Document Name: Specifications (Mechanical) Date: March 7, 2009 Rev. Rev.

0 Project: AL RAJHI STEEL ( CUT & BEND PROCESSING BLDG) - JEDDAH Owner: AL RAJHI STEEL CO.

SECTION 15090 SUPPORTS, ANCHORS AND SEALS

PART 1 GENERAL 1.01 WORK INCLUDED A. B. C. D. 1.02 Pipe hangers and supports. Duct hangers and supports. Flashing for mechanical equipment. Sleeving for mechanical equipment.

RELATED WORK A. B. C. D. E. F. Section 03300: Cast-In Place Concrete Section 05500: Miscellaneous Metals Section 01710: Cleaning Section 15060: Pipe and Pipe Fittings Section 15840: Ductwork Section 15400: Plumbing Systems

1.03

REFERENCE STANDARDS A. BSI - British Standards Institution BS 3974 Part 1 & 2 BS 4360 B. ASTM - American Society for Testing and Materials A526 Steel Sheet, zinc-coated (galvanized) by hot dip process commercial quality A570 Hot-Rolled carbon steel sheet and strip. C. ANSI - American National Standards Institute B 31.1 D. NFPA NFPA 14 Power Piping National Fire Protection Association Standard for Installation of Standpipe and Hose System Sheet Metal and Air Conditioning Contractors National Association
Page 1 of 7

Pipe Supports

E.

SMACNA -

(SDEC) SECTION 05090

Document Name: Specifications (Mechanical) Date: March 7, 2009 Rev. Rev. 0 Project: AL RAJHI STEEL ( CUT & BEND PROCESSING BLDG) - JEDDAH Owner: AL RAJHI STEEL CO.

SMACNA 1.04 SUBMITTALS A. B. C.

Duct Manuals

Mill and shop material test reports. Certificate for material strength properties. Detail and fabrication drawings.

PART 2 PRODUCTS 2.01 INSERTS AND CLAMPS A. Inserts: Malleable iron case of galvanized steel shell and expander plug for threaded connection with lateral adjustment, top slot for reinforcing rods, lugs for attaching to forms. Size inserts to suit threaded hanger rods. Provide suitable arrangements for all pipe hangers supported from steel structure or structural members welded to building steel structure using beam clamps. Clamping arrangements shall be in accordance with BS 3974 Part 2.

B. C.

2.02

PIPE HANGERS AND SUPPORTS Pipe hangers and supports shall be in accordance with BS 3974 and the following: A. Generally all horizontal piping shall be supported with steel pipe hangers. Hanger assembly shall comprise: 1. 2. Pipe clip or one piece strap complete with load and clip bolts. Sling rod having a sling eye at the lower end and a spherical washer and nuts at the top end. Pipe hangers shall be designed and selected in accordance with BS 3974 so that they are suitable for load carried and temperature range. Pipe clips for cold insulated pipes shall be of suitable size to fit over load bearing insulation. Alternatively load bearing metal shield may be used between insulation and pipe clip. Multiple or Trapeze Hangers: Steel channels with welded spacers clamps, ubolts and hanger rods, cast iron roll and stand for hot pipe sizes 150 mm and over. Wall Support: Pipe sizes to 75 mm, cast iron hook. Wall Support for Pipe Sizes 100 mm and Over: Welded steel bracket and wrought steel clamp, adjustable steel yoke and cast iron roll for hot pipe sizes 150 mm and over Vertical Support: Steel riser clamp.

B.

C.

D.

E. F.

G.

(SDEC) SECTION 05090

Page 2 of 7

Document Name: Specifications (Mechanical) Date: March 7, 2009 Rev. Rev. 0 Project: AL RAJHI STEEL ( CUT & BEND PROCESSING BLDG) - JEDDAH Owner: AL RAJHI STEEL CO.

H.

Floor Support for Pipe sizes to 100 mm and All Cold Pipe Sizes: Cast iron adjustable pipe saddle, locknut nipple, floor flange and concrete pier or steel support. Floor Support for Hot Pipe Sizes 150 mm and over: Adjustable cast iron roll and stand, steel screws and concrete pier or steel support. Design hangers to impede disengagement by movement of supported pipe. Provide copper plated hangers and supports for copper piping or provide sheet lead packing between hanger or support and piping.

I.

J. K.

2.03

HANGER RODS A. Provide steel hanger rods, threaded both ends, or continuous threaded.

