50M size of 6 vents and stop log gates elements Hoist bridge and Hoist equipment for spill way regulator of Bhupathipalem Reservoir project. - Est. Rs. 5.15 Crores CR.No.18/07-08. Name of Sub Work: Providing Electrification and lighting arrangement for Spill Way , Earth dam & Head sluice of Bhupathipalem Reservoir Project DETAILED ESTIMATE Description of Items Sl. No. 1 Supply, laying, commisioning and testing of under ground 31/2 core 95 sq.mm 1.1kv PVC armored, Aluminium cable for lighting purpose including cost of materials, conveyance to site of work laying the cable, al labour and incidental charges etc., complete for finished item of work and as directed by the Engineer-in-charge From Transformer to Meter board in two rows. From Meter board to Main Control Panel board in Control Room in two rows. Add5% variation Total 2 Supply, laying, commisioning and testing of 31/2 core 50 sq.mm XLPE 1.10Kv armoured cable for lighting purpose including cost of materials, conveyance to site of work laying the cable, al labour and incidental charges etc., complete for finished item of work and as directed by the Engineer-in-charge From Main Control Panel to Motor control panel at Spill way 50+155+38+12+37+98 From Main Control Panel to Street light control panel at Spill way 50+155+38+12+37+98 From Main Control Panel to R/s Adit starting at berm 50+150+38+12+92
From Motor Control Panel to Radial gate motors on hoist of spillway Gate-1;- 3+1 =4 3+10+1 = 14 Gate-II :- 3+10+2.75+1= 16.75 3+10+2.75+10+1 =26.75 Gate-III:- 3+10+2.75+10+2.75+1 =29.50 3+10+2.75+10+2.75+10+1 = 39.50 Gate-IV:- 3+10+2.75+10+2.75+10+2.75+1 = 42.25 3+10+2.75+10+2.75+10+2.75+10+1 = 52.25 Gate-V:- 3+10+2.75+10+2.75+10+2.75+10+2.75+1 =55.00 3+10+2.75+10+2.75+10+2.75+10+2.75+10+1 = 65.00 Gate-VI:-3+10+2.75+10+2.75+10+2.75+10+2.75+10+2.75+1 = 67.75 3+10+2.75+10+2.75+10+2.75+10+2.75+10+2.75+10+1 = 77.75
No.
Qty,
1x2 1x2
40 10
1x1
490.5
490.5
Add5% varitions
Page 1 of 13
Description of Items Sl. No. 3 Supply, errection, commissioning and testing of 3.5 core 25 sq.mm XLPE Aluminium 1.10 KVarmoured cable for lighting poles including cost of materials, conveyance to site of wok, laying the cable, all labour and incidental charges etc., complete for finished item of work and as directed by Engineer-inCharge. From Street Control panel to Right flank lighting 202+4(9)+4(1.5)=244 Left flank lighting 453+10(9)+10(1.5)=558 Berm on R/S160+4(9)+4(1.5)+37+12=251 Berm onL/S453+6(9)+6(1.5)+37+12=565 From Street Control panel to flood Light at spill way (11(1)+4(1.5)+5=22 From sump well to audit entranceand to street control panel(3+37+0.3+49.48+2.5+36.87+2.5) At junction State High way and Earth dam Flood light at D/s (202+11(1)+4(1.5)=219 From R/S D/S Rocktoe towards downstream 50+180=230 + 38=268m From L/S D/S Rocktoe towards downstream 44.5+120=164.5m Add 5% varitions
No.
Qty,
244 558 251 565 22 131.65 219 268 164.5 2423.15 126.85 2550Rmt
4 Supply, errection, commissioning and testing of 3 core, 2.5 sq.mm PVC flexible copper wire for lighting and other lighting purpose etc., including cost of materials, conveyance to site of work all labour and incidental charge etc., complete for finished item of work and as directed by Engineer-incharge. From street control panel to Audit entrance to end in two lines and connections to 1 x2 lamps(3+37+0.3+49.48+2.5+73.75+2.5+49.48) From street control panel to Audit entrance to instrumentation gallery(3+37+0.3+49.48+2.5+63.75+22) Add 5% varitions 1x1
218
436
178
Total
Page 2 of 13
Description of Items Sl. No. 5 Supply, fixing, commissioning and testing of L.T.
