Local Authority Jaffna MC Chavakacheri UC Point-Pedro UC Valvettithurai UC Chavakachcheri PS Delft PS Karainagar PS Kayts PS Nallur PS Point - Pedro PS Vada. South west PS Vali. East PS Vali. North PS Vali. South PS Vali. South west PS Vali. West PS Velanai PS Sub Total Total Grant /(Rs.Mn) 102.83 94.39 98.43 98.02 121.29 99.81 93.78 95.03 96.30 127.48 101.35 110.46 104.20 101.35 108.18 100.38 103.33 1756.61 2011 (30%) 31.00 28.00 30.00 29.00 36.00 30.00 28.00 29.00 29.00 38.00 30.00 33.00 31.00 30.00 32.00 30.00 31.00 525.00 2012 (45%) 46.00 42.00 44.00 44.00 55.00 45.00 42.00 43.00 43.00 57.00 46.00 50.00 47.00 46.00 49.00 45.00 46.00 790.00 2013 (25%) 25.83 24.00 25.00 25.00 30.00 25.00 23.00 24.00 24.00 32.00 25.00 28.00 26.00 25.00 27.00 25.00 26.00 439.83 2

DPMU, Pura Neguma, Jaffna

Description
2011

Jaffna
2012 2013

Total

Allocation No.of Works Pura Neguma Commitment Pura Neguma Expenditure UnderPreparation Tender called Termination 0-50% 51-75% 76-99% 100%

527.000 64 439.094 398.575

791.000 34 403.590 259.336 1 2

439.000 58 803.976 107.989 43 2 5 1 2 5

1757.000 156 1646.660 765.900 44 2 1 12 3 3 91


3

1 1 1 3 61 25
DPMU, Pura Neguma, Jaffna

103.83 Mn

DPMU, Pura Neguma, Jaffna

Se.No

Name of Implementing Local Authority and Description of Sub Project

Implementation Period End Start Date Date

Commitment(Million) No.of TEC km/ Pura (Million) Commu Pura Sqf. Etc. Commu Council Neguma nity Council Neguma nity Expendi (World Expendi (LA) Expendi (People) ture Bank & ture ture Govt) 0.35 1.799 0.057 0.057 0.119 0.095 1.623 1.358

Progress Up to 31.07. 2013 (Mn)

Phy %

Total Expenditur e

Construction of tarr road at Vasanthapuram 1st& 2nd lane Reconstruction of Drainage at Sippithalai lane Reconst. Of Thirunagar main channel Retaining wall from Thiyoku Nursary school Mettaling & Tarring Nallur Thurka lane & Surrounding Const. of Anjuthankulam outlet channel, retaining wall and culvert

2.8.2011

02.11.2011

100%

1.51

2.8.2011

02.11.2011

0.625

1.768

0.054

0.054

0.117

0.093

1.596

1.279

100%

1.426

26.03.12

26.06.12

0.23

6.073

0.184

0.184

0.388

0.105

5.5

4.311

100%

4.600

26.03.12

26.06.12

1.47

8.121

0.249

0.249

0.537

0.527

7.335

6.465

100%

7.241

26.03.12

26.06.12

0.36

5.441

0.164

0.164

0.367

0.02

4.909

3.381

100%

3.565

DPMU, Pura Neguma, Jaffna

Se.No

Name of Implementing Local Authority and Description of Sub Project

Implementation Period

Commitment(Million) No.of TEC Pura km/ (Million Pura Negum Commu Commu Sqf. Etc. ) Negum Council a nity nity Council Expendi a (World (People Expendi (LA) Expendi ture Bank & ) ture ture Govt)

Progress Up to 31.07. 2013 (Mn)

Start Date

End Date

Phy %

Total Expenditu re

Mettaling & Tarring Vidan's lane and By lanes and construction & reconst. of channel and retaining wall Reconstruction of Cheddiyar thoddam , Murugesar Veethy and Construction of Culvert

26.03.12

26.06.12

1.74

6.832

0.205

0.205

0.45

0.27

6.176

5.436

100%

5.911

18.607

0.203

0.000

1.28

0.002

17.12

2.103 Termination

2.105

1.743 13.107 0.119 0.925 12.063 Tender Called Tender Called

Reconstruction of Cheddiyar thoddam Veethy and Culvert -A Reconstruction of Murugesar Veethy - B

2.118

0.05

0.136

1.932

DPMU, Pura Neguma, Jaffna

Se.No

Name of Implementing Local Authority and Description of Sub Project

Implementation Period

Commitment(Million)

Progress Up to 31.07. 2013 (Mn) Pura Pura Negum Negum a a (World Expend Bank & iture Govt)

Start Date

End Date

TEC No.of km/ (Millio Commu Commu n) Sqf. Etc. Council nity nity Council Expend (People Expend (LA) iture ) iture

Phy %

Total Expenditu re

10

11

12

Reconstruction of Mavadi Vairavar kovil , Kamel with channel and Drainage 26.09.2012 25.12.2012 Reconstruction of Bharathy &bylanes ,stanley lane and perinpanayakam Road Reconstruction of Odai,Sivappiraka sam & Bylanes ,Thalaiyali Veethy, College Lane 5.10.2012 4.02.2013 Reconstruction of Water tank 1St. & 3ed. Cross road ,Sinnakkadai 4th Cross Street & Kondady Veethy with drainge 26.09.2012 25.12.2012

7.732 0.66

0.244

0.389

0.012

7.099

5.036

95%

5.048

9.001

0.148

0.571

0.001

8.281

0.055

Under Preparation

0.056

22.317 0.742

0.34

1.44

0.007

20.531

8.911

40%

8.918

4.956

0.178

0.248

0.012

4.53

1.808

65%

1.820

0.38

DPMU, Pura Neguma, Jaffna

Se.No

Name of Implementing Local Authority and Description of Sub Project

Implementation Period No.of TEC km/ Sqf. Etc. (Million) Start Date End Date

Commitment(Million)

Progress Up to 31.07. 2013 (Mn)

Pura Pura Communi Communi Council Neguma Neguma ty Council Expendit (World ty Expendit Expendit (LA) Bank & (People) ure ure ure Govt) 0.199 0.333 0.012 6.092 3.449

Phy %

Total Expenditure

13

Reconstruction of Drainage at 21.09.2012 20.12.2012 Convent road & Mathiyas Veethy Reconstruction of Suvamiar Uppukulam 5.10.2012 Veethy with cross street & Reclamation Road Recosntruction of Hindu ladies lane, Aththysoodi Veethy, Convent lane and Gana Vairavar Front lane

0.42

6.624

100%

3.461

14

4.02.2013

2.49

11.723

0.367

0.588

0.007

10.768

3.451

45%

3.458

15

5.10.2012

4.02.2013

1.80

10.878

0.257

0.612

0.007

10.008

6.336

90%

6.343

Total

137.081 3.018

0.913

8.500

1.527 125.563 53.379

55.819

DPMU, Pura Neguma, Jaffna

12

94.39 Mn

22

Implementation Period Name of Implementing Local Location Se.No Project No Authority and (Village) Description of Sub Project

Progress Up to 31st July 2013

Start Date

End Date

TEC Pura No.of (Mn) Coun Com Com. Coun Pura Negu Total km/ cil Negu ma Phy % Expen munit Expen cil Expen Sqf. y diture (LA) ma Expen diture Etc. diture diture

NELSIP/NP/J/ Reconst. Of Kalvayal ChUC/W/03( Ramalingam Old Kalvayal ChUC-1) School Joint Road

