ESITO SUPERVISIONE
Supervision Outcome
DATA
Date
REV
Issue
Purpose
ESAMINATO
Supervised by
COLLABORAZIONI
Co-operations
EMESSO
APPROVATO
Approved by
Issued by
Documento / Document no
Indice Sicurezza
Security Index
MOHPB050103
INOLTRO A IR/ATN
[X]
SISTEMA
00A
For approval
NON RICHIESTO
Fori information
Not requested
COMPONENTE
LOTTO
Component
Lot
CONTRATTO N.
Subcontract
Document type
TL
PER INFORMAZIONE
DISCIPLINA
System
TIPO DOCUMENTO
[]
Company use/p
PROGETTO
FILE
File
MOHPB05010300.DOC
Project
TITOLO
Title
CLIENTE
SLOVENSKE ELEKTRARNE
Owner
JOB no :
Discipline
--------------
INOLTRO AL CLIENTE
Submittal to Owner
PER APPROVAZIONE
For approval
PER INFORMAZIONE
For information only
NON RICHIESTA
Not requested
Questo documento propriet di Enel Ingegneria e Ricerca Spa. E severamente proibito riprodurre anche in parte il documento o divulgare ad
altri le informazioni contenute senza la preventiva autorizzazione scritta.
Progetto
Identificativo
project
document no.
MOHPB050104
Cliente
ENEL
Sistema
customer
DIVISIONE INGEGNERIA E RICERCA sys.
AREA TECNICA NUCLEARE
Rag. Soc. Fornitore
Sigla
Cl. ris.
Tipo doc.
suppliers
class
doc type
code
Comm.-S.comm. Emittente
Pagina
Di
job. no.
page
of
issued by
ANN1004
IMN
69
TL
ITER
Ansaldo
Cliente
Identificativo Componente
order
Sostituisce
title
substitutes
Cant.
site
Forn.
supplier
customer
Note
notes
ELECTRONIC FILENAME:
ELECTRONIC FORMAT:
DESCRIPTION:
Rev.
Rev.
rev.
rev.
00
18/01/2013
FIRST ISSUE
PR
Rev.
Data
Descrizione
rev.
date
description
Stato
validit
issue st.
F.Poggi
F. De Angelis
Redazione
Controllo/
approvazione
Autorizzazione
emissione
checked / approved by
issue authorization
prepared by
Informazioni strettamente riservate di propriet Ansaldo - Da non utilizzare per scopi diversi da quelli per cui sono state fornite
confidential information property of Ansaldo - not to be used for any purpose other than that for which is supplied
ANN019_1
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
Data /
date
Descrizione /description
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
Table of Contents
BACKGROUND AND PURPOSE.........................................................................10
1.1 BACKGROUND..............................................................................................10
1.2 PURPOSE.......................................................................................................10
1.3 BASIC CONSIDERATIONS............................................................................10
QUALITATIVE ASSESSMENT OF AGGRESSIVE PIPE BREAK LINES............12
1.4 ASSESSMENT OF LINE 1 :BRANCH 3KBF50BR005, TERMINAL END
3KBF50/04_B1.....................................................................................................13
1.5 ASSESSMENT OF LINE 10: BRANCH 3KBF10BR001, TERMINAL END
3KBF10/01_B1.....................................................................................................17
1.6 ASSESSMENT OF LINE 12: BRANCH 3KBF10BR005, TERMINAL END
3KBF10/04_B1.....................................................................................................21
1.7 ASSESSMENT OF LINE 14: BRANCH 3KBF50BR001, TERMINAL END
3KBF50/01_B1.....................................................................................................25
1.8 ASSESSMENT OF LINE 27:BRANCH 3JNB60BR001, TERMINAL END
3JNB60/01_B1.....................................................................................................29
1.9 ASSESSMENT OF LINE 27:BRANCH 3JNG12BR001, TERMINAL END
3JNG12/02_B1.....................................................................................................32
1.10 ASSESSMENT OF LINE 27:BRANCH 3JNG12BR002, TERMINAL END
3JNG12/04_B1.....................................................................................................35
1.11 ASSESSMENT OF LINE 27:BRANCH 3JNG13BR001, TERMINAL END
3JNG13/01_B1.....................................................................................................39
1.12 ASSESSMENT OF LINE 27:BRANCH 3JNG13BR002, TERMINAL END
3JNG13/03_B1.....................................................................................................42
1.13 ASSESSMENT OF LINE 27:BRANCH 3JNG61BR017, TERMINAL END
3JNG61/01_B1.....................................................................................................45
1.14 ASSESSMENT OF LINE 84 :BRANCH 3KBF10BR002, TERMINAL END
3KBF10/02_B1.....................................................................................................49
1.15 ASSESSMENT OF LINE 84 :BRANCH 3KBF10BR004, TERMINAL END
3KBF10/03_B1.....................................................................................................53
1.16 ASSESSMENT OF LINE 84 :BRANCH 3KBF50BR002, TERMINAL END
3KBF50/02_B1.....................................................................................................57
1.17 ASSESSMENT OF LINE 84 :BRANCH 3KBF50BR004, TERMINAL END
3KBF50/03_B1.....................................................................................................61
CONCLUSION AND RECOMMENDATION..........................................................65
REFERENCES .....................................................................................................66
1.18 CODES.........................................................................................................66
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
