Você está na página 1de 6

PAGE NO.

- 1 OF 6

LARSEN & TOUBRO LIMITED MSQ UP GRADATION (EPCC 1) PROJECT


PROCEDURE OR COATING AND !RAPPING O UNDERGROUND CARBON STEEL PIPELINES.

DATE:-05.01.2008 REV.NO.- 01
PROCEDURE NO.LT"MSQ"P"UG"C!"012

CONTENTS

1) PURPOESE 2) RE ERENCE DOCUMENTS #) MATERIALS $) PROCEDURE 5) INSPECTION %) REPAIR &) MAC'INE LIMITATION 8) 'ANDLING O COATED PIPES
() SA ET) PRECAUTIONS

APPROVED B) L & T

REVIE!ED " APPROVED B) JACOBS

PAGE NO.- 2 OF 6

LARSEN & TOUBRO LIMITED MSQ UP GRADATION (EPCC 1) PROJECT


PROCEDURE OR COATING AND !RAPPING O UNDERGROUND CARBON STEEL PIPELINES.

DATE:-05.01.2008 REV.NO.- 01
PROCEDURE NO.LT"MSQ"P"UG"C!"012

1.0 PURPOSE 1.1. 1.2. 2.1. 2.2. 2.#. 2.$. This procedure describes guidelines to carry out tape coating of UG piping at IOCL P !IP T "#FI!#"$ % &'( UPG" ) TIO! P"O*#CT+ In case of conflict bet,een this procedure and contract specification- the latter shall go.ern+ s per *acobs spec+ !o+ /1001L''1123 44 C122/ Coal tar protecti.e coating lining to steel carbon pipeline ''PC1'P12 steel structure Painting council- surface preparation specification 'T& G5 test 6ethod for cathodic disbanding of pipeline coating 2.0 RE RENCE DOCUMENTS:

#.0 MATERIALS: #.1. #.2. #.#. #.$. #.5. Protecti.e tapes and other 6aterials brought to site shall be as per specification+ &anufacturer7s test certificates shall be sub6itted for re.ie, prior to use+ The pri6er shall be type 8 as specified in 44 C122/+ Field and laboratory test shall be carried out for each batch of pri6er 9 tape+ Pri6er and tape shall be supplied by the sa6e 6anufacturer+

$.0 PROCEDURE:

$.1.
$.1.1.

SUR ACE PREPARATION:

Prior to blast cleaning- all oil- grease on the pipe surface shall be thoroughly re6o.ed by flushing ,ith suitable sol.ent as per ''PC 'P11 and ,iping ,ith clean tags+ )egreased pipe 6etal surface shall be shot:grit blast cleaned to ''PC1'P112 or 'a 2; of 'I'12<1<322+ This cleaning operation shall be follo,ed i66ediately ,ith pri6ing by spraying : brush+

$.1.2.

8last cleaned surface shall be ade=uately scrubbed 6anually ,ith stiff ,ire brush

APPROVED B) L & T

REVIE!ED " APPROVED B) JACOBS

PAGE NO.- / OF 6

LARSEN & TOUBRO LIMITED MSQ UP GRADATION (EPCC 1) PROJECT


PROCEDURE OR COATING AND !RAPPING O UNDERGROUND CARBON STEEL PIPELINES.

DATE:-05.01.2008 REV.NO.- 01
PROCEDURE NO.LT"MSQ"P"UG"C!"012

,here e.er blasted surface get rusted- prior to application of pri6er+ $.1.#. ll ,eld >oints shall be cleaned 6anually ,ith stiff ,ire brush:buffing ,heel after asse6bly and ,elding- prior to pri6ing+ $.2. $.2.1. $.2.2. PRIMING: I66ediately after girt blasting the surface shall be applied ,ith fast drying un6odified pure chlorinated rubber based coal tar synthetic pri6er+ 'econd coat of pri6er to be applied before application of coal tar ena6el+ The entire surface of pipe should be pri6ed+ !o specific ti6e gap bet,een t,o coats of pri6er needs to be 6aintained but after the second coat of pri6er- the ena6el coating should before the pri6er is co6pletely hardened+ $.#. PREPARATION O COATING MATERIAL: The 6etal dru6s that shall be cropped or cut on suitable platfor6 to pre.ent the ena6el co6ing in contact ,ith ,ooden cinders- grass and other for6s of conta6ination+ The ena6el shall be confir6ed to Type1I or Type1II coal tar ena6el as per 44 C122/+ The cropped out pieces if ena6el 6ay not 4ight 6ore then 12 ?gs+ The bro?en pieces shall be placed in a clean 6elting ?ettle ,hich is 6ade of hea.y duty- &' sheet in for6 of closed .essel+ To 6aintain unifor6 co.erage of 6aterial re=uired =uantity of ena6el is heated in the ?ettle ,ith te6perature range of 2/22C to 2@22C+ Te6perature of ena6el can be chec?ed by dipping ther6o6eter in the ena6el+ Ther6o6eter shall be used in heating ?ettle in a such ,ay so as read the te6perature clearly+ The ther6o6eter shall ha.e te6perature range up to /222C+

$.$.

MEC'ANICAL APPLICATION O COATING AND !RAPPING :

APPROVED B) L & T

REVIE!ED " APPROVED B) JACOBS

PAGE NO.- @ OF 6

LARSEN & TOUBRO LIMITED MSQ UP GRADATION (EPCC 1) PROJECT


PROCEDURE OR COATING AND !RAPPING O UNDERGROUND CARBON STEEL PIPELINES.

