Type of media filter: Single pass: Sand Recirc"lating: Sand#gra$el Foam Foam Reference #: Permit(s) #: Time: Peat Te%tile t!er: Peat t!er: t!er: t!er:
Date:
Comments:
Tric&ling filter: 'ra$el Plastic (pflo) filter: Sand#gra$el *ood c!ips 'eneric Proprietary +an"fact"rer: +odel: +an"fact"rer assembled Contractor assembled ,. -%ca$ation a. Sta&e location b. c. d. e. f. g. /erify ele$ations 0ottom ele$ation: *ater present in e%ca$ation 3f yes4 de)atering performed: 0ottom of e%ca$ation graded to specifications 0ottom of e%ca$ation stable 0edding material: Dept! in.
!. 6.
.es
12 P/C
Container#liner: a. b. c. d.
Rigging and lifting according to man"fact"rer Container#liner )atertig!t +o"nting pad or anti7floatation flange installed Temporary or permanent bracing installed Filter drainage systems (nder7drain medi"m: Contractor7assembled
.es
12
.es .es
12 12
8. a. b.
+an"fact"rer7assembled .es 12
(nder7drain piping installed Pipe diameter: Slot opening )idt!: Slot spacing: Slot orientation: 3nternal p"mp basin installed le$el and pl"mb
c.
.es
12
d.
(nder7drain perforates container#liner Proper )atertig!t boot#fitting installed Proper )atertig!t gl"e 9oint made e. S"b7aeration piping installed P/C Polyet!ylene Constr"ction: +an"fact"rer7assembled Contractor7assembled rifice spacing: rifice diameter: rifice orientation:
.es
12
Comments:
.es
12
:.
+edia a. +an"fact"rer7assembled +edia placed into container#liner properly Properly compacted b. Contractor7assembled Specification met Proper !andling d"ring transport to site Properly stored Properly placed into container#liner Properly compacted
.es 12 .es
12
;.
0ac&fill proced"res a. +aterial: b. c. d. e. 2nti7floatation meas"res installed 0ac&fill placed in le$el lifts e$en )it! media 0ac&fill properly compacted Side)all ins"lated. Type: .es .es .es .es .es .es 12 12 12 12 12 12
<.
-lectrical installation a. Cond"it#9"nction bo%(s) installed b. Connections#penetrations properly sealed and )atertig!t
=.
-ffl"ent distrib"tion: a. Distrib"tion met!od: Press"re distrib"tion i. P"mp ii. b. Sip!on 'ra$ity distrib"tion
>.
Free access
0"ried
@id .es
Comments:
12 12 12
c. d. e.
@id sec"red Distrib"tion component accessible Filter protected from storm)ater flo)
11. 3ns"lation of access points a. +edia filter lid ins"lated by man"fact"rer Type of ins"lation: b. 2ccess riser lid(s) ins"lated i. Contractor7assembled +an"fact"rer7assembled Type of ins"lation: ii. 3ns"lation does not interfere )it! internal electrical or piping components 1,. 2dditional tas&s for tric&ling filters a. P"ll tet!ers attac!ed to all p"mps P"ll tet!er strengt! adeA"ate for tas& b. c. d. P"ll tet!ers to p"mps sec"red properly
12 12
.es
12 12 12 12 12
-ffl"ent recycle p"mp piping installed to primary tan& inlet .es Sl"dge ret"rn p"mp piping installed to primary tan& inlet .es .es
18. a. b. c.
Site stabili5ed after constr"ction: -rosion control meas"res in place Site loamed#topsoil dressed4 seeded4 and#or m"lc!ed Finis! grading and landscaping being done by ot!ers
d.
.es