2.8.2011

2.12.2011

1.6 12.151 0.385 0.384 0.743 0.451 11.023 8.548

100

9.383

NELSIP/NP/J/ Reconst. Of ChUC/W/04( Meesalai West ChUC-2) Kerniyadi Veethy

Meesalai 2.8.2011

2.12.2011

1.5 10.848 0.334 0.334 0.623 0.365 9.891 7.824

100

8.523

Const. of Chavaka NELSIP/NP/J/ Paththiniyar Thuravu 20.03.2012 20.06.2012 1.1 chcheri ChUC/W/03 Road

9.499 0.349

0.35

0.625 0.293 8.525 7.228

100

7.871

Reconstruction of NELSIP/NP/J/ Nunavil Kalvayal 1st Nunavil ChUC/W/04 Lane & Adiyampitty Road

Documentation Work for Tender 1.2

10.79

Reconstruction of NELSIP/NP/J/ Mavadipillaiyar ChUC/W/05 Road

Meesalai Documentation Work 1.4 East for Tender

15.77

DPMU, Pura Neguma, Jaffna

23

Implementation Period Name of Implementing Local Location Authority and (Village) Description of Sub Project

Progress Up to 31st July 2013

Se.No

Project No

Start Date

End Date

TEC Pura No.of (Mn) Coun Com Com. Coun Pura Negu Total cil km/ munit Expen cil Negu ma Phy % Expen Sqf. Expen y diture (LA) ma Expen diture Etc. diture diture

Reconstruction of Meesal Documentation NELSIP/NP/J/C Thalaiyady Amman ai West Work for Tender hUC/W/06 2nd Lane

1.25

7.59

NELSIP/NP/J/C Reconstruction of hUC/W/07 Bangalow Road

Meesal Documentation ai -south Work for Tender

1.37

13.89

Chavak Reconstruction of NELSIP/NP/J/C Documentation Sappachchimavadi achcher hUC/W/08 Work for Tender Pillaiyar Kovil Road i

0.69

8.34

Reconstruction of NELSIP/NP/J/C Veerapaththirar hUC/W/09 Road

Nunavil Preparing -West Estimate

10

NELSIP/NP/J/C Reconstruction of Madduv Preparing hUC/W/10 Muthaliyaveli Road il Estimate

DPMU, Pura Neguma, Jaffna

24

Implementation Period Name of Implementing Local Location Authority and (Village) Description of Sub Project

Progress Up to 31st July 2013

Se.No

Project No

Start Date

End Date

TEC Pura No.of (Mn) Coun Total Com Com. Coun Pura Negu km/ cil munit Expen cil Negu ma Phy % Expen Sqf. Expen ma Expen diture y diture (LA) Etc. diture diture

11

Reconstruction of 4,5 NELSIP/NP/J/C Preparing Ellai Veethy Iyanar Kalvayal hUC/W/11 Estimate Road

12

Reconstruction of NELSIP/NP/J/C Kirampuvil West hUC/W/12 Road

Kalvayal

Preparing Estimate

13

NELSIP/NP/J/C Reconstruction of Nunavil - Preparing hUC/W/13 Kaththappadi Road Centre Estimate

Total

4.2 32.498 1.068 1.068 1.991 1.109 29.439 23.600

25.871

25

Reconst. of Kalvayal Ramalingam old school joint Road 1.6 Km (8.548Mn)

Reconst. of Meesalai West Kerniyadi Road 1.5 Km (7.824Mn)

DPMU, Pura Neguma, Jaffna

26

Reconst. of Paththiniyarthuravu Road 1.1Km (7.228Mn)

27

98.43 Mn

DPMU, Pura Neguma, Jaffna

28

Implementation Period Name of Implementing Local Location Authority and (Village) Description of Sub Project

Progress Up to 31st July 2013

Se.No

Project No

Start Date

End Date

TEC Pura No.of (Mn) Coun Com Com. Coun Pura Negu Total km/ cil munit Expen cil Negu ma Phy % Expen Sqf. Expen diture (LA) y ma Expen diture Etc. diture diture

NELSIP/NP/J/PP Const. of Retaining Beach UC/W/01 wall Road NELSIP/NP/J/A Construction CLG/W/01 Athiyady DC (PPUC) Channel Reconstruction of NELSIP/NP/J/A Aththiyady DC CLG/W/07(PPU Channel C) Continuous Work

16.03.2012 15.06.2012

0.348

8.617 0.258 0.258 0.434 0.093 7.925 6.066 100%

6.417

50% Athiyady 11.07.2012 11.11.2012 1.230 28.078 0.846 0.000 1.543 0.000 25.689 1.941 termin 1.941 ated

Athiyadi 13.08.2012 09.02.2013

26.827 0.884 0.000 1.342 0.000 24.601 16.244 100% 16.244

PN/NP/J/CLG/ Reconstruction of Peruvedd 21.02.2013 18.12.2013 W/02(PPUC) Peruveddy Channel y Construction of Channel at NELSIP/NP/J/PP Peruveddi Visvakula Pointpedr Preparing Estimate o UC/W/02 Joint Lane

41.584 1.248 0.000 2.078 0.000 38.258 25.016 80%

25.016

Total

0.348 105.1 3.236 0.258 5.397 0.093 96.473 49.267

49.618

29

Const. of Retaining Wall 0.348Km (6.066 Mn)

Reconst. of Aththiyady Drainage Channel 1.230Km (25.689 Mn)

DPMU, Pura Neguma, Jaffna

30

DPMU, Pura Neguma, Jaffna

31

98.02 Mn

DPMU, Pura Neguma, Jaffna

32

Se.No Project No

Name of Implementing Local Location Authority and (Village) Description of Sub Project

Implementation Period

Progress Up to 31st July 2013 Pura Counc No.of TEC Total Pura Negu Com. Counc il km/ (Mn) Com Negu ma Phy % Expen Expen munity il (LA) Expen Sqf. diture ma Expen diture diture Etc. diture

Start Date

End Date

Reconstruction of KKS Road 2nd Kerudavil NELSIP/NP/J/ lane,Netkolu lane, North 11.05.2012 10.08.2012 1.118 5.565 VVUC/W/01 Netkolu Varivar Kovil Cluster- 01 front road ,

0.268 0.233 0.278 0.302 5.019 5.459

100%

5.994

Reconstruction of Periakadakkarai Thondama NELSIP/NP/J/ Road, Vellankarai naru15.05.2012 14.08.2012 1.665 11.145 VVUC/W/02 cemetry Road, Cluster- 02 Veeramakali Aman Kovil Road

0.37

0.000 0.584 0.348 10.191 10.724 100% 11.072

Reconstruction of Retaining wall along Valvettitur NELSIP/NP/J/ coastal Area from ai North 11.05.2012 10.08.2012 0.255 14.167 0.492 0.000 0.706 0.062 12.969 14.067 100% 14.129 VVUC/W/03 vady lane access to west mathavady area Construction of NELSIP/NP/J/ vegetable Market Valvettithu 12.04.2013 11.12.2013 CLG/W/02(V with Shopping rai town VUC) Complex-package A

24.988 0.248 0.000 1.732 0.000 23.018 4.905

40%

4.905

Construction of NELSIP/NP/J/ vegetable Market Valvettithu CLG/W/ with Shopping 12.04.2013 11.08.2013 10.625 0.105 0.000 0.736 0.000 9.784 0.076 rai town DPMU, Pura Neguma, Jaffna 02A(VVUC) Complex-package B

20%

33

0.076

Se.No

Project No

Name of Implementing Local Location Authority and (Village) Description of Sub Project

Implementation Period No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 31st July 2013 Pura Coun Total Com Com. Coun Pura Negu cil munit Expen cil Negu ma Phy % Expen Expen diture ma Expen y diture (LA) diture diture

Start Date

End Date

Construction of NELSIP/NP/J/V Retaining Wall at VVT VTUC/W/04 Sithampara College West play ground -North NELSIP/NP/J/V Reconstruction of VTUC/W/05 Konavalai Road Reconstruction of NELSIP/NP/J/V Aatrankarai Road up to Field Work VTUC/W/06 centre Total

