Escolar Documentos
Profissional Documentos
Cultura Documentos
ii iii
Fuel & Forge
I
Blast powder
ii
iii
Jump steel
iv
vii
viii
ix
No
Spe. SK
SK
Un SK
Fuse
Earth
Red 500 200x earth D.D.T. gauge 200 mm with coir powder polythen sods dust e
Tape
Steel
Kg 1 2 3 Remove top soil, 150mm deposit within site (100m2) Excavate over site, deposit spread out level. (3m3) Excavate for trench / pit in loose / soft soil, deposit spread out level. (3m3) Ditto - in ordinary soil. (3m3) Ditto - in land / dense soil. (3m3) Ditto - in mud / wet soil. (3m3) Ditto - in soft, disintegrated rock (not requiring blasting). (3m3) Ditto - in rock requiring blasting. (3m3) Benching in rock, but blasting prohibited (1m2) 1.10 1.60 11.00 1.75
Lm
Kg
m3
Nr
m3
Kg
m2
1.10 2.40 3.75 3.20 2.75 2.20 1.60 0.35 3.05 0.50
0.25 0.20
4 5 6 7 8 9
10 Backfill and compact in trench / pit with selected excavated earth. (m3) 11 Ditto - with imported earth. (3m3)
0.04
0.04
12 Fill under floors watering, compacting and leveling, in 75 mm layers with selected excavated earth. (3m3) 13 Ditto - with imported earth. (3m3)
2.20
0.04
2.20
3.75
0.04
(2) Materials
No
ii
iii
Jump steel
iv
vi
vii
viii
ix
ii
Steel fuel & Forge
iii
Fuel & Forge
No
Spe. SK
SK
Un SK
Fuse
Earth
Red 500 200x earth D.D.T. gauge 200 mm with coir powder polythen sods dust e
Tape
Kg 1 Cutting turf sods, loading to and unloading from, laying and watering for 30 days(10 m2) Anti termite treatement to excavated foundated trenches and filling. (10m2) Polythene type 500 damp proof membrane on compacted fill, with 60 mm wide sealingtape. (10m2) 0.10 5.00
Lm
Kg
m3
Nr 263
m3 0.75
Kg
m2
m 0.40
0.50
7.30
0.20
12.00
25.00
I
Cement
ii
Sand
iii
40 Metal
(2) Materials iv v vi
25 Metal 20 Metal
vii
viii
ix
I
Vibrator
No
Concrete Work
Spe. SK
SK
Un SK
50 Kg 1 2 3 4 5 Mixing 1:3:6 (40) concrete (3m3) Grade 15 Mixing 1:2:4 (25) concrete (3m3) Grade 20 Mixing 1:2:4 (20) concrete (3m3) Grade Mixing 1:1 1/2 :3 (20) concrete (3m3) - Grade Mixing 1:1:2 (20) concrete (3m3) Grade 30 Placing - 50 mm screeds under foundation depth not exceeding 1.5m (10m2) 1.10 1.10 1.10 1.10 6.40 6.40 6.40 6.40 13.80
m3 2.80
m3
m3
m2
m3
Day
Day 0.34
1.10
6.40
1.30
2.90
0.34
0.125
0.50
0.52
Building Schedule of Rates 7 8 Placing - 75 mm ditto Placing 150mm thick mass concrete ground floor slab (10m2) 0.125 0.50 0.75 1.25 0.80 1.50
Building Schedule of Rates 9 Placing 225x225 R.C.C. colomn on ground floor including curing. (1.25m3)
3.20
3.20
5.60
1.50
1.00
3.20
4.25
5.60
1.50
1.00
Building Schedule of Rates 11 Placing 125 mm thick R.C.C. floor slab at first floor levelfloor including curing. (1.50m3)
3.20
4.25
2.80
1.65
1.00
I
25 Tk Planks
ii
100x50 Timber
iii
50x50 Timber
iv
(2) Materials v vi
Wedges Etc Mould Oil
vii
16 dia 50 long Bolts
viii
Wire Nails
ix
No
Form work
Spe. SK
SK
Un SK
50x25 Metal
50 Kg 1 Form work to floor 225x225 colomn in ground floor (140m2 contact area) Making mould per use (4 Nos) Assembling - per use 3 4 Dismantling, cleaning and repainting - per use Form work to under side of the first floor slab (20m2 contact area) Making panels (4 uses, including 20% repair cost) Assembling per use Dismantle and cleaning per use Form work to beams in ground floor (5m2 contact area) Making the mould per use.(4uses) Assembling Dismantling and cleaning
m3
m3
m3
m3
Nr
Kg
Day
Day
0.125
0.13
0.45
1.30
1.25
0.20
1.00
1.00
6.70
10.00
0.50
5 6 7
1.10 0.60
4.40 2.20
45.50
5.00
1.00
0.30 0.10
2.50 6.20
3.75 7.30
2.00
0.25 0.70
8 9
ii
iii
iv
(2) Materials v vi
vii
viii
ix
No
Reinforcement
No
Reinforcement
Spe. SK
SK
Un SK
Binding wire
Spacers or Chairs
50 Kg 1 Mild steel / Tor steel reinforcement to lintols slab beams or columns bent to shape laid in position & tied with G.I. Wires (50Kg) 1.00 1.00 1.15
Kg
Kg
0.70
1.5% of 2(I)
ii
iii
iv
(2) Materials v vi
Slacked lime
vii
viii
ix
No
Brick work
Spe. SK
SK
Un SK
Brick
Sand
Cement
Wirecut Bricks
Acids
Water
Scaffoldi ng x% of (I)
Day 1 2 Brick work in 1:5 cement sand mtr in foundation.(3m3) -Ditto- in 1:8 cement , sand mortar in foundation.(3m3) -Ditto- in 1:5 cement , sand mortar in 112.5 mm thick walls in ground floor (10m2) -Ditto- 225 mm thick walls in ground floor (10m2) -Ditto- 337.5 mm thick walls in ground floor (10m2) -Ditto- in 1:8 cement and sand mortar in ground floor (10m2) Brick work (wire cut) in cement and sand mortar in 112 5 mm the walls in ground floor (10m2) -Ditto- 225 mm thick walls in ground floor (10m2)
m3 0.75 1.15
Ltr
50 Kg
Ltr
1.60
2.15
0.60
0.30
1.40
0.05
4 5 6
0.03
0.02
0.03
1.6
2.15
0.25
1.30
0.60
0.05
2.40
4.05
0.55
2.70
1.20
0.03
Building Schedule of Rates 9 -Ditto- 337.5 mm thick walls in ground floor (10m2) 4.05 5.90 0.90 4.85 1.80
0.02
Building Schedule of Rates Extra over for facing including raised 3 mm thick in cement and 10 sand 1:1 texture in ground floor (10m2) 11 175mm the floor paved in lime mortar 2:5 in ground floor (10m2)
5.40
3.75
0.05
0.55
0.45
1.25
2.50
0.40
0.35
1.30
200
Steps 338 x 150 mm in brick in cement and sand 1:5 12.5 mm 12 thick cement and sand 1 :2 rendering adusive necessary errors (3 m) Brick drains in cement and sand 1:5 225 mm wide 150-225 mm average depth including cement 13 rendering 12.5 mm thick 1:2 to exposed faces with 450 mm ramp including necessary errors. (3 m) 14 -Ditto- with out ramp (3 m )
0.50
0.50
0.12
0.14
0.50
1.27
1.27
0.14
0.14
0.81
1.02
1.27
0.11
0.12
0.71
ii
iii
iv
(2) Materials v vi
vii
viii
ix
No
Spe. SK
SK
Sand
Scaffoldi ng
1,000 1 200 mm thick hollow block work (400 x 200 x 200 ) in cement and sand mortar 1:5 in ground floor (caubes unfilled )(10m2) 100 mm thick -ditto- (400 x 200 x 100 mm ) 1.61 2.69 0.13
m3 0.18
50 Kg 1,000 0.81
0.03
1.08
2.15
0.09
0.43
0.13
0.03
ii
iii
(2) Materials iv v vi
vii
viii
ix
No
No
Spe. SK
SK
Un SK
50x20 Rubble
Sand
Cement
m3
m3
50 Kg
Building Schedule of Rates Random rubble masonry in cement , sand mortar 1:5 in below FFL (350mm thick) (3m3) -Ditto in super structure(3m3)
4.24
6.35
3.90
0.90
5.30
4.77
7.41
3.90
0.90
5.30
I
Fire Wood
ii
iii
(2) Materials iv v vi
Slacked Powder lime Pigment
vii
viii
ix
No
Plstering
Spe. SK
SK
Un SK
Bitumen
Sand
Cement
Kg 1 19mm thick DPC in cement and sand 1:2 finished with 2 coats of hot bitumen blinded with sand (10m2) 16mm thick plasering to walls in lime and sand 2:5 including floating with lime putty (10 m2) -Ditto- cement and sand 1 :3 including cement floating (10 m2) 10mm thick plastering to sofft of slab cement and sand 1:3 including flating with lime putty (10m2) Ditto- to sides & soffit of beams (10m2) 16 mm thick walls in lime cement and sand 1:1:5 finished semirough with wooden float. (10m2) -Ditto- finish smooth with lime putty(10m2) 12mm thick rendering in cemnt and sand 1 : 3 finish smooth 1.34 2.69 4.90
Ltr 6.83
m3 0.34
50 Kg 50 Kg 2.42
Kg
1.08
1.88
0.21
1.40
1.08
1.61
0.18
1.51
2.69
2.69
0.15
0.86
