

MD1-0-V-183-01-13107

Pump Sectional Drawing for GSP(Vertical and Submersible)_Cooling Water Filling p

MD1-0-V-183-01-13108

Pump Sectional Drawing for GSP(Vertical and Submersible)_Fuel Oil System Area Op

MD1-0-V-183-01-13112

Pump Sectional Drawing for GSP(Vertical and Submersible)_Transformer Area Sump p

MD1-0-V-183-01-13113

Pump Sectional Drawing for GSP(Vertical and Submersible)_Auxiliary Transformer

MD1-0-V-183-05-00005

Inspection Test Plan for GSP(Vertical and Submersible)

MD1-0-V-183-05-00006

Inspection and Test Procedure for GSP(Vertical and Submersible)

IC

MD1-0-V-183-05-00008

Painting Procedure for GSP(Vertical and Submersible)

IC

MD1-0-V-183-09-11101

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Stat

MD1-0-V-183-09-11102

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-BLR

MD1-0-V-183-09-11103

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Main

MD1-0-V-183-09-11104

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Coal

MD1-0-V-183-09-11105

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Lime

MD1-0-V-183-09-11107

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Cool

MD1-0-V-183-09-11108

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Fuel

MD1-0-V-183-09-11112

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Tras

MD1-0-V-183-09-11113

Pump Data & Curve Curve & calculation Sheet for GSP (Vertical & Summerible)-Aux.

MD1-0-V-183-09-11201

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible) _Lubrica

MD1-0-V-183-09-11202

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible) STG Buil

MD1-0-V-183-09-11203

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Gas

MD1-0-V-183-09-11204

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_WWT Undd

MD1-0-V-183-09-11205

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_STG Bui

MD1-0-V-183-09-11206

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_CWP Disc

MD1-0-V-183-09-11207

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Central

MD1-0-V-183-09-11208

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Switch

MD1-0-V-183-09-11209

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Water Tr

MD1-0-V-183-09-11210

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Warehous

MD1-0-V-183-09-11211

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Admin

MD1-0-V-183-09-11212

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Admin.

MD1-0-V-183-09-11213

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Guard

MD1-0-V-183-09-11214

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Coal

MD1-0-V-183-09-11215

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_STG Buil

MD1-0-V-183-09-11216

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Ammonia

MD1-0-V-183-09-11217

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Dewater

MD1-0-V-183-09-11218

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Fire

MD1-0-V-183-09-11219

Pump Data & Curve & Calculation Sheet for GSP(Vertical and Submersible)_Central

MD1-0-V-185-06-10100

Closed cooling water head tank strength calculation sheet

MD1-0-V-185-06-20100

Closed cooling water chemical injection cylinder strength calculation sheet

MD1-0-V-185-06-30100

Start-up flash tank strength calculation sheet

MD1-0-V-185-06-40100

Condensate return tank strength calculation sheet

MD1-0-V-185-06-80100

Dirty oil tank strength calculation sheet

MD1-0-V-185-06-90100

Steam coil air heater drain tank strength calculation sheet

MD1-0-V-185-10-10001

Closed cooling water head tank general assembly

IC

MD1-0-V-185-10-20001

Closed cooling water chemical injection cylinder general assembly

IC

MD1-0-V-185-10-30001

Start-up flash tank general assembly

IC

MD1-0-V-185-10-40001

Condensate return tank general assembly

IC

MD1-0-V-185-10-80001

Dirty oil tank general assembly

IC

MD1-0-V-185-10-90001

Steam coil air heater drain tank general assembly

IC

MD1-0-V-186-01-00101

Shop Inspection and Test Plan

MD1-0-V-186-05-00101

WPS & PQR for Field Erected Tank

MD1-0-V-186-05-00102

Painting Specification and Procedures

MD1-0-V-186-05-00103

Shop ndt procedures

MD1-0-V-186-05-00104

Quality Assurance Program & Manual (Field Erected Tank)

MD1-0-V-186-06-00101

Strength Calculation for Raw Water Storage Tank

MD1-0-V-186-06-00201

Strength Calculation for Filtered Water Storage Tank

MD1-0-V-186-06-00301

Strength Calculation for Demi. Water Storage Tank

MD1-0-V-186-06-00401

Strength Calculation for Fire Water Storage Tank

MD1-0-V-186-06-00501

Strength Calculation for Condensate Water Storage Tank

MD1-0-V-186-06-00601

Strength Calculation for Portable Water Storage Tank

MD1-0-V-186-06-00701

Strength Calculation for Fuel Oil Storage Tank

MD1-0-V-186-06-00702

Fuel Oil Storage Tank Thermal Design Report of Bottom Heater

MD1-0-V-186-06-00801

Strength Calculation for Diesel Oil Storage Tank

MD1-0-V-186-10-00101

General Assembly for Raw Water Storage Tank

MD1-0-V-186-10-00102

Raw Water Storage Tank Nozzle Orientation (1/2)

MD1-0-V-186-10-00103

Raw Water Storage Tank Nozzle Orientation (2/2)

MD1-0-V-186-10-00201

General Assembly for Filtered Water Storage Tank

MD1-0-V-186-10-00202

Filtered Water Storage Tank Nozzle Orientation (1/2)

MD1-0-V-186-10-00203

Filtered Water Storage Tank Nozzle Orientation (2/2)

MD1-0-V-186-10-00301

General Assembly for Demi. Water Storage Tank

MD1-0-V-186-10-00302

Demi Water Storage Tank Nozzle Orientation (1/2)

MD1-0-V-186-10-00303

Demi Water Storage Tank Nozzle Orientation (2/2)

MD1-0-V-186-10-00401

General Assembly for Fire Water Storage Tank

MD1-0-V-186-10-00402

Fire Water Storage Tank Nozzle Orientation (1/2)

MD1-0-V-186-10-00403

Fire Water Storage Tank Nozzle Orientation (2/2)

MD1-0-V-186-10-00501

General Assembly for Condensate Water Storage Tank

MD1-0-V-186-10-00502

Condensate Storage Tank Nozzle Orientation (1/2)

MD1-0-V-186-10-00503

Condensate Storage Tank Nozzle Orientation (2/2)

MD1-0-V-186-10-00601

General Assembly for Portable Water Storage Tank

MD1-0-V-186-10-00602

Portable Water Storage Tank Nozzle Orientation

MD1-0-V-186-10-00701

FUEL OIL STORAGE TANK GENERAL ASSEMBLY

MD1-0-V-186-10-00702

Fuel Oil Storage Tank Nozzle Orientation (1/2)

MD1-0-V-186-10-00703

Fuel Oil Storage Tank Nozzle Orientation (2/2)

MD1-0-V-186-10-00801

General Assembly for Diesel Oil Tank

MD1-0-V-186-10-00802

Diesel Oil Storage Tank Nozzle Orientation

MD1-0-V-186-11-00119

Raw Water Storage Tank Spiral Stairway (1/4)

MD1-0-V-186-11-00120

Raw Water Storage Tank Spiral Stairway (2/4)

MD1-0-V-186-11-00121

Raw Water Storage Tank Spiral Stairway (3/4)

MD1-0-V-186-11-00122

Raw Water Storage Tank Spiral Stairway (4/4)

MD1-0-V-186-11-00123

Raw Water Storage Tank Spiral Stairway (1/3)

MD1-0-V-186-11-00124

Raw Water Storage Tank Spiral Stairway (2/3)

MD1-0-V-186-11-00125

Raw Water Storage Tank Spiral Stairway (3/3)

MD1-0-V-186-11-00127

Raw Water Storage Tank Name Plate Detail

MD1-0-V-186-11-00201

Filtered Water Storage Tank Shell Plate Detail

MD1-0-V-186-11-00202

Filtered Water Storage Tank 1st Course Shell Plate Arrangement (1/2)

MD1-0-V-186-11-00203

Filtered Water Storage Tank 1st Course Shell Plate Arrangement (2/2)

MD1-0-V-186-11-00204

Filtered Water Storage Tank Bottom Plate Arrangement (1/3)

MD1-0-V-186-11-00205

Filtered Water Storage Tank Bottom Plate Arrangement (2/3)

MD1-0-V-186-11-00206

Filtered Water Storage Tank Bottom Plate Arrangement (3/3)

MD1-0-V-186-11-00207

Filtered Water Storage Tank Roof Plate Arrangement (1/3)

MD1-0-V-186-11-00208

Filtered Water Storage Tank Roof Plate Arrangement (2/3)

MD1-0-V-186-11-00209

Filtered Water Storage Tank Roof Plate Arrangement (3/3)

MD1-0-V-186-11-00210

Filtered Water Storage Tank Roof Structure Detail (1/3)

MD1-0-V-186-11-00211

Filtered Water Storage Tank Roof Structure Detail (2/3)

MD1-0-V-186-11-00212

Filtered Water Storage Tank Roof Structure Detail (3/3)

MD1-0-V-186-11-00213

Filtered Water Storage Tank Shell Manhole Detail

MD1-0-V-186-11-00214

Filtered Water Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00215

Filtered Water Storage Tank Shell Nozzle Detail (1/3)

MD1-0-V-186-11-00216

Filtered Water Storage Tank Shell Nozzle Detail (2/3)

MD1-0-V-186-11-00217

Filtered Water Storage Tank Shell Nozzle Detail (3/3)

MD1-0-V-186-11-00218

Filtered Water Storage Tank Roof Nozzle Detail

MD1-0-V-186-11-00219

Filtered Water Storage Tank Spiral Stairway (1/4)

MD1-0-V-186-11-00220

Filtered Water Storage Tank Spiral Stairway (2/4)

MD1-0-V-186-11-00221

Filtered Water Storage Tank Spiral Stairway (3/4)

MD1-0-V-186-11-00222

Filtered Water Storage Tank Spiral Stairway (4/4)

MD1-0-V-186-11-00223

Filtered Water Storage Tank Spiral Stairway (1/3)

MD1-0-V-186-11-00224

Filtered Water Storage Tank Spiral Stairway (2/3)

MD1-0-V-186-11-00225

Filtered Water Storage Tank Spiral Stairway (3/3)

MD1-0-V-186-11-00226

Filtered Water Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00227

Filtered Water Storage Tank Name Plate Detail

MD1-0-V-186-11-00301

Demi. Water Storage Tank Shell Plate Detail

MD1-0-V-186-11-00302

Demi. Water Storage Tank 1st Course Shell Plate Arrangement (1/2)

MD1-0-V-186-11-00303

Demi. Water Storage Tank 1st Course Shell Plate Arrangement (2/2)

MD1-0-V-186-11-00304

Demi. Water Storage Tank Bottom Plate Arrangement (1/3)

MD1-0-V-186-11-00305

Demi. Water Storage Tank Bottom Plate Arrangement (2/3)

MD1-0-V-186-11-00306

Demi. Water Storage Tank Bottom Plate Arrangement (3/3)

MD1-0-V-186-11-00307

Demi. Water Storage Tank Roof Plate Arrangement (1/3)

MD1-0-V-186-11-00308

Demi. Water Storage Tank Roof Plate Arrangement (2/3)

MD1-0-V-186-11-00309

Demi. Water Storage Tank Roof Plate Arrangement (3/3)

MD1-0-V-186-11-00310

Demi. Water Storage Tank Roof Structure Detail (1/3)

MD1-0-V-186-11-00311

Demi. Water Storage Tank Roof Structure Detail (2/3)

MD1-0-V-186-11-00312

Demi. Water Storage Tank Roof Structure Detail (3/3)

MD1-0-V-186-11-00313

Demi. Water Storage Tank Shell Manhole Detail

MD1-0-V-186-11-00314

Demi. Water Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00315

Demi. Water Storage Tank Shell Nozzle Detail (1/3)

MD1-0-V-186-11-00316

Demi. Water Storage Tank Shell Nozzle Detail (2/3)

MD1-0-V-186-11-00317

Demi. Water Storage Tank Shell Nozzle Detail (3/3)

MD1-0-V-186-11-00318

Demi. Water Storage Tank Roof Nozzle Detail

MD1-0-V-186-11-00319

Demi. Water Storage Tank (A) Spiral Stairway (1/4)

MD1-0-V-186-11-00320

Demi. Water Storage Tank (A) Spiral Stairway (2/4)

MD1-0-V-186-11-00321

Demi. Water Storage Tank (A) Spiral Stairway (3/4)

MD1-0-V-186-11-00322

Demi. Water Storage Tank (A) Spiral Stairway (4/4)

MD1-0-V-186-11-00323

Demi. Water Storage Tank (B) Spiral Stairway (1/4)

MD1-0-V-186-11-00324

Demi. Water Storage Tank (B) Spiral Stairway (2/4)

MD1-0-V-186-11-00325

Demi. Water Storage Tank (B) Spiral Stairway (3/4)

MD1-0-V-186-11-00326

Demi. Water Storage Tank (B) Spiral Stairway (4/4)

MD1-0-V-186-11-00327

Demi. Water Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00328

Demi Water Storage Tank Name Plate Detail

MD1-0-V-186-11-00401

Fire Water Storage Tank Shell Plate Detail

MD1-0-V-186-11-00402

Fire Water Storage Tank 1st course shell plate arrangement (1/2)

MD1-0-V-186-11-00403

Fire water storage tank 1st course shell plate arrangement (2/2)

MD1-0-V-186-11-00404

Fire Water Storage Tank bottom plate arrangement (1/3)

MD1-0-V-186-11-00405

Fire Water Storage Tank bottom plate arrangement (2/3)

MD1-0-V-186-11-00406

Fire water storage tank bottom plate arrangement (3/3)

MD1-0-V-186-11-00407

Fire Water Storage Tank Roof plate arrangement (1/3)

MD1-0-V-186-11-00408

Fire Water Storage Tank Roof plate arrangement (2/3)

MD1-0-V-186-11-00409

Fire Water Storage Tank Roof plate arrangement (3/3)

MD1-0-V-186-11-00410

Fire Water Storage Tank Roof Structure Detail (1/3)

MD1-0-V-186-11-00411

Fire Water Storage Tank Roof Structure Detail (2/3)

MD1-0-V-186-11-00412

Fire Water Storage Tank Roof Structure Detail (3/3)

MD1-0-V-186-11-00413

Fire Water Storage Tank Shell Manhole Detail

MD1-0-V-186-11-00414

Fire Water Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00415

Fire Water Storage Tank Shell Nozzle Detail (1/3)

MD1-0-V-186-11-00416

Fire Water Storage Tank Shell Nozzle Detail (2/3)

MD1-0-V-186-11-00417

Fire Water Storage Tank Shell Nozzle Detail (3/3)

MD1-0-V-186-11-00418

Fire Water Storage Tank Roof Nozzle Detail

MD1-0-V-186-11-00419

Fire Water Storage Tank (A) Spiral Stairway (1/4)

MD1-0-V-186-11-00420

Fire Water Storage Tank (A) Spiral Stairway (2/4)

MD1-0-V-186-11-00421

Fire Water Storage Tank (A) Spiral Stairway (3/4)

MD1-0-V-186-11-00422

Fire Water Storage Tank (A) Spiral Stairway (4/4)

MD1-0-V-186-11-00423

Fire Water Storage Tank (B) Spiral Stairway (1/3)

MD1-0-V-186-11-00424

Fire Water Storage Tank (B) Spiral Stairway (2/3)

MD1-0-V-186-11-00425

Fire Water Storage Tank (B) Spiral Stairway (3/3)

MD1-0-V-186-11-00426

Fire Water Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00427

Fire Water Storage Tank Name Plate Detail

MD1-0-V-186-11-00501

Condensate Storage Tank Shell Plate Detail

MD1-0-V-186-11-00502

Condensate Storage Tank 1st Course Shell Plate Arrangement (1/2)

MD1-0-V-186-11-00503

Condensate Storage Tank 1st Course Shell Plate Arrangement (2/2)

MD1-0-V-186-11-00504

Condensate Storage Tank Bottom Plate Arrangement (1/2)

MD1-0-V-186-11-00505

Condensate Storage Tank Bottom Plate Arrangement (2/2)

MD1-0-V-186-11-00506

Condensate Storage Tank Roof Plate Arrangement (1/2)

MD1-0-V-186-11-00507

Condensate Storage Tank Roof Plate Arrangement (2/2)

MD1-0-V-186-11-00508

Condensate Storage Tank Roof Structural Detail (1/2)

MD1-0-V-186-11-00509

Condensate Storage Tank Roof Structure Detail (2/2)

MD1-0-V-186-11-00510

Condensate Storage Tank Shell Manhole Detail

MD1-0-V-186-11-00511

Condensate Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00512

Condensate Storage Tank Shell Nozzle Detail (1/2)

MD1-0-V-186-11-00513

Condensate Storage Tank Shell Nozzle Detail (2/2)

MD1-0-V-186-11-00514

Condensate Storage Tank Roof Nozzle Detail (1/2)

MD1-0-V-186-11-00515

Condensate Storage Tank (A) Spiral Stairway (1/3)

MD1-0-V-186-11-00516

Condensate Storage Tank (A) Spiral Stairway (2/3

MD1-0-V-186-11-00517

Condensate Storage Tank (A) Spiral Stairway (3/3)

MD1-0-V-186-11-00518

Condensate Storage Tank (B) Spiral Stairway (1/3)

MD1-0-V-186-11-00519

Condensate Storage Tank (B) Spiral Stairway (2/3)

MD1-0-V-186-11-00520

Condensate Storage Tank (B) Spiral Stairway (3/3)

MD1-0-V-186-11-00521

Condensate Storage Tank Roof Nozzle Detail (2/2)

MD1-0-V-186-11-00522

Condensate Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00523

Condensate Storage Tank Name Plate Detail

MD1-0-V-186-11-00601

Potable Water Storage Tank Shell Plate Detail

MD1-0-V-186-11-00602

Potable Water Storage Tank 1st Course Shell Plate Arrangement

MD1-0-V-186-11-00603

Potable Water Storage Tank Bottom Plate Arrangement

MD1-0-V-186-11-00604

Potable Water Storage Tank Roof Plate Arrangement

MD1-0-V-186-11-00605

Potable Water Storage Tank Roof Structure Detail

MD1-0-V-186-11-00606

Potable Water Storage Tank Shell Manhole Detail

MD1-0-V-186-11-00607

Potable Water Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00608

Potable Water Storage Tank Shell Nozzle Detail (1/2)

MD1-0-V-186-11-00609

Potable Water Storage Tank Shell Nozzle Detail (2/2)

MD1-0-V-186-11-00610

Potable Water Storage Tank Roof Nozzle Detail

MD1-0-V-186-11-00611

Potable Water Storage Tank Spiral Stairway (1/3)

MD1-0-V-186-11-00612

Potable Water Storage Tank Spiral Stairway (2/3)

MD1-0-V-186-11-00613

Potable Water Storage Tank Spiral Stairway (3/3)

MD1-0-V-186-11-00614

Potable Water Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00615

Portable Water Storage Tank Name Plate Detail

MD1-0-V-186-11-00616

Potable water storage tank internal ladder detail

MD1-0-V-186-11-00701

Fuel Oil Storage Tank Shell Plate Detail

MD1-0-V-186-11-00702

Fuel Oil Storage Tank 1st Course Shell Plate Arrangement (1/2)

MD1-0-V-186-11-00703

Fuel Oil Storage Tank 1st Course Shell Plate Arrangement (2/2)

MD1-0-V-186-11-00704

Fuel Oil Storage Tank Bottom Plate Arrangement (1/2)

MD1-0-V-186-11-00705

Fuel Oil Storage Tank Bottom Plate Arrangement (2/2)

MD1-0-V-186-11-00706

Fuel Oil Storage Tank Roof Plate Arrangement (1/2)

MD1-0-V-186-11-00707

Fuel Oil Storage Tank Roof Plate Arrangement (2/2)

MD1-0-V-186-11-00708

Fuel Oil Storage Tank Roof Structure Detail (1/2)

MD1-0-V-186-11-00709

Fuel Oil Storage Tank Roof Structure Detail (2/2)

MD1-0-V-186-11-00710

Fuel Oil Storage Tank Shell Manhole Detail (1/2)

MD1-0-V-186-11-00711

Fuel Oil Storage Tank Shell Manhole Detail (2/2)

MD1-0-V-186-11-00712

Fuel Oil Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00713

Fuel Oil Storage Tank Shell Nozzle Detail (1/2)

MD1-0-V-186-11-00714

Fuel Oil Storage Tank Shell Nozzle Detail (2/2)

MD1-0-V-186-11-00715

Fuel Oil Storage Tank Roof Nozzle Detail

MD1-0-V-186-11-00716

Fuel Oil Storage Tank Heating Coil Detail

MD1-0-V-186-11-00717

Fuel Oil Storage Tank (A) Spiral Stairway (1/3)

MD1-0-V-186-11-00718

Fuel Oil Storage Tank (A) Spiral Stairway (2/3)

MD1-0-V-186-11-00719

Fuel Oil Storage Tank (A) Spiral Stairway (3/3)

MD1-0-V-186-11-00720

Fuel Oil Storage Tank Foam Chamber Platform Detail

MD1-0-V-186-11-00721

Fuel Oil Storage Tank (B) Spiral Stairway (1/3)

MD1-0-V-186-11-00722

Fuel Oil Storage Tank (B) Spiral Stairway (2/3)

MD1-0-V-186-11-00723

Fuel Oil Storage Tank (B) Spiral Stairway (3/3)

MD1-0-V-186-11-00724

Fuel Oil Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00725

Fuel Oil Storage Tank Level Gauge Detail

MD1-0-V-186-11-00726

Fuel Oil Storage Tank Floating Suction Detail (1/2)

MD1-0-V-186-11-00727

Fuel Oil Storage Tank Floating Suction Detail (2/2)

MD1-0-V-186-11-00728

Fuel Storage Tank Name Plate Detail

MD1-0-V-186-11-00729

Fuel oil storage tank insulation detail

IC

MD1-0-V-186-11-00730

Fuel oil storage tank internal ladder detail

MD1-0-V-186-11-00731

Fuel oil storage tank pipe support detail(a)

MD1-0-V-186-11-00732

Fuel oil storage tank pipe support detail(b)

MD1-0-V-186-11-00801

Diesel Oil Storage Tank Shell Plate Detail

MD1-0-V-186-11-00802

Diesel Oil Storage Tank 1st Course Shell Plate Arrangement

MD1-0-V-186-11-00803

Diesel Oil Storage Tank Bottom Plate Arrangement

MD1-0-V-186-11-00804

Diesel Oil Storage Tank Roof Plate Arrangement

MD1-0-V-186-11-00805

Diesel Oil Storage Tank Roof Structure Detail

MD1-0-V-186-11-00806

Diesel Oil Storage Tank Shell Manhole Detail

MD1-0-V-186-11-00807

Diesel Oil Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00808

Diesel Oil Storage Tank Shell Nozzle Detail (1/2)

MD1-0-V-186-11-00809

Diesel Oil Storage Tank Shell Nozzle Detail (2/2)

MD1-0-V-186-11-00810

Diesel Oil Storage Tank Roof Nozzle Detail

MD1-0-V-186-11-00811

Diesel Oil Storage Tank Spiral Staiway (1/3)

MD1-0-V-186-11-00812

Diesel Oil Storage Tank Spiral Staiway (2/3)

MD1-0-V-186-11-00813

Diesel Oil Storage Tank Spiral Staiway (3/3)

MD1-0-V-186-11-00814

Diesel Oil Storage Tank Foam Chamber Platform Detail

MD1-0-V-186-11-00815

Diesel Oil Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00816

Diesel Oil Storage Tank Level Gauge Detail

MD1-0-V-186-11-00817

Diesel Oil Storage Tank Floating Suction Detail (1/2)

MD1-0-V-186-11-00818

Diesel Oil Storage Tank Floating Suction Detail (2/2)

MD1-0-V-186-11-00819

Diesel Oil Storage Tank Name Plate Detail

MD1-0-V-186-11-00820

Diesel oil storage tank internal ladder detail

MD1-0-V-186-11-00821

Diesel oil storage tank pipe support detail

MD1-0-V-191-01-10001

STG Building EOT Crane General Arrangement Drawings

MD1-0-V-191-01-10002

Cw pump house eot crane general arrangement drawings

IC

MD1-0-V-191-01-10005

Warehouse EOT Crane General Arrangement Drawings

MD1-0-V-191-01-10006

Fuel oil pump house hoist general arrangement drawings

MD1-0-V-191-01-10008

Fuel oil unloading jetty jib crane general arrangement drawings

MD1-0-V-191-01-10101

Chlorination building hoist general arrangement drawings

MD1-0-V-191-01-10102

Diesel Generator House Hoist General Arrangement Drawings

MD1-0-V-191-01-10105

Return Water Pump House Hoist General Arrangement Drawings

MD1-0-V-191-01-10106

Compressed Air System Monorail Hoist General Arrangement Drawings

MD1-0-V-191-01-10107

Water treatment building hoist general arrangement drawings

MD1-0-V-191-01-10108

Pa fan rotor hoist general arrangement drawings

IC

MD1-0-V-191-01-10109

Pa fan motor hoist general arrangement drawings

IC

MD1-0-V-191-01-10110

Sa fan rotor hoist general arrangement drawings

IC

MD1-0-V-191-01-10111

Sa fan motor hoist general arrangement drawings

IC

MD1-0-V-191-01-10112

Aph basket hoist general arrangement drawings

IC

MD1-0-V-191-01-10113

Boiler area hoist general arrangement drawings

IC

MD1-0-V-191-01-10114

Stripper cooler hoist general arrangement drawings

IC

MD1-0-V-191-01-10115

Loopseal blower hoist general arrangement drawings

IC

MD1-0-V-191-01-10116

Stripper cooler blower hoist general arrangement drawings

IC

MD1-0-V-191-01-10117

Fire protection pump house general arrangement drawings

MD1-0-V-191-01-10118

Waste water area pump room hoist general arrangement drawings

MD1-0-V-191-01-10119

Chlorination building vaporizer hoist general arrangement drawings

MD1-0-V-191-01-10120

CCWC Monorail Hoist General Arrangement Drawings

MD1-0-V-191-01-10124

Hydrogen Seal Oil Unit Monorail Hoist General Arrangement Drawings

MD1-0-V-191-01-10125

Stator Winding Liquid Cooling Unit Monoral Hoist General Arrangement

MD1-0-V-191-01-10207

ACWP Manual Hoist General Arrangement Drawings

MD1-0-V-191-01-10208

FWH Manual Hoist General Arrangement Drawings

MD1-0-V-191-01-10209

Condenser Manual Hoist General Arrangement Drawings

MD1-0-V-191-01-60001

Foundation Information Drawing for CW Intake Screen Plant Gantry Crane

MD1-0-V-191-05-00001

Inspection test plan for cranes & hoists

MD1-0-V-191-05-00002

Inspection Test Procedure for Cranes & Hoists

MD1-0-V-191-05-00003

WPS & PQR for Cranes & Hoists

MD1-0-V-191-05-10000

Painting specification & procedure for crane & hoist

MD1-0-V-191-05-40000

Packing Procedure for Crane & Hoist

IC

MD1-0-V-191-09-10001

Technical Data Sheet for Cranes & Hoists

RT

MD1-0-V-400-05-00221

Inspection and Test Plan for CS Pipes (Seamless)

MD1-0-V-400-05-00222

Inspection test procedure for cs pipes (seamless)

MD1-0-V-400-05-00226

Inspection and test plan for cs pipes(seam)

MD1-0-V-400-05-00227

Inspection and test procedure for cs pipes(seam)

MD1-0-V-400-05-00326

Inspection and test plan for ss pipes(seam)

MD1-0-V-400-05-00327

Inspection and test procedure for ss pipes(seam)

MD1-0-V-400-05-00421

Inspection and Test Plan for GRP Pipe

MD1-0-V-400-05-00422

Inspection and Test Procedure for GRP Pipes

MD1-0-V-400-05-00423

Approved shop test & inspection report for grp pipes

MD1-0-V-400-05-00528

Inspection and test plan for carbon forged fitting

MD1-0-V-400-05-00621

Inspection and test plan for cs / ss fitting

MD1-0-V-400-05-00623

ITP for CS / SS Fitting

MD1-0-V-400-05-00624

Pmi procedure for cs / ss fitting

IC

MD1-0-V-400-05-00625

Wps & pqr for cs / ss fitting

IC

MD1-0-V-400-05-00626

Marking procedure for cs / ss fitting

MD1-0-V-400-05-00627

Rust prevention procedure for cs / ss fitting

MD1-0-V-400-05-00628

Packing procedure for cs / ss fitting

MD1-0-V-400-05-00821

Inspection & test plan for cs & ss flanges

MD1-0-V-400-05-01011

Handling & Storage Instruction for HDE Piping

MD1-0-V-400-05-01012

Instruction of Underground Installation

MD1-0-V-400-05-01013

Heat Fusion Joining Instruction

MD1-0-V-400-05-01014

Leak Testing Instruction

MD1-0-V-400-05-01015

Maintenance & Repair Instruction

MD1-0-V-400-05-01021

Inspection & Test Plan

MD1-0-V-400-05-01022

Inspection & Test Procedure

MD1-0-V-400-05-01121

Inspection and Test Plan for Groove Coupling Fitting

MD1-0-V-400-05-01151

Inspection and Test Plan for Bolt & Nuts

MD1-0-V-400-05-01152

Inspection and Test Procedure for Bolt & Nuts

MD1-0-V-400-05-01161

Inspection and Test Plan for Gasket

MD1-0-V-400-05-01221

Inspection and Test Plan for Cast Valves

MD1-0-V-400-05-01222

Inspection and test procedure for cast valves (manual & auto)

IC

MD1-0-V-400-05-01233

Operation & maintenance manual for cast valves

MD1-0-V-400-05-01322

Inspection and test procedure for forged valves (manual & auto)

IC

MD1-0-V-400-05-01333

Operation & maintenance manual for forged valves

MD1-0-V-400-05-01521

Shop inspection and test plan for safety and relief valve

MD1-0-V-400-05-01522

Inspection and test procedure for safety valve

MD1-0-V-400-05-01622

Inspection and test procedure for butterfly & check valves

MD1-0-V-400-05-01721

Inspection and test plan for non-return check valves

MD1-0-V-400-05-01722

Inspection and Test Procedure for Combined NRV

IC

MD1-0-V-400-05-01733

Operation & maintenance manual for combined nrv dn2400

MD1-0-V-400-05-02122

Inspection and test procedure for strainers

MD1-0-V-400-05-02133

Operation and maintenance manual for strainers

MD1-0-V-400-05-02221

Inspection and test plan for traps(steam/air)

MD1-0-V-400-05-02222

Inspection and test procedure for traps(steam/air)

MD1-0-V-400-05-02233

Operation & maintenance manual for traps(steam/air)

MD1-0-V-400-05-02321

Inspection and Test Plan for Flexible & Expansion Joint

MD1-0-V-400-05-02322

Inspection and test procedure for flexible & expansion joint

MD1-0-V-400-05-02333

Operation & maintenance manual for flexible & expansion joint

MD1-0-V-400-07-00411

Stress analysis report for grp pipes

MD1-0-V-400-09-01211

Data sheet for motor operated cast valves

MD1-0-V-400-09-01212

Data Sheet for Power Assisted Non Return Valves

AC

MD1-0-V-400-09-01611

Datasheet for motor operated butterfly valve

MD1-0-V-400-09-01711

Datasheet for combined nrv dn2400

MD1-0-V-400-09-02111

Datasheet for Strainers

MD1-0-V-400-09-02211

DataSheet for Traps(steam/air)

MD1-0-V-400-10-00411

Component Dimension Table For GRP Pipes

MD1-0-V-400-10-01211

Outline drawing for manual cast valves

MD1-0-V-400-10-01212

Outline drawing for motor operated cast valves

MD1-0-V-400-10-01213

Outline Drawing for Power Assisted Non Return Valves

IC

MD1-0-V-400-10-01711

Outline drawing for combined nrv dn2400

MD1-0-V-400-10-02111

Outline drawing for strainers

MD1-0-V-400-10-02211

Outline Drawing for Traps(steam/air)

MD1-0-V-400-23-00411

Piping Arrangement Drawing for GRP Pipes (1 of 2)

MD1-0-V-400-23-00412

Piping Arrangement Drawing for GRP Pipes (2 of 2)

MD1-0-V-400-25-02421

Painting procedure at shop for hanger & support

MD1-0-V-400-25-02422

Material handling & packing procedure for hanger & support

IC

MD1-0-V-400-25-02423

Heat treatment procedure for hanger & support

MD1-0-V-400-25-02424

Wps & pqr for hanger & support

MD1-0-V-400-25-02425

Inspection and test plan for hanger & support

MD1-0-V-400-25-02426

Inspection and test procedure for hanger & support

MD1-0-V-400-25-02427

Non destructive examination procedure for hanger & support

MD1-0-V-400-25-02428

Function test procedure for hanger & support

MD1-0-V-560-01-00003

Anode Arrangement Drawings for Cathodic Protection System

MD1-0-V-560-11-00001

Layout & Circuit Diagrams for Cathodic Protection System

MD1-0-V-594-02-00001

Technical Specification & Drawing of Boiler Elevator

MD1-0-V-594-02-00002

Technical Specification & Drawing of Administration Building Elevator

MD1-0-V-594-02-00003

Catalogue for Elevator(Boiler & Admin. Building)

MD1-0-V-594-05-00002

Shop Test and Inspection Plan for Elevator (Boiler & Admin. Building)

MD1-0-V-594-05-00003

Field Test and Inspection Plan for Elevator (Boiler & Admin. Building)

MD1-0-V-594-05-00004

Inspection & Test Procedure for Elevator (Boiler & Admin. Building)

MD1-0-V-594-05-00005

Manual for Installation, Erection, Operation & Maintenance for Elevator

MD1-0-V-594-08-00002

Spare Part and Special Tool List for Elevator (Boiler & Admin. Building)

MD1-0-V-660-09-30001

Datasheet and Catalog for Pressure and Temperature Indicator (BOP)

MD1-0-V-660-11-30001

Dimensional Drawing for Pressure and Temperature Indicator (BOP)

MD1-0-V-710-57-10001

Material Approval Request Air Conditioning System

MD1-0-V-710-57-10002

Inspection and test plan & inspection and test procedure

MD1-0-V-710-57-20001

Material Approval Request of Ventilation Fans

MD1-0-V-710-57-20002

Inspection and Test Plan & Inspection Test Procedure of Ventilation Fans

MD1-0-V-750-01-00121

General Arrangement Drawing for Fix Foam Unit

MD1-0-V-750-05-00137

PROJECT QUALITY PLAN FOR FIRE FIGHTING

MD1-0-V-750-05-00138

INSPECTION AND TEST PLAN FOR FIRE FIGHTING

MD1-0-V-750-05-00139

SHOP INSPECTION & TEST PROCEDURE FOR FIRE FIGHTING

MD1-0-V-750-05-00140

Field Commissioning and Test Procedure for Clean Agent Fire Extinguishing Syste)

MD1-0-V-750-05-00401

Operation and Maintenance Manual for Fire Protection System

IC

MD1-0-V-750-08-00005

Sub-Vendor List

IC

MD1-0-V-750-09-00006

Equipment Data Sheet: Outdoor Hydrant

MD1-0-V-750-09-00007

Equipment Data Sheet: Hose Cabinet

MD1-0-V-750-09-00008

Equipment Data Sheet: Isolation Valve for Hydrant

MD1-0-V-750-09-00009

Equipment Data Sheet: Valve Box for Gate Valve for Hydrant

MD1-0-V-750-09-00010

Equipment Data Sheet: Post Indicator Valve

MD1-0-V-750-09-00011

Equipment Data Sheet: Guard Post for Fire Hydrant & PIV (Quotation Item A-7.0)

MD1-0-V-750-09-00012

Equipment Data Sheet: Indoor Hydrant (Quotation Item No.B-1.0)

MD1-0-V-750-09-00013

Equipment Data Sheet: Hose Reel

MD1-0-V-750-09-00014

Equipment Data Sheet: Pressure Guage (Quotation Item No.B-3.0 and E-11.0)

MD1-0-V-750-09-00015

Equipment Data Sheet: Fire Department Connection (Quot No.B-4.0, C-8.0 and E-10)

MD1-0-V-750-09-00016

Equipment Data Sheet: Check Valve

MD1-0-V-750-09-00017

Equipment Data Sheet: OS&Y Gate Valve (Blass Material)

MD1-0-V-750-09-00018

Equipment Data Sheet: Prossure Transmitter

MD1-0-V-750-09-00019

Equipment Data Sheet: Deluge Valve

AC

MD1-0-V-750-09-00020

Equipment Data Sheet: Water Spray Nozzle

MD1-0-V-750-09-00021

Equipment Data Sheet: Y Strainer

MD1-0-V-750-09-00022

Equipment Data Sheet: Alarm Check Valve

MD1-0-V-750-09-00023

Equipment Data Sheet: Sprinkler Head

MD1-0-V-750-09-00024

Equipment Data Sheet: Flexible Sprinkler Hose

AC

MD1-0-V-750-09-00025

Equipment Data Sheet: Test Valve

MD1-0-V-750-09-00026

Equipment Data Sheet: Bladder Foam Tank Skid

MD1-0-V-750-09-00027

Equipment Data Sheet: Foam Monitor

MD1-0-V-750-09-00028

Equipment Data Sheet: Foam Chamber

MD1-0-V-750-09-00029

Equipment Data Sheet: Low Expansion Foam Concentrate

MD1-0-V-750-09-00030

Equipment data sheet : fix foam unit

MD1-0-V-750-09-00031

Equipment Data Sheet: FM-200 Fire Suppresion System

MD1-0-V-750-09-00032

Equipment Data Sheet: Portable ABC Dry Chemical Fire Extinguisher

MD1-0-V-750-09-00033

Equipment Data Sheet: Portable CO2 Fire Extinguisher

MD1-0-V-750-09-00034

Equipment Data Sheet: Mobile Dry Powder Extinguisher

MD1-0-V-750-09-00035

Equipment Data Sheet: Mobile CO2 Extinguisher

MD1-0-V-750-09-00036

Equipment Data Sheet: Rescue and Salvage Equipment

MD1-0-V-750-12-00004

Bill of materials

IC

MD1-0-V-750-21-00065

Clean Agent Fire Extinguishing Sytem for Main Control Room (Control BLDG)

MD1-0-V-750-21-00073

Clean Agent Fire Extinguishing Sytem for Electronic Equip. Room (Control BLDG)

MD1-0-V-750-21-00081

Clean Agent Fire Extinguishing Sytem for Control & Protection Room (SWYD Control

MD1-0-V-750-21-00089

Clean agent fire extinguishing system piping & instrumentation drawing for esp

MD1-0-V-750-21-00097

Clean agent fire extinguishing system piping & instrumentation drawing for esp

MD1-0-V-750-21-00105

Clean agent fire extinguishing system piping & instrumentation drawing for cont

MD1-0-V-750-23-00066

Clean Agent Fire Extinguishing System General Drawing for Main Control Room

MD1-0-V-750-23-00074

Clean Agent Fire Extinguishing System Piping General Drawing for Electronic Room

MD1-0-V-750-23-00082

Clean Agent Fire Exting. Syst Piping General Drawing for Control & Protection Rm

MD1-0-V-750-23-00090

Clean agent fire extinguishing system piping & instrumentation drawing for esp

MD1-0-V-750-23-00098

Clean agent fire extinguishing system piping general arrangement drawing for es

MD1-0-V-750-23-00106

Clean agent fire extinguishing system piping general arrang drawing for control

MD1-0-V-750-23-00143

Vesda System Piping General Arrangement Drawing

MD1-0-V-750-24-00068

Clean agent fire extinguishing system piping iso metric drawing for main contro)

MD1-0-V-750-24-00076

Clean agent fire extinguishing system piping iso metric drawing for electronic )

MD1-0-V-750-24-00084

Clean agent fire extinguishing system piping iso metric drawing for control)

MD1-0-V-750-24-00092

Clean agent fire extinguishing system piping iso metric drawing for esp controlc

MD1-0-V-750-24-00100

Calculation sheets for clean agent fire extinguishing system:esp control room (c

MD1-0-V-750-24-00108

Clean agent fire extinguishing system piping iso metric drawing for control & eq

MD1-0-V-750-25-00067

Clean Agent Fire Exting. Syst Cylinder Install for Main Control Room (SWYD)

MD1-0-V-750-25-00075

Clean Agent Fire Exting. Syst Cylinder Install for Electronic Equip Room

MD1-0-V-750-25-00083

Clean Agent Fire Exting. Syst Cylinder Install for Control & Protection room

MD1-0-V-750-25-00091

Clean agent fire extinguishing system cylinder installation & pipe support deta

MD1-0-V-750-25-00099

Clean agent fire extinguishing system cylinder installation & pipe support deta

MD1-0-V-750-25-00107

Clean agent fire extinguishing system cylinder installation & pipe support detai

MD1-0-V-750-55-00058

Calculation Sheet for Clean Agent Fire Exting. Sys: Main Control Room

MD1-0-V-750-55-00059

Calculation Sheet for Clean Agent Fire Exting. Sys: Electronic Equip. Room

MD1-0-V-750-55-00060

Calculation Sheet for Clean Agent Fire Exting. Sys: Control & Protection Room

MD1-0-V-750-55-00061

Calculation sheets for clean agent fire extinguishing system : esp control room

MD1-0-V-750-55-00062

Calculation sheets for clean agent fire extinguishing system : esp control room

MD1-0-V-750-55-00063

Calculation sheets for clean agent fire extinguishing system : control & equip

MD1-0-V-750-55-00144

Calculation Sheets for Vesda System

MD1-0-V-751-02-00012

Suction & Discharge Pressure Gauge for Fire Water Pump

MD1-0-V-751-02-00013

Air Release Valve Data for Fire Water Pump

MD1-0-V-751-02-00014

Flow Meter Data for Fire Water Pump

MD1-0-V-751-02-00015

Gate Valve & Check Valve Data for Fire Water Pump

MD1-0-V-751-02-00105

Engine Data for Diesel Fire Water Pump

MD1-0-V-751-02-00111

Coupling Data for Diesel Fire Water Pump

MD1-0-V-751-02-00113

Nose Data Sheet for Diesel Fire Water Pump

MD1-0-V-751-02-00206

Coupling Data for Electric Fire Water Pump

MD1-0-V-751-02-00208

Nose Data sheet Electric Fire Water Pump

MD1-0-V-751-02-00305

Coupling Data for Jockey Pump

MD1-0-V-751-02-00306

Nose Data sheet for Jockey Pump

MD1-0-V-751-03-00003

Cause & Effect Chart for Fire Water Pump

MD1-0-V-751-03-00004

Phylosophy of Operation for Fire Water Pump

MD1-0-V-751-05-00016

Inspection & test plan for fire water pumps

MD1-0-V-751-05-00017

Hydrostatic test procedure for fire water pumps

MD1-0-V-751-07-00401

Mechanical Run Test Report for Diesel Fire Pump

MD1-0-V-751-07-00402

Hydrostatic Test Report for Diesel Fire Pump

MD1-0-V-751-07-00403

Performance Test Report for Diesel Fire Pump

MD1-0-V-751-07-00404

Engine Test Record for Diesel Fire Pump

MD1-0-V-751-07-00406

Impeller Balance Record for Diesel Fire Pump

MD1-0-V-751-07-00408

NDE Test Report for Diesel Fire Pump

MD1-0-V-751-07-00409

Visual & Dimension Inspection Report for Diesel Fire Pump

MD1-0-V-751-07-00410

Painting Inspection Report for Diesel Fire Pump

MD1-0-V-751-07-00411

Hydrostatic Test Report for Electric Fire Pump

MD1-0-V-751-07-00412

Performance Test Report for Electric Fire Pump

MD1-0-V-751-07-00415

Impeller Balance Record for Electric Fire Pump

MD1-0-V-751-07-00417

NDE Test Report for Electric Fire Pump

MD1-0-V-751-07-00418

Visual & Dimension Inspection Report for Electric Fire Pump

MD1-0-V-751-07-00419

Painting Inspection Report for Electric Fire Pump

MD1-0-V-751-07-00420

Hydrostatic Test Report for Jockey Pumps

MD1-0-V-751-07-00421

Performance Test Report for Jockey Pumps

MD1-0-V-751-07-00422

Motor Test Report for Jockey Pumps

MD1-0-V-751-07-00423

Controller Functional Test Record for Jockey Pumps

MD1-0-V-751-07-00425

Visual & Dimension Inspection Report for Jockey Pumps

MD1-0-V-751-07-00426

Painting Inspection Report for Jockey Pumps

IC

MD1-0-V-751-07-00427

NDE Test Report for Jockey Pumps

MD1-0-V-751-09-00101

Pump Data Sheet & Performance Curve for Diesel Fire Water Pump

MD1-0-V-751-09-00201

Pump Data Sheet & Performance Curve for Electric Fire Water Pump

MD1-0-V-751-09-00301

Pump Data Sheet & Performance Curve for Jockey Pump

MD1-0-V-751-10-00102

General Arrangement Drawing for Diesel Fire Water Pump

MD1-0-V-751-10-00107

Fuel Tank Drawing for Diesel Fire Water Pump

MD1-0-V-751-10-00110

Muffler Drawing for Diesel Fire Water Pump

MD1-0-V-751-10-00112

Pressure Relief Valve Drawing with Waste Cone for Fire Water Pump

MD1-0-V-751-10-00202

General Arrangement Drawing for Electric Fire Water Pump

MD1-0-V-751-10-00207

Casing Relief Valve Drawing for Electric Fire Water Pump

MD1-0-V-751-10-00302

General Arrangement Drawing for Jockey Pump

MD1-0-V-751-11-00103

Cross Sectional Drwg & BOM for Diesel Fire Water Pump

MD1-0-V-751-11-00104

Sound Enclosure Dwg for Fire Water Pump

MD1-0-V-751-11-00108

High & Lowe Fuel Level Switch Drwg for Jockey Pump

I
AC

MD1-0-V-751-11-00203

Pump Cross Sectional Drwg & BOM for Electric Fire Water Pump

MD1-0-V-751-11-00303

Pump Cross Sectional Drwg & BOM for Jockey Pump

MD1-0-V-751-21-00002

Piping & Instrument Diagram for Fire Water Pump

MD1-0-V-751-34-00109

Cooling Loop Drawing for Diesel Fire Water Pump

MD1-0-V-751-35-00106

Controller Date for Diesel Fire Water Pump

MD1-0-V-751-35-00205

Controller Date for Electric Fire Water Pump

MD1-0-V-751-35-00307

Controller Date for Jockey Pump

MD1-0-V-805-01-00001

General Arrangement Drawing for Water Treatment (1 of 7)

MD1-0-V-805-01-00002

General Arrangement Drawing for Water Treatment (2 of 7)

MD1-0-V-805-01-00003

General Arrangement Drawing for Water Treatment (3 of 7)

MD1-0-V-805-01-00004

General Arrangement Drawing for Water Treatment (4 of 7)

MD1-0-V-805-01-00005

General Arrangement Drawing for Water Treatment (5 of 7)

MD1-0-V-805-01-00006

General Arrangement Drawing for Water Treatment (6 of 7)

MD1-0-V-805-01-00007

General Arrangement Drawing for Water Treatment (7 of 7)

MD1-0-V-805-02-00004

Piping material classification for wt & wwt system

MD1-0-V-805-05-00001

Project Quality Assurance Plan

MD1-0-V-805-05-00002

Inspection and Test Plan (ITP)

