THERMAL POWER PLANTS

Country Project Project Description Client Start End Financing


Organisation

LYBIA Conversion to gas of power Turnkey realisation of the conversion to gas GECOL 1999 2001 CLIENT
plants of the electric power plants Benghazi North
and Tripoli South

LYBIA Conversion to gas of 2 power Turnkey realisation of the conversion to gas GECOL 1999 2000 CLIENT
plants of two diesel-oil fired power plants in Tripoli
(500 MW - several units) and Benghazi (450
MW and 166 MW).

FRANCE Cogeneration plant a St. Denis Turnkey construction of a cogeneration plant Municipality of Paris 1999 2001 CLIENT
with a LM 6000 engine at St. Denis (Paris)

SINGAPORE Pulau Sakra Cogeneration Extension of the mission of Owner's Engineer SembCorp Utilities & 1999 2001 CLIENT
Complex - Contact extent to for the construction of the cogeneration unit Terminal Pte Ltd.
the 2nd Phase of Pulau Sakra (380 MW and 600 t/h steam) (S.U.T.)
and demineralisation plant (3 x 350 t/h)

SINGAPORE Pulau Sakra cogeneration Owners engineer mission for the construction SembCorp Utilities & 1999 2001 CLIENT
complex - 2nd Phase of a cogeneration plant at Pulau Sakra (800 Terminal Pte Ltd.
MW and 700 t/h steam) and a (S.U.T.)
demineralisation plant (3 x 350 t/h)
BELGIUM Centralisation of the control Experts mission for the centralisation of the BAYER 1999 2000 CLIENT
rooms for the energy control rooms for the energy networks (left
networks (left bank) bank).

FRANCE Cogeneration Unit at Calais Turnkey realisation of a cogeneration unit of ELYO 1999 2000 CLIENT
50 Mwe - 128 t/h of steam for the supply of
the Titan oxyde plant Tioxide at Calais.

FRANCE Cogeneration unit at Condat Turnkey realisation of a cogeneration unit of ELYO - 1999 2000 CLIENT
86 Mwe - 220 t/h of steam for the supply of COGETHERM
the Condat paper mill in the Périgord region.
Country Project Project Description Client Start End Financing
Organisation

FRANCE Cogeneration unit at Sochaux Turnkey realisation of a cogeneration unit of COGETHERM 1999 2000 CLIENT
42 Mwe - 101 t/h of steam for the supply of
the Peugeot factory at Sochaux in the Jura
region.

INDIA 200 MW Sujana combined Owner's engineer assignment for the Sujana Power Ltd. & 1999 2000 CLIENT
cycle power plant construction of the 200 MW combined cycle Electricity & Gas
power plant for Sujana Power Ltd. International (E.G.I.)

LUXEMBOURG 380 MW power Plant at Extension of the Owners Engineer mission for Twin erg. 1999 2000 CLIENT
Esch-Sur-Alzette the construction of the Esch-Sur-Alzette
power plant.
THAILAND Combined cycle power plant Owner's Engineer mission for the H - Power 1999 2000 CLIENT
of Bowin construction of the Bowin combined cycle
power plant ( 700 MW )

LYBIA Technical audit power plants Experts missions for the technical audit of Gecol 1999 1999 CLIENT
several thermal power plants in various
locations in Lybia: Tripoli, Derna, Benghazi,
Tobruk,

BELGIUM Centralisation of the control Complete engineering mission and works BAYER 1998 2001 CLIENT
posts and I & C revamping of supervision for the centralisation of the
Lillo1 control posts and Instrumentation &
Command revamping of Lillo 1

CHILE Tocopilla Power Plant Complete engineering mission for the Inversora Electrica 1998 2000 CLIENT
extension of the existing power plant of Andina
Tocopilla (615 MW); with a new "single
shaft"unit of 400 MW; including a gas turbine
of 264 MW and a steam turbine of 150 MW.
Country Project Project Description Client Start End Financing
Organisation

LYBIA Zawia power plant (4 x 165 Works supervision mission for the Gecol 1998 2000 CLIENT
MW) construction of the Zawia Gas Turbine Power
plant (4 x 165 MW)

PERU Southern Peru power plant Owner's engineer mission for the Southern ENERSUR 1998 2000 CLIENT
Peru power plant (unit 1).

CHILE Nehuenco combined cycle Engineering mission for the analysis of all Inversiones Colbùn 1997 1999 CLIENT
power plant design documents for the 370 MW combined
(phase 2) cycle power plant at Nehuenco; transfer of
the responsibilities to the site; works
supervision and construction follow -up
(phase 2)
THAILAND Surat Thani cogeneration Turnkey construction of a palm oil waste Southern Palmoil Co. 1997 1999 CLIENT
plant fired cogeneration plant to produce 50 MW Ltd
and 33 t/h of steam.