0.17
2.15
2.15
0.15
0.86
0.17
1.08
1.34
0.21
0.86
0.43
7 8
1.61 1.08
1.61 1.61
0.21 0.15
0.86 0.15
0.65
Building Schedule of Rates 9 -Ditto cement and sand 1 :2 in floors finishes smooth (10 m2) 1.08 1.88 0.15 1.61
Building Schedule of Rates 19 mm thick rendering in cement 10 and sand 1:2 in floors finished smooth (10 m2) 11 -Ditto in cement and sand 1 :2 in floors finished smooth (10 m2)
1.34
2.42
0.24
1.88
1.34 1.34
2.42 2.42
0.24 0.24
19mm thick rendering in cement 12 and sand 1:2 in cloloured cement floors finished smooth (10 m2) 12.5 x 150 mm skirting in cement and sand 1:3 project or finished 13 with floating including forming grove (3m)
0.37
0.31
0.01
0.10
0.11
I
150x 150 mm Glazed Tiles
ii
iii
(2) Materials iv v vi
300x white 300 mm Colour Cement Terra Pigment Tiles
vii
wax Polish
viii
Cotton waste
ix
No
Spe. SK
SK
Un SK
Cement
Sand
Scaffoldi ng
Nr Glased tiles fixed to walls including bedding in cement mortar 1:2 & pointing in ground floor ( specils mesured separately)10 m2) Terrazzo floor tiles on 12.5 mm thick cement and sand 1:2 in ground floor (10m2)
50 Kg
m3
Kg
Nr
Kg
Kg
Kg
4.30
4.57
473
2.69
0.34
0.49
4.30
3.76
1.34
0.21
113
0.97
0.24
0.97
I
200x 200 mm Pressed Tiles
ii
iii
(2) Materials iv v vi
Wax Polish Cotton waste
vii
viii
ix
No
Pressed Tiles
Spe. SK
SK
Un SK
Cement
Sand
Coloured Pigment
Scaffoldi ng
Kg
50 Kg
m3
Kg
Kg
Kg
Building Schedule of Rates Pressed floor tiles bedded in 12.5 mm cement mortar 1:2 and pointing in neat cement in ground floor (10 m2)
4.30
4.84
254
1.34
0.21
0.12
0.12
0.97
ii
iii
(2) Materials iv v
vi
Sand paper
vii
viii
I
Wire brush
No
Spe. SK
SK
Primer Wood Anti Anti minaral Enamel Un SK Preserva corrosiv corrosiv terpentin Paint tive e e Paint e
Ltr 1 Prepare and apply one coats of preservative (oil type) to structural timber including touching up cut end ect. After fixing (10 m2) Prepare sufaces of steel trusses and apply two coatsof anti corrossive Apply one coat of anti - corrosive primer and two coats of enamal paint to mild steelon already shop primed and erected steel roof truss (10 m2) Prepare and apply two coats primer and finishing coat of enamal paint to mild steel (angle/flat) plates (10m2) Painting steel on new steeel work with 2 coats of anti corrosive paint (10m2) Painting new timber work with two coats of wood preservative. (10 m2) Prepare and painting wood work with primer two coats enamel paint (10m2) 0.81 0.54 2.95
Ltr
Ltr
Ltr
Ltr
Nr
Nr
Nr
Nr 1/10
1.61
1.61
2.42
0.16
1.00
1/8
2.69
1.08
0.22
0.22
1.43
1/5
3% of (I)
1.08
1.61
3.23
0.43
1.43
1.00
2/5
1.61
0.72
1/5
0.54
2.44
1/5
1.61
0.54
0.81
2.69
2.00
1/10
Building Schedule of Rates Prepare and apply one coats of preservative (oil type) to structural timber including touching up cut end ect. After fixing (10 m2) Preparea surfaces of steel truss and apply two coats of anti corrosive primer (10m2)
0.81
0.54
2.95
1/10
1.61
1.61
2.42
0.16
1.00
1/8
Apply one coat of anti - corrosive 10 primer two coats of anti corrosive primer (10 m2) Prepare and apply two caots primer and finishing caots of 11 enamal paint to mild steel ( angle/ flat) (10m2) Painting steel on new timber work 12 with 2 coats of anti corrosive paint (10m2) Painting new timber work with two 13 coats of wood preservative. (10 m2) Preparing and paing wood work 14 with primer two coats enamal paint (10m2)
2.69
1.08
0.22
0.22
1.43
1/5
3% of (I)
1.08
1.61
3.23
0.43
1.43
1.00
2/5
1.61
0.72
1/5
1/5 1/10
I
Boiled lime
ii
iii
Yellow ochre
(2) Materials iv v
vi
vii
viii
ii
No
Spe. SK
SK
Un SK
Salt
Blue
Cement
Scaffoldi ng
50 Kg 1 2 White and coloured watshing two coats in single storey(100m2) -Ditto- in two sotored building (100m2) 2.42 3.23 2.42 3.23 0.54 0.54
Kg 0.97 0.97
Kg 0.24 0.24
g 61.00 61.00
Kg
Nr
Building Schedule of Rates 3 Cement washing to walls of single stored building 2 coats(100m2) 2.15 2.15 0.67 1.00 3% of (I)
ii
iii
(2) Materials iv v
Wax Polish Sand Papers
vi
Flannel cloth
vii
viii
I
Floor brush
ii
No
Spe. SK
SK
Un SK
Primer
Emulsio n Paint
Varnish
75 mm brush
Ltr 1 Prepare & apply one coat of alkali resistant primer and two coats of emulsion paint to walls (10m2) 1.34 0.97
Ltr 1.51
Ltr
Kg
Nr 2.00
Nr
Nr
Nr 1/10 3% of (I)
Painting walls with emulsion paint (2 coats) (10m2) Prepare & apply one coat alkali resistant primer and two coats of emulsion paint to soffit of slab(10m2) Varnish two coats with copal vaenish after sand paapering (10m2) Wax polish to timber in panels & floors(10m2)
0.81
1.51
1/10
3% of (I)
1.88
0.97
1.61
1/10
3% of (I)
0.54
0.54
1.94
1/3
0.40
0.37
7.00
0.50
1/10
ii
50x 25 mm Reeper
iii
Roof Tiles
iv
(2) Materials v vi
vii
viii
Half round clay Tiles
ix
115 m long Ridges
No
Roofing
Spe. SK
SK
Un SK
Timber
Wire Asbesto Roofing nails 2'' s Screws long corrugat Washers ed sheet
Scaffoldi ng
m3
Lm
Nr
Kg
Kg
m2
Nr
Nr
Pair
Building Schedule of Rates Timber frame work for calicut pattern tile hip roof in sigle strore building consisting of wall plate beam ridge plate rafter ect. (preservative treatement to be mesured separately) 60m2
7.53
8.60
1.14
227
3.90
0.97
3% of (I)
Building Schedule of Rates Roof covering with calicut pattern clay tiles in single stored building (Timber frame work & ridge covering mesured separely)(60m2) Timber frame work for corrugated asbestos sheet roof in sigle stored building (60 m2) Roof covering with corrugated asbetose sheets in single stored building (Timber frame work & ridge covering mesured separely)(60m2) One layer half round clay tiles over corrugated asbetos roof covering (10m2) Asbestos close fittings ridging fixed complete with roofing screws or bolts (work) (4m) 0.25
3.23
3.23
807
3% of (I)
2.69
3.23
0.44
3% of (I)
1.00
2.15
41.95
78.00
3% of (I)
2.15
700
3% of (I) 3% of (I)
0.25
16.00
4.00
I
Ridge Tiles
ii
iii
(2) Materials iv v vi
Slaked Colourin lime g Powder 25 mm Planks
vii
38 mm brass screws
viii
ix
No
Roofing
Spe. SK
SK
Un SK
Cement
Sand
Scaffoldi ng
Nr 1 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4 (4m) 19x225 mm high valance board fixed with brass screws to ends of rafters (for tile roofing) (30m) 225 mm high barge board fixed with brass screws at 600mm centres to sides of rafters 0.27 0.27 10.00
50 Kg 0.37
m3 0.06
Kg 7.43
Kg 0.25
m2
Nr
2.95
2.95
7.20
70.00
5% of (I) 5% of (I)
2.95
2.95
7.20
50.00
(2) Materials
No
Roof plumbing
No
Roof plumbing
Spe. SK
SK
Un SK
Slaked lime
Sand
Planks
Scaffoldi ng
m2 B,w,g. (1.2mm) glavanised iron sheet gutter 900mm girth overall once bent end caps not less than 225 mm with 25 mm tongued & grooved plank to slop and profile on timber members. B,w,g. (1.2mm) glavanised iron flashing mm girth overall 3 times bent with end not less than 150 mm lead soldered, and taked up to not less than 150 mm chase cut in wall & pointed in cement tar 1:2 lower end dress over roof ring not less than 300 mm wide (4.5 m).
