SUBSTRUCTURE

04. SUBSTRUCTURE 4.1 FUNCTION The substructure has the functionof supporting the drawworks,rotary table, stands of DP andderrick. The top side is generallycalled the rig floor. Substructure are made followingAPI STD 4E or 4F regulations.There is usually a plate mountedon the substructure identifying itsmain characteristics.

- AP I P la te

apirigroup.com/substructure.html

1/7

11/7/13

SUBSTRUCTURE

NAME OF THE BUILDER ADDRESS API STANDARD (ie API 4F) SERIAL NUMBER HEIGHT (ft) MAXIMUM STATIC LOAD OF ROTARY TABLE MAXIMUM SETBACK STATIC LOAD 4.2 SUBSTRUCTURE LOAD and DIMENSIONS - Substructure Load Derrick or mast weight Rig Floor and equipment Maximum load of pipe that can be set back in the derrick Maximum hook load - Dimensions Substructure dimensions are proportional to the rig power. PYRAMID Dimensions

apirigroup.com/substructure.html

2/7

11/7/13

SUBSTRUCTURE

4.3 TYPES AND CHARACTERISTICS - Sub structure T yp e s Land rigs are made for frequent Rig Up, moving and Rig Down.This is the main reason why different substructure types have been developed. Two main types Type Box on Box Type: High Floor Substructure - T yp e Box on Box Different modules orboxes are positioned toraise the rig floor.The numbers of boxesdepends on the heightrequired to install thewellhead and BOP stack.

- T yp e : High Floor Sub structure

apirigroup.com/substructure.html

3/7

11/7/13

SUBSTRUCTURE

These have been developed to accommodatehigher BOP stacks and wellheads.Although each builder has their own model, they allhave the following characteristics:Enables the drawworks and derrick to be rigged upat ground level, eliminating the need for big cranes;Uses the rig's drawworks to raise the floor andderrick (some models use hydraulic pistons). 4.4 RIG UP SYSTEMS "SWING UP" - PYRAMID "SWING LIFT" - BRANHAM "SLING SHOT" - DRECO - SWING UP - P YR AMID Drawwork lifts the mast, the substructure and the complete rig floor.Only 2 main lifts are required - 1st lift to pick up mast and part of rig floor

- 2nd lift to pick up draw work and aft part of rig floor.

apirigroup.com/substructure.html

4/7

11/7/13

SUBSTRUCTURE

- SWING LIFT - BRANHAM - Position of lifting cables - 1st PHASE: A-frame positioning - 2nd PHASE : Lifting the Mast - 3rd PHASE : Lifting the Drawworks Lifting Cables - Scheme 1st A-frame Positioning - Scheme

2nd Lifting the Mast - Scheme

3nd Lifting the Drawworks - Scheme

apirigroup.com/substructure.html

5/7

11/7/13

SUBSTRUCTURE

- SLING SHOT DR E CO Dedicated hydraulic pistons to lift derrick, substructure and complete rig floor. Lifting sequence - Beginning - After 3 minutes - After 6 minutes - After 9 minutes

4.5 INSPECTIONS Periodical inspections Substructure, derrick and lifting equipment must have periodical inspections, (every six months)following the builder's instructions and the API regulations: API RP 4G ed API RP 54. International Organization for Standardization (ISO) ISO 13534. ENI rules ask also a complete re-certification of the derrick/mast every 5 years.
apirigroup.com/substructure.html 6/7

11/7/13

SUBSTRUCTURE

apirigroup.com/substructure.html

7/7