Escolar Documentos
Profissional Documentos
Cultura Documentos
Local Authority Jaffna MC Chavakacheri UC Point-Pedro UC Valvettithurai UC Chavakachcheri PS Delft PS Karainagar PS Kayts PS Nallur PS Point - Pedro PS Vada. South west PS Vali. East PS Vali. North PS Vali. South PS Vali. South west PS Vali. West PS Velanai PS Sub Total Total Grant /(Rs.Mn) 102.83 94.39 98.43 98.02 121.29 99.81 93.78 95.03 96.30 127.48 101.35 110.46 104.20 101.35 108.18 100.38 103.33 1756.61 2011 (30%) 31.00 28.00 30.00 29.00 36.00 30.00 28.00 29.00 29.00 38.00 30.00 33.00 31.00 30.00 32.00 30.00 31.00 525.00 2012 (45%) 46.00 42.00 44.00 44.00 55.00 45.00 42.00 43.00 43.00 57.00 46.00 50.00 47.00 46.00 49.00 45.00 46.00 790.00 2013 (25%) 25.83 24.00 25.00 25.00 30.00 25.00 23.00 24.00 24.00 32.00 25.00 28.00 26.00 25.00 27.00 25.00 26.00 439.83 2
Description
2011
Jaffna
2012 2013
Total
Allocation No.of Works Pura Neguma Commitment Pura Neguma Expenditure UnderPreparation Tender called Termination 0-50% 51-75% 76-99% 100%
1 1 1 3 61 25
DPMU, Pura Neguma, Jaffna
103.83 Mn
Se.No
Commitment(Million) No.of TEC km/ Pura (Million) Commu Pura Sqf. Etc. Commu Council Neguma nity Council Neguma nity Expendi (World Expendi (LA) Expendi (People) ture Bank & ture ture Govt) 0.35 1.799 0.057 0.057 0.119 0.095 1.623 1.358
Phy %
Total Expenditur e
Construction of tarr road at Vasanthapuram 1st& 2nd lane Reconstruction of Drainage at Sippithalai lane Reconst. Of Thirunagar main channel Retaining wall from Thiyoku Nursary school Mettaling & Tarring Nallur Thurka lane & Surrounding Const. of Anjuthankulam outlet channel, retaining wall and culvert
2.8.2011
02.11.2011
100%
1.51
2.8.2011
02.11.2011
0.625
1.768
0.054
0.054
0.117
0.093
1.596
1.279
100%
1.426
26.03.12
26.06.12
0.23
6.073
0.184
0.184
0.388
0.105
5.5
4.311
100%
4.600
26.03.12
26.06.12
1.47
8.121
0.249
0.249
0.537
0.527
7.335
6.465
100%
7.241
26.03.12
26.06.12
0.36
5.441
0.164
0.164
0.367
0.02
4.909
3.381
100%
3.565
Se.No
Implementation Period
Commitment(Million) No.of TEC Pura km/ (Million Pura Negum Commu Commu Sqf. Etc. ) Negum Council a nity nity Council Expendi a (World (People Expendi (LA) Expendi ture Bank & ) ture ture Govt)
Start Date
End Date
Phy %
Total Expenditu re
Mettaling & Tarring Vidan's lane and By lanes and construction & reconst. of channel and retaining wall Reconstruction of Cheddiyar thoddam , Murugesar Veethy and Construction of Culvert
26.03.12
26.06.12
1.74
6.832
0.205
0.205
0.45
0.27
6.176
5.436
100%
5.911
18.607
0.203
0.000
1.28
0.002
17.12
2.103 Termination
2.105
2.118
0.05
0.136
1.932
Se.No
Implementation Period
Commitment(Million)
Progress Up to 31.07. 2013 (Mn) Pura Pura Negum Negum a a (World Expend Bank & iture Govt)
Start Date
End Date
TEC No.of km/ (Millio Commu Commu n) Sqf. Etc. Council nity nity Council Expend (People Expend (LA) iture ) iture
Phy %
Total Expenditu re
10
11
12
Reconstruction of Mavadi Vairavar kovil , Kamel with channel and Drainage 26.09.2012 25.12.2012 Reconstruction of Bharathy &bylanes ,stanley lane and perinpanayakam Road Reconstruction of Odai,Sivappiraka sam & Bylanes ,Thalaiyali Veethy, College Lane 5.10.2012 4.02.2013 Reconstruction of Water tank 1St. & 3ed. Cross road ,Sinnakkadai 4th Cross Street & Kondady Veethy with drainge 26.09.2012 25.12.2012
7.732 0.66
0.244
0.389
0.012
7.099
5.036
95%
5.048
9.001
0.148
0.571
0.001
8.281
0.055
Under Preparation
0.056
22.317 0.742
0.34
1.44
0.007
20.531
8.911
40%
8.918
4.956
0.178
0.248
0.012
4.53
1.808
65%
