ERECTION BILL

AGENCY: JPS CONSTRUCTION


BILL No:RA 01

S.No.

Drg.No.

DESCRIPTION

90.619-10-000-A1 Hot Dust Bin

391 FN3

90.619-10-000-A1 Dismantle of Hot Dust Bin Part V-2 & V-3

90.619-10-000-A1 Dismantle of Hot Dust Bin Spiders

A1-8148-L1S-1-08

A1-8148-L1S-1-08

Work
completed
as per
Drg Wt
in MT

As per
Billed Wt
in MT

Excess
Wt in
MT

Rate per
unit Rs/-

As per Billed Payable


Value in Rs/- Value in

Rs/-

Excess
value in
Rs/-

33.728

33.728

0.000

5500.00

185504.00

185504.00

0.00

0.800

800.000

799.200

6000.00

5200.00

4800.00

400.00

20.900

20.900

0.000

1300.00

27170.00

27170.00

0.00

1.205

1.205

0.000

1300.000

1566.50

1566.50

0.00

Coal Shed Truss - 15 Mtr Span

29.143

29.143

0.000

2600.00

75771.80

75771.80

0.00

Coal Shed Truss - 12 Mtr Span

18.820

18.820

0.000

2600.00

48932.00

48932.00

0.00

903.796 799.200 19300.00

344144.30

343744.30

400.00

Bag Filter Fan

Total

104.596

Payble Amount for above bill is Rs/- 344,144

9/19/2011

Remarks

Truss 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

Truss 2
22.9

123.683

22.9

84.318

19.7

226.550

19.7

227.003

19.7

45.842

12.1

36.953

12.1

38.042

12.1

40.063

8.2

28.823

8.2

28.823

8.2

32.652

5.8

9.280

5.8

10.254

5.8

11.287

5.8

12.319

5.8

13.357

5.8

14.500

4.5

3.780

4.5

3.978

4.5

7.452

4.5

4.779

4.5

7.907

4.5

4.779

4.5

7.907

4.5

5.081

50X6

5.401
3.682
11.500
11.523
2.327
3.054
3.144
3.311
3.515
3.515
3.982
1.600
1.768
1.946
2.124
2.303
2.500
0.840
0.884
1.656
1.062
1.757
1.062
1.757
1.129
2.041

4.5

9.185

0.75x1.000

0.75075

78.5

58.934

0.75x0.35

1.62

78.5

127.170

0.3x0.325

0.6846

78.5

53.741

0.13

78.5

10.205

0.6

78.5

47.100

0.48

78.5

37.680

0.1x0.125

0.1134

78.5

8.902

0.07x0.1

0.098

78.5

7.693

150X10
150X10
130X10
130X10
130X10
100X8
100X8
100X8
90X6
90X6
90X6
65X6
65X6
65X6
65X6
65X6
65X6
50X6
50X6
50X6
50X6
50X6
50X6
50X6
50X6

0.5x0.25
1x0.5
0.8x0.5

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

100X8
100X8
110X10
90X6
90X6
65X6
65X6
65X6
65X6
65X6
65X6
65X6
65X6
65X6
50X6
50X6
50X6
50X6
50X6
50X6
50X6
50X6
50X6
0.75x0.30
0.6x0.3
0.3x0.325
0.3x0.25
0.1x0.125
0.07x0.1

2487.552

31255.63155

24.28565

2404.279

Truss 2
8.215
11.229
4.205
3.051
1.450
2.500
2.183
3.337
1.954
3.337
1.725
3.091
1.496
2.119
2.174
1.574
1.012
1.651
1.688
0.943
0.774
1.517
1.496

12.1

99.402

12.1

135.871

13.4

56.347

8.2

25.018

8.2

11.890

5.8

14.500

5.8

12.661

5.8

19.355

5.8

11.333

5.8

19.355

5.8

10.005

5.8

17.928

5.8

8.677

5.8

12.290

4.5

9.783

4.5

7.083

4.5

4.554

4.5

7.430

4.5

7.596

4.5

4.244

4.5

3.483

4.5

6.827

4.5

6.732

0.675

78.5

52.988

0.54

78.5

42.390

0.2925

78.5

22.961

0.3

78.5

23.550

0.1134

78.5

8.902

0.098

78.5

7.693

3677.491

7354.983

1189.939 189.3133

18742.01
18931.328

ERECTION BILL

: JPS CONSTRUCTION
BILL No:RA 01
S.No.

1
2

DESCRIPTION
Fabrication of Cooler and Raw Mill Cable
trench Chequred plate
Erection of Cooler and Raw Mill Cable trench
Chequred plate

Work
As per
comple- Billed
Unit
ted as Qty
per Drg

Excess Rate per


unit Rs/Qty

As per
Billed
Amount
in Rs/-

PayableA Excess
mount in Amount
Rs/in Rs/-

MT

8.81

2500

22025.00

0.00

22025.00

MT

8.81

4000

35240.00

0.00

35240.00

BagFilter 391 BF2 - Erection

MT

1.9

6000

11400.00

0.00

11400.00

BagFilter 391 FN2 - Erection

MT

1.1

6000

6600.00

0.00

6600.00

Airslide Erection 391 AS4.391AS5,391AS6 &


391 AS3

Mtrs

164.696

500

82348.00

0.00

82348.00

Aislide Support and Discharging

MT

1.61

6000

9660.00

0.00

9660.00

Airslide Blower 391 FN9,391FN E, 391 FN


A,391 FN B,391 FN C,391 FN G,391 FN H &

MT

6000

12000.00

0.00

12000.00

Airslide Pipelining for 391 AS6 & AS5.

Mtrs

102

20869.00

0.00

20869.00

200142.00

0.00

200142.00

9
10

290.926

9/19/2011
Remarks

SUMMARY OF R. A. BILL
AGENCY: JPS CONSTRUCTION
Date : 06.01.12

BILL No -- R.A. 04
Sl.
No.

DESCRIPTION

Unit

Work
completed as
per Drg Wt

As per
Billed
Wt

Excess Rate per As per Billed


Wt.
unit Rs/- Value in Rs/-

Payable
Value in
Rs/-

Excess/Hold
value in Rs/-

Bag Filter Equipment


Erection

MT

5.926

5.926

0.000

6000.00

35556.00

35556.00

0.00

Fab. & Ere. Of Plate Work,


Air Pipe Support & Platform

MT

15.556

16.042

0.486

6500.00

104278.00

101114.00

3164.00

Fab. & Ere. Of Bag House


Air Pipe Line (Dia. 7.87'')

MTR

63.660

63.660

0.000

381.70

24298.70

14579.22

9719.48

MTR

28.000

28.000

0.000

572.30

1358.00

1358.00

0.00

MTR

66.500

66.500

0.000

130.00

8645.00

8645.00

0.00

6 Grating Erection Work

MT

0.447

0.447

0.000

3200.00

1788.00

1430.40

357.60

7 Hold RA Bill III

..

61434.00

18430.20

43003.80

237357.70

181112.82

56244.88

4 Reducer (Dia. 11.8'')


5

Bag House & Clinker Silo


Hand Rail

Total

Net Payble Amount against 4th R.A. Bill is Rs/- 181112.82 Only
( In Words-- Rs. One Lac Eighty One Thousands One Hundred Twelve and Eighty Two Paisa Only )

TRUSST ENGINEERS

06.01.12
Remarks

Excess due to size of


Chequred Plate
40 % Hold due in Billed
value due to Qlty. &
incompletion

Diff. occurred due to


higher rate than the
Work Order
70 % of Billed Value Still
Hold