Retail Supply Tariff approved by K.E.R.C.

in Tariff Order for the year 2013 -14 For BESCOM


Sl. Tariff No. Category Category Description Particulars Existing Proposed by Tariff as per BESCOM Tariff Order2012 Approved as per Tariff Order 2013 Remarks

Low Tension Supply


Fully subsidized by GOK Free Free Free Fully subsidized by GOK

LT-1

BJ/KJ

Monthly Min. per Installation per Month. CDT(Commission Determined Tariff) EC per KWH Sanctioned Load Fixed Charge (FC) FC For Ist KW

Cost of Supply: 504 Ps. / unit Rs 30/504 Ps. Rs 30/504 Ps. Rs 30 /504 Ps No Change in CDT

Rs.25/Rs.35/-

Rs.25/Rs.35/-

FC For 1st KW FC For addl. KW

Rs.25/Rs.35/-

No Increase No Increase

LT-2 (a)(i)

Domestic - Applicable to Areas under Bruhat Bangalore Mahangara Palike (BBMP), Municipal Corporations and all Urban Local Bodies

FC For addl. KW Consumption Energy Charges (EC) 0 to 30 KWH 31 to 100 KWH 101 to 200 KWH Above 200 KWH Sanctioned Load Fixed Charge (FC) FC For Ist KW FC For addl. KW Consumption Energy Charges (EC) 0 to 30 KWH 31 to 100 KWH 101 to 200 KWH Above 200 KWH

230 Ps 350 Ps 460 Ps 560Ps

300Ps. 420 Ps 530 Ps 630 Ps 0 to 30 KWH 31 to 100 KWH 101 to 200 KWH Above 200 KWH

250 Ps 370 Ps 485 Ps 585 Ps

20 Ps Increased 20 Ps Increased 25 Ps Increased 25 Ps Increased

Rs.15/Rs.25/-

FC For 1st KW FC For addl. KW

Rs.15/Rs.25/-

No Increase No Increase

LT-2 (a)(ii)

Domestic Areas under Village Panchayats

220 Ps 320 Ps 430 Ps 510Ps

290 Ps. 390 Ps 500 Ps 580 Ps

0 to 30 KWH 31 to 100 KWH 101 to 200 KWH Above 200 KWH

240 Ps 340 Ps 455 Ps 535 Ps

20 Ps Increased 20 Ps Increased 25 Ps Increased 25 Ps Increased

LT-2(b)(i)

Pvt. Educational Sanctioned Load Institutions & Pvt. Fixed Charge (FC) Hospitals and Nursing FC per KW Homes: FC Minimum per Applicable to Areas Month under Bruhat Consumption Bangalore Mahangara Energy Charges Palike (BBMP) , (EC) Municipal Corporations and all 0 to 200 KWH areas coming under Urban Local Bodies. above 200 KWH Sanctioned Load Fixed Charge (FC) FC per KW Pvt. Educational FC Minimum per Institutions and Pvt. Month Hospital & Nursing Consumption Homes - Applicable to Energy Charges Areas coming under (EC) Village Panchayats 0 to 200 KWH above 200 KWH Sanctioned Load Fixed Charge (FC) per KW Consumption Energy Charges (EC) 0 to 50 KWH Above 50 KWH

Rs.35/Rs.65/-

Rs.35/Rs.65/-

FC per KW FC Minimum per month

Rs.35/Rs.65/-

No Increase No Increase

570 Ps 670 Ps

640 Ps 740 Ps

0 to 200 KWH above 200 KWH

570 Ps 670 Ps

No Increase No Increase

Rs.25/Rs.50/-

Rs.25/Rs.50/-

LT-2(b)(ii)

FC per KW FC Min. per month

Rs.25/Rs.50/-

No Increase No Increase

520 Ps 620 Ps Rs.40/-

590 Ps 690 Ps Rs.40/-

0 to 200 KWH above 200 KWH FC per KW

520 Ps 620 Ps Rs.40/-

No Increase No Increase No Increase

LT-3(i)