1.820
0.38
Se.No
Implementation Period No.of TEC km/ Sqf. Etc. (Million) Start Date End Date
Commitment(Million)
Pura Pura Communi Communi Council Neguma Neguma ty Council Expendit (World ty Expendit Expendit (LA) Bank & (People) ure ure ure Govt) 0.199 0.333 0.012 6.092 3.449
Phy %
Total Expenditure
13
Reconstruction of Drainage at 21.09.2012 20.12.2012 Convent road & Mathiyas Veethy Reconstruction of Suvamiar Uppukulam 5.10.2012 Veethy with cross street & Reclamation Road Recosntruction of Hindu ladies lane, Aththysoodi Veethy, Convent lane and Gana Vairavar Front lane
0.42
6.624
100%
3.461
14
4.02.2013
2.49
11.723
0.367
0.588
0.007
10.768
3.451
45%
3.458
15
5.10.2012
4.02.2013
1.80
10.878
0.257
0.612
0.007
10.008
6.336
90%
6.343
Total
137.081 3.018
0.913
8.500
55.819
12
94.39 Mn
22
Implementation Period Name of Implementing Local Location Se.No Project No Authority and (Village) Description of Sub Project
Start Date
End Date
TEC Pura No.of (Mn) Coun Com Com. Coun Pura Negu Total km/ cil Negu ma Phy % Expen munit Expen cil Expen Sqf. y diture (LA) ma Expen diture Etc. diture diture
NELSIP/NP/J/ Reconst. Of Kalvayal ChUC/W/03( Ramalingam Old Kalvayal ChUC-1) School Joint Road
2.8.2011
2.12.2011
100
9.383
Meesalai 2.8.2011
2.12.2011
100
8.523
Const. of Chavaka NELSIP/NP/J/ Paththiniyar Thuravu 20.03.2012 20.06.2012 1.1 chcheri ChUC/W/03 Road
9.499 0.349
0.35
100
7.871
Reconstruction of NELSIP/NP/J/ Nunavil Kalvayal 1st Nunavil ChUC/W/04 Lane & Adiyampitty Road
10.79
15.77
23
Implementation Period Name of Implementing Local Location Authority and (Village) Description of Sub Project
Se.No
Project No
Start Date
End Date
TEC Pura No.of (Mn) Coun Com Com. Coun Pura Negu Total cil km/ munit Expen cil Negu ma Phy % Expen Sqf. Expen y diture (LA) ma Expen diture Etc. diture diture
Reconstruction of Meesal Documentation NELSIP/NP/J/C Thalaiyady Amman ai West Work for Tender hUC/W/06 2nd Lane
1.25
7.59
1.37
13.89
Chavak Reconstruction of NELSIP/NP/J/C Documentation Sappachchimavadi achcher hUC/W/08 Work for Tender Pillaiyar Kovil Road i
0.69
8.34
10
24
Implementation Period Name of Implementing Local Location Authority and (Village) Description of Sub Project
Se.No
Project No
Start Date
End Date
TEC Pura No.of (Mn) Coun Total Com Com. Coun Pura Negu km/ cil munit Expen cil Negu ma Phy % Expen Sqf. Expen ma Expen diture y diture (LA) Etc. diture diture
11
Reconstruction of 4,5 NELSIP/NP/J/C Preparing Ellai Veethy Iyanar Kalvayal hUC/W/11 Estimate Road
12
Kalvayal
Preparing Estimate
13
Total
25.871
25
26
27
98.43 Mn
28
Implementation Period Name of Implementing Local Location Authority and (Village) Description of Sub Project
Se.No
Project No
Start Date
End Date
TEC Pura No.of (Mn) Coun Com Com. Coun Pura Negu Total km/ cil munit Expen cil Negu ma Phy % Expen Sqf. Expen diture (LA) y ma Expen diture Etc. diture diture
NELSIP/NP/J/PP Const. of Retaining Beach UC/W/01 wall Road NELSIP/NP/J/A Construction CLG/W/01 Athiyady DC (PPUC) Channel Reconstruction of NELSIP/NP/J/A Aththiyady DC CLG/W/07(PPU Channel C) Continuous Work
16.03.2012 15.06.2012
0.348
6.417
50% Athiyady 11.07.2012 11.11.2012 1.230 28.078 0.846 0.000 1.543 0.000 25.689 1.941 termin 1.941 ated
PN/NP/J/CLG/ Reconstruction of Peruvedd 21.02.2013 18.12.2013 W/02(PPUC) Peruveddy Channel y Construction of Channel at NELSIP/NP/J/PP Peruveddi Visvakula Pointpedr Preparing Estimate o UC/W/02 Joint Lane
25.016
Total
49.618
29
30
31
98.02 Mn
32
Se.No Project No
