Você está na página 1de 8

H-1

CHAPTER H-1
SUPPLY OF MANURE, INSECTICIDES, PLANTS, POTS, T & P ETC
Note : The rates are inclusive of all taxes etc and for estimation purpose only
% Variation Reason

Chapte r Code No. 1 1.1

Description 2 Supply of dry manure including loading unloading transportation & stacking at site : Fram Yard Manure (Organic) Compost Goat Dungmanure Supply of Chemical Fertilizers at store in bags weighing not less than 50 Kg each including loading unloading & transportation etc. Urea

Unit 3

Rate (Rs) 2005 4

Proposed for variation Rate (Rs.) Increase Decrea 2007


se 7

1.1.1 1.1.2 1.1.3 1.2

Cum Cum Cum

300.00 350.00 500.00

300.00 350.00 500.00

0.00 0.00 0.00

1.2.1

Per 50 Kg Bag Per 50 Kg Bag Per 50 Kg Bag Per 50 Kg Bag Per 50 Kg Bag

220.00

220.00

0.00

1.2.2

D.A.P.

550.00

550.00

0.00

1.2.3

Super Phosphate

300.00

300.00

0.00

1.2.4

Murrate of Photash

450.00

450.00

0.00

1.2.5

Straw Meal

900.00

900.00

0.00

1.3

Supply & Stacking good earth at site complete including loading unloading & transportation etc. Supply of Insecticides & Pesticides at store in dust / liquid form complete : Methyl Prathion 2 %

Cum

75.00

75.00

0.00

1.4

1.4.1

Per 25 Kg Bag Per 250 ml Per Litre Per Litre Per Litre Per 100 Grms

400.00

400.00

0.00

1.4.2

Karathion (Liquid)

300.00 370.00 280.00 325.00 100.00

300.00 370.00 280.00 325.00 100.00

0.00 0.00 0.00 0.00

1.4.3 1.4.4 1.4.5 1.4.6

Metacid (Liquid) Roger (Liquid) Cholorophyriphos 20 Ec Bauiston 50 %

0.00

H-2

Chapte r Code No. 1 1.5 1.5.1 1.5.2 1.5.3 1.5.4 1.5.5 1.5.6 1.5.7 1.6

% Variation

Reason

Description 2 Supply of Garden Tools & Implements at store complete : Spade weighing 1.5 Kg with handle Khurpa weighing 500 gm with handle Gurvana weighing 800 gm with handle Hedge Shear (Kamani Steel) Secaetur Garden Rack with handle Pick - Axe Supply of different sized pots at site store including loading Unloading & transportation etc. complete : Cement pot 300 mm Size Cement Pot 350 mm size Asbestos Pot 350 mm size Supply of different sized earthen pots at site / store including loading unloading & transportation etc. complete : Earthen Pot 150 mm size Earthen Pot 225 mm size Earthen Pot 300 mm size Supply of different sized lawn mower including transportation etc. as store complete : 300 mm size Hand Lawn Mower 350 mm size Hand Lawn Mower 450 mm size Hand Lawn Mower 500 mm size Hand Lawn Mower 600 mm size Hand Lawn Mower Supply of different size Tokaras / Tokaris etc. at store complete : Big Size (600 mm dia)

Unit 3

Rate (Rs) 2005 4

Proposed for variation Rate (Rs.) Increase Decrea 2007


se 7

Each Each Each Each Each Each Each

75.00 45.00 60.00 275.00 150.00 60.00 90.00

75.00 45.00 60.00 275.00 150.00 60.00 90.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

1.6.1 1.6.2 1.6.3 1.7

Each Each Each

46.00 65.00 46.00

46.00 65.00 46.00

0.00 0.00 0.00

1.7.1 1.7.2 1.7.3 1.8

Each Each Each

6.00 10.00 15.00

6.00 10.00 15.00

0.00 0.00 0.00

1.8.1 1.8.2 1.8.3 1.8.4 1.8.5 1.9

Each Each Each Each Each

2200.00 2500.00 3800.00 4800.00 5500.00

2200.00 2500.00 3800.00 4800.00 5500.00

0.00 0.00 0.00 0.00 0.00

1.9.1

Each

35.00

35.00

0.00

H-3

Chapte r Code No. 1 1.9.2 1.10

% Variation

Reason

Description 2 Small Size (450 mm dia) Supply of P.V.C. hose pipe of different sizes at Store including transportation etc. complete :

Unit 3 Each

Rate (Rs) 2005 4 25.00

Proposed for variation Rate (Rs.) Increase Decrea 2007


se 7

5 25.00

0.00

1.10.1 50 mm dia 1.10.2 38 mm dia 1.10.3 25 mm dia 1.11 Supply of different H.P. Motor pumps submersible pumps / Multistaged pumps at store including transportation etc. complete :