CHILE Nehuenco combined cycle Owners Engineer and works supervision Colbùn Machicura 1997 1998 CLIENT
power plant mission for the construction of the 370 MW
(phase 1) combined cycle power plant of Nehuenco
(phase 1)
UNITED ARAB Desalination unit Feasibility study for a desalination unit. Emirates Trading 1997 1998 CLIENT
EMIRATES Agency

BELGIUM Modernisation of the Power Complete engineering mission for the Electrabel 1996 2000 CLIENT
Plant 'Langerlo 2.000' capacity upgrade (from 2 x 230 MW to 2 x
305 MW) and the modernisation and
automation in order to increase security of the
power plant
UNITED ARAB Extension of the Al Taweelah Complete engineering mission and works Water & Electricity 1996 2000 CLIENT
EMIRATES A power and desalination supervision for the upgrading and extension Department
plant of the power (400 MW) and seawater (W.E.D.)
desalination plant (225.000 m³/d.)of Al
Taweelah A
Country Project Project Description Client Start End Financing
Organisation

SINGAPORE Pulau Sakra Cogeneration Technical assistance mission for the SembCorp Utilities & 1996 1999 CLIENT
complex - 1st Phase development of the complex: preparation of Terminal Pte Ltd.
the utility networks (drinking water, chilled (S.U.T.)
water, demineralised water, sprinkler
network, H.V.A.C., steam, fuel oil, ...),
sewage system, water purification plant,
seawater intake with a 70,000 m³/h.
UNITED ARAB Seawater desalination plants Complete engineering mission for 3 seawater Ministry of Electricity 1996 1999 CLIENT
EMIRATES at Ras Al Khaimah, Ajman desalination units, each with a capacity of & Water
and Fujairah 45.000 m³/d drinking water, and 6 reservoirs (M.E.W.)
of 18.000 m³ each.
BELGIUM 150/70/30 kV substation at Restructuration and design of the 150/70/30 Solvay 1996 1998 CLIENT
the Solvay 2 plant kV substation of the Solvay 2 plant

CHINA Zhenijang cogeneration plant Complete mission for the follow -up of the Zhenjiang Changhong 1996 1998 CLIENT
execution works for the construction of a 2 x Thermal Power
15 MW + 100 t/h process steam cogeneration Company
plant of Zhenjiang in the Jiangsu Province

BELGIUM Cogeneration Plant at Geel Complete engineering mission for a AMOCO & Electrabel 1996 1997 CLIENT
cogeneration plant with a gas turbine "dry
low emissions" of 43 MW and a recuperation
boiler of 100 t/h steam at 75 bar and 400 ° C

BELGIUM Gent Ringvaart combined Complete engineering mission for the Electrabel & S.P.E. 1995 1997 CLIENT
cycle power plant - 350 MW relisation of the combined cycle power plant
Gent Ringvaart - 350 MW

ITALY Combined cycle power plant Control mission and works supervision ROSEN 1995 1997 CLIENT
at Rosignano. mission for the construction of the 353 MW
thermal power and steam production plant of
Rosen at Rosignano
Country Project Project Description Client Start End Financing
Organisation

OMAN Al Manah power plant Extension of the mission for the detailed United Power 1995 1997 CLIENT
design and the works supervision for the 90 Company
MW thermal power plant of Al Manah (U.P.C.)

UKRAINE Repowering of the Uglegorsk Repowering of a 800 MW coal fired power Minenergo 1995 1995 TACIS
power plant plant at Uglegorsk

OMAN Al Manah power plant Complete engineering mission for the United Power 1994 1997 CLIENT
construction of the Al Manah thermal power Company
plant (90 MW) (U.P.C.)

BELGIUM Kallo thermal power plant design and works supervision mission fr the Electrabel 1994 1996 CLIENT
modernisation and upgrading of the complete
control and monitoring system (phase II)

BELGIUM Cogeneration plant at Complete engineering mission for the S.P.E. 1994 1995 CLIENT
Vandemoortele construction of a 22 MW cogeneration plant
on the site of the Vandemoortele factory
(edible oils) at Izegem
BELGIUM Brugge Herdersbrug 480 MW Preliminary studies for the 480 MW Electrabel 1994 1994 CLIENT
combined cycle power plant combined cycle power plant of Brugge
Herdersbrug

BELGIUM Gent Ringvaart 350 MW Preliminary studies for the 350 MW Electrabel 1994 1994 CLIENT
combined cycle power plant combined cycle power plant at Gent
Ringvaart

UNITED ARAB High schools at Al Ain (2 Project management and works supervision Public Works 1993 1999 CLIENT
EMIRATES campus) and Abu Dhabi (2 for the construction of 2 colleges. Department (P.W.D.)
campus)
Country Project Project Description Client Start End Financing
Organisation

CABO VERDE Mindelo desalination plant Turnkey construction of the Mindelo ELECTRA 1993 1997 AFDB
desalination plant

MOROCCO Combined cycle power plants Preliminary design for the combined cycle Office National de 1992 1996 CLIENT
of Kénitra and Mohammédia. power plants of Kénitra and Mohammédia. l'Electricité (O.N.E.)

