CHECK LIST FOR PT INJECTION EHV Sub Stn Make PT HSV Sr. No. 1 2 3 4 5 6 7 8 9 10 11 Particulars of the test Check and confirm tightness of all connections in PT MB Check and confirm star point formation and earthing of star point of each core Check and confirm correct formation of open delta in PT MB Check and confirm earthing of one terminal of open delta Check and confirm PT bus wiring in each CP / RP Check and confirm operation of PT selection scheme, if provided, before PT injection Check and confirm tightness of links of TBs / TTBs in all CP / RP Check and confirm proper gradation of HRC fuses in PT terminal box / PT MB and respective CP / RP (6A HRC fuse in PT Terminal box, 4A HRC fuse in PTMB and 2A HRC fuse
in CP / RP)

Line / Bus Sr. No. - R ph Ratio Y ph

Date B ph

Whether carried out

Check and confirm magnitude and phase angle of voltages in respective protective relays / meters as per set value by carrying secondary PT injection through relevant test kit in each core from PT MB(Carry out this test for confirmation of wiring) Check and confirm Ph to Ph and Ph to E voltages in all relays / meters as per settings during secondary PT injection Check and confirm operation of PT voltage selection scheme and measure voltages accordingly as per the schematic during secondary PT injection
Where ever No or Not Applicable (NA) selected, mention specific remarks on separate sheet Page 1 of 3

Check List for PT Injection

Maharashtra State Electricity Transmission Company

Testing & Communication Circle, Aurangabad


12 13 14 15 16 17 18 19 20 Remove PT secondary fuse in PT MB and check Open delta / zero sequence voltage in Backup relay during secondary PT injection (Confirm this test for each phase) Apply 3ph 440V AC supply to PT primary and check PT secondary voltages at respective protection relays / metering in each CP / RP Check and confirm appropriate secondary voltage in all protective relays and metering Remove one phase and check open delta / zero sequence voltage in Backup relay(Confirm this test for each phase) Check and confirm all PT fuses / MCBs in PT terminal box / PT MB / RP - CP

Dy. Ex. Engineer EHV Testing Unit Testing Division -

Project LATUR

Check List for PT Injection

Where ever No or Not Applicable (NA) selected, mention specific remarks on separate sheet

Page 2 of 3

Maharashtra State Electricity Transmission Company

Testing & Communication Circle, Aurangabad


Remarks about check point where No or NA selected SrNo 1. 2. 3. 4. 5. 6. 7. 8. 9. Short Description of Check Point Remarks

Check List for PT Injection

Where ever No or Not Applicable (NA) selected, mention specific remarks on separate sheet

Page 3 of 3