Commercial: Applicable to areas coming under Bruhat Bangalore Mahangara Palike (BBMP) , Municipal Corporations and all Urban Local Bodies

620 Ps 720 Ps

690 Ps 790 Ps

0 to 50 KWH Above 50 KWH

645 Ps 745 Ps

25 Ps Increased 25 Ps Increased

Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW Fixed Charge (FC) per KW Rs 55/Rs 55/FC per KW Rs55 /No Increase

Retail supply Tariff of BESCOM for FY 14 Existing, Proposed & Approved

LT-3(ii)

Commercial Applicable to Areas coming under Village Panchayats

Consumption Energy Charges (EC) Sanctioned Load Fixed Charge (FC)/KW Consumption Energy Charges (EC) 0 to 50 KWH Above 50 KWH

Same as above

Rs.30/-

Rs.30/-

FC per KW

Rs.30/-

No Increase

570 Ps 670 Ps

640 Ps 740 Ps

0 to 50 KWH Above 50 KWH

595 Ps 695 Ps

25 Ps Increased 25 Ps Increased

LT-4(a)

IP Sets 10 HP & below

Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW Fixed Charge (FC) Rs 45/Rs 45/FC per KW Rs 45 /No Increase per KW Consumption Energy Charges Same as above (EC) FC per HP Nil FC per HP Nil CDT Free as per GoK order. 131 ps per 131 ps per kwh (Commission (In case, GOK do not Kwh Determined Tariff) release the subsidy, CDT CDT shall be collected (Commission 151 Ps per 131 Ps per KWH from the Consumers) Determined Tariff) KWH Change in CDT 20 Ps Increase

9 10

LT-4(b)

IP Sets Above 10 HP IP Sets Hor. Nur., Coffee, Tea & Rubber : 10 HP & below IP Sets Hor. Nur. Coffee, Tea & Rubber: Above 10 HP

FC per HP EC per KWH FC per HP EC per KWH FC per HP EC per KWH

Rs.30/150 Ps Rs.20/150 Ps Rs.30/150 Ps

Rs.30/220 Ps Rs.20/220 Ps Rs.30/220 Ps

FC per HP EC per KWH FC per HP EC per KWH FC per HP EC per KWH

Rs 30/175 Ps Rs.20/175 Ps Rs.30/175 Ps

No Increase 25 Ps Increased No Increase 25 Ps Increased No Increase 25 Ps Increased

LT-4(c)(i)

11

LT-4(c)(ii)

12

LT-5 (a)

Heating and Motive Power: Applicable to Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations.

Sanctioned Load Fixed Charge (FC)/HP 5 HP & below Rs.30/Rs.30/Above 5 HP but Rs.30/Rs.30/below 40 HP 40 HP & above but Rs.40/Rs.40/below 67 HP 67 HP & above Rs.110/Rs.110/Demand Based Tariff (Optional) Above 5 HP but Rs.50/Rs.50/below 40 HP 40 HP & above but Rs.70/Rs.70/below 67 HP 67 HP & above Rs.160/Rs.160/Consumption Energy Charges (EC) 0 to 500 KWH 420 Ps 490 Ps Above 500 KWH Sanctioned Load Fixed Charge (FC)/HP 5 HP & below Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above 520 Ps 590 Ps

5 HP & below Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above

Rs30./Rs.30/Rs.40/Rs110./Rs.50/Rs.70/Rs.160/-

No Increase No Increase No Increase No Increase

No Increase

0 to 500 KWH Above 500 KWH

445 Ps 545 Ps

25 Ps Increased 25 Ps Increased

Rs.25/Rs.30/Rs.35/Rs.100/-

Rs.25/Rs.30/Rs.35/Rs.100/-

5 HP & below Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above

Rs.25/Rs.30/Rs.35/Rs.100/Rs.45/Rs.60/Rs.150/-

No Increase No Increase No Increase No Increase

13

LT-5(b)

