Você está na página 1de 5

Iran Zinc mines Development Company: Industry Overview and… 147

Iran Zinc Mines Development Company: Industry


Overview and R&D Center Research Activities
A. Rashtchi*, D. Moradkhani** and H.A. Ghanbari
*Mineral Processing Leadership, **Managing Director Associated Professor,
R&D Center, Iran Zinc Mines Development Company Faculty of Engineering, Zanjan University

ABSTRACT: Ever since the establishment of Iran Zinc Mines Development Company in 1996, it has played a
significant role in promoting positive potentials for the Zinc metal industry in Iran. For the reason that the
Angouran ore has a distinct nature, and as one of largest nonsolfide reserve in the world, any other contemporary
techniques failed to process the suitable minerals efficiently. Research and development center in IZMDC
pursues efficient and feasible approach to the processing and recovering the Zinc and Lead minerals. Main
purposes of these studies are to increase the recovery of Zinc metal in refineries and moreover to undertake new
methods and techniques. These studies categorized as: Conventional methods of mineral processing, Modern
techniques such as SX and recovering the residuals in tailing and very low grade ore.

1. BRIEF BACKGROUND an intense intention to build a 100,000t capacity


plant in cooperation of consortium Iranian and
1.1 Company European companies, is in progress. This plant
designed to recover 94% of zinc content of feed
Ever since the establishment of Iran Zinc Mines
ore and 84% of lead.
Development Company in 1996, it has played a
significant role in promoting positive potentials
for the Zinc metal industry in Iran. 1.2 Angouran Mine
Company's contribution to Iran's overall
Angouran mine is the most important ore supply
Zinc and Lead metal production constitutes 85%
for Iran lead and zinc industry. More than 80% of
and 95% respectively. This make company
zinc product in Iran is dependent to excavated
largest producer of zinc in Middle East.
ore from this mine that is mostly oxide ore. This
Subsidiaries of IZMDC consist of largest Iran
mine cosidered as non sulphide lead and zinc
lead and zinc mineral processing plant (Calcimin
reserve carrying >16 Mt 26% Zn and 4%
Co.) in Dandi Zanjan province and 100,000 ton
Pb.Location of the deposit is about 120 Km NW
capacity calcination plant in Zanjan (Zangan zinc
Zanjan in Zagross montains.
industry Co.) and also seven zinc refinery plant
as below: Ore body hosted by complex consists of
marbels and schists overlayed by sedimentary
• 30,000tpy Bafgh Smelting Co. plant
and volcanic sequence. Complex ore body
• 20,000tpy Calcimin Co. Qeshm plant consisists of an oxid cap, underlyed by a mixed
• 12,000tpy Calcimin Co. Bandar Abbas plant sulphid-oxid body, then downwarded into Zn-Pb
sulphide ore (Approximate grade: Pb < 3%, Zn
• 18,000tpy Calcimin Co. Dandi plant > 40%)The upper level of the ore body are
• 12,000tpy Calcimin Co. Zanjan plant dominated by smithsonite-rich ore. Other phases
are composed of carbonated oreand supergen
• 15,000tpy National Iran Lead and zinc Co.
weatherd ore. In this phase minerals are Zn–rich
plant
clays, mimetite,smithsonite,hydroxy and oxide of
• 18,000tpy Faravary Mavad Maadani Co. Fe and Mn, calcite, hydrozicite and hemi-
plant morphite. Beneth of the ore body is limited to
In addition there is a 30,000t Lead smelting footwal schist; proximity to fottwall schist
plant in National Lead and Zinc Co. site. There is mixture of oxid and sulphide ore is present. Main
148  Mineral Processing Technology (MPT 2007)
composition of sulphide-oxide ore are flotation cells. The lead tailing after lead flotation
smithsonite,arsenopyrite, galena, pyrite and consists of 33-40% Zn and 15-25% silica; which
quartz (Approximate Grade: Pb > 5 , Zn > %33). is treated az zinc concentrate. Recovery of lead
concentrate is 75-85% with grade of 54-60% Pb.
Both concentrates are dewatered in seperate
thickners and filtered in vaccum filters, belt
Angouran
Ore body filters and filter press are used to reduce the
moisture. The coars zinc concentrate from belt
filter is sent to calcination plant for enrichment of
zinc from 35 to 50-55% by heating it up to
Sulfide Mix Carbonate
800oC.The fine zinc concentrate from filter press
Ore Ore Ore is sent to zinc refinery plant in Zanjan and Dandi.
The low grade ore which contains about 15-
22% zinc,is washed and subjected to heavy
media seperation, after separating 0-2 mm
Brecciated
Hard Carbonate
Soft
Very low Calamine materials. Heavy media enriches the material
Carbonate
Carbonate Grade
which leads to increase in zinc grad materials to
28-35% and afterward it is sent to plant for
Diagram 1: Ore Classification of angouran mine furthur treatment, while the tailing which
contains 8-9% Zn tailed in the tailing dam in
Mineralized schist consists of smithsonite, order to recycl the water.
cerussite and Clay mineral (Approximate Grade: Zangan Zinc Calcination plant maintain heat
Pb > %1, Zn < % 13). In regards to these data; treatment on carbonated ore with the purpose of
Angouran ore could be categorized as shown in increasing the grade. İn this plant after crushing
(Diagram 1). and miling the ore which contains 22-30% Zn,
direct heat calcination in furnace increases the
2. INDUSTRY'S PROCESS concentrate grade to 27-40%.