MD1-0-V-805-05-00003

Inspection and test procedure

MD1-0-V-805-05-00005

Method Statement for WT & WWT System Installation Work

IC

MD1-0-V-805-05-00021

Painting specification and procedure for wt & wwt

MD1-0-V-805-05-00022

Lining specification for wt&wwt system

MD1-0-V-805-05-00025

Non destructive examination(nde) procedures

MD1-0-V-805-06-10000

Seismic & Wind Load Calculation for WT & WWT

MD1-0-V-805-08-00003

Equipment list for wt & wwt

MD1-0-V-805-08-00011

Travelling Trashrack Rake Assembly

MD1-0-V-805-08-00015

Lubricant list for wt & wwt system

MD1-0-V-805-08-00020

Piping Line List for WT & WWT System

MD1-0-V-805-08-00038

Quality Inspection and Test Plan for Seawater Intake Facilities

IC

MD1-0-V-805-08-00039

NDE procedure for Seawater Intake Facilities

MD1-0-V-805-08-00068

Test Procedure (at Factory) for Seawater Intake Facilities

MD1-0-V-805-08-00069

Control Procedure (at Factory) for Seawater Intake Facilities

IC

MD1-0-V-805-09-01001

Centrifugal pump & motor data sheet for wt & wwt

RT

MD1-0-V-805-09-01002

Diaphragm pump & motor data sheet for wt & wwt system

AC

MD1-0-V-805-09-01003

Agitator with motor data sheet for wt & wwt system

AC

MD1-0-V-805-09-01004

Blower with motor data sheet for wt & wwt system

AC

MD1-0-V-805-09-01005

Heater exchanger data sheet for wt system

AC

MD1-0-V-805-09-01006

Line mixer data sheet for wt & wwt system

AC

MD1-0-V-805-09-01007

Safety shower & eye washer data sheet for wt & wwt system

AC

MD1-0-V-805-09-01008

Pipe oil skimmer for api & cpi for wwt system

AC

MD1-0-V-805-09-01009

Booster pump with motor data sheet for wt system

AC

MD1-0-V-805-09-02001

Electric heater data sheet for wt & wwt system

MD1-0-V-805-10-00015

Sea Water Intake Facility Travelling Band Screen

MD1-0-V-805-10-00016

Sea Water Intake Facility Stop Log & Lifting Beam & Guide Ways

MD1-0-V-805-10-00019

Sea Water Intake Facility Fine Bar Screen-Assembly

MD1-0-V-805-10-00020

Sea Water Intake Facility Coarse Bar Screen-Assembly

MD1-0-V-805-21-00001

Piping & Instrument Diagram for WT & WWT

MD1-0-V-805-21-00002

Nameplate drawing for wt & wwt

MD1-0-V-805-21-00006

Sea Water Intake Facility P&ID

AC

MD1-0-V-810-10-01001

Clarifier Assembly & Detail Drawing for WT

MD1-0-V-810-10-01002

Automatic Gravity Filter Assembly & Detail Drawing for WT

MD1-0-V-810-10-01003

Polymer solution tank assembly & detail drawing for wt

MD1-0-V-810-10-01004

Coagulant solution tank assembly & detail drawing for wt

MD1-0-V-810-10-01005

Caustic solution tank assembly & detail drawing for wt

MD1-0-V-810-10-01006

Naocl dosing tank assembly & detail drawing for wt

MD1-0-V-820-10-01001

Activated Carbon Filter Assembly & Detail Drawing for WT

MD1-0-V-820-10-01002

Carbon Exchanger Assembly & Detail Drawing for WT

MD1-0-V-820-10-01003

Defasifier & Degasified Water Tank Assembly & Detail Drawing for WT

MD1-0-V-820-10-01004

Anion Exchanger Assembly & Detail Drawing for WT

MD1-0-V-820-10-01005

Mixed Bed Polisher Assembly & Detail Drawing for WT

MD1-0-V-820-10-01006

Acid Storage Tank Assembly & Detail Drawing for WT

MD1-0-V-820-10-01007

Caustic Storage Tank Assembly & Detail Drawing for WT

MD1-0-V-820-10-01008

Resin Trap for Ion Exchanger Assembly & Detail Drawing for WT

MD1-0-V-820-10-01009

Instrument Air Receiver Assembly & Detail Drawing for WT

MD1-0-V-820-10-01010

Service Air Receiver Assembly & Detail Drawing for WT

MD1-0-V-820-10-01011

Fume scrubber assembly & detail drawing for wt & wwt

MD1-0-V-820-10-01012

Salt dissolving tank for anion assembly & detail drawing for wt

MD1-0-V-820-10-01013

Mobile Equipment Assembly & Detail Drawing for WT

MD1-0-V-820-10-01014

Acid Measuring Tank for Cation & MB Ex. Assembly & Detail Drawing for WT

MD1-0-V-820-10-01015

Caustic Measuring Tank for Anion & M.B Ex. Assembly & Detail Drawing for WT

MD1-0-V-830-10-01001

Naocl dosing tank for potable assembly & detail drawing for wt

MD1-0-V-830-10-01002

Activated Carbon Filter for Potable Assembly & Detail Drawing for WT

MD1-0-V-840-10-01001

Clarifer Assembly & Detail Drawing for WWT

MD1-0-V-840-10-01002

Activated Carbon Filter Assembly & Detail Drawing for WWT

MD1-0-V-840-10-01003

Sludge Thickner Assembly & Detail Drawing for WWT

MD1-0-V-840-10-01004

Acid Sotrage Tank Assembly & Detail Drawing for WWT

MD1-0-V-840-10-01005

Caustic Sotrage Tank Assembly & Detail Drawing for WWT

MD1-0-V-840-10-01006

Acid Measuring Tank Assembly & Detail Drawing for WWT

MD1-0-V-840-10-01007

Caustic Dilution Tank Assembly & Detail Drawing for WWT

MD1-0-V-840-10-01008

Caustic Measuring Tank Assembly & Detail Drawing for WWT

MD1-0-V-840-10-01009

Caustic Dilution Tank Assembly & Detail Drawing for WWT

MD1-0-V-840-10-01010

Polymer solution tank assembly & detail drawing for wwt

MD1-0-V-840-10-01011

Coagulant solution tank assembly & detail drawing for wwt

MD1-0-V-840-10-01012

Pressure Filter Assembly & Detail Drawing for WWT

MD1-0-V-840-10-01013

Walkway assembly & detail drawing for wwt

MD1-0-V-850-01-00001

General Arrangement for Chemical Dosing System

MD1-0-V-850-02-00001

Piping Material Specification for Boiler Chemical Dosing System

MD1-0-V-850-02-00002

Painting specification and procedure for boiler chemical dosing system

MD1-0-V-850-03-00001

System description for boiler chemical dosing system

MD1-0-V-850-04-00001

Code and Standard for Boiler Chemical Dosing System

MD1-0-V-850-05-00002

Inspection Test Report for Boiler Chemical Dosing System

MD1-0-V-850-05-00005

Weld procedures specification(wps) and qualification records(pqr) for all tank

IC

MD1-0-V-850-05-00006

Non-Destructive Examination(NDE) Procedures for Boiler Chemical Dosing System

MD1-0-V-850-05-00007

Inspection and test plan(itp) for boiler chemical dosing system

IC

MD1-0-V-850-05-00008

Inspection and test procedure for boiler chemical dosing system

IC

MD1-0-V-850-08-00003

Equipment List for Boiler Chemical Dosing System

MD1-0-V-850-08-00014

Utility and Chemical Consumption List for Chemical Dosing System

MD1-0-V-850-08-00015

Lubricant List for Boiler Chemical Dosing System

MD1-0-V-850-08-00016

Valve List for Boiler Chemical Dosing System

MD1-0-V-850-08-00017

Pipe Line List for Boiler Chemical Dosing System

MD1-0-V-850-09-00001

Motor Data Sheet for Boiler Chemical Dosing System

MD1-0-V-850-09-00003

Equipment Date Sheet for Boiler Chemical Dosing System

MD1-0-V-850-09-00004

Pump Data Sheet for Boiler Chemical Dosing System

MD1-0-V-850-21-00001

Piping and Instrument Diagram Chemical Dosing System

MD1-0-V-860-01-00005

General Arrangement for Gaseous Chlorination System

MD1-0-V-860-01-00006

Piping Arrangement Drawing for Gaseous Chlorination System

MD1-0-V-860-02-00001

Code and Standard for Gaseous Chlorination System

MD1-0-V-860-02-00002

Weld Procedures Spec.(WPS)& Qualification Records(QPR) Gaseous Chlorinations Sys

MD1-0-V-860-02-00008

Piping material classification for gaseous chlorination

MD1-0-V-860-03-00002

System Design and Operational Description For Gaseous Chlorination System

MD1-0-V-860-03-00004

System Description for Gaseous Chlorination System

MD1-0-V-860-05-00011

Non-Destructive Examination (NDE) Procedures Gasous Chlorination

MD1-0-V-860-05-00012

Project Quality Assurance Plan for Gaseous Chlorination System

MD1-0-V-860-05-00013

Inspection and Test Plan(ITP) for Gaseous Chlorination System

MD1-0-V-860-05-00014

Inspection and Test Procedure for Gaseous Chlorination System

MD1-0-V-860-05-00020

Painting Specification and Procedure for Gaseous Chlorination System

MD1-0-V-860-08-00003

Equipment List for Gaseous Chlorination System

MD1-0-V-860-08-00017

Control Valve List for Gaseous Chlorination System

MD1-0-V-860-08-00021

Utility and chemical Consumption List for Gaseous Chlorination System

MD1-0-V-860-08-00022

Lubricanting List for Gaseous Chlorination System

MD1-0-V-860-08-00023

Valve List for Gaseous Chlorination System

MD1-0-V-860-09-00004

Equipment data sheet for gaseous Chlorination System

MD1-0-V-860-09-00005

Pump Data Sheet and performance Curves Characteristic Gaseous Chlorination

MD1-0-V-860-09-00006

Blower Data Sheet and Performance Curves Characteristic Gaseous

MD1-0-V-860-21-00001

P & I Diagram for Gaseous Chlorination System (1 of 2)

MD1-0-V-860-21-00002

P & I Diagram for Gaseous Chlorination System (2 of 2)

MD1-0-V-860-21-00003

P & I Diagram for Chlorine Gas Neutralizing System

MD1-0-V-860-21-00004

P & I Diagram for Chlorine Gas Analysis System

MD1-0-V-860-21-00005

P & I Diagram for Gaseous Chlorination System (interlock) (1 of 3)

MD1-0-V-860-21-00006

P & I Diagram for Gaseous Chlorination System (interlock) (2 of 3)

MD1-0-V-860-21-00007

P & I Diagram for Gaseous Chlorination System (interlock) (3 of 3)

MD1-0-V-870-01-00005

General arrangement for sewage treatment system

IC

MD1-0-V-870-02-00004

Piping material classification for sewage treatment system

MD1-0-V-870-03-00003

System Description for Sewage Treatment System

MD1-0-V-870-05-00007

Project Quality Assurance Plan for Sewage Treatment System

MD1-0-V-870-05-00008

Inspection and Test Plan for Sewage Treatment System

MD1-0-V-870-05-00009

Inspection and Test Procedure for Sewage Treatment System

IC

MD1-0-V-870-05-00014

Painting specification and procedure for sewage treatment system

MD1-0-V-870-08-00003

Equipment list for sewage treatment system

MD1-0-V-870-08-00015

Utility and Chemical Consumption List for Sewage Treatment System

MD1-0-V-870-09-00004

Equipment data sheet for sewage treatment system

MD1-0-V-870-11-00003

Equipment sizing details for sewage treatment system

MD1-0-V-870-21-00001

P&i diagram for sewage treatment system

MD1-0-W-800-57-00001

Water Balance Diagram

MD1-0-W-810-21-00001

P & I Diagram for Preliminary Raw Water Treatment System

MD1-0-W-810-22-00001

Flow Diagram for Preliminary Raw Water Treatment System

MD1-0-W-820-03-00001

System Description for Water Treatment System

MD1-0-W-820-06-00001

Calculation Sheet for Water Treatment System

MD1-0-W-820-21-00001

P & I Diagram for Demineralized Water Treatment System (1)

MD1-0-W-820-21-00002

P & I Diagram for Demineralized Water Treatment System (2)

MD1-0-W-820-22-00001

Flow Diagram for Demineralized Water Treatment System

MD1-0-W-830-21-00001

P & I Diagram for Portable Water Treatment System

MD1-0-W-830-22-00001

Flow Diagram for Portable Water Treatment System

MD1-0-W-840-03-00001

System Description for Waste Water Treatment System

MD1-0-W-840-06-00001

Calculation Sheet for Waste Water Treatment System

MD1-0-W-840-21-00001

P & I Diagram for Waste Water Treatment System (1)

MD1-0-W-840-21-00002

P & I Diagram for Waste Water Treatment System (2)

MD1-0-W-840-22-00001

Flow Diagram for Waste Water Treatment System

MD1-0-W-850-06-00001

Calculation Sheet for Boiler Chemical Dosing System

MD1-0-W-850-21-00001

P & I Diagram Chemical Dosing System

MD1-0-W-850-22-00001

Flow Diagram for Chemical Dosing System

MD1-0-W-860-03-00001

System Description for Gaseous Chlorination System

MD1-0-W-860-06-00001

Calculation Sheet for Gaseous Chlorination System

MD1-0-W-860-21-00001

P & I Diagram for Gaseous Chlorination System

MD1-0-W-860-22-00001

Flow Diagram for Gaseous Chlorination System

MD1-0-W-870-21-00001

P & I Diagram for Sewage Treatment System

MD1-0-W-870-22-00001

Flow Diagram for Sewage Treatment System

MD1-1-P-122-24-00011

Piping Isometric Drawing - Valve Sealing Water System (Unit #1)

MD1-1-P-131-24-00001

Piping Isometric Drawing- Steam Circulating Water System (Unit #1)

MD1-1-P-131-24-00011

Piping Isometric Drawing- Aux. Cooling Water System (Unit #1)

MD1-1-P-141-24-00001

Piping Isometric Drawing- Closed Cooling Water System (Unit #1)

MD1-1-P-411-01-00001

General Arrangement Drawing- Unit #1 Boiler Area

MD1-1-P-412-01-00001

General Arrangement Drawing- Unit #1 ESP & Main Stack Area

MD1-1-P-412-23-00001

Pipe Arrangement & Support Location Drawing - Electrostatic Precipitator #1A Ara

MD1-1-P-412-23-00002

Pipe Arrangement & Support Location Drawing - Electrostatic Precipitator #1B Ara

MD1-1-P-841-24-00001

Piping Isometric Drawing - Waste Water System (Unit #1)

MD1-1-P-851-24-00001

Piping Isometric Drawing - Chemical Dosing System (Unit #1)

MD1-2-P-122-24-00011

Piping Isometric Drawing - Valve Sealing Water System (Unit #2)

MD1-2-P-131-24-00001

Piping Isometric Drawing- Circulating Water System (Unit #2)

MD1-2-P-131-24-00011

Piping Isometric Drawing- Aux. Cooling Water System (Unit #2)

MD1-2-P-141-24-00001

Piping Isometric Drawing- Closed Cooling Water System (Unit #2)

MD1-2-P-411-01-00001

General Arrangement Drawing- Unit # 2 Boiler Area

MD1-2-P-412-01-00001

General Arrangement Drawing- Unit # 2 ESP & Main Stack Area

MD1-2-P-412-23-00001

Pipe Arrangement & Support Location Drawing - Electrostatic Precipitator #2A Ara

MD1-2-P-412-23-00002

Pipe Arrangement & Support Location Drawing - Electrostatic Precipitator #2B Ara

MD1-2-P-841-24-00001

Piping Isometric Drawing - Waste Water System (Unit #2)

MD1-2-P-851-24-00001

Piping Isometric Drawing - Chemical Dosing System (Unit #2)