Ltr
50 Kg 50 Kg
m3
m2
Kg
Kg
1.48
0.25
1.97
5.85
1.12
0.10
0.05
0.03
4.57
0.89
0.49
0.12
0.74
2.93
0.05
0.03
0.45
I
Timber Class I
ii
50 mm wire nails
iii
Fibre/ Plastic Plugs
(2) Materials iv v vi
vii
viii
ix
I
50 mm brush
No
Ceiling
Spe. SK
SK
Un SK
Cement
Sand
Ternap
Scaffoldi ng
m3 Timber frame work for 1.2 x 1.2 m flkat asbestos ceiling (shet mesured separately ) comprising of 100 x 50mm joints and 50 x 50 mm bearers in class 1 timber (20m 2)
Kg
Nr
50 Kg
m3
Ltr
2.75
0.55
1.65
0.25
0.50
29.00
0.25
0.06
1.67
1/4
3% of (I)
ii
iii
(2) Materials iv v vi
vii
viii
ix
No
Ceiling
No
Ceiling
Spe. SK
SK
Un SK
6 mm dout nails
38 mm brass screws
Scaffoldi ng
No
Ceiling
Building Schedule of Rates m2 Horizontal ceiling lining using 1.2 x 1.2 m flat asbestos cement sheets fixed with and including beading and cove mrnlding on timber frame work ( Timber frame work and painting mesured separately ) 20 m2 m m Kg Nr
1.66
2.21
21.54
20.19
42.06
0.13
106
3% of (I)
I
100x 50mm timber joists
ii
iii
iv
(2) Materials v vi
38 mm brass screws 50x6 mm Timber strips
vii
19 mm Nails
viii
ix
No
Ceiling
Spe. SK
SK
Un SK
Sand
Scaffoldi ng
m 19 mm thick tonged & grooved lunmuidella ceiling boards fixed horizontal on 100x50 mm class I timber joists at 600mm centres 38 mm brass nails (20m2)
m2
50 Kg
m3
Kg
Kg
4.42
1.10
7.73
39.15
22.05
0.03
0.13
4.42
3% of (I)
19 x 150 mm wide tonged & grooved lunmuidella ceiling boards fixed to undersides of rafters ( exsisting) with 38 mm brass nails including levlelling with timber strips whrerre necessary. (18 m2)
3.23
6.45
21.97
4.30
13.11
2.15
3% of (I)
I
100x75 mm Timber
ii
Spear stone
iii
Fibre plastic plugs
(2) Materials iv v vi
16 mm 100 mm a.s. long dowels brass 100 mm Screws long 38 mm thick planks
vii
viii
ix
No
Spe. SK
SK
Un SK
Scaffoldi ng
m3
Nr
Nr
Nr
Nr
m2
m2
Nr
Building Schedule of Rates Door single hung 975x2100 mm high overall with frame having 31 mm thick sash and 94x69 mm timber frame (glazing iron mongery & painting measured separately) (2.10 m2) Door glazed & panelled double hung 1200 x2100 mm high overall with frame including 38 mm thickn sash & 94x69mm frame (glazing iron mongery & painting measured separately) (2.60 m2) Plywood door single hung 938x2088mm overall with frame having 31 mm thick sash and 94x69 mm frame ( iron mongery & painting measured separately) (2.02 m2) Door ledged, braced & battened single hung 750x1950 mm overall, with frame having 22 mm tongued & grooved planks and 94x69 mm frame( iron mongery & painting measured separately) (1.51m2) Window, glazed 2100x1200 mm high overall with frame comprising 3 Nr. Openable sashes and 94x69 mm frame and mullions(glasing, iron mongery and painting measured separately) (2.60)
5.00
1.50
0.04
2.00
6.00
6.00
2.00
1.30
0.47
6.00
2.00
0.05
2.00
6.00
6.00
2.00
1.49
0.65
0.75
0.25
0.63
0.05
2.00
6.00
6.00
2.25
0.25
1.25
0.05
2.00
6.00
6.00
2.00
1.95
36.00
6.00
0.50
3.00
0.09
4.00
4.00
0.86
I
3 mm thick glass panes
ii
12x12 mm beading
iii
Brass panel pins
iv
(2) Materials v vi
vii
viii
ix
No
Spe. SK
SK
Un SK
Scaffoldi ng
m3
Nr
Building Schedule of Rates 3 mm clear sheet glass panes exceeding 0.09 but not exceeding 0.38 m2 cut and fixed with timber beadings to doors and windows (consider sash 900x1200 mm high with 75x31 mm style & 4 Nos. glass panes) (0.84m2)
0.50
0.50
0.84
9.14
48.00
I
20 mm pipes
ii
25 mm pipes
iii
32 mm pipes
(2) Materials iv v vi
20 mm clips & nails 25 mm clips & nails 32 mm clips & nails
vii
32 mm sockets
viii
Solvent cement
ix
No
Plumbing (PVC)
Spe. SK
SK
Un SK
m 1 20mm diameter PVC Pipes fixed to walls (specils paid separely) (3 m) 25mm diameter PVC Pipes to walls (Specials paid separely) 32 mm diameter ditto-(30m) 0.13 0.13 3.90
Nr 3.00
Nr
Nr
Nr
Gms 2.00
2 3
0.13 0.5
0.13 0.50
3.90 32.00
3.00 32.00
I
40 mm pipes
ii
40 mm sockets
iii
40 mm clips & nails
iv
(2) Materials v vi
50 mm sockets 50 mm clips & nails
vii
viii
Solvent cement
ix
No
Plumbing (PVC)
Spe. SK
SK
Un SK
50 mm pipes
m 1 40 mm diameter PVC fixed to walls (sepecils paid separely)(30m) 50mm diameter PVC to walls ( sepecils paid separely)(30m) 0.75 0.75 32.00
Nr 8.00
Nr 35.00
Nr
Nr
Gms 48.00
0.75
0.75
32.00
8.00
35.00
64.00
ii
iii
iv
(2) Materials v vi
vii
viii
ix
No
Plumbing (PVC)
No
Plumbing (PVC)
Spe. SK
SK
Un SK
63 mm pipes
63 mm sockets
90 mm pipes
90 mm socket
Solvent cement
m 1 2 63mm diameter PVC to walls ( sepecils paid separely)(30m) 90mm diameter PVC to walls ( sepecils paid separely)(30m) Excavation for laying 20mm to 90 mm diameter PVC pipes in ground not less than 450 mm deep , back filling & compacting (30m) 0.75 1.00 0.75 1.00 32.00
Nr 8.00
Nr 35.00
Nr
Nr
Gms 112
32.00
8.00
35.00
200
2.22
ii
iii
iv
(2) Materials v vi
vii
20 mm special
viii
Solvent cement
ix
No
Plumbing (PVC)
Spe. SK
SK
Un SK
Cement
Sand
50 Kg Chasing bricks work for laying 20mm to 50 mm diameter PVC pipes and making good average depth 50mm (Pipes a& specials mesured separtaely) (30m) Ditto- for laying 50mm to 90 mm diameter PVC pipe sin ground floor & m.G average depth 75 mm ditto. 20mm dia special s elbow/ bends/ sockets (10specils) 0.25
m3
Nr
Gms
2.95
2.95
0.10
0.03
3.45
3.45
0.20
0.08
10.00
20.00
ii
iii
iv
(2) Materials v vi
vii
viii
ix
No
Plumbing (PVC)
No
Plumbing (PVC)
Spe. SK
SK
Un SK
No
Plumbing (PVC)
Building Schedule of Rates Nr Nr Nr Nr Nr Nr Nr Gms 30.00
25mm diameter PVC specils viz elbow/ bends/ sockets (10 nr specils) 32mm diameter - ditto- (10nr specials ) 40mm diameter - ditto- (10nr ) 50mm diameter - ditto- (10nr ) 63mm diameter - ditto- (10nr ) 75mm diameter - ditto- (10nr ) 90mm diameter - ditto- (10nr )
0.25
10.00
2 3 4 5 6 7
ii
iii
(2) Materials iv v vi
vii
viii
ix
90 mm Tee
No
Plumbing (PVC)
Spe. SK
SK
Un SK
Nr 1 2 3 4 20mm diameter PVC specilss viz tee (10nr) 25mm diameter - ditto- (10nr specials ) 32mm diameter - ditto- (10nr specials ) 40mm diameter - ditto- (10nr ) 0.50 0.50 0.50 0.50 10.00
Nr
Nr
Nr
Nr
Nr
Nr
Gms 30.00
Nr
ii
iii
iv
(2) Materials v vi
vii
viii
ix
No
Plumbing (PVC)
No
Plumbing (PVC)
Spe. SK
SK
Un SK
20 mm Tee
25 mm Tee
32 mm Tee
40 mm Tee
50 mm Tee
63 mm Tee
75 mm Tee
Solvent cement
90 mm Tee
Nr 1 2 3 4 50mm diameter - ditto- (10nr ) 63mm diameter - ditto- (10nr ) 75mm diameter - ditto- (10nr ) 90mm diameter - ditto- (10nr ) 1.00 1.00 1.50 1.50
Nr
Nr
Nr
Nr 10.00
Nr
Nr
Gms
Nr
I
100 mm dia G.I pipes
ii
iii
Timber plugs 150x 150x 50
(2) Materials iv v vi
75 mm iron screws
vii
Fire wood
viii
Sundries in Cement & sand
ix
No
Plumbing (PVC)
Spe. SK
SK
Un SK
Yarn
Cement
Lead
Scaffoldi ng
m 100 mm dia G.I . Soil/ vent pipe fixed vertically to walls jointed with cement caulking (special measured separately) (2m) 100 mm dia G.I . pipes fixed vertically to walls jointed with lead caulking (special measured separately) (2m)
