REVISION: 1

OBRA FRENTE FECHA

CONSTRUCCION DEL TRAMO 2 LINEA 1 DEL METRO DE LIMA ESTACION SAN MARTIN 4/15/2013
JORNADA: Pagina: 1

tem

Descripcin de la Actividad

Und

Metrado Total

Metrado a la Fecha

21 Metrado Saldo

SEMANA 22 Mon 15 Tue 16 Wed 17 Thu 18 Fri 19 Sat 20 Sun 21 22 Tue 23 24

SEMANA 23 Wed Thu 25 Fri 26 Sat 27 Sun 28 Mon 29 Tue 30 01

SEMANA 24 Wed Thu 02 Fri 03 Sat 04 Sun 05 Mon 06 Tue 07 08

SEMANA 25 Wed Thu 09 Fri 10 Sat 11 Sun 12

NO ELIMINAR N

0 1 1.1 1.1.16 1.1.17 1.1.18 1.1.19 1.1.20 1.1.21 1.1.22 1.1.23

INSERCION URBANA REA TCNICA MDULO 01: CISTERNA ENCOFRADO COLUMNAS / MUROS 2 CONCRETO COLUMNAS / MUROS 2 ENCOFRADO LOSA MACIZA /VIGAS ACERO LOSA MACIZA / VIGAS CONCRETO LOSA MACIZA / VIGAS ACERO PARAPETO ENCOFRADO PARAPETO CONCRETO PARAPETO m2 m3 m2 kg m3 kg m2 m3 362.976 44.736 94.55 1524.8 19.94 162.62176 48.6 5.832
362.98 8 44.74 94.55 1,524.80 19.94 162.62 48.60 5.83 8 8 8 6 6 6 6 6 6 6 7 5 5 5 6

1.2

MDULO 02: CABINA ELCTRICA ACABADOS-SOLAQUEO IMPRIMANTE-PINTURA SUB-COMTRATA m2 m2 gbl 433.95 433.95 1
4 4 5 5 5 5 1 1

1.3

MDULO 03: SER IMPRIMANTE m2 212.45


5 5

1.4 1.6 2 2.7 2.7.1 2.7.2 2.7.3 2.7.4 2.7.5 2.7.6 2.7.7

MDULO 04: SHAFT MDULO 06: CERCO PERIMTRICO AREA DE PASAJEROS MDULO 07: ESCALERA 1 - PBLICA EXCAVACION

252 m3 m3 Kg Kg Kg m2

252.938 50 9.9 1654.56 25.8712 2459.2738 22

SOLADO / FALSAS ZAPATAS Concreto Cimentacin Acero Zapatas Acero Columnas 1 Acero Placas Muro - 1 Encofrado Zapatas

2.7.8 2.7.9-1 2.7.9-2 2.7.10 2.7.11 2.7.12 2.7.13 2.7.14 2.7.15 2.7.16 2.7.17 2.7.18 2.7.19 2.7.20 2.7.21 2.7.22 2.7.23 2.8 i

Concreto Cimentacin Encofrado Sobrecimiento Concreto Sobrecimiento Muro Alb. Confinada Soga Muro Alb. Confinada cabeza Acero Columnas 2 Acero Placas Muro - 2 Encofrado Columnas Encofrado Placas Muro CONCRETO COLUMNAS / MUROS C Placas Muro Encofrado Vigas Encofrado Escaleras Acero Vigas Acero Escaleras Concreto Vigas Concreto Escaleras
MDULO 08: ESCALERA 2 - SEMIPBLICA ETAPA I

m3 m2 m3 m2 m2 Kg Kg m2 m2 m3 m3 m2 m2 Kg Kg m3 m3

52.86 44 4.64 0 54.404 25.8712 2459.2738 18.521 208.676 1.746 51.896 406.677 275.278 9635.6107 3338.8672 73.66 40.851
10 10 5 5 5 5

10

10

10

10

10

Encofrado Escaleras Acero Vigas Acero Escaleras Concreto Vigas Concreto Escaleras
MDULO 08: ESCALERA 2 - SEMIPBLICA ETAPA II