MD1-V-171-01-00078

Technical Data Sheet for Conveyor Belting for Chs

MD1-V-171-08-00005

Conveyor Belt Schedule for Coal handling System

MD1-V-850-11-00002

Name Plate Drawing and List of all Equipment in KKS Sys for Chemical Dosing Sys

MD1-V-850-23-00001

Pipimg Arrangement Drawings Chemical Dosing System

SUDIN

02/11/12

SUDIN

26/03/13

SUDIN

26/03/13

SUDIN

01/03/13

SUDIN

01/03/13

SUDIN

01/03/13

SUDIN

01/03/13

SUDIN

01/03/13

SUDIN

01/03/13

SUDIN

01/03/13

10

SUDIN

01/03/13

11

SUDIN

01/03/13

12

SUDIN

12/07/13

13

SUDIN

12/07/13

14

SUDIN

14/05/13

15

SUDIN

14/05/13

16

SUDIN

17/07/13

17

SUDIN

17/07/13

18

SUDIN

08/05/13

19

SUDIN

08/05/13

20

SUDIN

16/11/12

21

SUDIN

22/01/13

22

SUDIN

22/01/13

23

SUDIN

22/01/13

24

SUDIN

08/03/13

25

SUDIN

08/03/13

26

SUDIN

08/03/13

27

SUDIN

08/02/13

28

SUDIN

08/02/13

29

SUDIN

26/04/13

30

SUDIN

22/02/13

31

SUDIN

22/02/13

32

SUDIN

22/02/13

33

SUDIN

22/02/13

34

SUDIN

04/01/13

35

SUDIN

22/02/13

36

SUDIN

22/02/13

37

SUDIN

22/02/13

38

SUDIN

22/02/13

39

SUDIN

22/02/13

40

SUDIN

22/02/13

41

SUDIN

22/02/13

42

SUDIN

22/02/13

43

SUDIN

22/02/13

44

SUDIN

22/02/13

45

SUDIN

22/02/13

46

SUDIN

22/02/13

47

SUDIN

06/03/13

48

SUDIN

06/03/13

49

SUDIN

06/03/13

50

SUDIN

14/09/12

51

SUDIN

14/09/12

52

SUDIN

13/06/13

53

SUDIN

14/09/12

54

SUDIN

14/09/12

55

SUDIN

14/09/12

56

SUDIN

14/09/12

57

SUDIN

14/09/12

58

SUDIN

14/09/12

59

SUDIN

14/09/12

60

SUDIN

14/09/12

61

SUDIN

14/09/12

62

SUDIN

14/09/12

63

SUDIN

14/09/12

64

SUDIN

14/09/12

65

SUDIN

14/09/12

66

SUDIN

14/09/12

67

SUDIN

14/09/12

68

SUDIN

14/09/12

69

SUDIN

14/09/12

70

SUDIN

26/09/12

71

SUDIN

26/09/12

72

SUDIN

26/09/12

73

SUDIN

26/09/12

74

SUDIN

26/09/12

75

SUDIN

26/09/12

76

SUDIN

04/01/13

77

SUDIN

04/01/13

78

SUDIN

04/01/13

79

SUDIN

26/09/12

80

SUDIN

26/09/12

81

SUDIN

26/09/12

82

SUDIN

26/09/12

83

SUDIN

22/11/12

84

SUDIN

22/11/12

85

SUDIN

22/11/12

86

SUDIN

22/11/12

87

SUDIN

22/11/12

88

SUDIN

22/11/12

89

SUDIN

22/11/12

90

SUDIN

22/11/12

91

SUDIN

22/11/12

92

SUDIN

22/11/12

93

SUDIN

22/11/12

94

SUDIN

22/11/12

95

SUDIN

22/11/12

96

SUDIN

22/11/12

97

SUDIN

22/11/12

98

SUDIN

22/11/12

99

SUDIN

22/11/12

100

SUDIN

22/11/12

101

SUDIN

05/12/12

102

SUDIN

05/12/12

103

SUDIN

05/12/12

104

SUDIN

05/12/12

105

SUDIN

05/12/12

106

SUDIN

05/12/12

107

SUDIN

26/06/13

108

SUDIN

26/06/13

109

SUDIN

26/06/13

110

SUDIN

26/06/13

111

SUDIN

26/06/13

112

SUDIN

26/06/13

113

SUDIN

26/06/13

114

SUDIN

26/06/13

115

SUDIN

05/12/12

116

SUDIN

05/12/12

117

SUDIN

05/12/12

118

SUDIN

05/12/12

119

SUDIN

05/12/12

120

SUDIN

05/12/12

121

SUDIN

05/12/12

122

SUDIN

05/12/12

123

SUDIN

13/06/13

124

SUDIN

13/06/13

125

SUDIN

13/06/13

126

SUDIN

13/06/13

127

SUDIN

13/06/13

128

SUDIN

13/06/13

129

SUDIN

13/06/13

130

SUDIN

13/06/13

131

SUDIN

13/06/13

132

SUDIN

13/06/13

133

SUDIN

05/12/12

134

SUDIN

10/07/13

135

SUDIN

10/07/13

136

SUDIN

28/06/13

137

SUDIN

07/03/13

138

SUDIN

24/01/13

139

SUDIN

24/01/13

140

SUDIN

17/07/13

141

SUDIN

14/06/13

142

SUDIN

14/06/13

143

SUDIN

14/06/13

144

SUDIN

14/06/13

145

SUDIN

14/06/13

146

SUDIN

14/06/13

147

SUDIN

14/06/13

148

SUDIN

14/06/13

149

SUDIN

14/06/13

150

SUDIN

10/06/13

151

SUDIN

13/03/13

152

SUDIN

17/07/13

153

SUDIN

17/07/13

154

SUDIN

11/06/13

155

SUDIN

11/06/13

156

SUDIN

11/06/13

157

SUDIN

11/06/13

158

SUDIN

11/06/13

159

SUDIN

11/06/13

160

SUDIN

27/06/13

161

SUDIN

17/07/13

162

SUDIN

05/12/12

163

SUDIN

05/12/12

164

SUDIN

05/12/12

165

SUDIN

05/12/12

166

SUDIN

05/12/12

167

SUDIN

13/03/13

168

SUDIN

30/07/13

169

SUDIN

07/03/13

170

SUDIN

07/03/13

171

SUDIN

07/03/13

172

SUDIN

07/03/13

173

SUDIN

13/06/13

174

SUDIN

24/04/13

175

SUDIN

07/03/13

176

SUDIN

13/06/13

177

SUDIN

13/06/13

178

SUDIN

19/06/13

179

SUDIN

10/07/13

180

SUDIN

10/07/13

181

SUDIN

13/06/13

182

SUDIN

13/06/13

183

SUDIN

08/05/13

184

SUDIN

28/06/13

185

SUDIN

08/02/13

186

SUDIN

25/06/13

187

SUDIN

25/06/13

188

SUDIN

25/06/13

189

SUDIN

25/06/13

190

SUDIN

23/05/13

191

SUDIN

23/05/13

192

SUDIN

23/05/13

193

SUDIN

23/05/13

194

SUDIN

23/05/13

195

SUDIN

23/05/13

196

SUDIN

23/05/13

197

SUDIN

23/05/13

198

SUDIN

23/05/13

199

SUDIN

23/05/13

200

SUDIN

23/05/13

201

SUDIN

10/12/12

202

SUDIN

01/03/13

203

SUDIN

01/03/13

204

SUDIN

01/03/13

205

SUDIN

01/03/13

206

SUDIN

01/03/13

207

SUDIN

01/03/13

208

SUDIN

01/03/13

209

SUDIN

01/03/13

210

SUDIN

01/03/13

211

SUDIN

01/03/13

212

SUDIN

01/03/13

213

SUDIN

01/03/13

214

SUDIN

22/01/13

215

SUDIN

22/01/13

216

SUDIN

22/01/13

217

SUDIN

22/01/13

218

SUDIN

22/01/13

219

SUDIN

27/05/13

220

SUDIN

27/05/13

221

SUDIN

19/06/13

222

SUDIN

08/02/13

223

SUDIN

08/02/13

224

SUDIN

08/02/13

225

SUDIN

02/05/13

226

SUDIN

05/02/13

227

SUDIN

05/02/13

228

SUDIN

05/02/13

229

SUDIN

22/03/13

230

SUDIN

22/03/13

231

SUDIN

22/03/13

232

SUDIN

22/03/13

233

SUDIN

26/04/13

234

SUDIN

02/04/13

235

SUDIN

02/04/13

236

SUDIN

02/04/13

237

SUDIN

02/04/13

238

SUDIN

02/04/13

239

SUDIN

02/04/13

240

SUDIN

02/04/13

241

SUDIN

02/04/13

242

SUDIN

02/04/13

243

SUDIN

02/04/13

244

SUDIN

22/03/13

245

SUDIN

22/03/13

246

SUDIN

22/03/13

247

SUDIN

26/04/13

248

SUDIN

22/03/13

249

SUDIN

22/03/13

250

SUDIN

22/03/13

251

SUDIN

26/04/13

252

SUDIN

02/04/13

253

SUDIN

02/04/13

254

SUDIN

02/04/13

255

SUDIN

02/04/13

256

SUDIN

11/04/13

257

SUDIN

11/04/13

258

SUDIN

11/04/13

259

SUDIN

14/05/13

260

SUDIN

17/12/12

261

SUDIN

17/12/12

262

SUDIN

17/12/12

263

SUDIN

17/12/12

264

SUDIN

01/10/12

265

SUDIN

20/03/13

266

SUDIN

22/01/13

267

SUDIN

20/03/13

268

SUDIN

20/03/13

269

SUDIN

22/01/13

270

SUDIN

23/05/13

271

SUDIN

23/05/13

272

SUDIN

19/06/13

273

SUDIN

02/04/13

274

SUDIN

02/04/13

275

SUDIN

02/04/13

276

SUDIN

02/04/13

277

SUDIN

08/03/13

278

SUDIN

08/03/13

279

SUDIN

08/03/13

280

SUDIN

08/03/13

281

SUDIN

27/03/13

282

SUDIN

08/02/13

283

SUDIN

08/02/13

284

SUDIN

08/02/13

285

SUDIN

26/04/13

286

SUDIN

27/03/13

287

SUDIN

27/03/13

288

SUDIN

27/03/13

289

SUDIN

27/03/13

290

SUDIN

19/12/12

291

SUDIN

19/12/12

292

SUDIN

22/02/13

293

SUDIN

22/02/13

294

SUDIN

22/02/13

295

SUDIN

19/12/12

296

SUDIN

22/02/13

297

SUDIN

19/12/12

298

SUDIN

19/12/12

299

SUDIN

22/02/13

300

SUDIN

19/12/12

301

SUDIN

22/02/13

302

SUDIN

22/02/13

303

SUDIN

22/02/13

304

SUDIN

22/02/13

305

SUDIN

19/12/12

306

SUDIN

22/02/13

307

SUDIN

22/02/13

308

SUDIN

19/12/12

309

SUDIN

19/12/12

310

SUDIN

19/12/12

311

SUDIN

19/12/12

312

SUDIN

19/12/12

313

SUDIN

19/12/12

314

SUDIN

06/03/13

315

SUDIN

06/03/13

316

SUDIN

06/03/13

317

SUDIN

06/03/13

318

SUDIN

25/04/13

319

SUDIN

27/03/13

320

SUDIN

20/11/12

321

SUDIN

25/01/13

322

SUDIN

27/05/13

323

SUDIN

08/02/13

324

SUDIN

22/03/13

325

SUDIN

02/04/13

326

SUDIN

22/03/13

327

SUDIN

01/03/13

328

SUDIN

02/04/13

329

SUDIN

07/02/13

330

SUDIN

23/05/13

331

SUDIN

22/01/13

332

SUDIN

08/03/13

333

SUDIN

22/02/13

334

SUDIN

31/01/13

335

SUDIN

08/02/13

336

SUDIN

23/04/12

337

SUDIN

31/01/13

338

SUDIN

31/01/13

339

SUDIN

27/12/12

340

SUDIN

27/12/12

341

SUDIN

27/12/12

342

SUDIN

19/06/13

343

SUDIN

27/12/12

344

SUDIN

08/03/13

345

SUDIN

27/12/12

346

SUDIN

30/07/13

347

SUDIN

25/02/13

348

SUDIN

14/03/13

349

SUDIN

04/01/13

350

SUDIN

04/01/13

351

SUDIN

04/01/13

352

SUDIN

04/01/13

353

SUDIN

22/02/13

354

SUDIN

22/02/13

355

SUDIN

04/03/13

356

SUDIN

06/02/13

357

SUDIN

26/04/13

358

SUDIN

26/04/13

359

SUDIN

26/04/13

360

SUDIN

26/04/13

361

SUDIN

10/12/12

362

SUDIN

10/12/12

363

SUDIN

12/04/13

364

SUDIN

03/04/13

365

SUDIN

18/12/12

366

SUDIN

19/12/12

367

SUDIN

19/12/12

368

SUDIN

13/03/13

369

SUDIN

06/02/13

370

SUDIN

13/03/13

371

SUDIN

19/12/12

372

SUDIN

08/05/12

373

SUDIN

19/12/12

374

SUDIN

19/12/12

375

SUDIN

19/12/12

376

SUDIN

30/07/13

377

SUDIN

11/04/13

378

SUDIN

13/03/13

379

SUDIN

06/02/13

380

SUDIN

06/02/13

381

SUDIN

06/02/13

382

SUDIN

27/12/12

383

SUDIN

21/01/13

384

SUDIN

21/01/13

385

SUDIN

21/01/13

386

SUDIN

27/03/13

387

DAVID

23/01/13

388

DAVID

23/01/13

389

SUDIN

22/02/13

390

SUDIN

22/02/13

391

SUDIN

25/02/13

392

SUDIN

10/12/12

393

SUDIN

28/06/13

394

SUDIN

12/04/13

395

SUDIN

12/04/13

396

SUDIN

12/04/13

397

SUDIN

12/04/13

398

SUDIN

08/07/13

399

SUDIN

08/07/13

400

SUDIN

12/04/13

401

SUDIN

19/12/12

402

SUDIN

31/01/12

403

SUDIN

31/01/13

404

SUDIN

25/06/13

405

SUDIN

22/02/13

406

SUDIN

26/04/13

407

SUDIN

11/04/13

408

SUDIN

19/06/13

409

SUDIN

21/02/13

410

SUDIN

11/04/13

411

SUDIN

11/04/13

412

SUDIN

21/02/13

413

SUDIN

17/07/13

414

SUDIN

17/07/13

415

SUDIN

21/02/13

416

SUDIN

28/05/13

417

SUDIN

28/05/13

418

SUDIN

11/04/13

419

SUDIN

11/04/13

420

SUDIN

12/06/13

421

SUDIN

10/05/13

422

SUDIN

10/05/13

423

SUDIN

10/05/13

424

SUDIN

10/05/13

425

SUDIN

10/05/13

426

SUDIN

10/05/13

427

SUDIN

10/05/13

428

SUDIN

10/05/13

429

SUDIN

10/05/13

430

SUDIN

10/05/13

431

SUDIN

10/05/13

432

SUDIN

19/06/13

433

SUDIN

19/06/13

434

SUDIN

26/04/13

435

SUDIN

26/04/13

436

SUDIN

26/04/13

437

SUDIN

26/04/13

438

SUDIN

26/04/13

439

SUDIN

26/04/13

440

SUDIN

26/04/13

441

SUDIN

26/04/13

442

SUDIN

26/04/13

443

SUDIN

26/04/13

444

SUDIN

26/04/13

445

SUDIN

26/04/13

446

SUDIN

26/04/13

447

SUDIN

26/04/13

448

SUDIN

02/05/13

449

SUDIN

02/05/13

450

SUDIN

02/05/13

451

SUDIN

02/05/13

452

SUDIN

02/05/13

453

SUDIN

26/04/13

454

SUDIN

26/04/13

455

SUDIN

28/05/13

456

SUDIN

31/01/13

457

SUDIN

31/01/13

458

SUDIN

31/01/13

459

SUDIN

01/07/13

460

SUDIN

25/06/13

461

SUDIN

03/10/12

462

SUDIN

03/10/12

463

SUDIN

03/10/12

464

SUDIN

03/10/12

465

SUDIN

05/12/12

466

SUDIN

22/11/12

467

SUDIN

19/06/13

468

BINH

15/11/12

469

SUDIN

02/11/12

470

SUDIN

18/01/13

471

BINH

28/12/12

472

BINH

28/12/12

473

SUDIN

22/02/13

474

SUDIN

28/03/13

475

SUDIN

24/12/12

476

SUDIN

24/01/13

477

SUDIN

29/05/13

478

BINH

25/02/13

479

BINH

06/12/12

480

BINH

06/02/13

481

BINH

25/12/12

482

BINH

25/12/12

483

BINH

25/12/12

484

MAX

14/01/13

485

SUDIN

10/12/12

486

SUDIN

21/02/13

487

SUDIN

31/05/13

488

SUDIN

27/03/13

489

SUDIN

12/11/12

490

SUDIN

06/06/13

491

SUDIN

27/12/12

492

BINH

28/12/12

493

BINH

19/12/12

494

BINH

11/12/12

495

SUDIN

05/11/12

496

BINH

30/11/12

497

SUDIN

30/11/12

498

BINH

11/12/12

499

BINH

05/12/12

500

BINH

05/12/12

501

SUDIN

18/12/12

502

SUDIN

04/02/13

503

BINH

11/12/12

504

BINH

19/12/12

505

SUDIN

08/06/12

506

SUDIN

07/11/12

507

SUDIN

10/06/13

508

SUDIN

23/04/13

509

SUDIN

18/01/13

510

SUDIN

28/05/13

511

SUDIN

14/11/12

512

SUDIN

14/11/12

513

SUDIN

13/06/13

514

SUDIN

10/04/13

515

SUDIN

13/06/13

516

SUDIN

05/12/12

517

SUDIN

17/07/13

518

SUDIN

30/07/13

519

SUDIN

02/05/13

520

SUDIN

07/03/13

521

SUDIN

22/02/13

522

SUDIN

27/12/12

523

SUDIN

22/02/13

524

SUDIN

08/02/13

525

SUDIN

17/07/13

526

SUDIN

29/05/13

527

SUDIN

26/06/13

528

SUDIN

22/02/13

529

SUDIN

06/06/13

530

SUDIN

13/06/13

531

SUDIN

16/07/13

532

SUDIN

08/07/13

533

SUDIN

26/02/13

534

SUDIN

22/02/13

535

SUDIN

22/02/13

536

SUDIN

14/11/12

537

SUDIN

25/04/13

538

SUDIN

25/02/13

539

SUDIN

30/07/13

540

SUDIN

03/04/13

541

SUDIN

16/07/13

542

SUDIN

10/04/13

543

SUDIN

17/07/13

544

SUDIN

02/05/13

545

SUDIN

24/04/13

546

SUDIN

27/06/13

547

SUDIN

02/05/13

548

SUDIN

19/06/13

549

SUDIN

29/04/13

550

SUDIN

29/04/13

551

SUDIN

29/04/13

552

SUDIN

29/04/13

553

SUDIN

29/04/13

554

SUDIN

29/04/13

555

SUDIN

29/04/13

556

SUDIN

29/04/13

557

SUDIN

29/04/13

558

SUDIN

29/04/13

559

SUDIN

29/04/13

560

SUDIN

29/04/13

561

SUDIN

19/06/13

562

SUDIN

09/04/13

563

SUDIN

17/05/13

564

SUDIN

10/04/13

565

SUDIN

10/04/13

566

SUDIN

13/06/13

567

SUDIN

17/05/13

568

SUDIN

23/05/13

569

SUDIN

23/05/13

570

SUDIN

30/07/13

571

SUDIN

28/05/13

572

SUDIN

17/05/13

573

SUDIN

17/05/13

574

SUDIN

17/05/13

575

SUDIN

17/05/13

576

SUDIN

25/04/13

577

SUDIN

12/07/13

578

SUDIN

14/05/13

579

SUDIN

08/07/13

580

SUDIN

10/07/13

581

SUDIN

28/05/13

582

SUDIN

25/04/13

583

SUDIN

28/05/13

584

SUDIN

13/06/13

585

SUDIN

23/05/13

586

SUDIN

28/05/13

587

SUDIN

23/05/13

588

SUDIN

23/05/13

589

SUDIN

23/05/13

590

SUDIN

28/05/13

591

SUDIN

16/05/13

592

SUDIN

02/11/12

593

SUDIN

02/11/12

594

SUDIN

06/06/13

595

SUDIN

13/06/13

596

SUDIN

06/06/13

597

SUDIN

22/05/13

598

SUDIN

22/05/13

599

SUDIN

22/05/13

600

SUDIN

22/05/13

601

SUDIN

28/05/13

602

SUDIN

06/06/13

603

SUDIN

10/04/13

604

SUDIN

06/06/13

605

SUDIN

26/11/12

606

SUDIN

26/11/12

607

SUDIN

06/11/12

608

SUDIN

02/05/13

609

SUDIN

22/02/13

610

SUDIN

22/02/13

611

SUDIN

22/02/13

612

SUDIN

22/02/13

613

SUDIN

22/02/13

614

SUDIN

23/05/13

615

SUDIN

22/02/13

616

SUDIN

22/02/13

617

SUDIN

23/05/13

618

SUDIN

02/05/13

619

SUDIN

23/11/12

620

SUDIN

23/11/12

621

SUDIN

06/11/12

622

SUDIN

06/11/12

623

SUDIN

23/11/12

624

SUDIN

23/05/13

625

SUDIN

02/04/13

626

SUDIN

22/02/13

627

SUDIN

08/11/12

628

SUDIN

15/03/13

629

SUDIN

22/02/13

630

SUDIN

26/04/13

631

SUDIN

22/02/13

632

SUDIN

03/04/13

633

SUDIN

07/11/12

634

SUDIN

06/11/12

635

SUDIN

07/11/12

636

SUDIN

02/04/13

637

SUDIN

13/03/13

638

SUDIN

27/03/13

639

SUDIN

27/03/13

640

SUDIN

27/03/13

641

SUDIN

27/03/13

642

SUDIN

27/03/13

643

SUDIN

27/03/13

644

SUDIN

27/03/13

645

SUDIN

27/03/13

646

SUDIN

27/03/13

647

SUDIN

27/03/13

648

SUDIN

27/03/13

649

SUDIN

27/03/13

650

SUDIN

27/03/13

651

SUDIN

27/03/13

652

SUDIN

27/03/13

653

SUDIN

27/03/13

654

SUDIN

27/03/13

655

SUDIN

27/03/13

656

SUDIN

27/03/13

657

SUDIN

10/04/13

658

SUDIN

08/05/13

659

SUDIN

25/04/13

660

SUDIN

25/04/13

661

SUDIN

25/04/13

662

SUDIN

25/04/13

663

SUDIN

25/04/13

664

SUDIN

25/04/13

665

SUDIN

25/04/13

666

SUDIN

25/04/13

667

SUDIN

25/04/13

668

SUDIN

25/04/13

669

SUDIN

22/03/13

670

SUDIN

22/03/13

671

SUDIN

22/03/13

672

SUDIN

22/03/13

673

SUDIN

22/03/13

674

SUDIN

22/03/13

675

SUDIN

22/03/13

676

SUDIN

22/03/13

677

SUDIN

22/03/13

678

SUDIN

22/03/13

679

SUDIN

11/04/13

680

SUDIN

16/11/12

681

SUDIN

28/06/13

682

SUDIN

13/06/13

683

SUDIN

12/04/13

684

SUDIN

10/07/13

685

SUDIN

13/06/13

686

SUDIN

03/04/13

687

SUDIN

03/04/13

688

SUDIN

03/04/13

689

SUDIN

03/04/13

690

SUDIN

13/06/13

691

SUDIN

04/12/12

692

SUDIN

25/06/13

693

SUDIN

13/06/13

694

SUDIN

25/02/13

695

SUDIN

13/06/13

696

SUDIN

25/06/13

697

SUDIN

25/04/13

698

SUDIN

13/06/13

699

SUDIN

13/06/13

700

SUDIN

13/06/13

701

SUDIN

25/06/13

702

SUDIN

25/02/13

703

SUDIN

25/02/13

704

SUDIN

03/12/12

705

SUDIN

03/12/12

706

SUDIN

03/12/12

707

SUDIN

13/06/13

708

SUDIN

03/12/12

709

SUDIN

30/07/13

710

SUDIN

22/11/12

711

SUDIN

08/05/13

712

SUDIN

12/07/13

713

SUDIN

12/07/13

714

SUDIN

08/05/13

715

SUDIN

14/03/13

716

SUDIN

14/03/13

717

SUDIN

14/03/13

718

SUDIN

14/03/13

719

SUDIN

18/01/13

720

SUDIN

18/01/13

721

SUDIN

18/01/13

722

SUDIN

18/01/13

723

SUDIN

18/01/13

724

SUDIN

25/06/13

725

SUDIN

22/02/13

726

SUDIN

22/02/13

727

SUDIN

22/02/13

728

SUDIN

11/04/13

729

SUDIN

08/05/13

730

SUDIN

01/03/13

731

SUDIN

08/05/13

732

SUDIN

17/12/12

733

SUDIN

02/05/13

734

SUDIN

10/10/12

735

SUDIN

02/05/13

736

SUDIN

20/12/12

737

SUDIN

28/05/13

738

SUDIN

10/12/12

739

SUDIN

10/12/12

740

SUDIN

10/12/12

741

SUDIN

10/12/12

742

SUDIN

10/12/12

743

SUDIN

10/12/12

744

SUDIN

10/12/12

745

SUDIN

10/12/12

746

SUDIN

10/12/12

747

SUDIN

10/04/13

748

SUDIN

10/06/13

749

SUDIN

10/06/13

750

SUDIN

10/06/13

751

SUDIN

10/06/13

752

SUDIN

08/02/13

753

SUDIN

08/02/13

754

SUDIN

10/12/12

755

SUDIN

10/12/12

756

SUDIN

17/12/12

757

SUDIN

10/12/12

758

SUDIN

10/12/12

759

SUDIN

10/12/12

760

SUDIN

04/03/13

761

SUDIN

14/06/13

762

SUDIN

04/03/13

763

SUDIN

17/12/12

764

SUDIN

17/12/12

765

SUDIN

25/04/13

766

SUDIN

08/05/13

767

SUDIN

08/02/13

768

SUDIN

27/06/13

769

SUDIN

13/03/13

770

SUDIN

26/06/13

771

SUDIN

17/12/12

772

SUDIN

25/09/12

773

SUDIN

17/12/12

774

SUDIN

17/12/12

775

SUDIN

25/09/12

776

SUDIN

26/03/13

777

SUDIN

26/03/13

778

SUDIN

12/07/13

779

SUDIN

22/02/13

780

SUDIN

12/07/13

781

SUDIN

17/12/12

782

SUDIN

26/03/13

783

SUDIN

10/12/12

784

SUDIN

26/04/13

785

SUDIN

08/07/13

786

SUDIN

07/03/13

787

SUDIN

02/05/13

788

SUDIN

21/01/13

789

SUDIN

27/06/13

790

SUDIN

22/02/13

791

SUDIN

08/02/13

792

SUDIN

08/02/13

793

SUDIN

08/02/13

794

SUDIN

08/02/13

795

SUDIN

08/07/13

796

SUDIN

08/07/13

797

SUDIN

08/07/13

798

SUDIN

21/02/13

799

SUDIN

08/07/13

800

SUDIN

21/02/13

801

SUDIN

08/07/13

802

SUDIN

08/07/13

803

SUDIN

21/02/13

804

SUDIN

21/02/13

805

SUDIN

25/04/13

806

SUDIN

25/04/13

807

SUDIN

13/03/13

808

SUDIN

02/11/12

809

SUDIN

04/12/12

810

SUDIN

04/12/12

811

SUDIN

04/12/12

812

SUDIN

04/12/12

813

SUDIN

04/12/12

814

SUDIN

04/12/12

815

SUDIN

04/12/12

816

SUDIN

12/04/13

817

SUDIN

12/04/13

818

SUDIN

02/05/13

819

SUDIN

02/05/13

820

SUDIN

10/04/13

821

SUDIN

10/04/13

822

SUDIN

13/06/13

823

SUDIN

26/03/13

824

SUDIN

15/04/13

825

SUDIN

25/02/13

826

SUDIN

08/07/13

827

SUDIN

14/05/13

828

SUDIN

14/05/13

829

SUDIN

14/05/13

830

SUDIN

31/01/13

831

SUDIN

28/02/13

832

SUDIN

28/02/13

833

SUDIN

28/02/13

834

SUDIN

28/02/13

835

SUDIN

10/07/13

836

SUDIN

22/02/13

837

SUDIN

22/02/13

838

SUDIN

22/02/13

839

SUDIN

22/02/13

840

SUDIN

22/02/13

841

SUDIN

08/05/13

842

SUDIN

08/05/13

843

SUDIN

08/02/13

844

SUDIN

08/02/13

845

SUDIN

12/12/12

846

SUDIN

08/02/13

847

SUDIN

08/02/13

848

SUDIN

08/02/13

849

SUDIN

12/12/12

850

SUDIN

10/07/13

851

SUDIN

06/11/12

852

SUDIN

06/11/12

853

SUDIN

13/03/13

854

SUDIN

11/04/13

855

SUDIN

27/06/13

856

SUDIN

08/05/13

857

SUDIN

08/05/13

858

SUDIN

08/05/13

859

SUDIN

10/07/13

860

SUDIN

15/03/13

861

SUDIN

12/04/13

862

SUDIN

26/06/13

863

SUDIN

10/12/12

864

SUDIN

15/03/13

865

SUDIN

15/03/13

866

SUDIN

10/07/13

867

SUDIN

10/07/13

868

SUDIN

10/07/13

869

SUDIN

10/07/13

870

SUDIN

10/12/12

871

SUDIN

19/06/13

872

SUDIN

21/02/13

873

SUDIN

15/03/13

874

SUDIN

13/06/13

875

SUDIN

07/03/13

876

SUDIN

14/05/13

877

SUDIN

21/01/13

878

SUDIN

27/06/13

879

SUDIN

22/02/13

880

SUDIN

08/02/13

881

SUDIN

08/07/13

882

SUDIN

08/07/13

883

SUDIN

08/07/13

884

SUDIN

08/07/13

885

SUDIN

08/07/13

886

SUDIN

08/07/13

887

SUDIN

08/07/13

888

SUDIN

08/07/13

889

SUDIN

07/12/12

890

SUDIN

07/12/12

891

SUDIN

07/12/12

892

SUDIN

27/12/12

893

SUDIN

10/12/12

894

SUDIN

10/12/12

895

SUDIN

10/12/12

896

SUDIN

10/12/12

897

SUDIN

10/12/12

898

SUDIN

12/10/12

899

SUDIN

14/06/13

900

SUDIN

19/02/13

901

SUDIN

19/02/13

902

SUDIN

12/04/13

903

SUDIN

13/06/13

904

SUDIN

25/06/13

905

SUDIN

12/07/13

906

SUDIN

12/12/12

907

SUDIN

12/12/12

908

SUDIN

12/12/12

909

SUDIN

15/03/13

910

SUDIN

15/03/13

911

SUDIN

15/04/13

912

SUDIN

18/12/12

913

SUDIN

25/02/13

914

SUDIN

12/12/12

915

SUDIN

03/04/13

916

SUDIN

12/04/13

917

SUDIN

22/01/13

918

SUDIN

12/06/13

919

SUDIN

12/06/13

920

SUDIN

12/06/13

921

SUDIN

22/01/13

922

SUDIN

02/04/13

923

SUDIN

02/04/13

924

SUDIN

02/04/13

925

SUDIN

27/03/13

926

SUDIN

27/03/13

927

SUDIN

25/02/13

928

SUDIN

22/02/13

929

SUDIN

07/03/13

930

SUDIN

02/05/13

931

SUDIN

21/01/13

932

SUDIN

27/06/13

933

SUDIN

22/02/13

934

SUDIN

14/05/13

935

SUDIN

14/05/13

936

SUDIN

14/05/13

937

SUDIN

14/05/13

938

SUDIN

14/05/13

939

SUDIN

14/05/13

940

SUDIN

14/05/13

941

SUDIN

14/05/13

942

SUDIN

14/05/13

943

SUDIN

14/05/13

944

SUDIN

14/05/13

945

SUDIN

14/05/13

946

SUDIN

14/05/13

947

SUDIN

14/01/05

948

SUDIN

14/05/13

949

SUDIN

14/05/13

950

SUDIN

19/06/13

951

SUDIN

25/02/13

952

SUDIN

25/02/13

953

SUDIN

25/02/13

954

SUDIN

25/02/13

955

SUDIN

14/05/13

956

SUDIN

25/02/13

957

SUDIN

14/05/13

958

SUDIN

14/05/13

959

SUDIN

12/12/12

960

SUDIN

12/12/12

961

SUDIN

25/02/13

962

SUDIN

14/05/13

963

SUDIN

12/12/12

964

SUDIN

12/12/12

965

SUDIN

05/07/13

966

SUDIN

14/05/13

967

SUDIN

12/12/12

968

SUDIN

12/07/13

969

SUDIN

12/07/13

970

SUDIN

12/12/12

971

SUDIN

12/12/12

972

SUDIN

12/12/12

973

SUDIN

12/07/13

974

SUDIN

12/12/12

975

SUDIN

12/12/12

976

SUDIN

12/12/12

977

SUDIN

12/12/12

978

SUDIN

12/12/12

979

SUDIN

12/07/13

980

SUDIN

12/12/12

981

SUDIN

12/07/13

982

SUDIN

22/02/13

983

SUDIN

22/02/13

984

SUDIN

22/02/13

985

SUDIN

01/10/12

986

SUDIN

12/07/13

987

SUDIN

12/07/13

988

SUDIN

23/05/13

989

SUDIN

16/05/13

990

SUDIN

10/05/13

991

SUDIN

14/05/13

992

SUDIN

14/05/13

993

SUDIN

29/04/13

994

SUDIN

22/02/13

995

SUDIN

23/05/13

996

SUDIN

23/05/13

997

SUDIN

23/05/13

998

SUDIN

10/05/13

999

SUDIN

23/05/13

1000

SUDIN

24/05/13

1001

SUDIN

24/05/13

1002

SUDIN

24/05/13

1003

SUDIN

24/05/13

1004

SUDIN

24/05/13

1005

SUDIN

24/05/13

1006

SUDIN

24/05/13

1007

SUDIN

24/05/13

1008

SUDIN

30/07/13

1009

SUDIN

30/07/13

1010

SUDIN

30/07/13

1011

SUDIN

30/07/13

1012

SUDIN

30/07/13

1013

SUDIN

30/07/13

1014

SUDIN

30/07/13

1015

SUDIN

30/07/13

1016

SUDIN

30/07/13

1017

SUDIN

30/07/13

1018

SUDIN

30/07/13

1019

SUDIN

30/07/13

1020

SUDIN

30/07/13

1021

SUDIN

30/07/13

1022

SUDIN

30/07/13

1023

SUDIN

30/07/13

1024

SUDIN

30/07/13

1025

SUDIN

30/07/13

1026

SUDIN

30/07/13

1027

SUDIN

30/07/13

1028

SUDIN

30/07/13

1029

SUDIN

30/07/13

1030

SUDIN

30/07/13

1031

SUDIN

30/07/13

1032

SUDIN

30/07/13

1033

SUDIN

30/07/13

1034

SUDIN

30/07/13

1035

SUDIN

30/07/13

1036

SUDIN

30/07/13

1037

SUDIN

30/07/13

1038

SUDIN

30/07/13

1039

SUDIN

30/07/13

1040

SUDIN

30/07/13

1041

SUDIN

30/07/13

1042

SUDIN

30/07/13

1043

SUDIN

30/07/13

1044

SUDIN

30/07/13

1045

SUDIN

08/07/13

1046

SUDIN

08/07/13

1047

SUDIN

28/06/13

1048

SUDIN

30/07/13

1049

SUDIN

30/07/13

1050

SUDIN

30/07/13

1051

SUDIN

30/07/13

1052

SUDIN

30/07/13

1053

SUDIN

30/07/13

1054

SUDIN

30/07/13

1055

SUDIN

30/07/13

1056

SUDIN

30/07/13

1057

SUDIN

30/07/13

1058

SUDIN

30/07/13

1059

SUDIN

30/07/13

1060

SUDIN

30/07/13

1061

SUDIN

30/07/13

1062

SUDIN

30/07/13

1063

SUDIN

30/07/13

1064

SUDIN

30/07/13

1065

SUDIN

30/07/13

1066

SUDIN

30/07/13

1067

SUDIN

30/07/13

1068

SUDIN

30/07/13

1069

WITTAYA

30/07/13

1070

SUDIN

30/07/13

1071

SUDIN

30/07/13

1072

SUDIN

30/07/13

1073

SUDIN

30/07/13

1074

SUDIN

30/07/13

1075

SUDIN

30/07/13

1076

SUDIN

09/04/13

1077

SUDIN

09/04/13

1078

SUDIN

09/04/13

1079

SUDIN

09/04/13

1080

SUDIN

09/04/13

1081

SUDIN

09/04/13

1082

SUDIN

03/04/13

1083

SUDIN

03/04/13

1084

SUDIN

03/04/13

1085

SUDIN

03/04/13

1086

SUDIN

03/04/13

1087

SUDIN

03/04/13

1088

SUDIN

22/02/13

1089

SUDIN

22/02/13

1090

SUDIN

22/02/13

1091

SUDIN

22/02/13

1092

SUDIN

22/02/13

1093

SUDIN

12/11/12

1094

SUDIN

12/11/12

1095

SUDIN

12/11/12

1096

SUDIN

12/11/12

1097

SUDIN

12/11/12

1098

SUDIN

12/11/12

1099

SUDIN

12/11/12

1100

SUDIN

14/11/12

1101

SUDIN

12/11/12

1102

SUDIN

05/02/13

1103

SUDIN

05/02/13

1104

SUDIN

05/02/13

1105

SUDIN

05/02/13

1106

SUDIN

05/02/13

1107

SUDIN

05/02/13

1108

SUDIN

05/02/13

1109

SUDIN

05/02/13

1110

SUDIN

05/02/13

1111

SUDIN

05/02/13

1112

SUDIN

05/02/13

1113

SUDIN

05/02/13

1114

SUDIN

21/02/13

1115

SUDIN

21/02/13

1116

SUDIN

21/02/13

1117

SUDIN

31/01/13

1118

SUDIN

31/01/13

1119

SUDIN

05/02/13

1120

SUDIN

05/02/13

1121

SUDIN

05/02/13

1122

SUDIN

05/02/13

1123

SUDIN

05/02/13

1124

SUDIN

06/02/13

1125

SUDIN

06/02/13

1126

SUDIN

06/02/13

1127

SUDIN

06/02/13

1128

SUDIN

06/02/13

1129

SUDIN

06/02/13

1130

SUDIN

06/02/13

1131

SUDIN

05/02/13

1132

SUDIN

04/02/13

1133

SUDIN

04/02/13

1134

SUDIN

04/02/13

1135

SUDIN

04/02/13

1136

SUDIN

04/02/13

1137

SUDIN

04/02/13

1138

SUDIN

04/02/13

1139

SUDIN

04/02/13

1140

SUDIN

04/02/13

1141

SUDIN

04/02/13

1142

SUDIN

04/02/13

1143

SUDIN

04/02/13

1144

SUDIN

04/02/13

1145

SUDIN

04/02/13

1146

SUDIN

04/02/13

1147

SUDIN

04/02/13

1148

SUDIN

04/02/13

1149

SUDIN

04/02/13

1150

SUDIN

06/02/13

1151

SUDIN

06/02/13

1152

SUDIN

06/02/13

1153

SUDIN

06/02/13

1154

SUDIN

06/02/13

1155

SUDIN

06/02/13

1156

SUDIN

06/02/13

1157

SUDIN

04/02/13

1158

SUDIN

05/02/13

1159

SUDIN

05/02/13

1160

SUDIN

05/02/13

1161

SUDIN

05/02/13

1162

SUDIN

05/02/13

1163

SUDIN

05/02/13

1164

SUDIN

05/02/13

1165

SUDIN

05/02/13

1166

SUDIN

05/02/13

1167

SUDIN

05/02/13

1168

SUDIN

05/02/13

1169

SUDIN

05/02/13

1170

SUDIN

05/02/13

1171

SUDIN

05/02/13

1172

SUDIN

05/02/13

1173

SUDIN

05/02/13

1174

SUDIN

05/02/13

1175

SUDIN

05/02/13

1176

SUDIN

05/02/13

1177

SUDIN

06/02/13

1178

SUDIN

06/02/13

1179

SUDIN

06/02/13

1180

SUDIN

06/02/13

1181

SUDIN

06/02/13

1182

SUDIN

06/02/13

1183

SUDIN

06/02/13

1184

SUDIN

23/11/12

1185

SUDIN

05/02/13

1186

SUDIN

05/02/13

1187

SUDIN

04/02/13

1188

SUDIN

04/02/13

1189

SUDIN

04/02/13

1190

SUDIN

04/02/13

1191

SUDIN

04/02/13

1192

SUDIN

04/02/13

1193

SUDIN

04/02/13

1194

SUDIN

04/02/13

1195

SUDIN

04/02/13

1196

SUDIN

04/02/13

1197

SUDIN

04/02/13

1198

SUDIN

04/02/13

1199

SUDIN

04/02/13

1200

SUDIN

04/02/13

1201

SUDIN

04/02/13

1202

SUDIN

04/02/13

1203

SUDIN

04/02/13

1204

SUDIN

04/02/13

1205

SUDIN

06/02/13

1206

SUDIN

06/02/13

1207

SUDIN

06/02/13

1208

SUDIN

06/02/13

1209

SUDIN

06/02/13

1210

SUDIN

06/02/13

1211

SUDIN

06/02/13

1212

SUDIN

04/02/13

1213

SUDIN

05/02/13

1214

SUDIN

31/01/13

1215

SUDIN

31/01/13

1216

SUDIN

31/01/13

1217

SUDIN

31/01/13

1218

SUDIN

31/01/13

1219

SUDIN

31/01/13

1220

SUDIN

31/01/13

1221

SUDIN

31/01/13

1222

SUDIN

31/01/13

1223

SUDIN

31/01/13

1224

SUDIN

31/01/13

1225

SUDIN

31/01/13

1226

SUDIN

31/01/13

1227

SUDIN

31/01/13

1228

SUDIN

06/02/13

1229

SUDIN

06/02/13

1230

SUDIN

06/02/13

1231

SUDIN

06/02/13

1232

SUDIN

06/02/13

1233

SUDIN

06/02/13

1234

SUDIN

31/01/13

1235

SUDIN

31/01/13

1236

SUDIN

05/02/13

1237

SUDIN

31/01/13

1238

SUDIN

31/01/13

1239

SUDIN

31/01/13

1240

SUDIN

31/01/13

1241

SUDIN

31/01/13

1242

SUDIN

31/01/13

1243

SUDIN

31/01/13

1244

SUDIN

31/01/13

1245

SUDIN

31/01/13

1246

SUDIN

31/01/13

1247

SUDIN

06/02/13

1248

SUDIN

06/02/13

1249

SUDIN

06/02/13

1250

SUDIN

31/01/13

1251

SUDIN

05/02/13

1252

SUDIN

22/02/13

1253

SUDIN

21/02/13

1254

SUDIN

21/02/13

1255

SUDIN

21/02/13

1256

SUDIN

21/02/13

1257

SUDIN

21/02/13

1258

SUDIN

01/02/13

1259

SUDIN

22/02/13

1260

SUDIN

22/02/13

1261

SUDIN

22/02/13

1262

SUDIN

22/02/13

1263

SUDIN

22/02/13

1264

SUDIN

22/02/13

1265

SUDIN

22/02/13

1266

SUDIN

22/02/13

1267

SUDIN

22/02/13

1268

SUDIN

22/02/13

1269

SUDIN

06/02/13

1270

SUDIN

06/02/13

1271

SUDIN

06/02/13

1272

SUDIN

22/02/13

1273

SUDIN

06/02/13

1274

SUDIN

06/02/13

1275

SUDIN

06/02/13

1276

SUDIN

22/02/13

1277

SUDIN

22/02/13

1278

SUDIN

26/11/12

1279

SUDIN

26/11/12

1280

SUDIN

05/02/13

1281

SUDIN

22/02/13

1282

SUDIN

21/02/13

1283

SUDIN

21/02/13

1284

SUDIN

21/02/13

1285

SUDIN

31/01/13

1286

SUDIN

31/01/13

1287

SUDIN

31/01/13

1288

SUDIN

31/01/13

1289

SUDIN

31/01/13

1290

SUDIN

31/01/13

1291

SUDIN

31/01/13

1292

SUDIN

31/01/13

1293

SUDIN

31/01/13

1294

SUDIN

31/01/13

1295

SUDIN

06/02/13

1296

SUDIN

06/02/13

1297

SUDIN

06/02/13

1298

SUDIN

31/01/13

1299

SUDIN

31/01/13

1300

SUDIN

31/01/13

1301

SUDIN

31/01/13

1302

SUDIN

31/01/13

1303

SUDIN

05/02/13

1304

SUDIN

21/02/13

1305

SUDIN

21/02/13

1306

SUDIN

02/04/13

1307

SUDIN

21/02/13

1308

SUDIN

04/03/13

1309

SUDIN

13/03/13

1310

SUDIN

08/05/13

1311

SUDIN

13/03/13

1312

SUDIN

16/05/13

1313

SUDIN

12/07/13

1314

SUDIN

21/01/13

1315

SUDIN

13/03/13

1316

SUDIN

20/03/13

1317

SUDIN

20/03/13

1318

SUDIN

20/03/13

1319

SUDIN

20/03/13

1320

SUDIN

20/03/13

1321

SUDIN

20/03/13

1322

SUDIN

20/03/13

1323

SUDIN

20/03/13

1324

SUDIN

20/03/13

1325

SUDIN

13/03/13

1326

SUDIN

13/03/13

1327

SUDIN

13/03/13

1328

SUDIN

06/02/13

1329

SUDIN

28/01/13

1330

SUDIN

04/03/13

1331

SUDIN

04/03/13

1332

SUDIN

04/03/13

1333

SUDIN

04/03/13

1334

SUDIN

31/05/13

1335

SUDIN

23/05/13

1336

SUDIN

23/05/13

1337

SUDIN

23/05/13

1338

SUDIN

08/07/13

1339

SUDIN

08/07/13

1340

SUDIN

22/11/12

1341

SUDIN

25/02/13

1342

SUDIN

21/02/13

1343

SUDIN

03/05/13

1344

SUDIN

03/05/13

1345

SUDIN

08/05/13

1346

SUDIN

26/03/13

1347

SUDIN

10/12/12

1348

SUDIN

16/11/12

1349

SUDIN

03/05/13

1350

SUDIN

20/03/13

1351

SUDIN

12/06/13

1352

SUDIN

12/06/13

1353

SUDIN

27/03/13

1354

SUDIN

27/03/13

1355

SUDIN

12/06/13

1356

SUDIN

27/03/13

1357

SUDIN

20/03/13

1358

SUDIN

13/03/13

1359

SUDIN

19/02/13

1360

SUDIN

08/11/12

1361

SUDIN

08/11/12

1362

SUDIN

08/11/12

1363

SUDIN

08/11/12

1364

SUDIN

14/11/12

1365

SUDIN

04/03/13

1366

SUDIN

21/02/13

1367

SUDIN

14/06/13

1368

SUDIN

13/06/13

1369

SUDIN

06/06/13

1370

SUDIN

19/06/13

1371

SUDIN

25/03/13

1372

SUDIN

20/03/13

1373

SUDIN

26/03/13

1374

SUDIN

02/05/13

1375

SUDIN

14/03/13

1376

SUDIN

27/05/13

1377

SUDIN

02/05/13

1378

SUDIN

02/05/13

1379

SUDIN

28/03/13

1380

SUDIN

02/05/13

1381

SUDIN

25/02/13

1382

SUDIN

25/02/13

1383

SUDIN

13/03/13

1384

SUDIN

26/03/13

1385

SUDIN

04/03/13

1386

SUDIN

28/05/13

1387

SUDIN

25/02/13

1388

SUDIN

25/02/13

1389

SUDIN

17/07/13

1390

SUDIN

26/03/13

1391

SUDIN

11/04/13

1392

SUDIN

13/06/13

1393

SUDIN

11/03/13

1394

SUDIN

10/06/13

1395

SUDIN

19/06/13

1396

SUDIN

22/11/12

1397

SUDIN

26/03/13

1398

SUDIN

26/03/13

1399

SUDIN

11/04/13

1400

SUDIN

02/04/13

1401

SUDIN

10/06/13

1402

SUDIN

19/06/13

1403

SUDIN

18/12/12

1404

SUDIN

18/12/12

1405

SUDIN

04/03/13

1406

SUDIN

04/03/13

1407

SUDIN

13/03/13

1408

SUDIN

13/03/13

1409

SUDIN

03/04/13

1410

SUDIN

13/03/13

1411

SUDIN

13/03/13

1412

SUDIN

13/03/13

1413

SUDIN

24/01/13

1414

SUDIN

24/01/13

1415

SUDIN

06/06/13

1416

SUDIN

06/06/13

1417

SUDIN

06/06/13

1418

SUDIN

12/07/13

1419

SUDIN

12/07/13

1420

SUDIN

12/07/13

1421

SUDIN

12/07/13

1422

SUDIN

12/07/13

1423

SUDIN

25/06/13

1424

SUDIN

25/06/13

1425

SUDIN

19/06/13

1426

SUDIN

02/05/13

1427

SUDIN

28/06/13

1428

SUDIN

06/06/13

1429

SUDIN

08/03/13

1430

SUDIN

08/02/13

1431

SUDIN

08/02/13

1432

SUDIN

08/02/13

1433

SUDIN

01/08/13

1434

SUDIN

30/07/13

1435

SUDIN

28/01/13

1436

SUDIN

19/06/13

1437

SUDIN

08/05/13

1438

SUDIN

08/05/13

1439

SUDIN

08/05/13

1440

SUDIN

08/05/13

1441

SUDIN

08/05/13

1442

SUDIN

08/05/13

1443

SUDIN

08/05/13

1444

SUDIN

11/04/13

1445

SUDIN

08/05/13

1446

SUDIN

08/05/13

1447

SUDIN

11/04/13

1448

SUDIN

08/05/13

1449

SUDIN

19/02/13

1450

SUDIN

19/06/13

1451

SUDIN

11/04/13

1452

SUDIN

11/04/13

1453

SUDIN

19/06/13

1454

SUDIN

04/12/12

1455

SUDIN

08/05/13

1456

SUDIN

08/05/13

1457

SUDIN

19/06/13

1458

SUDIN

11/04/13

1459

SUDIN

11/04/13

1460

SUDIN

10/04/13

1461

SUDIN

08/05/13

1462

SUDIN

08/05/13

1463

SUDIN

08/05/13

1464

SUDIN

08/05/13

1465

SUDIN

08/05/13

1466

SUDIN

08/05/13

1467

SUDIN

28/01/13

1468

SUDIN

11/03/13

1469

SUDIN

11/03/13

1470

SUDIN

11/03/13

1471

SUDIN

11/03/13

1472

SUDIN

11/03/13

1473

SUDIN

08/05/13

1474

SUDIN

11/03/13

1475

SUDIN

11/03/13

1476

SUDIN

11/03/13

1477

SUDIN

11/03/13

1478

SUDIN

11/03/13

1479

SUDIN

08/05/13

1480

SUDIN

23/04/13

1481

SUDIN

21/02/13

1482

SUDIN

21/02/13

1483

SUDIN

21/02/13

1484

SUDIN

11/03/13

1485

SUDIN

11/03/13

1486

SUDIN

08/05/13

1487

SUDIN

11/03/13

1488

SUDIN

11/03/13

1489

SUDIN

11/03/13

1490

SUDIN

11/03/13

1491

SUDIN

11/03/13

1492

SUDIN

08/05/13

1493

SUDIN

11/04/13

1494

SUDIN

11/04/13

1495

SUDIN

11/04/13

1496

SUDIN

11/03/13

1497

SUDIN

11/03/13

1498

SUDIN

08/05/13

1499

SUDIN

23/04/13

1500

SUDIN

04/12/12

1501

SUDIN

04/12/12

1502

SUDIN

04/12/12

1503

SUDIN

04/12/12

1504

SUDIN

09/04/13

1505

SUDIN

04/12/12

1506

SUDIN

09/04/13

1507

SUDIN

04/12/12

1508

SUDIN

04/12/12

1509

SUDIN

04/12/12

1510

SUDIN

04/12/12

1511

SUDIN

04/12/12

1512

SUDIN

04/12/12

1513

SUDIN

22/03/13

1514

SUDIN

22/02/13

1515

SUDIN

06/06/13

1516

SUDIN

06/06/13

1517

SUDIN

06/06/13

1518

SUDIN

06/06/13

1519

SUDIN

06/06/13

1520

SUDIN

06/06/13

1521

SUDIN

06/06/13

1522

SUDIN

06/06/13

1523

SUDIN

06/06/13

1524

SUDIN

06/06/13

1525

SUDIN

06/06/13

1526

SUDIN

06/06/13

1527

SUDIN

06/06/13

1528

SUDIN

06/06/13

1529

SUDIN

06/06/13

1530

SUDIN

06/06/13

1531

SUDIN

06/06/13

1532

SUDIN

06/06/13

1533

SUDIN

06/06/13

1534

SUDIN

06/06/13

1535

SUDIN

06/06/13

1536

SUDIN

04/12/12

1537

SUDIN

04/12/12

1538

SUDIN

04/12/12

1539

SUDIN

04/12/12

1540

SUDIN

04/12/12

1541

SUDIN

04/12/12

1542

SUDIN

04/12/12

1543

SUDIN

04/12/12

1544

SUDIN

04/12/12

1545

SUDIN

04/12/12

1546

SUDIN

04/12/12

1547

SUDIN

04/12/12

1548

SUDIN

04/12/12

1549

SUDIN

04/12/12

1550

SUDIN

04/12/12

1551

SUDIN

27/06/13

1552

SUDIN

04/12/12

1553

SUDIN

30/07/13

1554

SUDIN

30/07/13

1555

SUDIN

04/12/12

1556

SUDIN

22/01/13

1557

SUDIN

22/01/13

1558

SUDIN

22/01/13

1559

SUDIN

22/01/13

1560

SUDIN

22/01/13

1561

SUDIN

22/01/13

1562

SUDIN

22/01/13

1563

SUDIN

28/06/13

1564

SUDIN

08/02/13

1565

SUDIN

02/04/13

1566

SUDIN

28/06/13

1567

SUDIN

28/03/13

1568

SUDIN

21/02/13

1569

SUDIN

28/06/13

1570

SUDIN

02/04/13

1571

SUDIN

06/06/13

1572

SUDIN

10/07/13

1573

SUDIN

07/11/12

1574

SUDIN

22/02/13

1575

SUDIN

10/07/13

1576

SUDIN

23/10/12

1577

SUDIN

08/11/12

1578

SUDIN

15/03/13

1579

SUDIN

23/11/12

1580

SUDIN

12/04/13

1581

SUDIN

28/06/13

1582

SUDIN

28/06/13

1583

SUDIN

28/06/13

1584

SUDIN

28/06/13

1585

SUDIN

28/06/13

1586

SUDIN

28/06/13

1587

SUDIN

28/06/13

1588

SUDIN

12/04/13

1589

SUDIN

28/06/13

1590

SUDIN

07/11/12

1591

SUDIN

07/11/12

1592

SUDIN

07/11/12

1593

SUDIN

07/11/12

1594

SUDIN

15/11/12

1595

SUDIN

07/03/13

1596

SUDIN

02/11/12

1597

SUDIN

10/12/12

1598

SUDIN

10/12/12

1599

SUDIN

22/02/13

1600

SUDIN

22/02/13

1601

SUDIN

22/02/13

1602

SUDIN

22/02/13

1603

SUDIN

10/12/12

1604

SUDIN

10/12/12

1605

SUDIN

10/12/12

1606

SUDIN

10/12/12

1607

SUDIN

10/12/12

1608

SUDIN

10/12/12

1609

SUDIN

10/12/12

1610

SUDIN

10/12/12

1611

SUDIN

10/12/12

1612

SUDIN

10/12/12

1613

SUDIN

22/02/13

1614

SUDIN

22/02/13

1615

SUDIN

10/12/12

1616

SUDIN

10/12/12

1617

SUDIN

10/12/12

1618

SUDIN

22/02/13

1619

SUDIN

10/12/12

1620

SUDIN

10/12/12

1621

SUDIN

10/12/12

1622

SUDIN

10/12/12

1623

SUDIN

10/12/12

1624

SUDIN

10/12/12

1625

SUDIN

10/12/12

1626

SUDIN

10/12/12

1627

SUDIN

10/12/12

1628

SUDIN

10/12/12

1629

SUDIN

22/02/13

1630

SUDIN

22/02/13

1631

SUDIN

10/12/12

1632

SUDIN

22/02/13

1633

SUDIN

05/12/12

1634

SUDIN

27/03/13

1635

SUDIN

15/03/13

1636

SUDIN

06/05/13

1637

SUDIN

04/03/13

1638

SUDIN

28/06/13

1639

SUDIN

12/04/13

1640

SUDIN

27/06/13

1641

SUDIN

12/04/13

1642

SUDIN

12/04/13

1643

SUDIN

24/01/13

1644

SUDIN

27/03/13

1645

SUDIN

04/03/13

1646

SUDIN

04/03/13

1647

SUDIN

31/01/13

1648

SUDIN

24/04/13

1649

SUDIN

10/05/13

1650

SUDIN

24/04/13

1651

SUDIN

03/04/13

1652

SUDIN

19/02/13

1653

SUDIN

12/07/13

1654

SUDIN

11/01/13

1655

SUDIN

11/04/13

1656

SUDIN

11/01/13

1657

SUDIN

21/02/13

1658

SUDIN

26/04/13

1659

SUDIN

22/01/13

1660

SUDIN

22/01/13

1661

SUDIN

13/06/13

1662

SUDIN

27/06/13

1663

SUDIN

29/05/13

1664

SUDIN

05/12/12

1665

SUDIN

19/02/13

1666

SUDIN

05/02/13

1667

SUDIN

12/07/13

1668

SUDIN

29/05/13

1669

SUDIN

15/03/13

1670

SUDIN

05/02/13

1671

SUDIN

05/02/13

1672

SUDIN

14/03/13

1673

SUDIN

14/03/13

1674

SUDIN

14/03/13

1675

SUDIN

14/03/13

1676

SUDIN

14/03/13

1677

SUDIN

14/03/13

1678

SUDIN

14/03/13

1679

SUDIN

04/03/13

1680

SUDIN

13/03/13

1681

SUDIN

28/05/13

1682

SUDIN

21/01/13

1683

SUDIN

10/04/13

1684

SUDIN

04/07/13

1685

SUDIN

07/03/13

1686

SUDIN

14/03/13

1687

SUDIN

02/05/13

1688

SUDIN

03/05/13

1689

SUDIN

14/03/13

1690

SUDIN

07/03/13

1691

SUDIN

04/03/13

1692

SUDIN

30/07/13

1693

SUDIN

04/01/13

1694

SUDIN

06/06/13

1695

SUDIN

19/12/12

1696

SUDIN

30/07/13

1697

SUDIN

30/07/13

1698

SUDIN

04/01/13

1699

SUDIN

30/07/13

1700

SUDIN

04/01/13

1701

SUDIN

03/04/13

1702

SUDIN

19/12/12

1703

SUDIN

30/07/13

1704

SUDIN

30/07/13

1705

SUDIN

04/01/13

1706

SUDIN

13/03/13

1707

SUDIN

30/07/13

1708

SUDIN

04/01/13

1709

SUDIN

03/04/13

1710

SUDIN

19/12/12

1711

SUDIN

30/07/13

1712

SUDIN

04/01/13

1713

SUDIN

30/07/13

1714

SUDIN

04/01/13

1715

SUDIN

10/06/13

1716

SUDIN

20/12/12

1717

SUDIN

16/07/13

1718

SUDIN

19/06/13

1719

SUDIN

21/02/13

1720

SUDIN

11/04/13

1721

SUDIN

28/05/13

1722

SUDIN

28/05/13

1723

SUDIN

16/07/13

1724

SUDIN

10/06/13

1725

SUDIN

10/06/13

1726

SUDIN

20/12/12

1727

SUDIN

16/07/13

1728

SUDIN

19/06/13

1729

SUDIN

21/02/13

1730

SUDIN

11/04/13

1731

SUDIN

28/05/13

1732

SUDIN

28/05/13

1733

SUDIN

16/07/13

1734

SUDIN

10/06/13

1735

SUDIN

11/04/13

1736

SUDIN

11/04/13

1737

SUDIN

03/04/13

1738

SUDIN

03/04/13

1739

MD1-0-C-370-06-00010

Hydraulic Calculation for C.W System

MD1-0-D-201-01-00201

Drainage Plan for Steam Turbine Building (1/2)

MD1-0-D-201-01-00202

Drainage Plan for Steam Turbine Building (2/2)

MD1-0-D-203-01-00201

Plumbing Plan for Central Control Building Ground Floor

MD1-0-D-203-01-00202

Plumbing Plan for Central Control Building 1st Floor

MD1-0-D-203-01-00203

Plumbing Plan for Central Control Building 2nd Floor

MD1-0-D-203-01-00204

Plumbing Plan for Central Control Building 3rd Floor

MD1-0-D-203-01-00205

Plumbing Plan for Central Control Building Roof

MD1-0-D-203-01-00301

Toilet Enlarged Plan for Central Control BLDG 2nd floor

MD1-0-D-203-01-00302

Toilet Enlarged Plan for Central Control BLDG 3rd floor

MD1-0-D-203-01-00303

Enlarged Plumbing Plan for Central Control Building Laboratory Room

MD1-0-D-203-21-00201

Plumbing P&I Diagram for Central Control Building

MD1-0-D-215-21-00201

Plumbing P&I Diagram for Switchyard Control Building

MD1-0-D-216-21-00201

Plumbing P&I Diagram for Water Treatment BLDG

MD1-0-D-250-21-00201

Plumbing P&I Diagram for Workshop Building

MD1-0-D-252-21-00201

Plumbing P&I Diagram for I&C Electrical and Mechanical Warehouse

MD1-0-D-254-01-00201

Plumbing Plan for Administration Building Ground Floor

MD1-0-D-254-01-00202

Plumbing Plan for Administration Building 1st Floor

MD1-0-D-254-01-00203

Plumbing Plan for Administration Building 2nd Floor

MD1-0-D-254-01-00204

Plumbing Plan for Administration Building 3rd Floor

MD1-0-D-254-01-00301

Enlarged Plumbing Plan for Administration Building Ground Floor (1/8)

MD1-0-D-254-01-00302

Enlarged Plumbing Plan for Administration Building Ground Floor (2/8)

MD1-0-D-254-01-00303

Enlarged Plumbing Plan for Administration Building 1st Floor (3/8)

MD1-0-D-254-01-00304

Enlarged Plumbing Plan for Administration Building 1st Floor (4/8)

MD1-0-D-254-01-00305

Enlarged Plumbing Plan for Administration Building 2nd Floor (5/8)

MD1-0-D-254-01-00306

Enlarged Plumbing Plan for Administration Building 2nd Floor (6/8)

MD1-0-D-254-01-00307

Enlarged Plumbing Plan for Administration Building 3rd Floor (7/8)

MD1-0-D-254-01-00308

Enlarged Plumbing Plan for Administration Building 3rd Floor (8/8)

MD1-0-D-254-21-00201

Plumbing P&I Diagram for Administration Building-1 (1 of 2)

MD1-0-D-254-21-00202

Plumbing P&I Diagram for Administration Building-1 (2 of 2)

MD1-0-D-254-21-00203

Plumbing P&I Diagram for Administration Building-2 (1 of 2)

MD1-0-D-254-21-00204

Plumbing P&I Diagram for Administration Building-2 (2 of 2)

MD1-0-D-255-21-00201

Plumbing P&I Diagram for Common Service Building

MD1-0-F-750-04-00001

Design Criteria for Fire Fighting & Fire Alarm System

MD1-0-F-750-06-00001

Fire Pump Sizing Calculation

MD1-0-F-750-21-00001

Drawing List for Fire Fighting System

MD1-0-F-750-21-00003

P&ID- Fire Water Distribution System

MD1-0-F-750-21-00004

P&ID- Indoor Hydrant System (Turbine Building)

MD1-0-F-750-21-00005

P&ID- Indoor Hydrant System (Unit 1A Boiler)

MD1-0-F-750-21-00006

P&ID- Indoor Hydrant System (Unit 1B Boiler)

MD1-0-F-750-21-00007

P&ID- Indoor Hydrant System (Unit 2A Boiler)

MD1-0-F-750-21-00008

P&ID- Indoor Hydrant System (Unit 2B Boiler)

MD1-0-F-750-21-00009

P&ID- Indoor Hydrant & Hose Reel System

MD1-0-F-750-21-00010

P&ID- Indoor Hydrant System (Coal Transfer tower)

MD1-0-F-750-21-00011

P&ID- Indoor Hydrant & Hose Reel System (Car Garage)

MD1-0-F-750-21-00012

P&ID- Indoor Hydrant & Hose Reel System (Switchyard Control House)

MD1-0-F-750-21-00013

P&ID- Sprinkler & Indoor Hydrant System (Control Bldg)

MD1-0-F-750-21-00014

P&ID- Sprinkler & Indoor Hydrant System (Administration Bldg)

MD1-0-F-750-21-00015

P&ID- Sprinkler & Indoor Hydrant & Hose Reel System (I&C Electrical & Mech.)

MD1-0-F-750-21-00016

P&ID- Water Spray & Sprinkler System (Turbine Bldg)

MD1-0-F-750-21-00017

P&ID- Water Spray System (Boiler Air Heaters)

MD1-0-F-750-21-00018

P&ID- Water Spray System (Boiler Burners)

MD1-0-F-750-21-00019

P&ID- Water Spray, Sprinkler & Hose Reel Sys. (Hydrogent Plant Building)

MD1-0-F-750-21-00020

P&ID- Water Spray System (Unit 1 Transformer Area)

MD1-0-F-750-21-00021

P&ID- Water Spray System (Unit 2 Transformer Area)

MD1-0-F-750-21-00022

P&ID- Water Spray System (Station Aux. Transfermer (110KV Switchyard area)

MD1-0-F-750-21-00023

P&ID- Water Spray System (Fuel Oil Storage & Diesel Oil Storage Tank)

MD1-0-F-750-21-00024

P&ID- Foam & Hose Reel System

MD1-0-F-750-21-00025

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys.

MD1-0-F-750-21-00026

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Control Bldg, Electronic)

MD1-0-F-750-21-00027

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Coal Handling Control)

MD1-0-F-750-21-00028

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Coal Handling Control & Equi

MD1-0-F-750-21-00029

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Hydrogen Plant)

MD1-0-F-750-21-00030

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Unit 1 ESP Control House)

MD1-0-F-750-21-00031

P&ID- Clean Agent (FM-200) Fire Extinguishing Sys. (Unit 2 ESP Control House)

MD1-0-F-750-23-00001

Fire Fighting Layout For Underground Piping (Overall)

MD1-0-F-750-23-00002

Fire Fighting Layout For Underground Piping (1/17)

MD1-0-F-750-23-00003

Fire Fighting Layout For Underground Piping (2/17)

MD1-0-F-750-23-00004

Fire Fighting Layout For Underground Piping (3/17)

MD1-0-F-750-23-00005

Fire Fighting Layout For Underground Piping (4/17)

MD1-0-F-750-23-00006

Fire Fighting Layout For Underground Piping (5/17)

MD1-0-F-750-23-00007

Fire Fighting Layout For Underground Piping (6/17)

MD1-0-F-750-23-00008

Fire Fighting Layout For Underground Piping (7/17)

MD1-0-F-750-23-00009

Fire Fighting Layout For Underground Piping (8/17)

MD1-0-F-750-23-00010

Fire Fighting Layout For Underground Piping (9/17)

MD1-0-F-750-23-00011

Fire Fighting Layout For Underground Piping (10/17)

MD1-0-F-750-23-00012

Fire Fighting Layout For Underground Piping (11/17)

MD1-0-F-750-23-00013

Fire Fighting Layout For Underground Piping (12/17)

MD1-0-F-750-23-00014

Fire Fighting Layout For Underground Piping (13/17)

MD1-0-F-750-23-00015

Fire Fighting Layout For Underground Piping (14/17)

MD1-0-F-750-23-00016

Fire Fighting Layout For Underground Piping (15/17)

MD1-0-F-750-23-00017

Fire Fighting Layout For Underground Piping (16/17)

MD1-0-F-750-23-00018

Fire Fighting Layout For Underground Piping (17/17)

MD1-0-F-750-23-00101

Fire Fighting Piping Plan for Steam Turbine Building (Ground Floor-1)

MD1-0-F-750-23-00102

Fire Fighting Piping Plan for Steam Turbine Building (Ground Floor-2)

MD1-0-F-750-23-00103

Fire Fighting Piping Plan for Steam Turbine Building (Mez Floor-1)

MD1-0-F-750-23-00104

Fire Fighting Piping Plan for Steam Turbine Building (Mez Floor-2)

MD1-0-F-750-23-00105

Fire Fighting Piping Plan for Steam Turbine Building (Operating Floor-1)

MD1-0-F-750-23-00106

Fire Fighting Piping Plan for Steam Turbine Building (Operating Floor-2)

MD1-0-F-750-23-00117

Fire Fighting Piping Plan for Central Control Building-Ground Floor

MD1-0-F-750-23-00118

Fire Fighting Piping Plan for Central Control Building- 1st Floor

MD1-0-F-750-23-00119

Fire Fighting Piping Plan for Central Control Building- 2nd Floor

MD1-0-F-750-23-00120

Fire Fighting Piping Plan for Central Control Building- 3rd Floor

MD1-0-F-750-23-00121

Fire Fighting Piping Plan for Central Control Bulding- Roof Floor

MD1-0-F-750-23-00122

Fire Fighting Piping Plan for Central ControlBuilding (Clean Agent System-1)

MD1-0-F-750-23-00123

Fire Fighting Piping Plan for Central Control Building (Clean Agent System-2)

MD1-0-F-750-23-00124

Fire Fighting Piping Plan for Central Control Building (Clean Agent System-3)

MD1-0-F-750-23-00125

Fire Fighting Piping Plan for Unit 1 Transformer

MD1-0-F-750-23-00126

Fire Fighting Piping Plan for Unit 1 Main Transformer-1

MD1-0-F-750-23-00127

Fire Fighting Piping Plan for Unit 1 Main Transformer-2

MD1-0-F-750-23-00128

Fire Fighting Piping Plan for Unit 1 Main Transformer-3

MD1-0-F-750-23-00129

Fire Fighting Piping Plan for Unit 1 Unit Aux, Transformer

MD1-0-F-750-23-00130

Fire Fighting Piping Plan for Unit 2 Transformer

MD1-0-F-750-23-00131

Fire Fighting Piping Plan for Unit 2 Main Transformer-1

MD1-0-F-750-23-00132

Fire Fighting Piping Plan for Unit 2 Main Transformer-2

MD1-0-F-750-23-00133

Fire Fighting Piping Plan for Unit 2 Main Transformer-3

MD1-0-F-750-23-00134

Fire Fighting Piping Plan for Unit 2 Unit Aux. Transformer

MD1-0-F-750-23-00135

Fire Fighting Piping Plan for Steam Turbine Building (Dirty Lube Oil Tank)

MD1-0-F-750-23-00136

Fire Fighting Piping Plan for Unit 1 esp Control & ash elec. Building

MD1-0-F-750-23-00137

Fire Fighting Piping Plan for Unit 2 esp Control & ash elec. Building

MD1-0-F-750-23-00138

Fire fighting piping plan for ash slurry pump house(ground floor)

MD1-0-F-750-23-00143

Fire Fighting Piping Plan for Water Treatment Building

MD1-0-F-750-23-00145

Fire Fighting Piping Plan for Fire Protection Pump House-1

MD1-0-F-750-23-00146

Fire Fighting Piping Plan for Fire Protection Pump House-2

MD1-0-F-750-23-00148

Fire Fighting Piping Plan for Limestone Storage Building

MD1-0-F-750-23-00149

Fire fighting piping plan for fuel oil pump house

MD1-0-F-750-23-00150

Fire fighting piping plan for fuel oil storage tank-1

MD1-0-F-750-23-00151

Fire fighting piping plan for fuel oil storage tank-2

MD1-0-F-750-23-00152

Fire fighting piping plan for diesel oil storage tank

MD1-0-F-750-23-00153

Fire fighting piping section & detail for fuel oil and diesel oil storage tank

MD1-0-F-750-23-00154

Fire fighting piping plan for dike area(air foam system)

MD1-0-F-750-23-00155

Fire fighting piping plan for fuel oil storage tank-1(air foam system)

MD1-0-F-750-23-00156

Fire fighting piping plan for fuel oil storage tank-2(air foam system)

MD1-0-F-750-23-00157

Fire fighting piping plan for diesel oil storage tank(air foam system)

MD1-0-F-750-23-00159

Fire fighting piping plan for workshop building

MD1-0-F-750-23-00160

Fire Extinguisher Location Plan for Bulldozer Garage

MD1-0-F-750-23-00161

Fire extinguisher location plan for coal handling control building

MD1-0-F-750-23-00162

Fire fighting piping plan for coal handling control building(clean agent system)

MD1-0-F-750-23-00171

Fire Fighting Piping Plan for Administration Building (Ground Floor)

MD1-0-F-750-23-00172

Fire Fighting Piping Plan for Administration Building (1st Floor)

MD1-0-F-750-23-00173

Fire Fighting Piping Plan for Administration Building (2nd Floor)

MD1-0-F-750-23-00174

Fire Fighting Piping Plan for Administration Building (3rd Floor)

MD1-0-F-750-23-00175

Fire Fighting Piping Plan for Administration Building (4th Floor)

MD1-0-F-750-23-00178

Fire Fighting Piping Plan for car Garage-3

MD1-0-F-750-23-00181

Fire Fighting Piping Plan for Switchyard Control House (Ground Floor)

MD1-0-F-750-23-00182

Fire Fighting Piping Plan for Switchyard Control House (1st Floor)

MD1-0-F-750-23-00183

Fire Fighting Piping Plan for Switchyard Control House (Clean Agent System-1)

MD1-0-F-750-23-00184

Fire Fighting Piping Plan for Switchyard Control House (Clean Agent System-2)

MD1-0-F-750-23-00185

Fire Fighting Piping Plan for Station Aux. Transformer (110KV Switchyard Area)

MD1-0-F-750-23-00186

Fire Extinguisher Location Plan for Cooling Water Pump House

MD1-0-F-750-23-00187

Fire Extinguisher Location Plan for Gasous Chlorination Building

MD1-0-F-750-23-00189

Fire Extinguisher Location Plan for Fuel Oil Unloading Pump House

MD1-0-F-750-23-00190

Fire Extinguisher Location Plan for Return Water Pump House

MD1-0-F-750-23-00191

Fire fighting piping plan for diesel generator house

MD1-0-F-750-23-00192

Fire Fighting Piping Plan for Unit 1 esp Control & ash elec. bldg(Clean agent)

MD1-0-F-750-23-00193

Fire Fighting Piping Plan for Unit 2 esp Control & ash elec. bldg(Clean agent)

MD1-0-F-750-23-00198

Pipe support detail

MD1-0-F-750-23-00199

Fire extinguisher location plan for ash slurry pump house(first floor)

MD1-0-H-201-21-00201

HVAC P&I Diagram for Steam Turbine Building

MD1-0-H-203-01-00201

HVAC Plan for Central Control Building Ground Floor- Duct

MD1-0-H-203-01-00202

HVAC Plan for Central Control Building 1st Floor- Duct

MD1-0-H-203-01-00203

HVAC Plan for Central Control Building 2nd Floor- Duct

MD1-0-H-203-01-00204

HVAC Plan for Central Control Building 3rd Floor- Duct

MD1-0-H-203-01-00205

HVAC Plan for Central Control Building Roof- Duct

MD1-0-H-203-01-00206

HVAC Enlarged Plan for Central Control Building HVAC Room-1

MD1-0-H-203-01-00207

HVAC Enlarged Plan for Central Control Building HVAC Room-2

MD1-0-H-203-01-00208

HVAC Enlarged Plan for Central Control Building 2nd Floor-Piping

MD1-0-H-203-01-00209

HVAC Plan for Central Control Building 3rd Floor- Piping

MD1-0-H-203-01-00210

HVAC Plan for Central Control Building Roof- Piping

MD1-0-H-203-08-00101

Equipment List for Central Control Building-1

MD1-0-H-203-08-00102

Equipment List for Central Control Building-2

MD1-0-H-204-21-00201

HVAC P&I Diagram for Coal handling Control Building

MD1-0-H-205-21-00201

HVAC P&I Diagram for Fuel Oil Pump House

MD1-0-H-207-21-00201

HVAC P&I Diagram for Fire Protection Pump House

MD1-0-H-208-21-00201

Hvac p&i diagram for ash slurry pump house

MD1-0-H-209-21-00201

HVAC P&I Diagram for ESP Control & ASH Elec.Building-1

MD1-0-H-209-21-00202

HVAC P&I Diagram for ESP Control & ASH Elec. Building-2

MD1-0-H-210-21-00201

Hvac p&i diagram for diesel generator house

MD1-0-H-211-21-00201

Hvac p&i diagram for cooling water pump house

MD1-0-H-212-21-00201

HVAC P&I Diagram for Gaseous Chlorination Building

MD1-0-H-213-21-00201

Hvac p&i diagram for fuel oil unloading pump house

MD1-0-H-215-01-00201

HVAC Plan for Switchyard Control Building Ground Floor

MD1-0-H-215-01-00202

HVAC Plan for Switchyard Control Building 1st Floor

MD1-0-H-215-01-00203

HVAC Plan for Switchyard Control Building Roof

MD1-0-H-215-08-00101

Equipment List for Switchyard Control Building

MD1-0-H-215-21-00201

HVAC P&I Diagram for Switchyard Control Building

MD1-0-H-216-21-00201

HVAC P&I Diagram for Water Treatment Building

MD1-0-H-217-21-00201

HVAC P&I Diagram for Limestone Handling SYS. Control Building

MD1-0-H-219-21-00201

Hvac p&i diagram for limestorne storage shed

MD1-0-H-250-21-00201

HVAC P&I Diagram for Workshop Building

MD1-0-H-252-21-00201

HVAC P&I Diagram for I&C Electrical & Mechanical Warehouse

MD1-0-H-254-01-00201

HVAC Plan for Administration Building Ground Floor- Duct

MD1-0-H-254-01-00202

HVAC Plan for Administration Building 1st Floor- Duct

MD1-0-H-254-01-00203

HVAC Plan for Administration Building 2nd Floor- Duct

MD1-0-H-254-01-00204

HVAC Plan for Administration Building 3rd Floor- Duct

MD1-0-H-254-01-00205

HVAC Plan for Administration Building 4th Floor- Duct

MD1-0-H-254-01-00206

HVAC Plan for Administration Building Roof- Duct

MD1-0-H-254-01-00207

HVAC Plan for Administration Building Auditorium Floor- Duct

MD1-0-H-254-01-00208

HVAC Plan for Administration Building Auditorium Roof- Duct

MD1-0-H-254-01-00301

HVAC Plan for Administration Building Ground Floor- Piping

MD1-0-H-254-01-00302

HVAC Plan for Administration Building 1st Floor- Piping

MD1-0-H-254-01-00303

HVAC Plan for Administration Building 2nd Floor- Piping

MD1-0-H-254-01-00304

HVAC Plan for Administration Building 3rd Floor- Piping

MD1-0-H-254-01-00305

HVAC Plan for Administration Building 4th Floor- Piping

MD1-0-H-254-01-00306

HVAC Plan for Administration Building Auditorium Floor- Piping

MD1-0-H-254-01-00307

HVAC Plan for Administration Building Auditorium Roof- Piping

MD1-0-H-254-01-00401

HVAC Room-1 Enlarged Duct Plan for Administration Building

MD1-0-H-254-01-00402

HVAC Room-2 Enlarged Duct Plan for Administration Building

MD1-0-H-254-01-00501

HVAC Room-1 Enlarged Piping Plan for Administration Building

MD1-0-H-254-01-00502

HVAC Room-2 Enlarged Piping Plan for Administration Building

MD1-0-H-254-08-00101

Equipment List for Administration Building-1

MD1-0-H-254-08-00102

Equipment List for Administration Building-2

MD1-0-H-254-08-00103

Equipment List for Administration Building-3

MD1-0-H-254-21-00201

HVAC P&I Diagram for Administration Building- Duct (1/5)

MD1-0-H-254-21-00202

HVAC P&I Diagram for Administration Building- Duct (2/5)

MD1-0-H-254-21-00203

HVAC P&I Diagram for Administration Building- Duct (3/5)

MD1-0-H-254-21-00204

HVAC P&I Diagram for Administration Building- Duct (4/5)

MD1-0-H-254-21-00205

HVAC P&I Diagram for Administration Building- Duct (5/5)

MD1-0-H-254-21-00206

HVAC P&I Diagram for Administration Building- Piping

MD1-0-H-255-21-00201

HVAC P&I Diagram for Common Service Building

MD1-0-H-710-04-00101

Design Criteria for HVAC system

MD1-0-H-710-11-00004

General Standard Detail for HVAC Duct (4/4)

MD1-0-H-710-11-00012

General Standard Detail for HVAC Piping (2/2)

MD1-0-M-130-03-00001

System Description- Circulating Water System

MD1-0-M-130-07-00001

Report for CW System Surge Analysis

MD1-0-M-130-21-00011

P & I Diagram- Circulating Water System (1/4)

MD1-0-M-130-21-00012

P & I Diagram- Circulating Water System (2/4)

MD1-0-M-130-21-00013

P & I Diagram- Circulating Water System (3/4)

MD1-0-M-130-21-00014

P & I Diagram- Circulating Water System (4/4)

MD1-0-M-140-21-00012

P & I diagram - closed cooling water system (2/4)

MD1-0-M-140-21-00013

P & I diagram - closed cooling water system (3/4)

MD1-0-M-140-21-00014

P & I diagram - closed cooling water system (4/4)

MD1-0-M-140-21-00021

P & I Diagram- Service Water Distribution System

MD1-0-M-140-21-00022

P & I Diagram- Demin. Water Distribution System

MD1-0-M-140-21-00023

P & I Diagram- Filtered Water Distribution System

MD1-0-M-150-21-00021

P & I Diagram- Instrument Air Distribution System

MD1-0-M-150-21-00031

P & I Diagram- Service Air Distribution System

MD1-0-M-150-21-00051

P & I Diagram- N2 Gas System

MD1-0-M-160-21-00011

P & I Diagram- Heavy Fuel Oil Unloading System

MD1-0-M-160-21-00012

P & I Diagram- Heavy Fuel Oil Supply System (1/2)

MD1-0-M-160-21-00014

P & I Diagram- Heavy Fuel Oil Drain System

MD1-0-M-160-21-00015

P & I Diagram- HFO Heating Steam System

MD1-0-M-160-21-00021

P & I Diagram- Diesel Oil System

MD1-0-M-160-21-00030

P & I Diagram - Steam Coil Air Heater Drain System (1/2)

MD1-0-M-160-21-00031

P & I Diagram- Steam Coil Air Heater System (2/2)

MD1-0-M-170-22-00022

Flow Diagram- Fly Ash Handling System

MD1-0-M-170-22-00023

Flow Diagram- Ash Slurry Disposal and Water Return System

MD1-0-M-170-22-00024

Flow Diagram- Sand Filling and Bed Ash Rebedding System

MD1-0-M-171-06-00001

Calculation- Coal Handling System

MD1-0-M-172-06-00001

Calculation- Limestone Handling System

MD1-0-M-173-06-00001

Calculation- Ash Handling System

MD1-0-M-180-21-00011

P & I Diagram- Oily Waste Drainage System

MD1-0-M-180-21-00012

P & I Diagram- Oily Waste Drainage System (2 of 2)

MD1-0-M-180-21-00021

P & I Diagram- Chemical Waste Drainage System (1/3)

MD1-0-M-180-21-00022

P & I Diagram- Chemical Waste Drainage System (2/3)

MD1-0-M-180-21-00023

P & I Diagram- Chemical Waste Drainage System (3/3)

