An array (Matrix) of small turbines instead of conventional sized turbines Best suited for low head sites with existing dam and weir structures Most economical in larger numbers -> not a typical small hydro application
www.andritz.com
www.andritz.com
HYDROMATRIX Advantages
Use of existing weir structures No major civil construction > less cost Little excavation & no coffer dams > less geological risk No additional land usage -> environmentally friendly Existing river flow pattern can be maintained HYDROMATRIX Modules removeable at flood conditions Standardized modular concept
www.andritz.com
Head 2 - 20 m
HWL
TWL
Sill level
www.andritz.com
Nussdorf Freudenau Agonitz Lower St. Anthony Falls Colebrook Chievo Ashta I&II
Jebel Aulia
www.andritz.com
www.andritz.com
www.andritz.com
HYDROMATRIX 9 units
HYDROMATRIX 3 units
www.andritz.com
10
www.andritz.com
Additional weight through new crane and trash rack cleaning machine
Civil works Anchors for guiding rails, supports and platforms Protection pipes, cable trays
12
www.andritz.com
Turbine
Turbine
Generator
Generator
13
www.andritz.com
StrafloMatrix
Generator outside of flow (straight flow)
Synchronous Operation Permanent Magnet Technology Shorter, Less Weight No PF Compensation required
14
www.andritz.com
BOP Equipment:
According to maintenance schedule UW - Cables: Change every 10-12 years
Accessibility
Easy access to all maintenance-relevant components without disturbance of overall plant operation
15
www.andritz.com
StrafloMatrixTM
Turbine runner serves as support for the generator rotor Generator rotor is equipped with permanent magnets
16
www.andritz.com
Navigation Dams
Irrigation Dams
Intake Towers
18
www.andritz.com
HYDROMATRIX
20
www.andritz.com
22
www.andritz.com
23
www.andritz.com
24
www.andritz.com
25
www.andritz.com
27
www.andritz.com
28
www.andritz.com
29
www.andritz.com
30
www.andritz.com
31
www.andritz.com
Construction Phase
32
www.andritz.com
HYDROMATRIX
HYDROMATRIX
Application: Shiplocks
38
www.andritz.com
39
www.andritz.com
40
www.andritz.com
41
www.andritz.com
Ptotal = 1.35 MW
Annual Energy: 12 GWh Project Start: 2007
During StrafloMatrix plant construction
Commissioning: 2009
42
www.andritz.com
The Winner of Austrian State Award for Environmental and Energy Technology 2010
44
www.andritz.com
(3)
45
www.andritz.com
46
www.andritz.com
D = 1,320 mm
n=327.3 rpm H GR max = 7.6 m P Gen = 625 kW Max. Plant Capacity: 10 MW Annual Energy: 62 GWh Project Start: 2007
LOWER ST. ANTHONY FALLS - USA Site Construction and Equipment Installation
48
www.andritz.com
2 HYDROMATRIX plants 45 Modules (1 row) per plant 1 TG-Unit per Module Ptotal = 24 + 45 MW Annual Energy: 242 GWh Project Start: Dec. 2008 Commissioning: 2012
50
www.andritz.com
Source: Energij Ashta - A project company of VERBUND and EVN, used by permission
51
www.andritz.com
52
www.andritz.com
Source: Energij Ashta - A project company of VERBUND and EVN, used by permission
53
www.andritz.com
Hydromatrix TG-units
54
www.andritz.com
Ashta 1 - UG-Gallery, ready for installation of Ashta 1 - Installed Draft Tube Gate
E & M equipment
55
www.andritz.com
Upstream view
Downstream view
56
www.andritz.com,
Upstream view
Downstream view
57
www.andritz.com
HYDROMATRIX
59
www.andritz.com
Radial gates
Bay 11 Bay 10 Bay 9 Bay 8 Bay 7 Bay 6 Bay 5 Bay 4 Bay 3 Bay 2 Bay 1
HYDROMATRIX modules
Flow
60
www.andritz.com
5 Power Modules installed in stoplog slots of the tainter gate bays HYDROMATRIX: 2 x 17 units per Module Runner Diameter: Rated Net Head: Rated unit Discharge Rated Module Discharge Rated output / TG unit: Total Rated Plant Output: 1.25 m 6.5 m 10.6 m/s 360.4 m/s 500 kW 85 MW
61
www.andritz.com
Spillway Gates
Intake Trashracks
TW
62
www.andritz.com
63
www.andritz.com