1.19 DOCUMENTS...............................................................................................67
ACRONYMS.........................................................................................................69
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
List of Figures
FIGURE 2-1A: WHIPPING MOTION FOR BRANCH 3KBF50BR005 AT THE
CORRESPONDING TE 3KBF50/04_B1...............................................................14
FIGURE 2-2B: WHIPPING MOTION FOR BRANCH 3KBF50BR005 AT THE
CORRESPONDING TE 3KBF50/04_B1...............................................................15
FIGURE 2-3 A: WHIPPING MOTION FOR BRANCH 3KBF10BR001 AT THE
CORRESPONDING TE 3KBF10/01_B1...............................................................18
FIGURE 2-4 B: WHIPPING MOTION FOR BRANCH 3KBF10BR001 AT THE
CORRESPONDING TE 3KBF10/01_B1...............................................................19
FIGURE 2-5 A: WHIPPING MOTION FOR BRANCH 3KBF10BR005 AT THE
CORRESPONDING TE 3KBF10/04_B1...............................................................22
FIGURE 2-6 B: WHIPPING MOTION FOR BRANCH 3KBF10BR005 AT THE
CORRESPONDING TE 3KBF10/04_B1...............................................................23
FIGURE 2-7 A: WHIPPING MOTION FOR BRANCH 3KBF50BR001 AT THE
CORRESPONDING TE 3KBF50/01_B1...............................................................26
FIGURE 2-8 A: WHIPPING MOTION FOR BRANCH 3KBF50BR001 AT THE
CORRESPONDING TE 3KBF50/01_B1...............................................................27
FIGURE 2-9 A,B: WHIPPING MOTION FOR BRANCH 3JNB60BR001 AT THE
CORRESPONDING TE 3JNB60/01_B1...............................................................30
FIGURE 2-10 A,B: WHIPPING MOTION FOR BRANCH 3JNG12BR001.01 AT
THE CORRESPONDING TE 3JNG12/02_B1.......................................................33
FIGURE 2-11 A,B: WHIPPING MOTION FOR BRANCH 3JNG12BR002 AT THE
CORRESPONDING TE 3JNG12/04_B1...............................................................37
FIGURE 2-12 A,B: WHIPPING MOTION FOR BRANCH 3JNG13BR001 AT THE
CORRESPONDING TE 3JNG13/01_B1...............................................................40
FIGURE 2-13 A,B: WHIPPING MOTION FOR BRANCH 3JNG13BR002 AT THE
CORRESPONDING TE 3JNG13/03_B1...............................................................43
FIGURE 2-14 A,B: WHIPPING MOTION FOR BRANCH 3JNG61BR017 AT THE
CORRESPONDING TE 3JNG61/01_B1...............................................................47
FIGURE 2-15 A: WHIPPING MOTION FOR BRANCH 3KBF10BR002 AT THE
CORRESPONDING TE 3KBF10/02_B1...............................................................50
FIGURE 2-16 B: WHIPPING MOTION FOR BRANCH 3KBF10BR002 AT THE
CORRESPONDING TE 3KBF10/02_B1...............................................................51
FIGURE 2-17 A,B: WHIPPING MOTION FOR BRANCH 3KBF10BR004 AT THE
CORRESPONDING TE 3KBF10/03_B1...............................................................55
FIGURE 2-18 A,B: WHIPPING MOTION FOR BRANCH 3KBF50BR002 AT THE
CORRESPONDING TE 3KBF50/02_B1...............................................................59
FIGURE 2-19 A,B: WHIPPING MOTION FOR BRANCH 3KBF50BR004 AT THE
CORRESPONDING TE 3KBF50/03_B1...............................................................63
List of Tables
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
10
1.1 BACKGROUND
The scope of this document is to provide a qualitative assessment of possible interaction between High
Energy Pipe Breaks and the adjacent Safety Structure, Systems and Components (SSCs), required for plant
shutdown. This documents includes a preliminary analysis of the effects of pipe whip due to high energy
lines break on critical components within Room A203/1, located in the Nuclear Island of the Unit 3 of
Mochovce Nuclear Power Plant.
1.2 PURPOSE
The purpose of this document is to assess whether a postulated high energy line break has to be considered
aggressive, based essentially on layout considerations and simplified assumptions about pipe dynamics
following a break. High energy pipe breaks resulting in potential damage to pipe-line and components
relevant for safety (see ref. 1.19) will be considered aggressive breaks.
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
11
For a complete survey of the methodology employed to indentify pipe break locations and to evaluate the
overall impact of postulated high energy pipe breaks see ref. 1.19.
Each postulated pipe break location is identified by the corresponding branch tag and terminal end or
intermediate location point tag. Information about the system (i.e. DPS) each analyzed branch belongs to and
about the corresponding PK line are also provided as a reference. It should be pointed out that PK lines
identification is according to ref. 1.19 (to be consistent with lines identification used in the Free Whip
Analysis reports, see ref. 1.19 for room A203/1), whereas the stress analyses reports (ref. 1.19) can actually
follow a different piping lines numbering.
The layout of safety relevant components is inferred from the plant 3D model ref. 1.19 and from available
layout drawings (see ref. 1.19 for room A203/1).
It is possible that the plant 3D model ref. 1.19 shows some inconsistency and the layout drawings do not
show all components included in the target list ref. 1.19: in such cases the conclusions of this qualitative
assessment have to be considered preliminary. Any relevant inconsistency resulting from the plant 3D model
ref. 1.19 inspection will be pointed out in this report.
