Activity Name
OD
PACKAGE 422 (3
(3-Week Look Ahead)-WEEK 151 (DD 02/Dec/2013)
07-Jan-14
115.00
32.00
06-Oct-13 A
07-Jan-14
115.00
32.00
06-Oct-13 A
07-Jan-14
98.80
32.00
28-Oct-13 A
07-Jan-14
8.00
44.00
8.00
19.00
02-Dec-13
29-Oct-13 A
10-Dec-13
23-Dec-13
12.00
18.00
0.00
1.80
18-Nov-13 A
03-Nov-13 A
28-Nov-13 A
03-Dec-13
100%
High Level MEP Works (Cable Trays, Ducting and Piping) (3)
18.00
18.00
1.80
7.00
03-Nov-13 A
29-Oct-13 A
03-Dec-13
09-Dec-13
90%
High Level MEP and Painting Works (Supports and Cable Trays are in progress) (1)
18.00
18.00
7.00
7.00
29-Oct-13 A
29-Oct-13 A
09-Dec-13
09-Dec-13
61.11%
18.00
12.00
7.00
12.00
29-Oct-13 A
10-Dec-13
09-Dec-13
23-Dec-13
61.11%
12.00
98.80
12.00
32.00
10-Dec-13
28-Oct-13 A
23-Dec-13
07-Jan-14
0%
Basement Floor
Part 01
Part 03
422P-140290
Part 04
422P-140310
Part 06
422P-140230
Ground Floor
45.46
19.00
17-Nov-13 A
23-Dec-13
18.00
2.00
18.00
17.00
2.00
18.00
17-Nov-13 A
22-Dec-13
17-Nov-13 A
21-Dec-13
23-Dec-13
22-Dec-13
5.56%
0%
18.00
18.00
18.00
18.00
17-Nov-13 A
02-Dec-13
22-Dec-13
22-Dec-13
0%
12.00
6.00
18.00
12.00
6.00
18.00
02-Dec-13
16-Dec-13
02-Dec-13
15-Dec-13
22-Dec-13
22-Dec-13
0%
0%
12.00
6.00
98.80
12.00
6.00
32.00
02-Dec-13
16-Dec-13
28-Oct-13 A
15-Dec-13
22-Dec-13
07-Jan-14
0%
0%
18.00
6.00
18.00
55.00
8.00
6.00
18.00
28.00
28-Oct-13 A
11-Dec-13
18-Dec-13
23-Oct-13 A
10-Dec-13
17-Dec-13
07-Jan-14
02-Jan-14
33%
0%
0%
18.00
18.00
24-Nov-13 A
22-Dec-13
18.00
12.00
24-Nov-13 A
15-Dec-13
Highlevel Cable Traying, Trunking, Ducting and piping (before & along with Blockwall work
18.00
18.00
12.00
18.00
24-Nov-13 A
02-Dec-13
15-Dec-13
22-Dec-13
0%
Blockwall Works
18.00
28.00
18.00
28.00
02-Dec-13
24-Nov-13 A
22-Dec-13
02-Jan-14
0%
Part 02
422P-140770
Part 03
422P-140780
422P-140360
Part 04
422P-140790
422P-140390
Part 05
422P-140720
422P-140740
422P-140750
Office Building
Ground Floor (Including
(Includ
Roof Slab)
MEP
422-CN-C120-31-3032
Finishes
422P-140430-1
First Floor
28.00
28.00
24-Nov-13 A
02-Jan-14
Highlevel Cable Traying, Trunking, Ducting and piping (before & along with Blockwall work
Highlevel MEP and Finishes (After Blockwall Works)
18.00
18.00
12.00
12.00
18.00
10.00
24-Nov-13 A
14-Dec-13
24-Nov-13 A
15-Dec-13
02-Jan-14
12-Dec-13
0%
0%
Block wall Works (Closer to Central Switch Hall) (After 1.2m height)
12.00
18.00
10.00
9.00
24-Nov-13 A
23-Oct-13 A
12-Dec-13
11-Dec-13
5%
18.00
25.00
9.00
19.00
23-Oct-13 A
18-Nov-13 A
11-Dec-13
23-Dec-13
50%
Raft at the Connection of Left and Right Wing to Areas 1 and 2 resp. and mid tunnel
18.00
17.00
8.00
17.00
18-Nov-13 A
24-Nov-13 A
10-Dec-13
21-Dec-13
55.56%
2.00
8.00
6.00
8.00
19.00
2.00
6.00
6.00
8.00
19.00
02-Dec-13
24-Nov-13 A
05-Dec-13
12-Dec-13
24-Nov-13 A
03-Dec-13
08-Dec-13
11-Dec-13
21-Dec-13
23-Dec-13
0%
25%
0%
0%
MEP
422-CN-C120-31-3042
