UGVCL/SP/III/444 /3-Ph Whole Current Energy meters(10-60A)with DLMS Bidders are hereby requested to note that following amendments are made for purchase of three phase 10-60 Amp. Whole current Static Meters with DLMS.

Amendment No. 2
The Amendment made in technical specification are as under. Existing Clause No.10 The meter shall have galvanically isolated communication port so that it can be easily connected to a hand-held meter reading instrument (MRI) for Data transfer or subsequently hooked to remote metering instrument such as modem etc. The meter shall be capable of executing instructions from base computer service center only after due authentication through protected two level pass word, for the following: i) Meter make, type & Sr.No. ii) Change in integration period iii) Change in automatic re-setting for billing data date & time. iv) Meter should have provision for eight time zones as per ICS, however presently it should be configured in three zones , i.e. peak, night and others as specified .So that in future it shall be modified as per the requirement up to eight zones and same should be recorded/displayed. The meter shall thereafter communicate above information while off-loading the data to computer through hand-held meter reading instrument (MRI) with either relevant billing quantities or relevant energy audit/load survey data. Clause No.6.A.5 (First Para) Modified. Clause No.10 The meter shall have galvanically isolated communication port so that it can be easily connected to a hand-held meter reading instrument (MRI) for Data transfer or subsequently hooked to remote metering instrument such as modem etc. The meter shall be capable of executing instructions from base computer service center only after due authentication through protected two level pass word, for the following: i) Change in integration period ii) Change in automatic re-setting for billing data date & time. iii) Meter should have provision for eight time zones as per ICS, however presently it should be configured in three zones , i.e. peak, night and others as specified .So that in future it shall be modified as per the requirement up to eight zones and same should be recorded/displayed. The meter shall thereafter communicate above information while off-loading the data to computer through hand-held meter reading instrument (MRI) with either relevant billing quantities or relevant energy audit/load survey data. Clause No.6.A.5 (First Para)

Recording of active energy (Kwh) for Recording of active energy (Kwh) for billing purpose. billing purpose. The Meter should record and display max. demand in KW (i.e. Fundamental plus Harmonics power ) and Total KWH ( i.e. Fundamental plus Harmonics energy ) and cumulative Total export Kwh energy ( i.e. Fundamental plus Harmonics energy).
Date:

The Meter should record and display max. demand in KW (i.e. Fundamental plus Harmonics power ) and Total KWH ( i.e. Fundamental plus Harmonics energy ) .

Seal & Signature of Tenderer

Clause No.11 (Last Para) Unique procedure of Meter Sr. no. having 8 Alfa-numeric character will be decided by UGVCL and will be given at the time of placing Order so that same sr.no. will appear on meter and MRI data.

Clause No.11 (Last Para) Unique procedure of Meter Sr. no. having Alfa-numeric character will be decided by UGVCL and will be given at the time of placing Order so that 7 digit numeric part will appear on meter display and Alfanumeric part will appear in BCS (MRI data) as well as on name plate.

All other points remains unchanged.