Name of Implementing Local Location Authority and (Village) Description of Sub Project
Implementation Period
Progress Up to 31st July 2013 Pura Counc No.of TEC Total Pura Negu Com. Counc il km/ (Mn) Com Negu ma Phy % Expen Expen munity il (LA) Expen Sqf. diture ma Expen diture diture Etc. diture
Start Date
End Date
Reconstruction of KKS Road 2nd Kerudavil NELSIP/NP/J/ lane,Netkolu lane, North 11.05.2012 10.08.2012 1.118 5.565 VVUC/W/01 Netkolu Varivar Kovil Cluster- 01 front road ,
100%
5.994
Reconstruction of Periakadakkarai Thondama NELSIP/NP/J/ Road, Vellankarai naru15.05.2012 14.08.2012 1.665 11.145 VVUC/W/02 cemetry Road, Cluster- 02 Veeramakali Aman Kovil Road
0.37
Reconstruction of Retaining wall along Valvettitur NELSIP/NP/J/ coastal Area from ai North 11.05.2012 10.08.2012 0.255 14.167 0.492 0.000 0.706 0.062 12.969 14.067 100% 14.129 VVUC/W/03 vady lane access to west mathavady area Construction of NELSIP/NP/J/ vegetable Market Valvettithu 12.04.2013 11.12.2013 CLG/W/02(V with Shopping rai town VUC) Complex-package A
40%
4.905
Construction of NELSIP/NP/J/ vegetable Market Valvettithu CLG/W/ with Shopping 12.04.2013 11.08.2013 10.625 0.105 0.000 0.736 0.000 9.784 0.076 rai town DPMU, Pura Neguma, Jaffna 02A(VVUC) Complex-package B
20%
33
0.076
Se.No
Project No
Name of Implementing Local Location Authority and (Village) Description of Sub Project
Progress Up to 31st July 2013 Pura Coun Total Com Com. Coun Pura Negu cil munit Expen cil Negu ma Phy % Expen Expen diture ma Expen y diture (LA) diture diture
Start Date
End Date
Construction of NELSIP/NP/J/V Retaining Wall at VVT VTUC/W/04 Sithampara College West play ground -North NELSIP/NP/J/V Reconstruction of VTUC/W/05 Konavalai Road Reconstruction of NELSIP/NP/J/V Aatrankarai Road up to Field Work VTUC/W/06 centre Total
Preparing Estimate
36.175
34
35
36
37
121.29Mn
38
Implementation Period Name of Implementing Location Local Authority and (Village) Description of Sub Project
Se.No
Project No
Start Date
End Date
TEC Pura No.of (Mn) Com. Coun Com Coun Pura Negu Total km/ cil Expe munit cil Negu ma Phy % Expen Sqf. nditur Expen y (LA) ma Expen diture Etc. e diture diture
Mirusuvil
2.8.2011
2.12.2011
1.000
4.684
2.12.2011
1.000
5.050
Reconst. Of NELSIP/NP/J/ChP Navalkuli West Navalkuli S/W/08(ChPS-3) Koolarupitty Road Reconstruction of NELSIP/NP/J/ACL Karampakam G/W/01 -CHPS Vidaththatpalai Road
2.8.2011
2.12.2011
1.000
4.765
Vidathth 01.07.2012 01.11.2012 24.928 0.795 0.698 1.355 0.823 22.778 18.164 100% 19.685 atpalai 2.009
Mettaling & Tarring NELSIP/NP/J/ChP Karampa Ammakadai Road 23.07.2012 21.10.2012 0.970 10.946 0.335 0.335 0.554 0.511 10.057 7.125 100% S/W/05 kurichchi 2nd Stage
7.971
39
Implementation Period Name of Implementing Local Locatio Authority and n Description of Sub (Village) Project
Se.No
Project No
Start Date
End Date
Pura Coun Com Com. Coun Pura Negu Total cil Negu ma Phy % Expen munit Expen cil Expen y diture (LA) ma Expen diture diture diture
NELSIP/NP/J/ Mettaling & Tarring Mirusuvil 11.02.2013 11.06.2013 2.280 23.850 0.716 0.000 1.213 1.145 21.92 8.019 100% ACLG/W/04( Mirusuvil Hospital CHPS) Front Road 2nd Stage
9.164
Re.Con of Manthuvil Manthu NELSIP/NP/J/ Kudiyetta thidda Preparing Estimate vil ChPS/W/06 Road
Re. Con of Kaithady NELSIP/NP/J/ North Navapuram ChPS/W/08 Madduvil Sivan Kovil Rd
Total
51.319
40
41
42
43
99.81 Mn
44
Implementation Period Se.No Project No Name of Implementing Local Location Authority and (Village) Description of Sub Project No.of km/ Sqf. Etc.