m2 Kg Kg m3 m3

275.278 9635.6107 3338.8672 73.66 40.851

FONDO VIGA DE AMARRE ACERO VIGA DE AMARRE CONCRETO VIGA DE AMARRE


MDULO 08: ESCALERA 2 - SEMIPBLICA ETAPA III

PLACA 11- ENCOFRADO PLACA !!- VACIADO CONCRETO

MDULO 08: ESCALERA 2 - SEMIPBLICA ETAPA IV

FONDO DE ESCALERA- PARTE II ACERO ESCALERA- PARTE II CONCRETO ESCALERA _ PARTE II


MDULO 02: JEFE DE ESTACIONES MDULO 03: CUARTO DE EQUIPOS Y CUARTO DE BASURA

2.3.3

acero parapetos encofrado parapetos concreto parapetos

4 5

2.4.3

MDULO 04: SALA DE TABLEROS

Kg

245.76045
4 4 4 5

ENCOFRADO FRIZo CONCRETO FRIZO

2.5.5 2.6.5 2.13.2 w 2.14.1 2.14.2 2.14.3 2.14.4 2.14.5 2.14.6 2.15 2.15.1 2.16

MDULO 05: ASCENSOR 2 MDULO 06: ASCENSOR 1 MDULO 13: CERCO

m2 m2 Kg

33.15 33.15 76.832

MDULO 14: BUZONES Y BANCODUCTOS EXCAVACION

Solado Acero Placas Muro 210 Encofrado Placas Muro C Placas Muro Encofrado Losa Maciza Acero Losa Maciza CONCRETO losa maciza
MDULO 15: PISOS excavaciones encofrados

m3 Kg m2 m3 m2 Kg m3

0.697 550.8608 86.63 9.389 5.76 88.704 143.159

6 5 5 5 6

2.16.1 2.16.2 2.16.3 2.16.4 2.16.5 2.16.6 2.16.7 2.16.8 2.16.9

Concreto losa falso piso


MDULO 16: PRTICO DE INGRESO

Acero Zapatas Acero Placas Muro 210 - 1 Concreto Cimentacin Acero Placas Muro 210 - 2 Encofrado Placas Muro C Placas Muro Encofrado Vigas Acero Vigas CONCRETO VIGAS / LOSA MACIZA

Kg Kg m3 Kg m2 m3 m2 Kg m3

178.7904 453.4952 6.84 453.4952 74.16 10.197 36.3 377.928 4.95


11,340.00 39 47 59 42 24 29 21 24 29 29 27 22 30 30 26 26 15 21 23 21 21 25 20 20

NO ELIMINAR NI ESCRIBIR.

12/4/20137:19 AM

REGISTRO GESTION DE PROYECTOS

REVISION: 0

ANLISIS DE RESTRICCIONES
CODIGO DE PROYECTO
NOMBRE DE PROYECTO Proyecto Antapaccay Frente Identif. de Rest. Actividad del CG CENTRAL HIDROELECTRICA DE HUANZA Descripcin de la Restriccin Fecha de Identif. de Restriccin Fecha Requerida (PROD) Responsable

Fecha Inicial Propuesta (AS)

Fecha Propuesta (AS)

Estado

Impedimento de las AS para levantar la Restriccin

7de28

\\vboxsrv\conversion_tmp\scratch_3\193463447.xls.ms_office

GESTION DE PROYECTOS

PLAN SEMANAL

CODIGO DE PROYECTO NOMBRE DE PROYECTO CENTRAL HIDROELECTRICA DE HUANZA te m Descripcin de la Actividad

AREA / DPTO PRODUCCION CLIENTE CONEHUA Und Metrado Semanal Ratio Meta

MDULO 01: CISTERNA ENCOFRADO COLUMNAS / MUROS 2 CONCRETO COLUMNAS / MUROS 2 ENCOFRADO LOSA MACIZA /VIGAS ACERO LOSA MACIZA / VIGAS CONCRETO LOSA MACIZA / VIGAS ACERO PARAPETO ENCOFRADO PARAPETO CONCRETO PARAPETO MDULO 02: CABINA ELCTRICA ACABADOS-SOLAQUEO IMPRIMANTE-PINTURA SUB-COMTRATA MDULO 03: SER IMPRIMANTE MDULO 07: ESCALERA 1 - PBLICA MDULO 07: ESCALERA 1 - PBLICA EXCAVACION m2 212.45 m2 m2 433.95 433.95 m2 m3 m2 kg m3 kg m2 m3 m3' 362.976 44.736 94.55 1524.8 19.94 162.6218 48.6 5.832 53.911
Falta Recursos Falta Recursos Falta Recursos Falta Recursos Falta Recursos Falta Recursos

SOLADO / FALSAS ZAPATAS Concreto Cimentacin Acero Zapatas Acero Columnas 1


MDULO 08: ESCALERA 2 - SEMIPBLICA ETAPA I m2 Kg 275.278 9635.611

Encofrado Escaleras Acero Vigas

m2 Kg

275.278 9635.611

Acero Escaleras Concreto Vigas Concreto Escaleras


MDULO 03: CUARTO DE EQUIPOS Y CUARTO DE BASURA

Kg m3 m3

3338.867 73.66 40.851

acero parapetos encofrado parapetos concreto parapetos


MDULO 04: SALA DE TABLEROS

ENCOFRADO FRIZo CONCRETO FRIZO Acero Zapatas

Kg

178.7904

1.3 MDULO 14: BUZONES Y BANCODUCTOS EXCAVACION


I

Solado Acero Placas Muro 210 Encofrado Placas Muro C Placas Muro Encofrado Losa Maciza Acero Losa Maciza CONCRETO losa maciza
1,790.00 -1,790.00