A18200
Finishes
422P-1123223
Third Floor
422P-140420
Generator Building
422P-140810
Nov 23
M T W Thr Fri Sat S
Nov 30
M T W Thr Fri Sat S
2013
Dec 07
M T W Thr Fri Sat S
Dec 14
M T W Thr Fri Sat S
Dec 21
Dec 28
M T W Thr Fri Sat S M T
0%
Part 01
422P-140760
422P-128164
Activity %
Complete
06-Oct-13 A
422P-140510
Finish
32.00
Construction
422P-140800
Start
115.00
A19790
RD
Date
02-Dec-13
Revision
Three Week Lookahead Schedule
Checked
Approved
PROJECT:
KAIA DEVELOPMENT PROJECT - PHASE 1
Activity ID
Activity Name
422-CN-C120-31-3052
422-CN-C120-31-3092
A17310
A15880
08-Dec-13
11-Dec-13
21-Dec-13
23-Dec-13
08-Dec-13
25%
0%
0%
0%
8.00
8.00
6.00
6.00
24-Nov-13 A
24-Nov-13 A
08-Dec-13
08-Dec-13
0%
8.00
53.36
6.00
25.20
24-Nov-13 A
10-Nov-13 A
08-Dec-13
31-Dec-13
0%
53.36
25.20
10-Nov-13 A
31-Dec-13
9.00
9.00
24-Nov-13 A
11-Dec-13
2.00
9.00
9.00
53.36
2.00
9.00
9.00
25.20
02-Dec-13
24-Nov-13 A
24-Nov-13 A
10-Nov-13 A
03-Dec-13
11-Dec-13
11-Dec-13
31-Dec-13
0%
14.00
53.36
14.00
5.60
25.20
2.80
14-Nov-13 A
10-Nov-13 A
10-Nov-13 A
08-Dec-13
31-Dec-13
04-Dec-13
60%
14.00
14.00
14.00
71.00
7.00
11.20
14.00
4.80
24-Nov-13 A
20-Nov-13 A
15-Dec-13
06-Oct-13 A
09-Dec-13
15-Dec-13
31-Dec-13
07-Dec-13
50%
20%
0%
18.00
12.00
68.92
2.00
4.80
15.00
06-Oct-13 A
28-Oct-13 A
23-Nov-13 A
03-Dec-13
07-Dec-13
18-Dec-13
75%
60%
68.92
15.00
23-Nov-13 A
18-Dec-13
6.00
6.00
02-Dec-13
08-Dec-13
0%
9.00
9.00
18.00
8.00
9.00
18.00
23-Nov-13 A
09-Dec-13
02-Dec-13
10-Dec-13
18-Dec-13
22-Dec-13
25%
0%
18.00
18.00
02-Dec-13
22-Dec-13
12.00
6.00
18.00
12.00
6.00
18.00
02-Dec-13
16-Dec-13
02-Dec-13
15-Dec-13
22-Dec-13
22-Dec-13
18.00
18.00
02-Dec-13
22-Dec-13
18.00
28.00
18.00
6.00
02-Dec-13
28-Oct-13 A
22-Dec-13
08-Dec-13
0%
9.00
9.00
1.00
6.00
28-Oct-13 A
21-Nov-13 A
02-Dec-13
08-Dec-13
85%
70%
Basement 02
422P-128425-11
Raft Concrete (on the Basement Service Gallery and B2 of DCP)
Area 05
422-CN-C120-31-3082 Walls and Columns (Near the 2nd area of the Basement Service Gallery) (2)
Mezzanine level
Slab/Beam Reinforcement
Slab Scaffolding/Form Work Area 01
Slab Scaffolding/Form Work Area 02
Slab/Beam Reinforcement Area 01
Slab/Beam Reinforcement Area 02
N17260
A17280
Precast Fence
422P-140480
422P-140490
Activity %
Complete
24-Nov-13 A
05-Dec-13
12-Dec-13
22-Dec-13
24-Nov-13 A
Structural Works
N234435
N22P-128425-1
N22P-1323423
Finish
6.00
6.00
8.00
2.00
6.00
422P-128425-1
Mezzanine level
N22P-128415
Start
8.00
6.00
8.00
2.00
8.00
Right Wing
422-CN-C120-31-3062
RD
Left Wing
422-CN-C120-31-3072
OD
Remaining Work
Actual Work
Critical Remaining...
Nov 23
M T W Thr Fri Sat S
2013
Dec 07
M T W Thr Fri Sat S
Dec 14
M T W Thr Fri Sat S
Dec 21
Dec 28
M T W Thr Fri Sat S M T
0%
80%
0%
0%
Nov 30
M T W Thr Fri Sat S
Date
02-Dec-13
Revision
Three Week Lookahead Schedule
Checked
Approved