Project Data Sheets (PDS) contain summary information on the project or program: Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
04 Sep 2007
PDS Updated as of
09 Mar 2008
Project Name
Country
Sri Lanka
Project/Program Number
37263-012
Status
Closed
Geographical Location
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Thematic Classification
Economic growth
FINANCING
Type/Modality of Assistance Technical Assistance TOTAL Approval Number 4315 Source of Funding Technical Assistance Special Fund Approved Amount (US$ thousand) 1,000 US$ 1,000
Indigenous Peoples
DESCRIPTION
The purpose of this TA will be to assist the Government prepare a road master plan through a prioritized plan to develop the road network for the next 20 years. This will be achieved through the development of (i) a Road Network Master Plan for the country's core network; (ii) an investment Plan for the next 10-20 years; and (iii) financing strategies to increase participation of the private sector in road works. The approach is to use generalized information to determine a ranking based on relative benefits and costs, and to establish a pipeline of possible projects for implementation in the next 10-20 years under various funding scenarios. Physical development should be guided by this road master plan, taking inco consideration the need to develop a modern highway system without abandoning the improvement of the existing road network.
DEVELOPMENT IMPACT
PROJECT OUTCOME
Description of Outcome Progress Towards Outcome
BUSINESS OPPORTUNITIES
Date of First Listing 06 Sep 2007
Consulting Services
The TA will require 70 person-months of consulting services months of international consultants and 45 of domestic cons will have expertise in (i) transport policy, (ii) transport econom engineering including structural engineering, (iv) geotechnica engineering; (v) traffic engineering, (vi) surveying, (vii) enviro social and poverty analysis, and (ix) resettlement planning.
Procurement
http://www.adb.org/projects/37263-012/business-opportunities
TIMETABLE
Concept Clearance
Fact-finding
Approval
20 Jan 2004
MILESTONES
Closing Approval No. Technical Assistance 4315 Approval 20 Jan 2004 Signing 11 Feb 2004 Effectivity Original 11 Feb 2004 31 Mar 2005 Revised 31 Mar 2008 Actual
Executing Agencies
LINKS
Project Website http://www.adb.org/projects/37263-012/main
http://www.adb.org/projects/37263-012/documents