CANTIDAD DE HHs PREVISTAS CANTIDAD DE HHs REALES HHs GANADAS/PERDIDAS

REVISION: 1 Fecha: Pagina: 1 FECHA: UBICACION: San Juan de Lurigancho, lima, Lima Fecha de Fecha de Ratio Inicio Trmino Duracin Program. Planeada Planeada (das) HH Programada s SEMANA 22 Wed Thu 17 18 4/15/2013 15/02/2012

HH Previstas

Mon 15

Tue 16

0.88 1.34 0.63 Falta Recursos Falta Recursos Falta Recursos Falta Recursos Falta Recursos Falta Recursos

4/15/2013 4/19/2013 4/20/2013

4/18/2013 4/19/2013 4/20/2013

4.00 1.00 1.00

HH HH HH HH HH HH HH HH HH

320 HH 8 60 HH 60 HH HH HH HH HH HH HH

0.18 0.46

4/15/2013 4/17/2013

4/16/2013 4/20/2013

2.00 4.00

HH HH

80 HH 4 200 HH

4 5 5

0.47

4/15/2013

4/16/2013

2.00

HH

100 HH 5

4/18/2013 4/16/2013

4/19/2013 4/16/2013

2.00 1.00 1.00 1 4 HH HH 60 HH 100 HH

0.22 0.01

1.00 2.00

0.87 0.02

2.00 1.00 3.00 2.00

5 HH HH 240 HH 8 160 HH 8 8 8 8

0.07 0.81 1.47

3.00 1.00 1.00

HH HH HH

240 HH 60 HH 60 HH

4 5

0.28

3.00 1.00

4 HH 50 HH

4 5

6 5 5 5 6 PERSONAL PROYECTADO PERSONAL REAL EN OBRA SEGN SCHEDULE DIFERENCIA DE PERSONAL -39 -47 -64 -52 39 47 64 52

:1 15/02/2012

SEMANA 22 Fri 19 Sat 20 Sun 21

NO ELIMINAR NI ESCRIBIR.

## 6 6

##

##

## ## ##

## 5 5

## ## ## ## ##

##

##

5 ##

##

##

6 5

8 6 6

35

29

-35

-29

CAUSAS DE INCUMPLIMIENTO
PROG LOG EQ ADM CLI-ING CLI-PRI EJEC SC PdR GA QA/QC EXT PROGRAMACION GYM LOGISTICA GYM EQUIPOS GYM ADMINISTRATIVOS GYM CLIENTE INGENIERA CLIENTE PRIORIDAD ERRORES DE EJECUCIN SUBCONTRATAS PdR GA AREA DE CALIDAD EXTERNOS

AUSAS DE INCUMPLIMIENTO
Error en la programacin, cambios en programacin o mala utilizacin de las herramientas de programacin. Falta de recursos en obra (equipos mayores y menores, herramientas, subcontratos y materiales). Averas, fallas en equipos o mantenimientos no programados. No ingreso de personal a obra. Entrega inoportuna de informacin de ingeniera solicitada al cliente con la anticipacin adecuada. Cambio repentino de prioridades por encargo del cliente sin la anticipacin adecuada. Implica retrabajos por malas ejecuciones en campo. Entrega tarda de un trabajo a cargo de un subcontratista. Paralizaciones por accidentes o incidentes Falta de aprobacin de protocolos o liberaciones. Retraso por clima, tormentas electricas o por eventos extraodinarios (marchas, huelgas) y por falta de entrega de permisos o licencias.

Fecha

PORCENTAJE DE PLAN COMPLETADO (PPC)


NOMBRE DE PROYECTO CLIENTE CONEHUA Ubicacin: HUANZA, HUAROCHIRI, LIMA

CENTRAL HIDROELECTRICA DE HUANZA Pd SC QA/QC CAUSAS DE INCUMPLIMIENTO SEMANAL R 0.0% 0.0% GA 0.0 CLI-PRI 0.0% % EXT 25.0% EJEC 25.0%

SC

CLI-ING 0.0% ADM 0.0% EQ 0.0% LOG 0.0% PROG 50.0%

CLI-PRI EJEC 0% 9% 0% CLI-ING 9% ADM 0% EQ 0%

CAUSAS PdR DEGA INCUMPLIMIENTO ACUMULADO QA/QC


0% 0% EXT 27%

LOG 46%

PROG 9%

Item

Activity Name

METRADO PROGR.