2.1 Mineral Processing


2.2 Hydro Metallurgy
There are 2 plant involving in concentration
within company; Calcimin complex and Zangan Hydrometallurgy plants subordinated to IZMDC
Zinc Calcination plant. mainly utilizes three kinds of ore in the
Due to distinct nature of Angouran mine ore, beginning of their process. Faravary Mavad
several methods are in use in order to consume Madani consumes raw ore material excavated
the excavated ore. Most of the Pb low grade ore from mine while other plants feed by raw or
is used directly in refinery plants (Faravari calcined concentrate obtained from Calcimine
Mavad Madani plant). Calcimin plant uses plant and Zangan Zinc Calcination plant.
reverse flotation method to facilitate Process in these plants (Diagram 2) begins
concentration of the zinc from accompanying with leaching the feed by sulfuric acid then
lead and gangue minerals. This plant has a contamination is removed and filtered in order to
capacity of 25,000 tpy lead concentrate and purify the electrolyte. Electro winning procedure
270,000 tpy zinc concenterate. takes place in separate cells using Pb-Ag-Ca
Process in this plant is divided to two lines: anodes and Aluminum cathodes. Produced zinc
low grade and high grade. High grade ore metal grad varies from 99.95 to 99.98. Only
treatment begins by grinding the high grade Bafgh smelting plant is capable of producing
crushed ore, which is transported via ropeway, SHG 99.99 zinc ingot.
with rodmill and ball mill.Lead concenterate is
being concentrated by flotation process in a
battery of rougher, scavenger and cleaner
Iran Zinc mines Development Company: Industry Overview and… 149
Raw ore Three major processes are designed and
adopted to recover the named elements from
residuals:
Mineral Tailing
Lead
3.1 Recovery of Zn from Leach Filter
Raw zinc Cake

Calcinat Recovering the Zn in the form of basic zinc


sulfate is sugested in many industrial
Calcined prescriptions.This process because of high
Sulfuric
Additive Concenttrate amount of Cl and F in this residual , faces lots of
Water Recycled difficulties. Most of the technical problomes in
Leachin this area solved and also techniques are
g Neutralizing
developed to produce thebasic zinc sulfate (BZS)
with grade of 22% Zn.
Neutralizing Leach
Additive