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
12
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
13
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperatur
e [C]
Terminal End
ID
3KBF50BR005
108
12.26
255
3KBF50BC001/H3
3KBF50/04_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
14
3KBF50BC001
Whipping pipe
motion
3KBF50BR005
3KBF50/04_B
1
Plastic hinge
location
3KBF50BC002
Figure 22-1a: Whipping motion for Branch 3KBF50BR005 at the corresponding TE 3KBF50/04_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
3KBF50BR005
00
15
T.E
3KUA05AA002
3KUB02AA002
3KUB01AA002
3KUB03AA002
3KBF50BR023
Figure 22-2b: Whipping motion for Branch 3KBF50BR005 at the corresponding TE 3KBF50/04_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
16
Item
3KBF50BC001
3KBF50BC002
Heat exchanger
'Aftercooler
QUICKACT.VALVESAMPLING-HA
'Quick-acting
bellows motor
valve
'QUICKACT.VALVESAMPLING-HA
'Quick-acting
bellows motor
valve
'QUICKACT.VALVESAMPLING-HA
'Quick-acting
bellows motor
valve
'QUICKACT.VALVESAMPLING-HA
'Quick-acting
bellows motor
valve
Pipe Branch
Pipe Branch
3KUB03AA002
3KUB03AA002
3KUB01AA002
3KUB01AA002
3KUB02AA002
3KUB02AA002
3KUA05AA002
Thickness
[mm]
DPS
Directly
Impacted
Classification2
3.03.01
3.03.01
Yes
Yes
Critical
Critical
3.10.01
Yes
Not Critical
3.19.05
Yes
Not Critical
3.10.01
Yes
Not Critical
3.19.05
Yes
Not Critical
3.10.01
Yes
Not Critical
3.19.05
Yes
Not Critical
3.10.01
Yes
Not Critical
3.19.05
Yes
Not Critical
Not available
3.03.01
Yes
Critical
Pipe Branch
Not available
Not available
3.06.01
-
Not
Not
Critical
Critical
Pipe Branch
Not available
3.03.01
Not
Not Critical
3KUA05BR001
Pipe Branch
Not available
3.03.01
Not
Not Critical
3PER49BR001.03
Pipe Branch
Not available
3PER49AA031
Valve
3.06.01
Yes
Not Critical
3KUA05AA002
3KBF50BR023
3QFR23BR008.05
3GHC19BR001
3KUA06BR001
Diameter
[mm]
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
17
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperatur
e [C]
Terminal End
ID
3KBF10BR001
108
12.69
270
3KBF10BC001/H1
3KBF10/01_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
18
3KBF10BR014
3KBF10BC001
3KBF10BC002
3KBF10/01_B
1
3KBF10BR023
Whipping pipe
motion
3KBF50BR005
Plastic hinge
location
Figure 22-3 a: Whipping motion for Branch 3KBF10BR001 at the corresponding TE 3KBF10/01_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
19
T.E
a
b
3KBF10BR006
3KAA10BR015.50
Figure 22-4 b: Whipping motion for Branch 3KBF10BR001 at the corresponding TE 3KBF10/01_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
20
Diameter
[mm]
Thickness
[mm]
DPS
Directly
Impacted
Classification4
3.03.01
Yes
Critical
3.03.01
Yes
Critical
3KBF10BC002
Heat
exchanger
Aftercooler
3KAA10BR015.50
Pipe Branch
3.12.01
Yes
Critical
3KBF10BR014
Pipe Branch
3.03.01
Yes
Critical
3KBF10BR006
Pipe Branch
3.03.01
Yes
Critical
3.03.01
Yes
Critical
3KBF10BC001
3KBF10AA108 (a)
Valve
3KBF10AA106 (b)
Valve
Pipe Branch
3KBF10BR023
Item
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
21
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperature
[C]
Terminal End
ID
3KBF10BR005
108
12.26
255
3KBF11BJ002/H2
3KBF10/04_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
22
3KTA14BR001/01
Plastic hinge
location
3PER49BR001
3KBF10BC001
3KBF10BR005
3JEF11BR005
3PER49BR002
3KBF10/04_B
1
3KBF10BR001/01
Whipping pipe
motion
3KBF10BC002
Figure 22-5 a: Whipping motion for Branch 3KBF10BR005 at the corresponding TE 3KBF10/04_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
23
3KBF10BR005
3QJS60BR005
T.E
3QJS10BR001
3KBF70BR001
3KBF20BR001
3KBF10BR023
Figure 22-6 b: Whipping motion for Branch 3KBF10BR005 at the corresponding TE 3KBF10/04_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
24
Diameter
[mm]
Thickness
[mm]
3KBF10BC001
Heat exchanger
3KBF10BC002
Aftercooler
3QJS60BR005
3QJS10BR001
3KBF70BR001
3KBF20BR001
3KBF10BR023
3KBF10BR001/01
3JEF11BR005
3PER49BR001
3PER49BR002
3GHC19BR001
3KTA14BR001/01
Pipe Branch
Component ID
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
DPS
Directly
Impacted
Classification6
3.03.01
Yes
Critical
3.14.01
3.01.05
Yes
Not Critical
Not Critical
3.14.01
3.14.01
3.03.01
3.03.01
3.01.03
3.06.01
3.06.01
Pipe Branch
Pipe Branch
3.14.01
Yes
Yes
Yes
Yes
Yes
Yes
Not
Not
Yes
Not
Not Critical
Not Critical
Critical
Critical
Critical
Critical
Critical
Not Critical
Critical
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
25
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperatur
e [C]
Terminal End
ID
3KBF50BR001
108
12.69
270
3KBF50BC001/H1
3KBF50/01_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
26
3KBF50BC001
3KBF50BC002
3KBF50BR002
3KBF50/01_B
1
3KBF50BR023
3KBF10BR005
3KBF50BR007
Whipping
pipe motion
Plastic hinge
location
3KBF50BR006
Figure 22-7 a: Whipping motion for Branch 3KBF50BR001 at the corresponding TE 3KBF50/01_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
27
T.E
3KBF50BR014
3KBF10BR005
3KAA10BR014.50
b
a
Figure 22-8 a: Whipping motion for Branch 3KBF50BR001 at the corresponding TE 3KBF50/01_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
28
Diameter
[mm]
Thickness
[mm]
DPS
Directly
Impacted
Classification8
3KBF50BC001
3KBF50BC002
3KBF50BR014
Heat exchanger
3.03.01
Yes
Critical
Aftercooler
3.03.01
Not
Critical
3KBF50AA103(a)
Valve
3.03.01
Yes
Critical
Component ID
3KAA10BR014.50
3KBF50BR006
3KBF50BR023
3KBF50BR002
3KBF50BR007
3KBF50AA105(b)
Pipe Branch
Pipe Branch
3.12.01
Not
Critical
Pipe Branch
3.03.01
Yes
Critical
Pipe Branch
3.03.01
Yes
Critical
Pipe Branch
3.03.01
