Você está na página 1de 2

BP-22

PAINTING AND WALLCOVERINGS

SCOPE OF WORK

DESIGNATED 100% CBE SUBCONTRACTING SET-ASIDE REQUIREMENT

DEFINITION OF PROJECT AREA:

The Scope of Work includes the painting and wallcovering work for the Georgetown
Neighborhood Library which is located at 3260 R Street, NW, Washington, DC.

PAINTING AND WALLCOVERINGS


Contractor shall be responsible for labor, material and equipment for painting and
wallcovering work at the existing building and the new addition as indicated in bid
documents (100% Final Construction Drawings and Specifications dated July 9, 2009).
Available on CD. Work includes but is not limited to the following specification sections
Division 1 – General Requirements
Division 7 – Thermal and Moisture Protection
07920 Joint Sealants
Division 9 – Finishes
09911 Exterior Painting
09912 Interior Painting
09931 Wood Stains and Transparent Finishes
09991 Encapsulation Coating System

1. Furnish and install the interior caulking and sealants between dissimilar
materials as indicated.
2. Furnish and install the caulking between door frames, trim and casings
and drywall or masonry.
3. Furnish and install the interior caulking between aluminum window
frames and masonry or drywall.
4. Exterior painting includes put is not limited to railings, flagpole and pipe
bollards.
5. Furnish and install all required primers and fillers as indicated.
6. Painting and staining of the doors and frames as indicated.
7. Minor prep work and patching as required.
8. Painting and staining of the drywall, masonry, doors, trim,
miscellaneous metals and miscellaneous items with the required coats as
indicated.
9. Protection for new and existing surfaces.
10. Sufficient temporary lighting for your work.
11. Hoisting as required for this work.
12. Provide any Independent Testing & Inspection Services required for this
Work, including materials testing and inspections;
13. During the period of this work, contractor agrees that all employees
must be experienced in performing the work.
14. Contractor shall coordinate this work with other work in progress.
15. The Contractor shall ensure that no elements determined to be unstable
are left unsupported. Any and all required structural bracing for
structural systems to remain shall be included in this scope of work.
16. Contractor shall remove and transport debris resulting from erection
operations and materials to site disposal area. Recyclable materials shall
be separated and stored or stockpiled without intermixing with other
surplus materials before transporting to recycling facilities in accordance
with a recycling program consistent with the Project LEED Certification
Program.
17. Contractor shall comply with all identified performance and
specification requirements to achieve LEED points toward the Silver
certification goal as indicated in the bid documents.
18. Contractor shall take all necessary precautions to avoid damage to all
existing and completed construction in place.
19. It is Contractor’s responsibility to read the Hazardous Materials Survey
Report for Georgetown Neighborhood Library, including the July 8th
2008 addendum.
20. Contractor shall submit bids detailing their proposed means, methods
and schedule for this scope of work.
21. Provide labor for incidental project clean-up
22. Provide miscellaneous temporary protection of existing conditions
during construction as specifically specified herein and OSHA safety
barricades, rails and floor coverings, for this Work.
23. Engineering, site survey and layout for this Work.
24. Provide monthly Project construction progress documentation &
photographs, including existing building pre-construction condition
documentation.
25. Contractor shall leave the workplace in a clean and presentable
condition ready for subsequent trades and prepared for finishes as
specified.
26. Submittals will be required for approval prior to execution of the work.

Você também pode gostar