DISAB Group
Vacuum technology
- a natural part of spillage handling in the cement manufacturing technology!
Why?
Better internal and external environment Increase of production efficiency Reduce maintenance costs Efficient recovery of valuable material Increase operational profit
Cleaning
Transport
Recovery
A clean electric motor has longer life time Repair time is reduced if equipment is cleaned Access to point of repair is quicker with vacuum removal
A vacuum loader can transport material more than 150 mtr Cement can be sucked and blown back to the process A vacuum loader can often pay for itself just by reducing plant downtime
Large volumes of valuable material spills under belts and mills Collected material spills can be returned to the process without contamination
We can recover this material to your process. Value: SR 10 13 for 50 kg means SR 260.- / ton There are hundreds of tons to be recovered.
Mobile unit
3 men
A heavy mobile vacuum unit to handle emergency break downs with high volume of material spillages.
Mounted on a semi-trailor
Cement haven a volume weight of ca 1,5 ton / m3. Clinker will have a volume weight of ca 2 ton / m3 When we have cement will this weight be 15 ton. When we have clinker will tihs weight be 20 ton Almost all of this weight will be on the rear axles.
The vacuum loader weight is totally 10 400 kg.. The weight is when the container is empty. The weight distribution on front and rear axles are dependent upon the wheel base. Most of this weight will be on the rear axles. P 210/9-3210 require for Volvo FM 400 Wheel base of 4 900 mm: Front axle 3,5 ton / Rear axles 6,9 ton
The truck itself has also a weight . The chassis weight of Volvo FM 400 is ca 8,1,ton. This chassis weight is divided: Front axle 4,7 ton / Rear axle 3,4 ton.
The maximum weight on the axles are: Front axle: 3,5 + 4,7 = 8,2 ton Rear axle cement: 15 + 6,9 + 3,4 = 23,2 ton Rear axle clinker 20 + 6,9 + 3,4 = 30,3 ton The max on rear axle is 32 ton. We have safety margin. If we increase the container to 16 m3 it will be: Rear axle clinker: 32 + 6,9 +3,4 = 42,3 ton This is not acceptable for truck guarantees or safety.
The axles of the truck will have permissable maximum weight to ensure safety and long life time. Special axles can be supplied. The Volvo FM 400 has a total permissable weight of 40 or 41 ton. Front axle 8 ton or 9 ton. ( We require 9 ton ) Rear axles 2 x 16 ton = 32 ton
Vacuum system
Vacuum unit
Filter separator
Typical lay-out drawing Stationary vacuum system Packing Plant Ground floor Material collected is waste
Collected in pre separator
The contract was won on a single supplier justification basis. Commissioned in December 2009
Vacuum or Airflow
The vacuum unit create an air stream in a pipe Material is mixed in to the air stream The vacuum is to overcome pressure loss in the airflow system
How can I use the vacuum technology without making the investment?
Use a vacuum contractor ! Most cement plants in Europe use a vacuum contractor - They are called in when you need the service - Your employees focus on cement production - The cost is on operational budget and not on the investment budget - The service of a vacuum contractor is by day, month or year
ARMTURE, Dammam now offer ISM Industrial Spillage Management. Vacuum contractor service with modern vacuum loaders all over KSA
ISM, Dammam
A Division of Armture
ISM, Dammam
A Division of Armture
Inspect Report Clean & Fix Planning is Critical Setting the Standard
ISM, Dammam
A Division of Armture
Railvac excavator
London Underground
Steel plants
Heavy sludge
Ports
www.haugensystem.com info@haugensystem.com
This machine I sold 26 years ago to Jordan Cement. It is still in operation - and so am I.