Program/Project Titles
1. Integrating DRR/CCA Project and Enhancing Capacities on DRRM/CCA Project (RDC/NEDA-X) 2. Enabling the Cities of Cagayan de Oro and Iligan to Cope with Climate Change (Project Climate Twin Phoenix of Climate Change Commission) 3. Nationwide Operations for the Assessment of Hazards (NOAH) under the National Flood Monitoring, Forecasting and Mitigation Program (NFM2) of DOST 4. Strengthening Capacity of LGUs on DRRM CCA (DILG) 5. Integrated Rehabilitation Management Framework Plan (DENR/USAID) 6. Urban Infrastructure Investment Program and Prefeasibility Study in the Areas of Cagayan de Oro River Watershed Management Wastewater, Management and Solidwaste Management under the CDIA 7. Philippine Rural Development Program (PRDP) of DA 8. Integrated Natural Resources and Environmental Management Project (INREMP) of DENR 9. Preparatory Survey for the Flood Risk Management Project for Cagayan de Oro River (FRIMPCDOR) of DPWH 10. Post-disaster Recovery, Adaptation and Resiliency building in Five Barangays of Cagayan de Oro (Balai Mindanao) 11. Storm Water Drainage Situation Study in Cagayan de Oro City (Oro Chamber)
Region 10, Five Provinces Three Cities (Cagayan, Iligan and Valencia)
Implementing NEDA/RDC-X, in close coordination with HLURB Entities and RLUC-X, the covered LGUs and selected NGOs/PS and academe Timetable/ Period Source of Fund 2010 up to May 2013 UNDP (AusAID and NZAP)
d. Disaster Risk Reduction and Management (DRRM) Options (structural & nonstructural)
e. IEC on DRRM/CCA Phase 2: Formulation of DRR/CCA-Enhanced Regional Physical Framework Plan, Provincial Development Physical Framework Plans and Comprehensive Land Use Plans a. Capacity building on integrating DRRM/CCA in development and physical planning b. Formulation of DRR/CCA-Enhanced RPFP, 5 PDPFPs and 3 CLUPs c. Advocacy of DRR/CCA-Enhanced plans
methodologies 1 & 2 and vulnerability assessment at the provincial level by the Regional Project Core Team Workshops conducted and continuing technical assistance provided by HLURB and NEDA to the 3 cities
IEC and Consultation
Regional DRR/CCA forum conducted on July 31, 2012 presentation of draft DRAs of the five provinces in the region
Regional experts forum in partnership with climate Change Commission on October 1011, 2012
2. Enabling the Cities of Cagayan de Oro and Iligan to Cope with Climate Change Project Climate Twin Phoenix
Location/ Area/ Coverage Implementing Entities Timetable/ Period Source of Fund Components/ Deliverables
Cities of Cagayan de Oro and Iligan and the municipalities surrounding the CDO and Mandulog river basins Climate Change Commission 2012-2014 GOP, AusAID, UNDP/ BCPR Component 1: Climate Change Vulnerability/Disaster Risk Assessment
2. Enabling the Cities of Cagayan de Oro and Iligan to Cope with Climate Change Project Climate Twin Phoenix
Components /Deliverables
Output 1: Climate/disaster risk vulnerabilities of CDO and Iligan cities and the surrounding areas assessed (risk maps and V & A reports produced) Component 2: Development of Priority Climate Adaptation and Disaster Risk Mitigation Actions Output 2: Community-based and Managed Early Warning Systems (CBMEWS); and Interagency/Multi-sectoral coordination mechanisms for disaster preparedness and response strengthened in the targeted areas Component 3: IEC Campaign and Competency Development of Local Actors on CCA and DRM Output 3: Awareness of general populace on C/DRM and competencies of key local actor in target areas on mainstreaming CCA/DRM into local planning and regulatory processes enhanced Output 4: C/DRM mainstreaming demonstrated in local land use/development plans and regularly processes in target areas Component 4: Socio-economic Resilience development for the Poor and Most Vulnerable Output 5: Climate-resilient livelihood models and risk sharing/transfer mechanisms and products Component 5: Knowledge Management Output 6: Local knowledge management system for communities around the CDO and Mandulog river basins established
3. Nationwide Operations for the Assessment of Hazards (NOAH) under the National Flood Monitoring, Forecasting and Mitigation Program (NFM2) of DOST
Location/ Area/ Coverage Implementing Entities Timetable/ Period Source of Fund Nationwide DOST 2012-2013
Components/ Deliverables