MD1-0-M-180-21-00024

P & i diagram - coal transfer tower area drainage system

MD1-0-M-180-21-00025

P & i diagram - limestone transfer tower area drainage system

MD1-0-M-180-21-00031

P & I Diagram- Seawater Drainage System

MD1-0-M-180-21-00041

P & I Diagram- Dirty Oil Transfer System

MD1-0-P-413-01-00001

General Arrangement Drawing- Ash Slurry Pump House & Ash Silo, Mixing Tanks Area

MD1-0-P-415-01-00001

General Arrangement Drawing-Aux. Boiler & Service Gas(CO2/N2) Storage Shelter

MD1-0-P-425-01-00001

General Arrangement Drawing- Diesel Generator House

MD1-0-P-435-01-00001

General Arrangement Drawing- Coal Yard Area

MD1-0-P-440-01-00001

General Arrangement Drawing- Water Treatment & Water Storage Tanks Area

MD1-0-P-445-01-00001

General Arrangement Drawing- Fuel Oil Tanks Area

MD1-0-P-450-01-00001

General Arrangement Drawing- Cooling Water Pump House & Gaseous Chlorination BLG

MD1-0-P-470-01-00001

General Arrang. Drawing- Fuel Oil Unload. Pump House & Limestone Unload Jetty

MD1-0-T-030-05-00070

ITP for Field Erected Tank

MD1-0-T-030-05-00071

ITP for Steel Structure Erection

MD1-0-T-030-05-00073

ITP for Under Ground Piping

MD1-0-T-030-05-00120

ITP for UG Piping of HDPE

MD1-0-T-030-05-00241

Inspection & Test Plan for HVAC Duct Works

MD1-0-T-030-05-00242

Inspection & Test Plan for Plumbing and Piping of Building

MD1-0-V-135-21-00005

P&I Diaram, Debris Filter

MD1-0-V-186-01-00101

Shop Inspection and Test Plan

MD1-0-V-186-06-00101

Strength Calculation for Raw Water Storage Tank

MD1-0-V-186-06-00201

Strength Calculation for Filtered Water Storage Tank

MD1-0-V-186-06-00301

Strength Calculation for Demi. Water Storage Tank

MD1-0-V-186-06-00401

Strength Calculation for Fire Water Storage Tank

MD1-0-V-186-06-00501

Strength Calculation for Condensate Water Storage Tank

MD1-0-V-186-06-00601

Strength Calculation for Portable Water Storage Tank

MD1-0-V-186-06-00701

Strength Calculation for Fuel Oil Storage Tank

MD1-0-V-186-06-00801

Strength Calculation for Diesel Oil Storage Tank

MD1-0-V-186-10-00101

General Assembly for Raw Water Storage Tank

MD1-0-V-186-10-00102

Raw Water Storage Tank Nozzle Orientation (1/2)

MD1-0-V-186-10-00103

Raw Water Storage Tank Nozzle Orientation (2/2)

MD1-0-V-186-10-00201

General Assembly for Filtered Water Storage Tank

MD1-0-V-186-10-00202

Filtered Water Storage Tank Nozzle Orientation (1/2)

MD1-0-V-186-10-00203

Filtered Water Storage Tank Nozzle Orientation (2/2)

MD1-0-V-186-10-00301

General Assembly for Demi. Water Storage Tank

MD1-0-V-186-10-00302

Demi Water Storage Tank Nozzle Orientation (1/2)

MD1-0-V-186-10-00303

Demi Water Storage Tank Nozzle Orientation (2/2)

MD1-0-V-186-10-00401

General Assembly for Fire Water Storage Tank

MD1-0-V-186-10-00402

Fire Water Storage Tank Nozzle Orientation (1/2)

MD1-0-V-186-10-00403

Fire Water Storage Tank Nozzle Orientation (2/2)

MD1-0-V-186-10-00501

General Assembly for Condensate Water Storage Tank

MD1-0-V-186-10-00701

FUEL OIL STORAGE TANK GENERAL ASSEMBLY

MD1-0-V-186-10-00801

General Assembly for Diesel Oil Tank

MD1-0-V-186-11-00201

Filtered Water Storage Tank Shell Plate Detail

MD1-0-V-186-11-00202

Filtered Water Storage Tank 1st Course Shell Plate Arrangement (1/2)

MD1-0-V-186-11-00203

Filtered Water Storage Tank 1st Course Shell Plate Arrangement (2/2)

MD1-0-V-186-11-00204

Filtered Water Storage Tank Bottom Plate Arrangement (1/3)

MD1-0-V-186-11-00205

Filtered Water Storage Tank Bottom Plate Arrangement (2/3)

MD1-0-V-186-11-00206

Filtered Water Storage Tank Bottom Plate Arrangement (3/3)

MD1-0-V-186-11-00207

Filtered Water Storage Tank Roof Plate Arrangement (1/3)

MD1-0-V-186-11-00208

Filtered Water Storage Tank Roof Plate Arrangement (2/3)

MD1-0-V-186-11-00209

Filtered Water Storage Tank Roof Plate Arrangement (3/3)

MD1-0-V-186-11-00210

Filtered Water Storage Tank Roof Structure Detail (1/3)

MD1-0-V-186-11-00211

Filtered Water Storage Tank Roof Structure Detail (2/3)

MD1-0-V-186-11-00212

Filtered Water Storage Tank Roof Structure Detail (3/3)

MD1-0-V-186-11-00213

Filtered Water Storage Tank Shell Manhole Detail

MD1-0-V-186-11-00214

Filtered Water Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00215

Filtered Water Storage Tank Shell Nozzle Detail (1/3)

MD1-0-V-186-11-00216

Filtered Water Storage Tank Shell Nozzle Detail (2/3)

MD1-0-V-186-11-00217

Filtered Water Storage Tank Shell Nozzle Detail (3/3)

MD1-0-V-186-11-00218

Filtered Water Storage Tank Roof Nozzle Detail

MD1-0-V-186-11-00226

Filtered Water Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00301

Demi. Water Storage Tank Shell Plate Detail

MD1-0-V-186-11-00302

Demi. Water Storage Tank 1st Course Shell Plate Arrangement (1/2)

MD1-0-V-186-11-00303

Demi. Water Storage Tank 1st Course Shell Plate Arrangement (2/2)

MD1-0-V-186-11-00304

Demi. Water Storage Tank Bottom Plate Arrangement (1/3)

MD1-0-V-186-11-00305

Demi. Water Storage Tank Bottom Plate Arrangement (2/3)

MD1-0-V-186-11-00306

Demi. Water Storage Tank Bottom Plate Arrangement (3/3)

MD1-0-V-186-11-00307

Demi. Water Storage Tank Roof Plate Arrangement (1/3)

MD1-0-V-186-11-00308

Demi. Water Storage Tank Roof Plate Arrangement (2/3)

MD1-0-V-186-11-00309

Demi. Water Storage Tank Roof Plate Arrangement (3/3)

MD1-0-V-186-11-00310

Demi. Water Storage Tank Roof Structure Detail (1/3)

MD1-0-V-186-11-00311

Demi. Water Storage Tank Roof Structure Detail (2/3)

MD1-0-V-186-11-00312

Demi. Water Storage Tank Roof Structure Detail (3/3)

MD1-0-V-186-11-00313

Demi. Water Storage Tank Shell Manhole Detail

MD1-0-V-186-11-00314

Demi. Water Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00315

Demi. Water Storage Tank Shell Nozzle Detail (1/3)

MD1-0-V-186-11-00316

Demi. Water Storage Tank Shell Nozzle Detail (2/3)

MD1-0-V-186-11-00317

Demi. Water Storage Tank Shell Nozzle Detail (3/3)

MD1-0-V-186-11-00318

Demi. Water Storage Tank Roof Nozzle Detail

MD1-0-V-186-11-00327

Demi. Water Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00401

Fire Water Storage Tank Shell Plate Detail

MD1-0-V-186-11-00402

Fire Water Storage Tank 1st course shell plate arrangement (1/2)

MD1-0-V-186-11-00403

Fire water storage tank 1st course shell plate arrangement (2/2)

MD1-0-V-186-11-00404

Fire Water Storage Tank bottom plate arrangement (1/3)

MD1-0-V-186-11-00405

Fire Water Storage Tank bottom plate arrangement (2/3)

MD1-0-V-186-11-00406

Fire water storage tank bottom plate arrangement (3/3)

MD1-0-V-186-11-00407

Fire Water Storage Tank Roof plate arrangement (1/3)

MD1-0-V-186-11-00408

Fire Water Storage Tank Roof plate arrangement (2/3)

MD1-0-V-186-11-00409

Fire Water Storage Tank Roof plate arrangement (3/3)

MD1-0-V-186-11-00410

Fire Water Storage Tank Roof Structure Detail (1/3)

MD1-0-V-186-11-00411

Fire Water Storage Tank Roof Structure Detail (2/3)

MD1-0-V-186-11-00412

Fire Water Storage Tank Roof Structure Detail (3/3)

MD1-0-V-186-11-00413

Fire Water Storage Tank Shell Manhole Detail

MD1-0-V-186-11-00414

Fire Water Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00415

Fire Water Storage Tank Shell Nozzle Detail (1/3)

MD1-0-V-186-11-00416

Fire Water Storage Tank Shell Nozzle Detail (2/3)

MD1-0-V-186-11-00417

Fire Water Storage Tank Shell Nozzle Detail (3/3)

MD1-0-V-186-11-00418

Fire Water Storage Tank Roof Nozzle Detail

MD1-0-V-186-11-00426

Fire Water Storage Tank Rainwater Down Pipe Detail

MD1-0-V-400-23-00411

Piping Arrangement Drawing for GRP Pipes (1 of 2)

MD1-0-V-400-23-00412

Piping Arrangement Drawing for GRP Pipes (2 of 2)

MD1-0-V-594-02-00001

Technical Specification & Drawing of Boiler Elevator

MD1-0-V-594-02-00002

Technical Specification & Drawing of Administration Building Elevator

MD1-0-V-750-09-00006

Equipment Data Sheet: Outdoor Hydrant

MD1-0-V-750-09-00007

Equipment Data Sheet: Hose Cabinet

MD1-0-V-750-09-00008

Equipment Data Sheet: Isolation Valve for Hydrant

MD1-0-V-750-09-00009

Equipment Data Sheet: Valve Box for Gate Valve for Hydrant

MD1-0-V-750-09-00010

Equipment Data Sheet: Post Indicator Valve

MD1-0-V-750-09-00011

Equipment Data Sheet: Guard Post for Fire Hydrant & PIV (Quotation Item A-7.0)

MD1-0-V-750-09-00012

Equipment Data Sheet: Indoor Hydrant (Quotation Item No.B-1.0)

MD1-0-V-750-09-00013

Equipment Data Sheet: Hose Reel

MD1-0-V-750-09-00014

Equipment Data Sheet: Pressure Guage (Quotation Item No.B-3.0 and E-11.0)

MD1-0-V-750-09-00015

Equipment Data Sheet: Fire Department Connection (Quot No.B-4.0, C-8.0 and E-10)

MD1-0-V-750-09-00016

Equipment Data Sheet: Check Valve

MD1-0-V-750-09-00017

Equipment Data Sheet: OS&Y Gate Valve (Blass Material)

MD1-0-V-750-09-00018

Equipment Data Sheet: Prossure Transmitter

MD1-0-V-750-09-00020

Equipment Data Sheet: Water Spray Nozzle

MD1-0-V-750-09-00021

Equipment Data Sheet: Y Strainer

MD1-0-V-750-09-00022

Equipment Data Sheet: Alarm Check Valve

MD1-0-V-750-09-00023

Equipment Data Sheet: Sprinkler Head

MD1-0-V-750-09-00025

Equipment Data Sheet: Test Valve

MD1-0-V-750-09-00026

Equipment Data Sheet: Bladder Foam Tank Skid

MD1-0-V-750-09-00027

Equipment Data Sheet: Foam Monitor

MD1-0-V-750-09-00028

Equipment Data Sheet: Foam Chamber

MD1-0-V-750-09-00029

Equipment Data Sheet: Low Expansion Foam Concentrate

MD1-0-V-750-09-00030

Equipment data sheet : fix foam unit

MD1-0-V-750-09-00031

Equipment Data Sheet: FM-200 Fire Suppresion System

MD1-0-V-750-09-00032

Equipment Data Sheet: Portable ABC Dry Chemical Fire Extinguisher

MD1-0-V-750-09-00033

Equipment Data Sheet: Portable CO2 Fire Extinguisher

MD1-0-V-750-09-00034

Equipment Data Sheet: Mobile Dry Powder Extinguisher

MD1-0-V-750-09-00035

Equipment Data Sheet: Mobile CO2 Extinguisher

MD1-0-V-750-09-00036

Equipment Data Sheet: Rescue and Salvage Equipment

MD1-0-V-750-55-00058

Calculation Sheet for Clean Agent Fire Exting. Sys: Main Control Room

MD1-0-V-750-55-00059

Calculation Sheet for Clean Agent Fire Exting. Sys: Electronic Equip. Room

MD1-0-V-750-55-00060

Calculation Sheet for Clean Agent Fire Exting. Sys: Control & Protection Room

MD1-0-V-751-35-00106

Controller Date for Diesel Fire Water Pump

MD1-0-V-751-35-00205

Controller Date for Electric Fire Water Pump

MD1-0-V-850-03-00001

System description for boiler chemical dosing system

MD1-0-V-850-09-00001

Motor Data Sheet for Boiler Chemical Dosing System

MD1-0-V-850-09-00004

Pump Data Sheet for Boiler Chemical Dosing System

MD1-0-V-860-03-00004

System Description for Gaseous Chlorination System

MD1-0-V-860-09-00004

Equipment data sheet for gaseous Chlorination System

MD1-0-V-860-09-00005

Pump Data Sheet and performance Curves Characteristic Gaseous Chlorination

MD1-0-V-860-09-00006

Blower Data Sheet and Performance Curves Characteristic Gaseous

MD1-0-W-800-57-00001

Water Balance Diagram

MD1-0-W-810-21-00001

P & I Diagram for Preliminary Raw Water Treatment System

MD1-0-W-820-03-00001

System Description for Water Treatment System

MD1-0-W-820-06-00001

Calculation Sheet for Water Treatment System

MD1-0-W-820-21-00001

P & I Diagram for Demineralized Water Treatment System (1)

MD1-0-W-820-21-00002

P & I Diagram for Demineralized Water Treatment System (2)

MD1-0-W-830-21-00001

P & I Diagram for Portable Water Treatment System

MD1-0-W-840-03-00001

System Description for Waste Water Treatment System

MD1-0-W-840-06-00001

Calculation Sheet for Waste Water Treatment System

MD1-0-W-840-21-00001

P & I Diagram for Waste Water Treatment System (1)

MD1-0-W-840-21-00002

P & I Diagram for Waste Water Treatment System (2)

MD1-0-W-850-06-00001

Calculation Sheet for Boiler Chemical Dosing System

MD1-0-W-850-21-00001

P & I Diagram Chemical Dosing System

MD1-0-W-860-03-00001

System Description for Gaseous Chlorination System

MD1-0-W-860-06-00001

Calculation Sheet for Gaseous Chlorination System

MD1-0-W-860-21-00001

P & I Diagram for Gaseous Chlorination System

MD1-0-W-870-21-00001

P & I Diagram for Sewage Treatment System

MD1-1-P-131-24-00001

Piping Isometric Drawing- Steam Circulating Water System (Unit #1)

MD1-1-P-411-01-00001

General Arrangement Drawing- Unit #1 Boiler Area

MD1-1-P-412-01-00001

General Arrangement Drawing- Unit #1 ESP & Main Stack Area

MD1-2-P-131-24-00001

Piping Isometric Drawing- Circulating Water System (Unit #2)

MD1-2-P-411-01-00001

General Arrangement Drawing- Unit # 2 Boiler Area

MD1-2-P-412-01-00001

General Arrangement Drawing- Unit # 2 ESP & Main Stack Area

SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47

MD1-0-F-750-23-00179A

Fire Extinguisher Location


A Plan for Motorcycle
SUDIN & Bicycle Shed

MD1-0-H-208-01-00201A

Hvac plan for ash slurryApump houseSUDIN


ground floor

MD1-0-H-208-01-00202A
MD1-0-H-208-01-00203A
MD1-0-H-208-08-00101A
MD1-0-H-211-01-00201A
MD1-0-H-211-01-00202A
MD1-0-H-211-08-00101A
MD1-0-H-710-06-00210A
MD1-0-M-150-06-00001
C
MD1-0-T-053-07-00336A
MD1-0-T-054-07-00371A
MD1-0-T-057-07-00271B
MD1-0-T-057-07-00272B
MD1-0-T-057-07-00318A
MD1-0-T-750-04-00041C
MD1-0-V-113-10-00045B
MD1-0-V-131-09-00002B
MD1-0-V-132-09-00008B
MD1-0-V-132-09-00084A
MD1-0-V-133-02-00012A
MD1-0-V-133-09-00009B
MD1-0-V-134-09-00012A
MD1-0-V-141-09-00001B
MD1-0-V-141-09-00002A
MD1-0-V-141-09-00004B
MD1-0-V-151-09-00015A
MD1-0-V-153-05-00001A
MD1-0-V-153-05-00002A
MD1-0-V-166-09-00001A
MD1-0-V-167-09-00002A
MD1-0-V-171-01-00122B
MD1-0-V-171-02-00001B
MD1-0-V-171-04-00011B
MD1-0-V-171-04-01002A
MD1-0-V-172-01-00123A
MD1-0-V-172-01-00126A
MD1-0-V-172-03-02102D
MD1-0-V-172-04-00021B
MD1-0-V-172-06-00004B
MD1-0-V-182-02-00011A
MD1-0-V-182-02-03001A
MD1-0-V-182-08-20006A
MD1-0-V-183-09-11101A
MD1-0-V-183-09-11102A
MD1-0-V-183-09-11103A
MD1-0-V-183-09-11104A

1
2
Hvac plan for ash slurryApump houseSUDIN
crane runway floor
3
Hvac plan for ash slurryApump houseSUDIN
first floor
4
Equipment list for ash slurry
A
pump house
SUDIN
5
Hvac plan for cooling water
A
pump house
SUDIN
ground floor
6
Hvac plan for cooling water
A
pump house
SUDIN
roof
7
Equipment list for cooling
A water pumpSUDIN
house
8
Hvac load calculation for
A ash slurry pump
SUDIN
hosue
9
Calculation- Compressed
A Air SystemSUDIN
10
Material Approval Request
A for Paint (Underside
MAX
Surface of Tank Bottom Plate)
11
Material approval request
A for paint (ag
SUDIN
fire fighting piping system)
12
Material Approval Request
A for CopperBINH
Tube Pipe (Nung Won)
13
Material Approval Request
A for Copper
SUDIN
Tube Pipe Fitting (Jung Woo)
14
Material Appoval Request
A for Sound SUDIN
Attenuator (NSV)
15
Fire Fighting System & AFire Alarm System
SUDINDesign Basis
16
Condenser - cw expansion
A joint datasheet
SUDIN
17
Technical data sheet for
A circulating water
SUDIN
pump
18
Sea water intake facility
A - equipmentSUDIN
data sheet
19
Sea Water Intake Facility
A - Screen Wash
SUDIN
Pump Curves & Data Sheet
20
Heat Exchanger Data Sheet
A
and Drawing
SUDIN
21
Water box vacuum pump
A data sheet SUDIN
22
Ball Recirculation pumpAdata & Characteristic
SUDIN Curves
23
Technical Data According
A to the Contractor's
SUDIN Form, CCW Cooler
24
Valve data, ccw cooler A
SUDIN
25
Technical Data Sheet for
A Self Cleaning
SUDIN
Filter
26
Air Compressor - Technical
A
Data Sheet
SUDIN
27
Packing Procedure for A
Service Gas System
SUDIN
28
NDE(PT)Procedure forAService Gas System
SUDIN
29
Technical Data Sheet A
SUDIN
30
Performance curve for A
fo pump
SUDIN
31
Technical SpecificationAof Bridge Type
SUDIN
Reclaimer For CHS
32
Technical SpecificationAof Luffing Travelling
SUDIN Stacker For CHS
33
Design Basis Report For
A Dust Extraction
SUDIN
System
34
Acceptance Of Indian Standard
A
Materials(Mechanical)In
SUDIN
Place Of ASTM Standars Ma
35
General Arrangement and
A Data Sheet
SUDIN
of Magenet for Limestone Handling System
36
Technical data sheet ofAconveyor belting
SUDIN
for lhs
37
System Description & Operational
A
Description
SUDIN FO LHS
38
Design Basic Report forA Dist Extraction
SUDIN
System for Limesone Handling System
39
Stockpile Capacity Calculation
A
for Limestone
SUDIN Handling System
40
Emergency Diesel Generator
A
Set Diesel
SUDIN
Engine Generator Specification
41
Emergency Diesel Generator
A
Set Equipment
SUDIN Painting Specification
42
Piping Specification forAEmergency Diesel
SUDINGenerator
43
Pump Data & Curve Curve
A & calculation
SUDIN
Sheet for GSP (Vertical & Summerible)-Stat
44
Pump Data & Curve Curve
A & calculation
SUDIN
Sheet for GSP (Vertical & Summerible)-BLR
45
Pump Data & Curve Curve
A & calculation
SUDIN
Sheet for GSP (Vertical & Summerible)-Main
46
Pump Data & Curve Curve
A & calculation
SUDIN
Sheet for GSP (Vertical & Summerible)-Coal
47

SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN

48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94

MD1-0-V-183-09-11105A

Pump Data & Curve Curve


A & calculation
SUDIN
Sheet for GSP (Vertical & Summerible)-Lime

MD1-0-V-183-09-11107A

Pump Data & Curve Curve


A & calculation
SUDIN
Sheet for GSP (Vertical & Summerible)-Cool

MD1-0-V-183-09-11108A
MD1-0-V-183-09-11112A
MD1-0-V-183-09-11113A
MD1-0-V-183-09-11201A
MD1-0-V-183-09-11202A
MD1-0-V-183-09-11203A
MD1-0-V-183-09-11204A
MD1-0-V-183-09-11205A
MD1-0-V-183-09-11206A
MD1-0-V-183-09-11207A
MD1-0-V-183-09-11208A
MD1-0-V-183-09-11209A
MD1-0-V-183-09-11210A
MD1-0-V-183-09-11211A
MD1-0-V-183-09-11212A
MD1-0-V-183-09-11213A
MD1-0-V-183-09-11214A
MD1-0-V-183-09-11215A
MD1-0-V-183-09-11216A
MD1-0-V-183-09-11217A
MD1-0-V-183-09-11218A
MD1-0-V-183-09-11219A
MD1-0-V-186-05-00102B
MD1-0-V-400-05-00422A
MD1-0-V-400-05-02322A
MD1-0-V-400-09-01211A
MD1-0-V-400-09-01611C
MD1-0-V-400-09-01711A
MD1-0-V-400-09-02111A
MD1-0-V-400-09-02211A
MD1-0-V-400-10-00411C
MD1-0-V-594-05-00003A
MD1-0-V-660-09-30001A
MD1-0-V-751-02-00012A
MD1-0-V-751-02-00013A
MD1-0-V-751-02-00014A
MD1-0-V-751-02-00015A
MD1-0-V-751-02-00105B
MD1-0-V-751-02-00111A
MD1-0-V-751-02-00113B
MD1-0-V-751-02-00206A
MD1-0-V-751-02-00208A
MD1-0-V-751-02-00305A
MD1-0-V-751-02-00306A
MD1-0-V-751-03-00003A

48
49
Pump Data & Curve Curve
A & calculation
SUDIN
Sheet for GSP (Vertical & Summerible)-Fuel
50
Pump Data & Curve Curve
A & calculation
SUDIN
Sheet for GSP (Vertical & Summerible)-Tras
51
Pump Data & Curve Curve
A & calculation
SUDIN
Sheet for GSP (Vertical & Summerible)-Aux.
52
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible) _Lubrica
53
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible) STG Buil
54
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_Gas
55
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_WWT Undd
56
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_STG Bui
57
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_CWP Disc
58
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_Central
59
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_Switch
60
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_Water Tr
61
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_Warehous
62
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_Admin
63
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_Admin.
64
Pump Data & Curve & A
Calculation Sheet
WITTAYA
for GSP(Vertical and Submersible)_Guard
65
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_Coal
66
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_STG Buil
67
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_Ammonia
68
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_Dewater
69
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_Fire
70
Pump Data & Curve & A
Calculation Sheet
SUDIN
for GSP(Vertical and Submersible)_Central
71
Painting Specification and
A Procedures
SUDIN
72
Inspection and Test Procedure
A
for GRP
SUDIN
Pipes
73
Inspection and test procedure
A
for flexible
SUDIN
& expansion joint
74
Data sheet for motor operated
A
cast valves
SUDIN
75
Datasheet for motor operated
A
butterfly
SUDIN
valve
76
Datasheet for combinedA nrv dn2400 SUDIN
77
Datasheet for StrainersA
SUDIN
78
DataSheet for Traps(steam/air)
A
SUDIN
79
Component DimensionATable For GRP
SUDIN
Pipes
80
Field Test and Inspection
A Plan for Elevator
SUDIN(Boiler & Admin. Building)
81
Datasheet and CatalogAfor Pressure and
SUDIN
Temperature Indicator (BOP)
82
Suction & Discharge Pressure
A
GaugeSUDIN
for Fire Water Pump
83
Air Release Valve DataAfor Fire Water
SUDIN
Pump
84
Flow Meter Data for Fire
A Water PumpSUDIN
85
Gate Valve & Check Valve
A Data for Fire
SUDIN
Water Pump
86
Engine Data for Diesel A
Fire Water Pump
SUDIN
87
Coupling Data for Diesel
A Fire Water Pump
SUDIN
88
Nose Data Sheet for Diesel
A
Fire Water
SUDIN
Pump
89
Coupling Data for Electric
A Fire WaterSUDIN
Pump
90
Nose Data sheet Electric
A Fire Water SUDIN
Pump
91
Coupling Data for Jockey
A Pump
SUDIN
92
Nose Data sheet for Jockey
A
Pump SUDIN
93
Cause & Effect Chart for
A Fire Water Pump
SUDIN
94

SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN

95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141

MD1-0-V-751-03-00004A

Phylosophy of Operation
A for Fire Water
SUDIN
Pump

MD1-0-V-751-09-00101A

Pump Data Sheet & Performance


A
Curve
SUDIN
for Diesel Fire Water Pump

MD1-0-V-751-09-00201A
MD1-0-V-751-09-00301A
MD1-0-V-751-21-00002B
MD1-0-V-751-35-00307A
MD1-0-V-805-05-00021A
MD1-0-V-805-05-00022B
MD1-0-V-805-09-02001B
MD1-0-V-850-09-00003A
MD1-0-V-870-03-00003A
MD1-0-V-870-05-00014A
MD1-0-V-870-09-00004A
MD1-V-171-01-00078 A

95
96
Pump Data Sheet & Performance
A
Curve
SUDIN
for Electric Fire Water Pump
97
Pump Data Sheet & Performance
A
Curve
SUDIN
for Jockey Pump
98
Piping & Instrument Diagram
A
for FireSUDIN
Water Pump
99
Controller Date for Jockey
A Pump
SUDIN
100
Painting specification and
A procedure SUDIN
for wt & wwt
101
Lining specification for A
wt&wwt system
SUDIN
102
Electric heater data sheet
A for wt & wwt
SUDIN
system
103
Equipment Date Sheet Afor Boiler Chemical
SUDINDosing System
104
System Description for ASewage Treatment
SUDINSystem
105
Painting specification and
A procedure SUDIN
for sewage treatment system
106
Equipment data sheet for
A sewage treatment
SUDIN system
107
Technical Data Sheet for
A Conveyor Belting
SUDINfor Chs
108

SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN

142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188

SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN

189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235

SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN

236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282

SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN

283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329

SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN

330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376

SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN
SUDIN

377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414

MD1-0-D-216-01-00201

Plumbing Plan for Water Treatment BLDG

MD1-0-D-216-01-00301

Enlarged Plumbing Plan for Water Treatment BLDG

MD1-0-D-250-01-00201

Plumbing Plan for Workshop Building

MD1-0-D-250-01-00301

Enlarged Plumbing Plan for Workshop Building

MD1-0-D-254-01-00205

Plumbing Plan for Administration Building Roof

MD1-0-D-255-01-00201

Portable Water Piping Plan for Common Service Building

MD1-0-D-255-01-00202

Sanitary Sewer & Vent Piping Plan for Common Service Building

MD1-0-F-750-06-00003

Clean Agent System hydraulic Calculation

MD1-0-F-750-23-00169

Fire Fighting Piping Plan For I&C Electrical & Mechanical Warehouse

MD1-0-F-750-23-00170

Fire Fighting Piping Plan For Common Service Building

MD1-0-H-201-01-00201

HVAC Plan for Steam Turbine Building Ground Floor (1/2)

MD1-0-H-201-01-00202

HVAC Plan for Steam Turbine Building Ground Floor (2/2)

MD1-0-H-201-01-00203

HVAC Plan for Steam Turbine Building Mezzanine Floor (1/2)

MD1-0-H-201-01-00204

HVAC Plan for Steam Turbine Building Mezzanine Floor (2/2)

MD1-0-H-201-01-00205

HVAC Plan for Steam Turbine Building Operation Floor (1/2)

MD1-0-H-201-01-00206

HVAC Plan for Steam Turbine Building Operation Floor (2/2)

MD1-0-H-201-01-00207

HVAC Plan for Steam Turbine Building Roof (1/2)

MD1-0-H-201-01-00208

HVAC Plan for Steam Turbine Building Roof (2/2)

MD1-0-H-201-01-00209

Enlarged HVAC Plan for Steam Turbine Building AVR Room-1,2

MD1-0-H-201-01-00210

Enlarged HVAC Plan for Steam Turbine Building Sampling Room-1,2

MD1-0-H-201-08-00101

Equipment List for Steam Turbine Building

MD1-0-H-203-21-00201

HVAC P&I Diagram for Central Control Building-Duct (1/4)

MD1-0-H-203-21-00202

HVAC P&I Diagram for Central Control Building-Duct (2/4)

MD1-0-H-203-21-00203

HVAC P&I Diagram for Central Control Building-Duct (3/4)

MD1-0-H-203-21-00204

HVAC P&I Diagram for Central Control Building-Duct (4/4)

MD1-0-H-203-21-00205

HVAC P&I Diagram for Central Control Building-Piping

MD1-0-H-207-01-00201

HVAC P&I Diagram for Fire Protection Pump House Ground Floor Duct Plan

MD1-0-H-207-08-00101

Equipment List for Fire Protection Pump House

MD1-0-H-209-01-00201

HVAC Plan for ESP Control & ASH Elec. Building-1 Ground Floor

MD1-0-H-209-01-00202

HVAC Plan for ESP Control & ASH Elec. Building-1 First Floor

MD1-0-H-209-01-00203

HVAC Plan for ESP Control & ASH Elec. Building-1 Roof

MD1-0-H-209-01-00204

HVAC Plan for ESP Control & ASH Elec. Building-2 Ground Floor

MD1-0-H-209-01-00205

HVAC Plan for ESP Control & ASH Elec. Building-2 First Floor

MD1-0-H-209-01-00206

HVAC Plan for ESP Control & ASH Elec. Building-2 Roof

MD1-0-H-209-08-00101

Equipment List for ESP Control & ASH Elec. Building-1

MD1-0-H-209-08-00102

Equipment List for ESP Control & ASH Elec. Building-2

MD1-0-H-212-01-00201

HVAC Plan for Gaseous Chlorination Building Ground Floor

MD1-0-H-212-01-00202

HVAC Plan for Gaseous Chlorination Building Roof

MD1-0-H-212-08-00101

Equipment List for Gaseous Chlorination Building

MD1-0-H-216-01-00201

HVAC Plan for Water Treatment BLDG Ground Floor

MD1-0-H-216-01-00202

HVAC Plan for Water Treatment BLDG Roof

MD1-0-H-216-08-00101

Equipment List for Water Treatment Building

MD1-0-H-219-01-00201

Hvac plan for limestorne storage shed. ground floor

MD1-0-H-219-01-00202

Hvac plan for limestorne storage shed. roof

MD1-0-H-219-08-00101

Equipment list for limestorne storage shed

MD1-0-H-250-01-00201

HVAC Plan for Workshop Building Ground Floor

MD1-0-H-250-01-00202

HVAC Plan for Workshop Building Roof

MD1-0-H-250-08-00101

Equipment List for Workshop Building

MD1-0-H-251-01-00201

HVAC Plan for Bulldozer Garage

MD1-0-H-255-01-00201

HVAC Plan for Common Service Building Ground Floor

MD1-0-H-255-01-00202

HVAC Plan for Common Service Building Roof

MD1-0-H-255-08-00201

Equipment List 1- for Common Service Building

MD1-0-H-255-08-00202

Equipment List 2- for Common Service Building

MD1-0-H-257-01-00201

HVAC Plan for Car Garage-1,2,3

MD1-0-H-710-06-00201

HVAC Load Calculation for Steam Turbine Building

MD1-0-H-710-06-00209

HVAC Load Calculation for ESP Control & ASH Elec. Building-1,2

MD1-0-H-710-06-00211

HVAC Load Calculation for Central Control Building

MD1-0-H-710-06-00212

HVAC Load Calculation for Gaseous Chlorination Building

MD1-0-H-710-06-00215

HVAC Load Calculation for Switchyard Control House

MD1-0-H-710-06-00221

HVAC Load Calculation for Water Treatment Building

MD1-0-H-710-06-00250

HVAC Load Calculation for Workshop Building

MD1-0-H-710-06-00255

HVAC Load Calculation for Common Service Building

MD1-0-H-710-08-00002

Symbol & Legend & Abbreviation for HVAC System

MD1-0-H-710-08-00003

Symbol & Legend & Abbreviation for Plumbing System

MD1-0-H-710-11-00001

General Standard Detail for HVAC Duct (1/4)

MD1-0-H-710-11-00002

General Standard Detail for HVAC Duct (2/4)

MD1-0-H-710-11-00003

General Standard Detail for HVAC Duct (3/4)

MD1-0-H-710-11-00011

General Standard Detail for HVAC Piping (1/2)

MD1-0-H-710-11-00021

General Standard Detail for Plumbing

MD1-0-M-130-22-00021

Flow Diagram- Aux. Cooling Water System

MD1-0-M-140-06-00001

Calculation- Closed Cooling Water System

MD1-0-M-150-22-00011

Flow Diagram- Compressed Air Supply System

MD1-0-M-160-22-00011

Flow Diagram- Heavy Fuel Oil Unloading System

MD1-0-M-160-22-00012

Flow Diagram- Heavy Fuel Oil Supply System

MD1-0-M-160-22-00013

Flow Diagram- HFO Heating Steam System

MD1-0-M-160-22-00021

Flow Diagram- Diesel Oil System

MD1-0-V-134-21-00005

P&I Diagram, Condenser Tube Cleaning System

MD1-0-V-186-05-00101

WPS & PQR for Field Erected Tank

MD1-0-V-186-10-00502

Condensate Storage Tank Nozzle Orientation (1/2)

MD1-0-V-186-10-00503

Condensate Storage Tank Nozzle Orientation (2/2)

MD1-0-V-186-10-00601

General Assembly for Portable Water Storage Tank

MD1-0-V-186-10-00602

Portable Water Storage Tank Nozzle Orientation

MD1-0-V-186-10-00702

Fuel Oil Storage Tank Nozzle Orientation (1/2)

MD1-0-V-186-10-00703

Fuel Oil Storage Tank Nozzle Orientation (2/2)

MD1-0-V-186-10-00802

Diesel Oil Storage Tank Nozzle Orientation

MD1-0-V-186-11-00119

Raw Water Storage Tank Spiral Stairway (1/4)

MD1-0-V-186-11-00120

Raw Water Storage Tank Spiral Stairway (2/4)

MD1-0-V-186-11-00121

Raw Water Storage Tank Spiral Stairway (3/4)

MD1-0-V-186-11-00122

Raw Water Storage Tank Spiral Stairway (4/4)

MD1-0-V-186-11-00123

Raw Water Storage Tank Spiral Stairway (1/3)

MD1-0-V-186-11-00124

Raw Water Storage Tank Spiral Stairway (2/3)

MD1-0-V-186-11-00125

Raw Water Storage Tank Spiral Stairway (3/3)

MD1-0-V-186-11-00127

Raw Water Storage Tank Name Plate Detail

MD1-0-V-186-11-00219

Filtered Water Storage Tank Spiral Stairway (1/4)

MD1-0-V-186-11-00220

Filtered Water Storage Tank Spiral Stairway (2/4)

MD1-0-V-186-11-00221

Filtered Water Storage Tank Spiral Stairway (3/4)

MD1-0-V-186-11-00222

Filtered Water Storage Tank Spiral Stairway (4/4)

MD1-0-V-186-11-00223

Filtered Water Storage Tank Spiral Stairway (1/3)

MD1-0-V-186-11-00224

Filtered Water Storage Tank Spiral Stairway (2/3)

MD1-0-V-186-11-00225

Filtered Water Storage Tank Spiral Stairway (3/3)

MD1-0-V-186-11-00227

Filtered Water Storage Tank Name Plate Detail

MD1-0-V-186-11-00319

Demi. Water Storage Tank (A) Spiral Stairway (1/4)

MD1-0-V-186-11-00320

Demi. Water Storage Tank (A) Spiral Stairway (2/4)

MD1-0-V-186-11-00321

Demi. Water Storage Tank (A) Spiral Stairway (3/4)

MD1-0-V-186-11-00322

Demi. Water Storage Tank (A) Spiral Stairway (4/4)

MD1-0-V-186-11-00323

Demi. Water Storage Tank (B) Spiral Stairway (1/4)

MD1-0-V-186-11-00324

Demi. Water Storage Tank (B) Spiral Stairway (2/4)

MD1-0-V-186-11-00325

Demi. Water Storage Tank (B) Spiral Stairway (3/4)

MD1-0-V-186-11-00328

Demi Water Storage Tank Name Plate Detail

MD1-0-V-186-11-00419

Fire Water Storage Tank (A) Spiral Stairway (1/4)

MD1-0-V-186-11-00420

Fire Water Storage Tank (A) Spiral Stairway (2/4)

MD1-0-V-186-11-00421

Fire Water Storage Tank (A) Spiral Stairway (3/4)

MD1-0-V-186-11-00422

Fire Water Storage Tank (A) Spiral Stairway (4/4)

MD1-0-V-186-11-00423

Fire Water Storage Tank (B) Spiral Stairway (1/3)

MD1-0-V-186-11-00424

Fire Water Storage Tank (B) Spiral Stairway (2/3)

MD1-0-V-186-11-00425

Fire Water Storage Tank (B) Spiral Stairway (3/3)

MD1-0-V-186-11-00427

Fire Water Storage Tank Name Plate Detail

MD1-0-V-186-11-00501

Condensate Storage Tank Shell Plate Detail

MD1-0-V-186-11-00502

Condensate Storage Tank 1st Course Shell Plate Arrangement (1/2)

MD1-0-V-186-11-00503

Condensate Storage Tank 1st Course Shell Plate Arrangement (2/2)

MD1-0-V-186-11-00504

Condensate Storage Tank Bottom Plate Arrangement (1/2)

MD1-0-V-186-11-00505

Condensate Storage Tank Bottom Plate Arrangement (2/2)

MD1-0-V-186-11-00506

Condensate Storage Tank Roof Plate Arrangement (1/2)

MD1-0-V-186-11-00507

Condensate Storage Tank Roof Plate Arrangement (2/2)

MD1-0-V-186-11-00508

Condensate Storage Tank Roof Structural Detail (1/2)

MD1-0-V-186-11-00509

Condensate Storage Tank Roof Structure Detail (2/2)

MD1-0-V-186-11-00510

Condensate Storage Tank Shell Manhole Detail

MD1-0-V-186-11-00511

Condensate Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00512

Condensate Storage Tank Shell Nozzle Detail (1/2)

MD1-0-V-186-11-00513

Condensate Storage Tank Shell Nozzle Detail (2/2)

MD1-0-V-186-11-00514

Condensate Storage Tank Roof Nozzle Detail (1/2)

MD1-0-V-186-11-00515

Condensate Storage Tank (A) Spiral Stairway (1/3)

MD1-0-V-186-11-00516

Condensate Storage Tank (A) Spiral Stairway (2/3

MD1-0-V-186-11-00517

Condensate Storage Tank (A) Spiral Stairway (3/3)

MD1-0-V-186-11-00518

Condensate Storage Tank (B) Spiral Stairway (1/3)

MD1-0-V-186-11-00519

Condensate Storage Tank (B) Spiral Stairway (2/3)

MD1-0-V-186-11-00520

Condensate Storage Tank (B) Spiral Stairway (3/3)

MD1-0-V-186-11-00521

Condensate Storage Tank Roof Nozzle Detail (2/2)

MD1-0-V-186-11-00522

Condensate Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00523

Condensate Storage Tank Name Plate Detail

MD1-0-V-186-11-00601

Potable Water Storage Tank Shell Plate Detail

MD1-0-V-186-11-00602

Potable Water Storage Tank 1st Course Shell Plate Arrangement

MD1-0-V-186-11-00603

Potable Water Storage Tank Bottom Plate Arrangement

MD1-0-V-186-11-00604

Potable Water Storage Tank Roof Plate Arrangement

MD1-0-V-186-11-00605

Potable Water Storage Tank Roof Structure Detail

MD1-0-V-186-11-00606

Potable Water Storage Tank Shell Manhole Detail

MD1-0-V-186-11-00607

Potable Water Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00608

Potable Water Storage Tank Shell Nozzle Detail (1/2)

MD1-0-V-186-11-00609

Potable Water Storage Tank Shell Nozzle Detail (2/2)

MD1-0-V-186-11-00610

Potable Water Storage Tank Roof Nozzle Detail

MD1-0-V-186-11-00611

Potable Water Storage Tank Spiral Stairway (1/3)

MD1-0-V-186-11-00612

Potable Water Storage Tank Spiral Stairway (2/3)

MD1-0-V-186-11-00613

Potable Water Storage Tank Spiral Stairway (3/3)

MD1-0-V-186-11-00614

Potable Water Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00615

Portable Water Storage Tank Name Plate Detail

MD1-0-V-186-11-00701

Fuel Oil Storage Tank Shell Plate Detail

MD1-0-V-186-11-00702

Fuel Oil Storage Tank 1st Course Shell Plate Arrangement (1/2)

MD1-0-V-186-11-00703

Fuel Oil Storage Tank 1st Course Shell Plate Arrangement (2/2)

MD1-0-V-186-11-00704

Fuel Oil Storage Tank Bottom Plate Arrangement (1/2)

MD1-0-V-186-11-00705

Fuel Oil Storage Tank Bottom Plate Arrangement (2/2)

MD1-0-V-186-11-00706

Fuel Oil Storage Tank Roof Plate Arrangement (1/2)

MD1-0-V-186-11-00707

Fuel Oil Storage Tank Roof Plate Arrangement (2/2)

MD1-0-V-186-11-00708

Fuel Oil Storage Tank Roof Structure Detail (1/2)

MD1-0-V-186-11-00709

Fuel Oil Storage Tank Roof Structure Detail (2/2)

MD1-0-V-186-11-00710

Fuel Oil Storage Tank Shell Manhole Detail (1/2)

MD1-0-V-186-11-00711

Fuel Oil Storage Tank Shell Manhole Detail (2/2)

MD1-0-V-186-11-00712

Fuel Oil Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00713

Fuel Oil Storage Tank Shell Nozzle Detail (1/2)

MD1-0-V-186-11-00714

Fuel Oil Storage Tank Shell Nozzle Detail (2/2)

MD1-0-V-186-11-00715

Fuel Oil Storage Tank Roof Nozzle Detail

MD1-0-V-186-11-00716

Fuel Oil Storage Tank Heating Coil Detail

MD1-0-V-186-11-00717

Fuel Oil Storage Tank (A) Spiral Stairway (1/3)

MD1-0-V-186-11-00718

Fuel Oil Storage Tank (A) Spiral Stairway (2/3)

MD1-0-V-186-11-00719

Fuel Oil Storage Tank (A) Spiral Stairway (3/3)

MD1-0-V-186-11-00720

Fuel Oil Storage Tank Foam Chamber Platform Detail

MD1-0-V-186-11-00721

Fuel Oil Storage Tank (B) Spiral Stairway (1/3)

MD1-0-V-186-11-00722

Fuel Oil Storage Tank (B) Spiral Stairway (2/3)

MD1-0-V-186-11-00723

Fuel Oil Storage Tank (B) Spiral Stairway (3/3)

MD1-0-V-186-11-00724

Fuel Oil Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00725

Fuel Oil Storage Tank Level Gauge Detail

MD1-0-V-186-11-00728

Fuel Storage Tank Name Plate Detail

MD1-0-V-186-11-00801

Diesel Oil Storage Tank Shell Plate Detail

MD1-0-V-186-11-00802

Diesel Oil Storage Tank 1st Course Shell Plate Arrangement

MD1-0-V-186-11-00803

Diesel Oil Storage Tank Bottom Plate Arrangement

MD1-0-V-186-11-00804

Diesel Oil Storage Tank Roof Plate Arrangement

MD1-0-V-186-11-00805

Diesel Oil Storage Tank Roof Structure Detail

MD1-0-V-186-11-00806

Diesel Oil Storage Tank Shell Manhole Detail

MD1-0-V-186-11-00807

Diesel Oil Storage Tank Roof Manhole Detail

MD1-0-V-186-11-00808

Diesel Oil Storage Tank Shell Nozzle Detail (1/2)

MD1-0-V-186-11-00809

Diesel Oil Storage Tank Shell Nozzle Detail (2/2)

MD1-0-V-186-11-00810

Diesel Oil Storage Tank Roof Nozzle Detail

MD1-0-V-186-11-00811

Diesel Oil Storage Tank Spiral Staiway (1/3)

MD1-0-V-186-11-00812

Diesel Oil Storage Tank Spiral Staiway (2/3)

MD1-0-V-186-11-00813

Diesel Oil Storage Tank Spiral Staiway (3/3)

MD1-0-V-186-11-00814

Diesel Oil Storage Tank Foam Chamber Platform Detail

MD1-0-V-186-11-00815

Diesel Oil Storage Tank Rainwater Down Pipe Detail

MD1-0-V-186-11-00816

Diesel Oil Storage Tank Level Gauge Detail

MD1-0-V-186-11-00817

Diesel Oil Storage Tank Floating Suction Detail (1/2)

MD1-0-V-186-11-00818

Diesel Oil Storage Tank Floating Suction Detail (2/2)

MD1-0-V-186-11-00819

Diesel Oil Storage Tank Name Plate Detail

MD1-0-V-191-01-10001

STG Building EOT Crane General Arrangement Drawings

MD1-0-V-191-01-10005

Warehouse EOT Crane General Arrangement Drawings

MD1-0-V-191-01-10125

Stator Winding Liquid Cooling Unit Monoral Hoist General Arrangement

MD1-0-V-191-01-10207

ACWP Manual Hoist General Arrangement Drawings

MD1-0-V-191-01-10208

FWH Manual Hoist General Arrangement Drawings

MD1-0-V-191-01-10209

Condenser Manual Hoist General Arrangement Drawings

MD1-0-V-560-01-00003

Anode Arrangement Drawings for Cathodic Protection System

MD1-0-V-710-57-10001

Material Approval Request Air Conditioning System

MD1-0-V-850-04-00001

Code and Standard for Boiler Chemical Dosing System

MD1-0-V-850-08-00014

Utility and Chemical Consumption List for Chemical Dosing System

MD1-0-V-850-08-00015

Lubricant List for Boiler Chemical Dosing System

MD1-0-V-850-08-00016

Valve List for Boiler Chemical Dosing System

MD1-0-V-860-02-00001

Code and Standard for Gaseous Chlorination System

MD1-0-V-860-02-00008

Piping material classification for gaseous chlorination

MD1-0-V-860-03-00002

System Design and Operational Description For Gaseous Chlorination System

MD1-0-V-860-08-00021

Utility and chemical Consumption List for Gaseous Chlorination System

MD1-0-V-860-21-00001

P & I Diagram for Gaseous Chlorination System (1 of 2)

MD1-0-V-860-21-00002

P & I Diagram for Gaseous Chlorination System (2 of 2)

MD1-0-V-860-21-00003

P & I Diagram for Chlorine Gas Neutralizing System

MD1-0-V-860-21-00004

P & I Diagram for Chlorine Gas Analysis System

MD1-0-V-860-21-00005

P & I Diagram for Gaseous Chlorination System (interlock) (1 of 3)

MD1-0-V-860-21-00006

P & I Diagram for Gaseous Chlorination System (interlock) (2 of 3)

MD1-0-V-860-21-00007

P & I Diagram for Gaseous Chlorination System (interlock) (3 of 3)

