1.3+ m

An array (Matrix) of small turbines instead of conventional sized turbines Best suited for low head sites with existing dam and weir structures Most economical in larger numbers -> not a typical small hydro application

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Application criteria


Available plant discharge from ~ 60 m/s Available head from 2 m up to 25 m Minimum submergence 1.5 m below tailwater Unit output from 100 kW up to ~ 1500 kW Grid connection in close vicinity Structure available & suitable for HYDROMATRIX

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Advantages
Use of existing weir structures No major civil construction > less cost Little excavation & no coffer dams > less geological risk No additional land usage -> environmentally friendly Existing river flow pattern can be maintained HYDROMATRIX Modules removeable at flood conditions Standardized modular concept

Compressed project schedule


High availability & easy maintenance

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Application Range

Head 2 - 20 m
HWL

Submergence > 1.5 m

TWL

Plant Flow > 60 m/s


Unit flow 5-12 m3/s Unit Output 100 kW up to 1500 kW

Sill level

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Projects Locations

Nussdorf Freudenau Agonitz Lower St. Anthony Falls Colebrook Chievo Ashta I&II

Jebel Aulia

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Operating Range

ANDRITZ HYDRO 2012

www.andritz.com

StrafloMatrix Operating Range

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Energy Production

HYDROMATRIX 9 units

HYDROMATRIX 3 units

Typical Compact Hydro - solution

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Design Features


Unregulated propeller turbine (CuAlNiFe or CrNi 13.4) Directly driven synchronous (Permanent Magnet Technology) or asynchronous generator Welded hydraulic steel structure

Mechanical face seal


Roller type bearings, oil sump lubrication Light weight (9 13 t) -> truckable

Minimum maintenance -> annual oil change


Flexible concept - Modular switchgear

10

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Influences on Dam Structure


Loads on dam Horizontal dam loads

Statical loads less than without HYDROMATRIX


Dynamical loads identical Vertical dam loads Additional weight through modules

Additional weight through new crane and trash rack cleaning machine
Civil works Anchors for guiding rails, supports and platforms Protection pipes, cable trays

12

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Innovation: From HYDROMATRIX to StrafloMatrixTM


HYDROMATRIX StrafloMatrixTM

Turbine

Turbine

Generator

Generator

13

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Differences HYDROMATRIX vs StrafloMatrixTM


HYDROMATRIX
Simple Bulb Design
Synchronous or Asynchronous Operation Perm. Magnets or Conventional Rotor Winding Longer, Heavier than StrafloMatrix

StrafloMatrix
Generator outside of flow (straight flow)
Synchronous Operation Permanent Magnet Technology Shorter, Less Weight No PF Compensation required

PF Compensation (for asynchronous version only)

14

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Operation Aspects


Maintenance intervals
TG-Units: Annual Oil Inspection / Change

BOP Equipment:
According to maintenance schedule UW - Cables: Change every 10-12 years

Accessibility
Easy access to all maintenance-relevant components without disturbance of overall plant operation

Expected life time


Identical to conventional hydropower concepts

15

ANDRITZ HYDRO 2012

www.andritz.com

StrafloMatrixTM

Features of the StrafloMatrix unit

Turbine runner serves as support for the generator rotor Generator rotor is equipped with permanent magnets

16

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Potential Applications

Navigation Dams

Irrigation Dams

Intake Towers

Canals and Abandoned Shiplocks

18

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX

Application: Irrigation Dams

HYDROMATRIX Experience Irrigation Dams JEBEL AULIA /Sudan


Client: National Electricity Corp. D = 1,120 mm n = 375 rpm H = 5.5 m Ptu = 380 kW 80 Hydromatrix units in 40 modules Ptotal = 30.4 MW Existing barrage on the White Nile Contract award: 2000

20

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Experience Irrigation Dams JEBEL AULIA /Sudan

Status November 2003

22

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Experience Irrigation Dams JEBEL AULIA /Sudan

Status November 2003

23

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Experience Irrigation Dams JEBEL AULIA /Sudan

Status November 2003

24

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Experience Irrigation Dams JEBEL AULIA /Sudan

Status November 2003

25

ANDRITZ HYDRO 2012

www.andritz.com

StrafloMatrixTM Experience Agonitz / Austria


Client: Energie AG D = 1,120 mm n = 428.6 rpm H = 8.5 m Ptu = 700 kW 1 unit, further development of HYDROMATRIX Contract award: 2002 Commissioning: 2003