Preparing Estimate

Kerudav Preparing il-East Estimate

Thonda Preparing manaru Estimate South

66.49 1.483 0.233 4.036 0.712 60.98 35.230

36.175

34

Reconst. of Kerudavil North Cluster Road 1.188Km (5.459 Mn)

Reconst. of Thondamanaru Cluster Roads 1.665Km (10.724 Mn)

DPMU, Pura Neguma, Jaffna

35

Reconst. of Retaining wall along coastal area 0.255Km (14.067 Mn)

DPMU, Pura Neguma, Jaffna

36

Const. of Market With Shopping Complex A (23.018 Mn)

Const. of Market With Shopping Complex B (9.784 Mn)

DPMU, Pura Neguma, Jaffna

37

121.29Mn

DPMU, Pura Neguma, Jaffna

38

Implementation Period Name of Implementing Location Local Authority and (Village) Description of Sub Project

Progress Up to 31st July 2013

Se.No

Project No

Start Date

End Date

TEC Pura No.of (Mn) Com. Coun Com Coun Pura Negu Total km/ cil Expe munit cil Negu ma Phy % Expen Sqf. nditur Expen y (LA) ma Expen diture Etc. e diture diture

Reconst. Of NELSIP/NP/J/ChP Mirusuvil Hospital S/W/06(ChPS-1) Front Veethy

Mirusuvil

2.8.2011

2.12.2011

1.000

6.485 0.210 0.235 0.219 0.147 6.056 4.302 100%

4.684

Reconst. Of NELSIP/NP/J/ChP Ammakadai S/W/07(ChPS-2) Veethy

Karampa 2.8.2011 i Kurce

2.12.2011

1.000

6.646 0.218 0.144 0.265 0.162 6.163 4.744 100%

5.050

Reconst. Of NELSIP/NP/J/ChP Navalkuli West Navalkuli S/W/08(ChPS-3) Koolarupitty Road Reconstruction of NELSIP/NP/J/ACL Karampakam G/W/01 -CHPS Vidaththatpalai Road

2.8.2011

2.12.2011

1.000

6.876 0.259 0.259 0.219 0.150 6.398 4.356 100%

4.765

Vidathth 01.07.2012 01.11.2012 24.928 0.795 0.698 1.355 0.823 22.778 18.164 100% 19.685 atpalai 2.009

Mettaling & Tarring NELSIP/NP/J/ChP Karampa Ammakadai Road 23.07.2012 21.10.2012 0.970 10.946 0.335 0.335 0.554 0.511 10.057 7.125 100% S/W/05 kurichchi 2nd Stage

7.971

39

Implementation Period Name of Implementing Local Locatio Authority and n Description of Sub (Village) Project

Progress Up to 31st July 2013

Se.No

Project No

Start Date

End Date

TEC No.of (Mn) km/ Sqf. Etc.

Pura Coun Com Com. Coun Pura Negu Total cil Negu ma Phy % Expen munit Expen cil Expen y diture (LA) ma Expen diture diture diture

NELSIP/NP/J/ Mettaling & Tarring Mirusuvil 11.02.2013 11.06.2013 2.280 23.850 0.716 0.000 1.213 1.145 21.92 8.019 100% ACLG/W/04( Mirusuvil Hospital CHPS) Front Road 2nd Stage

9.164

Re.Con of Manthuvil Manthu NELSIP/NP/J/ Kudiyetta thidda Preparing Estimate vil ChPS/W/06 Road

NELSIP/NP/J/ Re.Con of Sarasalai ChPS/W/07 Iyanar Road

Sarasal Preparing Estimate ai-South

Re. Con of Kaithady NELSIP/NP/J/ North Navapuram ChPS/W/08 Madduvil Sivan Kovil Rd

Kaithad y North, Preparing Estimate Kaithad y East

Total

8.259 79.731 2.533 1.671 3.825 2.938 73.37 46.710

51.319

40

Reconstruction of Mirusivil Hospital Front Road 1.00 Km (4.302 Mn)

Reconstruction of Ammakadai Road 1.00 Km(4.744 Mn)

41

Reconst. of Kularupiddy Road 1.00 Km (4.356 Mn)

Reconst. of Karampakam Vidaththalpalai Road 2.009Km (18.164 Mn)

42

Reconst. of Ammakadai Road (2nd Stage) 0.970Km (7.125 Mn)

Reconst. of Hospital Front Road (2nd Stage) 2.280Km (21.92 Mn)

43

99.81 Mn

44

Implementation Period Se.No Project No Name of Implementing Local Location Authority and (Village) Description of Sub Project No.of km/ Sqf. Etc.

TEC (Mn)

Progress Up to 31st July 2013

Start Date

End Date

Pura Coun Negu Com. Total Com Coun cil Pura ma Expe Phy % Expen munit cil Expe Negu Expe nditur diture y (LA) nditur ma nditur e e e

Reconst. Of South NELSIP/NP/J/DELP Sudalai Vigaravadi Delft West 2.8.2011 2.12.2011 5.351 0.218 0.000 0.299 0.029 4.834 3.422 100% 3.451 1.500 S/W/29(DELPS-1) Veethy Termin 2.8.2011 2.12.2011 2.000 7.130 0.29 0.000 0.399 0.027 6.441 1.883 ation 1.910 (35%) Kalamuna i 05.06.13 04.09.13 1.100 7.044 0.200 0.000 0.373 0.000 6.471 0.041 55% 0.041

NELSIP/NP/J/DELP S/W/30(DELPS-2) 2

Reconstruction of Jagappar Kovil Kalamunai PN/NP/J/DELPS/ Concrete Veethy W/07

NELSIP/NP/J/DELP S/W/31(DELPS-3) 3 PN/NP/J/DELPS/ W/08

2.8.2011 2.12.2011 0.800 2.854 0.116 0.000 0.16 0.018 2.578 1.430 100% 1.448 Reconstruction of Murukan Kovil Kopalapiddy Concrete Veethy Kopalapid dy 05.06.13 04.09.13 0.275 1.655 0.049 0.000 0.092 0.000 1.514 0.000 50% 0.000

45

Implementation Period Se. No Name of Implementing Local Location Authority and (Village) Description of Sub Project No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 31st July 2013

Project No

Start Date

End Date

Pura Counc Pura Negu Total Com. il Counc Comm Negu ma Phy % Expend Expen il (LA) Expen unity iture ma Expen diture diture diture

Construction of NELSIP/NP/J/DE Children's Reading LPS/W/04 and Trainig Hall

Mannalt hurai

19.10.2012 19.05.2013

432m2 25.326 0.515 0.000 1.066 0.000 23.74 12.016 90%

12.016

NELSIP/NP/J/DE Reconstruction of LPS/W/07 Thomayar Veethy

Delft

Documentation work for Tender

NELSIP/NP/J/DE Supplying of boat LPS/G/01

Delft

Tender Called

Reconstruction of NELSIP/NP/J/DE Hospital East LPS/W/08 Manalthurai Rd

Delft

Documentation work for Tender

Total

5.675 49.360 1.388 0.000 2.389 0.074 45.58 18.793

18.866

46

Reconst. of Jakapar Kovil Kalmunai Road - 2.0Km (8.354 Mn)

47

Reconst. Of Murugan Kovil Koppalapiddy Road 0.8Km ( 2.944 Mn)

Const. of Reading & Training Hall (23.74 Mn)

48

93.78 Mn

49

Implementation Period Se. No Name of Implementing Local Location Authority and (Village) Description of Sub Project

Progress Up to 31st July 2013 No.of TEC km/ (Mn) Pura Counc Sqf. Total Com Com. Pura Negu Counc il Etc. muni Expen Negu ma Phy % Expend il (LA) Expen iture ma Expen ty diture diture diture