R. Mtr R. Mtr R. Mtr

100.00 85.00 40.00

100.00 85.00 40.00

0.00 0.00 0.00

1.11.1 Motor Pumps 5 H.P. ISI Marked 1.11.2 Motor Pumps 7.5 H.P. ISI Marked 1.11.3 Motor Pumps 10 H.P. ISI Marked 1.11.4 Submersible Pumps 3 H.P. ISI Marked KSB 1.11.5 Submersible Pumps 5 H.P. ISI Marked KSB 1.11.6 Submersible Pumps 10 H.P. ISI Marked KSB 1.12 Supply of different varities of tree/ shrubs/ climbers according to height and age of the plant at site including loading/ unloading & transportation etc. complete :

Each Each Each Each Each Each

9230.00 11830.00 14130.00 16000.00 19000.00 25000.00

9230.00 11830.00 14130.00 16000.00 19000.00 25000.00

0.00 0.00 0.00 0.00 0.00 0.00

1.12.1 Different flowing plants 900 mm to 1500 mm

Each

15.00 to 40.00 12.00 to 25.00 25.00 to 50.00

15.00 to 40.00 12.00 to 25.00 25.00 to 50.00

1.12.2 Different varities of shrubs 600 mm to 900 mm

Each

1.12.3 Different varities of Climber 900 mm to 1500 mm

Each

Supply of different varieties of Bougainvillea in poly bags/ earthen pots according to height, growth and age of plant at site including loading/ unloading & transportation etc. complete : 1.13.1 Local Variety of Bougainvillea 600 mm to 900 mm 1.13.2 Different Varieties of Bougainvillea 600 mm to 900 mm 1.14 Supply of different varieties of Rose plants in Polyethylene bags/ earthen pots according to height , growth and age of the plant at site including loading/ unloading & transportation etc. complete :

1.13

Each Each

10.00 to 25.00 25.00 to 40.00

10.00 to 25.00 25.00 to 40.00

H-4

Chapte r Code No. 1

% Variation

Reason

Description 2

Unit 3 Each

Rate (Rs) 2005 4 10.00 to 15.00 30.00 to 50.00

Proposed for variation Rate (Rs.) Increase Decrea 2007


se 7

5 10.00 to 15.00 30.00 to 50.00

1.14.1 Desi Rose / Root Stock Plants/ Ganganagri

1.14.2 Different varieties of Grafted Rose Plant

Each

1.15

1.16

Supply of different varieties of Palms in polyethylene bags/ earthen pots according to height , growth and age of the plant at site including loading/ unloading & transportation etc. complete : Supply of different varieties of Palms indoor plants in polythene bags/ earthen pots according to height , growth and age of the plant at site including loading/ unloading & transportation etc.

Each

25.00 to 50.00

25.00 to 50.00

1.16.1 Desi Crotons

Each

30.00 to 40.00 40.00 to 60.00 80.00 to 100.00 100.00 to 200.00 200.00 to 400.00 80.00 to 150.00 80.00 to 100.00 80.00 to 100.00 125.00 to 250.00 100.00 to 250.00

30.00 to 40.00 40.00 to 60.00 80.00 to 100.00 100.00 to 200.00 200.00 to 400.00 80.00 to 150.00 80.00 to 100.00 80.00 to 100.00 125.00 to 250.00 100.00 to 250.00

1.16.2 Selective Varieties of Crotons

Each

1.16.3 Rubber Plants etc.

Each

1.16.4 Daffen Bachia

Each

1.16.5 Arecca Palm

Each

1.16.6 Song of India

Each

1.16.7 Aglonmia

Each

1.16.8 Drassina

Each

1.16.9 Singonium with Moss Stick

Each

1.16.10 Miscellaneous

Each

H-13

CHAPTER - H-2

MAINTENANCE OF GARDENS
Note :- The Rates are inclusive of all taxes etc. and for estimation purpose only. Chapt er Code No.
% Variation

Description

Unit

Rate (Rs) 2005 4

Propose d Rate (Rs.) 2007 5

Reason for variation

Increa Decreas se e

1 2.1

2 Maintenance of Lawns :

2.1.1 Spreading of manure and good earth in required thickness (Cost of manure and good earth to be paid separately). 2.1.2 Irrigation of Lawns

Cum

4.00

4.00

0.00

Per Hect Per Day 2.1.3 Uprooting weeds from the lawn plots and treched area after 10 to 15 days of its flooding with including disposal of uprooted vegetation. 2.1.4 Mowing manually / with power machines a) Manually

--

--

100 Sqm

150.00

150.00

0.00

Per Hect 1000.00 1000.00 0.00 b) With power machines Per Hect 800.00 2.1.5 Maintenance of Shrubbary or hedge cutting inlcuding disposal of rubbish with all leads & lifts. 100 Sqm 800.00 0.00

300.00

300.00

0.00

2.1.6 Sweeping / Cleaning of Garden roads. Lawns & Per 100 Sqm Paths & disposal of all rubbish. 2.1.7 Security of the Garden per gate for 24 Hours in 3 Per Day (24 Hours) Shift with the exilitary persons.

1.50

1.50

0.00

--

--

2.1.8 Maintenance / Fittig of permanent ornamental pots/ Per 50 Kg Bag 900.00 Seasonal plots (a) Mixing earth and manure inproporotion as specified or directed for pots

900.00

0.00

Cum

30.00

30.00

0.00

(b)

Filling and planting of sapplings and watering of Per 100 Pots Per day plots

50.00

50.00

0.00

H-14

Chapt er Code No.