MD1-0-W-810-22-00001

Flow Diagram for Preliminary Raw Water Treatment System

MD1-0-W-820-22-00001

Flow Diagram for Demineralized Water Treatment System

MD1-0-W-830-22-00001

Flow Diagram for Portable Water Treatment System

MD1-0-W-840-22-00001

Flow Diagram for Waste Water Treatment System

MD1-0-W-850-22-00001

Flow Diagram for Chemical Dosing System

MD1-0-W-860-22-00001

Flow Diagram for Gaseous Chlorination System

MD1-0-W-870-22-00001

Flow Diagram for Sewage Treatment System

SUDIN

MD1-0-D-204-01-00201A

Plumbing Plan for Coal IHandling Control


SUDIN
Building

SUDIN

MD1-0-D-204-01-00301A

Enlarged Plumbing PlanI for Coal Handling


SUDINControl Building

SUDIN

MD1-0-D-205-01-00201A

Plumbing Plan for Fuel IOil Pump House


SUDIN

SUDIN

MD1-0-D-205-01-00301A

Enlarged Plumbing PlanI for Fuel Oil Pump


SUDINHouse

SUDIN

MD1-0-D-212-01-00201A

Plumbing plan for gaseous


I chlorination
SUDIN
building

SUDIN

MD1-0-D-212-01-00301A

Enlarged plumbing planI for gaseous SUDIN


chlorination building

SUDIN

MD1-0-D-252-01-00201A

Plumbing Plan for I&C Electrical


I
and SUDIN
Mechanical Warehouse

SUDIN

MD1-0-D-252-01-00301A

Toilet Enlarged Plan forI I&C Electrical


SUDIN
and Mechanical Warehouse

SUDIN

MD1-0-F-750-24-00101A

Fire Fighting Piping Isometric


I
drawingSUDIN
for Underground Piping

SUDIN

MD1-0-F-750-24-00107A

Fire Fighting Piping Isometric


I
drawingSUDIN
for Central Control Building

SUDIN

MD1-0-F-750-24-00128A

Fire Fighting Piping Isometric


I
drawingSUDIN
for Common Service Building

SUDIN

MD1-0-F-750-24-00129A

Fire Fighting Piping Isometric


I
drawingSUDIN
for Administration Building

SUDIN

MD1-0-F-750-24-00134A

Fire Fighting Piping Isometric


I
drawingSUDIN
for Switchyard Control House

SUDIN

MD1-0-H-204-01-00201A

HVAC Plan for Coal Handling


I
ControlSUDIN
Building Ground Floor

SUDIN

MD1-0-H-204-08-00101A

Equipment List for CoalI Handling Control


SUDIN
Building

SUDIN

MD1-0-H-205-01-00201A

HVAC Plan for Fuel Oil IPump HouseSUDIN


Ground Floor

SUDIN

MD1-0-H-205-01-00202A

HVAC Plan for Fuel Oil IPump HouseSUDIN


Ground Floor

SUDIN

MD1-0-H-205-08-00101A

Equipment List for Fuel IOil Pump House


SUDIN

SUDIN

MD1-0-H-210-01-00201A

Hvac plan for diesel generator


I
houseSUDIN
ground floor

SUDIN

MD1-0-H-210-01-00202A

Hvac plan for diesel generator


I
houseSUDIN
roof

SUDIN

MD1-0-H-210-08-00101A

Equipment list for dieselI generator house


SUDIN

SUDIN

MD1-0-H-213-01-00201A

Hvac plan for fuel unloading


I
pump house
SUDIN
ground floor

SUDIN

MD1-0-H-213-01-00202A

Hvac plan for fuel unloading


I
pump house
SUDIN
roof

SUDIN

MD1-0-H-213-08-00101A

Equipment list for fuel oil


I unloading pump
SUDIN
house

SUDIN

MD1-0-H-216-01-00203A

HVAC Plan for Water Treatment


I
Area
SUDIN
Waste Water Pond Pump Room

SUDIN

MD1-0-H-217-01-00201A

HVAC Plan for Limestone


I Handling SYS.
SUDIN
Control Building Ground Floor

SUDIN

MD1-0-H-217-08-00101A

Equipment List for Limestone


I
Handling
SUDIN
SYS. Control Building

SUDIN

MD1-0-H-252-01-00201A

HVAC Plan for I&C Electrical


I
and Mechnical
SUDIN Warehouse Ground Floor

SUDIN

MD1-0-H-252-01-00202A

HVAC Plan for I&C Electrical


I
and Mechnical
SUDIN Warehouse Roof Plan

SUDIN

MD1-0-H-252-08-00101A

Equipment List for I&C Electrical


I
& Mechnical
SUDIN Warehouse

SUDIN

MD1-0-H-710-06-00204A

HVAC Load CalculationI for Coal Handling


SUDIN
Control Building

SUDIN

MD1-0-H-710-06-00205A

HVAC Load CalculationI for Fuel Oil Pump


SUDINHouse

SUDIN

MD1-0-H-710-06-00208A

Hvac load calculation for


I diesel generator
SUDIN
house

SUDIN

MD1-0-H-710-06-00217A

HVAC Load CalculationI for Limestone


SUDIN
Handling SYS. Control Building

SUDIN

MD1-0-H-710-06-00254C

HVAC Load CalculationI for Administration


SUDINBuilding

SUDIN

MD1-0-H-710-06-00256A

HVAC Load CalculationI for I&C Electrical


SUDIN
& Mechanical Warehouse

SUDIN

MD1-0-H-710-08-00001A

Drawing List for HVAC &


I Plumbing System
SUDIN

SUDIN

MD1-0-M-130-06-00001
C

Calculation- Circulating IWater System


SUDIN

SUDIN

MD1-0-M-130-22-00011
B

Flow Diagram- Circulating


I Water System
SUDIN
(1/2)

SUDIN

MD1-0-M-130-22-00012
B

Flow Diagram- Circulating


I Water System
SUDIN
(2/2)

SUDIN

MD1-0-M-140-22-00011
B

Flow Diagram- Closed Cooling


I
NG Water
SUDIN
System

SUDIN

MD1-0-M-170-22-00011
D

Flow Diagram- Coal handling


I
SystemSUDIN

SUDIN

MD1-0-M-170-22-00021
B

Flow Diagram- Bottom Ash


I
Handling SUDIN
System

SUDIN

MD1-0-M-170-22-00031
C

Flow Diagram- Limestone


I Handling System
DAVID

SUDIN

MD1-0-M-170-22-00032
C

Flow Diagram- Limestone


I Grinding System
DAVID

SUDIN

MD1-0-M-180-06-00001
A

Calculation for Field Erected


I
Tank Capacity
SUDIN

SUDIN

MD1-0-P-151-24-00001A

Piping Isometric Drawing


I - InstrumentSUDIN
Air System

SUDIN

MD1-0-P-151-24-00011A

Piping Isometric Drawing


I - Service Air
SUDIN
System

SUDIN

MD1-0-P-153-24-00001A

Piping Isometric Drawing


I - N2 Gas Distribution
SUDIN
System

SUDIN

MD1-0-P-165-24-00001A

Piping isometric drawing


I - fuel oil system
SUDIN

SUDIN

MD1-0-P-400-23-00001B

Pipe Arrangement & Support


I
Location
SUDIN
Drawing Index

SUDIN

MD1-0-P-413-23-00001A

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Fly Ash Silo and Mixing Tank Area

SUDIN

MD1-0-P-445-23-00001B

Pipe arrangement & support


I
locationSUDIN
drawing - fuel oil storage tanks & transfer)

SUDIN

MD1-0-P-445-23-00002B

Pipe arrangement & support


I
locationSUDIN
drawing - fuel oil storage tanks & transfer)

SUDIN

MD1-0-P-475-07-00001B

Stress Analysis Report I- Ash Slurry Pipe


SUDIN
for MD2 Discharge Canal

SUDIN

MD1-0-P-475-23-00001B

Pipe arrangement & support


I
locationSUDIN
drawing - yard area (1)

SUDIN

MD1-0-P-475-23-00002B

Pipe arrangement & support


I
locationSUDIN
drawing - yard area (2)

SUDIN

MD1-0-P-475-23-00003B

Pipe arrangement & support


I
locationSUDIN
drawing - yard area (3)

SUDIN

MD1-0-P-475-23-00004B

Pipe arrangement & support


I
locationSUDIN
drawing - yard area (4)

SUDIN

MD1-0-P-475-23-00005B

Pipe arrangement & support


I
locationSUDIN
drawing - yard area (5)

SUDIN

MD1-0-P-475-23-00006B

Pipe arrangement & support


I
locationSUDIN
drawing - yard area (6)

SUDIN

MD1-0-P-475-23-00007B

Pipe arrangement & support


I
locationSUDIN
drawing - yard area (7)

SUDIN

MD1-0-P-475-23-00008B

Pipe arrangement & support


I
locationSUDIN
drawing - yard area (8)

SUDIN

MD1-0-P-475-23-00009B

Pipe arrangement & support


I
locationSUDIN
drawing - yard area (9)

SUDIN

MD1-0-P-475-23-00010B

Pipe arrangement & support


I
locationSUDIN
drawing - yard area (10)

SUDIN

MD1-0-P-475-23-00011A

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Yard Area (11)

SUDIN

MD1-0-P-475-23-00012A

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Yard Area (12)

SUDIN

MD1-0-P-475-23-00013A

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Yard Area (13)

SUDIN

MD1-0-P-475-57-00001A

Pipe loading for sleeper(1/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00002A

Pipe loading for sleeper(2/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00003A

Pipe loading for sleeper(3/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00004A

Pipe loading for sleeper(4/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00005A

Pipe loading for sleeper(5/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00006A

Pipe loading for sleeper(6/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00007A

Pipe loading for sleeper(7/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00008A

Pipe loading for sleeper(8/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00009A

Pipe loading for sleeper(9/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00010A

Pipe loading for sleeper(10/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00011A

Pipe loading for sleeper(11/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00012A

Pipe loading for sleeper(12/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00013A

Pipe loading for sleeper(13/14)


I

SUDIN

SUDIN

MD1-0-P-475-57-00014A

Pipe loading for sleeper(14/14)


I

SUDIN

SUDIN

MD1-0-P-480-23-00001B

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Yard Pipe Rack (1/5)

SUDIN

MD1-0-P-480-23-00002B

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Yard Pipe Rack (2/5)

SUDIN

MD1-0-P-480-23-00003B

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Yard Pipe Rack (3/5)

SUDIN

MD1-0-P-480-23-00004B

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Yard Pipe Rack (4/5)

SUDIN

MD1-0-P-480-23-00005B

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Yard Pipe Rack (5/5)

SUDIN

MD1-0-P-480-57-00001B

Pipe loading for pipe rack(1/2)


I

SUDIN

SUDIN

MD1-0-P-480-57-00002B

Pipe loading for pipe rack(2/2)


I

SUDIN

SUDIN

MD1-0-P-490-23-00001B

Pipe arrangement & support


I
locationSUDIN
drawing - diesel oil storage tank area

SUDIN

MD1-0-P-821-24-00001A

Piping Isometric Drawing


I - Demi Water
SUDIN
System

SUDIN

MD1-0-P-831-24-00001A

Piping Isometric Drawing


I - Potable Water
SUDIN
System

SUDIN

MD1-0-P-832-24-00001A

Piping Isometric Drawing


I - Service Water
SUDIN
System

SUDIN

MD1-0-P-861-24-00001A

Piping Isometric Drawing


I - Gaseous Chlorination
SUDIN
System

SUDIN

MD1-0-P-871-24-00001A

Piping Isometric Drawing


I - Sewage Treatment
SUDIN System

SUDIN

MD1-0-T-053-05-00121C

Method Statement for Field


I
erected tank
SUDIN

SUDIN

MD1-0-T-053-05-00126C

Method Statement for Crane


I
& Hoist SUDIN

SUDIN

MD1-0-T-053-05-00147B

Method Statement for Inspection


I
& Test
BINH
(DAEJOO)

SUDIN

MD1-0-T-053-05-00175A

Method statement for tower


I
crane

SUDIN

MD1-0-T-053-05-00267B

Method Statement for Bolt


I TighteningSUDIN

SUDIN

MD1-0-T-053-05-00372B

Method statement for field


I erected tank
SUDIN
painting work

SUDIN

MD1-0-T-054-05-00270B

Procedure of Job Site Lamination


I
Joint
SUDIN
For GRP Pipes

SUDIN

MD1-0-T-054-05-00335B

NSTRUCITON For GRPI MATERIAL SUDIN


INDUCTION AND LAMINATION TRAINING

SUDIN

MD1-0-T-057-05-00216A

Method Statement of HVAC


I
Duct Works
SUDIN

SUDIN

MD1-0-T-057-05-00217B

Method Statement of Plumbing


I
WorkSUDIN

SUDIN

MD1-0-T-057-05-00218B

Method Statement of Refrigerant


I
Piping
SUDIN
Works

SUDIN

MD1-0-V-111-09-00407B

H2&CO2 Gas System Design


I
Data SUDIN

SUDIN

MD1-0-V-115-05-00009A

Deaerator and storage Itank, nde procedure


SUDIN

SUDIN

MD1-0-V-121-05-00012A

Inspection and Test Procedure


I
for Fluid
SUDIN
Coupling

SUDIN

MD1-0-V-122-08-00014A

Sub-Supplier List for Condensate


I
Extraction
SUDIN Pump

SUDIN

MD1-0-V-131-01-00001A

Mechanical Outline Drawing


I
For CWP
SUDIN

SUDIN

MD1-0-V-131-01-00003A

Sectional Drawing

SUDIN

MD1-0-V-131-01-00004A

Piping Arrangement Drawing


I
for Circulating
SUDIN Water Pumps

SUDIN

MD1-0-V-131-02-00001A

Shop test and inspection


I plan for circulating
SUDIN water pumps

SUDIN

MD1-0-V-131-05-00002A

Hydrostatic Test Procedure


I
for Circulating
SUDIN
Water Pumps

SUDIN

MD1-0-V-131-05-00004B

Liquid Penetrant Examination


I
Procedure
SUDIN
for Welds

SUDIN

MD1-0-V-131-05-00006A

Factory acceptance testI procedures SUDIN

SUDIN

MD1-0-V-131-05-00007A

Quality assurance manual


I for circulating
SUDIN
water pumps

SUDIN

MD1-0-V-131-05-00008A

Painting procedure

SUDIN

MD1-0-V-131-05-00009A

Circulating Water Pumphouse


I
Hydraulic
SUDIN
Model Test Procedure

SUDIN

MD1-0-V-131-05-00010B

WPS and PQR for Circulating


I
Water SUDIN
Pumps

SUDIN

MD1-0-V-131-05-00011A

Liquid Penetrant Examination


I
Procedure
SUDIN
for Castings

SUDIN

MD1-0-V-131-05-00015A

Repair Welding Procedure


I for Casings
SUDIN

SUDIN

MD1-0-V-131-08-00002A

Sub-Supplier List for Circulating


I
Water
SUDIN
Pumps

SUDIN

MD1-0-V-131-08-00015B

Welder Qualification Record


I
for Circulating
SUDINWater Pumps

SUDIN

MD1-0-V-131-10-00001B

Mechanical Outline Drawing


I
for CWPSUDIN

SUDIN

MD1-0-V-131-11-00001A

Name plate drawing with


I engraving details
SUDIN

SUDIN

MD1-0-V-131-11-00004A

Bearing drawing with cooling


I
water system
SUDINtechnical data

SUDIN

MD1-0-V-131-11-00006A

Detail of coupling parts I

SUDIN

MD1-0-V-131-21-00001A

Piping and Instrument Diagram


I
for CWP
SUDIN

SUDIN

MD1-0-V-132-02-00063A

Sea water intake facilityI - piping material


SUDIN
classification

SUDIN

MD1-0-V-132-05-00037A

Welding Book for Seawater


I
Intake Facilities
SUDIN

SUDIN

MD1-0-V-132-05-00038A

Quality inspection and test


I plan for seawater
SUDIN intake facilities

SUDIN

MD1-0-V-132-05-00041A

Sea Water Intake Facility


I - Method Statement
SUDIN for Sea Water Intake Facility

SUDIN

MD1-0-V-132-08-00002A

Sea water intake facilityI - utility consumption


SUDIN list

SUDIN

MD1-0-V-132-08-00005A

Sea Water Intake Facility


I - Supplier List
SUDIN

SUDIN

MD1-0-V-132-08-00032A

Sea water intake facilityI - valve list

SUDIN

MD1-0-V-132-08-00040A

Sea water intake facilityI - painting procedure


SUDIN

SUDIN

MD1-0-V-132-08-00050A

Sea Water Intake Facility


I - Commissioning
SUDINSpare Parts List

SUDIN

MD1-0-V-132-10-00012A

Travelling trash rack rake


I - monorail SUDIN
assembly

SUDIN

MD1-0-V-132-10-00018A

Sea water intake facilityI - stop log guide


SUDIN
scraper assembly

SUDIN

SUDIN

SUDIN

SUDIN

SUDIN

SUDIN

MD1-0-V-132-10-00021A

Trash and waste transport


I
system assembly
SUDIN

SUDIN

MD1-0-V-132-10-00022A

Stop logs storage assembly


I

SUDIN

MD1-0-V-132-10-00023A

Sea water intake facilityI - trash and waste


SUDIN
water transport system, trash contay

SUDIN

MD1-0-V-132-11-00013A

Travelling trash rack rake


I - rake assembly
SUDIN

SUDIN

MD1-0-V-132-11-00014A

Travelling trash rack rake


I - ele. wire rope
SUDIN
hoist ass.y

SUDIN

MD1-0-V-132-11-00025A

Travelling band screen I- chain guide SUDIN


assembly

SUDIN

MD1-0-V-132-11-00027A

Travelling band screen I- filtering panel


SUDIN
assembly

SUDIN

MD1-0-V-132-11-00028A

Travelling band screen I- internal washing


SUDIN
plant assembly

SUDIN

MD1-0-V-132-11-00029A

Travelling band screen I- cover & hopper


SUDIN
assembly

SUDIN

MD1-0-V-132-11-00030A

Travelling band screen I- driving group


SUDIN
assembly

SUDIN

MD1-0-V-132-11-00031A

Sea Water Intake Facility


I - External Washing
SUDIN Plant Assembly

SUDIN

MD1-0-V-132-21-00006A

Sea Water Intake Facility


I P & ID

SUDIN

MD1-0-V-133-01-00001A

Water box vacuum pump


I ganeral arrangement
SUDIN
drawing

SUDIN

MD1-0-V-133-02-00010A

Water Box Vacuum Pump


I Performance
SUDIN
Curve

SUDIN

MD1-0-V-133-05-00025A

Water Box Vacuum Pump


I
Painting Procedure
SUDIN

SUDIN

MD1-0-V-133-05-00026A

Water box vacuum pump


I packing procedure
SUDIN

SUDIN

MD1-0-V-133-05-00027A

Water box vacuum pump


I hydro test procedure
SUDIN

SUDIN

MD1-0-V-133-05-00028B

Water Box Vacuum Pump


I PKG Performance
SUDIN Test Procedure

SUDIN

MD1-0-V-133-05-00031A

Water Box Vacuum Pump


I WPS & PQR
SUDIN

SUDIN

MD1-0-V-133-05-00033A

Operation & maintenance


I manual

SUDIN

MD1-0-V-133-05-00043A

Water Box Vacuum Pump


I Site Testing
SUDIN
and Commissioning Procedure

SUDIN

MD1-0-V-133-06-00013A

Water box vacuum pump


I strength calculation
SUDIN sheet

SUDIN

MD1-0-V-133-08-00007A

Water box vacuum pump


I equipment SUDIN
list

SUDIN

MD1-0-V-133-08-00017A

Water box vacuum pump


I valve list SUDIN

SUDIN

MD1-0-V-133-08-00029A

Lubrication List

SUDIN

SUDIN

MD1-0-V-133-08-00030A

Utility consumption list I

SUDIN

SUDIN

MD1-0-V-133-08-00042A

Water Box Vacuum Pump


I Sub Vender
SUDIN
List

SUDIN

MD1-0-V-133-11-00008A

Water box vacuum pump


I name plateSUDIN
drawing

SUDIN

MD1-0-V-133-11-00011A

Water Box Vacuum Pump


I Sectional SUDIN
Drawing

SUDIN

MD1-0-V-134-01-00015B

Piping layout drawing ofI ball strainer SUDIN


(dn 1650)

SUDIN

MD1-0-V-134-01-00022A

Inspection and Test Plan


I for Workshop
SUDIN
- Tube Cleaning System

SUDIN

MD1-0-V-134-02-00041A

Painting Schedule - Condenser


I
TubeSUDIN
Cleaning System

SUDIN

MD1-0-V-134-05-00023A

Quality Assurance Manual


I - Tube Cleaning
SUDINSystem

SUDIN

MD1-0-V-134-05-00024A

Inspection and Test Procedure


I
- Tube
SUDIN
Cleaning System

SUDIN

MD1-0-V-134-05-00025A

NDT Procedures - Tube


I Cleaning System
SUDIN

SUDIN

MD1-0-V-134-08-00037A

Equipment List for Condenser


I
Tube Cleaning
SUDIN System

SUDIN

MD1-0-V-134-11-00006A

Equipment Outline Drawng


I
of Ball Strainer
SUDIN(DN 1650)

SUDIN

MD1-0-V-134-11-00008A

Equipment Outline Drawng


I
of Ball Recirculating
SUDIN
Pump Skid, Ball Vessel & Ball Skd

SUDIN

MD1-0-V-134-11-00010C

Equipment outline drawing


I of ball injection
SUDINnozzle & v-piece

SUDIN

MD1-0-V-135-01-00010B

Piping layout drawing ofI debris filter (dn


SUDIN
1650)

SUDIN

MD1-0-V-135-01-00015A

Inspection & Test Plan Ifor WorkshopSUDIN


- Debris Filter

SUDIN

MD1-0-V-135-05-00016A

Quality Assurance Manual


I - Debris Filter
SUDIN

SUDIN

MD1-0-V-135-05-00017A

Inspection Test Procedure


I - Debris Filter
SUDIN

SUDIN

MD1-0-V-135-05-00018A

NDT Procedures - Debris


I Filter

SUDIN

SUDIN

MD1-0-V-135-08-00030A

Equipment List for Debris


I Filter

SUDIN

SUDIN

MD1-0-V-135-11-00006B

Equipment Outline Drawing


I
of DebrisSUDIN
Filter- DN 1650

SUDIN

MD1-0-V-141-01-00001A

Assembly Drawing

SUDIN

SUDIN

SUDIN

SUDIN

SUDIN

MD1-0-V-141-01-00002A

General Arrangement Drawing


I
for Self
SUDIN
Cleanning Filter

SUDIN

MD1-0-V-141-03-00001A

Control System Description,


I
Autho Filter
SUDIN

SUDIN

MD1-0-V-141-05-00001A

Operation and Maintenance


I
Manuals,SUDIN
CCW Cooler

SUDIN

MD1-0-V-141-05-00002A

Quality assurance manual,


I ccw cooler
SUDIN

SUDIN

MD1-0-V-141-05-00003A

Inspection test plan, ccw


I cooler

SUDIN

MD1-0-V-141-05-00004A

Inspection test procedure,


I ccw coolerSUDIN

SUDIN

MD1-0-V-141-05-00006A

Painting schedule, ccwI cooler

SUDIN

MD1-0-V-141-05-00007A

Welding book(wps/pqr/wqr/weld
I
map),
SUDIN
ccw cooler

SUDIN

MD1-0-V-141-05-00009A

Manufacturing Quality Control


I
Procedures
SUDIN
for Auto Filter of CCWC

SUDIN

MD1-0-V-141-05-00010A

Hydrotest procedure, auto


I filter

SUDIN

SUDIN

MD1-0-V-141-05-00012A

Painting schedule, autoI filter

SUDIN

SUDIN

MD1-0-V-141-05-00013B

Rubber-lining ProcedureI and Data Sheets,


SUDINAuto Filter

SUDIN

MD1-0-V-141-05-00015A

Operation and Maintenance


I
Manual for
SUDIN
Auto Filter

SUDIN

MD1-0-V-141-08-00003A

Master Spare Parts ListI (Contract & Recommended),


SUDIN
CCW Cooler

SUDIN

MD1-0-V-141-08-00004A

Master Special Tools List,


I CCW Cooler
SUDIN

SUDIN

MD1-0-V-141-08-00006A

Closed Cooling Water CoolerI


Equipment
SUDIN
List

SUDIN

MD1-0-V-141-08-00008A

Auto Filter- Equipment List


I

SUDIN

SUDIN

MD1-0-V-141-08-00011B

Inspection & Test Plan, IAuto Filter

SUDIN

SUDIN

MD1-0-V-141-08-00012A

Loading data for auto filter


I

SUDIN

SUDIN

MD1-0-V-141-08-00017A

Valve list for auto filter I

SUDIN

SUDIN

MD1-0-V-141-08-00020A

Utilities Consumptions- IAuto Filter

SUDIN

SUDIN

MD1-0-V-141-11-00001A

Name plate drawings forI ccw cooler SUDIN

SUDIN

MD1-0-V-141-11-00002A

Name plate drawing, auto


I filter

SUDIN

MD1-0-V-141-21-00001A

Piping & Instrumentation


I Diagram forSUDIN
Self Cleaning Filter

SUDIN

MD1-0-V-141-32-00001A

Start up & Shut Down Block


I
Diagram,SUDIN
Auto Filter

SUDIN

MD1-0-V-141-55-00001A

Strength Calculations I

SUDIN

SUDIN

MD1-0-V-141-55-00002A

Calculation notes for auto


I filter

SUDIN

SUDIN

MD1-0-V-141-55-00003A

Thermal calculation sheet,


I ccw coolerSUDIN

SUDIN

MD1-0-V-142-01-00001A

General arrangement drawing


I
for service
SUDIN
water pump

SUDIN

MD1-0-V-142-01-00002A

Sectional drawing for service


I
water pump
SUDIN

SUDIN

MD1-0-V-142-01-10001A

General arrangement drawing


I
for closed
SUDIN
cooling water pump

SUDIN

MD1-0-V-142-01-10002A

Sectional drawing for closed


I
coolingSUDIN
water pump

SUDIN

MD1-0-V-142-01-20002A

Sectional drawing for demi.


I
water transfer
SUDINpump

SUDIN

MD1-0-V-142-01-30001A

General arrangement drawing


I
for condensate
SUDIN make up pump

SUDIN

MD1-0-V-142-01-30002A

Sectional drawing for condensate


I
make-up
SUDINpump

SUDIN

MD1-0-V-142-01-40001A

General arrangement drawing


I
for auxiliary
SUDINcooling water booster pump

SUDIN

MD1-0-V-142-01-40002A

Sectional drawing for auxiliary


I
coolingSUDIN
water booster pump

SUDIN

MD1-0-V-142-01-50002A

Sectional drawing for steam


I
coil air heater
SUDINdrain pump

SUDIN

MD1-0-V-142-01-60001A

General arrangement drawing


I
for diesel
SUDIN
oil drain pump

SUDIN

MD1-0-V-142-01-60002A

Sectional drawing for diesel


I
oil drainSUDIN
pump

SUDIN

MD1-0-V-142-01-70001A

General arrangement drawing


I
for boiler
SUDIN
initial filling & warm-up recirculation p

SUDIN

MD1-0-V-142-01-70002A

Sectional drawing for boiler


I
initial filling
SUDIN
& warm-up recirculation pump

MD1-0-V-142-01-80001A

General arrangement drawing


I
for dirty
SUDIN
oil transfer pump

MD1-0-V-142-01-80002A

Sectional drawing for dirty


I oil transferSUDIN
pump

MD1-0-V-142-01-90001A

General arrangement drawing


I
for dirty
SUDIN
oil drain pump

MD1-0-V-142-01-90002A

Sectional drawing for dirty


I oil drain pump
SUDIN

MD1-0-V-142-05-00005A

Painting procedure for general


I
service
SUDIN
pumps(horizontal)

SUDIN

SUDIN

SUDIN

MD1-0-V-142-06-00001A

Calculation Sheet for Service


I
Water Pump
SUDIN

MD1-0-V-142-06-10001A

Calculation Sheet for Closed


I
CoolingSUDIN
Water Pump

MD1-0-V-142-06-20001A

Calculation Sheet for Demi.


I
Water Transfer
SUDIN Pump

MD1-0-V-142-06-30001A

Calculation Sheet for Condensate


I
Make-up
SUDIN Pump

MD1-0-V-142-06-40001A

Calculation Sheet for Auxiliary


I
Cooling
SUDIN
Water Booster Pump

MD1-0-V-142-06-60001A

Calculation Sheet for Diesel


I
Oil DrainSUDIN
Pump

MD1-0-V-142-06-70001A

Calculation Sheet for Deaerator


I
Recirculation
SUDIN Pump

MD1-0-V-142-06-80001A

Calculation Sheet for Dirty


I Oil Transfer
SUDIN
Pump

MD1-0-V-142-06-90001A

Calculation Sheet for Dirty


I Oil Drain Pump
SUDIN

MD1-0-V-142-11-00001A

Name Plate Drawings I

MD1-0-V-151-05-00028A

Air Compressor - Inspection


I
and TestSUDIN
Procedure

MD1-0-V-151-08-00021A

Air Compressor - Equipment


I
List

MD1-0-V-151-08-00022A

Air compressor - utility consumption


I
list
SUDIN

MD1-0-V-151-08-00027A

AIR COMPRESSOR, INSPECTION


I
AND
SUDIN
TEST PLAN

MD1-0-V-151-21-00033B

Air Compressor- Symbol


I & Legend For
SUDIN
P&I Diagram

MD1-0-V-151-57-00026A

Air Compressor - NameI Plates Drawing


SUDIN

MD1-0-V-153-01-00003A

Test and Inspection Plan


I for Service SUDIN
Gas System

MD1-0-V-153-08-00003A

Sub Supplier List for Service


I
Gas System
SUDIN

MD1-0-V-153-08-00004A

Instrument List For Service


I
Gas System
SUDIN

MD1-0-V-153-08-00005A

Valve List for Service Gas


I System SUDIN

MD1-0-V-153-08-00007A

Painting Schedule for Service


I
Gas System
SUDIN

MD1-0-V-153-08-00010A

Terminal point list for service


I
gas system
SUDIN

SUDIN

SUDIN

MD1-0-V-153-10-00004A

Name Plate for ServiceI Gas SystemSUDIN

MD1-0-V-166-05-00001A

Inspection & test procedure


I
for fuel oil
SUDIN
heater

MD1-0-V-166-05-00002A

Inspection & Test Plan for


I Fuel Oil Heater
SUDIN

MD1-0-V-166-05-00003A

WPS & PQR

MD1-0-V-166-05-00004A

Nde procedure for fuel Ioil heater

MD1-0-V-166-06-00001A

Strength calculation for Ifuel unloadingSUDIN


heater

MD1-0-V-166-06-00002A

Strength calculation for Ifuel oil heaterSUDIN


level 1

MD1-0-V-166-06-00003A

Strength calculation forI fuel oil heater


SUDIN
level 2

MD1-0-V-166-06-00004A

Strength calculation for Ifuel oil coolerSUDIN

MD1-0-V-166-10-00101A

General Assembly for Fuel


I Oil Unloading
SUDIN
Heater

MD1-0-V-166-10-00201A

General Assembly for Fuel


I Oil HeaterSUDIN
Level 1

MD1-0-V-166-10-00301A

General Assembly for Fuel


I Oil HeaterSUDIN
Level 2

MD1-0-V-166-10-00401A

General Assembly for Fuel


I Oil CoolerSUDIN

MD1-0-V-167-05-00003A

Painting Procedure

SUDIN

MD1-0-V-167-10-00003A

Coupling drawing

SUDIN

MD1-0-V-167-10-00004A

Name plate drawing

SUDIN

MD1-0-V-171-01-00001C

Plot Plan for Coal Handling


I
System SUDIN

MD1-0-V-171-01-00002B

Typical Cross Section ofI Conveyor Galleries


SUDIN for CHS

MD1-0-V-171-01-00003C

Elevation & Profile for CHS


I

MD1-0-V-171-01-00004C

Stockyard Layout For Coal


I Handling SUDIN
System

MD1-0-V-171-01-00005C

Rail Fixing ArrangementI of StockyardSUDIN


Layout For Stacker

MD1-0-V-171-01-00006A

Bunker House Load Data


I at Tripper Floor
SUDIN
& Tripper Floor Roof

MD1-0-V-171-01-00007C

Rail Fixing ArrangementI of StockyardSUDIN


Layout For Reclaimer

MD1-0-V-171-01-00008B

Sprinkler Fixing Arrangement


I
For Stockyard
SUDIN Layout With Load Data

MD1-0-V-171-01-00012B

General Arrangement ofI Transfer Tower


SUDIN
No.TT-02 for CHS

SUDIN
SUDIN

SUDIN

MD1-0-V-171-01-00013B

General Arrangement ofI Transfer Tower


SUDIN
No.TT-03 for CHS

MD1-0-V-171-01-00014B

General Arrangement ofI Transfer Tower


SUDIN
No.TT-04 for CHS

MD1-0-V-171-01-00015B

General Arrangement ofI Crusher House


SUDIN
for CHS

MD1-0-V-171-01-00016B

General Arrangement ofI Transfer Tower


SUDIN
No.TT-06 for CHS

MD1-0-V-171-01-00021A

Mechanical General Arrangment


I
of Belt
SUDIN
Conveyor BC-01A/B for CHS

MD1-0-V-171-01-00022B

Mechanical General Arrangement


I
of SUDIN
Belt Conveyor BC-02AB for CHS

MD1-0-V-171-01-00023B

Mechanical General Arrangement


I
of SUDIN
Belt Conveyor BC-03AB for CHS

MD1-0-V-171-01-00024B

Mechanical General Arrangement


I
of SUDIN
Belt Conveyor BC-05A/B for CHS

MD1-0-V-171-01-00030A

GENERAL ARRANGEMENT
I
OF BELT
SUDIN
FEEDER BFD-01 FOR CHS

MD1-0-V-171-01-00031A

GENERAL ARRANGEMENT
I
OF BELT
SUDIN
FEEDER BFD-02A/B FOR CHS

MD1-0-V-171-01-00041B

General Arrangement ofI Idlers for Coal


SUDIN
Handling System (Impact Idlers)-8 Sheets

MD1-0-V-171-01-00042B

General Arrangement ofI Pulley For Coal


SUDIN
Handling System

MD1-0-V-171-01-00043B

General Arrangement ofI Travelling Tripper


SUDINfor Coal Handling System

MD1-0-V-171-01-00044A

General Arangement ofI Flap Gate With


SUDIN
Schedule for Coal Handling System

MD1-0-V-171-01-00045A

General Arangement ofI Internal Scrapper


SUDIN
with Schedule for Coal Handling System

MD1-0-V-171-01-00046A

Typical General Arangement


I
of Skirt SUDIN
Board for Coal Handling System

MD1-0-V-171-01-00047A

General arrangement ofI rcc plat formSUDIN


for crusher in tt-05

MD1-0-V-171-01-00048A

General Arrangement Drawing


I
of Rack
SUDIN
& Pinion Gate for Coal Handling System

MD1-0-V-171-01-00051C

Gen. Arrang. Drwg & Data


I for Reversible
SUDIN
Hammer Crusher 2000 mm Dia x 2800 mm LG

MD1-0-V-171-01-00052B

Gen. Arrang. Drwg & Data


I Sheet for SUDIN
Vibrating Grizzy IN FOR TT-01

MD1-0-V-171-01-00053B

Gen. Arrang. Drwg & Data


I Sheet for SUDIN
Vibrating Screen IN TT-05

MD1-0-V-171-01-00073A

GENERAL ARRANGEMENT
I
OF INLINE
SUDIN
MAGNETIC SEPARATOR FOR CHS

MD1-0-V-171-01-00079B

TECHNICAL DATA SHEET


I
OF BELT
SUDIN
FOR BUNKER SEALING FOR CHS

MD1-0-V-171-01-00101B

General Arrangement ofI Luffing Travelling


SUDINStacker for CHS

MD1-0-V-171-01-00105A

Wheel Load Data for Linear


I
Stacker SUDIN

MD1-0-V-171-01-00121B

General Arrangement ofI Bridge TypeSUDIN


Reclaimer for Coal Handling System

MD1-0-V-171-01-00123A

Wheel Load data for Bridge


I
Type Reclaimer
SUDIN

MD1-0-V-171-01-00151B

General Arrangement ofI Centrifugal Fan


SUDIN
for the Dust Collection System for CHS

MD1-0-V-171-01-00152B

General Arrangement ofI Bag Filter forSUDIN


the Dist Collection System for CHS

MD1-0-V-171-01-00155A

Ducting Layout for DustI Collection System


SUDINfor Tower TT-03 for CHS

MD1-0-V-171-01-00156A

Ducting layout for dust collection


I
system
SUDIN
for transfer tower tt-04

MD1-0-V-171-01-00158A

Ducting Layout for DustI Collectlon System


SUDINfor Tower TT-06 for CHS

MD1-0-V-171-05-40002B

Welder Qualification Records


I

SUDIN

MD1-0-V-171-05-40005A

NDE Procedure for CHS


I

SUDIN

MD1-0-V-171-05-40008A

Welding consumable control


I
procedure
SUDIN
of chs

MD1-0-V-171-05-40014B

Itp for steel structure(tower)


I

SUDIN

MD1-0-V-171-05-40015B

Itp for steel structure(gallery)


I

SUDIN

MD1-0-V-171-05-40016B

Itp for trevelling tripper I

SUDIN

MD1-0-V-171-05-40018B

Itp for vibrating grizzly feeder


I

SUDIN

MD1-0-V-171-05-40020B

ltp for skirt board

SUDIN

MD1-0-V-171-05-40021B

Itp for internal scrapper I

SUDIN

MD1-0-V-171-05-40031A

ITP for sprocket for reclimer


I
for CHSSUDIN

MD1-0-V-171-05-40032A

ITP for chain for reclaimer


I for CHS SUDIN

MD1-0-V-171-06-00001B

Volumetric Capacity Calculation


I
of Surge
SUDIN
Bin for Coal Handling System

MD1-0-V-171-06-00002B

Stockpile Capacity Calculation


I
for Coal
SUDIN
Handling System

MD1-0-V-171-06-00006B

Power & Tension Calc. Ifor Belt Conveyor


SUDIN
BC-01A/B for CHS

MD1-0-V-171-06-00007B

Power & Tension Calc. Ifor Belt Conveyor


SUDIN
BC-02A/B for CHS

MD1-0-V-171-06-00008B

Power & Tension Calc. Ifor Belt Conveyor


SUDIN
BC-03A/B for CHS

MD1-0-V-171-06-00009B

Power & Tension Calc. Ifor Belt Conveyor


SUDIN
BC-05A/B for CHS

MD1-0-V-171-06-00010B

Power & Tension Calc. Ifor Belt Conveyor


SUDIN
BC-06A/B for CHS

MD1-0-V-171-06-00011B

Power & Tension Calc. Ifor Belt Conveyor


SUDIN
BC-08 & BC-11 for CHS

MD1-0-V-171-06-00012B

Power & Tension Calc. Ifor Belt Conveyor


SUDIN
BC-09 & BC-10 for CHS

MD1-0-V-171-06-00013A

Power and tension calculation


I
for beltSUDIN
feeder bfd-01 for chs

MD1-0-V-171-06-00014A

Power and tension calculation


I
for beltSUDIN
feeder bfd-02a/b for chs

MD1-0-V-171-06-00015A

Derivation for Stacker Wheel


I
load

MD1-0-V-171-06-00016A

Derivation for reclaimerIWheel load SUDIN

MD1-0-V-171-08-00001B

HOIST SCHEDULE FOR


I COAL HANDLING
SUDIN SYSTEM

MD1-0-V-171-08-00002B

IDLER SCHEDULE FOR


I COAL HANDLING
SUDIN SYSTEM

MD1-0-V-171-21-02101A

P & id for coal handling Isystem

MD1-0-V-172-01-00002B

Plot Plan for LimestoneIHandling System


SUDIN

MD1-0-V-172-01-00003A

Typical cross-sections of
I conveyor galleries
SUDIN for lhs

MD1-0-V-172-01-00004B

Elevation & Profile For Limestone


I
Handling
SUDINSystem

MD1-0-V-172-01-00005B

Stockyard Layout for Limestone


I
Handling
SUDIN
System

MD1-0-V-172-01-00011C

General Arrangement ofI Transfer Tower


SUDIN
No.LT-01 for LHS

MD1-0-V-172-01-00012C

General Arrangement ofI Transfer Tower


SUDIN
No.LT-02 for LHS

MD1-0-V-172-01-00013C

General Arrangement ofI Transfer Tower


SUDIN
No.LT-03 for LHS

MD1-0-V-172-01-00014C

General Arrangement ofI Transfer Tower


SUDIN
No.LT-04 for LHS

MD1-0-V-172-01-00020C

Mechanical foundation load


I
data of grinding
SUDIN house

MD1-0-V-172-01-00031B

General Arrangement ofI Belt Conveyor


SUDIN
L-01 for LHS

MD1-0-V-172-01-00032B

General Arrangement ofI Belt Conveyor


SUDIN
L-02 for LHS

MD1-0-V-172-01-00033B

General Arrangement ofI Belt Conveyor


SUDIN
L-03 for LHS

MD1-0-V-172-01-00034B

General Arrangement ofI Belt Conveyor


SUDIN
BC-L-04 for LHS

MD1-0-V-172-01-00035B

General Arrangement ofI Belt Conveyor


SUDIN
L-05 for LHS

MD1-0-V-172-01-00036A

General arrangement ofI belt feeder bf-02


SUDIN
for lhs

MD1-0-V-172-01-00037A

General arrangement ofI reversible belt


SUDIN
feeder rbf-01 for lhs

MD1-0-V-172-01-00051B

General Arrangement ofI Idlers for Limestone


SUDIN handling System

MD1-0-V-172-01-00052A

General Arrangement ofI Pulley For Limestone


SUDIN Handling System

MD1-0-V-172-01-00053B

General Arrangement ofI Travelling Tripper


SUDINfor Limestone Handling System

MD1-0-V-172-01-00054A

GENERAL ARRANGEMENT
I
DRAWING
SUDIN
OF RACK &

MD1-0-V-172-01-00055B

General Arrangement Drawing


I
of Internal
SUDIN
Scrapper for Limestone Handling Sys.

MD1-0-V-172-01-00056B

Typical General Arrangement


I
of SkirtSUDIN
Board for Limestone Handling System

MD1-0-V-172-01-00057B

General Arrangement ofI Telescopic Chute


SUDINfor Limestone Handling System

MD1-0-V-172-01-00073B

General Arrangement ofI Screw Conveyor


SUDIN
SC-02A/B for LHS

MD1-0-V-172-01-00074A

General Arangement Drawing


I
& DataSUDIN
Sheet for Vibrating Feeder Below Receiv. Hoppe

MD1-0-V-172-01-00075A

General Arangement Drawing


I
& DataSUDIN
Sheet for Vibrating Feeder Below Surge Bin

MD1-0-V-172-01-00086A

General arrangement ofI receiving hopper


SUDIN
for lhs

MD1-0-V-172-01-00103A

Ga of fluidizing arrangement(ls
I
silo) SUDIN

MD1-0-V-172-01-00105A

Ga of air lock vessel(alv)


I - 0.75m3(for
SUDIN
limestone silo)

MD1-0-V-172-01-00109A

Ga of vent filter for ls silo


I

MD1-0-V-172-01-00171B

General Arrangement ofI Centrifugal Fan


SUDIN
for Dust Collection System for LHS

MD1-0-V-172-01-00172B

General Arrangement ofI Bag Filter forSUDIN


the Dist Collection System for LHS

MD1-0-V-172-01-00174A

General Arrangement &I Ducting Layout


SUDIN
of Dust Collection System LT01 Transfer LHS

MD1-0-V-172-01-00175A

General Arrangement &I Ducting Layout


SUDIN
of Dust Collection System LT02 Transfer LHS

MD1-0-V-172-01-00176A

General Arrangement &I Ducting Layout


SUDIN
of Dust Collection System LT03 Transfer LHS

SUDIN

SUDIN

SUDIN

MD1-0-V-172-01-00177A

General Arrangement &I Ducting Layout


SUDIN
of Dust Collection System LT04 Transfer LHS

MD1-0-V-172-05-40002B

Welder Qualification Records


I

SUDIN

MD1-0-V-172-05-40005A

NDE Procedure for LHSI

SUDIN

MD1-0-V-172-05-40008A

Welding consumable control


I
procedure
SUDIN
of lhs

MD1-0-V-172-05-40011B

INSPECTION AND TEST


I PLAN FORSUDIN
CONVEYOR PULLEY ASSEMBLY

MD1-0-V-172-05-40012B

INSPECTION AND TEST


I PLAN FORSUDIN
TECHNOLOGICAL STRUCTURES

MD1-0-V-172-05-40013B

INSPECTION AND TEST


I PLAN FORSUDIN
DISCHARGE CHUTES

MD1-0-V-172-05-40014B

Itp for steel structure(tower)


I
for l.h.s SUDIN

MD1-0-V-172-05-40015B

Itp for steel structure(gallery)


I
for l.h.sSUDIN

MD1-0-V-172-05-40016B

Itp for travelling tripper for


I l.h.s

SUDIN

MD1-0-V-172-05-40017B

Itp for skirt board for l.h.s


I

SUDIN

MD1-0-V-172-05-40018B

Itp for internal scrapper Ifor l.h.s

SUDIN

MD1-0-V-172-06-00001A

Volumetric Capacity Calculation


I
for Surge
SUDIN
Bin in LT-05 for LHS

MD1-0-V-172-06-00002A

Volumetric Capacity Calculation


I
of Limestone
SUDIN Storage Silo

MD1-0-V-172-06-00003A

Volumetric Capacity Calculation


I
of Reclaim
SUDIN Hopper For LHS

MD1-0-V-172-06-00007B

Power and Tension Calculation


I
For Belt
SUDIN
Conveyor L-01 For LHS

MD1-0-V-172-06-00008B

Power and Tension Calculation


I
For Belt
SUDIN
Conveyor L-02 For LHS

MD1-0-V-172-06-00009B

Power and Tension Calculation


I
For Belt
SUDIN
Conveyor L-03 For LHS

MD1-0-V-172-06-00010B

Power and Tension Calculation


I
For Belt
SUDIN
Conveyor L-04 For LHS

MD1-0-V-172-06-00011B

Power and Tension Calculation


I
For Belt
SUDIN
Conveyor L-05 For LHS

MD1-0-V-172-06-00021A

Sizing Calculation for Conveying


I
Air for
SUDIN
LHS

MD1-0-V-172-08-00001B

Hoist Schedule For Limestone


I
Handling
SUDIN
System

MD1-0-V-172-08-00002B

IDLER SCHEDULE FOR


I LIMESTONE
SUDIN
HANDLING

MD1-0-V-172-08-00005A

Conveyor belt scheduleI for limestoneSUDIN


handling system

MD1-0-V-172-08-00523A

Schedule for Technological


I
Foundation
SUDIN
Bolt for LHS

MD1-0-V-172-11-02110A

GA of Junction Box for LHS


I

MD1-0-V-172-21-00001A

P & ID of Pneumatic Conveying


I
System
SUDIN
for Limestone Handling

MD1-0-V-172-21-00002A

P & ID Limestone Storage


I Silo Fluidzing
SUDIN
System

MD1-0-V-172-21-00003A

P & ID For Limestone Conveying


I
Air SUDIN
Blower

MD1-0-V-173-01-00031C

Layout of Dry Flight Conveyor


I
from Boiler
SUDIN
to Bottom Ash Silo (U1 & U2)

MD1-0-V-173-01-00032B

GA of Bottom Ash Silo (BAS-2B)


I

MD1-0-V-173-01-00033B

Ga of ash slurry & ash water


I
pump house
SUDIN

MD1-0-V-173-01-00036C

General Arrangement ofI Fly Ash Silos


SUDIN

MD1-0-V-173-01-00051A

General Layout of Ash Handling


I
System
SUDIN

MD1-0-V-173-01-00053A

Equipment & piping layout


I
in eco & aph
SUDIN
hopper area

MD1-0-V-173-01-00054A

Fly ash conveying piping


I layout from SUDIN
esp to buffer hopper

MD1-0-V-173-01-00055A

Fly ash conveying piping


I layout from SUDIN
buffer hopper to fa silo

MD1-0-V-173-05-40002B

Welder Qualification Records


I

SUDIN

MD1-0-V-173-05-40005A

NDE Procedure for AHSI

SUDIN

MD1-0-V-173-05-40008A

Welding consumable control


I
procedure
SUDIN
of ahs

MD1-0-V-173-06-00201A

Ash Slurry Pump SizingI Calculation SUDIN

MD1-0-V-173-06-00202A

HP Water Pump Sizing ICalculation SUDIN

MD1-0-V-173-06-00203A

Seal Water Pump Sizing


I CalculationSUDIN

MD1-0-V-173-06-00204A

Return Water Pump Sizing


I
Calculation
SUDIN

SUDIN

SUDIN

MD1-0-V-173-06-00205A

Ash Water Pump Sizing


I Calculation SUDIN

MD1-0-V-173-06-00206A

Ash Slurry Sump SizingI Calculation SUDIN

MD1-0-V-173-06-00207B

Vacuum Pump Sizing Calculation


I

SUDIN

MD1-0-V-173-06-00208A

Transport Air Blower forI Rebedding Sizing


SUDINCalculation

MD1-0-V-173-06-00211A

Silo Fluidising Blower Sizing


I
Calculation
SUDIN

MD1-0-V-173-06-00212A

Silo Fluidising Blower Heater


I
Sizing Calculation
SUDIN

MD1-0-V-173-06-00213A

Air Lock Vessel for Re-Bedding


I
Sizing
SUDIN
Calculation

MD1-0-V-173-06-00214A

Silo Volume CalculationI

MD1-0-V-173-06-00215A

Fly Ash Silo Vent Filter I& Vent Fan Sizing


SUDIN
Calculation

MD1-0-V-173-06-00216A

Bottom Ash Silo Vent Filter


I
and VentSUDIN
Fan Sizing Calculation

MD1-0-V-173-06-00217A

Silo Jet Pump Sizing Calculation


I

MD1-0-V-173-06-00218B

Fly Ash Conveying Blower


I Sizing Calculation
SUDIN

MD1-0-V-173-08-00266A

Piping Material Classification


I
for ASHSUDIN
Handling System

MD1-0-V-173-10-00071B

GA of Adaptor Below ESP


I Hopper

MD1-0-V-173-10-00072B

GA of Adaptor Below ECO


I & APH Hopper
SUDIN

MD1-0-V-173-10-00073A

Ga ash intake valve (dnI 200)

SUDIN

MD1-0-V-173-10-00074A

Ga of air intake valve (dn


I 200)