METRADO EJECUTADO

SEMANA 20 Mon 08 Tue 9 Wed 10 Thu 11 Fri 12 Sat 13 Sun 14

ANALISIS DE CUMPLIMIENTO SI NO TIPO

CAUSAS DE INCUMPLIMIENTO

MEDIDA CORRECTIVA

MDULO 01: CISTERNA ACERO COLUMNAS / MUROS 2 ENCOFRADO COLUMNAS / MUROS 2 CONCRETO COLUMNAS / MUROS 2 ENCOFRADO LOSA MACIZA /VIGAS MDULO 02: CABINA ELCTRICA ACABADOS-SOLAQUEO IMPRIMANTE-PINTURA SUB-COMTRATA MDULO 03: SER ACABADOS-SOLAQUEO MDULO 08: ESCALERA 2 - SEMIPBLICA m2 212.45
5 5 x

kg m2 m3 m2

1954.8 362.976 44.736 94.55

6 12 12 12 6 6

x x x x
EJEC

reparacion de losa reparacion de losa reparacion de losa

m2 m2 gbl

433.95 433.95 1

6 10 1 1 1

x x x

Encofrado Escaleras Acero Vigas Acero Escaleras Concreto Vigas Concreto Escaleras
MDULO 03: CUARTO DE EQUIPOS Y CUARTO DE BASURA

m2 Kg Kg m3 m3

275.278 9635.6107 3338.8672 73.66 40.851

10

10

10

10

10

10

encofrado losa macisa de cuarto de quipos concreto losa macisa de cuarto de equipos acero parapetos encofrado parapetos concreto parapetos
MDULO 04: SALA DE TABLEROS

5 6 5

x x x
EXT

retrazo por aprobacion de concreto, y supervision

ENCOFRADO LOSA MACIZA /VIGAS


MDULO 14: BUZONES Y BANCODUCTOS EXCAVACION

5 5 5 5 6 5

x x x x
PROG

Solado Acero Placas Muro 210 Encofrado Placas Muro C Placas Muro Encofrado Losa Maciza
MDULO 16: PRTICO DE INGRESO

Acero Zapatas Acero Placas Muro 210 - 1 Concreto Cimentacin Acero Placas Muro 210 - 2 Encofrado Placas Muro C Placas Muro

Kg Kg m3 Kg m2 m3 m2

178.7904 453.4952 6.84 453.4952 74.16 10.197 36.3

5 5

5 5

x x

PPC ACUMULADO CUMPLIMIENTO


MES N SEMANA HASTA EL DIA TAREAS PROGRAMADAS SEMANAL ACUMULADO TAREAS CUMPLIDAS SEMANAL

PPC ACUMULADO POR CAUSAS DE INCUMPLIMIENTO

CAUSAS DE INCUMPLIMIENTO PROG LOG EQ ADM CLI-ING CLI-PRI EJEC SC PdR GA QA/QC EXT
Error en la programacin, cambios en programacin o mala utilizacin de las herramientas de programacin. Falta de recursos en obra (equipos mayores y menores, herramientas, subcontratos y materiales). Averas, fallas en equipos o mantenimientos no programados. No ingreso de personal a obra. Entrega inoportuna de informacin de ingeniera solicitada al cliente con la anticipacin adecuada. Cambio repentino de prioridades por encargo del cliente sin la anticipacin adecuada. Implica retrabajos por malas ejecuciones en campo. Entrega tarda de un trabajo a cargo de un subcontratista. Paralizaciones por accidentes o incidentes Falta de aprobacin de protocolos o liberaciones.

Retraso por clima, tormentas electricas o por eventos extraodinarios (marchas, huelgas) y por falta de entrega de permisos o licenci

TOTAL DE ACTIVIDADES NO CUMPLIDAS

ADO

NTO
TAREAS CUMPLIDAS ACUMULADO SEMANAL PPC ACUMULADO META

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

S DE INCUMPLIMIENTO TOTAL % ACUMULAD O 9% 45% 0% 0% 9% 9% 0% 0% 0% 0% 27%


100%

TOTAL # 1 5 0 0 1 1 0 0 0 0 3
11.00

SEM 0 0 0 0 0 1 0 0 0 0 0 1

SEM 1 0 3 0 0 0 0 0 0 0 0 0 3

SEM 2 0 2 0 0 0 0 0 0 0 0 0 2

rogramacin.

s).

da.

alta de entrega de permisos o licencias.

SEM 3 0 0 0 0 1 0 0 0 0 0 3 4

SEM 4 1 0 0 0 0 0 0 0 0 0 0 1

SEM 5

SEM 6

SEM 7

SEM 8

SEM 9

Insertar Columna para aumentar semana SEM 10 SEM 11 SEM 12 SEM 13 SEM 14 SEM 15 SEM 16

SEM 17

SEM 18

SEM 19

SEM 20

SEM 21

SEM 22

SEM 23

SEM 24

SEM 25

SEM 26

SEM 27

SEM 28