(Insert Client / Project Name Here)

Requirements Traceability Matrix (RTM)


A. General Information
Information to be provided in this section gives a specific name to the project as well as pertinent information about the
personnel involved.

Project Name: Date:


Client: Modification Date:
Prepared by: Authorized by:
Version:

Overview
B. Responsibilities
The requirements traceability matrix will be maintained by the project manager or designee; however, input to the table may be
required from other team members. Document the responsibilities in this section and indicate who has primary responsibility for
maintaining the RTM.

______________________________________________________________________________________________________
SDLCP051001 Page 1 Requirements Traceability Matrix
Requirements Traceability Matrix
C. Description of Matrix Fields
Develop a matrix to trace the requirements back to the project objectives identified in the Baseline Project Plan (BPP), the project
requirements mentioned in the System Requirements Statement (SRS), and forward through the remainder of the project life cycle
phases. Place a copy of the matrix as an Appendix in the SRS, the System Design Specification (SDS), etc. Expand the matrix in
each phase to show traceability of deliverables to the requirements and vice versa. The requirements traceability matrix should
contain the following fields:

A unique identification number containing the general category of the requirement (e.g., HRMN) and a number assigned in
ascending order (e.g., 1.0; 1.1; 1.2).

Priority (Each requirement needs to be given a priority on a scale from 1 to 5. 1 = critical, 5 = nice to have if you can get
around to it.)

A brief requirement statement / phrase.

Requirement source (BPP, SRS, SDS etc.)*.

SRS source*.

SDS source*.

Program Module containing the requirement.

Test Specification containing the requirement test (In your BPP update that accompanies your SDS)*.

Test Case number(s) where requirement is to be tested (In your Implementation deliverables)*.

Verification of successful testing of requirements (In your Implementation deliverables)*.

Modification field. If requirement was changed, eliminated, or replaced, indicate disposition and authority for modification.

* Note: Each field should specify the page number in the document where this is referenced, the initials of the team member
responsible for this section, and a check mark if it is completed.

See example next page.

______________________________________________________________________________________________________
SDLCP051001 Page 2 Requirements Traceability Matrix
Client / Project Name
Requirements Traceability Matrix

Unique Priorit Requirement Source of System System Program Test Test Successful Modification Remarks
Number y Requirement Requirement Design Module Spec. Case(s) Test of
Spec. Spec. Verification Requirement

____________________________________________________________________________________________________________________________________________
SDLCP051001 Page 3 Requirements Traceability
Matrix