SUDIN

MD1-0-V-173-10-00076A

GA of Vacuum BreakerI

SUDIN

MD1-0-V-173-10-00077B

GA of Branch Isolation Valve


I

SUDIN

MD1-0-V-173-10-00078A

GA of Adaptor CouplingI - Vacuum System


SUDIN

MD1-0-V-173-10-00085A

GA of Air Lock Vessel for


I Bed Ash SUDIN

MD1-0-V-173-10-00087A

GA of Vent Filter for F.AI Silo

SUDIN

MD1-0-V-173-10-00088A

GA of Vent Filter for B.AI Silo

SUDIN

MD1-0-V-173-10-00090A

GA of Fluidizing Pad forI Silo

SUDIN

MD1-0-V-173-10-00092A

GA of Slurrifier

SUDIN

MD1-0-V-173-10-00093A

GA of Jet Pump

SUDIN

MD1-0-V-173-10-00094A

GA of Mixing / Transfer ITank

SUDIN

MD1-0-V-173-10-00097A

GA of Manual Plug GateI

SUDIN

MD1-0-V-173-21-00005A

Legend & Symbol for P&I


I Diagram SUDIN

MD1-0-V-173-21-00008A

P&ID- Bottom Ash Handling


I
System SUDIN
- Bottom Ash Silo Unloading & Fludizing

MD1-0-V-173-21-00009A

P&ID- Fly Ash System- IHopper Area SUDIN

MD1-0-V-173-21-00010A

P&ID- Fly Ash System- ISilo Roof

MD1-0-V-173-21-00012A

P&ID- Fly Ash System- ISilo Unloading


SUDIN

MD1-0-V-173-21-00013A

P&ID Diagram of Fludizing


I Air Distribution
SUDINfor Fly Ash Silo

MD1-0-V-173-21-00014A

P&ID- HP Water & Return


I Water System
SUDIN

MD1-0-V-173-21-00015A

P&ID-Ash Slurry Transfer


I System

MD1-0-V-173-21-00016A

P&ID-Fly Ash System- Vacuum


I
Pressure
SUDIN
Transfer Area

MD1-0-V-173-21-00018A

P&ID-Fly Ash System- Buffer


I
HopperSUDIN
Aeration

MD1-0-V-173-21-00019A

P&ID - Instrument Air Distribution


I

MD1-0-V-173-55-00899A

Conveyor Supporting StructureI


Calculation
SUDIN of Foundation Load Data (Vol 1)

MD1-0-V-182-02-11002A

Motor Driven Air Compressor


I
OutlineSUDIN
Drawing for Emergency Diesel Generator

MD1-0-V-182-02-11003A

Engine Driven Air Compressor


I
Outline
SUDIN
Drawing for Emergency Diesel Generator

MD1-0-V-182-06-04001A

Auxiliary Equipment Capacity


I
Calculation
SUDIN
Sheet for Emergency Diesel Generator

MD1-0-V-182-08-40001A

DCS I/O List for Emergency


I
Diesel Generator
SUDIN

MD1-0-V-182-09-02001A

Emergency diesel generator


I
set equipment
SUDINheat emmission sheet

MD1-0-V-182-10-10011A

Diesel Engine and Generator


I
Assembly
SUDIN
Outline Drawing for Emergency Diesel Generr

MD1-0-V-182-10-10012A

Engine Outline DrawingI for Emergency


SUDIN
Diesel Generator

MD1-0-V-182-10-10013A

Generator Outline Drawing


I
for Emergency
SUDINDiesel Generator

MD1-0-V-182-10-11004A

Air Receiver Tank for Emergency


I
Diesel
SUDIN
Generator

MD1-0-V-183-01-12101A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Lubrication Oil Storage Area

SUDIN

SUDIN

SUDIN

SUDIN

SUDIN

SUDIN

MD1-0-V-183-01-12102A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Boiler Blowdown Sump Pump

MD1-0-V-183-01-12103A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Maintenance Wastewater Basin

MD1-0-V-183-01-12104A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Coal Handling Transfer Tower

MD1-0-V-183-01-12105A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Transfer Tower Area Sump Pump

MD1-0-V-183-01-12107A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Cooling Water Filling Pump

MD1-0-V-183-01-12108A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Fuel Oil System Area Oily Sump

MD1-0-V-183-01-12112A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Transformer Area Sump Pump

MD1-0-V-183-01-12113A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Auxiliary Transformer Area Su

MD1-0-V-183-01-12201A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Lubrication Oil Storage Area

MD1-0-V-183-01-12202A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_STG Building Chemical Sump Pup

MD1-0-V-183-01-12203A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Gas Chlorination Area Sump Pup

MD1-0-V-183-01-12204A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_WWT Underground Sump Pump

MD1-0-V-183-01-12205A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_STG Building Seawater Sump Pum

MD1-0-V-183-01-12206A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_CWP Discharge Valve pit

MD1-0-V-183-01-12207A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Central Control Building Sewap

MD1-0-V-183-01-12208A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Switchyard Control Building

MD1-0-V-183-01-12209A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Water Treatment Building Seweg

MD1-0-V-183-01-12210A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Warehouse & Workshop Building

MD1-0-V-183-01-12211A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Administration Building(North)

MD1-0-V-183-01-12212A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Administration Building(South)

MD1-0-V-183-01-12213A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Guard House Sewage Pump

MD1-0-V-183-01-12214A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Coal Handling Control Building

MD1-0-V-183-01-12215A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_STG Building Oily Sump Pump

MD1-0-V-183-01-12216A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Ammonia Storage Area Sump Pump

MD1-0-V-183-01-12217A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Dewatering Portable Pump

MD1-0-V-183-01-12218A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Fire Protection Pump House

MD1-0-V-183-01-12219A

Outline Drawing for GSP(Vertical


I
andSUDIN
Submersible)_Central Control Building Sewag

MD1-0-V-183-01-13101A

Pump Sectional Drawing


I for GSP(Vertical
SUDIN
and Submersible)_Start-up Flash Tank Arp

MD1-0-V-183-01-13102A

Pump Sectional Drawing


I for GSP(Vertical
SUDIN
and Submersible)_Boiler Blowdown Sump Pp

MD1-0-V-183-01-13103A

Pump Sectional Drawing


I for GSP(Vertical
SUDIN
and Submersible)_Maintenance Wastewatern

MD1-0-V-183-01-13104A

Pump Sectional Drawing


I for GSP(Vertical
SUDIN
and Submersible)_Coal Handling Transfer

MD1-0-V-183-01-13105A

Pump Sectional Drawing


I for GSP(Vertical
SUDIN
and Submersible)_Limestone Handling Trar

MD1-0-V-183-01-13107A

Pump Sectional Drawing


I for GSP(Vertical
SUDIN
and Submersible)_Cooling Water Filling p

MD1-0-V-183-01-13108A

Pump Sectional Drawing


I for GSP(Vertical
SUDIN
and Submersible)_Fuel Oil System Area Op

MD1-0-V-183-01-13112A

Pump Sectional Drawing


I for GSP(Vertical
SUDIN
and Submersible)_Transformer Area Sump p

MD1-0-V-183-01-13113A

Pump Sectional Drawing


I for GSP(Vertical
SUDIN
and Submersible)_Auxiliary Transformer

MD1-0-V-183-05-00005A

Inspection Test Plan forI GSP(VerticalSUDIN


and Submersible)

MD1-0-V-185-06-10100A

Closed cooling water head


I tank strength
SUDIN
calculation sheet

MD1-0-V-185-06-20100A

Closed cooling water chemical


I
injection
SUDIN
cylinder strength calculation sheet

MD1-0-V-185-06-30100A

Start-up flash tank strength


I
calculation
SUDIN
sheet

MD1-0-V-185-06-40100A

Condensate return tankI strength calculation


SUDIN sheet

MD1-0-V-185-06-80100A

Dirty oil tank strength calculation


I
sheet
SUDIN

MD1-0-V-185-06-90100A

Steam coil air heater drain


I tank strength
SUDIN
calculation sheet

MD1-0-V-186-05-00103A

Shop ndt procedures

MD1-0-V-186-05-00104B

Quality Assurance Program


I
& ManualSUDIN
(Field Erected Tank)

MD1-0-V-186-06-00702A

Fuel Oil Storage Tank Thermal


I
Design
SUDIN
Report of Bottom Heater

MD1-0-V-186-11-00326A

Demi. Water Storage Tank


I
(B) SpiralSUDIN
Stairway (4/4)

SUDIN

MD1-0-V-186-11-00616A

Potable water storage tank


I
internal ladder
SUDIN
detail

MD1-0-V-186-11-00726A

Fuel Oil Storage Tank Floating


I
Suction
SUDIN
Detail (1/2)

MD1-0-V-186-11-00727A

Fuel Oil Storage Tank Floating


I
Suction
SUDIN
Detail (2/2)

MD1-0-V-186-11-00730A

Fuel oil storage tank internal


I
ladder detail
SUDIN

MD1-0-V-186-11-00731A

Fuel oil storage tank pipe


I support detail(a)
SUDIN

MD1-0-V-186-11-00732A

Fuel oil storage tank pipe


I support detail(b)
SUDIN

MD1-0-V-186-11-00820A

Diesel oil storage tank internal


I
ladderSUDIN
detail

MD1-0-V-186-11-00821A

Diesel oil storage tank pipe


I
support detail
SUDIN

MD1-0-V-191-01-10006A

Fuel oil pump house hoist


I general arrangement
SUDIN
drawings

MD1-0-V-191-01-10008A

Fuel oil unloading jetty jib


I crane general
SUDIN
arrangement drawings

MD1-0-V-191-01-10101A

Chlorination building hoist


I general arrangement
SUDIN
drawings

MD1-0-V-191-01-10102A

Diesel Generator HouseI Hoist General


SUDIN
Arrangement Drawings

MD1-0-V-191-01-10105A

Return Water Pump House


I
Hoist General
SUDIN
Arrangement Drawings

MD1-0-V-191-01-10106A

Compressed Air SystemI Monorail Hoist


SUDIN
General Arrangement Drawings

MD1-0-V-191-01-10107A

Water treatment building


I hoist general
SUDIN
arrangement drawings

MD1-0-V-191-01-10117A

Fire protection pump house


I
general arrangement
SUDIN
drawings

MD1-0-V-191-01-10118A

Waste water area pumpI room hoist general


SUDIN arrangement drawings

MD1-0-V-191-01-10119A

Chlorination building vaporizer


I
hoist general
SUDIN arrangement drawings

MD1-0-V-191-01-10120A

CCWC Monorail Hoist General


I
Arrangement
SUDIN Drawings

MD1-0-V-191-01-10124A

Hydrogen Seal Oil Unit IMonorail Hoist


SUDIN
General Arrangement Drawings

MD1-0-V-191-01-60001A

Foundation Information IDrawing for CW


SUDIN
Intake Screen Plant Gantry Crane

MD1-0-V-191-05-00001B

Inspection test plan for cranes


I
& hoists
SUDIN

MD1-0-V-191-05-00002A

Inspection Test Procedure


I
for Cranes
SUDIN
& Hoists

MD1-0-V-191-05-00003A

WPS & PQR for Cranes


I & Hoists

MD1-0-V-191-05-10000B

Painting specification &Iprocedure forSUDIN


crane & hoist

MD1-0-V-400-05-00221A

Inspection and Test Plan


I for CS Pipes
SUDIN
(Seamless)

MD1-0-V-400-05-00222A

Inspection test procedure


I for cs pipesSUDIN
(seamless)

MD1-0-V-400-05-00226B

Inspection and test planI for cs pipes(seam)


SUDIN

MD1-0-V-400-05-00227B

Inspection and test procedure


I
for cs pipes(seam)
SUDIN

MD1-0-V-400-05-00326B

Inspection and test planI for ss pipes(seam)


SUDIN

MD1-0-V-400-05-00327A

Inspection and test procedure


I
for ss pipes(seam)
SUDIN

MD1-0-V-400-05-00421C

Inspection and Test Plan


I for GRP Pipe
SUDIN

MD1-0-V-400-05-00423A

Approved shop test & inspection


I
report
SUDIN
for grp pipes

MD1-0-V-400-05-00528A

Inspection and test planI for carbon forged


SUDIN
fitting

MD1-0-V-400-05-00621B

Inspection and test planI for cs / ss fitting


SUDIN

MD1-0-V-400-05-00623A

ITP for CS / SS Fitting I

SUDIN

SUDIN

MD1-0-V-400-05-00626B

Marking procedure for cs


I / ss fitting SUDIN

MD1-0-V-400-05-00627A

Rust prevention procedure


I for cs / ssSUDIN
fitting

MD1-0-V-400-05-00628A

Packing procedure for cs


I / ss fitting SUDIN

MD1-0-V-400-05-00821A

Inspection & test plan for


I cs & ss flanges
SUDIN

MD1-0-V-400-05-01011B

Handling & Storage Instruction


I
for HDE
SUDIN
Piping

MD1-0-V-400-05-01012A

Instruction of Underground
I Installation
SUDIN

MD1-0-V-400-05-01013A

Heat Fusion Joining Instruction


I

SUDIN

MD1-0-V-400-05-01014A

Leak Testing InstructionI

SUDIN

MD1-0-V-400-05-01015A

Maintenance & Repair Instruction


I

SUDIN

MD1-0-V-400-05-01021A

Inspection & Test Plan I

SUDIN

MD1-0-V-400-05-01022B

Inspection & Test Procedure


I

SUDIN

MD1-0-V-400-05-01121B

Inspection and Test Plan


I for Groove SUDIN
Coupling Fitting

MD1-0-V-400-05-01151A

Inspection and Test Plan


I for Bolt & Nuts
SUDIN

MD1-0-V-400-05-01152A

Inspection and Test Procedure


I
for Bolt
SUDIN
& Nuts

MD1-0-V-400-05-01161A

Inspection and Test Plan


I for Gasket SUDIN

MD1-0-V-400-05-01221A

Inspection and Test Plan


I for Cast Valves
SUDIN

MD1-0-V-400-05-01233A

Operation & maintenance


I manual forSUDIN
cast valves

MD1-0-V-400-05-01333A

Operation & maintenance


I manual forSUDIN
forged valves

MD1-0-V-400-05-01521A

Shop inspection and test


I plan for safety
SUDIN
and relief valve

MD1-0-V-400-05-01522B

Inspection and test procedure


I
for safety
SUDIN
valve

MD1-0-V-400-05-01622A

Inspection and test procedure


I
for butterfly
SUDIN
& check valves

MD1-0-V-400-05-01721A

Inspection and test planI for non-return


SUDIN
check valves

MD1-0-V-400-05-01733A

Operation & maintenance


I manual forSUDIN
combined nrv dn2400

MD1-0-V-400-05-02122A

Inspection and test procedure


I
for strainers
SUDIN

MD1-0-V-400-05-02133A

Operation and maintenance


I
manual for
SUDIN
strainers

MD1-0-V-400-05-02221A

Inspection and test planI for traps(steam/air)


SUDIN

MD1-0-V-400-05-02222A

Inspection and test procedure


I
for traps(steam/air)
SUDIN

MD1-0-V-400-05-02233A

Operation & maintenance


I manual forSUDIN
traps(steam/air)

MD1-0-V-400-05-02321A

Inspection and Test Plan


I for Flexible SUDIN
& Expansion Joint

MD1-0-V-400-05-02333A

Operation & maintenance


I manual forSUDIN
flexible & expansion joint

MD1-0-V-400-07-00411C

Stress analysis report for


I grp pipes SUDIN

MD1-0-V-400-10-01211A

Outline drawing for manual


I
cast valves
SUDIN

MD1-0-V-400-10-01212A

Outline drawing for motor


I operated cast
SUDIN
valves

MD1-0-V-400-10-01711B

Outline drawing for combined


I
nrv dn2400
SUDIN

MD1-0-V-400-10-02111B

Outline drawing for strainers


I

MD1-0-V-400-10-02211A

Outline Drawing for Traps(steam/air)


I
SUDIN

MD1-0-V-400-25-02421A

Painting procedure at shop


I
for hanger
SUDIN
& support

MD1-0-V-400-25-02423A

Heat treatment procedure


I for hangerSUDIN
& support

MD1-0-V-400-25-02424A

Wps & pqr for hanger &I support

MD1-0-V-400-25-02425A

Inspection and test planI for hanger &SUDIN


support

MD1-0-V-400-25-02426A

Inspection and test procedure


I
for hanger
SUDIN
& support

MD1-0-V-400-25-02427A

Non destructive examination


I
procedure
SUDIN
for hanger & support

MD1-0-V-400-25-02428A

Function test procedureI for hanger &SUDIN


support

MD1-0-V-560-11-00001B

Layout & Circuit Diagrams


I for Cathodic
SUDIN
Protection System

MD1-0-V-594-02-00003A

Catalogue for Elevator(Boiler


I
& Admin.
SUDIN
Building)

MD1-0-V-594-05-00002A

Shop Test and Inspection


I Plan for Elevator
SUDIN(Boiler & Admin. Building)

MD1-0-V-594-05-00004A

Inspection & Test Procedure


I
for Elevator
SUDIN
(Boiler & Admin. Building)

MD1-0-V-594-05-00005A

Manual for Installation, Erection,


I
Operation
SUDIN& Maintenance for Elevator

MD1-0-V-594-08-00002A

Spare Part and Special ITool List for Elevator


SUDIN (Boiler & Admin. Building)

MD1-0-V-660-11-30001A

Dimensional Drawing for


I Pressure and
SUDIN
Temperature Indicator (BOP)

MD1-0-V-710-57-10002A

Inspection and test planI & inspectionSUDIN


and test procedure

MD1-0-V-710-57-20001B

Material Approval Request


I of Ventilation
SUDIN
Fans

MD1-0-V-710-57-20002A

Inspection and Test Plan


I & Inspection
SUDIN
Test Procedure of Ventilation Fans

MD1-0-V-750-01-00121C

General Arrangement Drawing


I
for FixSUDIN
Foam Unit

MD1-0-V-750-05-00137A

PROJECT QUALITY PLAN


I
FOR FIRE
SUDIN
FIGHTING

MD1-0-V-750-05-00138A

INSPECTION AND TEST


I PLAN FORSUDIN
FIRE FIGHTING

MD1-0-V-750-05-00139A

SHOP INSPECTION & ITEST PROCEDURE


SUDIN FOR FIRE FIGHTING

MD1-0-V-750-05-00140A

Field Commissioning and


I Test Procedure
SUDIN
for Clean Agent Fire Extinguishing Syste)

SUDIN

SUDIN

MD1-0-V-750-21-00065B

Clean Agent Fire Extinguishing


I
Sytem
SUDIN
for Main Control Room (Control BLDG)

MD1-0-V-750-21-00073B

Clean Agent Fire Extinguishing


I
Sytem
SUDIN
for Electronic Equip. Room (Control BLDG)

MD1-0-V-750-21-00081B

Clean Agent Fire Extinguishing


I
Sytem
SUDIN
for Control & Protection Room (SWYD Control

MD1-0-V-750-21-00089A

Clean agent fire extinguishing


I
systemSUDIN
piping & instrumentation drawing for esp

MD1-0-V-750-21-00097A

Clean agent fire extinguishing


I
systemSUDIN
piping & instrumentation drawing for esp

MD1-0-V-750-21-00105A

Clean agent fire extinguishing


I
systemSUDIN
piping & instrumentation drawing for cont

MD1-0-V-750-23-00066B

Clean Agent Fire Extinguishing


I
System
SUDIN
General Drawing for Main Control Room

MD1-0-V-750-23-00074B

Clean Agent Fire Extinguishing


I
System
SUDIN
Piping General Drawing for Electronic Room

MD1-0-V-750-23-00082B

Clean Agent Fire Exting.I Syst Piping SUDIN


General Drawing for Control & Protection Rm

MD1-0-V-750-23-00090A

Clean agent fire extinguishing


I
systemSUDIN
piping & instrumentation drawing for esp

MD1-0-V-750-23-00098A

Clean agent fire extinguishing


I
systemSUDIN
piping general arrangement drawing for es

MD1-0-V-750-23-00106A

Clean agent fire extinguishing


I
systemSUDIN
piping general arrang drawing for control

MD1-0-V-750-23-00143A

Vesda System Piping General


I
Arrangement
SUDIN Drawing

MD1-0-V-750-24-00068A

Clean agent fire extinguishing


I
systemSUDIN
piping iso metric drawing for main contro)

MD1-0-V-750-24-00076A

Clean agent fire extinguishing


I
systemSUDIN
piping iso metric drawing for electronic )

MD1-0-V-750-24-00084A

Clean agent fire extinguishing


I
systemSUDIN
piping iso metric drawing for control)

MD1-0-V-750-24-00092A

Clean agent fire extinguishing


I
systemSUDIN
piping iso metric drawing for esp controlc

MD1-0-V-750-24-00100A

Calculation sheets for clean


I
agent fireSUDIN
extinguishing system:esp control room (c

MD1-0-V-750-24-00108A

Clean agent fire extinguishing


I
systemSUDIN
piping iso metric drawing for control & eq

MD1-0-V-750-25-00067B

Clean Agent Fire Exting.I Syst Cylinder


SUDIN
Install for Main Control Room (SWYD)

MD1-0-V-750-25-00075B

Clean Agent Fire Exting.I Syst Cylinder


SUDIN
Install for Electronic Equip Room

MD1-0-V-750-25-00083B

Clean Agent Fire Exting.I Syst Cylinder


SUDIN
Install for Control & Protection room

MD1-0-V-750-25-00091A

Clean agent fire extinguishing


I
systemSUDIN
cylinder installation & pipe support deta

MD1-0-V-750-25-00099A

Clean agent fire extinguishing


I
systemSUDIN
cylinder installation & pipe support deta

MD1-0-V-750-25-00107A

Clean agent fire extinguishing


I
systemSUDIN
cylinder installation & pipe support detai

MD1-0-V-750-55-00061A

Calculation sheets for clean


I
agent fireSUDIN
extinguishing system : esp control room

MD1-0-V-750-55-00062A

Calculation sheets for clean


I
agent fireSUDIN
extinguishing system : esp control room

MD1-0-V-750-55-00063A

Calculation sheets for clean


I
agent fireSUDIN
extinguishing system : control & equip

MD1-0-V-750-55-00144A

Calculation Sheets for Vesda


I
SystemSUDIN

MD1-0-V-751-05-00016A

Inspection & test plan for


I fire water pumps
SUDIN

MD1-0-V-751-07-00401A

Mechanical Run Test Report


I
for Diesel
SUDIN
Fire Pump

MD1-0-V-751-07-00402A

Hydrostatic Test ReportI for Diesel Fire


SUDIN
Pump

MD1-0-V-751-07-00403A

Performance Test Report


I for Diesel Fire
SUDIN
Pump

MD1-0-V-751-07-00404A

Engine Test Record for IDiesel Fire Pump


SUDIN

MD1-0-V-751-07-00406A

Impeller Balance Record


I for Diesel Fire
SUDIN
Pump

MD1-0-V-751-07-00408A

NDE Test Report for Diesel


I
Fire Pump
SUDIN

MD1-0-V-751-07-00409A

Visual & Dimension Inspection


I
Report
SUDIN
for Diesel Fire Pump

MD1-0-V-751-07-00410A

Painting Inspection Report


I for DieselSUDIN
Fire Pump

MD1-0-V-751-07-00411A

Hydrostatic Test ReportI for Electric Fire


SUDIN
Pump

MD1-0-V-751-07-00412A

Performance Test Report


I for ElectricSUDIN
Fire Pump

MD1-0-V-751-07-00415A

Impeller Balance Record


I for ElectricSUDIN
Fire Pump

MD1-0-V-751-07-00417A

NDE Test Report for Electric


I
Fire Pump
SUDIN

MD1-0-V-751-07-00418A

Visual & Dimension Inspection


I
Report
SUDIN
for Electric Fire Pump

MD1-0-V-751-07-00419A

Painting Inspection Report


I
for Electric
SUDIN
Fire Pump

MD1-0-V-751-07-00420A

Hydrostatic Test ReportI for Jockey Pumps


SUDIN

MD1-0-V-751-07-00421A

Performance Test Report


I for Jockey SUDIN
Pumps

MD1-0-V-751-07-00422A

Motor Test Report for Jockey


I
PumpsSUDIN

MD1-0-V-751-07-00423A

Controller Functional Test


I Record forSUDIN
Jockey Pumps

MD1-0-V-751-07-00425A

Visual & Dimension Inspection


I
Report
SUDIN
for Jockey Pumps

MD1-0-V-751-07-00427A

NDE Test Report for Jockey


I
Pumps SUDIN

MD1-0-V-751-10-00102A

General Arrangement Drawing


I
for Diesel
SUDIN
Fire Water Pump

MD1-0-V-751-10-00107A

Fuel Tank Drawing for Diesel


I
Fire Water
SUDIN
Pump

MD1-0-V-751-10-00110A

Muffler Drawing for Diesel


I Fire WaterSUDIN
Pump

MD1-0-V-751-10-00112A

Pressure Relief Valve Drawing


I
with Waste
SUDINCone for Fire Water Pump

MD1-0-V-751-10-00202A

General Arrangement Drawing


I
for Electric
SUDIN
Fire Water Pump

MD1-0-V-751-10-00207A

Casing Relief Valve Drawing


I
for Electric
SUDIN
Fire Water Pump

MD1-0-V-751-10-00302A

General Arrangement Drawing


I
for Jockey
SUDIN
Pump

MD1-0-V-751-11-00103A

Cross Sectional Drwg &I BOM for Diesel


SUDIN
Fire Water Pump

MD1-0-V-751-11-00104A

Sound Enclosure Dwg for


I Fire WaterSUDIN
Pump

MD1-0-V-751-11-00108A

High & Lowe Fuel LevelI Switch DrwgSUDIN


for Jockey Pump

MD1-0-V-751-11-00203A

Pump Cross Sectional Drwg


I
& BOM SUDIN
for Electric Fire Water Pump

MD1-0-V-751-11-00303A

Pump Cross Sectional Drwg


I
& BOM SUDIN
for Jockey Pump

MD1-0-V-751-34-00109A

Cooling Loop Drawing for


I Diesel FireSUDIN
Water Pump

MD1-0-V-805-01-00001C

General Arrangement Drawing


I
for Water
SUDIN
Treatment (1 of 7)

MD1-0-V-805-01-00002C

General Arrangement Drawing


I
for Water
SUDIN
Treatment (2 of 7)

MD1-0-V-805-01-00003C

General Arrangement Drawing


I
for Water
SUDIN
Treatment (3 of 7)

MD1-0-V-805-01-00004C

General Arrangement Drawing


I
for Water
SUDIN
Treatment (4 of 7)

MD1-0-V-805-01-00005C

General Arrangement Drawing


I
for Water
SUDIN
Treatment (5 of 7)

MD1-0-V-805-01-00006C

General Arrangement Drawing


I
for Water
SUDIN
Treatment (6 of 7)

MD1-0-V-805-01-00007B

General Arrangement Drawing


I
for Water
SUDIN
Treatment (7 of 7)

MD1-0-V-805-02-00004B

Piping material classification


I
for wt &SUDIN
wwt system

MD1-0-V-805-05-00001A

Project Quality Assurance


I Plan

SUDIN

MD1-0-V-805-05-00002B

Inspection and Test Plan


I (ITP)

SUDIN

MD1-0-V-805-05-00003B

Inspection and test procedure


I

SUDIN

MD1-0-V-805-05-00025A

Non destructive examination(nde)


I
procedures
SUDIN

MD1-0-V-805-06-10000A

Seismic & Wind Load Calculation


I
forSUDIN
WT & WWT

MD1-0-V-805-08-00003B

Equipment list for wt & wwt


I

MD1-0-V-805-08-00011A

Travelling Trashrack Rake


I AssemblySUDIN

MD1-0-V-805-08-00015A

Lubricant list for wt & wwt


I system

MD1-0-V-805-08-00020A

Piping Line List for WT I& WWT System


SUDIN

MD1-0-V-805-08-00039A

NDE procedure for Seawater


I
Intake Facilities
SUDIN

MD1-0-V-805-08-00068B

Test Procedure (at Factory)


I
for Seawater
SUDIN
Intake Facilities

MD1-0-V-805-10-00015A

Sea Water Intake Facility


I Travelling Band
SUDIN
Screen

MD1-0-V-805-10-00016A

Sea Water Intake Facility


I Stop Log &SUDIN
Lifting Beam & Guide Ways

MD1-0-V-805-10-00019A

Sea Water Intake Facility


I Fine Bar Screen-Assembly
SUDIN

MD1-0-V-805-10-00020A

Sea Water Intake Facility


I Coarse BarSUDIN
Screen-Assembly

MD1-0-V-805-21-00001A

Piping & Instrument Diagram


I
for WT SUDIN
& WWT

MD1-0-V-805-21-00002A

Nameplate drawing for wt


I & wwt

MD1-0-V-810-10-01001A

Clarifier Assembly & Detail


I Drawing for
SUDIN
WT

MD1-0-V-810-10-01002A

Automatic Gravity FilterI Assembly & Detail


SUDINDrawing for WT

MD1-0-V-810-10-01003A

Polymer solution tank assembly


I
& detail
SUDIN
drawing for wt

MD1-0-V-810-10-01004A

Coagulant solution tankI assembly & detail


SUDINdrawing for wt

MD1-0-V-810-10-01005A

Caustic solution tank assembly


I
& detail
SUDIN
drawing for wt

MD1-0-V-810-10-01006A

Naocl dosing tank assembly


I
& detail SUDIN
drawing for wt

SUDIN

SUDIN

SUDIN

MD1-0-V-820-10-01001A

Activated Carbon Filter IAssembly & Detail


SUDINDrawing for WT

MD1-0-V-820-10-01002A

Carbon Exchanger Assembly


I
& DetailSUDIN
Drawing for WT

MD1-0-V-820-10-01003A

Defasifier & Degasified IWater Tank Assembly


SUDIN & Detail Drawing for WT

MD1-0-V-820-10-01004A

Anion Exchanger Assembly


I
& Detail SUDIN
Drawing for WT

MD1-0-V-820-10-01005A

Mixed Bed Polisher Assembly


I
& Detail
SUDIN
Drawing for WT

MD1-0-V-820-10-01006A

Acid Storage Tank Assembly


I
& DetailSUDIN
Drawing for WT

MD1-0-V-820-10-01007A

Caustic Storage Tank Assembly


I
& Detail
SUDIN
Drawing for WT

MD1-0-V-820-10-01008A

Resin Trap for Ion Exchanger


I
Assembly
SUDIN
& Detail Drawing for WT

MD1-0-V-820-10-01009A

Instrument Air ReceiverI Assembly & SUDIN


Detail Drawing for WT

MD1-0-V-820-10-01010A

Service Air Receiver Assembly


I
& Detail
SUDIN
Drawing for WT

MD1-0-V-820-10-01011A

Fume scrubber assembly


I & detail drawing
SUDINfor wt & wwt

MD1-0-V-820-10-01012A

Salt dissolving tank for anion


I
assembly
SUDIN
& detail drawing for wt

MD1-0-V-820-10-01013A

Mobile Equipment Assembly


I
& DetailSUDIN
Drawing for WT

MD1-0-V-820-10-01014A

Acid Measuring Tank for


I Cation & MBSUDIN
Ex. Assembly & Detail Drawing for WT

MD1-0-V-820-10-01015A

Caustic Measuring TankI for Anion & SUDIN


M.B Ex. Assembly & Detail Drawing for WT

MD1-0-V-830-10-01001A

Naocl dosing tank for potable


I
assembly
SUDIN
& detail drawing for wt

MD1-0-V-830-10-01002A

Activated Carbon Filter Ifor Potable Assembly


SUDIN & Detail Drawing for WT

MD1-0-V-840-10-01001A

Clarifer Assembly & Detail


I Drawing for
SUDIN
WWT

MD1-0-V-840-10-01002A

Activated Carbon Filter IAssembly & Detail


SUDINDrawing for WWT

MD1-0-V-840-10-01003A

Sludge Thickner Assembly


I
& Detail Drawing
SUDIN for WWT

MD1-0-V-840-10-01004A

Acid Sotrage Tank Assembly


I
& DetailSUDIN
Drawing for WWT

MD1-0-V-840-10-01005A

Caustic Sotrage Tank Assembly


I
& Detail
SUDIN
Drawing for WWT

MD1-0-V-840-10-01006A

Acid Measuring Tank Assembly


I
& Detail
SUDIN
Drawing for WWT

MD1-0-V-840-10-01007A

Caustic Dilution Tank Assembly


I
& Detail
SUDIN
Drawing for WWT

MD1-0-V-840-10-01008A

Caustic Measuring TankI Assembly &SUDIN


Detail Drawing for WWT

MD1-0-V-840-10-01009A

Caustic Dilution Tank Assembly


I
& Detail
SUDIN
Drawing for WWT

MD1-0-V-840-10-01010A

Polymer solution tank assembly


I
& detail
SUDIN
drawing for wwt

MD1-0-V-840-10-01011A

Coagulant solution tankI assembly & detail


SUDINdrawing for wwt

MD1-0-V-840-10-01012A

Pressure Filter Assembly


I & Detail Drawing
SUDINfor WWT

MD1-0-V-840-10-01013A

Walkway assembly & detail


I
drawing for
SUDIN
wwt

MD1-0-V-850-01-00001A

General Arrangement for


I Chemical Dosing
SUDINSystem

MD1-0-V-850-02-00001B

Piping Material Specification


I
for Boiler
SUDIN
Chemical Dosing System

MD1-0-V-850-02-00002A

Painting specification and


I procedure SUDIN
for boiler chemical dosing system

MD1-0-V-850-05-00002A

Inspection Test Report for


I Boiler Chemical
SUDINDosing System

MD1-0-V-850-05-00006A

Non-Destructive Examination(NDE)
I
Procedures
SUDIN
for Boiler Chemical Dosing System

MD1-0-V-850-08-00003A

Equipment List for Boiler


I Chemical Dosing
SUDINSystem

MD1-0-V-850-08-00017A

Pipe Line List for Boiler IChemical Dosing


SUDIN
System

MD1-0-V-850-21-00001B

Piping and Instrument Diagram


I
Chemical
SUDIN
Dosing System

MD1-0-V-860-01-00005C

General Arrangement for


I Gaseous Chlorination
SUDIN
System

MD1-0-V-860-01-00006A

Piping Arrangement Drawing


I
for Gaseous
SUDIN
Chlorination System

MD1-0-V-860-02-00002A

Weld Procedures Spec.(WPS)&


I
Qualification
SUDIN Records(QPR) Gaseous Chlorinations Sys

MD1-0-V-860-05-00011A

Non-Destructive Examination
I
(NDE) SUDIN
Procedures Gasous Chlorination

MD1-0-V-860-05-00012A

Project Quality Assurance


I Plan for Gaseous
SUDIN Chlorination System

MD1-0-V-860-05-00013A

Inspection and Test Plan(ITP)


I
for Gaseous
SUDINChlorination System

MD1-0-V-860-05-00014A

Inspection and Test Procedure


I
for Gaseous
SUDIN Chlorination System

MD1-0-V-860-05-00020A

Painting Specification and


I ProcedureSUDIN
for Gaseous Chlorination System

MD1-0-V-860-08-00003A

Equipment List for Gaseous


I
Chlorination
SUDIN
System

MD1-0-V-860-08-00017B

Control Valve List for Gaseous


I
Chlorination
SUDIN System

MD1-0-V-860-08-00022A

Lubricanting List for Gaseous


I
Chlorination
SUDINSystem

MD1-0-V-860-08-00023A

Valve List for Gaseous IChlorination System


SUDIN

MD1-0-V-870-02-00004A

Piping material classification


I
for sewage
SUDIN
treatment system

MD1-0-V-870-05-00007A

Project Quality Assurance


I Plan for Sewage
SUDINTreatment System

MD1-0-V-870-05-00008A

Inspection and Test Plan


I for SewageSUDIN
Treatment System

MD1-0-V-870-08-00003A

Equipment list for sewage


I treatment system
SUDIN

MD1-0-V-870-08-00015A

Utility and Chemical Consumption


I
List
SUDIN
for Sewage Treatment System

MD1-0-V-870-11-00003A

Equipment sizing detailsI for sewage treatment


SUDIN system

MD1-0-V-870-21-00001A

P&i diagram for sewageI treatment system


SUDIN

MD1-1-P-122-24-00011A

Piping Isometric Drawing


I - Valve Sealing
SUDIN
Water System (Unit #1)

MD1-1-P-131-24-00011B

Piping Isometric DrawingI Aux. Cooling


SUDIN
Water System (Unit #1)

MD1-1-P-141-24-00001B

Piping Isometric DrawingI Closed Cooling


SUDIN
Water System (Unit #1)

MD1-1-P-412-23-00001A

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Electrostatic Precipitator #1A Ara

MD1-1-P-412-23-00002A

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Electrostatic Precipitator #1B Ara

MD1-1-P-841-24-00001A

Piping Isometric Drawing


I - Waste Water
SUDIN
System (Unit #1)

MD1-1-P-851-24-00001A

Piping Isometric Drawing


I - Chemical SUDIN
Dosing System (Unit #1)

MD1-2-P-122-24-00011A

Piping Isometric Drawing


I - Valve Sealing
SUDIN
Water System (Unit #2)

MD1-2-P-131-24-00011B

Piping Isometric DrawingI Aux. Cooling


SUDIN
Water System (Unit #2)

MD1-2-P-141-24-00001B

Piping Isometric DrawingI Closed Cooling


SUDIN
Water System (Unit #2)

MD1-2-P-412-23-00001A

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Electrostatic Precipitator #2A Ara

MD1-2-P-412-23-00002A

Pipe Arrangement & Support


I
Location
SUDIN
Drawing - Electrostatic Precipitator #2B Ara

MD1-2-P-841-24-00001A

Piping Isometric Drawing


I - Waste Water
SUDIN
System (Unit #2)

MD1-2-P-851-24-00001A

Piping Isometric Drawing


I - Chemical SUDIN
Dosing System (Unit #2)

MD1-V-171-08-00005 A

Conveyor Belt ScheduleI for Coal handling


SUDIN
System

MD1-V-850-11-00002 A

Name Plate Drawing and


I List of all Equipment
SUDIN in KKS Sys for Chemical Dosing Sys

MD1-V-850-23-00001 A

Pipimg Arrangement Drawings


I
Chemical
SUDIN
Dosing System

MD1-0-F-750-23-00107A

Fire Fighting Piping Plan for Boiler Unit 1A, 1B & 2B - 1

AC

SUDIN

MD1-0-F-750-23-00108A

Fire Fighting Piping Plan for Boiler Unit 1A, 1B & 2B - 2

AC

SUDIN

MD1-0-F-750-23-00109A

Fire Fighting Piping Plan for Boiler Unit 1A, 1B & 2B - 3

AC

SUDIN

MD1-0-F-750-23-00110A

Fire Fighting Piping Plan for Boiler Unit 1A, 1B & 2B - 4

AC

SUDIN

MD1-0-F-750-23-00111A

Fire Fighting Piping Plan for Boiler Unit 2A - 1

AC

SUDIN

MD1-0-F-750-23-00112A

Fire Fighting Piping Plan for Boiler Unit 2A - 2

AC

SUDIN

MD1-0-F-750-23-00113A

Fire Fighting Piping Plan for Boiler Unit 2A - 3

AC

SUDIN

MD1-0-F-750-23-00114A

Fire Fighting Piping Plan for Boiler Unit 2A - 4

AC

SUDIN

MD1-0-F-750-23-00196A

Standard Detail-1

AC

SUDIN

MD1-0-F-750-23-00197A

Standard Detail-2

AC

SUDIN

MD1-0-M-160-21-00013
A

P & I Diagram- Heavy Fuel Oil Supply System (2/2)

AC

SUDIN

MD1-0-T-030-05-00458A

ITP for Bulk Handling system

AC

SUDIN

MD1-0-T-053-07-00231D

Material Approval Request for Steel Structure Paint (International Paint Korea)

AC

BINH

MD1-0-T-053-07-00253B

Material Approval Request for Bolt

AC

BINH

MD1-0-T-053-07-00282B

Material Approval Request for PEB Cold Formed Sections (Kirby)

AC

BINH

MD1-0-T-057-07-00153C

Material Approval Request for U-PVC (BINH MINH)

AC

BINH

MD1-0-T-057-07-00236C

Material Approval Request for SR Joint (HVAC, Seowon)

AC

BINH

MD1-0-T-057-07-00274B

Material Approval Request for Galvanized Steel Sheet (POSCO)

AC

BINH

MD1-0-T-057-07-00293B

Material Approval Request for Insulation (KCC)

AC

BINH

MD1-0-V-132-03-00009A

Sea water intake facility - system description

AC

SUDIN

MD1-0-V-135-09-00022B

Technical data sheet for df

AC

SUDIN

MD1-0-V-142-09-00004A

Pump data sheet & performance curve for service water pump

AC

SUDIN

MD1-0-V-142-09-10004A

Pump data sheet & performance curve for closed cooling water pump

AC

SUDIN

MD1-0-V-142-09-20004A

Pump data sheet & performance curve for demi. water transfer pump

AC

SUDIN

MD1-0-V-142-09-30004A

Pump data sheet & performance curve for condensate make-up pump

AC

SUDIN

MD1-0-V-142-09-40004A

Pump data sheet & performance curve for auxiliary cooling water booster pump

AC

SUDIN

MD1-0-V-142-09-50004A

Pump data sheet & performance curve for steam coil air heater drain pump

AC

SUDIN

MD1-0-V-142-09-60004A

Pump data sheet & performance curve for diesel oil drain pump

AC

SUDIN

MD1-0-V-142-09-70004A

Pump data sheet & performance curve for boiler initial filling & warm-up recircp

AC

SUDIN

MD1-0-V-142-09-80004A

Pump data sheet & performance curve for dirty oil transfer pump

AC

SUDIN

MD1-0-V-142-09-90004A

Pump data sheet & performance curve for dirty oil drain pump

AC

SUDIN

MD1-0-V-153-02-00001A

Valve Specification for Service Gas System

AC

SUDIN

MD1-0-V-153-02-00002A

Cylinder specification for service gas system

AC

SUDIN

MD1-0-V-153-09-00001A

Technical bid data for service gas system

AC

SUDIN

MD1-0-V-167-09-00001A

Equipment data sheet for fo pump

AC

SUDIN

MD1-0-V-171-01-00071A

General arrangement and data sheet of belt scale for chs

AC

SUDIN

MD1-0-V-172-01-00133A

General Arrangement for Grab Bucket Type Barge Unloader

AC

SUDIN

MD1-0-V-172-02-00133A

Technical Specification for Grab Bucket Type Barge Unloader

AC

SUDIN

MD1-0-V-172-04-00031A

Design basis report for service water ,service air & instrument air system

AC

SUDIN

MD1-0-V-172-21-00021A

P & ID Diagram for De System for Lime Handing System

AC

SUDIN

MD1-0-V-172-21-00031A

P & ID Diagram for Service Water, Service Air & Instrument Air System

AC

SUDIN

MD1-0-V-173-03-00281B

Design Basic Report & System Description

AC

SUDIN

MD1-0-V-400-09-01212A

Data Sheet for Power Assisted Non Return Valves

AC

SUDIN

MD1-0-V-750-09-00019B

Equipment Data Sheet: Deluge Valve

AC

SUDIN

MD1-0-V-750-09-00024A

Equipment Data Sheet: Flexible Sprinkler Hose

AC

SUDIN

MD1-0-V-751-05-00017A

Hydrostatic test procedure for fire water pumps

AC

SUDIN

MD1-0-V-805-09-01002B

Diaphragm pump & motor data sheet for wt & wwt system

AC

SUDIN

MD1-0-V-805-09-01003B

Agitator with motor data sheet for wt & wwt system

AC

SUDIN

MD1-0-V-805-09-01004B

Blower with motor data sheet for wt & wwt system

AC

SUDIN

MD1-0-V-805-09-01005B

Heater exchanger data sheet for wt system

AC

SUDIN

MD1-0-V-805-09-01006B

Line mixer data sheet for wt & wwt system

AC

SUDIN

MD1-0-V-805-09-01007B

Safety shower & eye washer data sheet for wt & wwt system

AC

SUDIN

MD1-0-V-805-09-01008B

Pipe oil skimmer for api & cpi for wwt system

AC

SUDIN

MD1-0-V-805-09-01009A

Booster pump with motor data sheet for wt system

AC

SUDIN

MD1-0-V-805-21-00006A

Sea Water Intake Facility P&ID

AC

SUDIN

MD1-0-D-208-01-00201A

Plumbing Plan for Ash IC


Slurry Pump House
SUDIN

MD1-0-F-750-23-00163

MD1-0-D-208-01-00301A

Enlarged Plumbing Plan


ICfor Ash Slurry
SUDIN
Pump House

MD1-0-F-750-23-00164

MD1-0-P-440-23-00001B

Pipe arrangement & support


IC
locationSUDIN
drawing - water treatment areaMD1-0-F-750-23-00165
(1/2)

MD1-0-P-440-23-00002B

Pipe arrangement & support


IC
locationSUDIN
drawing - water treatment areaMD1-0-F-750-23-00166
(2/2)

MD1-0-T-053-05-00146B

Method Statement for Steel


IC StructureBINH
Packing (DAEJOO)

MD1-0-F-750-23-00167

MD1-0-T-053-05-00185A

Method statement for coal


IC handling system
SUDIN

MD1-0-F-750-23-00168

MD1-0-T-053-05-00256B

Method Statement for Steel


IC StructureSUDIN
Galvanizing (DAEJOO)

MD1-0-M-140-21-00011

MD1-0-T-054-05-00434A

painting packing and transportation


IC
ofSUDIN
pipe spool

MD1-0-T-052-07-00257

MD1-0-V-131-05-00005A

Site Installtion Procedure


IC

MD1-0-T-053-07-00265

MD1-0-V-131-07-00005A

Circulating Water Pumphouse


IC
Hydraulic
SUDIN
Model Test Report

MD1-0-T-053-07-00281

MD1-0-V-131-08-00029A

Packing Procedure

SUDIN

MD1-0-T-053-07-00284

MD1-0-V-131-10-00009A

Site Erection and Installtion


IC Drawing SUDIN

MD1-0-T-057-07-00235

MD1-0-V-133-08-00035A

Spare Parts List (2Years)


IC

MD1-0-T-057-07-00239

MD1-0-V-141-08-00009A

Erection & Commissioning


IC Spare Parts,
SUDIN
Auto Filter

MD1-0-T-057-07-00299

MD1-0-V-142-01-50001A

General arrangement drawing


IC
for steam
SUDIN
coil air heater drain pump MD1-0-T-057-07-00317

MD1-0-V-142-05-00003A

Quality manual

MD1-0-T-057-07-00319

MD1-0-V-142-06-50001A

Calculation Sheet for Steam


IC
Coil Air SUDIN
Heater Drain Pump

MD1-0-T-057-07-00322

MD1-0-V-151-01-00006A

Air Compressor- General


IC Arangement
SUDIN
Drawing

MD1-0-V-131-03-00001

MD1-0-V-151-21-00008B

Air Compressor- Overall


ICP&I DiagramSUDIN

MD1-0-V-133-03-00004

MD1-0-V-151-21-00009B

Air Compressor- P&ID IC


For Air Compressor
SUDIN

MD1-0-V-171-08-00102

MD1-0-V-151-21-00010B

Air Compressor- P&ID IC


For Air Dryer SUDIN

MD1-0-V-172-08-00102

MD1-0-V-153-01-00001B

General Arrangement DWG


IC
for N2 Supply
SUDINSystem

MD1-0-V-182-09-00002

MD1-0-V-153-05-00004A

Test and inspection procedure


IC
for service
SUDIN
gas system

MD1-0-V-191-09-10001

MD1-0-V-153-10-00001A

Assembly DRWG for N2


ICSupply System
SUDIN

MD1-0-V-805-09-01001

MD1-0-V-153-10-00002A

Assembly DRWG for N2


ICSupply System
SUDIN

MD1-0-V-153-10-00003A

Assembly DRWG for N2


ICSupply System
SUDIN

MD1-0-V-153-21-00001A

Others (P&ID For N2 Supply


IC
System)SUDIN

MD1-0-V-161-01-19185A

Equipment Maintenance
ICMonorail

SUDIN

MD1-0-V-161-06-01104A

Calculation Report- Tripper


IC Bridge

SUDIN

MD1-0-V-171-01-00011D

General Arrangement of
ICTransfer Tower
SUDIN
No.TT-01 for CHS

MD1-0-V-171-01-00025B

Mechanical General Arrangement


IC
of SUDIN
Belt Conveyor BC-06A/B for CHS

MD1-0-V-171-01-00026B

Mechanical General Arrangement


IC
of SUDIN
Belt Conveyor BC-08 for CHS

MD1-0-V-171-01-00027B

Mechanical General Arrangement


IC
of SUDIN
Belt Conveyor BC-09 for CHS

MD1-0-V-171-01-00028C

Mechanical General Arrangement


IC
of SUDIN
Belt Conveyor BC-10 for CHS

MD1-0-V-171-01-00029B

Mechanical General Arrangement


IC
of SUDIN
Belt Conveyor BC-11 for CHS

MD1-0-V-171-01-00072A

General arrangement ofICmetal detector


SUDIN
for chs

MD1-0-V-171-01-00075A

General Arrangement and


IC Data Sheet
SUDIN
of Coal Sampling Unit for Coal Handling Systm

MD1-0-V-171-01-00084A

General Arrangement of
ICGear Box forSUDIN
Coal Handling System

MD1-0-V-171-04-00001A

Design basis report dust


ICsupression,service
SUDIN water & service air system

MD1-0-V-171-05-02044A

Start-up & Shut-down Procedure


IC
for CHS
SUDIN

MD1-0-V-171-05-40001A

Wps / pqr(steel structure)