Yes
Not Critical
3.03.01
Yes
Critical
Pipe Branch
Valve
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
29
Table 22-9: Reference Data for Branch 3JNB60BR001 Pipe Break TE 3JNB60/01_B1
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperature
[C]
Terminal End
ID
3JNB60BR001
270
20
1.5
160
3T-571.03
3JNB60/01_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
Whipping pipe
motion
00
30
3JNB60BR001
Plastic hinge
location
3KBF50/01_B
1
3JNB60BR007
3JNG61BR017
3QFR23BR006.12-01/B01
3LCQ12BR001
3JNB60BR001
3KTA11BR033
a
b
3KWA12BR003
3KWA11BR011
T.E
Figure 22-9 a,b: Whipping motion for Branch 3JNB60BR001 at the corresponding TE
3JNB60/01_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
31
Table 22-10:
10: List of components affected by a postulated break at TE 3JNB60/01_B1
10
Component
ID
Item
3LCQ12BR001
Pipe Branch
3KTA11BR033
Pipe Branch
3JNB60BR007
Pipe Branch
3JNG61BR017
Pipe Branch
3KWA12BR003
3KWA12AA006
(a)
3KWA11BR011
3KWA11AA009
(b)
Pipe Branch
Diameter
[mm]
Valve
Thickness
[mm]
3.01.0
7
3.14.0
1
Directly
Impacted
Yes
Classification10
Not Critical
Yes
Not Critical
Yes
Critical
No
No Critical
3.06.0
1
Yes
No Critical
3.06.0
1
Yes
No Critical
Pipe Branch
Valve
DPS
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
32
Table 22-11:
11: Reference Data for Branch 3JNG12BR001 Pipe Break TE 3JNG12/02_B1
11
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperature
[C]
Terminal End
ID
3JNG12BR001.01
89
16
60
Sup 490
3JNG12/02_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
33
TE 3JNG12/02_B1
Whipping pipe
motion
3KBF13BR001
3KBF12BR001
3JNG12BR001
3KBF12BR001
Plastic hinge
location
Figure 22-10 a,b: Whipping motion for Branch 3JNG12BR001.01 at the corresponding TE
3JNG12/02_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
34
Table 22-12:
12: List of components affected by a postulated break at TE 3JNG12/02_B1
12
Component ID
Item
Diameter
[mm]
Thickness
[mm]
DPS
Directly
Impacted
Classification12
3JNG10BR002
Pipe Branch
273
20
3.14.01
Yes
Critical
3JNG11BR002
Pipe Branch
273
20
3.14.01
Yes
Critical
3JNB20BR001
Pipe Branch
273
20
3.14.01
Yes
Critical
3KBF12BR001
3KBF12BR002
3KTA14BR001.03
3QJS60BR003
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
Not available
Not available
18
2.6
32
3.5
3.01.07
3.01.07
3.14.01
-
Yes
Critical
Yes
No
No
Critical
No Critical
No Critical
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
1.10
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
35
Figure 2-5 a,b show the terminal end 3JNG12/01_B1 of pipe line 24, branch 3JNG12BR001, and its
surrounding. According to ref. 1.19 the pipe line break is postulated to occur in correspondence of this
terminal end.
Both pictures show also the expected final plastic hinge position around which whipping pipe pivoting is
expected. A quantitative evaluation for plastic hinge formation along branch 3KBF11BR003 is reported in
ref. 1.19. A possible pipe whip trajectory and the area affected by the unrestrained motion of the broken
terminal end are also sketched. The piping layout of this portion of line 24 is not contained in a single plan.
In such condition (see also ref. 1.19) thereby it is safer to assume that components included within a
spherical volume centred on plastic hinge location can be potentially impacted
The figure shows that several pipe branches could be directly impacted and damaged by the whipping pipe .
The most part of these are included in the target list ref. 1.19
From above considerations it can be concluded that the postulated pipe break occurring at terminal end
3JNG12/01_B1 should be considered aggressive.
Further analyses considering jet impingement effects on nearby components and on the walls restraining
whipping pipe motion are required for a final pipe break classification.
Table 2-9 reports the relevant data for the analyzed pipe break and. Table 2-10 contains a list of components
that can be potentially affected by whipping pipe motion.
Table 22-13:
13: Reference Data for Branch 3JNG12BR002 Pipe Break TE 3JNG12/04_B1
13
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperatur
e [C]
Terminal End
ID
3JNG12BR002
273
20
3.5
60
3JNG12BB001/H1
3JNG12/04_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
3JNG13/01_B1
3JNG13/01_B1
3JNG13BR001
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
3JNG12BB001
3JNG13BR001
00
36
3JNG12BR002
3JNG12/04_B1
Whipping pipe
motion
3JNG61AA013
Plastic hinge
location
T.E
3JNG12BR001.01
3QBR24BR001.01
3JNG12BR002
3JNB60BR001
3JNB61BR017
ANN019_1
(Ripristinato)882594110052524049.doc
VALVE 6 of
BRANCH /
3JNG13BR001
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
37
Figure 22-11 a,b: Whipping motion for Branch 3JNG12BR002 at the corresponding TE
3JNG12/04_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
38
Table 22-14:
14: List of components affected by a postulated break at TE 3JNG12/04_B1
Component ID
14
Item
3JNG12BB001
Hydroaccumulator
3JNG13BR001
Pipe Branch
3JNG13BR002
3JNB61BR017
Pipe Branch
3JNG61AA013(a)
Valve
3JNB60BR001
3QBR24BR001.01
Pipe Branch
Diameter
[mm]
Thickness
[mm]
DPS
3.14.0
1
3.14.0
1
Directly
Impacted
Classification14
Yes
Critical
Yes
Critical
Pipe Branch
Pipe Branch
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
1.11
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
39
Figure 2-5 a,b show the terminal end 3JNG12/01_B1 of pipe line 24, branch 3JNG12BR001, and its
surrounding. According to ref. 1.19 the pipe line break is postulated to occur in correspondence of this
terminal end.