TEC (Mn)
Start Date
End Date
Pura Coun Negu Com. Total Com Coun cil Pura ma Expe Phy % Expen munit cil Expe Negu Expe nditur diture y (LA) nditur ma nditur e e e
Reconst. Of South NELSIP/NP/J/DELP Sudalai Vigaravadi Delft West 2.8.2011 2.12.2011 5.351 0.218 0.000 0.299 0.029 4.834 3.422 100% 3.451 1.500 S/W/29(DELPS-1) Veethy Termin 2.8.2011 2.12.2011 2.000 7.130 0.29 0.000 0.399 0.027 6.441 1.883 ation 1.910 (35%) Kalamuna i 05.06.13 04.09.13 1.100 7.044 0.200 0.000 0.373 0.000 6.471 0.041 55% 0.041
NELSIP/NP/J/DELP S/W/30(DELPS-2) 2
2.8.2011 2.12.2011 0.800 2.854 0.116 0.000 0.16 0.018 2.578 1.430 100% 1.448 Reconstruction of Murukan Kovil Kopalapiddy Concrete Veethy Kopalapid dy 05.06.13 04.09.13 0.275 1.655 0.049 0.000 0.092 0.000 1.514 0.000 50% 0.000
45
Implementation Period Se. No Name of Implementing Local Location Authority and (Village) Description of Sub Project No.of km/ Sqf. Etc. TEC (Mn)
Project No
Start Date
End Date
Pura Counc Pura Negu Total Com. il Counc Comm Negu ma Phy % Expend Expen il (LA) Expen unity iture ma Expen diture diture diture
Mannalt hurai
19.10.2012 19.05.2013
12.016
Delft
Delft
Tender Called
Delft
Total
18.866
46
47
48
93.78 Mn
49
Implementation Period Se. No Name of Implementing Local Location Authority and (Village) Description of Sub Project
Progress Up to 31st July 2013 No.of TEC km/ (Mn) Pura Counc Sqf. Total Com Com. Pura Negu Counc il Etc. muni Expen Negu ma Phy % Expend il (LA) Expen iture ma Expen ty diture diture diture
Project No
Start Date
End Date
2.8.2011
2.12.2011
1.500
8.479
Sampalo 21.03.2012 20.06.2012 1.130 7.431 0.464 0.464 0.464 0.209 6.530 5.445 100% dai
6.118
Palaiyak 21.03.2012 21.06.2012 2.00 15.024 0.471 0.471 0.892 0.470 13.661 10.826 100% 11.767 andy
NELSIP/NP/J/A Metalling &Tarring Thoppuk 4 CLG/W/06(KRP Thoppukkadu 20.02.2013 20.06.2013 1.420 21.062 0.634 0.634 1.054 0.085 19.374 15.058 100% 15.777 adu S) vairavar Kovil Veethy
Marutha 02.08.2012 31.10.2012 2.070 12.527 0.59 0.590 0.639 0.247 11.298 9.631 100% 10.468 puram
50
Se. No
Project No
Name of Implementing Local Location Authority and (Village) Description of Sub Project
Start Date
End Date
Pura Counc Total Pura Negu Com. Comm Counc il Negu ma Phy % Expend Expen il (LA) Expen unity iture ma Expen diture diture diture
keniyady
Karainag ar
2.05
22.554
Karainag ar
Tender Called
0.86
8.857
Total
69.135
51
52
53
54
95.03 Mn
55
Se.N Project No o
Name of Implementing Local Locatio n Authority and Description of Sub (Village) Project
Start Date
End Date
Pura Counc Com. Pura Negu Total Comm Counc il Negu ma Phy % Expen Expen il (LA) Expen unity diture diture ma Expen diture diture
Melingi munai
2.8.2011
2.12.2011
0.830
6.430
4.005
NELSIP/NP/J Reconst. Of Analaidi 2 /KYPS/W/34 Analaidivu Kadaiyadi 2.8.2011 vu (KYPS-2) Cross Road
2.12.2011
0.850
5.748
4.081
Kayts
7.441
5.843
7.341
5.571
Sooriya 23.03.2012 23.06.2012 0.978 12.416 0.374 0.374 0.619 0.061 11.423 9.522 100% wathai
9.957
56
Se.N o
Project No
Name of Implementing Local Location Authority and (Village) Description of Sub Project
Implementation Period
Progress Up to 31st July 2013 No.of TEC km/ (Mn) Pura Sqf. Counc Total Com. Pura Negu Etc. Counc il Comm Expen Negu ma Phy % Expend unity il (LA) Expen iture ma Expen diture diture diture