Demand Based Tariff (Optional Above 5 HP but Rs.45/Rs.45/Heating and Motive below 40 HP Power Applicable all 40 HP & above but Areas other than those Rs.60/Rs.60/below 67 HP covered under 67 HP & above Rs.150/Rs.150/LT-5(a). Consumption Energy Charges (EC) 0 to 500 KWH 400 Ps 470 Ps 501 to 1000 KWH Above 1000 KWH 470 Ps 500 Ps 540 Ps 570 Ps

No Increase No Increase No Increase

0 to 500 KWH 501 to 1000 KWH Above 1000 KWH

425 Ps 495 Ps

25 Ps Increased 25 Ps Increased

525 Ps

25 Ps Increased

14

Time of day 22.00Hrs to 06.00Hrs

Increase(+)/reduction(-) in energy charges over the normal tariff applicable (-)125 paise per Unit

Retail supply Tariff of BESCOM for FY 14 Existing, Proposed & Approved

06.00Hrs to18.00Hrs 18.00Hrs to 22.00Hrs 15 LT-6 (a) Water Supply FC per HP EC per KWH FC per KW 16 LT-6 (b) Public Lighting EC per KWH Rs.35/320 Ps Rs.50/420 Ps

0 (+)100 paise per unit Rs.35/390 Ps Rs.50/490 Ps FC per HP EC per KWH FC per KW EC per KWH Rs.35/320 Ps Rs.50/445 Ps No Increase No Increase No Increase 25 Ps Increased

Less than 67 HP Weekly Min. per KW 17 LT-7 Temporary Supply EC per KWH

Rs.160/-

Rs.160/-

Weekly Min. per KW EC per KWH

Rs.160/Weekly Min: No Increase

820 Ps

890 Ps

850 Ps

E.C: 30 Ps Increased

High Tension Supply


No Increase Rs.180/18 HT-1 HT Water Supply DC per KVA 380 Ps EC per KWH HT Industrial: Applicable to Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations. Applicable to Bangalore Metropolitan Railway Corporation Ltd. (BMRCL). Demand Charges (DC) per KVA Consumption Energy Charges (EC 0 to 1 Lakh KWH Above 1 Lakh KWH Demand Charges (DC) per KVA Consumption Energy Charges (EC) Rs.180/Rs.180/DC per KVA Rs.180/No Increase 450 Ps EC per KWH 380 Ps No Increase Rs.180/DC per KVA Rs.180/-

19

HT-2(a)(i)

510 Ps 550 Ps Rs.180

580 Ps 620 Ps Rs.180

0 to 1 Lakh KWH Above 1 Lakh KWH DC per KVA

535 Ps 575 Ps Rs.180/-

25 Ps Increased 25 Ps Increased No Increase

20

HT-2(a)(i)

460 Ps

530 Ps

EC per KWH

480 Ps

20 Ps Increased

21

HT-2(a)(ii)

HT Industrial: Applicable to Areas other than those covered under HT-2(a)(i)

Demand Charges (DC) per KVA Consumption Energy Charges (EC 0 to 1 Lakh KWH Above 1 Lakh KWH Demand Charges (DC) per KVA Consumption Energy Charges (EC) Per KWH

Rs.170/-

Rs.170/-

DC per KVA

Rs.170/-

No Increase

510 Ps 540 Ps Rs.180

580 Ps 610 Ps Rs.180

0 to 1 Lakh KWH Above 1 Lakh KWH DC per KVA

535 Ps 565 Ps Rs.180/-

25 Ps Increased 25 Ps Increased No Increase

22

HT-2(a)(i) and HT-2(a)(ii)

Railway Traction and Effluent Treatment Plants HT Commercial Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations.