50 Kg
m3
Nr
Kg
Kg
50 Kg 5% of (I)
0.25
0.25
2.20
0.16
1.00
2.00
1.00
0.25
0.25
2.20
0.16
1.00
2.00
2.97
0.07
10% of (I)
5% of (I)
ii
iii
1:3:6 (40) concrete
(2) Materials iv v vi
vii
viii
ix
No
(EW
Spe. SK SK Un SK 100 mm Cement EV pipes
Yarn
No
Building Schedule of Rates 100mm diameter glazed eathwarepipes laid on 150mm thick bedding in cement concrete 1:3:6 (40mm ) including excavation average 600mm depth , back filling with selected excavatere materials and concrete haunching to joints(30m)
1.97
14.76
50.00
0.50
2.09
0.89
ii
iii
iv
(2) Materials v vi
vii
viii
RCC cover slab
ix
No
Spe. SK
SK
Un SK
112 mm S.W. 112 mm Cement 100 mm Cement Brick gulley Excavati Brick renderin G.I. concrete work in 100mm on work g (1:2) Grating (1:5)
Scaffoldi ng
Nr 100mm diamerete stone gully with 150 x150 x 150mm gulley box including excavation , 100mm cement concrete 1:2:4 (20mm) base , and 1 :5 extended 150mm above top of guley box including making connection , 12mm cement and sand 1:2 renderign internally and exposed faces finished smoooth with neat cement floating and providing G.I grating on to pof gulley(1nr)
m3
m2
m3
m2
Nr
m2
Nr
0.50
0.50
1.00
0.11
0.51
0.02
0.09
1.00
Building Schedule of Rates Manhole 600 x 600mm internally with invertdepth not exceeding 600mm including excavation, backfilling 150 mm cement concrete 1:2:4 (20mm) base with 9 mm dia mild steel rods at 100 mm centres both ways, forming channels & benching in similar concrete, 112 mm walls in brick in cement 1:5, 12 mm thick cement & sand 1:2 rendering internally and exposed surfaces including channels, benching & 50 mm thick RCC removable cover slab 675x675mm in-let & out-let connection all complete to working order(1Nr)
1.50
2.50
0.99
0.20
8.64
10.18
1.00
ii
20 mm tap
iii
Waste plug & chain
iv
(2) Materials v vi
38 mm brass screws
vii
viii
ix
No
Sanitary Fittings
Spe. SK
SK
Wooden plug
Cement
Nr 550x400 mm glased fireclay wash basin with 20 mm diameter chromium plated pillar tap, waste plug , chromium plated waste chain and stay, including fixing wash basing on brackets.(water supply and waste water connection measured separately) (1Nr)
Nr
Nr
Nr
Nr
Kg
0.50
1.00
1.00
1.00
1.00
4.00
6.00
0.91
ii
iii
(2) Materials iv v vi
vii
viii
ix
No
Sanitary Fittings
No
Sanitary Fittings
Spe. SK
SK
20 mm stop cock
Sand
Nr
Nr
Kg
Nr
Nr
Nr
Nr
m3
Sink 600x375x175 mm overall vitreous china with rubber plug and chromium plate and chain waste carried on iron brackets painted & fixed to walls.( water supply and waste water connection measured separately)(Nr)
0.50
0.50
1.00
2.00
0.91
2.00
8.00
ii
iii
(2) Materials iv v vi
Low 38 mm level brass suite screws complet e
vii
20 mm stop cock
viii
ix
No
Sanitary Fittings
Spe. SK
SK
Un SK
Sand
Nr Closet pedestal type with L/L flushing system, flush pipe double plastic seat cover, 20 mm dia stop cock, trap supplied & fixed complete to working order(1Nr)
Kg
Nr
Nr
Nr
Nr
m3
1.00
0.25
1.00
0.91
2.00
1.00
1.00
0.01
ii
iii
(2) Materials iv v vi
vii
viii
ix
No
Sanitary Fittings
Spe. SK
SK
Un SK
9 ltr G.I. Cistern with 40 mm Squattin flush g pan pipe with trap chain & over flow pipe
Clip
Wooden plug
38 mm brass screws
20 mm stop cock
Cement
Metal
Sand
Nr
Nr
Nr
Nr
Nr
Nr
Kg
m3
m3
Building Schedule of Rates Closet squatting type with trap including high level cistern fixed complete with flush pipe and 20 mm dia stop cock, all complete with working order
1.00
0.50
1.00
1.00
1.00
1.00
5.00
12.00
1.00
0.25
0.02
0.01
ii
Urinals bowls
iii
9 Ltr Cistern
iv
vii
38 mm brass screws
viii
ix
No
Sanitary Fittings
Spe. SK
SK
Un SK
Bidet
Rawl plug
Spreade r
Cement
Sand
Nr 1 Vitreous china bidet suite fixed complete to working order 4 No. Bowl type urinal with trap and 9 Litre capacity automatic flushing cistern and spreaders complete to working orders. (4Nr) 1.00 1.00 1
Nr
Nr
Nr
Nr
Nr
Kg
m3
1.00
0.25
1.00
4.00
1.00
8.00
1.00
4.00
4.00
1.81
0.01
Etc.
iv
Tools Etc.
0.04
0.04
0.04
0.07
0.04
0.04
Etc.
iv
Tools Etc.
0.04
0.02
Etc.
iv Tools Etc
0.03
0.05
0.05 0.05
0.03
0.03
0.03
Etc.
iv
Tools Etc
0.05
0.05 0.05
0.05
0.05 0.05
0.05
Etc.
iv
Tools Etc
0.05
Etc.
iv
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
Etc.
iv
Tools Etc
0.03
0.05
Etc.
iv
Tools Etc
0.30
0.03
Etc.
iv
Tools Etc
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
Etc.
iv
Tools Etc
0.03
0.03
Etc.
iv
Tools Etc
0.03
v
Tools Etc
v
Tools Etc
v
Tools Etc
Etc.
iv
Tools Etc
Etc.
iv
Tools Etc
0.03
0.03
0.03
Etc.
iv
Tools Etc
0.03
0.03
Etc.
iv
Tools Etc
0.03
Etc.
iv
Tools Etc
0.03
Etc.
iv
Tools Etc
0.03
0.03
Etc.
iv
Tools Etc
0.03
0.03
0.03
0.03
0.03
Etc.
iv
Tools Etc
0.03
Etc.
iv
Tools Etc
0.03
0.03 0.03
Etc.
iv
Tools Etc
0.03
0.03
Etc.
iv
Tools Etc
0.03 0.03
0.03
Etc.
iv
Tools Etc
0.03
0.03
0.03
Etc.
iv
Tools Etc
0.03
Etc.
iv
Tools Etc
Etc.
iv
Tools Etc
Etc.
iv
Tools Etc
0.03
0.03
Etc.
iv
Tools Etc
0.03
Etc.
iv
Tools Etc
0.03
0.03
Etc.
iv
Tools Etc
0.03
Etc.
iv
Tools Etc
0.03
Etc.
iv
Tools Etc
0.03
Etc.
iv
Tools Etc
0.03
Etc.
iv
Tools Etc
0.03
0.03
Prices
I Excavation & Earth work Labour (days) ii iii
SK Un SK
Materials I
Blast powder
ii
Fuse
iii
Jump steel
iv
Earth
Spe. SK
Price Rs.
Kg 12.00
Lm 18.00
Kg 55.00
m3 300.00 Materials
I
Cement
ii
Sand
iii
40 Metal
iv
25 Metal
Concrete Work
Spe. SK
SK
Un SK
Price Rs.
50 Kg 700.00
m3 7400.00
m3 3000.00
m3 3200.00 Materials
I
25 Tk Planks
ii
100x50 Timber
iii m3 30000.00
iv m3 2650.00 Materials
Form work
Spe. SK
SK
Un SK
Price Rs.
50 Kg 665.00
m3 55000.00
i Reinforcement
i
M.S for Steel
ii
Binding wire
iii
Spacers or Chairs
iv
Spe. SK
Price Rs.
50 Kg 5150.00
Kg 170.00
Kg 65.00 Materials
I Brick Work
Spe. SK
iii
Un SK
I
Brick
ii
Sand
iii
Cement
iv
Wirecut Bricks
Price Rs.
1000.00 2000.00
m3 7400.00
50 Kg 700.00
I
Blocks 400x 200x 200 mm
ii
Sand
iii
Cement
iv
Blocks 400x 200x 100 mm
Spe. SK
Price Rs.
1000.00
18500.00
m3 7400.00
50 Kg 700.00
1000.00
14500.00
Materials I
50x20 Rubble
ii
Sand
iii
Cement
iv
Spe. SK
Price Rs.
m3 600.00
m3 7400.00
50 Kg 700.00
I Plstering
Materials I
Fire Wood
ii
Bitumen
iii
Sand
iv
Cement
Spe. SK
Price Rs.
Kg 15.00
Ltr 60.00
m3 7400.00
50 Kg 700.00 Materials
I
150x 150 mm Glazed Tiles
ii
Cement
iii
Sand
iv
white Cement
Spe. SK
Price Rs.
Nr 15.00
50 Kg 700.00
m3 7400.00
Kg 20.00 Materials
I
200x 200 mm Pressed Tiles
ii
Cement
iii
Sand
iv
Wax Polish
Pressed Tiles
Spe. SK
SK
Un SK
Price Rs.
Kg 30.00
50 Kg 700.00
m3 7400.00
Kg 200.00 Materials
ii
iii
Primer minaral terpentine
iv
Enamel Paint
Spe. SK
Price Rs.
Ltr 80.00
Ltr 250.00
Ltr 55.00
xi
Salt
xii
Yellow ochre
xiii
Blue
xiv
Cement
xv
Wax Polish
Boiled lime
Price Rs.