Start Date
End Date
Metalling &Tarring NELSIP/NP/J/A Naranthai Sinnamadu Sinnama CLG/W/10(KYP 13.08.2012 11.12.2012 1.323 19.37 0.603 0.603 0.993 0.141 17.774 14.134 100% 14.878 1st &2 nd Road & du S) Drainage Metalling &Tarring NELSIP/NP/J/KY Naranthai PS/W/06 Utharappiddy Road NELSIP/NP/J/A Metalling &Tarring CLG/W/09(KYP Puliyankoodal North S) Road Metalling &Tarring NELSIP/NP/J/KY Naranthanai PS/W/08 Ganesha school Rd NELSIP/NP/J/KY Reconstruction of PS/W/07 Koththikula veethy Naranth annai 01.08.2012 30.10.2012 North 1.1 9.318 0.488 0.488 0.521 0.064 8.309 8.830 100% 9.382
Pulliyank 10.09.2012 08.01.2013 1.557 20.938 0.696 0.696 1.051 0.064 19.191 15.789 100% 16.549 oodal Naranth 01.08.2012 30.10.2012 1.323 12.031 0.607 0.607 0.666 0.053 10.758 11.170 100% 11.830 annai
10
kayts
9.304
11
Reconstruction of Karamp Preparing Estimate NELSIP/NP/J/KY Uppukula Road and an North PS/W/09 Link Road Total 110.31 4.174 4.174 5.697 1.128 100.44 86.097 91.400
57
DPMU, Pura Neguma, Jaffna
58
59
60
61
DPMU, Pura Neguma, Jaffna
62
96.30 Mn
63
Implementation Period Name of Implementing Local Locatio Authority and n Description of Sub (Village) Project No.of km/ Sqf. Etc. TEC (Mn)
Progress Up to 31st July 2013 Pura Coun Total Com Com. Coun Pura Negu cil munit Expen cil Negu ma Phy % Expen Expen diture ma Expen y diture (LA) diture diture
Se.No Project No
Start Date
End Date
NELSIP/NP/J/ Reconstruction of NaPS/W/05( Ariyalai South East Manipuri Veethy NaPS-1) NELSIP/NP/J/ Const. of Kerniyady NaPS/W/02 Road Reconstruction NELSIP/NP/J/ Manippuri joint NaPS/W/03 Veethy & Manippuri 8th CrossVeethy
Ariyalai
2.8.2011
2.12.2011
1.000
8.074
5.784
Kokuvil
16.05.2012 15.08.2012
1.476
7.005
4.743
Ariyali
01.07.2012 01.10.2012
1.343
Construction of NELSIP/NP/J/ Children indoor CLG/W/03(N Kokuvil games,Training APS) centre & Cultural Hall
17.04.2013 04.02.2014
25%
8.484
Kokuvil
14.08
Reconstruction of NELSIP/NP/J/ Koddukkinaru Pilaiyar Ariyalai East NaPS/W/04 Kovil Veethy at Ariyalai - East Total
4.50
32.282
64
65
66
Construction of children indoor games, Training centre & cultural hall (51.462 Mn)
67
127.48 Mn
68
Implementation Period Name of Implementing Location Local Authority (Village) and Description of Sub Project
Se.No
Project No
Start Date
End Date
TEC (Mn)
Pura Counc Total Pura Negu Com. Comm Counc il Negu ma Phy % Expen Expen il (LA) Expen unity diture ma Expen diture diture diture
Reconst of NELSIP/NP/J/PPP Uruththiravattai S/W/09(PPPS-1) School Veethy Reconst. Of NELSIP/NP/J/PPP Thikkam School S/W/10(PPPS-2) Veethy Reconst. Of NELSIP/NP/J/PPP Kampavaththai S/W/03 internal Roads
2.12.2011
1.370
8.865
100%
6.076
Thikkam
2.8.2011
2.12.2011
0.750
5.909
100%
4.106
Puloly
16.04.2012 15.07.2012
1.000
9.092
100%
9.264
9.908
100%
9.847
Reconstruction of Periyathe NELSIP/NP/J/PPP Periyathevanatht vanathth 16.04.2012 15.07.2012 S/W/06) 1.050 hai Road ai Reconstruction of NELSIP/NP/J/PPP Kudakka 16.04.2012 15.07.2012 Kudakkamparai mparai 1.150 S/W/04 internal Road
8.371
100%
7.302
9.145
100%
8.358
69
Implementation Period Name of Implementing Location Local Authority Project No (Village) and Description of Sub Project TEC (Mn)
Se.No
Start Date
End Date