BELGIUM Gent cogeneration plant Complete engineering mission for the S.P.E. 1992 1995 CLIENT
construction of a 51 MW combined cycle
power plant.

BELGIUM Modernisation of the Mol Modernisation and upgrading of the power Electrabel 1991 1994 CLIENT
power plant plant, diminution of the Nox emissions,
general review of the security, installation of
an automated control room
BELGIUM Combined cycle power plant Complete engineering mission for a 460 MW Electrabel & SPE 1991 1994 CLIENT
at Seraing combined cycle power plant. 2 gas turbines of
145 MW and a steam turbine producing 170
MW.
INDONESIA Gresik Combined Cycle Project management on behalf of the owner, Perusahaan Umum 1991 1994 AGCD
power plant design and works supervision for a combined Listrik Negara P.L.N.
cycle power plant of 3 x 500 MW (3 gas
turbines of 112 MW and a steam turbine of
170 MW per unit)
BELGIUM Cogeneration unit at Complete engineering mission for the Electrabel 1991 1993 CLIENT
Langerbrugge construction of a cogeneration unit: a 38 MW
gas turbine and a steam generator with a 140
t/h capacity
BELGIUM Cogeneration unit at the Esso Complete engineering mission for the Esso & Electrabel 1991 1993 CLIENT
petroleum refinery at construction of a cogeneration unit:a 38 MW
Antwerp turbine and a steam generator with a capacity
between 75 t/h and 170 t/h (with
postcombustion)
Country Project Project Description Client Start End Financing
Organisation

BELGIUM Drogenbos combined cycle Complete engineering mission for a 460 MW Electrabel 1990 1993 CLIENT
power plant combined cycle power plant. 2 gas turbines of
145 MW and a steam turbine producing 170
MW
UNITED ARAB Al Taweelah B Power and Complete engineering mission for the Water & Electricity 1989 1997 CLIENT
EMIRATES Desalination plant construction of a thermal power plant (732 Department (W.E.D.)
MW) and seawater a desalination unit
(300.000 m³/d)
BELGIUM Fluidised bed power plant at Complete engineering mission for the Electrabel 1989 1994 CLIENT
Beringen installation of a prototype of a fluidised bed
power plant. The steam produced feeds a 28
MW turbine.
INDONESIA Utilisation of biomass for Economical analysis to evaluate the use of Perusahaan Umum 1989 1989 AGCD
electric power generation. biomass for electric power generation Listrik Negara (P.L.N.)

UNITED ARAB 4 diesel power plants in Complete engineering mission for the Water & Electricity 1986 1988 CLIENT
EMIRATES remote areas (total capacity construction of 4 diesel power plants ant its Department
40 MW) associated distribution network in remote (W.E.D.)
areas
MOROCCO Jorf Lasfar thermal power Complete engineering mission for the Office National de 1985 1996 AGCD
plant construction of the coal fired thermal power l'Electricité
plant of Jorf Lasfar (2 x 330 MW). (O.N.E.)

NETHERLANDS Combined cycle power plant Complete engineering mission f or the Shell Nederland Chemie1985 1987 CLIENT
at Shell Moerdijk construction of the combined cycle power
plant with a gas turbine of 37 MW; a
generator of 36 MW coupled to the turbine, a
gas conduct at 540 °; and 2 HP steam
generators of 220 t/h
ALGERIA Photovoltaic solar power Turnkey construction of a photovoltaic solar Commissariat aux 1983 1985 CLIENT
plant 30 kW power plant 30 kW at Melouka Energies Nouvelles
Country Project Project Description Client Start End Financing
Organisation

SAUDI ARABIA Medina-Yanbu power and Preliminary and final design for the power Saline Water 1982 1986 CLIENT
desalination plant and and seawater desalination plant (40 MIGPD) Conversion
drinking water pipeline and water supply pipeline Medina - Yanbu. Corporation
(S.W.C.C.)
CHINA Coal fired power plant at Ping Turnkey construction of the coal fire power China National 1981 1987 BCL
Ding Shan plant (2 x 320 MW) at Ping Ding Shan for the Technical Import
extension of the existing power plant at Corporation
Yaomeng (C.N.T.I.C.)
UNITED ARAB Diesel power plants in 5 Design and works supervision for the Water & Electricity 1981 1983 CLIENT
EMIRATES remote areas (total capacity construction of 5 diesel power plants and its Department (W.E.D.)
10 MW) associated distribution network in remote
areas
LYBIA Power and desalination plants Complete engineering missions for the Electricity Corporation 1971 1987 CLIENT
of Benghazi construction of two thermal power plants of Benghazi
(160 et 375 MW) and two desalination plants
(48.000 m³/j. et 100.000 m³/j.)
BELGIUM Ruien thermal power plant Complete engineering mission for the Electrabel 1961 1989 CLIENT
construction of the different units of the ruien
thermal power plant: 2 x 60 MW; 2 x 130
MW; 2 x 300 MW;