Content:
1. History of the existing bridge structure 2. Existing design of the bridge 3. Scope of upcoming reconstruction 4. Bibliography
Due to the terms of use of dual carriageways, sidewalks on the outside of the bridge cantilevers, serve as escape walkways and for an operating personnel of the bridge. They are not intended to use for pedestrians nor cyclists. Supports and foundations Steel superstructure is based on two abutments and six pillars. Bridge abutments fulfill several functions: fundamental function of extreme support of the bridge, allows convenient service and renovation of heating pipelines and water supply maintained in the construction of the bridge, contain many multi-purpose rooms.
The pillars are made of reinforced concrete, brand 350 (class B30). They are separated, distinct for each structure and shaped to transfer forces from the superstructure on a continuous footing. For aesthetic reasons, pillars have divided side panels. With the exception of one pillar, placed in current, based on the caisson, the two abutments and the other five pillars are placed on piles (drilled with diameter of 120 and 90 cm, and the piles Franki). Piles are crowned with slab shared for separated piers. What is important in view of the upcoming reconstruction of the bridge, the research made by IBDiM found significant reserves of load in comparison with load design: "[] Permissible load of the pile is more than twice the load accepted in the project. This indicates that the evaluation of pile capacity in support no. 5 made by BPBK Stolica", even assuming 6m dilution is overly cautious." [2] Superstructure Object consists two independent bridges (structures) based on separate pillars situated on jointed foundation. Superstructure is a continuous beam and both bridges are mirror image of each other. Each of them, in the spans of 60, 75 and 90m, consists of two solid-web girders braced with transverse frames every 7.5m with a deck in the form of an orthotropic slab with traverses every 2.50m. In two, 120m spans, located in river current, superstructure is closed from the bottom with ribbed slab creating box structure transversally framed every 7.5m. The girders height is constant, 4.30m for the internal web and 4.09 m for the external web. Distance between webs is 10.50m. Orthotropic slab of deck is extended by cantilevers out of the webs. Length of both-side cantilevers spaced every 2.50m is the same and amounts to 4.0m. The total width of the deck is 18.50m.
Additional equipment Superstructure of both bridges is also a construction for a range of communal facilities. Within each superstructure, on the lower transverse frame following devices are based: Heating pipeline (south bridge) 2x1000 mm Water supply (north bridge ) 2x1000mm
Bibliography
1. www.um.warszawa.pl - Informacje o inwestycji: MODERNIZACJA DROGI S8 ODC. POWZKOWSKA - MARKI (Odcinek >> Wisostrada - Modlioska) 2. PROJEKT WYKONAWCZY, ETAP II, Wze "Powzkowska" - wze "Modlioska autor: Transprojekt-Warszawa Sp. z o.o. 3. http://tvnwarszawa.tvn24.pl/print/informacje,news,miedzy-leninem-a-grotemroweckim,32966.html