50 Kg 400.00
Kg 10.00
Kg 65.00
g 20.00
Kg 700.00
Kg 200.00
45.00 Materials
xxii
150 mm brush
Price Rs.
ii
50x 25 mm Reeper
iii
Roof Tiles
iv
Wire nails 6'' long
Roofing
Spe. SK
SK
Un SK
Roofing Day Day Day 1200.00 900.00 600.00 m3 60000.00 Lm 60.00 Nr 18.00 Kg 400.00 Materials xvi
38 mm brass screws
Price Rs.
xi
Cement
xii
Sand
xiii
Slaked lime
xiv
Colouring Powder
xv
25 mm Planks
Roofing
Ridge Tiles
Price Rs.
Nr 35.00
50 Kg m3 700.00 7400.00
Kg 250.00
Kg 150.00
m2 1200.00
Nr 3.00 Materials
I Roof plumbing
I
G.I Sheets
ii
Wood Preservative
iii
Cement
iv
Slaked lime
Spe. SK
Price Rs.
m2 875.00
Ltr 80.00
50 Kg 700.00
50 Kg 250.00 Materials
I
Timber Class I
ii
50 mm wire nails
iii
Fibre/ Plastic Plugs
iv
Cement
Ceiling
Spe. SK
SK
Un SK
Price Rs.
m3 60000.00
Kg 400.00
Nr 60.00
xi
38x12 mm Halmilla beading
xii
xiii
xiv
xv
Ceiling
Price Rs.
m 250.00
m Kg 60.00 400.00
Nr 3.00
Kg 400.00
m 15.00
Nr 80.00 Materials
I
100x75 mm Timber
ii
Spear stone
iii
iv
Price Rs.
m3 60000.00
Nr 250.00
Nr 60.00
Nr 4.50 Materials
xi
Price Rs.
m 60.00
Nr 80.00
Price Rs.
xi
40 mm sockets
xii
40 mm clips & nails
xiii
50 mm pipes
xiv
50 mm sockets
xv
50 mm clips & nails
Plumbing (PVC)
40 mm pipes
Price Rs.
m 40.00
Nr 30.00
Nr 6.00
m 45.00
Nr 40.00
Nr 6.00
xxii
xxiii
20 mm special
xxiv
25 mm specials
xxv
32 mm specials
xxvi
40 mm specials
xxvii
50 mm specials
Plumbing (PVC)
Price Rs.
Sand
m3 7400.00
Nr 25.00
Nr 25.00
Nr 25.00
Nr 25.00
Nr 25.00
Nr 25.00 Materials xL
Yarn
xxxiv
xxxv
50 mm Tee
xxxvi
63 mm Tee
xxxvii
75 mm Tee
xxxviii
90 mm Tee
xxxix
100 mm dia G.I pipes
Plumbing (PVC)
40 mm Tee
Price Rs.
Nr 25.00
Nr 25.00
Nr 25.00
Nr 25.00
Nr 25.00
m 250.00
I
100 mm EV pipes
ii
Cement
iii
1:3:6 (40) concrete
iv
Yarn
Day Day Day 1200.00 900.00 600.00 (1) Labour (days) I ii iii
Nr 100.00
50 Kg 700.00
m3 3800.00
I
S.W. gulley 100mm
ii
Excavation
iii
112 mm Brick work
iv
Cement concrete
Spe. SK
SK
Un SK
Price Rs.
Day Day Day 1200.00 900.00 600.00 (1) Labour (days) I ii iii
Nr 500.00
m3 200.00
m2 700.00
m3 5000.00 Materials
I
Wash basin with brackets
ii
20 mm tap
iii
iv
Sanitary Fittings
Spe. SK
SK
Un SK
Price Rs.
Nr 9000.00
Nr 115.00
Nr 50.00
Nr 15.00
xi
xii
50mm thick tapered wooden blocks
xiii
xiv
Low level suite complete
xv
Materials xvi
Sanitary Fittings
20 mm stop cock
Metal
Price Rs.
Nr Nr 3500 350.00
Nr 85.00
Nr 1500.00
Nr 650.00
m3 3200.00 Materials
xxii
xxiii
Sanitary Fittings
Price Rs.
Nr 2.00 3500.00
Materials v
vi
vii
D.D.T. powder
viii
500 gauge polythene
ix
Tape
Nr 75.00 Materials v
20 Metal
m3 350.00
Kg 40.00
m2 25.00
m 45.00
vi
Jute Hessian
vii
Mixed concrete
viii
ix
m3 3500.00 Materials v
Wedges Etc
m2 60.00
m3 6500.00
vi
Mould Oil
vii
16 dia 50 long Bolts
viii
Wire Nails
ix
m3 4500.00 Materials v
45.00
Nr 55.00
Kg 150.00
vi
vii
viii
ix
Materials v
Acids
vi
Slacked lime
vii
viii
ix
50 Kg 250.00
vi
vii
viii
ix
Materials v
vi
vii
viii
ix
Materials v
Slacked lime
vi
Powder Pigment
vii
viii
ix
50 Kg 250.00 Materials v
300x 300 mm Terra Tiles
Kg 200.00
vi
Colour Pigment
vii
wax Polish
viii
Cotton waste
ix
Nr 35.00 Materials v
Coloured Pigment
Kg 350.00
Kg 200.00
Kg 50.00
vi
Cotton waste
vii
viii
ix
Kg 350.00 Materials v
wire brush
Kg 50.00
vi
Sand paper
vii
Primer
viii
Emulsion Paint
ix
Varnish
Nr 15.00
Ltr 160.00
Ltr 350.00
Ltr 400.00
xviii
xix
xx
xxi
Floor brush
Nr 80.00 120.00
Nr 100.00 150.00
Materials v
Wire nails 2'' long
vi
Asbestos corrugated sheet
vii
Roofing Screws Washers
viii
Half round clay Tiles
ix
115 m long Ridges
Kg 400.00 Materials
m2 300.00
Nr 15.00
Nr 4.00
Pair 25000.00
Materials v
Sand
vi
Planks
vii
38 mm wire nails
viii
Soldering lead
ix
m3 7400.00 Materials v
Sand
m2 900.00
Kg 400.00
Kg 1200.00
vi
Ternap
vii
100x 50mm timber joists
viii
ix
m3 7400.00 Materials
Ltr 85.00
m 200.00
m2 900.00
m2 350.00
Materials v
16 mm a.s. dowels 100 mm long
vi
38 mm thick planks
vii
25 mm thick planks
viii
2025x 825 mm plywood sash
ix
3 mm thick glass panes
Nr 175.00 Materials
m2 1400.00
m2 1500.00
Nr 2100.00
m2 700.00
Materials v
25 mm clips & nails
vi
32 mm clips & nails
vii
32 mm sockets
viii
Solvent cement
ix
Cement
Nr 6.00
Nr 25.00
Gms 150.00
50 Kg 700.00
xviii
63 mm clips & nails
xix
xx
xxi
90 mm clips & nails
90 mm pipes 90 mm socket
Nr 10.00
m 85.00
Nr 65.00
Nr 15.00
xxx
90 mm specials
xxxi
20 mm Tee
xxxii
25 mm Tee
xxxiii
32 mm Tee
Nr 25.00
Nr 25.00
Nr 25.00
Nr 25.00
xLii
75 mm iron screws
xLiii
Lead
xLiv
Fire wood
xLv
Nr 5.00
Kg 150.00
50 Kg 15.00
vi
vii
viii
ix
(2) Materials v
Cement rendering (1:2)
vi
vii
viii
RCC cover slab
ix
m2 120.00 Materials v
38 mm brass screws
Nr 250.00
m2 700.00
Nr 200.00
vi
Cement
vii
Sand
viii
Squatting pan with trap
ix
Clip
Nr 3.00
Kg 14.00
m3 7400.00
Nr 4500.00
Nr 10.00
Materials xvii
9 ltr G.I. Cistern with 40 mm flush pipe chain & over flow pipe
xviii
xix
xx
xxi
Bidet
Nr 8500.00
Nr 1500.00
Basic Cost
No
Material Cost
Plant cost
1 2 3 4 5 6 7 8 9
Remove top soil, 150mm deposit within site (100m2) Excavate over site, deposit spread out level. (3m3) Excavate for trench / pit in loose / soft soil, deposit spread out level. (3m3) Ditto - in ordinary soil. (3m3) Ditto - in land / dense soil. (3m3) Ditto - in mud / wet soil. (3m3) Ditto - in soft, disintegrated rock (not requiring blasting). (3m3) Ditto - in rock requiring blasting. (3m3)
6600.00 1050.00 660.00 1440.00 2250.00 1920.00 1650.00 2640.00 2880.00 660.00 840.00 1320.00 1320.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.60 0.00 0.00 281.25 0.00 1125.00
264.00 42.00 26.40 57.60 90.00 76.80 115.50 122.92 835.20 26.40 33.60 52.80 52.80
Benching in rock, but blasting prohibited (1m2) Backfill and compact in trench / pit with 10 selected excavated earth. (m3) 11 Ditto - with imported earth. (3m3) Fill under floors watering, compacting 12 and leveling, in 75 mm layers with selected excavated earth. (3m3) 13 Ditto - with imported earth. (3m3)
No
Material Cost
Plant cost
Cutting turf sods, loading to and 1 unloading from, laying and watering for 30 days(10 m2) Anti termite treatement to excavated 2 foundated trenches and filling. (10m2)
3000.00 300.00
19987.50 292.00
1200.00 12.00
Polythene type 500 damp proof 3 membrane on compacted fill, with 60 mm wide sealingtape. (10m2)
210.00
1425.00
4.20
No
Concrete Work
Material Cost
Plant cost
1 2 3 4 5 6
Mixing 1:3:6 (40) concrete (3m3) Grade 15 Mixing 1:2:4 (25) concrete (3m3) Grade 20 Mixing 1:2:4 (20) concrete (3m3) Grade Mixing 1:1 1/2 :3 (20) concrete (3m3) Grade Mixing 1:1:2 (20) concrete (3m3) Grade 30 Placing - 50 mm screeds under foundation depth not exceeding 1.5m (10m2)
4830.00 4830.00 4830.00 4830.00 4830.00 412.50 562.50 1200.00 4800.00 5430.00 5430.00
29900.00 21960.00 20375.00 18370.00 19770.00 3380.00 5200.00 9750.00 10086.00 10086.00 10893.00 .