Project No

Start Date

End Date

NELSIP/NP/J/KR Reconst. Of Oori Oori 1 PS/W/32(KRPSMurukan Kovil Veethy 1)

2.8.2011

2.12.2011

1.500

12.583 0.379 0.379 0.480 0.334 11.724 7.766 100%

8.479

NELSIP/NP/J/KR Reconstruction of PS/W/02 Sampalodai Road

Sampalo 21.03.2012 20.06.2012 1.130 7.431 0.464 0.464 0.464 0.209 6.530 5.445 100% dai

6.118

Reconstruction of NELSIP/NP/J/KR Palaiyakandy Sivan PS/W/03 Kovil Road

Palaiyak 21.03.2012 21.06.2012 2.00 15.024 0.471 0.471 0.892 0.470 13.661 10.826 100% 11.767 andy

NELSIP/NP/J/A Metalling &Tarring Thoppuk 4 CLG/W/06(KRP Thoppukkadu 20.02.2013 20.06.2013 1.420 21.062 0.634 0.634 1.054 0.085 19.374 15.058 100% 15.777 adu S) vairavar Kovil Veethy

Metalling &Tarring NELSIP/NP/J/KR Kovalam 5 PS/W/04 Maruthapuram 1st joing veethy

Marutha 02.08.2012 31.10.2012 2.070 12.527 0.59 0.590 0.639 0.247 11.298 9.631 100% 10.468 puram

DPMU, Pura Neguma, Jaffna

50

Se. No

Project No

Name of Implementing Local Location Authority and (Village) Description of Sub Project

Implementation Period No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 31st July 2013

Start Date

End Date

Pura Counc Total Pura Negu Com. Comm Counc il Negu ma Phy % Expend Expen il (LA) Expen unity iture ma Expen diture diture diture

NELSIP/NP/J/A Metalling &Tarring 6 CLG/W/05(KRP Paththar keniy Road S) & Drainage

keniyady

20.02.201 20.06.201 1.620 3 3

21.466 0.804 0.804

1.106 0.160 19.556 15.562 100% 16.526

NELSIP/NP/J/A Reconstruction of 7 CLG/W/07(KRP Subramaniam Road S)

Karainag ar

Documentation work for Tender

2.05

22.554

Reconstruction of NELSIP/NP/J/KR Thannai PS/W/05 Suntharamoorthy Road

Karainag ar

Tender Called

0.86

8.857

Total

9.740 90.093 3.342 3.342 4.635 1.505 82.14 64.288

69.135

DPMU, Pura Neguma, Jaffna

51

Reconst. of Oori Murugan Kovil Veethy 1.5Km (7.766 Mn)

Reconst. of Sampalodai Road 1.13Km (5.445 Mn)

DPMU, Pura Neguma, Jaffna

52

Reconst. of Palayakandy Sivan Kovil Road 2.0Km (10.826 Mn)

Reconst. of Thoppukadu Vairavar Kovil Veethy 1.42Km (19.374 Mn)

DPMU, Pura Neguma, Jaffna

53

Reconst. of Kovalam Maruthapuram Veethy 2.07Km (9.631 Mn)

Reconst. of Paththar Kerniy Road 1.62Km (19.556 Mn)

54

95.03 Mn

55

Se.N Project No o

Name of Implementing Local Locatio n Authority and Description of Sub (Village) Project

Implementation Period No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 31st July 2013

Start Date

End Date

Pura Counc Com. Pura Negu Total Comm Counc il Negu ma Phy % Expen Expen il (LA) Expen unity diture diture ma Expen diture diture

NELSIP/NP/J Reconst. Of 1 /KYPS/W/33 Melingimunai Main (KYPS-1) Road

Melingi munai

2.8.2011

2.12.2011

0.830

6.430

0.232 0.232 0.348 0.145 5.850 3.628 100%

4.005

NELSIP/NP/J Reconst. Of Analaidi 2 /KYPS/W/34 Analaidivu Kadaiyadi 2.8.2011 vu (KYPS-2) Cross Road

2.12.2011

0.850

5.748

0.244 0.244 0.264 0.133 5.240 3.704 100%

4.081

NELSIP/NP/J Reconst. Of Camp /KYPS/W/03 Road

Kayts

23.03.2012 23.06.2012 1.06

7.441

0.237 0.237 0.384 0.363 6.820 5.243 100%

5.843

Reconst. Of NELSIP/NP/J Seddiyanthodda /KYPS/W04 Road

Naranth anai 05.04.2012 05.07.2012 0.985 North

7.341

0.212 0.212 0.352 0.040 6.777 5.319 100%

5.571

NELSIP/NP/J Reconst. Of /KYPS/W/05 Sooriyawathai Road

Sooriya 23.03.2012 23.06.2012 0.978 12.416 0.374 0.374 0.619 0.061 11.423 9.522 100% wathai

9.957

56

DPMU, Pura Neguma, Jaffna

Se.N o

Project No

Name of Implementing Local Location Authority and (Village) Description of Sub Project

Implementation Period

Progress Up to 31st July 2013 No.of TEC km/ (Mn) Pura Sqf. Counc Total Com. Pura Negu Etc. Counc il Comm Expen Negu ma Phy % Expend unity il (LA) Expen iture ma Expen diture diture diture

Start Date

End Date

Metalling &Tarring NELSIP/NP/J/A Naranthai Sinnamadu Sinnama CLG/W/10(KYP 13.08.2012 11.12.2012 1.323 19.37 0.603 0.603 0.993 0.141 17.774 14.134 100% 14.878 1st &2 nd Road & du S) Drainage Metalling &Tarring NELSIP/NP/J/KY Naranthai PS/W/06 Utharappiddy Road NELSIP/NP/J/A Metalling &Tarring CLG/W/09(KYP Puliyankoodal North S) Road Metalling &Tarring NELSIP/NP/J/KY Naranthanai PS/W/08 Ganesha school Rd NELSIP/NP/J/KY Reconstruction of PS/W/07 Koththikula veethy Naranth annai 01.08.2012 30.10.2012 North 1.1 9.318 0.488 0.488 0.521 0.064 8.309 8.830 100% 9.382

Pulliyank 10.09.2012 08.01.2013 1.557 20.938 0.696 0.696 1.051 0.064 19.191 15.789 100% 16.549 oodal Naranth 01.08.2012 30.10.2012 1.323 12.031 0.607 0.607 0.666 0.053 10.758 11.170 100% 11.830 annai

10

kayts

01.08.2012 30.10.2012 1.004 9.28

0.481 0.481 0.499 0.064 8.300 8.759 100%

9.304

11

Reconstruction of Karamp Preparing Estimate NELSIP/NP/J/KY Uppukula Road and an North PS/W/09 Link Road Total 110.31 4.174 4.174 5.697 1.128 100.44 86.097 91.400

57
DPMU, Pura Neguma, Jaffna

Reconst. of Melinchimunai Main Road 0.830Km (3.628 Mn)

Reconst. of Kaddaiyadi Cross Road 0.85Km (3.704 Mn)

58

Reconst. of Camp Road 1.06Km (5.243 Mn)

Reconst. of Seddiyanthodda Road 0.985Km (5.319 Mn)

59

Reconst. of Sooriyawattai Road 0.978Km (9.522 Mn)

60

Reconst. of Naranthanai Utharappiddy Road 1.1Km (8.830 Mn)

Reconst. of Puliyankoodal North Road 1.557Km (19.191 Mn)

61
DPMU, Pura Neguma, Jaffna

Reconst. of Naranthanai Ganesha School Road1.323Km (11.170 Mn)

Reconst. of Koththikula Road 1.004Km (8.759 Mn)