Pura Coun Com Com. Coun Pura Negu Total cil munit Expen cil Negu ma Phy % Expen Expen y diture (LA) ma Expen diture diture diture
Mettaling & NELSIP/NP/J/ Tarring Kerudavil Kerudavil PPPS/W/07 Amman Kovil Road NELSIP/NP/J/ Construction of ACLG/W/14( Shopping PPPS) complex NELSIP/NP/J/ Construction of CLG/W/01(P Market at PPS) manthikai Kaddaikadu NELSIP/NP/J/ Nithiyaveddai PPPS/W/08 Road Saveriyar Kovil NELSIP/NP/J/ Road (Church PPPS/W/09 Road)
9.854
8.193
Manandi
10.04.2013 07.10.2013
50%
4.400
40%
3.746
10
Preparing Estimate
11
Preparing Estimate
Total
61.292
70
71
72
73
74
75
101.35 Mn
76
Implementation Period Name of Implementing Local Authority and Description of Sub Project
Se.N o
Project No
Location (Village)
Start Date
End Date
TEC Pura Counc No.of (Mn) Total Pura Negu Com. Com Counc il km/ Negu ma Phy % Expen Expen munity il (LA) Expen Sqf. diture ma Expen diture diture Etc. diture
1.8.2011
1.12.2011
0.900
6.317
100%
4.705
1.8.2011
1.12.2011
1.800
100%
8.640
Maththoni
21.03.2012 20.06.2012
0.650
3.996
100%
3.188
NELSIP/NP/J/V Reconstruction of Karaveddy 17.01.2013 17.04.2013 0.805 3.578 dSWPS/W/04 Srinaratha Veethy West
100%
2.819
Alvai
100%
4.234
77
Implementation Period Se. No Name of Implementing Local Location Authority and (Village) Description of Sub Project
Progress Up to 31st July 2013 No.of TEC (Mn) Pura km/ Counc Pura Negu Total Com. Sqf. Counc il Comm Expen Negu ma Phy % Expen Etc. il (LA) Expen unity diture ma Expen diture diture diture
Project No
Start Date
End Date
6.345
3.397
Reconstruction of Karanav NELSIP/NP/J/V Kavilkerai Vellavaikal 17.01.2013 17.04.2013 1.400 dSWPS/W/07 ai East Veethy
8.546
5.092
5.972
Reconstruction of NELSIP/NP/J/V Kalaimahal Imaiyann 17.01.2013 17.04.2013 1.131 dSWPS/W/09 Community Center am Veethy
7.496
5.344
Total
9.416 65.903
43.391
78
79
81
82
83
110.46 Mn
84
Se. No
Project No
Name of Implementing Local Location Authority and (Village) Description of Sub Project
Progress Up to 31st July 2013 Pura Counc Pura Negu Total Com. il Comm Counc Negu ma Phy % Expend Expen il (LA) Expen unity ma Expen iture diture diture diture
Start Date
End Date
Kopay
2.8.2011 2.12.2011
1.750
9.901
8.827
Achelu
2.8.2011 2.12.2011
1.500
8.179
7.289
Awarank 2.8.2011 2.12.2011 11.208 0.350 0.350 0.483 0.469 10.375 9.177 100% al west 2.000
9.996
03.4.2012 03.7.2012
1.500
8.186
Total
34.298
85
86
87
104.20 Mn
88
Implementation Period Se. No Name of Implementing Local Location Authority and (Village) Description of Sub Project
Progress Up to 31st July 2013 No.of TEC km/ (Mn) Pura Counc Sqf. Pura Negu Total Com. il Comm Counc Etc. Negu ma Phy % Expend Expen il (LA) Expen unity ma Expen iture diture diture diture
Project No
Start Date
End Date
Pannalai
2.8.2011
2.12.2011
0.960
5.902
4.548
2.12.2011
0.970
5.788
4.650
NELSIP/NP/J/V Reconst. Of Tellipalai 22.03.2012 21.06.2012 8.698 NPS/W/03 Ponnipulam Road 1.070
7.428
NELSIP/NP/J/V Reconst. Of Alavedd 22.03.2012 21.06.2012 6.894 NPS/W/04 vellijampathy Road y East 1.030
5.830
Reconst. Of NELSIP/NP/J/V Alavedd 22.03.2012 21.06.2012 9.991 Kooththancheema y North 1.390 NPS/W/05 Road
8.284
89
Se. No
Project No
Name of Implementing Local Location Authority and (Village) Description of Sub Project