1787.10 1787.10 1787.10 1787.10 1787.10 20.63 28.13 60.00 394.00 412.90 412.90
7 Placing - 75 mm ditto 8 9 10 Placing 150mm thick mass concrete ground floor slab (10m2) Placing 225x225 R.C.C. colomn on ground floor including curing. (1.25m3)
Placing 225x225 R.C.C. beam at first floor r including curing. (1.25m3) Placing 125 mm thick R.C.C. floor slab 11 at first floor levelfloor including curing. (1.50m3)
No
Form work
Material Cost
Plant cost
Form work to floor 225x225 colomn in 1 ground floor (140m2 contact area) Making mould per use (4 Nos) 2 Assembling - per use 3 Dismantling, cleaning and repainting per use
Form work to under side of the first floor slab (20m2 contact area) 4 Making panels (4 uses, including 20% repair cost) 5 Assembling per use 6 Dismantle and cleaning per use Form work to beams in ground floor 7 (5m2 contact area) Making the mould per use.(4uses) 8 Assembling 9 Dismantling and cleaning
1500.00
554530.50
75.00
No
Reinforcement
Material Cost
Plant cost
Mild steel / Tor steel reinforcement to lintols slab beams or columns bent to shape laid in position & tied with G.I. Wires (50Kg)
1800.00
6012.04
90.00
No
Brick work
Material Cost
Plant cost
1 2 3 4 5 6 7 8
Brick work in 1:5 cement sand mtr in foundation.(3m3) -Ditto- in 1:8 cement , sand mortar in foundation.(3m3) -Ditto- in 1:5 cement , sand mortar in 112.5 mm thick walls in ground floor (10m2) -Ditto- 225 mm thick walls in ground floor (10m2) -Ditto- 337.5 mm thick walls in ground floor (10m2) -Ditto- in 1:8 cement and sand mortar in ground floor (10m2) Brick work (wire cut) in cement and sand mortar in 112 5 mm the walls in ground floor (10m2) -Ditto- 225 mm thick walls in ground floor (10m2)
9 10 11
12
13
14
-Ditto- 337.5 mm thick walls in ground floor (10m2) Extra over for facing including raised 3 mm thick in cement and sand 1:1 texture in ground floor (10m2) 175mm the floor paved in lime mortar 2:5 in ground floor (10m2) Steps 338 x 150 mm in brick in cement and sand 1:5 12.5 mm thick cement and sand 1 :2 rendering adusive necessary errors (3 m) Brick drains in cement and sand 1:5 225 mm wide 150-225 mm average depth including cement rendering 12.5 mm thick 1:2 to exposed faces with 450 mm ramp including necessary errors. (3 m) -Ditto- with out ramp (3 m )
750.00
1626.00
1905.00
1883.00
1680.00
1605.00
No
Material Cost
Plant cost
200 mm thick hollow block work (400 x 200 x 200 ) in cement and sand mortar 1:5 in ground floor (caubes unfilled )(10m2) 100 mm thick -ditto- (400 x 200 x 100 mm )
3063.00
4304.00
2262.00
2852.00
No
Material Cost
Plant cost
1 2
Random rubble masonry in cement , sand mortar 1:5 in below FFL (350mm thick) (3m3) -Ditto in super structure(3m3)
6354.00 7308.00
12710.00 12710.00
No
Plstering
Material Cost
Plant cost
2 3 4 5 6 7 8 9 10 11 12
19mm thick DPC in cement and sand 1:2 finished with 2 coats of hot bitumen blinded with sand (10m2) 16mm thick plasering to walls in lime and sand 2:5 including floating with lime putty (10 m2) -Ditto- cement and sand 1 :3 including cement floating (10 m2) 10mm thick plastering to sofft of slab cement and sand 1:3 including flating with lime putty (10m2) Ditto- to sides & soffit of beams (10m2) 16 mm thick walls in lime cement and sand 1:1:5 finished semirough with wooden float. (10m2) -Ditto- finish smooth with lime putty(10m2) 12mm thick rendering in cemnt and sand 1 : 3 finish smooth -Ditto cement and sand 1 :2 in floors finishes smooth (10 m2) 19 mm thick rendering in cement and sand 1:2 in floors finished smooth (10 m2) -Ditto in cement and sand 1 :2 in floors finished smooth (10 m2) 19mm thick rendering in cement and sand 1:2 in cloloured cement floors finished smooth (10 m2) 12.5 x 150 mm skirting in cement and sand 1:3 project or finished with floating including forming grove (3m)
2820.00
4693.30
84.60
2100.00 1938.00 4035.00 3225.00 1776.00 2415.00 1938.00 2100.00 2658.00 2658.00 2658.00
1904.00 2389.00 1754.50 1754.50 2263.50 2318.50 1215.00 2237.00 3092.00 3470.00 3949.00
63.00 58.14 121.05 96.75 53.28 72.45 58.14 63.00 79.74 79.74 79.74
13
519.00
166.00
15.57
No
Material Cost
Plant cost
Glased tiles fixed to walls including bedding in cement mortar 1:2 & pointing in ground floor ( specils mesured separately)10 m2) Terrazzo floor tiles on 12.5 mm thick cement and sand 1:2 in ground floor (10m2)
7902.00
11503.80
237.06
7416.00
6883.00
222.48
No
Pressed Tiles
Material Cost
Plant cost
No
Pressed Tiles
Material Cost
Plant cost
Pressed floor tiles bedded in 12.5 mm cement mortar 1:2 and pointing in neat cement in ground floor (10 m2)
8064.00
10226.50
241.92
No
Material Cost
Plant cost
Prepare and apply one coats of preservative (oil type) to structural timber including touching up cut end ect. After fixing (10 m2) Prepare sufaces of steel trusses and apply two coatsof anti - corrossive Apply one coat of anti - corrosive primer and two coats of enamal paint to mild steelon already shop primed and erected steel roof truss (10 m2) Prepare and apply two coats primer and finishing coat of enamal paint to mild steel (angle/flat) plates (10m2) Painting steel on new steeel work with 2 coats of anti corrosive paint (10m2) Painting new timber work with two coats of wood preservative. (10 m2)
1296.00
236.00
12.00
2898.00
788.80
10.00
3876.00
378.84
16.00
2262.00
1317.89
32.00
1932.00
180.00
16.00
6 7
648.00 2256.00
195.20 660.97
16.00 8.00
Prepare and painting wood work with primer two coats enamel paint (10m2) Prepare and apply one coats of preservative (oil type) to structural 8 timber including touching up cut end ect. After fixing (10 m2) Preparea surfaces of steel truss and 9 apply two coats of anti - corrosive primer (10m2) Apply one coat of anti - corrosive primer 10 two coats of anti corrosive primer (10 m2) Prepare and apply two caots primer and 11 finishing caots of enamal paint to mild steel ( angle/ flat) (10m2)
1296.00
236.00
8.00
2898.00
788.80
10.00
3876.00
378.84
16.00
2262.00
1317.89
32.00
12
Painting steel on new timber work with 2 coats of anti corrosive paint (10m2) Painting new timber work with two coats of wood preservative. (10 m2) Preparing and paing wood work with primer two coats enamal paint (10m2)
1932.00
180.00
16.00
13 14
648.00 2256.00
195.20 660.97
16.00 8.00
No
Material Cost
Plant cost
1 2 3
White and coloured watshing two coats in single storey(100m2) -Ditto- in two sotored building (100m2) Cement washing to walls of single stored building 2 coats(100m2)
No
Material Cost
Plant cost
1 2 3 4 5
Prepare & apply one coat of alkali resistant primer and two coats of emulsion paint to walls (10m2) Painting walls with emulsion paint (2 coats) (10m2) Prepare & apply one coat alkali resistant primer and two coats of emulsion paint to soffit of slab(10m2) Varnish two coats with copal vaenish after sand paapering (10m2) Wax polish to timber in panels & floors(10m2)
No
Roofing
Material Cost
Plant cost
Timber frame work for calicut pattern tile hip roof in sigle strore building consisting of wall plate beam ridge plate rafter ect. (preservative treatement to be mesured separately) 60m2
14196.00
70575.00
Roof covering with calicut pattern clay tiles in single stored building (Timber frame work & ridge covering mesured separely)(60m2) Timber frame work for corrugated asbestos sheet roof in sigle stored building (60 m2) Roof covering with corrugated asbetose sheets in single stored building (Timber frame work & ridge covering mesured separely)(60m2) One layer half round clay tiles over corrugated asbetos roof covering (10m2) Asbestos close fittings ridging fixed complete with roofing screws or bolts (work) (4m)
5814.00
807.00
5166.00
26400.00
2490.00
13755.00
1290.00
2800.00
450.00
100240.00
No
Roofing
Material Cost
Plant cost
Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4 (4m) 19x225 mm high valance board fixed with brass screws to ends of rafters (for tile roofing) (30m) 225 mm high barge board fixed with brass screws at 600mm centres to sides of rafters
486.00
2948.00
14.58
5310.00
8850.00
159.30
5310.00
8790.00
159.30
No
Roof plumbing
Material Cost
Plant cost
B,w,g. (1.2mm) glavanised iron sheet gutter 900mm girth overall once bent end caps not less than 225 mm with 25 mm tongued & grooved plank to slop and profile on timber members. B,w,g. (1.2mm) glavanised iron flashing mm girth overall 3 times bent with end not less than 150 mm lead soldered, and taked up to not less than 150 mm chase cut in wall & pointed in cement tar 1:2 lower end dress over roof ring not less than 300 mm wide (4.5 m).
