765 KV S/C KORAADI - AKOLA TRANMISSION LINE M/S JYOTI STRUCTURES LTD. LOC.NO. to LOC. No
ITEM CHECKED
RESULT
OBSERVATION, IF ANY
A) 1)
Pre-stringing checks: Backfilling of soil and revetment/Benching wherever required is done. Yes/No.
2)
Towers are tightened properly and all the members, Nut/Bolts are provided.
Yes/No
3)
Yes/No
4)
All line materials, tested T&P, safety equipments and relevant drawings available for stringing.
Yes/No.
5)
Yes/No
6)
Yes/No.
7)
Yes/No
8)
Yes/No
B) 1) 2) 3) 4)
Paying Out of Earthwire Work is being carried out with full safety measures as per guide line. Traveling rounds are provided. Paying out is carried out as per approved Drum schedule. All pulleys fixed on towers for paying out are moving freely. Yes/No. Yes/No Yes/No Yes/No.
5)
Yes/No
6)
Yes/No.
7)
Necessary arrangement have been provided to avoid rubbing of earthwire against hard ground.
Yes/No
8)
Yes/No
C) 1)
Paying out of Conductor Work is being carried out with full safety Measures as per guideline. Yes/No
2)
Yes /No
3)
Yes/No.
4)
Yes/No
5) 6)
Details of insulators and fitting are recorded. Paying out is carried out as per approved Drum schedule.
Yes/No Yes/No.
7)
Yes/No
8)
Yes/No.
Walkie-talkie and through persons standing On towers for smooth and safe paying out. 9) Conductor is checked continuously as it Is unwound from drum. Damaged portion, If any, is removed/repaired. 10) Proper arrangements made to avoid rubbing of conductor on ground/hard surfaces. 11) Details of conductor and M.S.J./repair sleeve Is recorded. D) 1) Final Sagging & Tensioning of Earthwire & Conductor Sag board is fixed correctly after taking into account length of suspension clamp/fittings. 2) No. of sag boards fixed in a section is as per technical specification. 3) Sag is measured correctly at prevailing Temperature. Details recorded 4) Sag mismatch is within permissible limits of 40mm as checked with theodolite. 5) After measuring sag, marking/cutting of earthwire/conductor is done correctly to fix tension clamp/fittings). 6) Details of tension clamp/fitting are recorded Yes/No Yes/No. Yes/No Yes/No Yes/No. Yes/ No Yes/No Yes/No Yes/No
E) 1)
Clipping of Earth wire and Conductor For clipping, the marking is done correctly so that suspension clamp/fitting hangs exactly vertical. Yes/No
2)
Yes/No
3)
Following line material provided as per specification. Details recorded as shown below.
Yes/No
a) b)
Suspension clamp of earth wire and conductor a Vibration Dampers for earth wire and conductor
Details of c) spacer/spacer damper/jumper spacer Reco d) e) 4) Jumper for earthwire/conductor. Pilot fitting, wherever necessary. Sag/tension again measured after clipping and found Ok.
5)
Yes/No.
6)
All line materials provided as per specification and approved drawings. All necessary details recorded for traceablility.
Yes/No
7)
Yes/No.
8)
Minimum Ground clearance, clearance over Power line/railway line/river crossing are as per specification.
Yes/No
Certificate : Stringing is completed in all respects. FOR JYOTI STRUCTURES LTD. Signature Name Designation Date FOR PMC Projects (India) Pvt.Ltd Signature.. Name Designation : .. Date
DETAILS OF EARTHWIRE/CONDUCTOR
1. 2. 3. MAKE. Batch No. Location Remarks SR.NO. DRUM NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 LENGTH INITIAL LENGTH PAID LOC. TO LOC. PHASE BAL.
EARTHWIRE 1 2
There is no damage to earthwire/conductor before or during stringing. Strands are in perfect position.
Name..
Name
Designation
Designation:..
Date
Date..
DETAILS OF M.S. JOINT FOR EARTHWIRE/CONDUCTOR AND REPAIR SLEEVE FOR CONDUCTOR
1. Make. 2. Batch No. 3. Location. Sl. No. 1 2 3 4 5 6 7 8 Between Loc No. Phase REMARKS
4) M.S. Joint has been provided at least 30 meters away from tower. 5) There is no M.S. Joint over railway/River/Main road crossing. 6) Not more than one M.S. joint provided in one span for each earthwire/conductor..