27

ANDRITZ HYDRO 2012

www.andritz.com

StrafloMatrixTM Experience Agonitz / Austria


Installation of the first permanent StrafloMatrix unit in March 2004

28

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Experience NUSSDORF / Austria


Client: AHP / EVN / Wienstrom

29

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Experience NUSSDORF / Austria


Client: AHP / EVN / Wienstrom D = 1,320 mm n = 336.7 rpm H = 5.86 m Ptu = 545 kW 12 single units Ptotal = 4.5 MW Contract award: 2004 Commissioning: 2005

30

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Experience NUSSDORF / Austria


Client: AHP / EVN / Wienstrom D = 1,320 mm n = 336.7 rpm H = 5.86 m Ptu = 545 kW 12 single units Ptotal = 4.5 MW Contract award: 2004 Commissioning: 2005

31

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Experience NUSSDORF / Austria

Construction Phase

32

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX

Application: Intake Towers

HYDROMATRIX Experience Intake Tower COLEBROOK / USA


Client: Metro Hartford D = 660 mm n = 900 rpm H = 8 - 35 m Ptu = 500 kW 6 units in 2 modules*) Ptotal = 3 MW Contract award: 1987 Commissioning: 1988
*) Design by Obermeyer Hydro Inc.
34 ANDRITZ HYDRO 2012 www.andritz.com

HYDROMATRIX

Application: Shiplocks

HYDROMATRIX Experience Sluice in Shiplocks FREUDENAU / Austria


Client: Donaukraft D = 910 mm n = 500 rpm H = 10.3 - 1.0 m Ptu = 200 kW 25 units in one module Ptotal = 5 MW Contract award: 1997 Commissioning: 2000

38

ANDRITZ HYDRO 2012

www.andritz.com

CHIEVO DAM - Italy Project Location

39

ANDRITZ HYDRO 2012

www.andritz.com

CHIEVO DAM - Italy Design Challenges


Use minimum river discharge for hydropower generation at existing lock & dam Maintain flood discharge capability through lock Use existing lock structure without major modifications Preserve architectural appearance of historic environment Establish possibilities for fish migration

40

ANDRITZ HYDRO 2012

www.andritz.com

CHIEVO DAM - Italy Plant Layout

41

ANDRITZ HYDRO 2012

www.andritz.com

StrafloMatrixTM Experience CHIEVO DAM / Italy


Client: Consorzio Canale Ind. le G.Camuzzoni
Consultant: Studio Frosio D = 1,320 mm n = 250 rpm H = 3.8 m Ptu = 270 kW 5 units in 1 module
Prior to StrafloMatrix plant construction

Ptotal = 1.35 MW
Annual Energy: 12 GWh Project Start: 2007
During StrafloMatrix plant construction

Commissioning: 2009

42

ANDRITZ HYDRO 2012

www.andritz.com

StrafloMatrixTM Experience CHIEVO DAM / Italy

The Winner of Austrian State Award for Environmental and Energy Technology 2010

44

ANDRITZ HYDRO 2012

www.andritz.com

LOWER ST. ANTHONY FALLS - USA StrafloMatrixTM Power Plant

LSAF prior to installation of StrafloMatrixTM Power Plant

(3)

LSAF after installation of StrafloMatrixTM Power Plant

45

ANDRITZ HYDRO 2012

www.andritz.com

LOWER ST. ANTHONY FALLS - USA Design Challenges


Use existing lock structure without major modifications (no excavation)

Maintain flood discharge capability through lock


Model test at TU VIE Fulfill grid interconnection requirements

No adverse effects on barge and rec. boat traffic


Preserve architectural appearance of existing lock

46

ANDRITZ HYDRO 2012

www.andritz.com

LOWER ST. ANTHONY FALLS - USA StrafloMatrixTM Plant in Auxiliary Shiplock


Technical Data:
16 TG-units (2 rows of 8)

D = 1,320 mm
n=327.3 rpm H GR max = 7.6 m P Gen = 625 kW Max. Plant Capacity: 10 MW Annual Energy: 62 GWh Project Start: 2007

Commissioning and taking over: 2011


Output 8 % higher than guarenteed
47 ANDRITZ HYDRO 2012 www.andritz.com

LOWER ST. ANTHONY FALLS - USA Site Construction and Equipment Installation

48

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Experience ASHTA I & II / Albania