Both pictures show also the expected final plastic hinge position around which whipping pipe pivoting is
expected. A quantitative evaluation for plastic hinge formation along branch 3KBF11BR003 is reported in
ref. 1.19. A possible pipe whip trajectory and the area affected by the unrestrained motion of the broken
terminal end are also sketched. The piping layout of this portion of line 24 is not contained in a single plan.
In such condition (see also ref. 1.19) thereby it is safer to assume that components included within a
spherical volume centred on plastic hinge location can be potentially impacted
The figure shows that several pipe branches could be directly impacted and damaged by the whipping pipe .
The most part of these are included in the target list ref. 1.19
From above considerations it can be concluded that the postulated pipe break occurring at terminal end
3JNG12/01_B1 should be considered aggressive.
Further analyses considering jet impingement effects on nearby components and on the walls restraining
whipping pipe motion are required for a final pipe break classification.
Table 2-9 reports the relevant data for the analyzed pipe break and. Table 2-10 contains a list of components
that can be potentially affected by whipping pipe motion.
Table 22-15:
15: Reference Data for Branch 3JNG13BR001 Pipe Break TE 3JNG13/01_B1
15
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperature
[C]
Terminal End
ID
3JNG13BR001
89
16
60
3T-574
3JNG13/01_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
40
3JNG13BR001
Plastic hinge
location
Whipping
pipe motion
3JMN41AA004
3JNG13/01_B1
3JNG13BR001
3JNG13BR002
3JMN41BR002-01
3KTA12AP001
3JNG61BR017
T.E
Figure 22-12 a,b: Whipping motion for Branch 3JNG13BR001 at the corresponding TE
3JNG13/01_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
41
Table 22-16:
16: List of components affected by a postulated break at TE 3JNG13/01_B1
Component ID
Item
Diameter
[mm]
Thickness
[mm]
DPS
Directly
Impacted
Classification16
3JNG10BR002
Pipe Branch
273
20
3.14.0
1
Yes
Critical
3JNG11BR002
Pipe Branch
273
20
Yes
Critical
3JNB20BR001
Pipe Branch
273
20
Yes
Critical
Yes
Critical
Yes
Critical
No
No Critical
No
No Critical
3KBF12BR001
3KBF12BR002
3KTA14BR001.03
3QJS60BR003
16
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
Not available
Not available
18
2.6
32
3.5
3.14.0
1
3.14.0
1
3.01.0
7
3.01.0
7
3.14.0
1
-
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
1.12
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
42
Figure 2-5 a,b show the terminal end 3JNG12/01_B1 of pipe line 24, branch 3JNG12BR001, and its
surrounding. According to ref. 1.19 the pipe line break is postulated to occur in correspondence of this
terminal end.
Both pictures show also the expected final plastic hinge position around which whipping pipe pivoting is
expected. A quantitative evaluation for plastic hinge formation along branch 3KBF11BR003 is reported in
ref. 1.19. A possible pipe whip trajectory and the area affected by the unrestrained motion of the broken
terminal end are also sketched. The piping layout of this portion of line 24 is not contained in a single plan.
In such condition (see also ref. 1.19) thereby it is safer to assume that components included within a
spherical volume centred on plastic hinge location can be potentially impacted
The figure shows that several pipe branches could be directly impacted and damaged by the whipping pipe .
The most part of these are included in the target list ref. 1.19
From above considerations it can be concluded that the postulated pipe break occurring at terminal end
3JNG12/01_B1 should be considered aggressive.
Further analyses considering jet impingement effects on nearby components and on the walls restraining
whipping pipe motion are required for a final pipe break classification.
Table 2-9 reports the relevant data for the analyzed pipe break and. Table 2-10 contains a list of components
that can be potentially affected by whipping pipe motion.
Table 22-17:
17: Reference Data for Branch 3JNG13BR002 Pipe Break TE 3JNG13/03_B1
17
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperature
[C]
Terminal End
ID
3JNG13BR002
273
20
3.5
60
3JNG13BB001/
H1
3JNG13/03_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Whipping pipe
motion
3QJS60BR003
3KTA14BR001.03
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
43
3JNG13/03_B1
3JNG12BR002
3JNB60BR001
3JNB60BR001
b
3JNG12AA001
T.E
3JNG13BB001
a
3KBF12BR001
3JNG12AA002
c
3JNB60AA001
3KBF12BR002
d
3JNB60AA002
3JNG13BR002
Figure 22-13 a,b: Whipping motion for Branch 3JNG13BR002 at the corresponding TE
3JNG13/03_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
44
Table 22-18:
18: List of components affected by a postulated break at TE 3JNG13/03_B1
Component ID
Item
Diameter
[mm]
Thickness
[mm]
DPS
Directly
Impacted
Classification18
3JNG10BR002
Pipe Branch
273
20
3.14.0
1
Yes
Critical
3JNG11BR002
Pipe Branch
273
20
Yes
Critical
3JNB20BR001
Pipe Branch
273
20
Yes
Critical
Yes
Critical
Yes
Critical
No
No Critical
No
No Critical
3KBF12BR001
3KBF12BR002
3KTA14BR001.03
3QJS60BR003
18
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
Not available
Not available
18
2.6
32
3.5
3.14.0
1
3.14.0
1
3.01.0
7
3.01.0
7
3.14.0
1
-
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
1.13
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
45
Figure 2-5 a,b show the terminal end 3JNG12/01_B1 of pipe line 24, branch 3JNG12BR001, and its
surrounding. According to ref. 1.19 the pipe line break is postulated to occur in correspondence of this
terminal end.
Both pictures show also the expected final plastic hinge position around which whipping pipe pivoting is
expected. A quantitative evaluation for plastic hinge formation along branch 3KBF11BR003 is reported in
ref. 1.19. A possible pipe whip trajectory and the area affected by the unrestrained motion of the broken
terminal end are also sketched. The piping layout of this portion of line 24 is not contained in a single plan.
