Allow the transit of bigger ships between the Pacific and Atlantic oceans and maximize capacity
Improve water consumption by enhancing water saving basins Increase the Canals productivity, safety and efficiency Long term sustainable and growing contributions to the Panamanian economy
17.66 M m3
Atlantic Site PostPanamax Locks Increase of Gatun Lakes maximum operating level Atlantic entrance deepening and widening
26.7 m
27.1 m
Gatun Lake widening and deepening and widening of Gaillard Cut s navigation channels
8.7 M m3
Pacific entrance
Pacific Access Channel
49 M m3
MEC 3
80 Ha
PAC : last award contract 7-Jan-10 Company: Consortium ICA-FCC-MECO Amount of award: B/. 267,798,795.99 Order to proceed: 22-Ene-10 Start date: 27-Apr-10
Actual
0% 50%
75%
100%
Scope of Contract:
26 M m3 excavation
Borinquen dam construction Clearing of 80 hectares of MEC.
Actual
0%
.
50%
67%
100%
Nov 2010
9m
Boho
Actual
100%
m 3/ 1,786K m 3
Gatun Lake
Volume: 1,786K
Buena Vista
Actual Volume: 913K m 3/
100%
913K m 3
San Pablo
Actual
100%
Juan Grande
Gatn
Actual Volume: 146K m 3/146K
9% 100%
m3
Actual
Gamboa
Barro Colorado
Pea Blanca
Actual
100%
Chagres Crossing
Actual
93%
m 3/ 312K m 3
Tabernilla
Actual Volume: 1,910K m 3/
Gamboa
100%
1,910K m 3
Volume: 290K
Mamey
Actual
71%
Actual
0% 50%
76%
100%
Bas Obispo
Actual
Actual
89%
Quibian I dredge
83%
Las Cascadas
Actual
27%
Empire
Cunette
Actual
92%
Volumen: 219K
m3/
240K m3
Actual
100%
Culebra
Actual
100%
Cucaracha
Centenario Bridge
Volume: 512K
m3/
512K m3
100%
Paraiso
Actual
Cornelius dredge
Mindi Dredger
Quibian I Dredger
Cornelius Dredger
Scope of Contract: Deepening of 27.5m a 9.14m PLD Channel Width = 218m Length = 1.6km Volume approved 4 M m3 Award: August 16, 2010 Amount: B/. 54,550,647 Company: Jan De Nul n.v. Conclusion of the contract: November 13, 2012
Actual
0% 50%
81%
100%
Widening: of 198 m to 225 m (navigation channel) Channel width to 218 m (North access channel)
Award: September 25, 2009 Amount: B/. 144,236,596.44 Company: Jan De Nul NV Conclusion of contract: April 25, 2013
Actual
0% 50%
98%
100%
Scope of Contract: Design and Construction of Locks Award: July 15, 2009 Order to Proceed: August 25, 2009 Initial Amount + options: B/. 3,158,600,059
31%
50% 100%
4,400 TEU
33.5 m (110)
12.4 m (39.5)
32.3 m (106)
49 m (160)
15.2 m (50)
18.3m (60)
6.5m (21)
8.3m (27)
Gates Lock-Head-Set
Locks Gate 2 Locks Gate 1
WSB 3
WSB 2
WSB 1
With the water saving basins the new locks will use 7% less water than the existing locks in every transit
Existing Locks
40
64 + 2 (replacement)
16 + 2 (replacement)
Ocean
Lake
6 September 2012
6 September 2012
6 September 2012
6 September 2012
6 September 2012
6 September 2012
Bid for the acquisition of 32 hydraulic cylinders was published. Closing date 13 July 2012
8% Actual
0% 50% 100%
Inspections by ANAM
Project
Amphibians
Birds
Mammals
Reptiles
Total
PAC 1
PAC 2
40
15
0
19
40
108
68
51
148
193
PAC 3
PAC 4 E y P Pacific E y P Gatun Lake E y P Atlantic Pacific Locks Atlantic Locks
70
22 13 27 10 21 46
20
7 0 1 0 9 6
163
164 3 73 287 184 550
167
152 34 64 116 248 423
420
345 50 165 413 462 1025
Total
264
62
1572
1323
3221
Cultural Resources
Cubo de acero
Resto de Vagones
PAC - 3
Archeological surveys
Daga colonial
Cubo de acero
Map showing Mamei camp during Canal construction at the begining of the 20th Century and the location of the incinerator.
Architectural Review Generates blueprints and an analysis of the structure which provides a framework for the definition of the rescue and preservation actions for the item
33
81 96
163
270 159 1283
996
MEDIA CARE
International Media Care Local Media Care PUBLIC CARE Calls: 800-0714 Emails: ampliacion@pancanal.com
1055
150
867 358
22 quarterly reports
2011
2008
2009
2010
2007
2006
2. Mangrove in Chiriqu Viejo River - 50 has 3. Center for Forestry Research - 100 has 4. Montuoso Forest Reserve - 50 has
5. General Omar Torrijos National Park - 150 has 6. Altos de Campana National Park - 30 has 7. Camino de Cruces National Park - 115 has
These projects, executed in coordination with ANAM and ARAP, include the provinces of Colon, Panama, Cocle, Herrera and Chiriqui.
Contractor: Consultores Ambientales y Reforestadores S.A. (CAREFORSA) Awarded: February 2012 Number of hectares: 61 has Protected Area : Tapagra Hydrological Protection Area
35% Actual
0% 50% 100%
% Progress
2007
2008
2009
2010
2011
2012
2013
2014
2015
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Locks
Specifications and locks models Design and build post-Panamax locks Pacific access channel - phase 1 Pacific access channel - phase 2 Pacific access channel - phase 3 Pacific access channel - phase 4 Dredging of the Pacific entrance 100% 100%
100% 31%
Access channel
Dredging
Deepening and widening of Gatun Lake and deepening of Culebra Cut Dredging of the Atlantic entrance
8%
Execution Baseline
Beginning of operations
97