IC

SUDIN

MD1-0-V-171-05-40003A

Quality Assurance PlanIC

SUDIN

MD1-0-V-171-05-40010A

INSPECTION AND TEST


IC PLAN FORSUDIN
IDLERS

MD1-0-V-171-05-40011A

INSPECTION AND TEST


IC PLAN FORSUDIN
CONVEYOR PULLEY ASSEMBLY

MD1-0-V-171-05-40012A

INSPECTION AND TEST


IC PLAN FORSUDIN
TECHNOLOGICAL STRUCTURES

MD1-0-V-171-05-40013A

INSPECTION AND TEST


IC PLAN FORSUDIN
DISCHAGE CHUTES

MD1-0-V-171-05-40017A

Itp for reversible hammer


IC mill crusherSUDIN

IC

IC

SUDIN

SUDIN

SUDIN

MD1-0-V-171-05-40019A

Itp for liner motion screen


IC

SUDIN

MD1-0-V-171-05-40022A

Itp for non-slewing travelling


IC
luffing stacker
SUDIN

MD1-0-V-171-05-40023A

Itp for bridge type relaimer


IC

MD1-0-V-171-21-00001A

P & id for dust suppression,


IC service water
SUDIN
& service air system for chs(dust su)

MD1-0-V-171-21-00011A

P & id for de system forICcoal handlingSUDIN


system(for tt-01)

MD1-0-V-171-57-00001A

Operation and Control Philosophy


IC
of SUDIN
Dust Suppression System for Coal Handling Sm

MD1-0-V-172-01-00101A

Ga and Stack-up Drawing


IC for Limestone
SUDIN
Handling System Below Limestone Silo

MD1-0-V-172-01-00102B

Ga and Piping Layout for


IC Pneumatic SUDIN
Limestone Handling System

MD1-0-V-172-01-00124A

General arrangement and


IC data sheetSUDIN
of rod mill for lhs

MD1-0-V-172-01-00128A

General Arrangement of
ICGear Box forSUDIN
LHS

MD1-0-V-172-05-02046A

Start-up & Shut-down Procedure


IC
for Limestone
SUDIN
Handling System

MD1-0-V-172-05-40001A

Wps / pqr(steel structure)


IC

SUDIN

MD1-0-V-172-05-40003A

Quality Assurance PlanIC

SUDIN

MD1-0-V-172-05-40010A

INSPECTION AND TEST


IC PLAN FORSUDIN
IDLERS

MD1-0-V-172-06-00012A

Power and Tension Calculation


IC
For Belt
SUDIN
Conveyor No. L-06A/B

MD1-0-V-172-21-02101A

P & i diagram for limestone


IC handling SUDIN
system

MD1-0-V-173-01-00030B

Layout of Dry Flight Conveyor


IC
below SUDIN
Bottom Ash Cooler Area (Unit #1 & Unit #2)

MD1-0-V-173-01-00034A

Ga of return water pump


ICarrangement
SUDIN

MD1-0-V-173-01-00043A

GA of Vacuum Pump(for
IC Unit #1)

SUDIN

MD1-0-V-173-01-00044A

GA of FA Conveying Blower
IC

SUDIN

MD1-0-V-173-01-00045A

GA of Buffer Hopper Fluidizing


IC
Blower
SUDIN
For Unit #1

MD1-0-V-173-01-00056A

Ash slurry piping from silo


IC to ash slurry
SUDIN
sump

MD1-0-V-173-01-00057A

Layout of ash disposal IC


& return waterSUDIN
piping

MD1-0-V-173-01-02531A

Ash slurry pump houseIC


electrical equipment
SUDIN layout

MD1-0-V-173-05-40001A

Wps / pqr(steel structure)


IC

SUDIN

MD1-0-V-173-05-40003A

Quality Assurance PlanIC

SUDIN

MD1-0-V-173-10-00089B

GA of Pressure Vacuum
ICRelief ValveSUDIN

MD1-0-V-173-21-00006B

P&ID- Bottom Ash Handling


IC
System SUDIN
for Boiler 1A & 2B

MD1-0-V-173-21-00007B

P&ID- Bottom Ash Handling


IC
System SUDIN
for Boiler 1B & 2A

MD1-0-V-173-21-00011B

P&ID- Fly Ash System-IC


Vacuum Blower
SUDIN

MD1-0-V-173-21-00017B

P&ID-Fly Ash System- IC


Conveying Blower
SUDIN

MD1-0-V-173-22-00002B

Single Line Flow DiagramIC Bottom Ash


SUDIN
Handling System

MD1-0-V-173-22-00003B

Single Line Flow DiagramIC ECO. APH


SUDIN
and Fly Handling System

MD1-0-V-173-22-00004B

Single Line Flow DiagramIC Water andSUDIN


Slurry System

MD1-0-V-182-10-11001A

Remote radiator outlineICdrawing for emergency


SUDIN
diesel generator

MD1-0-V-182-21-12001A

Symbol & Legend P&IDICfor Emergency


SUDIN
Diesel Generator

MD1-0-V-182-21-12002A

Cooling Water System IC


P&ID for Emergency
SUDIN Diesel Generator

MD1-0-V-182-21-12003A

Diesel Oil System P&IDICfor Emergency


SUDIN
Diesel Generator

MD1-0-V-182-21-12004A

Lube Oil System P&ID IC


for EmergencySUDIN
Diesel Generator

MD1-0-V-182-21-12005A

Exhaust Gas System P&ID


IC for Emergency
SUDINDiesel Generator

MD1-0-V-182-21-12006A

Air System P&ID for Emergency


IC
Diesel
SUDIN
Generator

MD1-0-V-182-21-12007A

Motor Driven Air Compressor


IC
P&ID for
SUDIN
Emergency Diesel Generator

MD1-0-V-182-21-12008A

Engine Driven Air Compressor


IC
P&ID SUDIN
for Emergency Diesel Generator

MD1-0-V-183-05-00006A

Inspection and Test Procedure


IC
for GSP(Vertical
SUDIN
and Submersible)

SUDIN

MD1-0-V-183-05-00008A

Painting Procedure forIC


GSP(VerticalSUDIN
and Submersible)

MD1-0-V-185-10-10001A

Closed cooling water head


IC tank general
SUDIN
assembly

MD1-0-V-185-10-20001A

Closed cooling water chemical


IC
injection
SUDIN
cylinder general assembly

MD1-0-V-185-10-30001A

Start-up flash tank general


IC assemblySUDIN

MD1-0-V-185-10-40001A

Condensate return tankICgeneral assembly


SUDIN

MD1-0-V-185-10-80001A

Dirty oil tank general assembly


IC

MD1-0-V-185-10-90001A

Steam coil air heater drain


IC tank general
SUDIN
assembly

MD1-0-V-186-11-00729A

Fuel oil storage tank insulation


IC
detail SUDIN

MD1-0-V-191-01-10002A

Cw pump house eot crane


IC general arrangement
SUDIN
drawings

MD1-0-V-191-01-10108A

Pa fan rotor hoist general


IC arrangement
SUDIN
drawings

MD1-0-V-191-01-10109A

Pa fan motor hoist general


IC arrangement
SUDIN
drawings

MD1-0-V-191-01-10110A

Sa fan rotor hoist general


IC arrangement
SUDIN
drawings

MD1-0-V-191-01-10111A

Sa fan motor hoist general


IC arrangement
SUDIN
drawings

MD1-0-V-191-01-10112A

Aph basket hoist general


IC arrangement
SUDIN
drawings

MD1-0-V-191-01-10113A

Boiler area hoist general


ICarrangement
SUDIN
drawings

MD1-0-V-191-01-10114A

Stripper cooler hoist general


IC
arrangement
SUDIN
drawings

MD1-0-V-191-01-10115A

Loopseal blower hoist general


IC
arrangement
SUDIN drawings

MD1-0-V-191-01-10116A

Stripper cooler blower hoist


IC general arrangement
SUDIN
drawings

MD1-0-V-191-05-40000A

Packing Procedure for IC


Crane & HoistSUDIN

MD1-0-V-400-05-00624A

Pmi procedure for cs / ss


IC fitting

SUDIN

MD1-0-V-400-05-00625A

Wps & pqr for cs / ss fitting


IC

SUDIN

MD1-0-V-400-05-01222A

Inspection and test procedure


IC
for castSUDIN
valves (manual & auto)

MD1-0-V-400-05-01322A

Inspection and test procedure


IC
for forged
SUDIN
valves (manual & auto)

MD1-0-V-400-05-01722A

Inspection and Test Procedure


IC
for Combined
SUDIN NRV

MD1-0-V-400-10-01213A

Outline Drawing for Power


IC Assisted Non
SUDIN
Return Valves

MD1-0-V-400-25-02422A

Material handling & packing


IC procedure
SUDIN
for hanger & support

MD1-0-V-750-05-00401A

Operation and Maintenance


IC Manual for
SUDIN
Fire Protection System

MD1-0-V-750-08-00005A

Sub-Vendor List

IC

SUDIN

MD1-0-V-750-12-00004A

Bill of materials

IC

SUDIN

MD1-0-V-751-07-00426A

Painting Inspection Report


IC for JockeySUDIN
Pumps

MD1-0-V-805-05-00005A

Method Statement for WT


IC & WWT System
SUDINInstallation Work

MD1-0-V-805-08-00038A

Quality Inspection and Test


IC Plan for Seawater
SUDIN Intake Facilities

MD1-0-V-805-08-00069A

Control Procedure (at Factory)


IC
for Seawater
SUDIN Intake Facilities

MD1-0-V-850-05-00005A

Weld procedures specification(wps)


IC
and
SUDIN
qualification records(pqr) for all tank

MD1-0-V-850-05-00007A

Inspection and test plan(itp)


IC for boilerSUDIN
chemical dosing system

MD1-0-V-850-05-00008A

Inspection and test procedure


IC
for boiler
SUDIN
chemical dosing system

MD1-0-V-870-01-00005A

General arrangement for


IC sewage treatment
SUDIN system

MD1-0-V-870-05-00009A

Inspection and Test Procedure


IC
for Sewage
SUDINTreatment System

SUDIN

Fire Fighting Piping Plan


RTfor Coal Receiving
SUDIN Tower TT-01
Fire Fighting Piping Plan
RTfor Coal Transfer
SUDINTower TT-02
Fire Fighting Piping Plan
RTfor Coal Transfer
SUDINTower TT-03
Fire Fighting Piping Plan
RTfor Coal Transfer
SUDINTower TT-04
Fire Fighting Piping Plan
RTfor Coal Crusher
SUDIN
Tower TT-05
Fire Fighting Piping Plan
RTfor Coal Transfer
SUDINTower TT-06
P & I Diagram- ClosedRT
Cooling WaterSUDIN
System(1/4)
Material Approval Request
RT for Paint (KCC)
BINH
Material Approval Request
RT for PEB Paint
BINH
Material Approval Request
RT for PEB Steel
BINHPlate (Kirby)
Material Approval Request
RT for PEB Circular
BINH Hollow Section (Kirby)
Material Approval Request
RT for Duct Fiture
BINH(HVAC, Samkwang)
Material Approval Request
RT for Pipe Fitting
SUDIN
(HVAC, Hanwool)
Material Approval Request
RT for HVAC BINH
Valve (HS VALVE)
Material Approval Request
RT for HVACSUDIN
Butterfly Valve (Jeong Do)
Material Approval Request
RT for U-PVCBINH
(Tien Phong)
Material Approval Request
RT for FlexibleBINH
Duct Hose (DAEHAN F&S)
System Design and Operational
RT
Description
SUDIN
Water Box Vacuum Pump
RT System Description
SUDIN
Master Spare Parts ListRT
for Coal Handling
SUDIN
System
Master Spare Parts ListRT
for Limestone
SUDIN
Handling System
Teachnical Data and Specification
RT
forSUDIN
emergency diesel Generator
Technical Data Sheet for
RTCranes & Hoists
SUDIN
Centrifugal pump & motor
RT data sheetSUDIN
for wt & wwt

DISCIPLINE = MTBN, Mechanical Turbine


revision

status

MD1-0-M-110-03-00002

System Discription- Turbine Bypass System

MD1-0-M-110-21-00021

P & I Diagram- Turbine Bypass System (1/2)

MD1-0-M-110-21-00022

P & I Diagram - Turbine Bypass System (2/2)

MD1-0-M-110-21-00051

P & I Diagram- Aux. Steam System (1/2)

MD1-0-M-110-21-00052

P & I Diagram- Aux. Steam System (2/2)

MD1-0-P-420-01-00001

General Arrangement Drawing-Steam Turbine Building Plan Section (A-A)

MD1-0-P-420-01-00011

General Arrangement Drawing-Steam Turbine Building Plan Section (B-B)

MD1-0-T-030-05-00397

ITP for Steam Turbine-Generator Installation

AC

MD1-0-T-053-05-00451

Method Statement for Condenser Lifting

IC

MD1-0-V-111-01-00001

Steam Turbine Mechanical Outline (1/2)

MD1-0-V-111-01-00002

Steam Turbine Mechanical Outline (2/2)

MD1-0-V-111-01-00003

Arrangement of Steam Pipes & Valves

IC

MD1-0-V-111-01-00012

Inspection and Test Plan for Turbine

MD1-0-V-111-01-00014

Major Turbine Components Lift & Laydown (1/2)

MD1-0-V-111-01-00015

Major Turbine Components Lift & Laydown (2/2)

MD1-0-V-111-01-00018

Piping arrangement of lube oil system (1/4)

IC

MD1-0-V-111-01-00019

Piping arrangement of lube oil system (2/4)

IC

MD1-0-V-111-01-00020

Piping arrangement of lube oil system (3/4)

IC

MD1-0-V-111-01-00021

Piping arrangement of lube oil system (4/4)

IC

MD1-0-V-111-01-00022

Steam Turbine & Generator Anchor Bolt Plan

MD1-0-V-111-01-00023

Arrangement of Grout Pads & Foundation Plates for Steam Turbine (1/2)

MD1-0-V-111-01-00024

Arrangement of Grout Pads & Foundation Plates for Steam Turbine (2/2)

MD1-0-V-111-01-00025

Turbine Conduit Location

MD1-0-V-111-01-00034

Steam Turbine Foundation Interface (1/3)

MD1-0-V-111-01-00035

Steam Turbine Foundation Interface (2/3)

MD1-0-V-111-01-00036

Steam Turbine Foundation Interface (3/3)

MD1-0-V-111-01-00037

Arrangement- Turbine Lagging Support

MD1-0-V-111-01-00045

Piping arrangement of generator end shield(turbine end)

IC

MD1-0-V-111-01-00046

Piping arrangement of generator end shield(collector end)

IC

MD1-0-V-111-01-00047

Guidance for Maintenance Disassembly Area of Unit 1 Steam Turbine and Generator)

RJ

MD1-0-V-111-01-00048

Guidance for Maintenance Disassembly Area of Unit 2 Steam Turbine and Generator)

RJ

MD1-0-V-111-01-00230

Turbine Air Piping (1/2)

MD1-0-V-111-01-00231

Turbine Air Piping (2/2)

MD1-0-V-111-01-00400

Generator Mechanical Outline (1/2)

MD1-0-V-111-01-00401

Generator Mechanical Outline (2/2)

MD1-0-V-111-01-00402

Arrange of Grout Pads & FDN Plates For Gen.

MD1-0-V-111-01-00403

Suggested Side Thrust Support For Foundation Plate and Location of Jacking Posts

MD1-0-V-111-01-00404

Stator Lifting Arrangement

IC

MD1-0-V-111-01-00405

Generator & Exciter Lagging Supports

MD1-0-V-111-01-00406

Stator Frame Feet and Hardware (1/2)

MD1-0-V-111-01-00407

Stator Frame Feet and Hardware (2/2)

MD1-0-V-111-01-00414

Generator Foundation Interface (1/2)

MD1-0-V-111-01-00415

Generator Foundation Interface (2/2)

MD1-0-V-111-01-00419

Piping Connections Generator (1of2)

MD1-0-V-111-01-00420

Piping Connections Generator (2of2)

MD1-0-V-111-03-00001

System Description of Steam Turbine and Generator

MD1-0-V-111-03-00400

System Description of Stator Winding Liquid Cooling System

AC

MD1-0-V-111-03-00401

System Description of Generator Shaft Seal System

AC

MD1-0-V-111-03-00402

System Description of Gas Control System

AC

MD1-0-V-111-05-00001

Turbine Startup and Shutdown Curves

RT

MD1-0-V-111-05-00002

Lube Oil Flushing Schmatic & Connection

IC

MD1-0-V-111-05-00003

Turbine Startup and Shutdown Procedure

MD1-0-V-111-05-00004

Method Statement for Steam Turbine Installation Work

MD1-0-V-111-05-00010

Quality Assurance Program and Procedure Manual

MD1-0-V-111-05-00016

Packing Prodcedure

MD1-0-V-111-05-00017

Long Term Storage Instruction for Steam Turbine & Auxiliary System

IC

MD1-0-V-111-05-00022

Specification of ASME PTC 6 Flow Section

AC

MD1-0-V-111-05-00031

Hydrostatic Test Procedure for Turbine HIP Casing

IC

MD1-0-V-111-05-00032

Leak Test Procedure for Turbine LP Casing

MD1-0-V-111-05-00033

Pressure Test Procedure for Turbine HIP Casing

MD1-0-V-111-05-00034

Over Speed & Balancing Test Procedure for Turbine HIP & LP Rotor

MD1-0-V-111-05-00035

Function test procedure for hydraulic power unit

IC

MD1-0-V-111-05-00100

Welding Procedure For Generator Stator Frame

MD1-0-V-111-05-00150

WPS/PQR for Turbine LP Casing

MD1-0-V-111-05-00151

Qualified welder table for turbine lp inner casing

MD1-0-V-111-05-00152

Post Weld Heat Treatment Procedure for Turbine LP Casing

IC

MD1-0-V-111-05-00153

WPS & PQR for Turbine LP Inner Casing

MD1-0-V-111-05-00154

Qualified welder table for turbine lp inner casing

MD1-0-V-111-05-00155

Post weld heat treatment procedure for turbine lp inner casing

IC

MD1-0-V-111-05-00156

WPS & PQR for Turbine & Generator Piping(MSP, LOP, GSP)

IC

MD1-0-V-111-05-00158

Qualified Welder Table for Turbine & Generator Piping

MD1-0-V-111-05-00159

WPS & PQR for Crossover Pipe

MD1-0-V-111-05-00160

Post Weld Heat Treatment Procedure for Crossover Pipe

IC

MD1-0-V-111-05-00161

WPS & PQR for Lube Oil Tank

MD1-0-V-111-05-00162

WPS & PQR for Lagging

MD1-0-V-111-05-00163

WPS & PQR for Seal Oil System

MD1-0-V-111-06-00001

Performance Test Steam Seal Flow Calculations

MD1-0-V-111-06-00002

Steam Turbine Overspeed Calculation

IC

MD1-0-V-111-07-00001

Rotor Dynamics Report

MD1-0-V-111-07-00002

Campbell Diagram of Blades

MD1-0-V-111-08-00002

Line list of steam turbine

IC

MD1-0-V-111-08-00006

Equipment List for Steam Turbine & Generator

IC

MD1-0-V-111-08-00007

Electrical Load List for Steam Turbine & Generator

MD1-0-V-111-08-00402

Terminal Point List for Generator System

IC

MD1-0-V-111-09-00001

Valve Characteristic Curve (MSV,CV,RSV,CIV)

MD1-0-V-111-09-00002

Foundation Loading Data for STG

MD1-0-V-111-09-00003

Turbine Generator Foundation

MD1-0-V-111-09-00004

Misalignment Tolerance Matrix (MTM)

MD1-0-V-111-09-00005

Extraction System Data Sheet- SE 11/39

IC

MD1-0-V-111-09-00007

HVAC Data for Steam Turbine & Generator

MD1-0-V-111-09-00008

Extraction System Requirements

MD1-0-V-111-09-00010

Utility Consumption List for Steam Turbine & Generator

IC

AC

MD1-0-V-111-10-00001

Outline-Main Stop & control Valve (1/2)

MD1-0-V-111-10-00002

Outline-Main Stop & control Valve (2/2)

IC

MD1-0-V-111-10-00003

Outline- Combined Reheat Valve Outline (1/2)

MD1-0-V-111-10-00004

Outline- Combined Reheat Valve Outline (2/2)

IC

MD1-0-V-111-10-00005

Turbine Cross Section Assembly (1 of 2)

MD1-0-V-111-10-00006

Turbine Cross Section Assembly (2 of 2)

MD1-0-V-111-10-00007

Outline of S/T Hydraulic Power Unit (1/2)

MD1-0-V-111-10-00008

Outline of S/T Hydraulic Power Unit (2/2)

MD1-0-V-111-10-00009

Outline Lube Oil Conditioner

IC

MD1-0-V-111-10-00012

Gland Steam Condenser Outline

IC

MD1-0-V-111-10-00013

Assembly of Tubine Exhausted Hood To Condenser (1/4)

MD1-0-V-111-10-00014

Assembly of Tubine Exhausted Hood To Condenser (2/4)

MD1-0-V-111-10-00015

Assembly of Tubine Exhausted Hood To Condenser (3/4)

MD1-0-V-111-10-00016

Assembly of Tubine Exhausted Hood To Condenser (4/4)

MD1-0-V-111-10-00017

Turbine Exhaust Hood Anchor & Guide Bracket Ass'y (1/3)

MD1-0-V-111-10-00018

Turbine Exhaust Hood Anchor & Guide Bracket Ass'y (2/3)

MD1-0-V-111-10-00019

Turbine Exhaust Hood Anchor & Guide Bracket Ass'y (3/3)

MD1-0-V-111-10-00020

Temporary Device for Steam Blowing Out-MSV

MD1-0-V-111-10-00021

Temporary Device for Steam Blowing Out-CRV

MD1-0-V-111-10-00022

Outline- Ventilator Valve

MD1-0-V-111-10-00023

Outline of Reverse Flow Valve

MD1-0-V-111-10-00024

Outline-turbine lagging enclosure (1/2)

MD1-0-V-111-10-00030

Outline of Relief Valve for Steam Turbine

MD1-0-V-111-10-00032

Lube oil cooler outline

IC

MD1-0-V-111-10-00033

Flow diagram for lube oil conditioner

IC

MD1-0-V-111-10-00400

Stator Winding Liquid Cooling Unit Outline

MD1-0-V-111-10-00401

H2 & CO2 Control Valve Outline (1/2)

MD1-0-V-111-10-00402

H2 & CO2 Control Valve Outline (2/2)

MD1-0-V-111-10-00403

Hydrogent Manifold Outline

MD1-0-V-111-10-00404

CO2 Manifold Outline

MD1-0-V-111-10-00405

Liquid Detector Outline

MD1-0-V-111-10-00406

Hydrogent Gas Dryer (1/2)

MD1-0-V-111-10-00407

Hydrogent Gas Dryer (2/2)

MD1-0-V-111-10-00408

Hydrogent Control Cabinet Outline

MD1-0-V-111-10-00409

Hydrogent Seal Oil Supply Unit Outline

IC

MD1-0-V-111-10-00410

Float Trap Outline

MD1-0-V-111-10-00411

Hydrogen Cooler Outline

MD1-0-V-111-10-00412

Auxiliary Detraining Section Outline

MD1-0-V-111-10-00414

Generator Seal Oil Drain Enlargement

MD1-0-V-111-10-00415

Hydrogen Gas Dryer (3/3)

IC

MD1-0-V-111-11-0000

Bearing alignment diagram

MD1-0-V-111-11-00001

Typical Sections for Cont. Thermowells

MD1-0-V-111-11-00002

Turbine Casing Nozzle Weld Preparation Information for Fields Connection

IC

MD1-0-V-111-11-00003

Bearing Alignment Diagram

MD1-0-V-111-11-00004

Weld Preparations Information for Valve

IC

MD1-0-V-111-21-00003

P&ID Steam (Cold Reheat Steam & Steam Extractions System)

MD1-0-V-111-21-00011

P&ID Lube Oil Tank (2/2)

IC

MD1-0-V-111-21-00012

P&ID Hydraulic Fluid System (Symbol & Legend) (1/7)

MD1-0-V-111-21-00402

P&ID Generator Shalft Seal System Schematic (1/2)

MD1-0-V-111-21-00403

P&ID Generator Shalft Seal System Schematic (2/2)

MD1-0-V-111-21-00404

H2 & CO2 Control Piping Diagram (1/2)

MD1-0-V-111-21-00405

H2 & CO2 Control Piping Diagram (2/2)

MD1-0-V-111-22-00001

Flow Diagram for TBN Lube Oil Purification System

AC

MD1-0-V-111-23-00001

Piping Arrangement of Lube Oil Conditioner System

MD1-0-V-111-23-00002

Piping Arangement for Hydraulic Fluid Piping

MD1-0-V-111-23-00400

Piping arrangement for generator

MD1-0-V-111-55-00004

Steam Turbine Supplementary Design Data

MD1-0-V-112-05-00007

Nde procedure for turbine bypass system

MD1-0-V-112-09-00001

Technical specification(data) sheet for hp bypass valve (vlb-160btc) for turbinm

AC

MD1-0-V-112-09-00002

Technical specification(data) sheet for hp spray water valve (840h) for turbinem

AC

MD1-0-V-112-09-00003

Technical specification(data) sheet for hp spray water isolation valve (840h) fm

AC

MD1-0-V-112-09-00004

Technical specification(data) sheet for lp steam stop valve (vs-500bt) for turbm

AC

MD1-0-V-112-09-00005

Technical specification(data) sheet for lp bypass valve (vlr-500btc) and lp des

AC

MD1-0-V-112-09-00006

Technical specification(data) sheet for lp spray water valve (840h) for turbinem

AC

MD1-0-V-112-09-00007

Technical specification(data) sheet for lp spray water isolation valve (840g)

AC

MD1-0-V-113-01-00001

Steam Surface Condenser- General Layout (Condenser "A" & "B")

MD1-0-V-113-01-00002

Condenser-General-Arrangement (Plan View) (Condenser "A")

MD1-0-V-113-01-00003

Condenser-General-Arrangement (Side Elevation) (Condenser "A")

MD1-0-V-113-01-00004

Condenser-General-Arrangement (Inlet/Outlet End View) (Condenser "A")

MD1-0-V-113-01-00005

Condenser-General Arrangement (Reversing End View) (Condenser "A")

MD1-0-V-113-01-00006

Condenser-General Arrangement (Plan View) (Condenser "B")

MD1-0-V-113-01-00007

Condenser-General Arrangement (Side Elevation) (Condenser "B")

MD1-0-V-113-01-00008

Condenser-General Arrangement (Inlet/Outlet End View) (Condenser B)

MD1-0-V-113-01-00009

Condenser-General Arrangement (Reversing End View) (Condenser "B")

MD1-0-V-113-04-00017

Condenser- Design Report

MD1-0-V-113-05-00022

Condenser-Instruction Manuals for Erection Installation Operation and

MD1-0-V-113-05-00023

Condenser - performance test procedure

IC

MD1-0-V-113-05-00030

Condenser- Quality Inspection Plan

MD1-0-V-113-05-00040

Painting Specification and Procedure for Condenser and Auxiliaries

IC

MD1-0-V-113-05-00051

Rubber lining procedure

IC

MD1-0-V-113-05-00070

Inspection and Test Procedure for Condenser Accessory

IC

MD1-0-V-113-08-00010

Steam Surface Condenser- Connection List

MD1-0-V-113-08-00048

Condenser - Special Tool List

MD1-0-V-113-08-00056

Condenser - valve list

MD1-0-V-113-09-00014

Condenser- Data Sheet

MD1-0-V-113-09-00016

Condenser- Performance Curves

MD1-0-V-113-09-00019

Condenser- Equalizing Duct Sizing Datasheet

MD1-0-V-113-10-00012

Steam Surface Condenser- Support Pad Arrangement (Condenser "A" & "B")

MD1-0-V-113-10-00043

Condenser - tubesheet stress analysis report

IC

MD1-0-V-113-10-00044

Condenser - main expansion joint datasheet

MD1-0-V-113-11-00021

Steam Surface Condenser- Support Pad Arrangement (Condenser "A" & "B")

MD1-0-V-113-11-00057

Condenser - main expansion joint assembly

MD1-0-V-113-11-00058

Condenser - cw expansion joint drawing

MD1-0-V-113-55-00015

Condenser- Allowable Nozzle Load

MD1-0-V-113-55-00018

Condenser- Strength Calculation

MD1-0-V-113-55-00042

Condenser- Thermal Calculation

MD1-0-V-114-05-00011

Quality assurance program/manual, quality control procedure for the workshop ae

MD1-0-V-114-06-00001

Forces and Moments Imposed on Nozzle Connections, terminal Points for

IC

MD1-0-V-122-03-00001

System description for condensate extraction pump

AC

MD1-0-V-122-05-00004

PT proceduce for condensate extraction pump

MD1-0-V-122-05-00005

UT proceduce for condensate extraction pump

IC

MD1-0-V-122-05-00006

Wps & pqr for cep

MD1-0-V-122-11-00001

Suction strainer outline drawing for cep

IC

MD1-0-V-123-03-00026

Condenser Vacuum Pump - System Description

AC

MD1-0-V-123-05-00016

Condenser Vacuum Pump - Instruction Manuals For Erection, Installation

MD1-0-V-123-05-00018

Condenser vaccum pump - quality inspection plan

MD1-0-V-123-05-00019

Condenser vaccum pump - inspection and test procedure

MD1-0-V-123-08-00012

Condenser Vacuum Pump- Lubricant List

MD1-0-V-123-08-00017

Condenser Vacuum Pump- Spare Parts List

MD1-0-V-123-09-00003

Condenser Vacuum Pump- Data Sheet

MD1-0-V-123-09-00004

Condenser Vacuum Pump- Heat Exchanger Data Sheet

MD1-0-V-123-09-00010

Condenser Vacuum Pump- Performance Curve

MD1-0-V-123-10-00001

Condenser Vacuum Pump- Sectional Drawing

MD1-0-V-123-11-00015

Condenser Vacuum Pump- Installation Drawing

MD1-0-V-123-21-00002

Condenser Vacuum Pump- P&ID

MD1-0-V-123-57-00013

Condenser Vacuum Pump- Valve Data With Drawing

MD1-0-V-132-08-00007

Installation Layout

MD1-0-V-134-08-00035

Valve list for tcs

IC

MD1-0-V-134-09-00029

Technical data sheet for tcs

MD1-0-V-134-11-00009

Equipment outline drawing of ball recirculating monitor

MD1-0-V-134-55-00027

Strength calculation sheet for tcs

MD1-0-V-134-55-00028

Nozzle calculation sheet for tcs

MD1-0-V-135-08-00028

Valve list for df

IC

MD1-0-V-135-55-00020

Strength calculation sheet - debris filter

MD1-0-V-135-55-00021

Nozzle calculation sheet - debris filter

MD1-0-V-185-05-00006

Flash Tank- Size Calculation

IC

MD1-0-V-185-10-00001

Flash Tank- "B" Outline Drawing

IC

MD1-0-V-185-10-00002

Flash Tank- "A" Outline Drawing

IC

MD1-0-V-185-10-00007

Vent & vent duct detail for flash tank "b"

IC

MD1-0-V-185-10-00009

Vent pipe ass'y for flash tank "a"

IC

MD1-0-V-185-10-00010

Drain pipe ass'y for flash tank "b"

MD1-0-V-185-10-00011

Drain pipe ass'y for flash tank "a"

MD1-0-V-870-08-00016

Line list for Sewage Treatment System

MD1-0-V-870-08-00019

Valve list for Sewage Treatment System

MD1-0-V-870-08-00020

Specialty list for Sewage Treatment System

MD1-1-P-420-01-00001

General Arrangement Drawing- Unit#1 Steam Turbine Building Plan (Ground Floor)

MD1-1-P-420-01-00002

General Arrangement Drawing- Unit#1 Steam Turbine Building Plan (Mezzanine Fl

MD1-1-P-420-01-00003

General Arrangement Drawing- Unit#1 Steam Turbine Building Plan (Operating Floor

MD1-1-P-420-01-00004

General Arrangement Drawing- Unit#1 Steam Turbine Building Plan (Roof)

MD1-1-P-420-23-00001

Pipe arrangement & support location drwg - unit #1 steam turbine building (1/4)

IC

MD1-1-P-420-23-00002

Pipe arrangement & support location drwg - unit #1 steam turbine building (2/4)

MD1-1-P-420-23-00003

Pipe arrangement & support location drwg - unit #1 steam turbine building (3/4)

IC

MD1-1-P-420-23-00004

Pipe arrangement & support location drwg - unit #1 steam turbine building (4/4)

MD1-1-P-420-23-00011

Pipe arrang & support location drwg- unit #1 ST building mezzanine plan (1/2)

IC

MD1-1-P-420-23-00012

Pipe arrang & support location drwg- unit #1 ST building mezzanine plan (2/2)

IC

MD1-1-P-420-23-00021

Pipe arrangement & support location drawing - unit #1 steam turbine building op)

MD1-1-P-420-23-00022

Pipe arrangement & support location drawing - unit #1 steam turbine building op)

IC

MD1-1-P-420-23-00031

Pipe arrangement & support location drawing - unit #1 steam turbine building hen

IC

MD1-1-P-420-23-00041

Pipe arrangement & support location drawing - unit #1 steam turbine building ron

MD1-1-V-411-10-02411

Support Detail Drawing for Main Steam System (Boiler Area #1)

MD1-1-V-411-10-02412

Support Detail Drawing for CRH Steam System (Boiler Area #1)

MD1-1-V-411-10-02413

Support Detail Drawing for HRH Steam System (Boiler Area #1)

MD1-1-V-411-10-02414

Support Detail Drawing for Bypass Steam System (Boiler Area #1)

MD1-1-V-411-10-02415

Support Detail Drawing for Feed Water System (Boiler Area #1)

MD1-2-P-420-01-00001

General Arrangement Drawing- Unit#2 Steam Turbine Building Plan (Ground Floor)

MD1-2-P-420-01-00002

General Arrangement Drawing- Unit#2 Steam Turbine Building Plan (Mezzanine Floor

MD1-2-P-420-01-00003

General Arrangement Drawing- Unit#2 Steam Turbine Building Plan (Operating Floor

MD1-2-P-420-01-00004

General Arrangement Drawing- Unit#2 Steam Turbine Building Plan (Roof)

MD1-2-V-411-10-02411

Support Detail Drawing for Main Steam System (Boiler Area #2)

MD1-2-V-411-10-02412

Support Detail Drawing for CRH Steam System (Boiler Area #2)

MD1-2-V-411-10-02413

Support Detail Drawing for HRH Steam System (Boiler Area #2)

MD1-2-V-411-10-02414

Support Detail Drawing for bypass Steam System (Boiler Area #2)

MD1-2-V-411-10-02415

Support Detail Drawing for Feed Water System (Boiler Area #2)

DAVID

19/06/13

DAVID

19/06/13

DAVID

19/06/13

DAVID

19/06/13

DAVID

19/06/13

DAVID

02/04/13

DAVID

02/04/13

DAVID

02/05/13

ALAN

31/07/13

SOUMEN

02/11/12

10

SOUMEN

02/11/12

11

DAVID

27/03/13

12

DAVID

22/07/13

13

SOUMEN

05/11/12

14

SOUMEN

05/11/12

15

DAVID

03/04/13

16

DAVID

03/04/13

17

DAVID

03/04/13

18

DAVID

03/04/13

19

MARK

11/10/12

20

MARK

11/10/12

21

MARK

11/10/12

22

MARK

11/10/12

23

DAVID

02/04/13

24

DAVID

02/04/13

25

DAVID

02/04/13

26

DAVID

02/04/13

27

DAVID

03/04/13

28

DAVID

03/04/13

29

DAVID

24/05/13

30

DAVID

24/05/13

31

DAVID

16/07/13

32

DAVID

16/07/13

33

SOUMEN

02/11/12

34

SOUMEN

02/11/12

35

MARK

11/10/12

36

MARK

11/10/12

37

SOUMEN

11/10/12

38

DAVID

08/03/13

39

MARK

11/10/12

40

MARK

11/10/12

41

SOUMEN

25/06/12

42

SOUMEN

25/06/12

43

DAVID

12/06/13

44

DAVID

12/06/13

45

SOUMEN

20/12/12

46

DAVID

04/04/13

47

DAVID

04/04/13

48

DAVID

04/04/13

49

SOUMEN

15/10/12

50

SOUMEN

01/11/12

51

DAVID

28/03/13

52

SOUMEN

11/10/12

53

SOUMEN

13/09/12

54

DAVID

04/03/13

55

DAVID

08/07/13

56

DAVID

12/06/13

57

DAVID

01/07/13

58

DAVID

02/04/13

59

DAVID

24/05/13

60

DAVID

02/04/13

61

DAVID

08/05/13

62

SOUMEN

14/09/12

63

SOUMEN

28/01/13

64

DAVID

26/03/13

65

DAVID

23/07/13

66

DAVID

11/06/13

67

DAVID

08/05/13

68

DAVID

08/05/13

69

DAVID

08/07/13

70

DAVID

08/07/13

71

DAVID

12/07/13

72

DAVID

12/07/13

73

DAVID

10/07/13

74

DAVID

10/07/13

75

DAVID

10/07/13

76

SOUMEN

30/07/12

77

SOUMEN

02/04/13

78

SOUMEN

05/11/12

79

SOUMEN

05/11/12

80

DAVID

04/03/13

81

SOUMEN

04/04/13

82

DAVID

22/03/13

83

SOUMEN

15/11/12

84

SOUMEN

27/07/12

85

DAVID

24/04/13

86

DAVID

24/04/13

87

SOUMEN

12/07/12

88

SOUMEN

27/07/12

89

SOUMEN

26/10/12

90

SOUMEN

27/07/12

91

SOUMEN

04/04/13

92

DAVID

27/03/13

93

DAVID

27/03/13

94

DAVID

27/03/13

95

DAVID

27/03/13

96

SOUMEN

05/11/12

97

SOUMEN

05/11/12

98

SOUMEN

02/04/13

99

SOUMEN

02/04/13

100

DAVID

02/05/13

101

DAVID

23/04/13

102

DAVID

24/08/12

103

DAVID

24/08/12

104

DAVID

24/08/12

105

DAVID

24/08/12

106

DAVID

24/08/12

107

DAVID

24/08/12

108

DAVID

24/08/12

109

SOUMEN

18/02/13

110

SOUMEN

18/02/13

111

SOUMEN

05/11/12

112

SOUMEN

05/11/12

113

DAVID

02/04/13

114

SOUMEN

05/11/12

115

DAVID

29/04/13

116

DAVID

02/05/13

117

DAVID

24/05/13

118

SOUMEN

02/11/12

119

SOUMEN

02/11/12

120

DAVID

24/08/12

121

SOUMEN

02/11/12

122

SOUMEN

02/11/12

123

DAVID

24/08/12

124

DAVID

24/08/12

125

DAVID

24/08/12

126

DAVID

04/04/13

127

DAVID

23/04/13

128

SOUMEN

18/10/12

129

SOUMEN

20/12/12

130

SOUMEN

20/12/12

131

DAVID

24/04/13

132

SOUMEN

31/01/13

133

SOUMEN

25/09/12

134

SOUMEN

06/11/12

135

SOUMEN

08/03/13

136

SOUMEN

06/11/12

137

SOUMEN

17/12/12

138

SOUMEN

17/12/12

139

SOUMEN

17/12/12

140

DAVID

02/05/13

141

DAVID

02/05/13

142

SOUMEN

16/11/12

143

SOUMEN

16/11/12

144

SOUMEN

27/07/12

145

SOUMEN

20/12/12

146

SOUMEN

27/07/12

147

DAVID

02/05/13

148

DAVID

30/08/12

149

DAVID

02/04/13

150

DAVID

26/02/13

151

DAVID

26/02/13

152

DAVID

26/02/13

153

DAVID

26/02/13

154

DAVID

26/02/13

155

DAVID

26/02/13

156

DAVID

26/02/13

157

SOUMEN

04/02/13

158

SOUMEN

04/02/13

159

SOUMEN

04/02/13

160

SOUMEN

04/02/13

161

SOUMEN

04/02/13

162

SOUMEN

04/02/13

163

SOUMEN

04/02/13

164

SOUMEN

04/02/13

165

SOUMEN

04/02/13

166

DAVID

08/07/13

167

SOUMEN

11/01/13

168

DAVID

26/04/13

169

DAVID

21/06/13

170

DAVID

23/07/13

171

DAVID

29/05/13

172

DAVID

29/05/13

173

SOUMEN

19/12/12

174

DAVID

12/07/13

175

DAVID

21/06/13

176

DAVID

02/05/13

177

DAVID

23/04/13

178

DAVID

24/04/13

179

SOUMEN

19/12/12

180

DAVID

25/06/13

181

DAVID

10/06/13

182

SOUMEN

19/12/12

183

DAVID

12/07/13

184

DAVID

02/05/13

185

SOUMEN

19/12/12

186

SOUMEN

06/02/13

187

SOUMEN

04/01/13

188

SOUMEN

26/02/13

189

DAVID

06/06/13

190

DAVID

09/04/13

191

DAVID

21/06/13

192

DAVID

21/06/13

193

DAVID

09/04/13

194

DAVID

24/04/13

195

DAVID

30/07/13

196

DAVID

04/03/13

197

DAVID

12/06/13

198

DAVID

12/06/13

199

SOUMEN

18/12/12

200

DAVID

25/02/13

201

DAVID

16/05/13

202

DAVID

16/05/13

203

DAVID

07/03/13

204

DAVID

07/03/13

205

DAVID

04/03/13

206

DAVID

30/07/13

207

DAVID

07/03/13

208

SUDIN

04/04/13

209

DAVID

26/02/13

210

DAVID

06/05/13

211

DAVID

02/05/13

212

DAVID

02/05/13

213

DAVID

02/05/13

214

DAVID

26/02/13

215

DAVID

06/05/13

216

DAVID

06/05/13

217

DAVID

18/03/13

218

DAVID

08/05/13

219

DAVID

08/05/13

220

DAVID

08/07/13

221

DAVID

08/07/13

222

DAVID

08/07/13

223

DAVID

08/07/13

224

SUDIN

25/04/13

225

SUDIN

25/04/13

226

SUDIN

25/04/13

227

DAVID

02/04/13

228

DAVID

02/04/13

229

DAVID

02/04/13

230

DAVID

02/04/13

231

DAVID

26/06/13

232

DAVID

26/06/13

233

DAVID

26/06/13

234

DAVID

26/06/13

235

DAVID

27/06/13

236

DAVID

27/06/13

237

DAVID

27/06/13

238

DAVID

27/06/13

239

DAVID

27/06/13

240

DAVID

27/06/13

241

DAVID

08/07/13

242

DAVID

08/07/13

243

DAVID

08/07/13

244

DAVID

08/07/13

245

DAVID

08/07/13

246

DAVID

02/04/13

247

DAVID

02/04/13

248

DAVID

02/04/13

249

DAVID

02/04/13

250

DAVID

08/07/13

251

DAVID

08/07/13

252

DAVID

08/07/13

253

DAVID

08/07/13

254

DAVID

08/07/13

255

MD1-0-M-110-03-00002

System Discription- Turbine Bypass System

MD1-0-M-110-21-00021

P & I Diagram- Turbine Bypass System (1/2)

MD1-0-M-110-21-00022

P & I Diagram - Turbine Bypass System (2/2)

MD1-0-M-110-21-00051

P & I Diagram- Aux. Steam System (1/2)

MD1-0-M-110-21-00052

P & I Diagram- Aux. Steam System (2/2)

MD1-0-P-420-01-00001

General Arrangement Drawing-Steam Turbine Building Plan Section (A-A)

MD1-0-P-420-01-00011

General Arrangement Drawing-Steam Turbine Building Plan Section (B-B)

MD1-1-P-420-01-00001

General Arrangement Drawing- Unit#1 Steam Turbine Building Plan (Ground Floor)

MD1-1-P-420-01-00002

General Arrangement Drawing- Unit#1 Steam Turbine Building Plan (Mezzanine Fl

MD1-1-P-420-01-00003

General Arrangement Drawing- Unit#1 Steam Turbine Building Plan (Operating Floor

MD1-1-P-420-01-00004

General Arrangement Drawing- Unit#1 Steam Turbine Building Plan (Roof)

MD1-2-P-420-01-00001

General Arrangement Drawing- Unit#2 Steam Turbine Building Plan (Ground Floor)

MD1-2-P-420-01-00002

General Arrangement Drawing- Unit#2 Steam Turbine Building Plan (Mezzanine Floor

MD1-2-P-420-01-00003

General Arrangement Drawing- Unit#2 Steam Turbine Building Plan (Operating Floor

MD1-2-P-420-01-00004

General Arrangement Drawing- Unit#2 Steam Turbine Building Plan (Roof)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

MD1-0-V-111-03-00001C

System Description of Steam


A
Turbine
SOUMEN
and Generator

MD1-0-V-111-01-00012

MD1-0-V-113-09-00014D

Condenser- Data SheetA

DAVID

MD1-0-V-111-01-00034

MD1-0-V-113-10-00044B

Condenser - main expansion


A
joint datasheet
DAVID

MD1-0-V-111-01-00035

MD1-0-V-123-09-00003C

Condenser Vacuum PumpA


Data Sheet
DAVID

MD1-0-V-111-01-00036

MD1-0-V-123-09-00004C

Condenser Vacuum PumpA


Heat Exchanger
DAVID Data Sheet

MD1-0-V-111-01-00037

MD1-0-V-123-21-00002D

Condenser Vacuum PumpA


P&ID

DAVID

MD1-0-V-111-01-00405

MD1-0-V-134-09-00029B

Technical data sheet for


A tcs

DAVID

MD1-0-V-111-05-00016
MD1-0-V-111-09-00002
MD1-0-V-111-09-00003
MD1-0-V-111-11-00003
MD1-0-V-113-09-00016
MD1-0-V-113-55-00018
MD1-0-V-123-05-00016
MD1-0-V-123-09-00010
MD1-0-V-123-10-00001
MD1-0-V-123-11-00015
MD1-0-V-123-57-00013

Inspection and Test Plan


I for Turbine DAVID

MD1-0-T-030-05-00397

Steam Turbine Foundation


I Interface DAVID
(1/3)

MD1-0-V-111-03-00400

Steam Turbine Foundation


I Interface DAVID
(2/3)

MD1-0-V-111-03-00401

Steam Turbine Foundation


I Interface DAVID
(3/3)

MD1-0-V-111-03-00402

Arrangement- Turbine Lagging


I
Support
DAVID

MD1-0-V-111-05-00022

Generator & Exciter Lagging


I
Supports
DAVID

MD1-0-V-111-05-00033

Packing Prodcedure

DAVID

MD1-0-V-111-22-00001

Foundation Loading Data


I for STG

DAVID

MD1-0-V-112-09-00001

Turbine Generator Foundation


I

DAVID

MD1-0-V-112-09-00002

Bearing Alignment Diagram


I

SOUMEN

MD1-0-V-112-09-00003

Condenser- Performance
I Curves

DAVID

MD1-0-V-112-09-00004

Condenser- Strength Calculation


I

SOUMEN

MD1-0-V-112-09-00005

Condenser Vacuum Pump


I - Instruction
DAVID
Manuals For Erection, Installation
MD1-0-V-112-09-00006

Condenser Vacuum PumpI


Performance
DAVID
Curve

MD1-0-V-112-09-00007

Condenser Vacuum PumpI


SectionalDAVID
Drawing

MD1-0-V-122-03-00001

Condenser Vacuum PumpI


Installation
DAVID
Drawing

MD1-0-V-123-03-00026

Condenser Vacuum PumpI


Valve Data
DAVID
With Drawing

ITP for Steam Turbine-Generator Installation

AC

DAVID

MD1-0-V-111-01-00001

System Description of Stator Winding Liquid Cooling System

AC

DAVID

MD1-0-V-111-01-00002

System Description of Generator Shaft Seal System

AC

DAVID

MD1-0-V-111-01-00014

System Description of Gas Control System

AC

DAVID

MD1-0-V-111-01-00015

Specification of ASME PTC 6 Flow Section

AC

DAVID

MD1-0-V-111-01-00022

Pressure Test Procedure for Turbine HIP Casing

AC

DAVID

MD1-0-V-111-01-00023

Flow Diagram for TBN Lube Oil Purification System

AC

SOUMEN

MD1-0-V-111-01-00024

Technical specification(data) sheet for hp bypass valve (vlb-160btc) for turbinm

AC

DAVID

MD1-0-V-111-01-00025

Technical specification(data) sheet for hp spray water valve (840h) for turbinem

AC

DAVID

MD1-0-V-111-01-00230

Technical specification(data) sheet for hp spray water isolation valve (840h) fm

AC

DAVID

MD1-0-V-111-01-00231

Technical specification(data) sheet for lp steam stop valve (vs-500bt) for turbm

AC

DAVID

MD1-0-V-111-01-00400

Technical specification(data) sheet for lp bypass valve (vlr-500btc) and lp des

AC

DAVID

MD1-0-V-111-01-00401

Technical specification(data) sheet for lp spray water valve (840h) for turbinem

AC

DAVID

MD1-0-V-111-01-00402

Technical specification(data) sheet for lp spray water isolation valve (840g)

AC

DAVID

MD1-0-V-111-01-00403

System description for condensate extraction pump

AC

DAVID

MD1-0-V-111-01-00406

Condenser Vacuum Pump - System Description

AC

DAVID

MD1-0-V-111-01-00407
MD1-0-V-111-01-00414
MD1-0-V-111-01-00415
MD1-0-V-111-01-00419
MD1-0-V-111-01-00420
MD1-0-V-111-05-00003
MD1-0-V-111-05-00004
MD1-0-V-111-05-00010
MD1-0-V-111-05-00032
MD1-0-V-111-05-00034
MD1-0-V-111-05-00100
MD1-0-V-111-05-00150
MD1-0-V-111-05-00151
MD1-0-V-111-05-00153
MD1-0-V-111-05-00154
MD1-0-V-111-05-00158
MD1-0-V-111-05-00159
MD1-0-V-111-05-00161
MD1-0-V-111-05-00162
MD1-0-V-111-05-00163
MD1-0-V-111-06-00001
MD1-0-V-111-07-00001
MD1-0-V-111-07-00002
MD1-0-V-111-08-00007
MD1-0-V-111-09-00001
MD1-0-V-111-09-00004
MD1-0-V-111-09-00007
MD1-0-V-111-09-00008
MD1-0-V-111-10-00001
MD1-0-V-111-10-00003
MD1-0-V-111-10-00005
MD1-0-V-111-10-00006

MD1-0-V-111-10-00007
MD1-0-V-111-10-00008
MD1-0-V-111-10-00013
MD1-0-V-111-10-00014
MD1-0-V-111-10-00015
MD1-0-V-111-10-00016
MD1-0-V-111-10-00017
MD1-0-V-111-10-00018
MD1-0-V-111-10-00019
MD1-0-V-111-10-00020
MD1-0-V-111-10-00021
MD1-0-V-111-10-00022
MD1-0-V-111-10-00023
MD1-0-V-111-10-00024
MD1-0-V-111-10-00030
MD1-0-V-111-10-00400
MD1-0-V-111-10-00401
MD1-0-V-111-10-00402
MD1-0-V-111-10-00403
MD1-0-V-111-10-00404
MD1-0-V-111-10-00405
MD1-0-V-111-10-00406
MD1-0-V-111-10-00407
MD1-0-V-111-10-00408
MD1-0-V-111-10-00410
MD1-0-V-111-10-00411
MD1-0-V-111-10-00412
MD1-0-V-111-10-00414
MD1-0-V-111-11-0000
MD1-0-V-111-11-00001
MD1-0-V-111-21-00003
MD1-0-V-111-21-00012
MD1-0-V-111-21-00402
MD1-0-V-111-21-00403
MD1-0-V-111-21-00404
MD1-0-V-111-21-00405
MD1-0-V-111-23-00001
MD1-0-V-111-23-00002
MD1-0-V-111-23-00400
MD1-0-V-111-55-00004
MD1-0-V-112-05-00007
MD1-0-V-113-01-00001
MD1-0-V-113-01-00002
MD1-0-V-113-01-00003
MD1-0-V-113-01-00004
MD1-0-V-113-01-00005
MD1-0-V-113-01-00006

MD1-0-V-113-01-00007
MD1-0-V-113-01-00008
MD1-0-V-113-01-00009
MD1-0-V-113-04-00017
MD1-0-V-113-05-00022
MD1-0-V-113-05-00030
MD1-0-V-113-08-00010
MD1-0-V-113-08-00048
MD1-0-V-113-08-00056
MD1-0-V-113-09-00019
MD1-0-V-113-10-00012
MD1-0-V-113-11-00021
MD1-0-V-113-11-00057
MD1-0-V-113-11-00058
MD1-0-V-113-55-00015
MD1-0-V-113-55-00042
MD1-0-V-114-05-00011
MD1-0-V-122-05-00004
MD1-0-V-122-05-00006
MD1-0-V-123-05-00018
MD1-0-V-123-05-00019
MD1-0-V-123-08-00012
MD1-0-V-123-08-00017
MD1-0-V-132-08-00007
MD1-0-V-134-11-00009
MD1-0-V-134-55-00027
MD1-0-V-134-55-00028
MD1-0-V-135-55-00020
MD1-0-V-135-55-00021
MD1-0-V-185-10-00010
MD1-0-V-185-10-00011
MD1-0-V-870-08-00016
MD1-0-V-870-08-00019
MD1-0-V-870-08-00020
MD1-1-P-420-23-00002
MD1-1-P-420-23-00004
MD1-1-P-420-23-00021
MD1-1-P-420-23-00041
MD1-1-V-411-10-02411
MD1-1-V-411-10-02412
MD1-1-V-411-10-02413
MD1-1-V-411-10-02414
MD1-1-V-411-10-02415
MD1-2-V-411-10-02411
MD1-2-V-411-10-02412
MD1-2-V-411-10-02413
MD1-2-V-411-10-02414

MD1-2-V-411-10-02415

Steam Turbine Mechanical Outline (1/2)

Steam Turbine Mechanical Outline (2/2)

Major Turbine Components Lift & Laydown (1/2)

Major Turbine Components Lift & Laydown (2/2)

Steam Turbine & Generator Anchor Bolt Plan

Arrangement of Grout Pads & Foundation Plates for Steam Turbine (1/2)

Arrangement of Grout Pads & Foundation Plates for Steam Turbine (2/2)

Turbine Conduit Location

Turbine Air Piping (1/2)

Turbine Air Piping (2/2)

Generator Mechanical Outline (1/2)

Generator Mechanical Outline (2/2)

Arrange of Grout Pads & FDN Plates For Gen.