480 Ps

550Ps

EC per KWH

500 Ps

20 Ps Increased

23

HT-2(b)(i)

Demand Charges (DC) per KVA Consumption Energy Charges (EC) 0 to 2 Lakhs KWH Above 2 Lakhs KWH

Rs.200/-

Rs.200/-

DC per KVA

Rs.200/-

No Increase

670 Ps 700 Ps

740 Ps 770Ps

0 to 2 Lakhs KWH Above 2 Lakhs KWH

695 Ps 725 Ps

25 Ps Increased 25 Ps Increased

Rs.190/HT Commercial Applicable to Areas other than those covered under HT-2(b)(i) Demand Charges (DC) per KVA Consumption 0 to 2 Lakhs KWH Above 2 Lakhs KWH Applicable to Government Hospitals & Hospitals run by HT-2(C)(i) Charitable Institutions Newly & ESI Hospitals and Introduced Educational Institutions belonging to Govt. , Local Bodies & Aided Institutions Applicable to Hospitals and Educational HT-2(C)(ii) Institutions other than Newly Introduced those covered under HT2(C) (i) Demand Charges (DC)per KVA 0 to 1 Lakh KWH 650 Ps 680 Ps

Rs.190/-

DC per KVA

Rs.190/-

No Increase

24

HT-2(b)(ii)

720 Ps 750 Ps

0 to 2 Lakhs KWH Above 2 Lakhs KWH DC per KVA 0 to 1 Lakh KWH Above 1 Lakh KWH

675 Ps 705 Ps Rs.170/500 Ps

25 Ps Increased 25 Ps Increased

25

Newly Introduced Category Above 1 Lakh KWH 550 Ps

26

Demand Charges (DC)per KVA 0 to 1 Lakh KWH Above 1 Lakh KWH

DC per KVA 0 to 1 Lakh KWH Above 1 Lakh KWH

Rs.170/600 Ps 650 Ps

Newly Introduced Category

Retail supply Tariff of BESCOM for FY 14 Existing, Proposed & Approved

27

HT-3 (a)(i)

HT Lift Irrigation Schemes under Government Depts./Corporations.

EC per KWH and Annual Minimum

125 Ps EC per KWH 150 Ps subject to 195 Ps and subject to Min. subject to Min. Annual Minimum annual Min. of Rs. 1000/of Rs. 1000 per of Rs.1000 /per HP per HP per annum per HP per annum annum

No Increase in Annual Minimum Charges EC ; 25 Ps Increased

Rs.30/-

Rs.30/-

FC per HP/PM

Rs.30/No Increase

F.C. per HP /PM

28

HT-3 (a)(ii)

HT Private Lift Irrigation Schemes /Societies : Connected to Urban / Express feeders

E.C. per KWH

85 Ps

155 Ps

EC per KWH 110 Ps

25 Ps Increased

F.C. per HP/PM HT Private Lift Irrigation Schemes /Societies other than those covered under HT-3 (a)(ii) (Not Connected to Urban / Express feeders) E.C. per KWH

Rs.10/-

Rs.10/-

FC per HP/PM

Rs.10/-

No Increase

85Ps

155 Ps

EC per KWH

110 Ps 25 Ps Increased

29

HT-3 (a)(iii)

30

HT-3 (b)

HT supply to Agriculture/ Horticulture Farms

EC per KWH and Annual Minimum

295 Ps subject to Min. of Rs. 1000 per HP per annum

365 Ps subject to Min. EC per KWH of and Rs. 1000 per HP Annual Minimum per annum Rs 100/DC per KVA

320 Ps subject to Min. of Rs. 1000 per HP per annum

No Change in Annual Min E.C: 25 Ps Increased

HT-4 HT Res. Apartments Applicable to all areas

DC per KVA

Rs 100/-

Rs 100/-

No Increase

31

EC per KWH

490 Ps 470 Ps 540 Ps EC per KWH 20 Ps Increased

Fixed Charges/ Demand Charges 32 HT-5 Temporary Supply

Energy Charges

Rs. Rs. 210/HP/Mont Rs. 210/HP/Month h for the 210/HP/Month for the entire entire for the entire Fixed Charges/ sanctioned sanctioned sanctioned Demand Charges load / load / load / Contract Contract Contract demand demand demand 850 Ps 820 Ps 890 Ps Energy Charges

No Increase

30 Ps Increased

Retail supply Tariff of BESCOM for FY 14 Existing, Proposed & Approved