% Variation

Description

Unit

Rate (Rs) 2005 4

Propose d Rate (Rs.) 2007 5

Reason for variation

Increa Decreas se e

1 (c)

2 3 Weding Hoeing, stacking & colouring of pots Per 100 Pots Per day material will be supplied by the department

50.00

50.00

0.00

2.1.9 Preparation of beds for bedging and shrubbary by excavating 60 cms deep and trenching the excavated base to a further depth of 30 cms refilling the excavated earth after breaking clods & mixing with manure in the ratio 8 : 1 ( 8 Parts of stacked volume of earth after reduction by 20 % one part of stacking volume of manure after reduction by 8% flooding with water filling with earth if necessary (Cost of manure of extra earth to be paid for separately) 2.2 Digging pits in ordinary soil & refilling the same with the excavated earth mixed with manure in the ratio of 2 : 1 by volume (2 parts of stacked volume of earth after reduction by 20 % 1 parts of stacked volume of manure after reduction by 8 %) flooding with water and dressing including removal of surplus earth (Cost of manure or extra good earth if needed to be paid separately) pit dia 60 cm x 60 cm deep Planting of annual sapplings watering in the bed Watering of group plantation at the bed Preparation of eding cutting Lawn Group plantation in the bed specified place

Each

10.00

10.00

0.00

Each Sqm Sqm Sqm Sqm

10.00 0.50 0.10 0.25 1.00

10.00 0.50 0.10 0.25 1.00

0.00 0.00 0.00 0.00 0.00

2.3 2.4 2.5 2.6

81

CHAPTER - H-3

DEVELOPMENT OF GARDENS
Note :- The Rates are inclusive of all taxes etc. and for estimation purpose only. Chapt er Code No. 1 3.1 Rate (Rs) 2005 4 Proposed Rate (Rs.) 2007 5
% Variation Reason for variation

Description

Unit

Increas Decrea e se 6 7 8

2 Laying of lawns including ploughing levelling breaking of clods manuring & removal of stones etc. (Cost of manure or extra good earth to be paid separately) Maintenance of lawns for 30 days or more till the grass forms a thick lawns free from weeds & fit for moving in the duration of planting if lawn die some where the contractor will replant it at his own cost

3.1.1 In rows 15 cms apart in either direction

100 Sqm 100 Sqm 100 Sqm

1000.00

1000.00

0.00

3.1.2 In rows 7.5 cms apart in either direction

1500.00

1500.00

0.00

3.1.3 In rows 5 cms apart in either direction

2000.00

2000.00

0.00

3.2

Renovating lawns including weeding cheeling the grass forking the ground top dressing with manure Mixing the same with forked soil watering maintaining the lawns for 30 days or more till grass forms a thick lawns free from weeds & fit for moving & disposal of rubbish as directed.

100 Sqm

3000.00

3000.00

0.00

3.3

Planting of trees / Shrubs/ hedge & climbers plants 100 Plants at desired distance in a row & watering. Preparation of different sized beds as directed. 100 Sqm

10.00

10.00

0.00

3.4

300.00

300.00

0.00

H-88

CHAPTER - H-4 MAINTENANCE OF ROAD SIDE PLANTATION


Chapt er Code No. Propos Rate ed (Rs) Rate 2005 (Rs.) 2007 4 5
% Variation Reason for variation

Description

Unit

Increa Decrea se se 6 7 8

1 1 a)

2 Preparation of soil including cleaning & removing of unwanted shrubs removal of stones & garbage. Digging of pits size 60 x 60 x 60 cms including removal of stones. Manuring applicable of insecticides & watering atleast 15 litre per plant after planting. Loading & unloading of plants from Deptt Nursery to site Per Km. Preparation of Thawala sizing 60 cms Diametre & 10 cms Deep once in a month.

3 Per 100 Sqm

80.00

80.00

0.00

b)

Per Pit Per 1000 Plants Per Thawala

15.00

15.00

0.00

c)

80.00

80.00

0.00

d)

0.50

0.50

0.00

e)

Inter cultural operation hoeing & weeding etc, in Per Plants 90 cms Dia & 15 cms deep. Watering of plants with the own tanker i.e.at least Per Plants 20 Litre water for plant at one time. Transportation of tree guards from Depot to the plantation site including loading & unloading. Security of plants & fencing etc. Per Tree Guard Per Plant Per Month

0.60

0.60

0.00

f)

0.50

0.50

0.00

g)

10.00

10.00

0.00

h)

0.50

0.50

0.00

i)

Prunning & trumming and cutting of old big trees on the road side. The contractor will deposit the cut wood in the Deptt.

Per Tree

30.00

30.00

0.00

Maintenance of plants by the contractor including of pits / bids watering preparation of Thawala Hoeing weeding etc. & application of insecticides etc. & security if the plant die during maintenance contractor has to replace same height plant at his Per Plant Per Month own cost.

10.00

10.00

0.00