Suggested Side Thrust Support For Foundation Plate and Location of Jacking Posts

Stator Frame Feet and Hardware (1/2)

Stator Frame Feet and Hardware (2/2)

Generator Foundation Interface (1/2)

Generator Foundation Interface (2/2)

Piping Connections Generator (1of2)

Piping Connections Generator (2of2)

Turbine Startup and Shutdown Procedure

Method Statement for Steam Turbine Installation Work

Quality Assurance Program and Procedure Manual

Leak Test Procedure for Turbine LP Casing

Over Speed & Balancing Test Procedure for Turbine HIP & LP Rotor

Welding Procedure For Generator Stator Frame

WPS/PQR for Turbine LP Casing

Qualified welder table for turbine lp inner casing

WPS & PQR for Turbine LP Inner Casing

Qualified welder table for turbine lp inner casing

Qualified Welder Table for Turbine & Generator Piping

WPS & PQR for Crossover Pipe

WPS & PQR for Lube Oil Tank

WPS & PQR for Lagging

WPS & PQR for Seal Oil System

Performance Test Steam Seal Flow Calculations

Rotor Dynamics Report

Campbell Diagram of Blades

Electrical Load List for Steam Turbine & Generator

Valve Characteristic Curve (MSV,CV,RSV,CIV)

Misalignment Tolerance Matrix (MTM)

HVAC Data for Steam Turbine & Generator

Extraction System Requirements

Outline-Main Stop & control Valve (1/2)

Outline- Combined Reheat Valve Outline (1/2)

Turbine Cross Section Assembly (1 of 2)

Turbine Cross Section Assembly (2 of 2)

Outline of S/T Hydraulic Power Unit (1/2)

Outline of S/T Hydraulic Power Unit (2/2)

Assembly of Tubine Exhausted Hood To Condenser (1/4)

Assembly of Tubine Exhausted Hood To Condenser (2/4)

Assembly of Tubine Exhausted Hood To Condenser (3/4)

Assembly of Tubine Exhausted Hood To Condenser (4/4)

Turbine Exhaust Hood Anchor & Guide Bracket Ass'y (1/3)

Turbine Exhaust Hood Anchor & Guide Bracket Ass'y (2/3)

Turbine Exhaust Hood Anchor & Guide Bracket Ass'y (3/3)

Temporary Device for Steam Blowing Out-MSV

Temporary Device for Steam Blowing Out-CRV

Outline- Ventilator Valve

Outline of Reverse Flow Valve

Outline-turbine lagging enclosure (1/2)

Outline of Relief Valve for Steam Turbine

Stator Winding Liquid Cooling Unit Outline

H2 & CO2 Control Valve Outline (1/2)

H2 & CO2 Control Valve Outline (2/2)

Hydrogent Manifold Outline

CO2 Manifold Outline

Liquid Detector Outline

Hydrogent Gas Dryer (1/2)

Hydrogent Gas Dryer (2/2)

Hydrogent Control Cabinet Outline

Float Trap Outline

Hydrogen Cooler Outline

Auxiliary Detraining Section Outline

Generator Seal Oil Drain Enlargement

Bearing alignment diagram

Typical Sections for Cont. Thermowells

P&ID Steam (Cold Reheat Steam & Steam Extractions System)

P&ID Hydraulic Fluid System (Symbol & Legend) (1/7)

P&ID Generator Shalft Seal System Schematic (1/2)

P&ID Generator Shalft Seal System Schematic (2/2)

H2 & CO2 Control Piping Diagram (1/2)

H2 & CO2 Control Piping Diagram (2/2)

Piping Arrangement of Lube Oil Conditioner System

Piping Arangement for Hydraulic Fluid Piping

Piping arrangement for generator

Steam Turbine Supplementary Design Data

Nde procedure for turbine bypass system

Steam Surface Condenser- General Layout (Condenser "A" & "B")

Condenser-General-Arrangement (Plan View) (Condenser "A")

Condenser-General-Arrangement (Side Elevation) (Condenser "A")

Condenser-General-Arrangement (Inlet/Outlet End View) (Condenser "A")

Condenser-General Arrangement (Reversing End View) (Condenser "A")

Condenser-General Arrangement (Plan View) (Condenser "B")

Condenser-General Arrangement (Side Elevation) (Condenser "B")

Condenser-General Arrangement (Inlet/Outlet End View) (Condenser B)

Condenser-General Arrangement (Reversing End View) (Condenser "B")

Condenser- Design Report

Condenser-Instruction Manuals for Erection Installation Operation and

Condenser- Quality Inspection Plan

Steam Surface Condenser- Connection List

Condenser - Special Tool List

Condenser - valve list

Condenser- Equalizing Duct Sizing Datasheet

Steam Surface Condenser- Support Pad Arrangement (Condenser "A" & "B")

Steam Surface Condenser- Support Pad Arrangement (Condenser "A" & "B")

Condenser - main expansion joint assembly

Condenser - cw expansion joint drawing

Condenser- Allowable Nozzle Load

Condenser- Thermal Calculation

Quality assurance program/manual, quality control procedure for the workshop ae

PT proceduce for condensate extraction pump

Wps & pqr for cep

Condenser vaccum pump - quality inspection plan

Condenser vaccum pump - inspection and test procedure

Condenser Vacuum Pump- Lubricant List

Condenser Vacuum Pump- Spare Parts List

Installation Layout

Equipment outline drawing of ball recirculating monitor

Strength calculation sheet for tcs

Nozzle calculation sheet for tcs

Strength calculation sheet - debris filter

Nozzle calculation sheet - debris filter

Drain pipe ass'y for flash tank "b"

Drain pipe ass'y for flash tank "a"

Line list for Sewage Treatment System

Valve list for Sewage Treatment System

Specialty list for Sewage Treatment System

Pipe arrangement & support location drwg - unit #1 steam turbine building (2/4)

Pipe arrangement & support location drwg - unit #1 steam turbine building (4/4)

Pipe arrangement & support location drawing - unit #1 steam turbine building op)

Pipe arrangement & support location drawing - unit #1 steam turbine building ron

Support Detail Drawing for Main Steam System (Boiler Area #1)

Support Detail Drawing for CRH Steam System (Boiler Area #1)

Support Detail Drawing for HRH Steam System (Boiler Area #1)

Support Detail Drawing for Bypass Steam System (Boiler Area #1)

Support Detail Drawing for Feed Water System (Boiler Area #1)

Support Detail Drawing for Main Steam System (Boiler Area #2)

Support Detail Drawing for CRH Steam System (Boiler Area #2)

Support Detail Drawing for HRH Steam System (Boiler Area #2)

Support Detail Drawing for bypass Steam System (Boiler Area #2)

Support Detail Drawing for Feed Water System (Boiler Area #2)

MD1-0-T-053-05-00451

Method Statement for Condenser Lifting

IC

MD1-0-V-111-01-00003

Arrangement of Steam Pipes & Valves

IC

MD1-0-V-111-01-00018

Piping arrangement of lube oil system (1/4)

IC

MD1-0-V-111-01-00019

Piping arrangement of lube oil system (2/4)

IC

MD1-0-V-111-01-00020

Piping arrangement of lube oil system (3/4)

IC

MD1-0-V-111-01-00021

Piping arrangement of lube oil system (4/4)

IC

MD1-0-V-111-01-00045

Piping arrangement of generator end shield(turbine end)

IC

MD1-0-V-111-01-00046

Piping arrangement of generator end shield(collector end)

IC

MD1-0-V-111-01-00404

Stator Lifting Arrangement

IC

MD1-0-V-111-05-00002

Lube Oil Flushing Schmatic & Connection

IC

MD1-0-V-111-05-00017

Long Term Storage Instruction for Steam Turbine & Auxiliary System

IC

MD1-0-V-111-05-00031

Hydrostatic Test Procedure for Turbine HIP Casing

IC

MD1-0-V-111-05-00035

Function test procedure for hydraulic power unit

IC

MD1-0-V-111-05-00152

Post Weld Heat Treatment Procedure for Turbine LP Casing

IC

MD1-0-V-111-05-00155

Post weld heat treatment procedure for turbine lp inner casing

IC

MD1-0-V-111-05-00156

WPS & PQR for Turbine & Generator Piping(MSP, LOP, GSP)

IC

MD1-0-V-111-05-00160

Post Weld Heat Treatment Procedure for Crossover Pipe

IC

MD1-0-V-111-06-00002

Steam Turbine Overspeed Calculation

IC

MD1-0-V-111-08-00002

Line list of steam turbine

IC

MD1-0-V-111-08-00006

Equipment List for Steam Turbine & Generator

IC

MD1-0-V-111-08-00402

Terminal Point List for Generator System

IC

MD1-0-V-111-09-00005

Extraction System Data Sheet- SE 11/39

IC

MD1-0-V-111-09-00010

Utility Consumption List for Steam Turbine & Generator

IC

MD1-0-V-111-10-00002

Outline-Main Stop & control Valve (2/2)

IC

MD1-0-V-111-10-00004

Outline- Combined Reheat Valve Outline (2/2)

IC

MD1-0-V-111-10-00009

Outline Lube Oil Conditioner

IC

MD1-0-V-111-10-00012

Gland Steam Condenser Outline

IC

MD1-0-V-111-10-00032

Lube oil cooler outline

IC

MD1-0-V-111-10-00033

Flow diagram for lube oil conditioner

IC

MD1-0-V-111-10-00409

Hydrogent Seal Oil Supply Unit Outline

IC

MD1-0-V-111-10-00415

Hydrogen Gas Dryer (3/3)

IC

MD1-0-V-111-11-00002

Turbine Casing Nozzle Weld Preparation Information for Fields Connection

IC

MD1-0-V-111-11-00004

Weld Preparations Information for Valve

IC

MD1-0-V-111-21-00011

P&ID Lube Oil Tank (2/2)

IC

MD1-0-V-113-05-00023

Condenser - performance test procedure

IC

MD1-0-V-113-05-00040

Painting Specification and Procedure for Condenser and Auxiliaries

IC

MD1-0-V-113-05-00051

Rubber lining procedure

IC

MD1-0-V-113-05-00070

Inspection and Test Procedure for Condenser Accessory

IC

MD1-0-V-113-10-00043

Condenser - tubesheet stress analysis report

IC

MD1-0-V-114-06-00001

Forces and Moments Imposed on Nozzle Connections, terminal Points for

IC

MD1-0-V-122-05-00005

UT proceduce for condensate extraction pump

IC

MD1-0-V-122-11-00001

Suction strainer outline drawing for cep

IC

MD1-0-V-134-08-00035

Valve list for tcs

IC

MD1-0-V-135-08-00028

Valve list for df

IC

MD1-0-V-185-05-00006

Flash Tank- Size Calculation

IC

MD1-0-V-185-10-00001

Flash Tank- "B" Outline Drawing

IC

MD1-0-V-185-10-00002

Flash Tank- "A" Outline Drawing

IC

MD1-0-V-185-10-00007

Vent & vent duct detail for flash tank "b"

IC

MD1-0-V-185-10-00009

Vent pipe ass'y for flash tank "a"

IC

MD1-1-P-420-23-00001

Pipe arrangement & support location drwg - unit #1 steam turbine building (1/4)

IC

MD1-1-P-420-23-00003

Pipe arrangement & support location drwg - unit #1 steam turbine building (3/4)

IC

MD1-1-P-420-23-00011

Pipe arrang & support location drwg- unit #1 ST building mezzanine plan (1/2)

IC

MD1-1-P-420-23-00012

Pipe arrang & support location drwg- unit #1 ST building mezzanine plan (2/2)

IC

MD1-1-P-420-23-00022

Pipe arrangement & support location drawing - unit #1 steam turbine building op) IC

MD1-1-P-420-23-00031

Pipe arrangement & support location drawing - unit #1 steam turbine building hen IC

DISCIPLINE = SWYD, Switchyard


MD1-0-E-500-31-00003

Electrical Phase Diagram

WITTAYA

MD1-0-E-500-31-00021

Single Line Diagram Gen. & SWYD Synchronizing

WITTAYA

MD1-0-E-570-01-00101

General Arrangement Drawing-500KV and 110KV SWYD

WITTAYA

MD1-0-E-570-01-00201

General Arrangement Drawing-110KV SWYD

WITTAYA

MD1-0-E-570-31-00101

Single Line Diagram 500KV SWYD

WITTAYA

MD1-0-E-570-31-00102

Relay Protection & Measurement Diagram 500KV SWYD (B10)

WITTAYA

MD1-0-E-570-31-00103

Relay Protection & Measurement Diagram 500KV SWYD (B20)

WITTAYA

MD1-0-E-570-31-00104

Relay Protection & Measurement Diagram 500KV SWYD (B30)

WITTAYA

MD1-0-E-570-31-00201

Single Line Diagram 110KV SWYD

WITTAYA

MD1-0-E-570-31-00202

Relay Protection & Measurement Diagram 110KV SWYD

WITTAYA

MD1-0-E-590-01-00500

Earthing and Lightning Protection Layout-500KV and 110KV SWYD Index Plan

WITTAYA

MD1-0-E-590-01-00501

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (1)

WITTAYA

MD1-0-E-590-01-00502

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (2)

WITTAYA

MD1-0-E-590-01-00503

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (3)

WITTAYA

MD1-0-E-590-01-00504

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (4)

WITTAYA

MD1-0-E-590-01-00505

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (5)

WITTAYA

MD1-0-E-590-01-00506

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (6)

WITTAYA

MD1-0-E-590-01-00507

Earthing and Lightning Protection Layout-500KV and 110KV SWYD (7)

WITTAYA

MD1-0-E-593-01-25401

Cable Route Plan- Switchyard Control Bldg Ground Floor

WITTAYA

MD1-0-E-593-01-25402

Cable Route Plan- Switchyard Control Bldg 1st Floor

WITTAYA

MD1-0-E-593-01-25403

Cable Route Plan- Switchyard Control Bldg Roof Floor

WITTAYA

MD1-0-V-570-01-00001

500KV and 100KV Switchyard Layout and Section Drawing

WITTAYA

MD1-0-V-570-01-00002

500KV and 110KV Switchyard Lighning System

WITTAYA

MD1-0-V-570-01-00004

500KV and 110KV Switchyard Control & Protection System Panel Layout

WITTAYA

MD1-0-V-570-01-00005

500KV & 110KV Switchyard Control Building Panel Arrangement

WITTAYA

MD1-0-V-570-01-00006

500kV and 110kV Switchyard AC and DC System Panel Layout

WITTAYA

MD1-0-V-570-01-00008

500KV & 110KV Switchyard Cable Raceway Plan

WITTAYA

MD1-0-V-570-01-00010

110KV Switchyard Cable Route Plan

WITTAYA

MD1-0-V-570-02-00001

500kV and 110kV Switchyard Tech. Spec. for Busbar Conductor

WITTAYA

MD1-0-V-570-02-00002

500KV and 110KV Switchyard Technical Specifications for Control and Protection t

WITTAYA

MD1-0-V-570-02-00003

500KV & 110KV Switchyard Technical Specifications for AC and DC System

WITTAYA

MD1-0-V-570-02-00004

500KV & 110KV Switchyard Technical Specification of Computerized Control System

WITTAYA

MD1-0-V-570-02-00005

500kV and 110kV Switchyard Tech. Spec. for Cable

WITTAYA

MD1-0-V-570-02-00007

500kv and 110kv switchyard technical specification for 220v DC battery

WITTAYA

MD1-0-V-570-05-00008

500KV AND 110KV SWITCHYARD QUALITY ASSURANCE PROGRAM

WITTAYA

MD1-0-V-570-05-00009

Inspection and Test Plan for 123KV Circuit Breaker

WITTAYA

MD1-0-V-570-05-00010

Inspection and test procedure for 123kv circuit breaker

WITTAYA

MD1-0-V-570-05-00011

Inspection and Test Plan for 550KV Circuit Breaker

WITTAYA

MD1-0-V-570-05-00012

Inspection and test procedure for 550kv circuit breaker

WITTAYA

MD1-0-V-570-05-00013

Inspection and Test Plan for 123KV Disconnecting Switch

WITTAYA

MD1-0-V-570-05-00014

Inspection and test procedure for 123kv diconnecting switch

WITTAYA

MD1-0-V-570-05-00015

Inspection and Test Plan for 550KV Disconnecting Switch

WITTAYA

MD1-0-V-570-05-00016

Inspection and test procedure for 550kv disconnecting switch

WITTAYA

MD1-0-V-570-05-00017

Inspection and Test Plan for 123KV Current Transformer

WITTAYA

MD1-0-V-570-05-00018

Inspection and test procedure for 123kv current transformer

WITTAYA

MD1-0-V-570-05-00019

Inspection and Test Plan for 550KV Current Transformer

WITTAYA

MD1-0-V-570-05-00020

Inspection and test procedure for 550kv current transformer

WITTAYA

MD1-0-V-570-05-00021

Inspection and Test Plan for 123KV Voltage Transformer

WITTAYA

MD1-0-V-570-05-00022

Inspection and test procedure for 123KV Voltage Transformer

WITTAYA

MD1-0-V-570-05-00023

Inspection and Test Plan for 550KV Voltage Transformer

WITTAYA

MD1-0-V-570-05-00024

Inspection and test procedure for 550kv voltage transformer

WITTAYA

MD1-0-V-570-05-00025

Inspection and Test Plan for 96KV Surge Arrester

WITTAYA

MD1-0-V-570-05-00026

Inspection and test procedure for 96kv surge arrester

WITTAYA

MD1-0-V-570-05-00027

Inspection and Test Plan for 438KV Surge Arrester

WITTAYA

MD1-0-V-570-05-00028

Inspection and test procedure for 438kv surge arrester

WITTAYA

MD1-0-V-570-05-00029

Inspection and test plan for 123kv post and disc insulator

WITTAYA

MD1-0-V-570-05-00030

Inspection and test procedure for 123kv post and disc insulator

WITTAYA

MD1-0-V-570-05-00031

Inspection and test plan for 550kv post and disc insulator

WITTAYA

MD1-0-V-570-05-00032

Inspection and test procedure for 550kv post and disc insulator

WITTAYA

MD1-0-V-570-05-00037

Inspection and test plan for control and protection panel

WITTAYA

MD1-0-V-570-05-00038

Inspection and test procedure for control and protection panel - 110kv swyd

WITTAYA

MD1-0-V-570-05-00039

Inspection and test plan for control and protection panel - 500kv swyd

WITTAYA

MD1-0-V-570-05-00040

Inspection and test procedure for control and protection panel - 500kv swyd

WITTAYA

MD1-0-V-570-05-00041

Inspection and Test Plan for Switchyard Computerized Control System

WITTAYA

MD1-0-V-570-05-00042

Inspection and Test Procedure for Switchyard Computerized Control System

WITTAYA

MD1-0-V-570-05-00043

Inspection and test plan for ac and dc distribution panel - 110kv swyd

WITTAYA

MD1-0-V-570-05-00044

Inspection and test procedure for ac and dc distribution panel - 110kv swyd

WITTAYA

MD1-0-V-570-05-00045

Inspection and test plan for ac and dc distribution panel-500kv swyd

WITTAYA

MD1-0-V-570-05-00046

Inspection and test procedure for ac and dc distribution panel - 500kv swyd

WITTAYA

MD1-0-V-570-05-00047

Inspection and test plan for switchyard 220v dc battery and battery charger

WITTAYA

MD1-0-V-570-05-00048

Inspection and test procedure for switchyard 220v dc battery and battery charger

WITTAYA

MD1-0-V-570-05-00051

Inspection and test plan for busbar and lightning conductor

WITTAYA

MD1-0-V-570-05-00052

Inspection and test procedure for busbar and lightning conductor

WITTAYA

MD1-0-V-570-05-00053

Inspection and test plan for switchyard cable

WITTAYA

MD1-0-V-570-05-00054

Inspection and test procedure for switchyard cable

WITTAYA

MD1-0-V-570-05-00055

Inspection and test plan for terminal connector and busbar material and accessos

WITTAYA

MD1-0-V-570-05-00056

Inspection and test procedure for terminal connector and busbar material and acs

WITTAYA

MD1-0-V-570-05-00057

Inspection and test plan for communication system

WITTAYA

MD1-0-V-570-05-00058

Inspection and test procedure for communication system

WITTAYA

MD1-0-V-570-05-00059

Site inspection and test plan for switchyard primary equipment

WITTAYA

MD1-0-V-570-05-00061

500kv and 110kv switchyard working method statement

WITTAYA

MD1-0-V-570-05-00062

Site inspection and test procedure for switchyard rocedure for switchyard

WITTAYA

MD1-0-V-570-05-00063

Site Inspection and Test Plan for Switchyard Secondary Equipment

WITTAYA

MD1-0-V-570-05-00064

Site Inspection and Test Procedure for Switchtard Secondary Equipment

WITTAYA

MD1-0-V-570-05-00065

Site inspection and test plan for telecommunication equipment

WITTAYA

MD1-0-V-570-05-00066

Site inspection and test procedure for telecommunication equipment

WITTAYA

MD1-0-V-570-05-00069

Site inspection and test plan for switchyard installation

WITTAYA

MD1-0-V-570-05-00076

500KV and 110KV Switchyard Control and Protection System Operation and Maintenal

WITTAYA

MD1-0-V-570-06-00002

500KV and 110KV Switchyard Lighning Protection Calculation

WITTAYA

MD1-0-V-570-06-00003

500KV and 110KV Switchyard Flood Lighting Calculation

WITTAYA

MD1-0-V-570-06-00004

500kv and 110kv switchyard ct calculation

WITTAYA

MD1-0-V-570-06-00005

500kv and 110kv switchyard vt calculation

WITTAYA

MD1-0-V-570-06-00007

500kv and 110kv switchyard 220v dc system sizing calculation

WITTAYA

MD1-0-V-570-07-00001

110KV Switchyard Equipment Shop Test and Inspection Report

WITTAYA

MD1-0-V-570-07-00003

500KV Switchyard AC/DC System Shop Test and Inspection Report

WITTAYA

MD1-0-V-570-07-00004

110KV Switchyard Control and Protection System Shop Test and Inspection Report

WITTAYA

MD1-0-V-570-08-00006

500KV and 110KV Switchyard Spare Parts and Special Tools List

WITTAYA

MD1-0-V-570-08-00008

110kv switchyard cable schedule

WITTAYA

MD1-0-V-570-08-00009

500kV and 110kV Switchyard Cable Schedule for Computerized Control System

WITTAYA

MD1-0-V-570-08-00012

500kv switchyard cable schedule

WITTAYA

MD1-0-V-570-10-00001

500KV & 110KV Switchyard Tech. Specification, Steel Supporting Structure Drwg

WITTAYA

MD1-0-V-570-10-00002

500KV & 110KV Switchyard Tech. Specification, Steel Tower Structr. Drwgs

WITTAYA

MD1-0-V-570-11-00002

500kV and 110kV Switchyard Mounting Guideline

WITTAYA

MD1-0-V-570-11-00003

500KV & 110KV Switchyard Technical Specification, Terminal Connector

WITTAYA

MD1-0-V-570-11-00004

500kV and 110kV Switchyard Earthing Material

WITTAYA

MD1-0-V-570-11-00005

500kV and 110kV Switchyard Lightning Material

WITTAYA

MD1-0-V-570-11-00007

500KV & 110KV Switchyard Technical Specification, Busbar Material- Accessories

WITTAYA

MD1-0-V-570-11-00008

110kV Switchyard Computerized Control System Graphics

IC

WITTAYA

MD1-0-V-570-31-00003

500kV and 110kV Switchyard AC and DC System Single Line Diagram

WITTAYA

MD1-0-V-570-32-00001

500KV & 110KV SWITCHYARD TECHNICAL SPECIFICATION, 500KV CIRCUIT BREAKERA

WITTAYA

MD1-0-V-570-32-00002

500KV & 110KV Switchyard Technical Specification, 123 KV Circuit Breaker

WITTAYA

MD1-0-V-570-32-00003

500KV & 110KV Switchyard Technical Specification, 550KV Disconnect Switch

WITTAYA

MD1-0-V-570-32-00004

500KV & 110KV Switchyard Technical Specification, 123KV Disconnect Switch

WITTAYA

MD1-0-V-570-32-00005

500KV & 110KV Switchyard Technical Specification, 550KV Current Transformer

WITTAYA

MD1-0-V-570-32-00006

500KV & 110KV Switchyard Technical Specification, 123KV Current Transformer

WITTAYA

MD1-0-V-570-32-00007

500KV & 110KV Switchyard Tech. Spec, 550KV Capacitive Voltage Transformer

WITTAYA

MD1-0-V-570-32-00008

500KV & 110KV Switchyard Tech. Spec, 123KV Capacitive Voltage Transformer

WITTAYA

MD1-0-V-570-32-00009

500KV & 110KV Switchyard Tech. Spec, 420 KV Surge Arrester

WITTAYA

MD1-0-V-570-32-00010

500KV & 110KV Switchyard Tech. Spec, 96 KV Surge Arrester

WITTAYA

MD1-0-V-570-32-00011

500KV & 110KV Switchyard Tech. Spec, 550KV Post & Disc Insulator

WITTAYA

MD1-0-V-570-32-00012

500KV & 110KV Switchyard Tech. Spec, 123KV Post & Disc Insulator

WITTAYA

MD1-0-V-570-32-00013

500kV and 110kV Switchyard Power Supply Principle for Control

WITTAYA

MD1-0-V-570-32-00015

500kv and 110kv switchyard schematic diagram for ac and dc system

WITTAYA

MD1-0-V-570-32-00017

500KV & 110KV Switchyard Schematic Diagram for Computerized Control System

WITTAYA

MD1-0-V-570-33-00001

500KV and 110KV Switchyard Tripping Matrix

WITTAYA

MD1-0-V-570-33-00002

500KV & 110KV Switchyard Logic Control Diagram

WITTAYA

MD1-0-V-570-36-00001

500KV and 110KV Switchyard Computerized Control System General Configuration

WITTAYA

MD1-0-V-570-36-00004

500kv and 110kv switchyard automatic data collecting and transmitting system gen

WITTAYA

15/03/13

14/05/13

14/05/13

14/05/13

10/05/13

06/05/13

06/05/13

06/05/13

22/07/13

06/05/13

10

28/02/13

11

11/01/13

12

11/01/13

13

28/02/13

14

11/01/13

15

11/01/13

16

28/02/13

17

28/02/13

18

19/12/12

19

19/12/12

20

19/12/12

21

19/11/12

22

04/04/13

23

20/12/12

24

14/03/13

25

31/01/13

26

24/01/13

27

22/07/13

28

19/12/12

29

23/07/13

30

22/07/13

31

05/07/13

32

22/04/13

33

03/04/13

34

08/03/13

35

27/02/13

36

10/05/13

37

27/02/13

38

23/05/13

39

22/04/13

40

03/04/13

41

22/04/13

42

03/04/13

43

25/04/13

44

03/04/13

45

25/04/13

46

03/04/13

47

25/04/13

48

25/04/13

49

25/04/13

50

25/04/13

51

06/05/13

52

06/05/13

53

06/05/13

54

06/05/13

55

03/04/13

56

08/03/13

57

03/04/13

58

08/03/13

59

27/02/13

60

06/05/13

61

27/02/13

62

06/05/13

63

06/05/13

64

06/05/13

65

27/02/13

66

06/05/13

67

27/02/13

68

06/05/13

69

06/05/13

70

04/03/13

71

28/02/13

72

28/02/13

73

06/05/13

74

28/02/13

75

03/04/13

76

27/02/13

77

22/04/13

78

22/04/13

79

22/04/13

80

28/02/13

81

22/04/13

82

12/07/13

83

12/07/13

84

22/04/13

85

22/04/13

86

06/05/13

87

05/07/13

88

31/01/13

89

31/01/13

90

02/04/13

91

02/04/13

92

03/04/13

93

05/07/13

94

08/07/13

95

08/07/13

96

21/06/13

97

21/06/13

98

22/07/13

99

21/06/13

100

12/10/12

101

12/10/12

102

24/12/12

103

04/04/13

104

19/12/12

105

04/04/13

106

04/04/13

107

21/06/13

108

31/01/13

109

15/03/13

110

30/01/13

111

31/01/13

112

31/01/13

113

15/03/13

114

15/03/13

115

30/01/13

116

30/01/13

117

30/01/13

118

30/01/13

119

06/02/13

120

14/03/13

121

31/01/13

122

10/05/13

123

05/07/13

124

15/03/13

125

15/03/13

126

15/03/13

127

06/05/13

128

MD1-0-E-500-31-00003

Electrical Phase Diagram


A

MD1-0-E-500-31-00021

MD1-0-E-570-01-00101

MD1-0-E-570-01-00201
MD1-0-E-570-31-00101

WITTAYA

MD1-0-V-570-02-00001

Single Line Diagram Gen.


A & SWYD WITTAYA
Synchronizing

MD1-0-V-570-02-00002

General Arrangement Drawing-500KV


A
WITTAYA
and 110KV SWYD

MD1-0-V-570-02-00003

General Arrangement Drawing-110KV


A
WITTAYA
SWYD

MD1-0-V-570-02-00004

Single Line Diagram 500KV


A
SWYD WITTAYA

MD1-0-V-570-02-00005

MD1-0-E-570-31-00102

Relay Protection & Measurement


A
Diagram
WITTAYA
500KV SWYD (B10)

MD1-0-V-570-02-00007

MD1-0-E-570-31-00103

Relay Protection & Measurement


A
Diagram
WITTAYA
500KV SWYD (B20)

MD1-0-V-570-05-00059

MD1-0-E-570-31-00104

Relay Protection & Measurement


A
Diagram
WITTAYA
500KV SWYD (B30)

MD1-0-V-570-05-00062

MD1-0-E-570-31-00201

Single Line Diagram 110KV


A
SWYD WITTAYA

MD1-0-V-570-05-00063

MD1-0-E-570-31-00202

Relay Protection & Measurement


A
Diagram
WITTAYA
110KV SWYD

MD1-0-V-570-05-00064

MD1-0-E-590-01-00500

Earthing and Lightning A


Protection Layout-500KV
WITTAYA and 110KV SWYDMD1-0-V-570-05-00065
Index Plan

MD1-0-E-590-01-00501

Earthing and Lightning A


Protection Layout-500KV
WITTAYA and 110KV SWYDMD1-0-V-570-05-00066
(1)

MD1-0-E-590-01-00502

Earthing and Lightning A


Protection Layout-500KV
WITTAYA and 110KV SWYDMD1-0-V-570-05-00069
(2)

MD1-0-E-590-01-00503

Earthing and Lightning A


Protection Layout-500KV
WITTAYA and 110KV SWYD (3)

MD1-0-E-590-01-00504

Earthing and Lightning A


Protection Layout-500KV
WITTAYA and 110KV SWYD (4)

MD1-0-E-590-01-00505

Earthing and Lightning A


Protection Layout-500KV
WITTAYA and 110KV SWYD (5)

MD1-0-E-590-01-00506

Earthing and Lightning A


Protection Layout-500KV
WITTAYA and 110KV SWYD (6)

MD1-0-E-590-01-00507

Earthing and Lightning A


Protection Layout-500KV
WITTAYA and 110KV SWYD (7)

MD1-0-V-570-01-00005

500KV & 110KV Switchyard


A
ControlWITTAYA
Building Panel Arrangement

MD1-0-V-570-11-00003

500KV & 110KV Switchyard


A
Technical
WITTAYA
Specification, Terminal Connector

MD1-0-V-570-11-00007

500KV & 110KV Switchyard


A
Technical
WITTAYA
Specification, Busbar Material- Accessories

MD1-0-V-570-32-00001

500KV & 110KV SWITCHYARD


A
TECHNICAL
WITTAYA SPECIFICATION, 500KV CIRCUIT BREAKER

MD1-0-V-570-32-00002

500KV & 110KV Switchyard


A
Technical
WITTAYA
Specification, 123 KV Circuit Breaker

MD1-0-V-570-32-00004

500KV & 110KV Switchyard


A
Technical
WITTAYA
Specification, 123KV Disconnect Switch

MD1-0-V-570-32-00005

500KV & 110KV Switchyard


A
Technical
WITTAYA
Specification, 550KV Current Transformer

MD1-0-V-570-32-00006

500KV & 110KV Switchyard


A
Technical
WITTAYA
Specification, 123KV Current Transformer

MD1-0-V-570-32-00007

500KV & 110KV Switchyard


A
Tech. Spec,
WITTAYA
550KV Capacitive Voltage Transformer

MD1-0-V-570-32-00008

500KV & 110KV Switchyard


A
Tech. Spec,
WITTAYA
123KV Capacitive Voltage Transformer

MD1-0-V-570-32-00009

500KV & 110KV Switchyard


A
Tech. Spec,
WITTAYA
420 KV Surge Arrester

MD1-0-V-570-32-00010

500KV & 110KV Switchyard


A
Tech. Spec,
WITTAYA
96 KV Surge Arrester

MD1-0-V-570-32-00011

500KV & 110KV Switchyard


A
Tech. Spec,
WITTAYA
550KV Post & Disc Insulator

MD1-0-V-570-32-00012

500KV & 110KV Switchyard


A
Tech. Spec,
WITTAYA
123KV Post & Disc Insulator

500kV and 110kV Switchyard


A
Tech.WITTAYA
Spec. for Busbar Conductor

MD1-0-E-593-01-254010

Cable Route Plan- Switchyard


I
Control
WITTAYA
Bldg Ground Floor

500KV and 110KV Switchyard


A
Technical
WITTAYA
Specifications for Control and
MD1-0-E-593-01-25402
Protection t
0

Cable Route Plan- Switchyard


I
Control
WITTAYA
Bldg 1st Floor

500KV & 110KV Switchyard


A
Technical
WITTAYA
Specifications for AC and DCMD1-0-E-593-01-25403
System
0

Cable Route Plan- Switchyard


I
Control
WITTAYA
Bldg Roof Floor

500KV & 110KV Switchyard


A
Technical
WITTAYA
Specification of Computerized
MD1-0-V-570-01-00001
Control System
1

500KV and 100KV Switchyard


I
Layout
WITTAYA
and Section Drawing

500kV and 110kV Switchyard


A
Tech.WITTAYA
Spec. for Cable

MD1-0-V-570-01-000020

500KV and 110KV Switchyard


I
Lighning
WITTAYA
System

500kv and 110kv switchyard


A
technical
WITTAYA
specification for 220v DC battery
MD1-0-V-570-11-000050

500kV and 110kV Switchyard


I
Lightning
WITTAYA
Material

Site inspection and testAplan for switchyard


WITTAYA
primary equipment

500KV & 110KV Switchyard


I
Technical
WITTAYA
Specification, 550KV Disconnect Switch

MD1-0-V-570-32-000030

Site inspection and testAprocedure for


WITTAYA
switchyard rocedure for switchyard
Site Inspection and Test
A Plan for Switchyard
WITTAYASecondary Equipment
Site Inspection and Test
A Procedure WITTAYA
for Switchtard Secondary Equipment
Site inspection and testAplan for telecommunication
WITTAYA
equipment
Site inspection and testAprocedure for
WITTAYA
telecommunication equipment
Site inspection and testAplan for switchyard
WITTAYA
installation

MD1-0-V-570-01-00004B

500KV and 110KV Switchyard


I
Control
WITTAYA
& Protection System Panel Layout

MD1-0-V-570-01-00006B

500kV and 110kV Switchyard


I
AC and
WITTAYA
DC System Panel Layout

MD1-0-V-570-01-00008C

500KV & 110KV Switchyard


I
Cable Raceway
WITTAYAPlan

MD1-0-V-570-01-00010A

110KV Switchyard Cable


I Route PlanWITTAYA

MD1-0-V-570-05-00008B

500KV AND 110KV SWITCHYARD


I
WITTAYA
QUALITY ASSURANCE PROGRAM

MD1-0-V-570-05-00009B

Inspection and Test Plan


I for 123KV WITTAYA
Circuit Breaker

MD1-0-V-570-05-00010B

Inspection and test procedure


I
for 123kv
WITTAYA
circuit breaker

MD1-0-V-570-05-00011B

Inspection and Test Plan


I for 550KV WITTAYA
Circuit Breaker

MD1-0-V-570-05-00012B

Inspection and test procedure


I
for 550kv
WITTAYA
circuit breaker

MD1-0-V-570-05-00013B

Inspection and Test Plan


I for 123KV WITTAYA
Disconnecting Switch

MD1-0-V-570-05-00014B

Inspection and test procedure


I
for 123kv
WITTAYA
diconnecting switch

MD1-0-V-570-05-00015B

Inspection and Test Plan


I for 550KV WITTAYA
Disconnecting Switch

MD1-0-V-570-05-00016B

Inspection and test procedure


I
for 550kv
WITTAYA
disconnecting switch

MD1-0-V-570-05-00017B

Inspection and Test Plan


I for 123KV WITTAYA
Current Transformer

MD1-0-V-570-05-00018A

Inspection and test procedure


I
for 123kv
WITTAYA
current transformer

MD1-0-V-570-05-00019B

Inspection and Test Plan


I for 550KV WITTAYA
Current Transformer

MD1-0-V-570-05-00020A

Inspection and test procedure


I
for 550kv
WITTAYA
current transformer

MD1-0-V-570-05-00021B

Inspection and Test Plan


I for 123KV WITTAYA
Voltage Transformer

MD1-0-V-570-05-00022A

Inspection and test procedure


I
for 123KV
WITTAYA
Voltage Transformer

MD1-0-V-570-05-00023B

Inspection and Test Plan


I for 550KV WITTAYA
Voltage Transformer

MD1-0-V-570-05-00024A

Inspection and test procedure


I
for 550kv
WITTAYA
voltage transformer

MD1-0-V-570-05-00025B

Inspection and Test Plan


I for 96KV Surge
WITTAYA
Arrester

MD1-0-V-570-05-00026B

Inspection and test procedure


I
for 96kv
WITTAYA
surge arrester

MD1-0-V-570-05-00027B

Inspection and Test Plan


I for 438KV WITTAYA
Surge Arrester

MD1-0-V-570-05-00028B

Inspection and test procedure


I
for 438kv
WITTAYA
surge arrester

MD1-0-V-570-05-00029B

Inspection and test planI for 123kv post


WITTAYA
and disc insulator

MD1-0-V-570-05-00030A

Inspection and test procedure


I
for 123kv
WITTAYA
post and disc insulator

MD1-0-V-570-05-00031B

Inspection and test planI for 550kv post


WITTAYA
and disc insulator

MD1-0-V-570-05-00032A

Inspection and test procedure


I
for 550kv
WITTAYA
post and disc insulator

MD1-0-V-570-05-00037A

Inspection and test planI for control and


WITTAYA
protection panel

MD1-0-V-570-05-00038B

Inspection and test procedure


I
for control
WITTAYA
and protection panel - 110kv swyd

MD1-0-V-570-05-00039A

Inspection and test planI for control and


WITTAYA
protection panel - 500kv swyd

MD1-0-V-570-05-00040B

Inspection and test procedure


I
for control
WITTAYA
and protection panel - 500kv swyd

MD1-0-V-570-05-00041A

Inspection and Test Plan


I for Switchyard
WITTAYA
Computerized Control System

MD1-0-V-570-05-00042A

Inspection and Test Procedure


I
for Switchyard
WITTAYA Computerized Control System

MD1-0-V-570-05-00043A

Inspection and test planI for ac and dc


WITTAYA
distribution panel - 110kv swyd

MD1-0-V-570-05-00044B

Inspection and test procedure


I
for acWITTAYA
and dc distribution panel - 110kv swyd

MD1-0-V-570-05-00045A

Inspection and test planI for ac and dc


WITTAYA
distribution panel-500kv swyd

MD1-0-V-570-05-00046B

Inspection and test procedure


I
for acWITTAYA
and dc distribution panel - 500kv swyd

MD1-0-V-570-05-00047B

Inspection and test planI for switchyard


WITTAYA
220v dc battery and battery charger

MD1-0-V-570-05-00048A

Inspection and test procedure


I
for switchyard
WITTAYA
220v dc battery and battery charger

MD1-0-V-570-05-00051A

Inspection and test planI for busbar and


WITTAYA
lightning conductor

MD1-0-V-570-05-00052A

Inspection and test procedure


I
for busbar
WITTAYA
and lightning conductor

MD1-0-V-570-05-00053B

Inspection and test planI for switchyard


WITTAYA
cable

MD1-0-V-570-05-00054A

Inspection and test procedure


I
for switchyard
WITTAYA
cable

MD1-0-V-570-05-00055B

Inspection and test planI for terminalWITTAYA


connector and busbar material and accessos

MD1-0-V-570-05-00056A

Inspection and test procedure


I
for terminal
WITTAYA
connector and busbar material and acs

MD1-0-V-570-05-00057B

Inspection and test planI for communication


WITTAYA
system

MD1-0-V-570-05-00058B

Inspection and test procedure


I
for communication
WITTAYA
system

MD1-0-V-570-05-00061A

500kv and 110kv switchyard


I
workingWITTAYA
method statement

MD1-0-V-570-05-00076A

500KV and 110KV Switchyard


I
Control
WITTAYA
and Protection System Operation and Maintenal

MD1-0-V-570-06-00002B

500KV and 110KV Switchyard


I
Lighning
WITTAYA
Protection Calculation

MD1-0-V-570-06-00003B

500KV and 110KV Switchyard


I
FloodWITTAYA
Lighting Calculation

MD1-0-V-570-06-00004B

500kv and 110kv switchyard


I
ct calculation
WITTAYA

MD1-0-V-570-06-00005B

500kv and 110kv switchyard


I
vt calculation
WITTAYA

MD1-0-V-570-06-00007B

500kv and 110kv switchyard


I
220v dc
WITTAYA
system sizing calculation

MD1-0-V-570-07-00001A

110KV Switchyard Equipment


I
ShopWITTAYA
Test and Inspection Report

MD1-0-V-570-07-00003A

500KV Switchyard AC/DC


I System Shop
WITTAYA
Test and Inspection Report

MD1-0-V-570-07-00004A

110KV Switchyard Control


I and Protection
WITTAYA
System Shop Test and Inspection Report

MD1-0-V-570-08-00006A

500KV and 110KV Switchyard


I
Spare
WITTAYA
Parts and Special Tools List

MD1-0-V-570-08-00008B

110kv switchyard cable Ischedule

MD1-0-V-570-08-00009A

500kV and 110kV Switchyard


I
CableWITTAYA
Schedule for Computerized Control System

MD1-0-V-570-08-00012B

500kv switchyard cable Ischedule

MD1-0-V-570-10-00001A

500KV & 110KV Switchyard


I
Tech. Specification,
WITTAYA Steel Supporting Structure Drwg

MD1-0-V-570-10-00002A

500KV & 110KV Switchyard


I
Tech. Specification,
WITTAYA Steel Tower Structr. Drwgs

MD1-0-V-570-11-00002B

500kV and 110kV Switchyard


I
Mounting
WITTAYA
Guideline

MD1-0-V-570-11-00004B

500kV and 110kV Switchyard


I
Earthing
WITTAYA
Material

MD1-0-V-570-31-00003B

500kV and 110kV Switchyard


I
AC and
WITTAYA
DC System Single Line Diagram

MD1-0-V-570-32-00013B

500kV and 110kV Switchyard


I
PowerWITTAYA
Supply Principle for Control

MD1-0-V-570-32-00015B

500kv and 110kv switchyard


I
schematic
WITTAYA
diagram for ac and dc system

MD1-0-V-570-32-00017B

500KV & 110KV Switchyard


I
Schematic
WITTAYA
Diagram for Computerized Control System

MD1-0-V-570-33-00001C

500KV and 110KV Switchyard


I
Tripping
WITTAYA
Matrix

MD1-0-V-570-33-00002C

500KV & 110KV Switchyard


I
Logic Control
WITTAYA
Diagram

MD1-0-V-570-36-00001B

500KV and 110KV Switchyard


I
Computerized
WITTAYAControl System General Configuration

MD1-0-V-570-36-00004C

500kv and 110kv switchyard


I
automatic
WITTAYA
data collecting and transmitting system gen

WITTAYA

WITTAYA