Construction Schedule Installation of 110KV Double Circuit Overhead Transmission lines

SN Activity Project Office Establishment Overhead Transmission Line 1 a b c c 2 a b c 3 4 a b c 5 a b 6 7 a b c d e f 8 a b 9 Survey Route alignment Detailed Tower spotting & Profiling Check Survey Access road Subgrade First Layer Second Layer Soil Investigation Structure Pad Subgrade First Layer Second Layer Foundation 1 Stage Concreting 2 Stage Concreting Earthing Erection Base assembly Base erection Upper assembly Upper erection Tower Passing Palnut erection OPGW Stringing OPGW Paying Out
nd st

Unit LOT

Total Qty 1

2011 Dec Planned 1

2012 Jan Planned Feb Planned Mar Planned Apr Planned May Planned Jun Planned Jul Planned Aug Planned Sept Planned Oct Planned Nov Planned Dec Planned Jan Planned Feb Planned Mar Planned Apr May Jun Planned Planned Planned

2013 Jul Planned Aug Planned Sept Planned Oct Planned Nov Planned Dec Planned Jan Planned

2014

KM KM KM KM

40.3 40.3 40.3 40.3

40.3 40.3 40.3 40.3

KM KM KM No.

52.4 52.4 52.4 134

15

15 12

15 12 10 36

7.4 12 12 36

12 12 26

4.4 12

4.4

36

No. No. No.

134 134 134

30

30 30

30 30 30

30 30 30

14 30 30

14 30

14 PRELIMINARY ACCEPTANCE CERTIFICATE TECHANICAL COMPLETION CERTIFICATE 10.3 30 15 10 19 5.3 15 5.3 20 20.3 40.3 6 6 6 6 4 4 6 6

No. No. No.

134 134 134

20 15

25 20 25

25 25 25

25 30 25

30 25 25

9 19 25 9

No. No. No. No. No. No. KM KM No. KM KM KM KM

134 134 134 134 134 134 40.3 40.3 134 40.3 40.3 40.3 40.3

25 25

30 25 30 25

30 30 30 30 40

30 30 30 30 40 50 10

19 30 19 30 40 50 15 15 30 5 19 19 14 34 15.3 15 30 15 10

Final Sag Conductor Stringing a Insulator Hoisting b Conductor Paying Out c Final Sag 10 Final Checking 11 Testing & Commissioning 110KV XLPE POWER & FIBRE OPTIC CABLES 12 Excavation,Trench,Joint Bay,Crossings 13 Power cable pulling (6x1.25) 14 Cable pulling (F.O) Termination XLPE Cable (Outdoor 15 sealing) Termination XLPECable (GIS sealing 16 end) 17 Jointing Fibre Optic Cable 18 Termination of Fibre optic cable 19 110 KV Surge Arrestors Outdoor TOTAL

25

KM KM KM No. No. No. No. No.

1.25 7.5 2.5 12 12 4 4 12

0.5

0.725 3

4.5 2.5

Construction Schedule Installation of 110KV Double Circuit Overhead Transmission lines


SN Activity Unit Total Qty 2011 Dec Planned 2012 Jan Planned Feb Planned Mar Planned Apr Planned May Planned Jun Planned Jul Planned Aug Planned Sept Planned Oct Planned Nov Planned Dec Planned Jan Planned Feb Planned Mar Planned Apr May Jun Planned Planned Planned 2013 Jul Planned Aug Planned Sept Planned Oct Planned Nov Planned Dec Planned Jan Planned 2014

PRELIMINARY ACCEPTANCE CERTIFICATE

TECHANICAL COMPLETION CERTIFICATE

Construction Schedule

0KV Double Circuit Overhead Transmission lines


2014 Feb Planned

FINAL ACCEPTANCE CERTIFICATE

Construction Schedule

0KV Double Circuit Overhead Transmission lines


2014 Feb Planned

FINAL ACCEPTANCE CERTIFICATE