In such condition (see also ref. 1.19) thereby it is safer to assume that components included within a
spherical volume centred on plastic hinge location can be potentially impacted
The figure shows that several pipe branches could be directly impacted and damaged by the whipping pipe .
The most part of these are included in the target list ref. 1.19
From above considerations it can be concluded that the postulated pipe break occurring at terminal end
3JNG12/01_B1 should be considered aggressive.
Further analyses considering jet impingement effects on nearby components and on the walls restraining
whipping pipe motion are required for a final pipe break classification.
Table 2-9 reports the relevant data for the analyzed pipe break and. Table 2-10 contains a list of components
that can be potentially affected by whipping pipe motion.
Table 22-19:
19: Reference Data for Branch 3JNG61BR017 Pipe Break TE 3JNG61/01_B1
19
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperature
[C]
Terminal End
ID
3JNG61BR017
273
20
12.36
125
3T-571.04
3JNG61/01_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
46
Whipping pipe
motion
Plastic hinge
location
3JNG61BR017
3KBF10/03_B1
3JEF11BR004-002
3QJS10BR001
3SRK31BR022
3JNG61BR017
3JNB60BR001
3LCQ12BR001
3KTA11BR033.08
3QBR50BR001
3JMN61AA004
T.E
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
47
Figure 22-14 a,b: Whipping motion for Branch 3JNG61BR017 at the corresponding TE
3JNG61/01_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
48
Table 22-20:
20: List of components affected by a postulated break at TE 3JNG61/01_B1
Component ID
Item
Diameter
[mm]
Thickness
[mm]
DPS
Directly
Impacted
Classification20
3JNG10BR002
Pipe Branch
273
20
3.14.0
1
Yes
Critical
3JNG11BR002
Pipe Branch
273
20
Yes
Critical
3JNB20BR001
Pipe Branch
273
20
Yes
Critical
Yes
Critical
Yes
Critical
No
No Critical
No
No Critical
3KBF12BR001
3KBF12BR002
3KTA14BR001.03
3QJS60BR003
20
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
Not available
Not available
18
2.6
32
3.5
3.14.0
1
3.14.0
1
3.01.0
7
3.01.0
7
3.14.0
1
-
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
1.14
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
49
Figure 2-5 a,b show the terminal end 3JNG12/01_B1 of pipe line 24, branch 3JNG12BR001, and its
surrounding. According to ref. 1.19 the pipe line break is postulated to occur in correspondence of this
terminal end.
Both pictures show also the expected final plastic hinge position around which whipping pipe pivoting is
expected. A quantitative evaluation for plastic hinge formation along branch 3KBF11BR003 is reported in
ref. 1.19. A possible pipe whip trajectory and the area affected by the unrestrained motion of the broken
terminal end are also sketched. The piping layout of this portion of line 24 is not contained in a single plan.
In such condition (see also ref. 1.19) thereby it is safer to assume that components included within a
spherical volume centred on plastic hinge location can be potentially impacted
The figure shows that several pipe branches could be directly impacted and damaged by the whipping pipe .
The most part of these are included in the target list ref. 1.19
From above considerations it can be concluded that the postulated pipe break occurring at terminal end
3JNG12/01_B1 should be considered aggressive.
Further analyses considering jet impingement effects on nearby components and on the walls restraining
whipping pipe motion are required for a final pipe break classification.
Table 2-9 reports the relevant data for the analyzed pipe break and. Table 2-10 contains a list of components
that can be potentially affected by whipping pipe motion.
Table 22-21:
21: Reference Data for Branch 3KBF10BR002 Pipe Break TE 3KBF10/02_B1
21
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperatur
e [C]
Terminal End
ID
3KBF10BR002
108
12.49
55-270
3KBF10BC002/H4
3KBF10/02_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
50
3KBF10BR002
Plastic hinge
location
3KBF10BR001/01
3KBF10BR004
3KUA05BR01
Whipping pipe
motion
3KBF10BC002
3KBF10/03_B1
3KBF50BR014
Figure 22-15 a: Whipping motion for Branch 3KBF10BR002 at the corresponding TE 3KBF10/02_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
51
3KBF10BC002
3KBF10BR002
T.E
3KBF10BR007
/3KAA10BR014.10
Figure 22-16 b: Whipping motion for Branch 3KBF10BR002 at the corresponding TE 3KBF10/02_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
52
Table 22-22:
22: List of components affected by a postulated break at TE 3KBF10/02_B1
Component ID
Item
Diameter
[mm]
Thickness
[mm]
DPS
Directly
Impacted
Classification22
3JNG10BR002
Pipe Branch
273
20
3.14.0
1
Yes
Critical
3JNG11BR002
Pipe Branch
273
20
Yes
Critical
3JNB20BR001
Pipe Branch
273
20
Yes
Critical
Yes
Critical
Yes
Critical
No
No Critical
No
No Critical
3KBF12BR001
3KBF12BR002
3KTA14BR001.03
3QJS60BR003
22
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
Not available
Not available
18
2.6
32
3.5
3.14.0
1
3.14.0
1
3.01.0
7
3.01.0
7
3.14.0
1
-
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
1.15
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
53
Figure 2-5 a,b show the terminal end 3JNG12/01_B1 of pipe line 24, branch 3JNG12BR001, and its
surrounding. According to ref. 1.19 the pipe line break is postulated to occur in correspondence of this
terminal end.
Both pictures show also the expected final plastic hinge position around which whipping pipe pivoting is
expected. A quantitative evaluation for plastic hinge formation along branch 3KBF11BR003 is reported in
ref. 1.19. A possible pipe whip trajectory and the area affected by the unrestrained motion of the broken
terminal end are also sketched. The piping layout of this portion of line 24 is not contained in a single plan.
In such condition (see also ref. 1.19) thereby it is safer to assume that components included within a
spherical volume centred on plastic hinge location can be potentially impacted
The figure shows that several pipe branches could be directly impacted and damaged by the whipping pipe .