62

96.30 Mn

63

Implementation Period Name of Implementing Local Locatio Authority and n Description of Sub (Village) Project No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 31st July 2013 Pura Coun Total Com Com. Coun Pura Negu cil munit Expen cil Negu ma Phy % Expen Expen diture ma Expen y diture (LA) diture diture

Se.No Project No

Start Date

End Date

NELSIP/NP/J/ Reconstruction of NaPS/W/05( Ariyalai South East Manipuri Veethy NaPS-1) NELSIP/NP/J/ Const. of Kerniyady NaPS/W/02 Road Reconstruction NELSIP/NP/J/ Manippuri joint NaPS/W/03 Veethy & Manippuri 8th CrossVeethy

Ariyalai

2.8.2011

2.12.2011

1.000

8.074

0.252 0.252 0.367 0.208 7.455 5.324 100%

5.784

Kokuvil

16.05.2012 15.08.2012

1.476

7.005

0.211 0.000 0.335 0.023 6.459 4.720 100%

4.743

Ariyali

01.07.2012 01.10.2012

1.343

18.894 0.581 0.000 0.977 0.052 17.336 13.219 100% 13.271

Construction of NELSIP/NP/J/ Children indoor CLG/W/03(N Kokuvil games,Training APS) centre & Cultural Hall

17.04.2013 04.02.2014

55.977 0.780 0.000 3.735 0.041 51.462 8.443

25%

8.484

NELSIP/NP/J/ Reconstruction of NaPS/W/03 Namakal Veethy

Kokuvil

Documentation work 2.19 for Tender

14.08

Reconstruction of NELSIP/NP/J/ Koddukkinaru Pilaiyar Ariyalai East NaPS/W/04 Kovil Veethy at Ariyalai - East Total

Documentation work 0.33 for Tender

4.50

89.950 1.824 0.252 5.414 0.324 82.712 31.706

32.282

64

Reconst. of Ariyalai South East Manipuri Road 1.0Km (5.324 Mn)

65

Reconst. of Kerniyadi Road 1.476Km (6.459 Mn)

Reconst. of Manipuri & 8th Cross Road 1.343Km (13.219 Mn)

66

Construction of children indoor games, Training centre & cultural hall (51.462 Mn)

67

127.48 Mn

68

Implementation Period Name of Implementing Location Local Authority (Village) and Description of Sub Project

Progress Up to 31st July 2013

Se.No

Project No

Start Date

End Date

No.of km/ Sqf. Etc.

TEC (Mn)

Pura Counc Total Pura Negu Com. Comm Counc il Negu ma Phy % Expen Expen il (LA) Expen unity diture ma Expen diture diture diture

Reconst of NELSIP/NP/J/PPP Uruththiravattai S/W/09(PPPS-1) School Veethy Reconst. Of NELSIP/NP/J/PPP Thikkam School S/W/10(PPPS-2) Veethy Reconst. Of NELSIP/NP/J/PPP Kampavaththai S/W/03 internal Roads

Uruththira 2.8.2011 vattai

2.12.2011

1.370

8.865

0.268 0.240 0.477 0.269 8.120 5.567

100%

6.076

Thikkam

2.8.2011

2.12.2011

0.750

5.909

0.205 0.195 0.204 0.205 5.500 3.706

100%

4.106

Puloly

16.04.2012 15.07.2012

1.000

9.092

0.282 0.322 0.485 0.463 8.325 8.479

100%

9.264

NELSIP/NP/J/PPP Reconstruction of Polikandy 16.04.2012 15.07.2012 S/W/05 Poomagal road 1.150

9.908

0.354 0.414 0.608 0.490 8.946 8.943

100%

9.847

Reconstruction of Periyathe NELSIP/NP/J/PPP Periyathevanatht vanathth 16.04.2012 15.07.2012 S/W/06) 1.050 hai Road ai Reconstruction of NELSIP/NP/J/PPP Kudakka 16.04.2012 15.07.2012 Kudakkamparai mparai 1.150 S/W/04 internal Road

8.371

0.258 0.288 0.472 0.365 7.641 6.649

100%

7.302

9.145

0.286 0.334 0.498 0.418 8.361 7.606

100%

8.358

69

Implementation Period Name of Implementing Location Local Authority Project No (Village) and Description of Sub Project TEC (Mn)

Progress Up to 31st July 2013

Se.No

Start Date

End Date

No.of km/ Sqf. Etc.

Pura Coun Com Com. Coun Pura Negu Total cil munit Expen cil Negu ma Phy % Expen Expen y diture (LA) ma Expen diture diture diture

Mettaling & NELSIP/NP/J/ Tarring Kerudavil Kerudavil PPPS/W/07 Amman Kovil Road NELSIP/NP/J/ Construction of ACLG/W/14( Shopping PPPS) complex NELSIP/NP/J/ Construction of CLG/W/01(P Market at PPS) manthikai Kaddaikadu NELSIP/NP/J/ Nithiyaveddai PPPS/W/08 Road Saveriyar Kovil NELSIP/NP/J/ Road (Church PPPS/W/09 Road)

03.08.2012 01.11.2012 1.234

9.854

0.313 0.226 0.576 0.378 8.965 7.589 100%

8.193

Manandi

10.04.2013 07.10.2013

29.671 0.585 0.000 1.844 0.086 27.242 4.313

50%

4.400

Manthikai 17.04.2013 14.10.2013

26.103 0.453 0.000 1.154 0.086 24.496 3.660

40%

3.746

10

Preparing Estimate

11

Preparing Estimate

Total

7.704 116.918 3.004 2.019 6.318 2.760 107.59 56.514

61.292

70

Reconst. of Thikkam school Road 0.75Km (3.706 Mn)

Reconst. of Urithiravthai School Road 1.370Km (5.567 Mn)

DPMU, Pura Neguma, Jaffna

71

Reconst. of Kampavaththai internal Road 1.0Km (8.479 Mn)

Reconst. of Kudakkamparai internal Road 1.15Km (7.606 Mn)

DPMU, Pura Neguma, Jaffna

72

Reconst. of Poomahal Road 1.15Km (8.943 Mn)

Reconst. of Periyathevanaththai Road 1.05Km (6.649 Mn)

DPMU, Pura Neguma, Jaffna

73

Reconst. of Kerudavil amman Kovil Road 1.230Km (7.589 Mn)

Const. of Manaandy Market & Shopping Complex (27.242 Mn)

74

Const. of Manthikai Market & Shopping Complex (24.496 Mn)

DPMU, Pura Neguma, Jaffna

75

101.35 Mn

76

Implementation Period Name of Implementing Local Authority and Description of Sub Project

Progress Up to 31st July 2013

Se.N o

Project No

Location (Village)

Start Date

End Date

TEC Pura Counc No.of (Mn) Total Pura Negu Com. Com Counc il km/ Negu ma Phy % Expen Expen munity il (LA) Expen Sqf. diture ma Expen diture diture Etc. diture

NELSIP/NP/J/V Reconst of Kulanai Thunnalai 1 dSWPS/W/11( Veethi VdSWPS-1)

1.8.2011

1.12.2011

0.900

6.317

0.211 0.236 0.475 0.584 5.631 3.885

100%

4.705

NELSIP/NP/J/V Reconst of Miththil Thunnalai 2 dSWPS/W/12( Sempadu Veethy, Centre VdSWPS-2)

1.8.2011

1.12.2011

1.800

12.739 0.398 0.415 0.854 0.157 11.487 8.068

100%

8.640

Reconst. of NELSIP/NP/J/V Maththoni public DSWPS/W/03 market Road

Maththoni

21.03.2012 20.06.2012

0.650

3.996

0.144 0.144 0.228 0.204 3.624 2.840

100%

3.188

NELSIP/NP/J/V Reconstruction of Karaveddy 17.01.2013 17.04.2013 0.805 3.578 dSWPS/W/04 Srinaratha Veethy West