3183.00
9981.85
95.49
1140.00
3360.75
34.20
No
Ceiling
Material Cost
Plant cost
Timber frame work for 1.2 x 1.2 m flkat asbestos ceiling (shet mesured separately ) comprising of 100 x 50mm joints and 50 x 50 mm bearers in class 1 timber (20m 2)
4785.00
17700.95
163.55
No
Ceiling
Material Cost
Plant cost
Horizontal ceiling lining using 1.2 x 1.2 m flat asbestos cement sheets fixed with and including beading and cove mrnlding on timber frame work ( Timber frame work and painting mesured separately ) 20 m2
3318.00
15480.10
99.54
No
Ceiling
Material Cost
Plant cost
19 mm thick tonged & grooved lunmuidella ceiling boards fixed horizontal on 100x50 mm class I timber joists at 600mm centres 38 mm brass nails (20m2) 19 x 150 mm wide tonged & grooved lunmuidella ceiling boards fixed to undersides of rafters ( exsisting) with 38 mm brass nails including levlelling with timber strips whrerre necessary. (18 m2)
9943.10
28671.26
298.29
7746.00
1091.52
232.38
No
Material Cost
Plant cost
No
Material Cost
Plant cost
Door single hung 975x2100 mm high overall with frame having 31 mm thick sash and 94x69 mm timber frame (glazing iron mongery & painting measured separately) (2.10 m2) Door glazed & panelled double hung 1200 x2100 mm high overall with frame including 38 mm thickn sash & 94x69mm frame (glazing iron mongery & painting measured separately) (2.60 m2) Plywood door single hung 938x2088mm overall with frame having 31 mm thick sash and 94x69 mm frame ( iron mongery & painting measured separately) (2.02 m2) Door ledged, braced & battened single hung 750x1950 mm overall, with frame having 22 mm tongued & grooved planks and 94x69 mm frame( iron mongery & painting measured separately) (1.51m2) Window, glazed 2100x1200 mm high overall with frame comprising 3 Nr. Openable sashes and 94x69 mm frame and mullions(glasing, iron mongery and painting measured separately) (2.60)
6900.00
6162.00
207.00
8400.00
7298.00
252.00
1503.00
3887.00
45.09
3675.00
60967.00
110.25
9450.00
6948.00
283.50
No
Material Cost
Plant cost
3 mm clear sheet glass panes exceeding 0.09 but not exceeding 0.38 m2 cut and fixed with timber beadings to doors and windows (consider sash 900x1200 mm high with 75x31 mm style & 4 Nos. glass panes) (0.84m2)
900.00
4976.40
27.00
No
Plumbing (PVC)
Material Cost
Plant cost
No
Plumbing (PVC)
Material Cost
Plant cost
1 2 3
20mm diameter PVC Pipes fixed to walls (specils paid separely) (3 m) 25mm diameter PVC Pipes to walls (Specials paid separely) 32 mm diameter ditto-(30m)
No
Plumbing (PVC)
Material Cost
Plant cost
1 2
40 mm diameter PVC fixed to walls (sepecils paid separely)(30m) 50mm diameter PVC to walls ( sepecils paid separely)(30m)
1350.00 1350.00
8930.00 11570.00
40.50 40.50
No
Plumbing (PVC)
Material Cost
Plant cost
1 2
63mm diameter PVC to walls ( sepecils paid separely)(30m) 90mm diameter PVC to walls ( sepecils paid separely)(30m) Excavation for laying 20mm to 90 mm diameter PVC pipes in ground not less than 450 mm deep , back filling & compacting (30m)
1350.00 1800.00
19990.00 33765.00
40.50 54.00
1332.00
39.96
No
Plumbing (PVC)
Material Cost
Plant cost
Chasing bricks work for laying 20mm to 50 mm diameter PVC pipes and making good average depth 50mm (Pipes a& specials mesured separtaely) (30m) Ditto- for laying 50mm to 90 mm diameter PVC pipe sin ground floor & m.G average depth 75 mm ditto. 20mm dia special s elbow/ bends/ sockets (10specils)
4425.00
922.10
132.75
2 3
5175.00 300.00
732.00 3250.00
155.25 9.00
No
Plumbing (PVC)
Material Cost
Plant cost
No
Plumbing (PVC)
Material Cost
Plant cost
1 2 3 4 5 6 7
25mm diameter PVC specils viz elbow/ bends/ sockets (10 nr specils) 32mm diameter - ditto- (10nr - specials ) 40mm diameter - ditto- (10nr ) 50mm diameter - ditto- (10nr ) 63mm diameter - ditto- (10nr ) 75mm diameter - ditto- (10nr ) 90mm diameter - ditto- (10nr )
No
Plumbing (PVC)
Material Cost
Plant cost
1 2 3 4
20mm diameter PVC specilss viz tee (10nr) 25mm diameter - ditto- (10nr - specials ) 32mm diameter - ditto- (10nr - specials ) 40mm diameter - ditto- (10nr )
No
Plumbing (PVC)
Material Cost
Plant cost
1 2 3 4
50mm diameter - ditto- (10nr ) 63mm diameter - ditto- (10nr ) 75mm diameter - ditto- (10nr ) 90mm diameter - ditto- (10nr )
No
Plumbing (PVC)
Material Cost
Plant cost
100 mm dia G.I . Soil/ vent pipe fixed vertically to walls jointed with cement caulking (special measured separately) (2m) 100 mm dia G.I . pipes fixed vertically to walls jointed with lead caulking (special measured separately) (2m)
450.00
1294.20
13.50
450.00
1085.75
13.50
No
(EW
Material Cost
Plant cost
100mm diameter glazed eathwarepipes laid on 150mm thick bedding in cement concrete 1:3:6 (40mm ) including excavation average 600mm depth , back filling with selected excavatere materials and concrete haunching to joints(30m)
11220.00
13398.80
336.60
No
Material Cost
Plant cost
100mm diamerete stone gully with 150 x150 x 150mm gulley box including excavation , 100mm cement concrete 1:2:4 (20mm) base , and 1 :5 extended 150mm above top of guley box including making connection , 12mm cement and sand 1:2 renderign internally and exposed faces finished smoooth with neat cement floating and providing G.I grating on to pof gulley(1nr)
750.00
1239.80
22.50
Manhole 600 x 600mm internally with invertdepth not exceeding 600mm including excavation, backfilling 150 mm cement concrete 1:2:4 (20mm) base with 9 mm dia mild steel rods at 100 mm centres both ways, forming channels & benching in similar concrete, 112 mm walls in brick in cement 1:5, 12 mm thick cement & sand 1:2 rendering internally and exposed surfaces including channels, benching & 50 mm thick RCC removable cover slab 675x675mm in-let & out-let connection all complete to working order(1Nr)
2850.00
9560.80
85.50
No
Sanitary Fittings
Material Cost
Plant cost
550x400 mm glased fireclay wash basin with 20 mm diameter chromium plated pillar tap, waste plug , chromium plated waste chain and stay, including fixing wash basing on brackets.(water supply and waste water connection measured separately) (1Nr)
1050.00
9255.74
31.50
No
Sanitary Fittings
Material Cost
Plant cost
Sink 600x375x175 mm overall vitreous china with rubber plug and chromium plate and chain waste carried on iron brackets painted & fixed to walls.( water supply and waste water connection measured separately)(Nr)
750.00
4406.74
22.50
No
Sanitary Fittings
Material Cost
Plant cost
No
Sanitary Fittings
Material Cost
Plant cost
Closet pedestal type with L/L flushing system, flush pipe double plastic seat cover, 20 mm dia stop cock, trap supplied & fixed complete to working order(1Nr)
2025.00
2242.74
60.75
No
Sanitary Fittings
Material Cost
Plant cost
Closet squatting type with trap including high level cistern fixed complete with flush pipe and 20 mm dia stop cock, all complete with working order
2250.00
11912.50
67.50
No
Sanitary Fittings
Plant cost
Vitreous china bidet suite fixed complete to working order 4 No. Bowl type urinal with trap and 9 Litre capacity automatic flushing cistern and spreaders complete to working orders. (4Nr)
1800.00
15000.00
54.00
2025.00
39187.34
60.75
Cost
Basic Cost
O/ H
Profit
Selling Price
0.10 6864.00 1092.00 686.40 1497.60 2340.00 1996.80 1765.50 2849.52 3715.20 686.40 1154.85 1372.80 2497.80 686.40 109.20 68.64 149.76 234.00 199.68 176.55 284.95 371.52 68.64 115.49 137.28 249.78
0.12 823.68 131.04 82.37 179.71 280.80 239.62 211.86 341.94 445.82 82.37 138.58 164.74 299.74 8374.08 1332.24 837.41 1827.07 2854.80 2436.10 2153.91 3476.41 4532.54 837.41 1408.92 1674.82 3047.32