DATE:-05.01.2008 REV.NO.- 01
PROCEDURE NO.LT"MSQ"P"UG"C!"012

$.$.1.

The pipe shall be ?ept rotating on a 6achine ha.ing circu6ferential and linear 6otions,hile the pipes are in rotating condition- pour the hot cold ena6el 6anually and spread unifor6ly ,ith the help of rubber brushes+

$.$.2.

'i6ultaneously- one ,rap of glass fibre tissue ha.ing properties as stated in *acobs specification shall be applied o.er the 6olten coal tar ena6el+ Initially- the ,rap is held ,ith hand and pressed o.er the 6olten ena6el+ There after the re.ol.ing pipe puffs the fiber ,arp fro6 the reel- ,hich ensures continuous ,rapping o.er the 6olten ena6el ,ith re=uired o.erlap Ai+e+ 1/ 66B+

$.$.#. $.$.$.

'econd coat of coal tar ena6el as ,ell as glass fiber tissue paper shall be applied as per abo.e procedure+ Third coat of 6olten coal tar ena6el shall be applied neCt+ Final outer ,rap of i6pregnated fibre felt shall be applied i66ediately o.er third coat of coal tar ena6el- si6ilar to inner ,rap application+ The o.erlap at edges of all ,rappings should be 6ini6u6 1/ 66+ the coating shall be continuous for the full length of the pipe eCcept 222 66 at both ends of the pipes+ Finally- carry out ,hit ,ash ,ith crylic ,ater e6ulsion LateC Paint &aterial+ This application ,ill be carried out 6anually by paintbrushes+ There after the pipes is lifted by suitable 6ethods and allo,ed to dry on ,ooden sleepers+

5.0 INSPECTION: 5.1. ll stage inspection 9 docu6entation shall be carried out as per For6at !o+ LT:&'(:TC:222"e.+22 Profile gauge:co6parator- for chec?ing surface preparation as per ' a.ailable+ 5.2. 5.#. fter application of tape coating- .isual inspection shall be carried out for unifor6ity ,ithout any ,rin?le- irregularities and o.erlapping ,idth+ Thic?ness of the coal tar ena6el coating shall be 6easured ,ith the digital thic?ness gauge+ 2; - shall be 6ade

APPROVED B) L & T

REVIE!ED " APPROVED B) JACOBS

PAGE NO.- < OF 6

LARSEN & TOUBRO LIMITED MSQ UP GRADATION (EPCC 1) PROJECT


PROCEDURE OR COATING AND !RAPPING O UNDERGROUND CARBON STEEL PIPELINES.

DATE:-05.01.2008 REV.NO.- 01
PROCEDURE NO.LT"MSQ"P"UG"C!"012

&ini6al acceptable thic?ness shall be @+<66+ 5.$. ll coated and ,rapped pipes shall be tested ,ith the positi.e signalling de.ice to indicate any fault- holes- brea?s or conducti.e particles in the protecti.e coating+ The test .oltage shall be 1/ DE+ 5.5. Peel test shall be conducted at te6perature fro6 12FC to 2<FC per cceptable criteria shall be as per 44 122/+ %.0 REPAIR: 4here.er any holiday is obser.ed or any defecti.e ,or? is found- re6o.e the ,rapping and coating to the re=uired eCtend fro6 those areas by using a sharp ?nife+ Then heated ena6el shall be applied 6anually o.er the area follo,ing the procedure described abo.e and inner and outer ,rap applied+ Golidays test shall repeated for the portion+ &.0 MAC'INE LIMITATION: &achine used for coating and ,rapping as described abo.e can be used fro6 pipes fro6 1277H to @5 IH only+ For pipes upto 5J H and abo.e @5J H- coating and ,rapping shall be done 6anually ,ith out rotation of pipes+ 8.0 'ANDLING O COATED PIPES The coated pipes shall be handled at all ti6es ,ith e=uip6ents such as ,ide belt slings and padded s?ids designed to pre.ent da6age to the coating+ 8are cables- chains- hoo?s etc+ shall not be per6itted to co6e in contact ,ith coatings+ suitable crane 6ay be used+ Coated pipes shall be supported at t,o bare ends clear fro6 ground either on ?ids or sand bags+ 44 122/ 6ethods+

APPROVED B) L & T

REVIE!ED " APPROVED B) JACOBS

PAGE NO.- 6 OF 6

LARSEN & TOUBRO LIMITED MSQ UP GRADATION (EPCC 1) PROJECT


PROCEDURE OR COATING AND !RAPPING O UNDERGROUND CARBON STEEL PIPELINES.

DATE:-05.01.2008 REV.NO.- 01
PROCEDURE NO.LT"MSQ"P"UG"C!"012

(.0 SA ET) PRECAUTIONS (.1. (.2. (.#. de=uate and proper PP# shall be pro.ided to persons in.ol.ed in short of grit blasting ,or?+ de=uate and proper PP# shall be pro.ided to persons in.ol.ed in hot application of coal tar ena6el along ,ith the ,raps+ Proper fire fighting syste6 shall be pro.ided during application of pri6er and ena6el coats and all safety re=uire6ents shall be ensured for under ground trenching- lo,ering 9 bac? filling+ (.$ ll precaution shall be obser.ed as per the instruction of P&C: O4!#"+

APPROVED B) L & T

REVIE!ED " APPROVED B) JACOBS

Você também pode gostar