0.118 0.112 0.177 0.0700 3.283 2.637

100%

2.819

Reconstruction of NELSIP/NP/J/V Alvai Manokara 5 dSWPS/W/05 Veethy (Samananthurai)

Alvai

17.01.2013 17.04.2013 0.800 5.762

0.171 0.166 0.290 0.1590 5.301 3.909

100%

4.234

DPMU, Pura Neguma, Jaffna

77

Implementation Period Se. No Name of Implementing Local Location Authority and (Village) Description of Sub Project

Progress Up to 31st July 2013 No.of TEC (Mn) Pura km/ Counc Pura Negu Total Com. Sqf. Counc il Comm Expen Negu ma Phy % Expen Etc. il (LA) Expen unity diture ma Expen diture diture diture

Project No

Start Date

End Date

NELSIP/NP/J/V Reconstruction of Udupidd 17.01.2013 17.04.2013 1.070 dSWPS/W/06 Nesavusalai Veethy y

6.345

0.183 0.000 0.326 0.0710 5.836 3.326 100%

3.397

Reconstruction of Karanav NELSIP/NP/J/V Kavilkerai Vellavaikal 17.01.2013 17.04.2013 1.400 dSWPS/W/07 ai East Veethy

8.546

0.258 0.000 0.432 0.0710 7.856 5.021 100%

5.092

Reconstruction of NELSIP/NP/J/V Maniyakaran dSWPS/W/08 Thodda Veethy

Karanav 17.01.2013 17.04.2013 0.860 11.124 ai South

0.316 0.000 0.572 0.0710 10.236 5.901 100%

5.972

Reconstruction of NELSIP/NP/J/V Kalaimahal Imaiyann 17.01.2013 17.04.2013 1.131 dSWPS/W/09 Community Center am Veethy

7.496

0.231 0.227 0.372 0.2010 6.893 4.916 100%

5.344

NELSIP/NP/J/C Construction of 10 LG/W/05(VdPS Market Complex at Nelliyadi Preparing Estimate Nelliady )

Total

9.416 65.903

2.030 1.300 3.726 1.588 60.147 40.503

43.391

DPMU, Pura Neguma, Jaffna

78

Reconst. of Kulanai Road 0.9Km (3.885 Mn)

Reconst. of Mithilsempadu Road 1.80Km (8.068 Mn)

DPMU, Pura Neguma, Jaffna

79

Reconst. of Maththoni Public Market Road 0.65Km (2.840 Mn)

Reconst of Manokara Samanathurai Rd .866Km (3.909 Mn)

DPMU, Pura Neguma, Jaffna

Reconstruction of Srinaratha Road .805Km (2.637 Mn)

DPMU, Pura Neguma, Jaffna

81

Reconstruction of Nesavusalai Road 1.040Km (5.836 Mn)

Reconstruction of maniyakaran Road .886Km (10.236 Mn)

DPMU, Pura Neguma, Jaffna

82

Reconst of kalaimagal community Rd 1.135Km (5.916 Mn)

Recont of Kavilkirai Road .1.4Km (7.856 Mn)

DPMU, Pura Neguma, Jaffna

83

110.46 Mn

DPMU, Pura Neguma, Jaffna

84

Se. No

Project No

Name of Implementing Local Location Authority and (Village) Description of Sub Project

Implementation Period No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 31st July 2013 Pura Counc Pura Negu Total Com. il Comm Counc Negu ma Phy % Expend Expen il (LA) Expen unity ma Expen iture diture diture diture

Start Date

End Date

NELSIP/NP/J/VE Reconst. Of Kopay 1 PS/W/16(VEPSKiluvanai Veethy 1)

Kopay

2.8.2011 2.12.2011

1.750

9.901

0.310 0.311 0.428 0.416 9.163 8.100 100%

8.827

NELSIP/NP/J/VE Reconst .of 2 PS/W/17(VEPS- Thanipanaiyaddi 2) Veethy

Achelu

2.8.2011 2.12.2011

1.500

8.179

0.254 0.254 0.351 0.341 7.574 6.695 100%

7.289

NELSIP/NP/J/VE Reconst. Of 3 PS/W/18(VEPS- Vanniyasingam 3) Veethy

Awarank 2.8.2011 2.12.2011 11.208 0.350 0.350 0.483 0.469 10.375 9.177 100% al west 2.000

9.996

NELSIP/NP/J/VE Reconst. Of old post Kopai PS/W/04 office veethy South

03.4.2012 03.7.2012

1.500

10.899 0.327 0.327 0.546 0.448 10.026 7.411 100%

8.186

Total

6.750 40.187 1.241 1.242 1.808 1.674 37.138 31.382

34.298

DPMU, Pura Neguma, Jaffna

85

Reconst. of Killuvanai Veethy 1.75Km (8.100 Mn)

Reconst. of Thanipanaiyadi Veethy 1.5Km (6.695 Mn)

86

Reconst. of Vanniyasingam Veethy 2.0Km (9.177 Mn)

Reconst. of Old Post Office Road 1.5Km (7.411 Mn)

87

104.20 Mn

88

Implementation Period Se. No Name of Implementing Local Location Authority and (Village) Description of Sub Project

Progress Up to 31st July 2013 No.of TEC km/ (Mn) Pura Counc Sqf. Pura Negu Total Com. il Comm Counc Etc. Negu ma Phy % Expend Expen il (LA) Expen unity ma Expen iture diture diture diture

Project No

Start Date

End Date

NELSIP/NP/J/V Reconst. Of 1 NPS/W/22(VNP Ponnaiya Veethy S-2)

Pannalai

2.8.2011

2.12.2011

0.960

5.902

0.189 0.189 0.277 0.202 5.436 4.157 100%

4.548

NELSIP/NP/J/V Reconst. 2 NPS/W/22(VNP Kuddiyapulam S-2) veethy

Kuddiyap 2.8.2011 ulam

2.12.2011

0.970

5.788

0.190 0.190 0.178 0.160 5.420 4.300 100%

4.650

NELSIP/NP/J/V Reconst. Of Tellipalai 22.03.2012 21.06.2012 8.698 NPS/W/03 Ponnipulam Road 1.070

0.335 0.336 0.601 0.358 7.762 6.734 100%

7.428

NELSIP/NP/J/V Reconst. Of Alavedd 22.03.2012 21.06.2012 6.894 NPS/W/04 vellijampathy Road y East 1.030

0.210 0.210 0.349 0.036 6.335 5.584 100%

5.830

Reconst. Of NELSIP/NP/J/V Alavedd 22.03.2012 21.06.2012 9.991 Kooththancheema y North 1.390 NPS/W/05 Road

0.300 0.300 0.526 0.041 9.165 7.943 100%

8.284

89

Se. No

Project No

Name of Implementing Local Location Authority and (Village) Description of Sub Project

Implementation Period No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 30th of June 2013 Pura Counc Pura Negu Total Com. il Comm Counc Negu ma Phy % Expen Expen il (LA) Expen unity ma Expen diture diture diture diture

Start Date

End Date

Reconstruction of NELSIP/NP/J/V Kernipiddy veethy Alavedd 20.08.201 19.11.201 1.174 NPS/W/06 (Periya Kinnaththady y East 2 2 Veethy)

9.958

0.299 0.299 0.531 0.0200 9.128 6.638 100%

6.957

Mettaling & Tarring NELSIP/NP/J/V Periya Kanakar NPS/W/07 valavu Road

Mallaga 20.08.201 19.11.201 1.430 14.764 0.394 0.394 0.652 0.140 13.718 10.809 100% 11.343 m South 2 2

NELSIP/NP/J/V Mettaling & Tarring NPS/W/08 Kuruvalai veethy

Mallaga 20.08.201 19.11.201 1.130 14.642 0.488 0.488 0.770 0.278 13.384 9.866 100% 10.632 m South 2 2