Basic Cost
O/ H
Profit
Selling Price
1639.20
163.92
196.70
1999.82
Basic Cost
O/ H
Profit
Selling Price
0.10 36517.10 28577.10 26992.10 24987.10 26387.10 3813.13 5790.63 11010.00 15280.00 15928.90 16735.90 3651.71 2857.71 2699.21 2498.71 2638.71 381.31 579.06 1101.00 1528.00 1592.89 1673.59
0.12 4382.05 3429.25 3239.05 2998.45 3166.45 457.58 694.88 1321.20 1833.60 1911.47 2008.31 44550.86 34864.06 32930.36 30484.26 32192.26 4652.01 7064.56 13432.20 18641.60 19433.26 20417.80
Basic Cost
O/ H
Profit
Selling Price
556105.50
55610.55
66732.66
678448.71
Basic Cost
O/ H
Profit
Selling Price
7902.04
790.20
948.24
9640.49
Basic Cost
O/ H
Profit
Selling Price
0.10 17383.80 19083.80 7211.90 13942.70 20877.45 14723.30 8271.90 16087.70 1738.38 1908.38 721.19 1394.27 2087.75 1472.33 827.19 27966535.93
0.12 2086.06 2290.06 865.43 1673.12 2505.29 1766.80 992.63 1930.52 21208.24 23282.24 8798.52 17010.09 25470.49 17962.43 10091.72 27984554.15
2398.50
239.85
287.82
2926.17
3845.15
384.52
461.42
4691.08
3335.40
333.54
400.25
4069.19
Basic Cost
O/ H
Profit
Selling Price
5227.10
522.71
627.25
6377.06
Basic Cost
O/ H
Profit
Selling Price
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
7597.90
759.79
911.75
9269.44
4067.00 4385.14 5910.55 5076.25 4092.78 4805.95 3211.14 4400.00 5829.74 6207.74 6686.74
3090065.93 438.51 591.06 507.63 409.28 480.60 321.11 440.00 582.97 620.77 668.67
488.04 526.22 709.27 609.15 491.13 576.71 385.34 528.00 699.57 744.93 802.41
3094620.97 5349.87 7210.87 6193.03 4993.19 5863.26 3917.59 5368.00 7112.28 7573.44 8157.82
700.57
468452.94
84.07
469237.58
Basic Cost
O/ H 0.10
Selling Price
19642.86
1964.29
23964.29
14521.48
1452.15
1742.58
17716.21
Basic Cost
O/ H
Profit
Selling Price
Basic Cost
O/ H
Profit
Selling Price
Basic Cost
O/ H
Profit
Selling Price
3696.80
369.68
443.62
4510.10
4270.84
427.08
512.50
5210.42
3611.89
361.19
433.43
4406.51
2128.00
212.80
255.36
2596.16
859.20 2924.97
85.92 292.50
103.10 351.00
1048.22 3568.46
1540.00
154.00
184.80
1878.80
3696.80
369.68
443.62
4510.10
4270.84
427.08
512.50
5210.42
3611.89
361.19
433.43
4406.51
2128.00
212.80
255.36
2596.16
859.20 2924.97
85.92 292.50
0.12 351.00
945.24 3568.46
Basic Cost
O/ H 0.10
Selling Price
Basic Cost
O/ H 0.10
Selling Price
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
84771.00
8477.10
10172.52
103420.62
6621.00
662.10
794.52
8077.62
31566.00
3156.60
3787.92
38510.52
16245.00
1624.50
1949.40
19818.90
4090.00
409.00
490.80
4989.80
100690.00
10069.00
12082.80
122841.80
Basic Cost
O/ H
Profit
Selling Price
14319.30
1431.93
1718.32
17469.55
14259.30
1425.93
1711.12
17396.35
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
13260.34
1326.03
1591.24
16177.61
4534.95
453.50
544.19
5532.64
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
22649.50
2264.95
2717.94
27632.39
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
18897.64
1889.76
2267.72
23055.12
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
38912.65
3891.27
4669.52
47473.44
9069.90
906.99
1088.39
11065.28
Basic Cost
O/ H
Profit
Selling Price
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
13269.00
1326.90
1592.28
16188.18
15950.00
1595.00
1914.00
19459.00
5435.09
543.51
652.21
6630.81
64752.25
6475.23
7770.27
78997.75
16681.50
1668.15
2001.78
20351.43
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
5903.40
590.34
708.41
7202.15
Basic Cost
O/ H
Profit
Selling Price
Basic Cost
O/ H
Profit
Selling Price
Basic Cost
O/ H
Profit
Selling Price
Basic Cost
O/ H
Profit
Selling Price
1371.96
137.20
164.64
1673.79
Basic Cost
O/ H 0.10
Profit 0.12
Selling Price
5479.85
547.99
657.58
6685.42
6062.25 3559.00
606.23 355.90
727.47 427.08
7395.95 4341.98
Basic Cost
O/ H
Profit
Selling Price
Basic Cost
O/ H
Profit
Selling Price
0.10 5059.00 6559.00 9559.00 12868.00 21868.00 30868.00 36868.00 505.90 655.90 955.90 1286.80 2186.80 3086.80 3686.80
0.12 607.08 787.08 1147.08 1544.16 2624.16 3704.16 4424.16 6171.98 8001.98 11661.98 15698.96 26678.96 37658.96 44978.96
Basic Cost
O/ H
Profit
Selling Price
Basic Cost
O/ H 0.10
Selling Price
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
1757.70
175.77
210.92
2144.39
1549.25
154.93
185.91
1890.09
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
24955.40
2495.54
2994.65
30445.59
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
2012.30
201.23
241.48
2455.01
12496.30
1249.63
1499.56
15245.49
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
10337.24
1033.72
1240.47
12611.43
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
5179.24
517.92
621.51
6318.67
Basic Cost
O/ H
Profit
Selling Price
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
4328.49
432.85
519.42
5280.76
Basic Cost
O/ H
Profit
Selling Price
0.10
0.12
14230.00
1423.00
1707.60
17360.60
Basic Cost
O/ H
Profit
Selling Price
41273.09
4127.31
4952.77
50353.17
Powder Pigment 150x 150 mm Glazed Tiles white Cement 300x 300 mm Terra Tiles Colour Pigment wax Polish Cotton waste 200x 200 mm Pressed Tiles Wood Preservative Anti corrosive Primer minaral terpentine Enamel Paint Sand paper Wire brush Primer Emulsion Paint Varnish Boiled lime Salt Yellow ochre Blue Flannel cloth Weather shield paint 50 mm brush 75 mm brush 150 mm coir brush Floor brush 150 mm brush Timber 50x 25 mm Reeper Roof Tiles Wire nails 6'' long Wire nails 2'' long Asbestos corrugated sheet Roofing Screws Washers Half round clay Tiles 115 m long Ridges(pair) Ridge Tiles Colouring Powder 25 mm Planks
200.00 15.00 20.00 35.00 350.00 200.00 50.00 30.00 80.00 250.00 55.00 218.00 15.00 175.00 160.00 350.00 400.00 400.00 10.00 65.00 20.00 45.00 350.00 80.00 120.00 100.00 150.00 200.00 60000.00 60.00 18.00 400.00 400.00 300.00 15.00 4.00 25000.00 35.00 150.00 1200.00
38 mm brass screws
G.I Sheets Planks 38 mm wire nails Soldering lead
875.00 900.00 400.00 1200.00 60000.00 60.00 85.00 350.00 200.00 900.00 250.00 60.00 400.00 400.00 15.00 60000.00 250.00 4.50 175.00 1400.00 1500.00 2100.00 700.00 60.00 80.00
Timber Class I Fibre/ Plastic Plugs Ternap Flat Asbestos sheets 100x 50mm timber joists 150x38 mm Lunumidella Planks
50x50 mm Halmilla covemenlding 38x12 mm Halmilla beading 6 mm dout nails 19 mm Nails 50x6 mm Timber strips
100x75 mm Timber Spear stone 100 mm long brass Screws 16 mm a.s. dowels 100 mm long 38 mm thick planks 25 mm thick planks 2025x 825 mm plywood sash 3 mm thick glass panes
0.12 0.10 Price 250.00 15000.00 8500.00 1500.00 2.00 3500.00 4500.00 350.00 85.00 3500.00 6500.00 10.00 9000.00 115.00 50.00 15.00 3.00 1500.00 350.00 650.00 40.00 35.00 30.00 6.00 6.00 6.00 25.00 150.00 40.00 30.00 6.00 45.00 40.00 6.00
40 mm pipes 40 mm sockets 40 mm clips & nails 50 mm pipes 50 mm sockets 50 mm clips & nails
63 mm pipes 63 mm sockets 63 mm clips & nails 90 mm pipes 90 mm socket 90 mm clips & nails
20 mm special 25 mm specials 32 mm specials 40 mm specials 50 mm specials 63 mm specials 75 mm specials 90 mm specials 20 mm Tee 25 mm Tee 32 mm Tee
25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 250.00 120.00 15.00 5.00 150.00 100.00 3800.00 500.00 200.00 700.00 5000.00 120.00 250.00 700.00 200.00
40 mm Tee 50 mm Tee 63 mm Tee 75 mm Tee 90 mm Tee 100 mm dia G.I pipes Yarn Timber plugs 150x 150x 50 75 mm iron screws Lead
S.W. gulley 100mm Excavation 112 mm Brick work Cement concrete Cement rendering (1:2) 100 mm G.I. Grating 112 mm Brick work in (1:5) RCC cover slab
Sand
Sand