Você está na página 1de 9

SECTION 15411 WATER SUPPLY SYSTEM 1. PART 1 - GENERAL 1.01 SECTION INCLUDES A.

The Work under this Section consists of furnishing and installing a complete water supply system as indicated on the drawings and as specified in this section. This Section specifies the water distribution piping system, including potable cold and hot water piping, fittings, and specialties within the building and up to interface point of existing utilities.

B.

1.02 REFERENCES A. ASTM - American Society for Testing and Materials ASTM A 53 Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated (Galvanized), Welded and Seamless. Carbon Steel Forgings for General Purpose Piping. Specification for Solder Metal. Seamless Copper Tube. Seamless Copper Water Tube. Plastic Pipe,

ASTM A 181 ASTM B 32 ASTM B 75 ASTM B 88

ASTM D 1785 Poly Vniyl Chloride(PVC) Schedule 40, 80 and 120.

ASTM D 2000 Rubber Products in Automotive Applications. ASTM D 2467 Socket-Type (Vinyl Chloride) (PVC) Plastic Pipes Fittings, Schedule 80 ASTM D 2564 Solvent Cement for Poly Vniyl Chloride(PVC) Plastic Pipe and Fittings. ASTM D 2855 Making Solvent-Cemented Joints with Poly Vniyl Chloride(PVC) Pipes and Fittings ASTM D 3139 Joints for Plastic Pressure Flexible Elastomeric Seals B. ANSI - American National Standard Institute 15411-1 Water Supply System Pipes Using

ANSI A21.10 ANSI A21.10A ANSI A112.26.1 ANSI B2.1 ANSI B16.3 ANSI B16.4 ANSI B16.9 ANSI B16.18 ANSI B16.22 ANSI B16.23 ANSI B16.25 ANSI B31.3 ANSI Z21.22 C.

Gray Iron and Ductile Iron Fittings for Water and Other Liquids. Supplement to ANSI A21.10. Water Hammer Arrestors. Pipe Threads (Except Dry Seal). Malleable-Iron and 300 Pound. Screwed Fittings, 150

Cast-Iron Screwed Fittings, 125 and 250 Pound. Factory-Made Wrought Steel Butt-welded Fittings. Cast Bronze Fittings. Solder Joint Pressure

Wrought Copper and Bronze solder-Joint Pressure Fittings. Cast Bronze solder-Joint Fittings - DWV. Butt-welded Ends. Code for Pressure Piping. Relief Valves and Automatic Gas Shutoff Services. Drainage

ASME - American Society of Mechanical Engineers ASME A40.8 ASME B1.20.1 ASME B1.20.7 ASME B16.4 ASME B16.39 ASME B31.9 SECTION IX National Plumbing Code. Pipe Threads, General Purpose (Inch.) Hose Coupling Screw Threads. Cast Iron Threaded Fittings. Malleable Iron Threaded Fittings. Building Service Piping. Welded and Brazing and Pressure Vessel qualifications Code.

D.

ASSE - American Society of Sanitary Engineering 15411-2 Water Supply System

ASSE 1003 ASSE 1011 ASSE 1013 E.

Water Pressure Reducing Valves Domestic Water Supply System. Hose Connection Vacuum Breakers. Reduced Pressure Preventers. Principle

for

backflow

AWWA - American Water Works Association AWWA C110 Gray-Iron and Ductile-Iron fittings, 2 In. through 48 In., for Water and other Liquids. Includes AWWA C110A (ANSI A21.10A). Standard Joints. Standard Mains. for for Grooved and Shouldered of of Water Water Meters

AWWA C606 AWWA C651 AWWA C652 AWWA C700 AWWA C702 AWWA C900

Disinfection

Standard for Disinfection Storage Facilities. Standard for Cold-Water Displacement Type.

Standard for Cold-Water Meters Compound Type. Standard for Polyvinyl Chloride (PVC) Pressure Pipe, 4 Inch Through 12 Inch, for Water. Society of the

F.

MSS - Manufacturers Standardization Valve and Fittings Industry MSS SP-67 Butterfly Valves.

G.

SASO - Saudi Arabian Standards Organization SASO-14 SASO-15 Pipes for Potable Water Unplasticized Plastic (UPVC). of

Method of Testing of Pipes for Potable Water of Unplasticized Plastic (UPVC).

1.03 SUBMITTALS A. Product and Maintenance Data: Submit manufacturer's product and maintenance data for the items specified in this section. 15411-3 Water Supply System

B.

Coordination Drawings: Prepare and submit coordination drawings for the water distribution piping.