The most part of these are included in the target list ref. 1.19
From above considerations it can be concluded that the postulated pipe break occurring at terminal end
3JNG12/01_B1 should be considered aggressive.
Further analyses considering jet impingement effects on nearby components and on the walls restraining
whipping pipe motion are required for a final pipe break classification.
Table 2-9 reports the relevant data for the analyzed pipe break and. Table 2-10 contains a list of components
that can be potentially affected by whipping pipe motion.
Table 22-23:
23: Reference Data for Branch 3KBF10BR002 Pipe Break TE 3KBF10/02_B1
23
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperatur
e [C]
Terminal End
ID
3KBF10BR004
108
12.49
55-270
3KBF10BC001/H2
3KBF10/03_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
ANN019_1
(Ripristinato)882594110052524049.doc
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
54
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
55
3KBF10BR004
3KAA10BR015.50
Plastic hinge
location
3KBF10/03_B1
Whipping pipe
motion
3KBF10BC001
3KBF10BR004
3KAA10BR015.10
3KAA10BR014.50
T.E
Figure 22-17 a,b: Whipping motion for Branch 3KBF10BR004 at the corresponding TE
3KBF10/03_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
56
Table 22-24:
24: List of components affected by a postulated break at TE 3KBF10/03_B1
Component ID
Item
Diameter
[mm]
Thickness
[mm]
DPS
Directly
Impacted
Classification24
3JNG10BR002
Pipe Branch
273
20
3.14.0
1
Yes
Critical
3JNG11BR002
Pipe Branch
273
20
Yes
Critical
3JNB20BR001
Pipe Branch
273
20
Yes
Critical
Yes
Critical
Yes
Critical
No
No Critical
No
No Critical
3KBF12BR001
3KBF12BR002
3KTA14BR001.03
3QJS60BR003
24
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
Not available
Not available
18
2.6
32
3.5
3.14.0
1
3.14.0
1
3.01.0
7
3.01.0
7
3.14.0
1
-
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
1.16
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
57
Figure 2-5 a,b show the terminal end 3JNG12/01_B1 of pipe line 24, branch 3JNG12BR001, and its
surrounding. According to ref. 1.19 the pipe line break is postulated to occur in correspondence of this
terminal end.
Both pictures show also the expected final plastic hinge position around which whipping pipe pivoting is
expected. A quantitative evaluation for plastic hinge formation along branch 3KBF11BR003 is reported in
ref. 1.19. A possible pipe whip trajectory and the area affected by the unrestrained motion of the broken
terminal end are also sketched. The piping layout of this portion of line 24 is not contained in a single plan.
In such condition (see also ref. 1.19) thereby it is safer to assume that components included within a
spherical volume centred on plastic hinge location can be potentially impacted
The figure shows that several pipe branches could be directly impacted and damaged by the whipping pipe .
The most part of these are included in the target list ref. 1.19
From above considerations it can be concluded that the postulated pipe break occurring at terminal end
3JNG12/01_B1 should be considered aggressive.
Further analyses considering jet impingement effects on nearby components and on the walls restraining
whipping pipe motion are required for a final pipe break classification.
Table 2-9 reports the relevant data for the analyzed pipe break and. Table 2-10 contains a list of components
that can be potentially affected by whipping pipe motion.
Table 22-25:
25: Reference Data for Branch 3KBF10BR002 Pipe Break TE 3KBF50/02_B1
25
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperatur
e [C]
Terminal End
ID
3KBF50BR002
108
12.49
55-270
3KBF50BC002/H4
3KBF50/02_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
3KBF10BR004
Whipping pipe
motion
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
58
3KBF50BC002
3KBF50/02_B1
Whipping pipe
motion
Plastic hinge
location
3KBF50BR002
3KBF50BC002
T.E
3KBF50BR001
3KBF50BR007
ANN019_1
(Ripristinato)882594110052524049.doc
3KBF50BR014
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
59
Figure 22-18 a,b: Whipping motion for Branch 3KBF50BR002 at the corresponding TE
3KBF50/02_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
60
Table 22-26:
26: List of components affected by a postulated break at TE 3KBF50/02_B1
Component ID
Item
Diameter
[mm]
Thickness
[mm]
DPS
Directly
Impacted
Classification26
3JNG10BR002
Pipe Branch
273
20
3.14.0
1
Yes
Critical
3JNG11BR002
Pipe Branch
273
20
Yes
Critical
3JNB20BR001
Pipe Branch
273
20
Yes
Critical
Yes
Critical
Yes
Critical
No
No Critical
No
No Critical
3KBF12BR001
3KBF12BR002
3KTA14BR001.03
3QJS60BR003
26
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
Not available
Not available
18
2.6
32
3.5
3.14.0
1
3.14.0
1
3.01.0
7
3.01.0
7
3.14.0
1
-
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
1.17
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
61
Figure 2-5 a,b show the terminal end 3JNG12/01_B1 of pipe line 24, branch 3JNG12BR001, and its
surrounding. According to ref. 1.19 the pipe line break is postulated to occur in correspondence of this
terminal end.
Both pictures show also the expected final plastic hinge position around which whipping pipe pivoting is
expected. A quantitative evaluation for plastic hinge formation along branch 3KBF11BR003 is reported in
ref. 1.19. A possible pipe whip trajectory and the area affected by the unrestrained motion of the broken
terminal end are also sketched. The piping layout of this portion of line 24 is not contained in a single plan.
In such condition (see also ref. 1.19) thereby it is safer to assume that components included within a
spherical volume centred on plastic hinge location can be potentially impacted
The figure shows that several pipe branches could be directly impacted and damaged by the whipping pipe .
The most part of these are included in the target list ref. 1.19
From above considerations it can be concluded that the postulated pipe break occurring at terminal end
3JNG12/01_B1 should be considered aggressive.
Further analyses considering jet impingement effects on nearby components and on the walls restraining
whipping pipe motion are required for a final pipe break classification.
