SITE INSPECTION & APPROVAL RECORDS


Project Reference No. ______________________________________________________________ (This report is to be immediately updated by the QPs, and builder:- (a) before tunnelling below or in close proximity to any structures or; (b) at inter al of not more than !"" m section of bored tunnels or; (c) at inter al of not more than #" m section for the case of $%T& tunnels or; (d) for any inter ention of cutter head or; (e) prior to re-commencement of bored tunnel machine with stoppage longer than '# hours( QP shall ensure that a copy of each of these completed reports is )ept on site)
Chainage of tunnel excavation Depth of tunnel excavation from ground surface Dates of QPs site inspections & monitoring of ground and/or building movements Areas/ buildings inspected Dates Of QPs approval given to builder to proceed with next section of tunnel wor s! Comments

"unnel launch/receiving chamber/shaft At C# At C#

$ confirm that the above information is accurate and correct! $ am satisfied that the tunnel wor s as constructed are in accordance with design calculations and construction plans! $ am satisfied that all necessar% measures are in&place and that the tunneling wor s is not affecting an% properties! $ have inspected the site and am satisfied with the performance of the tunnel wor s and the tunnelling wor s is being carried out in full compliance with the face pressure and other e% performance indicators for ensuring stabilit% and safet% of tunneling wor s!

____________________________ __________________________________ Na e! "ta # & "$%nature of &P'S( Na e! "ta # & "$%nature of &P'*eo('S(+ Date) Date) $ confirm that $ have carried out the tunnel wor s according to the QPs plans and design calculations and within face pressure and other e% performance indicators' and $ have obtained the QPs approval before further excavation to the next section of tunnels!

(((((((((((((((((((((((((((((((((((((((((((((((((((((((( Na e! "ta # & "$%nature of ,u$-.er Re/$e0 ,1 AC an. AC'*eo()2

Date ) ____________

$ have reviewed the as&installed e% structural elements of the building wor s) earth retaining or stabilising structures and tunnel structure and am satisfied that the% do not show an% inade*uac%!

___________________________ Na e! "ta # & "$%nature of AC Date)


* +or geotechnical aspects of the building wor s(

_____________________________________ Na e! "ta # & "$%nature of AC'*eo(+ Date)

BEV/TUN Aug 15, 2012

Tun_UBW_Annex D

*ROUND 3OVE3ENT ASSESS3ENT RECORD


Project Reference No. (This record is to be completed together with e ery Tun+,-.+%nnex / and a copy must be )ept on site) 4 a A""e"" ent of 3on$tor$n% Rea.$n%" an. A.jacent Structure" at C5) $ have assessed the results ta en from the monitoring instrumentation and site observations! "he maximum measured movements are, -round settlement reading , (((((((((((((((( mm .uilding settlement reading , (((((((((((((((( mm Other instrument readings , (((((((((((((((( /to attach summar% where appropriate0 $ have inspected the site and its neighbouring areas) and assessed the effects of tunnel excavation' and confirmed that no ad1acent structures are affected b% the tunnel wor s and the wor s can safel% proceed to the next tunnel section! Act$on" ta7en 2 $ am not satisfied with the tunnel supporting wor s as installed and its performance as follows,

6 a

2 $ have ta en the following immediate actions ,

_____________________________ Na e! "ta # & "$%nature of &P'S( Date)

_____________________________________ Na e! "ta # & "$%nature of &P'*eo('S(+ Date)

8 a b

Ta7$n% of rea.$n%" $n S$te Su#er/$"or9" #re"ence) $ confirm that the tunnels wor s have been constructed according to the construction plans and design calculations endorsed b% the QP! $ have also witnessed the ta ing of readings from the monitoring instruments from (((((((((( to ((((((((((( /dates0! $ have ept a record of the dates and times of these events! Other comments,

(((((((((((((((((((((((((((((((((((((((((((((((((((((((( Na e & "$%nature of S$te Su#er/$"or'"( 'RE(


* +or geotechnical aspects of the building wor s(

Date) ___________

3ote, 2 delete if not applicable