distribution board outdoor, double door panel type made of 16 SWG GI sheet with primary coat of red oxide and one coat of enamel paint with 1 no. of 200A MCCB as incoming, 4 Nos. of 65A SFU as out going leads with KWH, V, Ampe meter and metering equipment, indicating lamps, 200A, 4pole change over swich including panel mounting suitable 200A bus-bar and control wiring with suitable flexible copper wire, including cost of all materials, fittings, labour charges and all incidental charges etc., complete for finished item of work and as directed by the Engineer-in-charge.
No.
Qty,
1x1
Page 3 of 13
Description of Items Sl. No. 6 Supply, fixing, commissioning and testing of distribution
boards outdoor, double door panel type made of 16 SWG GI sheet with primary coat of red oxide and one coat of enamel paintincluding cost of 125A SFU with HRC fuses as incoming and 10no. of 32A TPN including control wiring, indication lamps as directed by the department including cost of all materials, fittings, labour charges and all incidental charges etc., complete for finished item of work and as directed by the Engineer-in-charge.
No.
Qty,
1x1
1x1
1x1
1x1
Page 4 of 13
Description of Items Sl. No. 10 Supply, fixing, commissioning and testing of sodium
vapour lamp of CTTI scape model of crompton greaves cat Ref.No.MH SSG 1515 IH/G/150 W MH philips equivalent make with IP 65 protection for lamp compartment and IP54 protection for control gear compartment including cost of all materials, fittings, labour charges and all incidental charges etc., complete for finished item of work and as directed by the Engineerin-charge.
No.
Qty,
For single arm poles For double arm poles R\sD\Sfrom electrical room to Rock Toe-3
1x24 2x5 1 x3
24 10 3 37 Nos
Page 5 of 13
Description of Items Sl. No. 11 Supply, fixing, commissioning and testing of Integral
flood light luminaire complete with conrtrol gear box with suitable lamp cat Ref.No.MH SSG 1515 IH/G/250 W MH crompton greaves / philips/bajaj equivalent make with IP 65 protection for lamp compartment including cost of all materials, fittings, labour charges and all incidental charges etc., complee for finished item of work and as directed by the Engineer-in-charge. at Spillway
No.
Qty,
at Head sluice At the junction of state high way and earth dam at U/s
4 4 4 12 Nos
In the left Audit In the Gallary in the Right Audit At the sump well In the Instrumentation Gallary
5 7 5 2 5 24
For Earth Dam : 675/50 For berm R/s D/s from electrical room to rock toe
14 10 3 Total
14 10 3 27 Nos
Page 6 of 13
No.
Qty,
75/15
5 Total
5 5Nos
At spill way entrance At head sluice At the junction of state highway and earth dam 16 Earth Work Excavation for foundation in all kinds of soils including boulders upto 0.3m diameter for dam spillway intake structures and other appurtenant works and placing the excavated soil neatly in dump area or disposing off the same as directed etc., for cable trench and foundation for poles, complete with lead upto 1 KM and all lifts. for foundation Add variations
1 1 1 Total
1 1 1 3Nos
1x35
0.6
0.6
1 Say
Page 7 of 13
Description of Items Sl. No. 17 Providing and laying insitu vibrated M-15 (28 days cube
strenghts not less than 15 N/mm2) grade cement concrete using 40mm down size approved, clean, hard graded aggregates including cost of all materials machinery, labour, form work, centering, scafolding, cleaning batching mixing placing in position, levelling vibrating finishing curing complete for foundation concrete for poles for plan concrete works with initiallead up to 1 KM and all lifts (cement concrete 210 kg/cum with use of super plaster CA 0.9 cum FA 0.4cum for foundation of poles.
No.
Qty,
For foundation of poles Add variations 18 Supply, fixing, commissioning and testing of lightning
arrestor of copper heavy duty including copper strip 25 x 1.5 mm of 12m length and earthing arangements etc. including cost of all materials, fittings, labour and all incidental charges etc. complete for finished item of work and as directed by the Engineer-in-charge.