NELSIP/NP/J/V Mettaling & Tarring NPS/W/09 Thammalai Veethy

Allaved 20.08.201 19.11.201 1.490 12.512 0.358 0.359 0.622 0.019 11.532 9.365 100% dy West 2 2

9.743

10

NELSIP/NP/J/V Mettaling & Tarring NPS/W/10 Soda Company Rd

Mallaka 20.08.201 19.11.201 1.235 m 2 2 Centre

8.449

0.266 0.267 0.469 0.019 7.714 6.202 100%

6.488

90

Se. No

Project No

Name of Implementing Local Location Authority and (Village) Description of Sub Project

Implementation Period No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 30th of June 2013

Start Date

End Date

Pura Counc Total Pura Negu Com. Counc il Comm Negu ma Phy % Expend Expen il (LA) Expen unity ma Expen iture diture diture diture

11

NELSIP/NP/J/V Reconstruction of Kollankal Documentation NPS/W/11 Paddikkadavai Road addi work for Tender

1.47

11.61

12

Reconstruction of NELSIP/NP/J/V Alaveddi Documentation Murungayappulam West work for Tender NPS/W/12 Road and Link Road

1.05

14.41

13

NELSIP/NP/J/V Reconstruction of NPS/W/13 Cemetery Road

Vasavila n-West

Documentation work for Tender

1.07

11.85

14

Reconstruction of NELSIP/NP/J/V Appachchippilai NPS/W/14 Road

Alaveddi Documentation South work for Tender

0.71

3.47

Total

11.87 97.598 3.029 3.032 4.975 1.273 89.59 71.597

75.903

91

Reconst. Of Ponnaiya Road 0.96Km (4.157 Mn)

Reconst. of Kudiyappulam Cemetery Road 0.970Km (4.300 Mn)

92

Reconst. of Ponnipulam Road 1.070Km (6.734 Mn)

Reconst. of Velliyampathy Road 1.03Km (5.584 Mn)

93

Reconst. of Koothanseema Road 1.39Km (7.943 Mn)

94

Reconst. of Periyakinatradi Veethy 1.174Km (6.638 Mn)

Reconst. of Kanakar Valavu Part Road 1.43Km (10.809 Mn)

95

Reconst. of Kuruvalai Veethy 1.13Km (9.866 Mn)

Reconst. of Thammalai Veethy 1.49Km (9.365 Mn)

96

Reconst. of Sodacompany Road 1.235Km (6.202 Mn)

97

101.35 Mn

98

Se. No

Project No

Name of Implementing Location Local Authority (Village) and Description of Sub Project

Implementation Period No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 31st July 2013

Start Date

End Date

Pura Counc Total Pura Negu Com. il Comm Counc Negu ma Phy % Expend Expen il (LA) Expen unity iture ma Expen diture diture diture

NELSIP/NP/J/VS Reconst. of 1 PS/W/13(VSPS- Malvam 3rd Cross Road 1)

Uduvil

2.8.2011

2.12.2011

0.820

4.778

0.147 0.151 0.181 0.113 4.450 3.047 100%

3.310

NELSIP/NP/J/VS Reconst. of 2 PS/W/14(VSPS- Kadakarampai 2) Cemetry Road

Kuplan

2.8.2011

2.12.2011

1.150

6.830

0.221 0.224 0.209 0.201 6.400 4.921 100%

5.346

NELSIP/NP/J/VS Reconst. Kali 3 PS/W/15(VSPSKovil Veethy 3)

Ellalai

2.8.2011

2.12.2011

1.000

4.475

0.137 0.137 0.249 0.109 4.089 2.837 100%

3.083

Reconst.of NELSIP/NP/J/VS Sabapathipillai PS/W/04 Road

Chunaka 18.06.2012 17.09.2012 13.089 0.394 0.394 0.668 0.468 12.027 9.276 m North 0.810

100% 10.138

Reconst. Of NELSIP/NP/J/VS Sellappa PS/W/05 Maniyakaaran Veethy

Punnalaik adduvan 18.06.2012 17.09.2012 11.865 0.367 0.368 0.602 0.484 10.895 9.102 100% 2.030 South

9.955

99

Se.No

Project No

Name of Implementing Local Location Authority and (Village) Description of Sub Project

Implementation Period

Progress Up to 31st July 2013 No.of TEC Pura km/ (Mn) Counc Total Pura Negu Com. Sqf. Counc il Comm Negu ma Phy % Expen Expen Etc. il (LA) Expen unity ma Expen diture diture diture diture

Start Date

End Date

Mettaling & Tarring NELSIP/NP/J/V Nagathampiran SPS/W/06 Veethy NELSIP/NP/J/A Mettaling & Tarring CLG/W/11(VS Kantharoodai PS) Cemetry Veethy Reconstruction of NELSIP/NP/J/V Singathin SPS/W/07 KaladdY Veethy at Inuvil

Eveni

22.8.2012 20.11.2012 1.810 14.867 0.488 0.488 0.736 0.546 13.643 11.959 100% 12.973

Chunna 04.9.2012 02.01.2013 2.000 21.109 0.644 0.645 kam

1.06

0.980 19.405 18.776 100% 20.401

Inuvil

Documentation work for Tender

1.9

26.41

Reconstruction of NELSIP/NP/J/V Mangalaman SPS/W/08 Veethy at Evinai

Evinai

Documentation work for Tender

1.85

20.67

10

Reconstruction of Elzalai NELSIP/NP/J/V Kuppilan Annamar East SPS/W/09 Veethy at Kuppulan

Documentation work for Tender

0.85

11.47

Total

9.620 77.013 2.398 2.407 3.705 2.901 70.909 59.918

65.206

100

Reconst. of Malvam 3rd cross Road 0.82 Km (3.047 Mn)

Reconst. of Kadakkadampai Road 1.15Km (4.921 Mn)

101

Reconst. of Kaalikovil Road 1.0Km (2.837 Mn)

102

Reconst. of Sellappamaniyakaran Road 2.030km (9.102 Mn)

Reconst. of Sabapathippillai Road 0.810km (12.027 Mn)

103

Reconst. of Cemetry Road 2.0Km (18.776 Mn)

Reconst. of Nagathampiran Road 1.81Km (11.959 Mn)

104

108.18 Mn

105

Se. Project No No

Name of Implementing Local Location Authority and (Village) Description of Sub Project

Implementation Period No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 31st July 2013 Pura Counc Total Pura Negu Com. Counc il Comm Negu ma Phy % Expend Expen il (LA) Expen unity ma Expen iture diture diture diture

Start Date

End Date

NELSIP/NP/J/ Reconst. Of 1 VSWPS/W/23 Sinnappa Veethy (VSWPS-1)

Mannipay

2.8.2011

2.12.2011

1.300

7.696

0.255 0.255

0.331 0.171

7.110 4.901

100%

5.327

NELSIP/NP/J/ Reconst. of 2 VSWPS/W/24 Alankulai Lane (VSWPS-2)

Mannipay

2.8.2011

2.12.2011

1.390

7.529

0.247 0.247

0.322 0.170

6.960 4.800

100%

5.217

NELSIP/NP/J/ Reconst. Cemetry 3 VSWPS/W/25 Veethy, Ilavalai (VSWPS-3)

Mannipay

2.8.2011

2.12.2011

1.610

6.121

0.185 0.186

0.236 0.229

5.700 4.773

100%

5.188

NELSIP/NP/J/ Reconst. Of Mannipay 4 VSWPS/W/26 Utchchiodai Veethi (VSWPS-4)