1.04 WARRANTY A. The Contractor shall furnish the Engineer a written guarantee covering the satisfactory operation of the plumbing installation in all its parts for a period of one (1) year after date of acceptance. During this period, the Contractor shall repair or replace any defective work and pay for any repair or replacement costs.

1.05 QUALITY ASSURANCE A. Plumbing Code Compliance: Comply with applicable portions of Uniform Plumbing Code (UPC) - 1994 Edition, BOCA Basic National Plumbing Code and the local utility authority.

2. PART 2 - PRODUCTS 2.01 PIPES AND FITTINGS A. Hot and cold water supply pipes inside building shall be polyvinyl chloride pipes (PVC), schedule 80 conforming to ASTM D 2846, with solvent cement shall conform to ASTM D 2564. Use UPVC for cold water and CPVC for hot water. Exposed pipes shall be copper chrome unless otherwise indicated in drawings. Pipes and Fittings Outside Building: 02668 - WATER DISTRIBUTION SYSTEM. plated Refer pipes

B. C.

Section

2.02 VALVES A. Valves shall be as specified in Section 15100 - VALVES.

2.03 PIPING SPECIALTIES A. Water Hammer Arresters: Bellows type, with stainless steel casing and bellows, pressure rated for 250 psi, tested and certified in accordance with PDI WH-201. Flexible Connectors: Stainless steel bellows with a woven flexible bronze wire reinforcing protective o jacket; rated for 150 psig water working pressure, 250 F operating temperature and suitable for up to maximum 19 mm misalignment. Connectors shall be a minimum of 300 mm long and have threaded or flanged ends; sweat ends are not acceptable. 15411-4 Water Supply System

B.

C.

Hose Bibbs: Bronze body with integrated vacuum breaker, renewable composition disc, tee handle, 19 mm NPT inlet, 19 mm hose outlet. Backflow Preventers: Reduced pressure principle assembly consisting of shut-off valves on inlet and outlet, and strainer on inlet. Assemblies shall include test cocks, and pressure-differential relief valve located between two positive seating check valves, and comply with ASSE 1013. Relief Valves 1. Provide proper size for relief valve, in accordance with ASME Boiler and Pressure Vessel Codes, for indicated capacity of the appliance for which installed. Combined Pressure-Temperature Relief Valves: Bronze body, test lever, thermostat, complying with ANSI Z 21.22 listing requirements for temperature discharge capacity. Provide temperature relief at o 210 F and pressure relief at 150 psi.

D.

E.

2.

F.

Vacuum Breakers 1. Atmospheric constant pressure or hose-bib type.

2.04 WATER METER A. Water meter shall conform to AWWA Standards and the utility company requirements.

2.05 ELECTRICAL WATER HEATERS A. Electric water heaters shall be suitable for vertical or horizontal installations (as required) and provided with lifting lugs and channel skid base. Vessel shall be constructed to Section IV of the ASME Code, and UL Standards. Vessel shall be glass-lined with magnesium anode protection, pressure tested to 2 MPa working pressure. Entire vessel and electrical controls shall be encased in a sheet metal enclosure with baked enamel finish. Tank shall be insulated with verminproof fiber glass insulation. Units shall be provided with adjustable setting thermostatic controls and immersed nichrome heating elements. Water heaters shall prewired to solderless terminal lugs, factory tested, complete with ASME temperature and pressure relief valves and bear UL label. Water heaters shall meet or exceed the requirements of ASHRAE 90A-1980 Standard for energy efficiency. Water heaters shall also meet requirements of SASO 11. 15411-5 Water Supply System

B.

Temperature and pressure relief valves shall comply with the ASME rates and the vacuum relief valve shall comply with ANSI Z21.22, all valves shall be 3/4 inch in size and shall be labeled accordingly. Refer to drawings for specific electric water heater capacities, minimum recovery and electrical ratings.

C.

2.06 DRINKING WATER COOLERS A. Water coolers shall be bottle type with drinking water valve, integrated cup dispenser and disposal unit as shown on drawings, size as shown on drawings. Water cooler Unit shall have the following features: 1. One piece welded construction without seams, exposed edges or screws and fabricated of 16 gauge, Type 304 stainless steel polished in one direction to satin finish. Cup dispenser and disposal unit shall be supplied with removable stainless steel cup holder and disposal chamber and shall be without cup filler. Drinking tap unit shall be provided with matching finish push-back glass filler. Compressor: Shall be lifetime lubricated hermetic with static type condenser and adjustable thermostat (fan type condensers not acceptable).

B.

2.