Client: Energji Ashta

2 HYDROMATRIX plants 45 Modules (1 row) per plant 1 TG-Unit per Module Ptotal = 24 + 45 MW Annual Energy: 242 GWh Project Start: Dec. 2008 Commissioning: 2012

50

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Experience ASHTA I & II / Albania


Plant Layout
2 Plants, 45 TG-Units each
HPP Vau i Dejes KW Vau i Dejes

6 km newly constructed discharge canal between Ashta 1 & 2


Spathara weir Spatharawehr

Turn-key supply of E & M Equipment


HPP Ashta22 KW Ashta

HPP Ashta 1 1 KW Ashta

Restwasserkanal, Residual flow canal, Fischaufstiegshilfe Fish ladder

Unterwasserkanal mit anschl. Tailrace canal with riverbed deepening Unterwassereintiefung

Diversion channel Ausleitungskanal

Source: Energij Ashta - A project company of VERBUND and EVN, used by permission

51

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Experience ASHTA I & II / Albania

TECHNICAL DATA: Ashta 1


OUTPUT: 45 x 534 kW = 24.03 MW / 24.64 MVA HEAD: 4.98 m SPEED: 300.0 rpm RUNNER DIAMETER: 1,320 mm RATED VOLTAGE: 3,300 V

TECHNICAL DATA: Ashta 2


NUMBER OF TG-UNITS: 45 OUTPUT: 45 x 1,003 kW = 45.14 MW / 46.29 MVA HEAD: 7.53 m SPEED: 375.0 rpm RUNNER DIAMETER: 1,320 mm RATED VOLTAGE: 3,300 V Sectional View Ashta 1

52

ANDRITZ HYDRO 2012

www.andritz.com

ASHTA I & II Project Power house


Ashta I View from downstream side

Ashta II View from downstream side

Source: Energij Ashta - A project company of VERBUND and EVN, used by permission

53

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX ASHTA I & II / Albania

Ashta 1- during construction, Upstream view

Hydromatrix TG-units

54

ANDRITZ HYDRO 2012

www.andritz.com

ASHTA I & II Site Construction - Status 2011


Ashta 1 - First section, upstream side, Intake canal Ashta 1 - power house & installed crane

Ashta 1 - UG-Gallery, ready for installation of Ashta 1 - Installed Draft Tube Gate

E & M equipment

Ashta 2 - Start of concreting dam

55

ANDRITZ HYDRO 2012

www.andritz.com

ASHTA I Site Construction - Status January 2012

Upstream view

Downstream view

56

ANDRITZ HYDRO 2012

www.andritz.com,

ASHTA II Site Construction: Januar 2012

Upstream view

Downstream view

57

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX

Application: Navigation Dams

HYDROMATRIX Concept Navigation Dams Ohio River

59

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Concept Navigation Dams Ohio River


Typical purpose of navigation dams: Navigation and flood control HYDROMATRIX concept: Installation of movable HYDROMATRIX modules in bulkhead gate slots

Lock & Dam on the Ohio River

Radial gates
Bay 11 Bay 10 Bay 9 Bay 8 Bay 7 Bay 6 Bay 5 Bay 4 Bay 3 Bay 2 Bay 1

HYDROMATRIX modules

Flow

60

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Concept Navigation Dams Ohio River

5 Power Modules installed in stoplog slots of the tainter gate bays HYDROMATRIX: 2 x 17 units per Module Runner Diameter: Rated Net Head: Rated unit Discharge Rated Module Discharge Rated output / TG unit: Total Rated Plant Output: 1.25 m 6.5 m 10.6 m/s 360.4 m/s 500 kW 85 MW

61

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Concept Module Cross Section


HW

Spillway Gates

Intake Trashracks
TW

Generator Switchgear & control system

Hydraulic Pressure Unit

Turbine Generator units

Draft Tube Gates

62

ANDRITZ HYDRO 2012

www.andritz.com

HYDROMATRIX Contact Worldwide


http://www.hydromatrix.com

For more information about HYDROMATRIX please contact:


Alexander BIHLMAYER HYDROMATRIX Product Management

ANDRITZ HYDRO GmbH A - 4031 Linz, Austria Lunzerstrasse 78


Phone: Fax: E-mail: Web: +43 (732) 6986 74261 +43 (732) 6980 2554 alexander.bihlmayer@andritz.com http://www.andritz.com

63

ANDRITZ HYDRO 2012

www.andritz.com

Você também pode gostar