______________________________________________________Installation instruction Applicability: GILERA GP 800 08 1. Turn the engine off. 2.

Remove the engine plastic lid and the front lateral fairings. ____________________ Feeding voltage section_____________________ 1. Locate and unplug the stock black two-way connectors located on the injectors (see pict.1)

pict.1 2. Plug the black two-way connectors of the RAPID BIKE wiring harness to stock black two-way connectors previously unplugged. (see pict.2). The connector marked with red tape must be plugged to the front cylinder.

pict.2
Issued by PM Approved by DG Rev.02 Dated 10/04/08 page 1/5

______________________________________________________Installation instruction _________________________ TPS section ________________________ 3. Locate and unplug the stock black three-way connector located on the left side of the motorcycle. (see pict.3.)

pict.3 4. Connect the green wire of the RAPIDBIKE wiring harness to the stock wire marked with the letter C(see pict.4.) and place back the stock connector previously unplugged.

pict.4

Issued by PM

Approved by DG

Rev.02

Dated 10/04/08

page 2/5

______________________________________________________Installation instruction

_________________________ Pick-Up section _________________________ 5. Locate and unplug the stock black three-way connector located on the motorcycle left side (see pict.7).

pict.7 6. Connect the connectors of the RAPID BIKE wiring harness to the stock connectors previously unplugged (see pict.8).

pict.8

Issued by PM

Approved by DG

Rev.02

Dated 10/04/08

page 3/5

______________________________________________________Installation instruction

7. Connect the eyelet of the RAPID BIKE black wire to the negative pole of the battery which is located in the rear side of the bike (see pict.9).

pict.9 ________________________ O2 section _________________________ 8. Unplug the stock lambda connectors and connect them to the specific connectors** of the wiring harness (see pict.10).

pict.10 ** Please carefully check the RB-O2 MODULATOR installation manual.

Issued by PM

Approved by DG

Rev.02

Dated 10/04/08

page 4/5

______________________________________________________Installation instruction _____________________________ Final section _____________________________ 12. Connect the Rapid Bike wiring harness to the Rapid Bike module. 13. Carefully check the correct connection of all connectors. 14. Fix the RAPID BIKE control unit to the motorbike by means of some strips placing it in the glovecompartment. 15. Place back the engine plastic lid and the front lateral fairings.

Issued by PM

Approved by DG

Rev.02

Dated 10/04/08

page 5/5