2.07 DOMESTIC WATER FILTERS A. Furnish as shown on plans, domestic water filters (one duty/one standby) complete with all required accessories. Sediment removal filters shall be cartridge type with no carbon treatment. The filter element in replaceable cartridge shall be made of 100% spun polypropylene designed for potable water usage. Filters shall be suitable to remove suspended matter such as rust and scale particles, dirt, sand and micro organism such as cyst and spores. Water filters shall be of type and capacity as shown on the drawings.

2.08 PIPE INSULATION A. Insulation of hot water pipes shall be as per requirements of Section 15250 - MECHANICAL INSULATION.

2.09 ELEVATED DOMESTIC WATER TANK A. Elevated storage water tank shall be factory fabricated 15411-6 Water Supply System

non-toxic glass fiber reinforced polyester (GFRP) of capacity as shown on drawings. Tank shall be horizontal cylindrical with spherical heads and designed for operation at atmospheric pressure. Tank shall be constructed, tested and installed in accordance with manufacturer recommendations and comply with all regulations of authorities having jurisdiction. 1. Tank shall meet the design loading conditions and designed to support accessory equipment such as ladders, drop tubes, etc. Tank shall be vented to atmosphere. Accessories: accessories. Tank shall be provided with full

2. 3. 2.10 PUMPS A.

Refer to Section 15160 - PUMPS.

2.11 PIPE HANGERS AND SUPPORTS A. Refer to Section 15140 - HANGERS AND SUPPORTS.

3. PART 3 - EXECUTION 3.01 WATER SERVICE A. Water service shall be extended from valved outlets to main at point of tie-in. All valves, meter, and such other components as shown shall be installed to provide a complete water supply system.

3.02 INSTALLATION A. See Section 15050 - BASIC PIPING MATERIALS AND METHODS for general piping installation instructions. Refer to the drawings for further details.

3.03 FIELD QUALITY CONTROL A. General: Do not enclose, cover, or put into operation water distribution piping system until it has been inspected, tested and approved by the Engineer. Expose all such work for testing that has been covered or concealed before it has been inspected, tested and approved by the Engineer. Notify the Engineer at least 24 hours prior to the time such inspection is to be made. Prepare inspection and test reports for the Engineer's review. Testing: Test water supply and distribution piping, and 15411-7 Water Supply System

B.

water tank(s) prior to covering or concealment. The entire piping system shall be tested at a hydrostatic pressure of one and a-half (1-1/2) times the expected operating pressure without exceeding the pressure rating of the piping system materials, and proven tight at this pressure. Isolate the test source and allow to stand for a period of 4 hours. If testing is performed in segments, submit a separate report for each test, complete with diagram of portion of the system tested. C. Defective Work: Leaks and loss of pressure observed during testing constitute defects that must be repaired to the satisfaction of the Engineer. Repair all leaks and defects with new materials and retest system or portion thereof until satisfactory results are obtained. Prepare reports for all tests and required corrective action, and submit to the Engineer for review and approval. 3.04 CLEANING AND DISINFECTION Clean and disinfect water supply and distribution piping, and water tank(s) as follows: A. Purge all new water distribution piping systems and parts of existing systems that have been altered, extended, or repaired prior to use. Use the purging and disinfecting procedure described in either AWWA C651, or AWWA C652, or as described below: 1. Flush the piping system with clean, potable water until dirty water does not appear at the points of outlet. Fill the system or part thereof with a water/chlorine solution containing at least 50 parts per million of chlorine. Isolate (valve off) the system or part thereof and allow to stand for 24 hours. Drain the system or part thereof of the previous solution and refill with a water/chlorine solution containing at least 200 parts per million of chlorine and isolate and allow to stand for 3 hours. Following the allowed standing time, flush the system with clean, potable water until chlorine does not remain in the water coming from the system. Submit water samples in sterile bottles, taken in 15411-8 Water Supply System

2.

3.

4.

5.

presence of the Engineer, to the Independent Testing Laboratory for biological examination. Repeat the procedure if the biological examination made by the Independent Testing Laboratory shows evidence of contamination. 6. Prepare reports for all purging and disinfecting activities, and submit to the Engineer for review and approval.

3.05 AS-BUILT DRAWINGS A. The Contractor shall prepare and submit as-built drawings in reproducible form to the Engineer. All revisions, omissions, and/or additions to the various plumbing installations shall be marked down in red pencil. Accessories and specialties such as flexible pipe connectors, water hammer arrestors, water pressure regulators, vacuum breakers, hose bibbs, etc. shall be as approved by the Engineer. END OF SECTION

B.

15411-9 Water Supply System

Você também pode gostar