Each and every item to be tagged,Operational notes to be written on P&I (specially for free liquid draing, control of flow, choking/ cleaning of lines, equipment, draing of liquid to drain header for pumps and others, venting at safe location,proper isola Max and min limit of CV and inst wrt to operation requirement, tagging on IA supply from distribution pot,intrinsic safe condition,passing of SOV and CV,confirm cleaning before box up of inst,special requirement of installation and line up. wrt P&I, acesibilty for maint , leak testing, draining, venting,operation of valves,maint of CV, inst,support check, procedure and timing for spring support & bellow unlocking, Rating of motors, start and stop special requirments, VFD control for motors,Proper illumination in area,proper availability of service cubicals,accessibilty for maint.,dust control, spec check for flame proof motor,no load trial for 8hrs, PA system audib Slope of drain, accumulation of water, check for acid/ alkali proof lining tiles and its bonding material,expolsion proof area specification and inspection tests detail,detail for fire proofing , acid proofing in areas, gaps, painting of walls, piping and Leveling, Foundations load distribution and Supports, accesibilty to flanges and Nozzles, Earthing, manhole accesibilty, nozzles, vessels trims, sight glass, gaskets, skirt drain, internals, inspection reports Leveling, Foundations load distribution and Supports, accesibilty to flanges and Nozzles, Earthing, ,accesibilty, gaskets, drain and routing, inspection reports,Final Alignment with and without nozzles load, Trip setting, load trial.report Supports, Strength, Painting Supports, Strength, Painting Supports, Strength, Painting Bolting, cross beam connection, alignmnt, leveling, welding, sizes,earthing, arrangement for lifting devices and traverse movement.Settling of structure with respect to load. Supports, Strength,leveling, Welding,Painting
Piping
Electrical
Civil
Mechanical Static
Rotary
Cable dressing, location wrt pipe racks, leakage, earthing Location wrt leakages and sealing
Index, isometric,HT loops,test pressrure, media,flushing,drying spec.,insulation and painting Index, SLD, lighting,UPS,PA system,telephone
Drawings,manual,internal details,inspection report,photographs,check sheet for installation,insulation and painting Drawings,manual,internal details,inspection report,photographs,check sheet for installation,trial run and commissioning,insulation and painting