2.8.2011

2.12.2011

1.240

5.362

0.166 0.167

0.216 0.179

4.980 3.971

100%

4.317

Reconst. Of NELSIP/NP/J/ Unthupalaikaddai VSWPS/W/05 Veethy

Sillalai

04.04.2012 04.07.2012 1.030 9.700

0.358 0.358

0.499 0.562

8.843 7.808

100%

8.728

106

Se. No

Project No

Name of Implementing Local Location Authority and (Village) Description of Sub Project

Implementation Period No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 31st July 2013 Pura Counc Total Pura Negu Com. Counc il Comm Negu ma Phy % Expen Expen il (LA) Expen unity diture ma Expen diture diture diture

Start Date

End Date

NELSIP/NP/J/VS Reconstruction of WPS/W/06 Nallunni Veethy

Kiraamp atu

Documentation work for Tender

1.4

16.86

Reconstruction of Arasady Aavalai NELSIP/NP/J/VS Veethy link 7 Kompanipulam WPS/W/07 Veethy

Sandilip Documentation ay-North work for Tender

2.22

24.80

Reconstruction of Suthuma Documentation NELSIP/NP/J/VS Maavadi Veethy lai-South work for Tender WPS/W/08 (Old Schools Veethy)

1.425

15.84

Reconstruction of Manipp NELSIP/NP/J/VS Anantha Veethy link ai-East WPS/W/09 vairavar Kovil Veethy

Documentation work for Tender

1.35

10.58

10

Reconstruction of NELSIP/NP/J/VS Mathagal vilan WPS/W/10 Veethy

Mathak al,Vilan

Documentation work for Tender

2.6

33.01

Total

6.570 36.408 1.211 1.213 1.604 1.311 33.593 26.253

28.777

107

Reconst. Of Sinnappah Veethy 1.3Km (4.901 Mn)

Reconst. of Allankulai Lane 1.39Km (4.800 Mn)

108

Reconst. of Cemetry Veethy 1.61Km (4.773 Mn)

Reconst. of Uchchiyodai Veethy 1.24Km (3.971 Mn)

109

Reconst. of Unthusanthai Unthupalakai Road 1.03Km (7.808 Mn)

110

100.38 Mn

111

Se.N o

Project No

Name of Implementing Locatio n Local Authority and Description of (Village) Sub Project

Implementation Period No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 31st July 2013

Start Date

End Date

Pura Counc Pura Negu Total Com. il Comm Counc Negu ma Phy % Expen Expen il (LA) Expen unity ma Expen diture diture diture diture

NELSIP/NP/J/V Reconst. Chulipur 1 WPS/W/19(VW Chulipuram Periya 2.8.2011 am PS-1) Thampiran Veethy

2.12.2011

1.300

10.973 0.334 0.000 0.494 0.468 10.145 6.111 100%

6.579

Reconst of NELSIP/NP/J/V Nochchi Nochchiampathy 2 WPS/W/19(VW ampath 2.8.2011 Patchanthai PS-2) y Veethy

2.12.2011

1.500

13.164 0.410 0.000 0.595 0.509 12.159 9.003 100%

9.512

NELSIP/NP/J/V Re-Construction of Chulipur 23.04.2012 22.07.2012 15.380 0.817 0.000 0.907 0.587 13.656 11.962 100% 12.549 WPS/W03 Pallasuddi Road 2.250 am

Reconstruction of Chankanai Vallai Chanka NELSIP/NP/J/V Road 1st Lane, 4 Preparing Estimate WPS/W04 Vickneswara nai Road, JaffnaPonnalai 1st Lane

112

Implementation Period Se. No Project No Name of Implementing Local Location Authority and (Village) Description of Sub Project No.of km/ Sqf. Etc. TEC (Mn)

Progress Up to 31st July 2013

Start Date

End Date

Pura Counc Pura Negu Total Com. Counc il Comm Negu ma Phy % Expen Expen il (LA) Expen unity diture ma Expen diture diture diture

Reconstruction of NELSIP/NP/J/V Moolai Saivaoirakasa Moolai WPS/W05 Vidyalaya Road

Preparing Estimate

Reconstruction of NELSIP/NP/J/V Vaddukkoddai WPS/W06 Kalainager Road Malavarayar Rd

Vadduk Preparing Estimate koddai

Total

5.050 39.517 1.561

1.996 1.564

35.96

27.077

28.640

113

Reconst. of Periyathampiran Road 1.3Km (6.111 Mn)

Reconst. Of Nochiyampathy Road 1.5Km (9.003 Mn)

114

Reconst. of Pallasuddy Road 2.25Km (11.962 Mn)

115

103.33 Mn

116

Name of Implementing Local Location Se.N Authority and Project No (Village) o Description of Sub Project

Implementation Period

Progress Up to 31st July 2013 No.of TEC km/ (Mn) Pura Counc Sqf. Total Pura Negu Com. Counc il Comm Etc. Negu ma Phy % Expen Expen il (LA) Expen unity diture ma Expen diture diture diture

Start Date

End Date

NELSIP/NP/ Reconst. Of 1 J/VLPS/W/ Rasaiya Veethy 27(VLPS-1)

Kurikaduva 2.8.2011 n

2.11.2011

2.600

10.211 0.338 0.338 0.594 0.092 9.279 5.896 100%

6.326

NELSIP/NP/ Reconst of 2 J/VLPS/W/ Sangaththa Keni 28(VLPS-2) Veethy

Punguduth 2.8.2011 eevu

2.12.2011

1.500

10.659 0.321 0.321 0.545 0.100 9.793 4.822 100%

5.243

Reconst. of NELSIP/NP/ Perunkulam veethy 3 J/VLPS/W/ Nainathivu 11.04.2012 11.08.2012 14.030 0.423 0.423 0.704 0.118 12.903 11.455 100% 11.995 0.670 & Const. of 03 retaining wall

NELSIP/NP/ Construction of 4 J/VLPS/W/ Market 04

Thuraiyoor 19.09.2012 16.02.2013

11.370 0.000 0.000 0.000 0.000 11.370 5.555

90%

5.555

Construction of NELSIP/NP/ thuraiyoor fish 5 J/VLPS/W/ market -Access 04A road at velanai

DPMU, Pura Neguma, Jaffna Thuraiyoor 21.03.2013 19.07.2013 10.179 0.810 0.000 1.255 0.722 8.114 3.270 100%

3.992

117

Implementation Period Se.N o Project No Name of Implementing Location Local Authority (Village) and Description of Sub Project

Progress Up to 31st July 2013 No.of TEC km/ (Mn) Pura Counc Sqf. Total Pura Negu Com. Counc il Comm Etc. Negu ma Phy % Expend Expen il (LA) Expen unity ma Expen iture diture diture diture

Start Date

End Date

Construction of NELSIP/NP/J/AC Market LG/W/12(VLPS) Muththaveli

Pungud 09.11.2012 08.05.2013 uthivu

17.631 0.859 0.000 0.999 0.024 15.773 0.116

40%

0.140

NELSIP/NP/J/AC Const.of Sudalai Mandati 09.08.2012 07.12.2012 1.600 18.500 0.557 0.000 0.966 0.847 16.977 11.236 100% 12.083 LG/W/08(VLPS) Veethy vu

NELSIP/NP/J/VLP Construction of S/W/05 Modern Market

Velanai

Preparing Estimate

NELSIP/NP/J/VLP Reconstruction of Alaipidd S/W/06 Venpuravi Road i

Preparing Estimate

Total

6.370 92.580 3.308 1.082 5.063 1.903 84.209 42.35

45.335

118

Reconst. of Rasaiah Road 2.6Km (9.279 Mn)

Reconst. of Sankatharkerny Road 1.5Km (9.793 Mn)

119

Reconst. of Sudalai Road 1.60Km (11.236 Mn)

Const. of Market at thuraiyoor 11.370 Mn)

120

Const. of Vegitable Market at Muthathuveli (15.773 Mn)