2.04

DUCT HANGERS AND SUPPORTS A. B. C. Hangers: Galvanized steel band iron or rolled angle and 9.5 mm rods. Wall Supports: Galvanized steel band iron or fabricated angle bracket. Vertical Support at Floor: Rolled angle.

2.05

FLASHING A. B. Steel Flashing: 26 gage (0.50 mm) galvanized steel. Lead Flashing: 24.5 kg/square meter (5 lb./sq. ft.) sheet lead for waterproofing, 5 kg/square meter (1 lb./sq. ft.) sheet lead to soundproofing. Safes: 24.5 kg/square meter (5 lb./sq. ft.) sheet lead or 0.20 mm (8 mil) thick neoprene. Caps: Steel, 22 gage (0.80 mm) minimum, 16 gage (1.50 mm) at fire resistance structures.

C.

D.

2.06

SLEEVES A. B. Pipes through Floors: Schedule 40 galvanized steel pipe. Pipes through Beams, Walls, Fire Proofing, Footings, Potentially Wet Floor: Form with steel pipe or cast iron pipe diameter shall not be less than 50 mm larger in diameter than the pipe to be installed. Round Ducts: Form with galvanized steel. Rectangular Ducts: Form with galvanized steel or wood. Size all sleeves large enough to allow for movement due to expansion and to provide for continuous insulation.

C. D. E.

PART 3 EXECUTION 3.01 INSERTS A. Use inserts for suspending hangers from reinforced concrete slabs and sides of reinforced concrete beams wherever practicable.
Page 3 of 7

(SDEC) SECTION 05090

Document Name: Specifications (Mechanical) Date: March 7, 2009 Rev. Rev. 0 Project: AL RAJHI STEEL ( CUT & BEND PROCESSING BLDG) - JEDDAH Owner: AL RAJHI STEEL CO.

B.

Set inserts in position in advance of concrete work. Provide reinforcement rod in concrete for inserts carrying pipe over 100 mm or ducts over 1524 mm wide. Where concrete slabs form finished ceiling, finish inserts flush with slab surface.

C. D.

3.02

Where inserts are omitted, drill through concrete slab from below and provide rod with recessed square steel plate and nut above slab. PIPE HANGERS AND SUPPORTS A. Support horizontal steel and copper piping as follows: Nominal Pipe Size, mm Support, m 12.7 19-38 50 & 65 75 & 100 150 to 300 350 to 450 B. Distance Between 1.83 1.83 3.05 3.66 4.27 6.1 Hanger Rod Diameter, mm 9.5 9.5 9.5 15.8 22.2 25

Install hangers to provide minimum 12.7 mm clear space between finished covering and adjacent work. Place a hanger within 0.305 m of each horizontal elbow. Use hangers which are vertically adjustable 38 mm minimum after piping is erected. Support horizontal soil pipe near each hub, with 1.5 m maximum spacing between hangers. Support vertical piping at every other floor. Support vertical soil pipe at each floor at hub. Where several pipes can be installed in parallel and at same elevation, provide multiple or trapeze hangers. Where practical, support riser piping independently of connected horizontal piping.

C. D.

E.

F.

G.

H.

3.03

LOW VELOCITY DUCT HANGERS AND SUPPORTS A. Hanger Minimum Sizes: 1. 1. Up to 750 mm wide: 25 mm x 16 gauge (1.50 mm) at 3.05 m spacing 775 mm to 1200 mm wide: 38 mm x 16 gauge (1.50 mm) at 3.05 m spacing Over 1200 mm wide 38 mm x 16 gauge (1.50 mm) at 2.44 m spacing:
Page 4 of 7

3.
(SDEC) SECTION 05090

Document Name: Specifications (Mechanical) Date: March 7, 2009 Rev. Rev. 0 Project: AL RAJHI STEEL ( CUT & BEND PROCESSING BLDG) - JEDDAH Owner: AL RAJHI STEEL CO.

B.

Horizontal Duct on Wall Supports Minimum Sizes: 1. Up to 450 mm wide: 38 mm x 16 gauge (1.50 mm) or 25 x 25 x 3.2 mm at 2.44 m spacing 475 mm to 1000 mm wide: 38 x 38 x 3.2 mm at 1.22 m spacing.

2. C.

Vertical Duct on Wall Supports Minimum Sizes: 1. 2. At 300 mm spacing; Up to 600 mm wide: 38 mm x 16 gauge; 625 mm to 900 mm wide: 25 x 25 x 3.2 mm; 925 mm to 1200 mm wide: 32 x 32 x 3.2 mm.

