02
REVISION : 00
COM-TS-TK-TKS
Managers, coordinators, and supervisors
Production Line / Project: Lini Produksi / Proyek: New / Activites Revision: Baru / Revisi Aktivitas :
2-Aug-07
Signature / Tanda Tangan
Name, position and signature of the JSA team members. Nama, jabatan dan tanda tangan dari anggota tim JSA Hadi Suprayitno : CME Coordinator (
Name, position and signature of the person reviewed and approved: Nama, jabatan dan tanda tangan dari orang yang telah meninjau dan menyetujui:
Distribution: Line Manager, Corporate Safety Distribusi: Manager Lini, Corporate Safety Scoring Table of Effect "E", Probability "P" and Frequency "F" Tabel Penilaian Akibat "E", Kemungkinan "P" dan Frekwensi "F" Scoring Penilaian Effect "E" Akibat "E" Harm Luka Sickness Sakit Serious invalidity Cacat berat Fatal Fatal Catastrophe Bencana Probability "P" Kemungkinan "P" Unlikely Kecil kemungkinan Not normal Tidak biasa Possible Mungkin Expected can happen Diperkirakan bisa terjadi Expected will happen Diperkirakan akan terjadi Potential Hazards Bahaya Potensial
Arief Wibisono yohanes ( Area manager Mid Java & DIY ) Risk Assessment Score "R" Angka Penilaian Risiko "R" Frequency "F" Frekwensi "F" Seldom (yearly) Jarang (setahun sekali) Sometimes (monthly) Kadang-kadang (sebulan sekali) Weekly Seminggu sekali Regularly (daily) Teratur (setiap hari) Always Selalu Continuously Terus menerus
R=E+P+F
1 2 3 6 7 10 40
Low risk Risiko rendah Medium risk Risiko sedang High risk Risiko tinggi
R < 10 10 R < 19 19 R
SITAC Activity
a. Site Acquisition b. Technical site survey - Community problem - neighbour problems that close with site
7 7
10 6
2 1
19 14
Use the right permit procedure, held on appropriate community sociallization, make sure that all problem which related with all CME work are clear before CME activity started.That problems including land and access clearing from tree
LOGISTIC Activity
a. Material unloading - Hit by fallen heavy material - twisted muscle a. Material unwraping checking c. Material lifting - injured due too using tools - scratched by wraping wood - hit by fallen materials and scratched
7 3 3 3 7
6 6 6 6 3
1 1 1 1 1
14 10 10 10 11
Use the right procedure and methods, use the relevant PPE Use the following Dop : - Ergonomic : ( Dop 06-16 ) - Loading and unloading : ( Dop 06-33 ) - Safety sign : ( Dop 06-46 ) Use The relevant PPE - Manual Handling : ( Dop 09-01 ) Use The relevant PPE
BE/027/Int/0095 1 of 12
DATE : 06.11.02
REVISION : 00
CME Activity
Pre Reconstruction Requirments a. Site Survey b. soil test ( sondir and boring) Civil, Mechanical, Electrical works a. Tower Foundation construction - Exavation - fall into exavation area - Hesped up by landslide - Exavation waste soil - Steel bar reinforcement preparation - Formwork / Bekisting - Injury due to using tools - Injury due to using tools - Fall from height - Concrete Pouring - Forms stripping and soil bacfilling b. Tower Construction - Tower erection - Fall from height - hit by fallen materials - Ascesorris Installation - Fall from height - hit by fallen materials - Tower painting - Fall from height - hit by fallen materials - ahocked by lightning - Dehidration - Scratched c. Base frame construction - base frame foundation construct d.Base Frame Installation - Base frame member installation - Injury due to using tools - Fall from height - Electric Shock when using bore tool e. Grounding Installation - Tower, base frame and fence grounding - Injury due to using tools - Shocked by Lightning - Scratched f. Fence, paving and Yard - Backfilling and soil compaction - Fence construction - Paving block Installation - Injury due to using tools - Injury due to using tools - Injury due to using tools - Injury due to using tools - Injury due to using tools - Injury due to using tools - Neighbour problem (near site) - Injury due to using tools
7 7
1 3
1 1
9 11
Use the right permit procedure and appropriate community sociallization Use the manual, use PPE, use the right methods
7 10 3 1 3 7 3 3
3 3 6 6 6 3 1 3
2 1 2 2 2 1 1 1
12 14 11 9 11 11 5 7
use the right methods with appropriate supervision, provide a safety area signs Prepare a proper area for that soil exavation