QTY.
Phase
REMARKS
QTY.
Phase
REMARKS
RECORDS OF INSULATORS
1. Type2. Make. 3. Batch No. 4. Electro Mechanical Strength. 5. Quantity and Location.
Quantity Sl. No. Loc. NO. Qty.as per RRRRRRR specification 125KN Remarks RIGHT 120KN TOP 210KN LEFT 120KN
4) Insulators are completely cleaned with soft cloth. Glazing is proper. There is no crack, scratch or white spot on its surface. 5) While hoisting, no damage caused to insulators. FOR JYOTI STRUCTURES LTD.
Signature Name Designation Date
Sl. No.
Loc. NO.
Remarks
6) Insulators are completely cleaned with soft cloth. Glazing is proper. There is no crack, scratch or white spot on its surface.
7) While hoisting, no damage caused to insulators.
5) All nuts/bolts properly tightened. 6) All components of fittings have been provided as per approved drawings. Dimensions and galvanizing are Ok. Fitting is cleaned and there is no damage to any component. 7) All split pins properly provided. FOR JYOTI STRUCTURES LTD.
Signature Name Designation Date
1) 2) 3)
Loc No. C
o
and .
Sag
MIDDLE
Sag
4)
During paying out/rough sagging, tension in conductor/Earth wire was as per technical specifications.
5)
For final Sagging, initial stringing chart for conductor and final stringing chart for earth wire are used.
FOR PMC Projects (India) Pvt.Ltd Signature.. Name Designation: ... Date..
1) 2) 3)
Loc No. C
o
and
Sag
LEFT
4) During paying out/rough sagging, tension in conductor/Earth wire was as per technical specifications. 5) For final Sagging, initial stringing chart for conductor and final stringing chart for earth wire are used.
FOR PMC Projects (India) Pvt.Ltd Signature.. Name Designation: ... Date..
1) 2) 3)
Sl.No. 1 2 3
Loc No.
Quantity
Remarks
All Components of clamps have been provided as per approved drawings. Dimensions and galvanizing are Ok clamp is cleaned and there is no damage to any component. 4) 5) 6) All Nuts & bolts have been properly tightened. Spilt pins have been properly fixed. In case of tension clamp, dimensions before and after compression recorded
1) 2) 3)
Sl.No. 1 2
Phase/wire No.
No. of V.D.
4)
All components of V.D. have been provided as per approved drawings. Dimensions and galvanizing are O.K. V.D. is cleaned and there is no damage to any component.
5) 6)
Nuts & bolts tightened properly. V.D. fixed as per approved placement chart.
1) 2) 3)
Sl.No.
To Loc No.
Span
Nos. of spacer
Jumper Spacer
4)
All Components of spacer have been provided as per approved drawings. Dimensions and galvanizing are Ok. Spacer is cleaned and there is no damage to any component.
5) 6)
Nuts & bolts tightened properly. Spacer/spacer damper fixed as per approved placement chart.
Aluminium Portion As per drg. Actual Aft. Comp. Aft. Comp Length C-C F-F Lengt C-C F-F h
v) vi) vii)
Aluminium Portion As per drg. Actual Aft. Comp. Aft. Comp Length C-C F-F Lengt C-C F-F h
Apprd. Drg. No. ACJ- 001 Details of dimensions Aluminum Portion Steel Portion As per drg. Aft. Comp. Length C-C F-F Actual Aft. Comp. Length C-C F-F As per drg. Aft. Comp. Length C-C F-F Actual Aft. Comp Length C-C F-F
Span 3499mtr, Loc. No to Apprd. Drg. No. AGTC -001 & AGCJ -001
iv)
Details of dimensions Aluminium Portion Steel Portion As per drg. Aft. Comp. Length C-C F-F Actual Aft. Comp. Length C-C F-F As per drg. Bef. Comp. Aft. Comp. Length Outer Length C-C F-F dia Actual Aft. Comp Length C-C F-F
i)
The following may be checked as per approved drawing. a) Marking and cutting. b) Correct sizes of dies. c) Centering & fixing of sleeves. d) Fixing of all the components ie. Aluminium end pipes, hole plugs etc. e) Compression of sleeves at specified pressure. f) Application of filler paste (Zinc chromate)
ii) iii)
All the sharp edges have been filled after compression. There is no crack, bend or any damage to joint after compression.