3. D.

Vertical Duct Floor Supports Minimum Sizes: 1. 2. 3. Riveted or screwed to duct; Up to 1500 wide: 38 x 38 x 3.2 mm; Over 1500 wide: 51 x 51 x 3.2 mm

3.04

MEDIUM AND HIGH VELOCITY DUCT HANGERS AND SUPPORTS A. Round Duct Hangers Minimum Sizes: 1. 2. 3. 4. 5. At 3 m spacing. Up to 450 mm diameter: 25 mm x 16 gauge (1.50 mm) 475 mm to 900 mm diameter: 25 mm x 12 gauge (2.50mm) 925 mm to 1250 mm diameter: 38 mm x 12 gauge (2.50mm) 1275 mm to 2010 mm diameter: 2 at 38 mm x 12 gauge (2.50 mm) from girth reinforcing angle

B.

Vertical Duct Floor Supports Minimum Sizes: 1. 2. 3. Rivet to duct and tie angles together with rod, angles or cinch band. Up to 1200 mm wide: 38 x 38 x 3.2 mm; Over 1200 mm wide: 51 x 51 x 4.8 mm;

C.

Angle reinforcing may be used for support omitting trapeze.

3.05

EQUIPMENT BASES AND SUPPORTS. A. Provide for major equipment, reinforced concrete housekeeping bases poured directly on structural floor slab 150 mm thick minimum, extended 150 mm minimum beyond machinery bed plates. Provide templates, anchor bolts and accessories required for mounting and anchoring equipment.

(SDEC) SECTION 05090

Page 5 of 7

Document Name: Specifications (Mechanical) Date: March 7, 2009 Rev. Rev. 0 Project: AL RAJHI STEEL ( CUT & BEND PROCESSING BLDG) - JEDDAH Owner: AL RAJHI STEEL CO.

B.

Construct supports of structural steel members or steel pipe and fittings. Brace and fasten with flanges bolted to structure. Provide rigid anchors for ducts and pipes immediately after vibration connections to equipment.

C.

3.06

PRIMING A. Prime coat exposed steel hangers and supports. Hangers and supports located in crawl spaces, pipes shafts and suspended ceiling spaces are not considered exposed.

3.07

FLASHING A. B. Flash and counter flash where mechanical equipment passes through weather or water proofed walls, floors, and roofs. Flash vent and soil pipes projecting 75 mm minimum above finished roof surface with lead worked 25 mm minimum into hub, 200 mm minimum clear on sides with minimum 600 mm x 600 mm sheet size. For pipes through outside walls turn flange back into wall and caulk. Flash floor drains over finished areas with lead 250 mm clear on sides with minimum 900 mm x 900 mm sheet size. Fasten flashing to drain clamp device. Provide curbs for mechanical roof installations 200 mm minimum high. Flash and counter flash with steel, soldered and waterproofed. Provide continuous lead or neoprene safes below air supply casing, built-up mop sinks, shower stalls, shower room floors located above finished rooms. Solder at joints, flash into floor drains and turn up 150 mm into walls or to top of curbs and caulk into joints. Provide lead flashing around ducts and pipes passing from equipment rooms, installed according to manufacturer's data for sound control.

C.

D.

E.

F.

3.08

SLEEVES A. Set sleeves in position in advance of concrete work. Provide suitable reinforcing around sleeves. Extend sleeves through potentially wet floors 25 mm above finished floor level. Caulk sleeves full depth and provide floor plate. Where piping or ductwork passes through floor, ceiling or wall close off space between pipe or duct and construction with non-combustible insulation. Provide tight fitting metal caps on both sides and caulk. Install chrome plated escutcheons where piping passes through finished surfaces.

B.

C.

D.

3.09

PAINTING A. All painting shall be in conformance with Section 09900.

3.10

CLEANING A. All cleaning shall be in conformance with Section 01710


Page 6 of 7

(SDEC) SECTION 05090

Document Name: Specifications (Mechanical) Date: March 7, 2009 Rev. Rev. 0 Project: AL RAJHI STEEL ( CUT & BEND PROCESSING BLDG) - JEDDAH Owner: AL RAJHI STEEL CO.

***** END OF SECTION *****

(SDEC) SECTION 05090

Page 7 of 7

Você também pode gostar