Progress Up to 30th of June 2013 Pura Counc Pura Negu Total Com. il Comm Counc Negu ma Phy % Expen Expen il (LA) Expen unity ma Expen diture diture diture diture
Start Date
End Date
Reconstruction of NELSIP/NP/J/V Kernipiddy veethy Alavedd 20.08.201 19.11.201 1.174 NPS/W/06 (Periya Kinnaththady y East 2 2 Veethy)
9.958
6.957
Mallaga 20.08.201 19.11.201 1.430 14.764 0.394 0.394 0.652 0.140 13.718 10.809 100% 11.343 m South 2 2
Mallaga 20.08.201 19.11.201 1.130 14.642 0.488 0.488 0.770 0.278 13.384 9.866 100% 10.632 m South 2 2
Allaved 20.08.201 19.11.201 1.490 12.512 0.358 0.359 0.622 0.019 11.532 9.365 100% dy West 2 2
9.743
10
8.449
6.488
90
Se. No
Project No
Name of Implementing Local Location Authority and (Village) Description of Sub Project
Start Date
End Date
Pura Counc Total Pura Negu Com. Counc il Comm Negu ma Phy % Expend Expen il (LA) Expen unity ma Expen iture diture diture diture
11
NELSIP/NP/J/V Reconstruction of Kollankal Documentation NPS/W/11 Paddikkadavai Road addi work for Tender
1.47
11.61
12
Reconstruction of NELSIP/NP/J/V Alaveddi Documentation Murungayappulam West work for Tender NPS/W/12 Road and Link Road
1.05
14.41
13
Vasavila n-West
1.07
11.85
14
0.71
3.47
Total
75.903
91
92
93
94
95
96
97
101.35 Mn
98
Se. No
Project No
Name of Implementing Location Local Authority (Village) and Description of Sub Project
Start Date
End Date
Pura Counc Total Pura Negu Com. il Comm Counc Negu ma Phy % Expend Expen il (LA) Expen unity iture ma Expen diture diture diture
Uduvil
2.8.2011
2.12.2011
0.820
4.778
3.310
Kuplan
2.8.2011
2.12.2011
1.150
6.830
5.346
Ellalai
2.8.2011
2.12.2011
1.000
4.475
3.083
Chunaka 18.06.2012 17.09.2012 13.089 0.394 0.394 0.668 0.468 12.027 9.276 m North 0.810
100% 10.138
Punnalaik adduvan 18.06.2012 17.09.2012 11.865 0.367 0.368 0.602 0.484 10.895 9.102 100% 2.030 South
9.955
99
Se.No
Project No
Name of Implementing Local Location Authority and (Village) Description of Sub Project
Implementation Period
Progress Up to 31st July 2013 No.of TEC Pura km/ (Mn) Counc Total Pura Negu Com. Sqf. Counc il Comm Negu ma Phy % Expen Expen Etc. il (LA) Expen unity ma Expen diture diture diture diture
Start Date
End Date
Mettaling & Tarring NELSIP/NP/J/V Nagathampiran SPS/W/06 Veethy NELSIP/NP/J/A Mettaling & Tarring CLG/W/11(VS Kantharoodai PS) Cemetry Veethy Reconstruction of NELSIP/NP/J/V Singathin SPS/W/07 KaladdY Veethy at Inuvil
Eveni
22.8.2012 20.11.2012 1.810 14.867 0.488 0.488 0.736 0.546 13.643 11.959 100% 12.973
1.06
Inuvil
1.9
26.41
Evinai
1.85
20.67
10
0.85
11.47
Total
65.206
100
101
102
103
104
108.18 Mn
105
Se. Project No No
Name of Implementing Local Location Authority and (Village) Description of Sub Project
Progress Up to 31st July 2013 Pura Counc Total Pura Negu Com. Counc il Comm Negu ma Phy % Expend Expen il (LA) Expen unity ma Expen iture diture diture diture
Start Date
End Date
Mannipay
2.8.2011
2.12.2011
1.300
7.696
0.255 0.255
0.331 0.171
7.110 4.901
100%
5.327
Mannipay
2.8.2011
2.12.2011
1.390
7.529
0.247 0.247
0.322 0.170
6.960 4.800
100%
5.217
Mannipay
2.8.2011
2.12.2011
1.610
6.121
0.185 0.186
0.236 0.229
5.700 4.773
100%
5.188
2.8.2011
2.12.2011
1.240
5.362
0.166 0.167
0.216 0.179
4.980 3.971
100%
4.317
Sillalai
0.358 0.358
0.499 0.562
