Você está na página 1de 5

Anacostia Waterfront Initiative Transportation Master Plan Update

Informational Meeting Thursday, December 12, 2013

Welcome
Welcome to the District Department of Transportations Anacostia Waterfront Initiative (AWI) Transportation Master Plan Update Informational Meeting. The Master Plan serves as our roadmap for coordinating all of the projects and initiatives already being planned, designed and constructed within the AWI Program area. The plan helps us to minimize construction impacts on you -- our residents, businesses and other important stakeholders and also advance these important projects as quickly and eciently as possible. Tonights meeting is intended to share with you the progress we have made and the projects and initiatives being included in the next Master Plan update currently being completed. The meeting is being conducted in two parts: 1) a short overview presentation about the Master Plan and 2) an Open House to allow you to learn more about the DDOT transportation projects and other major partnering agency initiatives being coordinated and included in the next Master Plan update.

AWI Transportation Master Plan Corridors

Master Plan Corridors


In keeping with the Master Plan update, the Open House divides the program area into six corridors and also accounts for various program area-wide and partnering agency projects and initiatives. The six corridors are: South Capitol Street Corridor Suitland Parkway Corridor Middle Anacostia Crossings Corridor Kenilworth Corridor M Street SE/SW Corridor Anacostia Riverwalk Trails Sta representing projects in each of the corridors will answer your questions and add you to their contact lists for future updates and information. More Information The Anacostia Waterfront Initiative (AWI) is a 30-year, $10 billion series of transportation, environmental, economic, community and recreation projects that are transforming the shores of the Anacostia River into a world-class waterfront. The AWI Program area stretches from the Tidal Basin to the citys northeast border with Maryland. For more information about DDOTs AWI Program, go to www.anacostiawaterfront.org. To ask questions, comment or be added to the AWI community contact list, please email ddot.awi@dc.gov or call 202-741-8528.

anacostiawaterfront.org

South Capitol Street Corridor


Projects
1 2 3 4 5 6 Frederick Douglass Memorial Bridge Rehabilitation Ballpark Roadways (2008 Near Term Improvements) South Capitol Street Phase 1 (Segments 1 and 2) South Capitol Street Phase 2 (Segments 4 and 5) I-295/Malcolm X Bridge Rehabilitation I-295/Malcolm X Interchange

Status
Completed Completed Design Design Completed Design

Suitland Parkway Corridor


Projects
1 2 3 4 Suitland Parkway Pedestrian/Bike Trail South Capitol Street Phase 2 Segment 3 Martin Luther King, Jr. Avenue Two-Way Reconstruction Martin Luther King, Jr. Avenue Two-Way Widening

Status
Planning Design Completed Design

anacostiawaterfront.org

Middle Anacostia Crossings Corridor


Projects
1 2 3 4 5 6 7 8
Pennsylvania & Potomac Ave SE Intersection Pennsylvania Ave & DC 295 Entrance Ramp Improvements Pennsylvania Ave & Minnesota Ave Intersection Pedestrian Bridge: Anacostia HS to Anacostia Park 11th Street Bridge Project Phase 1 11th Street Bridge Project Phase 2 Barney Circle and Southeast Boulevard Virginia Avenue/CSX National Gateway - 12th Steet SE

Status
Environmental Documentation Completed Design Completed Completed Under Construction Environmental Documentation Environmental Documentation

Kenilworth Corridor
1 2 3 4 5 6 7 8
Kenilworth Corridor Near Term Improvements Nannie Helen Burroughs Interchange East Capitol Street Interchange Benning Road Interchange Eastern Avenue Interchange Kenilworth Avenue Mainline Improvements Parkside Pedestrian Bridge DC 295/Kenilworth Pedestrian Bridges

Projects

Status
Completed Completed Planning Planning Completed Planning Design Design

anacostiawaterfront.org

M Street SE/SW Corridor


Projects
1 2 3 4 5
4th Street SW Reconstruction

Status
Completed

Maine Avenue SW Improvements Completed The Wharf - Infrastructure Maryland Avenue SW / CSX National Gateway M Street SE/SW Transportation Study Design Planning Planning

Anacostia Riverwalk Trails Corridor


Planning Design Completed

anacostiawaterfront.org

AWI-Wide Projects

1 2 3 4 5 6 7 8

DC Streetcar Water Taxi Soccer Stadium St. Elizabeths East Infrastructure 14th Street Bridge Improvements DC Water Clean Rivers/CSO Project Anacostia Park Master Plan Long Bridge Study AWI Master Drainage Plan Private Development

Projects

Planning, Design and Construction Planning Planning Design Environmental Documentation Design and Construction Environmental Documentation Environmental Documentation Design and Construction Design and Construction

Status

anacostiawaterfront.org

Você também pode gostar