1x35
0.6
0.6
1x1
1x1
4350
4350 Rmt
20 Supply, fixing, commissioning and testing of copper strip 25 x 6 mm for earthing arangements etc. including cost of all materials, fittings, labour and all incidental charges etc. complete for finished item of work and as directed by the Engineer-in-charge for inner loop earthing of motors.
1x1
200
200 Rmt
1x1
200
200
Page 8 of 13
Description of Items Sl. No. No. 22 Earth work Excavation for Eathing Pit installing 4 1/2" dia.,3m GI Pipe and filling with char coal and salt in layers as per specification and pit cap with water pouring facility for Earthing including cost of 1 x 20 all materials, labour and all incidental charges etc. complete for finished item of work as directed by the Engineer-in-charge.
Qty,
20
Page 9 of 13
Description of Items Sl. No. No. 23 Supply, fixing, commissioning and testing of Cable rack over Hoist bridges of spillway and on walkway bridge and cable trench including cost of all materials, fittings, labour and all incidental charges etc. complete for finished item of work and as 1 x 80 directed by the Engineer-in-charge for running motors cable along the hoist bridge
Qty,
80
24 Supply, fixing, commissioning and testing of PVC Pipe of 32mm dia. and 2mm thickness inside the audit and gallary of spillway including cost of all materials, fittings, necessary bends, joints and couplings, labour and all incidental charges etc. complete for finished item of work and as directed by the Engineer-in-charge. from R/s audit end to left side audit end (555+2.5+73.75+2.5+55.3) = 189.55 from R/s audit end to Instrumentation gallary (55.5+2.5+63.75+22) =14375 from R/s audit end to sump well motor (55.5+2.5+37+2.5) =97.30 Add 5% variations
25 Supply, fixing, commissioning and testing of "KEERAJ" or equivalent make SIEREN/HOOTER horizontal double side 3 pole, 400/440V, 2800 RPM, 50Hz, 3 H.P Motor, 5Km on either side with rain protection suitable G.I. protection box including the cost of all materials, fittings, labour and all incidental charges etc. complete for finished item of work and as directed by the Engineer-in-charge.
1x1
26 Supply, fixing, commissioning and testing of 10 H.P. Submersible motor, 5 stage kirloskar / equivalent company make with pump including cost of automatic float level operating system at Sump Well including cost of all materials, fittings, labour and all incidental charges etc. complete for finished item of work and as directed by the Engineer-incharge.
1x1
Page 10 of 13
No.
Qty,
For Hand Railing - 10 Rmt Earth work excavation CC M15 - 40 MSA GI pipe 100mm dia for vertical post 3 No. 3 No. 3 Nos. 0.45 0.45 1.5 0.45 0.45 0.45 0.45 0.27 cum 0.27 cum 4.5 Rmt 6 Nos. 20 Rmt
55 mm dia hole charges in two rows for vertical post 3 x 2 G.I. Pipe 50 mm dia in two rows of Hand Rails 2x2x5 R/s D/s = 180 Mtres L/s D/s = 120 Mters R/s at junction of State high way and Earth Dam = 20 Meters. 3x2 50mm dia drilling charges Welding charges for vertical posts at 5M C/c 3 Nos. Total vertical posts 10/5+1=3 Nos. No. of holes to be welded 3 Nos
6 Nos. 3 Nos.
28 Supply of WAP Aluminium self 1x1 supportingextension ladder with accessories "A" type (Model 007) for fixing of lamps and Accessories up to 11m height including cost of materials,transportation to site of work, errection,commissioning and testing etc,. complete for finished item of work. 29 Supply and Fixing of single compression brass cable
glands for 3.5 core PVC armoured cable from 25 sqmm to 50 sqmm with brass washers complete
1No
146 Nos.
20 Nos.
Page 11 of 13
Description of Items Sl. No. 31 Supply and fixing of crimping type copper lugs
confirming to I.S. specifications for cable upto 16 sq.mm including nuts and bolts with connections
No.
584 Nos.
48 Nos.
32 Nos.
1x2
2 Nos.
Page 12 of 13
Sl. No.
Description of Items
No.
Qty,
Page 13 of 13