8.843 7.808
100%
8.728
106
Se. No
Project No
Name of Implementing Local Location Authority and (Village) Description of Sub Project
Progress Up to 31st July 2013 Pura Counc Total Pura Negu Com. Counc il Comm Negu ma Phy % Expen Expen il (LA) Expen unity diture ma Expen diture diture diture
Start Date
End Date
Kiraamp atu
1.4
16.86
2.22
24.80
Reconstruction of Suthuma Documentation NELSIP/NP/J/VS Maavadi Veethy lai-South work for Tender WPS/W/08 (Old Schools Veethy)
1.425
15.84
Reconstruction of Manipp NELSIP/NP/J/VS Anantha Veethy link ai-East WPS/W/09 vairavar Kovil Veethy
1.35
10.58
10
Mathak al,Vilan
2.6
33.01
Total
28.777
107
108
109
110
100.38 Mn
111
Se.N o
Project No
Name of Implementing Locatio n Local Authority and Description of (Village) Sub Project
Start Date
End Date
Pura Counc Pura Negu Total Com. il Comm Counc Negu ma Phy % Expen Expen il (LA) Expen unity ma Expen diture diture diture diture
NELSIP/NP/J/V Reconst. Chulipur 1 WPS/W/19(VW Chulipuram Periya 2.8.2011 am PS-1) Thampiran Veethy
2.12.2011
1.300
6.579
Reconst of NELSIP/NP/J/V Nochchi Nochchiampathy 2 WPS/W/19(VW ampath 2.8.2011 Patchanthai PS-2) y Veethy
2.12.2011
1.500
9.512
NELSIP/NP/J/V Re-Construction of Chulipur 23.04.2012 22.07.2012 15.380 0.817 0.000 0.907 0.587 13.656 11.962 100% 12.549 WPS/W03 Pallasuddi Road 2.250 am
Reconstruction of Chankanai Vallai Chanka NELSIP/NP/J/V Road 1st Lane, 4 Preparing Estimate WPS/W04 Vickneswara nai Road, JaffnaPonnalai 1st Lane
112
Implementation Period Se. No Project No Name of Implementing Local Location Authority and (Village) Description of Sub Project No.of km/ Sqf. Etc. TEC (Mn)
Start Date
End Date
Pura Counc Pura Negu Total Com. Counc il Comm Negu ma Phy % Expen Expen il (LA) Expen unity diture ma Expen diture diture diture
Preparing Estimate
Total
1.996 1.564
35.96
27.077
28.640
113
114
115
103.33 Mn
116
Name of Implementing Local Location Se.N Authority and Project No (Village) o Description of Sub Project
Implementation Period
Progress Up to 31st July 2013 No.of TEC km/ (Mn) Pura Counc Sqf. Total Pura Negu Com. Counc il Comm Etc. Negu ma Phy % Expen Expen il (LA) Expen unity diture ma Expen diture diture diture
Start Date
End Date
Kurikaduva 2.8.2011 n
2.11.2011
2.600
6.326
2.12.2011
1.500
5.243
Reconst. of NELSIP/NP/ Perunkulam veethy 3 J/VLPS/W/ Nainathivu 11.04.2012 11.08.2012 14.030 0.423 0.423 0.704 0.118 12.903 11.455 100% 11.995 0.670 & Const. of 03 retaining wall
90%
5.555
Construction of NELSIP/NP/ thuraiyoor fish 5 J/VLPS/W/ market -Access 04A road at velanai
DPMU, Pura Neguma, Jaffna Thuraiyoor 21.03.2013 19.07.2013 10.179 0.810 0.000 1.255 0.722 8.114 3.270 100%
3.992
117
Implementation Period Se.N o Project No Name of Implementing Location Local Authority (Village) and Description of Sub Project
Progress Up to 31st July 2013 No.of TEC km/ (Mn) Pura Counc Sqf. Total Pura Negu Com. Counc il Comm Etc. Negu ma Phy % Expend Expen il (LA) Expen unity ma Expen iture diture diture diture
Start Date
End Date
40%
0.140
NELSIP/NP/J/AC Const.of Sudalai Mandati 09.08.2012 07.12.2012 1.600 18.500 0.557 0.000 0.966 0.847 16.977 11.236 100% 12.083 LG/W/08(VLPS) Veethy vu
Velanai
Preparing Estimate
Preparing Estimate
Total
45.335
118
119
120
121