Hi all, I'm racking my brains trying to find the best way to disassembly a product. I want to assembly the product with its BOM and its routing, but also I want to have the capability to have the reverse process taking advantage of from the master data I just have (the same BOM and routing). I can have a negative qty on production order...... Have You any hint? Thank You. Helpful Answer by Rajesh Vittal

1441 Views
Average User Rating (0 ratings)

Helpful AnswerRe: Disassembly production order

Rajesh Vittal Aug 27, 2007 1:45 PM (in response to Sergio Branca)
Dear, It is nothing but the by-product ot co-product concept in SAP. suppose u have Product A and BOm item B and C. U have productin order for A and B and C are consumed, Now you need tio have BOM for B where A is input material C is a byroduct. So when you create a Production order for B, it will consume A and it will give B and C(c as by product/co-product) You cannot have the same BOM....If you want to have the correct cost.

Report Abuse

o Re: Disassembly production order

Like (0)

ravi ramasamy Aug 28, 2007 9:04 AM (in response to Sergio Branca)
Hi, The BOM & routing of the finished product cannot be used for the dismantling process. A typical procedure for dismantling process is given below: 1)Create a separate order type for dismantling process 2)Create a Ref operation set for dismantling operation. You can have dismantling as the only one operation. The work center can be a work bench/ Assembly rig. Enter a suitable control key with auto GR. 3)Create an order using CO07 without ref to any material. Enter the order type for dismantling process. Enter the Ref opn set for dismantling when the system asks. 4) In the operation overview/detail screen change the standard value data as required depending upon the product dismantled

5) In the component over view enter the finished product with positive qty, enter the components of the finished product and maintain their qty in negative. Save the order 6)During confirmation you can enter the actual time taken for dismantling. Now system will consume the finished product that is dismantled & all its components will be put back into stock automatically. Note for settlement rule : You can have the cost center as the a/c assignment category. Enter the cost center for which the dismantling work bench/rig is assigned

Regards, Ramasamy

Report Abuse

o o
Re: Disassembly production order

Like (0)

Rajesh Vittal Aug 28, 2007 11:07 AM (in response to ravi ramasamy)
Dear, where will you settle the order?

Report Abuse

o
Re: Disassembly production order

Like (0)

Sergio Branca Aug 30, 2007 3:01 PM (in response to ravi ramasamy)
Thanks all.

Report Abuse

Re: Disassembly production order

Like (0)

Pritam Biswal Oct 2, 2011 1:31 PM (in response to Sergio Branca)


Hi Sergio I am working on the same scenario. Please tell me how you configured this scenario... Regards PKB