Table 2-9 reports the relevant data for the analyzed pipe break and. Table 2-10 contains a list of components
that can be potentially affected by whipping pipe motion.
Table 22-27:
27: Reference Data for Branch 3KBF50BR004 Pipe Break TE 3KBF50/03_B1
27
Line - Branch
Diameter
[mm]
Thickness
[mm]
Operating
Pressure
[MPa]
Operating
Temperatur
e [C]
Terminal End
ID
3KBF50BR004
108
12.49
55-270
3KBF50BC001/H2
3KBF50/03_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
62
3KTA14BR001/01
Plastic hinge
location
3KBF50BR004
Whipping pipe
motion
3KBF50/03_B1
3KBF50BC001/H2
3PER49BR001
3KBF50BR004
3PER49BR002
3GHC19BR001
T.E
3JEF11BR005
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
63
Figure 22-19 a,b: Whipping motion for Branch 3KBF50BR004 at the corresponding TE
3KBF50/03_B1
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
64
Table 22-28:
28: List of components affected by a postulated break at TE 3KBF50/03_B1
Component ID
Item
Diameter
[mm]
Thickness
[mm]
DPS
Directly
Impacted
Classification28
3JNG10BR002
Pipe Branch
273
20
3.14.0
1
Yes
Critical
3JNG11BR002
Pipe Branch
273
20
Yes
Critical
3JNB20BR001
Pipe Branch
273
20
Yes
Critical
Yes
Critical
Yes
Critical
No
No Critical
No
No Critical
3KBF12BR001
3KBF12BR002
3KTA14BR001.03
3QJS60BR003
28
Pipe Branch
Pipe Branch
Pipe Branch
Pipe Branch
Not available
Not available
18
2.6
32
3.5
3.14.0
1
3.14.0
1
3.01.0
7
3.01.0
7
3.14.0
1
-
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
65
Table 33-29 : Summary of Qualitative Assessment for branches within room A203/1
Diameter
[mm]
Terminal End
ID
Classification
3JNG10BR002
273
3JNG10 02_B1
Aggressive
3JNG11BR002
273
3JNG11 02_B1
Aggressive
3JNG21BR017
273
3JNG21 01_B1
Aggressive
3JNB20BR001
273
3JNB20 01_B1
Aggressive
3JNG12BR001
89
3JNG12 01_B1
Aggressive
Branch
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
66
REFERENCES
1.18
CODES
/1/. ANSI/AISC N690-1994 American National Standard Specification for the Design, Fabrication and
Erection of Steel Safety-Related Structures for Nuclear Facilities
/2/. ANSI - American National Standard Institute ANSI B1.1 and B18.2; 1989 Edition
/3/. ANSI/ASME B31.1 Code for Pressure Piping, 1989 Edition
/4/. ANSI/ANS 58-2 American Nuclear Society/American Nuclear Standard Design Basis for Protection
of Light Water Nuclear Power Plant Against the Effect of Postulated Pipe Ruptures 1988 Edition
/5/. ASME Boiler and Pressure Vessel Code. Section III, Division 1, Sub-Sections, NB, NC ,ND, NF &
Appendices 2007 Edition
/6/. U.S. Nuclear Regulatory Commission NUREG-0800, Branch Technical Position 3-3 Protection
Against Postulated Piping Failures in Fluid Systems Outside Containment Rev. 3, March 2007
/7/. U.S. Nuclear Regulatory Commission NUREG-0800, Branch Technical Position 3-4 Postulated
Rupture locations in Fluid System Piping Inside and Outside Containment Rev. 2, March 2007
/8/. U.S. Nuclear Regulatory Commission NUREG-0800, Standard Review Plan 3.6.2, Determination of
Rupture Locations and Dynamic Effects Associated with the Postulated Rupture of Piping, Rev.
2, March 2007
/9/. U.S. Nuclear Regulatory Commission: Relaxation in Arbitrary Intermediate Pipe Rupture
Requirements (Generic Letter 87-11) MEB 3-1 , Rev.2 June 19, 1987.
/10/. Regulatory Guide 1.61 Damping Values for Seismic Design of Nuclear Power Plants Rev.1,
March 2007
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
67
/11/. Regulatory Guide 1.92 Combining Modal Response and Spatial Components in Seismic
Analysis Rev.2, July 2006
/12/. Eurocode 2, EN 1992-1-1: Design of concrete structures Part 1-1: General rules and rules for
buildings.
/13/. Eurocode 3, EN 1993-1-1: Design of steel structures Part 1-1: General rules and rules for
buildings.
/14/. ACI 349-01 Code Requirements for Nuclear Safety-Related Concrete Structures and
Commentary
1.19
DOCUMENTS
/15/. PNM34080182 Methodology and procedures for evaluation of high energy pipe rupture
/16/. E052000301T_F2 Classification of classified equipment into the safety classes and seismic
classification
/17/. PNM34082456 Material Selection Methodology
/18/. E041200015T Environmental Characteristics
/19/. E042200001T Codes and Standards Applicable to Plant Completion
/20/. 3D Model Navis Work Session, dated October 11, 2012
/21/. MOHPB000027 Target List HEPB analysis Batch 1
/22/. MOHPB000020 High Energy line list Batch 1
/23/. PNM340082030 Methodology for complex qualification of structures, systems and components
assurance of Mochovce NPP Unit 3 and 4.
/24/. MOHPB050070 Room A202/1 - Free Whip Analysis - Simplified Approach ANSI/ANS 58.2
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
68
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)
Progetto
Project
Mochovce 3&4 Nuclear Island
High Energy Pipe Break Analysis
Identificativo
Rev.
Cl. ris.
Pagina
Document no.
Rev.
class
Page
MOHPB050104
00
69
ACRONYMS
ANS
ASME
ECCS
FEA
HE
High Energy
PWR
SRP
SSC
SSE
PBL
PKL
Package Lines
RCLCS
ANN019_1
(Ripristinato)882594110052524049.doc
MOHPB050104 (Ripristinato)