Residuals 3.2 Recovery of Zn, Ni and Cd from Leach


Decontamination containing
Co, Cd, Ni
Filter Cake

Electrowinnin Recycled
As shown in (Diagram 3) this process begins
electrolytes with leaching and then each of elements is
recovered by solvent extraction (SX) methods. İn
Zinc Metal this techinque residuals will be cobalt salt and
some amount of zinc sulfate.
Diagram 2: Process in Hydrometallurgical plants
Residuals containing
Co, Ni, Zn and Cd
3. RESIDUALS AND TAILING Additives Sulfuric Acid
Water
Angouran mine ore contains variety of other Recycled
Leaching Electrolyte
elements which most of them are valuable to
extract and also harmful to the environment
(Table 1) if being released. Hence recovering
some of these elements which are peresented
L
mostly in taling and filter cake residuals is one of S
the key researchs being conducted in IZMDC.
Cd Electrowinning Cd
Cementation
Table 1: element in hydrometallurgical plant
Residuals SX first Stage
Electrowinning Zn
Element Residuals Abundance
Pb Leach filter cake 8-25%
Zn Leach filter cake 4-10% SX Second
Electrowinning Ni
Cd Purification filter cake 11-17% Stage

Ni Purification filter cake 3-5%


Co Purification filter cake 1-2%
Recycled Electrolyte
Zn Purification filter cake Up to 40%
Ge Purification filter cake Up to 1000ppm
In Purification filter cake Up to 100ppm Diagram 3: Recovery of Ni, Cd and Zn
150  Mineral Processing Technology (MPT 2007)
3.3 Recovery of Co and Zn Sulfate From installing new leaching, SX, EW, tailings-
Leach Filter Cake neutralisation and electrolyte-cooling circuits.
The SX circuit used DEHPA diluted with
As shown in (Diagram 4) the beginig of this kerosene as the organic phase and featured
process is to leach the sediments of the last Bateman Reverse-Flow Mixer Settlers
purification filter cakes. Produced zinc sulfate in incorporating extraction, stripping, scrubbing and
this method is seperated by spray dryer and organic regeneration. Bateman Pulsed Columns
crystalizator. were also used to test the SX unit operations.
Residuals
containing Co,
5. CONCLUSIONS
Additives Ni, Zn and Cd Sulfuric Acid

Recycled Research and development center in IZMDC


pursues efficient and feasible approach to the
Leaching
processing and recovering the Zinc and Lead
Zinc minerals. Main purposes of these studies are to
increase the recovery of Zinc metal in refineries
S Sulfate Decontamina
tion solvent and moreover to undertake new methods and
L solution
Nitric Acid techniques.
Sulfuric Acid In revision of conventional methods, use of
Crystallizator or spray
dryer new agents and reagents are considered. Most of
Co oxide
leaching the designated researches due to optimization
were conducted in grinding and milling process.
Zinc Sulfate
Na OH Na ClO4
Using the modern techniques is one of the
challenges to survive in the competitive markets.
Co oxide And
S Sulfate Hydorxid
Therefore with participation of world's forgoing
L solution companies, some recent advances in the field of
solvent extraction were examined in laboratory
Crystallizator or spray and pilot scale.
Ni And dryer
Cd
Several laboratory researches and semi-pilot
experiences were related to recovering valuable
Co Oxid elements from leach and hydrometallurgy plants
filter cake and tailing. These include recovering
Diagram 4: Recovery of Co and Zinc sulfate of residual Zinc and Lead in mineral processing
tailing and filter cakes. Also recovering the
Cadmium and Nickel metals are secondary
4. FOREIGN CONSULTANT targets.
A demonstration plant, designed, constructed and
operated by BATEMAN for the Iran Zinc Mines REFERENCES
Development Corporation (IZMDC), confirmed
the process route selected for the feasibility study [1] Bateman, Co., Final Report on demonstration
on a proposed refinery for the Angouran Mine, plant. Bateman Engineering (2001).
which could produce 100 000 t/yr of zinc from an [2] Gilg, HA., Allen C., Balassone G, Boni, M,
ore feed of 473 000 t/yr. The plant was located at Moore, F, Marble-hosted sulfide ores in the
IZMDC's research centre, about 20 km from Angouran Zn-(Pb & Ag) deposit, NW Iran.
Zanjan in North West Iran. The demonstration Mineralium Deposita, Vol. 41, No. 1, May 2006.
plant was constructed by modifying an existing [3] Iran Zinc Mines Development Co., 2004-2005
hydrometallurgical plant, producing about 120 Annual report, 2006, Iran Zinc Mines
Development Co. Tehran. Iran.
t/yr of zinc cathode. Modifications included