Você está na página 1de 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008)

Rev 3 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Compaction Testing
PROJECT TITLE

30-Jun-08 DATE APPROVED QR NUMBER

SAIC-A-1005
WBS / BI / JO NUMBER

XX/X/200X

CIVIL-

CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL

EQUIPMENT DESCRIPTION REV. NO. PURCHASE ORDER NUMBER

EQPT CODE

SYSTEM ID.

PLANT NO.

EC / PMCC / MCC NO. QUANTITY INSP. MH's SPENT TRAVEL TIME

ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL

SAUDI ARAMCO USE ONLY


WORK PERMIT REQUIRED?

ITEM No.

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

A1

Contractor's testing agency shall be a Saudi ARAMCO approved civil testing agency.

SAES-A-114 Sec. 5.1.1

A2

One Modified Proctor Test per ASTM D1557 with corresponding Proctor curve shall be performed for each type of fill material or where there is a change in the type or the source of material.

SAES-A-114 Sec. 6.3.3.1

A3

For cohesionless free draining soils, ASTM D4253 Maximum Index Density and Unit Weight of Soils Using a Vibratory Table and ASTM D4254 Minimum Index Density and Unit Weight of Soil and Calculation of Relative Density shall also be performed for each type of cohesionless, free draining material or where there is a change in the type or the source of material..

SAES-A-114 Sec. 6.3.3.1

A4

In-place density shall be determined using one of the following: ASTM D-1556 Sand Cone Method; ASTM D-2167 Rubber Balloon Method; ASTM D-2922 Nuclear Method; or ASTM D-2937 Drive-cylinder.

SAES-A-114 Sec. 6.3.3.2

A5

Acceptance testing of in-place density and moisture content (field density testing) on compacted fill will be performed at the following rates: 1. Under all foundations - one test every 1000 ft (90 m) of each lift. 2. Under area paving - one test every 2000 ft (180 m) of each lift. 3. Road base and sub-base - one test every 2000 ft (180 m) of base or sub-base. 4. Backfill of trenches - one test for every 50 linear ft (15 m) of each lift. 5. General fill - one test every 5000 ft (460 m) of each lift.

SAES-A-114 Sec. 6.3.3.2

A6

As a minimum, at least one in-place density test must be performed on every lift of fill and further placement shall not be allowed until the required density has been achieved.

SAES-A-114 Sec. 6.3.3.3

A7

Nuclear density gauges, when used, shall have a valid calibration certificate per the requirement of ASTM D2922, Sec. A1.2.

SAES-A-114 Sec. 3.2

Page 1 of 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) SAIC NUMBER

Rev 3

30-Jun-08 DATE APPROVED QR NUMBER

Compaction Testing
PROJECT TITLE

SAIC-A-1005
WBS / BI / JO NUMBER

XX/X/200X

CIVIL-

CONTRACTOR / SUBCONTRACTOR

ITEM No.

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

A8

The depth of the test holes shall be no greater than 300mm (12 inches) deep. (ASTM D 2922, Sec. 1.1)

SAES-A-114 Sec. 3.2

REMARKS:

REFERENCE DOCUMENTS: 1- SAES-A-114 -- Excavation and Backfill, 28 April, 2004

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Y = YES

N = NO F = FAILED

Page 2 of 2