work carefully and use glove and safety shoes, need appropriate supervision
Use the right methos, use glove, safety shoes, need appropriate supervision too Use the right methos, use glove, safety shoes, need appropriate supervision too
10 10 10 10 10 10 10 3 3
10 10 10 10 10 10 6 6 3
1 1 1 1 1 1 1 3 1
21 21 21 21 21 21 17 12 7
Recommended to be done by quilified personals. Use the right methods and PPE need appropriate supervision work carefully, use helmet, make sure that erection area are clear Recommended to be done by quilified personals. Use the right methods and PPE need appropriate supervision work carefully, use helmet, make sure that erection area are clear Recommended to be done by quilified personals. Use the right methods and PPE need appropriate supervision work carefully, use helmet, make sure that erection area are clear Avoid rainy when installation prepare dringkin water, Work carefully and use glove
3 7 10
1 3 1
1 1 1
5 11 12
work carefully, use the right methods Recommended to be done by quilified personals. Use the right methods and relevant PPE
1 7 3
3 3 3
1 1 1
5 11 7
Check the equipment always, use the right methods Avoid working when rainy day Work carefully and use safety glove
3 1 1
3 3 3
1 1 1
7 5 5
Recommended check every single equipments, use the right methods, use safety shoes, gloves, prepare good skafolding
BE/027/Int/0095 2 of 12
DATE : 06.11.02
REVISION : 00
Job Safety Analysis Worksheet (continued) Lembaran Analisa Keselamatan Kerja (lanjutan) Basic Job Steps Langkah Dasar Pekerjaan Potential Hazards Bahaya Potensial
E 1 10 10
P 3 10 3
F 1 1 1
R 5 21 14
Solutions / Risk Control Plans Solusi / Rencana Pengendalian Risiko work carefully, and check every equipments that used Work carefully, recommended to not working at rainy day Use relevant PPE, prepare good stair
BE/027/Int/0095 3 of 12
Score
Observation
U U U U U U U U
8 2 4 4 4 4 2 2
H H H H
U U N/A U
4 4
4 38
Total Score General II. 1101 1102 1103 1104 1105 1106
SITE ACCESS Access by unauthorized persons to site is prevented. Access to site is in safe condition for every circumstances Designated walkpath routes free of tripping and sliping hazards Emergency exits are clearly visible and free of obstacles Access by unauthorized persons to site is prevented. Access lighting to BTS is working and sufficient H M M M H H
U U U U U U
4 2 2 2 4 4 18
November 2007
PERSONNEL All personnel have undergone health assessment prior to work on site. Personnel on site must be fit to work Personnel must be competent to perform work safely (Safety trained) Individuals are supervised according to their capabilities and the degree of risk of the task No underage workers employed General public individuals shall not be allowed on site without safety Induction or PPE. Personnel from other companies and contractors, not under the responsibility of the assessed subcontractor, shall be advised about the Safety requirements of working on site. H H H H E H
U U U U U U
4 4 4 4 8 4
1207
2 30
U U U U U
4 2 4 2 4 12
U U U U U
4 4 4 8 4 12
U U U N/A N/A
4 4 2
November 2007
SITE ID : 0 SITE NAME : 0 VII. MATERIAL HANDLING Appropriate storage system is in place Loading area is clearly defined, marked and free from obstacles. Site is clear from hazardous substances (or under controlled storage) in line with MSDS M M M
U U U
2 2 2 6
122
Item / Area
I. II. III. IV. V. VI. VII. GENERAL SITE ACCESS PERSONNEL WORKING TOOLS & EQUIPMENTS PERSONAL PROTECTIVE EQUIPMENT ANTENNA/FEEDER ACCESS MATERIAL HANDLING
Maximum Score
Score
38 18 30 12 12 6 6
42 18 30 12 12 12 6
OVERALL RATING
Total
132
A
122
B
92%
B/A*100
Project Baseline Health & Safety Performance Indicator: Maximum of 30% of total score is acceptable
November 2007
Observation
November 2007
November 2007
122
November 2007
DATE : 14.07.03
REVISION : 00
: :
Division, Department / Contractor Company : Divisi, Departemen / Perusahaan Kontraktor : Title of Person who does Job : Jabatan orang yang Mengerjakan Pekerjaan : Job Pekerjaan : :
Production Line / Project : Lini Produksi / Proyek : New / Revision Baru / Revisi : :
Revision - 01
Name, position and signature of the Hazards Identification team members. Nama, jabatan dan tanda tangan dari anggota tim Identifikasi Bahaya.
