Kabul Satellite City Construction


(Ministry of Urban Development & Housing)

Kabul Satellite City Construction


Project Outline
After After years years of of conflict conflict and and overcrowding, overcrowding, large large parts parts of of Kabul Kabul have have been been totally totally destroyed destroyed and and lack lack proper proper sanitation, sanitation, clean clean water water supply supply and and electricity. electricity. Returning Returning refugees refugees are are crowding crowding into into Kabul Kabul and and without without the the availability availability of of proper proper accommodation, accommodation, are are building building makeshift makeshift dwellings dwellings and and overburdening overburdening the the municipal municipal systems. systems. To To alleviate alleviate the the overcrowding overcrowding situation situation in in Kabul, Kabul, the the Ministry Ministry of of Urban Urban Development Development & & Housing Housing plans plans to to construct construct a a new new town town for for more more than than 700,000 700,000 inhabitants, inhabitants, located located in in northnortheast east of of Kabul. Kabul. The The proposed proposed project project will will include include the the provision provision of of a a clean clean water water supply supply system, system, electric electric power power supply, supply, roads, roads, phone phone lines, lines, recreation recreation parks, parks, schools, schools, market market center, center, shops, shops, fire fire and and police police stations, stations, hospitals, hospitals, kindergartens kindergartens and and administrative administrative buildings. buildings.

Kabul Satellite City Construction


Technical Description
The Ministry of Urban Development and Housing has identified a large tract of land, north-east of Kabul, for construction of the new city. This will be within 30 kilometers from Kabul city center. Most of the land belongs to the government and is currently not in use. The city will be divided into 10 separate districts with about 70,000 inhabitants in each. The living accommodations will consist of bungalows and 2 to 4-story apartment buildings.

Kabul Satellite City Construction

Kabul Satellite City Construction

Kabul Satellite City Construction


Project Site
The The satellite satellite city city will will be be built built in in an an area area called called Paymunar Paymunar to to the the north north of of Kabul Kabul close close to to Kabul Kabul Airport. Airport.

Project Status/Timeline
The The Ministry Ministry of of Urban Urban Development Development and and Housing Housing has has started started investigating investigating the the availability availability of of drinking drinking water water and and identified identified various various sources. sources. The The Ministry Ministry has has also also made made land land surveys, surveys, taken taken aerial aerial photographs photographs and and started started planning planning the the outlay outlay of of the the city. city. It It is is anticipated anticipated that that one one district district will will be be completed completed by by the the end end of of 2004 2004 and and that that the the first first batch batch of of approximately approximately 70,000 70,000 inhabitants inhabitants will will be be able able to to move move into into the the new new development development site. site. The The new new city city is is expected expected to to be be ready ready to to accommodate accommodate its its full full capacity capacity by by 2013. 2013.

Kabul Satellite City Construction


Equipment & Services
This project covers several sectors for urban development including water supply, electricity and power supply, city-street construction and housing. Given the type and nature of the project, required equipment for clean water supply will be:

Water Water and and sewer sewer pipes; pipes; Valves, Valves, fittings, fittings, service service connection connection assemblies, assemblies, air air release release valves, valves, blow blow off off assemblies, assemblies, taps, taps, plumbing plumbing fittings; fittings; Water Water production, production, treatment treatment and and pumping pumping equipment, equipment, including including various various equipment equipment generally generally identified identified with with collecting, collecting, pumping, pumping, treating treating and and distributing distributing water water from from the the source source to to customers; customers; and and Bulk Bulk and and retail retail water water meters; meters; and and water water pressure pressure gauges gauges and and water water level level measuring measuring devices, devices, and and water water treatment treatment equipment. equipment.

Kabul Satellite City Construction


Equipment & Services
Equipment for electricity and power supply component:
Power Power generators; generators; Cables Cables and and wires; wires; Transformers; Transformers; and and Control Control rooms. rooms.

Equipment and services for housing construction:


Construction Construction management management supervision; supervision; Planning Planning and and design design services; services; Cranes Cranes (rubber (rubber tire, tire, crawler); crawler); Bull Bull dozers dozers and and earthwork earthwork hauling hauling equipment; equipment; Cement Cement plants. plants.

Kabul Satellite City Construction


Services & Equipment (cont.)
Services and Equipment for the city street construction:
Engineering Engineering services services in in street street design design and and city city road road infrastructure; infrastructure; Construction Construction management management supervision; supervision; Asphalt Asphalt pavement pavement plants, plants, asphalt asphalt pavers, pavers, and and asphalt asphalt distributors; distributors; Trucks Trucks (dump, (dump, off off road, road, concrete concrete mixer, mixer, asphalt asphalt transport); transport); Compacting Compacting equipment equipment (pneumatic, (pneumatic, steel steel wheel, wheel, vibratory); vibratory); Cranes Cranes (rubber (rubber tire, tire, crawler); crawler); Loaders Loaders (front (front end, end, pneumatic pneumatic and and track); track); and and Bull Bull dozers dozers and and earthwork earthwork hauling hauling equipment. equipment.

Kabul Satellite City Construction


Project Financing
Though the Afghan Government has started the initial phase of this project using its own funds, main project financing will have to be provided by multilateral funding institutions as well as private investors.