Sensors/Communication Development/Rain Gauges/Water level sensor/Communication Platform FloodNET: Rainfall and Flood Information Network - Rainforcasting, Riverbasin Modeling, DREAM Program, 3D mapping, Flood simulation, Weather Media,, Weather Channel, SMS, online platforms, etc. -Established in eight areas Status of -Roll-Out in 2012: 18 Riverbasins nationwide including Tagoloan Implementation (As of September 30, River Basin ,17 Riverbasins including Tagoloan
2012)
All LGUs in Region X DILG 2012-2013 DILG-LGA Assessment -Seal of Disaster Preparedness, Capacity Building, Training on DRR CCA into CDP, Training on the Formulation of Climate Change Action Plan, Training on Infra Audit, Reorganization of Cagayan de Oro River Basin Management Council, Community Based Disaster Risk Reduction & Management (CBDRRM), Access to Financing Reorganized CDORBMC Drafted MOA
Timetable/ Period
Source of Fund Components/ Deliverables
2012-2013
USAID/DENR Rehabilitation Plan for adoption and Implementation; Stakeholders engagement and partnership building; Resource profiling of project site, Community mobilization and engagement, Nursery Operations
Status of Implementation
proposal stage
6. Urban Infrastructure Investment Program and Prefeasibility Study in the Areas of Cagayan de Oro River Watershed Management Wastewater, Management and Solidwaste Management under the CDIA
Location/ Area/ Coverage Implementing Entities Timetable/ Period Source of Fund Components/ Deliverables Status of Implementation Cagayan de Oro City City Government of Cagayan de Oro May - October 2012 CDIA (with ADB as the Funding Partner) Preparation of the Pre-Feasibility Study for Wastewater, Watershed and Solid Waste Management On-going; pre-feasibility study will be completed on October 2012
Implementing Entities
Timetable/ Period Source of Fund
DA/LGUs
2013 to 2018 World Bank, Global Environment Fund, GOP-DA, and GOP-LGU PRDPs thrust to develop a more market-oriented and climate resilient agriculture and fishery sector in the targeted Program, a. Investments for AFMP Planning at the Local and National Levels (I-PLAN), Intensified Building-Up of Infrastructure and Logistics for Development (I-BUILD), Investments for Rural Enterprises and Agri-fishery Productivity (I-REAP), Support to Program Implementation or I-SUPPORT To be implemented starting 2013
Components/ Deliverables
Status of Implementation
9. Preparatory Survey for the Flood Risk Management Project for Cagayan de Oro River (FRIMP-CDOR)
Location/ Area/ Coverage Implementing Entities Timetable/ Period Source of Fund Bukidnon Watershed Area and Cagayan de Oro River Basin Department of Public Works and Highways (DPWH) With- DENR, NIA, OCD, NEDA, PAG-ASA, NWRB August 2012 November 2013; (16-months) Grant: Japan International Cooperation Agency (JICA)
Components/ Deliverables
Master Plan for Cagayan de Oro River Basin and Feasibility Study Report a. Stage 1: Basic Survey- Aug 2012-Feb.2013; b. Stage 2: Master Plan March 2013-July2012 c. Stage 3:Feasibility Study August 2013-Nov.2013
Ongoing
10. Post-disaster Recovery, Adaptation and Resiliency building in Five Barangays of Cagayan de Oro
Location/ Area/ Coverage Implementing Entities Timetable/ Period Source of Fund Components/ Deliverables
5 barangays in Cagayan de Oro City: Bonbon, Carmen, Indahag, Iponan, Macasandig Balay Mindanaw Foundation, Incorporated (BMFI)
March 2012-March 2013 AusAID
1.Community based Support Work
-Project orientations (area profile, etc.); MOU-signing; Preparations for the trainings;
2. Capacity building and Resiliency building
-DRR training for Barangay DRR Trainers -Conduct of Participatory Capacity and Vulnerability Assessment (PCVA) -Center-based Enterprise Development Training -Barangay-based Enterprise Workshops -Community based DRRRM Planning Status of Implementation (As of September 30, 2012) At the stage of conducting Urban Container Gardening (UCG) trainings, consolidating PCVA results (UCG) trainings, consolidating PCVA results (Carmen and Iponan), and identifying other enterprises that are appropriate and disaster adaptive.
Cagayan de Oro City Oro Chamber/ PUM Senior Expert Mission June 2012 (15 days only) Oro Chamber/ PUM Expert Mission (technical assistance) Results and recommendations on the Storm Water Drainage Situation Study in Cagayan de Oro City Forum with stakeholders was conducted in June 2012