Moerhadi
Didiet Priatmadji
Atri Bolivar
Tinem BMN PM
Ishak Halim
Tinem OSP PM
Name, position and signature of the person reviewed and approved : Nama, jabatan dan tanda tangan dari orang yang telah meninjau dan menyetujui :
Distribution: Line Manager, Corporate Safety Distribusi : Manager Lini, Corporate Safety
Scoring Table of Effect "E", Probability "P" and Frequency "F" Tabel Penilaian Akibat "E", Kemungkinan "P" dan Frekwensi "F" Scoring Penilaian Effect "E" Akibat "E" Harm Luka Probability "P" Kemungkinan "P" Unlikely Kecil kemungkinan
Risk Assessment Score "R" Angka Penilaian Risiko "R" Frequency "F" Frekwensi "F" Seldom (yearly) Jarang (setahun sekali) Sometimes (monthly) Kadang-kadang (sebulan sekali) Weekly Seminggu sekali Regularly (daily) Teratur (setiap hari)
R=E+P+F
1 2 3 6 7 10 40
R < 10
Sickness Sakit
10 R < 19
Serious invalidity Cacat berat Fatal Fatal Catastrophe Bencana Potential Hazards Bahaya Potensial
Expected can happen Diperkirakan bisa terjadi Expected will happen Diperkirakan akan terjadi
19 R
Machinery Permesinan
Soil Test - Sondir & boring Excavation work : - Excavator back hoe 7 1 1 9
Define the right and safe place, make sure the excavation area is clear.
11
Sheet / Lembar 10 / 12
BE/096/Int/0186 10 of 12
Concrete work : - Ready mix truck - Ready mix pump - Molen / Concrete mixing - Vibrator Other: - Compactor - Genset
Equipment Perlengkapan
3 3 3 1
1 1 1 1
1 1 1 1
5 5 5 3
1 1
1 3
1 1
3 5
- Mattock/Hoe (cangkul) - Electric Drill (bor listrik) - Tackle (katrol) - Electric Saw (gergaji listrik)
Workplace Tempat Kerja
1 3 7 7
6 3 3 3
1 1 1 1
8 7 11 11
- Underbrush & rural area, far from town - Hill, gulch area (bukit, jurang) - Work at hight / tower - Inside Shelter
Workers Pekerja
1 7 10 3
3 3 10 1
1 1 1 1
5 11 21 5
Appropriate communication equipment and transportation, local information briefing, provide JSA (if necessary). Work carefully, prepare first aid kit, safety sign, relevant PPE and provide JSA (if necessary). Work Carefully, use safety harness and other relevant PPE, safety sign and provide JSA. Use relevant PPE, safety sign and provide JSA.
- Machine operator (operator mesin) - Tower erector - Shelter constructor - M&E installer - BTS installer - BTS inspector/troubleshooter - BTS commisioner - Microwave installer - Microwave inspector/troubleshooter - Microwave commisioner
Work Pekerjaan
7 10 1 10 1 7 1 10 10 10
3 10 3 3 3 6 1 6 6 3
1 1 1 1 1 1 1 1 1 1
11 21 5 14 5 14 3 17 17 14
License permit (SIM, if required), proper training and PPE. Proper training, provide right PPE.
10
Health check, personal medication, provide appropriate communication equipment, transportation and first aids.
- Sondir & Boring - Tower foundation excavation - Tower erection - Shelter installation - M&E installation - Fencing & Paving block installation
7 10 10 1 10 1
3 6 10 3 3 3
1 1 1 1 1 1
11 17 21 5 14 5
Work Carefully, check Equipment, right technique. Check equipment, right technique, work carefully, safety signs and provide relevant PPE. Done by qualified personnel, provide safety signs, safety harness and other relevant PPE. Work Carefully, Check Equipment, right technique, safety signs.
Sheet / Lembar 11 / 12
BE/096/Int/0186 11 of 12
- BTS installation - BTS inspection/troubleshooting - BTS commisioning - Microwave installation - Microwave inspection/troubleshooting - Microwave commisioning
Housekeeping Housekeeping
1 7 1 10 10 10
3 6 1 6 6 3
1 1 1 1 1 1
5 14 3 17 17 14
Work Carefully, Check Equipment, right technique.
1 1
6 6
1 1
8 8
Provide segregate area for storage, safety signs. Provide waste disposal box and label it, keep the area always clean.
Sheet / Lembar 12 / 12
BE/096/Int/0186 12 of 12