IV B.Tech I Semester Supplementary Examinations, February 2007
POWER PLANT ENGINEERING
(Mechanical Engineering)
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
⋆⋆⋆⋆⋆
1. Draw a net line diagram of in plant coal handling and indicate the name of equip-
ments used at different stages? [16]
3. (a) With help of a block diagram explain the main components of a open cycle
gas turbine power plant.
(b) Give the classification of gas turbine power plants. [8+8]
4. What are the various factors to be considered in selecting the site for a hydro
electric power plant and sicuss about primary and secondary investigations. [16]
5. (a) What are the various factors to be considered in the selection and location of
a wind mill?
(b) Explain the construction and operation of a two blade wind mill. [8+8]
6. With a neat sketch explain the working of a simple constant pressure gas turbine.
Mention its advantages and disadvantages. [16]
⋆⋆⋆⋆⋆
1 of 1
Code No: RR410304 Set No. 2
IV B.Tech I Semester Supplementary Examinations, February 2007
POWER PLANT ENGINEERING
(Mechanical Engineering)
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
⋆⋆⋆⋆⋆
2. Draw a neat diagram of cyclone burner and explain its outstanding features. [16]
4. What are the various factors to be considered in selecting the site for a hydro
electric power plant and sicuss about primary and secondary investigations. [16]
5. (a) What is the importance of the parameter gas conductivity in MHD Genera-
tion?
(b) With neat sketch explain the MHD cycle combined with thermal power cycle.
[8+8]
6. With a neat sketch explain the working of a simple constant pressure gas turbine.
Mention its advantages and disadvantages. [16]
7. (a) How does a nuclear fission differ from nuclear fusion? [4]
(b) Enumerate and explain the essential components of nuclear reactor. [8]
(c) What are the advantages of gas cooled reactors? [4]
8. (a) Define:
i. Connected load
ii. Maximum demand
iii. Demand factor [6]
(b) The peak load on a power station is 30 MW. The loads having maximum
demands of 25 MW, 10MW, 5 MW and 7 MW are connected to the power
station. The capacity of the power station is 40MW and annual load factor is
50 % find.
i. Average load on the power station.
ii. Energy supplied per year.
iii. Demand factor.
iv. Diversity factor. [10]
⋆⋆⋆⋆⋆
1 of 1
Code No: RR410304 Set No. 3
IV B.Tech I Semester Supplementary Examinations, February 2007
POWER PLANT ENGINEERING
(Mechanical Engineering)
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
⋆⋆⋆⋆⋆
1. (a) Draw a chart showing operations and devices used in coal handling plant.
(b) Describe different types of coal conveyors. [8+8]
2. What is a condenser? Name the different types of condenser. Describe the Opera-
tion of
(a) Surface condenser
(b) Jet condenser [16]
3. (a) Write short notes on the following:
i. Starting system of diesel power plant.
ii. Part load performance of diesel power plant. [4+4]
(b) Explain with the help of a block diagram the lubrication system of diesel power
plant [8]
4. Explain rotational speed, specific speed, maximum possible efficiency, part load
efficiency, head of water, type of water available. [16]
5. (a) What are the various factors to be considered in the selection and location of
a wind mill?
(b) Explain the construction and operation of a two blade wind mill. [8+8]
6. With a neat sketch explain the working of a simple constant pressure gas turbine.
Mention its advantages and disadvantages. [16]
7. (a) What is a moderator? [4]
(b) What you understand by thermal shielding? [8]
(c) Describe in brief giving neat sketch, the working of a pressurized water reactor
plant. [4]
8. (a) Explain economics in plant. [5]
(b) What are general arrangement for power distribution. [5]
(c) Estimate the generating cost per unit supplied from a power plant having the
following data
Plant capacity = 120 MW.
Capital cost = Rs.600 × 106
Annual load factor = 40 %
Annual cost of fuel, taxation, oil and salaries = Rs.500000
Interest and depreciation = 12 % [6]
1 of 2
Code No: RR410304 Set No. 3
⋆⋆⋆⋆⋆
2 of 2
Code No: RR410304 Set No. 4
IV B.Tech I Semester Supplementary Examinations, February 2007
POWER PLANT ENGINEERING
(Mechanical Engineering)
Time: 3 hours Max Marks: 80
Answer any FIVE Questions
All Questions carry equal marks
⋆⋆⋆⋆⋆
1. Why Non conventional sources are considered as future major power resources to
face power crisis in the world? Which of them are more prominent? and justiry.
[16]
3. Describe the following systems in brief with respect Diesel Power Plant.
4. (a) Explain in detail the spillways, baffle piers and drainage gallery.
(b) Explain the various factors to be considerd in the selection of a hydraulic
turbine. [8+8]
5. (a) What are the various factors to be considered in the selection and location of
a wind mill?
(b) Explain the construction and operation of a two blade wind mill. [8+8]
6. With a neat sketch explain the working of a simple constant pressure gas turbine.
Mention its advantages and disadvantages. [16]
8. (a) Explain
i. Load factor
ii. Demand factor [6]
(b) A power station has to supply load as follows :
1 of 2
Code No: RR410304 Set No. 4
ii. Draw load duration curve.
iii. Calculate load factor
iv. Calculate plant capacity [10]
⋆⋆⋆⋆⋆
2 of 2